Loading...
HomeMy WebLinkAbout03-03-25 - Council Work Session AgendaCITY IN KE CITY COUNCIL AGENDA Updated 2/28/25 Monday, March 3, 2025 City Council: Mayor Rafferty, Councilmembers Cavegn, Lyden, Ruhland and Stoesz Interim City Administrator: Dave Pecchia COUNCIL WORK SESSION, 6:00 P.M. Council Chambers (Not televised) I No Public Comment allowed per the Rules of Decorum Item # Topic Time (Estimated) 1. Call to Order and Roll Call 6:00 PM 2. Setting the Agenda: Addition or Deletion of Agenda Items 6:00 PM 3. Administration Update, Dave Pecchia 6:00 PM — 6:15 PM 4. Update on City Administrator Search, Meg Sawyer 6:15 PM — 6:35 PM 5. Burque Estates PUD Concept Plan, Katie Larsen 6:35 PM — 7 :05 PM 6. Public Works Facility, Const. Manager RFQ/RFP, Michael Grochala 7:05 PM — 7:20PM 7. Backup Building Insp. & Plan Review Service, Michael Grochala 7:20 PM — 7:35 PM 8. Public Safety Department Q4 Update, Curt Boehme 7:35 PM — 7:45 PM 9. Notices and Communications, City Council 7:45 PM — 8:00 PM ADJOURNMENT This timeline is tentative. The final timeline will be set after the City Council's decision to proceed. Decision by Council to December 23,'2024 proceed ■ Meet with staff, stakeholders, and each member of the Council Project Kick-off & ■ Gather all pertinent background information January 8,'2025 Information gathering ■ Gather salary information and review job description ■ Review scope of process Professional position profile Develop position profile and advertisement. January 20, 2025 Approve position profile Council approves profile, job description, salary range, scope of work, January 27, 2025 and scope of work and timeline. ■ Post position upon approval of profile January 28, 2025- Candidate recruitment ■ Comprehensively advertise February 25, 2025 ■ Direct outreach and recruitment of prospective candidates Screening of applicants DDA HR will review and rank applicants based on job related criteria & February 26, 2025 desired attributes and select semifinalists. Personality Index DDA HR will administer a Work Personality Index Select to all March 16, 2025 semifinalists. Video interview Each semifinalist will complete a video interview. March 16, 2025 Selection of finalists 0 Council selects finalists for interviews. March 24,'2025 DDA HR will notify candidates not selected as finalists. Includes: ■ Criminal background: county, state, national Background check of all ■ Sex offender registry April 7, 2025 finalists ■ Social Security number verification ■ Education verification ■ Credit check DDA HR will conduct reference checks with current and/or former employers on all finalists assessing each candidate's: ■ Role and responsibilities Reference check on all • Performance and strengths finalists Leadership and management style April 7, 2025 ■ Communication and interpersonal skills ■ Community engagement ■ Areas for improvement ■ Overall fit with organization Intellect profile DDA HR will administer an intellect profile measuring verbal reasoning, April 7, 2025 mathematical and logical reasoning, and overall mental'. aptitude. DDA H R will provide the Council information including: ■ Summary of references Finalist packet 0 Results of background checks April 8, 2025 Intellect Profile and Work Personality Index Select reports • Video interview ■ Resumes, etc. DDA HR will prepare all interview materials and be present at all 2025 Interviews interviews and other functions to assist in facilitation. It is recommended Specialril Meeting that Council interviews be at asp meeting. Decision Council will select candidate for offer. April 15 2025 DDA HR will present offer to and negotiate an agreement with the Offer and agreement recommended candidate based on the parameters established by April 18, 2025 Council Projected start date New Administrator begins. May 2025 CITY COUNCIL WORK SESSION STAFF REPORT ITEM NO. 5 STAFF ORIGINATOR: Katie Larsen, City Planner WORK SESSION DATE: March 3, 2025 TOPIC: Burque Estates PUD Concept Plan BACKGROUND Review Schedule: Complete Application Date: January 14, 2025 60-Day Deadline: March 15, 2025 Environmental Board Meeting: January 29, 2025 Park Board Meeting: February 5, 2025 Planning & Zoning Board Meeting: February 12, 2025 City Council Work Session: March 3, 2025 City Council Meeting: NA The applicant, Lino Lakes Partners, LLC, is proposing a residential development south of North Pointe, east of CSAH 54 (20th Avenue) and west of 1-35E. The development contains three (3) parcels totaling approximately 59 gross acres and 58 housing units. The proposed development is called Burque Estates. The Land Use Application is for the following: • PUD Concept Plan/Concept Plan ("concept plan") Future land use applications may include: • Rezone property from R, Rural to R2, Two -Family Residential or PUD, Planned Unit Development • PUD Preliminary Plan/Preliminary Plat • PUD Final Plan/Final Plat This staff report is based on the following submittals: • Applicant Narrative received on January 13, 2025 1 • Burque Estates Concept Plan and Plan Sheets prepared by Larson Engineering, Inc. dated January 13, 2025 • Wetland Investigation prepared by CDC Consulting, LLC dated October 30, 2024 BACKGROUND Current Proposal The proposed Burque Estates consists of 58 single-family detached dwellings. See the attached applicant's narrative for a detailed description of the development. ANALYSIS Existing Conditions The existing site consists of three (3) parcels totaling 59.32 acres. Per the January 29, 2025 Environmental Board staff report, there is one home on the site, a large wetland area, mowed fields, several small ponds, and a private ditch. The existing house and accessory structures would be removed. Surrounding Zoning and Land Use 2040 Future Direction Zoning Current Land Use Land Use Single Family North PUD Medium Density Residential R, Rural South Rural Residential Urban Reserve Rural Residential and PUD and R-X, Rural Single Family and East Single Family Executive Urban Reserve Residential West R, Rural Agricultural Urban Reserve Comprehensive Plan Land Use The site has two (2) land use designations per the City's 2040 Comprehensive Plan: the two (2) north lots are low density residential and the one (1) south lot is urban reserve. Staff Comments: 1. A comprehensive plan amendment would be required to re -guide the urban reserve lot to low density residential. 2. The comprehensive plan amendment would need to demonstrate that overall City wide density meets the minimum 3.0 units per acre. Per the 2040 Comprehensive Plan, the site is in Planning District 3. There are no specific planning goals or issues that need to be addressed for this site. Density The following chart is a preliminary density analysis using Met Council's density formula: Gross Area (acres) 59.32 Wetlands & Water Bodies (28.06) Public Parks & Open Space 0.00 Arterial ROW (2.14) Other (Utility Transmission Easement) 0.00 Other (Wetland Buffer Area) (5.78) Net Area (acres) 23.34 # of Units 58 Gross Density (units/acre) 0.98 Net Density (units/acre) 2.49 As noted above, the site consists of two (2) land use designations, low density residential and urban reserve. A comprehensive plan amendment would be required to change the urban reserve lot to low density. This density analysis is based on the assumption the plan is amended to low density which is consistent with the full build -land use plan. Low density residential development requires 1.6 to 3.0 units per acres. The proposed development would be 2.49 units per acre which is consistent with land use and density requirements. Growth Management Strategy Page 3-17 of the 2040 Comprehensive Plan details the City's Growth Management Strategy. The strategy works in conjunction with the City's utility staging plan. The City will plan to accommodate an annual average of 230 units per year over each 5-year phasing period not to exceed 345 units in any one year. From 2010 to 2024, the City's average annual number of units is 123. This is less the allowed 230 unit annual allocation. The proposed 58 lot development would be consistent with the growth management strategy. Current Zoning and Land Use Current Zoning R, Rural Current Land Use Agricultural Future Land Use per Low Density Residential and Urban Reserve lure Comp Plan Utility Staging Area Stage 1B (2025-2030) Stage 3 (Post 2040) Rezoning The property is currently zoned R, Rural. The R, Rural zoning is a holding district until municipal water and sanitary sewer are available to the site and the property owner is interested in having the property developed. Initial staff meetings with the developer indicated the possible need for PUD, Planned Unit Development zoning to allow for lot width and lot depth flexibility. However, it appears both the 60 lot -Yield Plan (60 ft wide lots) and the 58 lot Concept Plan (65ft wide lots) meet the minimum R-2, Two Family Residential zoning requirements; therefore, PUD rezoning is not needed. Per City Code Section 1007.112(1), land that is guided low density residential may be zoned R-2. The following table analyzes the R-2 requirements for the single family lots in the proposed Yield Plan and Concept Plan. Proposed Proposed R Yield Plan Concept Plan Requirements (60 lots) (58 lots) Min. Lot Size 7,500 sf 7,500 — 21,159 sf 7,825 — 21,159 sf Min. Lot Width --Interior Lot 60 ft 60 ft 65 ft --Corner Lot 80 ft 80 ft 80 ft Min. Lot Depth 125 ft 125 ft 125 ft --Double Frontage 135 ft 180 ft 180 ft Building Setback (ft) -From Streets Lois Lane and Arlo Lane (Both Minor Collector) 25 ft 25 ft 25 ft -Rear Yard --Principal 25 ft 25 ft 25 ft -Accessory 5 ft 5 ft 5 ft -Side Yard --Principal 10 ft 10 ft 10 ft --Accessory 5 ft 5 ft 5 ft Buffer Abutting Arterial St 15 ft wide Required Required Impervious Surface 65% Evaluated w/building permit Evaluated w/ building permit Note that lot widths are measured at the minimum front yard setback. The proposed yield plan and concept plan meets or exceeds the minimum R-2 lot width and lot size requirements. Building Design Standards and Other Performance Standards Building and architectural design standard review is not required at concept plan level. City Code Section 1007.043 details minimum residential building design standard requirements. City Code Section 1007.112(4) details minimum R-2 building requirements as well. Staff Comment: 1. All building design standards requirements shall be met. Subdivision Ordinance Blocks and Lots The concept plan proposes 58 residential lots and eight (8) outlots. Outlots would contain wetlands, buffers, stormwater ponds etc. Streets and Alleys CSAH 54 (201" Ave N) is an A -Minor Arterial Reliever road. Sixty (60) feet of road right-of-way is being dedicated along CSAH 54 from the section line. Thirty (30) feet of road right-of-way is also being dedicated along a section of the north lot line for future extension and connection of CSAH 34 (Birch Street) and Cypress Street. This would be a future Anoka County Highway Department and/or City project. Internal streets have 60ft wide road right-of-way and are 32ft wide. Staff Comments: 1. Street and utilities shall be stubbed south to the lot line of 6468 20t" Avenue for future development. 2. Sidewalk shall be installed along the street in Block 1. 3. A traffic study shall be required. 4. A noise study shall be required. Easements Staff Comments: 1. Standard drainage and utility easements at least 10 feet wide shall be provided along all lot lines. 2. Drainage and utility easements shall also be dedicated over stormwater management facilities. 3. Conservation easements and wetland buffers shall be required over wetlands, ditches, and greenway corridors. Stormwater Management and Erosion and Sediment Control The concept plan shows four (4) stormwater ponds throughout the development. They are part of the multi -purpose greenway corridor incorporating trails, stormwater management, floodplain, ditches, and open space. Public Utilities Public water, sanitary, and storm sewer utilities will be installed within the development. The site is in Sanitary Sewer District 3 (Sub -district 3C). Flow from these areas, including that from Centerville, is collected along East Cedar Street and conveyed east to MCES Meter M220 and Gravity Interceptor 802325. The site is in both Utility Staging Area 1B (2025-2030) and 3 (Post 2040). The City's water supply system well firm capacity is currently constrained by poor water quality in some wells, the White Bear Lake court orders and ongoing litigation, and annual variability in water use due to drought and other factors. Based on the water supply capacity and well trigger analysis completed in April 2024, the city may need to add an additional well to accommodate this development or the development may be deemed premature. The City is currently working through this process with MNDNR. The site provides opportunity to implement a stormwater reuse system for irrigation purposes. The system should be evaluated and implemented to the extent feasible to offset the use of municipal water for irrigation. Staff Comments: 1. The water supply issue needs to be addressed prior to preliminary plat submittal. 2. A Comprehensive Plan Amendment is required to amend the utility staging areas. Yield Plan Initial staff meetings with the developer indicated the possible need for PUD, Planned Unit Development zoning to allow for lot width and lot depth flexibility. As required per City Code Section 1001.026(4) for a PUD, the applicant submitted the attached yield plan. The yield plan shows the maximum number of dwelling units that would be permitted given the minimum lot size and lot widths for conventional subdivisions and other requirements of the Lino Lakes Zoning and Subdivision Chapters. After review, it appears both the 60 lot Yield Plan (60 ft wide lots) and the 58 lot Concept Plan (65ft wide lots) meet the minimum R-2, Two Family Residential zoning requirements; therefore, PUD rezoning and yield plan are not needed. Phasing Plan A phasing plan was not submitted but it is anticipated that the development would be built in one (1) phase. Traffic Study A traffic study is required at the time of preliminary plat submittal. Staff Comments: 1. The applicant shall work with Anoka County Highway Department regarding access and turn lanes on CSAH 54 (20t" Avenue). Parks, Greenways and Trail Plan Per Figure 10-2: Neighborhood Service Areas of the 2024 Comprehensive Plan, the development is within the neighborhood service area of North Pointe Park. The greenway system extends through the site and a proposed trail connection is required from the existing trail in North Pointe Park to CSAH 54 (201h Avenue) and CSAH 34 (Birch Street). Staff Comments: 1. Trail corridor options shall be explored per the attached Public Services Director/Park Board memo. 2. If a trail is constructed along the wetland, a connection shall be made between Lot 8-9, Block 1 to the street. 3. Trail corridors should be a minimum 20 feet in width above the high water level. Tree Preservation and Landscaping A Tree Preservation Plan and Landscape Plan in compliance with Section 1007.043(17), Required Screening, Landscaping and Buffer Yards shall be submitted with the preliminary plat application. Staff Comments: 1. A landscaping screen and minimum 15 ft wide buffer will be required along the I-35E. 2. A noise study will be required with the preliminary plat. 3. Berm and/or any noise mitigation requirements shall be measured from side or rear yard ground elevations to top of berm or fence. EQB Environmental Review An Environmental Assessment Worksheet is not mandated. The 58 lot, unattached residential units are under the 250 unattached unit threshold required for a mandatory EAW. Wetlands The site includes 28 acres of wetland and a 30 ft wide buffer is provided. An approved wetland delineation will be required. The applicant will need to work with VLAMWO for Wetland Conservation Act regulations. Floodplain The 2015 FEMA Floodplain Map indicates Zone A flood plain over a majority of the wetlands on site. Staff Comments: 1. Any floodplain impacts are subject to City requirements per City Code Chapter 1103. 2. A Base Flood Elevation is required to be determined, using detailed methods acceptable by the Federal Emergency Management Agency (FEMA). 3. A FEMA CLOMR and LOMR may be required for development if there are floodplain impacts. Additional City and Government Agency Review Comments Anoka County Anoka County Highway Department comments are in the attached email. School District Centennial ISD#12 did not provide comments. Lino Lakes Public Safety Police Division had no comments. Fire Division reviewed the concept plan and no issues. City Engineer City Engineer comments are in the attached memo. Environmental Board The Environmental Board reviewed the concept plan on January 29, 2025 and their comments are in the attached memo. Park Board The Park Board reviewed the concept plan on February 5, 2025 and their comments are in the attached memo. Planning & Zoning Board The Planning & Zoning Board reviewed the concept plan on February 12, 2025. They were generally supportive of the concept plan. Their comments include: • Supported straight R2, Two Family Residential zoning and comprehensive plan amendment. 9 • Traffic impacts with right in/right out only access onto 20th Avenue and no access at Birch Street needs be evaluated. • Recommended a neighborhood meeting. • Preferred trail construction along wetland. Preliminary Plat The City's review and comments on the concept plan's relation to the 2040 Comprehensive Plan and development regulations does not grant any rights to the applicant to develop the property as depicted by the concept plan. A land use application for preliminary plat shall be required. The city strongly recommends the property owner/applicant hold a neighborhood meeting for informal comment and feedback prior to preliminary plat application. RECOMMENDATION Staff is requesting feedback from the City Council: 1. Thoughts on comprehensive plan amendment to land use designation (Urban Reserve to Low Density Residential) and utility staging areas (Post 2040 to Stage 1B). Additional Staff Comments: 1. All plan sheets: a. Lot widths shall be measured at the minimum front yard setback. 2. Yield Plan: a. The total number of units shall be shown. b. Under Existing Wetlands, show both sq. ft. and acres. 3. Concept Plan: a. The total number of units shall be shown. b. Under Existing Wetlands, show both sq. ft. and acres. 4. Sheet C100, Concept Subdivision Plan: a. Density chart is incorrect. Revise chart to match page 4 of this staff report. b. Under Single Family Home Lot Density chart, show wetlands in both sq. ft. and acres. ATTACHMENTS 1. Site Location & Aerial Map 2. Land Use Plan Map 3. Utility Staging Plan Map 4. Applicant's Narrative 5. Concept Plan Set 10 6. City Engineer Memo dated February 5, 2025 7. Environmental Memo dated January 29, 2025 8. Public Services Director/Park Board Memo dated February 6, 2025 9. Anoka County Comments dated January 29, 2025 11 Attachment 1: Site Location & Aerial Map Burque Estates Parcels 1 in = 500 Ft N A January 30, 2025 Map Powered By Datafi wsb Attachment 2: Land Use Plan Map Burque Estates -Land Use Plan 41 j qA MW r-� Y r u I � f ;� ar s. V, - r } r 84 t Parcels Urban Reserve Low Density Residential Medium Density Residential o f Parks and Open Space IN L KES 1 in = 500 Ft N A January 30, 2025 Map Powered By Datafi wsb Attachment 3: Utility Staging Plan Map Burque Estates -Utility Staging Plan 1 in = 500 Ft Parcels Stage 1A Planned Service Area (2018 - 2025) Stage 113 Planned Service Area (2025 - 2030) N Stage 3 Planned Service Area (Post 2040) CITY" O F January 30, 2025 IN L KES Map Powered By Datafi wsb Attachment 4: Applicant's Narrative Burque Estates Narrative Burque Estates is 50 acres of land. Its easterly boundary is 35E, the westerly boundary is Centerville Road, and it lies south of the Northpointe Development. The property consists of several acres of wetlands (see concept plan). There is a 30' wetland buffer that has been taken into consideration in the design. The area for building is mostly open grass with one single family home that will be removed. There is a flowage area across outlot "C" for 35E. There are 15 acres of developable land after subtracting the wetlands, R/W and outlots. There are 58 homes total creating a density of 3.67 homes per acre. We are proposing a single-family development with an R2 zoning designation. The southerly portion has a standard lot size of 65' X 125'. Some of the homes will back up to 35E. We will work with city staff to provide a sound buffer for the homes. We are extending Chestnut Street south as planned in the city transportation plan, it will exit onto 201" Avenue. We will work with Washington County Highway Department to determine what needs to be provided for a turn lane. Property is being dedicated to R/W for a future connection with Birch Street and Cyprus. Property is also being dedicated for a future roundabout at 2011 Avenue and Birch Street. The Project would be built this year with construction starting in June of 2025. Attachment 5: Concept Plan Set PROJECT: BURQUE ESTATES LINO LAKES, MN VICINITY MAP LINO LAKES PARTNERS, LLC 6150 202ND STREET FOREST LAKE, MN 55025 INDEX OF DRAWINGS T Title Sheet - Existing Conditions - Tree Survey (Cornerstone Land Surveying, Inc.) - Existing Conditions - Flood Plain (Cornerstone Land Surveying, Inc.) - Yield Plan (Cornerstone Land Surveying, Inc.) - Concept Plan (Cornerstone Land Surveying, Inc.) C100 Concept Subdivision Plan C200 Neighborhood Plan C300 Resource Inventory Plan PROJECT CONTACTS Civil Engineer: Tom Herkenhoff, P.E. Larson Engineering, Inc. 3524 Labore Road White Bear Lake, MN 55110 651.481.9120 CALL BEFORE YOU DIG! Gopher State One Call TWIN CITY AREA: 651-454-0002 TOLL FREE: 1-800-252-1166 z O I— U U) z O U O LL O z L.L z W L.L o i ;v � z L 27) _0 O •� 0 oc J N a O? O a� camp �J �CO J CN J W M�� c J N O N O U N W J w Lo O W L0 VJ z Q U J W Z LLj Y N Q 0zC:) N F_ Z�LOw J Q o n a� U W Q z �2 U) U) W Y W0 Q D z (:1 J N D ID U I hereby certify that this plan, specifications or report was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the state of Minnesota. Thomas J. Herkenhoff, P.E. Date: 01.08.25 Lic. No.: 25520 Rev. Date Description 1Q 01.13.25 City Re -Submittal Project #: 12246099 Drawn By: TJR/KBK Checked By: TJH Issue Date: 12.09.24 Sheet Title: TITLE SHEET Sheet: W:\2024\Civil\12246099 - Lino Lakes Burque Subdivision\2. Design\B. Drawing Files\12246099 OOT - Title Sheet.dwg � I R M�15.6 NV=911.6 STUB INV=8g7.35 PLAN ADJ. I � i > - 4' \T/ / 71 211 \V/ ` / 41 \V/ �zC3 � 33�cs - - 4- W I\V// M CO �Lo ro v 1 ` CULVERT UNDER n WATER / UNDER WATER Ia"16" — — 24" SAN NH d \ RIM=q \ ° INV 02.22 l�^ SAN MH / UH V • RIM-gI6.5\ ` INV=g02.75 ° C S89057' 14" W TUINVB LA AP 03. 1951.38 P PLAN AP � 36'- 15" 20"DEAD 18" 30„ o` _25" 21" --32" --la" 0 0 16" q2 22"DEAD ^� 2"DEAD-J \\I// IQII I 191, 908 191 4 1 32" I RO NE 908 _ XISTIN P Ia' HODS RCP=q I� , co GARAGE 4"- 9 oil- OP ^� q 24'JZ� -21"` Jl 24 / Ig3'I -23" i I3 �i 25" `OJ 1 -30II \/ -20" .V II I a \V/ >> \ INV=gOg.S O 24" RCP 0� NV g09 � ��INV=gOg. 1 - 183.00 --'� quo 039'59" _o\�L I1 i 914 �- - 92p--- s �1 q24 1 442.55 0 r N89 39'59"E 6 FOUND 1/2 - NCH IRON PIPE O 0\� FOUND I/2 NCH IRON PIPE 9�0 A O 20"33" 21" - C Ia" 19'I \V/ 25 2 'V r L�f � N 920 ate- FOUND 1/2 \ INCH IRON PIPE FOUND 1/2 .MARKED RLS 3 INCH IRON ROD-\ 40361 41 fLD aN 9� 92� -22" 00 NORTH 120 FLOOD INFORMATION: FLOOD ZONE LINES SHOWN PER FEMMA MAPPING AND NOT FIELD VERIFIED. PORTIONS OF THIS PROPERTY LIES WITHIN ZONE AE, AND ZONE A, AREAS DETERMINED TO BE WITHIN THE 0.2% ANNUAL CHANCE FLOODPLAIN OTHER AREAS INCLUDING ALL BUILDINGS ARE LOCATED IN ZONE X, AREAS DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN AS SHOWN ON FEMA FLOOD INSURANCE RATE MAP NUMBER 27003CO370E HAVING AN EFFECTIVE DATE OF DECEMBER 16TH, 2015. THE BASE FLOOD ELEVATION OF 912.0 (ZONE AE) IS SHOWN ON THE SURVEY FOR REFERENCE PURPOSES ONLY. TREES: TYP. TYP. DENOTES TREES LOCATED BY: DECIDUOUS CONIFEROUS TREE rREE CORNERSTONE LAND SURVEYING, INC. IS i Igo ON 1-8-2025 TREE SIZE �� TREES 1 8" DIAMETER OR GREATER (CONCEPT PLAN REQUIREMENT) 144 TREES SHOWN INCLUDING 5 DEAD TREES INCLUDING 3 OUTSIDE OF PARCEL SURVEY NOTES: 1 . BEARINGS ARE BASED ON THE ANOKA COUNTY COORDINATE SYSTEM. DATE OF PUBLISHED COORDINATES = SEPTEMBER 1 ST, 2015 2. UNDERGROUND UTILITIES SHOWN PER FIELD LOCATES AND GIS MAPPING PROVIDED BY THE CITY OF LINO LAKES. THERE MAY SOME UNDERGROUND UTILITIES, GAS, ELECTRIC, ETC. NOT SHOWN OR LOCATED. 3. CONTOURS SHOWN PER LIDAR DATA OBTAINED FROM THE DNR MNTOPO WEBSITE. NOT FIELD VERIFIED. 4. ELEVATIONS BASED ON GPS DERIVED VALUES FOR NAVD 88 S. PORTIONS OF THIS PROPERTY LIES WITHIN ZONE A, ZONE AE, AREAS DETERMINED TO BE WITHIN THE 0.2% ANNUAL CHANCE FLOODPLAIN OTHER AREAS INCLUDING BUILDINGS. OTHER AREAS ARE LOCATED IN SHADED ZONE X, AND UNSHADED ZOINE X. AREAS DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN AS SHOWN ON FEMA FLOOD INSURANCE RATE MAP NUMBER 27003CO370E HAVING AN EFFECTIVE DATE OF DECEMBER 16TH, 2015 THE BASE FLOOD ELEVATION FOR ZONE A IS 912.0. NOT FIELD VERIFIED. 6. WETLANDS DELINEATED BY ANDERSON DATED 9-1 1-24. WETLAND FLAGS LOCATED BY CORNERSTONE LAND SURVEYING ON 9-16-24. LEGEND: FOUND MONUMENT FIRE DEPT. CONNECTION O SET 112" IRON PIPE HYDRANT MARKED RLS NO. 25718 CURB STOP ry CABLE TV PEDESTAL ue UNDERGROUND ELECTRIC � WATER WELL AC AIR CONDITIONER ury UNDERGROUND CABLE TV O WATER MANHOLE OE ELECTRIC MANHOLE wn WATER METER uF UNDERGROUND FIBER OPTIC ELECTRIC METER u-r UNDERGROUND TELEPHONE EP ELECTRIC PEDESTAL ® POST INDICATOR VALVE ou OVERHEAD UTILITY er ELECTRIC TRANSFORMER X WATER VALVE uc UNDERGROUND GAS BOLLARD LIGHT POLE > SANITARY SEWER p FLAG POLE GUY WIRE MB MAIL BOX >> STORM SEWER -0- POWER POLE � TRAFFIC SIGN WATERMAIN OC GAS MANHOLE MANHOLE —x x FENCE EdUNKNOWN GAS METER SOIL BORING CURB [TYPICAL] O TELEPHONE MANHOLE ® TRAFFIC SIGNAL *.:": ' ''.+':' ' ••y Ed TELEPHONE PEDESTAL ys•'• <;.;�:�;;,..,;;;^, � �+;�, ry+ CONCRETE SURFACE - .. 0 SANITARY CLEANOUT CONIFEROUS TREE O SANITARY MANHOLE (0 CATCH BASIN BITUMINOUS SURFACE or DECIDUOUS TREE ® Or 90 STORM DRAIN ® FLARED END SECTION O STORM MANHOLE B U R(DU E ESTATES CONTACT: CDC Consulting LLC, C/O Todd Christenson todd2414c@aol.com 763-268-9442 COUNTY/CITY: ANOKA CO U IVY OF LINO LAKES REVISIONS: DATE REVISION 1-9-25 TREE SURVEY FOR CONCEPT PLAN CERTIFICATION: I hereby certify that this plan was prepared by me, or under my direct supervision, and that I am a duly Licensed Land Surveyor under the laws of the state of Minnesota. Dante L. Thurmes Registration tuber: 25718 Date:__6 _29 _24 - PROJECT LOCATION: �s-1g ZOTH AVE_ PID#25-31-22-32-0001 PID#25-31-22-31-0003 PID#25-31-22-33-0001 Suite #200 1970 Northwestern Ave. Stillwater, MN 55082 Phone 651.275.8969 dan@cssurvey .net CORNERSTONE LAND SURVEYING, INC. FILE NAME SURVCDCO2 PROJECT NO. CDC2402 EXISTING CONDITIONS I ES)T1/4 S C. 25 ANOKA CC � 11 N I FOUND 1/2 INCH IRON PIPE i 1 I W� h 33 M. M CO o � O � / UNDER WATER / 00 OF FOUND W � Z^vNE Q �za/ WL. -- - C/L OFF DI' PER AIR PF 1 Q\U 4- O _; TOP rONIR_,5 SHOWN PER I RCP=q I q (DNR LIDAR DATA, NOT I CID IFELD VERIFIED. I " 9/SrJJJ ------------I 3 (Y � 9/6\ � r V 1 NW CO NER OF THE SW 1/4 OF THE SW O1-- 1/4 OF SEC. 25 10, .`" o\) O NORTH LINE OF THE SW'�� r f 6 1/4 OF THE f- SW I/4 OF SEC. 25 0,K f I � \1 U � INV=gOq.S A;" � /e 0 24" RCP ZONE INV q09 11 v0\\o - 183.00 - -� L.__w �_�_ _ —�/i'/ 039'59"F ; WETLAND #5— < I 0\\� �I q14 1=12,520 SQ.FT_� a' a, TP INV=911.6 STUB ZONE INV ADJ. \ \ \ PLAN ADJ. A E RAN 7H r / 1 / n / -/- r - INV=g02.75 \ ZONE AE APJ INV= >95>. 38 PLAN DJ � NORTH LINE OF THE SW -�� 2/`C` ` F 1/4 OF SEC. 25 ^I vlV� 9I� \\// �/// ZONE A V r6NT0UR5 SHOWN PER I DNR LIDAR DATA, NOT I MILD VERIFIED. W-----------1 I ------------I WETLAND #1 AREA=1064,022 SQ.FT. EXCLUDING 60' R/W (TOTAL=1,105,743 SQ.FT_1 r^yC/L OF DITCH j PER AIR PHOTO I rl � \ \\ + V r %, w z \\V// O U Z N �o 3_ I � 1 1 CULVERT ZONE A UNDER n WATER _ 908 r A 0) OV 9/ SHED 3 6OD 9 � ry 0 � 26.52 N89° 8'37'IE �c % -�-ch - -- 1830 rWETLANO #4 _ I� 920 AREA=32I._327 SQ.FT. r --- /\ 4,4j J "i / O 6 ai/ W Q�q,\ 1qJ I� O / 442.55 r i N89 39 59"E al) i 0- FOUND 1/2 - I - I NCH IRON PIPE NO H INE OF THE [ INCH IRONPIPE o\ S UTH 26.76 F T OF HE S 1/4 0 THE SW I/ OF S C. 25 ` I A/ // I Ac) / / O o\) Q� �4 -SAN NH RIM=q INV 02.22 A / I r -/- / / r\ / \ / n / - r•- / V \ / / I / / / / \ / / / V / L - UH rWI-RETLAND A74tD C / AE=12 SQ.FT. r N N 920 ---' FOUND I/2 / �� FOUND I/2 c� INCH IRON PIPE � -MARKED RLS 3 7 INCH IRON ROD - �' p N 40361 \ a' 0` / 921.5 I � 920) V/ c / 51 VrWETLAND #3 I CMP AREA=64,480 SQ.FT._, NE X /off /(0 EXISTING WETLANDS WL#1 = 1105743 SQ.FT. WL#2 = 7412 WL#3 = 64480 WL#4 = 32237 WL#5 = 12520 TOTAL = 1,222,392 FLOOD INFORMATION: + FLOOD ZONE LINES SHOWN PER FEMMA MAPPING AND NOT FIELD VERIFIED. PORTIONS OF THIS PROPERTY LIES WITHIN ZONE AE, AND ZONE A, AREAS DETERMINED TO BE WITHIN THE 0.2% ANNUAL CHANCE FLOODPLAIN OTHER AREAS INCLUDING ALL BUILDINGS ARE LOCATED IN ZONE X, AREAS DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN AS SHOWN ON FEMA FLOOD INSURANCE RATE MAP NUMBER 27003CO370E HAVING AN EFFECTIVE DATE OF DECEMBER 16TH, 2015. THE BASE FLOOD ELEVATION OF 912.0 (ZONE AE) IS SHOWN ON THE SURVEY FOR REFERENCE PURPOSES ONLY. LEGAL DESCRIPTION: The following Legal Description is as shown on Land Title, Inc., as agent for First American Title Insurance Company Title Commitment No. 698402, dated September 1 7th, 2024. That part of the unplatted Village of Lino Lakes, Section Twenty-five (25), Township Thirty-one (31), Range Twentytwo (22) described as the Northwest one quarter (NW 1 /4) of the Southwest one quarter (SW 1 /4) except that part taken by the State of Minnesota for highway. Pursuant to a Lis Pendens filed on March 19, 1964. Subject to the right of access on the Northwesterly side of the highway. AND That part of the Northeast one quarter (NE 1/4) of the Southwest one quarter (SW 1/4) lying westerly of Highway 1 35 Eastbound (I 35E); Subject to any easements of record; Section Twenty-five (25), Township Thirty-one (31), Range Twenty-two (22). AND That part of the Southwest 1/4 of Southwest 1/4, Section Twenty-five (251, Township Thirty-one (31), Range Twenty-two (22) described as follows: Commencing on the Southwest corner of Section Twenty-five (25), thence North on the Westerly line of Southwest 1/4 of Southwest 1/4 of Section Twenty-five (25), Township Thirty-one (31), Range Twenty-two (22) a distance of 1100.5 feet to the actual point of beginning of the land to be described. Then continue North on said Westerly line to the Northwest Corner of the Southwest 1/4 of Southwest 1/4 of Section Twenty-five (25), Township Thirty-one (31), Range Twenty-two (22). Then Easterly on the North line of said Southwest 1/4 to the most westerly right of way line of Interstate Highway 35E. Then Southwesterly on said Westerly right of way line of 35E to a point a distance of 1 21 9.4 feet North of the South Line of the Southwest 1/4 of Southwest 1/4 of Section Twenty-five (25), Township Thirty-one (31), Range Twentytwo (22) as measured along the Westerly right of way line of Interstate Highway Number 35E. Then Westerly parallel to the North line of the Southwest 1/4 a distance of 206.52 feet. Then Southwesterly on a line parallel to the Westerly right of way Tine of Interstate No. 35E to a point of intersection with a line which is 728.78 feet North of and parallel to the South line of Southwest 1/4 of Southwest 1/4 of Section Twenty-five (25),Township Thirty-one (31), Range Twenty- two (22). Then Westerly parallel to the South line of said Southwest 1 /4 to a point a distance of 183 feet East of the West line of the Southwest 1/4 of Southwest 1/4 of Section Twenty-five (25). Then Northerly parallel to the West line of said One - quarter a distance of 371.72 feet. Then westerly parallel to the South line of the Southwest 1 /4 of Southwest 1/4 of Section Twenty-five (25), Township Thirty-one (31), Range Twenty-two (22) a distance of 183 feet to the actual point of beginning and there terminating, Anoka County, Minnesota. Abstract Property EASEMENT NOTES: The following survey related exceptions appear on the Land Title, Inc., as agent for First American Title Insurance Company Title Commitment No. 698402, dated September 1 7th, 2024. 1 1 11 . Final Certificate in regards to condemnation of land for Trunk Highway purposes dated May 26, 1973, filed June 12, 1973 as Document Number 390639. (AS SHOWN ON SURVEY) 1 A 12. Subject to road(s) as shown by available maps. (AS SHOWN ON SURVEY) AREA: + TOTAL AREA = 2,584,1 38 SQ.FT. / 59.32 ACRES SURVEY NOTES: + 1 . BEARINGS ARE BASED ON THE ANOKA COUNTY COORDINATE SYSTEM. DATE OF PUBLISHED COORDINATES = SEPTEMBER 1 ST, 2015 2. UNDERGROUND UTILITIES SHOWN PER FIELD LOCATES AND GIS MAPPING PROVIDED BY THE CITY OF LINO LAKES. THERE MAY SOME UNDERGROUND UTILITIES, GAS, ELECTRIC, ETC. NOT SHOWN OR LOCATED. 3. CONTOURS SHOWN PER LIDAR DATA OBTAINED FROM THE DNR MNTOPO WEBSITE. NOT FIELD VERIFIED. 4. ELEVATIONS BASED ON GPS DERIVED VALUES FOR NAVD 88 S. PORTIONS OF THIS PROPERTY LIES WITHIN ZONE A, ZONE AE, AREAS DETERMINED TO BE WITHIN THE 0.2% ANNUAL CHANCE FLOODPLAIN OTHER AREAS INCLUDING BUILDINGS. OTHER AREAS ARE LOCATED IN SHADED ZONE X, AND UNSHADED ZOINE X. AREAS DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN AS SHOWN ON FEMA FLOOD INSURANCE RATE MAP NUMBER 27003CO370E HAVING AN EFFECTIVE DATE OF DECEMBER 16TH, 2015 THE BASE FLOOD ELEVATION FOR ZONE A IS 912.0. NOT FIELD VERIFIED. 6. WETLANDS DELINEATED BY ANDERSON DATED 9-1 1-24. WETLAND FLAGS LOCATED BY CORNERSTONE LAND SURVEYING ON 9-16-24. LEGEND: + FOUND MONUMENT FIRE DEPT. CONNECTION O SET 112" IRON PIPE HYDRANT MARKED RLS NO. 25718 CURB STOP ry CABLE TV PEDESTAL ue UNDERGROUND ELECTRIC � WATER WELL AC AIR CONDITIONER ury UNDERGROUND CABLE TV O WATER MANHOLE OE ELECTRIC MANHOLE wn WATER METER uF UNDERGROUND FIBER OPTIC ELECTRIC METER uT UNDERGROUND TELEPHONE EP ELECTRIC PEDESTAL ® POST INDICATOR VALVE ou OVERHEAD UTILITY er ELECTRIC TRANSFORMER X WATER VALVE uc UNDERGROUND GAS � BOLLARD LIGHT POLE > SANITARY SEWER p FLAG POLE GUY WIRE f�B MAIL BOX >> STORM SEWER -0- POWER POLE � TRAFFIC SIGN WATERMAIN OG GAS MANHOLE U UNKNOWN MANHOLE —X—X—FENCE Ed GAS METER SOIL BORING CURB [TYPICAL] O TELEPHONE MANHOLE ® TRAFFIC SIGNAL *.:": ' ''.+':' ' ••y O TELEPHONE PEDESTAL k F;..:.; ,.,,q..•.,ys.' ' .q,,,.;..,;;;^, � �+;�, ry+ CONCRETE SURFACE - .. 0 SANITARY CLEANOUT CONIFEROUS TREE O SANITARY MANHOLE (0 CATCH BASIN BITUMINOUS SURFACE or DECIDUOUS TREE ® Or ® STORM DRAIN ® FLARED END SECTION O STORM MANHOLE B U R(DU E ESTATES CONTACT: CDC Consulting LLC, C/O Todd Christenson todd2414c@aol.com 763-268-9442 COUNTY/CITY: ANOKA CO U NAY C��Y OF LINO LAKES REVISIONS: DATE REVISION 6-29-24 CONCEPT PLAN 9-16-24 WETLANDS 1 2-3-24 TITLE COMMITMENT 1-7-25 REVISED CERTIFICATION: I hereby certify that this plan was prepared by me, or under my direct supervision, and that I am a duly Licensed Land Surveyor under the laws of the state of Minnesota. Danle L. Thurmes Registration tuber: 25718 Date:__6 _29 _24 PROJECT LOCATION: + ZOTH AVE_ PID#25-31-22-32-0001 PID#25-31-22-31-0003 PID#25-31-22-33-0001 + Suite #200 1970 Northwestern Ave. Stillwater, MN 55082 Phone 651.275.8969 dan@cssurvey .net CORNERSTONE LAND SURVEYING, INC. + FILE NAME SURVCDCO2 PROJECT NO. CDC2402 EXISTING CONDITIONS DLO 00o c dzv LOT BLOCK AREA 1 1 15334 2 1 9117 3 1 7835 4 1 7733 5 1 7644 6 1 7662 7 1 7703 8 1 7746 9 1 8904 10 1 7832 11 1 8063 12 1 8293 13 1 11611 14 1 11640 15 1 10500 16 1 10621 17 1 7599 18 1 7500 19 1 10000 1 2 7500 2 2 11664 3 2 12178 1 3 12804 2 3 7754 3 3 7778 4 3 13248 5 3 12766 6 3 7594 7 3 7500 8 3 7500 9 3 10215 10 3 17933 11 3 14398 12 3 12849 13 3 21159 14 3 15588 15 3 9191 16 3 10470 1 4 10800 2 4 10800 3 4 10800 4 4 10800 5 4 11737 6 4 10864 7 4 17069 8 4 17036 9 4 18336 10 4 9684 11 4 8531 12 4 11162 13 4 10757 14 4 7825 15 4 7824 16 4 9147 1 5 15276 2 5 18224 3 5 24867 4 5 12484 5 5 9324 6 5 11033 OUTLOT A 1299100 OUTLOT B 41985 OUTLOT C 72856 OUTLOT D 23862 OUTLOT E 102067 OUTLOT F 28048 OUTLOT G 28501 20TH AVE 93072 R/W 226846 TOTAL 2584143 LEGAL DESCRIPTION: The following Legal Description is as shown on Land Title, Inc., as agent for First American Title Insurance Company Title Commitment No. 698402, dated September 1 7th, 2024. That part of the unplatted Village of Lino Lakes, Section Twenty-five (25), Township Thirty-one (31), Range Twentytwo (22) described as the Northwest one quarter (NW 1 /4) of the Southwest one quarter (SW 1 /4) except that part taken by the State of Minnesota for highway. Pursuant to a Lis Pendens filed on March 19, 1964. Subject to the right of access on the Northwesterly side of the highway. AND That part of the Northeast one quarter (NE 1 /4) of the Southwest one quarter (SW 1 /4) lying westerly of Highway 1 35 Eastbound (I 35E); Subject to any easements of record; Section Twenty-five (25), Township Thirty-one (31), Range Twenty-two (22). AND That part of the Southwest 1 /4 of Southwest 1 /4, Section Twenty-five (251, Township Thirty-one (31), Range Twenty-two (22) described as follows: Commencing on the Southwest corner of Section Twenty-five (25), thence North on the Westerly line of Southwest 1 /4 of Southwest 1 /4 of Section Twenty-five (25), Township Thirty-one (31), Range Twenty-two (22) a distance of 1100.5 feet to the actual point of beginning of the land to be described. Then continue North on said Westerly line to the Northwest Corner of the Southwest 1 /4 of Southwest 1 /4 of Section Twenty-five (25), Township Thirty-one (31), Range Twenty-two (22). Then Easterly on the North line of said Southwest 1 /4 to the most westerly right of way line of Interstate Highway 35E. Then Southwesterly on said Westerly right of way line of 35E to a point a distance of 1219.4 feet North of the South Line of the Southwest 1 /4 of Southwest 1 /4 of Section Twenty-five (25), Township Thirty-one (31), Range Twentytwo (22) as measured along the Westerly right of way line of Interstate Highway Number 35E. Then Westerly parallel to the North line of the Southwest 1 /4 a distance of 206.52 feet. Then Southwesterly on a line parallel to the Westerly right of way Tine of Interstate No. 35E to a point of intersection with a line which is 728.78 feet North of and parallel to the South line of Southwest 1 /4 of Southwest 1 /4 of Section Twenty-five (25),Township Thirty-one (31), Range Twenty- two (22). Then Westerly parallel to the South line of said Southwest 1 /4 to a point a distance of 183 feet East of the West line of the Southwest 1 /4 of Southwest 1 /4 of Section Twenty-five (25). Then Northerly parallel to the West line of said One - quarter a distance of 371.72 feet. Then westerly parallel to the South line of the Southwest 1 /4 of Southwest 1 /4 of Section Twenty-five (25), Township Thirty-one (31), Range Twenty-two (22) a distance of 183 feet to the actual point of beginning and there terminating, Anoka County, Minnesota. Abstract Property EASEMENT NOTES: The following survey related exceptions appear on the Land Title, Inc., as agent for First American Title Insurance Company Title Commitment No. 698402, dated September 1 7th, 2024. 1 1 11. Final Certificate in regards to condemnation of land for Trunk Highway purposes dated May 26, 1973, filed June 12, 1973 as Document Number 390639. (AS SHOWN ON SURVEY) 1 A 12. Subject to road(s) as shown by available maps. (AS SHOWN ON SURVEY) AREA: TOTAL AREA = 2,584,1 38 SQ.FT. / 59.32 ACRES SURVEY NOTES: 1 . BEARINGS ARE BASED ON THE ANOKA COUNTY COORDINATE SYSTEM. DATE OF PUBLISHED COORDINATES = SEPTEMBER 1 ST, 2015 2. UNDERGROUND UTILITIES SHOWN PER FIELD LOCATES AND GIS MAPPING PROVIDED BY THE CITY OF LINO LAKES. THERE MAY SOME UNDERGROUND UTILITIES, GAS, ELECTRIC, ETC. NOT SHOWN OR LOCATED. 3. CONTOURS SHOWN PER LIDAR DATA OBTAINED FROM THE DNR MNTOPO WEBSITE. NOT FIELD VERIFIED. 4. ELEVATIONS BASED ON GPS DERIVED VALUES FOR NAVD 88 S. PORTIONS OF THIS PROPERTY LIES WITHIN ZONE A, ZONE AE, AREAS DETERMINED TO BE WITHIN THE 0.2% ANNUAL CHANCE FLOODPLAIN OTHER AREAS INCLUDING BUILDINGS. OTHER AREAS ARE LOCATED IN SHADED ZONE X, AND UNSHADED ZOINE X. AREAS DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN AS SHOWN ON FEMA FLOOD INSURANCE RATE MAP NUMBER 27003CO370E HAVING AN EFFECTIVE DATE OF DECEMBER 16TH, 2015 THE BASE FLOOD ELEVATION FOR ZONE A IS 912.0. NOT FIELD VERIFIED. 6. WETLANDS DELINEATED BY ANDERSON DATED 9-1 1 -24. WETLAND FLAGS LOCATED BY CORNERSTONE LAND SURVEYING ON 9-16-24. LEGEND: FOUND MONUMENT is FIRE DEPT. CONNECTION Q SET 1 /2" IRON PIPE HYDRANT MARKED RLS NO. 25718 0 CURB STOP ry CABLE TV PEDESTAL WATER WELL ue AC AIR CONDITIONER O WATER MANHOLE urv— OE ELECTRIC MANHOLE wn WATER METER uF ELECTRIC METER 0 POST INDICATOR VALVE ur — EP ELECTRIC PEDESTAL �a WATER VALVE ou — er ELECTRIC TRANSFORMER O BOLLARD uc — >;X LIGHT POLE FLAG POLE > GUY WIRE Mg MAIL BOX >> POWER POLE � TRAFFIC SIGN I GO GAS MANHOLE U UNKNOWN MANHOLE Ed GAS METER UNDERGROUND ELECTRIC UNDERGROUND CABLE TV UNDERGROUND FIBER OPTIC UNDERGROUND TELEPHONE OVERHEAD UTILITY UNDERGROUND GAS SANITARY SEWER STORM SEWER WATERMAIN FENCE CURB [TYPICAL] SOIL BORING O TELEPHONE MANHOLE TRAFFIC SIGNAL ® TELEPHONE PEDESTAL..;';:^:,.;, CONCRETE SURFACE co SANITARY CLEANOUT CONIFEROUS TREE .. �o SANITARY MANHOLE ® or 0 CATCH BASIN DECIDUOUS TREE BITUMINOUS SURFACE or ® STORM DRAIN ® FLARED END SECTION OQ STORM MANHOLE B U R(DU E ESTATES CONTACT: CDC Consulting LLC, C/O Todd Christenson todd2414c@aol.com 763-268-9442 COUNTY/CITY: ANOKA CO U NAY CITY OF LINO LAKES REVISIONS: DATE REVISION 6-29-24 CONCEPT PLAN 9-16-24 WETLANDS 1-6-25 YIELD PLAN CERTIFICATION: I hereby certify that this plan was prepared by me, or under my direct supervision, and that I am a duly Licensed Land Surveyor under the laws of the state of Minnesota. Daniel L. Thurmes Registration Number: 25718 Date: 6-29-24 PROJECT LOCATION: 65 l 8 ZOTH AVE. PID#25-32-22-32-0001 PID#25-32-22-31-0003 PID#25-32-22-33-0001 J Suite #200 1970 Northwestern Ave. Stillwater, MN 55082 Phone 651.275.8969 dan@cssurvey .net CORNERSTONE LAND SURVEYING, INC. FILE NAME SURVCDCO2 PROJECT NO. CDC2402 YI ELD PLAN I ES) 1/4 C S C. 25, T31, ANOKA COUN 0 II / 1 FOUND 1/2 (f / / INCH IRON PIPE _ L \ I/� ZONE AE r \ RIM=9 ^ INV 02.22 F- ` / V \ / / 1 / / / / \ / / / V / L - ` rn — — — — — — — UH / n r r — ` ` SAN NH --/ ! / Jr, / 1 L/ L INV=75 W g02.ETLD #2 ANI lD N N AREA=7,412 SOFT. N C�� 92o FOUND 1/2 INCH IRON PIPE / FOUND 1/2 , MARKED RLS 3 INCH IRON ROD - S89 5,7 !4" W ZONE A E NV 6 03. /40361 1951.38 PLAN ADJ wl- oY/.�I —1yL o 877.33 14.43 � 52 / 439.36 14 d U:1 - \ , N I — � i ` IO^' 920 r1 00 7 s rue 00 1 V=8g7.35 f PLAN ADJ. W h 2 v7 NORTH LINE OF THE SW - c� c �e E i 7� I/4 OF SEC. 25 ` ,q ! ` ^IF £ o , 149.42 0 3^� �y Vw c / C ` o w ro h�. ------ �FV 5 o _ `� FUTURE [ 9se / �A' `9 3 o -60 -------------- i CYPRESS , V� I 6 34 STREET 4 40 / / 1 -- I RIW �O 7 j o 254.8 °0 ��-� �� I----- VW E X °° �� / EX /�� ZONEA ��y� o� �.,4 4.77 v��°'" 4V OUTL T F -- a 0 Io 0 nJ CD 3 3o Q cs POND 1 Q CONTOURS SHOWN PER ° Q z Q I DNR LIDAR DATA, NOT ch Q O - !FIELD VERIFIED. --I 9.48 / ---------- 1 a AKEA WETLAND #I -----I �� 6 RR o,° OUTLOTA IEXC UDING460' R/WFT I `� WETLAND iTarAL_---I,1 SO.F7_� o\ O � /^yC/L OF DITCH ^ \\I// / IPER AIR PHOTO I 9 133 - I 33 Q\\\ 77.14 h' 5 \ OTH O L30 9jO 0 WETLAND ��° POND o °jtr J o o / OUTLOT E o I 26� 02 ^� L _\------- z I t ^� 34.71 7 AREAA644, 8 9 74MP I 0 SO.. � 1 </ J rI 74.0.8 12" ----------� `O � C \� \ 8 NV=g 12.1 00 42 0 ntM 3� 15 N 14 10. CO 01 I y ^ o N 5 rye^ 7M C 7 's� 9, o lO OV I 65'@SB bo ®SB 00 � n - 50 L=54.52 =543 802 �. B 72 ZONE A / "o- W. po Sg3 7 h CL LVERr UIreR 908 o'ti� V 108.82 7 °O -� ti� 6 �-------, 11 7 � C/L OF DITCH V s �D 6 I _ 1PER AIR PHOTO I 908 10 �° J x� A3 o°O� '38 ° / UNDER 24" ���9 O 0 1 OUg 8g Z 0 / WATER O 9p RCP=912J A° o 00 1� 2 9 3 rn vj O 0 O 8 O 3 Oy. 8 r g5 0 /8 RCP=gI' p 1 ° h• 399 C Q3 O 7 CONTOURS SHOWN PER ° 1� 16 o V �\ 9 26 p y V 4 j IDNR LIDAR DATA, NOT 7 h J �30 \¢7681 O [ IFIELD VERIFIED. �0 /2� p 4 ��\ SS Ri ° 10 6 ` o° O �cb I Q I -- ----------I �� 331 /N1 S 040 �s �, ..............,\ 3 s Co 6 IQ 01 o NW CO NER OF THE you ��,� s �yk� 6 SW 4 OF THE SW �� ° �x 62 1 N sHEp O O /-- 1/4 OF SEC. 25 0� 4 dl \V/ 41 Z I rn , B 8 O �G o O NORTH LINE 1 OF THE SW' 1 3S 0 Z 6i s 3\ ��, 116,32 3.60 07 5 6 1/4 OF THE <� 0 0 '� �',, Q 3 SW I/4 OF �6 6h° s o SEC. 25 v �c TLn �� p II � �` I - � � \�h 10 o N o 5 INV =109 1321..9 1^ // 7 q\� 6 /n 36�.22 11.46 L 6 2 RCP Ov ` E \ ce J p W LA 6�- NV=goal. v W 0� so.ao es 7 OUTL B W ��� �,, �� / , o�; p\U 183.00 130.92 co PON0, �� V� sSu �7 � �q °39'5��� 1 0 0 7q # _�6^ J /i ro 75 o I ^I WETLAND 5 I \ �� 91� ro =12,520 SO.FT_I O , 6� S \� CO �LU n v TP N ^ �M\ h o� NS 8'37'1 �r7 - - - 153 - -- n 14 � - -- - y am h o. '�. �y� 'ems I (v 133.71 v ` ° WETLAND #4 N ` 7j 920, L-27.85 8 `�0/ AREA=32,327 SQ.FT. / o o 0 o v o 3 3 =90.00 0° 'Say ° N h^�(�,�� C / \(/ cn o �1 L=260.34 // VJ �~ / /L 0p rn N °° 00 Z H 6 L=60.00 L%60 1\ �V e \ � C v / 0 12 10 I \ 27.53 \ 1 .48 131.59 43. i / o �42.55 6 r ; \N89 39'59"E 6 ; FOUND I/2 - I OI INCH IRON PIPE �Q) NORTH LINE OF THE I I \ INCH IP-ON a r SOUTH 728.71 FEET OF _� He SW Ill,OF THE / 9`0 SW I/4 OF SEC. 25 c) EXISTING WETLANDS WL#1 = 1105743 SQ.FT. WL#2 = 7412 WL#3 = 64480 WL#4 = 32237 WL#5 = 12520 TOTAL = 1,222,392 LOT BLOCK AREA 1 1 17561 2 1 9165 3 1 8449 4 1 8330 5 1 8291 6 1 8334 7 1 8376 8 1 8174 9 1 8181 10 1 8642 11 1 8922 12 1 10977 13 1 11349 14 1 10415 15 1 10513 16 1 8494 17 1 8125 18 1 10000 1 2 8125 2 2 11664 3 2 12411 1 3 13691 2 3 8435 3 3 8855 4 3 12582 5 3 12250 6 3 9721 7 3 8750 8 3 11657 9 3 18898 10 3 14394 11 3 12849 12 3 21159 13 3 15585 14 3 9198 15 3 10470 4 11446 2 4 11700 3 4 11700 4 4 11700 5 4 11681 6 4 9990 7 4 16226 8 4 17000 9 4 16432 10 4 9483 11 4 9261 12 4 11162 13 4 9422 14 4 8615 15 4 8477 16 4 7825 1 5 15276 2 5 18224 3 5 24867 4 5 12484 5 5 9324 6 5 11033 OUTLOT A 1253436 OUTLOT B 41127 OUTLOT C 76256 OUTLOT D 23863 OUTLOT E 99978 OUTLOT F 28048 OUTLOT G 28501 OUTLOT H 24485 20TH AVE 93072 R/W 226836 CYPRESS R/W 22216 TOTAL 2584138 LEGAL DESCRIPTION: The following Legal Description is as shown on Land Title, Inc., as agent for First American Title Insurance Company Title Commitment No. 698402, dated September 1 7th, 2024. That part of the unplatted Village of Lino Lakes, Section Twenty-five (25), Township Thirty-one (31), Range Twentytwo (22) described as the Northwest one quarter (NW 1 /4) of the Southwest one quarter (SW 1 /4) except that part taken by the State of Minnesota for highway. Pursuant to a Lis Pendens filed on March 19, 1964. Subject to the right of access on the Northwesterly side of the highway. AND That part of the Northeast one quarter (NE 1 /4) of the Southwest one quarter (SW 1 /4) lying westerly of Highway 1 35 Eastbound (I 35E); Subject to any easements of record; Section Twenty-five (25), Township Thirty-one (31), Range Twenty-two (22). AND That part of the Southwest 1/4 of Southwest 1/4, Section Twenty-five (251, Township Thirty-one (31), Range Twenty-two (22) described as follows: Commencing on the Southwest corner of Section Twenty-five (25), thence North on the Westerly line of Southwest 1 /4 of Southwest 1 /4 of Section Twenty-five (25), Township Thirty-one (31), Range Twenty-two (22) a distance of 1100.5 feet to the actual point of beginning of the land to be described. Then continue North on said Westerly line to the Northwest Corner of the Southwest 1 /4 of Southwest 1 /4 of Section Twenty-five (25), Township Thirty-one (31), Range Twenty-two (22). Then Easterly on the North line of said Southwest 1/4 to the most westerly right of way line of Interstate Highway 35E. Then Southwesterly on said Westerly right of way line of 35E to a point a distance of 1219.4 feet North of the South Line of the Southwest 1/4 of Southwest 1/4 of Section Twenty-five (25), Township Thirty-one (31), Range Twentytwo (22) as measured along the Westerly right of way line of Interstate Highway Number 35E. Then Westerly parallel to the North line of the Southwest 1/4 a distance of 206.52 feet. Then Southwesterly on a line parallel to the Westerly right of way Tine of Interstate No. 35E to a point of intersection with a line which is 728.78 feet North of and parallel to the South line of Southwest 1/4 of Southwest 1/4 of Section Twenty-five (25),Township Thirty-one (31), Range Twenty- two (22). Then Westerly parallel to the South line of said Southwest 1 /4 to a point a distance of 183 feet East of the West line of the Southwest 1 /4 of Southwest 1/4 of Section Twenty-five (25). Then Northerly parallel to the West line of said One - quarter a distance of 371.72 feet. Then westerly parallel to the South line of the Southwest 1 /4 of Southwest 1/4 of Section Twenty-five (25), Township Thirty-one (31), Range Twenty-two (22) a distance of 183 feet to the actual point of beginning and there terminating, Anoka County, Minnesota. Abstract Property EASEMENT NOTES: The following survey related exceptions appear on the Land Title, Inc., as agent for First American Title Insurance Company Title Commitment No. 698402, dated September 1 7th, 2024. 1 1 11. Final Certificate in regards to condemnation of land for Trunk Highway purposes dated May 26, 1973, filed June 12, 1973 as Document Number 390639. (AS SHOWN ON SURVEY) 1 A 12. Subject to road(s) as shown by available maps. (AS SHOWN ON SURVEY) AREA: TOTAL AREA = 2,584,1 38 SQ.FT. / 59.32 ACRES SURVEY NOTES: 1 . BEARINGS ARE BASED ON THE ANOKA COUNTY COORDINATE SYSTEM. DATE OF PUBLISHED COORDINATES = SEPTEMBER 1 ST, 2015 2. UNDERGROUND UTILITIES SHOWN PER FIELD LOCATES AND GIS MAPPING PROVIDED BY THE CITY OF LINO LAKES. THERE MAY SOME UNDERGROUND UTILITIES, GAS, ELECTRIC, ETC. NOT SHOWN OR LOCATED. 3. CONTOURS SHOWN PER LIDAR DATA OBTAINED FROM THE DNR MNTOPO WEBSITE. NOT FIELD VERIFIED. 4. ELEVATIONS BASED ON GPS DERIVED VALUES FOR NAVD 88 5. PORTIONS OF THIS PROPERTY LIES WITHIN ZONE A, ZONE AE, AREAS DETERMINED TO BE WITHIN THE 0.2% ANNUAL CHANCE FLOODPLAIN OTHER AREAS INCLUDING BUILDINGS. OTHER AREAS ARE LOCATED IN SHADED ZONE X, AND UNSHADED ZOINE X. AREAS DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN AS SHOWN ON FEMA FLOOD INSURANCE RATE MAP NUMBER 27003CO370E HAVING AN EFFECTIVE DATE OF DECEMBER 16TH, 2015 THE BASE FLOOD ELEVATION FOR ZONE A IS 912.0. NOT FIELD VERIFIED. 6. WETLANDS DELINEATED BY ANDERSON DATED 9-1 1 -24. WETLAND FLAGS LOCATED BY CORNERSTONE LAND SURVEYING ON 9-16-24. LEGEND: FOUND MONUMENT is FIRE DEPT. CONNECTION O SET 1/2" IRON PIPE V HYDRANT MARKED RLS NO. 25718 0 CURB STOP ry CABLE TV PEDESTAL WATER WELL uE UNDERGROUND ELECTRIC AC AIR CONDITIONER UTV UNDERGROUND CABLE TV OW WATER MANHOLE OE ELECTRIC MANHOLE wM WATER METER uF UNDERGROUND FIBER OPTIC ELECTRIC METER ur UNDERGROUND TELEPHONE ® POST INDICATOR VALVE EP ELECTRIC PEDESTAL oU OVERHEAD UTILITY ET ELECTRIC TRANSFORMER r�a WATER VALVE uc UNDERGROUND GAS O BOLLARD LIGHT POLE > SANITARY SEWER C>� FLAG POLE GUY WIRE MB MAIL BOX >> STORM SEWER POWER POLE I WATERMAIN \G GAS MANHOLE -u- U TRAFFIC SIGN UNKNOWN MANHOLE —x x FENCE GAS METER SOIL BORING CURB [TYPICAL] O TELEPHONE MANHOLE TRAFFIC SIGNAL ® TELEPHONE PEDESTAL > rs,w �.., �",::,,;:: CONCRETE SURFACE\ .. co SANITARY CLEANOUT CONIFEROUS TREE () SANITARY MANHOLE ® ® CATCH BASIN BITUMINOUS SURFACE or DECIDUOUS TREE of ® STORM DRAIN ® FLARED END SECTION OO STORM MANHOLE FLOOD INFORMATION: FLOOD ZONE LINES SHOWN PER FEMMA MAPPING AND NOT PRINCIPAL BUILDING SETBACKS R-2 ZONING STANDARDS FIELD VERIFIED. PORTIONS OF THIS PROPERTY LIES WITHIN ZONE MINIMUM LOT AREA = 7500 SQ.FT. FRONT 25' AE, AND ZONE A, AREAS DETERMINED TO BE WITHIN THE 0.2% MINIMUM WIDTH SIDE = 10' ANNUAL CHANCE FLOODPLAIN OTHER AREAS INCLUDING ALL MINIMUM WIDTH CORNER = 80' REAR = BUILDINGS ARE LOCATED IN ZONE X, AREAS DETERMINED TO BE MINIMUM DEPTH = 125' LOT COVERAGE 65% OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN AS SHOWN ON FEMA FLOOD INSURANCE RATE MAP NUMBER 27003CO370E HAVING AN EFFECTIVE DATE OF DECEMBER 16TH, 2015. THE BASE FLOOD ELEVATION OF 912.0 (ZONE AE) IS SHOWN ON THE SURVEY FOR REFERENCE PURPOSES ONLY. B U R(DU E ESTATES CONTACT: CDC Consulting LLC, C/O Todd Christenson todd2414c@aol.com 763-268-9442 COUNTY/CITY: ANOKA CO U NAY C��Y OF LINO LAKES REVISIONS: DATE REVISION 6-29-24 CONCEPT PLAN 9-16-24 WETLANDS 1-6-25 REVISE 1-10-25 ADD STREET R/W CERTIFICATION: I hereby certify that this plan was prepared by me, or under my direct supervision, and that I am a duly Licensed Land Surveyor under the laws of the state of Minnesota. Dan"iell ThurmesRegistration tuber: 25718 Date:--6 _29 _24----- PROJECT LOCATION: �s-1g ZOTH AVE_ PID#25-32-22-32-0001 PID#25-32-22-31-0003 PID#25-32-22-33-0001 Suite #200 1970 Northwestern Ave. Stillwater, MN 55082 Phone 651.275.8969 dan@cssurvey .net CORNERSTONE LAND SURVEYING, INC. FILE NAME SURVCDCO2 PROJECT NO. CDC2402 CONCEPT PLAN MATCH LINE - SEE LOWER RIGHT A G\ BTUB INV-B03 2 PLAN ADJ. L4" -- 1 -- I-- -- -- 8„WM — — — — — — I', — 24 547.51 0 32" 141.43 439.36� o � n DEDICATED R/W FOR 1 2 �, 2 ; FUTURE ROADWAY \ �Ifp"' \ SANITARYS E � � V9.0 4 �M n 4- 4? `oo i iq 54.81 i ' I� � 1 00 L=62.110 » 19 A� 27"DEP I �� 224.77LQ / \V/ 4:�'DE/ / — / N 18"DBL / ILLU ,• J 18„ W I I I v / 9 SANITARY SEWER �'` oh 04Q o _ . — X Q"24 A-1� to / U„ I 18» � ,28 20 DEAD 18 41 ,M 44 O / 2 21 ,. 18" / P 19„ 48" 3ICI WDEAD / / — 30" 34.71 4. o ^1 i 42 74 09 19» A8o 1 » NW9121 T / CJ 3. \ .) NI 0 , I18" ✓ 1911 / of Z L=54.52 S2 L_54 p2 80 CULVERT UNDER 16"16"1 g" Q ^� oh• � � oti � s OO11 WM h� / 2 10 000 / O h o ♦ / ,3 ` q� CULVERT UNDER I 3 18 CP _ `n WATER CP=919121 ° (� 4) 00 G J �� \V,/ /�Qo , / , /° Q 20" s `��' 00 0 v'R. coo' p si <\ 3 � 24 / o b SANCTA SEWER �� R50' �o 9 / O 40O ' ^ I �I � 64j/ p L rn I J Off. V 1 I 25" ^� O�`� N` II h °»18» O • — (�o �6 � ' Y01- lir A W 24 o* / / 7' / ,( V / 41 / / SYMBOL LEGEND 0 GENERAL NEW BITUMINOUS PAVEMENT PROPERTY LINE EASEMENT LINE — • — • — RIGHT-OF-WAY LINE ..-. .-. ... ...— SETBACK LINE -. __J /O O D S SAN MH 918.9 INV-896.8 1 TV CB RIM-917.4 INV-912.9 • I (B RIM=915.8 INV=911. INV-911.6 1g• RCP " CONNECT TO EXISTING — SANITARY SEWER STUB . STUB INV=897M PLAN ADJ. 1 ^ 1 . 1 1 I I Birch St T 125 (155) 10 (10) N00 N a Ln 0 U MATCH LINE — _ _SEE UPPER LEFT — OC 18" �' / ,1 — o" Q CSAH 54 /BIRCH STREET I I � � � . / Q' 4 V INTERSECTION al �/ r`O I � OQ �? o Un \ � �[ / EXISTING TRAFFIC COUNT DATA — INv-9oe.5-- — 132.91 v ' o� �� l 1�622 1146 3 » 20 / `. (OBTAINED FROM "CSAH 54 CORRIDOR STUDY 8D L�{� O CP o 24"2 FINAL REPORT (MAY 17, 2024)" N 910.6 - I Q 8" W M o0 130.92 1 V fCV D �-t� , �R 00 CO 0 �6 / to 00 1 CONCEPT PLAN SUMMARY `o LL= 85 SINGLE FAMILY HOMES = 58 87 N _ SINGLE FAMILY HOME LOT DENSITY 195 k�/ L_6 �o 60pp GROSS DEV. AREA = 2,584,138 SQ FT 20TH AVE - (93,072 SQ FT) ROW = (226,832 SQ FT) OUTLOTS _ (1,575,694 SQ FT) 27.53 TOTAL SINGLE FAMILY AREA = 688,536 SQ FT = 15.807 ACRES I1139.48 — 131.59 — 143.95 / TOTAL SINGLE FAMILY LOTS = 58 UNITS PROPOSED NET DENSITY 3.67 UNITS/ACRE W:\2024\Civil\12246099 - Lino Lakes Burque Subdivision\2. Design\B. Drawing Files\12246099 C100 - Concept Plan.dwg Level of Service (Delay) Intersection Traffic AM Peak Hour PM Peak Hour Control Existing 2025 2040 Existing 2025 2040 CSAH 54 (201n Ave) and CSAH 34 (Birch St) SSS A / B (13 sec) A / B (14 sec) A / C (18 sec) A I C (15 sec) A / C (18 sec) A I D (34 sec) LOT COUNT PROPOSED TRAFFIC GENERATION 1) SINGLE-FAMILY RESIDENTIAL UNITS: CONCEPT PLAN 58 UNITS: APPROXIMATELY 9 VEHICLE TRIPS PER DAY PER UNIT SINGLE FAMILY HOMES = 58 522 DAILY VEHICLE TRIPS YIELD PLAN 2) NEW DEVELOPMENT WILL GENERATE A TOTAL OF APPROXIMATELY SINGLE FAMILY HOMES = 60 522 DAILY VEHICLE TRIPS. NORTH 0 50 100 200 z O U N� r� �/ z O U 0. O LL O z L.L z L FLU I..L _ U) a� L L Z U Q O.L U L c O J O N L L � � L=-00 2B�,2) �■— campCU J N — Lu J W M3( L nr- 1 )3A N O N F_ Lo U N L J w Lo o � � ZW�z < LL1 JLZY N J 0zN N � Z LO WN J 0 a� U v L Q z U/ u L Y L z 0 J CID ]) U W �o D_ I hereby certify that this plan, specifications or report was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the state of Minnesota. Thomas J. Herkenhoff, P.E. Date: 01.08.25 Lic. No.: 25520 Rev. Date Description 1Q 01.13.25 City Re -Submittal Project #: 12246099 Drawn By: TJR/KBK Checked By: TJH Issue Date: 12.09.24 Sheet Title: CONCEPT SUBDIVISION PLAN Sheet: I I �I I � I � W I Ct�W _ LJ • ROSEWOOD ST Birch Street _ IFAr I �►,' _ _ ' a �k -I ZONE AE _ . •» �'_; ••'t ��� DEDICATED R/W FOR �� G '� •. /x.`- � --,.• �,,,'Fr�•, � FUTURE ROADWAY ` � ZON E AEA BIRCHST - /.._ --- --�-- -- — — - -- - — _ ZONE A q t4e �Fqe F� / 9 / /I TO N E V( -� - ZONE X 9„ ZONE ALJJ / z II I4- TDEA18 him _ 8 III „9" *� I1I• ZONE A 6„16 4 o � o _ ONE \ POND 1Eb_ 1• s„ L / 1 M / oz° / 3„ - 06 / / ./ gyp.. .--� _ ��. _•=- _ - _ � -r / .. v • - OJ / POND /• / % / / ��_ �.• \ '`'- / , � e - •. K try « � 0 414 ONE \ / p 4 1 ( - - - it. - T -4F . , r _ 00 IT 00 <JI Bach St T 125 (155) 10 (10) 00 IN C14 0 0 U CSAH 54 / BIRCH STREET INTERSECTION EXISTING TRAFFIC COUNT DATA (OBTAINED FROM "CSAH 54 CORRIDOR STUDY FINAL REPORT (MAY 17, 2024)" Level of Service (Delay) Intersection Traffic AM Peak Hour PM Peak Hour Control Existing 2025 2040 Existing 2025 2040 CSAH 54 (20" Ave) and CSAH 34 (Birch St) SSS A / B (13 sec) A / B (14 sec) A / C (18 sec) A I C (15 sec) A / C (18 sec) A I D (34 sec) PROPOSED TRAFFIC GENERATION 1) SINGLE-FAMILY RESIDENTIAL UNITS: 58 UNITS: APPROXIMATELY 9 VEHICLE TRIPS PER DAY PER UNIT 522 DAILY VEHICLE TRIPS 2) NEW DEVELOPMENT WILL GENERATE A TOTAL OF APPROXIMATELY 522 DAILY VEHICLE TRIPS. NORTH 0 100 200 400 z O U N) L.L VJ z O U O LL O z z G LU L.L (� CDL LO u7 i5 Z P 2 U Q O 0 U L Y J O N L L L � CC;)CU (n C ■_ 1 00 c O ���� w 0 � ;n JwC) J N O Lo O U N w J w Lo o � z < LLI JWZY N J 0z0 N � Z�LOw J O LL Cn W Q z U, Uj W Y W z 0 J CID U W D_ 1 hereby certify that this plan, specifications or report was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the state of Minnesota. Thomas J. Herkenhoff, P.E. Date: 01.08.25 Lic. No.: 25520 Rev. Date Description 1Q 01.13.25 City Re -Submittal Project #: 12246099 Drawn By: TJR/KBK Checked By: TJH Issue Date: 12.09.24 Sheet Title: NEIGHBORHOOD PLAN Sheet: W:\2024\Civil\12246099 - Lino Lakes Burque Subdivision\2. Design\B. Drawing Files\12246099 C200 - Neighborhood Plan.dwg MATCH LINE - SEE LOWER RIGHT 0- - / SYMBOL LEGEND ' 1r N • % W eJ ' O / Rf i / I / all 24 27 18" / �• t 1 N I I 20"DEAD _ 18 CROPLAND GRASSLAND WETLANDS WETLAND #1: 1,105,743 SF WETLAND #2: 7,412 SF WETLAND #3: 64,480 SF WETLAND #4: 32,237 SF WETLAND #5: 12,520 SF TOTAL AREA: 1,222,392 SF MITIGATION AREA TO BE DETERMINED WOODED AREAS PAVED AREAS & BUILDINGS PROPERTY LINE SOIL BOUNDARY (PER WEB SOIL SURVEY) EXISTING TREE TREE COUNT TOTAL # OF TREE 18" OR LARGER: 144 / � , 12• CMP / / / / / '' / / f / B SAOI // / , / / /, / /, �/ // 4— ANTICIPATED TREES TO BE REMOVED: 68 y �� �� _�,'� NOTES I •f , • HdC2 ,'JHdC2 \ \ / 1 ^ // / // �/ /� / — \ \ \\ I� See Existing Conditions plan prepared by Cornerstone Land �:���(y�� / // I/ — \ \ \ Surveying for flood zones. 33 I . CULVERT UNDER ,I H1 n O _ \\'\P— \ \ \\I// T � WATER I I '"►����� 16 16 , 1.1,p unit 'ymbnl Map unit name BtB Braham loamy fine sand, 2 to 6 percent slopes / � I I I � <.�I • ,' 1 1SiJB 2� V j / Cb Cathro muck / UWATER NDER i p' ,,, ,�;,,,,,,,� e I � / / / Du Dundas loam ✓ I ��`- / r // + � ��� 1/ �� �, / / // / / / Hc1B Hayden fine sandy loam 2 to 6 percent slopes HdC2 Hayden fine sandy loam, 6 to 12 percent slopes, eroded HdD Hayden fine sandy loam, 12 to 24 percent slopes Rf I + KrnB Kingsley fine sandy loam, 2 to 6 percent slopes NeA Nessel fine sandy loam, 1 to 4 percent slopes • ` ' "/ ' ' �I / // ' / Rf Rifle mucky peat 46 I ' o 1 0 1RfJ 0 2�» O 0 22" //, H d C2 / // ,/ /!/ / < — INV=909.6 LL I Le RC 0 C) *7 - 4 JHdC2Jd U�,� o 7 i ti4i.1 I \0 0 4%p 44 1 f 0 cl 46 _ I ' ti - Ab \%\HdB ,,/ , / // / , ,/ , / _ _ , .� /�"#rl�.•.' I\\,\ \ \ `� �, '/ ,'v/ / 1, ,'i�---,�� \ - , W:\2024\Civil\12246099 - Lino Lakes Burque Subdivision\2. Design\B. Drawing Files\12246099 C300 - Resource Plan.dwg Rating A B/D B/D B B B C C A/D MH IIV=696.6 RIM-917.4 INV­912.9 INV-911.6 I _ RIM=916 INV=911.1.6 � , \ I MATCH LINE - 0 EE1JPP�LEF_T' NORTH 0 50 100 200 Z O U U) Z O U L.f_ O LL O Z L.L Z 2 LU L.L z E U Q CU O .L 0 c 4) N J CD of (6 p� O N L_ c J 00 � a�l,"t w >� 0 J W M > (0 J N O N 1Z) O Lo N W J w LO-� LI LO ♦�C/)�Z Q U)J �� W N Q OzOJ N co Z LO LI Cfl -J O Q Lt_ U U) W Z U, Uj W Y W Z 0 J CID I hereby certify that this plan, specifications or report was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the state of Minnesota. N Thomas J. Herkenhoff, P.E. Date: 01.08.25 Lic. No.: 25520 Rev. Date Description 1Q 01.13.25 City Re -Submittal Project #: 12246099 Drawn By: TJR/KBK Checked By: TJH Issue Date: 12.09.24 Sheet Title: RESOURCE INVENTORY PLAN Sheet: Attachment 6: City Engineer Memo dated February 5, 2025 wsb Memorandum To: Katie Larsen, Lino Lakes City Planner From: Kris Keller PE, WSB Diane Hankee PE, Lino Lakes City Engineer Date: February 5, 2025 Re: Burque Estates Concept Plan Review 027885-000 WSB's review of the Concept Plans for the Burque Estates development in Lino Lakes, MN, prepared by Larsen Engineering and received January 13, 2025. Our comments were made on the following documents: o Burque Estates - Concept Plan Submittal prepared by Larsen Engineering, dated U January 13, 2025. Z w co The following review comments should be responded to in writing by the applicant. — Engineering 0 a °° General co N The Burque Estates development includes approximately 60 acres between 201" Avenue (CSAH 54) and Interstate 35E, south of Birch Street. The current conceptual project proposes 58 single family units and associated infrastructure. 0 • Grading Z The Burque Estates development includes site grading for the 58 units as well as a extensions of Chestnut Street, and approximately four local streets that are yet to be a named. Z a U) • Stormwater Management a N W The Burque owned area of the site, 58.24 acres, overland flows to onsite private ditches U) that then flow through a culvert under 20th Ave and eventually outlets to Lake Amelia within VLAWMO. There is a culvert under 135E at the Burque Property that brings water from the w east side of 135E to the site. w co The concept plan shows limited stormwater management features. The applicant will be required to meet the City of Lino Lakes stormwater erosion and sediment control ordinance. w ;° Stromwater reuse will be required for all development irrigation. Ms. Katie Larsen 02/05/2025 Page 2 Water Supply The City's water supply system well firm capacity should meet or exceed its maximum day demand. This criteria is currently constrained by poor water quality in some wells, the White Bear Lake court orders and ongoing litigation, and annual variability in water use due to drought and other factors. Based on the water supply capacity and well trigger analysis completed in April 2024, excluding Well No. 2 due to poor water quality, if the City is able to add Well No. 7 then the system could serve approximately 7,300 households (about 1,400 households more than the existing 5,900 households) before Well No. 8 is needed. The final number of available households will need to be determined as the project progresses. The City has begun conversations with the Minnesota Department of Natural Resources (DNR) about permitting Well No. 7 and is awaiting confirmation whether it can be constructed at this time given the ongoing White Bear Lake litigation. Applicant to verify water pressure is adequate for all locations within the development. All proposed units are required to be on the municipal water supply. Water infrastructure for the Burque Estates Addition has not yet been designed and will need to be submitted for preliminary plat by the applicant. There is an existing 16-inch diameter trunk watermain within Cypress St that will need to be looped to the existing 16- inch diameter trunk watermain at Birch St. A 12-inch diameter watermain will need to be extended south through the property or along 20th Avenue. It should then loop back to the existing 8-inch diameter watermain within Chestnut St. Otherwise, the development will include a water system with predominately 8- inch diameter ductile iron pipe (DIP) water main with 1-inch Type K copper services being extended to each lot. Water supply will need to be evaluated in conjunction with current pending DNR water appropriation approvals. An additional 12" water stub will need to be extended to the south for future development. The development is in the City's Drinking Water Study Management Area and has high vulnerability and would be subject to those requirements. Sanitary Sewer Sanitary sewer collection for the Burque Estates development has not yet been proposed and will need to be submitted for preliminary plat by the applicant. It is anticipated that the existing 8-inch polyvinyl chloride (PVC) sanitary sewer within Cypress St that will need to be extended south to serve the south portion of the site. The sanitary sewer at Chestnut St is not deep enough to serve the south portion site. We recommend that the City consider project phasing such that the utilities are extended to the south with the first phase. The addition will need to be evaluated by the applicant as to whether the existing lift station will need to be oversized to accommodate the proposed development and the remaining sanitary sewer district 3C. Oversizing costs for the remaining sanitary sewer district 3C will be credited by the City. The site will otherwise be served by 8- inch Burque Estates Concept Plan Submittal - Engineering Review Ms. Katie Larsen 02/05/2025 Page 3 diameter main along with 4-inch Schedule 40 PVC service pipe to each lot. Additional sanitary sewer stubs will be extended to the south. • Transportation A general street layout has been proposed with the Concept Plan. The City of Lino Lakes' Comprehensive Plan requires neighborhood street connections. The Burque property is adjacent to 1-35E which is a Principal Arterial, 20th Avenue (CSAH 54) which is A -Minor Arterial Reliever, Birch Street (CSAH 34) is a Major Collector road, Cypress Street and Chestnut Street are local roads. The applicant is showing connections with the right of way to Chestnut Street in the northeast portion of the development and 20th Avenue (CSAH 54) in the southwest portion. Cypress Street is planned to be connected to Birch Street as outlined in the City's Comprehensive Plan. A traffic study will be required for the site. Trails and sidewalks A trail will be required along the east side of Chestnut Street from the north and then crossing Chestnut and following the wetlands around the back of Block 1. Areas where the trail will be near the wetlands will require an engineered (2') sand subgrade section. Additional sidewalks will be required along the connector roads or as directed by the City Planner. Comments 1. The traffic study shall include the intersections of Red Oak and 20th Avenue, 21st Avenue and Cedar Street, Birch Street and 20th Avenue and 20th Avenue at the proposed site intersection. The analysis should address the intersection geometrics (i.e. turn lanes) and traffic control needed to accommodate the proposed site development. 2. The traffic study shall meet the requirements outlined in City ordinances. The ten- year forecast review should be 2040 and include a future connection of Birch Street to Cypress Street. 3. The applicant will need to receive approval from Anoka County for the site access to 20th Avenue. The proposed access is approximately 1,300 feet south of Birch Street. It is anticipated that they will require left and right turn lanes on 20th Avenue. 4. Right of way shall be provided at the impacted intersections to accommodate any required or future improvements. In addition, right of way shall be provided east of the Birch Street for the future connection to the existing Northpointe development. 5. A noise study will be required, and noise attenuation should be accounted for in plat layout. Currently there is no space provided for noise attenuation and we anticipate this will impact to the proposed plat layout/ density. 6. Provide traffic calming (narrowed lanes, bump outs, etc.) at the midblock trail crossing on Chestnut Street • Wetlands and Environment Burque Estates Concept Plan Submittal - Engineering Review Ms. Katie Larsen 02/05/2025 Page 4 The site includes 35 acres of wetland and buffer. An approved wetland delineation will be required. The applicant will need to work with VLAMWO for Wetland Conservation Act regulations. The project indicates that there are approximately 28.06 acres of wetland. A wetland replacement plan based on the impacts will need to be submitted, reviewed, and approved through VLAMWO and the City. The site is located in the Wetland Management Corridor (WMC). Wetland buffers meeting minimum and average requirements will be required around all wetland areas following construction. Any disturbed buffer areas should be seeded with a seed mix containing native, non-invasive, species. The applicant should verify with the DNR's Natural Heritage Information System database for the potential presence of protected species within and near the project area, including protected plant species. The applicant should coordinate with the DNR on the need for additional studies or surveys as necessary. The applicant should verify and may need to conduct a Cultural Resource Assessment of the development site through SHPO. • Landscaping A Landscape Plan for the Burque Estates development has not yet been submitted. One will need to be submitted and reviewed by staff and the City's Environmental Coordinator The Environmental Coordinator will provide separate comments. • Floodplain The site includes 60-70% Zone A Floodplain. A Base Flood Elevation will need to be determined and approved by FEMA. A LOMR will be required and floodplain mitigation will be required as applicable. Drainage and Utility Easements Roadways are proposed within right-of-way and lots include standard drainage and utility easements. Larger drainage and utility easements will be required to be provided over any utilities outside the right of way and any surface water management features. The eastern 75' feet of CSAH 54 should be dedicated as right of way to Anoka County. Drainage and Utility easements, through 6620 20th Avenue, will be required to extend municipal utilities from Cypress Street to the proposed development. Conservation easements will be required over wetlands. Standard side yard drainage and utility easements and easements over public utilities will be required. • Development Agreement A development agreement will be required with the final plat. • Grading Agreement Burque Estates Concept Plan Submittal - Engineering Review Ms. Katie Larsen 02/05/2025 Page 5 Grading agreement not required at this time. • Stormwater Maintenance Agreement The stormwater maintenance for public facilities in the Burque Estates development will be covered under the City's Programmatic Stormwater Management Agreement after the facilities have been installed and accepted by the City. Borrow areas / Lakes area will be maintained by the HOA. • Permits Required Required permits will be determined at the time of preliminary plat submittal. Potential permits may include some of the following and others: 1. NPDES General Construction Permit 2. City of Lino Lakes Zoning Permit for Construction 3. Minnesota Pollution Control Agency Sanitary Sewer Extension Permit 4. Minnesota Department of Health 5. Rice Creek Watershed District Permit 6. Anoka County Right -of -Way Permit 7. USACE for Wetland Fill / Mitigation 8. FEMA LOMR If you or the applicant have any questions regarding these comments, please contact Kris Keller at (612) 419-3083 or kkeller@wsbeng.com. You may also contact Diane Hankee at (651) 982-2430 or dhankee@linolakes.us. Burque Estates Concept Plan Submittal - Engineering Review Attachment 7: Environmental Memo dated January 29, 2025 CITY ^"; OF I NKES To: Katie Larsen, City Planner From: Tom Hoffman, Environmental Coordinator Environmental Memo Date: January 29, 2025 Re: Environmental Comments— Burque Estates Concept Plan PUD Environmental Board had recommended the following at their January 29, 2025 meeting: 1. Tree preservation notes that trees 18" in diameter are shown and make up 144 trees. The requirements of the city is to show deciduous trees 6" or larger in diameter and coniferous trees 12' or taller a. Update the tree preservation plan to include all significant trees as defined in city code 1001.007. b. Provide a table showing each tree by species, diameter/height, condition, and if it is being removed. c. Future submittals shall include calculations for mitigation of trees outside of the basic use area. All removals outside of the basic use area will require mitigation and calculations should be provided on future plans. d. Provide removal of dead ash trees within dedicated park and open space to limit maintenance required by the city once ownership is transferred. 2. Submit a wetland delineation for the site. a. Mitigation will be required for any wetland impacts. b. Avoidance of wetlands should be considered, move stormwater management outside of existing wetlands. c. Rare, unique, and significant resources survey should be performed for impacted wetlands. 3. The site is shown to be within the flood plain. Provide information on base flood elevations for zone A. a. Any impacts to the floodplain will require compensatory storage be provided. 4. Wetland buffers should have a minimum width of 25 feet and be 50 feet wide on average. 5. Submit stormwater modeling for the site a. Storm water pond design should take into account the site's location in a highly vulnerable area of the Drinking Water Supply Management Area. This may limit infiltration possibilities on the site. b. A portion of this site is within the Lake Amelia Ditch Study. BMP's should be incorporated into the final design as shown on the study c. Lake Amelia is currently not listed as an impaired water body. The proximity of the project site to the lake and the drainage ditch that flows into the lake is crucial. Extra effort should be taken for stormwater management to protect the existing ditches and downstream resources. d. Water reuse should be explored as an option for any irrigation within the site. 6. Maintain the function and flow of the existing ditches within the property. The ditch system drains the site and upstream areas east of the freeway. Existing drainage areas will need to be preserved. a. Opportunities exist for rerouting the ditches with the proposed development along with restoration along the corridor. 7. The 2040 Comprehensive plan shows a portion of the site, along both ditches being part of the greenway system. a. Show the greenway system on future submittals and connection to the north to existing parks and trails facilities b. Provide conservation easements overall wetland and open space in the development to ensure connectivity with existing and future development. 8. Opportunities for wetland restoration onsite with the development. Potential wetland mitigation onsite. Preserve and enhance all wetlands where feasible. 9. The site is located within the Lino Lakes East wellhead protection area. Consideration for the vulnerability of the DWSMA should be considered during future proposals. 10. Complete a noise study as part of the development to see if any mitigation will be required. 11. The project will disturb more than an acre of soil and will be required to obtain an NPDES permit. Proof of permit shall be required before construction. 12. A SWPPP shall be required in additional submittals as required by the MPCA meeting sections 5.2-5.26 a. Final erosion and sediment control will be reviewed with future submittals b. Redundant perimeter control will be required around all wetlands onsite where a 50' natural buffer cannot be maintained during construction. Redundant perimeter control should be spaced 3-5' apart. Page 2 Attachment 8: Public Services Director/Park Board Memo dated February 6, 2025 C IT F LIN01KES DATE: February 6, 2025 TO: Katie Larsen, City Planner FROM: Rick DeGardner, Public Services Director RE: Burque Estates - Park Dedication Discussion The Park Boards primary discussion last night revolved around extending the existing trail along Chestnut Street westward to eventually provide pedestrian access to Tower Park, located at Birch Street and Centerville Road. There are two options to explore: Install a boardwalk/trail along the northern boundary of the development from 20t" Avenue South to Chestnut Street. The existing future Cyprus Street ROW, along with an 850' boardwalk would extend direct access from the existing trail on Chestnut Street to the Birch Street and 20t" Avenue South intersection. The future trail project of extending the trail along westward along the south side of Birch Street will complete the connection to Tower Pa rk. 2. Extend the paved trail southward along the east side of Chestnut Street from the Northpointe Development, then cross Chestnut Street and continue the trail along the wetland buffer. I included an attachment illustrating this. I think both options merit further investigation and discussion. There are significant pros and cons for each option! � M6 ZONE AE WEPT 1/4 CI)PPEa S. A N' D <J � S�8sr'aw ZONEAE� r` Fyly / E i�j�i a LIM w5rue 3w2"+VE'q� '/ yjv SM � p- - - .may Vj✓ Qom' J 7� �/_ E X� ZONE A aun Tv e LQ nE V I ' WE/IANO 6NE X i .... 3 5 N I _ s l 1 _ f ounore � a ZONE ®,13 JCI-a A 2 CIPC r // ry a [[ -'PI - - - � L) /C��� / II 60. s /. h Nwc a av rre �b ! ��r �� v� c _I/PIP 4j 9 �R �y oo4 8e4i h� + r Q �� ] N'.Mm PE 0a' 9 �yl I. OF TPe SW F 3 ' /1 W f I 3w I/4 it mcC ]ZONE LI, O OUTLOT \ a 19 _ , e �9 a ya �l ' %� es 8 371 o_ r '� ono hn 60 a o ,16 �60°' 12 �zss ILI_ N89 39 59 E ONTO L2e 8 E V SW1 920 3 fEe al fINL WE NDS THE /4C25 r WL41 7412 35Q.FT. R 3w / O. sec. zs / / r W 03 = 6448 N WLN4 3] -322N M#4=2520 37 u Attachment 9: Anoka County Comments dated January 29, 2025 From: Logan Keehr To: Katie Larsen Subject: RE: Land Use Application - Burque Estates Date: Wednesday, January 29, 2025 9:40:24 AM Attachments: image001.jpg Caution: This email originated outside our organization; please use caution. Hi Katie, Our comments on this Site Plat are: Our preferred location for a connection to CSAH 54 (20th Ave.) is directly across from CSAH 34 (Birch St.). This would allow for a full access connection since CSAH 34 will remain a full access intersection. Any access south of CSAH 34 would need to be a right in/right out intersection based on our access spacing guidelines. Any access connection would require a NB right turn lane. Let me know if you have any questions. Logan Keehr, PE Traffic Engineer II Anoka County Transportation Division High way- Transit-FI eet-Surveyor-GIS 1440 Bunker Lake Boulevard NW Andover, MN 55304 www.anokacountymn.gov Office: 763-324-3100 Direct: 763-324-3183 Fax: 763-324-3020 ou.r pass�ovu �s Uour safe w,2U hovi.el From: Julie Whitney <JWhitney@linolakes.us> Sent: Friday, January 17, 2025 12:52 PM To: metrodevreviews.dot@state.mn.us, Logan Keehr <Logan.Keehr@anokacountymn.gov>; M Eichinger <meichinger@isdl2.org> Cc: Katie Larsen <KLarsen@linolakes.us> Subject: Land Use Application - Burque Estates CITY COUNCIL WORK SESSION STAFF REPORT ITEM NO. 6 STAFF ORIGINATOR: Michael Grochala, Community Development Director WORK SESSION DATE: March 3, 2025 TOPIC: Public Works Facility Construction Manager as Agent RFQ/RFP BACKGROUND Staff is proposing to use the construction manager as agent (CMa) process as part of the public works facility design and construction. Under this process the City would retain a qualified construction management firm to assist with the overall design, management, and construction of the project. They would work hand in hand with City staff, architect, and engineering team to complete the project. Under this process the City would be bidding out components of the project directly rather than relying on a general contractor. The CMa scope of services would include: Pre -construction activities: these include consulting on aspects of project design with the City and Oertel Architects, creating parameters for quality, cost and time, constructability reviews and cost analysis and management of the overall project budget. This would also include development of a phasing and sequencing plan. Procurement activities: these would include developing a procurement plan include multiple bid packages, along with bid and award administration. Construction Phase: these activities would include coordination of all subcontractors, vendors and suppliers, prepare project schedule, lead change order review and dispute resolution in coordination with staff and Oertel Architects, enforcing and maintaining quality of control standards and review of contractor labor, materials and other costs. Closeout: Management and coordination of final start-up, testing and occupancy, facilitate commissioning process and compile all project documentation. The CMa essentially covers the day-to-day project management, along with providing another viewpoint during design discussions. We believe this will be extremely important given that we will be working on the existing Public Works site. The City previously used a construction manager for the City Hall building. REQUESTED COUNCIL DIRECTION Staff is requesting direction to seek proposals from qualified firms for providing these services. ATTACHMENTS None. CITY COUNCIL WORK SESSION STAFF REPORT ITEM NO. 7 STAFF ORIGINATOR: Michael Grochala, Community Development Director WORK SESSION DATE: March 3, 2025 TOPIC: Backup Building Inspection and Plan Review Services BACKGROUND The City entered into a Professional Services contract with MnSpect, LLC in 2020 to provide supplementary building inspection services during periods of peak demand. MnSpect currently provides, on an as needed basis, an inspector with a Limited Building Official certification. This person can complete inspections on one and two-family dwellings. To provide additional redundancy to our Building Department services, staff is proposing to expand the services provided by MnSpect to include: • Certified Building Official providing inspections on commercial properties. ($840/day) • Designated Building Official, for periods when the city doesn't have an internal designee. ($1,500/week) • Commercial Plan Review services ($135/hour) As noted above these are intended to be supplementary and/or emergency services used as needed to maintain service levels. Staff is still proposing to fill the vacant Building Inspector position. The 2025 building department budget includes $36,720 for contracted inspection services. REQUESTED COUNCIL DIRECTION Staff is requesting City Council direction to bring forward a professional service agreement amendment for consideration. ATTACHMENTS None. 1 CITY COUNCIL WORK SESSION STAFF REPORT ITEM NO. 8 STAFF ORIGINATOR: Curt Boehme, Interim Public Safety Director WORK SESSION DATE: March 3, 2025 TOPIC: Public Safety Update Update Staff will be on hand to gather feedback on the concept/draft 4t" Quarter 2024 Public Safety Update