Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
05-12-25 - Council Meeting Agenda
CITY COUNCIL AGENDA Updated 05-12-25 Monday, May 12, 2025 Broadcast on Cable TV Channel 16 and northmetrotv.com/lino-lakes-stream Mayor Rafferty, Councilmembers Cavegn, Lyden, Ruhland and Stoesz Interim City Administrator: Dave Pecchia CITY COUNCIL WORK SESSION, 6:00 P.M. Community Room (Not televised) I No Public Comment allowed per the Rules of Decorum 1. Call to Order and Roll Call 2. Setting the Agenda: Addition or Deletion of Agenda Items 3. Administration Update 4. Review Regular Agenda 5. Adjournment CITY COUNCIL MEETING, 6:30 P.M. Council Chambers I Televised ➢ Call to Order and Roll Call ➢ Pledge of Allegiance ➢ Public Comment Sign -in prior to start of meeting per Rules of Decorum ➢ Setting the Agenda: Addition or Deletion of Agenda Items SPECIAL PRESENTATIONS A. First Reading of Ordinance No. 06-25 Repealing City Code Chapter 208: Public Safety B. First Reading of Ordinance No. 07-25 Providing for a Police Department C. First Reading of Ordinance No. 08-25 Providing for a Fire Department D. Promotion of Police Chief - Mayor Rafferty - Oath of Office for Chief of Police Curt Boehme E. Promotion of Fire Chief - Mayor Rafferty - Oath of Office for Fire Chief Dan L'Allier Council Agenda -2- 1. CONSENT AGENDA A. Approval of Expenditures for May 12, 2025 (Check No. 122721 through 122796) in the Amount of $814,461.32 B. Approval of April 28, 2025, Work Session Minutes C. Approval of April 28, 2025, City Council Meeting Minutes D. Approval of April 28, 2025, Special Council Meeting Minutes E. Approval of May 5, 2025, Board of Appeal and Equalization Meeting Minutes F. Approval of May 5, 2025, Work Session Minutes G. Approval of Hiring of Part -Time Staff for the Rookery Activity Center 2. FINANCE DEPARTMENT REPORT No Report 3. ADMINISTRATION DEPARTMENT REPORT A. Restructuring of Police Department, Meg Sawyer B. Consider Appointment of Part -Time Firefighter, Meg Sawyer C. Consider Appointment of Police Officer, Meg Sawyer 4. PUBLIC SAFETY DEPARTMENT REPORT No Report 5. PUBLIC SERVICES DEPARTMENT REPORT A. Consider Resolution No. 25-59 Replacement of 2004 Olympian 30kW Generator — Lift Station 53 Backup Power, Justin Williams 6. COMMUNITY DEVELOPMENT REPORT A. Natures Refuge North, Michael Grochala i. Consider First Reading of Ordinance No. 09-25, Rezoning Certain Real Property from R-X, Rural Executive to PUD, Planned Unit Development ii. Consider Resolution No. 25-61, Approving Preliminary Plan and Preliminary Plat for Natures Refuge North B. Consider Resolution No. 25-60, Approve Change Order No. 1, 2025 Street Rehabilitation Project, Diane Hankee Council Agenda -3- C. Consider Resolution No. 25-57, Authorize the Preparation of Plans and Specs, Andall Street Culvert Project, Diane Hankee D. Consider Resolution No. 25-62, Approving Joint Powers Agreement with Anoka County for the 1-35E/County Road J Interchange Improvements, Michael Grochala E. Lino Lakes Main Street AUAR Distribution, Michael Grochala 7. UNFINISHED BUSINESS No Report 8. NEW BUSINESS No Report MLA 111MOrefil"relOv A. City Council Closed Meeting, Wednesday, May 14t" at 6:00 p.m. in the Community Room B. City Council Special Work Session, Wednesday, May 14t" at 6:30 p.m. in the Community Room. C. Planning and Zoning Board Meeting, Wednesday, May 14t" at 6:30 p.m. in the Council Chambers. D. City Hall will be closed on Monday, May 261" for the Memorial Day holiday. E. The May 26t" City Council Meeting has been moved to Tuesday, May 27tn IiTIXOIi ; ►l 7 �lA50 I CITY COUNCIL REGULAR MEETING STAFF REPORT AGENDA ITEM SPECIAL PRESENTATION A STAFF ORIGINATOR: Dave Pecchia, Interim City Administrator MEETING DATE: May 12, 2025 TOPIC: 15t Reading of Ordinance No. 06-25 Repealing Chapter 208: Public Safety Department VOTE REQUIRED: Simple Majority INTRODUCTION The City Council is being asked to consider the 1st Reading of Ordinance No. 06-25 Repealing City Code Chapter 208: Public Safety Department, of the Lino Lakes City Code. BACKGROUND Staff have been in the process of implementing recommendations of the Citygate report which included establishing a stand alone Police Department and Fire Department. Therefore, we are requesting the repeal of Chapter 208 which created a Public Safety Department which no longer aligns with the current organizational structures. RECOMMENDATION Staff recommends approval of 15t Reading of Ordinance No. 06-25 Repealing City Code Chapter 208: Public Safety Department. ATTACHMENTS Ordinance No. 06-25 1 1" Reading: May 12, 2025 Website Notice: May 13, 2025 2nd Reading: May 27, 2025 Publication: June 3, 2025 Adoption: May 27, 2025 Effective: July 3, 2025 CITY OF LINO LAKES ORDINANCE NO. 06-25 REPEALING CITY CODE CHAPTER 208: PUBLIC SAFETY DEPARTMENT The City Council of Lino Lakes ordains: Repeal of City Code Chapter 208 Section 1: The City of Lino Lakes City Council hereby repeals City Code Chapter 208: Public Safety Department, in its entirety. The City Council has adopted separate ordinances to establish a Police Department and Fire Department to replace the combined Public Safety Department fiinrtinnc ADOPTED by the Lino Lakes City Council this 271h day of May, 2025. CITY OF LINO LAKES Rob Rafferty, Mayor ATTEST Roberta Colotti, CIVIC, City Clerk CITY COUNCIL REGULAR MEETING STAFF REPORT AGENDA ITEM SPECIAL PRESENTATION B STAFF ORIGINATOR: Dave Pecchia, Interim City Administrator MEETING DATE: May 12, 2025 TOPIC: 111 Reading of Ordinance No. 07-25 Providing for a Police Department VOTE REQUIRED: Simple Majority INTRODUCTION The City Council is being asked to consider the 1st Reading of Ordinance No. 07-25 Providing for a Police Department. BACKGROUND Staff have been in the process of implementing recommendations outlined in the Citygate report which included establishing a separate Police Department and Fire Department. Therefore, we request the adoption of Ordinance No. 07- 25 which creates the Lino Lakes Police Department. The new ordinance aligns with the current organizational structure. RECOMMENDATION Staff recommends approval of 1st Reading of Ordinance No. 07-25 Providing for a Police Department. ATTACHMENTS Ordinance No 07-25 1 1" Reading: May 12, 2025 Website Notice: May 13, 2025 2nd Reading: May 27, 2025 Publication: June 3, 2025 Adoption: May 27, 2025 Effective: July 3, 2025 CITY OF LINO LAKES ORDINANCE NO. 07-25 PROVIDING FOR A POLICE DEPARTMENT The City Council of Lino Lakes ordains: Police Department SECTION 1: DEPARTMENT CREATED There is created a department of this city, which shall hereafter by known as the Lino Lakes Police Department. DUTIES It shall be the responsibility of the Lino Lakes Police Department to Drovide a healthv and safe community, preserve peace and public order, prevent and detect crime, respond to and assist with emergency medical needs, and enforce state and county laws and City ordinances, within the Citv of Lino Lakes. as authorized by the Citv Council. POLICE PERSONNEL The Lino Lakes Police Department shall be directed and supervised by the Chief of Police. The members of the Lino Lakes Police Department shall consist of the Chief of Police and police officers as the City Council shall hire. CHIEF OF POLICE The Chief of Police shall be responsible to the City Administrator and shall make complete reports on the operation of the Lino Lakes Police Department as requested by the Administrator or City Council. Other members of the Lino Lakes Police Department shall be responsible and accountable to the Chief of Police, who shall be responsible for the proper training and disciple of other members. The Chief of Police may recommend to the City Administrator a suspension without pay of any member of the Lino Lakes Police Department for just cause only. Suspensions without pay in excess of 30 days and recommendations for termination will require final action by the City Council. RANKS Members of the Lino Lakes Police Department. other than the Chief of Police. may be eiven a rank or designation as determined by the Chief of Police. The order of command shall flow from the Chief of Police downward in order as listed, each member being responsible to his or her superior officer. The ranks and the rules of qualification for any of the positions shall be as established by the Chief of Police and aaaroved by the Citv Council. t7:1501 r7 oil The Lino Lakes Police Department shall keep a daily record of all Police Department activities within the City, as prescribed by the City Council. Access to Police Department records shall be in accordance with the Minnesota Government Data Practice Act. UNIFORMS AND EQUIPMENT All city property issued to any member of the Police Department shall be returned in good condition to the City promptly upon termination of employment or as otherwise directed by the Chief of Police or City Administrator. Each member shall be responsible for and liable for each item and the proper care thereof while same is in his or her possession. Uniforms and equipment to perform duties will be provided to Police Department personnel. Uniforms are only to be worn while on duty, while in transit to or from work, for court, or at other official department functions or events. COMMUNITY SERVICE OFFICER A person holding the position of community service officer in the Lino Lakes Police Department may, under the direction of the Chief of Police, issue citations in lieu of arrest for violations of the following Chapters: 503 Animal Control Regulations, 802 Parking, 901 General Nuisance and 1006 Building Numbers. ADOPTED by the Lino Lakes City Council this 271h day of May, 2025. CITY OF LINO LAKES IN ATTEST Roberta Colotti, CIVIC, City Clerk Rob Rafferty, Mayor CITY COUNCIL REGULAR MEETING STAFF REPORT AGENDA ITEM SPECIAL PRESENTATION C STAFF ORIGINATOR: Dave Pecchia, Interim City Administrator MEETING DATE: May 12, 2025 TOPIC: 111 Reading of Ordinance No. 08-25 Providing for a Fire Department VOTE REQUIRED: Simple Majority INTRODUCTION The City Council is being asked to consider the 1st Reading of Ordinance No. 08-25 Providing for a Fire Department. BACKGROUND Staff have been in the process of implementing recommendations outlined in the Citygate report which included establishing a separate Police Department and Fire Department. Therefore, we request the adoption of Ordinance No. 08-25 which creates the Lino Lakes Fire Department. The new ordinance aligns with the current organizational structure. RECOMMENDATION Staff recommends approval of 1st Reading of Ordinance No. 08-25 Providing for a Fire Department. ATTACHMENTS Ordinance No 08-25 1 1" Reading: May 12, 2025 Website Notice: May 13, 2025 2nd Reading: May 27, 2025 Publication: June 3, 2025 Adoption: May 27, 2025 Effective: July 3, 2025 CITY OF LINO LAKES ORDINANCE NO. 08-25 PROVIDING FOR A FIRE DEPARTMENT The City Council of Lino Lakes ordains: Fire Department SECTION 1: DEPARTMENT CREATED There is created a department of this city, which shall hereafter by known as the Lino Lakes Fire Department. DUTIES It shall be the responsibility of the Lino Lakes Fire Department to provide a healthy and safe community, preserve life and protect property, prevent and suppress fires, respond to and assist with emereencv medical needs. and enforce state and countv Life Safetv Codes and Citv ordinances, within the City of Lino Lakes as authorized by the City Council. FIRE CHIEF The Fire Chief shall be responsible to the City Administrator and shall make complete reports on the operation of the Lino Lakes Fire Department as requested by the Administrator or City Council. Other members of the Lino Lakes Fire Department shall be responsible and accountable to the Fire Chief, who shall be responsible for the proper training and discipline of other members. The Fire Chief may recommend to the City Administrator a suspension, without pay of any member of the Lino Lakes Fire Department for iust cause only. Suspensions without pay in excess of 30 days and recommendations for termination will require final action by the City Council. The Fire Chief shall be responsible for the annual inspection, testing and maintenance of all fire apparatus. The Fire Chief shall maintain a replacement schedule of all fire apparatus in accordance with National Fire Protection Association guidelines. RANKS Members of the Lino Lakes Fire Department. other than the Fire Chief. may be eiven a rank or designation as determined by the Fire Chief. The order of command shall flow from the Fire Chief downward in order as listed, each member being responsible to his or her superior officer. The ranks and the rules of aualification for anv of the positions shall be as established by the Citv Council. t7 resl r7 oil The Lino Lakes Fire Department shall keep a daily record of all Fire Department activities within the City, as prescribed by the City Council. Access to Fire Department records shall be in accordance with the Minnesota Data Practices Act. UNIFORMS AND EQUIPMENT All city property issued to any member of the Fire Department shall be returned, in good condition, to the City, upon termination of employment or as otherwise directed by the Fire Chief or City Administrator. Each member shall be responsible for and liable for each item and the proper care thereof while same is in his or her possession. Uniforms and equipment to perform duties will be provided to Fire Department personnel. Fire Department personnel represented by a union will be Drovided a uniform allowance Dursuant to their labor aereement. UNIFORMS — WHEN WORN Uniforms are onlv to be worn while on duty, while in transit to or from work, or at other official department functions or events. ADOPTED by the Lino Lakes City Council this 271" day of May, 2025. CITY OF LINO LAKES .31 ATTEST Roberta Colotti, CIVIC, City Clerk Rob Rafferty, Mayor CITY COUNCIL REGULAR MEETING STAFF REPORT AGENDA ITEM SPECIAL PRESENTATION D STAFF ORIGINATOR: Meg Sawyer, Human Resources and Communications Manager MEETING DATE: May 12, 2025 TOPIC: Promotion of Chief of Police VOTE REQUIRED: Simple Majority INTRODUCTION The City Council is being asked to approve the promotion of Curt Boehme to the Chief of Police position within the newly created Police Department. BACKGROUND At the April 28, 2025 City Council meeting, Citygate Associates presented its final recommendations, advising the City Council to restructure the Public Safety Department into independent Police and Fire Departments. This proposed change necessitates amending the City Ordinance and establishing two new leadership roles: Chief of Police and Fire Chief, who would oversee their respective departments. Boehme joined the Lino Lakes Police Department in 2006 as a Patrol Officer. In 2018, he was promoted to Sergeant and subsequently led the department's new officer training program. From December 2020 to December 2024, Boehme served as Investigations Unit Supervisor, overseeing a team of investigators and an investigative assistant. He successfully completed the Northwestern School of Police Staff and Command in the fall of 2023. Since February 1, 2025, Boehme has been serving as Interim Public Safety Director. Boehme holds a Bachelor of Arts in Criminology from the University of Minnesota Duluth, with a minor in Political Science. The wage for Boehme will be $73.96 per hour, which is Step 10 in a 10-step wage scale for the Chief of Police position. With Council approval, Boehme's promotion to Chief of Police will be effective May 12, 2025. RECOMMENDATION Please approve the promotion of Curt Boehme to the position of Chief of Police within the Police Department. ATTACHMENTS None CITY COUNCIL REGULAR MEETING STAFF REPORT AGENDA ITEM SPECIAL PRESENTATION E STAFF ORIGINATOR: Meg Sawyer, Human Resources and Communications Manager MEETING DATE: May 12, 2025 TOPIC: Promotion of Fire Chief VOTE REQUIRED: Simple Majority INTRODUCTION The City Council is being asked to approve the promotion of Dan L'Allier to the Fire Chief position within the newly created Fire Department. BACKGROUND At the April 28, 2025 City Council meeting, Citygate Associates presented its final recommendations, advising the City Council to restructure the Public Safety Department into independent Police and Fire Departments. This proposed change necessitates amending the City Ordinance and establishing two new leadership roles: Police Chief and Fire Chief, who would oversee their respective departments. L'Allier brings over 40 years of experience in Firefighting, Emergency Medical Services (EMS), and Emergency Management. Since joining in 2014, he has led the development of the Fire Division, including staffing models, apparatus acquisition, and the construction of Fire Station 2. Prior to coming to Lino Lakes, he served as Fire Chief/Emergency Manager/Tactical Paramedic for the Virginia Fire and EMS Department, overseeing a team of 32 full-time personnel. He has successfully led fire departments with a mix of full-time, part-time, and paid -on -call firefighters. Since February 1, 2025, L'Allier has been serving as Interim Fire Chief for the City of Lino Lakes. The wage for L'Allier will be $70.38 per hour, which is Step 8 in a 10-step wage scale for the Fire Chief position. With Council approval, L'Allier's promotion to Fire Chief will be effective May 12, 2025. RECOMMENDATION Please approve the promotion of Dan L'Allier to the position of Fire Chief within the Fire Department. ATTACHMENTS None Expenditures May 12, 2025 Check # 122721 to # 122796 $8141461.32 Significant Disbursements this Period: • GMH Asphalt Corporation - $326,447.86 2025 Street Rehabilitation Project • North Country Chevrolet GMC - $158,572.50 2025 Chevrolet Tahoe #328, #329 & #330 (2024 CIP) CHECK REGISTER FOR CITY OF LINO LAKES CHECK NUMBER 122721 - 122796 - CHECK TYPE: PAPER CHECK check Date Check vendor Name Description Amount Bank CKING POOLED CHECKING 04/25/2025 122721 CENTRAL PENSION FUND Remittance Check 7,296.00 04/25/2025 122722 NCPERS GROUP LIFE INSURANCE Remittance Check 336.00 05/12/2025 122723 1ST CHOICE DOCUMENT DESTRUCTI APRIL SHREDDING 840.00 05/12/2025 122724 ALLINA HEALTH SYSTEM MEDICAL TRAINING 1,329.50 05/12/2025 122725 AMERICAN ENGINEERING TESTING, HAZARDOUS MATERIALS TESTING WINTER PROP 2,957.55 05/12/2025 122726 ANOKA COUNTY PROPERTY RECORDS COUNTY RECORDING 92.00 05/12/2025 122727 ASPEN MILLS, INC. UNIFORM ALLOWANCE - A. RIEHM 134.96 DEPT EXP - C. SOLORZANO 133.34 UNIFORM ALLOWANCE - B. PETRIE 32.45 UNIFORM ALLOWANCE - S. BERGERON 376.55 677.30 05/12/2025 122728 BILDEAUX SERVICES LIFT 9 - TREE FALLING CONSULTATION 300.00 05/12/2025 122729 BS&A SOFTWARE LLC PERMIT APP SERVICE FEE (1124125 - 4/6/2 900.00 05/12/2025 122730 CARDINAL INVESTIGATIONS PRE -EMPLOYMENT BACKGROUND - C. KANOWITZ 471.25 05/12/2025 122731 CENTERPOINT ENERGY NATURAL GAS 2,414.30 05/12/2025 122732 CITY OF BLAINE 2ND QTR 2025 UTILITIES 4,469.52 05/12/2025 122733 CITY OF ST. PAUL ASPHALT 1,557.22 05/12/2025 122734 COMO LUBE & SUPPLIES, INC. RECYCLE 265 GALLONS OF USED OIL 35.00 05/12/2025 122735 CONNEXUS ENERGY WATERMARK PARK PAVILION ELECTRICITY 16.77 ELECTRICITY 5,920.87 5,937.64 05/12/2025 122736 CORE & MAIN LP FULL FIRE HYDRANT ASSEMBLIES 22,530.24 05/12/2025 122737 CROWN MARKING, INC. EMPLOYEE NAME PLATES (3) 104.71 05/12/2025 122738 DELL MARKETING LP COMPUTER & DOCKING STATION (3) 7,394.31 REPLACEMENT COMPUTER & DOCKING STATIONS 19,746.95 27,141.26 05/12/2025 122739 EARL F. ANDERSEN PROPOSED DEVELOPMENT SIGNS (10) 1,383.35 COMPOST DUMPING SIGNS 111.35 1,494.70 05/12/2025 122740 EMERGENCY APPARATUS MAINTENAN CHECK ENGINE/STOP ENGINE LIGHT #625 318.35 BATTERY REPAIR #620 398.01 716.36 05/12/2025 122741 ENDURANCE FITNESS OF MN, LLC MONTHLY FEE 11,665.00 05/12/2025 122742 FACTORY MOTOR PARTS COMPANY TUNE UP PARTS FOR FIRE BOAT 31.24 SPARK PLUGS #505 119.04 (2) FRONT TAHOE BRAKE PADS (STOCK) 216.48 366.76 JS/U//LUL} ll:1U ANI CHECK REGISTER FOR CITY OF LINO LAKES CHECK NUMBER 122721 - 122796 - CHECK TYPE: PAPER CHECK check Date Check vendor Name Description Amount Bank CKING POOLED CHECKING 05/12/2025 122743 FIDELITY SECURITY LIFE INSURA MAY VISION INSURANCE & RETRO CREDIT 158.15 05/12/2025 122744 GDO LAW MAY PROSECUTOR CONTRACT 8,750.00 05/12/2025 122745 GILLUND ENTERPRISES, INC. PENETRATING OIL & SILICON SPRAY LUBRICA 217.40 05/12/2025 122746 GMH ASPHALT CORPORATION 2025 STREET REHABILITATION PROJECT 326,447.86 05/12/2025 122747 HACH COMPANY WATER SAMPLING CHEMICALS 187.90 05/12/2025 122748 HAWKINS, INC. WATER TREATMENT CHEMICALS 9,505.04 05/12/2025 122749 HOTSY MINNESOTA CAR WASH SOAP 269.73 TRUCK WASH AND HOSE REEL REPAIR 947.88 1,217.61 05/12/2025 122750 HUGO PLUMBING & PUMP SERVICE ROOKERY SHOWER REPAIR & REPLACEMENT PAR 1,112.00 05/12/2025 122751 IMPERIAL DADE RAGS 49.13 JANITORIAL SUPPLIES 349.02 JANITORIAL SUPPLIES 946.12 PRODUSTER REPLACEMENT SLEEVE 12.07 1,356.34 05/12/2025 122752 IMS ALLIANCE DEPT EXP - NAMETAGS (42) 111.70 05/12/2025 122753 INFINITE HEALTH COLLABORATIVE FIRE WELLNESS PROGRAM - AFG GRANT REIMB 7,250.00 FIRE WELLNESS PROGRAM - AFG GRANT REIMB 4,200.00 11,450.00 05/12/2025 122754 INNOVATIVE OFFICE SOLUTIONS L POST IT NOTES, PAPER & PENS 187.91 05/12/2025 122755 INTOXIMETERS, INC. MOUTHPIECES 92.00 05/12/2025 122756 J. BECHER & ASSOCIATES, INC. CIVIL SIREN REPAIR 639.00 05/12/2025 122757 KLM ENGINEERING, INC. AT&T MONOPOLE DRAWING REVIEW & INSPECTI 1,500.00 05/12/2025 122758 LANGUAGE LINE SERVICES APRIL INTERPRETATION SERVICES 136.99 05/12/2025 122759 Lennar MN Division ESCROW RELEASE - 2135 NORWAY LN 1,400.00 05/12/2025 122760 LRS TOILET RENTAL - TOWER PARK 97.51 TOILET RENTAL - WATERMARK PARK 111.43 TOLIET RENTAL - BIRCH PARK 65.00 TOILET RENTAL - CITY HALL PARK 18.57 TOILET RENTAL - CLEARWATER CREEK PARK 123.04 TOILET RENTAL - HIGLAND MEADOWS PARK 123.04 TOILET RENTAL - LINO PARK 90.53 TOILET RENTAL - MARSHAN PARK 58.04 TOILET RENTAL - SUNRISE PARK 65.00 752.16 05/12/2025 122761 MACQUEEN EQUIPMENT, INC. ADAPTERS (3) & ADJUSTABLE HYDRANT WRENC 207.98 05/12/2025 122762 MENARDS - FOREST LAKE STEEL RIVETS (STOCK) 1.99 TARP (4), ANTI -FREEZE & WATER 60.80 62.79 05/12/2025 122763 MET COUNCIL ENVIRONMENTAL SER JUNE WASTE WATER SERVICES 112,082.94 05/07/2025 11:10 AM CHECK REGISTER FOR CITY OF LINO LAKES CHECK NUMBER 122721 - 122796 - CHECK TYPE: PAPER CHECK check Date Check vendor Name Description Amount Bank CKING POOLED CHECKING 05/12/2025 122764 METRO SALES INCORPORATED CITY HALL CD COPIER 191.44 CITY HALL COPY ROOM COPIER 877.71 PD COPIER CONTRACT 36.00 1,105.15 05/12/2025 122765 METRO-INET MICROSOFT OFFICE 365 LICENSE - B. POTHE 192.00 MICROSOFT OFFICE 365 LICENSE - C. SOLOR 192.00 MICROSOFT OFFICE 365 LICENSE - A. ZUHLS 192.00 576.00 05/12/2025 122766 MHSRC/RANGE TUITION - M. LASKE & C. HECK 610.00 TUITION - M. LASKE & C. HECK 610.00 1,220.00 05/12/2025 122767 MICHAEL HOFFMAN STRAW FOR TREE SALE 40.00 05/12/2025 122768 MIDWAY FORD COMPANY EXHAUST FLEXPIPE #314 193.60 05/12/2025 122769 NORTH COUNTRY CHEVROLET BUICK 2025 CHEV TAHOE #328, #329, #330 158,572.50 05/12/2025 122770 NORTHERN TOOL COMMERCIAL ACCO RECEIVER TUBE 66.48 05/12/2025 122771 NORTHWAY IRRIGATION/LANDSCAPE ROOKERY IRRIGATION START UP 223.37 05/12/2025 122772 O'REILLY AUTOMOTIVE STORES ANTI -SEIZE FOR THE SHOP 29.69 ENGINE OIL FOR FIRE BOAT 11.99 HVAC FAN BELTS 24.84 66.52 05/12/2025 122773 PLUNKETT'S PEST CONTROL INC. GENERAL PEST CONTROL (5/l/2025 - 4/30/2 741.00 05/12/2025 122774 REACH MEDIA NETWORK ANNUAL PLAYER LICENSE RENEWAL 350.00 05/12/2025 122775 REDPATH AND COMPANY LLC 2024 AUDIT - PROGRESS BILLING #2 32,000.00 05/12/2025 122776 ROBERTA COLOTTI MILEAGE REIMBURSEMENT 56.70 05/12/2025 122777 RYAN SHEA UB REFUND FOR ACCOUNT: 023797-000 200.25 05/12/2025 122778 SAFEASSURE CONSULTANTS, INC. SAFETY TRAINING 5,275.66 05/12/2025 122779 SAFETY-KLEEN SYSTEMS, INC. SOLVENT 50.42 05/12/2025 122780 SAM JONES DRIVEWAY REPAIR DUE TO WATER MAIN BREAK 2,719.20 05/12/2025 122781 SHRED -IT, C/O STERICYCLE, INC DOCUMENT DESTRUCTION 119.81 05/12/2025 122782 STAPLES INC. OFFICE SUPPLIES 231.13 05/12/2025 122783 STREICHER'S, INC. UNIFORM ALLOWANCE - M. REINEKE 339.99 REPULS SPRAY (6) 101.94 441.93 05/12/2025 122784 STRYKER SALES, LLC AED REPAIR/SERVICE 494.00 AED REPAIR/SERVICE 494.00 AED REPAIR/SERVICE 494.00 AED REPAIR/SERVICE 494.00 AED REPAIR/SERVICE 494.00 05/07/2025 11:10 AM CHECK REGISTER FOR CITY OF LINO LAKES CHECK NUMBER 122721 - 122796 - CHECK TYPE: PAPER CHECK check Date Check vendor Name Description Amount Bank CKING POOLED CHECKING AED REPAIR/SERVICE 494.00 AED REPAIR/SERVICE 494.00 AED REPAIR/SERVICE 494.00 LIFEPACK REPAIR/SERVICE 590.00 4,542.00 05/12/2025 122785 T-MOBILE USA INC CELL PHONES & WI-FI 798.60 05/12/2025 122786 TACTICAL SOLUTIONS RADAR CERTIFICATION (4) & RADAR TUNING 210.00 RECONDITIONED RADAR #319 2,009.99 2,219.99 05/12/2025 122787 TASC - CLIENT INVOICES ADMIN FEES APRIL 2025 73.70 05/12/2025 122788 TESSMAN COMPANY FERTILIZER, GRASS SEED & CHEMICALS 5,073.82 05/12/2025 122789 TIMESAVER OFF -SITE SECRETARIA CHARTER COMMISSION MINUTES 4/10/25 172.00 05/12/2025 122790 TRANS UNION LLC PRE -EMPLOYMENT CREDIT CHECK 16.49 05/12/2025 122791 TWIN CITIES TRANSPORT & RECOV TOW ICR #25074013 2010 NISSAN ALTIMA 85.00 05/12/2025 122792 UPPER CUT TREE SERVICE ASH TREE REMOVAL - 911 ORANGE ST 1,500.00 TREE REMOVAL (4) - PEREGRINE CIR 1,290.00 2,790.00 05/12/2025 122793 WINNICK SUPPLY, INC. STEEL FOR MOUNTING VISE #515 60.35 05/12/2025 122794 XCEL ENERGY ELECTRIC 21,356.38 05/12/2025 122795 ZACK'S INC. MISC HAND TOOLS 319.65 MISC HAND TOOLS 336.90 656.55 05/12/2025 122796 ZIEGLER, INC. 5 GALLONS OF CATERPILLAR HYDRAULIC FLUI 118.64 MINI EXCAVATOR RENTAL - STORM WATER MAI 1,040.00 1,158.64 CKING TOTALS: Total of 76 Checks: 814,461.32 Less 0 void Checks: 0.00 Total of 76 Disbursements: 814,461.32 05/07/2025 11:10 AM Page: 4/4 CI Electronic Funds Transfer MN Statute 471.38 Subd. 3 OF Council Meeting May 12, 2025 4/25/2025 Payroll #09 4/25/2025 Payroll #09 Federal Deposit 4/25/2025 Payroll #09 PERA 4/25/2025 Payroll #09 State 4/25/2025 Payroll #09 Child Support 4/25/2025 Payroll #09 H.S.A. Bank Pretax 4/25/2025 Payroll #09 TASC Pretax 4/25/2025 Payroll #09 Mission Sq 457 Def. Comp #301596 4/25/2025 Payroll #09 Mission Sq Roth IRA #706155 4/25/2025 Payroll #09 MSRS HCSP #98946-01 4/25/2025 Payroll #09 MSRS Def. Comp #98945-01 4/25/2025 Payroll #09 MSRS Roth IRA #98945-01 5/2/2025 Council Payroll #05 5/2/2025 Council Payroll #05 Federal Deposit 5/2/2025 Council Payroll #05 PERA 5/2/2025 Council Payroll #05 State Transfer In/(Out) (217,385.11) (61,011.27) (60,122.61) (14,124.82) (334.86) (4,106.17) (913.42) (1,950.00) (669.23) (5,211.90) (2,405.00) (1,064.00) (3,707.31) (209.14) (410.72) (44.94) Lino Lakes City Council Work Session Minutes DATE: April 28, 2025 TIME STARTED: 6:00 P.M. TIME ENDED: 6:27 P.M. LOCATION: Community Room MEMBERS PRESENT: Mayor Rafferty Councilmembers Cavegn, Lyden, Stoesz and Ruhland MEMBERS ABSENT: None Staff Members Present: Interim City Administrator Dave Pecchia, City Clerk Roberta Colotti, Community Development Director Michael Grochala, Human Resources and Communications Manager Meg Sawyer, and Interim Public Safety Director Curt Boehme. 1. Call to Order and Roll Call Mayor Rafferty called the meeting to order at 6:00 p.m. 2. Setting the Agenda: Addition or Deletion of Agenda Items The agenda was adopted as presented. 3. Administration Update The Interim City Administrator provided the following updates. • Staff have been preparing for the City Council Work Session discussion topics. • The annual spring office cleaning was completed. • Draft ordinances for the establishment of the police department and fire department have been sent to the attorney for review and will be brought forward to the Council at a future meeting. • Staff reviewed the Citygate final report which is scheduled for prestation this evening. • With the new BS&A financial software the process for entering and reviewing over -time and comp -time has been streamlined. • Community Development has been managing construction projects and road closures and working with impacted neighborhoods. • The Fire Department responded to four structure fires recently. The response was impressive from the Lino Lakes Department in addition to mutual aid. • The Fire Chief secured radios from the City of Fridley and as a result all new firefighters will be issued a radio. • The Police Department is purchasing ballistic plates for police officer vests. The new vests have a varying warranty period, up to 15 years. These are a daily wear vest. Pagel of 3 • North Metro TV reviewed the organizational chart and determined to maintain the current co -executive director leadership structure. • A construction meeting was recently held for the new public works facility. • The May 51" Work Session agenda has a number of development project topics, and as a result it is requested that the Council schedule a special work session for either May 14t" or 15t" to discuss the implementation of the Citygate report. The Council discussed the public works facility construction plans. Councilmember Lyden questioned if a carport should be added for the police department to the public works facility. Mayor Rafferty stated that he preferred to keep the public works facility separate from the police department carport. Councilmember Ruhland asked if there was the need for a sub -station for the police department. The Interim City Administrator noted that the department had a sub -station at a local bank in the past. He reviewed that as identified by the Council at a prior meeting, the police department could be expanded to the space at City Hall that is currently leased out with notice to terminate the lease. Council Consensus It was the consensus of the City Council to schedule a Special Work Session for May 14, 2025, at 6 p.m., to be held at City Hall. 4. Review Regular Agenda The City Council reviewed the regular agenda. The City Council reviewed the Building Inspector appointment scheduled for the regular meeting. Citygate representatives will be present this evening to provide an overview of the Citygate final report for the Public Safety Department and will be available to answer any questions. The Community Development Director will be presenting the engineering items on the agenda this evening. It was noted that there is a resolution approving a publication summary as part of agenda Item 6B "Consider 2nd Reading of Ordinance No. 05-25, Vacating certain street, drainage and utility easements on 701" Street and Otter Crossing South". Page 2 of 3 5. Adjournment Mayor Rafferty adjourned the meeting at 6:27 p.m. These minutes were approved at the regular Council Meeting on May 12, 2025. Roberta Colotti, CMC City Clerk Page 3 of 3 Rob Rafferty, Mayor LINO LAKES CITY COUNCIL REGULAR MEETING MINUTES DATE: April 28, 2025 TIME STARTED: 6:30 PM TIME ENDED: 9:00 PM LOCATION: City Council Chambers MEMBERS PRESENT: Mayor Rafferty, Councilmembers Cavegn, Lyden, Ruhland and Stoesz MEMBERS ABSENT: None Staff Members Present: Interim City Administrator Dave Pecchia, City Clerk Roberta Colotti, Human Resources and Communications Manager Meg Sawyer, Community Development Director Michael Grochala, Interim Public Safety Director Curt Boehme, and Interim Fire Chief Dan L'Allier. The meeting was called to order by Mayor Rafferty at 6:30 p.m. Mayor Rafferty provided an overview of the Rules of Decorum. PUBLIC COMMENT Mayor Rafferty opened the public comment period at 6:32 p.m. Scott Coggins, 15043 Thrush Street, Andover, representing the citizen group, Anoka County Election Integrity Team (ACEIT), presented a handout for the consideration of the Council. The handout addressed the approval process for the poll pads with Anoka County, city liability for damages to the poll pad under the agreement with Anoka County, and liability for any violation of MN Statute 201.225 Subd. 2 (11) related to the use of poll pads. Chris Harvey, 14845 60t" Street N., Oak Park Heights, spoke about the proposed Madinah Lakes project and universal self-interest at a family and community level. Motion to close the public comment period at 6:36 p.m. RESULT: CARRIED [5-01 MOVER: Stoesz SECONDER: Cavegn AYES: Rafferty, Cavegn, Lyden, Ruhland and Stoesz NAYS: None SETTING THE AGENDA The agenda was adopted as presented. Page 1 of 4 Lino Lakes City Council Minutes 1. CONSENT AGENDA Motion to Approve Consent Agenda Items #1A through 1L as presented. RESULT: CARRIED [5-0] MOVER: Ruhland SECONDER: Cavegn AYES: Rafferty, Cavegn, Lyden, Ruhland and Stoesz NAYS: None 2. FINANCE DEPARTMENT REPORT None 3. ADMINISTRATION DEPARTMENT REPORT A. Appointment: Building Inspector Motion to appoint Chris Chandler to the Building Inspector position at Step 7 of the wage scale for the Building Inspector position, beginning on May 21, 2025. RESULT: CARRIED [5-0] MOVER: Lyden SECONDER: Stoesz AYES: Rafferty, Cavegn, Lyden, Ruhland and Stoesz NAYS: None 4. PUBLIC SAFETY DEPARTMENT REPORT A. Citygate Final Report Representatives of Citygate presented a PowerPoint presentation overviewing the Final Report of the Operational Study of the Public Safety Department. They presented their findings, the project scope elements, and the stakeholder assessment and contributions to the report. They then presented the Police Division Assessment followed by the Fire Division Assessment. Motion to accept the Citygate Final Report to be used as a tool for the future growth of the Lino Lakes Fire Department and Police Department. RESULT: CARRIED [5-0] MOVER: Lyden SECONDER: Stoesz AYES: Rafferty, Cavegn, Lyden, Ruhland and Stoesz NAYS: None 5. PUBLIC SERVICES DEPARTMENT REPORT None Page 2 of 4 Lino Lakes City Council Minutes 6. COMMUNITY DEVELOPMENT REPORT A. Resolution No. 25-52 Motion to adopt Resolution No. 25-52 Approving Interim Use Permit for Earth Moving and Stockpiling at Rehbeins Black Dirt (PIDS #24-31-22-24-0002, #24-31-22-24-0008, and #24-31-22-24-0009. RESULT: CARRIED [5-0] MOVER: Cavegn SECONDER: Ruhland AYES: Rafferty, Cavegn, Lyden, Ruhland and Stoesz NAYS: None B. Ordinance No. 05-25 Motion to dispense with the full reading of Ordinance No. 05-25 Vacating Certain Street, Drainage, and Utility Easements (70th Street and Otter Lake Service Road, Anoka County, Minnesota) RESULT: CARRIED [5-0] MOVER: Cavegn SECONDER: Ruhland AYES: Rafferty, Cavegn, Lyden, Ruhland and Stoesz NAYS: None Motion to provide second reading and adopt Ordinance No. 05-25 Vacating Certain Street, Drainage, and Utility Easements (70th Street and Otter Lake Service Road, Anoka County, Minnesota) RESULT: CARRIED [5-0] MOVER: Cavegn SECONDER: Ruhland AYES: Rafferty, Cavegn, Lyden, Ruhland and Stoesz NAYS: None Motion to adopt Resolution No. 25-56 Approving a Summary of Ordinance No. 05-25 for Publication. RESULT: CARRIED [5-0] MOVER: Cavegn SECONDER: Ruhland AYES: Rafferty, Cavegn, Lyden, Ruhland and Stoesz NAYS: None Page 3 of 4 Lino Lakes City Council Minutes C. Resolution No. 25-44 Motion to adopt Resolution No. 25-44 Approving Site Improvement Performance Agreement with Aldi, Inc. RESULT: CARRIED [5-0] MOVER: Cavegn SECONDER: Lyden AYES: Rafferty, Cavegn, Lyden, Ruhland and Stoesz NAYS: None 7. UNFINISHED BUSINESS None 8. NEW BUSINESS None 9. NOTICES AND COMMUNICATIONS • There is a Special City Council Meeting in the community room, immediately following this evening's regular meeting. The City Council will be conducting employment contract negotiations and general business may be discussed. The full agenda is posted to the City website. • Environmental Board Meeting on April 301h at 6:30 p.m. • Economic Development Advisory Committee Meeting on May 1st at 8:00 a.m. • Local Board of Appeal and Equalization Meeting on May 51h at 5:30 p.m. • City Council Work Session at 6 p.m. and Regular Meeting at 6:30 p.m. on May 51h • Park Board Meeting on May 7th at 6:30 p.m. ADJOURNMENT Mayor Rafferty adjourned the meeting at 9:00 p.m. These minutes were approved at the City Council Meeting on May 12, 2025. Roberta Colotti, CIVIC City Clerk Rob Rafferty, Mayor Page 4 of 4 LINO LAKES CITY COUNCIL SPECIAL MEETING MINUTES DATE: April 28, 2025 TIME STARTED: 9:05 PM TIME ENDED: 9:35 PM LOCATION: City Hall Community Room MEMBERS PRESENT: Mayor Rafferty, Councilmembers Cavegn, Lyden, Ruhland and Stoesz MEMBERS ABSENT: None Staff Members Present: Interim City Administrator Dave Pecchia, City Clerk Roberta Colotti, and Human Resources and Communications Manager Meg Sawyer. The meeting was called to order by Mayor Rafferty at 9:05 PM. PUBLIC COMMENT No Comment Provided SETTING THE AGENDA The agenda was adopted as presented. 1. CONSENT AGENDA None 2. FINANCE DEPARTMENT REPORT None 3. ADMINISTRATION DEPARTMENT REPORT The Human Resources and Communications Manager presented the draft City Administrator contract. The City Council discussed the contract terms and conditions. Motion to approve the City Administrator contract as written. RESULT: CARRIED [5-0] MOVER: Ruhland SECONDER: Lyden AYES: Rafferty, Cavegn, Lyden, Ruhland and Stoesz NAYS: None Page 1 of 2 Lino Lakes City Council Minutes 4. PUBLIC SAFETY DEPARTMENT REPORT None 5. PUBLIC SERVICES DEPARTMENT REPORT None 6. COMMUNITY DEVELOPMENT REPORT None 7. UNFINISHED BUSINESS None 8. NEW BUSINESS None 9. NOTICES AND COMMUNICATIONS No Report ADJOURNMENT Mayor Rafferty adjourned the meeting at 9:35 p.m. These minutes were approved at the City Council Meeting on May 12, 2025. Roberta Colotti, CIVIC City Clerk Rob Rafferty, Mayor Page 2 of 2 Lino Lakes City Council Local Board of Appeal and Equalization Meeting Minutes DATE: May 5, 2025 TIME STARTED: 5:30 P.M. TIME ENDED: 6:35 P.M. LOCATION: Community Room MEMBERS PRESENT: Mayor Rafferty Councilmembers Cavegn, Lyden, Stoesz and Ruhland (arrived at 5:51 p.m.) MEMBERS ABSENT: None Staff Members Present: Interim City Administrator Dave Pecchia and City Clerk Roberta Colotti. Anoka County Assessor's Office Staff Present: County Assessor Alex Guggenberger County and Residential Appraiser Shawn Halligan . 1. Call to Order and Roll Call Mayor Rafferty called the meeting to order at 5:30 p.m. 2. Setting the Agenda: Addition or Deletion of Agenda Items The agenda was adopted as presented. 3. Anoka County Assessors Report Anoka County Assessor Alex Guggenberger reviewed the percentage of each type of property, the assessment and taxation timeline, sample property valuation notice, 2025 assessment information, 12-month study/sales map, median sale price vs. estimate market value comparison chart, and market value change. 4. Local Boar of Appeal and Equalization Hearing Bob Gallagher, 6911 Black Duck Drive, Lino Lakes, PID #21-31-22-42-0012 and #21-31- 22-31-0008 appeared before the Board. He requested that his property valuation be reduced based on his property having three bedrooms vs. the four to five bedrooms of comparable properties, the age of the interior finishings, and having an unfinished basement whereas comparable properties have finished and/or walkout basements. Motion to reduce the property valuation for 6911 Black Duck Drive, PID #21-31-22-42- 0012 and #21-31-22-31-0008 to $975,000. RESULT: CARRIED [5-0] MOVER: Lyden SECONDER: Cavegn AYES: Rafferty, Cavegn, Lyden, Ruhland and Stoesz NAYS: None Page l of 2 Karen Edson, 1943 Red Oak Lane, Lino Lakes, PID #26-31-22-11-0036 appeared before the Board. She requested a review of her property valuation in comparison to neighboring properties as it appeared higher than neighboring properties. The property valuation review request for 1943 Red Oak Lake, PID #26-31-22-11-0036 was referred to the Anoka County Assessor by the Board. Patricia Burrows, 47 Elm Street, Lino Lakes, PID #18-31-22-33-0056 appeared before the Board. She asked for a review of her property valuation and the pace of the property valuation increase for her property over the past 10 years as it appeared high. The property valuation review request for 47 Elm Street, Lino Lakes, PID #18-31-22-33- 0056 was referred to the Anoka County Assessor by the Board. The County Assessor read into the minutes the two property requests that were received within 10 days of tonight's hearing. • Kenneth Osowski, 1048 Pheasant Run South, Lino Lakes, PID #28-31-22-43-0021 • Ronald & Lisa Schut, 6993 Black Duck Drive, Lino Lakes, PID #21-31-22-31-0035 Motion to accept the requests into the record by 1048 Pheasant Run South, Lino Lakes, PID #28-31-22-43-0021 and 6993 Black Duck Drive, Lino Lakes, PID #21-31-22- 31-0035 as presented by the Assessor. RESULT: CARRIED [5-0] MOVER: Ruhland SECONDER: Cavegn AYES: Rafferty, Cavegn, Lyden, Ruhland and Stoesz NAYS: None 5. Adjournment Motion to adjourn the meeting at 6:35 p.m. RESULT: CARRIED [5-0] MOVER: Cavegn SECONDER: Stoesz AYES: Rafferty, Cavegn, Lyden, Ruhland and Stoesz NAYS: None These minutes were approved at the regular Council Meeting on May 12, 2025. Roberta Colotti, CMC City Clerk Page 2 of 2 Rob Rafferty, Mayor Lino Lakes City Council Work Session Minutes DATE: May 5, 2025 TIME STARTED: 6:36 P.M. TIME ENDED: 10:05 P.M. LOCATION: Community Room MEMBERS PRESENT: Mayor Rafferty Councilmembers Cavegn, Lyden, Stoesz and Ruhland MEMBERS ABSENT: None Staff Members Present: Interim City Administrator Dave Pecchia, City Clerk Roberta Colotti, Community Development Director Michael Grochala, City Planner Katie Larsen, City Engineer Diane Hankee, Environmental Coordinator Tom Hoffman, Interim Public Safety Director Curt Boehme and Interim Fire Chief Dan L'Allier. 1. Call to Order and Roll Call Mayor Rafferty called the meeting to order at 6:36 p.m. 2. Setting the Agenda: Addition or Deletion of Agenda Items Mayor Rafferty requested to add an item to the end of the agenda regarding updating the titles of the Interim Public Safety Director and Interim Fire Chief. The agenda was adopted as amended. 3. Board of Appeal / Open Book Meeting Options Anoka County Assessor Alex Guggenberger reported that there are two options for the City related to property assessments. Lino Lakes currently holds a Local Board of Appeal and Equalization meeting, and the alternative is an Open Book meeting. The Open Book meeting has the advantage of additional time to accept appeals. He stated that currently the Open Book meetings are being held at the Anoka County Government building, however, satellite locations such as city hall could be established as more cities move to an Open Book format. He stated that a resolution to move to an Open Book meeting is the procedural step to change formats. He stated that the City could return to holding a Local Board of Appeal and Equalization meeting in the future by adopting an amending resolution. The Council was generally in favor of moving to an Open Book format. Councilmember Ruhland stated that he appreciated the additional time allowed for appeals under the Open Book format but preferred the Local Board of Appeal and Equalization meeting as it provided the Council with more local control over the appeal decision. This item will be brought forward to a regular meeting for formal consideration. Pagel of 8 4. Natures Refuge North PUD Preliminary Plan/ Preliminary Plat The Community Development Director stated that the applicant, M/I Homes of Minneapolis/St. Paul, LLC, has submitted an application for Rezoning to Planned Unit Development (PUD), PUD Preliminary Plan (PPP), and Preliminary Plat (PP) approvals. The project proposes to create 93 lots on 60 acres located north of Natures Refuge and is called Natures Refuge North. He noted that the applicant has been working with the City on this project for the past two and a half years. The Community Development Director stated that the Planning and Zoning Board held a public hearing on April 9, 2025, and recommended approval with several conditions. The Community Development Director stated that this evening the Council is requested to review their plan and provide direction regarding: 1. Building Design flexibility a. Garage setback requirements / option for a decorative garage door 2. Connection to Andall Street a. Outlot B Platted for future roadway The Community Development Director stated that the builder was present and available to answer any question about the project. He stated that this item is scheduled for formal action at the May 12, 2025, City Council meeting. Council Consensus To allow for building design flexibility by allowing for the garage construction extending in front of the house, without the requirement for a porch. With a limit on the percentage of homes constructed with this exemption to the code requirements. To construct a road connecting to Andall Street to improve public safety access. With limits on construction traffic and holding on the final access/construction until the time of occupancy within the new subdivision. The Community Development Director stated that this project would be brought to the May 12t" meeting for formal action. 5. Wilkinson Waters PUD Preliminary Plan/Preliminary Plat The City Planner provided a PowerPoint presentation overviewing the Wilkinson Waters project. She stated that the applicant, Wilkinson Waters LLC, is proposing a master planned development located on North Oaks Company Inc. property south of County Road J/Ash Street/CSAH 32, west of Centerville Road/CSAH 21 and north of Wilkinson Lake Boulevard. The development contains four parcels totaling approximately 76 gross acres and consists of a mix of 340-unit residential housing types and commercial development. It was noted that they first approached the City about this project in 2015. Page 2 of 8 The City Planner stated that the Comprehensive Plan Amendment requires notice to affected jurisdictions. They have 60 days to review and comment. The 60-day deadline is May 17, 2025, so the City Council meeting date for consideration is May 27, 2025. The Planning and Zoning Board held a public hearing on April 9, 2025. Unfortunately, the notice was not mailed to all property owners within 600 ft of the development boundary so a second hearing will be held on May 14th. The City Planner introduced the developer, contractor, engineer, architect, and senior building manager who were present this evening to answer any questions about the proposed project. The City Planner reviewed the site design and amendments to the project that have been made through the planning process. She stated that there are four main questions for the Council this evening, one is the height of the proposed senior building at 55', the other is a request for an exception to the requirement to wrap the side of the four- plex's with decorative brick, the third is a question of requiring a horizontal variation in the design at the first level for the apartment, and the four is the set -back between the apartment building and four-plex. The Council reviewed the height requirements and decorative elements of the proposed buildings. The height of the building was reviewed, and it was noted that there were several decorative elements to the roofline, that the senior building would be having activities on the first floor and a 10' ceiling was requested. It was noted that the four- plex siding faced inward towards each other and the decorative siding would not therefore be as essential. The apartment building did not have horizontal design variation but did have significant vertical design variation and had varying construction design sufficient for variety. The set -back between the apartment building and four-plex may be achieved with moving the road, however, the future senior building would be impacted. The senior building future manager stated that the additional land for the senior building would allow for less slope in the parking lot and sidewalks, which would be better for residents using a wheelchair or walker. Council Consensus It was the consensus of the Council to: - Support the 55' height exemption for the building. - Support an exemption from the design requirement to wrap the four-plex with decorative brick along the side of the buildings. - Support accepting the vertical design variation of the apartment building in consideration of the horizontal design elements presented. - Direct staff to further review the set -back requirement between the apartment building and four-plex in relation to the road design and location. The City Planner stated that this project will be brought back for formal action at the May 27t" Council meeting. Page 3 of 8 6. Watershed Based Implementation Funding (WBIF) Grant The Environmental Coordinator reported that in 2022 the City Council authorized a partnership with the Rice Creek Watershed District to identify potential water quality improvements to reduce volume and sediment/nutrient loading to Rice Lake. The study evaluated potential improvements to Shenandoah Park. The City partnered with Rice Creek Watershed District to fund the final report, which was completed in December of 2022. The report included four alternatives. The Board of Water and Soil Resources (BWSR) has established the Watershed Based Implementation Funding (WBIF) Grant Program. The grant program allocates funding to each watershed area for allocation in a collaborative local process. City staff and RCWD have proposed the Shenandoah project for funding through this program. The City of Lino Lakes was selected as one of the projects moving forward as part of the grant program. The grant in the amount of $52,650 is to complete plans for a stormwater improvement project. Grants must be completed and signed no later than June 1, 2025. Grant documents should be available for final signature at the May 12, 2025, City Council meeting. Once the design is completed the City and RCWD will pursue additional construction funding through the program to complete the proposed project. 7. Birchwood Acres Pond Treatment The Environmental Coordinator stated that staff have received feedback from concerned residents regarding the aesthetic quality of storm pond RLA-010-B located in Birchwood Acres Park. This pond treats stormwater runoff from nearly 70 properties located primarily on Hawthorn Road and Lonesome Pine Trail in the Park Grove development. Communication has gone back several years to deal with concerns of vegetation, smell, and stormwater management. The main concerns include the vegetation that covers the surface of the pond and odor. The vegetation present on this pond is primarily duckweed, which provides water purification by incorporating nutrients. It is also an important food source for wildlife. The odor is primarily due to decomposition of plants and algae. The Environmental Coordinator stated that in response to residents' concerns, city staff took steps to ensure the pond was functioning properly. The city also initiated water quality sampling to check phosphorous levels in September of 2020. The phosphorus detected was at levels typical for stormwater ponds. The pond was also surveyed in July of 2021 to determine its functionality in terms of stormwater management. The survey and associated analysis found that the pond is functional and does not require additional maintenance at this time. Page 4 of 8 The Environmental Coordinator stated that the question for the Council, is given that this pond is part of the city stormwater system and any amendment to one pond may impact the overall system, is there support for allowing a pilot project by private residents to improve the aesthetic quality of the pond. Council Consensus It was the consensus of the Council to support a privately funded pilot project for stormwater pond RLA-010-B located in Birchwood Acres Park. 8. 1-35E Joint Powers Agreement The Community Development Director stated that Ramsey County is preparing to solicit bids and award a contract for the improvements for 1-35E/CR J interchange improvements. The overall project cost is estimated at $23,761,410.60. Federal funds are available for the Project and are capped at $19,000,000.00. The City's share of the proposed improvements is $318,509.60. The Community Development Director stated that staff are still reviewing responsibilities with maintenance of the interchange roundabouts and street lighting. The City will be entering into the agreement with Anoka County. Anoka County and Ramsey County will have a master agreement in place covering the overall project costs. Landscaping improvements to the Centerville/CRJ roundabout are in addition to these costs. The portion of the project will likely be bid in 2026. Council Consensus It was the consensus of the City Council to schedule a review of the JPA for May 12, 2025, pending resolution of the interchange roundabout and street lighting maintenance and electric costs. 9. Special Assessment Senior Deferral Code Update The Community Development Director reported that Minnesota Statutes Chapter 435.193 allows cities to provide a hardship assessment deferral, provided standards are adopted establishing guidelines for determining the existence of hardship. City Code section 303.10 allows for the City Council to defer payment of special assessments on homestead property owned by a person that is 65 years of age or older or retired by virtue of permanent and total disability. The deferment is subject to certain income - related conditions. The Community Development Director stated that the ordinance has not been updated since 1983. He noted that the ordinance has three considerations for determining income and it's recommended that the city delete the two static factors and keeps the first factor that is annually adjusted as it relates to the low-income limits in effect at the time of the application for the metro area. Page 5 of 8 Councilmember Ruhland stated that there are county/state programs that the City could follow. The Community Development Director stated that staff would research other governmental programs and prepare an amendment as needed for the future consideration of the Council. 10. Liquor License Fees The City Clerk stated that business license renewal time is approaching, and the City has received a request from a local restaurant to split the payment of the annual license fees. It is requested that the Council provide direction regarding allowing the annual On - Sale Intoxication Liquor and Sunday Sales license fees to be paid in part at the time of application and then in full by or before December 31, 2025. This would be available to all restaurants upon request and the full license fee would be indicated on the renewal notice. Council Consensus It was the Consensus of the City Council to approve a split payment for On -Sale Intoxicating Liquor and Sunday Sales licenses with half payment due at the time of application and half payment due by or before December 31, 2025, upon request of the applicant. 11. Citygate Report — Interim Titles (Added Item) Mayor Rafferty requested that the staff holding the Interim titles for Public Safety Director, Fire Chief and Acting titles for the Sergeant title be confirmed as regular positions, removing the interim and acting titles, based on the future direction recommended by the Citygate report. Council Consensus It was the consensus of the City Council to schedule the appointment of the Police Chief, Fire Chief and Sergeants for the May 12, 2025, meeting, including the recognition ceremony for the Fire and Police Chief appointments. 12. Administration Report The Interim City Administrator provided the following updates. • The City Attorney has been researching and will have a draft prepared for the May 12t" meeting of the ordinance amendments for the establishment of a police department and fire department and repeal of the ordinance establishing a public safety department. • Administration, Human Resources and Finance staff have been reviewing the Citygate study implementation costs and processes. The Council will be presented with options and associated costs at the May 14t" Work Session. Page 6 of 8 • The Human Resources Department has reviewed the process for removing the Interim titles for the public safety staff. • The Human Resources and Communications Manager and Community Development Director revised the Community Development Specialist job description. This person is identified as the back-up for the Community Development staff. • The Administrative Assistant role has been reviewed as this person should become knowledgeable about all administrative operations so that they can fill in if needed due to a vacancy or absence in the administration department. • The Finance Department has been working on streamlining the "Injury on Duty" policies and procedures. • The Administration and Human Resources Departments have been working on the new recruitment and promotional process for the Police Department. The promotional process information will be made available to all staff. • The contract with the new City Administrator has been signed. The new Administrator is being notified of upcoming events and key meetings and will be attending certain meetings based on topic and availability. • The Community Development Director responded to the draft State Senate File 2229 regarding city zoning authority. • The public works facility construction manager contract is scheduled for the next Council meeting. • The contract with Citygate was extended to July 1, 2025, at no cost. This will allow the new City Administrator, the Council and staff to contact Citygate for more information about the report during the time of implementation. Councilmember Ruhland reported that there are several cities hiring Finance Directors and asked about the timing and process for hiring a Finance Director, following the conclusion of the contract for services with the Lino Lakes Interim Finance Director. The Interim City Administrator stated that the Human Resources Department has recommended that the hiring process be conducted in-house vs. hiring a firm to complete the search. The Interim Finance Director has reported that there are several qualified candidates that she would anticipate would be interested in the position. The timing of the hiring is proposed to correspond with the onboarding of the new City Administrator so that she can be part of the selection process. 13. Notices and Communications, City Council Mayor Rafferty reported that he was unable to attend the last VLAMO meeting. Page 7 of 8 Councilmember Stoesz reported that the parade route for Blue Heron Days had been updated since the last notice of the change in the route. 14. Adjournment Mayor Rafferty adjourned the meeting at 10:05 p.m. These minutes were approved at the regular Council Meeting on May 12, 2025. Roberta Colotti, CMC City Clerk Page 8 of 8 Rob Rafferty, Mayor CITY COUNCIL REGULAR MEETING STAFF REPORT AGENDA ITEM 1G STAFF ORIGINATOR: Meg Sawyer, Human Resources and Communications Manager MEETING DATE: May 12, 2025 TOPIC: Approval of the Hiring of Part -Time Staff for the Rookery Activity Center VOTE REQUIRED: Simple Majority INTRODUCTION The Council is being asked to approve the hiring of part-time staff for The Rookery. BACKGROUND Staff is seeking approval to hire part-time personnel to work at The Rookery. The recruiting process has identified candidates that will be a great addition to our staff at The Rookery. Staff recommends the Council approve the hiring of the part-time personnel listed below: First Name Last Name Title Kenley Smith Child Watch Attendant Grace Walker Child Watch Attendant Abigail Heath Child Watch Attendant Madelyn Smit Child Watch Attendant Nelly Clayton Child Watch Attendant Marisol Escobedo Manager on Duty Michael Fulton Lifeguard Meadow Babineau Child Watch Attendant Start dates vary based on position and training schedule. Please approve the above personnel for the part-time positions at The Rookery Activity Center. CITY COUNCIL REGULAR MEETING STAFF REPORT AGENDA ITEM 3A TAFF ORIGINATOR: Meg Sawyer, Human Resources and Communications Manager MEETING DATE: May 12, 2025 TOPIC: Restructuring of Police Department VOTE REQUIRED: Simple Majority INTRODUCTION The City Council is being asked to approve the restructuring of the Police Department and eliminating the positions of Deputy Director of Police and Police Captain. BACKGROUND At the April 28, 2025 City Council meeting, Citygate Associates recommended restructuring the Public Safety Department into separate Police and Fire Departments. Citygate also advised making organizational changes within the Police Department, which requires removing the Deputy Director of Police and Police Captain positions. With Council approval, the Deputy Director of Police and Police Captain will transition to the role of Police Sergeant as of May 17, 2025. Please approve the restructuring of the Police Department and eliminating the positions of Deputy Director of Police and Police Captain. ATTACHMENTS None CITY COUNCIL REGULAR MEETING STAFF REPORT AGENDA ITEM 313 STAFF ORIGINATOR: Meg Sawyer, Human Resources and Communications Manager MEETING DATE: May 12, 2025 TOPIC: Consider Appointment of Part -Time Firefighter VOTE REQUIRED: Simple Majority INTRODUCTION The City Council is being asked to approve the appointment of Benjamin Miller to the Part -Time Firefighter position within the Public Safety Department. BACKGROUND Staff has provided a conditional offer and is recommending the approval of Miller for the part- time position. Miller has completed Firefighter 1 & 2 as well as Hazardous Materials training and certification, and has been working as a Paid On -Call Firefighter for the City of Lino Lakes since January 16, 2025. The starting wage for Miller will be $26.27 per hour, which is Step 1 of a 7 step wage scale for the Part -Time Firefighting position. With the Council's approval, Miller would start in the position on May 19, 2025. The Public Safety Department currently has 14 Part -Time Firefighters on staff. RECOMMENDATION Please approve the appointment of Benjamin Miller to the Part -Time Firefighter position. ATTACHMENTS None CITY COUNCIL REGULAR MEETING STAFF REPORT AGENDA ITEM 3C STAFF ORIGINATOR: Meg Sawyer, Human Resources and Communications Manager MEETING DATE: May 12, 2025 TOPIC: Consider Appointment of Police Officer VOTE REQUIRED: Simple Majority INTRODUCTION The City Council is being asked to approve the appointment of Kayla McKinney to the Police Officer position within the Police Department. BACKGROUND Staff has completed the recruitment process, provided a conditional offer, and is recommending the approval of McKinney for the full-time position. McKinney will earn an Associate's Degree in Criminal Justice and Law Enforcement Transfer Pathway through Century College and complete her POST mandated Law Enforcement curriculum in Summer of 2025. McKinney has been working as a part-time Community Service Officer in the Lino Lakes Public Safety Department since February 2024. The starting wage for McKinney will be $42.22 per hour, which is Step 1 in a 7-step wage scale for the Police Officer position. With the Council's approval, McKinney will start in the Police Officer position once she receives her POST licensure. There are currently two vacant Police Officer positions within the Public Safety Department. The 2025 Approved Budget is funded for 28 sworn positions. The hiring of McKinney as an officer will bring the police department to 28 sworn staff. Approval of this request will not result in an increase to personnel cost for the police department. RECOMMENDATION Please approve the appointment of Kayla McKinney to the Police Officer position. ATTACHMENTS None CITY COUNCIL REGULAR MEETING STAFF REPORT AGENDA ITEM SA STAFF ORIGINATOR: Justin Williams, Public Works Superintendent MEETING DATE: May 12th, 2025 TOPIC: Consider Resolution No. 25-59 Replacement of 2004 Olympian 30kW Generator— Lift Station 53 Backup Power VOTE REQUIRED: Simple Majority INTRODUCTION Requesting approval for the replacement of a 2004 Olympian 30kW natural gas generator that provides emergency power to Lift Station 53 (6300 Laurene Ave), a critical lift station, using funds from the Sewer Capital Equipment account. BACKGROUND The existing generator was installed in 2004 and has served as the primary backup power source for lift station 53. Due to its age and wear, the reliability of the unit has become inconsistent, raising concerns about its ability to operate when needed during power outages. The short retention time at this lift station allows for only a narrow window before backups occur, making dependable emergency power essential to prevent sanitary sewer overflows and protect public health and the environment. This generator is currently scheduled for replacement in 2026 as part of the long-term capital replacement plan. However, due to its declining reliability and the critical nature of the lift station it serves, staff recommends advancing the replacement timeline. RECOMMENDATION Staff recommends the immediate replacement of the 2004 Olympian 30kW generator. New 40kW generators are currently in stock and available for purchase, which allows for timely procurement and installation. Turn key generator replacement cost is $37,375.00. Funding Source is the Sewer Capital Equipment Fund ATTACHMENTS Resolution 25-59 Turn Key Generator Replacement Quote CITY OF LINO LAKES RESOLUTION NO. 25-59 Replacement of 2004 Olympian 30kW Generator — Lift Station 53 Backup Power WHEREAS, the 2004 Olympian 30kW natural gas generator currently provides emergency backup power to Lift Station 53, a critical piece of the City's sanitary sewer infrastructure; and WHEREAS, the generator, originally installed in 2004, has experienced increasing reliability issues due to age and wear, raising concerns about its ability to perform during power outages; and WHEREAS, Lift Station 53 has a short retention time, allowing for only a narrow window to respond before backups occur, which makes reliable emergency power essential to protecting public health and the environment; and Whereas, this generator is currently scheduled for replacement in 2026 under the City's long-term capital improvement plan, staff recommends advancing the timeline due to the unit's declining reliability and the critical nature of its role. NOW, THEREFORE, BE IT RESOLVED by the City Council of Lino Lakes, Minnesota that approval is hereby granted for the early replacement of the 2004 Olympian 30kW generator serving Lift Station 53. BE IT FURTHER RESOLVED that funding for this replacement shall be the Sewer Capital Equipment Fund, and staff is authorized to proceed with the procurement and installation of a new 40kW generator as recommended. Adopted by the City Council of the City of Lino Lakes this 12th day of May, 2025. Rob Rafferty, Mayor ATTEST: Roberta Colotti, CIVIC, City Clerk INTFI%STATro Stanford Blackburn General Sales Manager POWER SYSTEMS Mobile:952-836-9091 21568 Highview Ave. Stanford.bIackburn@istate.com Lakeville, MN 55044 TO: Justin Williams, City of Lino Lakes 4-24-2025 Interstate Power Systems proposes the following generator with installation at Laurene Lift Station MTU GS40 Natural Gas Generator GENERATOR: 40 kW, 50kVA, 120 amps, 1800 RPM VOLTAGE: 120/240v 3 phase ENGINE: Ford 4.3L, 60 Hz, NG, EPA -Certified Selected Features Included: Steel Sub Base, Battery Cables, Oil Drain Extension, Lube Oil and Anti -freeze Electronic Isochronous Governor + / - .25% UL2200 Listed 130 Degree Rise Alternator Secondary Fuel Regulator Installed Selected Features Included: Lube Oil and Anti -freeze Isochronous Governor + / - .25% 2 Year / 3,000 Hour Comprehensive Standby Limited Warranty UL2200, 130° Temperature Rise CONTROL PANEL: Basler MGC-1510 The expanded Digital Genset Controller utilizes microprocessor based technology to provide a versatile system for genset control, protection, monitoring and event logging. 4 relay board. ENCLOSURE: Steel Enclosure includes bolt together construction with 14- gauge material, lockable hinged doors, keyed alike, a fixed storm proof air intake louver and expanded metal air discharge, muffler support brackets and exhaust piping allowing the muffler to be mounted internally, including rain cap. 1.5" sound attenuating foam. COOLING SYSTEM: Unit Mounted Radiator, 50 Degree Rise CIRCUIT BREAKER: Square D, 100 amps, Mounted and Wired BATTERY: Lead Acid Battery 370 CCA, Unit Mounted Steel Rack BATTERY CHARGER: 12v, 6 Amp, mounted and wired COOLANT HEATER: 120V, 1,000 Watts, Mounted and Wired MUFFLER: Critical Grade Internally Mounted Silencer • Labor to disconnect the existing generator, pull out existing feeders and control wiring • Labor to assist removing and setting with crane contractor • Allowance to re -connect control wiring and shore power • Electric permit • Labor for natural gas piping and connections • Replace Maxitrol with new Itron primary regulator • Crane service, haul away and dispose of old generator MTU 40kW Natural Gas Generator Set $28,975.00 Electrical & Mechanical installation $8,400.00 Total Proposal Price $37,375.00 MTU 40kW Generator is in Interstate's inventory. Freight to jobsite and crane service included. Start-up and testing by Interstate field service technician. Any applicable sales tax not included. Quote valid for 30 days. 2 I IPM . Rsr XTE Energy Systems TERMS AND CONDITIONS GENERAL: Stenographical and clerical errors are subject to correction. Orders resulting from quotations become contracts only upon issuance of our formal acknowledgment. These terms and conditions and our invoice terms and conditions attached hereto are a complete statement of the agreement between us and you. In no event shall we be bound to any other agreement, term, or condition that is contained in an outside agreement between you and any other party unless expressly consented to by us in writing. LIABILITY: Orders are accepted by us under the condition that we are not to be liable for losses or delays caused by strikes, accidents, fires or any other cause beyond our control. Damage resulting from improper storage or handling prior to placing products in service will not be considered our liability. We will not assume any responsibility, expense or liability for repairs made without our written consent. WE SHALL NOT BE LIABLE FOR ANY DAMAGES CAUSED BY THE PRODUCTS DELIVERED OR TO BE DELIVERED TO YOU, OR BY YOU OR ANY THIRD PARTY'S USE OF SUCH PRODUCTS. IN NO EVENT SHALL WE BE RESPONSIBLE FOR ANY INCIDENTAL, CONSEQUENTIAL, OR LIQUIDATED DAMAGES ASSOCIATED WITH THIS AGREEMENT. RETURNED MATERIAL: No material may be returned without first obtaining written approval, and no claim will be allowed nor credit given for material returned without such written approval. It is your duty to inspect goods within ten days after receipt. SHIPMENT: Our responsibility ceases with the delivery of merchandise in good order to transportation companies. Claims for shortage or damage in transit must be made by the customer against the carrier. In the absence of definite shipping instructions, we reserve the right to ship all material, upon completion, by any public carrier which in our opinion is satisfactory. PRICING; PAYMENT FOR GOODS AND SERVICES: Prices, quotations, specifications and other terms and all statements appearing in the Seller's sales literature and otherwise made by the Seller are subject to change without notice, including as a result of changes in market conditions, increases in raw materials, component, labor or overhead costs or because of labor disruptions or fluctuations in production volumes. Without limiting the generality of the foregoing, all prices are subject to and shall be increased by sales tax where applicable. 100% of invoice due within 30 days of delivery of equipment. TAXES: State and local sales and use taxes and excise taxes, where applicable, are in addition to quoted prices and will be billed unless the purchaser promptly certifies that the goods are for resale or are otherwise exempt. WARRANTY: WE WARRANTY ONLY THAT THE PRODUCTS CONFORM TO THE SPECIFICATIONS SET FORTH ON THE FACE HEREOF OR AS THE MANUFACTURER MAY PROVIDE. ALL WARRANTIES ON PRODUCTS, PARTS AND/OR MATERIALS PROVIDED BY US SHALL BE ONLY THE WARRANTY PROVIDED BY THE APPLICABLE MANUFACTURER OF SUCH PRODUCTS, PARTS OR MATERIALS AND SUCH WARRANTIES MAY BE AND HEREBY ARE PASSED THROUGH FROM US TO YOU. WE MAKE NO WARRANTIES, EXPRESS OR IMPLIED, OF MERCHANTABILITY, OR FITNESS FOR A PARTICULAR PURPOSE OR OTHERWISE, EXCEPT AS SET FORTH IN THE PRECEDING SENTENCE OR ON THE FACE HEREOF. IF SERVICES WILL BE PROVIDED BY US PURSUANT TO THIS AGREEMENT, THOSE SERVICES WILL BE SUBJECT TO INTERSTATE'S SERVICE WARRANTY. Signature below signifies approval and authorization to proceed with the purchase of equipment outlined in this proposal and acknowledges Interstate PowerSystems' terms and conditions above, including the Code of Conduct, Service Warranty, and General Terms & Conditions, which are expressly incorporated herein by reference, and are available at http://www.istate.com/about/terms-and-conditions or in hard copy upon request. Print Name: Title: Signature: Date: www.istate.com It ROTATE Energy Systems GENERAL TERMS AND CONDITIONS Formation of Contract 1.1 These terms and conditions constitute a complete statement of the agreement between the Buyer and Interstate Companies, Inc. (Seller) or its subsidiaries or operating divisions, or Istate Truck, Inc. or its subsidiaries or operating divisions, which shall not be supplemented or amended except as set forth on the face of this invoice or by separate written agreement signed by both parties. Provisions set forth on the face hereof shall govern, where inconsistent with these terms and conditions. 1.2 Terms and conditions of the buyer additional to or varying from those of this Invoice shall not be binding on the Seller unless specifically agreed to in writing by the Seller. The Seller's acceptance or acknowledgement of the Buyer's purchase orders or shipping instructions shall not constitute such written agreement. If this Invoice shall be deemed an acceptance of a prior offer by the Buyer, such acceptance is expressly conditional on the Buyer's assent to any additional or different terms contained herein. 2. Acceptance 2.1 No offers, arrangements or orders shall be binding on the Seller unless and until confirmed by the Seller in writing. 2.2 Acceptance by the Buyer of delivery of all or any part of the products sold hereunder shall be an acknowledgement and acceptance by the Buyer of these Terms and Conditions, whether or not the Buyer shall have first received this Invoice. 3. Price and Payment 3.1 The price shall be as specified on the face of this Invoice. 3.2 Prices, quotations, specifications and other terms and all statements appearing in the Seller's sales literature and otherwise made by the Seller are subject to change without notice. The Seller is not responsible for typographical errors made in any of its publications or stenographic or clerical errors made in preparation of quotations. All such errors are subject to correction. Without limiting the generality of the foregoing, all prices are subject to and shall be increased by sales tax where applicable. 3.3 Payment of the selling price and additional costs are due in accordance with the terms set forth on the face of this Invoice. All payments hereunder shall be made to Seller at 2601 East 80th Street, Minneapolis, MN 55425. Complaints or claims by the Buyer shall not impair the Seller's right to payment as provided hereunder and any adjustments to be made as a result of such complaints shall be made subsequent to such payment. 3.4 If the credit of the Buyer shall at any time, in the sole judgement of the Seller, become impaired, the Seller may at, its option, and without incurring any liability therefor, divert or prevent the discharge of shipments en route to the Buyer and cancel the unfilled portion of the contract, or require the Buyer to give such security as the Seller may specify to ensure payment or require payment in advance before making any further shipment. All costs and expenses incurred by the Seller as a result of its exercise of any right or option under this paragraph shall be for the account of the Buyer. www.istate.com 1wri RsrATE Energy Systems 3.5 Prompt payment is of the essence of this contract and a default in any payment will, at the option of the Seller, operate as a breach of the entire contract. Past due payments shall bear interest computed monthly at a rate of 1'/2 percent per month on the outstanding balance, or such lower rate as shall be the highest allowable under applicable law. 3.6 The Buyer shall be in default hereunder if any one or more of the following events occurs: (a) the Buyer shall default in fulfilling any of its obligations to Seller; (b) a receiver, liquidator or trustee of the Buyer, or of any of its property, is appointed by court order; (c) the Buyer is adjudicated bankrupt or insolvent; (d) any property of the Buyer is sequestered by court order; (e) a petition is filed by or against the Buyer under any bankruptcy, reorganization, arrangement, insolvency, moratorium, readjustment of debt, dissolution or liquidation law of any jurisdiction; (f) the Buyer becomes insolvent, makes an assignment for the benefit of its creditors; admits in writing its inability to pay its debts generally as they become due, or consents to the appointment of a receiver, trustee or liquidator of the Buyer or of all or any substantial part of its property in the event of such default, all unpaid payments shall, at the Seller's option, become immediately due and payable and the Seller shall have the right to consider its contract with the Buyer cancelled and to recover damages, and shall further have all rights and remedies, including those of a secured party, provided by applicable law. For purposes of this paragraph "Buyer" shall include any corporation controlling, controlled by, or under the common control with Buyer. 3.7 All costs incurred by the Seller as a result of non-payment or delay in payment by the Buyer, including, without limitation collection costs and reasonable attorney's fees, shall be paid by Buyer. 4. DISCLAIMER OF WARRANTY THE SELLER WARRANTS THAT THE PRODUCTS CONFORM TO THE SPECIFICATIONS SET FORTH ON THE FACE HEREOF OR AS THE MANUFACTURER MAY PROVIDE. THE SELLER MAKES NO WARRANTIES, EXPRESS OR IMPLIED, OF MERCHANTABILITY, FITNESS OR OTHERWISE, EXCEPT AS SET FORTH IN THE PRECEDING SENTENCE OR ON THE FACE HEREOF. Remedies of Buyer 5.1 Seller shall not be liable for any claim arising in connection with the products sold to the Buyer hereunder unless written notice is given by the Buyer to the Seller as provided in paragraph 5.2 below. 5.2 Written notice of any objection, complaint or claim concerning the product must be given: (a) with respect to claims of damage to the products which occurred in transit, within thirty (30) days after the date on which risk of loss with respect to the products passes to the Buyer. (b) with respect to claims of non -conformity to specifications, within ninety (90) days following the date on which risk of loss with respect to the products passes to the Buyer, provided however, that no claim of non -conformity will be honored if the Buyer has previously notified the Seller of its acceptance of the product following inspection thereof. 5.3 Failure to give such notice in the manner and within the time provided herein shall be deemed a waiver by the Buyer of all claims with respect to such products. 5.4 Seller will, at its sole discretion, either reimburse Seller's Invoice value to the Buyer of products found to be defective, or replace free of charge all products found to be defective, within thirty (30) days after the date of notice with respect to any such product was given in accordance with www.istate.com 1WrERSrA,TE Energy Systems paragraph 5.2 above; provided, however, that such products have not been abused by the Buyer or used in conditions for which the products were not intended. The aforesaid right of replacement or reimbursement shall be the Buyer's sole and exclusive remedy in the event of non -conformity or defect in the products. The Seller shall not be liable for the incidental or consequential damages to the Buyer as a result of the Seller's breach of Contract. In no event shall the Seller's liability exceed the Seller's Invoice value to the Buyer of the products sold regardless of the nature of the claim of the Buyer. 6. Passage of Title — Security Interest 6.1 Seller shall retain title to ownership of, and security interest in the products until the contract purchase price set forth on the face hereof shall have been paid in full and all covenants and agreements of Buyer herein shall have been performed. Seller shall have all common law and statutory lien rights available in the state where goods or services are provided and Buyer hereby agrees that if Buyer takes possession of the related equipment without making payment to Seller and thereafter Seller regains lawful possession of the equipment that was once subject to lien claims while there remains a balance due Seller, all such lien rights shall be reinstated as if Seller had always maintained lawful possession of all such equipment. 6.2 At the request of Seller, Buyer shall execute and deliver to Seller all such financing statement and other instruments and documents as may be requested by Seller to evidence and to perfect its security interest in the products. Expenses of filing financing statements or other security documents with the appropriate state and local governmental authorities shall be for the account of the Buyer. 7. Force Majeure 7.1 If because of force majeure the Seller is unable to carry out any of its obligations under this agreement and if the Seller promptly notifies the Buyer in writing expressly claiming such force majeure, then the provisions of paragraph 7.2 shall apply. The term "force majeure" as used herein shall mean any causes reasonably beyond the control and without fault or negligence of the Seller which holly or in substantial part prevent the manufacture, transportation, loading, unloading, delivery or storage of the products sold hereunder. Examples, without limitation, of force majeure are acts of God, acts of the public enemy, acts of war, riot or civil commotion, labor disputes, labor or material shortages, accidents, fire, explosions, floods, breakdowns of or damage of plants, equipment or facilities, partial or complete embargoes imposed by originating or connecting inland carriers, interruptions to or contingencies of transportation, orders or acts of any governmental authority, acts, rules, regulations or expressed policies of any government. 7.2 If force majeure notice is given under paragraph 7.1 above, the obligations of the Seller shall be suspended to the extent made necessary for such force majeure and during its continuance, if the obligations of the Seller remain suspended hereunder for a period amounting to forty-five (45) consecutive days measured from the dates of performance and at any time thereafter, then either party may terminate the agreement without liability by giving fifteen (15) days notice to the other party. At the expiration of said fifteen (15) days, unless such condition shall have been ended, the party giving such notice may terminate this agreement forthwith. 8. LIABILITY FOR DAMAGES 8.1 THE SELLER SHALL NOT BE LIABLE FOR ANY DAMAGES CAUSED BY THE PRODUCTS DELIVERED OR TO BE DELIVERED TO THE BUYER, OR BY THE www.istate.com 7 [Ul 1WrERS'1^i =' Energy Systems BUYER'S OR ANY THIRD PARTY'S USE OF SUCH PRODUCTS, AFTER THE PRODUCTS HAVE BEEN IDENTIFIED TO THE CONTRACT. 8.2 THE SELLER'S OBLIGATIONS HEREUNDER ARE EXPRESSLY SUBJECT TO THE OCCURRENCE OF EVENTS OF FORCE MAJEURE, AND NO LIABILITY SHALL BE INCURRED BY SELLER FOR DAMAGES OF ANY NATURE RESULTING FROM SUSPENSION, REDUCTION OR TERMINATION OF DELIVERIES FOR REASONS OF FORCE MAJEURE, OR FROM SELLER'S COMPLIANCE WITH ANY GOVERNMENT ACTION. 8.3 THE BUYER SHALL HOLD THE SELLER HARMLESS FROM ALL CLAIMS OR ACTIONS BROUGHT BY THIRD PARTIES WITH RESPECT TO ANY DAMAGES DESCRIBED IN THIS ARTICLE 8. Waiver — Severability of Terms 9.1 Waiver by the Seller of any default of the Buyer shall not be deemed a waiver of any other default of the Buyer. The express provision herein for certain rights and remedies of the Seller shall not be construed to deprive the Seller of any other rights and remedies to which it would otherwise be entitled under applicable law. 9.2 The invalidity of any provision of these Terms and Conditions shall not affect the remaining provisions hereof. Governing Law — Notice 10.1 This Invoice shall be interpreted in accordance with the internal laws of the State of Minnesota (without giving effect to its conflicts of laws rules) including, without limitation, the Uniform Commercial Code as enacted and in force from time to time in the State of Minnesota and no presumption shall be deemed to exist in favor or against either party as a result of the preparation and/or negotiation of this Invoice. 10.2 This Invoice and all the terms and conditions hereof shall be binding upon the Parties and their respective successors and assigns, however, the Buyer shall not assign or otherwise transfer any of its rights or obligations hereunder without the prior written consent of the Seller. 10.3 The parties hereto submit to the jurisdiction of the courts of the State of Minnesota (including Hennepin County Conciliation Court), and the Minnesota Federal Courts. The parties hereto also agree to service of any complaint by certified mail. To the extent that the Buyer or any of its property has or may hereafter acquire any right of sovereign immunity from suit, the Buyer hereby irrevocably waives any such right of sovereign immunity in respect of its obligations, rights and duties under this agreement. 10.4 Notices or other communications shall be given by telex or telegram, or by registered or certified mail, return receipt requested. Telex or telegram notice shall be deemed received twelve hours after transmission. Mail notice shall be deemed received on the fifth day after mailing (or on the next business day if the fifth day is not a business day). Where both methods of notice are used, the earlier shall establish the effective date of notice. Notice shall be given to the address of a parry as stated on the face hereof until appropriate notice otherwise www.istate.com CITY COUNCIL REGULAR MEETING STAFF REPORT AGENDA ITEM 6A STAFF ORIGINATOR: Michael Grochala, Community Development Director MEETING DATE: May 12, 2025 TOPIC: Natures Refuge North Consider 1st Reading of Ordinance No. 09-25, Rezoning Property from R-X, Rural Executive to PUD, Planned Unit Development ii. Consider Resolution No. 25-61, Approving PUD Preliminary Plan and Preliminary Plat, Natures Refuge North VOTE REQUIRED: Simple Majority INTRODUCTION Staff is requesting City Council consideration to approve the 1st Reading of Ordinance No. 09-25 from R-X, Rural Executive to PUD, Planned Unit Development and Resolution No. 25-61, PUD Preliminary Plan and Preliminary Plat approval. Review schedule: Complete Application Date: March 12, 2025 60-Day Review Deadline: May 11, 2025 60-Day Extension Deadline: July 10, 2025 Environmental Board Meeting: March 26, 2025 Park Board Meeting: April 2, 2025 Planning & Zoning Board Meeting: April 9, 2025 City Council Work Session: May 5, 2025 City Council Meeting: May 12, 2025 BACKGROUND 1 The applicant, M/I Homes of Minneapolis/St. Paul, LLC, originally submitted a land application for PUD Concept Plan ("concept plan") review in October of 2023. The proposed development, called Natures Refuge North, includes 2 parcels totaling approximately 60 gross acres located immediately north of the Natures Refuge development. In addition to advisory board and City Council review a neighborhood meeting was held on February 6, 2024. Concerns raised during the review process included development density, proximity of new housing to existing Arena Acres neighborhood, traffic and safety concerns with connection to Andall Street, impact on trees, wetlands and wildlife and garage sizes. Based on comments received from advisory boards, City Council review and the neighborhood meeting a revised concept was received in July of 2024. The revised concept plan application reduced the number of lots by 16 (converting them all to 60-foot-wide villa lots), increased the buffer to Arena Acres by at least 110 feet, reduced the proposed tree removal, and reduced the net density by 0.38 units per acre. The concept plan was reviewed by the City's Advisory Boards and City Council. The applicant has now submitted a PUD Preliminary Plan (PPP), Preliminary Plat and Rezoning to PUD for consideration. This staff report is based on the following submittals: • Narrative prepared by M/I Homes of Minneapolis/St. Paul dated April 22, 2025 • Preliminary Plat and Civil Plans prepared by Carlson McCain dated April 25, 2025 • Land Use Plan prepared by Carlson McCain dated March 4, 2025 • Sanitary Sewer Exhibit prepared by Carlson McCain dated March 4, 2025 • Net Area Exhibit prepared by Carlson McCain dated March 4, 2025 • Phasing Plan prepared by Carlson McCain dated March 4, 2025 • Surface Water Area Exhibit prepared by Carlson McCain dated March 4, 2025 • Ghost Plat unnamed and undated • Traffic Study prepared by SSTS, dated 10/15/2024, and revised 03/28/2025 ANALYSIS Current Proposal The proposed development includes 93 villa home lots designed for empty nesters and seniors looking for single level living with association maintenance. Project Phasing The project is proposed to be constructed in two phases. Phase 1 includes approximately 62 lots with the extension of Haywood Drive and Street D. Phase 2 will include the balance of the development along Street A, northwest of the pipeline. Existing Conditions The property is wooded with aspens dominating the canopy intermixed with birch, oak, maple, and red pine. Approximately 10 acres remain in agricultural use. Wetlands are located on site, including wetlands located withing the Rice Creek Watershed District Wetland Management Corridor. A natural gas pipeline crosses the property diagonally from the northeast corner to the southwest. Surrounding Zoning and Land Use Direction Zoning Current Land Use 2040 Future Land Use North R, Rural Rural Residential Urban Reserve PUD, Planned Unit Single Family Low Density South Development Residential Residential R-1, Single Family Low Density East Undeveloped Residential Residential West R, Rural Rural Residential Urban Reserve Comprehensive Plan Per the City's 2040 Comprehensive Plan the site is guided for low density residential. This land use provides for housing at densities ranging from 1.6 to 3.0 units per net acre that is served by municipal sewer and water services. The proposed net density is 2.99 units per acre, which is consistent with the Comprehensive Plan's guided land use and density range. The following chart implements Met Council's formula for calculating net density. Apr 2025 Gross Area (acres) 59.30 Wetlands & Water Bodies (5.31) Public Parks & Open Space (19.14) Arterial ROW 0.00 Other (Utility Transmission Easement) (3.38) Other (Wetland Buffer Area) 0.00 Net Area (acres) 31.47 # of Units 94* Gross Density (units/acre) 1.59 Net Density (units/acre) 2.99 *Assumes conversion of Outlot E to a single family lot Current Zoning and Land Use Current Zoning R-X, Rural Executive Current Land Use Agricultural/woodland Future Land Use per Low Density Residential 2040 Comp Plan Utility Staging Area Stage 1A (2018-2025) Stage 1B (2025-2030) The property is currently zoned R-X, Rural Executive. The R-X zoning is a holding district until municipal water and sanitary sewer are available to develop the site. The property will be rezoned to PUD, Planned Unit Development to implement a conservation development by allowing for zoning flexibility. A summary of PUD public benefit vs PUD flexibility is provided at the end of this staff report. Conventional Zoning Requirements vs. PUD Guidelines Per City Code Section 1007.024(4) for PUD, Planned Unit Development, the development guidelines for land guided low density residential development are either R-1, R-IX, or R-2. The following chart compares the R-2, Two Family Residential zoning requirements to the proposed development. PUD Standard R-2 Zoning Standard Proposed Villa Lots Flexibility Requested? 7,651 square feet Minimum Lot Size 7,500 square feet (Average lot size is No 9,266 SF) 4 Minimum Lot Width (interior lot) 60 feet 60 feet No Minimum Lot Width (corner lot) 80 feet 70 feet Yes Minimum Lot Depth 125 feet 125-165 feet No Minimum Front 25 feet 25 feet No Setback Minimum Side 10 feet (5 feet for Setback Attached Garage) 7.5feet Yes Minimum ROW 25 feet 20 feet Yes Setback (corner lots) Rear Setback 25 feet 25 feet No Impervious Surface 65% 65% No Collector Road Right- of -Way Width 80 feet 60 feet Yes Minimum 20 feet in Garage Size width and 520 square 21— 24 and 528 to No feet in size 600 SF Garage shall not protrude forward of the front wall of the The applicant is house, unless the house includes a front requesting allowance to porch that is unenclosed, a protrude up to 5' in Garage Design minimum of six (6) feet front of the house. Yes in depth, and extends Of the 34 house across 100 percent of elevations proposed the front facade of the by the applicant — 6 house. The garage shall elevations protrude then not protrude in front of house. forward of the front porch. The length of the garage wall facing the street shall not be Garage walls shall not be greater than Garage Design greater than 50 percent 58 percent of the Yes of the length of the length of the entire entire front facade of front facade. the structure for street - facing garage doors PUD Flexibility Provided: Collector road right of way. The right-of-way width of Haywood drive (Street C) will be reduced from 80' to 60' along Haywood Drive (Street C). This is consistent with previous flexibility to applied to the Natures Refuge to the south. The reduction in width minimizes the development footprint and increases the area of preservation. Sidewalk will still be included within the 60' right-of-way to accommodate pedestrians. Cul de sac length. The cul de sac length of Street D is proposed at 620'. 500' is the maximum length allowed. The street will be 32 feet wide instead of typical 30' and include hydrants and midpoint and end of cul de sac. Corner Lot width and Corner Setback. The applicant has requested a reduction in Corner Lot width from the required 80' to 70' and Corner Lot setback from 25' to 20'. Corner lot widths are generally wider to accommodate building setbacks from both streets and provide uniformity between lots fronting different streets. The city has generally allowed for reduced width and setback where corner lots back up to another corner lot or open space. Staff is supportive of this request. Side Setbacks. Side yard setbacks will be 7.5' instead of the typical 10' and 5. This maintains a uniform side yard setback between homes. Garage Requirements. The applicant originally requested flexibility from the garage area (520 SF), width (20'), and garage architectural design standards. The Planning & Zoning Board recommended that no flexibility be granted. The applicant has revised plans to meet or exceed both the garage area and garage width requirements. However, they continue to request flexibility to allow the garage to protrude 5' in front of the house without the front porch requirement. They also request flexibility on the maximum length of the garage wall facing the street from 50% of the front fagade width to a maximum of 57%. The garage architectural requirements are intended to minimize the visual impact of garage dominated streetscapes and avoid monotony on narrow lots of the R-2 zoning district. Of the 34 home different elevations proposed by M/I, only six include the protruding garage. Given the number of architectural choices the concern over a repetitive layouts being used throughout the development is minimized. However, there is no specific requirement that would prevent this. With the expansion of the maximum garage width percentage all of the houses to accommodate the garage size adjustments. The villas are intended to provide single level living so a majority of units do not provide the 2nd level living space required to exceed the 50% maximum garage length. With the increase to 57% all products would comply and the developer would agree to meet all the same requirements including: 11 • Decorative garage doors with a strip of windows • Garage width in excess of two stalls will be recessed two feet from the main garage facade. • Total garage width will not exceed 32 feet. Subdivision Ordinance Conservation Development Per City Code Section 1007.007: Subdivision Ordinance Definitions CONSERVATION DEVELOPMENT. The development pattern and technique whereby lots are arranged in closely related groups to preserve the natural amenities of the land through the creation of common open space. Natures Refuge North is a proposed conservation development. The villa lots preserve woodland and wetland areas, create more protected accessible public open space and establish the greenway corridor. The trail system is also incorporated into the greenway system vs. along the street creating a more enjoyable, safer, and valued recreational experience. The purpose of using the PUD zoning is to create a conservation development that establishes the defined public values of preserving and enhancing the on -site natural resources. The PUD also creates and enhances the greenway corridor and trails that are accessible to the public. Blocks and Lots The proposed development contains 93 single family lots and 5 outlots. The outlots contain wetlands, buffers, stormwater ponds etc. Outlot E, located on the northern end of the plat, meets the size requirement of an R-2 lot but cannot be constructed upon without a grading easement from the property to the north. This outlot shall be platted as a lot bringing the total single family lot count to 94. Staff Comments: 1. City Code Section 1007.024 (5)(c) requires that if a PUD includes preservation of natural habitat those areas shall be permanently protected through a conservation easement or other legally binding agreement with the City. The proposed open space areas should remain in the ownership of the HOA with a conservation easement granted to the City. 2. Since Outlot E meets the R-2 lot size requirements, Outlot E should be converted into Lot 11, Block 7. 7 Streets and Alleys Haywood Drive is identified as a minor collector road in the Transportation Plan and provides a north -south corridor from CSAH 14 (Main Street) to eventually Pine Street. All proposed street right-of-way widths are 60ft and the street is proposed to be 32ft wide from back of curb to back of curb. Street B is recommended to connect to Andall Street. Arena Acres was platted in 1981 and a 60 ft wide Outlot B was platted for future road connection to the east. This outlot is owned by the City. The extension will connect the neighborhoods and transportation system. This street connection is further supported by the following City Code Sections: § 1001.100 STREETS AND ALLEYS. (3) Streets, continuous. Except for cul-de-sacs, streets shall connect with streets already dedicated in adjoining or adjacent subdivisions or provide for future connections to adjoining unsubdivided tracts, or shall be a reasonable projection of streets in the nearest subdivided tracts. The arrangement of thoroughfares and collector streets shall be considered in their relation to the reasonable circulation of traffic, to topographic conditions, to runoff of storm water, to public convenience and safety, and in their appropriate relation to the proposed uses of the area to be served. This standard transportation practice has been implemented throughout the City such as the Foxbourough connection to Fox Road, Saddle Club connection to Fox Road and the St. Clair Estates connection to Hokah Drive and Sioux Lane. The Andall Street connection is supported by Lino Lakes Public Safety -Police Division and Fire Division in order to provide faster and more direct emergency response to the entire area. The connection is also supported by Public Works to provide better efficiency for street maintenance and snow plowing. Following discussion at the Monday, May 5, 2025, Council Work Session staff is proposing additional conditions regarding the access as follows: a. The street will be constructed following approval of the 2nd Addition Final Plat, except for grading and clearing and grubbing activities which may commence with the initial development phase. b. Construction limits shall be determined, and a tree preservation plan shall be submitted for review and approval by City prior to clearing and grubbing activities on Outlot A, Arena Acres. H., c. Street will remain closed to through traffic until paving of wear course on Street A with the 2nd Addition. d. Developer shall provide a planting plan for boulevard trees and shrubs for that portion of Street A within Outlot B, Arena Acres, where appropriate based on remaining tree canopy. Plan will be reviewed and approved by Environmental Coordinator. Sidewalks and Trails Sidewalks are proposed on the east side of Haywood Drive and Street A and the south side of Street C. Sidewalks shall be provided on Street B and Street D. The termination point of the sidewalk on Street D shall be determined by the City Engineer. A trail is proposed to connect to the trail in Natures Reserve to the south through the stormwater ponds south of Street D to the eastern edge of the property across Street C and then north between the wetlands and across the gas easement to the northern property line. Before the trail reaches the northern property line, a trail connection is constructed west to Street A between Lot 4 Block 1 and Lot 1 Block 2. The maximum length of a cul-de-sac is 500 ft. Street D cul de sac is 620 ft. The street will be 32 ft wide (vs 30 ft wide) and a sidewalk shall be installed. Public safety is in approval with the cul de sac length. Staff Comments: 1. A temporary turnaround will be required at the north end of Street A. 2. Sidewalks shall be included on Street B and Street D. 3. The trail corridor between Lot 4 Block 1 and Lot 1 Block 2 and east of Lots 1-4 Block 4 shall be widened to 30 feet wide. 4. Andall Street connection can be reduced to 24 feet wide. Easements and Outlots The applicant has provided 10 feet wide drainage and utility easements along the right-of-ways and along the rear property lines. 5 feet wide drainage and utility easements are provided along the side property lines to provide a total easement wide of 10 feet through both side yard easements, while where a stormwater utility pipe will be located between two lots, the applicant has provided 10 feet wide drainage and utility easements to accommodate the infrastructure. Drainage and utility easements will be dedicated over Outlots A, B, C and D. Outlots A, B, C and D will be owned and maintained by the development homeowner's association (HOA). As stated above, Outlot E should be converted into Lot 11, Block 7. There is a 100-foot-wide gas line easement that runs from southwest to northeast through Outlots A and C. Outlot F has been created on the revised April 25, 2025, plan set to accommodate a city lift station, formerly proposed to be located within an easement on Outlot D at the intersection of Street C and Street D. a 3&6 \ � 297.3 \ \ 207.4 •.sa �i4 '�' (i0.0 62.5 yes e r -----i r----i New Outlot for City Ldt Station 12 �; \ 126.125 qfL I I s0.465 qR I' .076 qR s I 11 �� S0 `\ 44.2 L 6o —J L— --�tl 62.5 t6.551 qR \ ' R STREET 1) 1 269.9 A conservation easement will be required for all protected open space areas (Outlots A, B, C and D). Staff Comments: 1. The portion Outlot D that is occupied by the lift station should be separated from Outlot D through the creation of a new outlot that would be dedicated to the City. 2. Conservation easements and wetland buffers shall be required over Outlots A, B, C and D. Stormwater Management and Erosion and Sediment Control The Preliminary Plat shows three stormwater ponds, one within Outlot C to the east of Block 2 and two located within Outlot D located to the south Block 4. The proposed trail runs between the two stormwater ponds within Outlot D and the southern of the two ponds will connect and expand the existing stormwater pond within Natures Reserve. The revised April 25th plan set shows the addition of a stormwater retention area northwest of Street A to address Rice Creek Watershed and City Engineer comments. Utilities 10 Public water, sanitary and storm sewer utilities will be installed within the development. Water and sanitary will extend north along Haywood Drive. Water main is also proposed to be extended to Andall Street as part of the road construction. The site is located in Sanitary Sewer District 2 (Sub -district 2K). Flow is collected southward to MCES Meter M211 and Gravity Interceptor 8361 along North Road which passes southwest through Circle Pines. PID# 05-31-22-42-0003 is located in Utility Staging Area 1A (2018-2025) and PID#05-31-22-13- 0001 is located in 1B (2025-2030). By resolution, the Council may move the one (1) parcel from Stage 1B (2025-2030) to Stage 1A (2018-2025). A sanitary sewer lift station is located along Haywood Street, east of Street D. This will provide service to the development as well as future service to the Olive and Orange Street neighborhood which are smaller (<0.5 acre) lots on private septic systems and wells. Proposed water use is within the capabilities of the City's existing water supply. The project will include a stormwater reuse irrigation system that will significantly reduce water use and impact on maximum day demands. Weekly summer water savings are estimated at 487,000 gallons. Parks, Greenways and Trail Plan Per the City's 2040 Parks, Greenways and Trails Plan, this development is within the Arena Acres and Wollan Park service areas. Arena Acres is a smaller 1-acre neighborhood park. Wollan's Park is an 18-acre open space wetland and not an active park. The Plan indicates a Future Neighborhood Park centrally located within the service area. Greenway corridors exist on site. Linear trails are proposed to provide connectivity to the existing Nature's Refuge trail to the south and a future trail connection when the property to the north is developed. The trail locations through open space and stormwater provide for a multifunctional greenway corridor. Staff Comments: 1. Trail corridors shall be a minimum 30ft wide. Tree Preservation and Landscaping The purpose of these standards is to protect valuable trees and vegetation stands while not interfering with landowners' reasonable use and development of property. The goal is to 11 minimize unnecessary loss of habitat, biodiversity, and forest resources and to replace removed trees in areas where tree cover is most critical. A tree survey was performed that identified: April 2025- PUD Preliminary Plan and Preliminary Plat Total Trees Surveyed 6009 Trees Removed (BUA) 2234 Trees Removed (non-BUA) 1262 Trees Preserved 2375 Mitigation Trees Required 292 The majority of trees on site are aspen with a mix of birch, oak, maple, and red pine. As discussed at the October 2024 meeting the applicant is proposing to dedicate approximately 34 acres of open space for tree preservation and future management. The applicant agrees to plant a minimum of 3 trees per lot throughout the development. One boulevard tree is required per lot. Staff will work with the developer on the two remaining trees to ensure that there isn't conflict with infrastructure and overplanting. Tree Preservation and Mitigation Standards have been met with the dedication of open space for preservation. Open Areas Landscape Standards The purpose of these standards is to provide general site beautification and high aesthetic quality with a mix of plant materials in open areas. Open area landscape standards call for 1 large tree and 2 large shrubs per 2500 sf. Topsoil salvaged from the area prior to construction will be spread over the new ponds and open space. The established seed bank should provide native species to thrive along with native seed mix. To allow sunlight and promote growth of the existing rare and unique species onsite, minimal tree planting is being requested throughout the open space. Sparce plantings of oaks will be planted within open space areas adjacent to the stormwater ponds. A revised landscape plan will be required detailing location and species. No planting within the existing pipeline easement and proposed storm sewer pipe locations are allowed. Rare, Unique, or Significant Resources 12 An initial habitat assessment was conducted by MNR in September 2023 after which follow-up surveys for the 2024 field season were recommended. Accordingly, MNR completed surveys in May and July 2024 resulting in observations during the early and mid -growing seasons. In total six species of threatened or endangered species were found onsite and are listed in the table below: Species Classification Rubus fulled Threatened Rubus semisetosus Threatened Trichophorum clintonii Threatened Viola lanceolata Threatened Rubus stipulates Endangered Carex pallescens Endangered A take permit application has been submitted to DNR for proposed impacts to onsite protected plant species. Opportunities for transplant of some species to the adjacent Wollan's Park wetland bank with approval from the DNR. Stockpiling and using existing topsoil onsite will help preserve native plant communities and possibly extend the range of threatened species. Environmental Review Record As previously noted, in 2006 a mandatory Environmental Assessment Worksheet (EAW) was prepared for the original Natures Refuge concept because the proposed 278 housing units exceeded the 250 housing unit threshold. The EAW thoroughly analyzed potential impacts to wetlands, rare plant and animal species, floodplain, water quality, noise, traffic and archeology. It was determined the project did not have the potential for significant environmental effects and the Council passed Resolution No. 07-06 making a Negative Declaration on the Need for an EIS. The scope and size of the existing Natures Refuge and revised Natures Refuge North (152 housing units on 155 gross acres) is smaller than the original 2006 proposal (278 housing units on 232 gross acres). A revised EAW is not required because the 152 housing units do not exceed the 250 housing unit threshold. # Lots Acres Natures Refuge 60 95 Natures Refuge North 94 60 TOTAL 154 155 13 Wetlands Per the Wetland Delineation Report, sixteen (16) wetlands were delineated on site, totaling 7.17 acres. As shown within the Preliminary Plat: April 2025 Total Wetlands 7.17 acres Total Wetland Impacts 1.93 acres WMC Wetland Buffer (Ave. 4.54 acres 50ft) City Wetland Buffer (10ft 0.64 acres min.) For the 1.93 acres of wetland impact, the developer will need to obtain 2.43 acres of wetland replacement. Some of the delineated wetlands are in the Rice Creek Watershed District (RCWD) Wetland Management Corridor. Wetlands preserved on site will have to meet RCWD and City buffer requirements. Impacts will require mitigation and will be reviewed by RCWD. Floodplain There is no FEMA floodplain on site. Traffic Study A Traffic Impact Study was prepared by SSTS, dated October 15, 2024, and revised March 28, 2025. The study analyzed two design years: • Year 2027 to correspond to the year after completion of the Proposed Project with full construction of the original Nature's Refuge site (61 single family homes) assumed. The following access scenarios are considered: o Two Access Scenario - Access at the existing Main St/Glenwood Dr intersection and access at a proposed Andall St connection. o Single Access Scenario — Access only via the existing Main St/Glenwood Dr intersection. • Year 2040 to correspond with a planning year horizon. In year 2040 the Pine Oaks Addition development, adjacent to the east side of the Proposed Project, is assumed to be developed. Two additional access points are considered, a northern connection to Pine St through the future Pine Oaks Addition and a connection of Haywood Dr to Wood 14 Duck Tr. Due to the feasibility concerns with the Andall St Access, access scenarios with and without the Andall St connection are considered. This study focuses on the roads and intersections that provide direct and indirect access to and from the site and details the existing and future roadway conditions at studied intersections and access points and includes traffic volumes, lane geometrics and traffic operational analysis results. The intersections reviewed included: • Main Street/Glenwood Drive • Main Street/Woodduck Trail • 4t" Avenue/Andall Street • Andall St/Proposed Access The study results indicate there is little to no significant impact on the adjacent streets and intersections due to trips expected to be generated by the proposed development. Trip generation for the proposed development is estimated at 868 daily. Approximately 8% or 70 vehicles a day is expected to use the Andall Street connection. This is well within the capacity of Andall Street and Woodduck Trail based on the engineering review. Per City Code Section 1001.013(2)(c)4. The existing LOS must be D or better for all streets and intersections providing access to the subdivision. If the existing level of service is E or F, the subdivision developer must provide, as part of the proposed project, improvements needed to ensure a level of service D or better. Based on the study Level of service requirements are met for both the 2027 and 2040 Build Scenarios with LOS maintained at C or better. Homeowners Association A homeowner's association will be established and provide both association maintained yards and snow removal. Staff is also recommending that the open space be owned by the association with the City retaining a Conservation Easement over the property. Additional City and Government Agency Review Comments Lino Lakes Public Safety The Police Division supports connection to Andall Street. The connection is important for public safety response to and from the development. 15 The Fire Division also supports the Andall Street connection to improve response times to the entire area. Environmental Board The Environmental Board reviewed the PUD and Preliminary Plat on March 26, 2025. Their comments are provided in the attached memo dated March 27, 2025. Park Board The Park Board reviewed the Preliminary Plat on April 2, 2025. The Board recommends cash fee in lieu of land dedication. The amount of cash dedication would be $329,000 ($3,500 per lot times 94 lots) minus the cost of trail construction. As discussed during concept plan review, the Park Board recommended designating the remaining cash dedication balances from Natures Refuge and Natures Refuge North to explore providing trails and leisure opportunities at Lino Lakes Elementary School. A collaborative arrangement with the Forest Lake School District to share resources could provide tremendous benefits for the students and general public. Planning and Zoning Board The Planning and Zoning Board held a public hearing on April 14, 2025. The board debated various aspects of the development resulting in two failed motions. The board approved a motion on a 5-1 vote to recommend approval with the conditions included in the staff recommendation, no flexibility from the garage requirements, and 24' foot connection of the road for emergency access only. City Engineer The City Engineer provided comments in the attached memo. Developer responses received following the Planning and Zoning board have been included. PUD Public Benefit vs PUD Flexibility Summary Per City Code Section 1007.024: (2) The PUD, by allowing deviation from the strict provisions of this ordinance related to setbacks, heights, lot area, width and depths, yards, etc., may be considered by the City when it would result in one or more of the following public benefits: (a) Implementation of a master plan consistent with the Planning District objectives of the Comprehensive Plan. s The need for a formal master plan was not identified for this area in the 2040 Comprehensive Plan. The proposed development is consistent with the 2006 EA concept plan for low density single family residential conservation development. (b) Innovations in development that address growing demands for all styles of economic expansion, greater variety in lot size, configuration, home type, design, enhanced architectural standards, and siting of structures through the conservation and more efficient use of land in such developments. The applicant is proposing a conservation development. The villas provide a housing option with main -level living with association -maintain yards and snow removal which addresses life -cycle housing. (c) Preservation and enhancement of desirable site characteristics such as wildlife habitat, unique natural resources, existing vegetation, natural topography, geologic features and reduction of negative impacts on the environment. The conservation development preserves and enhances desirable site characteristics by minimizing wetland, woodland, and rare plant species impacts. (d) Creative use of land and related physical development which allows a phased and orderly transition of varying land uses in close proximity to each other. The revised plan shifts the villas to the east and creates a 160-390 buffer along the west lot line near the existing Arena Acres neighborhood. (e) Efficient use of land resulting in smaller networks of utilities and streets thereby lowering development costs and public investments. The configuration of the lots preserves as many wetlands as possible and avoids a gas line easement that spans the site diagonally which results in a smaller network of utilities and streets. (f) Mix of land use types. There is no mix of land use types. (g) Provision of a housing type or target housing price that is desirable to the City. The villas provide a housing option with main -level living with association -maintain yards and snow removal which addresses life -cycle housing. 17 (h) Other public benefits and values as recognized in the City's Comprehensive Plan. • Planning District 2 identifies Wollan Park as a natural resource that should be protected. The proposed development strategically includes a stormwater pond/open space buffer near the Wollan Park wetland complex. This is a critical link to protecting this sensitive natural resource area. • A goal of the sanitary sewer plan is to provide service and capacity to developed areas of the city currently served by on -site systems. Municipal sanitary sewer and water also gets extended north which will eventually serve the Olive and Orange Street neighborhood which are smaller (<0.5 acre) lots on private septic systems and wells. • A goal of the Parks, Greenways & Trails Plan is to established greenway corridors. A multi functional greenway corridor incorporating stormwater management, trails and open space is established with the development. Summary Public Benefit Gained: 1. Conservation development that protects and enhances the on -site natural resources such as wetlands, woodlands, rare plant species, and open space that are accessible to the general public. 2. Main -level living villa homes with association -maintain yards and snow removal which addresses life -cycle housing. 3. Preserved wetlands and established wetland buffers/conservation easements 4. Orderly transition from existing large lot single family Arena Acres neighborhood to smaller single family detached lots. 5. Efficient use of land resulting in smaller network of utilities and streets 6. Protection of Wollan Park wetland complex. 7. Extension of sanitary sewer to eventually serve Olive and Orange Street neighborhood currently served by on -site systems. 8. Establish multi -functional greenway corridor and trail system that is accessible to the public. 9. Parkland payment in lieu of dedication fees will be collected in addition to the open space set aside under conservation easement or City ownership. RECOMMENDATION Staff is recommending that the City Council provide the following PUD flexibility for Natures Refuge North: 1. Reduced minor collector road right-of-way width from 80 feet to 60 feet on Haywood Drive (Street A). I 2. Reduced corner lot width from 80 feet to 70 feet. 3. Reduced setback from street (corner lot) to 20 feet on long side of lot. 4. Side yard setbacks shall be 7.5 feet. 5. Garage shall be allowed to protrude forward of the house, without front porch, a distance of no more than 5', subject to conformance with an anti -monotony plan that prohibits houses with protruding garages to be placed directly adjacent to or across from one another. 6. Unless 2nd floor living space extends over the garage, the maximum length of the garage wall facing the street shall not exceed 57% of the front facade subject to the following: Decorative garage doors with a strip of windows are required. b. Garage width in excess of two stalls will be recessed two feet from the main garage facade. C. Total garage width will not exceed 32 feet. 7. The maximum cul de sac length of Street D shall be 620 feet. Staff is recommending approval of the PUD Preliminary Plan and Preliminary Plat for Natures Refuge North subject to the following conditions: 1. That Street B connect to Andall Street with a minimum width of 24' subject to the following: The street will be constructed following approval of the 2nd Addition Final Plat, except for grading and clearing and grubbing activities which may commence with the initial development phase. b. Construction limits shall be determined, and a tree preservation plan shall be submitted for review and approval by City prior to clearing and grubbing activities on Outlot A, Arena Acres. C. Street will remain closed to through traffic until paving of wear course on Street A with the 2nd Addition. Developer shall provide a planting plan for boulevard trees and shrubs for that portion of Street A within Outlot B, Arena Acres, where appropriate based on 19 remaining tree canopy. Plan will be reviewed and approved by Environmental Coordinator. 2. Proposed open space areas should remain in the ownership of the HOA with a conservation easement granted to the City. Wetland buffers shall be provided around wetlands as required by RCWD. 3. Outlot E meets the R-2 lot size requirements and should be converted into Lot 11, Block 7 on the preliminary plat. 4. Trail corridors shall be a minimum of 30' wide. A separate easement agreement shall be provided for trail corridors. 5. Sidewalks shall be provided on Street B and Street D. The point of termination on Street D will be determined by City Engineer. 6. Cash fee in lieu of land dedication in the amount of $329,000 minus the cost of trail construction. 7. Compliance with the City Engineer Memo dated April 4, 2025 8. Compliance with the Environmental Memo dated March 27, 2025 9. A stormwater reuse irrigation system is required. 10. Draft homeowner's association documents shall be submitted with the final plat application. ATTACHMENTS 1. Ordinance No. 09-25 2. Resolution No. 25-61 3. Narrative prepared by M/I Homes of Minneapolis/St. Paul dated April 22, 2025 4. Preliminary Plat and Civil Plans prepared by Carlson McCain revised April 25, 2025 5. Land Use Plan prepared by Carlson McCain dated March 4, 2025 6. Phasing Plan prepared by Carlson McCain dated March 4, 2025 7. Ghost Plat unnamed and undated 8. Response Comment to City Engineer Memo dated April 4, 2025 9. Response Comments to Environmental Memo dated March 26, 2025 10. April 25, 2025 Response Comments to April 14,2025 P&Z staff report recommendations. 20 1" Reading: Website Notice: 2nd Reading: Publication: Adoption: Effective: CITY OF LINO LAKES ORDINANCE NO. 09-25 ORDINANCE TO REZONE CERTAIN REAL PROPERTY FROM R-X, RURAL EXECUTIVE TO PUD, PLANNED UNIT DEVELOPMENT FOR NATURES REFUGE The City Council of Lino Lakes ordains: Section 1: Findings of Fact 1. The City received a Land Use Application to rezone certain property from R-X, Rural Executive to PUD, Planned Unit Development. 2. The Planning and Zoning Board held a public hearing on April 9, 2025 3. Per Section 1007.015 (4)(e), the Planning and Zoning Board shall consider possible adverse effects of the proposed rezoning and its judgement shall be based upon, but not limited to, the following factors: (a) The proposed action consistent with the official City Comprehensive Plan. The proposed Natures Refuge North PUD conservation subdivision is consistent with the goals and policies of the comprehensive plan in regards to resource management, land use, housing, transportation and utilities. The development upholds the City's public values by creating a multi- functional open space greenway corridor integrated with the stormwater conveyance system, wetland management and trails. Natures Refuge North is consistent with residential land use and density requirements. Safe transportation corridors and public utilities also serve the development. (b) The proposed use is or will be compatible with present and future land uses of the area. The proposed Natures Refuge North development is compatible with the present and future land uses of the area. Existing and future land use to the north, south, east and west is residential. Lino Lakes Elementary School is immediately east of the site. (c) The proposed use conforms with all performance standards contained herein. The proposed Natures Refuge North development conforms with all the public benefits and PUD performance standards as outlined Resolution No. 25-61. (d) The proposed use can be accommodated with existing public services and will not overburden the City's service capacity. The proposed Natures Refuge development can be accommodated with existing public services and will not overburden the City"s service capacity. The site is ultimately served by MCES Interceptor 83-61 that is adequately sized for the development in the district. The existing water supply and water distribution system can provide adequate water volume and fire protection. (e) Traffic Generation by the proposed action is within capabilities of streets serving the property as required in City Code Section 1007.020 Traffic generated by the Natures Refuge North development is within the capabilities of streets serving the property. Section 2: Amendment The Zoning Ordinance of the City of Lino Lakes is hereby amended to rezone the following described property from R-X, Rural Executive to PUD, Planned Unit Development. Section 3: Legal Description The property is legally described as: The Southwest Quarter of the Northeast Quarter of Section 5, Township 31, Range 22, Anoka County, Minnesota; and the North Half of the Northwest Quarter of the Southeast Quarter of Section 5, Township 31, Range 22, Anoka County, Minnesota. Section 4: Development Regulations The development shall conform to the plans, requirements, and conditions of approval as listed in Council Resolution No. 25-61. Where not otherwise specified therein, the requirements of City Code Chapter 1007, based on section 1007.112, R-2, Two Family residential district, shall govern. Section 5: Effect This ordinance shall be in force and effect from and after its passage and publication according to the Lino Lakes City Charter and upon the filing of the final plat. Adopted by the Lino Lakes City Council this day of 12024. Rob Rafferty, Mayor ATTEST: Roberta Colotti, CIVIC City Clerk CITY OF LINO LAKES RESOLUTION NO. 25-61 APPROVING PUD PRELIMINARY PLAN AND PRELIMINARY PLAT FOR NATURES REFUGE NORTH WHEREAS, the City received an application for PUD Preliminary Plan and Preliminary Plat for Natures Refuge North, hereinafter referred to as "Development", and WHEREAS, City staff has completed a review of the Development based on the following: 1. Narrative prepared by M/I Homes of Minneapolis/St. Paul dated April 22, 2025 2. Preliminary Plat and Civil Plans prepared by Carlson McCain dated April 25, 2025 3. Land Use Plan prepared by Carlson McCain dated March 4, 2025 4. Sanitary Sewer Exhibit prepared by Carlson McCain dated March 4, 2025 5. Net Area Exhibit prepared by Carlson McCain dated March 4, 2025 6. Phasing Plan prepared by Carlson McCain dated March 4, 2025 7. Surface Water Area Exhibit prepared by Carlson McCain dated March 4, 2025 8. Ghost Plat unnamed and undated 9. Traffic Study, prepared by SSTS, dated 10/15/2024, and revised 03/28/2025. WHEREAS, a public hearing was held before the Planning & Zoning Board on April 9, 2025, and the board recommended approval of the Development with conditions, NOW, THEREFORE, BE IT RESOLVED by the City Council of Lino Lakes, Minnesota that FINDINGS OF FACT PUD, Planned Unit Development Per City Code Section 1007.024(1) the purpose of a PUD is to provide a district that grants flexibility from certain zoning regulations in order to achieve public benefits that may not otherwise be obtained under standard zoning regulations. (2) The PUD, by allowing deviation from the strict provisions of this ordinance related to setbacks, heights, lot area, width and depths, yards, etc., may be considered by the City when it would result in one or more of the following public benefits: (a) Implementation of a master plan consistent with the Planning District objectives of the Comprehensive Plan. The need for a formal master plan was not identified for this area in the 2040 Comprehensive Plan. The proposed development is consistent with the 2006 EA concept plan for low density single family residential conservation development. (b) Innovations in development that address growing demands for all styles of economic expansion, greater variety in lot size, configuration, home type, design, enhanced architectural standards, and siting of structures through the conservation and more efficient use of land in such developments. The applicant is proposing a conservation development. The villas provide a housing option with main -level living with association -maintain yards and snow removal which addresses life -cycle housing. The project will include enhanced architectural design requirements and an anti - monotony code. (c) Preservation and enhancement of desirable site characteristics such as wildlife habitat, unique natural resources, existing vegetation, natural topography, geologic features and reduction of negative impacts on the environment. The conservation development preserves and enhances desirable site characteristics by minimizing wetland, woodland, and rare plant species impacts. The site will include approximately 34 acres of open space preserved in a conservation easement. (d) Creative use of land and related physical development which allows a phased and orderly transition of varying land uses in close proximity to each other. The revised plan shifts the villas to the east and creates a 160-390 buffer along the west lot line near the existing Arena Acres neighborhood. (e) Efficient use of land resulting in smaller networks of utilities and streets thereby lowering development costs and public investments. The configuration of the lots preserves open space and as many wetlands as possible and avoids a gas line easement that spans the site diagonally which results in a smaller network of utilities and streets. (f) Mix of land use types. There is no mix of land use types. (g) Provision of a housing type or target housing price that is desirable to the City. The villas provide a housing option with main -level living with association -maintain yards and snow removal which addresses life -cycle housing. (h) Other public benefits and values as recognized in the City's Comprehensive Plan. • Planning District 2 identifies Wollan Park as a natural resource that should be protected. The proposed development strategically includes a stormwater pond/open space buffer near the Wollan Park wetland complex. This is a critical link to protecting this sensitive natural resource area. • A goal of the sanitary sewer plan is to provide service and capacity to developed areas of the city currently served by on -site systems. Municipal sanitary sewer and water also gets extended north which will eventually serve the Olive and Orange Street neighborhood which are smaller (<0.5 acre) lots on private septic systems and wells. • A goal of the Parks, Greenways & Trails Plan is to establish greenway corridors. A multi- functional greenway corridor incorporating stormwater management, trails and open space is established with the development. • The project will include a stormwater reuse irrigation system reducing demand on the City's water supply system. Preliminary Plat Per Section 1001.013, Premature Subdivision: (1) General. Any concept plan, preliminary plat or final plat deemed premature pursuant to the following criteria shall be denied by the City Council. (2) Conditions for establishing a premature subdivision. A subdivision maybe deemed premature should any of the following conditions not be met. (a) Consistency with the Comprehensive Plan. Including any of the following: 1. Land use plan; 2. Transportation plan; 3. Utility (sewer and water) plans; 4. Local water management plan; 5. Capital improvement plan; and 6. Growth management policies, including MUSA allocation criteria. Natures Refuge North is consistent with the goals and policies of the comprehensive plan in regards to resource management, land use, housing, transportation and utilities. The development is also consistent with the local water management plan, capital improvement plans and growth management policies. (b) Consistency with infill policies. A proposed urban subdivision shall meet the city's infill policies. Natures Refuge North is consistent with infill policies. The development is within the current Utility Staging Area 1A (2008-2015) and 18 (2025 — 2030). The cost, operation and maintenance of the utility system is consistent with the normal costs projected by the water and sanitary system plans. No future utility costs are proposed. (c) Roads or highways to serve the subdivision. A proposed subdivision shall meet the requirements for level of service (LOS), as defined by the Highway Capacity Manual. The Traffic Study indicates that there are little to no significant impacts on the adjacent streets and intersections. Level of service requirements are met for both the 2027 and 2040 Build Scenarios with LOS maintained at C or better. (d) Water supply. A proposed subdivision shall be deemed to have an adequate water supply. Natures Refuge North will have an adequate water supply. A 12" trunk watermain located along CSAH 14 (Main Street) serves the site. The project will include a stormwater reuse irrigation system significantly reducing demand on the municipal system. (e) Waste disposal systems. A proposed subdivision shall be served with adequate waste disposal systems. Natures Refuge North will be served with an adequate waste disposal system. A 21" trunk sanitary sewer main located along CSAH 14 (Main Street) serves the site. A sanitary sewer lift station will be installed along Haywood Street providing service to the Development and adjacent properties to the northeast. BE IT FURTHER RESOLVED by The City Council of The City of Lino Lakes hereby provides the following PUD, Planned Unit Development flexibility for Natures Refuge North: 1. Reduced minor collector road right-of-way width from 80 feet to 60 feet on Haywood Drive (Street A). 2. Reduced corner lot width from 80 feet to 70 feet. 3. Reduced setback from street (corner lot) to 20 feet on long side of lot. 4. Side yard setbacks shall be 7.5 feet. 5. Garage shall be allowed to protrude forward of the house, without front porch, a distance of no more than 5', subject to conformance with an anti -monotony plan that prohibits houses with protruding garages to be placed directly adjacent to or across from one another. 6. Unless 2n6 floor living space extends over the garage, the maximum length of the garage wall facing the street shall not exceed 57% of the front facade subject to the following: (a) Decorative garage doors with a strip of windows are required. (b) Garage width in excess of two stalls will be recessed two feet from the main garage facade. (c) Total garage width will not exceed 32 feet. 7. The maximum cul de sac length of Street D shall be 620 feet. BE IT FURTHER RESOLVED by The City Council of The City of Lino Lakes hereby approves the PUD Preliminary Plan and Preliminary Plat for Natures Refuge North subject to the following conditions: 1. That Street B connect to Andall Street with a minimum width of 24' subject to the following: a. The street will be constructed following approval of the 2nd Addition Final Plat, except for grading and clearing and grubbing activities which may commence with the initial development phase. b. Construction limits shall be determined, and a tree preservation plan shall be submitted for review and approval by City prior to clearing and grubbing activities on Outlot A, Arena Acres. c. Street will remain closed to through traffic until paving of wear course on Street A with the 2nd Addition. d. Developer shall provide a planting plan for boulevard trees and shrubs for that portion of Street A within Outlot B, Arena Acres, where appropriate based on remaining tree canopy. Plan will be reviewed and approved by Environmental Coordinator. 2. Proposed open space areas should remain in the ownership of the HOA with a conservation easement granted to the City. Wetland buffers shall be provided around wetlands as required by RCWD. 3. Outlot E meets the R-2 lot size requirements and should be converted into Lot 11, Block 7 on the preliminary plat. 4. Trail corridors shall be a minimum of 30' wide. A separate easement agreement shall be provided for trail corridors. 5. Sidewalks shall be provided on Street B and Street D. The point of termination on Street D will be determined by City Engineer. 6. Cash fee in lieu of land dedication in the amount of $329,000 minus the cost of trail construction. 7. Compliance with the City Engineer Memo dated April 4, 2025 8. Compliance with the Environmental Memo dated March 27, 2025 9. A stormwater reuse irrigation system is required. 10. Draft homeowner's association documents shall be submitted with the final plat application. Adopted by the City Council of the City of Lino Lakes this 12t" day of May, 2025. Rob Rafferty, Mayor ATTEST: Roberta Colotti, CIVIC, City Clerk NATURES REFUGE NORTH PRELIMINARY PLAT AND PLANNED UNIT DEVELOPMENT PLAN Natures Refuge North Preliminary Plat and Planned Unit Development Plan Submittal INTRODUCTION M/I Homes of Minneapolis/St. Paul, LLC (M/I Homes) is submitting an application for a Preliminary Plat and Planned Unit Development (PUD) plan for land north of Natures Refuge. The proposed plan includes 93 villa homes on an approximately 59.30-acre site. The original concept plan for this development was reviewed at by the City in late 2023, and a neighborhood meeting was held in February 2024. With feedback received from both city staff and officials as well as the neighborhood meeting, M/I Homes presented a revised concept plan, consistent with the proposed Preliminary Plat and PUD plan. This revised concept plan was reviewed by the Environmental Board, Planning Commission and City Council in late 2024. That revised concept plan and this proposed Preliminary Plat and PUD Plan accomplish the following: Approximately 8.5 acres of open space adjacent to the Arena Acres neighborhood. o We revised the original concept plan to pull back lots from Arena Acres to the center of the development, increasing the buffer width from Arena Acres from 50 feet to 1 60-400 feet, and reduced the number of lots from 108 to 93 homes. • Approximately 34 acres of open space (58% of the site) and preserves natural features. o We provided 4 more acres of open space from the original concept plan. Providing this additional open space reduced the number of trees removed by 1,400. The site plan also takes care to avoid as many wetland impacts as possible. • A neighborhood plan and homes designed for empty nesters and seniors looking for single level living with association maintenance. We are requesting a PUD for this development to introduce a villa home option to the Natures Refuge neighborhood. Villa homes offer single level living and provide a low maintenance living option for older adults. Natures Refuge, to the south of this proposed neighborhood, has 80-foot-wide lots with traditional single-family homes. This neighborhood is proposed to introduce all 60-foot-wide villa lots with main -level living with association -maintained yards and snow removal. The City of Lino Lakes allows for development through a PUD if it results in public benefit as outlined in the City's PUD ordinance. Nature Refuge North provides the following public benefits: • Addressing growing demands for all styles of economic expansion, greater variety in lot size, configuration, home type, design, enhanced architectural standards, and siting of structures through the conservation and more efficient use of land in such developments. o The single level living provided by villa homes include association -maintained yards and snow removal and therefore are popular with our senior buyers who are looking for a low maintenance home. It is not financially feasible to offer association -maintained yards and snow removal in the current neighborhood given the size of the lots. o The configuration of the lots works to preserve as many wetlands and trees as possible, and avoids a gas line easement that spans the site diagonally. Preservation and enhancement of desirable site characteristics such as wildlife habitat, unique natural resources, existing vegetation, natural topography, geologic features and reduction of negative impacts on the environment. As mentioned, the site design preserves over half the acreage in open space, which preserves as many wetlands and trees as possible. Creative use of land and related physical development which allows a phased and orderly transition of varying land uses in close proximity to each other. o The development abuts rural lots, and smaller lots allow a significant buffer from the rural lots while continuing to meet density requirements. • Provision of a housing type that is desirable to the city. Page 1 Natures Refuge North Preliminary Plat and Planned Unit Development Plan Submittal o The villa target buyers are older adults who value low maintenance living. It is not viable for an association to maintain a larger lot. • Other public benefits and values as recognized in the city's Comprehensive Plan. o The proposed development will provide a lift station that is able to serve homes in the Stage 1 B Planned Service Area as outlined in the City's Comprehensive Plan. We believe the general requirements for a PUD are met in the following ways: • Public or common open space to meet minimum requirements established in the ordinance. The site provides approximately 34 acres of open space. • If PUD includes preservation of natural habitat, those habitats shall be permanently protected through a conservation easement or other legally binding agreement. We have preserved approximately 58% open space within the site in order to preserve natural habitat. We are proposing to deed these outlots to the City as permanent open space to be preserved in perpetuity as public park. If the City elects not to accept the land as parkland, the HOA will own the land. Deed restrictions or restrictive covenants will preserve the land as open space. Homeowners Association Required. The lots will be governed by a homeowner's association (HOA) as further explained below. Recreational open space or trail corridors intended as public parks or public trails shall be dedicated to the city or granted through an easement. o We intend to grant an easement over the public trails once built as was done in Natures Refuge. We will either dedicate the open space to the city or place deed restrictions over the lots. 409=»_\Z There are four proposed street connections. One connecting from the south from Natures Refuge via Haywood Drive and connecting to future development to the north, one to the west to Arena Acres, and one to the east for future development. If the City desires, M/I Homes would be open to options to provide connections to Andall Street. The proposed development has a total of 93 60-foot-wide villa lots. The following table compares the proposed standards to the Two Family Residential (R-2) zoning district. The site is currently zoned Rural Executive (R-X). Standard R-2 Zoning Standard Villa Lots Minimum Lot Size 7,500 square feet 7,500 square feet (Average lot size is 9,266 square feet) Minimum Lot Width 60 feet 60 feet Minimum Lot Depth 125 feet 125 feet Minimum Front Setback 25 feet 25 feet Minimum Side Setback 10 feet (5 feet for Attached Garage) 7.5 feet** Minimum Corner Side Setback 25 feet 20 feet Rear Setback 25 feet 25 feet Impervious Surface 65% 65% Collector Road Right -of -Way Width 80 feet 60 feet* Garage Size Minimum 20 feet in width and 520 square feet in size We agree to adhere to these requirements. Page 2 Natures Refuge North Preliminary Plat and Planned Unit Development Plan Submittal Garage Design Garage shall not protrude We are requesting this be waived forward of the front wall of but agree that the garage cannot the house, unless the house protrude more than five feet forward includes a front porch that is the house (further explanation in the unenclosed, a minimum of paragraph below). six (6) feet in depth, and extends across 100 percent of the front fa4ade of the house. The garage shall then not protrude forward of the front porch. Garage Design The length of the garage Garage walls shall not be greater wall facing the street shall than 58 percent of the length of the not be greater than 50 entire front fagade (further percent of the length of the explanation in the paragraph below). entire front fagade of the structure for street -facing garage doors *This flexibility was granted for Natures Refuge. Haywood Drive from Natures Refuge was granted this flexibility, and the proposed development will extend Haywood Drive to the north. This flexibility is being requested for both Haywood Drive and Street A. **We will provide at least 15 feet between homes. The City currently allows a five-foot setback for garages and ten feet for homes, so this is generally consistent with R-2 zoning. GARAGE DESIGN STANDARDS In order to minimize impacts to trees, wetlands, and wildlife, we are proposing lot sizes consistent with the R-2 zoning standard with a lot width of 60 feet. R-2 zoning has different garage design requirements than the R- 1 zoning district and does not allow the length of the garage to be greater than 50 percent of the length of the entire front facade unless the second floor living space extends over the two -car portion of the garage; the garage doors are decorative and have a strip of windows; garages in excess of two stalls are broken up so the additional stalls are recessed two feet from the main garage stall; and garage width does not exceed 32 feet. We are proposing to be allowed garages that are up to 58 percent of the length of the entire facade. We agree to provide decorative garages with a strip of windows; not exceed two stalls or 32 feet in width; and to recess the garage doors two feet from the front of the garage. Some of our plans have living space above the garage, and we will provide a window above the garage where there is faux living space. This is further explained in the illustrations below. Because villas provide single -level living, we cannot provide the living space above the garage on all plans; we only have a few villa plans that are one and a half stories. We are also requesting that we be allowed some flexibility for some of our plans to have garages that protrude no more than five feet forward the house facade. The reason for these requests in flexibility is we cannot get to the 520 square foot garage size with meeting the design standards that are currently in place with single level living homes. In order to meet these requirements, we would need to make the house wider, and we cannot do that with the smaller lots we are proposing in order to conserve as much open space as possible. Page 3 Natures Refuge North Preliminary Plat and Planned Unit Development Plan Submittal Plans with Living Space Above Garage Page 4 Natures Refuge North Preliminary Plat and Planned Unit Development Plan Submittal Windows in Faux Living Space Above Garage Page 5 Natures Refuge North Preliminary Plat and Planned Unit Development Plan Submittal DENSITY The total site area is 59.30 acres with 5.62 acres of wetlands and 5.18 acres of wetland buffers. The planned density for this area is 1.6-3 units per acre. Netting out wetlands and wetland buffers, we are proposing a density of 1.98 units per acre, well below the maximum -allowed density. PUD flexibility and the R-2 zoning lot standards are necessary to meet the minimum density allowed in the City's Comprehensive Plan and to minimize tree removal. It is not possible to meet the minimum density with 80-foot lots given the wetlands and their required buffers, as well as the gas line easement. With this site plan, 80-foot lots would yield 69 lots as shown in the Yield Plan Density Exhibit, which would result in a density of 1.41 units per acre, which is well below the minimum density planned for this area. Furthermore, these larger lots would result in greater tree removal. TREE PRESERVATION AND OPEN SPACE As mentioned above, we have designed our neighborhood plan to conserve as many trees as possible. Of the 6,494 trees on the site, we are saving 3,060 trees: almost 50%. We are proposing to preserve these trees in permanent open space to be dedicated to the City for public park, or as open space to be owned by the HOA. Given the extensive dedication of open space/park for permanent tree preservation, we are requesting that the City accept the land dedication and tree preservations areas or allow the space to be owned by the HOA and protected by a conservation easement and left natural in lieu of paying tree restitution. As part of this request, M/I Homes will agree to plant three trees per home for a total tree replacement of 279 trees. The Environmental Board, Planning Commission, and Council agreed during the revised concept plan review that this flexibility should be granted. We are proposing this for a number of reasons. First, the proposed plan preserves a little over 58% open space, conserving as many trees as possible. This is a heavily wooded site that is guided for a density of 1.6- 3 units per acre, and we are proposing a very low density, almost near the lowest density allowed. Additionally, almost 50% of the trees on site are Quaking Aspen, which do not survive long due to Cankers, which will kill the trees in 3-8 years. Finally, we have received extensive feedback from the residents of Arena Acres regarding the preservation of trees on this land. The dedication of public land would allow them to enjoy this land and the trees that are being preserved. If the City chooses not to accept the land dedication, an alternative option would be to place a deed restriction on the open space area prohibiting the removal of trees, and the land would be left in its natural state. The HOA would own the open space property. ELEVATIONS Example elevations of our villa product have been provided. These are just an example of the many elevations we offer. We also have anti -monotony requirements to ensure that very similar elevations are not adjacent to one another within the community to preserve visual interest. TIMING We plan to begin grading the site in late spring/early summer after approval of preliminary plat and other applicable agency approvals. We understand a grading -only development agreement will be required in order to accomplish this and therefore request that this agreement be reviewed concurrently with this Preliminary Plat and PUD application. Installation of utilities will occur when final plat has been approved and all conditions of final plat approval have been met. A phasing plan has been provided and is in draft form. The phasing plan will ensure that the lift station is up and running with the first phase of the development. Page 6 Natures Refuge North Preliminary Plat and Planned Unit Development Plan Submittal A*2CA[469VA:KOKOIL llZI_\Z0W The development will have an HOA that will provide for the maintenance of the overall common elements in the community, including landscaping of the common areas as applicable and management of the natural resources. The HOA will also provide lawn care and snow removal for villa lots. Additionally, restrictions will be placed on outdoor storage and parking (no boats, campers, or trailers) in order to keep the community looking orderly and well maintained. Page 7 Natures Refuge North Preliminary Plat and Planned Unit Development Plan Submittal EXAMPLE ELEVATIONS — VILLAS The Willow The Cedarwood Page 8 ,now I MAU- NATURES REFUGE NORTH LINO LAKES, MINNESOTA I Y S 0 0 MAIN STREET (CSAH 14) 0 z ¢ w N v Z F 5 LILAC ST. N APOLLO DR. NOT TO SCALE VICINITY MAP ,, 5 SHEET INDEX ' 1. COVER 2. EXISTING CONDITIONS 3. PRELIMINARY PLAT INDEX 4-7. PRELIMINARY PLAT 8. PRELIMINARY SITE & UTILITY PLAN 9. PRELIMINARY GRADING & EROSION CONTROL PLAN INDEX C 10-13. PRELIMINARY GRADING & EROSION CONTROL PLAN 14-15. DETAILS - R1—R2. RESOURCE INVENTORY T1—T5. TREE PRESERVATION PLAN 3 L1—L4. LANDSCAPE PLAN F1. FLOODPLAIN EXHIBIT W1. WETLAND BUFFER EXHIBIT z 0 50 100 200 --- (IN FEET) BENCHMARK _j 1. Anoka County Benchmark No. 2011 — Elevation 894.88 ft. (NAVD88) 2. Anoka County Benchmark No. 2012 — Elevation 911.80 ft. (NAVD88) ENGINEERING CARLSON PFIE,45ANTII3NE SITE I hereby certify that this plan, specification Print Name: Brian J. Krystofiak, P.E. or report was prepared by me or under my Drawn: KRO Revisions: 1. 4/25/25 Per City &Watershed Comments M/I HOMES OF MINNEAPOLIS LLC NATURES REFUGE NORTH 1 SURVEYING , MIN iBLAMNE TELL.~. direct supervision and that I am a duly signature: � //� , ^� Designed: BJK 5354 Parkdale Drive, # 100 COVER of ENGINEERING �`NNIN€' Fax 7W. Licensed Professional Engineer under Date: 3/4/25 License #: 25063 Date: 3/4/25 Lino Lakes, Minnesota 15 / CA►RLSON-EN90NEEFINGDONF the laws of the State of Minnesota St. Louis Park, Minnesota 55416 1 1 Save Date: 04 25 25 f:\jobs\5401 - 5420\5412-03 - natures refuge north\cad c3d\engineering\preliminary\5412-03_cover.dwg # 5412-03 1 1\ I r o d' Up O J WI 0 �W^ U Z Q q) '" 1/2 inc�pen iron pipe -- ug- ug - Fence post (no fence) lies t0.7 ft.- North of property line Fence post (no fence) lies t1.1 ft. South of property line 0 C O O U 3 N (n N Ld 111.0 rn00 PO k 0) M ° co 00 T ° o N C__ z_�2 I WN O Wo C� I N zQN °zM �o UW S01 °54'53"W 1/2 inch open iron pipe 1252.48 (S-f0'4 ^ barbed wire fencd I N O � N c 0 oo� n`i m o °�� W �o t �.a) o I 0 0 Z m Z�: W �N z 0 �o o W a o � GO A I I z o F,\ 61) C\ /-1 LJ LJ I I l/ I V Val? 0 I i OA1 G0 p G° GO LLJo N PG���',y,�i �F,p�O°� �1 OQ��p011 F.�O'\`L I GO 0 \�� \p ��Q \,0Q p�� ° �F'�pQ 0° �1���'�'��` ��C� \,0Q D� ° �F.�O�� ���1 - lJ \) U o Q Q O��F. ��,' p`� rL�1 5ti� O�Q� Qp Northeast comer of the �� 5� F.��j�' G�5' �i -. \ 0 0��� 0� F' `L' East line of the North 1 2 of OWNER: z Southwest 1/4 of the pG�h' G�y� P p PGOca I �5 y,�i �0 ��, / PREFERRED PROPERTIES AND MANAGEMENT INC 0 __ the Northwest 1/4 of the P O \� Q\� p G� I �� 5'� PID:05-31-22-41-0004 - Northeast 1/4 of Q\��Q\0' Q\r\F'Q\0' Q Q\� Q\ P' 0� �'0�' � Southeast 1/4 of Section 5, I P Section 5, Township 31, Q\��Q\� Q\r\�Q\0' Township 31, Range 22 Southeast corner of the North Range 22 S01°53'15"IN I 1/2 of the Northwest 1/4 of- 1310.67 ° �� the Southeast 1/4 of Section Fence p st (no fence) lies � I S01 53 42 W 5, Township 31, Range 22 \ \ '�` `,7- f0.2 ft. youth and t0.4 ft. 659.98 — \West of property line I `9 AI/ � inch open iron pipe 7 n /n % T► / �, / 1/2 inch iron pipe WETLAND / ��_ East line of the Southwest 1/4 of the Northeast n (broken cap) ILI/ I VL/�\ I r� 1/ 9 \ \ \ 1 4 of Section 5, Township 31, Range 22 \ \ 1 WETLAND \� I z WETLAND ll W� CL Uj I � o 9 ��— Fence postfence) p (no l lies f 1.0 \ \ 09 \ O ft. South of property line \ \ 9po \ L /1 r— T ► ►r— o \ I _ a + z 1 r 7I=_ 0 / q i I existing gas line as field —�� \ \ �o o,. \ o CN U �— Fence post (no fence) lies marked and located \ s \\ ��2 0 \ 7^ _ — I \ f0.1 ft. South of property line \ 00 V ° O N ICN 0 \\ \\c, � - ° -N O �o \ / r o "� o � o \ N c o_o o ILIJQ) co _ 771 \\ P\ WETLAND �,o�z�� l `y ¢N I\ —Fence post (no fence) lies I \ 09 \°� Qo 0, \ / Y _ O c \_ O � f0.5 ft. South of property line \ \ 1 \ ` � O a I 'IL I \ \ `9\ c o��do \l\ � \ z F°- o ° c Co OI J 8S \ \1 0� �N°�� `Zaa W� ILI \ / o uiQ c W N WETLAND \ 9'�s ��� \ �. ZE � > I �IL WETLAND ---------- o _WETLAND (// ILL �� Q W� 0 ov Imo -WETLAND U►r Tr1L \ \ 9 \\ \ \ ` �� I \ \ V I WETLAND Imo -WETLAND I \ g\ V A\ WETLAND I \ \ \ \ \ I m \ WETLAND \ \ \ \\ \ - _ _ I IJ AImo\ / L, i existing gas line as field — J marked and located I ILL\\ \ \ Qo N � cno J - WETLAND \ \ \ Y /� ICq 1 Vl/�\ 1 _/1"l`: 'u� ILr1L\ 1 09\ \ I of 1 West line of the North 1 2 / 'I& WETLAND zwN mi' of the Northwest 1/4 of the Southeast 1/4 of Section 5, I \ \ \ // W Northwest corner of the Southwest Township 31, Range 22 � ''� � / ,� �0 <>CL WETLAND WETLAND- \ \ \\, \ -1/4 of the Northeast 1/4 of I 7 Fence ' Section 5, Township 31, Range 22 I post ( o fence) lies / I -WETLAND Fence post (no fence) lies / t0.1 ft. Eastiof property line_, r\\/\ \ \ \\ \ 0 ' t0.8 ft. East of property line —\ i Fence post (no fence) lies \ cos \ i / 1 i t0.2 ft. East of property line- \ ° ' \ \ � F�1 ce post (no fence) lies \ \\4� \ I / r �� /-1 'L N01 °54'53"E �-f 3 ft. East of property line \ \ I \ OWNER: 1315.28 ` x _ 09 z S01 '54'53"W WADE M & HEIDI M HALLSTROM \ OWNER: I c� o I x � 1983.42 \ PID: 05-31-22-24-0009 SCOTT W & CAROL A FEATHERSTONE Y 01 I / 'woven wire fence % 1/2 inch iron pipe N01 °54'53"E X RLS 415— — n \ West line of the Southwest 1/4 of__� (unreadable cap) -barbed wire fence end 9 661.14 V — \ PID:05-31-22-24-0010 JN the Northeast 1/4 of Section 5, barbed wire fence (lying -mil I \ I O 1 I Township 31, Range 22 OWNER: I -Fence post (no fence) on or west of propoerty \ z Z N / RAYMOND H & JUDITH K STADUM line more or less) Southwest corner North 1/2 j \ o L N c \ A L% r n/ n p li OWNER: \ 1\ L_ \ 1 V /-� I o 1 I ROD W KUKONEN / > o PID: 05-31-22-24-0016 OWNER:CD / \ JOHN ED KIN JOHNSON / AN D A L L STREET PID: 05-31-22-24-0008 PID: 05-31-22-24- 0015 / I of the Northwest 1/4 of the --I o a, Southeast 1/4 of Section 5, \ E ° o \ Township 31, Range 22 ° o ° ° V) lr OWNER: " DEBORAH J SCHULTZ OWNER: on � o PID: 05-31-22-31-0001 JOHN L BURCH \ a0 \ PID: 05-31-22-31-0007 \ ° I° \ `o z PARCEL DESCR/P7701V. (Per Schedule A of Title Commitment File No. 59590, with a commitment date of August 22, 2023 at 7:00 A.M., prepared by CBH Title, LLC as issuing agent for Old Republic National Title Insurance Company) The Southwest Quarter of the Northeast Quarter Section 5, Township 31, Range 22, and the North Half of the Northwest Quarter of the Southeast Quarter Section 5, Township 31, Range 22, Anoka County, Minnesota. (abstract property) GENERAL NOTES.• 1) The field work was completed on September 12, 2023. 2) Bearings shown hereon are based on the East line of the Southwest 1/4 of the Northeast 1/4 of Section 5, Township 31, Range 22, which is assumed to bear S01 °53'15"W. 3) Above ground utilities have been field located as shown. All underground locations shown hereon are APPROXIMATE. Prior to any excavations or digging, contact Gopher State One Call for an on -site location (651-454-0002). LEGEND - Denotes Anoka Section Monument, as noted • - Denotes Found Iron Monument - Denotes Light Pole - Denotes Miscellaneous Sign CP Q - Denotes Guard Post O - Denotes Sanitary Manhole SMH HYD \� - Denotes Fire Hydrant cv X - Denotes Gate Valve — U9 U9 — - Denotes Underground Gas ufo - Denotes Underground Fiber Optic - Denotes Watermain ->>- - Denotes Sanitary Sewer x x - Denotes Existing Fence as noted - Denotes Bituminous Surface jI - Denotes wetlands delineated by Kjolhoug Environmental services in 2023. - Denotes Existing 2 Ft. Contour - Denotes Existing 10 Ft. Contour z 0 50 100 200 ( SCALE IN FEET ) CARLSONSURVEYINGENGINEERING PHEASANT RIDGE DR NE SUITE 100 I hereby certify that this survey, plan Print Name: Thomas R. Balluff, L.S. or report was prepared by me or under my DRAWN BY: bjs Revisions: 1. 4/25/25 Per City & Watershed Comments M / I HOMES OF M I N N EAPO LI S, LLC NATURES REFUGE NORTHTAW.55449 2 direct supervision and that I am a duly Signature: ��/ ISSUE DATE: 3/4/2025 5354 Parkdale Drive, #100 EXISTING CONDITIONS of ENGINEERING :PLANNING FAX ��� �N-ENONEEi�NOMM Licensed Land Surveyor under the laws of the State of Minnesota Date: 3/4/2025 License #: 40361 FILE NO: 957 St. Louis Park, Minnesota 55416 Lino Lakes, Minnesota 15 Save Date: 04/25/25If:\jobs\5401 - 5420\5412-03 - natures refuge north\cad c3d\survey\pre-plat\5412-03_xcon.dwg 1 n I r o� Up 0 J W1 0 �W^ OVA Q I 0 W zo a� 1/2 inch open iron pipe 0 in_o O U (n N Lv L0 0)06 �O �� 0)V) ° oo T ° o N C__ O` L N � z_12 I WN O Wo C� I N Q ZQN �Z UW o I O I G o^ �� 0 Lu 0 GO oN dl? S/ lCN�p9 o W Q\� QP0 k 0 c0.: 0 0 Q Q / I Northeast corner of the l�L�,'S� Z Southwest 1/4 of the PGO� -� Northeast 114 of Section 5, Township 31, '\ Range 22 n l I �—� r� n /—I LJ LJ I 1 I I U I v GO GO I pO �011 F.�`L I GO 0 OR 0 0 ON � Oy Q' PGpO/ I �`L Q G��� Q\� Q�0 P pg S01 053'15"W 1310.67 � IiL \\ East line of the Southwest 1/4 of _ \ I ILL � 7/ �- the Northeast 1/4 of Section 51 \ \ WETLAND LL/ Township 31, Range 22 AL 13 `,WETLAND �� \\ ^/11 ►TI ►IA/r-�T r1 vvL_" /,I 12 \ 1 'Jul Al, WETLAND ► ®1 19 c 8 0 UTLO T C \ \ /-� r- T ► ►r- i �► \ \ \ \ WETLAND 11 6 \ \ ILL WETLAND LL Al \ \ \ av V F MMMMM ® ® ® ® ®ii . 1 2 3 4 \ \\®®IR\ ®i® ®® ®® 13 I East line of the North 1/2 of the Northwest 114 of the i' Southeast 1/4 of Section 5, Township 31, Range 22 1 I �- r- r-�- L_ PREFERRED PROPERTIES AND MANAGEMENT INC PID: 05-31-22-41-0004 Southeast corner of the North 1/2 of the Northwest 1/4 of--, the Southeast 1/4 of Section S01 053'42"W 5, Township 31, Range 22 659.98 3/4 inch open iron pipe I 2 4 / 5 STREET D 1� I WW 1� 16 20 15 21 4 ___ X 114 22 23 / Y � 24 : .: 1 26 13 112 1/2 inch iron pipe (broken cap) N O Q U 3O� QO 4 �, W N a z � o= r� WI U � r II O 18 0 UTLOT D I Q \i Z /1 r- T► ►r- I _ Li 10 I LI_ � o o OZ I I L I I o Q) o �� W� �z a,a Z 2 O I zWN ILI \ I 2 M / WETLANDS/ -' W "� ,_- �CL �: 0 Q .. ®®®®®®®■f®®®®®®®..®®®® Q n 1/1 jTl II A/r-^T .1 /^ �� O Q Z 2 I VU \ I r1VVL_.; I ,i �r to� o l 1 2 3 6 \\ ® 2 �QN� 0 28 �z 20 \ o a o o cn N 36 j / \ 30 4 35 \=�= 34 STREET A _� 31 33 / r 5 4 �. ° o az��"' �Y� 32 f o 10 11 ® ` 12 11 o N o 3 10 9 ® 7\ O�Q�I° 10 C ----- ® \ �° G,) 8 2 �- ® 17 3 6 5 4 LI J\ ILL 2 \ /� `\ / Z �•� \� ® / `\ •\%� \\ 0UTLOT A nr- -7-1 ►r-No �o WETLAND \ � (\ Pd `\ vi I r1L_ ' � w � i- — 1 \\ I � 'moo \ � . ��- . O� �O1 �Y1 / \ cos` n��7L_ LL ' WETLAND :z— �6N /IiL® \ \ I 1/2 inch open (IiL iron pipe WETLAND S01 °54'S3"W 1 \ \ 1252.48 (s-fo.4 --WETLAND - ' \ i `� \ ^/l► SIT► Ir- A ^T N01 054'53"E AL AL AL 1315.28 `� \ VRL sot °54'53"w \ OWNER: 1983.42 o N i WADE M& HEIDI M HALLSTROM \ OWNER: I cn o I - _ PID:05-31-22-24-0009 I _ o a \ \ COTT W & CAROL A FEATHERSTONE Y Oj 1 1/2 inch iron pipe N 01 °54'53"E _- West line of the Southwest 1/4 of —_'(Unreadable Cap) 661.14 1578 o o �\ Northwest corner of the Southwest PID:05-31-22-24-0010 JN the Northeast 1/4 of Section 5, West line of the North 1/2 of of the Northeast 1/4 of I o I Township 31, Range 22 OWNER: i \ i / RAYMOND H & JUDITH K STADUM the Northwest 1/4 of the i Southwest corner of the North I \ o `d N W o of 5, Township 31, Range 22 J N PID: 05-31-22-24-0015 Southeast 114 of Section 5, --� 1/2 of the Northwest 1/4 of--/ o o the Southeast 1 4 of Section E \ o ci Oj n L% r n/ n p W^ OWNER: o c N \ /-1 1 \ L_ \ 1 V /-1 I �,r) I PID: 05D3 22Iff K�4EN / r_ \ p 9 / g on cLi ° c o Township 31, Range 22 c t \ 5, Township31, Range 22 ° o ° U po LLI `-' OWNER: o p a / DEBORAH J SCHULTZ OWNER: \ o z / \ PID: 05-31-22-31-0001 \ JOHN L BURCH \ a� � OWNER: \ / l � / I \ PID: 05-31-22-31-0007 0� a JOHN EDWIN JOHNSON \ / o A N D A L L STREET \ / \ ) I2 PID: 05-31-22-24-0008 o 91818 1119'T r• W C� I I 4 6 PARCEL DESCR/PT10M. (Per Schedule A of Title Commitment File No. 59590, with a commitment date of August 22, 2023 at 7:00 A.M., prepared by CBH Title, LLC as issuing agent for Old Republic National Title Insurance Company) The Southwest Quarter of the Northeast Quarter Section 5, Township 31, Range 22, and the North Half of the Northwest Quarter of the Southeast Quarter of Section 5, Township 31, Range 22, Anoka County, Minnesota. SITE DATA TOTAL SITE AREA ±59.30 AC. TOTAL ROW AREA f5.59 AC. TOTAL OUTLOT AREA ±33.94 AC. OUTLOT A ±7.91 AC. OUTLOT B ±4.50 AC. OUTLOT C ±14.33 AC. OUTLOT D ±6.75 AC. OUTLOT E ±0.20 AC. OUTLOT F ±0.25 AC. TOTAL LOT AREA ±19.77 AC. SMALLEST LOT ±7,800 S.F. LARGEST LOT +12,996 S.F. AVERAGE LOT ±9,253 S.F. TOTAL NUMBER OF LOTS 93 GROSS DENSITY 1.57 LOTS/AC. EXISTING ZONING R-X PROPOSED ZONING PUD UTILITIES AVAILABLE SETBACK DATA MINIMUM RESIDENTIAL SETBACK DATA: FRONT 25 FT. SIDE 7.5 FT. SIDE CORNER 20 FT. REAR SETBACK 30 FT. PROPOSED DRAINAGE AND UTILITY EASEMENTS ARE SHOWN THUS: being 5 feet in width, and adjoining side lot lines, and 10 feet in width and adjoining right of way lines and rear lot lines unless otherwise shown on this plat. LEGEND - Denotes Anoka Section Monument, as noted 0 - Denotes Found Iron Monument - Denotes wetlands delineated by Kjolhaug Environmental services in 2023. z 0 50 100 200 ( SCALE IN FEET ) CARLSONSURVEYINGENCSINEE�tING PHEASANT RMSE DR NE SUITE 100 I hereby certify that this survey, plan Print Name: Thomas R. Balluff, L.S. or report was prepared by me or under my DRAWN BY: N]S Revisions: 1. 4/25/25 Per City & Watershed Comments M / I HOMES OF M I N N EAPO LI S, LLC NATURES REFUGE NORTHT�I� 3 MN 55449 direct supervision and that I am a duly Signature: A��/ ISSUE DATE: 3/4/2025 5354 Parkdale Drive, #100 PRELIMINARY PLAT INDEX of :PL'�� ENGINEERING ANNINE< FAX �� �N-ENONEEi�NOMM Licensed Land Surveyor under the laws of the State of Minnesota Date: 3/4/2025 License #: 40361 FILE NO: 957 c St. Louis Park, Minnesota 55416 Lino Lakes, Minnesota / / 15 Save Date: 04/25/25If:\jobs\5401 - 5420\5412-03 - natures refuge north\cad c3d\survey\pre-plat\5412-03—preplatindex.dwg I I - - - - co I 21 t9,912 sq.ft. / I ! I °o � ao � f10,550 sq.ft. /� / I �50'6 � � � - � � / I / / L - l � 0 UTLOT D 6 _ - - - L I J WETLAND / I V '� I Drainage and - - � 1 I f9,288 sq.ft. I, � I /'Utility Easement l / L � � I \ �o \ - \2g 9 /� f294,211 sq.ft. \ ' ' I I e and I- - -I - 155.9 \ M \ / Drainage and Utility Easement o TDrainag \ \ ' I - Utility Easement_ o - - - - ` ��/ - \ L I � o � \ � \ ^ (Over all of Outlot D) i \ // co - rt 133.0 O---- \.0 275.2 t10,879 sq.ft. 3 \ \Q 11 \o o aa)o _ Cof10,886 sq.ft. ±10,459 sq.ft. 0 ( D-N j�o .61 \ o 5 z I L_ IN t9,647 sq.ft. 13 I I so3±11,696 sq.ft. 12 C" 23 f11,934 sq.ft. U _ o / _ \ i i f9,993 sq.ft. /�5r�oco O/7Q �Sa)��a'ro9s RS / O�/OI ems > 0\ o e ez v>^ 24 f10,678 sq.ft. \ \ /8.4 - , - 7 - - - of / 820 s 600 , 1\6 vv vv 0I v v / / 25 79 ' 2 LIB 3 / / S SV / / t9,806 sq.ft. / / / vR� ;% v / / . / 26 / > �o ±10,675 sq.ft. / / \� ;' O s M / / / / U \ \ \ < / ^> > \ / f8,002 sq.ft. ►y `t o \ pj/ / \ �2 \S 26� 07,0/ l of l 2! l l / �� 6 0'4 \ \ a'oo \ �% / \ / /� ^�/ / f8,253 sq.ft. / / ��0 A 1/'1'7TI /1 A/r�T / � rn \ ,� \ ss \ / / l / 22 I VV� 1 hVvCZ) 1 I/ �t 146.3 r- c0 - // a/7o S9� / // // �\ S � \ / // / // /l / 28 / // 2.3 g3.5 - z \Q \ �' \ O \ / / 2 / / \s� 8j / f8,683 sq.ft. ft�, sq.. / / S \ / f9,045 sq.ft. / ;' O st 4 / / / / S __ 8 i �- \�`'/ / �g \ \ �i7P �L/ / /6'O R� 33.2 \ - \ / / / / 111 2 6� 9 I / 26.7 sO\Mo �/ //t8,145 sq.ft. �S2 0\ .2 •553'�4 S�7 51 ry e 1,II I I I II I I I I I I I I wf7,860 sq.ft. t9,812 sq.ft. 36�10 10 I UA t9,932 s q•ft. ONNE/O2 "NSp 30 � h E/R00AS2 f9,035 sq.ft. -a w /so/ CIP�10/ N / / rl�i I v \v IDU0 f8,110 sq.ft. v�685o RE°5 " A 34 31 •Q t8,472 sq.ft.)f7,860 sq.ft. 42.6 53'8126.530>> t9,469 sq.ft. 33 I� ° � 32 I . 1 -638sq.ft. \o \ f9 433 sq.ft. 60.3 9 lb 13 59.5 6 ' o V L-f8 930 sq.ft. ±12,996 sq.ft. o n�tn/1nr` ,r ° o°O121 _ ro� 8/ -- ,AST-,--o o/ f9,209 sq.ft. // 11 �/ / ' ---- AO 6 10 10L -0t9,752 sq.ft. �I t11,219 sq.ft. f8,800 sq.ft./--_-_-o�1I114 W 83.3 o A a 10 %9 OOD 79.4 Drainage47 sq.ft DRIVE 33000 �0aI \ Easement�N 27.9 W \ 1/ \ / /\ / rn \ I �o \ 9 / 1 \� 70.6 65 C / / f8,078 sq.ft. / / /� �S�.g 626 I I I 1 p 3b r0 v�yV A 2 V / /^ / / / / 54.9 II III II I I ItI I I9�,500 sq.ft. 54.9 N - o�N L II _Jro 5.01-10 \8 °i 0 =25o.0 \ ° / / f8,187 sq.ft. 375 // / \11 ,q.. II 290.2 .0 3 t8,059 sq.ft. % o E_ f8,809 sq.ft. / ±8,556 sq.ft. -5.0 // / 6 555.0 t9,367 sq.ft. 0 sq.ft. t8,61r / \ 6•/ t9,031 sq.ft. c" Cc/2 ''` 53.6 f8,703 sq.ft. 5g.8o 6 ooseao tx f11,263 sq.ft. o 8 70\ 59451 1 4 f8,703 sq.ft. ,2 -- J f8,70sq.ft. � 275 r1 1 f8,703 sq.ft. .8- 74. \ \\ \ / / / / � � \ / / I I I II \ \\ � � � •\� � s �� ' \ 167.2 50.2- 3 s OUTLOT A - - J (_ - - - - - - g0 4 " / \ / \ ±344,400 sq.ft. Q i\ -- 80.4 80.4 -- WETLAND \\ Y\ \\ Drainage and Utility Easement C7L \ -- � \ \ (Over all of Outlot A) 30 --- i Q tD I � � ILL ILL ILL AL AIV�he I ` AV � � � � LI_i A ILL ILL ILL 0 \ ' / W I - I V � 71-- L L �n 0 UTLOT A v V LO vv �� t344,400 sq.ft. I South line of the Southwest 1/4 of I \ WETLAND � - Drainage and Utility Easement �LL �LL �LLI the Northeast 1/4 of Section 5, � 0 25 50 100 (Over all of Outlot A) / I Township 31, Range 22 \ I_ LL Also the North line of the North 1/2 z of the Northwest 1/4 of the Southeast ,\\\ �� \ / \ (SCALE IN FEET ) \ I j 1/4, Section 5, Township 31, Range 22 � � \ j \ _ 7 0.0 �' I \ .)VV 1 r1e_r,`) 1 1/ `t South 1/4 corner of /1�✓ETLAN D � \ I 643.0 / \ h° \ \ l Northeast 1/4 of Section 5,_ 1354'53 \ \ � � � � Township 31, Range 22 01 54 53"E West line of the Southwest 1/4 of � \ \ � (cast iron Monument) �\ the Northeast 1/4 of Section 5,--"/ 1/2 inch iron pipe I S01°54'S3"W I 661.14 1983.42 Township 31, Range 22 I (Unreadable Cap) West line of the North 1/2 of the - - _ _ _ - Northwest 1/4 of the Southeast 1/4--' N01°54'53"E RLS 41578 �� - - OWNER: OWNER: / / RAYMOND H & JUDITH K STADUM of Section 5, Township 31, Range 22 JOHN L BURCH Southwest corner of the North 1/2 / OWNER: PID:05-31-22-24-0015 of the Northwest 1/4 of the / \ ROD W K2-24- PID: 05-31-22-31-0007 i PID:05-31-22-24-0016 / OWNER: Southeast 1/4 of Section 5,- DEBORAH J SCHULTZ Township 31, Range 22 \ / PID: 05-31-22-31-0001 PHEASANT RWCxE DR NE I hereby certify that this survey, plan Print Name: Thomas R. Balluff, L.S. DRAWN BY: NJS Revisions: M / I HOMES OF M I N N EAPO LI S, L LC 4 CARLSONSURVEYINGENGINEERINts E 100 or report was prepared by me or under my 1. 4/25/25 Per City& Watershed Comments NATURES REFUGE NORTHBLA""., p y g 5354 Parkdale Drive, #100 PRELIMINARY PLAT of MN 55449 direct supervision and that I am a duly Signature: ISSUE DATE: 3/4/2025 ENGINEERING PLANNING ���4 Licensed Land Surveyor under Lino Lakes, Minnesota �N-ENSINEERINILCOM the laws of the State of Minnesota Date: 3/4/2025 License #: 40361 FILE NO: 957 St. Louis Park, Minnesota 55416 15 Save Date: 04/25/251 f:\jobs\5401 - 5420\5412-03 - natures refuge north\cad c3d\survey\pre-plat\5412-03_preplat.dwg i AI V V A _F z \.7 L_ 0 25 50 100 I I OWNER: I ( SCALE IN FEET ) PINE ACRES DEVELOPMENT CO PID: 05-31-22-14-0011 IOWNER: M/I HOMES OF OWNER: LLC OWNER: I I PINE ACRES DEVELOPMENT CO OWNER; PID: 05-31-22-41-0004 PID:05-31-22-14-0012 PINE ACRES DEVELOPMENT CO OWNER: I PID:05-31-22-14-0013 PINE ACRES DEVELOPMENT CO East line of the North 1/2 of the S01053'15"W PID:05-31-22-14-0014 /----Northwest 1/4 of the Southeast 1/4 1310.67 / of Section 5, Township 31, Range 22 Southeast corner of the North 1/2 of the Northwest 1/4 of 38.8 S01 the Southeast 1/4 of Section 51`\ 297.3 °53'42"W Township 31, Range 22 38.8 � \� 98 I� East line of the Southwest 1/4 of �O �O 3/4 inch open 659.11/2 inch iron pipe �--the Northeast 1/4 of Section 5, L n pipe (broken cap) 336.2 - Township 31, Range 22 125? 128.8 __ \ _ _ -- 60.0 62.5 22.4 108.01 ?' Q r ---- FF62.5 - \ �' I I I 10 10 s.s1 vvI \ ► r7 1� \ 13 \ �� \ I I I � T_ i- l i I I .� f8,334 sq.ft. O a,� I I I 39.4 - o\ c� 0 UTLOT F I I I C3*_ t10,806 sq.ft. I I 6 o 30UTLro \\ \ LJ OT C 12 f8,126 sq.ft.I 1 f8,465 sq.f.I f623,126 sq.ft. fg�46sq.f1 II 1 II t94 sq.ft. /cn' Drainage and Utility Easement ,sq.. 5(Over all of Outlot C) / / / /�27\•S \ M I. / f9,917 sq.ft. 30 L_--- 10 10 \ � 11 30 \44.2 60.0 62.5 62.5 117.7 - -/ p a Q0 \\ t8,551 sq.ft. , 0 / / 6 \ L 0 cn0 6 /u \ 6 '' / M STREET D 0 ±10,074 sq.ft. I`----� a Z� 269.9 M I mil/ /� r' O �i I �I 10 I �o o� 1 �\ 1 P � o� U,\ f8,735 sq.ft. I r ---- - 167_3------ 67.8 I� WETLAND _ _ o - _ 130.p 1 I / / \ "0 \ ±10,074 sq.ft. I I ILL ILL/---__ ---� �I 18 / / \ o 1-21 _ fl)v wl z C'v/ - ^ 1 t12,211 sq.ft. /Co / , 17 I hN/ 9 I^ I l \ / / I f11,315 sq.ft. I �----132.2- -� I I \ //C t7,830 sq.ft. _ 149.4 // / ao---------- \ � � � 135 co / ---- ----- - I ----------- - ^ r - �__ � ---- ----- --_ --�--146.5----- JcV5 30 30 8 �o ,3 - - I t8,304 sq.ft. w 00 o/ 8 1���/ 30 / t8,921 sq.ft. /� / I `� 145_7 / f8,441 sq.ft. I / 3 L---_ 151. l� l 16 L--------------1 _ _ _ _ / I L _ 1 '� O `� - - - _ 3 - - - _/ / f9,642 sq.ft. o -- 30 30 `o 1 0 I 1450 <o/ry ��o e9 �i11-1Li I -1--__ii/° t8,975 sq.ft. �I �I 20 / 1 / --_ _ I l a-) q I / / / t9,542 sq.ft. / / R=60.0 _?�_ / \ o _ 145.2 - - - _ _ r� 1 O / �- ---- \IA/n\� \FIJI- L% I� /i I t8,265 sq.ft. /� 161.2 15 /w ;� �----------- �w / V V I L _ -- I / � � � � � - 129. I � - - -- - -- - - - - _l N / f11,366 sq.ft. I/�� 6�O 10 1 I - 0 I 21 /� / t9,912 sq.ft. 4 _ I / .01 I 00 ±10,550 sq.ft. 'N 150.6 \ 1 6 /� O UTLOT D / � I ro I 1 Drainage and / / \ I WETLAND / 1 f9,288 sq.ft. 1 I 'Utility Easement - - -/ L - - _ - -' \ �6, 126 9LO /�`� ±294,211 sq.ft. \ i 1 e and _ - 11 / - \ / \ / Drainage and Utility Easement o \ I / �Drainag - L 155.9 - i Utility Easement J I \� � I \ o - - - o J ^ (Over all of Outlot D) a) \ i 133.0 - - - \ .o \ / /\ 3 275.2 o \ ±10,879 sq.ft. / / 9 4 q�.3 \ 11 / ° 0 o) 110 I Ckf 22 �\ \ \ N� \(Ai / t10 886 sq.ft. oLo 5 CAco a 1 f10,459 sq.ft. / j \Q� �� °/ / / 1 i \ \ q' o \ L In 03 O r7 �I f9,647 sq.ft. 1 C� N\\ ,� �� /> \ /// 13 I I \ \9 // '� °' o / / / / \�� \ / r / f11,696 sq.ft. 1 I 12 \ \ 2 23 / / 00 \� rn1 1 ±11,934 sq.ft. \ \ / o \1 4 a� Lri 1� \ � \� � , � t9,993 sq.ft. / / / ���„\ � �I 1 \\ \\ / �0 c a`�i �o \ \ \ \ \ / / n <v / / \ \ 1 1 ale Q5e / / V) z cn \ \ 7 / / 24 / \ I / \ t10,678 sq.ft. A 88. J \ \ \ \ q �p / / / f9,820 sq.ft. 4 \•0 / 60.0 \ \ \ \ \ o \ ^ham / / / \ 8.7 3 / / S)3\ / // t9,806 sq.ft. / / \ sr� \ / / 0 / 26 \ \ ±10,675 sq.ft. vi/Lo <� // //�° s�� \\ /'o / f8,002 sq.ft. // p• / \ � / 7 / \\ \Aopom \ \\ / / ��� 6) 0 / / �/ / f8,25 sq.ft. / / / / \\�0 h" 7-1 IIA/[-;.-I-- .1 /it M \ 22 I V V �� 1 r 7 V V L_ .: 1 1 / `1- 46 3 8-3-5 - - -� �- 00 ��++ / �\ \ ,,� , a"o �9; / // // �\ �' <\\ / /I / / l 11 28 //z 3,518 sq.ft. / / / / \ S \ \ '� \ 0 \ \ / 2 / / �S� / t8,683 sq.ft.- / f9,045 sq.ft. / / \ O Rg` A rol 9 \ \ \ 1g` 0 33.2 --g9 os\ So�/ St8 145 sq.ft. \ 51.2 y 0 0��>/ 4 _j / ov 1 I i1I I I I I 1 II 00 f7,860 sq.ft. 2 sq.ft. 10�\ 3 t9,81636 -10 6� E 35 IW t9,932 sq.ft h� f9,035 sq.ft. �1 U1 -70 / / so \ /�� �°c >> i 0 ,6 2S0 / / I I o I 1 1 W f8,11 o sq.ft. I / / h , / 3 Q \ / / ! I I p o LLJ 11 34 I I� q I II \ / / 8 n \ / / 1� ocn __ ri i i \ \ / 3.4 \ / .71I f8.472 sa.ft I I I PHEASANT PJDGE DR NE I hereby certify that this survey, plan Print Name: Thomas R. Balluff, L.S. DRAWN BY: NJS Revisions: M / I HOMES O F M I N N EAPO LI S, LLC �AIML�N ENGINEERINts E 100 or report was prepared by me or under my 1. 4/25/25 Per City& Watershed Comments NATURES REFUGE NORTH LI_ LI_ <I � 000WNER o0 2 / S REFS 05 N1-2�/ / i / NP�URE PID/ BLAI",6& ., 5354 Parkdale Drive, #100 PRELIMINARY PLAT SURVEYING direct supervision and that I am a duly Signature: � z� ISSUE DATE: 3/4/2025 ENGINEERING PLANNING F-AX �. 79M Licensed Land Surveyor under Lino Lakes, Minnesota CAM-EN6INEERIN�COM the laws of the State of Minnesota Date: 3/4/2025 License #: 40361 FILE NO: 957 St. Louis Park, Minnesota 55416 Save Date: 04 25 25 1 f:\jobs\5401 - 5420\5412-03 - natures refuge north\cad c3d\survey\pre-plat\5412-03_preplat.dwg 5 � of �15 21 4I 1 � v I m ±10,55d0 sq.ft. c° 6 r� 1 Drainage an ` I WETLAND - \ \ , I f9,288 sq.ft. I � I /'Utility Easement - - - � / % L \ I-\�---- o a' / Drainage and 155.9 \ \ I I \ \ \ \ \ I / / co - -rt Utility Easement - � 0 0UTLOT C \ \ \ I �,� \ 133.0 - o a - - _ - - - -N� \ t1018��sq.ft. /,/� 3 I±645,265 sq.ft. \ \ Drainage and Utility Easement \ \ o 22 / \ (Over all of Outlot C) \ \ \ \ / ( I C"N I t10,459 sq.ft. ILL ILL ILL ILL ILL`\ V IW o C"\ WETLAND ` �° v f9,647 sq.ft. \ N\ \ \ v / /13 23 \17D / f11,696 sq.ft. ,IL / 81.0 81.3 `\ ` `\ I �� \ \ t9,993 sq.ft. o�\�\ t i g1• /� -- --- -� �\ 73 \ \ \m000�9` ,0 I \/ \\ \ \ \\ \ \ II I i s�7 24 Qg f10,678 sq.ft. t9,820 sq.ft. / / �-- 60 0 8 8.4oO 00 \ \O � CA o I o � f8 907 s ft. t8,976 sq.ft. / o \\ 134.0 6 _ < 1 I I I t8,986 sq.ft. c>// S /25 c � f8896 sq.ft. .o60.0 56.1 17.9 3 / t9,806 sq.ft. / / `\ \ \ t V i f10 675 sq.ft. / / \� V / �/ / 26 1 �0/ \\\ // / t8 002 sq.ft 014 t8,893 sq.ft. \ 7 \�JO/ 27°�0' 4 L ` ° 1 '0 f8,253-v osf7,896 sq.ft. 55.0 55.0 L : \�9� .0 6 20 o \3 / f8,518 sq.t.o o t9045 sq.ft. "�O '01 1 f9,069 sq.ft. vR=2500 (0/° ti `O z 3572.S`/ �j7,sq.. ,sq.. _ O 6O 3/ / . 9 - / / / / STREET A \\ <\ //// 7 ///�\ `\°S�� \\\ // / �° so 26.� s>, ��\ I I I I I v� ? �►� \ t243,345 sq.ft. \ \ Sj\ f7,860 sq.ft. \ S8 t9,812 sq.ft. 7 •O \ 1 , S \_ If / o I - R - �/ / / ��' a �3? 23.6 60.0 57.5 U �\ `,, �p � � I I � 0 0 0 / / col?i \ \ �6\ / / / /� SAS^ o 0 o 8 j o R� 5p V 1 1 V // 5 / \ \ I I /` ;'O sr\ / / t7,860 sq.ft. / / ` \ �� \ / \ / 7 /- 35.8 126.5 oN -- _ 141.2 _ -�-�- \ \ \ I I // / \)0 ;''y 9\ / / o / / `\ 42.6 3p.0 \ 6 / 0 e \ \ t9,4s8 sq.ft. �I I 4 // / v �° //// / /� \ �v ,�i ,^�.� // // // / a� \ \ \ \ 13 \ \ \\ \\ \\ \ \N \ LO �°t9,525 sq.ft. 9 p \61.0 1 1 \ sq.ft. ...�\ �• < /�7�065 t1q2,9e °9�\6a sq.ft. _ lb f8,45sq'ft\\ o /,/ 12t8,794 sq.ft. 6° 10 of9r209 s/ /.f/t. �% t9,752 sq.ft. ±11,219 sq.ft. % //o0� / / // t/ /8,8/1001 sq.ft. \wfs,o96 sq.ft. o�, o 42> i 8 � / / / /��` 0) 9 f9,544 sq.ft. Drainage f8,5 00 o 10 of7,802 sq.ft. N 'sUtility w t8,700 sq.ft. \ -,and 06 ,q.. \ O ; I \ 5g.25�o \ / // )(0S o ,%',` `\� �. 70.6 s5.2 I I I I f11,211 sq.ft. / '., 3 ^5 _ R=250.0 , / , � �• \ h � \ I . S9 \ / O 290.2 �� \ V A i 61.0 60.0 76.3 p � � ,�. � O 197.3 - \ i �3° R>00 \ \ v \ 5.0 oILL 555.0 -55\ \ \ \ / / - - - r \ \ \� f9,367 sq.ft. \ 0 0 / 6 / / I 1 I I \ \ o t8,703 sq.ft.aoo \ 1 Y o N\ j f11,263 sq.ft. / / 1 I I I � 3\ \o \ \ / / Og °` \ \ j ' \ 0ea700 0 of / // / t8,70�sq.ft. I I 4 I Ilo f8,703 sq.ft. N / r-1 I f8,703 sq.ft. Lu Zr LLJ wo I 96s \� L I I I I '�� \\ e� 7 0 UTLOT B ±195,878 sq.ft.----------- - 8p.4 80.4 - WETLAND \ \ (y \ Drainage and Utility Easement 30 30 �! � (Over all of Outlot B) ,,,L ,,,L ,,,L AL I 'L 'LL / ' /\ w 0 UTLOT A W L / \ \ o Northwest corner of the Southwest ±344,400 sq.ft. South line of the Southwest 1/4 of \ \ / 1/4 of the Northeast 1/4 of - Drainage and Utility Easement the Northeast 1/4 of Section 5, Section 5, Township 31, Range 22 i \ � � (Over all of Outlot A) /' Township 31, Range 22 I Also the North line of the North 1/2 -� � S01 054'53"W of the Northwest 1/4 of the Southeast '�I I'� 1252.48 1/4, Section 5, Township 31, Range 22 �\ _ - n � � `_ / 1/2 inch 612.3 30 1 30 ILIL ILL �' open iron \ 30.0 30.0 I = pipe i North 1/4 corner of Northeast W (S-t0.4 \ \ 1315.28 643.0 1ETLAND\1 \-1/4 of Section 5, Township 31, v� o W-f0.2) Range 22 0 \ I I (cast iron Monument) OWNER: N01 054'53"E West line of the Southwest 1/4 of \ \ the Northeast 1/4 of Section 5,--/ 1/2 inch iron pipe W N WADE M & HEIDI M HALLSTROM Co o Townshi 31, Range w c� PID: 05-31-22-24-0009 OWNER: I too p 9 22 j `� \ \ SCOTT W & CAROL A FEATHERSTONE I l Y I I (Unreadable Cap) J N / OWNER: RAYMOND H & JUDITH K STADUM o f � \ \ PID: 05-31-22-24-0010 I � z I OWNER: PID: 05-31-22-24-0015 I z Q \ '' N PID: 05D31 22-o f 0 016 / 0 25 50 100 \ o SCALE IN FEET) ( CARLSONSURVEYINGENGINEERING PHEASANT PJDGE DR NE E 100 I hereby certify that this survey, plan or report was prepared by me or under my Print Name: Thomas R. Balluff, L.S. DRAWN BY: NJS Revisions: 1. 4/25/25 Per City& Watershed Comments M / I HOMES O F M I N N EAPO LI S, L LC NATURES REFUGE NORTHBLA"NSF.., MN 55449 direct supervision and that I am a duly p y Signature: g ISSUE DATE: 3/4/2025 5354 Parkdale Drive, #100 PRELIMINARY PLAT of ENGINEERING PLANNING FAX �. Licensed Land Surveyor under the laws the State Minnesota Lino Lakes, Minnesota / 15 �N-ENONEEMN CEiM of of Date: 3/4/2025 License #: 40361 FILE NO: 957 St. Louis Park, Minnesota 55416 Save Date: 04/25/251 f:\jobs\5401 - 5420\5412-03 - natures refuge north\cad c3d\survey\pre-plat\5412-03_preplat.dwg O N U C I WI O AWN Q I Z6 I a: E I Northeast corner of the Southwest 1/4 of the Northeast 1/4 of Section 5, `\ Township 31, Range 22 \ I I o I U �C) oW o PINE ACRES DEVELOPMENT CO irk I 1\ I r- / 1 n I I PID: 05-31-22-14-0008 I 1 V L_ L/ /-1 C\ A n n I T I 1\ 1 w ;i!QN °LIJ L� I O OWNER: I _z PINE ACRES DEVELOPMENT CO a OWNER: PID: 05-31-22-14-0011 I PINE ACRES DEVELOPMENT CO OWNER: PID:05-31-22-14-0009 PINE ACRES DEVELOPMENT CO PID: 05-31-22-14-0010 OWNER: I PINE ACRES DEVELOPMENT CO PID: 05-31-22-14-0012 1/2 inch / \ S01 053'15"W I open iron ' \ 1310.67 pipe , � � 935.9 �]L 11L OWNER: PINE ACRES DEVELOPMENT CO OWNER: PID:05-31-22-14-0013 PINE ACRES DEVELOPMENT CO PID: 05-31-22-14-0014 \ 38.8 38.8 r � I \ ^ - jam T I I n N I �I I WETLAND East line of the Southwest 1/4 of .y0 .y0 V --the Northeast 1/4 of Section 5, \ Township 31, Range 22 125 ' \ j 128.8 13 \ I f8,334 sq.ft. 0, I 0 UTLOT F o \I 1521\ \ \ �\ \ ±10,806 sq.ft. �O t9,079 sq.ft. 0 \WETLAND I \ ��\ \ \ ^/l DTI 1"1 vvC.: 1 �� �t \ , - p JO V \� \ �i� ' \� � 11 30 \ 44.2 \ t8,551 sq.ft. \ LLJ ° Coll) �J) ` \ �� ���1 O wo \�� \\ \ `\ 0UTLOT C l I �� �' \ \ ±624,258 sq.ft. / P I 10 I o o°ol I I z 0 25 50 100 I ( SCALE IN FEET ) I I East line of t ----Northwest 1/, / of Section 5, I I I 297.3 \�T 3/4 inch open 336.2 iron pipe 6062.5 r-- .0 .0 ---- 62.5 - - -- 22.4 10 686 80 0 i \ \\ Vi10 I I I (D >,� I I 6� I 39 2 I 1 3 I f8,126 sq.ft�l I t8,465 sq.ft. `- 1±8,465 �,I sq.ft. I 1 f9,419 4 I I i sq.ft. f9,917 I------ L---- J10 10L- 60.0 62.5 -J 62.5 L 17.7 _ 34.8 STREET D I M � �93 - 269.9 I � C)f 0 �o Drainage and Utility Easement / U, I t8,735 sq.ft. I I r - - - - - - 167.3 - - - - - - - _ 67.8 \ \ (Over all of Outlot C) / WETLAND / L _ 1 /- - \ \ \ raga \ \ - 18 l 0� - - -� I / v sea \ / / - - - - - ^ I ±12,211 sq.ft. Co / 1 17 \ \ \ �00 \ �/ 9 I 4 / / f11,315 sq.ft. \I rn t7,830 sq.ft. L\ \ - -- 149.4 _ - - // /------- / I _- \ AL �� -13 /`O --- ----1 --- -- \ o \ n - -ri ►r- ^ -7 ---- L-- �°s \ L/� �- � /�\ -� 5-� / / -- T--146.5 I� 30 19 \ \ 8 �3 / t8,921 sq.ft. I I \ / 15 • 0 of / Co t8,441 sq.ft. / j 3 - - 151. 16 ` 0 \ \ L o 0 ----- t 42 sq.ft. / 9 6 s .f 3 ----- 00 V I CN 20 7 t9,542 sq.ft. / / R=60.0l�/ A / I� I `/ f8,265 sq.ft. /� L - - - Nr 16-1.2 // - _ 115 129_6 I / - - -___ N/ ±11,366 sq.ft. /h° 6p ---_j , I ---7 21 C I I 00 ±10,550 sq.ft. cn 150.6 6 \ \ (0 I Ira I Drainage and ---- -- -- ---_- \ � \ WETLAND \ ` \ I f9 288 sq.ft. I,� I i 'Utility Easement \ \ , I e and � -I � - � I Drainage L� 155.9 � I \ tUtility Easement o - - - - - - _ 0 v \ 133.0 o a o �{ - - -� ��o \ \ t10,8� 4sq.ft. / / 3g 275 2 vv v o 22 �� v 413- �N I ±10,459 sq.ft. \\ V \\ I 1i,� 010 o / \ \ WETLAND `\ � `� � � III fs,647 sq.ft. I ('I03 N\\ �� i� \ / 13 I I / \c� \ / / ±11,696 sq.ft. I I 1 \V ` AV 23 // / \d' �� of I f11,9: / 81.0 81.3 ` i f9,993 sq.ft. / .Ili .Ili .Ili .Ili / 0) 1 -- -� �\ 813 \ ` \\ I�\p \ C ���•/ // o�aa�°tc// 0/0 LLJ ,n / 1 / \ \ I -1> ��\ / / 24 t10,678 sq.ft. i f9,820 sq.ft. 4 - 60.0 ,f L 2 0 / � \ v v I \ O v 589Nr CA 68.1 t8'907 sq.t.° f8,976 s ft. r, y� 4 251/ 134.0 1 t8,896 s ft. 1 I f8,986 sq.ft. h ) A \ \ / S)V 0 _ \ \ \\ q' I I I I Mo / l / / \ \ �� \ \ I 3 t9,806 sq.ft. 0 60.0 56.1 17.9 i a -1 F\ o \ I I l / / \ \ V ; 26 �' \ ±10,675 sq.ft. / O 6' / ' N I I I I I \ \ \\ \ 1 I I I / / 5 / / \ \ ` < / / \ \ ; / / f8,002 sq.ft. N ° I I I I I \ \ 4 \ I I _ L - _ I I / / t8,893 sq.ft. / / \ \ ' o \� \ �o� / / \ \`� 26u o /0 / l o l / 27 J L / �^�/ / \ o00 // f8,253 sq.ft. t o I I \ c,� f7,896 sq.ft. \ \ J 55.0 55.0 / / \ �r7 I Iw 3 \\ \ �55.0 // fs,518 sq.ft. //// v �s v �\ °° ' vv // / / v s / / / \ . \ / f9,045 sq.ft. - v, 0 2 / S � / � / / / f8,683 ° o� o o � , �a� 1 1 o \ 2 / \ \ / / \ Q / 3 J P f9,069 sq.ft. \ 2 R=250.0 S / `L \ �'0 \ s / / _r z t7,800 s ft. t8,255 s ft. \ i 5 - - 3�2 SO / ��'/ / 9 \ �/ \ �6 �o - / l ° q q I I \ \ \ 50 ' \ \ e F \ / / 0 �2 S 3,3 2 i 26. J l l z I I \ / STREET ,� < / / / \ °se \ / / \ ss o ±243,345 A \r.. q./ 4.� aan e„ f+ 30 M \ �^ S? 7 ANT WEIGE IM NE I hereby certify that this survey, plan Print Name: Thomas R. Balluff, L.S. DRAWN BY: NJS Revisions: M / I HOMES O F M I N N EAPO LI S, L LC CARLSONSURVEYINGENSINEERINts or report was prepared by me or under my 1. 4/25/25 Per City& Watershed Comments NATURES REFUGE NORTH BLA""MN 55449 ., p y g 5354 Parkdale Drive, #100 PRELIMINARY PLATof direct supervision and that I am a duly Signature: ISSUE DATE: 3/4/2025 ENGINEERING PLANNING F-AX �. Licensed Land Surveyor under Lino Lakes, Minnesota i �N-ENI INEMNMCOM the laws of the State of Minnesota Date: 3/4/2025 License #: 40361 FILE NO: 957 St. Louis Park, Minnesota 55416 / 15 Save Date: 04/25/251 f:\jobs\5401 - 5420\5412-03 - natures refuge north\cad c3d\survey\pre-plat\5412-03_preplat.dwg SITE PLAN LEGEND EXISTING PROPOSED LIGHT POLE SANITARY MANHOLE O SMH MISCELLANEOUS SIGN -� EXISTING SPOT ELEVATION x0000.0 EXISTING TREETv >� TELEVISION BOX ❑o HYD FIRE HYDRANT GATE VALVE GV N H CLEANOUT co OEB I)• ELECTRIC BOX ❑ GAS METER GM O CATCH BASIN ® or ® ® or RAIN GUARDIAN EM R G ELECTRIC METER O TB TELEPHONE BOX ❑ UTILITY POLE Im FLARED END SECTION FD HH STORM MANHOLE O 0 STMH SERVICE SRV o SOIL BORING/TEST HOLE TH STREET LIGHT RETAINING WALL WATERMAIN(- SANITARY SEWER ---- >----- > ----- > —��>— STORM SEWER PROPERTY LINE SETBACK LINE CURB WETLAND ------------- ------------- DITCH UNDERGROUND TELEPHONE UNDERGROUND ELECTRIC UNDERGROUND GAS�- UNDERGROUND FIBEROPTIC- FENCE OVERHEAD ELECTRIC CONCRETE SURFACE BITUMINOUS SURFACE — I I L SINGE FAMILY 60 MIN. WIDE LOT PROPERTY LIN 25' COF SETBAC 30' E J-------------- 110' 1 BLDG 60' PAD NER -- 5, -----�*45' REAR SETBACK SIDE YARD SETBACKS GARAGE: 7.5 FT. HOUSE: 7.5 FT. CORNER: 25 FT. 25' FRONT SETBACK L1-4131, L1-11132, L1-13133, L1-23B4, L1-6135, L1-10136 30' FRONT SETBACK L24-35134 & L1-13135 - ;/W \ / v v I J to 1! \ a \\ 12 \ I \ MATCH EXISTING CONCRETE ID N \ \\ CURB & GUTTER O \ ANDALL STREET \ 5 / / / SAWCUT, MILL & MATCH EXISTING BITUMINOUS I I I DEVELOPER TO OBTAIN EASEMENT FROM ADJACENT PROPERTY OWNERS I� / IE 880.70-NE IE 880.60-W MAINTENANCE \ DRIVEWAY I I 6 L-- / 5 / , I I \ / I � � I I I /- I I , � I I I I I � \ I I I ' I \ I i \ I \ \ REMOVE PLUG & CONNECT p 0 EXISTING 16" DIP WATERMAIN W/16" G.V. & BOX MATCH EXISTING CONCRETE CURB & GUTTER REMOVE & DISPOSE OF EXISTING TEMPORARY CUL-DE-SAC o,- SAWCUT, MIL & MATCH \ EXISTING BIT�JMINOUS \ FAMATCH \EXISTING CONCRETE \ 2 \ CURB &\ GUTTER \ \ y 5 4 \ 4 \ REMOVE & wISPOSE OF TEMPORARY \CLEAN OUT \ CONNECT TO EXISTING 10" PVC SDk 35 SAN -SWR EX. IE 901.961�FII`LD VERIFY) OUTLOT D I \ I \ I\ � I \\ I \ z I \ \ \ 0 50 100 200 I \ \ (IN FEET) I \ I \. RP- NIrI—IM ARll EN%sINEEi�Mc; CARLSON �9FE10� ASANTi11 3 NE sITE1a I hereby certify that this plan, specification Print Name: Brian J. Krystofiak, P.E. or report was prepared by me or under my Drawn: KRO Revisions: 1. 4/25/25 Per City &Watershed Comments M/I HOMES OF MINNEAPOLIS LLC NATURES REFUGE NORTH PRELIMINARY SITE & 8 su�rvEYING IBLAM �L.48�.7 MIN 7s44 `W� direct supervision and that I am a duly signature: � //� - Designed: BJK 5354 Parkdale Drive, # 100 Of ENGINEERING PLANNIN6 Fax 7W. 7 Licensed Professional Engineer under Date: 3/4/25 License #: 25063 Date: 3/4/25 Lino Lakes, Minnesota UTILITY PLAN 1 5 1 M>� fl-WNW-ENNEE�INGMM- the laws of the State of Minnesota St. Louis Park, Minnesota 55416 1 Save Date: 04 25 25 1 f:\jobs\5401 - 5420\5412-03 - natures refuge north\cad c3d\engineering\preliminary\5412-03_site.dwg # 5412-03 LEGEND EXISTING PROPOSED PROPERTY LINE - - - EASEMENT LINE CURB LINE ____----___ BITUMINOUS CONCRETE �d SANITARY SEWER ---->-----> STORM SEWER ---->r---->� WATER MAIN --- -- -I - -I DENOTES INLET PROTECTION OVERHEAD UTILITY STORM CATCH BASIN STORM MANHOLE OUTLET CONTROL STRUCTURE O MANHOLE O HYDRANT HYD rnH 1 Gv GATE VALVE N ry TELEVISION BOX C TELEPHONE BOX UTILITY POLE n, RETAINING WALL FENCE x 10' CONTOUR -- 2' CONTOUR --- FEMA FLOOD PLAIN WETLAND LINE ---------- USACE WETLAND LINE ----------- vv.v 00.0 SPOT ELEVATION e x e x - E.O.F. EMERGENCY OVERFLOW 43 03 x 000.0.... SILT FENCE •••• TREEFENCE ............ GRADING LIMITS AAAAAAAAAAAA - TREELINE SOIL BORING TP FEMA FLOODPLAIN FP FP RCWD FLOODPLAIN fP fp -m ro- I NOTE: ALL TOPSOILS REMOVED FROM BUFFER AREAS MUST BE STOCKPILED AND RETURNED AS CLOSE TO THE ORIGINAL LOCATION AS POSSIBLE. WETLAND SUMMARY WETLAND FILL = 84,479 SF (1.94 AC) WMC WETLAND BUFFER AREA = 197,699 SF (4.54 AC) REQUIRED WMC WETLAND BUFFER AREA = 18 4,3 01 S.F. (4.23 AC) CITY WETLAND BUFFER AREA = 21,895 SF (0.50 AC) REQUIRED CITY WETLAND BUFFER AREA = 11,311 S.F. (0.26 AC) WMC BUFFER WIDTH: AVERAGE WIDTH 50' (ft) *MINIMUM WIDTH 25' (ft) NOTE: ALL AREAS EXCLUDE PAVED TRAIL SURFACES) ) * UNLESS OTHERWISE NOTED CITY BUFFER WIDTH: 10' (ft) (NO AVERAGING) CALL BEFORE YOU DIG Know what's below. Call before you dig. The subsurface utility information shown on this plan is utility Quality Level D. This quality level was determined according to the guidelines of Cl/ASCE 38-02, entitled "Standard Guideline for the Collection and Depiction of Existing Subsurface Utility Data." / \ .................. .... :l.... ........ ....... :''' ` t•:•:•:•:•:':•:•:•:':•:•:•:':•:•:•:•:•:•:•:•:•:•.1 ��-aoa7 I - -1 ;.�`•:,'�.. �� /' C WETLAND BUFFER i � •:'\:':•.'.':'.•.•.�:^.^',�os' - 11'677 S.F. PRP. / :•I'1 / 633 S.F. REQ.) WETLAND BU /, 28 875 S.F RP. e / ✓P r. o.z i '.T \ / _ •.'R'Y f.. k'•' i .i. 27 fT�S.F. RE >- Q• `11.3 2 v o� s. I - s a \ rC -- -- �4` r sos - rAr � s \ \ ? o, \ OI 16 \ O II a .r-.�)158 I s '�. 11 9 I I 9 \ r. •'i \ /i 0 TL 1.• ---� - I I -- \ soo F I i ' I I I 16r CR TICAL 905 0 \ - I F t� / - I \ - e SNOWMEL �.. � \ •� \ s \ ( � \ `\l'.'.,',•:.':.':.':,•:.':.':.':,•:.':..,•:....•....•:....•:.:'.:':::::::::::::::::::: fOGoS G SOG \\ / `� r.•.•.•.•.•.•`'•'•'•'•'•'•'•'•'•'•'•'•'•'•'•'•'•'• \ r> , \ 914.0 G 914. G 914'0 r �0 / \\ sao C WETLAND BUFFER 1 �'• 12 --{- _+ v r... A o z�x o. ox 11.3 3�- S s \ �.... ' �,336 S.F. PRP. f o. 1 8 sox oso A o o II e : ..�.........:. ... :::FF1:::':'::':�':�'::::.�.... .�..-.�..✓. �`�. ' / ... >' o\ v\ \ Cr WETLAND 30 r.. i _ L R(24,E 5 S.F. REQ.) aITICAL HWL = 906.0 (SNOWMELT) 3 10-FOOT MIN. oz � �'<o \bps h - -�3 I , � - a I \ rn o y ' w I '{'• °do O o J J CITY BUFFER NON WMC . ,• •' � , \ °° m a - \ \✓ \� 12,118 S.F. PRP. (5,741 S.F. REQ.) \ / • • C�0F� DINATE\ TH GAS COMPPANY // :>__ ��^ ..... • o/ - / / cz -I� _ m�-^ W o m o r z °' �: \ / \• • To� of FOR/STREET & UTILITY INSNALLATION A MUST HAVE 4 T'•'•'•'• ( - -\ /� C9 M,r- ---- ov y I i a'z & 1.:r Ig F T OF COVET')/ 2-FEET STREET 's \ C OSSING AN -FEET OF \ EPARATION ANY PIPE < � a I 1 BERM CITY BUFT E..... 0 O- WMMINC '•J i • ems• \ II 11 i I � e-9 O 7 I I 1 C I I \ `' ':'. �: :'.'.'.''''''''•'•'•' ':R�IP-RAP �. i•\+ `e\\ o •..\ (5 76 S.F. RE A•�' �J I a ` LAKE 300 OU4NWL = 902.0 I ' • 0v wZ + 3';�,��g• � I CRITICAL HWL = 904.7 WETLAND 35 c� to I ,; O o SNOWMELT RITICAL HWL = 906.1 / I O �� d o 8d ; (SNOWMELT) WMC WETLAND BUFFER ' I I -POND 500 �9s \ \ %•+ /''' 1 0 � u' > y�� I }_ \ \ r I (SNOWMELT)L� 32,222 S.F. PRP. ` \ \ j 1 \ ,. I I NWL = 905.0 \ \ y, \\ •\ ff'• , :" - �+ _ s� _ � � / .s s (32,1BE S.F. R�,)-- _ ,•. I ICRITICAL HWL 906.6 WETLAND 55 90' w.: (SNOWMELT) CRITICAL HWL = 904� P•: I 1. -e 5---_- � ,- V, I ,TOP OF 0a, ,. I RIP -RAP AT \ \ \ . ••/' ''• N 1t ; �, \ ? \ y g16.0 \ o o BERM OUTLETS (TYP.) E•� ��� (100 YR) / rey♦_ •.� . in / / o i EOF \,. II OUTLETS (TYP.)Ut WETLA / � r.•.•.�� I ------------- _ /h •'> I �., \ I`, \ s / i / (sG I I 2,297 F / oa' � \ °?o `;k�� � •:y'�'• •.•. �'•'•i`r of 90 os.o .,\,� \ ~��♦.•• I �t2�` \ / '/ \� ' ' °m l' ' 7� J 5 •\ / ' '�=-� � ,. • ,. n ... p m o9.0 WE�LAAND FILL / of o� \ / /, \ \ // \ pss eoy� e.... . / t...../5R r------ r - . -- s 6,1 i SF \ \ \ \, 1 SOO, /' / ^ , 1 \ / `\ I t , \> o°° of if. �•'•'•: �`5 �/ _- I ��� • r'• o. ; , - 4$ `l % _- �- , • v \ y WETLAND FILL \ I i.•.•.•.•. • o \ \ \ o ` - Joa. 1 q ` roP of 11,565 SF 906 EBERM t,.,.,.,. o.o 1. \ --- 131 r r j o \ 0 / / \•• \\ \ o�� �\ O \ Oil' �� / S��i j / (s08S g ; 1,87 SF._��a ?'� O ��� sos 8130 N/ 1Sp(i / \13 y 147\ / ,. s as 132t 1 4e 130 • / // \ o \ \ / S \\ / ¢0 0 2 ^ s - i'•'.'� 6.0 •a.:: INSTALL EROSION ,.-. ....•.•...•.•. �/.• '. \ / / Oa \ 7 k z , b/ \ _ o } «, ALONG SL / COORDINATE 'MTGAS CO NY ro a R ^ , / os._,- OPES is SOG MR� L _ _ c / oso T ! 1 l INSTALL EROSION h ' _ - - &ro `� / 7� / / y , FOR S�iE�T �} 1 8 \ / ` 10o`'soz o�ox - s / / l ,i o INSTALLATION - MU! HAVE 4 °O` 1 46 // I o ��ry y 7s0 eS / ^ �/ _ oa.o sG8. t /E�So CONTROL T. 20 91 / 0 -- -� 8 0 /` • / / ' / �! 1900�,���,.,.,.•.,.,.,.•.•...•.•'•...•.•'•'.. �s ALONG SLOPES G 914.3 G 914.3 I G j 9 SF ^ ps99o75 �^ \\ // Sl /// FEE OF COVER FOIR�TREET ?- .mil• O G ` :. J � •• v.c. \ / O CROS�NG AN 2-FED OF / c 1f. � �•7, (9 15 31 � f• ga � t% ,SEPARATION F ANY r \s g ' \ v sue`' / �/ % @ ,,a+ / \ l % , I 11 ` II 18 I (908. W r.qs� '�jsoe •:'�:= / -poi / / v\ / 'o \ CROSSIN , q �` \ ' os °° / • l; , G / / _ I 908.8 .✓ �?o; / / \ vo / 3.2 >< \ • \ / \ \ o / o / ?2 - \ \ / / il------- 1 WO/ � �!� � � \ I 9132 _ \ .- \ Cb, s / / �. • °\ // Y / / 1\\ G �0 ( O8. ,a h G \ \ --�- �- 11• I \ \ / t 1 r1 � I , sox /osax 12.3 / " C 4 • ,o.o 0 9\ \/ �• / s '[ � �: 7jS (g .5) 1 / / � � \ I �\ \ G 91'% \ \ SOG I I � / �\ / / - 9oa10 , ,I° G - / 14` 7 �"'b`\ �S � � / / �/ � 0 I G 0 � � J - 0 � / •!s L � \ \ (�\ / / 9,i \ \ •\ \'� // 1 43 1 44 \ • �Oe °" °'°E 6�/ % ,� / % � g7s. F � > *` \ , \ ,. G 0 I W �1 1 P + 5 o i ,2. �' / � % / ,� .� 1 J\ G,. I I \\ • o �o•a / j SOG 4 �Mgso � �� \/ 1�s / � r 91s.5 I _ -- , �'� , 6 � �� ,no G SOG \ \ L -__= G / , O / • �. f q / / / S. I / G �s\ c-srno _ _ I��,k� e/ G s \ `q °� � I_ L g13. rR \ \ '\ / / N / / O G - �1 I - - I G \ � \ 124 123 � ,a -, < s / x\ / / J /' / o G t c 914.4 \ \ S G � � • • 0 SOG \\ \ � \\`-125 °a° � 12�`�..' ,' S o �,\ \ \\ \ G i SOG II II SO j ) i \ o _-� , OC a \ 7�, 91 u 0 t• \ // I`\s 9 S \ ~° �a'y oo `saoo_ oa in r I/ G g '••112 i 11,' / / e ° s / 7� ' 1/ '�\ C � � .c• /'' \ G SOG I I `�26 oa5 •,•. �\ \ oi° / rR �\4 � -1 \ rPFF _ - / 7 ° / / \ - - - - - I � \ '/ • '• ` \ � /•J m /, -J L �*�� ors sio / N I I I I 1 ,`�, f •,.•\ / 9\ 1 1/ ', L� ` %yo ^'V� .., /1�1 \� oe\�0`� (e \ s / -' �" I I I mz ry1' S \ .., 27 I \ I I I L-------' �� > � ,% A\ '� / O �( 1� ,< \ • •' •' •' • O \ > / 91 I 1 9,0 9G o I� /a � - --� I L-------J I i •• • / \ i1 /d`^mac' � q° Aso \ / / .W.��°°wd_iLo �.•.� .Os \\ / /� °8'0 'S -- C' 1 WO 9oe °I' 0p� AMD BUFFER • a, .. •.,.f � yy t' / / G / / i :; ; o �129 12.0 ' : �; .;.;.. Zt;'• s1 % s17.o 0 L---- �2$ / °/ /��• f2.3�- - --'- g�'S' SIGN\(,JYP.) ...ti•.• 4s,z 2% :\ \\mo s mo 1 / � 1 > � \ \.� .�.. \�.;J : •t � // ` 0 / / / g1� I I I -l- 917. 1 1 Q (90 i I k\ G G \ 1,,;,•.•.',' ..,.;,. 1 t;..• � / 0 G 917.0 9.5) 909.- i\ Ln \LOW AREA• %� s m / _ _ -11 9 \'\ S \ • ,:s '/ p1p II 1 1 ___---J p5..,.,.•.,.,.,.•.,.,.,.•. . o ... CRITICAL HWL = 906.2 •.\\ \ ^ / % 43 •l L f G ) %: '•\: WETL 25- ` / , s, 09. _,,,,,,,;, , , , , , , , , , .. \ � / 102 J .... • $ • •\ \ n � � 137 \ �\ �5 ,•$•'909.5 •+•-.--^...:'.:.:.:.:....:.:.:.:.::::::::::::::::.. \ s / 1 9 o \ ITICAL H - 905. :�:: • -909.5 / SNOWMELT o \ c _ , G G .•�;•� \ :�:�.. ./ - so \ v \S sos. S \ SNOWMEL I. L 3 540 SF 0 � 1 - 1 4 \ \ \ \ •o I 1 I I - / I \ I L / L � 9 \ 90).5 / / SO N S WETLAND BUFFER ------- --- �� /� SIGN (TYP.) \ w .. WMC WETLAND BUFFE soa , . �'� `\ \ �'/ .... • • • •.•• I �.. 19,529 S.F. PRP. �:;'•'•'•'•'•'•'� -\ I I \ / M+� oF- :r `I\ i::;.• \\ / (19,238 S.F. REQ.)UJI • \ 1.. 4 C WETLAND BUFFER i o -, � W t \ . i/ .,'�'��..__�--^^� \\ '• -� 70.060 S.F. PRP. > m I m / \ v • •. *. I \v.•...... \ (69,587 S.F. REQ) Cq /'�:':':':':':':':':'::':':?:''�'�'�'•.r.•. WETLAND 15 r.'.. [ \ S t Of 0 9B� \ . I .... . ' ' '� r..... L :;: :::::: ' :::: c:: ' [:.:.' \\ \ \\ : J ::::..� CRITICAL HWL - 904.7 °' WETLAND FILL , :: (SNOWMELT) C4 \ 13.847 SF \ ✓ .......... J WETLAND 25- \ \\ �\ \ 1 CRITICAL HWL - 9 .5 1'•....:..:..:..:. N \ ---------- / os°.i :: �(SNOWMELT)�'� ; \`\ \ • \Sy `\ \ I.'':I of \\ --- - --- WETLAND -9oz'� I \ f # # •_ } _, _. -- • ---- _ --- \ CRITICAL HWL = 907 (SNOWMELT) \lam i SHEET 12 10 L__j \ \ } \ \\ m NNLJ Q0 LLJ 1 13 \ l 00 z 0 50 100 200 (IN FEET) BENCHMARK =j 1. Anoka County Benchmark No. 2011 - Elevation 894.88 ft. (NAVD88) 2. Anoka County Benchmark No. 2012 - Elevation 911.80 ft. (NAVD88) ENGINEERING CARLSON 3#PHEASANT iiIItIRNE SUITE =I hereby certify that this plan, specification Print Name: Brian J. Krystofiak, P.E. or report was prepared by me or under my Drawn: KRO Revisions: 1. 4/25/25 Per City &Watershed Comments M/I HOMES OF MINNEAPOLIS, LLC NATURES REFUGE NORTH 9 SURVEYING BLAINE, MIN 55449 TEL7W.41M79W direct supervision and that I am a duly Signature: //� Designed: BJK 5354 Parkdale Drive, # 100 GRADING INDEX of ENGINEERING PLANNING FAX �. 7 Licensed Professional Engineer under Date: 3/4/25 License #: 25063 Date: 3/4/25 Lino Lakes, Minnesota 15 CARLSON-ENGINEERING M the laws of the State of Minnesota St. Louis Park, Minnesota 55416 Save Date: 04 25 25 f:\jobs\5401 - 5420\5412-03 - natures refuge north\cad c3d\engineering\preliminary\5412-03-grade.dwg A 4 7r J`71 G-U I"' •" � - - = f �� !I � � � 1 / / � _' �- \ I. +lam ' '~' 1 11 5 ��' CRITICAL HWL = 904.7 i o ,• i-- �' 0 / / 171 _ - , �; SEE SHEET 11 I•i, ''•i,♦+i 35 •• !!nn I , o (SNOWMELT) •.• ♦. •♦♦,fi •, I I V (j/ O i V 1 I / N l \\ •i♦� i♦ •i♦♦•i 906.1 �'i 0 I I��U / p t�J U O \� ♦♦ f♦♦ �+J i ELT) I (n Nam- 166 s, �� a7o ' ♦'.'♦'.' , • • L_ 5J� r �� � / J •• q5.3 14.5 _/�\\ `�V �, /o1p \ O, 96 2 ` ap ♦♦♦♦♦♦ +,+,+ •' �''' '' o - - - - - co �`� vQ i 9 6 i �• o v> / ° ° RIP -RAP AT a a ♦ . , . , . ♦ f ♦ f ♦ f ♦ I 0 \ \ \ �� _ \ lOcb'TOPOF , • •�•• .� • , I \ W O // / I °� \ / 16.0 \ ` O // / BERM o OUTLETS (TYP•) f Q , , , ♦ , ♦ , ♦ , ♦ , ♦ , ♦ , ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ 49 G� \ ^�79 \ o WETLAND FILL. /'167� _ - - ago - ,, • I �� _ l \ /e,.. \ 9 \\/ �90 I 2,297 �iF / -� \ �Q I> ♦ ♦ ♦ ♦ ♦�♦ � O I / _ _ % \ V' O V / , / � \\ Q• \ / / \ Q6+ 9p , f $D Ate, •f,♦♦f,� ♦♦,♦♦♦,♦♦♦f 18 \\169 RIP -RAP AT \ s!° ' (�p2 i ♦ ♦ • ♦ • ♦ • ♦ • ♦ • ♦♦ \ OUTLETS (TYP.) \� o .+♦.♦.♦.♦.♦�.t./+♦+,♦ \ I 148 / / A� / / > J A R 8 \ •, • f ♦ ♦ ♦ f ♦ f • ♦ • f WETLAND FILL '♦'+'♦'♦'♦'♦'����/// �+'♦'+'♦'+ ♦', F�, 08.5 I y \ 11,565 SF F`,i++•i♦••+••• ,♦'f','f','f ,'•', O / I, , ♦ • ♦ , , , Off\ \ TOP OF .7Q6 • , ♦ , ♦ , �♦ , ♦ , ♦i0 OO \ F , f , • f , f , f • , • , , �\ I /. i\' / l l � BERM • '♦','♦',' t,'♦','♦','♦ '♦ , ,(fir ♦ ♦ , f,♦♦f \ `g I I ( 0 �i /•� O \ •0 / l 911.0 //�����` / TLAN FILL O "/�% O� ` \ kQ�Q kQ , h♦+,i♦• y ,',♦+,i♦+,i♦+ , , • , • ', • ,'• ,'•','♦♦,'♦♦, O / 0 6 \ / 0 l (96 •S l l 7 1,877 S�, `� I O •O \ Q� , , ♦ , ♦ , ♦ , ♦ , ♦ , ♦ , ♦ , ♦ , ♦ , ♦ , ♦ , f , f , f J(� , • , , , • , • , f f f f ♦ f ♦ f ♦ f ♦ ♦ , ♦ , \ /i\\\ V l / / / / �J911•` l ^ � �\\ 9 � O � \ � Jos i�♦f♦,/♦,♦f♦,♦f♦,♦f♦,♦•♦,♦•♦,♦•♦,♦•♦,♦•♦,♦•♦,♦•♦,♦♦♦,♦♦ , ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ s1 V• / L l �' 9>> o ' 1 \ ��°° RIP -RAP AT _ ° •; NSTALL EROSION .�,♦'�'♦'♦'♦'♦'♦R! ♦f♦♦♦f♦♦♦f♦♦♦, ♦ ♦♦♦,♦♦ , `�^�� 908°` ` i p6'p �' •• I CONTROL CAT. 20 I�♦•ir♦•ir♦•i,♦•i,♦•i,♦•i,♦•fir •i,♦•i, •i ♦+i,♦+ , \ 0 \ i9% \ -- \� s a9 OUTLETS TYP• O o • ♦♦f♦♦♦f♦♦♦f♦♦♦f♦♦♦f♦♦♦f♦♦♦f♦♦♦f♦♦ f ♦♦ ♦♦♦f \ ., \ G� \°�� oo /\'S s,2 J/ / / 91s. , / / �' / °�� ( = o� •� ALONG SLOPES... , . • . • r • , • , • , • , , COORDINATE WITH�GAS COMP ANY < ,k >� , _ _ _ _ p6•o _ I �' ' ' ' ' ' • ' • ' • ' • ' • ' • ' • ' \ FOR SIRE T & UTILITY , 1 �/ �R �'s X°cy 2' - 9�e �9099 , 186\> _- p �191�I I j O .♦♦�.f.f.f.,., ,♦, ♦ P�/,° i t , ♦ ♦ + ♦ + ♦ + ♦ + ♦ • ♦ ♦ • ♦ ♦ + INSTALLATION - MU HAVE 4 / o o / c / - 190� I '� T 146 / / / Q �2.s / / I I 908.0 O .. ♦ , ♦ f , f , f , f • , • • , \ � ♦ • ♦ • ♦ • f • f • f f ♦ f f ♦ f •. FEES\OF COVER FOf� TREET / / sO / qo"o ��° o ' J c ,/, \°6 p6 p - ,� I I (s0s.5) ,�♦ «,+ ♦+ ♦++•♦ ♦�♦++•♦• •♦♦. ♦ \�M\N / ,� ,y / .6og\+oa 29 / Gl/ 9 8.� 2--�111ETLA L 1 g08.o ♦.♦,♦♦♦,♦♦♦,♦♦ fi�/�,♦fi, •� < o. - - l 15 312 go 5 ,;,•Q6,=.= ', . ♦ .,•. ,• • CROS�NG AND 2-FEETOF / , (� /� / ®� o o� � � .�� p�� 9 9 // � 8.) .�" �•�' � a. / �- �i 3. . •,SEPARATION FOR ANY P `E /�\ /.;� / ,''S - \'9+ o °' 3s - �. c / °� / / I , 188 I 1189 I cos 5� I w0 0 !Y9o$. , ,,!` / ,,,� ,/ 60% , \ CROSSIN� % \\ � �° 0.6 . \ / •�? % / /go I � ♦ , ♦� • _• , ♦ -_ / i i% �\ off® , ♦ , , •° • • \ 4 ° 145 \v / �O®= sc2A,'' \\� I I _ _..+ ,�♦' ♦ �%9 / / i� / 1 ♦ , ♦ , • • • • . • • • 9 ° / ° o� 12.0 A G YVQ i g09 , I-------� g0a•5 I Wo I I G 916.0 '/�{ / ___ ��,��� ,�� ',�,�,♦, ,G \ \ • \ / ° / l _ / 2.90 F / 910 S I g09 0) I 916•0 - --- - / / ,,�� •i♦• 4 • , g ^ ,`O• / 913 �, \1 / / - 3 �9\ , so,9,'X� 97)S 0) 9.0 w \ o o \ 71004 . •8 1 2 S (9 .5) \ - _ 1p' O , / /8 /� 2 'A/ _ _g14 - f'♦ • 9os.10 • C / 914 \ \ ,3 Oo\ C, S S6 \ / rY I G o J �� i / 1 0 \ / s"oil° o N g / 2 7� l 0 I V v O I I I g PY 12+75 0 -� •. o X�ryo / ,�• 7� � � . �, I 12. EL. 9,�.75 �,:-.0 � , �� 12�,,� �22 i � 9 .,, �'�o� / S 9\ A\ 9 I I I 5 _ 1 \ \ 0 / / 1g / \ 09 \ 1> I WO916 I /3 5 �' / g1�. / • . ew`jh°9��x2s / \ / S \SS - - .2� W \ ••� k V00�4` = S� I I Ov • \ r / < / C xoo 15 3 P - 14.7 1�k° ��� y I� u9 �� G V`� 901 '\` a• IPE • . • 113 / / / / / / / \ / 0 / y\ 's8 S rRcc �� 6 �3k1 5 12.2 5 0 90 W I�w 40 / �• •. r \ / / / / / / /97 \\,G r IC �� 06� E g13•C 133 ---- 9\ 91 \ �0 g0 W G / / > �9 �±y � 914 3 1 1 G 91 / g loci • \ / / 112 / / 1 1 / 9 09 s S / \ 9, �\,s+oo 15+00 cwn 9� G / - -1 - 9aP.4s - -90� ' 0 05 / I / \ 8r PIPE • -14• -7 0 90� \ EX �l,•'0,*'0* 'i - _ - / • 9 r 910� • / �� / ^1 1�0 O / 17.0 I L V ♦ f ♦ ♦ , ♦ , Z / N . \ 07.6 � / / v �- I G 9 /� • 9 71008 \ > .. •. . 8�\ / " �10 / / t7,� / 912 2 14.3 917 •O I I 9�0 1Z J0� 0 o� ♦ '' ♦''' ♦''' ♦''' ♦''' ♦ ' ♦ ' ♦''' ♦ '' 904.10 ,. Q6V / / `9Q / �S 14. ,I G W0 1� 01 Ei , s+oo / V • II BUFFER o°c' ! °+'..�, � t / / / G / - - \ 1 I I 90 0�' v • , ♦ , ♦ , ♦ , ♦ , ♦ , ♦ ♦ f , f A /' W , , • , • , + , + , + , + , + , + , 12.3 - - - �� �� v� SIGNNNTYP•) .�. .�. .�. . �'� 6 1 4+00 0� / �S / I 1 G I G �� • , • , • , • , ♦ , ♦ , ♦ , ♦ , ♦♦ f , f , f 7 �9 09. p ./ f ♦ ♦ f ♦ f ♦ f ♦ , ♦ , ♦ , ♦ , ♦ , f , f , f G v A �� •.,�. vv / / / � / 0 G 917.0 I g09.5) 909• �\ �� • 4 �, �.�.\,� 11,� / / / I I I I I �� O I �f ♦ f ♦ f ♦ f ♦ f ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ , �f ♦ f ♦ f • • ♦ • ♦ • ♦ ♦ + ♦ + ♦ + ♦ + , + , + , + • + • + r� 1 ��\ \ • >.� • 6' RR w / (9 I �J ♦/♦♦♦♦f,♦ff,♦•f♦♦•f♦♦•f♦♦•f♦♦•f♦♦•f♦♦•f♦♦•f♦♦•f♦♦•f♦ L� ,♦+f,♦+f 12.3 \ \ \ . . . . . . . ' A • • 108 / / / Q09 0� I I I I �90g.�� I _ I � 1 01 906� p ' s ' ♦ ' ♦ ' ♦ ' ♦ ' ♦ ' ♦ ♦ ' ♦ ' ♦ ' , ♦ , ♦ , ♦ ' ♦ ' Gv �•. WETLA 25 B •• v / v 9•� I I I �• '+'•'+'•'+'•'+'•'♦'•'♦'•'♦'• '•'♦'•'♦'•'♦'+'♦'+'♦'+'♦'• N W '•'+'• ♦ • ♦ • ♦ • ♦ • f • f • f • f ♦ f ♦ f ♦ ♦ f ♦ f ♦ f ♦ ♦ ♦ ♦ ♦ ♦ ♦ f • f 3.� N \ ^ g ��, ° _ • 90 v / (9p9 Og S) 1 90 , I 1 0 2 _ , EX _ _,- , , , , , , , , , , , , , N v) 1 91 •�' ��/ 1• \ , . > . > . . .6ITICAL H 905• . , • 8 \ \ 'J 1 _ , ' , ' , ' , ' , ' , ' , ' , ♦ , ♦ , ♦ , ♦ ' ♦ ' ' ♦ ' ♦ ' ♦ ' ♦ ' ♦ ' ♦ ' ♦ ♦ , i 9 .3 914.0 G \� \ / • �. i. \ I • �� / 909 0 (909.5) 9pg,0 I J 05.7 ♦ , ♦ , ♦ , • , , • , • , • , • , • , • , • , f f f ♦ f ♦ f ♦ f ♦ ♦ , ♦ , ♦ , W • , 14. �G W \ \v-�14 :i. {.,9 �,.ii •• / / I 909.0 ;I I 1U1) _, Ex, ♦„ o , I i (SN 0WM EL • _ --_ 1 �/ i , ' ♦ ' ♦ ' ♦ ' , ' , ' , ' , ' ' , ' , ' , ♦ , ♦ , ♦ , ' ♦ ' ♦ ' ♦ ' ♦ ' ♦ ' ♦ ' ♦ ' , \ \ \ \ // •• . + . . . . . . \ . . ii. .i� I • • \107� / L �__JI I I 1 I \L I _J L p�'.� i i ♦ ♦ ♦ ♦ ♦ ♦ r ♦ r ♦ r ♦ , ♦ , , ♦ , ♦ , ♦ , ♦ , , ♦ , ♦ , ♦ , ♦ , ♦ , ♦ , ♦ , \� \ • L J ' f , f , f • , • , • , ♦ , ♦ , , ♦ , ♦ , ♦ ♦ , ♦ , ♦ , ♦ , ♦ , ♦ , ♦ , SC)U 01 f , f f , f • , • , • , ♦ , ♦ , ♦ , ♦ , ♦ , ♦ , ♦ , ♦ , ♦ , ♦ , ♦ Q -115 I\ \ / • • \ 4 +��+ Qs.8 pg.9 , •f,♦♦f,♦♦f,♦:f,♦♦f,♦:f±♦:f,♦• , / ---- I I ------ ' L 116� - A .................... I •� �. �.......... v �'++'�'. • - �. WETLAND BUFFER 118 � --� . • :�..°� vv ��9 + .:��'�� slcN TYP. .... ....... •�-�' �-----� �/---�v� � 05.E ,•••• ��� / / v 10.0 _'� �� \ °� WMC WETLAND BUFFE ;� ���� I / v v v v v • • • .. 908 , . • • • . • �- \ \ \ i .. / \ 19,529 S.F. PRP. \ \ \n • • • v �. • • • • • �' :%' �v �. �;; v v (19,238 S.F. REQ.) C WETLAND BUFFER-- v 70,060 S.F. PRP. �' : , . �' �- - - - -� !007v �:: f g vp 907.0 I (30 / \ . 1 \� \ (69,587 S.F. REQ.) SB 1 j \\>! U \ v // WETLAND 15 Q CV CRITICAL HWL = 904.7 I 9g8 t . \ °g\ \ m ......... + :�:.. , . , .. v \� v ���+ .. (SNOWMELT) cv z 0) �88_ . ':..... WETLAND 25-A ��' . ��; �' CRITICAL HWL 905.5 EOF (SNOWMELT)a. \vv 05.7 0Al \ v v \9 I� COX Cox \ x X P \\\ \` \ug \\ / 'i' P QQ\ 0 0 0 2 x \\ 100 / x � 0 \ \ \ o _ o`� \ / x x � � (IN FEET) BENCHMARK 1. Anoka County Benchmark No. 2011 - Elevation 894.88 ft. (NAVD88) \J N 2. - oka Coun y Bend rk No. 2012 Elevation 911.80 ft. 88) d; 3#IEASANT NE Revisions: i CARLSONSURVEYINGSUITE 100I hereby certify that this plan, specification Print Name: Brian J. Krystofiak, P.E. Drawn: KRO 1. 4/25/25 Per City &Watershed CommentsM/I HOMES OF MINNEAPOLIS, LLC 10EN%sINEEi�Mc; �AINEsn�N or report was prepared by me or under my NATURES REFUGE NORTH PRELIMINARY GRADING direct supervision and that I am a duly Signature: Designed: BJK TEL7S'3.48�793K� p y 2 -� g 5354 Parkdale Drive, #100 0 ENGINEERING PLANNING FAX ELW& Licensed Professional Engineer under Lino Lakes, Minnesota & EROSION CONTROL PLAN 1 CAM-ENSINEEM1146 M the laws of the State of Minnesota Date: 3/4/25 License #: 25063 Date: 3/4/25 St. Louis Park, Minnesota 55416 1 5 Save Date: 04/25/251 f:\jobs\5401 - 5420\5412-03 - natures refuge north\cad c3d\engineering\preliminary\5412-03_grade.dwg # 5412-03 LL�.I /�= •�••'• ;�•; >'•• ••'• � /•�•;• i>•C'7�'�' ;I��1>: �\• •�•••�•'•�/�•�•> � ,/.y` '' °•�O• �\�•X _•L• '°1••• o.1•�• .• -�_ o•_s••�� . 1 • _1 I •o•f _ � 1I-I I_ -I_5 �/ -I C'�T 5/_" •/ 4'I\��\-v I�/� ,\ j I��\.�/ �\ �O�12o-�f0 0 ��isi�� f \ / \�_p 3�O f, \�N� 4� � �► v, o `d�\ VNc%\� ._ -_/- -�___1.22N -0E.G\9 %L.�B- I . I - U/�' �o�� .1 s-\o\ \' % \�I\Ir -I __IF__ ---1__11-1 .- 37---�_-- �i- I -_ I I-\� � I/IrI a Ir- - ---- - -1 _- \ \ _/-- \-_- /-/qo�' I _\L\/ \ / E;��7(I-flJ'-.-���(�-,.VQv1iI 7Jn�J y.I�'� --\_••.♦♦r♦.. - -L-1•♦•••,•,.., �,.ff♦ffi♦.. -..W..♦♦.♦....�- r-♦♦r♦..1,,•,,.,, 1rn..01 ..♦.... - v-..Q�' /-I,••••., _j•�. +1I ....1-II .�- tt3•,..�\, J /-r.i.i.i- -•• \�' ♦♦♦--i9- .i._ �G--♦-�e, -%t.R_�-3\♦.♦ I •/ f.f, I . \�•r•° amII�•ff�i` • / .�-1/4/\ 4.�_S/5 /,�lam.♦ ?� 'I G.,-' 0'�/ �0.♦y'I '4\ -.,��� \ �.♦\ '/�°j.,'�\�c♦S Nr/\f♦'� �r♦' � �,' J��oi♦.) (9gyc•p♦ .n� �> /(v♦• 0 � °♦.• ,.�•O♦.\ 6• , \2•♦_o ^ Oi1�U-\_ \1r a �♦1 � iO / ooO I 0cr I Qo5�j ♦�� ♦ �ff. i 4 ♦♦. ♦ ,,+ of ... ♦ ,,+ .f' ....�� r♦ ,+•��.f ...� rr•� •+,+• f.ff ♦i.... .i.•.,•+,+•�{.f.,,f.f.a, ♦i.....�•.i.••r.♦.♦ ,•+,•••� .f.,,..f.fA/ ♦i...... .i.••ryyy♦♦.♦�•,•+•••• .f.,,..ff.f> ♦♦i....,•O.i.••..i,a♦�9D ♦♦••••♦�6 •.i.,,..a ,iii.. .i••..ai�♦♦••• 9 �.i,,. •,ii . ♦♦ . 8, (9... ` 8... . , ... ... ... ... .•• ,,i. .i♦•r.♦ .•• , ♦•i.♦♦. .••• , ♦•i.♦♦. .••• , ♦.•i.♦♦.. .•• ,.ff. . ♦♦.. r• •,+• ♦.. r• •+ ♦.. rr•• ••• ♦.. rr•• ••,• ♦.♦i. .i.•• ••,•• ♦♦.i.. ..i.• •,••• ..f, ♦♦.i.i• • ,♦♦i♦i♦i•,•,•,•,•,•,•,•,•,• ,♦,♦,♦, ...•...•...♦...•...r•..r•..r•..r•..r•..r•..r•...•...•.. ♦ , ♦ ♦ i ♦ i ♦ , • , , • , • , • , • , • , • ,.♦r, ♦,♦,,••• .f, i i O♦♦♦••• Si`i ♦♦♦•• i,.ii.f..�•i• i.♦i'.•♦.♦♦ ♦.♦♦♦♦+•.••'•''•.♦ i..♦•'•.'. ii.i.i.iiif..f.. •rrr•r. ••,• ,♦, i ♦ i ♦ i ♦ i f.f.i •rr•r. I••,•♦I I,♦,♦,♦, +.+.+.+.+ ,.,i♦i♦ ,.,. ,.,i♦i♦i ...+...+...+...+...•i.. i..•...•...•. i.♦.. rr•r.r ••,•• iff.i. i.♦. ♦.... •, Offii. .♦. ♦♦.... ♦,�. ♦ .♦.. .♦♦... •,.•. i ..♦...� .♦♦.. •♦,,., iff.o a..ii.iYr ♦. • ..•.•.•.•.•.• .•. •.•.•i•i• ......♦ •♦♦.♦♦. � f. .. i..ii �a♦..� ••♦•.♦♦ �.f•. .._ •••.♦♦ ��.•. ....iiQ �Q....4�oa a rrrr•••' .• .♦ ♦ ♦ . ♦ . ♦ . ♦ . ♦ . ♦ . ♦ . ♦ . ♦ . ♦ . ♦ . ♦ . ♦ . ♦ . ♦ . ♦ . ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦. ♦ ♦ ♦ ♦ ♦ ♦ •.r.r.r...... ...... ...r•..r•..r•..r•...•...•.. .•...•..•.r i. •.•.•.• i.i.i.i i• ..♦ OQ rrrr•r•••I I ••, ...f.ff.i ..♦ rrr•r•••. ••• ,.f.ff.i .♦ •r.♦♦.. o••��,.,.fff.iW .♦ •r•.♦♦.. ••.,.,ff.i+' .♦♦a•♦♦ •r•♦♦...'. ••�.•.,,.,.,♦, ...•...•...•...•...•.�906- i , i .,• ♦f♦f .♦♦..�•♦♦3♦r•♦♦...♦♦:•'ri' o•.•.,,.� f.,f.i.♦..,:,.+', ♦,,ii., ♦.•♦♦♦...♦.♦.' ♦. f,.fffi.i♦.. ♦,,iiii♦•.♦♦♦..♦.♦ Y♦♦,.,,, f,.fffi.♦.,. ♦,,iii.� ♦.♦.♦♦..i♦.♦. ♦♦♦.,,,. f C WETLAND BUFFER 10 ♦116775•F.PRP• ....... ♦ r ♦ r ♦ r ♦ r . r . . , r ♦i♦♦, 1,633 S. . F. REQ.) .•.•.•.f.ffi♦.,. .,,,♦fff.f.....♦.♦.♦ r♦•♦,,r.• ,.,,♦•,. .,,,.fff.f...♦.♦.♦ r..r.. . .♦....•.•11.8 10. i 11.5 1.5 0off♦♦ O ...... 10.5 . • . • i i . i . i . f ....♦•r♦,,r.• .,,�♦••. ..i♦.♦.♦ r♦,,r.r..�♦••.. . ii.♦.♦. r♦♦♦....♦♦�♦• ..�.ff..f,' ii♦♦.. r♦♦....♦.. ♦�♦..,fff..f,'. ii♦.♦.,. ♦♦♦....♦•r -- i♦.♦.♦.- ♦♦♦...♦�r 1 60 �♦..,. •ff..,♦.,.,.i. ♦♦♦...♦♦..,.•ff..,♦.,.,..-- i•i.i.i.i.i.i.i.i 902 - ... i • • . ..•.•. . . . . . . . . . .9 080 ,..♦. ,•, V ♦♦f♦,i♦i♦♦,Q ♦♦♦ 900 . i f . . . . . , . • . • . • . ♦ \, . • . • . • . , . , .16, ♦ r•r•r•r•r ZA 890 \0VO 1 V V n 56 5.4G 91` _D .91410 G 880 914. L � 12.2 1.8 870 0+50 0 911.65 L91075 04, 1+00 00o o 0.060 o\ O AND 30 Ln L`]O °'HWL = 906.0 912Q _ . i.' 00 �z WMELT) o �� CID I O - 174 O°O aL � 40 � O4 50 907.0 ! 52ILA C.2 0 0)' O LAKE 300 _ Lo •. - / NWL = 902.0 ... CIO 77 171 CRITICAL HWL 904.7 O ♦ 35 )01 906 1•CD Lo 4 ..r 1501 0 L�U oELT) 166 rn ak* •• 5.3 8 > .O RIP -RAP AT ♦♦....♦ .♦.,.,•: .,.,.i+. o ...... z ♦ f ♦ f ♦ f ♦ f •. . • i o W I CO� / W 0 \ / % \ p9\ \ / 6 _ \ D Orb / TOP OF o 4 . . ..... . �.' , .' • . I ' it BERM OUTLETS (TYP.) i . , . , ♦ , ♦ , ♦ , • • • I 0 \•� / I \ �� G \ / - - - ♦ Q , , ♦ , ♦ ♦ ♦ ♦ ♦ 0 25 50 100 G� /,�79 / \ / WETLAND FILL' $ , ,♦.♦.♦. ♦.♦.♦, 149 _ / 0 / o ..... . �' • 11 / \\ / \ \ / / n I 2,297 ��F IN FEET / . D p . . . . ' 1 . . . . . . • OI i' �% V / / / / �� \ / / kQ6+ CJQ� i f �� per. •fi�.�i� 1'.�i�.�i�.�. IN 0S-6 (' �/ 169 s�o - �O RIP -RAP AT 90 02 ,•••♦•♦•♦„ ♦, �,♦,♦ ISB OUTLETS (TYP.) ��� ko� ••.,,.,.,.,•,-4-t148 ♦, ♦ \ �%Lfi WETLAND FILL >,•.,.,� �`,,•, o oo ��, 08.5 I -9 11,565 SF . ��♦i,i.ir•.ir•. >•'•'•'•'•'• •'•'• a , • • f • , ♦ • \2x / 9O. � / �O� ! -� �0 / � TOP OF906 • •p♦>♦•••r•• ••••♦•••♦ • •'•' 9� BERM >♦'•'♦'•' �•'♦'•'♦'•'♦ '♦ f ♦ • ♦ ♦♦♦•♦ \ 9 ^ / / 9 / / /^���TLAN FILL O X°� k♦♦••♦'••� •♦♦••♦♦••♦♦• ♦ • r • • '• • •'•'•'•'•'•'•'• • ♦ • ♦ • ♦ • ♦ • ♦ • ♦ • > • ♦ • ♦ • ♦ • ♦ ♦ . ♦ . ♦ . 1,87'7 SF._ �� %- O � �,� � '0� >•♦••� •♦•♦•♦••••�'••♦•♦•♦•♦•♦•♦• 147 RIP -RAP AT _ _ -� NSTALL EROSION • 49 \ `' i \iQ/C ,�S � /�o°9°>> /x °° so�,9ic�\ is s '2� �,20 / / I �- .s95.�, 2//o ' � �\,,.906 I - - /• • / CON4T♦«RO,L••>C••A• >T♦•.,•'••♦2'♦••0 g� / 90 OUTLETS (TYP.) � f ALONG SLOPES COORDINATE WTFGASCOMPANY O (8�'° IFOR STREET & UTILITY �191 '�•.�'✓••'•.'.'♦,••,•'•♦•♦..'• .,,•'•♦•♦..'•, 6908.0 .. ,•'♦•♦ ..'.,•,•' ♦♦'•♦'•.• •,•♦♦•'•♦'•.,•,•' ♦♦'•♦' •.•,•♦♦•`'•♦A�•,,,' `• • ♦•,/•�,•♦♦,•• •• ,•♦, •,•♦♦ ♦. ♦ P•\♦l�j♦.•♦ . 'PINSTALLATION - MUST HAVE 4 SEE SHs/b\J9� FEESOF COVER FOR TREET 908.5)A DL • , • , • „ • , • , • • 5 �� i ,�� �-\�� 00 .0- PHEASANT DR NE 1.4Revisions: 2M/I HOMES OF MINNEAPOLIS, LLC 11 CARLSON SUITE I hereby certify that this plan, specification Print Name: Brian J. Krystofiak, P.E. Drawn: KRO 1. 4/25/25 Per City &Watershed Comments NATURES REFUGE NORTH PRELIMINARY GRADING ENGINEERING SLAiNEs MN or report was prepared by me or under my SURVEYING direct supervision and that I am a duly Signature: �_ /L Designed: B]K Of TEL76&AM7 -� 5354 Parkdale Drive, #100 ENGINEERING `NNiN€i IFAX� � Licensed Professional Engineer under Lino Lakes, Minnesota & EROSION CONTROL PLAN V�CA�QN-EI�NEE INGMM the laws of the State of Minnesota Date: 3/4/25 License #: 25063 Date: 3/4/25 St. Louis Park, Minnesota 55416 1 Save Date: 04/25/25 f:\jobs\5401 - 5420\5412-03 - natures refuge north\cad c3d\engineering\preliminary\5412-03_grade.dwg 1 A 4 7t J) t1G-V .�� I I \��8� ��9os •. 9\ SEE SHEET 13 :� WETLAND 35 •' i to O 171 • I _� - _ O N o �� \ \ \ CRITICAL HWL 906.1 •, O I ��'� o o� I� II I - - - �� \ WMC WETLAND BUFFE x I 1 p \96 \ 9 4g \ .� it 11 50 `n +o> ' - -- - o i - \ o ~ POND 500 \ I SN OWM ELT . • U) r�i M r N�- - - - - 32 222 S.F. PRP. I ' _ A v I I 1 �- - 12.9 32188 S.F. REQ.) NWL = 905.0 �\ \\ \ +� _�, _ aWr r- �• A ' I ICRI TI CAL HWL = 906.6 � 90 \ \ \ \ ,I • • � . o� T WETLAND 55 ��° I 1 (SNOWMELT) �\ A �\ •,. `9\ \ `', :• 05.3 _ �2.0 _ N `\ o� o.� , 14. CRITICAL HWL = 904, ,�:. I ! ---- �\ u9 •' �' o -- `� `� � / / 9 s �0 04.1 �� �. �� I - 895 - , ♦ • i • °� �° W I o� (ril I °9 / �� x 100 YR ,. �,° . RIP RAP AT ... • . , I (� cr \ \ 0, EOF ( ) ��'�'. ° 1 OUTLETS TYP. TOP of 9 ' • I 0 \ I y o,� 1 / / 40 119�I C ) BERM \ 1149 0� %�7 9 I --------------- _ �� ' c��9 ��o •• 1 -- ��---��/ i \ \09 II-1L- 129// a / \\/1�/ O• 91o8`s' 908 TOPI. TERM F 09.0=mmmw - 09.0 - - - - - S • WETLAND FILL c9 �, I / / / \ fi � � _ � � � � � � 6,1JL� SF \ \ � • U' 0�6V' .\ ^� 9\ I I . , \ \ 49 �- 0 1 16 9 �p 135 � • x� O9 -136 13��- .0 • \ A \ \ I �>� A ,bD�� \V92 09.5- i,i.i 134 ' I 11 I • 0 • \\ I `-' i� i� x .O� /�/ / ����� / i ,> .� - 11 0 / \ n \ \ \ I I % / /l 9�2 \ \ 0• • , \ \ \ \ I I -' i / i `OY �\ O � ' �9>>x0\C 0 I � �� .g �S --1 • . v I I •o '� �g moo° �< 8 v - - - 133 \ C, lid \! G G 'p G �'�i i l �3 8j' \ �' \ I , - , - , oxoo \ \ SO N N x S / / \ \ \ I I ,' O '� _ I 0 / Soo 1 1 �9p8 p130 131 132� \ \ \ 913.0t,,LL-) s,3.o , /Lq \\ �09 �/ G / , I �9 0/ 0147 X / 0. CV G � J 1o.s / // �\ ' • \\ \ \ \\ � �� �9, •�� � � G / 1 ,, \ \ 9 0 j I II SLG \ \a G / \ \ 1 o e ''� �� // `SOG, ////'^�,/� COORDINATE WITFl�GAS COMPANY \' < C �\ ���' ���s 9'?�2 / �5�� INSTALL EROSION S0G S0G I I \ w /�15 < , �p 5 0 - 9+oa �/ / 9�� / / 40 ° s "1%ti\ 7 1 .60 O \ FOR SIRE T &UTILITY / 9R �'�° - s \ / �' b.6o% % �� s �,/� INSTALLATION - MM� HAVE 4 146 CONTROL CAT. 20 "� y W 9�;,•8 \ \ ND F, F _ _ �. I �- 1p 8 o/ / �'o o / / S / h°o G 914.3 N G 9 �-, �9 \ c FEET \OF COVEF� F01 TREET � / O / o oA. o G 914.3 oo EL. 910.35 i / s / / og o ALONG SLOPES _ � �1• � � 90 \ � � / / �� '� / ®'�� � � �° 20� 0 1 29 p� �- O ,, ,� CROSSING AND 2-FEE9 OF / / o.; • �SEPARATJON FOR ANY PFP`E / / �. s - �• e PVI ' 3+50 12.9 12.5 / 1� \ �i oo `9 / ���O • \ \ CROSSI N \`�� % / / �° �7.s 0 60 s�\ E ,oy,2.60.a �`;� P ,� ,-_ 32 -- �R �� • . 145 / / �, � ?2 \ V.C.) 9� 9,3 77S \ \ G"�+ / / \ • • • 9 / p Q.p \ 14 s - - -j3 i oo �11 �a� 16 /� \ N I G / / 0 /^� 4 �p 9 O' / 97/ / - 12.3 ,.60% 0.60% 12.3 �` �A / A �� �� / ° 10.0 'o A 71004 v/ 38 � P H a I /7 \ \ 9�'J • \1 \ O G I v ^`� \ A� / `. / _ O • , 90s.10 • / / G / / 914' 13 LiJ G \ S I I 0G / / 9 \ ;� / 8 PIPE . °' ' off° ,moo / N 9j - / ? w v I , / ��� \ k vy / 143 144vv �� ��,o , S > z 12.8 12.5 12.2 _ U, ig�� 5 \ \ \ \ I i / / - \ / �� V • \ • V o, J / OG / "� / 7g 0 / U) i1 \ N \ S S0 N - - -�- - - - I- G \ \ \ 124 123 SO '?o f w \ \ \ , \ /', / o \,, SoG I I SOG g 113 G 914.4 �NI SOG \ \ \ 125 122�. , / / / s > > �� \ , 4� 11. '6P 8• IPE , • , r / 0 / f �I SJG I I ,-�''\ o$ \ �/ �� �R o` �` .F /�, G 9�4'0 ``.0 .• , r \ / / / / �9 / W I \ ° �~ \ / '` �\ 9 Sx, - _ 914.3 _ G - �`/ 9 ,o� S O G I 1- \ \ 12 6 5 \ \ \ \, 9�0 / if 'A \ , xo� `50 72, 5 13 1 _ i ,(a 9tl4.45 \ 0$ • • 2 B V S ° 1 `` _ \ 8 PIPE • - / / I- I I Imo_ \ • • \ < \/ ,� 6° �p ' ----� L- ,� ---- I I �127� . • ' �9\ 1 �1 ' / �� c %o 12.3 j1,�N \ 0 1 I 0 / �9 • n :.. o 71008 o L------ I • • • I A / S ♦ Aso 904.10 .. ' • . 6 /9 \ / \ X - I . • \ / o 9 s+o \ WETEMD BUFFER o' °+'::• ° % ' t / w 13.0 I 0.5 • 1 �� p��Q ��O \� o +oo - O • . o �129 12.0_ 128 1 �� vv v ,��� / �z.3 -^ p1lb •. SIGNv(TYP.) °> , :.'.0�0 10�-, 99120/6 • • �S `/ 3 �� \ ' ON ;___ \6' Ike 1z, G • '' •910 • •' LOW AREA• • • • • ,6791s A 120,� / ° 12.8 1 -- ��J• I�\\ a �'• O6 • . 906 ... CRITICAL HWL - 906.2 �> ' AfICAL WETL25 B�SNOWMELT 0•�. G - 1 G �, G °. \ H L 905. \ � I l ) WETLAND Fill, \ V S �; / 914•3 G 914.0 \ Cj� SNOWMEL\ ' \ \ \ 32,540 SF . � / / 0G / A • ' �\ ( T) soc 907.5 SOG / / I I SB 5 • � � I \115 Co 116 \ \ __ 118 _ -� a°�a�:° v {) • / • 905.E 10.0 • • • _ _� \ � 0� • • • • ' � \, •••..••• '>i v. w ��... /`00:* 0 06 I. �. +- V � WETLAND FILL v 13,84i' SF ............. ' ........................ . v v - '-� WETLAND 25-A :...................... v CRITICAL HWL 905.5 ......................... 1 EOF �(SNOWMELT) 05.7 z -_� 1 1 T�' 9p. . . . . . . . . . . . . 0 25 50 100 ` I o ' x - �� o x � m + o WETLA14 D �.. ly7 - T x 4, (IN FEET) CRITICAL HWL = 904.7 ' x m SNOWMELT m BENCHMARK 1. Anoka County Benchmark No. 2011 - Elevation 894.88 ft. (NAVD88) 2. Anoka County Benchmark No. 2012 - Elevation 911.80 ft. (NAVD88) o � e I � \ L-J / \ o O 0 31�QPHEASANT RIMIGE DR NE Rev1.4/ 5/2 M/I HOMES OF MINNEAPOLIS, LLC 12 CARLSON SUITE I hereby certify that this plan, specification Print Name: Brian J. Krystofiak, P.E. Drawn: KRO 1. 4/25/25 Per City &Watershed Comments NATURES REFUGE NORTH PRELIMINARY GRADING ENSINEERINC SLAINEs MN or report was prepared by me or under my SURVEYING direct supervision and that I am a duly Signature: Designed: B]K of TEL7�3.48�7 p y �- 2 -� 5354 Parkdale Drive, #100 ENGINEERING :PLANNING FAX ��� Licensed Professional Engineer under Lino Lakes, Minnesota & EROSION CONTROL PLAN ICARLSQN-ENQNEEfflIN,=M the laws of the State of Minnesota Date: 3/4/25 License #: 25063 Date: 3/4/25 St. Louis Park, Minnesota 55416 15 Save Date: 04/25/25 f:\jobs\5401 - 5420\5412-03 - natures refuge north\cad c3d\engineering\preliminary\5412-03_grade.dwg A 4 . ^ . tt- J) t1G-L I I I I I I II - � _ ♦ I / I �'906� Xi r \ OA ' • ♦ ♦ ♦ ♦ ♦ • ♦ ♦ • • f f f f f f f f ♦ • ♦ • ♦ • f • f • f f f f f f ♦ ♦ f ♦ ♦ ♦ • ♦ ♦ f • f f f ♦ ♦ f ♦ • ♦ f •�f f ♦ f ♦ f f f ♦ f ♦ f f f ♦ f ♦ f f f f f ♦ f f ♦ f f f f f • f ♦ • ♦ ♦ • f f f • f ♦• • ♦ • f f f • f ♦ • • ♦ • f f f f • f ♦ ♦ ♦ f f f f • f • f ♦ ♦ ♦ ♦ ♦ f f f f f • f • f ♦ ♦ ♦ ♦ ♦ • f • f • .f ♦ f ♦ ♦ ♦ • f ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ f• f• f f• f ♦ f ♦ f ♦ f ♦ f ♦ ♦ ♦ ♦ ♦ ♦ ♦ f f• f• f• • f♦ f♦ f ♦ f♦ ♦ f t f f• . f♦ f ♦ • • • ♦ • \♦ • ♦ • •Ta♦ • \ Mill 4116 f ♦ f♦ f♦ f f f f f f U9 A - 9 \ C WETLAND BUFFS /; °S IQ�' ♦ •'�, . • . • . • . 28,875 S.F. PRP. r. o ��� °�� X11.8 10.2 • k11 >> {11.5 10. 11.5 ' • • \\ (27,270 S.F. REQ.) 09k *11.3 .2 1.0- o \>i>i.i>i.i>i>i>i>i>i>i>i. 10 0 9.5 iiii ;j: j iii iii;i,ii.....i. / ��1i, 1r ----- , i it-5 -- �I 160 158 0 A�I 11 9 � u7 WET D E15 \ �.: i. ,i..i..i..i..i..i.:i:i:i:isisi:i:i:i:i \\CRITICAL HWL, = 905.0 o \� (SNOWMELT) j \ •�'\ 1 I 1 os �'"�, o o~ ti0Gi S G S G it SOG \ / `. i ` 15 6tox \ �� ' /� •• \ 1 G - 914. G 91410 G 1 914.0 `9 <\ 9 \ O �\ 0 ----- _ _� JI I \� \ o 12.2 11.8,L7" -I - PVI \. . / ��` ° ' ' � ,' ° ' `\ 15 5 \�� U7 NP \ N EL. 911.6`5 EL. 910.75 11.3 '7 6 \ \ 01 , C WETLAND BUFFER : , \ - ' - N 12.1-. -+ 1+,00+100 , 20/ o. o� 11.3 :.:.. .' .. 35,,336 S.F. PRP. . •• _ - I o I o. 1 18 oso� 0 609 ..,i...\49 (24,3�5 S.`F\. REQ.) I /'•' �� �� I N - ---- ---s1-2 -STTWETLAND 30 •• I54 4lC'J �>R0 � 9 ITICAL HWL 906.0 -(SNOWMELT) ._®V. \ r. \ \ \ 10 FOOT MIN.1 `� CD \ \ \1 CITY BUFFER NON WMC / /i',. _ _ _ - I \ 12,118 S.F.PRP. _174 \ \ \ (5,741 S.F. REQ.) '' :.. •' / O / N�N N L �' _ / / z .- °' a, Ld • • 9 COORDINATE WITH GAS COMPANY . . . \ • • • \ • • TTO� of FOR STREET &UTILITY__ , . , • • o� , ���34 �, _ _ L - - �, • BERIv�\ INc fALLATION -- MUST HAVE 4 °� • • - -� .� // O O I / \ r= - - - - - Lv 1 • • • 49 FEET OF COVER FOR STREET 2 w •' - °9S ' . \ CROSSING AND 2-FEET OF • . �, p , �; ry / �, 175 / \\ • . • 9 \SEPARATION FOR ANY PIPE �oF ��� _ �� �� _ 1 _J --s �,/ ; rn I m 1 J tr, \\ 8 s • • \ 10-FOOT MIN. •' I - - - - N O i `� o� - - _ - .'S� + \ BTOI ERM OF o I 90 \ 9°� • . \ 9 \ \ CITY BUFFER NON-WMC -i=�. ..................... ... I \ ° \\ • . ` \ \ \ 9,777 S.F. PRP. /a; - =:; : I O / \1 �\6 .�i• ••i ••i•••i•••i°'•:°:RIP-RAP AT •• I I \\ 90� \\ �,o°� \ \ (5,57U S.F. REQ.) J I o \ �_ � I°' /.' ....... OUTLETS (TYP. ,j' °+�j• I \\ \\ • • p177 \ d 9 r - C9 I o / / 171 WETLAND 35 I - , o 0 `v\ CRITICAL HWL = 906.1 I WMC WETLAND BUFFE I I p v�9° v ' • \ 49 v �,:� i°' • • 11 50 0 'n 1 +o" + POND 500 v v\ SNOWMELT . • I (n ro 11 - - - - - v 32,222 S.F. PRP. ,•, I I NWL = 905.0 \ \ • \ `.' I (SNOWMELT) • . 1 L Nrno NIA \i • (32,188 S.F. REQ.) I I _ \\ \\ •• �\\ ;••lllll�.•,.. _ _--- oF' aW� I r--- - \ , \ `�� ICRI TI CAL HWL = 906.6 \ 90 \ • • \ ` \ \ : 'I • • - - \ 17 \ `� WETLAND 55 �o �;; I I (SNOWMELT) \ R \\ • 9\ \ �� • • 05.3 0 _ _ _ 12.0 _ N >' ,4. �s CRITICAL HWL = 904. �� • : I ! _ - - - `• • .� . � - - �� O- 0 04.1 / • • I - -895- - • ♦ • • � r - �� x 100 YR ,. �,° RIP RAP Al v A . �.° .. • . I (n rs EOF ( ) �' ,• • I OUTLETS TYP. \ • TOP OF �9 \ ' • • O cr i ` \ °,° / 0 �� �,,.i. I C ) BERM v \ % 1149 c�%�� 79 ' • • 09 A �� �� • G) 0 .r''�• ---------------- --- --- l `\ I L_ \ I° ,\`Lg�/ (sob • I ofl/ __O°' ; \ `9 \ �I --12`r _� �����i� \� / \ /i 9�� s� 1 / \ x \ z /. TOP OF � o 09.0 09.0 WE AND FILL \ � Q �RM o p ��------ -- �� --� S� • 6,1.51 SF �\ V (� • v' 'n ��j // / ^� i 1 C�� / \V (� 0 25 50 100 / . �• • I I '• \ oy \ • Sg 6 �vO 6 .7 9�0 : • ��� og 5, , I �1,35 __ �__136 , 13-� , , �o o \ I > \�. / 09.5 x - v G� y \ .�. v� �_ 1 --- 9 148 x - (IN FEET) i :.i AN. 5 134,' I I • • \ \ \\ I I �/ / A�� /�/ I / % ` J O o �� BENCHMARK X ooI I i i 80 • • I o � ��° < / l �8 1:0 } 1. Anoka County Benchmark No. 2011 11► .0 133,^ SSG �G / �,38� • \\ \ �\ I / /, V %.° �, ' ^x°° ° ?� \ 9, ,\� / , / V - Elevation 894.88 ft. (NAVD88) \ �/ N x / • 9 I 1 ce 9 ,,\ �- -- MIT0.0 - \1 -------- r---- -Ir-- I 10.2 ` s�.� • \o O/ /�/ �/� \ j � '\°9 �\ •o/ / . / i / lLl Q(9908. ,S0 2. Anoka County Benchmark No. 2012 S0G v" SOO Elevation 911.80 ft. (NAVD88) 191130 132\�3p N � , 403 147� li<s9/ LG o �i / O,./s COORDINATE WITH\GAS COMPANY <, C •� ,; / / o /,k� INSTALL EROSION SOG SOG N \ < �5 - - 9 - 9 1 • • \ \ / \ �o 1.00 / /! �� C // // �� 40 FOR SIRE T &UTILITY __=�� I °ems-°% l INSTALLATION - MU HAVE 4 °°\ 146 / �o o ` CONTROL CAT. 20 } I ��.8 �� ND F� F o.60% 1p S / s w g P S �PVI 9+75 5� / \ • Ab�' ALONG SLOPES G 914.3 G 914.3 I N ,\A'6 g09 EL. 910.35 SEE SHEET 12 / S /\ / • •FEES\OF COVEF� FOI STREET/0,60o / U / �' Og A R I / O I EN%sINEEi�MCs CARLSONSURVEYINGI PHEASANT RIMIGE DR NE hereby certify that this plan, specification Print Name: Brian J. Krystofiak, P.E. or report was prepared by me or under my Drawn: KRO .4/2 /2 1. 4/25/25 Per City &Watershed Comments M/I HOMES OF MINNEAPOLIS, LLC NATURES REFUGE NORTH PRELIMINARY GRADING 13 �AIN� MN TEL7�3.4�7 direct supervision and that I am a duly Signature: �_ /L -� Designed: BJK 5354 Parkdale Drive, #100 of ENGINEERING PLANNING IFAx� � Licensed Professional Engineer under Date: 3/4/25 License #: 25063 Date: 3/4/25 Lino Lakes, Minnesota & EROSION CONTROL PLAN 15 ICARLSQN-ENONEEMINELt M the laws of the State of Minnesota St. Louis Park, Minnesota 55416 Save Date: 04/25/25 f:\jobs\5401 - 5420\5412-03 - natures refuge north\cad c3d\engineering\preliminary\5412-03_grade.dwg A 4 7t J) t1G-V SINGLE FAMILY HOLDOWNS 60 LOTS *30' FRONT SETBACK FOR LOTS 101-113 & 181-192 SLAB ON GRADE R/W NO SCALE *25' 60' 1 (FRONT SETBACK) FINISHED GRADE GRADING GRADE SOG I In 0.2' TOPSOIL 10, In 1 0 10' �r 1.0' 1 WALKOUT R/W NO SCALE *25' 60' (FRONT SETBACK) 25' wo 10, I I ----------- -- - ---- in x I I 2.5' 0.5' TOPSOIL t 1 0.5' MIN. TOPSOIL t FINISHED GRADE GRADING GRADE 1 I 0 I n 10' i i 1 0.5' MIN. 1 �T0PS01L 1 MODIFIED WALKOUT R/W *25' 60' (FRONT SETBACK) 25' I I IWO 2) 0 10' I --- 0.5' TOPSOIL LOOKOUT R/W NO SCALE *25' 60' 1(FRONT SETBACK) 25' I I LO 1 � 10, I i I I I 2.5' 0.5' TOPSOIL t FINISHED GRADE I GRADING GRADE 1 I 0 I �n 10' i i TOPSOIL 1 �1 -FINISHED GRADE -GRADING GRADE in 1 o 0 Lon r0.5' MIN. i TOPSOIL MODIFIED LOOKOUT R/W NO SCALE *25' 60' 1(FRONT SETBACK) 25' I 0.5' TOPSOIL _ 2' -hl _-II-III- ll \ 7 ? I SELECT BACKFILL MATERIAL II l =i i i ITi COMPACTED BACKFILL NON -SELECT BACKFILL MATERIAL COMPACTED BACKFILL J SUBGRADE CORRECTION (60' LOTS) - *60 on *UNLESS OTHERWISE SHOWN 0.5' TOPSOIL ARIES GRADING GRADE 3.0' 10' PROPOSED FINISHED GRADE EXISTING GRADE SELECT BACKFILL _ MATERIAL �<opF q MAXI'Q MAX. 10.0 I I MIN. BOTTOM OF UNSTABLE MATERIAL GRADING PLAN LOT KEY 59.4 - 60.5 I LIMIT OF SUBGRADE EXCAVATION NON -SELECT BACKFILL MATERIAL COMPACTED BACKFILL -1I I-1I Ii it I I� I I I-1I I-1I I - DRAINAGE & UTILITY 2U] GRADING LOT NUMBER EASEMENT SURFACE DRAINAGE LOWEST FLOOR ELEVATION ADDITIONAL CORRECTION AREA HOUSE TYPES R RAMBLER OR SPLIT ENTRY GROUND ELEVATION 961.0 LO -RAMBLER LOOKOUT OR SPLIT © BUILDING 96r2) ENTRY WALKOUT WO RAMBLER WALKOUT 0 SE SPLIT ENTRY RECOMMENDED SEWO-SPLIT ENTRY WALKOUT GARAGE SIDE G 68.0 CG CUSTOM GRADING SOGDENOTES SLAB ON GRADE FINISHED ELEVATION © LOT CORNER � � - - - - - - J FA ^ DENOTES STEP CONDITION (IN 6" STEPS) ISTREET I I TREE FENCE ANCHC T-POS 2"X2" NOTES: TYPICAL LAKE SECTION POND 300 4 4 �1 1� N . W. L. 10:1 ---- 10'1 3 3 1 Q 1 20' BOTTOM 20 VARIES TYPICAL POND SECTION POND 500, 600 1 1 -111I N.W.LE 3 n 3 1 LLJ Q 1 10' 10' BOTTOM VARIES BARRIER FENCING REED SOIL 1. TREE FENCING SHALL BE PLACED A MINIMUM OF 1 FOOT PER CALIPER INCH OF TREE DIAMETER FROM TREE(S) THAT IS/ARE TO BE SAVED. 2. ANCHOR POST MAY BE SPACED UP TO 10 FEET APART. 3. SECURELY ATTACH TREE FENCE TO ANCHOR POSTS W/ MINIMUM OF TWO ATTACHMENTS PER POST. 4. SEE MNDOT SPECIFICATION 2572. w z J 0 J LOT BENCHING DETAIL w w w z z z J J J 0 0 0 J J J LOT PROFILE _ DIRECTION OF FLOW (LOT) STREET PROFILE - �_ DIRECTION OF FLOW (STREET) 0.5'- 0.5' 0.5' SILT FENCE 0 0 ANCHOR W/ METAL T-POST OR WOOD 0 2"X2" STAKE 0 0 DIRECTION OF FLOW ° �:-- ° z ��-III-III N ° III' it III - NOTES: TURF ESTABLISHMENT TURF ESTABLISHMENT SHALL APPLY TO ALL DISTURBED AREAS AND SHALL BE ACCORDING TO MnDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION (LATEST EDITION) EXCEPT AS MODIFIED BELOW. TURF ESTABLISHMENT SHALL OCCUR AS SOON AS POSSIBLE BUT IN NO CASE MORE THAN 7 DAYS. SEED: MnDOT MIXTURE 25-141 AT 60 POUNDS PER ACRE. DORMANT SEED: SHALL BE APPLIED AT TWICE THE NORMAL RATE AFTER NOVEMBER 1ST. MULCH: TYPE 1 AT 2 TONS PER ACRE (DISK ANCHORED). FERTILIZER: TYPE 1 10-10-10 AT 200 POUNDS PER ACRE. ROCK CONSTRUCTION ENTRANCE FILTER FABRIC (36" MAX. HEIGHT) OPENING IN FABRIC WEAVE < 212 pm 6"X6" TRENCH (COMPACTED BACKFILL) UNDISTURBED SOIL 1. DIG A 6"X6" TRENCH ALONG THE INTENDED SILT FENCE LINE. 2. DRIVE ALL ANCHOR POSTS INTO THE GROUND AT THE DOWNHILL SIDE OF THE TRENCH. 3. POSTS SHALL BE SPACED A MAXIMUM OF 6 FEET APART. 4. LAY OUT SILT FENCE ALONG THE UPHILL SIDE OF THE ANCHOR POSTS AND BACK FILL 6"X6" TRENCH. 5. SECURELY ATTACH SILT FENCE TO ANCHOR POSTS W/ MINIMUM OF THREE ATTACHMENTS PER POST. 6. SEE MNDOT SPECIFICATIONS 2573 & 3886. 0 .EAR (MIN.) 1 6" MIN. T CARLSONSURVEYING�ITE1°Q #PHEASANT IRNE I hereby certify that this plan, specification Print Name: Brian J. Krystofiak, P.E. or report was prepared by me or under my Drawn: KRO Revisions: 1. 4/25/25 Per City &Watershed CommentsENfiINEE�IN>s M/I HOMES OF MINNEAPOLIS, LLC NATURES REFUGE NORTH 14 CNN ISLAINF. MN TEL7�3.48�7 direct supervision and that I am a duly p y Signature: �- 2 -� Designed: BJK 5354 Parkdale Drive, #100 DETAILS of ENGINEERING PLANNING FAX 76' 4W79M Licensed Professional Engineer under Date: 3/4/25 License #: 25063 Date: 3/4/25 Lino Lakes, Minnesota / 15 GAIN-ENI�NEERIN1ftiM the laws of the State of Minnesota St. Louis Park, Minnesota 554161 1 Save Date: 04/25/25 f:\jobs\5401 - 5420\5412-03 -natures refuge north\cad c3d\engineering\preliminary\5412-03_detaiIs. dwg , � A 4 . ^ . 7t J`t1G-V OUTLET CONTROL STRUCTURE POND 600 LAKE 300 901.5 OUTLET CONTROL STRUCTURE POND 500 WETLAND 898.0 898.0 TYPICAL STREET SECTION STREET B 60' R/W — 24' B/B R/W R/W 30' 30' 18' 12' 12' 18' h-6' 82.0% 2.5% MIN 2 4.0% SOD W/4" OF TOPSOIL N -'7 SEED & MULCH REMAINING R/W 1 20" CONCRETE 1 RIBBON CURB 6" TOPSOIL & SOD 6' SIDEWALK 4" CONCRETE (3A32) 4" FINE FILTERED AGGREGATE OR CLASS 5 AGGREGATE BASE OR RECYCLED EQUAL (MNDOT 3138) (SEE PLANS FOR LOCATION) R/W 1 rl— 0.04 5' SIDEWALK � 4" CONCRETE (3A32) 4" FINE FILTERED AGGREGATE OR CLASS 5 RECYCLED AGGREGATE BASE OR EQUAL (MNDOT 3138) (SEE PLANS FOR LOCATION) MODIFIED S CONCRETE CURB GUTTER T/C = �-.06 R/W � PAVEMENT SECTION SEE GEN-1 DETAIL TYPICAL STREET SECTION 60 R/W — 32 B/B (STREET D) 11 �i 16' 16' 2.0% MIN 20" CONCRETE RIBBON CURB B /C = � - . 40 14' 0.04' /FT PROPERTY LINE L SOD W/4" OF TOPSOIL 4' BEHIND CURB SEED & MULCH REMAINING R/W *PAVEMENT SECTION PROVIDE MASTIC ALONG CURB LINE BEFORE —SEE GEN-1 DETAIL WEAR COURSE IS PAVED s 0 ORIFICE INFRASAFE - 2'x3' DEBRIS COLLECTION DEVICE AS MANUFACTURED BY ROYAL ENVIRONMENTAL SYSTEMS INSERT BASKETS N W/OUT FILTER BAGS MICRON FILTER BAGS RED INSIDE BASKETSV/Sk, 2'x3' HDPE FRAME INSERT) EMERGENCY) OVERFLOW PORTS MEETS MN/DOT SPECIFICATION 3891.E "STORM DRAIN INLET PROTECTION - FILTER BAG INSERT" - DESIGNED FOR NEENAH R-3067 OR R-3290 SERIES R/W R/W VARIES VARIES 16' « 16' * VARIES I I I s" TYP JOINT ADHESIVE MAX, SLOPE 3:1 (MASTIC) 2.0� MIN. SLOPE � E! i;. 4" TOPSOIL i i &SOD SEED & MULCH REMAIN NG R W .. SUITABLE BACKFlLL SEE GEN 4 MATERIAL STD PLATE INSET A TYPICAL STREET SECTION 11 ■ROAD WIDTH DIMENSION M6�SURED TO BACK OF CURB 14' 0.04'/F SOD W/4" OF TOPSOIL 4' BEHIND CURB SEED &MULCH REMAINING R/W MODIFIED S CONCRETE CURB GUTTER T/C = �-.06 TYPICAL STREET SECTION 60 R/W — 32 B/B (STREET A 8c C) z n' 16' 16' 2.0% MIN *PAVEMENT SECTION —SEE GEN-1 DETAIL R/W - 8' 5'-t 1' 0.04'/FT —' 1— 5' SIDEWALK 4" CONCRETE (3A32) SOD W/4" 4" FINE FILTERED AGGREGATE OF TOPSOIL OR CLASS 5 AGGREGATE BASE OR RECYCLED EQUAL (MNDOT 3138) PROVIDE MASTIC ALONG CURB LINE BEFORE WEAR COURSE IS PAVED - 1.5" SPEC 2360 TYPE SP 9.5 WEARING COURSE (SPWEA240C) - SPEC 2357 BITUMINOUS TACK COAT - 3" SPEC 2360 TYPE SP 12.5 NON WEARING COURSE (SPNW6230C) 8" AGGREGATE BASE, CL 5 " - 24" APPROVED SUBGRADE ** 1.5" C 2360 TYPE SP 9.5 NG COURSE (SPWEA240C) C 2357 BITUMINOUS TACK COAT 3" S C 2360 TYPE SP 12.5 NON W ING COURSE (SPNW8230C) 8" AGGRE BASE, CL 5 INSET A * SELECT GRANULAR NOT \ NEEDED. ONSITE SANDS ARE ** THIS WORK SHALL INCLUDE OVER TURNING THE ACCEPTABLE. SOIL IN WET CONDITIONS TO DRY SUBGRADE MATERIAL AND PASSING ROLL TEST (INCIDENTAL). TYPICAL SECTION JANUARY, 2024 C I T o f (URBAN STREET) GEN-1 IINC�I KEG 1#1 INFRASAFE - 27" DEBRIS COLLECTION DEVICE AS MANUFACTURED BY ROYAL ENVIRONMENTAL SERVICES - HDPE INSERT BASKETS �'''°°� �000 SHOWN W/OUT FILTER BAGS ���° 400 MICRON FILTER BAGS REQUIRED INSIDE BASKETS 2X3 HDPE FRAME INSERT \E � `EMERGENCY OVERFLOW PORTS - MEETS MN/DOT SPECIFICATION 3891.E "STORM DRAIN INLET PROTECTION - FILTER BAG INSERT" - DESIGNED FOR NEENAH R-3250-A OR R-3250-1 (MNDOT 801) FRAME CASTING SPECIFICATIONS: MONUMENT CONSISTS OF A POST AND A PROTECTED OPEN SPACE SIGN WETLAND BUFFER SIGNS MOUNTED FLUSH WITH THE TOP OF THE POST FASTENED WITH NON -REMOVABLE SCREWS OR RIVETS SIZE: 5.5" H x 3.75" W ALUMINUM SHALL BE 5052-H38 OR 6061-T6 ALLOY. GAUGE SHALL BE 0.080 SIGN COLOR COLOR SHALL BE GREEN AND BLUE LETTERS ON A WHITE BACKGROUND. POST MATERIALS 4" X 4" SQUARE TREATED WOOD OR OTHER CITY APPROVED MATERIAL POST INSTALLATION MOUNTED TO A HEIGHT OF FOUR FEET ABOVE GRADE SET AT LEAST 42 INCHES IN THE GROUND INSTALLED AT EACH LOT LINE WHERE IT CROSSES A WETLAND BUFFER WITH A MAXIMUM 4 X 4 TREATED POST SPACING OF 300 FEET BETWEEN SIGNS (IF NO BUFFER IS REQUIRED THE MONUMENT SHALL BE AT THE EDGE OF THE WETLAND). PLACE ADDITIONAL POSTS AS NECESSARY TO FOLLOW BUFFER CONTOUR LINE DIGITAL COPY OF SIGN AVAILABLE FROM ENGINEERING DEPARTMENT CITY tKif O F E WETLAND BUFFER SIGN I JANUARY, 2024 NORTH SURVEYING GEN-22 EN%sINEEi�Mc; CARLSON 3�#PHEASANT IRNE SUITE MO I hereby certify that this plan, specification Print Name: Brian J. Krystofiak, P.E. or report was prepared by me or under my Drawn: KRO Revisions: 1. 4/25/25 Per City &Watershed Comments M/I HOMES OF MINNEAPOLIS, LLC NATURES REFUGE 15 �aIN� n�35449 N 7t J`t1G-V. --- — i ---- T- --� �- - - -----------F- I / I I I ,, I I I I I i ► ' I � /,' � LEGEND - I 1 I i SoA , 1 Ma SITE BOUNDARY LINE SoA EXISTING PROPERTY LINE SECTION LINE WETLAND / 1/4 SECTION LINE -------- / / \ I I , I 0, ---- 1/16 SECTION LINE - --- - - - - / / I /�-L- � \ 2' CONTOUR - - - - - - - - - - TW 10' CONTOUR 1 WETLANDsos-- ! 906'- \WATER — • - • - • - • - • — ,--L------0- % �-- TREE LINE ' \\ -- �%�_ I \ \ ' \ FENCE LINE - -•-•- -•- - - - , - ,\"\ / \ \ ! _---- os 6 -- --- ----� - OVERHEAD ELECTRIC - - �. - - �. -.M --------------T----------------- - - \� I WETLAND / / 10 UNDERGROUND TELEPHONE , \\ \� `-_ \ / \ \ MANHOLE O ' \ \�\ \\ \\\\\`��, ,� I o�\ // \\ \� I ♦♦♦ �♦ - /�-----------� MH HYD HYDRANT ' �\ 1 -�- / \\ /o 1\ I \ \ ♦♦ \ / \ GATE VALVE p4 1 \ \ \�\�\.\ I W 1 `�-----I i \\�i/ / W I♦♦♦ ''♦ FLARED END SECTION 0 \ \\ / / �° ♦AWI I POWER POLE `g \ `� / `� \ ♦ ♦ I ` / I \ // _ o I \ ��♦ Zm B \ ♦ I I I \ TELEPHONE BOX ❑ ' I TV WETLAND` \\ _ ���°� / / - - - - /� ♦♦ ♦� I \ \ \ / / / _ _ / / 10 \ ♦♦ ♦♦♦ TELEVISION BOX \ ° I L// / -' / 0 \ J MB MAIL BOX o I 96� -� \ `�-` `I �"�'\\ \\ �\ / i / �/ ll - ♦♦♦ \ ���N�1����M���*♦♦ I I II SIGN WETLAND I I� -'/ ♦♦♦♦'''v SoA pl I II ��\ I / ♦ I Iw - \\ - ♦♦vu���� i���M1� / - \ I SoA III I POND \1 \�/ /\♦♦♦♦��� \\� \�\ \\ :\\�\ 9°G\ j _--' 906 J j' \ , \ / ' 7 ♦♦♦ ''' ' �I S87. I o I , SITE DATA � , I ♦.♦ ,■�♦♦♦♦ �� ///\�\�� •� � ,��` \�', . 1 � � 0) CT) Ah TOTAL SITE AREA 59.3 AC. \ ,/ �� \ �� \ \ / I \ \ ��' ■�tjQ EXISTING ZONING SINGLE FAMILY RESIDENTIAL (R1) ` \ SoA \ -�` _ °\\ �� \� - ��/ / \� \ \ II �•,�I■� 6.7 ---------------- ` - - - - - -----_�--------- ,_// °\ \\• WETLAND ! ��/1 - I� I- _ _ - !'�♦� \\ _ _ I I. / NOTES //----- �, �■■�,.,\.\ ,\ --- ` ►I 1. SOIL DATA SHOWN IS BASED ON NATIONAL RESOURCE CONSERVATION j / ,' I ♦♦ I I I I / OUTLOT B SERVICE WEB SOIL SURVEY. ' ♦ \ ♦ M So Zm WETLAND 1 % ��t\\`\\ // \\ ♦;�• `� / YYYY,Y , \�_ , I■ SOIL TYPES , - - - - i / �� � - - `1 \� SB9s \ \ / �♦ I i , I W WMTLANU' \� ` / ��,I \ / ♦♦♦ ' / WE I /' / w Isanti fine sandy loam = `\\ \\�\\ T\\\—� ^ %/ I i %'/ WETLAND -- / 1` I , a Markey muck, Ocassionally ponded A Solderville fine sand B Zimmerman fine sand °\�\ A-- \ ---- ----- o -- WETLAND DRAINAGE- z--/ BREAK SoA \ - ---// \\ / -9� TJos 0 50 100 zoo ♦♦ 41�� ♦♦ � \ ♦SoA ♦ ♦♦ I��. '♦♦ - ♦� ♦♦♦ \�� \� `� oos.�L. WETLAND I N FEET) ��... '�♦ ♦. ♦♦♦ �1\ 0 yeah ` ••••���. ( r _ SoA '•' •♦�1 ♦' ♦ ♦ \ T®��!/PIPE ` ••�. _ `\` I \ \ 3 \\ \ / ♦♦ �� ♦♦♦♦ '\ ' ►♦ SOIL DELINEATION °, g14 45 i \` III �� \ ►J O , ---------------- �� ♦♦♦ WETLAND LINE (TYP) To 8 PIPE�i� / \ �,—_, ♦����� �I���� 4 � _ y --71008 / _ �•♦ \ — —\\\ TQP),,ROPE /%\\ '�'^•\ I i �\ ♦'' l�—9p8--\ (4 ♦ �\ 0 'SOIL TYPE \\`\ / °°\y \ \ I\ ' ,' \ — — �I ♦♦♦' (TYP)907.5 �, \ \ . , _ , - ♦ , �%X �111111111111111■ ♦♦♦♦ _� OUTLOT D IW ��7 I _ WETLAND °\ �� / 10 SEW \ 4(907.0 I JR \ SoA - !, I W --- WETLAND \ _ lL// SOA I `�,\� ��� ����. / / WETLAND I ZMR _ - ---- 1 ------------------------ / i I � I 12 o IW AN DAL : TREE SoA Revisions: ENCEINEERINCS CARLSONSURVEYING 3 tPHEASANTM DR NE SUITE 10 I hereby certify that this plan, specification Print Name: Brian J. Krystofiak, P.E. or report was prepared by me or under my Drawn: KRO 1. 4/25/25 Per City & Watershed Comments M / I HOMES O F M I N N EAPO LIS, LLC NATURES REFUGE NORTHBLAINE.MN R 1 TEL76&AM7,-� y // direct supervision and that I am a duly Signature: ��__ � , Designed: BJK 5354 Parkdale Drive, #100 RESOURCE INVENTORY of N ENGINEERING PLANNIN6 l ax �. � Licensed Professional Engineer under 3/4/25 25063 3/4/25 Lino Lakes, Minnesota 2 CU&SM-ENSINEEMNSMM the laws of the State of Minnesota Date: License #: Date: St. Louis Park, Minnesota 55416 Date: 03/03/25 f:\jobs\5401 - 5420\5412-03 - natures refuge north\cad c3d\engineering\preliminary\5412-03—resource inventory exhibit.dwg A 4 7t J) t1G—V. LEGEND SITE BOUNDARY LINE EXISTING PROPERTY LINE SECTION LINE - - - - 1/4 SECTION LINE -- -- ---- 1/16 SECTION LINE - - 2' CONTOUR---------- 10' CONTOUR --- WETLAND------------- WATER—•—•—•—•—•— TREE LINE FENCE LINE --------- OVERHEAD ELECTRIC ——� ——� — — UNDERGROUND TELEPHONE — — — — MANHOLE O MH HYDRANT "YD '0 GATE VALVE cv 0 FLARED END SECTION FES POWER POLE 10, TB TELEPHONE BOX ❑ TELEVISION BOX TV 0 MAIL BOX MB SIGN SITE DATA TOTAL SITE AREA 59.3 AC. EXISTING ZONING SINGLE FAMILY RESIDENTIAL (R1) NOTES 1. SOIL DATA SHOWN IS BASED ON NATIONAL RESOURCE CONSERVATION SERVICE WEB SOIL SURVEY. SOIL TYPES Iw Isanti fine sandy loam Ma Markey muck, Ocassionally ponded SoA Solderville fine sand ZmB Zimmerman fine sand - I • •• 100 200 (IN FEET) BENCHMARK 1. Anoka County Benchmark No. 2011 — Elevation 894.88 ft. (NAVD88) 2. Anoka County Benchmark No. 2012 — Elevation 911.80 ft. (NAVD88) _ I \ S ' I oA Ma SoA , WETLAND / WETLAND ------------- SoA z Mt mB WETLAND\, I 1 \ 10 \ / / ----------->--------- / / / / / / / / SoA / / OU TLOT B / I � IW I WETLAND " ;o rw / \ \ \ 2 \ 3 \ \I 100221■■� 4 iA / 5 / OUTLOT D , i 1 VV N s� _ _- WE I LAND I � I 907.0 se 1 SOA - \ , to WETLAND IW WETLAND\,i - - - - - '� IO , �., 1.: WETLAND I � s t IN,=� ;� �; ZmB „�o����..6 !Iv \ WETLAND - — — — \\\ 12..: 41 AN -=RE ti / I 4 \ CARLSONSURVEYING PHEASANT IIEINE s>>LAINI, I hereby certify that this plan, specification Print Name: Brian J. Krystofiak, P.E. or report was prepared by me or under my Drawn: KRO Revisions: 1. 4/25/25 Per City &Watershed CommentsENGINEERING M/I HOMES OF MINNEAPOLIS LLC � NATURES REFUGE NORTH RESOURCE INVENTORY R2 iBLAINE� MN 7s44 TEL7W.485.79W direct supervision and that I am a duly signature: � //� , ^� Designed: BJK 5354 Parkdale Drive, # 100 of ENGINEERING �`NNIN€' Fax 7W. Licensed Professional Engineer under Date: License #: 25063 Lino Lakes, Minnesota WITH AERIAL IMAGERY 2 CA►iEt-WN-ENGNEEFINQ11=14 the laws of the State of Minnesota 3/4/25 Date: 3/4/25 St. Louis Park, Minnesota 55416 Save Date: 03 03 25 f:\jobs\5401 - 5420\5412-03 - natures refuge north\cad c3d\engineering\preliminary\5412-03—resource inventory exhibit.dwg A 4 -M J`71 G—%J- VICINITY MAP I D V o �P 0 0 MAIN STREET (CSAH 14) 0 z a O� w w a z = v z � 5 LILAC ST. N APOLLO DR. NOT TO SCALE LEGEND EXISTING PROPOSED PROPERTY LINE EASEMENT LINE CURB LINE — — BITUMINOUS CONCRETE [,: , ' — - SANITARY SEWER > STORM SEWER >� WATER MAIN OVERHEAD UTILITY UTILITY STORM CATCH BASIN STORM MANHOLE OUTLET CONTROL STRUCTURE MANHOLE O HYDRANT HYD MH I�C? GATE VALVE Gv X T TELEVISION BOX ❑ TB TELEPHONE BOX ::1 UTILITY POLE RETAINING WALL FENCE 10' CONTOUR — 2' CONTOUR — FEMA FLOOD PLAIN WETLAND LINE SPOT ELEVATION LL:J x---- EMERGENCY OVERFLOW SILT FENCE TREE FENCE GRADING LIMITS TREELINE SOIL BORING SHEET INDEX T1. TREE PRESERVATION INDEX T2—T4. TREE PRESERVATION PLAN T5. TREE MITIGATION NOTE: REFER TO TREE INVENTORY REPORT FOR TREE IDENTinCA110N AND REMOVAL/REPALCEMENT INFORMA110N. the guidelines of GI/AS;UL 68—U2, entitled --Standard Guideline for the Collection and Depiction of Existing Subsurface Utility Data." DENOTES INLET PROTECTION O 00.0 -a x E.O.F. �0343 x E>E�> 000.0 0 0 0 0 0 0 0 0- ,AAAAA+ 0 50 100 200 (IN FEET) 11 BENCHMARK 1. Anoka County Benchmark No. 2011 set in the ground in a covered tube located 150 feet westerly of the centerline of Rondeau Road West and 40 feet northerly of the centerline of C.S.A.H. No. 14. Elevation=894.88 (NAVD 88) 2. Top Nut Hydrant East of the Southeast entrance to Lino Lakes Elementary School. Elevation=920.01 (NAVD 88) EN%sINEERMc; CARLSON PHEASANT MIDGE IR NE SUITE 100 I hereby certify that this plan, specification Print Name: Ryan J. Ruttger, RLA or report was prepared by me or under my Drawn: 330 Revisions: �. M / I HOMES NATURES REFUGE NORTH T 1 SURVEYING CNNN BLAINE, MN 55449 TEL7f3.48�7�I3 direct supervision and that I am a duly Signature: Designed: RJR 5354 Parkdale Drive TREE PRESERVATION INDEX of ENGINEERING PLANNING FAX fM Licensed Landscape Architect under Date: 3/4/25 License #: 56346 Date: 3/4/25 Lino Lakes, Minnesota T5 LSON-ENGINEERING01=M the laws of the State of Minnesota St. Louis Park, MN 55416 Save Date: 04 25 25 f:\jobs\5401 - 5420\5412-03 - natures refuge north\cad c3d\engineering\preliminary\5412-03_tree_pIan - new tree rules.dwg Tr J`71 G—VJ 1. \ \ �h^ ? 39 3raQp'eS°R � ♦�3 � 1@"' °�`%� of s , p`i /`g1og� p�°/j��� / m✓ y �ii 2 o� /AA° �•r I / .. ?-� )1r, ;1 ti� �T x ?2 1)ti° ' IIl D °°aj ° —� " �(0 52494CD2p4 ° 2029 .5) 5)VI-911.5 o 0Z�7 . F956° ��� II / n ------- -- - J� • / 'I — ° �iR ' 916. 0 0 / • 00 O p?f • / 3j,. <y � x / �— \ � .� I I I j O ro •• > 9 ` N x `° ,�w 16 6x / M % G 915,5 o tit 0 230 _ N � O N � % O'.j ° c / �y / \ pg23 1 2474x 1�69 1 2 ♦ M L / — - / -7 \ • 3g 3g45 O 0 / \ i �{t.3$ M 1gk 47O c w `t4O 3@ / X8 1@ � 8 / 0 2 x236@ 16 7�� 645 \ / ♦ `O� s _I �� > 38 / ,p� \ \ � \ � �/ / • ' � 2 0 • o� 2301 : \ ?3 `A' ' m� \ o I I / /� O �� •r ° F_ 154 030 7� • Off/ / k \� \ 2 \ i�Yl ` a' � O n / �`ro \ �/ • I 02153 1yy 16 1g / \I / 9� / I 915.8 I I I �� C �6 1 � / L01562 • 54115 '` / o \ \ / / \ Q Q V • o 1 0 o ^•• ho / _ �2 221�N2x50 �M� �,7 Q— 66 i N 9 -Oka @ 015 6 N ILK 90 N , i, ° 1c0° "1S?o 5o0-)� p ^° 6oN.f ^ - / '/'/ / •••• 04 I II I II I I I \ 906 J r 40 o17o 4° °7jR? o' ®>j o 181g o 67 o 01 ? 079 �° p 1516 Jed I I / � 16 x .�y M� \ • / 1712 " ,�'� 1768 ��9 ,� `1 k�K / p1748 1763 yo > y� 7 00 01000) / / / — 17�09d4 •°1 9�9176^2 L oiS�g o " "9 6,K° 175� p177 7 *'> 0 01776 kat S@o w°� >� p�®p�,^S 1 y5S m o 1I0O o ° j7`D c�b/, �� W / , 88b8 8668 8 ••• \ \ 0 , — — — — J I , � / ♦ ti s m �88 ® g2® o 4,0 9� 986 9p oo x x M x @ 1598\ / �cO • 0 / p 985 o ge` o �� �? oM 1 x74 'I >� ? ? 0� t L8 • N ry� 8 O� D 900 O 6 \ p 980 �� y }S, o O v \ / y[ \ / , C� o p 198 x9 5 0979 �77 PCI 1�k ° ^o' 098 O 988 >o Lei �� � X raw 7 � 0996 099 O 96 9 `n prt R� 77 0 °' o� o� rnm 6 x959 7 5 ` �@ Ig194 367Q>� 9A 0 9,0�0 @O O \ seep o J�E x9 0� J'( x� 9 �19 0`0 1 �4 �� r, a Q, ` h� 18 x 1 l 74 ° 970 ^ °j o \1 1 9 co Q0 co p91�j ?�a�9�0 O� 0� \ x30 4 \ ( J0. Liz ` 8 ^ e1 0 0 0 '� Q� x �`�do 1 ex 008 a 8 x51 d 0�204 9Zg ° 1 I ti ti 0077 �w� � m � �`� 7 CD 5 �i( �O rp I I I p 2001 0 > 1� }( ^ I 19 x e� o� �R \ -- 90 9p x e7 g x5764 7eE �' 635 0 0 O 01' I n6d g 1x x h o 1114, p9p'1 ` A9 11 N 610 c 61 V \ x 4 �0 � q g5 � '3j 801 \ I — 55 4 > $ � 248 1 � \ O paw � • 685x � � S? — — — — — — m 1 m • • • • N —906— al Gv - �I \ l�.i. w i i .•ri. !`� .!' '• '�.. . Q4— .................... ` .l @ y �so� tee• — -_ I I s +• \ @eo -900— _ E. At LEGEND EXISTING PROPOSED EXISTING PROPOSED PROPERTY LINE UTILITY POLE EASEMENT LINE RETAINING WALL KEY N CURB LINE — - FENCE 10' CONTOUR OUTSIDE INSIDE BITUMINOUS [ _ _ _ _ ] — GAS EASEMENT GAS EASEMENT CONCRETE ]:___•] 2' CONTOUR — — DENOTES TREE 20650 2065 SANITARY SEWER ----> FEMA FLOOD PLAIN TO BE SAVED WETLAND LINE STORM SEWER — - - - ->>— >> 00. 0 DENOTES TREE TO toss > 2065 x WATER MAIN DENOTES INLET SPOT ELEVATION-E3---- x----E3- ax �- — PROTECTION E. 0. F. BE REMOVED TREE LOCATION OVERHEAD UTILITY -one ... EMERGENCY OVERFLOW � � x r> r> TREE TAG # STORM CATCH BASIN ® 1. 000.0 STORM MANHOLE r oSILT FENCE -0 • • • • • - NOTE OUTLET CONTROL STRUCTURE O TREE FENCE o 0 0 0 0 0 0 0 - REFER TO TREE INVENTORY REPORT FOR TREE 0 25 50 100 MANHOLE O GRADING LIMITS A A A A A A- IDENTIFlCAT10N AND REMOVAL/REPALCEMENT HYD MH INFORMATION. HYDRANT GV TREELINE GATE VALVE T x (IN FEET) TELEVISION BOX ElSOIL BORING TELEPHONE BOX Revisions: CARLSONSURVEYINS&ENSINEEMM 3 # PHEASANT ODGE DR NE SUITE100 I hereby certify that this plan, specification Print Name: Ryan 3. Ruttger, RLA or report was prepared by me or under my Drawn: 330 1, M / I HOMES NATURES REFUGE NORTHTEL76BLAINF,MN7900 T2 TEL7fif.4:7 direct supervision and that I am a duly Signature: g � Designed: RJR g 5354 Parkdale DriveTREE PRESERVATION PLAN of ENGINEERING RLANNIN�s FAx7�.7sM Licensed Landscape Architect under p Date: 3/4/25 License #: 56346 Date: 3/4/25 c� Lino Lakes Minnesota , T5 �CARL.SON-ENQNEERINrCDM the laws of the State of Minnesota St. Louis Park, MN 55416 Save Date: 04 25 25 f:\jobs\5401 - 5420\5412-03 - natures refuge north\cad c3d\engineering\preliminary\5412-03_tree_plan - new tree rules.dwg 1 A 4 , ^ n o 2 N N ^`v �`1' 1� O 7233 p �f O h `Sid r r O ro 9 \ 08 ? 0 �4 ? O 9 k ^ 1 5 �. 0 O O �7227 07229 �5 r 8684 X8673 )g(8666 I � B1 \ � > S 0 6+S \ gp`` 9SRp A? S � / 4357 q3 � k3a p O�B@ 0 � 7 � 5312 M �h S2 h T 1 (jK8159 @qq1apgi033 • p ?S �� 4368° 4�399 4391 ° `>90 a1 0 4126 0 p 0 e� p 238 9p° oo,^ 520- - - - �l \ a°�of �o s 20 O s 5 °° Rcp . �9 1 �O _0 1 c�a ra o x�0 07232 - - - 3 i ( ti °j 9 h{35 ' S S2 ho, 9 / ° O 7oCIPAk p1225 906 O 06 2 1' 20 0 0, 9 T< h p7231 ,� 1 p(, 8 �@ S m M 3 • A3�` SS�,04396S ? 9g 4 \?e) p oA p 4810 ��yo' p 37 k°♦8668 m�`O h / h om , / �'� \ \ e �' M /N / a0 b9 59S� o° /obi o p 4981 0 2jG�O 1p o� 4192 >o p o s°•.���,0 \� o �/O /S O h0O 4209 4 to k A 9 0MS3 �� ,8 o / s o 0 0 26g 1WEL tT • a / R O O S 1 S O° �" '-�o ' 4i' \ % �9 9 ° O�O X 4 ° O �p` O� 8 055 0 0 0� i 0 1S18i �i 11 < �m �o e� • O / $ 8 9Sp 42 2p@ ktig o �6 �b 0 oS o O8656 8 h • ^ ^ 14354 x 9 9 18 4 9 4232 k O h 0 p o ` v° ro 0 2p q, 3 O° h / ti M° N 4g O O S �ii 0 1 9 b ?> c I I I I B65 66Q o `L 9n M 8 �. ♦ D 2 0 6\ 9° S • o �r 00 S ^ O S� m O p 5317 o S �o B o 0ag5186 el /h wo �6k N Sj 'do Si �>� {; = 85 N y \ \ @ 8 S O / 9 9 oe� k'� 0 2 S N 94 o S 4289 4271 0 10 e� O g 4P ry .00� S / "� 8 J Nc� 0 1 o h h S O oB 1 O SiS 7�� \ S ^v cSo \ ° / • B a° �1^/ '� 4gB3® x 99T S R2 o c� o S p ai 2 p5224 p ° rt^t h / 1 hs h�53 s 9 ^ae O a \ • S a 5 N ° 2 ° 4 o S' O �a b y �y S °,� °1 �2> I— — —� \ ° ° @ ag3 0 �9 _g A �n� 8` q5 `T g , , / • csm /� 0 0 ,�h _ 4339 �� o 0 d'0 k f>— .9 O 0 p 222 Ok of 6 5 0`v 69ram/ •'o °x 428� 51 O O O ti IQ \ OS �SS 0 2BSB �90 9 S 5!!82 / 4325 \ _ R9 2 ° �� �'� 520 5223� 05 51'36 43o srS o srao ^ yc ♦ \ 2 624 N n O • a 6 do so "k' 19 / `'o 0 427 0 O S 92 o ? S �, w ,� ♦ k m 01 le( O o _ 9 d .�`4 10 0 o p �L o 2 dd / g / o w . O �0 8 O ti� o �9 5182 `L ° O.�°' ♦ a� ao rns�� t1ffi —� 7B(6 1 • 596 '0°'6 w o o SY �° �4?� --I "98 p R? 3 k`L ��' p 6h n°� �94 00�'1 h`o' 4769 ° 0 o ? 0 S? • a1 x 0�4 ti B O @ 8 Voli ♦ 5173 h h qp 5189 0 0 0 m e M \ ` 1g$ u s 9 1� f 4 o " o S '` 0 203 oµry� pag37 rn ry 0 0 9g / �c+. so� So3 �2 �x�o° m °fib° Q 5979° / / 9 / �,�' 05 °p * 04290 ♦ y1�9 yam R p ,o S o o �. 0 $ N 9 ' / S 823 0 A� `�S 2 0o J, / 9 c` 4805 '1 o �� 193 0, 1 hh0 ►A 202 E �8 • 43 k o cr °� 4291 p 284 O O 1 0 0 5 O p t,1 O m h �, o-)A6g5 9� 1 / ,�j81° / x x p O B6 O 8@ O w ,o / 9 /0�' B23gE, �c 5 O � / 04315 119 0 `�?S`�o� ?� 1 ° °�2 d� '1 920 0 38 22 0 `�O o o °� • Je( �7 �ti ���aae[[[ op a9 ^� N N g958 °p c w 8 �f82 6 / ,,'. • o '� 0'�i 4314 a O o o ® x aso4Le 0 d'yO0.�105152N0q 9 0 �+ ate\ o+ !W�' "" NOS O / o� 0 0� ' >93 4 1 0 ° cs s •� 5153° 0 1 o O / 90 aD ao '�_ \ O a� rn z o 9 O� ° m �^ k2 �.2) h p h1a O O > > 0 �s O i0 4� o� 0 w ( m p( 9 �? /` ^N `°P 3efmN ?`� sE 62� `� °�1 p( O ° 6 • h /� 'I s c c0 O 83 - O 155 $ S j g° 088 o ro o hg`LZ rn �o°j° ep 6966 � � ,> 9 )d • S� S9> ho / / q S 4978� 0 04313 ry Ory9g ko� �k,L�y6 h�°�o 4j >o O 4700 ! O 'o ago 0 09 �Ol 0 ° m > tO `� rO 69 02531� �6 • > > n e�� k2 kti 06 O 51 0 kh 0 `A en p a 861 0 8925 �8b 9 1 - v` M3 37 N N ro°j aao 3eE j�46�J70 j 068 °''9 p s y ` '� S tb .�°p " o k0 ♦ h'` °h S7 �` / Rio 0 a h m �l T28 J� 1 Og 2 2 . n p 4943 �0 N b1 ? S ♦ 1 O 5154 0 m ° m ® '. �myr wy+ g;aE 0o O a m p 5 k o d .(I >B 05 h o ?O p 51 IJ 0rO 00 p 0 881 88 90 1 31 .� 1, v( 6gR o // °6 �o '� O m 6 O ry� k� 0 10k 5100 5109�'j1� n 8 - 4@ p �(6 63 h / c0 0 14945 _ 0� ' L L__g rn O a e aoi ° 8815 l Ay �S M ry`1 �h �o 5R 10 M / / gg1 O -W 060 p / c oQ' o / k'41 � � a N 2 O 0 as 8�2 g1 ° • o� �0 9 �9 .�n 6• ° ro�o R 9g O ap p4427 00 o�`— 0 e� 0 476 p /k �' O I( �iP 0S S G / 49 ti b 4,4b 0 0 '`'�• M � • � m d `O �. ? o o @ � 18 0 � ° 223 ��h1O I f/m B � O � 4279♦ w0 ^ O O o 0 h ao ( ° O 4j O N p( 9 '1 N J ci • 1iS Of k 1 e_A 00 IIJ .,g��h, • a ao 0 c,1 N N\ .9S �6915 O 0 OR qA oR S2� v oi°� 5234 4W5 ° 04 4 .wry 82 / 700 8849 0 oV �" • �qi ,y 31 1.9 24 RE �o � �i9260 69 y 6 201 ay W / x Si S • r O 0 �4425 � 449@ 0 19 o 05117 h m I / p 05 8 • o O S 9 448 I o� ° 8824 ® ,y a9�9 l mry pg896 9 I 3123 )3122 �' o g �° h �, 6 .- ro° • • .� e� 440 4413? o 8848 �"y �p o 8823 Dry �S M o, M 0 �18( Q2 N O O 6 047 c 4 "Y9 �1 . g 4942 4202 O 2 ry 8 4446 ° w ^ 9 S 00 4761 .� ^� Y` • O o & 4447 0 3 � la y19 N sE h �t'�i o���? @ 116 76 0 ° ° 0 N m 2�( �e( 1 � 9'>p � Cm 1 3002 9 `° N 'v @ iy III o 9 • o n 4412 O 4449 0 °� / o x$ p, , p 5 5 p 4 0 II le(89 k � i ��p .� ,� 4225 1 ry � � � 0 ♦ o c' h o 513 O 54 / o k o o / iy p 202?B p 4448 0 �' • • '� O � � o O S 95 �O� ro j�3120 1eE89 ti° b� Bg0 00 h m m c / L � : �►p, . 0Cn x0 ^� c423� v� 4423 O 11 p p 19� a 9R14• • .sue h n 8B 0�88 • a — — �(J g�°j)aE ?0 / •O 4 0 @ / ` rn d ♦ - -� • 4cg ° r�8 r' 6S3s @ — g M . 1 �0 O •° 030 e 0 • N • • 4929 kk 0 4405 p ♦ 00 S 0 • 5 w ao 00 k q1�•0 430 °> • 9 ~ S — — b m 9 @ `' 3 _ 21 J o 4@ M p 4404 1 '. 5 h p rj 1� �� gg g 3J� -\ • • rn ° 4g 44Q2 ° ♦ O / O I 0 0 4�° ° • '. �O rp0@g O m a, 9 cD L- - J • °� 69 0g @gf c ';9 O / \ �j • • yk `? 931 °0 42 0 ° 468 B2 4800 bi 1 k O 6g o 8855 air o ro R — ^ �y o 1. 8 9 > �1a(1 -a� a o! ^ 1 �g / ?g ti b • • • • • • o�4 0 468 O@� 0 0 11 0 0 ? 4 2 0 0 fl ro — A S o ro °� o h� 90� ?? •o,`�' • N 21� • • i • • • 4685 0 ♦ ►P� p( - - fie( ►P 0 I _ - �q 0 oft;_ � o BB@4 0 0 o a�0 • � I � I �'"� 1eE3013 fS� � � Je(@ — � -� lr � �0 9 '. 1,� � /°h • • Z97� � �L• • • 1 • : • • • • � 00 ^ 004,�0? ' o S �Q 0 0 � � � �( ra ` � \ ' 473 \ \ °8B eh6h p 9a�ry Ys� ? 0 1 M ° CIL157 I 8 w 31� ( 181b ,p w • o / —moo � • m — •o 84797 ° " p �° / �° �S ° • c��;r )K30370 cp d �' p 888 p 888. p M _t0 cr 3�g 197 m 1 0 Amp — N I I I '� • • • • m� ° k10 • M c . ,t ( p(4752 p(4 43 8891 v 8 ° 317 468�j • • ^ 4 • 4l �t � ° \ p � 6e�s � Leo— a, M �, l �l • ,�h '�`' o � � �,� 1 '� ^ � I I p�, ��' I r4s�12 \ • o • � 0 4 h a'`1C� +��� � • 4T1� � � � p(47 1 0a ° 0 0 " ? g1 0 1 7 �@ / \ ry r - - - - N 5 • • 0•2S �8 \ ` \ ry QB 47 M _ � ` sp�sss ssoo,oa o � �� °° ��°� ' � ^ / s/" \ eis � � - t I I � I 1 � \ % �� ° � 4747 \ \ I O � A \ 3B9@ o \ p38g .994 O °�9 O O O 888709 ` S? 32p ^ \ e�( i9 ,��11� �v / / \ A1°�''^\ p°jg(49 29 ?9Qgjg(sh�r1V 1R�2S 38�q o p tp 1 ro 9 0;9Q0 o -0 p �g85 '� eP` \ `"' 31 �° 3@ / 63 %2 �( 9 w ♦ 9� ro, o h ro Z\'� 0'a \ r7 � O� 0 9 • ` �\ 3203 / `O �6 ga ♦ 0 8 @ 0S \ SSs ha 0 0 ? �: 21 �! e`�fr 38 O • O T8 c S @ / . c 9 / Sg 1 \ OS g�E \ 4g19 I 2108 `L90'y w I I 3 �II^^ `SS B o o S 10 387 0 0 0 �O ti hry ^ \ / 31 9 ,1 ' < j�3316 6 \ ti 2 ♦` S9 o M °S 8 Oi OrO\ �j • g 1� r� \p( g�1 n �� 22 @9 26 �1m� �h p(4614 2 f 3a580 ♦ �o° Oo'S �? 9 p d324 , ti 30 / • 9 �N / 367 \ \ `at; \ �`3eE �O� n 2 9 Je 148 462 I 07 n0 r� rn ?�' Q • ' c / \ 339 2 b ?@9� s m- 6 f� r I Ii st@ I ,� ? O 324i , O \ ° 306 > 3 • ^� 9 a / \ ARL@ p 2858 m�, o� rn 9) I ti {1 9�(9ple(LIE I I y \ . '� '.9 o 1 • d o n `� q„e3 3360 393\ o >0 N ��ti N O y L 1 ti ...0 O 0 • N ) m "`� 7,, ) 69 nTill M n 6 ieE N 1 0� 0 ° k0o o �it ^O 71 032 • 323h0 M3 mo S �i �M "? \ 18 A3361 u1� �m N > 1 _2987� 6 N '�'� � ' 466300 s� y0 0 `g �♦ • g`4.540 i ! 2d� \ 8 3 6+ eE205 I ¢5 4594� \ / 3866 LPN°` cS ? 21 \ 3362 JeE33g p(2250� a a 0 29 of `sue 4b� p4583 I r93eE m( �E ;oi yh \ / 0 0� 262iJeE ry '� 4antlat �0'S �` ° N \\ \ ^� N/.. u' •• ry� h M M 33 �' ^ h 336¢\ 31'S/10� \ / 2 `Lti m 8 @ 2 g O p Q O / I O o 1•.: M �s h \ 3213� 6 M h s 2 1 0 °j •. ? °p, 17 M o g •• \ \ ry/ v/,, ryry 3 \2 321 0X • / O 3ebdL 35�14:P oo �o > pCK 2267 1 y >� Ohc� N 29 8 �5�( O I I • \ t9 • / 3 8XX / 9 • 3G53(� ,h� `S M 3 M oy M/ N 1 p(2 6 m g� ( N mS�q�2m( �2 N 1 I I 4S0 p( ? A lei, 3s9 / o� • / 26J 0 c • M M,— `� 1 `y1 �h 0 • X / S4j8( '? en U> n a v �' 6 1 o 'Sk • • < 0 A `b ? x S hk / \ 3� R ao , x > ry 3837� p °S • • 'y`t �'S 2 e a S6 / / / o \ \ SSe 21e(�9oS M w N ° N 6 F k gh1 ®� A°) • 2 2 3 c 80 Je(3677/ " 3303 \ 386 > Z ?Z 8 �� o , 9 998 g� 'S � ?Be A p( > \ < S �491� �0 k(3+1873/ 3X 3,3020 ^i3 )Jt3 � J 3 S 'h � � 'y •• �2289 � 2629 8 � •. \ 8! "� 1 03403 cv "� • u' n J m sr 9 B / 2288Je( s 0 r r k > w kcl° o -R �( X • Oj j r�j 'JX �34j2 h° o �( • O J .?. leE Mh J�E ° 383 p k • / 71 • 4 389g8 3� V "�334c 3 496/v3 75 / \ M w O N \ 9j 1 9M — 4534 @ R �E g l a ^ �7f 82 +r4 • �,; M `� �' `l� '`� JeE �, I 29 h 0 3833 34 0, h @ • • 2 9 ° 4133,, 6 / „3• 0 7 / \ \ a� �'28`i2 / 3 0� a°' M • 1 d '�s os \ e `O ,y @ I I 29 I \ ? 2a p(28 5 N SSS 83Op = aao 2 35 4�( r �@ • m \YP n P.9?S \ \ ?9hiJ� I 1g 286 12 '0 ry n 02837 282s 2 6 _ - - x�90 g0 ^ • N m 1! ,� j x \ , + `' ro / \ \ N I e -N- ° �• I I I I :� 1 � . a M )K2s36 S?�i p 3825 0 ry` 0 6 g O ' '� 0 e^ M $ µn 391 \ \ m v� 1'S SfeE N 2820 i ♦ N 0 p 3831 3B32O O^° ; �6304 0 0 / v , N >B dQ\ D I I -------- > 'mN I \ / h o 0 246 N`�I I I .N I 0 0 � O O 0 ♦ a0 / O O O "n m a1 / C 0 6tij° As / / \ / ��\ \ \ i \\\ i I I L JI I ''�� �59` 0°(1'' I "' \ I 381 ° ''�` " ^ Csl \ \ �3k °' \ \ 1 \ J I \� I I I I sl \ I 38 �a° \ 41 4. \\ \ �; 2 \ p 08�?) 0 380 1 �c �k1 kk 4 'L�ry•\\ �/ \ �� �\� \\\ //� \ �„ 25I m yp _2 0 0 O p ti I h ? N ry ? S \ 0 O m o 2 .. I kh \ eC / \\ J f n 2 N \ 03891 Mom° I / ` ? 4f2 Nk�/ • ?O o \\\\ ��� �ieE, \ \ / ��\ \ // // 1 \ \\\\ \ \ ' IN N h° 9� a°Do 389 0 ° ° o o / �ya`i• • / \ / / 34S>l�E k59 N 20 2 \ ^^ n I / I 2 \ 399 0 3 38� 1 < \ a5� 7BE3q / n y� 'lk° \ \ \ — L — = J Q\9)g Ste, , O� �� �ry �c / , O �� y l 3 1 24 0 �t�( /^ ^ p(`i p� \ \ �qS Oa J O �9 ` Sp @O/ '., O 0/A, _.oa�° hO3 !00?9s(gv° ° ` // / �° N0h • ` I a `�ry //\ �( "� 4 ro •fR\ Je(24940z4o24o'e rn or iO^9 III I III --J-- -- Np�M g �* (_O i 1101 ' 1"z039 i zo029 _ °> \ rydo I I 1- J 911.5 3 56 0 39 — ` h0 N 3k00 • �"S? ,`s � v ? 2 �� 1 g- J�V J n- - - - - - - 1 ' r 248 \ \ \ N / ry cp i L — \ I - j 1 • / ' p3 � 3� � ?� �.. y �j `�a� 'r � / i ��� 3 � ` � s � � V •L � � \ \ f �" / `� .� <o \� / I G g 16. Q I I � � � I I % • I a y° / c ? ?� p �°° ti . 3 ' s� ��e( ry N pI •.. " / `° co °° 1-66� / % I I G 915.5 1 1 O �1 QO _ 230 \ 2oo 3@ N �b� 1667 1�69 1 2 L M / ♦�_ i/ I I / \ - �I / _ LEGEND EXISTING PROPOSED EXISTING PROPOSED KEY PROPERTY LINE UTILITY POLE OUTSIDE INSIDE EASEMENT LINE RETAINING WALL GAS EASEMENT GAS EASEMENT N CURB LINE - - FENCE DENOTES TREE 20650 2065 BITUMINOUS [ _ _ _ _ ] 10' CONTOUR TO BE SAVED CONCRETE 2' CONTOUR — — ] ° �- �] FEMA FLOOD PLAIN DENOTES TREE TO 20 2065 X SANITARY SEWER ----> WETLAND LINE BE REMOVED s5 TREE LOCATION STORM SEWER ----->>- >> L`L`.0 00.0 TREE TAG # WATER MAIN DENOTES INLET SPOT ELEVATION-E3---- x----e3- a x — PROTECTION E.O.F. OVERHEAD UTILITY -one NOTE: ...� EMERGENCY OVERFLOW � � X E> � STORM CATCH BASIN ® ®. 000.0 REFER TO TREE INVENTORY REPORT FOR TREE STORM MANHOLE o SILT FENCE -0 • • • • • - IDENTIFICATION AND REMOVAL/REPALCEMENT OUTLET CONTROL STRUCTURE O TREE FENCE o 0 0 0 0 0 0 0- INFORMATION. 0 25 50 100 MANHOLE O GRADING LIMITS k\A A A A A HYD MH HYDRANT GV TREELINE GATE VALVE T X (IN FEET) TELEVISION BOX ElSOIL BORING TELEPHONE BOX '.# PHEASANT Itil1[E I NE Revisions: M / I HOMES T3 CARLSON sUITE1iE0 I hereby certify that this plan, specification Print Name: Ryan ]. Ruttger, RLA Drawn: JJO 1. NATURES REFUGE NORTH ENfiMEEliIN i BLAINE, MN 5544$ or report was prepared by me or under my SURVEYING TEL76&489:7 direct supervision and that I am a duly Signature: Designed: RJR 5354 Parkdale Drive TREE PRESERVATION PLAN Of ENGINEERING PLANNING FAX 7fMAM79W Licensed Landscape Architect under Lino Lakes, Minnesota T5 CAM-WN-ENIGNEEIE2INVCQM the laws of the State of Minnesota Date: 3/4/25 License #: 56346 Date: 3/4/25 St. Louis Park, MN 55416 Save Date: 04 25 25 f:\jobs\5401 - 5420\5412-03 -natures refuge north\cad c3d\engineering\preliminary\5412-03_tree_plan -new tree rules.dwg A 4 , ^ n L L L L�_ L L lz,�_ Le,,,,, ��0 6406 0 o l06326 06,362 0 6271 6201 O 202 /L77,"oj961 9° g1900 ,�k 87510 0 6747 0 6 44 11 p 6402 o k 794 g o e,4906153 61 ° 6407 0k • p r e e3� i 6ti 6105O o 62 O 6793 O • 910 N 62 0 ° 6795 154 o N40)BE8 27 6 °s� ,a • yr 2 / 9 10 O g9 677 p675 °,\.�°r ry77�n eRR a 4y 6i 32�BE�`� N g �co I O F' ? 0628@�pq O / 68000 O O ° 0 01 n 61 .r ` ) �i �( ?o c?� O6 63°p0 �00 g1 4,Vy1 60742 ^No `° M / 6 �% c f } `�aE 39 0a ' Q / L 06798 Oei9ro a kryr -8 — -r> — h yp I N g� �( �'��' _ 7?O�O 7fia�Y�aEo 181 Ol 48o JS 70 °° 1q1 O 0 6707 ? e^ m `1 / 61 61 1 , 0 a (1- 0 8422 °0 4 SSo • w m v 6y 1 >` 9 h ti tih — - p 6762 a e4080 00 21 ) • �h►� N 63j ' 11 $ q � 11h p6 84 o� e� • k e1aE )aEg I 1 ey 0 fkg yh°' h e ) m uro ° • 0 3 q n N a N N e 80 `380 ° o h 5 e 0 46 w 1� R N h S ml m / 66a9 6690 p 67 9a ,,0 0 737 ° °s �O1�6o^ry 05 p0 3 0 p 4j O 9 e L — — J — V f o ?S tp �N u, �f ° ag1 a ohm �`4moL6_7867696��s°e_606? ` > oS010 e) R �& m n s 96�( Zk / 66880 6 °6'6, 668 0 �O °0 67g1 6B0 61 ?e0 8415 ° 'R l m 6�'a I �i9 m ts A '�I 1 '� r — _ • • ft K 1� O 8 sr RiaE h 221 oga� a 6 4° o c' ^ o �x kky 447 8 e 8 315y,�, 'fs �eSR9 �? g -g2 BE N _ _ o •'� _9 06� g4ai` o �� k o h,�h`1' pg.>31 fO.10 '6'0 66443 Jai' $r / J kE N V • , g'1 h IQO 8 2 R,�144a ems? • oh °' 0 p hn hm eon,@�'So °s' a 8-1010 18 o R �(S 6 7 L ?S& (s1 • ♦ 12 O O O ti R4.86 ee - Day _ laE 388 e e p� • . ° ^h do ° bb °� o gal • �h- `�� _ 88 C� 83 7 �aE / � � • / ,b ao 01 6g28 0 'L9 c2 • 00 R y0 prt8170 O m h 0 fir' O h �S h, 0k 6 O 6a N �.`° p L/_ 888 Co laE6 1 rO Z° o g 34 08g21 6 °hh 5496 • - 893 a �e 6 0 O m 6666 ° Og 31 O o 605 mh00 ° O • 9 O prt6878 6879 s e 6y� 6610 eeSBo $0 o ga�1 ,� °gg /�m W ° • pi8877 _y6 ggg 0 0 ° m °ems ho^o j ;, ag1 �p 9 II pE8876 I O �A90 a4; 0 h `° 0 1° p °p ar,100 '0o 0 \ / i oo h° o o m o^K 6+ mA • i / / 2 � }E68S\7 6832 i7 NL -1-664eo eeR � ^� 427 ° • IVA FIT a" 161 ftll MEANS 00 O ° p 531 �Sr 'p 31 0 551 9514 O / S ° k0 yy05 526 �'20° O / 05278 s os? 0 5 72 05 0 552 0 5 10 \ 0 51 ^m d 550 0,5501 0� 4820 / `o o I5288 � °S 5? Ory A I °S 483® 29 40 / \ y0 l 0ac8 55090 ° ° 0 \20 48264�� 4 5183 !43, i �gti °.X' h�hN h�0y ° 92 �- —908— 0 4818 ♦?o / 11 //3 �i S0 21R)° P I p 96 SSSSSS4s \ rn* �� I v <o �� �k1'q ° 59 0° 5 y49 5446 ®M g° 11 97 0� r�^^ n^ ^ ^ 0 0 0 6 r 3 n '1 0 ° °� 40 64ji 2 54S 545 o O, 99, OSSA 1D� ° = 4843 °o O O 5 6 0° ryp / ry o 38 0 SR? a� °O • I�` ♦' I • • • p 57 2yyp'L� • % p• • • i i1n f' •' • • ' • • S 0`p004 �^ 1 O O1,\ yc�ry t� 0 �0 Sys\ ,fit O • • •�• • 'i • 1�p� • 5711 Ste? �GS> • • 5744 0 57 9 > k F4 ) • 5747 40 qIV ° ° ° yky° ° ° 1 E;Z23k• 37 $ 5° h� J s� L ss y1 ^h^ 0 0 °s e 8 h tik ? M `e� 57 O o g1x x �j ao / p 0�73 ro `�.t o 871 g d' � / 7 ° h`g' gpa h0 0g S m rn o o �y o }E6 9 fie( ,� — — — _ — 75 S O 4091 9 ? / O ° 6 h O \ "O �. i 0�h �`�6 •�� \ 7 / �ga3 `� ,. 6 1 r e 515 8 SAS m J3 ° O O 1N"g 0 5403 0 5408 O 620 /�0 8eo% ?� Nam^ 0� g g / 1 / e S 561 Sj off o 0185 S407o k06 n AC 0 0 °� O 6 �pEBg iE J 3� 6 ?? 01g S7 p4089 54040 o 0 Q� D 0 ro d ® • 6828 \ 1 x /p AO O 60 — ® ° ? 0 900 1 g J 0'` g1 p 10 J ?O y p 40 8 o 83g7 M dosp ° o O ao O • 824 0, Y 145 h �s °^° Sg pg5778 / x / �� / 4 8R0 ° o O CO 0 641 ao • 6 7 yam' > � yE 1 O cr O 083 0 / 0g h°° O \ o ° o °8 '�h //11 • 68 �4a le(6823� '` a1 X61�5 � � � I � 5649 n O ao � 5775 / � / 0 o/ 1p � � 9 4 O O hh ro rn �� 8402°D 8 .9 ROe 8414 p [ J 80010 • B 0 �`�' )K6820 6808 1 - $S, X 56 `� �o ° mE / a / y00 1082 ° wh "o, °D ��837 °d �00` 0084 3 22 �E ` 'n-�E O RO /� / 0 ' 0 "0 aa,9 `99 8412 8p06� 0 S i 151 / y� O / 3 • ?e ° ? eq 4 9 482 O O O O -0 A > I r ° h / 2 / ° / �O o ° Op ay1`) 23 ?) 0 40 °�S O 0 0 005 0 So0 • h \ 7 aa� i i 61 `' 1 °j� _ i �'> cP / J • y 01 O c�013 5083 /q �•'o�oh0 �j4 �yo /$ 8g0� J gq0 a „p�'? c o O\+> J eJ ' ga36- — 2t hh / 5 / k� / �72 O ° `�'O�` o o O 0 o ' / 0, no ° '� 05 O O ^ 801 y x , _ ti ? k'`� h . �� W74 e p ° i O 46 cog N }E6804 '� • ? S o 0so '� x `1 h g y� `�+ / 0M �n x / y0� p 5041 p 31 4073 / ef` ro O ° ) ` 101N OO a°p h °h tP 0 0 8333 g,,_ °e0 ° 8011 h0� • 6 11 ` h aN 5 O / o° R RJ O /O 71 \ e`�� e 8359 6pS �6 °D o SO 2 x 6803 I >�,,s 119M o� y� I w I �o � � �y'� x� ? O 'e[ 83 3 / O 2 p 5070 0 4033 403 4072 4069 x4900 \ �O °° g351 O O O o 0 2 0 pp 0 O 8041 00 12 �.'` a11p� �0 5 y / �Ocb 7�5 �i �o ^ 4> 05097 d ®x I \ 6337 N 8332' o 00' 0p'' V-11A ° cpo 0 1 O�aE 7 x 111 611 x 1 U )K5997� O 2 0° OSc CIS `1 O g OD O o \Q 'Ii N �O� • O? g 9 5g ? OSm r0 0 9i( S 9 5 I 77 x/ • 4 65g 0 °x o" O 9 I \ / o �� ° o M '� o e sfaE ti V 81 — J 5643 0 78 ) n OHO• / 08I / e 5044 O ° 834 8®833 p \ O O O 8330 p O S� • • • I S 6 )tE07 / ,'� S�1y1 ' n ,�h0 °/ OS i0 O .° O g o w � - h �y 0S o Sj 0 8793 o • / ? — _ _ 6 ; J — — — x 56 6 k I r • oR J OR o 324 5 O\ O — — ' � x � klyry � O S 06'e y h \ o oh O O�'S�o �`o / 31 hh 6 542 )tE S 9 5 k1 b 5 $ • qo° 60 6' `0 SO o N ry p 6+ ao > > e 4066 � m o N > n cq� 6 45 58 9 ► a x o �9� S0 k Lor >w >� a �.0 1° `� c $ • ,laE 3 24 �tp y�0 x g 0 0 99 f� 5 • i� 0 008 6� h 0 5 4063 0p 8 �p S? N 2 O n m Sj 08794 }(65 )K �. 1K i 59 I I 1 k� / ° 41 2�,, p 4058 I �b S y vi Ri p\ h 0^ `o / �o )IE \ 6583 0 0 ♦ / 8 97 • • c ° O 4171 0 5009 p 4064 ° 0� 488� o�S, O M p p O> OD 4 • 6' N Q V 50 4 of �i O 1 p O �b 539 O Y O rr S /'m0yti p 10 °S� 0 0y h o a� • / 1 5 6537 i 5/ 4 RJ k,�Ok 4 p 4151 Op �S304p 1� y16°� 8768 0� roo • �/ 1� ^ a+ )K 578 L _ o� I 5 x 2 O / 47 41 S0110 0 5046 O W / 8787a6 0e gJ820 9 O O ` h� OHO% 5 _ x eA k 00 �je 7 p 8773 0'` O O 7 ro / \ �E h'� e h o? I 1 1 • • k1 / 00 4 12 p 0 ° 4043 I o O Oe d+R�S 0^ °8�j S Q,� 775 87600 00'1 8732 / O^ O `5r+' 6+, N �• .I 9 95 x • �° O ry 0 0 R?7� '�� p O 1 `�130 c^ �9� 4 4048�°�° O 4041 �0 1y° 9 oL oej 7�\ ° 8733 O� } h ` \ 4 / 259 / R ? p 4VO 04 148 ° °RJR wqs �°c eA I h 0 n o8 0 g 1g 25 R p �4eO o O 5eo �O Oej 0S� • 8 / \ // 6533 s e / 0 /A ? / °¢244 ° °RJ R so O 0^ ODO e O -0 O O p a1 `s8 • / g0 \ 653 ?� �( I Rl p 42S 41 p �y+ % N I 8 16 °& s?�` O i O p 87 p 8728 0 p 8 29 p 811 / \ _ _ \ e O� 6532 6522 , f�yo1 % o I / ' x 05$ / o ox e R 112 k�"I o f 403 O 38 q0 O O h ° Oh ro 0 fy h 0 1 00 g ° 6j38 8714 0 8727 g7'�O /• 8 / y1 e6 e %aE� 8282 \ ^ ry y� k�L/ `O c'0 °q o o p O �0'� '0 'O )p 100 II �� 01 p 8722 ® 00O ^d` p p 8737 ° 8�' 0'�`1' �'` o� / �j o � �0 6 46 � m 6'? / ^ `'O 4 4114 ° 1'�° 9b�° �R I 403 °eJ� °j0^ro 87 3° p8715 N g125 e• \ e as. �52 �IaE}� 1 J / o ti� O O �0 4184 h50 O \ O o ) /� / 106 0 wj , O / 4 52 4240 p 4116 1 g6 p h O o O h ej O O / O ^h ? �01 0� rno 87 p o $ O 78 ^ l O 8724 9 213 k1 R 8124 lJ�/ / / �� J � � e O "� /'�4a 5111 ^ ry 1 O > \ /�-. >� o -8 ^19 °s �0 0 �� --� c^ oer'j k 12 >o? \ \ \ \ 1)K g2a m aS x \ 99 '�� ro o �',qS oN o a/ > �C la( a w°j n S 4( X65 23 6177 h� / 01 08 ° �? • J� // h N Moro �? \ 6030 p� S Vol 7e O 1 1 �$ $ \ N ^� OS o 1 / �7_ / ) 5 o \YO � .43 ry •--~�-• -� •° --• )o o +- j }- ♦~-�-� tom. 7 �q — • •_h• • N <� e? s o ' �248�0� Ili 7�1? 6 °9� �` 8 / 82 h \ 27 •yam '17yk �.h ,Ip^ qo O >�?' 21� O a7y224�y 4o °may $ np 2♦ 7233 p 8684I x 80 xsS1 s 81 e }E8o1OrO•i �R9�o`z6d>7227 °7229 8511 Sig 01 �4ro; a 6 d723 /O 1 \ 6 S2 h0 MH ♦� _Jd_0725j _ O 225 0906 0723 ^ ... `O �k1 q pgg259 0 se�9Ogs ho )KN a03s 5g •�- • s��_ - �,-� 8�1 4pq 8165 1) � \ 1 $ c� �°r cj1 e8g O \ p � // •Ja�` / WE L �, O h tO h • • ,� ` �. O N w P6� lei°° \ / / �o -R� 9 9°� \ .� 055� O O °�'-�- �0 01• �i ,��'`a ��h,�E d N �n e • o / o I / i — ] I °885657866p a°�I' �h�k N eJ. 0 ,o'er, y . / = D $5 2 N �('. 0 h`h�\ \ \ e9963_od 0k h0 y • •S9 y9 of L — J ° o ° off_ ag31 °fl �ja�let q�d L 2455� �V853N 6 9'Y i 6+ ° // \ • 000 IO Q�gprd° R "^h �'iP o nit Nrn �e ♦ x�g5 9Ojh_ 99��� \ / S $ 5582 / �O \ �°eeg3O hh ed`RS �,o "R ? O J ao ^ \ 1 42*%"824� N / 601 • g° 0 u°'i' �o •C o �q� hcO °o h ?8 �S 1 h/ X O ` \ 1 ?A4 o a , ao o,�S _L� �6 1 • 596 g a Oti . m O 37 N O • $ w 9�j . r,�,�� Aso 9�A oh hb BO) O / 0 `O .� d`47 0 / a� N a� a2~ n�.�Y r ei�73bi_� trF / LEGEND EXISTING PROPOSED EXISTING PROPOSED PROPERTY LINE UTILITY POLE EASEMENT LINE RETAINING WALL CURB LINE - - - = FENCE BITUMINOUS [ - - - ] 10' CONTOUR — — 2' CONTOUR — — - DEN CONCRETE [ •__.] FEMA FLOOD PLAIN SANITARY SEWER ----> WETLAND LINE STORM SEWER - - - - ->>- >> 00. 0 "" •" DEN WATER MAIN ---- DENOTES INLET SPOT ELEVATION -=3---- X - r-- .a x -- A -` PROTECTION E.O.F. OVERHEAD UTILITY ohe EMERGENCY OVERFLOW 41 43 X STORM CATCH BASIN ® ® ;r , F 000.0 STORM MANHOLE ® SILT FENCE + • • • • • - OUTLET CONTROL STRUCTURE O TREE FENCE ®o 0 0 0 0 0 0 MANHOLE HYD O GRADING LIMITS 0 0 0 0 HYDRANT 1�v MH TREELINE (__Y__Y_'Y�. GV GATE VALVE x TP TV TELEVISION BOX ❑ SOIL BORING TB TELEPHONE BOX ❑ R 5570 5584 / 4\ 9° O S2,reg O ?So� 0 7185�_,° 0 c8�.S_�',l18 07 ° M 9g o 7aA ` 6`r, c' N 0 9 TO ° ,' 0 c£ Oe'1 ; O h S? �O TT41��NQQ •� 524 0 1 N� / 0 y s° ° yy1 ° o5I @S p o o ° O �' k 0 S? 54 ®cS h h N� —� `L / ?B 61yZ'I° ? aS h 5574„®� 4 5558° ° ° e ti o / 543 f S yyg2 ryh0 S?S p 258 SS *O > ' S5 9 / Smarr 8 ?o O SS \ \ 1 ° ° 2�0 730 555 Oh ScS 08 ® O ?j0 O 05518 5515 / cP0 S O 55 SS ss> o 0 O 1 005 411 k p 190 J8 0 ° °os, �o o gee JK59�1� • g313 79 42/p Z �,,0 41830 4185 Ory^) 0 1� °k$ kg `9 a O \ 0 4875 I O o '`�? p41 1 ?S® o`v0 oy00 °5°5 O°' °' �6'0 \ 2 p 192 �r10 k.�rL"� 41 8 O `yam-O 8 0 50 48 O g ° 9�j0 °r° 4874 / Rj �: p 4188 R79 \ o 4 01� �" 412'� Kn O o 505 o p'� 1986 O 4 9' IIy 04383 0 o O 41� 4814 °° O ° 0 ° 9 h0 �y O / t , y(k o 042 '?k1.1 'L,Igo 0 0 51 k00� '� O tip. ♦ ?? ti 92 �� ° 4369 77" R p � 47 p ° 86 y p 2 307 O S 4357 43g7 ° 4ga90 0 k10 R7?) 04189 ^Oh OJ 0 08° \ 5312 ° h 5 ?S / 4368 ° 20j o 4399 ° 0 91 190 10 o \ og 126 ay Oo O 0R ° 0 0 p 238 9° �100 ") o^ 00 2jS ^ ^ 52060 / ��--� `L k 1 'p�j�\ ' cS J 8 / ° ° 02 R° O y °R R ° k �A O.'.'�a 10�1- O O O �3 n ° j O ' s� , 00439 ° *P ? �e ?� \?ems ° 0 0 4810 a 7 �v �o o � p 4981 O O �Q J 4192 S 0 S ° 53 ° 05 pS OS os sA / O Oa y000 04209 42808 klgk 9J k19 ?7 2J? ?OS -4 w 1 54 x[A�V0SO 4 4 0B ktig k`� h °' s0 O p 3 ° - 42 1 O v k`L°° s ^ O SJ� h o 05317 Os s?> / key 0?7 �° % � R�40 S?, p4 9 � �JO p 1a y1 �� ep ° 1 ?? 9 \ 1 48 R TOC 07 5224p O ?1?0 kryy � 51740 ���� 00 0 0 �Sp ° p 222 °k O O. %!. A e o 428� I , I 37o O O A 50 �t O 520 oy2 5136 2 N40 ` ° e o R 427,3o O '� OO i90 518y 0 S79 °L h199 1�� O O 4311 o �78 84 $ `` O ?e�, i ` 0 5173 h� o S y'`h 5189 ° 4 °O o o O p 203 4769 \ 09 / /� 90y ♦ O L429O 4805 y1111 h^,� R0 °S� 5130y`k9 p 202Let- 9O 284 O o1 os�0 1 OUTSIDE INSIDE N GAS EASEMENT GAS EASEMENT OTES TREE 20650 2065 TO BE SAVED OTES TREE TO 2065 2065 x BE REMOVED TREE LOCATION TREE TAG # WTA REFER TO TREE INVENTORY REPORT FOR TREE IDENTIFICATION AND REMOVAL/REPALCEMENT 0 25 50 100 INFORMATION. (IN FEET) ENfiMEE1iIN�i CARLSONSUMVEYINGSUITE 3690 PHEASANT MIDGE I� NE 100 I hereby certify that this plan, specification Print Name: Ryan ]. Ruttger, RLA or report was prepared by me or under my Drawn: JJO evlslons. 1, M / I HOME S MN �LAINE, MN �445 BLAINFTEL direct supervision and that I am a duly Signature: Designed: RJR 5354 Parkdale Drive ENGINEERING PLANNING s FAX76MAM7 Licensed Landscape Architect under CAM-ENONEEMN�COM the laws of the State of Minnesota Date: 3/4/25 License #: 56346 Date: 3/4/25 St. Louis Park, MN 55416 Date: 04/25/251f:\jobs\5401 - 5420\5412-03 - natures refuge north\cad c3d\engineering\preliminary\5412-03-tree-plan - new tree rules.dwg NATURES REFUGE NORTH Lino Lakes, Minnesota TREE PRESERVATION PLAN T4 of / T5 11 r A 4• A n 7t J`71 G—VJ LEGEND ---- --- / �� EXISTING PROPOSED / PROPERTY LINE EASEMENT LINE _ ICURB LINE ----- � j BITUMINOUS [ [ CONCRETE SANITARY SEWER > STORM SEWER >>— >� I � WATER MAIN -- DENOTES INLET ROTECTION / P OVERHEAD UTILITY °he , I / � STORM CATCH BASIN ® ITO '_ STORM MANHOLE 906— / I \ � A OUTLET CONTROL STRUCTURE O / MANHOLE HYD OMH HYDRANT cv O��L ����� GATE VALVE T D4 I TELEVISION BOX r \ �g°k _ J TELEPHONE BOX 1 U9 / s06 --- o - A UTILITY POLE RETAININGWALL FENCE 10' CONTOUR 9 2' CONTOUR FEMA FLOOD PLAIN o0 WETLAND LINE \ LI-1-1-1-1-1-1� 00.0 00.0 SPOT ELEVATION-E3---- X---- E.O.F. EMERGENCY OVERFLOW 43 x Ej> s 000.0 SILT FENCE ® ® ® ® ® ® TREE FENCE o0000000 - — tJI I GRADING LIMITS ILIL TREELINE / [ SOIL BORING TP`so 6 / 06 NOTE: REFER TO TREE INVENTORY REPORT FOR TREE) IDENTIFICATION AND REMOVAL/REPALCEMENT INFORMATION. _ J —1 Tr (Non —ESA) NATURAL RESOURCE ENHANCEMENT AREA (NREA) NATURAL RESOURCE CONSERVATION AREA (NRCA) LEGEND PROPOSED NATURAL RESOURCE CONSERVATION AREA NATURAL RESOURCE ENHANCEMENT AREA BASIC —USE AREA BOUNDARY _ GAS EASEMENT AREA (TREES NOT SIGNIFICANT IN THIS AREA) 9p 6 �1 II II I I I I I I I I II I I I I I I I I �I 0 0 O p 'I 906) I I I 904 II I� II I II o J-1 J1 —1-1 —1-1� go now JJ J�JJJJJ� J—X J �' J J JJ J J J JJ J J �J+J J 00 JJ J J JJ J JJJJj J � � _ own (1) (2) (3) o o REPLACEMENT RATIO Non -Basic Use Non -Basic Use Environmentaly Area (6-12" dbh Area (over 12" Basic Use Sensitive Area (ES4) deciduousor dbadeciduous Area Category 12 - 20' or over 20' evergreen) evergreen) Non -ESA 457:0 98:98 33:66 Natural Ibsource 0:0 13:26 1:3 Conservation Area Natural Resource 1777 : 444 986 : 1972 131 : 393 Enhancement Area J� -1_T_j -1 -1 -1 -1 -1 -1 -1 -1 -1 _j�� —hi —1-1 —1-1������� co —1-1-1-1J\-1-1-1-1 —1 i gob \ I I LJ "Non -Significant Trees Removed: 138 Total Replacement Trees Required: 3002 trees \ \ sos / " Non significant trees are defined as: Quality>1, Diameter>=6, Green Ash, _ White Ash, Amur Maple, Norway Maple, Silver Maple, Siberian Elm, / �'� = -- - Bn - 5 — � 907.7970873 Cottonwood, and Colorado Spruce. / �YV =6=Z u�olN�ss � —�- Revisions• k_77 lug' JIU i ` 0 100 200 400 (IN FEET) o I I I I �9' I \� _ BENCHMARK 1 A k C t B h k N 2011 t ENGINEERING CARLSONSURVEYING 3�9Q PHEASANT O DR NE SUITE 100 I hereby certify that this plan, specification Print Name: Ryan J. Ruttger, RLA or report was prepared by me or under myHLAINE,MN�s44 Drawn: ]]O 1, M / I HOMES TEL�.485.7 direct supervision and that I am a duly Signature: p y Designed: RJR g 5354 Parkdale Drive ENGINEERING �`NNIN€i �� Licensed Landscape Architect under CAM-ENONEEINM the laws of the State of Minnesota Date: 3/4/25 License #: 56346 Date: 3/4/25 St. Louis Park, MN 55416 �\ no a oun y enc mar o. se j in the ground in a covered tube located 150 feet westerly of the centerline of Rondeau Road West and \ / 40 feet northerly of the centerline of [ C.S.A.H. No. 14. Elevation=894.88 / (NAVD 88) \ 2. Top Nut Hydrant East of the Southeast \ / entrance to Lino Lakes Elementary School. Elevation=920.01 (NAVD 88) Save Date: 04/25/251 f:\jobs\5401 - 5420\5412-03 - natures refuge north\cad c3d\engineering\preliminary\5412.03—tree—mitigation - new tree rules.dwg NATURES REFUGE NORTH Lino Lakes, Minnesota T5 TREE MITIGATION of T5 11 r A 4' A n 7t J`71 G—VJ CITY OF LINO LAKES LANDSCAPE REQUIREMENTS ♦ s I I 1. BOULEVARD TREE STANDARDS. BOULEVARD TREES ARE REQUIRED AT THE RATE OF ONE TREE PER LOT FRONTAGE FOR SINGLE FAMILY AND TWO—FAMILY LOTS. BOULEVARD TREES SHALL BE PLANTED S ♦ y�� / \ \ I \ WITHIN 14 FEET OF THE CURB LINE OR AS OTHERWISE DETERMINED BY THE CITY FORESTER. 9 TREES REQUIRED = 99 (93 LOTS, INCLUDING 6 CORNER LOTS) sy �. gas--\ o - / TREES PROVIDED 309 (MIN 3 TREES PER LOT) 13 I 3 6 �L J / I ANDALL STREET:20-o \ w ff � / I I \ � I U I I I IT/ NI ij F I11 M 111011�11116, �1 Yi10■0'" i1A:�\I OUTLOT B II 1 � 1 I / WETLAND 1 I I� -��� �7 U9 \m I \ 5 \ 4 , 4 \/ obi A _ / OUTLOT D LANDSCAPE PLAN NOTES 1. EXISTING CONDITIONS. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO BIDDING AND CONSTRUCTION START. ANY DISCREPANCIES FOUND THAT AFFECT THE WORK SHALL BE REPORTED TO THE OWNER/LANDSCAPE ARCHITECT FOR CLARIFICATION PRIOR TO BIDDING OR APPROVING ANY ADDITIONAL WORK REQUIRED. 2. UTILITY LOCATES. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND VERIFYING ALL PUBLIC AND PRIVATE UTILITIES, INCLUDING IRRIGATION LINES, AT LEAST 48 HOURS BEFORE EXCAVATING OR IN ACCORDANCE WITH STATE LAW. IN MINNESOTA, CALL GOPHER STATE ONE —CALL AT 651-454-0002 FOR FIELD LOCATION OF PUBLIC UNDERGROUND UTILITY LINES. ALL LOCATES AND ITEMS NOTED AS 'FIELD VERIFY' ON THE PLANS SHALL BE VERIFIED BY THE CONTRACTOR AT THEIR EXPENSE. 3. PERMITS. CONTRACTOR SHALL VERIFY WITH THE OWNER/LANDSCAPE ARCHITECT THAT THE REQUIRED PERMITS HAVE BEEN OBTAINED PRIOR TO CONSTRUCTION START. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL APPLICABLE CODES, REGULATIONS, AND PERMITS GOVERNING THE WORK. 4. EXISTING ITEMS TO REMAIN. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING PAVEMENT, STRUCTURES, UTILITIES, TREES, SITE AMENITIES, ETC. THAT ARE TO REMAIN FROM DAMAGE DURING CONSTRUCTION. CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECTING ANY DAMAGE (AT CONTRACTOR'S EXPENSE) TO EXISTING ITEMS TO REMAIN. 5. CONSTRUCTION STAGING AND ACCESS. CONTRACTOR SHALL VERIFY THE LOCATION FOR CONSTRUCTION STAGING AND SITE ACCESS WITH THE OWNER/LANDSCAPE ARCHITECT PRIOR TO CONSTRUCTION START. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING PEDESTRIAN AND VEHICLE ACCESS WITHIN AND ADJACENT TO THE SITE THROUGHOUT THE CONSTRUCTION PERIOD UNLESS OTHERWISE NOTED. LONG—TERM STORAGE OF MATERIALS OR SUPPLIES ON —SITE WILL NOT BE PERMITTED. ALL WASTE AND/OR UNUSED MATERIAL SHALL BE PROMPTLY REMOVED FROM THE SITE. 6. SITE REMOVALS. REFER TO CIVIL PLANS FOR GENERAL SITE REMOVALS. ALL ITEMS NOTED TO BE REMOVED SHALL BE COMPLETED BY THE CONTRACTOR AND IMMEDIATELY DISPOSED OF OFF —SITE, IN ACCORDANCE WITH LOCAL REGULATIONS, UNLESS OTHERWISE NOTED. COORDINATE WITH OWNER/LANDSCAPE ARCHITECT FOR ANY ITEMS NOTED AS 'REMOVED BY OTHERS' OR 'REMOVE AND SALVAGE.' 7. UTILITY COORDINATION. REFER TO CIVIL PLAN SHEETS FOR INFORMATION RELATED TO PROPOSED UTILITIES. COORDINATE WITH ELECTRICAL CONTRACTORS FOR SITE ELECTRICAL WORK AND SITE LIGHTING. 8. CONSTRUCTION STAKING. UNLESS OTHERWISE NOTED, CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING CONTROL POINTS AND ALL CONSTRUCTION FIELD STAKING DURING THE COURSE OF THE PROJECT. 9. DIMENSIONS. DIMENSIONS TAKE PRECEDENCE OVER SCALE. DIMENSIONS ARE TO FACE OF CURB, EDGE OF PAVEMENT/WALKWAY, OR OUTSIDE FACE OF BUILDING UNLESS OTHERWISE NOTED. 10. PLAN QUANTITIES. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL MATERIAL QUANTITIES PER PLAN. MATERIAL SCHEDULES ARE PROVIDED SOLELY FOR CONTRACTOR'S CONVENIENCE. 11. REFERENCE SPECIFICATIONS. THE FOLLOWING SPECIFICATIONS SHALL GOVERN THIS PROJECT ACCORDING TO THE FOLLOWING ORDER: 1. ADDENDA, WITH THOSE OF A LATER DATE HAVING PRECEDENCE OVER THOSE OF AN EARLIER DATE. 2. LANDSCAPE SPECIFICATIONS. 3. PLAN DRAWINGS. 4. PLANT / MATERIAL SCHEDULES. 5. CITY STANDARD SPECIFICATIONS AND DETAILS. 6. MnDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION, LATEST EDITION. \ / , 0000 / I OUTLOT A / ' WETLAND 9�\\ \ 9\ ♦ \\ rn \\ \\ f� ♦ _ -A \ s� ♦ s� CALL BEFORE YOU DIG 0 50 100 200 (IN FEET) Know what's below. Call before you dig. EN�INEEflIN£s CARLSON 3PHEASANT 1fi1DRNE SUITE 1t>0 I hereby certify that this plan, specification Print Name: Ryan J. Ruttger, RLA or report was prepared by me or under my Drawn: RJR Revisions: 1. 04/25/25 -Per City Comments M/I HOMES OF MINNEAPOLIS, LLC NATURES REFUGE NORTH PRELIMINARY L1 SLJ VEYING iVNIN $LAINE, MN 55449 TEL763.4W7� direct supervision and that I am a duly Signature: (96 9#K7 Designed: RJR 5354 Parkdale Drive # 100 of �LANNIN& ENGINEERING FA��-0�� Licensed Landscape Architect under Date: 3/4/Z5 License #: 56346 Date: 3/4/Z5 Lino Lakes Minnesota � LANDSCAPE PLAN 4 €AM_WN-ENGNEE0NG=P4 the laws of the State of Minnesota St. Louis Park, Minnesota 55416 Save Date: 04 25 25 f:\jobs\5401 - 5420\5412-03 - natures refuge north\cad c3d\landscape\5412-03_landscape.dwg A 4 ,., ,, , 7t J`71 L—U— FM _ _ —904 / / 1 I--+ --— WETLAND - - - - - • / • o - -- -- ___ �'+ — _ � sos — 13 I sot _ 2 4 PP � I IIII I II '� .' '['s� � I ----- +` I , I I� 5 - I° \ IIIII HO I + _ '� �� , �;�, I 1 I Ito I 3 I I 4 / H� \ - BH I (9 S / - ,1 / ° + . i c� r / I .. I I Oa °J I \ -- G 14.0 G 914�0 I I 914.0 / / / \ '. 880 �I r .' i G G / '+. —� \ \ WETLAND BUFFER I-1-III91 \ s7o SIGN (n?.) ---------�-I� o SBrI WO <II II 3 s /J � - 1 I � I I ... J1 / 1 0 I 3 - III�I��-�j 7\� I I / WETLAND , I II n—• a--�,z I!ii_ oo \ _ I II o OU TLOT C I. --- I I EX. POND I i 1 8 I BF / / ' � � \ ill � , I RB .\ Ii � I I �I 6 / I OB — — \ I / o 17 --- -� I \�\\�_ ---_ _ - � I ' 2 I r � � �UTUT 0 � \ ` ' f / _ I III I .CYI ' �+ Nc LAKE wo1 o CD/ 16 �QJ I �I I obIf I I I BF \\ \ I '— --___IB5B I — _ III I gcrnw o � I + 2 � BH I� I / m N I 6 / CD 440* % j1 cA — — — — �_ / I r vv ,� -_____ - 4 v CD JL CMD oo I _ 4 21 FM \\ \ \ WETLAND I I III R4 i — _ _ _ I- 4 _ _ PP \/ 9js ems? ago _ _ _____�— J)� 8es�� e 8° OUTLOT B SB 9 \� / \ \� / / 916 '. '. 8 \ / ° 22 � � � \ �' � c \ g16 0 \ a � oo HO �� I --� 5 \ II iI I II V •�` � � � v �, I / I G v / 0S \ - I 1 , � KC 9, � III � i 9 � \ / o 0 HO __/ 1 eR �8 � J HO / r 1 I _ O 19 POND 10 3 (908 .0 WETLAND 9/J, RB 6 08• 2 -o ' 9? G / / 9� o ,( 4 — _ 91 (9099 0 / / ,/ - r I PP 6 ° / ,� ,,� I go8.o s AO G / 9 g08 0 (908.5) 910 • / ; • I I \ II T—T I— � s � I .. ••a r °� I I - I 9 5 g00.) I gg�o 909 >------ g08.5 I I G 916.0 + 9 (g09.0) g I g16.0 I I • -,�. / - - 138 I I I I I I I I I -- I •I pie cI 4 / II / G 91 0 1 I p/N 4 U / II I I N,Y G 917.0 / 91>0 -I916 I ' � I / < \ � / — • — — � IIII �q � / IIII = / � — IjIljljljI- -IIIII = U�� 0 / II �, 1 / —I BL � IIII II __ IIIIII 41+1 (909 �S -I = 11 > OB BE SB \-III II 9�s F2 s10 912° c� ���s 2 4 \ — / C -I- - _ _ _ I- I I G 917.0 \ 906 99G7 0 / / 91>S -III-IIIIIIII IIII 917.0 1 I g12— I'l \ \ \ \ RB • � / \ I S / I I 3 (g09.5) 91°0 G g10917° G g09.5) 909.0 2 . WP / 970.0go9.o \ _' �Y 90 �I TLAND / eon / 9S (909. I909.5)gOg.O I, \ \ 9 J / / 909 U (909.5) �g.0 I \ `,,__,-�I ' �J L 4„ ` •��-+ •-- iu \ \ \ I I ol / / 909.0 _.j ' LANDSCAPE ]PLAN ENLARGEMEe OUTH o 30 60 120 � � � BF 40 42) (IN FEET) 3 PHEASANT RIDGE DR NE Revisions: M/I HOMES OF MINNEAPOLIS, LLC L2 CARLSONSLRVEYING SUITE 100 I hereby certify that this plan, specification Print Name: Ryan J. Ruttger, RLA Drawn: RJR 1. 04/25/25 -Per City CommentsNATURES REFUGE NORTH PRELIMINARYEN�INEEflIN£s $LAINE, MN �44g or report was prepared by me or under my TLAINF, N5544 direct supervision and that I am a duly Signature: Designed: RJR 5354 Parkdale Drive # 1�0 of aNNIN&EL Licensed Landscape Architect under Lino Lakes Minnesota LANDSCAPE PLAN 4 ENGINEERINGFAX�-0�� Date: 3/4/Z5 License #: 56346 Date: 3/4/Z5 � €A311MN-ENGINEERINGIMP4 the laws of the State of Minnesota St. Louis Park, Minnesota 55416 Save Date: 04 25 25 f:\jobs\5401 - 5420\5412-03 -natures refuge north\cad cad\landscape\5412-03_landscape.dwg 4 , ^ n 7t JY1L— PLAN 5" 2-PLY NYLON STRAPS DOUBLE STRAND 12 GAUGE WIRE PAINTED FLUORESCENT ORANGE WHITE FLAGGING (TYP.) TREE WRAP 4 INCHES HARDWOOD MULCH 4 INCH DEEP SAUCER 8' STEEL TEE POST- 3 REQUIRED AT 120 BACKFILL MIX UNDISTURBED SUBSOIL REMOVE BURLAP ; ROPE FROM TOP 1 /3 OF THE BALL NOTE: SEE PLANTING NOTES FOR THE TYPE OF MULCH MATERIAL TO USE. 1�/ DECIDUOUS TREE PLANTING DETAIL � NOT TO SCALE I. SCARIFY BOTTOM AND SIDES OF HOLE PRIOR TO PLANTING 2. TRIM OUT DEAD WOOD AND WEAK AND/OR DEFORMED TWIGS. DO NOT CUT A LEADER. DO NOT PAINT CUTS. 3. SET PLANT ON UNDISTURBED NATIVE SOIL OR THOROUGHLY COMPACTED BACKFILL SOIL INSTALL PLANT SO THE ROOT FLARE IS AT OR UP TO 2" ABOVE THE FINISHED GRADE. 4. PLACE PLANT IN PLANTING HOLE WITH BURLAP AND WIRE BASKET, (IF USED), INTACT BACKFILL WITHIN APPROXIMATELY 12" OF THE TOP OF ROOTBALL, WATER PLANT. REMOVE TOP 113 OF THE BASKET OR THE TOP TWO HORIZONTAL RINGS, WHICHEVER IS GREATE26 REMOVE ALL BURLAP AND NAILS FROM TOP 1/3 OF THE BALL REMOVE ALL TWINE. 5. PLUMB AND BACKFILL WITH BACKFILL SOIL 6. WATER TO SETTLE PLANTS AND FILL VOIDS. 1. WATER WITHIN TWO HOURS OF INSTALLATION. WATERING MUST BE SUFFICIENT TO THOROUGHLY SATURATE _ ROOT BALL AND PLANTING HOLE. 6. PLACE MULCH WITHIN 48 HOURS OF III THE SECOND WATERING UNLESS SOIL MOISTURE IS EXCESSIVE CONIFEROUS TREE PLANTING DETAIL D NOT TO SCALE N NOTE: GUY ASSEMBLY OPTIONAL BUT CONTRACTOR ASSUMES FULL RESPONSIBILITY FOR MAINTAINING TREE IN A PLUMB POSITION FOR THE DURATION OF THE GUARANTEE PERIOD GUY ASSEMBLY- 16" POLYPROPYLENE OR POLYETHYLENE (40 MIL) 1-1/2" WIDE STRAP (TYP) DOUBLE STRAND 10 GA. WIRE, 2-1" ROLLED STEEL POSTS (MNDOT 3401) 4% 180° O.G. (SEE STAKING DIAGRAM) COORDINATE STAKING TO INSURE 2 12 UNIFORM ORIENTATION OF GUY 12 LINES AND STAKES STAKING DIAGRAM -GUY WIRE WITH WEBBING FLAGGING- ONE PER WIRE —4"-6" SHREDDED BARK MULCH (—EXISTING GRADE --MINIMUM 112 WIDTH OF ROOT BALL --PLANTING SOIL MIXTURE (5EE SPEC.) UNDISTURBED OR STABILIZED SUBSOIL TLC A\ I ++ \\ ` NDSC ]PE ]PLAN ENS R E ENT e N®RTE 0 30 60 120 43) (IN FEET) 3 PHEASANT ROGE DR NE Revisions: M/I HOMES OF MINNEAPOLIS, LLC L3 CARLSONSLRVEYING SUITE 100 I hereby certify that this plan, specification Print Name: Ryan J. Ruttger, RLA Drawn: RJR 1. 04/25/25 -Per City CommentsNATURES REFUGE NORTH PRELIMINARYEN�INEEflIN£s $LAINE, MN �44g or report was prepared by me or under my`� TLAINF,EL N5543 direct supervision and that I am a duly Signature:- Designed: RJR 5354 Parkdale Drive # 1�0 of aNNIN& Licensed Landscape Architect under Lino Lakes Minnesota LANDSCAPE PLAN 4 ENGINEERING FAX�-0�� Date: 3/4/Z5 License #: 56346 Date: 3/4/25 � =L €AMMN-ENGNEE�iINEF.t M the laws of the State of Minnesota St. Louis Park, Minnesota 55416 Save Date: 04 25 25 f:\jobs\5401 - 5420\5412-03 - natures refuge north\cad c3d\landscape\5412-03_landscape.dwg , � A 4 ^ ^ n 7t J`t1L—UJ CARLSON ENGINEERING PHEASANT RODE DR NE SUITE 100 I hereby certify that this plan, specification or report was prepared by me or under my BLAINE. MN SFA49 SURVEYING TEL 76K4M791 direct supervision and that I am a duly ENGINEERING PLANNING FAX763.4W75� Licensed Landscape Architect under CAARLSON-ENGNEERINGMM the laws of the State of Minnesota LANDSCAPE SPECIFICATIONS 1. TREE PROTECTION. ALL TREES NOT SPECIFICALLY NOTED OR MARKED ON SITE FOR REMOVAL SHALL REMAIN PROTECTED AND UNDISTURBED DURING CONSTRUCTION. TREE PROTECTION SHALL EXTEND TO THE DRIP LINE, WITHIN WHICH NO CONSTRUCTION ACTIVITY, MATERIAL STORAGE, OR VEHICLE PARKING SHALL BE PERMITTED. TREE PROTECTION FENCING SHALL BE ERECTED PRIOR TO CONSTRUCTION START PER PLANS OR AS DIRECTED BY OWNER/LANDSCAPE ARCHITECT AND SHALL CONSIST OF 4' TALL HEAVY DUTY ORANGE CONSTRUCTION FENCING WITH 6' STEEL FENCE POSTS SPACED 6' O.C. MAX. 2. EROSION CONTROL. REFER TO CIVIL PLAN SHEETS FOR STORMWATER POLLUTION PREVENTION PLAN (SWPPP), AND TEMPORARY AND PERMANENT STORMWATER BMPS, INCLUDING SILT FENCE, BIO—ROLLS, INLET PROTECTION, EROSION CONTROL BLANKETING, DUST CONTROL, SWEEPING AND ROCK CONSTRUCTION ENTRANCE. ALL DISTURBED AREAS SHALL RECEIVE PERMANENT STABILIZATION IN ACCORDANCE WITH THE LANDSCAPE PLAN WITHIN 7 DAYS AFTER CONSTRUCTION ACTIVITY IN THE DISTURBED AREA HAS CEASED. IN THE EVENT PERMANENT STABILIZATION CANNOT BE IMPLEMENTED WITHIN 7 DAYS, TEMPORARY STABILIZATION BMPS MUST BE IMPLEMENTED WITHIN 7 DAYS USING RAPID STABILIZATION METHOD 3. 3. CLEARING AND GRUBBING. CONTRACTOR SHALL BE RESPONSIBLE FOR CLEARING AND GRUBBING ALL AREAS INDICATED AS BEING DISTURBED OR OTHERWISE SHOWN ON PLANS. CLEARING AND GRUBBING SHALL INCLUDE REMOVAL AND DISPOSAL OF ALL TREES, STUMPS, BRUSH, GRASS, ROOTS AND OTHER ORGANIC MATERIAL AT AN APPROVED OFF —SITE DISPOSAL LOCATION. 4. SOIL PREPARATION. REFER TO GEOTECHNICAL REPORT FOR ANY REQUIRED SOIL CORRECTIONS, AMENDMENTS OR ADDITIONAL INFORMATION (IF APPLICABLE). EXISTING TOPSOIL SHALL BE STRIPPED FROM ALL DISTURBED AREAS AND STOCKPILED IN AN APPROVED LOCATION FOR RE —SPREAD. ALL AREAS WHERE SOIL HAS BEEN COMPACTED BY CONSTRUCTION ACTIVITY AND THAT ARE INDICATED TO BE SODDED, SEEDED OR PLANTING BED SHALL BE DE —COMPACTED TO A MINIMUM DEPTH OF 12 INCHES BY SOIL RIPPING, TILLING OR OTHER APPROVED SOIL LOOSENING METHOD PRIOR TO INSTALLATION OF ANY IRRIGATION, SEEDING, PLANTING, SODDING, ETC. 5. TOPSOIL MATERIAL. ALL EXISTING, AMENDED OR IMPORTED TOPSOIL SHALL MEET THE REQUIREMENTS OF MNDOT TOPSOIL TYPE A. A MINIMUM 4 INCH DEPTH OF TOPSOIL SHALL BE RE —SPREAD OR PLACED ON ALL AREAS TO BE SODDED OR SEEDED, INCLUDING DISTURBED OPEN SPACE AND NATURAL AREAS. ALL TOPSOIL SHALL BE FINE GRADED, RAKED AND DRAGGED TO PROVIDE A SMOOTH, UNIFORM SURFACE. TOPSOIL GRADES SHALL BE WITHIN .1 FEET OF INDICATED FINISHED GRADE AND SHALL BE TRUE TO GRADIENTS SHOWN ON PLANS. REFER TO CIVIL PLAN SHEETS FOR FILTRATION BASIN SOIL REQUIREMENTS (IF APPLICABLE). 6. SEEDING AND TURF ESTABLISHMENT. CONTRACTOR SHALL OBTAIN OWNER/LANDSCAPE ARCHITECT'S APPROVAL OF FINAL GRADES AND TOPSOIL PREP PRIOR TO SEEDING. APPLY 10-10-10 TYPE I STARTER FERTILIZER AT A RATE OF 200 LBS PER ACRE PRIOR TO SEEDING. SEEDS SHALL BE SOWED AT THE INDICATED RATE, VIA BROADCAST SPREADER, DROP SEEDER OR DRILL SEEDER. FOLLOWING SEED APPLICATION, INSTALL CATEGORY 20 — STRAW EROSION CONTROL BLANKET WITH NATURAL NETTING ON ALL SLOPES GREATER THAN 4:1. IN ALL OTHER AREAS, APPLY DISC —ANCHORED TYPE 3 MULCH (MCIA CERTIFIED WEED FREE GRAIN STRAW) AT A RATE OF 2 TONS PER ACRE. SOIL SHALL BE KEPT MOIST DURING ESTABLISHMENT WITH ADDITIONAL RE —SEEDING AS NECESSARY TO ACHIEVE A HEALTHY, UNIFORM STAND OF GRASS, FREE OF WEEDS AND WITH COVERAGE EXCEEDING 75% IN ANY 10'x10' AREA PRIOR TO FINAL ACCEPTANCE. 7. SODDING. CONTRACTOR SHALL OBTAIN OWNER/LANDSCAPE ARCHITECT'S APPROVAL OF FINAL GRADES AND TOPSOIL PREP PRIOR TO SODDING. APPLY 10-10-10 TYPE I STARTER FERTILIZER AT A RATE OF 200 LBS PER ACRE PRIOR TO SODDING AND ROLL TOPSOIL TO CREATE A UNIFORM SURFACE FOR LAYING SOD. SOD SHALL NOT BE CUT MORE THAN 24—HOURS IN ADVANCE OF INSTALLATION. CONTRACTOR SHALL KEEP SOD MOIST FOR A MINIMUM OF 30 DAYS AND SHALL BE RESPONSIBLE FOR MAINTAINING THE SOD UNTIL FINAL ACCEPTANCE. 8. PLANT MATERIAL. ALL PLANTING STOCK SHALL CONFORM TO THE "AMERICAN STANDARD FOR NURSERY STOCK," ANSI—Z60, LATEST EDITION, OF THE AMERICAN ASSOCIATION OF NURSERYMEN, INC. AND SHALL CONSTITUTE MINIMUM QUALITY REQUIREMENTS FOR PLANT MATERIALS. OWNER/LANDSCAPE ARCHITECT RESERVE THE RIGHT TO REJECT ANY PLANTS WHICH ARE DEEMED UNSATISFACTORY BEFORE, DURING, OR AFTER INSTALLATION. NO SUBSTITUTION OF PLANT MATERIAL SHALL BE ACCEPTED UNLESS APPROVED IN WRITING BY THE OWNER/LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. 9. PLANT MATERIAL SUBSTITUTIONS. ALL REQUESTS FOR PLANT SUBSTITUTIONS SHALL BE MADE IN WRITING TO THE OWNER/LANDSCAPE ARCHITECT AND MUST BE APPROVED BY THE CITY. 10. PLANT INSTALLATION AND ESTABLISHMENT. REFER TO STANDARD PLANTING DETAILS. CONTRACTOR SHALL STAKE TREE LOCATIONS FOR APPROVAL BY OWNER/LANDSCAPE ARCHITECT PRIOR TO PLANTING. ANY PLANT MATERIAL WHICH DIES, TURNS BROWN, OR DEFOLIATES (PRIOR TO TOTAL ACCEPTANCE OF THE WORK) SHALL BE PROMPTLY REMOVED FROM THE SITE AND REPLACED WITH MATERIAL OF THE SAME SPECIES, QUANTITY, AND SIZE. 11. MULCH MATERIAL. DOUBLE SHREDDED HARDWOOD MULCH OR ROCK MULCH AS INDICATED ON PLANS. ALL MULCH SHALL BE CLEAN AND FREE OF NOXIOUS WEEDS, SOIL, OR OTHER DELETERIOUS MATERIAL, AND SHALL BE INSTALLED OVER A NON —WOVEN GEOTEXTILE FABRIC (INCIDENTAL) OR OTHER APPROVED WEED BARRIER TO A MINIMUM SETTLED DEPTH OF 4". MULCH SHALL BE HELD BACK FROM PLANT STEMS/TRUNKS A MINIMUM OF Y. WOOD MULCH SHALL BE PLACED AROUND INDIVIDUAL TREES TO A 4' MINIMUM DIAMETER. MULCH SHALL BE INSTALLED WITHIN 48—HOURS OF PLANT INSTALLATION. 12. MAINTENANCE. MAINTENANCE SHALL BEGIN IMMEDIATELY AFTER EACH PORTION OF THE WORK IS IN PLACE. PLANT MATERIAL SHALL BE PROTECTED AND MAINTAINED UNTIL THE INSTALLATION OF THE PLANTS IS COMPLETE, INSPECTION HAS BEEN MADE, AND PLANTINGS ARE ACCEPTED EXCLUSIVE OF THE GUARANTEE. MAINTENANCE SHALL INCLUDE MOWING, TRIMMING, WATERING, FERTILIZING, WEED AND PESTICIDE CONTROL, MULCHING, REMOVAL OF DEAD MATERIALS, RE —SETTING PLANTS TO PROPER GRADE AND KEEPING PLANTS IN A PLUMB POSITION. AFTER ACCEPTANCE, THE OWNER SHALL ASSUME MAINTENANCE RESPONSIBILITIES, HOWEVER, THE CONTRACTOR SHALL RETAIN RESPONSIBILITY FOR ALL PLANT MATERIAL THROUGH THE COMPLETION OF THE WARRANTY PERIOD. 13. WATERING. UPON ESTABLISHMENT OF SEED AND INSTALLATION OF PLANTS, CONTRACTOR SHALL MAINTAIN A WATERING SCHEDULE WHICH WILL THOROUGHLY WATER ALL PLANTS AND TURF AREAS A MINIMUM OF ONCE A WEEK. MORE FREQUENT WATERING MAY BE REQUIRED DURING PERIODS OF HOT, DRY WEATHER. CONTRACTOR SHALL MAKE THE NECESSARY ARRANGEMENTS FOR WATER. IN THE ABSENCE OF PERMANENT IRRIGATION, TEMPORARY IRRIGATION, TREE WATERING BAGS, OR HAND —WATERING ARE ACCEPTABLE. 14. NATIVE PLANT ESTABLISHMENT. THIS PROJECT INCLUDES ONE OR MORE NATIVE PLANT SEED MIXES CONSISTING OF A VARIETY OF GRASSES, SEDGES AND FLOWERING FORBS. BECAUSE THESE PLANTS TYPICALLY HAVE A LONGER GERMINATION PERIOD, A COVER CROP SPECIES IS REQUIRED TO PROVIDE TEMPORARY COVER AND STABILIZATION. MAINTENANCE OF THESE SEEDED AREAS IS CRITICAL DURING THE FIRST SEVERAL YEARS TO ESTABLISH A SUCCESSFUL NATIVE PLANT COMMUNITY. SEEDED AREAS SHALL BE MOWED / WEED —WHIPPED TO A HEIGHT OF 6-10 INCHES IN MID—JULY AND EARLY SEPTEMBER DURING THE FIRST 2-3 YEARS OF ESTABLISHMENT. IN ADDITION, ALL NON—NATIVE SPECIES / WEEDS SHALL BE SPOT SPRAYED NO LESS THAN 3 TIMES A YEAR WITH HERBICIDE BY A LICENSED APPLICATOR. RE —SEEDING AS NECESSARY SHALL OCCUR IN MAY. A NATIVE PLANT COMMUNITY SHALL BE CONSIDERED SUCCESSFULLY ESTABLISHED NO SOONER THAT 3 YEARS AFTER INITIAL SEEDING — ONCE THE COVER CROP HAS BEEN SUFFICIENTLY REPLACED BY NATIVE PLANTS AND THE AREA IS FREE OF ALL NON—NATIVE AND INVASIVE SPECIES. AT THIS TIME, MAINTENANCE CAN BE REDUCED TO MOWING / WEED —WHIPPING TO A HEIGHT OF 6-10 INCHES ONCE A YEAR IN EARLY SEPTEMBER AND SPOT SPRAYING OF HERBACIDE ONLY AS NEEDED. 15. FINAL ACCEPTANCE. UPON SUBSTANTIAL COMPLETION OF THE WORK, CONTRACTOR SHALL REQUEST FINAL ACCEPTANCE OF THE WORK IN WRITING BY THE OWNER/LANDSCAPE ARCHITECT. IF ANY WORK IS FOUND TO BE INCOMPLETE OR UNSATISFACTORY IN THE OPINION OF THE OWNER/LANDSCAPE ARCHITECT, A WRITTEN PUNCH LIST WILL BE PREPARED LISTING ALL ITEMS THAT REQUIRE COMPLETING OR CORRECTING BEFORE FINAL ACCEPTANCE. 16. WARRANTY. ALL PLANTS, MATERIALS AND WORKMANSHIP SHALL BE GUARANTEED FOR ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE, UNLESS OTHERWISE SPECIFIED. THE GUARANTEE SHALL COVER THE FULL COST OF REPLACEMENT INCLUDING LABOR AND MATERIAL. Print Name: Ryan J. Ruttger, RLA Drawn: RJR Signature:. Designed: RJR Date: 3/4/25 License #: 56346 1 Date: 3/4/25 Revisions: 1. 04/25/25 - Per City Comments PLANT SCHEDULE SYMBOL CODE QTY BOTANICAL NAME �COMMONNAME SIZE CONTAINER TREES • RM 16 Acer rubrum 'Northwood' Northwood Red Maple 2" Cal. B&B • FM 18 Acer x freemanii 'Sienna' Sienna Glen Maple 2" Cal. B&B ' RB 12 Betula nigra Clump Form, 2" Cal Equivalent River Birch Multi -Trunk 8' Ht. B&B • HB 8 Celtis occidentalis Common Hackberry 2" Cal. B&B • HL 14 Gleditsia triacanthos inermis ' Harve' Northern Acclaim Thornless Honey Locust 2" Cal. B&B • KC 14 Gymnocladus dioica 'Espresso' Kentucky Coffeetree 2" Cal. B&B • WO 37 Quercus bicolor Swamp White Oak 2" Cal. B&B • HO 8 Quercus x macdanielii 'Clemons' TM Heritage Oak 2" Cal. B&B • BL 16 Tilia americana 'Boulevard' Boulevard Linden 2" Cal. B&B • AE 14 Ulmus americana 'Princeton' American Elm 2" Cal. B&B CONIFEROUS TREES BF 16 Abies balsamea Balsam Fir 6' Ht. B&B • BH 15 Picea glauca densata Black Hills Spruce 6' Ht. B&B Q) PP 11 Pinus ponderosa Ponderosa Pine 6' Ht. B&B NWiuriu tivw` a • WP 17 Pinus strobus White Pine 6' Ht. B&B ORNAMENTAL TREES OB 9 Aesculus glabra 'JN Select' TM Early Glow Ohio Buckeye 1.5" Cal. B&B SIB 18 Amelanchier x grandiflora Autumn Brilliance' Clump Form, 1.5" Cal Equivalent Autumn Brilliance Serviceberry 7' Ht. B&B BB 15 Carpinus caroliniana Native Blue Beech 1.5" Cal. B&B HT 13 Crataegus crus-galli ' Inermis' Thornless Hawthorn 1.5" Cal. B&B CA 17 Malus x ' Prairifire' Red Flowers Prairifire Crabapple 1.5" Cal. B&B JL 21 Syringa reticulata 'Ivory Silk' White Flowers Ivory Silk Japanese Tree Lilac 1.5" Cal. B&B GROUND COVERS SOD 88,633 sf Turf Sod Bluegrass Kentucky Bluegrass sod Type I - Turf Seed Mix Ti 79,793 sf Refer to notes for acceptable seeding methods MnDOT Southern Boulevard (SB) seed Seeding Rate 160 Ib/ac Type II - Native Seed Mix (Buffer) TII 105,301 sf Refer to notes for acceptable seeding methods MnDOT Southern Tallgrass Roadside (STR) seed Seeding Rate 39 Ib/ac Type III - Stormwater Seed Mix TIII 103,774 sf Refer to notes for acceptable seeding methods MnDOT Wet Ditch (WD) seed Seeding Rate 30 Ib/ac M/I HOMES OF MINNEAPOLIS, LLC 5354 Parkdale Drive, #100 St. Louis Park, Minnesota 55416 NATURES REFUGE NORTH Lino Lakes, Minnesota PRELIMINARY LANDSCAPE PLAN L4 of 4 #5412-03 f:\jobs\5401 - 5420\5412-03 - natures refuge north\cad c3d\landscape\5412-03_landscape.dwg LEGEND EXISTING PROPOSED PROPERTY LINE EASEMENT LINE ----------- ----------- CURB LINE ___________ BITUMINOUS --------- --------------------------- --------- CONCRETE - `----` SANITARY SEWER ---->-----> - - - - - - STORM SEWER - - - ---------------F WATER MAIN ---- I DENOTES INLET OVERHEAD UTILITY PROTECTION \ \ d ,,,• I \ � / �/ 1 I r` \ STORM CATCH BASIN STORM MANHOLE OUTLET CONTROL STRUCTURE I I I I // /� d // \ ' \• i\`•� I I I I I I ��� MANHOLE H� I I / a / �o� HYDRANT Gv GATE VALVE T TELEVISION BOX ❑ TB -906--J TELEPHONE BOX ❑ /� I I FEMA ZONE A FLOODPLAIN LINE / �/ / \ \ UTILITY POLE RETAINING WALL i/ �/'� \\ / \ \ / \ 90 I 906---�\ WETLAND I I 6' \ Cy \ FENCE ----0- --- %, / \ ' i-- \ _ 100 YR HWL = 904.1 10' CONTOUR ---= c\\\\ i Obi 904--� t / \ - ----- - RCWD (90D5) \ \` 4 ae \ 1Q DAY SNOWMELT - 904.5 2' CONTOUR --- •� _ \\ 9 // / // / FEMA FLOOD PLAIN ---v-v.v --- E.O.F. v�Vv•C�\v.� \�\\ \ V= '� \ \ vvv \ `,-�\`` �-�- A_____�r�- i I/ \ AV �v _` ,� �1 \ �7 72`\� /11.3 •''�- - �- I z� _ .. ........ .. ..1 -9Uoz o-09.51.5 . y WETLAND LINE00.0 SPOT ELEVATION - ---- x � x vA --- - 900 EMERGENCY OVERFLOW x E> 11CAL H (SNOWMEL905.0 000.0 o -- �-\- \♦�� �- --- ---� ---------� ------- � I ............. - v \v �i' � •e- � �,� \ / •0 / \ �-- o°' � i �-- I I �1I j r� v -- - SILT FENCE TREE FENCE e000000000000000_ 06aap ------_ I \TREELINE \ \ A\ ago SOIL BORING L �/I i/ / �'\ •,.' \ "-, 11.2 °s o4 I I II ° \ r \\tea \, 9 i\\ �\ \,\ \ \ / • I s \ Leo °s� ss o. •• o. \ TH FEMA FLOODPLAIN FP WETLAND 30 I '•°s\ _ STR T D RCWD FLOODPLAIN fP fP -ro r�- `.�-,�\ \\\ \\\ \ JRITIC LL=906.0-- --�2- �' \ DITCH 0 / �• _ \ I I I _\ 100 YR HWL = 904.1 \ \\ C\ \\ \\\ I / (SNOWMELT) I m I I o \ 10 DAY SNOWMELT = 904.5 \\ •\ \\ \ ; _i39--I- ry / - p a - POND 300 \ (PER RCWD MODEL) / o vv \✓ \v v v /\ --- _� ti;I I � vv ---� I a° NWL = 902.0 'o� �- ----- ICITICAL HWL = 904.� (SNOWMELT) v� 1 I o 6 rnv s v Aw \ �v vv A / \ �/ / L �� II ' -I------ I p / a �•a c / \\\•' \I�\ / \\\\�R�pF \ _ -__� // 1N 2 _4 ro /--- IN '^906� I I I / .•go2••---�_-�,� --1`` �e $ ` \<pes°s• \_ 906� �� \ .•� \ -- __- �(, I 4 I / / I I b '•�, ��/� \\ 9O2 \\ \ • \ \ \\ ` \ o _ I ------- _ \ \ N LAKE 300 v• �\ �V vv vv� --- 7.) A\ NWL = 902.0 WETLAND 35 i _-- CRITICAL HWL = 904.7 I I ° i � L, �\ (SNOWMELT) /// � \ ----------- .Ivy v vv • \ \ vA vv /CRITICAL HWL = 906.1- PON1S50• \ _ �s v vv••. `� V vvA vv I (SNOWMELT) \ NWL = 905.0 I•• I CRITICAL HWL \ .° . a=�°A\ v v \ \ A,\ \ \Vv \ vIos.3• _2.0 '_ vi "v o o A o a°s I dj WETLAND 55 j• CRITICAL 043/ (SNOWMELT) I . v v� • � \ vv v�� o r-- _ I I � v �/� � � v � // \ / / t • I /EOF1 - - �\ • ` • \ \ \ � // . 1 \ / !I \ ° i / � /I I \ � .�- / 6 ego � I / A� / '• i -° , vv v\\ $\ •\V V �: Imo, A ri / o� - v os PD-0 ` V ____ I l • \ J 09.0 90a 09.0 • \ \ / • m I i / / ` _ _ \ / / / \ .ps g00 �D B, �/�\ I • _ i r-- -� \ _o�rn i o �` °a � 90� �,�/ \\ � � Ev�' \�- �•'91 I ve \'/��a - - - % v V v v I v / y / ) , Jai i " _ �\ \ •:°� �eC_i' ' • Leo /l y�� • • •o. • v vv a\ \\ vv wv i�� s �- o . / I 1.0 ��y�i �� � � ♦♦ ♦♦ • Lr n- 5•• ooA �, 80 • v A y V f O 60 _ sos�� �\ r • y 11.0 - \ 1 ♦ 1 i • \ \ \ �\ \ I \ > \ O \ / °' l = / �' a9 / \\ co ` /-- ♦ 11.a 1 ♦ \ 9 y \ •�,.z •• o _ 9 \ _• / I / \ • \ \ y \ \ 1.8 Op \ / / _ _ \ 1O < 02 / \ i _ 0.2 6� i / \ • ' • \ \ \ \ \ ° \9 \ 2� / / \ 0 `. pJ / A ---- -- � � \ V '� I� � I i v ♦. A v > v a / / / sos ,.. ti �s / A � ----L I I -- A A \ V A � �r T'-� / / / `. A eo . v v s vvv / � .9 �' / � ^s S � * � � .�•��' , ,�_\ I I I I I A \V � � � // // ///� � vv • vv vv A \ � v � .ri°`i � v � 19 _ � � / / A / � // / osp ----os - 1 I � � i � '. � / / 9 " ��- i /�•� 1 ✓ f mo\'� �! <v i // ��°•. vv vv \ \� A ��°v vv I �/ / /�� o� �I I A o �� ors �P�� E 50• RB �� I \ -- -I-- N \> 70.E ,tOg O v // / / vv vv V \♦' A v / // � /// � /- / / '/ / � 1� �---� � I 1 I ��,� �•�._-� � - as A�� � �� \ .-i ' v / _ 004 .10 IN TOP B�.�PE.' or�/ M NWL = 901.9 .9Y0 v / / - I�100 YR HWL = 903.8 � 10 DAY SNOWMELT I_ PER RCWD MODEL 0 50 100 200 '� f vv vv v v ; = -' v �, / � �, �A� v \ � I I ;� v / � � � 4. I � .< _ �v v v 1( 2.4 - - ✓ ° • \ � ♦-siO � /5• � _ L � I \ \ � l T ' .. ;,✓" •• x�°5� I - _ �•• \ o � (IN FEET) � I i i� � ° \ ♦ S • T PIPE -- � / 49 77. � 1008 • � � : ; ; • .. 06 • ' / \\ / /,_ - 90 �a � � `P •' v / v PIPE o / W 13.0 I 'i2.0 105 / ' / A v / 7 v• v v �o g 991z -- ----� o�' - • I v ° s ,�, � � �\ ��� 1 7 v v. � / v is � / / -- I � F- ,� �, i A � .-�•.Ex`I • •.•'' LOW AREA'. .. \ \ / � �--- °j \ \ \ � \ � I ••'• / I- rn - ---- / I ...3 ��os � a , CRITICAL HWL = 906.2 \ v / / / % ' l r- / v v • I I/ r :•.`.••'" ��♦ I V • /�/ A I (SNOWMELT) / `\gRITICAL HWL'- 905d •� \ I / \ v� v V / A �� vv v i� \- (SNOWMELT), v, \ / �� �I '� •• ��p�--• •I I =v"- A FLOODPLAIN SUMMARY + v -----_`-NO ASSUMED FLOODPLAIN WITHIN a ' ���� 90 1!- a ! 100 YRHWLL H=WLso1.98 0W3h.8 10 DAY SNOWMELT = 90o 4.THE SITE BOUNDARY. ,m - 1 PER RCWD MODEL M� O o� 1 i v iA V 1 A V AVvA ' 1 % _ mw v IiLU 90 WE TLAND D 15 1 \ \\ V A V -904.7 C ITIC L HWL - \ \` \ IIV / / ♦♦ 1 �A vv,( �\ �� vv�vv NO FLOODPLAIINLSTORAGE EOr CRITCALWETLAHWL ND 25� 05.5 \\ �V�vv�v i WITHIN SITE BOUNDARY if h ---- 1 \ (SNOWMELT)- -90 ' j \\ WETLAND 50 \ CRITICAL HWL = 904.7t �°� \ l m "7 �� / \\ ♦ -� �\ ��.�. .. (SNOWMELT) \ \ ll i I / � i v #I -- \ \ i IL_J 100 YR HWL = 04.2 (PER D SNOWMELTPER RCWD MODEL T \ I \ ) 01 SUITE 3 NE Revisions: M/I HOMES OF MINNEAPOLIS LLC F1 CARLSON I hereby certify that this plan, specification Print Name: Brian J. Krystofiak, P.E. Drawn: KRO 1. 4/25/25 Per City &Watershed Comments ENGINEERING s LAI F, I or report was prepared by me or under my � NATURES REFUGE NORTH iBLAINE� MN 7s44 SURVEYING TEL76M489.79M direct supervision and that am a duly Signature: � //� , ^� Designed: BJK 5354 Parkdale Drive, #100 FLOODPLAIN EXHIBIT of ENGINEERING �`NNIN€z Fax 7W. Licensed Professional Engineer under Lino Lakes, Minnesota 1 CAM-WIN-ENSINEERINGWNF the laws of the State of Minnesota Date: 3/4/25 License #: 25063 Date: 3/4/25 St. Louis Park, Minnesota 55416 Save Date: 04 25 25 f:\jobs\5401 - 5420\5412-03 - natures refuge north\cad c3d\engineering\preliminary\5412-03-floodplain exhibit.dwg A 4 ,, ,, ,, -M J`71 G-1 LEGEND EXISTING PROPOSED PROPERTY LINE EASEMENT LINE CURB LINE BITUMINOUS [ ] CONCRETE , SANITARY SEWER > STORM SEWER >>— >> WATER MAIN ———— - I — DENOTES INLET PROTECTION OVERHEAD UTILITY ohe STORM CATCH BASIN STORM MANHOLE OUTLET CONTROL STRUCTURE O MANHOLE O HYDRANT HYD rnH 1�__? Gv GATE VALVE N ry TELEVISION BOX L Te TELEPHONE BOX UTILITY POLE RETAINING WALL FENCE 10' CONTOUR — 2' CONTOUR FEMA FLOOD PLAIN FP WETLAND LINE - - USACE WETLAND LINE - - - - - - CC.0 00.0 SPOT ELEVATION -_zi ---- X E_- � � X E.O.F. EMERGENCY OVERFLOW �*3 �*3 x 000.0 SILT FENCE • • • • • • - TREE FENCE ® o 0 0 0 0 0 0 GRADING LIMITS TREELINE SOIL BORING TP FEMA FLOODPLAIN FP RCWD FLOODPLAIN fp fp I WMC WETL ND BUFFER EXISTING WMC , 28 8�5 S.F. PRP. WETLAND BUFFER ,•9 I — O 90 — � � \ 27 27 S.F. REQ. s s ( ) I - — — WMC WETLAND BUFFER \ _ � �J11677 S.F. P . s_ 1.'. \ •��:.:.:.:.:.:.:'.>:.:� � — 11 633 S.F. RE u \ \ 0 9 —/7 2 i J \ _ 0 \ \ �....'.'...'.'.' .'.'.'......'. o - - - - g d -o - o . rrrrrrrrrrrrrrr•rrr•rrr rr ^ �rrr. rrrrrrrr 1..................................... ..... Q. W II _. WETLA D 5 . � — 9 I CR ICAL HV1�L -\ 05.0 I _--- - I ' I \ J::: / - / ... r...rr. .. rr..rr.. r..r. rr....rr..rr..r..: r.. NOWMEL '''''' -- . .............. ..... I I _ �.. �.. O II 890 a o � 9 9 J G / 0 \ J ............ I .....r. .................. ...... .... � 9 . .. ... .. .�. .. �O / 6J \ \ 1 J - 0 � E \.......� ... .. rn O :•� �':>;:.:.:.•,' 10 FO �M CITY — o \ W WETLAND BUFFER � , <�— 7 ' W Ti�A UFFER — I a :. - 35�33 S.F. PRP. I Q - TREE :::::'' ON WMC : � W = o I A H„ 9c6 c l:::' 9 c9 ;�,:,,,.•., \ \REQ8 S.F. PRP -� � � 3s0 �C,f a / `�—t'3-9— I vU` """"""• ( 41 S.F. RE 0 4 ............... _ - o MC\W��LANE \UF.FJR 32 222\S.F. PRE �%�\ �( \ �-' 32 188 �S. \REQ.)��� \ ��� \ \\ �•'•.-'l:;•' :; '�'v--�� _ _ _ =a- � S ,-,I oo �I907.0 •' __ — m L J �" 906 Q —_ _ II 9 9 _ a I 9 O O O I 0 - o I e - J s \ � r ' • • " �0 >F00� wilN CITY B O ^ .'.'.'.'.'. I CD \ WETL Nb BUFFER _ Ij / 0 \ / / v m •L �m N0 —WMC _ �\ _ _ I 9 — _ o ai - I r r.. .............. r® \ \' ................ ..... .......'....'... �\ — i - Ti -i .. 3 � ro I 77 S\F PRP •� i— -i � � � I I III '\ \\ \ ° \9e \9os \ . 5, 50\S. F. �:' t_U o o ( I <, a _ s \ \ \ \ R !'' I o WETLAND FILL o NwL \�/ m — —� 11,5 p � is ECRICAL HwL = 906.6v 9v v v --B°F — 65 F°�T, F WETLAND FILL `�� S 1NETLCR/ICAND 55 0 1,;,•. SNOWMEI !i • • a 0Y** HWL 904 I: 132 eoF�� (100 YR� ::. 0 :.. V — — �1 \ \ x :i w.... ! 6� i \ / / EXISTING WMC 1:'.:.:.:.:...:.:.:.....:.......... WETLAND BUFFER „ 1 7 SF 9p I L :� r.:::::::::::::::'' 910.44 �ILL- ��Ee R O T ANDS ILL- ;.... o / / 15 12 4 .. 00\Og�1004 \ J .. / /y3/_ so s0b�o -- I I__ �' c z/ \8 \ 8°VPE WEB AND LL I I / � S ._ v � � 90 �SF A���, �,/j I � � � ��'�/ 9� 0_ V iv, I s°G� g s I \ �� �, I I \ o r so3. c it �+1007 SPECIFICATIONS: I IIPE x 4. G / VO4 45 P v 3 WETLAND LL %� I 32 540 SF i i s .: / 9�9� — I g,, gjl Wo L �o::;:; PROTECTED OPEN - / , ^° + 0 \ 9 10 PIPE .. ,y\•'• � o o s//o� , � •'.'•'• �• _ �1 I/._ > \ �... .. ... {- ,909.5) \ /i:;;;:;:;:; •; •;•; .'. SPACE AREA ^ 1 °° c° \ \:. { / / I _ ao� l MONUMENT I II 910�91 g06 I 9°p -- \u0W AREA - CONSISTS �-9 90 > 1 I Beyond this marker is a protected area of OF A POST AND A PROTECTED OPEN SPACE SIGN resource management featuresandnatural g G o TICAL H \ y00.' \ S round cover abutting a watercourse wetland or , � • � • g g � % r, I (SNO MEL o ens ace. Federal State and local laws / � \ � •'''''•'• '•'•' '•'•'•'''• \. '•'•'•'•' '•'• � I '� p p WETLAND BUFFER SIGNS - - / ; , / / G / ............. ..... .....•. prohrbn activities that that could disturb this natural / / c=' I I I \ v ' ' ' ' °g \ �•'•'• • s _ area and adjoiningwater bodies. An -- - / / ° •'•':':': S �! I I \ I 46 MOUNTED FLUSH WITH THE TOP OF THE POST FASTENED WITH alterations such as dumping, tilling, Plowing, � ,� , / t— __ _I , , ,.,•;.;.;.;•;.;.' \ '.;�•;.'.;., / �iI-'\ I \ g \IIr' 7 r r mowingand and waste disposal are prohibited. NON REMOVABLE SCREWS OR RIVETS SIZE: 5.5" H x 3.75" W o - - - I � ' ':•:':':':•:•:': \ ,,, WETLAND FILL \ ALUMINUM SHALL BE 5052-H38 OR 6061-T6 ALLOY. GAUGE PROTECTED OPEN AREA SPACE + - , - \ -, A 13 847 SF SHALL BE 0 080 CITY Or �N(� KES SIGN COLOR COLOR SHALL BE GREEN AND BLUE LETTERS ON If you have questions on [he protection of this arc, and the adjacent water resource areas, please contact City Hall A WHITE BACKGROUND. at (651) 982-2400. e POST MATERIALS 4" X 4" SQUARE TREATED WOOD OR OTHER CITY APPROVED MATERIAL POST INSTALLATION MOUNTED TO A HEIGHT OF FOUR FEET ABOVE GRADE SET AT LEAST 42 INCHES IN THE GROUND INSTALLED AT EACH LOT LINE WHERE IT CROSSES A WETLAND BUFFER WITH A MAXIMUM SPACING OF 300 FEET BETWEEN SIGNS ( IF NO BUFFER IS 4 X 4 TREATED P043r REQUIRED THE MONUMENT SHALL BE AT THE EDGE OF THE WETLAND). PLACE ADDITIONAL POSTS AS NECESSARY TO FOLLOW BUFFER CONTOUR LINE L J \ DIGITAL COPY OF SIGN AVAILABLE FROM ENGINEERING DEPARTMENT WETLAND BUFFER SIGN JANUARY, 2024 C I T OF GEN-22 11INC1017WEq & WETLAND BUFFER SIGN 3.75" PROTECTED OPEN SPACE AREA Beyond this marker is a protected area of resource management features and natural ground cover abutting a watercourse, wetland or open space. Federal, State and local laws prohibit activities that could disturb this natural area and adjoining water bodies. Any alterations such as dumping, tilling, plowing, mowing and yard waste disposal are prohibited. C I TYAMS= O F LNOLA KES If you have questions on the protection of this area and the adjacent water resource areas, please contact City Hall at (651) 982-2400. `n 0 PLACE SIGN ON A 4"X4" TREATED WOOD POST WITH SIGN A MINIMUM OF 4' ABOVE GRADE. • COORDINATE WITH THE CITY OF LINO LAKES FOR SIGN LAYOUT AND PRINTING. DENOTES OPEN SPACE AREA / WETLAND SIGN _' :: j ='- \\ :;:;:• •:;:;:;:.: EXI STI N G WM C 908— --- \\ ''•''' '•' ' ' '•' \\ .,, :•/' WETLAND BUFFER WMC WETLAND BUFFER .' : r '. \ ! .... 70,b S.F. PRP. \ .... \�` Gg ` �� 5671 o 1 WETLAND 15 .. g : :'�':'••• .'.'.'' : " \ \\ './ 'AL HWL = 9227 ::., ..................... .•.;.% �'•'•'• O� \ ` \ o� \\ 7 x /moo � x .'k'.•.'.'.•.. WMC WETLAND BUFFER / 19,529 S.F. PRP. — �� --A (19,238 S.F. REQ.) \ WETLAND SUMMARY \ 1 WETLAND FILL = 84,479 SF (1.94 AC) WMC WETLAND BUFFER AREA = 197,699 SF (4.54 AC) REQUIRED WMC WETLAND BUFFER AREA - 184,301 S.F. (4.23 AC) CITY WETLAND BUFFER AREA = 21,895 SF (0.50 AC) REQUIRED CITY WETLAND BUFFER AREA - 11,311 S.F. (0.26 AC) WMC BUFFER WIDTH: AVERAGE WIDTH 50' (ft) *MINIMUM WIDTH 25' (ft) (NOTE: ALL AREAS EXCLUDE PAVED TRAIL SURFACES) * UNLESS OTHERWISE NOTED CITY BUFFER WIDTH: 10' (ft) (NO AVERAGING) CALL BEFO E YOU DIG Q Know what's below. Call before you dig. The subsurface utility information shown on this plan is utility Quality Level D. This quality level was determined according to the guidelines of Cl/ASCE 38-02, entitled "Standard Guideline for the Collection and Depiction of Existing Subsurface Utility Data." � t i z 0 50 100 200 (IN FEET) BENCHMARK 1. Anoka County Benchmark No. 2011 - Elevation 894.88 ft. (NAVD88) 2. Anoka County Benchmark No. 2012 - Elevation 911.80 ft. (NAVD88) ENGINEERING CARLSON 3tPHEASANT NIERNE S>r�ITE1a0 I hereby certify that this plan, specification Print Name: Brian J. Krystofiak, P.E. or report was prepared by me or under my Drawn: KRO Revisions: 1. 4/25/25 Per City &Watershed Comments M/I HOMES OF MINNEAPOLIS, LLC NATURES REFUGE NORTH WETLAND BUFFER W1 SURIVEYIN BLAINE. MN TEL'7�3.4�7 direct supervision and that I am a duly Signature: �_� // - - ,-� Designed: BJK g 5354 Parkdale Drive, #100 of ENGINEERING PLANNINIG l�ax'6. 79M Licensed Professional Engineer under Lino Lakes, Minnesota EXHIBIT 1 CU&SM-ENGINEEMNGM14 the laws of the State of Minnesota Date: 3/4/25 License #: 25063 Date: 3/4/25 St. Louis Park, Minnesota 55416 Save Date: 04/25/25 f:\jobs\5401 - 5420\5412-03 - natures refuge north\cad c3d\engineering\preliminary\5412-03_wetland buffer ex.dwg 11- A 4 7t J`t1G-V. Attachment 3. Land Use Plan NATURES REFUGE NIORTH LINO LAKES, MINNESOTA ARF'i- 6 � S AGR 1 FC;FND 0 PUBLIC OPEN SPACE 0 LAKE/BORROW AREA (NWL) 0 STORM PONDS STTF DATA TOTAL SITE AREA ±59.30 AC. TOTAL ROW AREA f5.59 AC. WATER AREA ±10.94 AC. ANDALL STREET WETLANDS (REMAINING) f5.31 AC. FRONT 25 OR ------- _ -T 0 WETLANDS (REMAIN;ING) LAKE/BORROW AREA (NWL) f4.02 AC. SIDE STORM PONDS f1.61 AC. SIDE CORNER 20 or w SINGLE FAMILY LO IS PUBLIC OPEN SPACE f22.97 AC. II I I I I I i OUTLOT B I I G 3 OUTLOT D TOTAL LOT AREA f19.80 AC. TOTAL NUMBER OF LOTS/UNITS 93 MINIMUM HOUSE SETBACK DATA: 30 FT.* 7.5 FT. 25 FT.* REAR SETBACK 30 FT. *30 FT. FRONT SETBACK FOR LOTS 25-36 BLOCK 4 & LOTS 1-12 BLOCK 5 o �P 0 0 MAIN STREET (CSAH 14) Lo < Q� Q LJ W Q Q U7 = v Z � 5 LILAC ST. N APOLLO DR. NOT TO SCALE VICINITY MAP (NO SCALE) SOIL BORINGS HAUGO GEOTECHNICAL SERVICES 2825 CEDAR AVE. S. MINNEAPOLIS, MN 55407 (612)729-2959 WETLANDS KJOLHAUG ENVIRONMENTAL SERVICES COMPANY 26105 WILD ROSE LANE SHOREWOOD, MINNESOTA 55331 (952)401-8757 OWNER CONTACT M/I HOMES OF MINNEAPOLIS, LLC. 5354 PARKDALE DRIVE #100 ST. LOUIS PARK, MN 55416 (763)586-7200 0 50 100 200 (IN FEET) BENCHMARK 1. Anoka County Benchmark No. 2011 — Elevation 894.88 ft. (NAVD88) 2. Anoka County Benchmark No. 2012 — Elevation 911.80 ft. (NAVD88) NTRIEDRNE Revisions: M/I HOMES OF MINNEAPOLIS LLC 1 CARLSON ENGINEERING;SUITE100 Drawn: ADB , �AINE�MN�449 NATURES REFUGE NORTH swrvEYIN Designed: BJK 5354 Parkdale Drive #100 LAND USE PLAN of TEL753.4M73 ENGINEERING PLANNINS FAXWMA89.7 CLino Lakes, Minnesota NNN I LS0N-EN61NEEMNrmC0M Date: 3/4/25 St. Louis Park, Minnesota 55416 1 Save Date: 03 13 25 f:\jobs\5401 - 5420\5412-03 -natures refuge north\cad c3d\engineering\exhibits\5412-03_land use.dwg # 5412-03 Attachment 4. Phasing Plan ug � ug — J L _D r — I AI � I T I / 1 n I - - I - r I � -) I^� r- , r- � LJ 1 \ i I j \ \ PROP - \ 57 LIFT TATION I I I I i I I \ \ 1 \ 56 58 59 �0 1 1 61 / / 1 t � � i\ \ I \ 55 _� L__� L_ L�i�� \ �� N v y STREET 6 63 \ r N 54 -7 --- vvv OUTLOT D ,' /- - - - / I 1 64 I / / � / / 74 � � � - _ _\ POND </ V vv J 65 I 4 \ 76 9 \ / 52 L_ / /-_-_-_--- u-__ -� II L 51 ?2 Y\ ---=—I L, / ` OUTLOT A \ \ I 50 1 Li — - -71 � 79 68 PR—OPO—SED TRAIL L�� 49 i 70 80/48 81 / / I OND I/ / // �/'` / P , \ �\ 1 35 I 36 ,� 34 11 1137 /// /�� �� \ ./ �/ 47 //„\ -9� / �/ 82 '�J1�-J L, L// 38 �� /%i \`9 ` //// TOO \� <` // 83 ////84�-/ 30 131 I I 32i\� EET p`% \A 3 /i %� </ �i� L—JL 11 46 $5/// STR 45 �. ` // 86 93 L-L L_ 40///87 /91 \=I III II II 92 11 � \ I /\ ✓ 41 ��i II I 1 II II II 24 I 123 / i �/� \ 9 \ ,��- �� / / < / 88 1 I �1 190 I I I I� , �- - �'009 \ \\ I / � �� \49 , 13 \,�\ OIL i 189,, I \ I N 26 43 10 // \ 20 \ — —I — // g 1 �/ ,X\ `�� / / / / I I I I 1 \ 3 I 1 I �\ 7 6 I 5 II 4 \\ I 19 18 I I 17 1116 �� 15 LL--JI�--�\- / SUMMARY OUTLOT C - J I- - - \ _ \ / U �, _ \\ \ , f PHASE I TOTAL: 62 LOTS OUT�OT B / PHASE II TOTAL: 31 LOTS w ,' / '- �_-�__ \ �g �� SITE TOTAL: 93 LOTS LL \ = NOTE: 1.) THE ENTIRE SITE WILL BE - \ I GRADED IN ONE PHASE. \ \ n _ _ AND LL STREET / \ / \ / \ z 0 50 100 200 ( SCALE IN FEET ) i PHEASANT RII3GE DR NE CARLSONSURVEYING ENGINEERING ENGINEERING PLANNING SUITE 100 BLAINE, MN 5544:IE TEL76MASM7 FAX 76'FA .7 CARLSON-ENIMNEERIN€AN M Save Date: 03 04 25 1 f:\jobs\5401 - 5420\5412-03 - natures refuge north\cad c3d\engineering\exhibits\5412.03 phasing exhibit.dwg Drawn: JJO Designed: Date: 3/4/25 Revisions: 1. M/I HOMES OF MINNEAPOLIS, LLC 5354 Parkdale Drive, #100 St. Louis Park, Minnesota 55416 NATURES REFUGE NORTH Lino Lakes, Minnesota PHASING PLAN Attachment 5. Ghost Plat O 12 OUTLOT BAP.—.' 13 OUTLOT B FLITURE STRET B 6 O.L E --------------------------- 10 2; -- - --------- G -------- - --------- 9 ------ - ---- ------ -------------- I ------------ 8 4 - -------------- --------- ------ 2 5 --------- ---- --------------- M---------------------- ----------------------- 1 3 > 4 -- ----------- ---- ------- -------- ------ 4 2 > 7 6 --- - -- -------- ---------- 10 -------------------- i F9 --------------------- rri ---- ------ ----------------- "j 4 i > -------------------------- ----------- - --------------- -- ------ 11 ------- . .............. .. ----- --------- -- - ----- ---- I . , 13 ......... 1, 3 5 12 4 2 10 OUTLOT A 2 L ---------------- ------------ C --- ks X 20 - ------------ 1 --------------------- - 22 18 WL ------------------------ 23 ------------------------ L------------------------ 24 ------------------------ \ ---------------- ------------ -- --------- I ---------------------- 2 25 16 ----------------------- ----------------------- 3 12 10 -------------- " ' 7 4 STREET D \ ----------- ----- --- 5 10 6 9 8 7 29 ZY 7 --- -- -------- OUTLOT C ------- — ----- ---------- 30 6 OUTLOT A ----------------- ------------ -------------- ----------- j ---------------------- 1 31 5 I -------------------------- ----------------------- -----------------I ------------------------- 4 32 -5- - ---- ----------- \ ------- ---- - ------ 33 0 ----------- ----- -- ---- ---- --- ----- 34 -- ------- ---------- ----- ---------- 35 ------------------------- OUTLOT B OUTLOT D 5 ---------------------------------- O 4 3 wMC wMC SAVED OUTLOT C wMC wMC wMC 7 0 U z W in co 0 In 00 00 co O z D a IL z z a CO 0 W W W Of co W 00 wsb Memorandum To: Eric Zweber, WSB Cc: Katie Larsen, Lino Lakes City Planner From: Kris Keller PE, WSB Diane Hankee PE, Lino Lakes City Engineer Date: April 4, 2025 Re: Natures Refuge North Preliminary Plat - Engineering Review 023898-000 WSB's review of the Preliminary Plat submittal for the Natures Refuge North development in Lino Lakes, MN, prepared by Carlson McCain and received March 10 2025. Our comments were made on the following documents: • Natures Refuge North Preliminary Plat Submittal prepared by Carlson McCain, dated March 4, 2025. • Natures Refuge North Stormwater Management Plan prepared by Carlson McCain, dated March 4, 2025. • Natures Refuge North Traffic Impact Study prepared by S2Traffic Solutions, dated March 28, 2025. The following review comments should be responded to in writing by the applicant. Responses Carlson Engineering 4/25/2025 • General The Natures Refuge North Addition is the second phase of the overall Natures Refuge development which includes 60 acres north of CSAH 14 (Main Street), west of CSAH 23 (Lake Street) and east of Wood Duck Trail. The project proposes 92 villa lots and associated infrastructure. This property was originally part of a larger development of which an Environmental Assessment Worksheet (EAW) was prepared. The evaluation concluded that the project did not have the potential for significant environmental effects. • Grading The Natures Refuge North Addition includes site grading for the 92 units as well as extensions of Haywood Drive and three local streets that are yet to be named. Comments: 1. Show EOF elevations , locations, and routes for all low points in the paved and green spaces. EOF's have been added to all low points and ponds. a. EOF elevations must meet minimum freeboard requirements with building lowest opening elevations (LOEs) EOF's elevation have been verified to meet freeboard requirements. Ms. Katie Larsen 04/04/2025 Page 2 • Stormwater Management Stormwater management for the Natures Refuge North Addition consists of storm sewer draining streets and yards, two sedimentation basins, and a large basin excavated for fill material. The stormwater systems shall meet the City's and Rice Creek Watershed District's (RCWD) Stormwater Management requirements. All proposed future public streets must meet City design standards. Existing and proposed discharge rates are summarized below. Pre- and Post- Development Discharge Rates (cfs) Condition 2-Year 10-Year 100-Year 10-Day Snowmelt Needed if basins Existing 0.27 1.25 9.48 landlocked Needed if basins Proposed 0.68 2.85 12.81 landlocked Comments: 1. Outflow rates increase for all modeled storm events beyond what can be attributed to model accuracy. Further attempts at providing rate control must be made. For example, ditching flows from back yards to the inlets routing to BMPs, lowering the FES north of Wetland 50 to better route flows into Pond 500, or small rate -control basins at areas that cannot reasonably be routed into a BMP. a. If increases cannot be avoided, it must be demonstrated that they will not cause an adverse downstream impact. Flows have been adjusted and plans modified. 2. The SWMP water quality calculations show 0.90 acres of existing impervious, however the HydroCAD existing modeling has 3.57 acres of unconnected roof land cover. Please clarify these differences. Existing impervious adjusted within water quality calculations. 3. Please revise the Water Quality calculations in the SWMP as they do not match HydroCAD modeling. For instance, HydroCAD modeling shows 16.86 total acres and 7.52 acres of impervious routed to Pond 600, but the SWMP has a total area of 9.77 acres and 0.196 acres of impervious. Water quality calculation updated. 4. NURP criteria specify a maximum depth of 10'. Pond 500 has a depth of 11', raising the bottom elevation to 10' will bring it into NURP compliance and still keep the majority of its dead volume. Pond 500 has been revised to a depth of 10' 5. Per new RCWD standards, any new impervious flowing to a pond designed in accordance with NURP criteria counts as full water quality treatment, therefore the full volume credit can be claimed for new impervious flowing to Pond 500 and 600 if properly designed. Water quality revised. 6. Pond 300 should be renamed to Lake 300 as its depth is well in excess of the 10' max depth outlined in NURP criteria. Additionally, it cannot be counted asproviding water quality treatment. Note has been revised. 7. Please clarify why drainage area 26S is modeled. It is offsite and has no changefrom existing to proposed conditions. 26S was modeled assuming the Street B connection to Andall may occur. We are assuming the new street will have ribbon curb and there will be no drainage increase to 26 (for now) 8. The 2.5" event should be modeled in HydroCAD to determine runoff volumes needed for pond dead storage. Nature Refuge North Addition Engineering Review Ms. Katie Larsen 04/04/2025 Page 3 The 2.5" event is calculated within our pond spreadsheet which gives us our required dead storage through calculations within this spreadsheet. 9. As many wetlands receiving runoff are Type 1, they are classified as highly susceptible and therefore must have no increase in bounce or inundation periodfor the 2- and 10-year events. Kjolhaug environmental reviewed the wetland susceptibility and all wetlands were adjusted. No wetlands are considered highly susceptible. 10. Detailed storm sewer plans, profiles, and calculations will be needed in future submittals. This should include all utility crossings to confirm constructability and any need for insulation. It should also include structure type and sizing to confirm constructability with pipe alignments. It is likely that more storm sewer design comments will be generated at that time. The plan and profiles will be provided with final plans. Design spreadsheet and structure map provided until final plans are made. a. The pipe run from FES to 503 as shown has a velocity under the minimum of 3 ft/s. FES removed as it does not provide a benefit. No surface water can be directed towards pond 500 in this location. 11. All proposed storm sewer serving public roads must be a minimum 15" diameterand consist of RCP. Noted. 12. Inlet spread and run calculations, especially at sag points, will be needed toconfirm public roads are designed in accordance with City standards of maintaining an 8' drivable lane during the 3-year storm event. Spread calcs added — based on 3-year event. 13. Erosion control blankets must be shown on slopes 4:1 and steeper, such as around proposed basins. Erosion control blanket added where necessary. • Water Supply The development will include a water system with 8 to 16 inch diameter ductile iron pipe (DIP) water main with 1-inch Type K copper services being extended to each lot. Comments: 1. Connect to existing 16" DIP Watermain Note added 2. Identify on all plans coordinating with utility (gas) provider for utility installation, grading, and street construction Note added. 3. Verify potential conflicts at all utility crossings a. Maintain minimum 18" separation from watermain/services Watermain will be adjusted (lowered) as needed to maintain separation from service crossings. This will be determined with final plans. b. Insulate when separation between storm sewer and watermain orforcemain is less than 36" Noted. To be shown on final plans. 4. Provide barricades to protect the temporary hydrant at the ends of Street A and Street C Barricades added and called out on site plan. 5. Add a gate valve to the western leg of the Street C/D tee Valve added 6. Extend watermain and hydrant with Street B to Andall Street with this development Street added and grading as been adjusted. • Sanitary Sewer Nature Refuge North Addition Engineering Review Ms. Katie Larsen 04/04/2025 Page 4 The site will be served by 8- inch diameter main along with 4-inch Schedule 40 PVC service pipe to each lot. Additional sanitary sewer stubs will be extended to the north, and east. A lift station is proposed to serve the development and future sewer districts to the east in conformance with the City's Comprehensive Plan. Comments: 1. Connect to existing 10" PVC SDR 35 sanitary sewer main a. Match existing slope Note added. Existing invert and slope based on proposed stub elevation from Natures Refuge. 2. [Lift Station] a. The lift station can be raised by 2 feet. Per discussion, the lift station was raised 4-feet. b. Projected peak hourly flow from 228 residential units is about 120 gpm, so8" sewers shown are sufficient. Noted. i. Forcemain will be 4". Noted. c. Deep 35' build at the lift station, but looks like it's needed to servethe northeast corner by gravity. Noted. i. Looks like about 50' radius around wet well for excavation during construction, hopefully enough unless Geotech requires shallower embankment. Noted. Assuming sandy soils — 1:1 minimum will be needed. Easement does cover a 50' radius from the center of lift station. Future maintenance should be covered. Sheet piling or trench box should cover any embankment issues along the street side if for some reason the lift station needed to be repaired. d. Can the 12' build at the northwest corner serve the street extending north outside the service area if desired? No. Currently it does not. Please advise if this sanitary line needs to service the area to the north. Insulate all sewer with less than T cover a. Consider lowering the watermain to limit conflicts between services and mains Watermain will be lowered as -needed for service conflicts — this will be shown with final plans. Transportation The proposed development will have a primary access from Haywood and Glenwood Drives. Which is the shortest route out the proposed neighborhood. The City also requires a connection to Andall St. to the existing Arena Acers Development.The City has an existing right of way to provide access to the easterly property. Per the traffic study the connection to Andall St will receive minimal traffic, however it will provide connectivity for public safety and the neighborhoods it serves. This connection is in conformance with the City's Ordinances for adjoining adjacent subdivision for reasonable circulation of traffic. The City of Lino Lakes' Comprehensive Plan requires neighborhood street connections for reduced travel times and linking neighborhoods together. The City's Engineering and Public Safety departments submit that the roadway connection to Andall Street shall be constructed as detailed below. Trails and sidewalks Nature Refuge North Addition Engineering Review Ms. Katie Larsen 04/04/2025 Page 5 A trail is proposed extending from the south end of the development at the connection with Natures Refuge, to the north end of the development and branching west to one of the new streets. Reference the City Planner's report for trail and sidewalk detail. Comments: 1. There is little to no significant impact on the adjacent streets and intersections dueto the trips expected to be generated by the proposed development. Noted. There is no difference in operations with or without the Andall Street access. The benefits of connecting the development to Andall Street are: a) Improving Fire and Life Safety response to both neighborhoods (providing additional means of access). b) Connectivity of neighborhoods which generally results in a reduction of overall vehicle miles traveled. c) Provides access for the existing neighborhood to sidewalks and trail system. Also, can provide a safer route to/from the school with almost no need to walk/bike on CSAH 14. Noted. Street added. 3. It may be beneficial to look into providing a trail extension from the school to Basswood to provide a non -motorized connection to the school completely independent from CSAH 14. Noted. 4. The CSAH 14/Wood Duck intersection is expected to operate acceptably during full - build scenarios. In the future the City should consider working with Anoka County to providing exclusive left -turn lanes on CSAH 14. Noted. 5. Andall Street should be constructed as a 24 foot wide roadway within the cleared path from the watermain / fire hydrant extension to the Arena Acres Development. The City will consider a sidewalk on one side of the roadway during the final plat review. It is anticipated that approximately 15 trees will be removed with the construction of the watermain and roadway. There will also be wetland impacts that will need to be mitigated. Street has been adjusted. 6. Provide a striped crosswalk at the east end of Street C instead of having thetrail cross the road Trail adjusted. Markings to be provided with final plans a. Provide pedestrian crossing and advanced pedestrian crossing signs Pedestrian crossing will be shown with final plans. b. Provide pedestrian ramps Trail adjusted in order for pedestrian ramps to be installed c. Realign trail to cross Street C at a perpendicular angle Revised. 7. Provide barricades to protect the temporary hydrant Barricades added and called out on site plan. 8. Provide a separate trail easement for the public trail crossing Outlot D This will be provided with final plans — once trail is built 9. Provide road profiles meeting 30 MPH horizontal and vertical design curves Speed limit reduction signs will be provided in lieu of meeting 30 MPH horizontal and Nature Refuge North Addition Engineering Review Ms. Katie Larsen 04/04/2025 Page 6 vertical curves. These will be provided with final plans. • Wetlands and Environment The project proposes approximately 1.62 acres of wetland impact. A wetland replacement plan will need to be submitted, reviewed, and approved through RCWD and the City. The current WCA NOD document states they are avoiding impacts to wetland 8 however, wetland 8 will be impacted with the connection to Andall Street and should be included with the impacts. Review of the MnDNR's Natural Heritage Information System database indicates the potential presence of several protected species within and near the project area, including protected plant species. The applicant should coordinate with the DNR on the need for additional studies or surveys. Wetland buffers meeting minimum and average requirements will be required around all wetland areas following construction. Any disturbed buffer areas should be seeded with a seed mix containing native, non-invasive, species. • Landscaping A Landscape Plan for Natures Refuge North Addition has been submitted and will be reviewed by staff and the City's Environmental Coordinator. The Environmental Coordinator will provide separate comments. • Floodplain The Natures Refuge North Addition does not impact the existing floodplain. • Drainage and Utility Easements Roadways are proposed within right-of-way and lots include standard drainage and utility easements. Larger drainage and utility easements will be required to be provided over any utilities outside the right of way and any surface water management features. Comments: 1. More detailed storm sewer plans must be submitted to sufficiently reviewrequired drainage and utility easements over pipes. a. This could potentially impact lot widths of existing parcels Design spreadsheet provided — storm depths verified easements verified. 2. Provide a separate trail easement for the public trail crossing Outlot D Trail easement will be provided after trail is constructed. • Development Agreement A development agreement will be required with the final plat. • Grading Agreement Grading agreement not required at this time. Nature Refuge North Addition Engineering Review Ms. Katie Larsen 04/04/2025 Page 7 • Stormwater Maintenance Agreement The stormwater maintenance for public facilities in the Natures Refuge North Addition will be covered under the City's Programmatic Stormwater Management Agreement after the facilities have been installed and accepted by the City. Borrow areas / Lakes area will be maintained by the HOA. • Permits Required Potential permits may include some of the following and others: 1. NPDES General Construction Permit To be acquired prior to grading — will be acquired with final plans 2. City of Lino Lakes Zoning Permit for Construction To be acquired with final plans 3. Minnesota Pollution Control Agency Sanitary Sewer Extension Permit To be acquired with final plans 4. Minnesota Department of Health To be acquired with final plans 5. Rice Creek Watershed District Permit To be acquired prior to grading 6. US Army Corps of Engineers Section 404 Permit 7. To be acquired prior to grading If you or the applicant have any questions regarding these comments, please contact Kris Keller at (612) 419-3083 or kkeller@wsbeng.com. You may also contact Diane Hankee at (651) 982-2430 or dhankee@linolakes.us. Nature Refuge North Addition Engineering Review Attachment7. EnvironmentalMemo CITY ", �0 F Environmental Memo INO KE To: Katie Larsen, City Planner From: Tom Hoffman, Environmental Coordinator Date: March 26, 2025 Re: Environmental Comments— Natures Refuge North PPP PP 04/25/25 — Carlson Engineering Responses Environmental Board had recommended the following at their March 26, 2025 meeting: 1. Coordinate with the Rare Plant Rescue group (contact Carrie Taylor at Anoka Conservation District) to allow for transport of any rare plants for which impact is unavoidable to a donor site, such as Wollan's Park Wetland Bank in Lino Lakes. Noted, this will be coordinated with developer. Show minimal plantings of oaks along the two stormwater ponds. These areas are to remain largely unplanted to encourage native plant species. A few oaks should be scattered around the basin to provide soil stabilization and screening. Revised landscape plan includes additional open space trees. 3. Stormwater management to be reviewed by City Engineer a. Use of stormwater for irrigation purposes for the site should be evaluated and if feasible required as part of site development. Larger Stormwater ponds constructed for fill should be evaluated for water reuse. Re -use system incorporated into site. b. Infiltration is required to be shown where feasible based on soil borings. If infiltration is not feasible follow the Minimum impact design standards (MIDS)) as designed bythe MPCA Additional groundwater information provided. Page 1 c. Stormwater Pond 500 and 600 are shown to be collecting drainage from wetland overflows. Verify basins are sized to handle additional runoff Basins are modeled to include the drainage from wetlands. Note that the wetlands are modeled with both a flow into the pond as well as any existing overland flows. Credit is not given for drainage from the wetlands that is directed to the stormwater ponds Noted. 4. City Tree Protection Fence detail should be added to the plan sheet. Standard detail Gen-27 Tree protection fence is not necessary as all areas outside of the grading limits will be protected by silt fence. 5. Trees scheduled to be preserved must have Tree Protection Fence installed in accordance with City tree protection fence detail. Noted. See comment above regarding silt fence. 6. Ash trees preserved will not provide any existing tree credit. All ash trees should be removed unless noted they are and will continue to be treated for EAB on two-year rotations Noted. All ash trees will be removed. 7. Seed mixes should be updated to MNDOT seed mix design numbers for final plans. Please provide more site -specific mixes for each location. Currently showing wet ditch planting for Stormwater areas and tall grass roadside mix for buffer locations. Seed mixes are consistent with approved WMC Seeding and Maintenance Plan for Natures Refuge (south), and 2024 MnDOT Seeding Manual. Note as of 2024 MnDOT seed mixes are no longer numbered and have been updated / replaced with new mix designs designated by letter. 8. Low maintenance turf should be evaluated throughout the development. Ground covers should be drought resistant to reduce the need forirrigation use. Noted. 9. Add a note to the landscape plan to stockpile topsoil and preserve during the project. Topsoil should be spread over the open space and natural areas to promote the existing seed bank and encourage native plants. Noted, landscape specifications for Soil Preparation and Topsoil Material on sheet L4. Page 2 10. The project will disturb more than an acre of soil and will be required to obtain an NPDES permit. Proof of permit shall be required before construction. Noted, this will be provided. a. A SWPPP shall be required in additional submittals as required by the MPCA meeting sections 5.2-5.26 SWPPP provided b. Final erosion and sediment control will be reviewed with future submittals Noted. 11. Wetlands 30 and 35 are outside of the WMC buffer area. These wetlands appear to be outside of the area of disturbance. Staff recommends extending buffers around both wetlands as much as possible. Combining the buffer between the two wetlands would add the most protection and add additional wildlife benefits. Noted. 12. Confirm wetland outlets are above the HWL for the wetlands and will not affect hydrology during final design. Wetland bounce and inundation verified within the storm water management plan. 13. The Andall St connection should have the minimum width as derived from the traffic study and allowed by city ordinance to allow for emergency services and public street connection. Reduction of the road width will preserve wetlands and trees through the corridor. Noted. Street width adjusted to 24-feet back to back with ribbon curb. a. Trail connections should be provided along with water stubs for fire prevention. Sidewalk added 14. Tree removal should be completed in the fall or winter to minimize impacts to migrating or nesting bat populations Noted. —to be coordinated with developer 15. Provide a Blandings turtle mitigation plan, surmountable curb is provided to allow turtles access off of the roads. Noted, turtle mitigation plan to be provided by developer. Surmountable curb installed where possible. 16. Submit the approved MN DNR Take Permit Noted, to be provided by Kjolhaug. Page 3 Responses 04/25/2025 Carlson Engineering RECOMMENDATION Staff is requesting feedback from the Planning & Zoning Board: 1. Are there other Benefits Gained or Flexibility Provided? 2. Thoughts on requested PUD flexibility? a. If garage forward of house is acceptable, should there be a limit on how far? Additional Staff Comments: 1. Proposed open space areas should remain in the ownership of the HOA with a conservation easement granted to the City. Noted. This will be provided. 2. Since Outlot E meets the R-2 lot size requirements, Outlot E should be converted into Lot 11, Block 7. This lot is unbuildable until either parcel to the north develops, or a grading easement is provided. 3. A temporary turn around will be required at the north end of Street A. Turn around will be provided and shown on final plans. 4. Sidewalks shall be provided on Street B and Street D Sidewalk added to street B. Street D sidewalk to be verified — cul-de-sac 5. The trail corridor between Lot 4 Block 1 and Lot 1 Block 2 and east of Lots 1-4 Block 4 shall be widened to 30 feet wide. Revised. 8. The portion Outlot D that is occupied by the lift station should be separated from Outlot D through the creation of a new outlot that would be dedicated to the City. Outlot added. 9. Conservation easements and wetland buffers shall be required over wetlands and greenway corridors. Easements and buffers will be provided per city & RCWD rules. 10. Trail corridors shall be a minimum 30ft wide. Noted. A separate 30-foot easement will be provided. 11. Cash fee in lieu of land dedication in the amount of $329,000 minus the cost of trail construction. Noted. 12. Compliance with the City Engineer Memo dated April 4, 2025 Responses to city engineer comments attached. 13. Compliance with the Environmental Memo dated March 27, 2025 Responses to environmental comments attached. CITY COUNCIL REGULAR MEETING STAFF REPORT AGENDA ITEM 613 STAFF ORIGINATOR: Diane Hankee, PE City Engineer MEETING DATE: May 12, 2025 TOPIC: Consider Resolution 25-60, Approve Change Order No. 1, 2025 Street Rehabilitation Project VOTE REQUIRED: Simple Majority INTRODUCTION Staff is requesting Council consideration of Change Order No. 1 for the 2025 Street Rehabilitation Project. BACKGROUND On February 10, 2025, the City Council awarded the bid for the 2025 Street Rehabilitation Project to GMH Asphalt in the amount of $1,197,031.00. Construction of the project began with replacing 39 gate valves due to age and corrosion. The City has been including gate valve replacements on our annual street improvement projects since 2019. While completing this year's project addition gate valve replacements were required. One was an offsite valve that failed when being used to isolate a project planned valve. In addition, two additional gate valves that were found during construction. Due to the contractor's willingness to replace at the unit bid prices and an effort to address water leaks, WSB staff and the Public Works Utility Department moved forward with replacements. For Council consideration is Change Order No. 1 in the amount of $22,068.85 to repair gate valves on Beaver Trail, the northwest corner of Fawn Lane and Birch Street intersection, and southeast corner of the Fawn Lane and Birch Street intersection. The watermain work on this project is funded through the Water Operating Fund. The 2025 Street Rehabilitation Project contract with GMH Asphalt with Change Order No. 1 would be increased to $1,219,099.95. The roadwork portion of the project is anticipated to be under the contract amount. RECOMMENDATION Staff is recommending approval of Resolution No. 25-60 for Change Order No. 1 in the amount of $22,068.85 for the 2025 Street Rehabilitation Project. ATTACHMENTS Resolution No. 25-60 Change Order No. 1 CITY OF LINO LAKES RESOLUTION NO. 25-60 RESOLUTION APPROVING CHANGE ORDER NO. 1 FOR 2025 STREET REHABILITATION PROJECT WHEREAS, pursuant to Resolution 25-19 of the Council adopted on February 10, 2025, awarding the contract for the 2025 Street Rehabilitation Project to GMH Asphalt in the amount of $1,197,031.00; and WHEREAS, a complete summary of costs are detailed in Change Order No. 1 in the amount of $22,068.85; and WHEREAS, 2025 Street Rehabilitation Project contract with GMH Asphalt with Change Order No. 1 would be increased to $1,219,099.95; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes, Minnesota that Change Order No. 1 is approved in the amount of $22,068.85. Adopted by the Council of the City of Lino Lakes this 12t" day of May 2025. Rob Rafferty, Mayor ATTEST: Roberta Colotti, City Clerk wsl, CHANGE ORDER Rev. December 2023 Page 1 of 1 WSB Project No. 026891-000 Owner Project No. Change Order No. 1 Project Title/Description: 2025 Rehabilitation Project Owner: City of Lino Lakes Owner Address: 600 Town Center Parkway Lino Lakes, MN 55014-1182 Contractor: GMH Asphalt Corporation Contractor Address: 9180 Laketown Road Chaska, MN 55318 Total Change Order Amount: $22,068.85 Issue: In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the work as altered by the following provisions. The Engineer in concurrence with the City of Lino Lakes, have agreed to add additional watermain gate valves and associated bid items that concurrently go with that work. Gate valves added include a 6" hydrant valve on Beaver Trail (46+00), 6" hydrant valve on Fawn Lane (37+15), and a 6" mainline valve on the Northwest Corner of Fawn Lane and Birch Street. This work will be considered "Contract Revisions" as provided for by Specification 1402. Payment for this work will be at contract unit prices. Contract Time: is not changed Estimate Of Cost: (Include any increases or decreases in contract items, any negotiated or force account items.) Group/Funding Category Item No. Description Unit Unit Price + or — Quantity + or — Amount $ Local 2104.502 REMOVE GATE VALVE & BOX EA $900.00 3 $2,700.00 Local 2104.503 REMOVE CURB & GUTTER LF $9.50 16 $152.00 Local 2104.504 REMOVE BITUMINOUS PAVEMENT S Y $14.35 20 $287.00 Local 2106.507 EXCAVATION - SUBGRADE C Y $20.00 13.4 $268.00 Local 2106.507 EXCAVATION - COMMON (P) C Y $28.00 3.35 $93.80 Local 2504.602 SACRIFICIAL ANODE EACH $688.00 3 $2,064.00 Local 2504.602 6" GATE VALVE & BOX EACH $3,705.00 3 $11,115.00 Local 2504.602 CONNECT TO EXISTING WATERMAIN EACH $795.00 6 $4,770.00 Local 2504.603 6" WATERMAIN DUCTILE IRON CL 52 L F $66.65 3 $199.95 Local 2504.608 DUCTILE IRON FITTINGS LB $12.70 33 $419.10 Net Change This Change Order $22,068.85 Click or tap here Click or tap here to Engineer: to enter text. enter text. Date: text. Click or tap here to enter Approved By Project Approved By Contractor: Date: Approved By Owner: Date: text. 4/29/2025 GMH Asphalt Corp Click or tap here Click or tap here to enter to enter text. text. Click or tap here to enter CITY COUNCIL REGULAR MEETING STAFF REPORT AGENDA ITEM 6C STAFF ORIGINATOR: Diane Hankee, City Engineer MEETING DATE: May 12, 2025 TOPIC: Consider Resolution Number No. 25-57, Authorize the Preparation of Plans and Specs, Andall Street Culvert Project VOTE REQUIRED: Simple Majority INTRODUCTION Staff is requesting Council authorization to prepare plans and specifications for the Andall Street Culvert Project. BACKGROUND The City's annual Surface Water Management Program (SWMP) addresses areas in need of maintenance, and conforms to the City's Storm Water Pollution and Prevention Plan. For the 2025 SWMP the City will include the Andall Street Culvert Project, which includes replacing a 36" culvert and two catch basin structures along Rice Creek Watershed District (RCWD) Ditch 10-22-32 and cleaning out a skimmer structure on Blackbird Lane. In 2024 the City public works department addressed an erosion issue at the catch basins. In addition they inspected the culvert with RCWD staff. It was determined that the culvert was deteriorating and in need of replacement. Staff has had conversations with RCWD and they fully support the maintenance/ replacement project. The project will be reviewed and permitted by RCWD. WSB LLC has submitted a proposal to complete the topographic survey, plans and specifications, and provide bid documents for the Andall Street Culvert Project for a total not to exceed the amount of $18,400.00. The estimated total project cost is $130,000.00. Funding for the project is expected to be from the Surface Water Utility Fund. The project is proposed to be completed by September 30, 2025. RECOMMENDATION Staff is recommending approval of Resolution No. 25-57, Authorizing the Preparation of Plans and Specifications, Andall Street Culvert Project. ATTACHMENTS Resolution No. 25-57 2. WSB Engineering Proposal 3. Project Location Map CITY OF LINO LAKES RESOLUTION NO. 25-57 AUTHORIZING PREPARATION OF PLANS AND SPECIFICATIONS FOR THE ANDALL STREET CULVERT PROJECT WHEREAS, the City Council finds that it would be in the best interest of the City to proceed with the preparation of plans and specifications for the Andall Street Culvert Project; and WHEREAS, WSB, the City Engineer, has submitted a proposal to prepare plans and specifications for said improvements. NOW, THEREFORE BE IT RESOLVED by the City Council of Lino Lakes, Minnesota: 1. Authorizes the Preparation of the Plans and Specifications for the Andall Street Culvert Project. 2. WSB is designated as the engineer for this improvement and directed to prepare plans and specifications for the Andall Street Culvert Project for an amount not to exceed $18,400.00 Adopted by the Council of the City of Lino Lakes this 12t" day of May, 2025. Rob Rafferty, Mayor ATTEST: Roberta Colotti, City Clerk 2 0 0 (7 Z w m 0 C. 00 U) Lo Z U) J 0 a a w Z Z C. 0 Cl) w I w Z) Z w a a Z w x 0 wsb May 7, 2025 City of Lino Lakes Mr. Michael Grochala 600 Town Center Parkway Lino Lakes, MN 55014 Re: Proposal to Complete Andall Street Culvert Project Construction Plans and Specifications Dear Mr. Grochala: WSB LLC. is providing this proposal for the design and bidding services for the Andall Street Culvert Project. This project includes replacing a 36" culvert and two structures along Rice Creek Watershed District (RCWD) Ditch 10-22-32 and cleaning out a skimmer structure on Blackbird Lane. Based on the project scope, WSB would perform the following tasks: Prepare Project Plans Construction plans will be prepared indicating the project locations and plan view sheets for the culverts. Surveyed topographic information will be used to prepare the construction plans. Base drawing information will include GSOC design locates, curb inspection, city parcel map information and record plans. II. Final Quantities An Engineer's Opinion of Probable Cost will be completed with the final construction plans. III. Prepare Permits, Specifications and Quoting Documents WSB will assist the City in preparing permit application(s) and/or approval requests and will assist the City with submitting the applications/approval requests to the appropriate regulatory agencies. Working with RCWD and obtaining a permit for work associated with ACD 10-22-32. WSB will develop the project plans and specifications based on the agency review comments. This task will include an internal constructability review of the plans, quantities, and specifications. Upon completion of permitting, and agency review and approval, a final set of construction documents will be prepared for quoting. WSB will assemble and submit the final contract documents, and solicit quotes for the project from at least five contractors. WSB will receive and \\metro-inet\linolakes\Shared\Community Development\Projects\Capital Improvement Projects\2025 SWMP\Staff Reports\20250512 CC Authorize Plans and Spec - Andall St Culvert\3. WSB Design Proposal.docx respond to proposal inquiries concerning the plans, specifications, and intent of the project. Logs of all inquiries will be kept and maintained to document inquiries. WSB will perform the project quoting on behalf of the City. The engineering fee to complete the design of the Andall Street Culvert Project is $18,400.00 (not to exceed). This letter represents our understanding of the Andall Street Culvert Project and the proposed scope of services. If you are in agreement with the scope of services and proposed fee, please sign in the appropriate space below and return one copy to us. WSB LLC will provide a separate proposal to the City for construction services once the plans are completed and the project is quoted. If you have any questions about this proposal, please feel free to call me at 612-360- 1278. Sincerely, WSB LLC. MRr1c �l GGLISOw Mark Erichson Director ACCEPTANCE: Brian Bourassa Client Representative The City of Lino Lakes hereby accepts the WSB proposal of $18,400.00 for services outlined in this letter. City of Lino Lakes Name Title Date \\metro-inet\linolakes\Shared\Community Development\Projects\Capital Improvement Projects\2025 SWMP\Staff Reports\20250512 CC Authorize Plans and Spec - Andall St Culvert\3. WSB Design Proposal.docx Andall Street Culvert Project C I T IN KE I Map Powered By Datafi ws b CITY COUNCIL REGULAR MEETING STAFF REPORT AGENDA ITEM 6D STAFF ORIGINATOR: Michael Grochala, Community Development Director MEETING DATE: May 12, 2025 TOPIC: Consider Resolution No. 25-62 Approving the Joint Powers Agreement with Anoka County for the Reconstruction of CSAH 21, CSAH 54 and County Road 84 as part of the County J and 1-35E Interchange Project VOTE REQUIRED: Simple Majority INTRODUCTION Staff is requesting approval of the Joint Powers Agreement (JPA) between the City of Lino Lakes and Anoka County to facilitate the reconstruction of the Hodgson Road and County Road J intersection. BACKGROUND Ramsey County is preparing to solicit bids and award a contract for the improvements for I- 35E/CR J interchange improvements. The overall project cost is estimated at $23,761,410.60. Federal funds are available for the Project and are capped at $19,000,000.00. The City's share of the proposed improvements is $318,509.60. This includes pro rata share of right-of-way, drainage, utility and roadway improvements. The City's share is funded primarily from Municipal State Aid Street funds with a small portion of funding from the Area and Unit Trunk Utility funds. Area and Unit funds will be reimbursed from developer fees charged with development of the northwest quadrant of the Centerville Road/CRJ intersection. The City will be entering into the agreement with Anoka County. Anoka County and Ramsey County will have a master agreement in place covering the overall project costs. Under the terms of the agreement the City is responsible for maintenance of the storm water pond in the NE quadrant of Centerville Road/CRJ intersection, the cost of which is split between City and Ramsey County based on contributing area. Lino Lakes will also be responsible for the trail on the west side of Centerville Road along with the crosswalk pavement markings on City streets, if applicable. The City will be responsible for maintenance of Centerville Road/CRJ roundabout (RAB) maintenance. The ramp RAB's will be maintained by MnDOT. Staff is meeting with Anoka County to discuss responsibilities and electricity costs for street lighting. Any changes will be presented at the Council meeting. Landscaping improvements to the Centerville/CRJ roundabout are in addition to these costs. That portion of the project will likely be bid in 2026. RECOMMENDATION Staff is recommending adoption of Resolution No. 25-62 approving the Joint Powers Agreement with Anoka County for Reconstruction of 1-35E and County Road J Interchange pending resolution of the street lighting concerns. ATTACHMENTS 1. Resolution No. 25-62 2. Joint Powers Agreement CITY OF LINO LAKES RESOLUTION NO. 25-62 THE RECONSTRUCTION OF COUNTY STATE AID HIGHWAY (CSAH) 21 (CENTERVILLE ROAD), CSAH 54 (20T" AVE S) AND COUNTY ROAD 84 (OTTER LAKE ROAD) AS PART OF THE COUNTY J AND 1-35E INTERCHANGE PROJECT IN THE CITY OF LINO LAKES, MN WHEREAS, Anoka County and the City of Lino Lakes agree it is in the best interest of the traveling public to reconstruct CSAH 21 (Centerville Road), CSAH 54 (20th Ave S) and CR 84 (Otter Lake Road) as part of the County Road J and 1-35E interchange project led by Ramsey County and, WHEREAS, Ramsey County as the lead agency of the County Road J and 1-351nterchange project has prepared preliminary design plans for the reconstruction of CSAH 21 (Centerville Road), CSAH 54 (20th Avenue S.) and CR84 (Otter Lake Road) in accordance with Anoka County and the Minnesota Department of Transportation standards to a staff approved layout condition; and, WHEREAS, Anoka County has jurisdiction over CSAH 21 (Centerville Road), CSAH 54 (201h Avenue S.) and CR86 (Otter Lake Road) and, WHEREAS, the parties agree that it is in their best interest that the cost of said project be shared; and, WHEREAS, Minn. Stat. § 471.59 authorizes political subdivisions of the state to enter into joint powers agreements for the joint exercise of powers common to each. NOW, THEREFORE, BE IT RESOLVED by the City Council of Lino Lakes, Minnesota that hereby approves the Joint Powers Agreement with Anoka County and authorizes the Mayor and City Clerk to execute the agreement on behalf of the City. Adopted by the City Council of the City of Lino Lakes this 12th day of May, 2025. Rob Rafferty, Mayor ATTEST: Roberta Colotti, CIVIC, City Clerk Anoka County Contract No. C00011514 JOINT POWERS AGREEMENT FOR THE RECONSTRUCTION OF COUNTY STATE AID HIGHWAY (CSAH) 21 (CENTERVILLE ROAD), CSAH 54 (20TH AVE S) AND COUNTY ROAD 84 (OTTER LAKE ROAD) AS PART OF THE COUNTY J AND I-35E INTERCHANGE PROJECT IN THE CITY OF LINO LAKES, MN Minnesota Department of Transportation SP 6281-53 and SP 0282-47 Ramsey County Project Nos. SP 062-601-017 and SP 062-659-020 Anoka County Project Nos. SP 002-621-012, SP 002-654-005 and SP 210-020-015 THIS AGREEMENT is made by the parties on the last date executed below, by and between the County of Anoka, a political subdivision of the State of Minnesota, 2100 Third Avenue, Anoka, Minnesota 55303, hereinafter referred to as "County", and the City of Lino Lakes, 600 Town Center Parkway, Lino Lakes, MN 55014, hereinafter referred to as "City". WITNESSETH WHEREAS, the parties to this agreement agree it is in the best interest of the traveling public to reconstruct CSAH 21 (Centerville Road), CSAH 54 (20th Ave S) and CR 84 (Otter Lake Road) as part of the County Road J and I-35E interchange project led by Ramsey County and, WHEREAS, said parties mutually agree that CSAH 21, CSAH 54 and CR 84 are in need of reconstruction; and, WHEREAS, Ramsey County as the lead agency of the County Road J and I-351nterchange project has prepared preliminary design plans for the reconstruction of CSAH 21 (Centerville Road), CSAH 54 (201h Avenue S.) and CR84 (Otter Lake Road) in accordance with Anoka County and the Minnesota Department of Transportation standards to a staff approved layout condition; and, WHEREAS, Anoka County has jurisdiction over CSAH 21 (Centerville Road), CSAH 54 (20th Avenue S.) and CR86 (Otter Lake Road) and, WHEREAS, the parties agree that it is in their best interest that the cost of said project be shared; and, WHEREAS, Minn. Stat. § 471.59 authorizes political subdivisions of the state to enter into joint powers agreements for the joint exercise of powers common to each. NOW, THEREFORE, IT IS MUTUALLY STIPULATED AND AGREED: L PURPOSE The parties have joined together for the purpose of reconstructing the roadway, drainage and trail as well as other utilities for County Road J (Ramsey County State Aid Highway 1) from Centerville Road (Ramsey County State Aid Highway 51/Anoka County State Aid Highway 21) to Otter Lake Road (Ramsey County State Aid Highway 60/Anoka County Road 84) including the I-35E interchange and intersection of County Road J (Ramsey County State Aid Highway 1) and 20th Avenue South (Anoka Anoka County Contract No. C00011514 County State Aid Highway 54). The Minnesota Department of Transportation (MnDOT) state project numbers are SP 6281-53 and SP 0282-47; the Ramsey County project numbers are SP 062-601-017, SP 062-659-020; the Anoka County project numbers are SP 002-621-012, SP 002-654-005 and the Lino Lakes project number is SP 210-020-015 (collectively the "Project"). Said engineering plans are filed in the office of the Ramsey County Public Works Department and Anoka County Highway Department and incorporated herein by reference. The parties to this Joint Powers Agreement (JPA) agree in principle that the Project is in the best interest of the traveling public and that the Construction Plan Title Sheet as shown in Exhibit "A" defines the final design of the Project. All Exhibits attached to or referred to in this JPA are incorporated by reference and made part of this Agreement. II. METHOD Ramsey County as lead agency for the project shall cause the construction of State Project number SP 6281-53 and SP 0282-47 Anoka County Project CP21-15-00, SP 002-621-012, SP 002-654-005, Ramsey County Project SP 062-601-017 and 062-659-020 and City project number SP 210-020-015. IMPROVEMENTS: It is agreed by the parties that in 2025/2026, County Road J will be reconstructed from Centerville Road (Anoka County State Aid Highway 21, Ramsey County State Aid Highway 59) to Otter Lake Road (Ramsey County State Aid Highway 60/Anoka County Road 84)including the I-35E interchange and intersection of County Road J (Ramsey County State Aid Highway 1) and 20th Avenue South (Anoka County State Aid Highway 54), as shown in "Exhibit A". Improvements include, but are not limited to: roadway widening, roundabout construction, bridge construction, concrete median, storm sewer and associated ponding, turn lanes, shoulders, lighting, bituminous trails, retaining walls and concrete curb & gutter. INTERSECTIONS: As agreed by the parties, improvements to the following intersections have been incorporated in the Exhibit "A" design: Ramsey County State Aid Highway 1 / Anoka County State Aid Highway 60 / Anoka County Road 84 / I-35E east ramps: Roundabout Ramsey County State Aid Highway 1 / Anoka County State Aid Highway 54 / 1-35E west ramps: Roundabout Ramsey County State Aid Highway 1 / Ramsey County State Aid Highway 59 / Anoka County State Aid Highway 21 /: Roundabout RIGHT OF WAY: The parties agree that the County will acquire all necessary right-of-way and easements for the Project. Acquisition of any additional right-of-way and/or easements needed for improvements to the city street 2 Anoka County Contract No. C00011514 intersections beyond what is defined in the Exhibit "A" Layout will be the responsibility of the city. It is agreed by the parties that all necessary right of way and easements will be in legal possession of the plead agency_prior to acceptance of bids for the project. Any City owned property or easements required for the construction will be conveyed to the County at no cost. DRAINAGE: The City shall pay for a percentage of the cost of the storm sewer system, including the detention basins and their outlet structures. The city portion of the cost is based on contributing flow through the storm sewer system to the detention basin determined by contributing area. The City of Lino Lakes shall pay Anoka County for a portion of the costs of the areas in the properties acquired by Anoka County specifically for ponding for the project, the costs will be determined based on contributing flows at the following percentages for the Centerville Pond Property. Contributing Flow Percentage: Anoka County 40%, Lino Lakes 7%, Ramsey County 53% Anoka County: $126,829.18 Lino Lakes: $22,195.11 Ramsey County: $168,048.66 SIDEWALK: The parties agree that the construction of the sidewalk along the west side of Centerville Road (CSAH 21) and within the Roundabout in the Anoka County side of the intersection is eligible for federal funds and that the City will be responsible for the local match in areas where no sidewalk exists, and the County will be responsible for the local match where a sidewalk currently exists. This sidewalk location has been agreed to by the city. The parties understand that the cost for the sidewalk includes concrete surfacing, aggregate base, excavation (including muck excavation), borrow material (granular and topsoil), and turf establishment. TRAFFIC CONTROL: The parties understand and agree that portions of CSAH 21 will be closed to thru traffic during construction. The parties agree and understand the cost share for traffic control for the city shall be a prorated share based on the city project cost divided by the total project cost. III. COSTS The contract costs of the work, or if the work is not contracted, the cost of all labor, materials, normal engineering costs and equipment rental required to complete the work, shall constitute the "actual construction costs" and shall be so referred to herein. 'Estimated construction costs" are good faith projections of the costs, which will be incurred for this project. Actual costs will vary and those will be the costs for which the relevant parties will be responsible. The estimated construction cost of the total project is $23,761,410.60. Anoka County Contract No. C00011514 Federal funds available for the Project are capped at $19,000,000.00. The federal funds shall be split based on the ratio of eligible cost incurred by each parry to the total eligible project cost. Eligible costs are the costs of items that can participate in federal funding as shown on Exhibit B. Any overruns in quantities beyond the federal funds will be charged to the local entities who are contributing to that portion of the project. After federal funding percentage is applied, the cost to the city for their share of the construction items of the Project is $274,365.27 The City participation in construction engineering will be at a rate of eight percent (8%) of their designated construction share of $274,365.27. The estimated cost to the City for construction engineering is $21,949,22. The total construction cost to the city after federal funds have been applied including construction engineering is $296,314.49 In summary, the total Lino Lakes Cost share of this project is $318,509.60 (Includes construction and Lino Lakes contribution for ponding properties in Anoka County) Upon award of the contract, the City shall pay to the County, upon written demand by the County, ninety five percent (95%) of its portion of the cost of the project estimated at $302,584.12 Prior to billing, this estimate will be updated by the County to reflect the actual bid prices as awarded. An updated cost estimate shall be provided to the City at the time of billing. The City's share of the cost of the project shall include only construction and construction engineering expense and does not include engineering design and administrative expenses incurred by the County. After final completion of the project, the City's share of the construction cost will be based upon actual construction costs. If necessary, adjustments to the initial ninety five percent (95%) charged will be made in the form of credit or additional charges to the City's share. Also, the remaining five percent (5%) of the City's portion of the construction costs shall be paid at that time. The County agrees to submit to the city for review final quantities and cost within one year of project substantial completion. IV. TERM / TERMINATION This Agreement shall become effective immediately upon execution and will remain in effect until the Project and all restoration activities are completed, with exception of the ownership and maintenance provisions within this Agreement which shall continue indefinitely. V. DISBURSEMENT OF FUNDS All funds disbursed by the County or City pursuant to this Agreement shall be disbursed by each entity pursuant to the method provided by law. VI. CONTRACTS AND PURCHASES All contracts let and purchases made pursuant to this Agreement shall be made by the County in conformance to the State laws. El Anoka County Contract No. C00011514 VII. STRICT ACCOUNTABILITY A strict accounting shall be made of all funds and report of all receipts and shall be made upon request by either party. Prior to city payment to the County, Anoka County shall provide the City a copy of all cost participation documents submitted to MnDOT State Aid to assist the city in their application for MSA funding. IX. MAINTENANCE A. Maintenance of the completed watermain, sanitary sewer, storm sewer (except catch basins and catch basin leads), and detention basins (including ponds and their outlet structures and grit chambers/collectors) shall be the sole obligation of the City. a. The City shall maintain the components of the storm sewer system. b. The cost for maintenance of trunk line outfalls and BMPs shall be distributed as follows: Centerville Wet Pond, City of Lino Lakes 47 %, Ramsey County 53 %, MnDOT 0%. c. The City of Lino Lakes shall notify Anoka County and Ramsey County of upcoming maintenance one year in advance to allow for proper notice and budgeting to Ramsey County. d. Within 30 days of completion of the maintenance, submit invoices to Ramsey County setting forth the share of the maintenance expense. Which invoice shall be paid within 30 days of submission. B. Maintenance of the bituminous trail on the west side of CSAH 21 shall be the responsibility of the City. The City shall be responsible for general routine maintenance, such as sweeping, clearing, plowing, trash removal and other incidental items. C. Maintenance of crosswalk pavement markings shall be the responsibility of the City and the County. The County will be responsible for the maintenance of the crosswalk pavement marking for the crossings at the Roundabout intersections. The City will be responsible for all crosswalk pavement markings for any trail/sidewalk crossings at all city streets. D. Maintenance of streetlights, including Roundabout lights and cost of electrical power to the streetlights shall be the sole obligation of the City. The City will be responsible for long-term maintenance and replacement of the complete street light system including items such as: poles, fixtures, luminaires, and control cabinets. E. The City shall be responsible for the maintenance and up -keep of the center islands located within the roundabout(s). X. NOTICE For purposes of delivery of any notices herein, the notice shall be effective if delivered to the County Administrator of Anoka County, 2100 Third Avenue, Anoka, Minnesota 55303, on behalf of the County, and to the City Administrator of Lino Lakes, 600 Town Center Parkway, Lino Lakes, MN 55014, on behalf of the City. Anoka County Contract No. C00011514 XI. INDEMNIFICATION The City and County mutually agree to indemnify and hold harmless each other from any claims, losses, costs, expenses or damages resulting from the acts or omissions of the respective officers, agents, or employees relating to activities conducted by either party under this Agreement. XII. ENTIRE AGREEMENT REQUIREMENT OF A WRITING It is understood and agreed that the entire agreement of the parties is contained herein and that this Agreement supersedes all oral agreements and all negotiations between the parties relating to the subject matter thereof, as well as any previous agreement presently in effect between the parties to the subject matter thereof. Any alterations, variations, or modifications of the provisions of this Agreement shall be valid only when they have been reduced to writing and duly signed by the parties. XIII. COUNTERPARTS This Agreement may be executed in any number of counterparts, each one of which shall be deemed to be an original, but all such counterparts together shall constitute one and the same instrument. 0 Anoka County Contract No. C00011514 IN WITNESS WHEREOF, the parties of this Agreement have hereunto set their hands on the dates written below: COUNTY OF ANOKA Jim Dickinson County Administrator RECOMMENDED FOR APPROVAL: an Joseph J. MacPherson, P.E. Transportation Division Manager APPROVED AS TO FORM AND EXECUTION: Christine V. Carney Assistant County Attorney CITY OF LINO LAKES By: Rob Rafferty Mayor Dated: By: David Pecchia Interim City Administrator Dated: an First Name Last Name City Attorney Dated: 7 Anoka County Contract No. C00011514 EXHIBIT "A" Project Title Sheet Anoka County Contract No. C00011514 EXHIBIT "B" Cost Distribution Spreadsheet Anoka County Contract No. C00011514 EXHIBIT "C" FOR PROJECTS CONSTRUCTED IN ANOKA COUNTY ITEMS COUNTY SHARE Concrete Curb & Gutter 50% Concrete Curb & Gutter for Median and Center Island Construction 100% Concrete Median Concrete Sidewalk Concrete Sidewalk Replacement Bikeways Bikeway Replacement Construction or Adjustment of Local Utilities Grading, Base and Bituminous Storm Sewer Driveway Upgrades Traffic Signals, new (communities larger than 5,000) w/ State Aid approved SJR Traffic Signals, replacement (communities larger than 5,000) w/ State Aid approved SJR 100% 0% 100% 0% 100%, Unless existing trail not placed at edge of R/W 0% 100% 100% 0% based on state aid letter*2 100%, of up -grades the cost of its legs of the intersection plus'% the cost of the County legs of the intersection Traffic Signals, new & replacements (communities less than 5,000) w/ State Aid approved SJR Traffic Signal, w/o State Aid approved SJR CITY SHARE based on state aid letter*Z 100%, in -kind '/2 the cost of its legs of the intersection the cost of its legs of the intersection 100% 0% 50% 0% 0*1 100% 0% 100% 0% the cost of its legs of the intersection 0% 100% EVP 0% 100% Engineering Services *3 *3 Right -of -Way 100%`4 0% Street Lights 0% 100% Noise Walls 100%, if not previously notified*5 100%, if previously notified*5 *1 The County pays for 100% of Standard Median Design such as plain concrete. If a local unit of government requests decorative median such as brick, stamped concrete, or landscaping, the local unit will pay the additional cost above the cost of standard median. *2 In the event no State Aid is being used, or in the event the state aid letter does not determine cost split percentages, drainage cost shares will be computed by the proportion of contributing flow outside the County right of way to the total contributing flow. *3 Engineering shall be paid by the Lead Agency except that any participating agency will pay construction engineering in the amount of 8% of the construction costs paid by that agency. *4 In the event that the Township or City requests purchase of right-of-way in excess of those right-of-ways required by County construction, the Township or City participates to the extent an agreement can be reached in these properties. For instance, a Township or City may request a sidewalk be constructed alongside a County roadway which would require additional right-of-way, in which case the Township or City may pay for that portion of the right-of-way. Acquisition of right-of-way for new alignments shall be the responsibility of the Township or City in which the alignment is located. This provision may be waived by agreement with the County Board if the roadway replaces an existing alignment and the local unit of government takes jurisdiction of that existing alignment. In addition, any costs, including right-of-way costs, incurred by the County because a Township or City did not acquire sufficient right-of-way during the platting process or redevelopment process as requested by the County shall be paid by the Township or City. *5 Notification includes any letter to the agency indicating that noise will potentially be an issue in the future, likely received during the Plat Review Process. Maintenance shall be the responsibility of the agency paying for the initial installation. When the County is the responsible agency, it shall pay 100% of Standard Noise Wall Cost. If a local agency requests decorative noise walls, the requesting agency will pay the additional cost above the cost of standard noise wall. 10 CITY COUNCIL REGULAR MEETING STAFF REPORT AGENDA ITEM 6E STAFF ORIGINATOR: Michael Grochala, Community Development Director MEETING DATE: May 12, 2025 TOPIC: Distribution of Lino Lakes Main Street Alternative Urban Areawide Review (AUAR), Mapping NW Main VOTE REQUIRED: None required. Informational Item. INTRODUCTION Representatives from Kimley Horn will be providing an update on the Alternative Urban Areawide Review (AUAR) process for distribution and comment. BACKGROUND On April 14, 2025 the City Council ordered preparation of the AUAR. The draft document is being prepared for submittal to the Environmental Quality Board (EQB) for publication. This will start a 30 day comment period. Leila Bunge, from Kimley Horn, will provide an overview of the draft AUAR, schedule and process for receiving public comments. RECOMMENDATION N/A. ATTACHMENTS 1. Scenario 1 2. Scenario 2.1 1 0 LEGEND Future Neighborhood Park Major Drainage Routes Minor Drainage Routes Existing Asphalt Existing Concrete Trail Proposed Trails Proposed Regional Trail Greenway System Natural Resource Enhancement/ Conservation Area City Comprehensive Plan Land Use Full Build Out Scenario Approx NORTH OF MAIN STREET Gross Acres net acres w/o wetlands and open Approx # Approx # of Units of Units SF of Commercial Low High g water 516 423 Low Density Resi (R1/R1-X/R2) 677 1269 Medium Density Resi (R2/R3) 138 207 36 35 63 62 370 494 High Density Resi (R4) Planned Resi / Com (R5) Planned Resi (80%) 11 11 90 112 Commerical (20%) 3 3 30,492 533 Sub -Total (approximate acres) 630 Approx SOUTH OF MAIN STREET Gross Acres net acres w/o wetlands and open Approx # of Units Low Approx # of Units High water 134 97 155 291 Low Density Resi (R1/R1-X/R2) Medium Density Resi (R2/R3) 76 64 254 381 High Density Resi (R4) 64 53 317 423 Planned Resi / Com (R5) Planned Resi (80%) 11 10 83 104 Commerical (20%) 3 3 28,314 9 Park & Open Space 16 Sub -Total (approximate acres) 304 236 TOTAL 934 1 769 1 2,084 3,281 ,t V eliv I:JbL,W Alk rtf 1 ;� t tl•,i��f �t i N;iXcj",, ,I r �. z` . i� yCd W R W LEGEND Future Neighborhood Park Major Drainage Routes Minor Drainage Routes Existing Asphalt Existing Concrete Trail Proposed Trails Proposed Regional Trail Greenway System Natural Resource Enhancement/ Conservation Area Land Use Gateway Scenario Village 2.1 Approx NORTH OF MAIN STREET Gross Acres net acres w/o wetlands and open Approx # of Units Low Approx # SF of of Units Commercial High g water 367 Low Density Resi (R1/R1-X/R2) 464 587 1101 88 Medium Density Resi (R2/R3) 88 352 528 64 384 512 High Density Resi (R4) 64 Planned Resi / Com (RS) 11 90 112 Planned Resi (80%) 11 3 30,492 Commerical (20%) 3 630 533 Sub -Total (approximate acres) Approx SOUTH OF MAIN STREET Gross Acres net acres who wetlands and open Approx # of Units L ow Approx # of Units High water 109 174 Low Density Resi (R1/R1-X/R2) 158 327 60 240 360 Medium Density Resi (R2/R3) 72 44 264 352 High Density Resi (R4) 44 Planned Resi / Com (RS) 11 11 90 112 Planned Resi (80%) 3 30,492 Commerical (20%) 3 16 9 Park & Open Space 304 236 Sub -Total (approximate acres) 934 1 769 TOTAL 2,181 3,404 1 " 111 :1TiT1±VJLTA I N W I Ink-4 10 ]VAA CIF"AL A t (Vic (�� ��►� .Wx,_;-P W R W LEGEND Future Neighborhood Park Major Drainage Routes Minor Drainage Routes Existing Asphalt Existing Concrete Trail Proposed Trails Proposed Regional Trail Greenway System Natural Resource Enhancement/ Conservation Area Land Use Gateway Scenario Village 2.1 Approx NORTH OF MAIN STREET Gross Acres net acres w/o wetlands and open Approx # of Units Low Approx # SF of of Units Commercial High g water 367 Low Density Resi (R1/R1-X/R2) 464 587 1101 88 Medium Density Resi (R2/R3) 88 352 528 64 384 512 High Density Resi (R4) 64 Planned Resi / Com (RS) 11 90 112 Planned Resi (80%) 11 3 30,492 Commerical (20%) 3 630 533 Sub -Total (approximate acres) Approx SOUTH OF MAIN STREET Gross Acres net acres who wetlands and open Approx # of Units L ow Approx # of Units High water 109 174 Low Density Resi (R1/R1-X/R2) 158 327 60 240 360 Medium Density Resi (R2/R3) 72 44 264 352 High Density Resi (R4) 44 Planned Resi / Com (RS) 11 11 90 112 Planned Resi (80%) 3 30,492 Commerical (20%) 3 16 9 Park & Open Space 304 236 Sub -Total (approximate acres) 934 1 769 TOTAL 2,181 3,404 1 " 111 :1TiT1±VJLTA I N W I Ink-4 10 ]VAA CIF"AL A t (Vic (�� ��►� .Wx,_;-P