Loading...
HomeMy WebLinkAbout06/11/2025 PZ Combined Packet PLANNING & ZONING BOARD AGENDA Wednesday, June 11th, 2025 Broadcast on Cable TV Channel 16 and northmetrotv.com/lino-lakes-stream ADVISORY BOARD MEETING, 6:30 P.M. Council Chambers (televised) 1. Call to Order and Roll Call 2. Pledge of Allegiance 3. Public Comment (sign-in prior to start of meeting per Rules of Decorum) 4.Setting the Agenda: Addition or Deletion of Agenda Items 5.Approval of Minutes: May 14, 2025 6. Action Items A. PUBLIC HEARING for Erickson PropertyRezoningand Preliminary Plat B.PUBLIC HEARING for Phelps Road Stockpile Interim Use Permit 7.Discussion Items A. Project Updates ADJOURNMENT Meeting guidelines on reverse side. CITY OF LINO LAKES ADVISORY BOARD MEETING GUIDELINES Advisory boards are fact-finding bodies established to aid the City Council in specific areas. The decisions of any board are considered advisory only and all final decisions rest with the City Council. Board meetings shall operate in accordance with the procedures established by the City Council. The following meeting guidelines are derived from the City Council Rules of Decorum. Members of the Audience – No person in the audience shall engage in disorderly or disruptive conduct such as audible commentary during a meeting, hand clapping, stamping of feet, whistling, using profane language, yelling and similar demonstrations, which conduct disturbs the peace and good order of the meeting. Public Comment– Comments from the public will be accepted on any matter, whether on the agenda or not. Comments will not be accepted during specific agenda items unless a Public Hearing has been noticed. Please remember to be courteous and respectful and abide by the following guidelines: Sign-in prior to the start of the meeting Step up to the microphone when recognized by the Presiding Officer (Chair or Vice- Chair) State your name and address for the record State the subject to be discussed Limit comments to 3 minutes Address comments to the board as a whole, not any specific member No question may be asked of a board member or staff member without the permission of the Presiding Officer (Chair or Vice-Chair) Elect a spokesperson for a group of persons who wish to address the board on the same subject Public Hearing – A public hearing is a separate item of business on the agenda. It gives the public an opportunity to comment on the topic identified. Please remember to be courteous and respectful and abide by the guidelines outlined for public comment (although no sign-in required). Typically, a public hearing proceeds as follows: 1. The Presiding Officer (Chair or Vice-Chair) will announce the agenda item and staff will present their report. 2. Board members have the opportunity to ask staff questions about the item. 3. The Presiding Officer (Chair or Vice-Chair) opens the public hearing and will recognize those who want to speak. 4. The Presiding Officer (Chair or Vice-Chair) shall close the public hearing. 5. The Board will then discuss the item. No further public comments are allowed. 6. The Board will make a recommendation and/or decision. After a motion has been made or a public hearing has been closed, no member of the public shall address the board from the audience on the matter under consideration. The Presiding Officer (Chair or Vice-Chair) shall maintain strict order and etiquette at all meetings. CITY OF LINO LAKES PLANNING & ZONING BOARD MINUTES DATE: May 14, 2025 TIME STARTED: 6:30 P.M. TIME ENDED: 9:11 P.M. MEMBERS PRESENT:Isaac Wipperfurth, Nathan Vojtech, Neil Evenson Michael Root, Suzy Guthmueller, Perry Laden, Patrick Kohler MEMBERS ABSENT: None STAFF PRESENT: Michael Grochala, Katie Larsen, Marissa Ertel 1. CALL TO ORDER AND ROLL CALL Chair Root called the Lino Lakes Planning & Zoning Board meeting to order at 6:30 p.m. on May 14, 2025. 2. PLEDGE OF ALLEGIANCE 3. PUBLIC COMMENT Mr. Root declared public comment open at 6:34 p.m. There were no public comments. Mr. Evenson moved to close public comment. Motion seconded by Mr. Vojtech. Public comment was closed at 6:34 p.m. 4. APPROVAL OF AGENDA The agenda was approved as presented. 5. APPROVAL OF MINUTES Mr. Vojtech moved to approve the April 9, 2025 meeting minutes. Motion seconded by Mr. Kohler. Motion carried 6 – 0, one abstention. DRAFT MINUTES Planning & Zoning Board May 14, 2025 Page 2 6.ACTION ITEMS A. Public Hearing: Wilkinson Waters Comprehensive Plan Amendment, Rezoning, and PUD Preliminary Plan/Preliminary Plat Ms. Larsen presented the staff report. The applicant, Wilkinson Waters LLC, is proposing a master planned development located on North Oaks Company Inc. property south of County Road J/Ash Street/CSAH 32, west of Centerville Road/CSAH 21 and north of Wilkinson Lake Boulevard. The development contains 4 parcels totaling approximately 76 gross acres and consists of mix of 340-unit residential housing types and commercial development. The proposed development is called Wilkinson Waters. The Comprehensive Plan Amendment requires notice to affected jurisdictions. They have 60 days to review and comment. The 60-day deadline is May 17, 2025 so the City Council meeting date for consideration is May 27, 2025. The Planning & Zoning Board held a public hearing on April 9th. Unfortunately, the notice was not mailed to all property owners within 600ft of the development boundary, second hearing will be held tonight. One concern brought up during the April 9th meeting was vehicle headlights entering or exiting the underground parking lot shining into adjacent houses along Ash St. Six (6) ft tall privacy fences will be installed along the Ash Street and Centerville Road drive lanes to screen the headlights. Mr. Laden questioned whether the architectural standards would pass to the future commercial development. Ms. Larsen stated they would consider that standards be set to ensure that future commercial development would match the higher level of architecture. Mr. Evenson had questions about how close the pickleball court would be to residential housing. Ms. Larsen stated it would be close to 200 feet. Mr. Evenson suggested relocating the pickleball court to be centrally located. Chair Root had a comment about the benefits to the open space for the development. Chair Root stated he would like to see the senior residential building held to the same gateway architectural standards. DRAFT MINUTES Planning & Zoning Board May 14, 2025 Page 3 Chair Root had questions about why as part of the staff recommendations the parking lot setbackwas not recommended by staff. Ms. Larsen stated that staff does not agree with the setback and it is not part of the flexibility. Ms. Guthmueller had concerns about the setbacks and how close the buildings are to each other. Ms. Guthmueller agrees with the City Council regarding removing townhomes to meet the setbacks. Ms. Guthmueller stated that the housing does not seem affordable. Mark Houge, North Oaks Company, was present to answer questions. Mr. Houge stated the pickleball court is not part of the plan, merely a suggestion. Mr. Vojtech had questions about the pricing for the apartments. Peter Stalland, partnered with North Oaks, was also available for comments. Mr. Stalland stated that the studio apartments would be around $1,300.00 a month. Mr. Root opened the public hearing at 7:24 p.m. Noelle Roden, 1603 Ash Street, spoke about the impact of the three-story buildings on the residents in her neighborhood. She stated that the buildings will be around 100 feet from her home. Ms. Roden was also concerned about the increase in traffic, the roundabout being added to the area and how construction of a new road would impact the ease of being able to leave the area. Ms. Roden would like to see more consideration and respect for existing residents. Amy Donlin, 6100 Centerville Road, spoke about the importance of roadblocking new developments in the area. Ms. Donlin would like to see the conservation standards upheld and would like the wildlife to remain untouched. Ms. Donlin would like to honor the dark skies and be able to see the sky at night. Ms. Donlin also had concerns about traffic in the area and the speed limit is currently too high. Steve Gallop, 6102 Centerville Road, agreed with the previous speaker about the dark skies and worries that the pickleball court would bring light and disturb this. Mr. Gallop is worried about the lighting on the street side of the development. Mr. Gallup stated that vehicle lights on Ash Street already are coming through and worries that this development would make this worse. He would like to see a tall berm added. Debra Gallop, 6102 Centerville Road, had concerns about how close the new development is to their existing home. Ms. Gallop stated that the lights will be an issue, and that the lights will drive out the wildlife. Ms. Gallop did state that North Oaks has DRAFT MINUTES Planning & Zoning Board May 14, 2025 Page 4 done a good job with landscaping in other developments. Ms. Gallop has worries about residents in the apartment complexes being able to see into her home.Ms. Gallop would like the tall buildings to be moved to the back, away from the roads. Jaworski Grove, 1605 Ash Street, stated that the proposed development is only 60 feet from their homes, not the 250 feet that has been presented. Ms. Grove stated that the pickleball courts would be very noisy, and the City of Maple Grove has recently banned pickleball courts for the noise. Ms. Grovealso stated that there is no way to be able to back into their driveways as suggested by Ramsey County with the roundabout coming in, the speed will only go up. Ms. Grove believes there is zero benefit to this development coming in. Mr. Laden moved to close the public hearing. Motion seconded by Mr. Evenson. The public hearing was closed at 7:39 p.m. Chair Root addressed some of the comments made during the public hearing. Regarding the distance from the development, Ms. Larsen stated that the City setback requirements are met and would be approximately 160 feet from the nearest house. Chair Root addressed the screening that would be present. Ms. Larsen stated that there would be increased coniferous trees, such as evergreens, to help provide screening. Berm would not screen anything. Chair Root wanted to emphasize that the Board is doing their best to consider the existing residents. Chair Root stated that dark skies are being considered with regards to the types of lighting that would be used, and the number of lights on the site. Chair Root wanted to address the traffic concerns for residents. Ms. Larsen stated that the roadwork that is currently being done in the area is not being done because of the development and was put into place well before this development came in. Mr. Wipperfurth had questions about the traffic studies done in the area and around Ash Street, whether it would become a right in right out. Ms. Larsen confirmed it would be right in right out. Mr. Wipperfurth is glad that the headlights are being addressed but still had worries about the headlights going into the houses on Ash Street. Chair Root stated that with the addition of screening, the headlights wouldn’t be as much of an issue. Mr. Kohler moved to approve the comprehensive plan amendment, rezoning and PUD preliminary plan/preliminary plat subject to conditions listed in the staff report and not DRAFT MINUTES Planning & Zoning Board May 14, 2025 Page 5 allow for the flexibility with the setbacks presented. Motion seconded by Mr. Evenson. Motion carried4-3. nd B.Public Hearing: Java Lino Lakes 2 Addition Preliminary Plat Ms. Larsen presented the staff report. The applicant, Java Companies, Inc., submitted a land use application for Java Addition nd Addition preliminary plat. The preliminary plat subdivides Lot 2, Block 1, Java Lino 2 Lakes into two (2) separate lots. On April 14, 2025, the City Council passed Resolution No. 25-45 approving the Java Lino Lakes final plat. The plat created three (3) commercial lots along Lake Drive. Lot 2, Block 1, Java Lino Lakes was proposed to have a 3-unit multi-tenant retail building. The applicant is now proposing 2 to subdivide this lot into 2 lots for the purpose of constructing a standalone Chipotle Restaurant and a standalone Pacific Dental office. Lot 1, Block 1, Java Lino Lakes 2nd Addition will still be an O’Reilly’s Auto Parts retail store as originally planned. Mr. Wipperfurth wanted to confirm that this was seen before the Board, and that the developer is splitting the one lot. Ms. Larsen confirmed that this was correct. Chair Root opened the public hearing at 8:03 p.m. No public comments were made. Mr. Wipperfurth moved to close the public hearing. Motion seconded by Mr. Kohler. The public hearing was closed at 8:03 p.m. Mr. Wipperfurth moved to approve the preliminary plat with one subject to conditions listed in the staff report. Motion seconded by Mr. Laden. Motion carried 7-0. C. Public Hearing: Clearwater Commons Preliminary Plat Ms. Larsen presented the staff report. The applicant, Capital Real Estate, Inc., submitted a land use application for Clearwater Commons preliminary plat and vacation. The preliminary plat is for three (3) commercial lots north of CSAH 14 (Main Street), west of I-35E, east of 21st Avenue North and south of the park and ride. A stand along Chipotle Restaurant is proposed on Lot 1. DRAFT MINUTES Planning & Zoning Board May 14, 2025 Page 6 Mr. Evenson wanted to know whether the North part of the lot would be commercial or residential. Ms. Larsen stated it would be commercial. Mr. Laden wanted to confirm that the traffic study considered all three lots and not just the Chipotle. Ms. Larsen confirmed that it was for all three. Chair Root wanted to know what had been evaluated for the north part of the lot regarding traffic. Ms. Larsen stated there had not been any studies done concerning that area since there is currently not any commercial development coming in with this application. Chair Root added that this area is becoming popular, with the developments such as Watermark and now the commercial developments. Mr. Root opened the public hearing at 8:14 p.m. Ryan Salmon, 2172 Heron Court, wanted to speak to the confusion about jurisdictions. Mr. Salmon wanted to make sure that concerns regarding traffic were addressed. The traffic in the area with Amazon has been very high. Mr. Salmon has concerns about safety for the children in the area. Mr. Salmon wanted to understand what the benefit of more commercial development in the area would be. Mr. Salmon would like to see a crosswalk added to the area to address foot traffic safety. Mr. Vojtech moved to close the public hearing. Motion seconded by Mr. Evenson. The public hearing was closed at 8:16 p.m. Chair Root addressed the concerns regarding adding more traffic to the area, and pedestrian safety. Ms. Larsen stated that regarding Lino Lakes we do have a trail, but with Kwik Trip that would be Centerville. Ms. Larsen stated that the traffic studies that have been conducted do meet City standards. City staff would not recommend putting a crosswalk at an uncontrolled intersection, which presents a false sense of security to pedestrians. Mr. Laden wanted a better understanding of how the foot traffic would be able to access the proposed site. Ms. Larsen showed via a map there would be sidewalks and the existing trail that would lead to the Chipotle. Mr. Wipperfurth would like to know who residents can go to regarding traffic lights and how traffic light times could be changed. Mr. Grochala stated it would be with MNDOT and Anoka County. Mr. Evenson moved to approve the preliminary plat subject to conditions listed in the staff report. Motion seconded by Mr. Wipperfurth. Motion carried 7-0. DRAFT MINUTES Planning & Zoning Board May 14, 2025 Page 7 D.Nelson Rehbein Property PUD Concept Plan Ms. Larsen presented the staff report. The applicant, Twin Cities Land Holding, LLC, is proposing a residential development in the southwest quadrant of CSAH 54 (20th Ave S) and Cedar Avenue. The development contains three (3) parcels totaling approximately 25 gross acres and 90 housing units. Mr. Evenson stated he does not think there would be a benefit to the City with a PUD. Mr. Wipperfurth agrees and does not think a PUD would be beneficial and should just be zoned. Mr. Wipperfurth asked whether the townhomes could be R2. Ms. Larsen said they would most likely be R3 with some changes to the lot sizes. Mr. Wipperfurth had questions regarding the road stubs and whether they would be able to connect to private drives. Mr. Vojtech also agreed that there was not a benefit to this site being a PUD. Mr. Kohler had concerns about the water use in the proposed development. Mr. Grochala stated that the developer will have to present the water use. Chair Root had questions about the density requirements. Chair Root questioned if it was all zoned R2 if it would not meet the density requirements. Chair Root would like to see this either all zoned R2 single family homes, and if there would need to be townhomes that they be located to the North. Chair Root also stated he had concerns about traffic in the area. Chair Root also agreed that the PUD would not be beneficial. Mr. Wipperfurth agreed with Chair Root about his traffic concerns. Ben Schmidt, Twin Cities Land Development, was present to answer questions. Mr. Schmidt spoke about the process of coming up with the concept plan and meeting density requirements. E. Otter Crossing South Final Plat Ms. Larsen presented the staff report. The applicant, TYME Properties, LLC., submitted a land use application for Otter Crossing South final plat. The plat is for one (1) commercial lot south of CSAH 14 (Main Street), east of I-35E and west of CR 84 (Otter Lake Road). This is the proposed ALDI’s grocery store lot. DRAFT MINUTES Planning & Zoning Board May 14, 2025 Page 8 Mr. Evensonmoved to approve the final plat subject to conditions listed in the staff report. Motion seconded by Mr. Laden. Motion carried 7-0. F. Linda Avenue Addition Final Plat Ms. Larsen presented the staff report. The applicant, James Christiansen, submitted a land use application for Linda Avenue Addition final plat. The plat is for two (2) residential lots at the southwest quadrant of Hodgson Road and Linda Avenue located at 6217 Hodgson Road. Mr. Laden had questions about whether there would be a required privacy fence. Mr. Laden does not think there should be a required privacy fence. Ms. Larsen stated that per the ordinance, they would have to have a buffer, whether that was a fence or landscaping. Mr. Kohler moved to approve the final plat with one subject to conditions listed in the staff report. Motion seconded by Mr. Vojtech. Motion carried 7-0. 7. DISCUSSION ITEMS A. ProjectUpdates Mr. Grochala provided project updates to the Board. Mr. Vojtech moved to adjourn the meeting. Motion seconded by Mr. Evenson. Meeting adjourned at 9:11 p.m. Respectfully submitted, Marissa Ertel– Community Development Administrative Assistant DRAFT MINUTES PLANNING & ZONING BOARD AGENDA ITEM 6A STAFF ORIGINATOR:Katie Larsen, City Planner MEETING DATE:June 11, 2025 REQUEST:PUBLIC HEARING:Erickson Property 1. Rezoning 2.Preliminary Plat CASE NUMBER: PZC2025-0005 APPLICANT: Hampton Companies Attn: Dan Brown 1824 Buerkle Road White Bear Lake, MN 55110 OWNER: Karina J. Erickson th Avenue 7590 20 Lino Lakes, MN 55038 REVIEW DEADLINE: Complete Application Date:May 12, 2025 60-Day Review Deadline:July 11, 2025 60-Day Extension Deadline: September 9, 2025 Environmental Board Meeting:May 28, 2025 Park Board Meeting:June 4, 2025 Planning & Zoning Board Meeting: June 11, 2025 City Council Work Session: July 7, 2025 City Council Meeting: July 14, 2025 INTRODUCTION The applicant, Hampton Companies, submitted a land use application for rezoning and preliminary plat for a residential subdivision called Erickson Property. The applicant th proposes to subdivide the existing lot located at 7590 20 Avenue into 14 single family lots. 1 BACKGROUND The Land Use Application is for: Rezoning Preliminary Plat This staff report is based on the following information: ALTA Survey prepared by Landform dated April 29, 2025 Erickson Property Plan Set prepared by Landform dated May 12, 2025 Stormwater Management Plan prepared by Landform revision date May 22, 2025 Geotechnical Exploration Report prepared by Haugo Geotechnical Services dated May 6, 2025 Narrative prepared by Landform dated May 12, 2025 ANALYSIS Existing Site Conditions The existing residential lot contains ahouse, and several accessory structures. According to Anoka County property records, the house was built in 1922. The site topography is relatively flat with the elevations at the soil boring locations ranging from about 903 to 910 feet above mean sea level (MSL). Zoning Current Zoning R, Rural Current Land Use Rural Residential 2040 Comp Plan Land Use Low Density Mixed Residential Utility Staging Area 1B: 2025-2030 Rezoning The lot is currently zoned R, Rural. It will be rezoned to R-2, Two Family Residential which is consistent with land guided Low Density Mixed Residential. Surrounding Zoning and Land Use 2 DirectionZoning Current Land Use Future Land Use Low Density Mixed NorthR, RuralRuralResidential Residential PUD, Planned Unit Low Density Mixed South Vacant Residential Development Residential PUD, Planned Unit Low Density Mixed EastVacantResidential Development Residential Low Density West R, Rural Agricultural Residential Land Use and Density The following chart implements Met Council’s formula for calculating net density. Gross Area (acres)5.15 Wetlands & Water Bodies 0.00 Public Parks & Open Space 0.00 Arterial ROW(0.70) Net Area (acres) 4.45 # of Units 14 Gross Density (units/acre)2.72 Net Density (units/acre) 3.15 The parcel is guided low density mixed residential development and requires 3.0 to 4.0 units per net acre. The proposed net density of 3.15 units per acre is consistent with the Comprehensive Plan. Zoning Requirements The lot is proposed to be zoned R-2, TwoFamily Residential. 3 R-2 60ft Single Family Lots Proposed Plan Requirements Min. Lot Size 7,500 sf7,619 – 11,506sf Min. Lot Width --Interior Lot 60 ft 60ft --Corner Lot 80 ft 80 ft Min. Lot Depth 125 ft127ft --Double Frontage135 ft NA Building Setback (ft) -From Streets 25 ft25 ft -Rear Yard --Principal25 ft 25 ft -Accessory5 ft 5 ft -Side Yard --Principal10 ft 10 ft --Accessory 5 ft 5 ft Buffer Abutting Arterial St 15 ft wideNA Evaluated w/ Impervious Surface 65% building permit The proposed lots meet zoning requirements. Building Requirements At the time of building permit, the lotswill be reviewed for compliance regarding impervious surface, building footprint area, garage size, and design and construction standards. R-2 performance standards shall be met. Subdivision Ordinance Conformity with the Comprehensive Plan and Zoning Code The preliminary plat is consistent with the comprehensive plan for low densitymixed residential development and zoning code requirements for R-2, TwoFamilyResidential as discussed above. 4 Blocks and Lots The preliminary plat contains 14 lots and 1 outlot. The outlot is for stormwater management. The outlot will be owned by an HOA and the stormwater pond will be maintained by the City. Streets and Alleys Osakis Street is a local road with 60 ft wide road right-of-way and 32ft wide paved road. It is an extension of the existing road within Watermark. A temporary cul de sac will be constructed on the north end. Sixty (60) ft of road right-of-way is being dedicated along th CSAH 54 (20Avenue) as required. Easements Standard drainage and utility easements at least ten (10) feet wide have been provided alongall other lot lines and stormwater management facility. Storm Water Management and Erosion and Sediment Control Per the June 4, 2025 Engineering Memo, stormwater management for the Erickson Property site consists of a sedimentation basin to provide treatment. Existing and proposed discharge rates are summarized below. Pre- and Post- Development Discharge Rates (cfs) Condition2-Year 10-Year 100-Year 10-Day Snowmelt Only needed if Existing 7.36 15.00 32.57 basins landlocked Currently Only needed if 3.086.0212.35 Proposedbasins landlocked Utilities An 8” watermain and 10” sanitary sewer will service the lots. Public Land Dedication The City will require cash in lieu of land dedication. Park Dedication Fees a Total # of Lots = 13 5 x 2025 Park Dedication Fee $3,500 = Total Due $45,500 a The existing lot/house will not be charged a park dedication fee; therefore, only 13 lots will be charged for park dedication fees. Parks, Greenways and Trail Plan The proposed subdivision is within the WatermarkPark neighborhood service areaand additional land dedication is not required. The park plan identifies a trail along CSAH 54 th (20Avenue). A trail currently exists along the Watermark development within the road right-of-way. A trail shall be graded in along the Erickson Property to tie into the existing trail. The City will install the trailat a future date. Screening, Landscaping, Buffer Yards and Tree Preservation Per the May 28, 2025 Environmental Board staff report: Tree Preservation and Mitigation Standards The purpose of these standards is to protect valuable trees and stands of vegetation while not interfering with landowners’ reasonable use and development of property. The goal is to minimize unnecessary loss of habitat, biodiversity, and forest resources and to replace removed trees in areas where tree cover is most critical. A tree survey has been provided. Most of the trees on site are oak, pine, maple. Majority of the trees were planted as windbreaks from the adjacent agricultural use. The tree inventory will need to be updated to only include significant trees and trees within the project location. The coniferous trees will need to be included by height. The site falls primarily withing the basic use area. No mitigation is required within this area. Twelve trees are being proposed for removal within the stormwater management area. Storm water ponding is not included within the basic use area. Mitigation will be required at a 1 to 1 ratio. There are currently ninety (90) significant trees identified on site. Thirteen (13) are proposed to be preserved as a part of the development. The developer is proposing planting 14 boulevard trees, one for each proposed lot. An additional 7 rear yard trees are being proposed within block 1. Staff recommends adding additional rear yard trees within block 2 to provide additional plantings and screening from the existing development. 6 Tree Preservation and Mitigation Standards will need to be met with future submittals. Open Areas Landscape Standards The developer will be required to meet open area landscape standards as part of the proposed project. Open area standards are to provide one large tree and two large shrubs per every 2500 square feet of open space. Final calculations for open area plantings will be calculated with final plat submittal to confirm final open space. Currently the proposal does not show open space landscaping. Buffer and Screen Standards There is no official requirements, but city staff are looking at providing additional plantings in the rear yards for screenings from existing properties. Double planted screening is being proposed with shrubs along the back of the property th lines for block one as screening from 20 Ave. Screening should be provided on the property lines. Currently showing plantings within the outlot, this will likely cause maintenance issues in the future. Canopy Cover Canopy cover requirements do not apply to single-family residential developments. Foundation Landscaping Foundation landscaping standards do not apply to single family residential development Sod and Ground Cover Standards All areas not otherwise improved in accordance with the approved site plans shall have a minimum depth of 4 inches of topsoil and be sodded including boulevard areas. Seed may be provided in lieu of sod in certain cases, including when the area is adjacent to natural areas or wetlands. Low maintenance turf should be evaluated throughout development. Ground covers should be drought resistant to reduce the need for irrigation use. Environmental Review The site is within the I-35E Corridor AUAR and is consistent with residential development for all 3 AUAR land use scenarios. 7 Wetlands There are no wetlands on site. FEMA Floodplain There is no FEMA floodplain on site. Shoreland Management Overlay The development is not located within a Shoreland Management Overly district. Impervious Surface Coverage The maximum allowed impervious surface coverage per lot is 65%. The impervious coverage for each lot will be evaluated with those individual building permits and surveys. Traffic Study A traffic analysis was completed noting that single family detached housing units average 9.43 trips per dwelling unit and the 14 lot subdivision would generate 132 daily trips. Traffic was analyzed with the Watermark development and the Erickson Property was included in the study. The proposed development is consistent with the Watermark traffic study. Noise Study Per the applicant’s narrative, this project will comply with the same findings of the Watermark Traffic Noise assessment that was conducted in March of 2016 to fulfill the requirements of the I-35E AUAR. This includes meeting the standards for noise levels found in the study for homes that are along CSAH 54 (20th Avenue). The project would need to meet the commercial noise standards (NAC-2) during nighttime hours as allowed by Minnesota Rule 7030.0050. This exemption will be met by following the three following items for all homes built along CSAH 45 (20th Ave) to meet the NAC-2 standards, instead of the residential standards (NAC-1), for nighttime hours: 1. The building is constructed in such a way that the exterior to interior sound level attenuation is at least 30 dB(A); 2. The building has year-round climate control; and 3. The building has no areas or accommodations that are intended for outdoor activities. Additional City and Government Agency Review Comments 8 Public Safety Comments Lino Lakes Police Department and Fire Department had no comments on the preliminary plat. Environmental Board The Environmental Board reviewed the development proposal on May 28, 2025. Their commentsare summarized in the attached Environmental Memo dated May 28, 2025. Agreements Stormwater Maintenance Agreement Private stormwater facilities will be maintained through a Declaration for Maintenance of Stormwater Facilities. The City of Lino Lakes shall be party to the Declaration. City Engineer to provide template. Development Agreement and Final Plat The applicant shall submit a Land Use Application for final plat after preliminary plat approval. A Development Agreement will then be prepared by the City as part of the final plat application. Comprehensive Plan Erickson Property is consistent with the goals and policies of the comprehensive plan regarding land use, housing, economic development, transportation, local water management plan, sanitary sewer, water supply and parks, greenway and trails. Land Use Plan Per the 2040 Comprehensive Plan, the parcel is guided low density mixed residential development and allows for 3.0 to 4.0 units per net acre. The proposed 14 single family housing units and net density of 3.15 units per acre is consistent with the Comprehensive Plan. Growth Management Strategy Page 3-17 of the 2040 Comprehensive Plan details the City’s Growth Management Strategy. The strategy works in conjunction with the City’s utility staging plan. 9 The City will plan to accommodate an annual average of 230 units per year over each 5- year phasing period not to exceed 345 units in any one year. From 2010 to 2024, the City’s average annual number of units is 123. This is less the allowed 230 unit annual allocation. The proposed 14 housing unit residential subdivision is consistent with the growth management strategy. Housing Plan A goal of the housing plan is to maintain existing housing stock to insure a high-quality environment in all residential neighborhoods. It is a policy to encourage in-fill housing where appropriate. Erickson Property meets the goals of the housing plan by supporting in-fill housing. Economic Development The 14 lot single family residential development does not negatively impact the City’s economic development plan. Transportation Plan A goal of the transportation plan is to ensure that streets are as safe as possible. Osakis th Streetis a local road and CSAH 54 (20 Avenue) is an A-Minor Arterial Reliever. Both streets have capacity to accommodate 14new single family homes. Local Water Management Plan The purpose of the water management program protect, preserve, and use natural surface and groundwater storage and retention systems and prevent erosion of soil into surface water systems. A stormwater pond, erosion control and rock construction entrance are proposed on site. Sanitary Sewer Plan The goal of the sanitary sewer plan is to maintain the city’s residents and businesses with an affordable and safe sanitary sewer system. The development will connect to the municipal sanitary sewer system. Water Supply Plan 10 A goal of the water supply plan is to provide residents and businesses with affordable potable water that is safe and of high quality for daily consumption and fire demand. The development will connect to the municipal water supply system. Parks, Greenways and Trails A goal and policy of the parks, greenways and trails plan is to continue to development and fund recreational activities in the City. The City will require cash in lieu of land dedication. Findings of Fact Rezoning The lot willbe rezoned from R, Rural to R-2, Two-Family Residential. Per City Code Section 1007.015 (4): (e) The Planning and Zoning Board shall hold the public hearing and consider possible adverse effects of the proposed amendment. Its judgement shall be based upon, but not limited to, the following factors: 1. The proposed action is consistent with the official City Comprehensive Plan. The rezoning is consistent with the 2040 Comprehensive Plan. 2. The proposed action is or will be compatible with present and future land uses of the area. The rezoning is compatible with present and future residential land uses of the area. 3. The proposed action conforms with all performance standards contained herein. Erickson Property conforms with all performance standards with minor revisions as noted. 4. The proposed action can be accommodated with existing public services and will not overburden the city’s service capacity. Erickson Property can be accommodated with existing public services and will not overburden the city’s service capacity 11 5.Traffic generation by the proposed action is within capabilities of streets serving the property as described in § 1007.020(4)(d) of this chapter. Traffic generated by the Erickson Property is within the capabilities of the streets serving the property. Preliminary Plat Per Section 1001.013, Premature Subdivision: (1)General.Any concept plan, preliminary plat or final plat deemed premature pursuant to the following criteria shall be denied by the City Council. (2) Conditions for establishing a premature subdivision. A subdivision may be deemed premature should any of the following conditions not be met. (a) Consistency with the Comprehensive Plan. Including any of the following: 1. Land use plan; 2. Transportation plan; 3. Utility (sewer and water) plans; 4. Local water management plan; 5. Capital improvement plan; and 6. Growth management policies, including MUSA allocation criteria. Erickson Property is consistent with the 2040 Comprehensive Plan. (b) Consistency with infill policies. A proposed urban subdivision shall meet the city's infill policies: 1. The urban subdivision must be located within the Metropolitan Urban Service Area (MUSA) or the staged growth area as established by the city's Comprehensive Plan; 2. The cost of utilities and street extensions must be covered by one or more of the following: a. An immediate assessment to the proposed subdivision; b. One hundred percent of the street and utility costs are privately financed by the developer; c. The cost of regional and/or oversized trunk utility lines can be financed with available city trunk funds; and d. The cost and timing of the expenditure of city funds are consistent with the city's capital improvement plan. 3. The cost, operation and maintenance of the utility system are consistent with the normal costs as projected by the water and sewer rate study; and 4. The developer payments will offset additional costs of utility installation or future operation and maintenance. 12 Erickson Propertyis consistent with infill policies. The development is within the current Utility Staging Area 1B=2025-2030. The cost, operation and maintenance of the utility system is consistent with the normal costs projected by the water and sanitary system plans. No future utility costs are proposed. (c) Roads or highways to serve the subdivision. A proposed subdivision shall meet the following requirements for level of service (LOS), as defined by the Highway Capacity Manual: 1. If the existing level of service (LOS) outside of the proposed subdivision is A or B, traffic generated by a proposed subdivision will not degrade the level of service more than one grade; 2. If the existing LOS outside of the proposed subdivision is C, traffic generated by a proposed subdivision will not degrade the level of service below C; 3. If the existing LOS outside of the proposed subdivision is D, traffic generated by a proposed subdivision will not degrade the level of service below D; 4. The existing LOS must be D or better for all streets and intersections providing access to the subdivision. If the existing level of service is E or F, the subdivision developer must provide, as part of the proposed project, improvements needed to ensure a level of service D or better; 5. Existing roads and intersections providing access to the subdivision must have the structural capacity to accommodate projected traffic from the proposed subdivision or the developer will pay to correct any structural deficiencies; 6. The traffic generated from a proposed subdivision shall not require city street improvements that are inconsistent with the Lino Lakes capital improvement plan. However, the city may, at its discretion, consider developer-financed improvements to correct any street deficiencies; 7. The LOS requirements in divisions (2)(c)1. to 4. above do not apply to the I- 35W/Lake Drive or I-35E/Main St. interchanges. At city discretion, interchange impacts must be evaluated in conjunction with Anoka County and the Minnesota Department of Transportation, and a plan must be prepared to determine improvements needed to resolve deficiencies. This plan must determine traffic generated by the subdivision project, how this traffic contributes to the total traffic, and the time frame of the improvements. The plan also must examine financing options, including project contribution and cost sharing among other jurisdictions and other properties that contribute to traffic at the interchange; and 8. The city does not relinquish any rights of local determination. Erickson Property meets the requirements for level of service (LOS). Osakis Street and th 20 Avenue havecapacity to accommodate 14 new single family homes. The city does not relinquish any rights of local determination. (d) Water supply. A proposed subdivision shall be deemed to have an adequate water supply when: 13 1. The city water system has adequate wells, storage or pipe capacity to serve the subdivision; 2. The water utility extension is consistent with the Lino Lakes water plan and offers the opportunity for water main looping to serve the urban subdivision; 3. The extension of water mains will provide adequate water pressure for personal use and fire protection; and 4. The rural subdivision can demonstrate that each of the proposed lots can be provided with a potable water supply. Erickson Propertywill have an adequate water supply. (e) Waste disposal systems. A proposed subdivision shall be served with adequate waste disposal systems when: 1. The urban sewered subdivision is located inside the city's MUSA or is consistent with the MUSA allocation criteria; 2. The city has sufficient MUSA and pipe capacity to serve the subdivision if developed to its maximum density; 3. The subdivision will result in a sewer extension consistent with Lino Lakes sewer plan and capital improvement plan; 4. A rural subdivision can demonstrate that each lot can be served by an adequate sanitary sewer disposal system; and 5. A rural subdivision with a proposed communal sanitary sewer or water system has an effective long range management and maintenance program with proper financing. Erickson Propertywill be served with an adequate waste disposal system. RECOMMENDATION Staff recommends approval of the Erickson Property preliminary plat with the following conditions: 1. The developer shall deed Outlot A to a Homeowner’s Association (HOA). 2.The HOA documents shalldetail who is responsible for maintenance of retaining walls on Lot 1, Block 1 and Lot 7, Block 2. th Avenue to allow for 3. The developer shall record an easement in favor of 7598 20 removal of the retaining walls if that lot were to develop. 4. The developer shall record a temporary easement for the cul de sac. 5. The developer shall submit to the City the MPCA SSTA Abandonment Reporting Form as proof that the private septic system has been properly removed. 6. The developer shall submit to the City the MDH Well and Boring Sealing Record as proof that the private well has been properly capped. 7. The housing units on the west side of Osakis Street shall meet the following noise requirements: 14 a. The buildings are constructed in such a way that the exterior to interior sound level attenuation is at least 30 dB(A). b. The buildings have year-round climate control. The following items shall be addressed in conjunction with the final plat submittal: 1. Comments from City Engineer Memo dated June 4, 2025. 2.Comments from Environmental Memo dated May 28, 2025. 3. Draft documents of the following shall be provided to the City for review prior to recording: a. Retaining wall easement b. HOA documents c. Temporary easement for cul de sac th 4. All applicable plan sheets shall show a trail graded in along CSAH 54 (20 Avenue). 5.Sheet C2.1, Preliminary Plat & Site Plan: a. The total number of lots shall be provided in the Lot Data Table. 6. Sheet L1.1, Tree Preservation & Mitigation Plan: a. The tree tag #’s as provided on Sheet C1.1 shall also be provided on this sheet. ATTACHMENTS 1.Site Location & Aerial Map 2.Applicant Narrative 3. Erickson Property Plan Set 4. City Engineer Memo dated June 4, 2025 5. Environmental Memo dated May 28, 2025 15 Sbjoz!Mbof Obssbujwf! Fsjdltpo!Qspqfsuz Qsfmjnjobsz!Qmbu!boe!Sf{pof Qsfqbsfe!gps; Ebo!Cspxo Ibnqupo!Dpnqbojft Nbz!23-!3136 TVCNJUUFE!UP QSFQBSFE!CZ Djuz!pg!Mjop!Mblft Mboegpsn!Qspgfttjpobm!Tfswjdft-!MMD ui 711!Upxo!Dfoufs!Qbslxbz 216!6Bwf!T-!Tvjuf!624 Mjop!Mblft-!NO!66125 Njoofbqpmjt-!NO!66512 Landform®, SensiblyGreen® and Site to Finish® are registered service marks of Landform Professional Services, LLC TABLEOFCONTENTS Introduction .................................................................................................................................................. 1 Zoning Map Amendment (Rezone) ............................................................................................................... 1 Preliminary Plat ............................................................................................................................................. 1 Summary ....................................................................................................................................................... 2 Contact Information ...................................................................................................................................... 2 Introduction On behalf of Hampton Companies, Landform is pleased to submit this application for a Zoning Map Amendment and th Preliminary Plat to allow the construction of 14 single-family homes at 7590 20 Avenue in Lino Lakes. The current 5.15-acre parcel contains an existing home and numerous outbuildings. The site is surrounded by the Watermark PUD development by Lennar to the North, East and South. Our plan is to extend the existing street grid planned for the Watermark development and provide another housing option. We are excited about the improvements proposed for this site. Zoning Map Amendment (Rezone) In order to facilitate the development of this site, and to match the designation found in the 2040 Comprehensive Plan for Lino Lakes, this parcel will need to be rezoned. The parcel is currently zoned as “R- Rural” and we are requesting it be zoned to “R-2 – Two-family Residential”. The R-2 zone will allow us to develop this site in the density range found in the comprehensive plan and the existing I-35E AUAR over the area. The rezone to R-2 also more closely matches the PUD zoning and lot standards found in the surrounding Watermark development adjacent to our site. Preliminary Plat We are also requesting approval of a preliminary plat for a 14-lot subdivision with 14 new single-family homes and 1 outlot for stormwater management purposes. This plat would be an extension of the Watermark development that currently surrounds it, but with a different housing look and design. This plat would not be premature as it is easily served by existing utilities and surrounded by similar density and development. The site plan shows compliance with the R-2 zoning lot standards, and meets the other applicable landscaping, subdivision design and screening requirements. Below are some findings and important information about the plat: 1. 14 new single family home lots that comply with the lot and bulk standards found in the proposed R-2 zone that would be developed at a density of 3.15 units/acre. We are close to the minimum density due to stormwater management requirements. th i. Gross Area: 5.15 Acres – ROW to 20 Avenue: 0.7 Acres = Net Area: 4.45 Acres ii. 14 units / Net Area: 4.45 Acres = 3.15 units/acre (3.146) th 2. New dedicated ROW in addition to the existing easement for CSAH 45 (20 Avenue) to allow future road improvements and the extension of the existing trail on the west side. Additionally, this plat will remove a th driveway onto the CSAH 45 (20 Avenue). 3. Stormwater improvements with plans for rainwater reuse irrigation. 4. Additional landscaping that takes advantage of the required number of trees from the Tree Preservation ordinance, and screening requirements between the rear of homes and the stormwater facilities to reduce noise th and light impacts from CSAH 45 (20 Avenue). 5. A Homeowners Association (HOA) is anticipated to be created for maintenance purposes of development wide facilities. th Uniformed traffic access to and from CSAH 54 (20Avenue) for the development is found in the extension of Osakis Street into the existing Watermark development. The 10th Edition ITE Manual stated that for Single-Family Detached Housing (210) use there is an average ADT of 9.43 trips per dwelling unit. Erickson Property, Lino Lakes, MN May 12, 2025 HAC25003 1 The plat shows 14 single-family homes, meaning an ADT of 132.02 for the entire development. However, it is our experience with homes of this size that the expected ADT overestimates total trips, and we would expect it to be closer to 115 ADT for the entire development. There is no additional increase expected for this development as a single-family home use tends to stay consistent on traffic demand and no additional density is planned or possible on this site within the next ten years. Additionally, this project will comply with the same findings of the Watermark Traffic Noise assessment that was conducted in March of 2016 to fulfill the requirements of the I-35E AUAR. This includes meeting the standards for th noise levels found in the study for homes that are along CSAH 54 (20 Avenue). The project would need to meet the commercial noise standards (NAC-2) during nighttime hours as allowed by Minnesota Rule 7030.0050. This th exemption will be met by following the three following items for all homes built along CSAH 45 (20Ave) to meet the NAC-2 standards, instead of the residential standards (NAC-1), for nighttime hours: 1. The building is constructed in such a way that the exterior to interior sound level attenuation is at least 30 dB(A); 2. the building has year-round climate control; and 3. The building has no areas or accommodations that are intended for outdoor activities. Finally, the home pads shown on the plan would meet the garage design standards found in the R-2 zone. We understand that garage design and placement is a key issue for development in Lino Lakes and want to ensure early that our lots are buildable given the design requirements. While the specific design will take place following the completion of the plat process, site plan design choices took into account all standards required for minimum garage size, shape, and location found in the R-2 zoning standards. Summary We respectfully request approval of the Zoning Map Amendment and Preliminary Plat to allow the construction of 14 thth single-family homes at 7590 20Avenue in Lino Lakes. We asked to be placed on the June 11 Planning th Commission and July 14 City Council Meeting as found on the 2025 Application Deadline & Meeting schedule. We are excited to work with you on this project. Contact Information This document was prepared by: Zeke Peters, AICP-C Landform 105 Fifth Avenue South, Suite 513 Minneapolis, MN 55401 Any additional questions regarding this application can be directed to Eric Luth, P.E. at eluth@landform.net or 612.638.0261. Erickson Property, Lino Lakes, MN May 12, 2025 HAC25003 2 Memorandum To:Katie Larsen, Lino Lakes City Planner From:Kris KellerPE, WSB Diane HankeePE, Lino LakesCity Engineer Date:June 4, 2025 Re:Erickson Property Preliminary PlatReview 030542-000 WSB’sreviewofthe Preliminary Platfor the Erickson Propertydevelopmentin Lino Lakes, MN, prepared by Landformand receivedMay 12, 2025. Our comments were made on the following documents: Erickson PropertyPreliminary Plan and Platprepared by Landform, dated May 12, 2025. Erickson PropertyStormwater Management Planprepared by Landform, dated May 12, 2025. The following review comments should be responded to in writing by the applicant. There are additional redline comments on the plan set that should be responded to as well. Not all redline comments are in the review memo. Engineering •General The Erickson Property development is approximately 5 acres which extends a stubbed th street (Osakis Street) from the Watermark (5) Development on the east side ofCSAH 54 th (20Avenue). Thecurrent project proposes 14 single familylots and associated infrastructure. •Grading The Erickson PropertyDevelopmentincludessite grading forthe 14 homesas well as the extension of Osakis Streetanddriveways. Comments: 1.Provide EOF elevations, locations and routes for all low points in the paved and greenspaces. 2.Show all high and break points 3.Label all inlet elevations 4.Replace the eastern existing FES with CBMH and utilize the existing rear swales th from Watermark 5th/6(see redline comments)eliminating the proposed swale on the Erickson Property lots. a.Consider removing FES and pipe and converting STMH to CBMH Ms. Katie Larsen 06/04/2025 Page 2 b. Minimum freeboard requirement between EOF and proposed/existing Lowest Opening Elevations (LOE) is 1' c. Utilize current grading as-builts/plans for Watermark 5. Drainage from one lot to another requires drainage and utility easement 6. Propose future 'ghost' grading including roadway for remaining area between Erickson Property and Watermark 6th to justify temporary retaining walls and how they will be removed in the future a. Further discussion regarding retaining wall location, ownership, and future maintenance will be required b. Retaining walls exceeding 4’ in height shall require a plan prepared by a Minnesota licensed structural engineer submitted for review and approval by the Building Official prior to permit issuance i. Provide fences for safety as required. 7. Driveways/Garages will need to be on the southern sides of the two most northern lots with the temporary cul de sac. • Stormwater Management Stormwater management for the Erickson Property site consists of a sedimentation basin to provide treatment. Existing and proposed discharge rates are summarized below. Pre- and Post- Development Discharge Rates (cfs) Condition 2-Year 10-Year 100-Year 10-Day Snowmelt Only needed if Existing 7.36 15.00 32.57 basins landlocked Currently Only needed if 3.08 6.02 12.35 Proposed basins landlocked Comments: 1. This development falls within the Northeast Drainage Area Comprehensive Stormwater Management Plan (CSMP) area and as such is beholden to additional rate control and volume reduction requirements. 2. The pond south of this development was constructed with the Watermark development and designed to include runoff from the Erickson Property. If rates are reduced or maintained from existing conditions, volume control provided in the form of stormwater reuse, and water quality treatment provided by the proposed pond, it is recommended to overflow the onsite pond south to the existing Pond 500 (NWL 899, HWL 904.3). This allows the proposed development to meet CSMP rate control requirements by utilizing the existing Watermark system that already meets requirements. 3. Why does PB-3 have water surface land cover modeled in HydroCAD? 4. The pond EOF must include riprap stabilization. 5. The modeled pond EOF of 906.5 does not reflect the EOF of 905.57 in the plans. 6. A detail must be provided for the pond outlet control structure. 7. The 10’ aquatic bench should continue around the entire pond. If that is not feasible, the bench should at least be on the eastern side of the basin to provide a safety bench for residents. 8. Provide calculations demonstrating spread at the catchbasin low points is 10’ or less for the 3-year storm event. Erickson Property Development - Engineering Review Ms. Katie Larsen 06/04/2025 Page 3 9.Rational method pipe capacity calculations must be provided showing storm sewer is sized to convey the 10-year storm event. The minimum pipe diameter is 15”. 10.The storm sewer draining to the pond must be raised to outlet at the pond NWL of 904. 11.The pipe between the catchbasins is 18” diameter, but the pipe to the pond is 15” diameter. Resize one or the other to avoid flow constriction. a.This pipe sizing also does not match the pipes modeled in HydroCAD. 12.Confirm constructability of MH-119 as a 2x3 structure based on proposed pipe sizes and alignments. 13.Mesic prairie seeding should continue down to the BMP NWL instead of southern boulevard. •Water Supply The proposed Erickson Property water system extension is consistent with the original Watermark preliminary plat. This development will be served by 8- inch diameter ductile iron th pipe (DIP) water main which was stubbed with the Watermark 5 Addition and with 1-inch Type K copper services being extended to each lot. A future 8” stub will be provided on the th north end to connect to the 8” water stub provided on Osakis Street with the Watermark 6 Addition in the future. Comments: 1.Provide utility profiles 2.Call out all utility crossings a.Maintain minimum 18" separation b.Insulate when separation between water (services/main) and storm sewer is less than 36" 3.Show existing watermain along Norway Ln 4.Test the existing gate valve in Norway Ln a.If holding, utilize the existing gate valve in Norway Ln for testing i.Do not connect to existing with a gate valve b.Otherwise, remove watermain back to and including existing gate valve i.Connect to existing with new 8” gate valve at that location thth 5.Utilize current utility as-builts/plans for Watermark 5and 6Additions •Sanitary Sewer The proposed Erickson Property sanitary sewer is generally consistent with the original Watermark preliminary plat. Originally this street was to be served from the north with an th Addition but, due to the northern 8” stub from Rainy Lane as part of the Watermark 6 most property in the stretch not participating, the segment will now need to be served from th the existing sanitary sewer in Norway Lane which was installed as part of Watermark 5 Addition. This development will be served by 8- inch diameter poly-vinyl chloride (PVC) pipe along with 4-inch diameter Schedule 40 PVC service pipe to each lot. Comments: 1.Provide utility profiles 2.Create a detail for connection to existing sanitary sewer main with sanitary manhole a.Describe process for maintaining existing sanitary sewer, watermain, and storm sewer service as well as vehicle access during construction Erickson Property Development - Engineering Review Ms. Katie Larsen 06/04/2025 Page 4 b.Review impact of proposed sanitary sewer main on existing storm sewer and watermain i.Provide how existing utilities will be protected during installation or salvaged and reinstalled or removed and replaced ii.Possible redesign/realignment of storm sewer 3.The sanitary sewer segment between MH-117 and MH-116 should be 8” PVC SDR 26 a.All other sanitary sewer main should be 8” PVC SDR 35 b.The minimum required slope is 0.40% 4.Update all details C7.X/X shown on the plans 5.Install 8" future sanitary sewer plug to the north of MH-113 •Transportation The proposed roadway is consistent with the original Watermark preliminary plat. The work in this development includes extending Osakis Street, proposed to be 32’ wide from back-of-curb to back-of-curb, and installing a temporary cul de sac on the north end. The termination of the curb will need to be further discussed with Public Works/Engineering. Trails and sidewalks A sidewalk is proposed along the west side of the road consistent with the original Watermark preliminary plat. The termination point of the sidewalk will need to be further discussed with Public Works/Engineering. Comments: 1.Show the restoration limits as a result of the proposed sanitary sewer connection (full-width) 2.Include type 3 barricades and future thru street sign at the north end of the temporary cul de sac a.Provide protection for the temporary hydrant 3.Further discussions of extending the existing bituminous trail or grading for a future th Avenue) are needed trail along the east side of CSAH 54 (20 thth and 6 Additions 4.Utilize current street as-builts/plans for Watermark 5 •Wetlands and Mitigation Plan Site disturbances are in an upland location and wetland impacts are not proposed. •Landscaping A Landscape Plan for Erickson Property development has been submitted and will be reviewed by staff and the City’s Environmental Coordinator. The Environmental Coordinator will provide separate comments. •Floodplain No floodplain impacts are proposed on site. Erickson Property Development - Engineering Review Ms. Katie Larsen 06/04/2025 Page 5 •Drainage and Utility Easements Roadways are proposed within right-of-way and lots include standard drainage and utility easements. Larger drainage and utility easements will be required to be provided over any utilities outside the right of way and any surface water management features Comments: 1.Provide additional easement for the temporary cul de sac 2.Provide additional easement for drainage from one property to another Development Agreement A development agreement will be required with the final plat. Grading Agreement Grading agreement not required at this time. •Stormwater Maintenance Agreement Private stormwater facilities will be maintained through a Declaration for Maintenance of Stormwater Facilities. The City of Lino Lakes shall be party to the Declaration. City Engineer to provide template. •Permits Required Required permits may include some of the following and others: 1.NPDES General Construction Permit 2.City of Lino Lakes Zoning Permit for Construction 3.Minnesota Pollution Control Agency Sanitary Sewer Extension Permit 4.Minnesota Department of Health 5.Rice Creek Watershed District Permit 6.US Army Corps of Engineers Section 404 Permit If you or the applicant have any questions regarding these comments, please contact Kris Keller at (612) 419-3083 or kkeller@wsbeng.com. You may also contact Diane Hankee at (651) 982-2430 or dhankee@linolakes.us. Erickson Property Development - Engineering Review Environmental Memo To: K atie Larsen, City Planner From: Tom Hoffman, Environmental Coordinator Date: May 28, 2025 Re: Environmental Comments – Erickson Properties Preliminary Plat Environmental Board had recommended the following at their May 28, 2025 meeting: 1.Stormwater management to be reviewed by City Engineer a.Use of stormwater for irrigation purposes for the site should be evaluated and if feasible required as part of site development. Larger stormwater ponds constructed for fill should be evaluated for water reuse. b.Infiltration is required to be shown where feasible based on soil borings. If infiltration is not feasible follow the Minimum impact design standards (MIDS)) as designed by the MPCA 2.EOF should be shown as stabilized rock to prevent erosion of the stormwater pond. ow maintenance turf should be evaluated throughout development. Ground covers 3.L should be drought resistant to reduce the need for irrigation use. 4.Provide a tree inventory for the site showing only significant deciduous trees of 6” in dbh or larger. Coniferous trees are measured by height, coniferous trees over 12’ would be considered significant. a.Coniferous trees should be measured by height not DBH. b.Remove off-site trees from the final tree inventory c.Mitigation table provided for trees outside of basic use. 5.On section 4.1, bold or change the color of the tree tags to be visible. 6.Current plans show Twelve (12) trees being removed for storm water ponding. Stormwater ponding is not included under the basic use area and therefore mitigation will be required of those removals. 7. Sheet L7.1 shows coniferous tree planting detail. No coniferous trees are being shown on the planting tables. Remove this detail if not in use. 8. On Block one lot one and block two lot seven, the trees are planted outside of the boulevard. The city is okay but noted there will not be future planting there. 9. Trees that are to be preserved should show tree protection (snow fence or silt fence) around the trees during construction. 10. Provide plantings in the rear of block two for screening from adjacent existing homes. 11. Provide calculations for open space requirements. 1 large tree and 2 large shrubs are required for every 2,500sf of open space. 12. Shrubs located in the rear lots of block 1 should be planted within the property boundaries for screening. Open space requirements will require the planting of shrubs within the outlot as well. 13. Seed mixes should be updated to MNDOT seed mix design numbers for final plans. Please provide more site-specific mixes for each location 14. Add inlet protection to catch basins on corner of Osakis and Norway lane 15. Add inlet protection to storm manholes adjacent to project site. 16. Provide redundant perimeter control along east boundary of project site adjacent to existing storm sewer. 17. The project will disturb more than an acre of soil and will be required to obtain an NPDES permit. Proof of permit should be required before construction. a. A SWPPP shall be required in additional submittals as required by the MPCA meeting sections 5.2-5.26 b. Final erosion and sediment control will be reviewed with future submittals 18. The project site falls within the I-35E AUAR study area. The proposed development will be required to meet all requirements of the AUAR including mitigation measures. 19. Tree removal should be completed in the fall or winter to minimize impacts to migrating or nesting bat populations Page 2 20. Provide a Blandings turtle mitigation plan, surmountable curb is provided to allow turtles access off of the roads. Page 3 PLANNING & ZONING BOARD AGENDA ITEM 6B STAFF ORIGINATOR:Kate Achenbach,Assistant City Engineer, WSB MEETING DATE:June 11, 2025 REQUEST:PUBLIC HEARING Phelps Road Stockpile Interim Use Permit CASE NUMBER: IUP 2025-0002 APPLICANT: Mark Smith 2120 Otter Lake Drive White Bear Lake, MN 55110 REVIEW SCHEDULE: Complete Application Date: May 9, 2025 60-Day Deadline: July 8, 2025 Environmental Board Meeting:N/A Park Board Meeting:N/A Planning & Zoning Board Meeting: June 11, 2025 City Council Work Session: June 23, 2025 City Council Meeting:June 23, 2025 BACKGROUND Mark Smith resubmitted a Land Use Application for aninterim use permit for earth moving and stockpiling on a property located on Phelps Road (PID #24-31-22-42-0004). The City’s Planning and Zoning Board and City Council approved this project back in 2022/2023. The applicant did not move forward with the project at that time and is now seeking approval again. There are no proposed changes to the project. The applicant is requesting approval of an interim use permit to place approximately 71,000 cubic yards (CY) of suitable fill material on the site for use during future industrial development. The stockpiles are proposed to be up to 15 feet higher than the existing grade of the site. Three separate stockpiles are proposed. 1 The following staff report is based on the plan set prepared by Stantec dated December 15, 2022, and received by the City on December 15, 2022. ANALYSIS Section 1007.051 of the Zoning Ordinance effective January 5, 2023, establishes requirements for earth moving and land reclamation. Earth removal, land reclamation, material storage, or filling are permitted uses in all zoning districts. An interim use permit is required when 5,000 cubic yards or more of material is planned to be removed or deposited on any lot or parcel. The existing parcel is approximately 14.39 acres and is located on the west end of Phelps Road at the intersection with the Otter Lake Service Road. The site is adjacent to I-35E. The northwest stockpile is proposed to have 4:1 side slopes, have a height of 15-ft, have a footprint of approximately 1.96 acres, and be approximately 30,000 CY in volume. The northeast stockpile is proposed to have 4:1 side slopes, have a height of 14-ft, have a footprint of approximately 1.11 acres, and be approximately 14,000 CY in volume. The southern stockpile is proposed to have 4:1 side slopes, have a height of 14-ft, have a footprint of approximately 1.74 acres, and be approximately 27,000 CY in volume. Access The site is located at the intersection of Phelps Road and the Otter Lake Service Road. The applicant is currently proposing access to the site via a rock construction entrance. Wetlands Wetlands are reviewed and permitted through RCWD. The applicant has an existing RCWD permit for the project. A wetland analysis was completed by Kjolhaug Environmental Services Company, Inc and is still valid. Drainage Ditches Judicial Ditch No. 3 (Clearwater Creek) is located along the south portion of the site. The applicant is not proposing any significant changes to the existing drainage patterns to the drainage ditches. Clearwater Creek is within the Natural Resource Conservation Area on the south side of the site. The applicant is not proposing any work in the Natural Resource Conservation Area. Floodplain 2 FEMA records indicate Zone A floodplain on the site. The applicant is not proposing any impacts to the floodplain on the site. Grading and Drainage Grading and erosion control plans were submitted and have been reviewed by the City Engineer and Environmental Coordinator. Please see attached comments. Comprehensive Plan and Zoning The parcel is guided for industrial development and is currently zoned LI, Light Industrial. Section 1007.051, Earth Moving and Land Reclamation states earth removal shall be permitted in all zoning districts and establishes conditions that must be met. Tree Preservation Plan A tree preservation plan is not required. There are no significant trees within the project area. Surrounding Parcels Direction Zoning Existing Land Use Future Land Use North GB Vacant Commercial Commercial South LI Commercial Industrial EastGI Industrial Industrial Otter Lake Service Otter Lake Service Otter Lake Service West Road & I-35ERoad & I-35E Road & I-35E Interim Use Permit Per City Code Section 1007.017(2) Interim Use Permits: (b) General Standards. An interim use shall comply with the following: 1. Meets the standards of a conditional use permit set forth in City Code Section 1007.016. The proposed earth moving and stockpiling operation meets the conditional use permit standards as noted below. 3 2. Conforms to the applicable performance standards of this ordinance. The proposed earth moving and stockpiling operation conform to the applicable performance standards of this ordinance as detailed in this staff report. 3. The use is allowed as an interim use in the respective zoning district. The property is zoned LI, Light Industrial. Earth moving and land reclamation is an allowed interim use in this zoning district. 4. The date or event that will terminate the use can be identified with certainty. The proposed earth moving and stockpiling operations, including turf establishment, shall be completed within 5 years of approval of the Interim Use Permit by City Council. 5. The use will not impose additional costs on the public if it is necessary for the public to take the property in the future. The proposed earth moving and stockpiling operation will not impose additional costs on the public. 6. The user agrees to any conditions that the City Council deem appropriate for the permission of the use. The user agrees to the conditions detailed in the Council resolution. Per City Code Section 1007.016(3) Conditional Use Permits: (e) The Planning and Zoning Board shall hold the public hearing and consider possible adverse effects of the proposed conditional use. Its judgement shall be based upon, but not limited to, the following factors: 1. The proposed development application has been found to be consistent with the design standards listed in City Code Section 1007.020(4). The proposed earth moving and stockpiling operation is consistent with the design standards as noted below. 2. Will not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons, property, or the general welfare because of excessive production of traffic, noise, smoke, fumes, glare, or odors. 4 The proposed earth moving and stockpiling operation will not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons, property, or the general welfare because of excessive production of traffic noise, smoke, fumes, glare, or odors. 3. Will not result in the destruction, loss, or damage of a natural, scenic or historic feature of major importance. The proposed earth moving and stockpiling operation will not result in the destruction, loss, or damage of a natural, scenic or historic feature of major importance. The site does contain a portion of the Natural Resource Conservation Area on the south side of the site. However, the applicant is not proposing any work in or near the Natural Resource Conservation Area. Per City Code Section 1007.020(4) Site and Building Plan Review: (a) The proposed development application must be consistent with the policies and recommendations of the Lino Lakes Comprehensive Plan. The proposed earth moving and stockpiling is consistent with the Comprehensive Plan. The grading plan and earth moving operation have been reviewed by City Staff and was permitted by the Rice Creek Watershed District (RCWD). The excavation and filling will not have a negative impact on land use, transportation, utilities or the environment. (b) The proposed development application is compatible with present and future land uses of the area. The proposed earth moving and stockpiling is compatible with present and future land uses of the area. Present land use is vacant industrial and future land use is industrial. Earth moving is allowed in all zoning districts with conditions. (c) The proposed development application conforms to performance standards herein and other applicable City Codes. The proposed earth moving and stockpiling conforms to the performance standards of the City Code with conditions as established. The plans have been reviewed by City staff and permitted by the Rice Creek Watershed District (RCWD). (d) Traffic generated by a proposed development application is within the capabilities of the City when: 1. If the existing level of service (LOS) outside of the proposed development is A or B, traffic generated by a proposed 5 development will not degrade the level of service more than one grade. 2. If the existing LOS outside of the proposed development is C, traffic generated by a proposed development will not degrade the level of service below C. 3. If the existing LOS outside of the proposed development is D, traffic generated by a proposed development will not degrade the level of service below D. 4.The existing LOS must be D or better for all streets and intersections providing access to the proposed development. If the existing level of service is E or F, the developer must provide, as part of the proposed project, improvements needed to ensure a level of service D or better. 5.Existing roads and intersections providing access to the proposed development must have the structural capacity to accommodate projected traffic from the proposed development or the developer will pay to correct any structural deficiencies. 6. The traffic generated from a proposed development shall not require City street improvements that are inconsistent with the Lino Lakes Capital Improvement Plan. However, the City may, at its discretion, consider developer-financed improvements to correct any street deficiencies. 7. The LOS requirements in paragraphs 1. to 4. Above do not apply to the I-35W/Lake Drive or I-35E/Main Street interchanges. At City discretion, interchange impacts must be evaluated in conjunction with Anoka County and the Minnesota Dept. of Transportation, and a plan must be prepared to determine improvements needed to resolve deficiencies. This plan must determine traffic generated by the proposed development project, how this traffic contributes to the total traffic, and the time frame of the improvements.The plan also must examine financing options, including project contribution and cost sharing among other jurisdictions and other properties that contribute to traffic at the interchange. A traffic study was not completed due to the fact that the work only includes earth moving and stockpiling for future site needs. Traffic generated by the earth moving and stockpiling operations will not permanently change the traffic on Phelps Road or the 6 Otter Lake Service Road nor will it permanently impact the intersections with Otter Lake Road at this time. A traffic study will be required when the site is developed. Phelps Road is a city street and was constructed to city standards from Otter Lake Road to the eastern property line of the site. Phelps Road is a 9-ton design, but during spring road restrictions, a 5-ton limit applies. The design of the Otter Lake Service Road is unknown and should be restricted to 5-ton weight due to current conditions of the road. Truck traffic will be limited to these weight restrictions. The hauling, dumping and grading of excavated materials shall occur within the project boundaries as shown on the plans. It is anticipated that the Otter Lake Service Road will need to be upgraded with future development. (e) The proposed development shall be served with adequate and safe water supply. The proposed earth moving and stockpiling does not require a water service as proposed. Municipal water main is located along Phelps Road and can be extended to the property should the applicant wish to connect in the future. (f) The proposed development shall be served with an adequate or safe sanitary sewer system. The proposed earth moving and stockpiling does not require service by sanitary sewer. Municipal sanitary sewer is located along Phelps Road and can be extended to the property should the applicant wish to connect in the future. (g) The proposed development shall not result in the premature expenditures of City funds on capital improvements necessary to accommodate the proposed development. The proposed earth moving and stockpiling operation will not expend City funds. (h) Fire prevention and fighting equipment acceptable to the Board of Fire Underwriters and City Council shall be readily available when any activity involving the handling or storage of flammable or explosive materials is carried on. The proposed earth moving and stockpiling operation does not involve any activity handling or storing flammable or explosive materials. 7 In addition to the criteria established under Section 1007.017, Interim Use Permits, Section 1007.051(4), Earth Moving and Land Reclamation establishes the following conditions that shall be met: (a) Properly fence any pit or excavation, and barricade entrances to prevent the general public from depositing garbage or refuse. The proposed plans indicate earth moving for stockpiling, not a pit. The proposed plans do not currently show any fencing around the earth moving areas or any barricades at the entrance, other than silt fence. (b) Slope the banks, and otherwise guard and keep any pit or excavation in such condition as not to be dangerous because of sliding or caving banks. The fill stockpiles are proposed with 4:1 side slopes on all sides, reducing the risk of sliding or caving banks. Areas not being worked shall be established with turf within seven (7) days of placement to avoid sliding. (c) Properly drain, fill, or level off any pit or excavation so as to make the same safe and healthful as the City may determine. The proposed earth moving and stockpiling site is designed to drain in a similar manner as the existing conditions. The majority of the site will drain towards the existing wetlands and Clearwater Creek. Erosion control is proposed and will be needed to ensure that sediment is prevented from entering the wetlands and Clearwater Creek. (d) Limit the depth of such excavation to an elevation no lower than the minimum floor elevation for building construction as established by the City Engineer, so as not to diminish development potential of the parcel. Not applicable to this project. (e) Limit any fill material to clean fill, defined as rock, sand, gravel, clay, or other like and similar non-decomposable material. Concrete, asphalt, metal, wood, and other debris shall be prohibited. The project is only proposing moving and stockpiling “suitable fill material”. The site will be limited to this type of material. The City will reserve the right to test the material. (f) Require that all decomposable material, or other unsuitable foundation material, be removed from an area before deposition of fill begins. 8 Not applicable to this project. (g)Prepare a site plan showing existing and proposed grade elevations and effect of storm water drainage on adjacent areas. A site plan showing the existing and proposed grade elevations for the proposed earth moving stockpiling was provided. (h) Specify a time when the excavation or land reclamation project shall be completed. The proposed earth moving and stockpiling operations, including turf establishment, shall be completed within 5 years of approval of the Interim Use Permit. (i)Place a minimum of four (4) inches of topsoil over the completed project and establish ground cover in a time period consistent with the City’s stormwater management and pollution prevention plan. The disturbed areas shall be seeded or hydromulched within seven (7) days of initial placement. (j) Reimburse the City for the cost of periodic inspections by the City for the purpose of determining that the terms under which the permit has been issued are being complied with. The City will maintain a $5,000 escrow provided by the owner that shall be reestablished th . This escrow will be for inspection, erosion control, and other annually by January 15 City costs associated with the earth moving and filling. If the above escrow amount is insufficient, the owner shall make such additional deposits as required by the City. The City shall have a right to reimburse itself from the Escrow with suitable documentation supporting the charges. (k)Implement the tree preservation plan. Not applicable to this site. (l)Post a form of security and sum as the permitted authority may require, running to the City, conditioned to pay the City the cost and expense of repairing or cleaning any highways, streets, or other public ways within the City made necessary by the specialburden resulting fromtransporting thereon by the applicant material to or from the site, the amount of such cost to be determined by the Council; and 9 conditioned further to comply with all the requirements of this Ordinance and the particular permit, and to save the City free and harmless from all suits or claims for damages resulting from the negligent excavation, removal, storage, or filling of rock, sand, dirt, gravel, clay, or other like material within the City. The City will collect a form of security at the time of approval of the Site Performance Agreement. (m) Other conditions deemed appropriate to the application by the City Engineer. This interim use permit, if approved by City Council, shall only be valid for 5 years and the owner will have to apply for renewal. All grading, stockpiling, and final turf establishment must be completed within the 5 years. Renewal must be approved by the City Council. Environmental Review The Environmental Coordinator has reviewed the proposal and recommendations are attached. Site Performance Agreement Site Performance Agreement shall be required. A grading permit and securities shall be deposited by the applicant. RECOMMENDATION Staff recommends approval of the interim use permit for earth moving and filling subject to the following conditions: 1.Fill stockpiles shall be limited to the areas identified in the plans prepared by Stantec. Dated December 15, 2022, and received by the City on December 15, 2022, and any revisions to the plans approved by the City. 2.Comments from the City Engineer letter dated January 4, 2023, shall be addressed. 3.Comments from the City Environmental Coordinator letter dated January 4, 2023, shall be addressed. 4. The vehicles accessing or exiting the site shall not track sediment on Phelps Road or Otter Lake Service Road. Any street tracking that does occur from vehicles entering or leaving the site must be swept within one calendar day of discovery. The sediment removal facilities on site, such as the gravel entrance, must be maintained to prevent tracking. 10 5.Fill stockpiles shall be at least 50-ft from the road easement and property lines. 6.The total fill stockpiles shall not exceed 210,000 square feet in area. 7.The northwestern stockpile shall have a maximum top elevation of 925, the northeastern stockpile shall have a maximum top elevation of 924, and the southern fill stockpile shall have a maximum top elevation of 922. 8.Maximum side slope of fill stockpiles to be 4:1/ 9.Equipment on site shall be limited to what is necessary for earth moving and filling operations, including loading and hauling equipment, and equipment needed for grading. Non-functioning equipment is not allowed to be stored on site. 10. Vehicles entering and leaving the site shall adhere to the road weight restrictions for each roadway. 11. No fill may be placed in the delineated wetlands, the Natural Resource Conservation Area, or the FEMA floodplain on the site. 12. Owner will follow the applicable standards and requirements of the City of Lino Lakes, Rice Creek Watershed District, Army Corp of Engineers, Minnesota Pollution Control Agency, Minnesota Department of Natural Resources and any other agency having jurisdiction over the property and shall secure and file with the City, copies of any permits required by outside agencies. Owner will file with the City within ten (10) days of receipt, copies of any permits and/or notice of enforcement actions by these agencies. 13. Owner will permit a City Inspector to view the premises during normal business hours. 14. The Interim Use Permit shall only be valid for 5 years once approved by City Council. All grading, stockpiling, and final turf establishment must be completed within the 5 years. The permit may be extended by the City Council following a written request bythe applicant submitted at least three months prior to expiration, and review at a public hearing. 15. A Site Performance Agreement shall be executed and recorded. ATTACHMENTS 1.Site Location & Aerial Map 2.City Engineer Letter dated January 4, 2023 3. City Environmental Coordinator Letter dated January 4, 2023 4.IUP Application Grading Plan dated December 15, 2022 11 Memorandum To:Katie Larsen, Lino Lakes City Planner From:Kelsey Gelhar PE, WSB Diane Hankee PE, Lino Lakes City Engineer Date:January 4, 2023 Re:Phelps Road StockpileIUP Plan Review WSB Project Number –021977-000 WSB has reviewedthe finalplansfor the Phelps Road Stockpile projectin Lino Lakes, MN, preparedby Stantec,received on December 15, 2022. These comments are based on the following documents: Stockpile Construction Planprepared byStantec,dated December 15, 2022,received December 15, 2022. ALTA/NPS Land Title Survey prepared byLandform, dated December 17, 2021, received December 15, 2022. Regulated Wetlands and Tributaries exhibit prepared by Kjolhaug Environmental Services Company, received December 15, 2022. Applicant to respond to these comments in writingon this word document. Any changes to the plans that are not associated with these comments shall be identified by either a summary in the response or in the plans with a revision cloud or note. Engineering •General The Phelps Road Stockpileprojectproposesto stockpile soilon the parcellocatedat the west end of Phelps Road. The applicant stated that the intent is to bring in sufficient fill to prepare for future industrial development on the site.The sitewill be accessed from Phelps Roadand is adjacent to I-35E. The parcel being utilized for thethree proposedstockpiles is approximately 14.39acres. The proposed stockpileswill be approximately 4.81acres intotalarea, will not exceed a height of 15feet, and be a total of approximately 71,000cubic yards of fill soilbased on the plans. Comments: 1.A geotechnical report and a traffic study will be required for any future development of buildings, utilities, etc. •Grading, Erosion Control& Stormwater Management Ms. Katie Larsen 01/04/2023 Page 2 The Phelps Road Stockpile project will require site grading for the proposed fill soil stockpiles. The northwest stockpile is proposed to have 4:1 side slopes, have a height of 15-ft, have a footprint of approximately 1.96 acres, and be approximately 30,000 CY in volume. The northeast stockpile is proposed to have 4:1 side slopes, have a height of 14- ft, a footprint of approximately 1.11 acres, and be approximately 14,000 CY in volume. The southern stockpile is proposed to have 4:1 side slopes, have a height of 14-ft, a footprint of approximately 1.74 acres, and be approximately 27,000 CY in volume. The proposed project is within the Rice Creek Watershed District (RCWD). The applicant is proposing to use silt fence to surround the stock pile areas and to protect wetlands and floodplain on the site. No significant changes to existing drainage patterns are proposed. Comments: 1. Applicant to update plans to address any comments provided by the City’s Environmental Coordinator regarding erosion control. 2. Applicant to verify if existing topsoil onsite is being removed prior to stockpiling. 3. No work is allowed until a Rice Creek Watershed District permit has been obtained. • Water Supply There is currently an existing 8-inch diameter ductile iron pipe (DIP) water main along Phelps Road that terminates at the east edge of the site. The applicant is not proposing any connections to the municipal water system with this plan. Staff does not have any comments at this time. • Sanitary Sewer There is currently an existing polyvinyl chloride (PVC) sewer main along Phelps Road that terminates at the east edge of the site. The applicant is not proposing any connections to the municipal sanitary sewer system with this plan. Comments: 1. Applicant to provide sanitation facilities on site for employees while stockpile operations are underway. • Transportation The site is located at the intersection Phelps Road and the Otter Lake Service Road. Phelps Road and the Otter Lake Service Road are local streets. Phelps Road is within a Public Street and Utility Easement that is 60-ft in width. The Otter Lake Service Road is within the MN DOT right-of-way in a road easement. Phelps Road was constructed to city standards from Otter Lake Road to the eastern property line of the site. Phelps Road is a 9-ton design, but during spring road restrictions, a 5-ton limit applies. The design of the Otter Lake Service Road is unknown and should be restricted to 5-ton weight due to current conditions of the road. Comments: Phelps Road Stockpile IUP Engineering Review Ms. Katie Larsen 01/04/2023 Page 3 1. Applicant to submit a hauling plan with truck weights and associated volume of material and the number of trips for the pile construction. This plan should meet the road restrictions. • Wetlands and Mitigation Plan There are two existing wetlands on the site according to the Regulated Wetlands and Tributaries exhibit prepared by Kjolhaug Environmental Services Company. The applicant is not proposing any wetland impacts with this project. Clearwater Creek is within the Natural Resource Conservation Area on the south side of the site. The applicant is not proposing any work in the Natural Resource Conservation Area. Staff does not have any comments at this time. • Landscaping The applicant did not propose any landscaping at this time. If submitted, landscaping will be reviewed in depth by the City’s Environmental Coordinator. • Floodplain There is a FEMA Zone A floodplain on the southern portion of the site near Clearwater Creek. The applicant is not proposing any impacts to the floodplain on the site. Staff does not have any comments at this time. • Drainage and Utility Easements The proposed work is located within the western most parcel on Phelps Road (PID 24-31- 22-42-0004). Phelps Road is within a Public Street and Utility Easement that is 60-ft in width. The Otter Lake Service Road is within a road easement in the Minnesota Department of Transportation right-of-way. There are drainage and utility easements and access easements along the northern property line. The applicant is not proposing any changes to the plat at this time. Site Performance Agreement A Site Performance Agreement will be required. Grading Agreement A Grading Agreement is not applicable at this time. • Stormwater Maintenance Agreement A Stormwater Maintenance Declaration is not applicable at this time. • Permits Required Phelps Road Stockpile IUP Engineering Review Ms. Katie Larsen 01/04/2023 Page 4 1. NPDES General Construction Permit 2. City of Lino Lakes Zoning Permit for Grading 3. Rice Creek Watershed District If you or the applicant has any questions regarding these comments, please contact Kelsey Gelhar at (612) 709-4897 or kgelhar@wsbeng.com. You may also contact Diane Hankee at (651) 982-2430 or dhankee@linolakes.us. Phelps Road Stockpile IUP Engineering Review Environmental Memo To:Kelsey Gelhar From: Andy Nelson Date:1/03/23 th Re: Environmental Comments/January 4, 2023/Phelps Road Stockpile 1. A seed mix for final stabilization must be specified and shown on sheet C-201, Grading and Post-Construction Stabilization Plan. 2. The construction entrance proposed for Phelps road must be replaced with a construction entrance for each site, one north and one south of Phelps Road. Page 1