HomeMy WebLinkAbout10/19/2005 Council Packet•
•
•
WORK SESSION AGENDA
CITY OF LINO LAKES
Wednesday
October 19, 2005
CITY COUNCIL WORK SESSION
Community Room (not televised)
5:30 P.M.
1. Hardwood Creek Development
2. VLAWMO
3. VFW Construction Project
4. Council salaries
Regular Agenda Items
Adjourn
PAGE 1
•
•
WS -1
WORK SESSION MEMORANDUM
To: City Council
From: Michael Grochala
Date: October 19, 2005
Re: Work Session Item 1
Hardwood Creek Comprehensive Plan Amendment
BACKGROUND
During the last two years the City Council, staff and the Hardwood Creek development
team have been discussing the opportunity for a master planned development
encompassing approximately 360 acres in the NW Quadrant of the I- 35E/Main Street
Interchange. In October of 2004 the City initiated the 135E Corridor AUAR, recognizing
the need to evaluate not only the impacts of the Hardwood Creek development but the
cumulative effects of development throughout the corridor. The Hardwood Creek
developer participated in the AUAR process as part of the advisory committee as well as
financially. The development team has also hosted three neighborhood /public open
house meetings.
At this time the developer has submitted an application to amend the Comprehensive Plan
for the purpose of moving forward with development planning. The Planning and Zoning
Board held a public hearing on the amendment at their September 14 regular meeting and
the September 27, 2005 special meeting. The Planning & Zoning Board has
recommended approval of the Comprehensive Plan Amendment. The proposed
comprehensive plan amendment is currently scheduled for council consideration at the
October 24, 2005 regular City Council meeting.
REVIEW
The council discussed the proposed Comprehensive Plan Amendment and the
development Concept Plan at it's October 5, 2005 City Council Work Session. Several
issues of concern were expressed by council members including, but not limited to, the
following:
Page 4
1. Housing density and number of townhome units.
2. Infrastructure costs and potential impact to taxpayers
The purpose of this memo is to provide additional information to address these concerns.
Housing density and number of townhome units.
The proposed Hardwood Creek development plan includes approximately 400 -420 single
family homes and 800 to 830 multifamily homes (townhomes) on approximately 270
acres of the development site (including permanent open space). The proposed housing
mix would allow for a residential development density of approximately 4.5 units per
acre. Approximately 45 acres of the site is currently guided for medium density
residential (3 to 6 units per acre) and 25 acres are guided as high density residential (6 to
12 units per acre). This would allow for up to 570 multi - family /townhome units on 70
acres (8.1 units /acre).
While the proposed Hardwood Creek Development increases the number of residential
units on the site, from a land planning standpoint, the proposed project allows for a better
distribution of the intensity of development than what is currently provided for within the
Comprehensive Plan.
Secondly, from a policy standpoint, the 4.5 unit per acre density over the site should assist
the city in satisfying Metropolitan Council Development Framework guidelines for an
average city wide residential development density of 3.0 units per acre. This was a point
of contention during the adoption of the 2002 Comprehensive Plan and required some
modification, on the City's part, of the land use plan. This should provide us with
additional flexibility as we begin to prepare for the 2008 Comprehensive Plan Update.
Finally, while staff cannot comment directly on the economics of the development, the
proposed density and unit type is linked to the site amenities that we will expect in any
development approvals from the site. The number of units provides for greater
economies of scale that make a highly landscaped, architecturally controlled development
feasible. These same economies also provide for the off -site infrastructure improvements
necessary to service the development and surrounding area. Additionally, the unit type
itself greatly influences the amount of open space preserved and /or created by the
development. Attached units (townhomes) by their very nature allow for more clustered
development which in turn provides for more open space on the site.
Generally, staff is supportive of the proposed housing density and product mix for the
above reasons. However, the development proposal does include a significant number of
housing units. To insure that the development creates the desired gateway into the
community the location, mix, look and orientation of housing product on the site is
extremely important. The developer is aware of and committed to addressing these
challenges. It is apparent from both staff and council comments that the housing products
themselves will need to improve significantly during the PUD process to gain approval.
Page 4
•
•
•
Infrastructure costs and potential impact to taxpayers
Water and Sanitary Sewer
The proposed development will require the extension of the City's trunk water and
sanitary sewer lines from Main Street to the project site. The existing trunk facilities,
installed in 1998, were designed to accommodate the potential demand from the
development site. The developer will be responsible for 100% of the sewer and water
costs associated with the extension of the utilities except for pipe over sizing and over
depth required to serve property outside of the project limits.
Additionally, the developer will be responsible for trunk utility area and unit charges.
These charges were established to equitably distribute the costs of trunk utility
infrastructure, i.e., wells, water towers, lift stations, oversized pipe etc. When over sizing
or deeper pipes are required to be installed to service areas outside of the development a
credit will be provided. Area and Unit charges are reviewed and updated annually based
on the ENR Construction Cost Index. The charges for 2005, based are as follows:
Sanitary Sewer Area Charge
Sanitary Sewer Unit Charge
Watermain Area Charge
Watermain Unit Charge
$2,520.00 acre
$1,095.00 per unit
$2,690 00 per acre
$1,765.00 per unit
In general the 363 acre site will generate approximately $1,891,230 in area charges based
on the 2005 fee schedule (the actual amount will be dependent on upland area and the
development year). Unit charges vary depending on use. A single family home
represents 1 unit. Based on 2005 rates and the proposed unit total (1,250) the residential
portion of the development would generate $3,575,000 in trunk utility unit fees. Unit
fees on commercial development would be in addition to this amount. The estimated
trunk utility charges should cover any city credit for over sizing or over depth as well as
contribute to debt retirement of infrastructure costs previously incurred. There is no
impact on taxpayers for sanitary sewer and water infrastructure.
Surface Water Management
The proposed development will require the installation of storm sewer and water quality
ponding. The developer is responsible for 100% of the cost of such improvements. The
City has established a Surface Water Management Charge that covers administration,
Surface Water Management Planning, Subwatershed Hydrologic Planning, Subwatershed
trunk lines, ponding and water quality projects. The charges for 2005 are based on
upland area and are as follows:
Single Family Residential $0.1 per square foot
Multiple Family Residential $0.137 per sq. ft.
Commercial /Industrial $0.151 per sq. ft.
Page 4
•
•
For example the 363 acre site, based solely on multiple family residential would generate
approximately $2,166,282 in charges (the actual number will change based on upland
area and commercial area). A credit for on -site surface water management improvements
is also provided based on the final design.
Transportation Improvements
The proposed development will require the installation of streets to service the
development as well as improvement to the surrounding county road system. The
developer will be responsible for 100% of the cost of all internal street improvements,
100% of the costs of required upgrades to CSAH 21 (20th Avenue) and CSAH 14 (Main
St.) that are outside the scope of the Anoka County CSAH 14 project. Additionally, the
developer is aware of and proposing to contribute to the necessary upgrades to the CSAH
14/I -35E Interchange. The amount of funding for the interchange from the Hardwood
Creek will be dependent on the scope of improvements and an equitable cost distribution
formula that will need to be prepared by the City.
It should be noted that the improvement of the CSAH 14/I -35E interchange is currently
needed to address existing traffic volumes. Regardless of the outcome of the Hardwood
Creek development the City will have a share in the cost of the interchange
improvements. Possible city funding sources for these improvements include, but are not
limited to, Municipal State Aid Funds, Special Assessments, and /or property tax levies.
The proposed Hardwood Creek development provides an opportunity to bring in private
sector dollars to assist with the funding of the interchange improvements and minimizes
the need to impact property taxes.
I hope this provides some clarity to the complex issues being discussed regarding the
proposed development. Staff has also enclosed for your review a copy of the Market
Study prepared by Maxfield Research Inc., and a copy of the application narrative
supplied by the Developer.
ATTACHMENTS
1. Project Narrative, dated September 7, 2005
2. Market Study, dated August 10, 2005
•
•
•
WlTage of Mardwood Creek
Lino Lakes, Minnesota
APPLICATION
FOR
COMPREHENSIVE PLAN AMENDMENT AND
PUD GENERAL CONCEPT PLAN
September 7, 2005
Prepared By:
ittgL
IA
LANDFORM
MINNEAPOLIS-PHOENIX
•
Village of Hardwood Creek
ott
LANDFORM
MI lEAPous•P HOLE PX
September 7, 2005
INTRODUCTION
Village at Hardwood Creek is a master - planned, mixed -use development offering an approach to life-
cycle housing and destination retail that is unique in this community. The project is planned as a
conservation development to preserve the existing resources of the site. The property is located east of
County Road 21 (20th Avenue), north of County Road 14 and west of I -35E.
Our proposal would allow development of a unique community on 362 -acres that will allow convenient
pedestrian access from the new homes to the retail center, which is planned to include several
restaurants and other service retail. The retail element of the plan would provide destination retail that is
still convenient and walkable for neighborhood residents. The mixed -use development would include
residential near the commercial so that residents could easily walk to pick up the paper and a morning
cup of coffee or enjoy a leisurely stroll to dinner at one of the many restaurants.
The City is currently completing the Alternative Urban Areawide Review (AUAR) for approximately 4,500
acres in the northeast portion of the City of Lino Lakes. The project site is included in the AUAR area.
We have reviewed the AUAR and believe the proposed project is well within the limits of the AUAR
scope. The City is expected to approve the AUAR later this month.
PUD GENERAL DEVELOPMENT CONCEPT
The City Planned Unit Development (PUD) ordinances require that mixed -use developments such as this
be rezoned to PUD. Therefore, we plan to request approval of a rezoning to PUD, PUD Development
Plan and Preliminary Plan following approval of the Comprehensive Plan Amendment and review of the
PUD Concept Plan. The PUD would allow a mix of retail and residential uses. The Zoning Ordinance
states that the purpose of the PUD is to provide "for development as an integrated, coordinated unit as
opposed to traditional ... piecemeal ... development ".
The development team has held open houses and neighborhood meetings to engage the residents in the
planning process. We have gotten good feedback that we intend to integrate into the plan, such as: a
desire to reflect the community's agricultural heritage through the landscape and architectural design of
the project; a desire to provide pedestrian connections with trails and sidewalks; a desire to preserve
natural areas within the site; etc. As we continue to refine the site plan, we intend to incorporate these
elements to create a unique development.
Page 1
Village of Hardwood Creek
LANDFORM
MINNEAIOLIE•INOENIX
September 7, 2005
Mix of Uses
Our concept plan includes 55 -70 acres of commercial development, which will result in approximately
500,000- 600,000 square feet of retail space. We anticipate a variety of users with a mix similar to The
Village of Blaine development, however, that development is smaller than our proposed development
with approximately 495,000 square feet of retail. City residents have indicated a desire to have retail
shopping choices on the site. Currently, residents are required to travel a significant distance for
shopping needs. Residents have also commented that with the growth in surrounding communities, the
area demands additional retail stores and they prefer to capture the tax benefits from retail development
within the City rather than seeing it go to the neighboring communities.
Our plan also includes a mix of residential homes that provide lifecycle housing opportunities for the
community. The plan includes approximately 400 -420 single family homes and 800 -830 multifamily
homes on approximately 150 -170 acres (270 acres including open space). This mix of housing would
allow development at approximately 4.5 units per acre, which would be less than the density currently
anticipated in areas of the site that are currently guided medium and high density residential and would
be less than the densities anticipated in the City's AUAR.
As we move forward through the development process, we will work with the City to finalize the design
and bring forward a unique development that provides needed retail and housing options in the City.
Parks, Trails and Open Space
The concept plan also shows 80 -95 acres permanent open space. This land is in addition to the
landscaped areas within the public street right -of -way and will include a mix of natural habitat corridors,
neighborhood recreation and trail corridors consistent with the City's Conservation Subdivision Design.
We will:
• Preserve natural habitat areas unique to Lino Lakes
• Create open spaces for passive and active recreation uses
• Create well- designed neighborhoods that feature common open space and
• Establish a unified landscape amenity for the enjoyment of residents
We are proposing dedication of approximately 5 -6 acres of public park in the west central portion of the
site for use as an active City park with play equipment and picnic areas. Additionally, we are proposing
numerous private open space /recreational spaces in the neighborhoods. The private recreational space
may include small neighborhood parks, tot -lots, passive open space and trail corridors. Sidewalks on the
main streets allow convenient connections to the trails within the project neighborhoods and, ultimately,
to the regional trail system.
Page 2
•
•
•
ottL
LANDFORM
Village of Hardwood Creek ""' " "' "' ° " „' " °` "'x September 7, 2005
Landscaping
The project team is working to create an integrated landscape theme throughout the project, including
plantings, lighting, streetscape and open space design. The main entrances to the site are planned as
boulevard streets with landscaped medians. The entrances to the development will have significant
landscaping and a development identification sign to create a unique entry feature. Our landscape
concept will emphasize streetscaping to create a welcoming entrance into the main development and
individual neighborhoods within Village of Hardwood Creek.
The landscape concept emphasizes significant water features, natural plantings in the open spaces and
more formal plantings within the development. The plan emphasizes street plantings, but will also
provide extensive landscaping throughout the development. The plan will incorporate native plant
material wherever possible.
Streets/Access
The neighborhood has been planned with a street connection to the north to allow for future access to
that property via a new north -south collector road.
The will have two accesses from County Road 21, but the main access is planned via the new north -
south collector road with an intersection at County Road 14. Successful commercial development
projects require direct access via a frontage road close to high traffic roadways. The site has excellent
visibility from I -35E, which is the highest traffic road nearest the property, and direct access to the
frontage road closest to I -35E will be important. While the subject property does not extend south to
County Road 14, we have a general access easement from the adjacent properties and we are working
with the landowners to the south to try to establish the street connection. Final site plan design cannot
be completed until the access location to the south is finalized.
Covenants /Association Documents
Except for the public park proposed in the west - central portion of the site, all open space will be owned
and maintained by an association. Village of Hardwood Creek will have a master association that will
maintain the shared common areas. Within the master association there will be a number of sub -
associations: the commercial association will maintain the common areas within the commercial portion
of the site and homeowners associations will be created for individual neighborhoods to maintain the
common space with their neighborhoods.
Page 3
•
•
•
LANDFORM
Village of Hardwood Creek "' " "` "' ° " "' " °` "" September 7, 2005
The developer is preparing covenants and homeowners association documents that will be provided to
the city for their review prior to final plat. These documents will address building materials, fences,
retaining walls, pond maintenance, landscaping maintenance and other association issues. We have
provided a draft of the master association document to give some idea of the intent of the document.
COMPREHENSIVE PLAN AMENDMENTS
We are requesting approval of three comprehensive plan amendments to allow development of the site
as proposed. In order to allow this unique development, the city must approve amendments to the land
use guide plan, growth area 1 MUSA allocation and growth management plan. The requested
amendments are discussed below.
Land Use Guide Plan Amendment
We are requesting approval of a reguiding from Industrial, Medium Density Residential and High Density
Residential to Mixed Use to allow development of this 362 -acre site as an integrated, master - planned
community. We anticipate approximately 55 -70 acres of commercial in the southeast portion of the site
and a mix of single family and multifamily within the remaining portion of the site. We expect to
incorporate 80 -95 acres of open space within the site as well.
The comprehensive plan designates the majority of this site as industrial with medium and high density
residential adjacent to County Road 21. The requested reguiding to mixed use would allow use to
develop the property as a Planned Unit Development with integrated commercial and residential land
uses. Discussions and feedback from residents at open houses and neighborhood meetings support this
change to allow this master planned community. Furthermore, Maxfield Research completed a market
study that analyzed growth trends and market potential. This study also supports the concept of a
commercial and residential mix on this site. We believe that a mix of retail commercial and residential is
a better land use for this site because it responds to market demand and provides a better transition from
this site to the existing residential neighborhoods.
We respectfully request approval of the reguiding, based on the finding that reguiding:
• Would comply with the spirit and intent of the City's Comprehensive Plan,
• Would comply with the mitigation provisions of the City's AUAR,
• Would allow development of this vacant site,
• Would provide increased taxes for the City
• Would provide life -cycle housing opportunities for Lino Lakes residents,
Page 4
•
•
•
ittgL
LANDFORM
Village of Hardwood Creek September 7, 2005
• Would provide destination retail to serve the neighborhood and the greater Lino Lakes
community and
• Would allow development of the master - planned, mixed -use Village of Hardwood Creek as
proposed.
Growth Area 1 MUSA Allocation
The property is currently located outside of the MUSA (Metropolitan Urban Service Area), but is located
in Growth Area 1, which is planned to be added to the MUSA between 1998 -2010. The Comprehensive
Plan anticipates development will occur in Growth Area 1, prior to 2010. However, the Growth Area I
includes more land than has MUSA acres allocated to the area, therefore, we are requesting an
allocation of MUSA reserve acreage to allow development of a mixed use, master planned community on
this 362 -acre site. Municipal utilities are available and do have adequate capacity to serve this site.
Furthermore, bringing this site into the MUSA to allow for this master - planned development will also
provide opportunities to improve the streets in this area by creating a local street system in this
development with a north -south collector that could provide an alternative to County Road 21.
We request approval of the MUSA extension based on the findings that:
• The change is consistent with the Comprehensive Plan,
• Development of the site is anticipated by the Comprehensive Plan,
• Adequate infrastructure is available to serve the site and
• The amendment will allow development of a unique, master - planned community.
Growth Management Policy
The City's Growth Management Policy generally limits new housing to an average of 147 units per year
through 2020 while carrying a 3 -year inventory. The 362 -acre site would include all of the MUSA
residential acreage and units planned by the City for development prior to 2010, but the Comprehensive
Plan does allow for comprehensive plan amendments for master - planned communities such as this. The
proposal would require a comprehensive plan amendment to allow the mixed -use development to
exceed the annual residential unit limit, the annual residential acreage limit and the 2010 MUSA acreage
limits.
In exchange for this flexibility from the growth management limits, the developer is proposing an
exceptional project to meet the retail and residential needs of eastern Lino Lakes. The proposed
development provides a comprehensive approach to land planning a significant piece of land in the city
rather than allowing the piecemeal development that the growth management limits could cause. With a
Page 5
•
•
•
ottL
LANDFORM
Village of Hardwood Creek
September 7, 2005
master - planned community like ours, the neighborhoods are integrated and connected, large amounts of
open space are preserved, and the scale of the development allows for streetscaping and other
amenities that simply would not be possible outside of a master - planned community like Village of
Hardwood Creek. The project allows the opportunity for great residential neighborhoods that are
connected to a vibrant commercial area with green corridors and pedestrian connections. It is our
intention to develop the site as a conservation development with 20 -26 percent permanent open space
plus landscaped medians and boulevards on the main streets, but we cannot begin work on the detailed
planning prior to approval of the requested comprehensive plan amendments. Therefore, while we
believe our conservation development would meet the purpose and intent of the ordinance, we are
asking the city to respond to this policy question now to ensure that our development proposal has the
City's support before we proceed with the site plan details.
Despite the City's Growth Management Policy, the City has continued to be impacted by the growth of
the surrounding communities through increased traffic. Our master planned development will provide
alternative roadways and relief from the existing thoroughfares.
The City always has the discretion to approve housing units and acreage above the annual limit where
the development proposal results in significant and discernable public values. The proposed
development complies with the growth management criteria. Specifically:
• We are proposing to provide a variety of housing types in this mixed -use development, which will
help to meet the City's housing goals. Centex Homes will be the primary builder, but a number
of custom home Tots will be reserved for local builders.
• The project will include transportation improvements that will benefit surrounding residents and
which could not otherwise be accomplished through traditional, piecemeal development.
• The concept plan shows 20 -26 percent of the development to be preserved as permanent open
space, which will help to preserve natural features.
• The retail and multi - family portions of the development will provide significant tax base for the
City of Lino Lakes.
• The public improvements planned with the site will have regional benefits for the community.
• The development of this site as an integrated neighborhood with destination retail provides a
unique opportunity for the City of Lino Lakes.
• Village of Hardwood Creek will have an extensive system of sidewalks and trails that will provide
access to and within the development.
• Innovative stormwater design will also be used within the development, where feasible.
Page 6
•
•
ittgL
LANDFORM
Village of Hardwood Creek
September 7, 2005
Unfortunately, the exceptional design of this project and a commercial development of this scale cannot
happen without the residential portion of the development. If the development is subject to the existing
City growth limits, the opportunities presented by this site will be lost. We request approval of an
exemption from the City's growth management restrictions to allow development of this mixed -use,
master - planned community over a period of approximately 5 years.
SCHEDULE
Assuming the AUAR is approved by the City Council this month, we request approval of this
Comprehensive Plan Amendment and PUD concept plan.
Following approval of the Comprehensive Plan Amendment, we would submit application for approval of
a rezoning to PUD, PUD development plan and preliminary plat. We would then submit for final plat and
final PUD development plan approval in the spring and begin site grading in the spring of 2006.
At this time, the developer anticipates 4 phases of Village of Hardwood Creek, but the final phasing plan
is dependent on a number of factors including the final site plan and market conditions. The phasing of
the project will general move south to north and we anticipate residential build -out over 4 -6 years and
commercial build -out within 5 years.
SUMMARY
We are requesting approval of the Comprehensive Plan Amendments and PUD General Concept Plan to
allow development of the Village of Hardwood Creek as a mixed -use development providing a variety of
residential housing opportunities and retail commercial.
Any additional questions in regards to this development can be directed to Kendra Lindahl with Landform
at klindahl(a�landformmsp.com or 612.638.0225 or Greg Hayes with Village of Hardwood Creek, LLC at
ohayes(ashingobee.com or 763.479.5636.
Page 7
•
Village of Hardwood Creek
LANDFORM
M,NNENPYL S,140ENI%
September 7, 2005
vilrage of Wardwood Creek DeveCopment Team
Master Developer:
Village of Hardwood Creek, LLC
669 North Medina Street
PO Box 8
Loretto, MN 55357 -0008
Commercial Developer:
Greg Hayes
Shingobee Builders, Inc.
669 North Medina Street
PO Box 8
Loretto, MN 55357 -0008
Residential Developer:
Bill Anner
Centex Homes
12400 Whitewater Drive, Suite 120
Minnetonka, MN 55343
Project Planner:
Kendra Lindahl, AICP
Landform
510 First Avenue North, Suite 650
Minneapolis, MN 55403
Landscape Architect:
Ben Sporer, RLA
Landform
510 First Avenue North, Suite 650
Minneapolis, MN 55403
Project Architect:
Jack Amdahl, AIA
KKE
300 First Avenue North
Minneapolis, MN 55401
Project Engineer and Land Surveyor:
William McCully
Glenn Rehbein Companies
8651 Naples Street NE
Blaine, MN 55449
Project Attorney:
Mark Vargo
8651 Naples Street NE
Blaine, MN 55449
Project PID# s:
13- 31 -22 -31 -0001, 13- 31 -22 -23 -0002, 13- 31 -22 -23 -0001, 13- 31 -22 -21 -0002, 13- 31 -22 -21 -0001,
13- 31 -22 -31 -0002, 13- 31 -22 -34 -0001, 12- 31 -22 -34 -0002, 12- 31 -22 -33 -0004, 12 -31 -22-43 -0001,
13- 31 -22 -33 -0001, 13- 31 -22 -32 -0001
Page 8
xfield
Research. Inc.
August 10, 2005
MEMORANDUM
TO: Mr. Greg Hayes
Shingobee Builders
FROM: Ms. Mary C. Bujold
Maxfield Research Inc.
RE: Summary of Growth Trends and Potential Market for Housing and
Commercial Uses for Village at Hardwood Creek
Maxfield Research Inc. has reviewed projected growth trends and overall market conditions in
Lino Lakes and the surrounding communities as they relate to the potential demand for housing
and commercial retail uses as proposed for the Village at Hardwood Creek master - planned
development.
The following paragraphs summarize our findings.
Growth Trends
Lino Lakes, several of the surrounding communities and Anoka County, in general, have been
growing rapidly as the Twin Cities population base continues to spread outward. As shown on
the following table, Lino Lakes is projected to add 5,500 people and 2,243 households during the
2000s. According to estimates published by Minnesota Planning, the State demographer, Lino
Lakes was estimated to have 18,368 people and 5,433 households as of 2003, well on their way
to achieving the 2010 projected growth figures.
Employment growth is not projected to be as strong as growth in population and households.
Nevertheless, the community is expected to add 506 new jobs by 2010. Most of these jobs are
expected to be in service- related industries including education, business and government
services, and retail. A concern voiced by residents in the community indicated a need for more
jobs locally.
615 Is' Avenue NE #400, Minneapolis, MN 55413
(612) 338 -0012 fax (612) 904 -7979
www.maxfieldresearch.com
•
•
•
Mr. Greg Hayes
Shingobee Builders
August 10, 2005
Page 2
TABLE 1
GROWTH TRENDS
LINO LAKES & ANOKA COUNTY
Census
Estimate
Forecast
2000 2003 2010
Change
2000 -2010
No. 1 Pct.
LINO LAKES
Population 16,971 18,368 22,500 5,529 32.6%
Households 4,857 5,433 7,100 2,243 46.2%
Employment 2,444 2,597 2,950 506 20.7%
ANOKA COUNTY
Population 298,084 313,197 357,670 59,586 20.0%
Households 106,429 112,627 135,300 28,871 27.1%
Employment 106,814 112,328 125,190 18,376 17.2%
Sources: Metropolitan Council; Maxfield Research Inc.
Compared to Anoka County, Lino Lakes is growing rapidly. Although Anoka County is
experiencing strong growth, Lino Lakes proportional growth exceeds that of Anoka County in
each category, population, households and employment. Lino Lakes is growing at a rate
approximately 40% more than Anoka County for both population and households.
Demographic Trends
Household Type
Table 2 presents household type trends for Lino Lakes in 1990 and 2000. This data shows that
all household types increased during the 1990s, a period of strong growth for the community.
Proportionately, households living alone increased the most. However, the largest household
group remains married couples with children, followed by married couples without children.
Married couples without children usually represent those that are younger who have not yet had
children and those that are older whose children are grown. Both of these groups without
children are candidates for multifamily housing. Although married couples with children
typically prefer a single - family home, we are finding that many young couples with only one
child will often move first into a townhome before moving up into a single - family home. As the
prices of single - family homes continue to rise dramatically, the townhome option has become a
more attractive alternative for those first -time homebuyers wanting to own a residence.
MAXFIELD RESEARCH INC.
e
•
•
Mr. Greg Hayes
Shingobee Builders
August 10, 2005
Page 3
TABLE 2
HOUSEHOLD TYPE
LINO LAKES
1990 and 2000
1 TS'Pe. of Household ..
Single - Living Alone
Number
Percent
1990.
230
2000
488
9.6 10.0
Married Couple Family w /Child
Number 1,352 2,455
Percent
56.6 50.5
Married Couple Family w/o Child
Number 696 1,313
Percent 29.1 27.0
Other Family
Number 213 395
Percent 8.9 8.1
Non - Family (Roommates)
Number 112 206
Percent 4.7 4.2
Total Households
Number 2,390 4,857
Percent 100.0 100.0
Sources: U. S. Census, 1990 & 2000.
There is a growing need for new housing products to provide life -cycle housing opportunities for
existing and future residents of Lino Lakes.
Age Distribution
Table 3 presents estimated and projected age distribution for Lino Lakes. This data shows the
large number of children, a figure that is projected to continue to grow during the 2000s. Lino
Lakes is a relatively young community. Over time, we expect to see a gradual shifting in
average age upward as the baby boom generation moves into its older adulthood and early senior
years.
MAXFIELD RESEARCH INC.
•
•
•
Mr. Greg Hayes
Shingobee Builders
August 10, 2005
Page 4
Household Incomes
Age
TABLE 3
AGE DISTRIBUTION
LINO LAKES
2000 -2010
ensus
Estimate °'.
2000
2005
Forecast
2010
17 and Under 5,651 6,806 7,332
18 -24 1,100 1,703 2,613
25 -34 2,381 1,961 2,330
35 -44 4,303 4,400 3,878
45 -54 2,054 2,567 3,208
55 -64 753 1,250 2,040
65 -74 327 441 741
75+ 222 292 358
Total 16,791 19,420 22,500
Average Age 30.1
31.6 33.1
Sources: Bureau of the Census; Claritas Inc.
Table 4 presents household incomes in Lino Lakes as compared to the Twin Cities Metro Area.
Household incomes are relatively high in the community. Compared to the Twin Cities Metro
Area, Lino Lakes' household incomes are slightly higher than those overall for the Metro Area.
Per capita incomes however, are nearly equal or slightly lower. This is likely due to the high
proportion of children in the community. Higher incomes will be attractive to retailers wanting
to locate in the community.
MAXFIELD RESEARCH INC.
•
•
•
Mr. Greg Hayes
Shingobee Builders
August 10, 2005
Page 5
TABLE 4
HOUSEHOLD INCOME
LINO LAKES /METRO AREA
Census`:
Estimate
2000
2005
orecast.
2010
Lino Lakes
Avg. HH Inc. $86,117 $102,446 $116,457
Med. HH Inc. $75,899 $87,062 $97,154
Per Capita $25,387 $30,603 $34,542
Metro Area
Avg. HH Inc. $68,439 $79,603 $90,676
Med. HH Inc. $55,235 $62,862 $70,462
Per Capita $26,776 $31,185 $35,509
Sources: Claritas, Inc.; Bureau of the Census
Residential Construction Trends
Table 5 presents information on recent residential construction trends in Lino Lakes and the
surrounding communities. The table shows that construction has been strong, more so in the
surrounding communities than in Lino Lakes. Multifamily development as a percent of total
construction has increased due to rising home prices and households choosing greater levels of
convenience.
MAXFIELD RESEARCH INC.
•
•
•
Mr. Greg Hayes
Shingobee Builders
August 10, 2005
Page 6
City
Lino Lakes
Blaine
Hugo
Forest Lake
Total
TABLE 5
RESIDENTIAL BUILDING PERMITS ISSUED
2002 through 2004
Single - Family;
200211 2003
2004
wnuomes
20021 20031 2004
202 120 128 16
450 429 520 203
42 44 93 119
139 262 167 178
833 855 908 516
% TH's /Other Multifamily as a % of total:
Source: Metropolitan Council
Housing Demand
1
284
8
237
530
ith er „1Ylult'lamily
200211 200311 2004
62 0
255 166 103 297
28 0 175 108
87 62 0 10
0
0
432 228 278 415
32.7% 31.9% 24.6% 14.5% 17.6% 23.6%
Village at Hardwood Creek is proposed to have approximately 1,200 housing units, a mix of
single- family and multifamily. At this time, the target proportion of multifamily to single - family
is expected to be 60 %140 %. This proportion is in keeping with trends that we are seeing in the
overall housing marketplace and the development of a broader variety of housing products to
meet households' life -cycle needs.
At the current development pace, we project that it would require between 3.5 to 5.0 years for
full build -out of the housing component provided that interest rates remain at their current lower
rates.
Retail Market Conditions
New neighborhood retail space was recently developed in Lino Lakes with SuperTarget and
Kohl's as the anchor tenants. Lino Lakes Town Center has approximately 350,000 square feet
along with additional retail pad sites. This center primarily serves the area west of I -35W and
further north and south on either side of 35W.
Households located on the east side of Lino Lakes are oriented primarily north -south along I-
35E. The closest commercial shopping is located at the intersection of I -35E and Highway 96
with Cub Foods and Walgreens. Vadnais Square with Target and Walmart is located at I -35E
and County Road E, about one -half mile south from Highway 96. This area attracts households
from Centerville, east side of Lino Lakes, Hugo, White Bear Lake, White Bear Township,
Vadnais Heights, Shoreview and White Bear Lake. Commercial uses on the proposed site would
draw households from Lino Lake, Hugo, White Bear Township, and as far away as Forest Lake
given the level of development that is being contemplated. In addition, providing neighborhood
MAXFIELD RESEARCH INC.
•
•
•
Mr. Greg Hayes
Shingobee Builders
August 10, 2005
Page 7
goods and services to households nearby will serve the existing resident base which has indicated
they are currently underserved in this area in addition to future households that will reside in the
area.
Retail Demand
Our analysis of consumer expenditures revealed that households in the Lino Lakes Draw Area
current spend $832.8 million on retail goods and services, excluding education, health care and
shelter - related expenses. Based on total household expenditures and an average per square foot
retail sales of $280 for neighborhood goods and services, results in a need for nearly 3.0 million
square feet of retail space. Our calculations exclude Blaine from the analysis, although retail
space in Blaine currently serves a portion of households in Lino Lakes. Thus, there is currently a
high proportion of retail leakage from Lino Lakes. Our estimates reveal that there is current
market support for approximately 300,000 square feet of retail at this time that will double over
the next five years.
Households in Lino Lakes are currently spending their retail dollars both inside of and outside of
Lino Lakes, more outside of the community as there is a lack of retail outlets to support all of the
demand.
During both formal and informal surveys, households have indicated a desire for additional sit -
down restaurants and other types of neighborhood retail goods to increase the variety of choices
nearby.
The proposed commercial space for the Village of Hardwood Creek development, 600,000
square feet will be supported over time as the population grows and as retail outlets are
established and customers gradually shift their buying patterns to outlets closer to home. The
strong projected household growth for Lino Lakes and the immediate surrounding communities
will attract new retailers to the area who see an opportunity to satisfy the growing demand for
goods and services in the community.
MAXFIELD RESEARCH INC.
•
WS - 2
WORK SESSION STAFF REPORT
Work Session Item No. 2
Date: Council Work Session October 19, 2005
To: City Council
From: Gordon Heitke
Re: VLAWMO Joint Powers Agreement
Background
The existing joint powers agreement with the member units which comprise the Vadnais
Lake Area Water Management Organization (VLAWMO) expires at the end of the year.
Throughout the past year, the City of Lino Lakes has maintained a position that it favored
merging into a watershed district in order to have a structure which would have the
resources to more effectively manage water issues. While some other members have also
expressed concern about VLAWMO's effectiveness and the need to make changes to the
structure of governance, all other members have indicated that they will extend the
current JPA for another year. The withdrawal of the City of Lino Lakes has the impact of
reducing the effectiveness of VLAWMO's ability to manage the watershed unit as a
portion of it would be outside of their area of jurisdiction and the City would have to find
another means of administering wetland regulations.
Throughout our discussion of the VLAWMO JPA, concerns have been discussed related
to lack of a water management plan, providing for a means of adequately funding the
organization in order to implement an appropriate work plan, and having an effective
structure of governance committed to managing the water resources. Since the
VLAWMO Board initially approved a budget which would provide for significantly
more resources to accomplish more activities, member communities have reduced the
amount, but adequate funding for the completion of a water plan has been maintained.
1
•
•
•
Attached is a copy of correspondence received by VLAWMO from the Board on Water
and Soil Resources (BWSR), the state agency which has oversight of water management
and water management entities. The position of Lino Lakes up to this time has prompted
some needed clarification from BWSR on how the WMO is to operate and provided
BWSR with a forum to express some of its concerns to VLAWMO.
Mr. Jeff McDowell, Acting Chairman of the VLAWMO Board and Lino Lakes
representative, and I have discussed this situation. The position of Lino Lakes and other
member units and BWSR have prompted some action and placed some expectations on
the part of VLAWMO. At this time it appears that the best course of action would be to
agree to an additional one -year extension of the JPA in the amount $5,411, making it
known that the City intends to monitor progress this year on the completion of the water
plan, plans for obtaining adequate funding for the future, and resolving issues of
governance related to member unit representation, eligible representatives, and voting.
Requested Council Direction
The VLAWMO Board needs to know the intention of the City of Lino Lakes in regard to
being a member of the VLAWMO JPA and providing its proportional share of the budget
in order for the necessary documents to be drawn and distributed to member units for
action in November and December. Staff is seeking direction from the Council on its
intent to continue participating in the JPA during 2006 and provide $5,411 as its share of
the budget. The Council may choose to include comments related to monitoring progress
made during 2006 related to the water plan, future funding and governance issues.
Attachments
1. VLAWMO letter, budget attachment, Sept. 8, 2005
2. Steve Woods, BWSR, correspondence to VLAWMO, Sept. 12, 2005
2
Memo
Vadnais Lake Area Water Management Organization
4701 Highway 61, White Bear Lake MN 55110
Tel. 651 -429 -8522; Fax 651 -429 -8579
Website: www.vlawmo.org; email: office @vlawmo.org
Date: September 8, 2005
To: Members of the VLAWMO Joint Powers Agreement
Cc: VLAWMO Board
From: Jeff McDowell, Acting Chair, VLAWMO
RE AWMO 2006 Budget, as amended
As red
$34
me
F" J
our PA and State Statute the VLAWMO Board approved a 2006 Budget of
ts June meeting. That budget, with the member assessments was submitted to the
before the end of June, 2005.
The WMO Board appreciates the time and energy you, as member communities, have put
into' consideration of the 2006 Budget. At an August 31st Membership Budget Committee
meeting a revised 2006 budget of $141,400 was recommended to VLAWMO. The VLAWMO
Board considered the revised budget at its September meeting, and is proposing increasing the
budget to $186,400 in order to adequately fund the Water Plan update. The newly proposed
budget and member assessment is attached.
The $186,400 budget was unanimously approved by the VLAWMO Board at the September
meeting.
The VLAWMO Board feels the proposed $45,000 increase is necessary to update theWater
Plan as outlined in Minnesota Rule, Chapter 8410.
The VLAWMO Board is asking each member community to formally address the proposed
budget prior to our October 13th Board meeting. At this meeting we hope to have the financial
support necessary to continue making progress on a conforming Water Plan.
Thank you for your support and patience on this matter. Any questions can be directed to
Stephanie McNamara (651 -429 -8522) or myself (651) 604 -4798.
VLAW, 4Q
Amended budget 2006 -Board approved 905 September 1, 2005
® EXPENSES
1 Monitoring and Assessment
1.a
1.b
1.c
7 #60.433vd-getffor 20QW) J* ;t�, O M
Citizen's Lake Monitoring ($1500)
footnotes
1
2.a
2.c
2.d
2
Ramsey Co lab work & bio assessment ($8500)
Lambert Cr. Data collection
Outside professional consultants
2
Engineering ITechnical(4 hr /mo @ $125= $6000)
2.e
Public Education ($1000)
Legal ($1500) 1
%.,t
rqi
AS.
3.a
3.b
Information systems
Finance (audit - $3500, bookkeeping help $500)
Website maintenance
r
Computer upgrades
4
Office
rent, copies, post, tel
6.a
5
Insurance
Maintenance
Liability, errors & ommissions, bond
7.a
Lambert Lake
Grass & Rice Lks
Whitaker weir & pond
IVIDA
AZNict
SI R
3
4
5
6
Administration
7.b
Administrator (+ FICA & PERA, no health)
7.c
summer intern ($7000)
Water resources tech
?aQ
;riia5
7
8 Training (staff /Board)
9 Misc. & Cont.
Projects
10 Water Plan project
grant funded in 2006
gam
11.a Source Water prote Wellhead protection assistance
11.b
Well sealin
WISL
10,
j *,
12 Fees for review service
13 Interest
14
15
16
•
11
Miscellanous WCA sub grant & other
Assessments
Assessments _
Gem Lake
2.85
. $
.
Lino Lakes
3.05`
North Oaks
29.32
'51;
SPRWS
• 3.4
:
Vadnais Heights
27.42
`4X04.0-4$:'
White Bear Lake
22.53
V9:.
White Bear Town
11.43
it { „' .;$a)3.127g,
Total assessments
$177,400
09/01/2005
•
•
•
2
Memo
Footnote discussion of amended 2006 Budget:
1. Monitoring and Assessment. The previously approved amounts for the volunteer
lake monitoring program and the Ramsey County lab work were continued. Lambert
Creek monitoring data collection was deferred pending the Water Plan and further
discussion with the St. Paul Regional Water Service (SPRWS).
2. Outside professional consultants. As larger capital improvement projects and
education pilot projects would be defined in the Water Plan this area was trimmed
back to level that would allow for development plan reviews by an engineering
consultant and some additional education (double 2005) monies. It was strongly
suggested that the application fee structure be reviewed and updated (see income
item) with costs such as engineering reviews of applications be considered a `pass -
through' cost borne by the applicant. Legal and financial consulting budgets were
maintained as approved.
3. Information Systems. A website upgrade, including links to all of the member sites
was considered essential and need not be deferred to 2007. The website upgrade was
increased from $1500 to $2000. This upgrade will stop short of making our database
available on -line. Updating our database first will most likely be an Implementation
item in the Water Plan. Computer systems budget was decreased from $4400 to
$3500. This however, could still allow for the purchase of a new computer for an
intern to use this year and potentially a full -time staff person to use in the future.
This item should include set -up and networking assistance.
4. Office. This was increased over the current level of $3300 to $4000. But it did not
assume moving to a market rate office space at the $15,000. Nor does it fund most
potential office upgrades (desks & file system) that have been identified if
VLAWMO adds a staff person.
5. Insurance. This is increased slightly over 2005 ($2600 to $2700), but somewhat
lower than approved 2006 of $3200. Workers compensation will not be needed for
the second person.
6. Maintenance. This item was considered essential, but costs were not broken out by
project area. The amount was increased from $7500 to $10,000.
7. Administration. The amount for the administrator was left as budgeted. The intern
funding was cut to $7000 based on the experience committee members. The
committee recommends deferring the additional staff person until the Water Plan
Implementation program is available. At that time VLAWMO may have a clearer
vision of the needs to met by staff person. One member suggested VLAWMO may
want to reduce or eliminate the engineering consultant budget item and might be
better served by hiring a staff engineer.
8. Training. With 1.5 staff rather than 2.5 staff persons, training was left at its current
level ($700) rather than the approved $1400.
9. Misc. and Contingency. This amount was reduced to the current level of $1000
rather than the approved $11,800 that anticipated moving, resetting up the office and
hiring another full time staff person.
10. Water Plan. Similar Water Plans in the metro area have been costing at least
$100,000. Particular attention will be paid to Goals & Policies and Implementation
Program, providing a level of detail now required by State Rules. The Water Plan
must be expedited and may cost more as a result. The recommended 2006 budget
($75,000) would bring the total available for the Water Plan update to $1 10,000.
11. Fees for Service. The current pricing structure will be reviewed and updated.
e
DATE: September 12, 2005
TO: Vadnais Lake Area Watershed Management Organization
FROM: Steve Woods, Assistant. Director
Jim Haertel, Water Management Specialist
SUBJECT: Follow up on questions raised at September 8, 2005 Meeting
I provided some verbal feedback on the August 31, 2005 letter from Roger Jenson
regarding Joint Power Agreement Issues. You have requested that we document our
position in writing and address additional issues that were raised at the meeting. The first
three questions mirror those of the August 31 letter and set forth our lack of concurrence
with its conclusions. The remaining questions were raised at the meeting. I said that I
would include these in our correspondence after conferring with Jim Haertel and our
representatives in the Attorney General's Office.
• 1. Can the Joint Power Agreement be continued for another year if Lino Lakes or
SPRWS (or both) decide not to sign the extension?
While we concur with WMO counsel that those members interested in doing so could
continue with a JPA, we disagree that the JPA could be extended over cities objecting to
being included. The net affect of the position contained in the August 31 letter would be
to allow a majority faction of the JPA entity to perpetually bind a minority of
communities to the JPA arrangement merely by extending expiration dates (as has been
done once already with the concurrence of members). The reference to MS 103B.211
sited in the correspondence refers to decisions of a WMO Board — membership is an
issue reserved for the governing bodies of the municipalities to act upon.
2. If the Board continues as a legal entity for an additional year based upon a
majority vote, what is the status of the non - signing members?
We disagree that a non - signing member is "likely bound by the agreement for 2006" for
the reasons noted in item one above. Furthermore, our experience in the courts has
shown us first hand that a city must opt out before it opts into another structure. State law
says any area not covered by the JPA requires the county to petition for the formation of
a watershed district or possibly to do the water planning and implementation themselves.
•
3. Consideration of VLAWMO petition on a smaller boundary area (omitting Lino
Lakes) and then continuing in it present course.
BWSR does not approve changes to WMO boundaries. We are limited to a review and
comment role. BWSR does set watershed district boundaries, however. Some of the
confusion in this answer may arise from the mistaken assumption that the term
"watershed district" includes watershed management organizations. It does not.
We describe this scenario as being "possible" on purpose. We believe the term
"probable" is overstating the likelihood that our 17- member board would automatically
vote to annex the Lino Lakes area into the Rice Creek Watershed District, for example.
The Board has historically been cautious about having a political border deviate
significantly from the hydrologic border in order to maintain the nexus between the use
of ad- valorem financing and water contributions.
4. How could the WMO obtain direct levy authority?
It is clear that the legislative intent was for MS 103B WMOs to have direct levy
authority. Subsequent decisions to bar use of the authority rest upon the absence of such
entities being explicitly listed as a special taxing district in MS 275.066. Several WMOs
have had special legislation passed in order to be listed in Chapter 275.
5. Would it be necessary for the JPA to explicitly grant the WMO the power to
• utilize direct levy authority?
The current JPA for the watershed does not include any clause that would lead us to
believe that the WMO Commissioners would have the power to directly levy for
administrative purposes without an amendment to the JPA. The current JPA for the
VLAWMO does address the power for the WMO to order projects contained in its
approved watershed plan and have them paid for either by the members or through the
appropriate county. Interpreted narrowly, we would not construe this power to be
indicative of the direct levy authority that a WMO board wants for administrative
purposes.
6. Are the JPA members required to provide their proportional allocation of the
budget that the city or township representatives to the WMO approve?
Yes, once the members have had a chance to comment on the proposed budget and a
majority of the Commissioners approve a final budget. Section IV, subd. 8 addresses
administrative funds. Section 4, subdivisions 4B and 10 address payment for
improvement items (i.e. non administrative) initiated pursuant to the approved watershed
plan. Another subdivision stipulates that the plan will be complied with by the members
unless arbitration is petitioned for.
•
7. The City of White Bear Lake still utilizes city staff to represent the city on the
WMO Board.
BWSR has worked with the City for two years to allow for a smooth transition to a
citizen commissioner as required by Minnesota Statue. In part, this was done to avoid
losing either the "institutional memory" that the public works director carried or the
considerable momentum he brought to the WMO activities. We believe the City has
ample time to find a citizen replacement. The continued presence of a city employee
voting on matters before the WMO Board will be viewed as an organizational
shortcoming in any deliberations BWSR may undertake regarding the VLAWMO's
implementation status.
8. The funding mechanisms utilized by Bassett Creek WMO and Hennepin County
is a potential funding alternative.
At the meeting I outlined direct levy and "indirect" levies obtained through the JPA
members. The direct levy issue was address in items 4 and 5 of this memorandum. JPA
members could raise their portion of the budget by utilizing their general fund, storm
water utility, sub watershed ad- valorem taxation, or, theoretically, direct assessment.
In addition to these mechanisms, the WMO can "directly" fund capital improvement
projects (contained in their approved plan) by certifying them to the county for payment
(MS 103B.251). The WMO may apportion the costs district -wide or by subwatershed
units. They may also establish more then one tax district for this purpose.
9. The VLAWMO plan will expire before the new plan is finished.
We see no way the VLAWMO can complete even a rough draft of a watershed
management plan before the expiration of the current plan. We understand that
substantial time was consumed as the organization grappled with the governance issue.
For this reason and at this time, BWSR staff does not intend to initiate an investigation of
the WMO's inability to implement the Metropolitan Surface Water Management Act
immediately upon expiration of the old plan. However, our continuing position that the
WMO needs to be making progress on the plan remains.
The last year has seen the WMO unable to make significant progress in even issuing a
request for proposals to hire a consultant to perform the work. We hold serious doubts
that the WMO will have any substantial work started on the update of the watershed plan
before the old plan expires. We encourage the WMO to act more urgently in getting this
progress underway. Failure to move ahead in this critical component of implementing
the Metropolitan Surface Water Management Act could lead to governance structures
that a majority of the communities in the VLAWMO currently do not wish to pursue.
We hope our response is clear on these issues and we remain available to discuss the
WMO's options for moving forward.
•
•
WS -3
WORK SESSION MEMORANDUM
To: City Council
From: Michael Grochala
Date: October 19, 2005
Re: Work Session Item 3
VFW Construction Project
This item has been placed on the agenda in response to public complaints received by
council members. Staff will provide a verbal update of the situation at the council work
session.