Loading...
HomeMy WebLinkAbout01/14/2026 P & Z Minutes CITY OF LINO LAKES PLANNING &ZONINGBOARD MINUTES DATE: January 14, 2026 TIME STARTED: 6:30 P.M. TIME ENDED: 8:01 P.M. MEMBERS PRESENT:Isaac Wipperfurth, Nathan Vojtech, Michael Root, Suzy Guthmueller, Perry Laden, Patrick Kohler, Neil Evenson MEMBERS ABSENT: STAFF PRESENT: Michael Grochala, Katie Larsen, Diane Hankee, Jessica Eller, Marissa Ertel 1. CALL TO ORDER AND ROLL CALL Chair Root called the Lino Lakes Planning & Zoning Board meeting to order at 6:30 p.m. onJanuary 14, 2026. 2.PLEDGE OF ALLEGIANCE 3.PUBLIC COMMENT Chair Root declared public comment open at 6:31 p.m. There was no one present for public comment. Mr. Vojtech motionedto close public comment at 6:31p.m.Motion was seconded by Mr.Kohler. Motion carried 7 – 0. 4. APPROVAL OF AGENDA The agenda was approved as presented. 5. APPROVAL OF MINUTES Mr. Kohler moved to approve the December 10, 2025 meeting minutes. Motion seconded by Mr. Wipperfurth. Motion carried 6 – 0, with one abstention. 6. ACTION ITEMS Planning & Zoning Board January 14, 2026 Page 2 A.2245 Tele Drive 3-Season Porch Setback Variance The applicant, Todd Wanka, is requesting a setback variance for the purpose of constructing a 3-season porch. The property address is 2245 Tele Drive. Mr. Wipperfurth had a question about the setback on the survey and if this was encroaching into the drainage and utility easement. Ms. Larsen confirmed that this would not in the drainage and utility easement. Ms. Guthmueller wanted to know if the neighbors needed to be notified. Ms. Larsen confirmed that only the City needed to be notified. Mr. Evenson motioned to approve the setback variance with staff recommendations. Motion was seconded by Ms. Guthmueller. Motion carried 7 – 0. B. Pine Oaks PUD Concept Plan Review The applicant, M/I Homes of Minneapolis/St. Paul, LLC, is proposing 82 single family villa lots in a conservation subdivision. The development is approximately 75 gross acres. It is located northeast of Natures Refuge North and is called Pine Oaks. Ms. Emily Becker was available for questions. Mr. Evenson wanted clarification on the PUD flexibilities and whether these were the same as both Natures Refuge developments. Ms. Larsen stated that not all of the flexibility would be the same between Pine Oaks and Natures Refuge. Mr. Evenson believes bringing onsite sewer to the surrounding areas would be a positive benefit to the City and residents. Mr. Wipperfurth likes the idea of connecting the neighborhoods and would appreciate the street connection being made with the surrounding neighborhoods. Mr. Kohler would like to see the road on the east be connected to Pine Street. Mr. Laden agrees with the comments made by the Board. Mr. Laden likes the amount of open space being considered. Mr. Laden would like to explore a road connection to the west for potential future development. Mr. Vojtech is wary of the connection between a high-density neighborhood to a low- density neighborhood. Mr. Vojtech worries about the traffic going through the existing neighborhood. Planning & Zoning Board January 14, 2026 Page 3 Mr. Root spoke on the flexibility for the 5-foot forward flexibility. Mr. Root is also in favor of the sewer and water availabilityto the area. Mr. Root is also in favor of the neighborhood connections to distribute traffic. Mr. Root would like to see the trail system be incorporated as a public benefit. Mr. Root is unsure of the idea of life-cycle housing. Ms. Larsen stated this would benefit towards the end-of-life cycle due to cost. Mr. Root believes that a neighborhood meeting should be required. Mr. Laden agreed that allowing the garage flexibility would help prevent the monotony of all garages looking the same. Mr. Vojtech wanted to know the approximate housing costs. Ms. Becker stated that the starting point would be around $450,000 to $500,000. Mr. Root restated the suggestions from the board, emphasizing the trail system, street connections between neighborhoods and requiring a neighborhood meeting by the developer. 7. DISCUSSION ITEMS A. Metropolitan Council 2050 System Statement Mr. Grochala presented the staff report. The Board discussed affordable housing that is currently available in the area and what changes are being made from the 2040 Comprehensive Plan and Imagine 2050. B. Public Works Design Update Mr. Grochala presented the staff report. C. Project Updates Ms. Larsen provided project updates to the Board. Mr. Wipperfurth moved to adjourn the meeting. Motion seconded by Mr. Vojtech. Meeting adjourned at 8:01 p.m. Planning & Zoning Board January 14, 2026 Page 4 Respectfully submitted, Marissa Ertel– Community Development Administrative Assistant