HomeMy WebLinkAbout04/08/2026 PZ Combined Packet
PLANNING & ZONING BOARD AGENDA
Wednesday, April 8, 2026
Broadcast on Cable TV Channel 16
and northmetrotv.com/lino-lakes-stream
ADVISORY BOARD MEETING, 6:30 P.M.
Council Chambers (televised)
1.Call to Order and Roll Call
2.Pledge of Allegiance
3.Public Comment (sign-in prior to start of meeting per Rules of Decorum)
4.Setting the Agenda: Addition or Deletion of Agenda Items
5.Approval of Minutes: March 11, 2026
6.Action Items
A.PUBLIC HEARING: Lyngblomsten PUD Amendment #4 (Mixed Use Building)
7.Discussion Items
A.Project Updates
ADJOURNMENT
CITY OF LINO LAKES
PLANNING & ZONING BOARD MINUTES
DATE: March 11, 2026
TIME STARTED: 6:30 P.M.
TIME ENDED: 6:42 P.M.
MEMBERS PRESENT:Isaac Wipperfurth, Nathan Vojtech,
Michael Root, Suzy Guthmueller, Patrick Kohler,
Neil Evenson
MEMBERS ABSENT:Perry Laden
STAFF PRESENT:Katie Larsen, Diane Hankee, Jessica Eller, Marissa Ertel
1.CALL TO ORDER AND ROLL CALL
Chair Root called the Lino Lakes Planning & Zoning Board meeting to order at 6:30 p.m.
on March 11, 2026.
2.PLEDGE OF ALLEGIANCE
3.PUBLIC COMMENT
Chair Root declared public comment open at 6:31 p.m.
There was no one present for public comment.
Mr. Vojtech motioned to close public comment at 6:31 p.m. Motion was seconded by
Mr. Wipperfurth. Motion carried 6 – 0.
4.APPROVAL OF AGENDA
The agenda was approved as presented.
5.APPROVAL OF MINUTES
Mr. Vojtech moved to approve the February 11, 2026 meeting minutes. Motion
seconded by Mr. Wipperfurth. Motion carried 5 – 0, with one abstention.
6.ACTION ITEMS
DRAFT MINUTES
Planning & Zoning Board
March 11, 2026
Page 2
nd
A.Public Hearing: Otter Crossing South 2 Addition Preliminary Plat
Ms. Larsen presented the staff report.
The applicant, TYME Properties LLC, is proposing to preliminary plat Outlot B, Otter
Crossing South into two (2) commercial lots. The preliminary plat is south of Main Street
nd
and west of Otter Lake Road and is called Otter Crossing South 2 Addition.
Mr. Wipperfurth asked about the stormwater pond, specifically the location of the
stormwater pond. Ms. Hankee stated the pond for the site will be located south of the
site.
Mr. Root wanted to confirm that further development would drive the construction of a
future roundabout on Otter Lake Road. Ms. Larsen did confirm that this would be the
case.
Paul Schreier, 3435 Labore Road, with TYME Properties LLC, was present to provide
comments and answer questions. Mr. Schreier stated there are already interested users
for the second site.
Chair Root opened the public hearing at 6:40 p.m.
There was no one present for public comment.
Mr. Vojtech motioned to close the public hearing at 6:40 p.m. Motion was seconded by
Ms. Guthmueller. Motion carried 6 – 0.
nd
Mr. Evenson motioned to approve the Otter Crossing South 2 Addition Preliminary Plat
with staff recommendations. Motion was seconded by Mr. Wipperfurth. Motion carried
6 – 0.
7.DISCUSSION ITEMS
A.Project Updates
Ms. Larsen provided project updates to the Board.
Mr. Vojtech moved to adjourn the meeting. Motion seconded by Mr. Evenson. Meeting
adjourned at 6:42 p.m.
DRAFT MINUTES
Planning & Zoning Board
March 11, 2026
Page 3
Respectfully submitted,
Marissa Ertel – Community Development Administrative Assistant
DRAFT MINUTES
PLANNING & ZONING BOARD
AGENDA ITEM 6A
STAFF ORIGINATOR: Katie Larsen, City Planner
MEETING DATE: April 8, 2026
TOPIC:PUBLIC HEARING: Lyngblomsten PUD Amendment #4-Mixed Use
Building
CASE NUMBER: PZC2026-0004
APPLICANT: Lyngblomsten at Lino Lakes, LLC
Attn: Jeff Heinecke
1415 Almond Avenue
St Paul, MN 55108
OWNER: Same
INTRODUCTION
The applicant, Lyngblomsten at Lino Lakes, LLC, submitted a Land Use Application for PUD
Amendment #4. They are requesting an amendment to the PUD Preliminary Plan/Preliminary
Plat (“PUD Amendment”) to construct a 4-story mixed use building at the southeast corner of
the site. The first floor would be commercial uses, and the other three floors would be 59
market-rate independent living units for residents age 55 and older.
Tentative Review Schedule:
Complete Application Date:March 19, 2026
60-Day Deadline:May 18, 2026
Environmental Board Meeting:March 25, 2026
Park Board Meeting:N/A
Planning & Zoning Board Meeting:April 8, 2026
City Council Work Session:May 4, 2026
May 11, 2026
City Council Meeting:
May 26, 2026
BACKGROUND
The Land Use Application is for the following:
1
PUD Preliminary Plan Amendment #4-Mixed Use Building
This staff report is based on the following information:
Lyngblomsten Lino Lake Campus Plan Set prepared by Wold Architects and Engineers
dated March 9, 2026
Applicant Narrative
Design Guidelines Revised March 2026
Stormwater Management Report prepared by Bolton & Menk revision date March 6,
2026
Geotechnical Evaluation Report prepared by Braun Intertec dated March 6, 2026
Traffic Study prepared by Transportation Collaborative & Consultants, LLC dated March
6, 2026
Use Area Tabulation submitted by Wold Architects and Engineers dated March 9, 2026
Previous Council Action
April 8, 2019: Ordinance No. 07-19 rezoning property from GB, General Business to PUD,
Planned Unit Development
o Details permitted, accessory, conditional and administrative uses specific to the
21 acre site
April 8, 2019: Resolution No. 19-42 approving PUD Development Stage Plan/Preliminary
Plat
o Establishes development’s framework regarding lot and yard requirements,
height regulations, impervious surface and design guidelines
May 11, 2020: Resolution No. 20-44 approving PUD Development Stage Plan
Amendment #1-Site Plan and Grading & Drainage Plan
o This amendment omitted the clubhouse and revised the site plan and grading &
drainage plans
July 26, 2021: Resolution No. 20-94 approving PUD Final Plan/Final Plat
December 11, 2023: Resolution No. 23-126 approving PUD Amendment #2-North Lot
Line Fence and Pickleball Court
o This amendment omitted the north lot line fence in lieu of additional landscaping
and allowed for the construction of a pickleball court in the southwest corner of
the site.
January 12, 2026: Resolution No. 26-04 approving PUD Amendment #3-Skilled Nursing
Care Center
o This amendment changed the 2-story skilled nursing care center to a 3-story
skilled nursing care center with 61 units to be located at 6070 Blanchard
Boulevard.
ANALYSIS
2
History
The original 21 acre Lyngblomsten site PUD Development Stage Plan (now called PUD
Preliminary Plan) was approved in April 2019 with Resolution No. 19-42. It included townhomes
on the north end, senior campus centrally located, and commercial development on the south
end. The commercial development generally consisted of a restaurant, retail building, and
possible fast-food restaurant.
In January 2026, City Council approved PUD Amendment #3 changing the 2-story skilled nursing
care center to a 3-story skilled nursing care center with 61 units. This project is temporarily on
hold.
In February 2026, EDAC and the Planning & Zoning Board had a very high-level discussions
regarding the proposed PUD Amendment #4 mixed use building. There was general support for
the project.
Proposed PUD Preliminary Plan Amendment #4
PUD Amendment #4 proposes to change the 3-story restaurant and commercial development
component to a 4-story mixed use building. The first floor would be commercial uses, and the
other three floors would be 59 market-rate independent living units for residents age 55 and
older. See attached Applicant’s Narrative for project details.
The mixed use building and site will include:
Surface parking lot
o 138 surface parking spaces
Underground parking
o 70 parking spaces
st
1 floor commercial
o 5 retail bays
o Restaurant
o Daycare
o Resident amenity center
fitness center, pickleball court, community room, and additional
gathering or wellness-oriented spaces that contribute to campus
life and resident engagement
th
2-4 floor residential
o 59 market-rate independent living units for residents age 55 and older
15 one-bedroom
21 one-bedroom + den
18 two-bedroom
5 two-bedroom + den
3
Comprehensive Plan and Density
The entire Lyngblomsten campus site is guided Signature Gateway. This land use allows
residential at a density of 8.0 to 10.0 units per acre with 15 units per acre allowed if the project
meets the City's housing goals. Goal #2 of the Comprehensive Plan-Housing Chapter is to
enhance opportunities for senior housing. The proposed 55+ independent living units and life
cycle housing meet this goal.
2021
PUD 2026 PUD
Final PlanAmend #4
Gross Area (acres)21.0221.02
Wetlands & Water Bodies(0.28)(0.28)
Public Parks & Open Space0.00 0.00
Arterial ROW(1.83)(1.83)
Other (Utility Transmission Easement)0.00 0.00
Other (Wetland Buffer Area)(0.24)(0.24)
Net Area (acres)18.6718.67
# of Units151*210*
Gross Density (units/acre)7.189.99
Net Density (units/acre)8.0911.25
*Per Met Council, nursing home and memory care units are not considered housing units and do
not count toward a community’s net residential density.
The original PUD contained 151 housing units. The additional 59 independent living units brings
the total housing unit count to 210. The overall net density is now 11.25 units per net acre
which is consistent with the Comprehensive Plan.
Zoning
Ordinance No. 07-19 rezoned the entire Lyngblomsten campus site to PUD, Planned Unit
Development to implement the Master Planning Study-Hodgson Road & CR J. Resolution No.
19-42 approving the PUD Preliminary Development Stage/Preliminary Plat establishes setback,
building height, architectural standards etc. requirements. The Design Guidelines for
Lyngblomsten at Lino Lakes further detail these requirements.
Per Ordinance No. 07-19, conditional use permits are required for the commercial day care
facility and residential apartments accessory to permitted or conditional uses in the PUD. The
findings of fact are detailed later in this report.
4
Master Planning Study-Hodgson Road & CR J
The development of this property is guided by the Master Planning Study-Hodgson Road & CR J
(“Master Plan”), which was approved by the City Council in 2007 with Resolution No. 07-21.
The Master Plan anticipated a mix of residential and commercial uses on the site, specifically
noting that the mixed use district “would allow for, though not mandate, the inclusion of
residential units, possibly in multi-story buildings. This would provide customers for the
commercial development, and the commercial services would be convenient to the residents.”
The Master Plan notes the Hodgson/Co Rd J intersection is a gateway and appropriate elements
are to be included in the development of the corners of this intersection.
In June 2024, the City created the Lino Lakes Gateway Planning study. The study identified the
Hodgson Road and County Road J intersection as a Primary Gateway. Per the study,
“This primary gateway is an entrance into the city of Lino Lakes from the south, adjacent to the
city of Shoreview. The roundabout island follows the design shown in “Roundabout Design -
Typical”. One (1) “Monument Sign Type A” will be located in the NE quadrant of the
intersection creating a gateway as users enter Lino Lakes on Hodgson Road.” See attached
monument sign and location. See attached excerpt from Gateway Planning Study.
The PUD Amendment #4 landscape plan shows a 1,000sf landscaped, outdoor area in the
southeast corner of the site that could accommodate outdoor seating and amenities. The two
(2) existing electrical transformer boxes and proposed grades limit the usable space; however,
additional gateway elements shall be incorporated into the area.
The original PUD Preliminary Plan/Preliminary Plat was found to be consistent with the Master
Plan. The proposed PUD Amendment #4 is also consistent with the Master Plan.
Design Guidelines
The Master Plan also notes that design guidelines must be prepared for any new development
project in the area. Design Guidelines for Lyngblomsten at Lino Lakes were prepared as part of
the original PUD Preliminary Plan and have been revised accordingly with the PUD Amendment
#4. The guidelines in conjunction with Resolution No. 19-42 detail site plan, building and
parking setbacks, gateway elements. Architectural standards, building heights, landscaping and
signage requirements.
The proposed PUD Amendment #4 is consistent with the design guidelines.
Site & Building Plan Review
Like the existing 4 story senior living campus building, the R-4, High Density Residential and
Multiple-family dwelling general building and use provisions will be applied to the proposed
mixed use building.
5
Resolution No. 19-42 approving the original PUD Preliminary Plan/Preliminary Plat established
building and parking lot setbacks. These setback requirements have remained the same
through PUD Amendments #1-3.
This PUD Amendment #4 proposes to change the mixed-use building setback requirements.
Currently, the commercial site is allowed a 10ft setback along Hodgson Road and Ash Street,
but staff recommends changing this to 25ft to be consistent with the existing 4 story senior
living campus building.
Red text indicates a proposed change.
Setbacks
Proposed
Current Setback Actual
Road or BoundaryBuildingSetback
Requirement (ft)Setback (ft)
Requirement (ft)
CSAH 49 (Hodgson
Road)
Cottage Homes4040
Senior Living
2525
Campus
Restaurant1010
Commercial
Development
102530
Mixed Use
Building
CR J (Ash Street)
Commercial
Development
102525
Mixed Use
Building
Public Road
(Blanchard Blvd)
Cottage Homes2525
Clubhouse25NA
Senior Living
1010
Campus
Restaurant15
Commercial
Development
1515120
Mixed Use
Building
6
Proposed
Current Setback Actual
Road or BoundaryBuildingSetback
Requirement (ft)Setback (ft)
Requirement (ft)
Private Road
23 from curb or
-Hammerly Ct Cottage Homes23
sidewalk
Restaurant &
Commercial15 from curb or
-Lyngblomsten Dr 1560
Mixed Use sidewalk
Building
North Lot Line 3030
West Lot Line 5050
Parking Lot 151515
Building Height
Resolution No. 19-42 approving the PUD Development Stage Plan/Preliminary Plat established
the following building heights:
Senior Living Campus
No building shall be erected or structurally altered to exceed forty-five (45) feet in height—or,
for a multiple dwelling building, the greater of four (4) stories or forty-five (45) feet—except as
allowed by §1007.043 (3).
Restaurant and Commercial Development
No building shall exceed a height of three (3) stories or thirty-six (36) feet, whichever is higher.
PUD Amendment #4 proposes to change the 3-story restaurant and commercial development
component to a 4-story mixed use building. The proposed mixed use building is similar in height
to the existing 4-story independent living building.
BuildingTop of Wall + Parapet = Total
Existing 4 story-Independent Living46’ 6” + 4’ 0” = 50’ 6”
Proposed 4 story Mixed Use47’ 8” + 2’ 10” = 50’ 6”
The attached Site and Building Plan Review Worksheet details compliance regarding setbacks,
architecture, lighting, off-street parking, etc. Comments highlighted in red shall be addressed.
7
The Master Plan states commercial buildings must incorporate trash and service areas within
the buildings rather than utilizing outdoor enclosures. The site plan shall be revised.
Impervious Coverage
The maximum allowed impervious surface coverage over the 21 acre site is 75%. Proposed
impervious surface coverage is 48%. Impervious surface coverage requirements are met.
Architecture
The Lyngblomsten Design Guidelines detail the architectural standard requirements for the
entire development. Exterior materials for the existing senior living campus building include
hardie plank siding (evening blue, arctic white, and woodlook) and stone. The stone for the
entire building is 35.3% which is greater than the minimum City Code 33% requirement.
The proposed mixed use building uses similar four-sided architecture and building articulation.
The same exterior materials are proposed except instead of evening blue, midnight black hardie
plank siding is proposed to provide some variation between the buildings. The total stone is
33.1% which meets the minimum City Code 33% requirement.
Architectural requirements are met.
Parking Space Requirements
The parking space requirements per net usable square footage where analyzed for each
proposed use. 197 spaces are required and 205 are provided. Parking space requirements are
met.
# Required
Net SF or Parking
UseCode Requirement# UnitsCode FactorSpacesNotes
1.5 spaces per independent living apartment unit other
than studio apartments. Studio apartments require 1 There are no studio apartments.
space per unit. Half of the parking spaces for 70 underground spaces + 135
Senior Housingindependent living shall be underground.591.589surface spaces provided.
Day Care1 space for each 300 square feet of floor area.6,71930022
Retail Store1 space for each 200 square feet of floor area.4,46520022
1 space for each 100 square feet of dining room, plus 1
Restaurantspace for each employee of the maximum work shift.2,6831004215 employees
1 space for each 67 square feet of gross floor area.
Fast Food Restaurant1,4566722
Total Required =197
135surface parking spaces
70underground spaces
Total Provided =205
Preliminary Plat
8
The Lyngblomsten at Lino Lakes preliminary plat for the entire 21 acre site was approved in
2019. Lot 2, Block 2 was the proposed stand alone restaurant lot. Outlot C was the future
commercial retail lot. No formal site and building plans were reviewed or approved for these
parcels. The final plat was approved in July 2021.
Lyngblomsten at Lino Lakes Second Addition will combine these two (2) parcels into one (1) lot.
The total lot area is 3.36 acres. The existing drainage and utility easement that runs between
these two (2) parcels will also be vacated by City Council action and new easements will be
dedicated on the final plat.
A 10’ x 10’ triangle of road right-of-way shall be dedicated on the plat in the southeast corner of
the lot to provide separation from the existing trail.
A separate land use application for final plat shall be submitted after preliminary plat approval.
Traffic Study
Traffic impacts were analyzed with the original PUD Preliminary Plan for the entire 21 acre
development. Ash Street / CR J / CR 1 and Hodgson Road / CR 49 intersection was
reconstructed as a roundabout in 2024 that included turn lanes and access changes as noted
earlier. The roadway reconstruction project was designed to accommodate long-term growth
within the study area.
A revised Traffic Study was prepared by Transportation Collaborative & Consultants, LLC dated
March 6, 2026 that incorporated both the mixed use building (PUD Amendment #4) and 61 unit
skilled nursing care center (PUD Amendment #3).
The peak hours within the study area represent 7:15 to 8:15 a.m. and 4:15 to 5:15 p.m.
The adjacent skilled nursing / assisted living development is estimated to generate 12
a.m. peak hour (7 in / 5 out), 15 p.m. peak hour (6 in / 9 out), and 254 daily (127 in / 127
out) trips.
The proposed mixed-use development is estimated to generate 173 a.m. peak hour (91
in /82 out), 192 p.m. peak hour (97 in / 95 out), and 1,426 daily (713 in / 713 out) trips.
Total daily trip generation is 1,680.
Level of Service
Level of Service (LOS) is used to describe the operating conditions of an intersection. Facilities
are given letter designations from “A” (best operating conditions) to “F” (worst conditions).
City Code Section 1001.013(2)(c), Premature Subdivision of the City’s Subdivision Ordinance
establishes minimum Level Of Service (LOS) requirements. The ordinance states that if the LOS
is A or B, the proposed subdivision shall not the degrade the LOS more than one grade. If the
9
LOS is C or D, it shall not degrade the LOS. Intersections with a LOS of E or F must be improved
to ensure a LOS of D or better.
Per the traffic study:
The proposed Level of Service requirements do not fall more than one grade. The proposed
subdivision meets the Level of Service requirements; therefore, it is not deemed premature.
Landscaping
Per the March 25, 2026 Environmental Board staff report:
Open Areas Landscape Standards
The purpose of these standards is to provide general site beautification and high aesthetic
quality with a mix of plant materials in open areas. Open area landscape standards call for 1
large tree and 2 large shrubs per 2500 SF.
The site has 33,995 SF of proposed open space. This equates to 14 trees and 28 shrubs being
planted in addition to required boulevard trees. The developer is proposing an additional 6
large shrubs.
Buffer and Screen Standards
10
Screening is required between a parking lot and public right of way, 30” screening is to be
provided. Currently screening is proposed along Blanchard Boulevard and additional screening
will be required adjacent to Lyngblomsten Drive.
Canopy Cover
Canopy cover is required to meet 40% of the vehicular hardscape. The site is proposing 54,375
SF of hardscape, requiring 23,450 SF of canopy coverage. Provided canopy coverage for the site
is 24,650 SF, exceeding requirements.
Foundation Landscaping
Foundation landscaping standards require 2 large trees and 6 large shrubs per 100 LF of
building front. The proposed building has 494 LF of frontage requiring 10 large trees and 30
large shrubs. The proposed landscape plan shows 10 large trees and 142 large shrubs, meeting
requirements.
Additional City and Government Agency Review Comments
Anoka County Highway Department reviewed the plans and had no comments.
Lino Lakes Police Department reviewed the plans and had no comments.
Lino Lakes Fire Department received the plans and had no comments.
City Engineer comments are provided in the attached memo.
Environmental Coordinator comments are provided in the attached memo.
The developer held a neighborhood meeting on March 24, 2026 and meeting minutes
are attached.
Findings of Fact
Planned Unit Development
Per City Code Section 1007.024:
(2)The PUD, by allowing deviation from the strict provisions of this ordinance related to
setbacks, heights, lot area, width and depths, yards, etc., may be considered by the City when it
would result in one or more of the following public benefits:
(a)Implementation of a master plan consistent with the Planning District objectives of
the Comprehensive Plan.
PUD Amendment #4 continues to implement the Hodgson Road & CR J Master Plan.
(b)Innovations in development that address growing demands for all styles of
11
economic expansion, greater variety in lot size, configuration, home type, design, enhanced
architectural standards, and siting of structures through the conservation and more efficient use
of land in such developments.
PUD Amendment #4 does not change Lyngblomsten’s innovation in development. The mixed use
building supports economic expansion and housing.
(c)Preservation and enhancement of desirable site characteristics such as wildlife
habitat, unique natural resources, existing vegetation, natural topography, geologic features and
reduction of negative impacts on the environment.
The existing wetland on site will not be impacted by PUD Amendment #4.
(d)Creative use of land and related physical development which allows a phased and
orderly transition of varying land uses in close proximity to each other.
PUD Amendment #4 continues to transition development from existing low density single family
homes to cottage home to a senior living campus consisting of independent living, assisted living
and skilled nursing facilities to the mixed use building.
(e)Efficient use of land resulting in smaller networks of utilities and streets thereby
lowering development costs and public investments.
PUD Amendment #4 does not change the existing utility and street network.
(f)Mix of land use types.
PUD Amendment #4 and the mixed use building provide both commercial and residential
development.
(g)Provision of a housing type or target housing price that is desirable to the City.
PUD Amendment #4 supports senior living housing options.
(h) Other public benefits and values as recognized in the City’s Comprehensive Plan.
PUD Amendment #4 supports life-cycle housing and diversifies the tax base.
Preliminary Plat
Per Section 1001.013, Premature Subdivision:
1.General. Any concept plan, preliminary plat or final plat deemed premature pursuant to the
following criteria shall be denied by the City Council.
12
2.Conditions for establishing a premature subdivision. A subdivision may be deemed
premature should any of the following conditions not be met.
a.Consistency with the Comprehensive Plan. Including any of the following:
i)Land use plan;
ii)Transportation plan;
iii)Utility (sewer and water) plans;
iv)Local water management plan;
v)Capital improvement plan; and
vi)Growth management policies, including MUSA allocation criteria.
Lyngblomsten at Lino Lakes Second Addition preliminary plat is consistent with the goals and
policies of the Comprehensive Plan and the Master Planning Study-Hodgson Road & CR J.
b.Consistency with infill policies. A proposed urban subdivision shall meet the city's infill
policies.
Lyngblomsten at Lino Lakes Second Addition preliminary plat is consistent with infill policies. The
development is within the current Utility Staging Area 1A (2018-2025). The cost, operation and
maintenance of the utility system is consistent with the normal costs projected by the water and
sanitary system plans. No future utility costs are proposed.
c.Roads or highways to serve the subdivision. A proposed subdivision shall meet the
requirements for level of service (LOS), as defined by the Highway Capacity Manual.
Existing level of service ranges from A to B for applicable intersections. The proposed level of
service does not fall below a C. Level of service requirements are met.
d.Water supply. A proposed subdivision shall be deemed to have an adequate water
supply.
Lyngblomsten at Lino Lakes Second Addition preliminary plat will have an adequate water
supply.
e.Waste disposal systems. A proposed subdivision shall be served with adequate waste
disposal systems.
Lyngblomsten at Lino Lakes Second Addition preliminary plat will be served with an adequate
waste disposal system.
Conditional Use Permits
13
Per Resolution No. 19-42, conditional use permits are required for commercial day care
facilities and residential apartments accessory to permitted or conditional uses.
Per City Code Section 1007.016(3):
(e) The Planning and Zoning Board shall hold the public hearing and consider possible
adverse effects of the proposed conditional use. Its judgement shall be based upon, but not
limited to, the following factors:
1. The proposed development application has been found to be consistent with the
design standards listed in § 1007.020(4).
See below.
2. Will not involve uses, activities, processes, materials, equipment and conditions of
operation that will be detrimental to any persons, property, or the general welfare because of
excessive production of traffic, noise, smoke, fumes, glare, or odors.
The proposed commercial day care facility and residential apartments will not involve activities
detrimental to any person, property, or the general welfare.
3. Will not result in the destruction, loss, or damage of a natural, scenic or historic feature
of major importance.
The proposed commercial day care facility and residential apartments will not result in the
destruction of a natural, scenic, or historic feature of major importance.
Per City Code Section 1007.020:
(4) Performance standards. Plans which fail to meet the following criteria shall not be
approved.
(a)The proposed development application must be consistent with the policies and
recommendations of the Lino Lakes Comprehensive Plan.
The proposed commercial day care facility and residential apartments are consistent with the
signature gateway land use.
(b)The proposed development application is compatible with present and future land uses
of the area.
The proposed commercial day care facility and residential apartments are compatible with
present and future land uses of the area.
14
(c)The proposed development application conforms to performance standards herein and
other applicable city codes.
The proposed commercial day care facility and residential apartments conform to City Code
performance standards with minor revisions as noted.
(d) Traffic generated by a proposed development application is within the capabilities of
the city when:
1. If the existing level of service (LOS) outside of the proposed development is A or B,
traffic generated by a proposed development will not degrade the level of service more than
one grade.
2. If the existing LOS outside of the proposed development is C, traffic generated by a
proposed development will not degrade the level of service below C.
3. If the existing LOS outside of the proposed development is D, traffic generated by a
proposed development will not degrade the level of service below D.
4. The existing LOS must be D or better for all streets and intersections providing access
to the proposed development. If the existing level of service is E or F, the developer must
provide, as part of the proposed project, improvements needed to ensure a level of service D or
better.
5. Existing roads and intersections providing access to the proposed development must
have the structural capacity to accommodate projected traffic from the proposed development
or the developer will pay to correct any structural deficiencies.
6. The traffic generated from a proposed development shall not require city street
improvements that are inconsistent with the Lino Lakes Capital Improvement Plan. However,
the city may, at its discretion, consider developer-financed improvements to correct any street
deficiencies.
7. The LOS requirements in divisions 1. to 4. above do not apply to the I-35W/Lake Drive
or I-35E/Main St. interchanges. At city discretion, interchange impacts must be evaluated in
conjunction with Anoka County and the Minnesota Dept. of Transportation, and a plan must be
prepared to determine improvements needed to resolve deficiencies. This plan must determine
traffic generated by the proposed development project, how this traffic contributes to the total
traffic, and the time frame of the improvements. The plan also must examine financing options,
including project contribution and cost sharing among other jurisdictions and other properties
that contribute to traffic at the interchange.
The proposed commercial day facility and residential apartments meet Level of Service (LOS)
requirements and is within the capabilities of the City. The existing roads and intersections
providing access to the proposed development have the structural capacity to accommodate
projected traffic from the proposed development.The traffic generated from a proposed
development does not require City street improvements that are inconsistent with the Lino
Lakes Capital Improvement Plan.
(e) The proposed development shall be served with adequate and safe water supply.
15
The proposed commercial day care facility and residential apartments will have an adequate
and safe water supply.
(f) The proposed development shall be served with an adequate or safe sanitary sewer
system.
The proposed commercial day care facility and residential apartments will be served with an
adequate waste disposal system.
(g) The proposed development shall not result in the premature expenditures of city funds
on capital improvements necessary to accommodate the proposed development.
The proposed commercial day care facility and residential apartments does not require City
funds.
(h) Fire prevention and fighting equipment acceptable to the Board of Fire Underwriters
and City Council shall be readily available when any activity involving the handling or storage of
flammable or explosive materials is carried on.
The proposed commercial day care facility and residential apartments will have fire prevention
and fighting equipment readily available.
Specific Conditional Use Permit (CUP) Requirements
In addition to the above administrative requirements of a conditional use permit, the following
specific performance standards of Resolution No. 19-42 must also be met:
(b) Commercial day care facilities provided that:
1.All requirements of the Minnesota Department of Health and Human Services, as may
be amended, are satisfactorily met and the structure and operation is licensed
accordingly.
The commercial day care facility shall be properly licensed.
2.Screening is provided in compliance with § 1007.049.
The commercial day care facility is properly fenced and screened.
3.Adequate off-street parking is provided in a location separated from any outdoor play
area(s).
The off-street parking is separated from outdoor play areas.
16
4. Adequate off-street loading spaces in compliance with § 1007.053.
Adequate off-street loading spaces are provided.
(g) Residential apartments accessory to permitted or conditional uses in the LB District
provided that:
1. The apartment is located in the same building as the principal use.
The apartment is located in the same building as the principal use.
2.Residential and non-residential use are not contained on the same floor.
Residential and non-residential uses are not contained on the same floor.
3.The residential and non-residential uses do not conflict in any manner.
The residential and non-residential uses do not conflict in any manner.
Public Land Dedication
Public land dedication fees will be finalized with the final plat. The following estimated
calculations are based on the preliminary plat and mixed use building.
Units or Fee per Unit or
AcresAcre
Mixed Use BuildingTotal #Total
Commercial3.36acres$2,725$9,156
Independent Senior Living Units59units$3,800$224,200
TOTAL$233,356
RECOMMENDATION
Staff recommends approval of Lyngblomsten PUD Amendment #4 for the mixed use building
with the following conditions:
1.Ordinance No. 07-19, Resolution No. 19-42, Resolution No. 20-44, Resolution No. 20-94,
Resolution No. 23-126, and Resolution No. 26-04 are still in effect.
2.The revised Lyngblomsten Design Guidelines shall provide additional development
guidance.
3.A separate land use application for final plat shall be submitted after preliminary plat
approval.
17
The following comments shall be addressed:
1.City Engineer Memo dated April 1, 2026
2.Environmental Memo dated April 1, 2026
3.All applicable plans sheets:
a.Street names shall be added.
b.Existing and proposed sidewalks and trails shall be clearly identified and labeled
as noted in the Legends.
i.See Sheet S0.1, Preliminary Plat for good example.
4.Sheet S0.1, Preliminary Plat:
a. A 10’ x 10’ triangle of road right-of-way shall be dedicated on the plat in the
southeast corner of the lot to provide separation from the existing trail.
5.Sheet C1.22, Site Plan South:
a.Exterior trash enclosures are not allowed. Plans shall be revised accordingly.
b.Parking space totals per row shall be added.
c.A sidewalk south of Lyngblomsten Drive from the Hodgson Rd trail shall be
added to connect with the proposed sidewalk in front of the restaurant.
d.An outdoor plaza with seating opportunities and amenities shall be constructed
in the southeast corner of the site to enhance the gateway corridor.
e.The parking calculations table shall match that as shown on page 9 of this staff
report.
i.Calculations shall also include proper rounding.
6.Sheet C1.23, Striping and Signage Plan Overall:
a.Remove parking space calculations from this sheet. There are multiple numbers
that are confusing.
7.Sheet A2.000, Mixed Use Basement Level Overall Floor Plan:
a.Twenty-four (24) ft wide drive aisles shall be maintained.
i.North end near staircase is only 20ft wide and shall be revised.
ii.Re-evaluate ADA parking spaces on the north end near the stairs and not
near elevators.
8.Sheet A5.105, Exterior Elevations:
a.Are the windows on Elevation 5 facing Hodgson Road faux windows?
i.The floor plans show storage near the windows.
ii.Storage items shall not be visible from the outside.
9.Sheet A5.106, Exterior Elevations:
a.Under Exterior Elevation Materials table, should second column A5.105/D7 and
F1 be A5.106?
b.In the Totals table, include a column with %.
ATTACHMENTS
18
1.Site Location and Aerial Map
2.Applicant Narrative
3.Current PUD Site Plan #3
4.Proposed PUD Site Plan #4
5.Civil Site Plan
6.Grading Plan
7.Landscape Plan
8.Existing Exterior Elevations-Independent Living Building
9.Proposed Exterior Elevations-Mixed Use Building
10.Architectural Rendering
11.Floor Plans
12.Master Planning Study-Hodgson Rd & CR J
13.Gateway Planning Study-Hodgson Rd & CR J
14.Site Plan Review Worksheet
15.Engineering Memo dated April 1, 2026
16.Environmental Memo dated April 1, 2026
19
Ipehtpo!Se
¸
¸
¸
¸
¸
¸
¸
¸
¸
9
2025
/
10
/
11
PUD AMENDMENT 3
Opuft!Qspkfdu!TQ!1315.5822!Ebufe!15.:3Opuft!Qspkfdu!TQ!1315.5822!Ebufe!15.:3Opuft!Qspkfdu!TQ!1315.5822!Ebufe!15.:3
Dfoufsmjof!pg!Ipehtpo!Se/!qfs!NOEPUDfoufsmjof!pg!Ipehtpo!Se/!qfs!NOEPUDfoufsmjof!pg!Ipehtpo!Se/!qfs!NOEPU
)GLB!Ixz/!3:*)GLB!Ixz/!3:*)GLB!Ixz/!3:*
Ipehtpo!SpbeIpehtpo!SpbeIpehtpo!Spbe
)Qvcmjdmz!Usbwfmfe!Spbexbz*)Qvcmjdmz!Usbwfmfe!Spbexbz*)Qvcmjdmz!Usbwfmfe!Spbexbz*
(73/412
FyjtujohFyjtujohFyjtujoh
IpvtfIpvtfIpvtf
51!BN602203131!8;44;
Mjop!Mblft!Dfousbm!.312:`DJUZ!TVCNJUUBM/swu
fompntufo\]297135!Mjop!Mblft\]`Sfwju\]297135!.MzohcmpntuDfousbm;!\]\]Xbf.tsw.no/xpmebf/dpn\]TuQbvm\]`IDTM\]Mzohc
TVCNJUUBM`hcfsfotAxpmebf/dpn/swu
op!Mblft!Dfousbm!.!312:`DJUZD;\]Vtfst\]hcfsfot\]Epdvnfout\]297135!.!Mzohcmpntufo!Mj
9 9
10
2025 2025
//
10 10
//
11 1103/09/2026
PUD AMENDMENT 3 PUD AMENDMENT 3
PUD AMENDMENT 4
(73/412
FyjtujohFyjtujohFyjtujoh
IpvtfIpvtfIpvtf
51!BN602203131!8;44;
Mjop!Mblft!Dfousbm!.312:`DJUZ!TVCNJUUBM/swu
fompntufo\]297135!Mjop!Mblft\]`Sfwju\]297135!.MzohcmpntuDfousbm;!\]\]Xbf.tsw.no/xpmebf/dpn\]TuQbvm\]`IDTM\]Mzohc
TVCNJUUBM`hcfsfotAxpmebf/dpn/swu
op!Mblft!Dfousbm!.!312:`DJUZD;\]Vtfst\]hcfsfot\]Epdvnfout\]297135!.!Mzohcmpntufo!Mj
CTY RD J / ASH ST
LOCATION
REGIONAL TRAIL
LINO LAKES
SHOREVIEW
MONUMENT SIGN - TYPE A
CONCEPTS
SEE MEDIAN
AND BOULEVARD
SEE ROUNDABOUT
FUTURE
CONCEPT - TYPICAL
DEVELOPMENT
CTY RD J / ASH ST
Memorandum
To:Katie Larsen, Lino Lakes City Planner
From:Kris Keller PE, WSB
Diane Hankee PE, Lino Lakes City Engineer
Date:April 1, 2026
Re: Lyngblomsten Nursing Home – Mixed (Residential/Commercial) Use Addition
Revised Preliminary PUD Plan Review
027097-000
WSB’s review of the revised Preliminary PUD Plan submittal for the Lyngblomsten Nursing Home
Addition in Lino Lakes, MN, prepared by Bolton and Menk and Wold and received March 16,
2026. Our comments were made on the following documents:
Lyngblomsten – Preliminary PUD prepared by Bolton and Menk, dated March 9, 2026,
2025
The following review comments should be responded to in writing by the applicant. There are
additional redline comments on the plan set that should be responded to as well. Not all redline
comments are in the review memo.
Engineering
•General
The Lyngblomsten Nursing Home is proposing a mixed-use (residential/commercial) building
to their campus located north of between Hodgson Road (CSAH 49) and Blanchard
Boulevard. The proposed building is a mixed-use structure with one lower-level parking level
(approx. 29,800 SF), a commercial first floor (approx. 29,800 SF), and three upper
residential floors (approx. 26,500 SF/ea). It proposes 59 independent living units as well as
retail, restaurant, and daycare facilities on the first floor together with both an underground
and outdoor parking areas as well as additional living amenities.
Comments:
1.With the Final PUD plan, provide new building specific plan sheets (similar to the
‘preliminary plat sheet S0.1’ provided) that accurately depict the current topological
information of the site as existing and clearly identify what grading/construction is
proposed with the new building.
2.With the Final PUD plan, provide existing conditions plan sheet with
removals/demolition required
a.Identify adjacent existing utilities that will be utilized
Ms. Katie Larsen
04/01/2026
Page 2
•Grading
The Lyngblomsten Mixed Use addition includes limited site grading for the building
outdoor parking area and blending into the streets and driveways. The lot was rough-
graded with the grading of the overall campus. A grading plan meeting City requirements
will need to be submitted as part of the preliminary and final plats.
Comments:
1.With the Final PUD plan, provide new building addition specific grading plan sheet
that accurately depicts the current topological information of the site as existing and
clearly identify what grading/construction is proposed with the new building addition.
2.All grading will need to meet maximum 3:1 slope requirements
•Stormwater Management
Additional onsite treatment will not be required as the existing ponding areas were designed
for drainage from this area. It is presumed that conveyance to these basins will be through
an internal storm sewer system and overland swales. The system shall meet the City’s and
RCWD Stormwater Management requirements.
Comments:
1.With the Final PUD plan, provide s sub-surface drainage system design, similar to
the other buildings on site
•Water Supply/Sanitary Sewer
A detailed utility plan for the Lyngblomsten Nursing Home Campus addition has not yet been
proposed and will need to be submitted for preliminary plat by the applicant. There are 2
sets of existing 8” sanitary sewer and water stubs to the lot. The number of units and
demand is within the anticipated capacity of the original campus design for the area and is
supported with the existing infrastructure.
Comments:
1.With the Final PUD plan, provide better clarify the current topological information of
the site as existing and clearly identify what grading/construction is proposed with the
new building addition.
a.Show where extension of service stubs will connect to the building
(mechanical room, etc.)
b.Identify and detail all connections to existing utilities
c.Label all water/utility fittings
d.Label all pipe characteristics (length, size, material, material grade, slope,
etc.)
2.Identify all utility crossings and provide the top and bottom of pipe elevations
a. Vertical pipe separation should be a minimum 18”
b. Insulate when separation between storm sewer and water is less than 36”
3.We recommend that the City Deputy Director of Public Safety-Fire Division review the
proposed plan for water supply and hydrant coverage.
Lyngblomsten Nursing Home – Skilled Nursing Addition - Engineering Review
Ms. Katie Larsen
04/01/2026
Page 3
•Transportation
Traffic from the addition is consistent to what was approved with the preliminary plat for
the overall campus traffic study. Access to the parking area will be created with
connections to Blanchard Boulevard on the west side and Lyngblomsted Drive on the
north side. Underground parking with an entrance from the parking area at the southwest
corner of the proposed building will be utilized as well.
Trails and sidewalks
Additional trails/ sidewalks are not proposed on the submitted Concept Plan as all
required ones have already been installed with previous phases of the overall campus
construction.
Comments:
1.With the Final PUD plan, show impacts to existing sidewalks with construction.
2.Provide a sidewalk/trail connection from the parking area to the eastern
trail/northeastern intersection (Hodgson Road)
•Wetlands and Mitigation Plan
No wetlands are proposed to be impacted with the proposed addition.
•Landscaping
A Landscape Plan for the Lyngblomsten Nursing Home Campus addition has not yet been
submitted. One will need to be submitted and reviewed by staff and the City’s
Environmental Coordinator. The Environmental Coordinator will provide separate comments.
•Floodplain
The submitted concept plan does not impact floodplain.
•Drainage and Utility Easements
All needed drainage and utility easements have been provided with the approved
preliminary plat.
Development Agreement
A development agreement will be required with the final plat.
Grading Agreement
Grading agreement not required at this time.
Lyngblomsten Nursing Home – Skilled Nursing Addition - Engineering Review
Ms. Katie Larsen
04/01/2026
Page 4
•Stormwater Maintenance Agreement
The stormwater maintenance for public facilities are already in place with the main building.
•Permits Required
Required permits will be determined at the time of preliminary plat submittal. Potential
permits may include some of the following and others:
1.NPDES General Construction Permit
2.City of Lino Lakes Zoning Permit for Construction
If you or the applicant have any questions regarding these comments, please contact Kris
Keller at (612) 419-3083 or kkeller@wsbeng.com. You may also contact Diane Hankee at (651)
982-2430 or dhankee@linolakes.us.
Lyngblomsten Nursing Home – Skilled Nursing Addition - Engineering Review
Environmental Memo
To:Katie Larsen, City Planner
From:Tom Hoffman, Environmental CoordinatorTom Hoffman, Environmental Coordinator
Date:April 1, 2026
Re: Environmental Comments – Lyngblomsten PUD Amendment 4
Environmental Board recommended the following at their March 25, 2026 meeting:
1. screening is required adjacent to parking lots to public right of way.
Screening should be provided on the north side of the parking lot adjacent to
Lyngblomsten Drive.
2.Provide tree protection fencing and detail in the plan set for existing
boulevard trees to be protected during construction.
3.Update canopy coverage calculations. My calculations show 11 trees
receiving 50% credit for an additional 1,200 SF. Potentially 1 tree is within 7-
12 and would receive 25 percent credit.
4.Recommend adding one additional tree along the Hodgson Road boulevard.
Currently the proposal shows trees throughout the building breaking up the
frontage. There is one gap of trees between the stairs and the restaurant
that doesn’t seem to blend into the overall design.
5.Confirm irrigation reuse area and provide final calculations for reuse.
6.Recommend matching curb to the rest of the development.
7.The project will disturb more than an acre of soil and will be required to
obtain an NPDES permit. Proof of permit shall be required before
construction.
a.A SWPPP shall be required in additional submittals as required by the
MPCA meeting sections 5.2-5.26.
b.Final erosion and sediment control will be reviewed with future
submittals.
c.Inlet protection required on all existing catch basins.
PLANNING & ZONING BOARD
STAFF REPORT
AGENDA ITEM 7.A.
STAFF ORIGINATOR:
MEETING DATE April 8, 2026
AGENDA ITEM:Project Updates
CASE NUMBER:
APPLICANT:
OWNER:
REVIEW SCHEDULE:
INTRODUCTION
BACKGROUND
RECOMMENDATION / REQUESTED DIRECTION
ATTACHMENTS
None