Loading...
HomeMy WebLinkAbout02/06/2002 Council PacketWORK SESSION AGENDA CITY OF LINO LAKES Wednesday February 6, 2002 CITY COUNCIL WORK SESSION 5:30 P.M. 1. Annual Report Summary for Police Department, Dave Pecchia 2. Annual Report Summary for Building Inspections, Dave Pecchia 3. Amendment to CUP, Gethsemane Church, Michael Grochala 4. Minor Subdivision, SSR & W Willard Morton and Brad Racutt, Jeff Smyser 5. Pheasant Hills 12th Addition, Rezoning, Comprehensive Plan Amendment and Preliminary Plat Approval, Jeff Smyser 6. Commercial Zoning Request, Jim Lansberger, Southwest quadrant of Main Street and I35W, Jeff Smyser 7. Peltier Lake Surface Water Zoning, Marty Asleson 8. Update on Referendum Process, Rick DeGardner 9. Update on Five -year Financial Plan, Al Rolek 10. Clearwater Creek Grading, John Powell 11. Discuss franchise agreement with Centennial Utilities 12. Note date for annual Board of Equalization meeting, April 22, 2002 13. Regular Agenda Items 14. Adjourn Revised 02/6/02 ajb 3:30 p.m. PAGE 1 • • MEMORANDUM DATE: February 6, 2002 TO: City Council FROM: Michael Grochala RE: Gethsemane Church As discussed at the January 28, 2002 council meeting, Gethsemane United Methodist Church is requesting a Conditional Use Permit Amendment to construct a picnic shelter. In preparation of the report, staff found that the conditions of a three (3) lot minor subdivision and rezoning request by the Church, approved by the City Council in 1997, have not been met. Specifically, the Church has failed to provide the right -of -way for Stage Coach Trail as required by condition of approval. The minor subdivision consisted of dividing the 8.9 acre church parcel into three lots. Parcel A, which included the existing church, was 5.3 acres. Parcel B was 3.2 acres and Parcel C, the parsonage, was 19,000 square feet. Included with the minor subdivision request was a concept drawing for the future subdivision of Parcel B which included the extension of Stage Coach Trail to the north property line. The purpose for requiring the dedication of the Stage Coach Trail right -of -way was to satisfy the subdivision requirement that all lots shall abut for their full frontage on a publicly dedicated street. Parcel B and Parcel C of the minor subdivision did not meet this requirement as originally proposed. To remedy this situation the minor subdivision was approved with the following conditions: 1. The subdivision include the formal dedication of the Stage Coach Trail right -of- way with the understanding that Parcels B and C will be financially responsible for the future construction of the street. 2. The City Engineer provide comment and recommendation in regard to utility issues. 3. Any other comments by staff. J:\mgrochala\Staff Reports \City Council \Gethsemane Church 02- 06- 02.dot I have reviewed the Planning & Zoning Board and City Council minutes, staff reports and submitted application documentation for the original minor subdivision application. It is my opinion that the City Council clearly intended that the Stage Coach Trail right -of- way be dedicated in its entirety as shown on the Concept Plan prepared by the Church. I based this opinion on the following: 1. The dedication of Stage Coach Trail right -of -way was required to satisfy subdivision requirements with regard to minimum lot frontage. 2. The only right -of -way discussed in the review process was that which was proposed by the church on the submitted Concept Plan. 3. The Planning & Zoning Board minutes of May 14, 1997 clearly indicates that the dedicated road right -of -way would not be improved until development of Parcel B (future plat). For these reasons and for conformance to the City' s 2001 Transportation Plan, which calls for the northerly extension of Stage Coach Trail, staff maintains its recommendation to require dedication of the street right -of -way to the north property line of Parcel B. If the council, within its legislative discretion, chooses to amend the original conditions of approval, staff requests that the following conditions be imposed: 1. That the Stage Coach Trail right -of -way be dedicated to the city commencing at the north line of the platted Stage Coach Trail right -of- way and extending northerly approximately 160 feet to the center of a cul- de -sac turnaround with a minimum right -of -way radius of 60 feet. 2. That the dedicated right -of -way be improved subject to the requirements of the City Engineer. Any necessary changes to the report and resolution requested by council will be made and distributed with the Friday update. J:\mgrochala\Staff Reports \City Council \Gethsemane Church 02- 06- 02.dot 2 • to tu XI N -•. d X 44 E RI PP §gd /� 0 t t Z • sf '' . 44.I t it A s ,... J ;} W v re a 0 w • • SL W a Z E n = � to 0 a 13 L - so 40 3Q 0 0 0 us E i Q� e 3 V to 9,9,1 o0 r t! L ft 13 0 z 0 O 4 MP i TIFICATIOM I g i t f N �_.°'__` 6 J 5 4 M • g • t ` • 1 0 a =