Loading...
HomeMy WebLinkAbout03/08/2004 Council Packet• AGENDA CITY OF LINO LAKES Monday, March 8, 2004 Council Chambers City Council meeting 6:30 p.m. (Scheduled to be broadcast on Channel 16) Call to Order and Roll Call Pledge of Allegiance Setting the Agenda: Addition or deletion of agenda items 1. Consent Agenda - A) Consideration of Expenditures: i) March 8, 2004 (Check No.70428 through 70513 in the amount of $116,690.98). ii) Centennial Fire District (Check No.14138 through 14168 in the amount of $10,777.50). B) Consider Resolution No. 04 -35, Approving Premises Permit Application, VFW Post 6583 C) Consider Resolution No. 04 -36 Abating Special Assessments on Parcel No. 30- 31 -22 -21 -0001 2. Open Mike 3. Finance Department Report, Al Rolek A) None. 4. Administration Department Report, Dan Tesch A) Consider 1St Reading of Ordinance No. 05 -04, Amending Liquor Code Relating to Strong Beer, Ann Blair B) Consider AFSCME Union Contract 2004 — 2005, Dan Tesch AGENDA 5. Public Safety Department Report, Dave Pecchia A) None. 6. Public Services Department Report, Rick DeGardner A) None. 7. Community Development Department Report, Michael Grochala A) Public Hearing, Consider 1St Reading of Ordinance 03 -04, Vacating Drainage and Utility Easements and Accepting New Easements, Lot 2, Block 1, Oak Brook Peninsula, Jim Studenski (No Report. Recommendation to continue public hearing to the March 22, 2004 regular city council meeting) B) Marshan Estates, Michael Grochala i. Consideration of Resolution No. 04 -31 Approving Comprehensive Plan Amendment from Low Density Unsewered Residential to Low Density Sewered Residential. ii. Consideration of Resolution No. 04 -32 Approving Preliminary Plat, Marshan Estates. C) Consideration of Resolution 04 -02 Approving Allocation of MUSA Reserve and Preliminary Plat, Justin's Preserve, Jeff Smyser D) Legacy at Woods Edge, Michael Grochala i. Consider 1st Reading of Ordinance No. 04 -04, Rezoning Certain Real Property from LB, Limited Business District to PUD, Planned Unit Development District. ii. Consideration of Resolution No. 04 -33 Approving Development Stage Plan/Preliminary Plat, The Village No. 2 8. Unfinished Business None. 9. New Business A) Approval of minutes of February 18, 2004 City Council Work Session B) Approval of minutes of February 20 -21, 2004 Special Council Work Session AGENDA • 10. Community Calendar, March 9, 2004 through March 22, 2004: A) Planning & Zoning Board Meeting, Wednesday, March 10, 2004, 6:30 p.m. B) Council Work Session, Wednesday, March 17, 2004, 5:30 p.m. C) City Council Meeting, Monday, March 22, 2004, 6:30 p.m. 11. Adjourn Revised 03/02/04 AJB 1:19 p.m. • • • EXPENDITURES MARCH 8, 2004 Date: 02/19/2004 Time: 10:30:52 City of Lino Lakes FM Entry - Invoice Journal R s : Vendor #: (A) Invoice #: (A) Entry Journal #: (R) 3761 3761 Trans #: (A) Line #: (A) Due Date: (A) Bank #: (A) Operator: JAL Page: 1 Options: Detail / Summary: S Invoice Status: A # of copies: 1 Sort: N Check Over Expend: N Discount • Vendor # Name # of items Net Gross Discount Lost 003250 XCEL ENERGY 1 3,300.31 3,300.31 .00 .00 003940 SEARS COMMERCIAL ONE 1 582.44 582.44 .00 .00 Grand Totals: 2 3,882.75 3,882.75 .00 .00* Date: 02/26/2004 Time: 12:26:32 City of Lino Lakes FM Entry - Invoice Journal es Vendor #: (A) Invoice #: (A) Entry Journal #: (r) 3782 3782 Trans #: (A) Line #: (A) Due Date: (A) Bank #: (A) Operator: JAL Page: 1 Options: Detail / Summary: S Invoice Status: A # of copies: 1 Sort: N Check Over Expend: N Discount Vendor # Name # of items Net Gross Discount Lost 001260 ACCLAIM BENEFITS 1 14.50 14.50 .00 .00 003050 MRPA 1 130.00 . 130.00 .00 .00 003600 PRESS PUBLICATIONS, INC. 1 460.50 460.50 .00 .00 004465 CROIX CUSTION HOMES, INC. 1 1,790.00 1,790.00 .00 .00 Grand Totals: 4 2,395.00 2,395.00 .00 .00* • Date: 02/26/2004 • Time: 12:27:38 City of Lino Lakes FM Entry - Invoice Journal les Vendor #: (A) Invoice #: (A) Entry Journal #: (R) 3780 3780 Trans #: (A) Line #: (A) Due Date: (A) Bank #: (A) Options: Detail / Summary: S Sort: N Operator: JAL Page: 1 Invoice Status: A # of copies: 1 Check Over Expend: N Discount Vendor # Name # of items Net Gross Discount Lost 000110 A T & T WIRELESS 1 49.00 49.00 .00 .00 000200 AMERICAN FAMILY. LIFE ASSUR, INC. 1 176.20 176.20 .00 .00 0003250 JOHNSON, KEVIN 1 65.57 65.57 .00 .00 001110 CIRCLE PINES, CITY OF 1 7,207.73 7,207.73 .00 .00 001260 ACCLAIM BENEFITS 1. 594.20 594.20 .00 .00 001395 NEXTEL COMMUNICATIONS 1 1,183.67 1,183.67 .00 .00 002000 INTL UNION OF OPER ENGR 1 420.00 420.00 .00 .00 003091 MN NCPERS LIFE INSURANCE 1 400.00 400.00 .00 .00 003250 XCEL ENERGY 1 469.85 469.85 .00 .00 003492 PETTY CASH 1 239.82 239.82 .00 .00 11110 HEITKE, GORDON 1 76.50 76.50 .00 .00 004452 KEEPERS LAW ENFORCEMENT SUPPLY COMPANY 1 260.00 260.00 .00 .00 Grand Totals: 12 11,142.54 11,142.54 .00 .00* Date: 03/02/2004 Time: 09:04:41 City of Lino Lakes FM Entry - Invoice Journal •es: Vendor #: (A) Invoice #: (A) Entry Journal #: (R) 3787 - 3789 Trans #: (A) Line #: (A) Due Date: (A) Bank #: (A) Operator: JAL Page: 1 Options: Detail / Summary: S Invoice Status: A # of copies: 1 Sort: N Check Over Expend: N Discount Vendor # Name # of items Net Gross Discount Lost 000017 MINNESOTA CHIEFS OF POLICE 2 520.00 520.00 .00 .00 000095 ADVANCED GRAPHIX, INC. 1 930.38 930.38 .00 .00 000210 AMERICAN FASTENER & SUPPLY, INC. 1 40.86 40.86 .00 .00 000227 .DELL MARKETING L.P. 1 2,118.63 2,118.63 .00 .00 ' 000260 AMERICAN PRESSURE, INC. 1 13.79 13.79 .00 .00 000293 WIPERS AND WIPES, INC. 1 30.76 30.76 .00 .00 000370 CENTRAL COMMUINICATIONS 1 441.00 441.00 .00 .00 000400 ANOKA, CITY OF 1 270.00 270.00 .00 .00 000430 ANOKA COUNTY G.I.S. DIVISION 1 106.50 106.50 .00 .00 000440 ANOKA COUNTY GOVERNMENT CENTER 1 223.45 223.45 .00 .00 1109 TARGET 2 108.55 108.55 .00 .00 000541 ASPEN MILLS, INC. 1 437.49 437.49 .00 .00 000542 MYERS TIRE SUPPLY COMPANY, INC. 1 253.08 253.08 .00 .00 000724 BLUE TOW SERVICE, INC. 1 160.00 160.00 .00 .00 000748 INDEPENDENT OFFICIALS 1 1,024.00 1,024.00 .00 .00 000819 GRONE, SHERI 1 3.00 3.00 .00 .00 000930 WILLIAM G. HAWKINS & ASSOCIATES 1 13,991.30 13,991.30 .00 .00 000946 C. P. OFFICE PRODUCTS 2 929.96 929.96 .00 .00 001292 DEHN OIL COMPANY, INC. 1 2,980.00 2,980.00 .00 ; .00 001480 HAWKINS WATER TREATMENT GROUP, INC. 1 61.38 61.38 .00 .00 001530 FOREST LAKE FORD, INC. 1 42.08 42.08 .00 .00 001600 GALL'S INC. 1 523.36 523.36 .00 .00 Date: 03/02/2004 Time: 09:04:42 City of Lino Lakes FM Entry - Invoice Journal # Name # of items Operator: JAL Page: 2 Discount Net Gross Discount Lost 001768 H & L MESABI, INC. 1 929.25 929.25 .00 .00 001859 HOME DEPOT CREDIT SERVICES 1 40.15 40.15 .00 .00 001880 HUGO FEED MILL & ELEVATOR, INC. 1 35.09 35.09 .00 .00 001920 SUN TURF, INC. 1 119.79 119.79 .00 .00 001971 INFRATECH TECHNOLOGIES, INC. 1 2,775.00 2,775.00 .00 .00 001982 US LINK 1 1,757.24 1,757.24 .00 .00 002113 KAULFUSS, RENEE 1 71.00 71.00 .00 .00 002178 WILSON DEVELOPMENT SERVICES 1 488.25 488.25 .00 .00 002200 KUSTOM SIGNALS, INC. 1 2,113.85 2,113.85 .00 .00 002340 IMAGE PRINTING & GRAPHICS, INC. 1 168.62 168.62 .00 .00 002511 MCCARTHY WELL COMPANY, INC. 3. 420.00 420.00 .00 .00 002516 TEE'S PLUS (EDH,INC.) 1 28.00 28.00 .00 .00 002550 MENARDS, INC. 5 117.77 117.77 .00 .00 002565 METRO ATHLETIC SUPPLY, INC. 1 631.17 631.17 .00 .00 002584 METRO SALES INCORPORATED 1 1,246.00 1,246.00 .00 .00 111112 MEYER, WAYNE 1 57.38 57.38 .00 .00 002820 MN. POLLUTION CONTROL AGENCY 3 586.00 586.00 .00 .00 002849 MINNESOTA PETROLEUM SERVICE, INC. 1 167:00 167.00 .00 .00 002900 MN. DEPARTMENT OF PUBLIC SAFETY 1 242.00 242.00 .00 .00 002926 MN WEIGHTS & MEASURES 1 250.00 250.00 .00 .00 003013 INVENTORY TRADING COMPANY, INC. 1 946.75 946.75 .00 .00 003092 NATIONAL ALLIANCE 1 1,395.00 1,395.00 .00. .00 003180 NEWMAN TRAFFIC SIGNS, INC. 1 1,534.35 1,534.35 .00 .00 003220 FACTORY MOTOR PARTS COMPANY, INC. 1 93.61 93.61 .00 .00 003370 NYSTROM PUBLISHING COMPANY, INC. 1 5,784.83 5,784.83 .00 .00 003390 OFFICEMAX, INC. 1 825.77 825.77 .00 .00 003524 PITNEY BOWES, INC. 1 247.78 247.78 .00 .00 Date: 03/02/2004 Time: 09:04:43 City of Lino Lakes FM Entry - Invoice Journal Operator: JAL Page: 3 Discount 11111r # Name # of items Net Gross Discount Lost 003600 PRESS PUBLICATIONS, INC. 3 171.55 171.55 .00 .00 003880 SHORT- ELLIOTT - HENDRICKSON, INC. 3 5,159.70 5,159.70 .00 .00 003882 SHRED -IT, INC. 1 54.95 54.95 .00 .00 003900 SAFETY KLEEN CORPORATION, INC. 2 166.30 166.30 .00 .00 004030 SMITH MICRO TECHNOLOGIES, INC. 1 228.65 228.65 .00 .00 004059 SMYSER, JEFF 1 30.00 30.00 .00 .00 004120 ST. JOSEPH EQUIPMENT, INC. 1 327.35 327.35 .00 .00 004150 STAR TRIBUNE, INC. 1 282.15 282.15 .00 .00 • 004240 STREICHER'S, INC. 5 1,367.26 1,367.26 .00 ,00 004300 SUPERIOR FORD, INC. 2 40,228.00 40,228.00 .00 .00 004427 TIMESAVER OFF -SITE SECRETARIAL, INC 3 1,344.60 1,344.60 .00 .00 004470 COMO LUBE & SUPPLIES 1 250.15 250.15 .00 .00 004491 DESIGN PRODUCTS 1 260.00 260.00 .00 .00 004500 D & D INSTRUMENTS, INC. 1 249.00 249.00 .00 .00 004511 ONSITE SEWAGE TREATMENT PROGRAM 1 . 25.00 25.00 .00 .00 1 ENERGY SALES, INC. 1 151.60 151.60 .00 .00 004590 UNIFORMS UNLIMITED, INC. 1 45.21 45.21 .00 .00 004620 UNIVERSITY OF MINNESOTA 1 520.00 520.00 .00 .00 .005037 ST. LOUIS PARK, CITY OF 1 39.00 39.00 .00 .00 900533 QUINLAN PUBLISHING GROUP 1 89.00 89.00 .00 .00 Grand Totals: 90 99,270.69 99,270.69 .00 .00* Date: 03/02/2004 Time: 09:11:02 • Ranges: Options: Operator: JAL Page: 1 City of Lino Lakes FM Entry - Invoice Payment - Approval of Bills Fund: Dept Id: Program: Vendor #: Invoice #: Schedule Journal #: Bank #: Cash #: Payroll Check Dates: (A) (A) (A) (A) (A) (R) (A) (A) (A) Print: D Report Format: 1 # of copies: 1 Total By Account: Y Check # Vendor Alpha Name 3762 3790 Sort: D Print Ranges /Options: Y Process Payroll: N Page on Sort: N Description Dept Amount 70433 AMERICAN FAMILY LIFE A 0 BLUE TOW SERVICE, INC. 70435 CROIX CUSTION HOMES, I DESIGN PRODUCTS GRONE, SHERI INTL UNION OF OPER ENG JOHNSON, KEVIN KAULFUSS, RENEE 0 0 70437 70438 0 70430 M 0 70439 0 0 0 0 PAYROLL WITHHOLDING TOW /SATURN & GMC P U REIMBURSE SAC /WATER /METE DOG HOUSE REIMBURSE PROGRAM REC PAYROLL WITHHOLDING REIMBURSE K -9 PURCHASES CANINE SUPPLIES KEEPERS LAW ENFORCEMEN CANINE EQUIPMENT PACKAGE KUSTOM SIGNALS, INC. ANTENNA /CABLE MN NCPERS LIFE INSURAN PAYROLL WITHHOLDING MN. DEPARTMENT OF PUBL LICENSES PRESS PUBLICATIONS, IN PUBLIC NOTICE /KNIVEL SHORT - ELLIOTT - HENDRICK VILLAGE DEVELOPMENT /JANU WILLIAM G. HAWKINS & A CRIMINAL /MUNICIPAL ATTOR Total for Dept ** 0 INDEPENDENT OFFICIALS GAMES 70440 MRPA MEN'S SOFTBALL BERTH Total for Dept 202 O TARGET SUPPLIES Total for Dept 205 O NATIONAL ALLIANCE PART KIT Total for Dept 207 ** * * * * ** 176.20 * * * * * * ** 160.00 * * * * * * ** 1,790.00 * * * * * * ** 260.00 * * * * * * ** 3.00 * * * * * * ** 420.00 * * * * * * ** 65.57 * * * * * * ** 71.00 * * * * * * ** 260.00 * * * * * * ** 2,071.89 400.00 * * * * * * ** 207.00 26.60 * * * * * * ** 1,394.00 236.00 7,541.26* ADULT SP 1,024.00 ADULT SP 130.00 1,154.00* SPECIAL 79.80 79.80* YOUTH IN 1,395.00 1,395.00* 70436 HEITKE, GORDON REIMBURSE MEALS MAYOR /CO O IMAGE PRINTING & GRAPH PRINTING MAYOR /CO O NYSTROM PUBLISHING COM NEWSLETTER PRINTING /POST MAYOR /CO 0 TIMESAVER OFF -SITE SEC FEB 18 MAYOR /CO Total for Dept 401 70432 ACCLAIM BENEFITS .FLEXIBLE SPENDING ADMINI ADMINIST 70436 HEITKE, GORDON REIMBURSE MEALS ADMINIST 70441 NEXTEL COMMUNICATIONS MONTHLY SERVICE /JANUARY ADMINIST 68.00 134.92 5,784.83 801.60 6,789.35* 608.70 8.50 19.91 Date: 03/02/2004 Time: 09:11:02 Operator: JAL Page: 2 City of Lino Lakes FM Entry - Invoice Payment.- Approval of Bills Check # Vendor Alpha Name Description Dept Amount 0 PRESS PUBLICATIONS, IN ADVERTISING /ASSOC PLANNE ADMINIST 0 STAR TRIBUNE, INC. ADVERTISING /ASSOC PLANNE ADMINIST 0 WILLIAM G. HAWKINS & A CRIMINAL /MUNICIPAL ATTOR ADMINIST Total for Dept 402 125.00 282.15 59.00 1,103.26* 0 ANOKA COUNTY G.I.S. DI PRECINCT MAPS ELECTION 106.50 0 OFFICEMAX, INC. OFFICE SUPPLIES ELECTION .10.39 Total for Dept 403 116.89* 70441 NEXTEL COMMUNICATIONS MONTHLY SERVICE /JANUARY SENIORS 51.41 Total for Dept 406 51.41* 0 WILLIAM G. HAWKINS & A CRIMINAL /MUNICIPAL ATTOR LEGAL CO 13,696.30 Total for Dept 414 13,696.30* 0 PRESS PUBLICATIONS, IN PUBLIC HEARING ECONOMIC 19.95 70443 PRESS PUBLICATIONS, IN ADVERTISING ECONOMIC 460.50 Total for Dept 415 480.45* 0 OFFICEMAX, INC. OFFICE SUPPLIES PLANNING 553.70 0 SHORT - ELLIOTT - HENDRICK PROFESSIONAL SERVICES /JA PLANNING 750.50 0 SMYSER, JEFF PROGRAM PLANNING 30.00 0 TIMESAVER OFF -SITE SEC FEB 9 & 11 PLANNING 190.00 Total for Dept 416 1,524.20* 70441 NEXTEL COMMUNICATIONS MONTHLY SERVICE /JANUARY Communit 0 SHORT - ELLIOTT - HENDRICK PROFESSIONAL SERVICES /JA Communit Total for Dept 418 III/1 T 0431 A T & T WIRELESS MONTHLY SERVICE /JANUARY POLICE 49.00 O ADVANCED GRAPHIX, INC. SQUAD CAR GRAPHICS POLICE 930.38 0 ANOKA COUNTY GOVERNMEN SHARED COSTS POLICE 223.45 0 ANOKA, CITY OF TRAINING POLICE 270.00 O ASPEN MILLS, INC. UNIFORM SUPPLIES POLICE 437.49 O CENTRAL COMMUINICATION A T & T CHARGES /JANUARY POLICE 441.00 O DELL MARKETING L.P. COMPUTER /SOFTWARE POLICE 2,118.63 O GALL'S INC. UNIFORM SUPPLIES POLICE 523.36 O INVENTORY TRADING COMP POLO SHIRTS POLICE 946.75 O KUSTOM SIGNALS, INC. ANTENNA /CABLE POLICE 41.96 O METRO SALES INCORPORAT MAINTENANCE AGREEMENT POLICE 204.00 O MINNESOTA CHIEFS OF PO REGISTRATION /4 SGTS POLICE 520.00 O MN. DEPARTMENT OF PUBL LICENSES POLICE 35.00 70441 NEXTEL COMMUNICATIONS MONTHLY SERVICE /JANUARY POLICE 588.87 70442 PETTY CASH SUPPLIES /PARKING /FILM PR POLICE 239.82 • 0 QUINLAN PUBLISHING GRO SUBSCRIPTION /BULLETIN POLICE 89.00 O SHREP•;;T, INC. DESTROY CONFIDENTIAL MAT POLICE 54.95 O STREICHER'S, INC. PAINT POLICE 1,367.26 0 SUPERIOR FORD, INC. FORD CROWN VICTORIA POLICE 40,228.00 O TARGET SUPPLIES POLICE 28.75 O TEE'S PLUS (EDH,INC.) T- SHIRTS POLICE 28.00 19.91 285.00 304.91* Date: 03/02/2004 Time: 09:11:03 Operator: JAL • Page: 3 City of Lino Lakes FM Entry - Invoice Payment. - Approval of Bills Check # Vendor Alpha Name Description Dept 0 UNIFORMS UNLIMITED, IN UNIFORM SUPPLIES POLICE 0 US LINK MONTHLY SERVICE /JANUARY POLICE Total for Dept 420 0 ONSITE SEWAGE TREATMEN PROGRAM /PETE K Total for Dept 422 0 C. P. OFFICE PRODUCTS 0 H & L MESABI, INC. 0 HOME DEPOT CREDIT SERV O MN WEIGHTS & MEASURES O NEWMAN TRAFFIC SIGNS, 70441 NEXTEL COMMUNICATIONS O US LINK OFFICE SUPPLIES BLADES MAILBOX SCALE INSPECTION STREET SIGNS MONTHLY SERVICE /JANUARY MONTHLY SERVICE /JANUARY Total for Dept 430 O AMERICAN FASTENER & SU PARTS /SUPPLIES 0 AMERICAN PRESSURE, INC KIT 4 VALVE CAP O C. P. OFFICE PRODUCTS OFFICE SUPPLIES O COMO LUBE & SUPPLIES OIL /DRUM 0 D & D INSTRUMENTS, INC MECH CLUSTER O DEHN OIL COMPANY, INC. GASOHOL O FACTORY MOTOR PARTS CO BEARING /CONN ROD O FOREST LAKE FORD, INC. PARTS O MINNESOTA PETROLEUM SE MAINTENANCE GAS PUMP #1 O MYERS TIRE SUPPLY COMP JUMPER PACK 70428. SEARS COMMERCIAL ONE FRIDGE /TOOLS ST. JOSEPH EQUIPMENT, HYDRAULIC DRAIN LINE Total for Dept 431 • 0 C. P. OFFICE PRODUCTS OFFICE SUPPLIES 70434 CIRCLE PINES, CITY OF MONTHLY SERVICE /JANUARY O ENERGY SALES, INC. RAM CONTROL MODULE O IMAGE PRINTING & GRAPH PRINTING O MENARDS, INC. CANE TIP /ROLLER O METRO SALES INCORPORAT MAINTENANCE AGREEMENT O MEYER, WAYNE REIMBURSE FLASH O PITNEY BOWES, INC. POSTAGE METER RENTAL 4 -1 70428 SEARS COMMERCIAL ONE FRIDGE /TOOLS O SMITH MICRO TECHNOLOGI SERVE MAINTENANCE O US LINK MONTHLY SERVICE /JANUARY 0 WIPERS AND WIPES, INC. CAN LINERS 70429 XCEL ENERGY MONTHLY SERVICE /JANUARY Total for Dept 432 70434 CIRCLE-PINES, CITY OF MONTHLY SERVICE /JANUARY O HUGO FEED MILL & ELEVA BEARING /SPROCKET ASSY 0 MENARDS, INC. SINK /ANGLE O METRO ATHLETIC SUPPLY, TUBES /CORD 70441 NEXTEL COMMUNICATIONS MONTHLY SERVICE /JANUARY BUILDING STREETS STREETS STREETS STREETS STREETS STREETS STREETS FLEET FLEET FLEET FLEET FLEET FLEET FLEET FLEET FLEET FLEET FLEET FLEET GOVERNME GOVERNME GOVERNME GOVERNME GOVERNME GOVERNME GOVERNME GOVERNME GOVERNME GOVERNME GOVERNME GOVERNME GOVERNME PARKS PARKS PARKS PARKS PARKS Amount 45.21 572.83 49,983.71* 25.00 25.00* 106.49 929.25 40.15 250.00 1,534.35 50.03 116.36 3,026.63* 40.86 13.79 106.50 250.15 249.00 2,980.00 93.61 42.08 167.00 253.08 156.51 327.35 4,679.93* 716.97 6,610.91 151.60 33.70 57.74 1,042.00 57.38 247.78 425.93 152.40 782.90 30.76 2,791.12 13,101.19* 596.82 35.09 60.03 631.17 302.38 Date: 03/02/2004 Time: 09:11:03 Operator: JAL Page: 4 City of Lino Lakes FM Entry - Invoice Payment - Approval of Bills Check # Vendor Alpha Name Description Dept Amount 0 SUN TURF, INC. AERATOR O UNIVERSITY OF MINNESOT REGISTRATION /DAVE L /MIKE O US LINK MONTHLY SERVICE /JANUARY 70444 XCEL ENERGY MONTHLY SERVICE /JANUARY Total for Dept 450 PARKS PARKS PARKS PARKS 70441 NEXTEL COMMUNICATIONS MONTHLY SERVICE /JANUARY RECREATI 0 ST. LOUIS PARK, CITY 0 WORKSHOP /BARRY B RECREATI Total for Dept 451 O TIMESAVER OFF -SITE SEC JAN 26,28,FEB 2, 4 Total for Dept 452 PARK BOA O OFFICEMAX, INC. OFFICE SUPPLIES ENVIRONM 0 SHORT - ELLIOTT - HENDRICK PROFESSIONAL SERVICES /JA ENVIRONM O TIMESAVER OFF -SITE SEC JAN 26,28,FEB 2, 4 ENVIRONM O UNIVERSITY OF MINNESOT REGISTRATION /DAVE L /MIKE ENVIRONM Total for Dept 461 O SAFETY KLEEN CORPORATI RECYCLE USED OIL Total for Dept 462 0 70441 0 0 •29 HAWKINS WATER TREATMEN MCCARTHY WELL COMPANY, NEXTEL COMMUNICATIONS SMITH MICRO TECHNOLOGI US LINK XCEL ENERGY SCREW CAP /TUBE PUMP INSPECTIONS MONTHLY SERVICE /JANUARY SERVE MAINTENANCE MONTHLY SERVICE /JANUARY MONTHLY SERVICE /JANUARY Total for Dept 494 O INFRATECH TECHNOLOGIES CLEAN LIFT STATION O MN. POLLUTION CONTROL CERTIFICATE /TIM B O SMITH MICRO TECHNOLOGI SERVE MAINTENANCE 70429 XCEL ENERGY MONTHLY SERVICE /JANUARY 70444, XCEL ENERGY MONTHLY SERVICE /JANUARY Total for Dept 495 SOLID WA WATER WATER WATER WATER WATER WATER SEWER SEWER SEWER SEWER SEWER O SHORT - ELLIOTT - HENDRICK BLACK DUCK PUMPING /JANUA OTHER O WILSON DEVELOPMENT SER AQUISITION /RELOCATION SE OTHER Total for Dept 499 Grand Total 119.79 390.00 149.05 159.88 2,444.21* 101.13 39.00 140.13* 136.00 136.00* 261.68 56.00 217.00 130.00 664.68* 166.30 166.30* 61.38 420.00 50.03 38.12 136.10 467.14 1,172.77* 2,775.00 586.00 38.13 42.05 309.97 3,751.15* 2,674.20 488.25 3,162.45* 116,690.98* Centennial Fire District Check Register 3/3/2004 The disbursements listed below are submitted by the Centennial. Fire District for your approval: DATE CHECK#. NAME 3/2/2004 14138 Alex Air Apparatus, Inc. 3/2/2004 14139 Brad Racutt 3/2/2004 14140 Bradley Stephens 3/2/2004 14141 .. Capitol Communications 3/2/2004 14142 Centennial Utilities 3/2/2004 14143 CenterPoint Energy 3/2/2004 14144 Citgo Petroleum Corporation 3/2/2004 14145 Connexus Energy 3/2/2004 14146 David Bruder 3/2/2004 14147. Emergency Apparatus Maintenance 3/2/2004 14148 Fire Instruction & Rescue Education, Inc. 3/2/2004 14149 Gateway Safety Products, Inc. 3/2/2004 14150 Glen Olson 3/2/2004 14151 International Assn. of Fire Chiefs 3/2/2004 14152. Jeff Amacher 3/2/2004 • 14153 Keeprs, Inc. /Cy's Uniform 3/2/2004 14154 . Kent Bamard 3/2/2004 14155 Kevin Stewart 3/2/2004 14156 McLeod USA 3/2/2004 14157 Metro Fire 3/2/2004 14158 Metrocall 3/2/2004 14159. Mike T. Peterson 3/2/2004 14160 Milo Bennett 3/2/2004 . 14161 Orkin Exterminating 3/2/2004 14162 Pioneer Products 3/2/2004 . 14163 Rick Bangert 3/2/2004 14164 Steve Mach 3/2/2004 • 14165 Target 3/2/2004 14166 Thierry Chevallier 3/2/2004 14167 Xcei Energy 3/2/2004 14168 Access Cardiosystems ACCOUNT. 42130 - Equipment Expense 42220 - Travel, Conference, School 42220 - Travel, Conference, School 42130 - Equipment Expense 42251 - Station 1 - Gas 42253 - Station 2 - Gas 42100 - Fuel and Lube 42252 - Station 1 - Electric 42220 - Travel, Conference, School 42000 - Vehicle Maintenance 42280 - Miscellaneous Expense 42130 - Equipment Expense 42220 - Travel, Conference, School 42200 - Dues and Memberships 42220 - Travel, Conference, School 42120 - Uniform Expense 42220 - Travel, Conference, School 42220 - Travel, Conference, School 42240 Telephone 42120 - Uniform Expense 42240 - Telephone 42130 - Equipment Expense 42220 - Travel, Conference, School 42110 - Other Maintenance 42110 - Other Maintenance 42130 - Equipment Expense 42220 - Travel, Conference, School 42280 - Miscellaneous Expense 42220 - Travel, Conference, School 42254 - Station 2 - Electric 45600 - Donated Items Expense AMOUNT 56.45 64.00 40.00 167.18 648.23 1,485.20 105.39 363.23 120.00 2,272.37 350.00 295.47 208.00 195.00 304.00 16.26 80.00 168.00 352.92 8.60 81.64 160.00 232.39 56.23 1,080.50 71.67 56.00 80.90 96.00 581.87 980.00 $10,777.50 AGENDA ITEM 1B STAFF ORIGINATOR: Jean Viger, Deputy Clerk MEETING DATE: March 8, 2004 TOPIC: Resolution 04 -35, Approving Premises Permit Application, VFW Post 6583 VOTE REQUIRED: Simple Majority (3/5 Vote) BACKGROUND: The VFW Post 6583 is in the process of renewing its gambling license, which is due to expire on April 30, 2004. The MN Gambling Control Board requires organizations to notify the appropriate local authority at the time of application. According to Minnesota Statute 349.213, Subd. 2, the gambling control board may not issue or renew a premises permit unless the organization submits a resolution from the city council approving the premises permit. The Lino Lakes Police Department has conducted a background investigation of the gambling manager and has found no reason to deny approval of the resolution. A copy of the notification and a copy of the background investigation is on file in the City Clerk's office. OPTIONS: 1. Approve Resolution 04 -35 2. Deny Resolution 04 -35 RECOMMENDATION: Option No. 1 COUNTY OF ANOKA CITY OF LINO LAKES RESOLUTION NO. 04-35 PREMISES PERMIT RENEWAL APPLICATION FOR VFW POST 6583, 7868 LAKE DRIVE, LINO LAKES, MN WHEREAS, WHEREAS, WHEREAS, the Lino Lakes City Council met at its regularly scheduled meeting of March 8, 2004; and the Minnesota Gambling Control Board requires organizations to notify the city council at the time of application; and the Minnesota Gambling Control Board requires organizations to submit a resolution from the city council approving the premises permit; and WHEREAS, the City of Lino Lakes has conducted a background investigation; and WHEREAS, the VFW Post 6583 is in compliance with City Ordinance. NOW, THEREFORE, BE IT RESOLVED, that the Lino Lakes City Council hereby approves the renewal premises permit application for VFW Post 6583 to conduct lawful gambling at 7868 Lake Drive, Lino Lakes, Minnesota. Approved by the City Council of the City of Lino Lakes this 8th day of March, 2004. John J. Bergeson, Mayor ATTEST: Ann J. Blair, City Clerk • • AGENDA ITEM 1C STAFF ORIGINATOR Al Rolek MEETING DATE March 8, 2004 TOPIC Consider Resolution 04-36 Abating Special Assessments on Parcel No. 30- 31 -22 -21 -0001 Simple Majority (3/5) VOTE REQUIRED BACKGROUND In 1997, the City of Lino Lakes levied special assessments in the amount of $586,602.29 on parcel number 30- 31 -22 -21 -0001, owned by Mr. George Reiling, for various improvements benefiting his property. Mr. Reiling appealed the amount of the special assessment to U.S. District Court. In 2001 the U.S. District Court reduced the amount of the assessment to $180,000.00. The City, in compliance with the court order, abated all remaining special assessment payments from the year 2001 forward. However, through an oversight, the special assessment installment for the year 2000 in the amount of $64,405.77, which should have also been abated, remains outstanding against the parcel. The property is set to go tax forfeit due to the outstanding assessment against the property. To avoid tax forfeiture of the parcel, the City Council needs to approve a resolution to abate the outstanding special assessment. This item is presented on the consent agenda as a housekeeping item. Approval of the resolution is necessary to come into compliance with the court order. It is the recommendation of staff that the City Council approve Resolution No. 04-36 abating the outstanding special assessment installment for 2000 in the amount of $64,405.77. OPTIONS 1. Approve Resolution 04-36. 2. Return to staff for further review RECOMMENDATION Option 1. CITY OF LINO LAKES RESOLUTION NO. 04-36 RESOLUTION AUTHORIZING THE ABATEMENT OF SPECIAL ASSESSMENTS ON PARCEL NUMBERS 30- 31 -22 -21 -0001 WHEREAS, the City of Lino Lakes in 1997 levied a special assessment in the amount of $586,602.29 on parcel number 30- 31 -22 -21 -0001, owned by Mr. George Reiling, for various improvements benefiting his property; and, WHEREAS, Mr. Reiling appealed the amount of said special assessment to U.S. District Court; and, WHEREAS, the U.S. District Court in 2001 reduced the amount of the assessment to $180,000.00; and, WHEREAS, the City of Lino Lakes, in compliance with the court order, abated all remaining special assessment payments from the year 2001 forward; and, WHEREAS, the special assessment installment for the year 2000 in the amount of $64,405.77, which should have been abated, remains outstanding against said parcel; and, WHEREAS, in order to avoid tax forfeiture of the parcel, the City Council of Lino Lakes wishes to abate such outstanding special assessment. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes that the outstanding special assessment installment for 2000 in the amount of $64,405.77 on parcel no. 30- 31 -22 -21 -0001, Anoka County Fund No. 32608, is hereby abated. Adopted by the City Council of Lino Lakes, Minnesota, this 8th day of March, 2004. Ann Blair, City Clerk • John Bergeson, Mayor e Agenda Item — 4A Staff Originator: Ann J. Blair, City Clerk Date: March 8, 2004 Topic: First Reading: Ordinance No. 05 -04 Amending the City Code, Section 700, the Liquor Code, by Adding Section Relating to Sale of Strong Beer in Conjunction with Wine and 3.2% Beer Sales Votes Required: Simple Majority (3/5) Background Section 700 of the City Code relating to Liquor and Beer Licensing was last updated in 2002. I am reviewing legislative changes and anticipate bringing forward a recommendation for a few updates in this area. At present, however, I have only one change which I recommend the Council consider. At your regular meeting of February 9, 2004, you approved a wine and 3.2 % beer license for Mansetti's Pizza. Minn. Stat. 340A.404, subd. 5 provides that a City may allow the sale of strong beer at an on -sale establishment that already has a wine and a 3.2% beer license as follows: (relevant excerpt) Subd. 5. Wine licenses. (b) The governing body of a municipality may by ordinance authorize a holder of an on -sale wine license issued pursuant to paragraph (a) who is also licensed to sell 3. 2' percent malt liquors at on -sale pursuant to section 340A.411, and whose gross receipts are at least 60 percent attributable to the sale of food, to sell intoxicating malt liquors at on -sale without an additional license. The wine/beer license at Mansetti's is the only one of its type in the city at this time. However, I anticipate that in the future, there may be similar establishments that wish to sell only wine and both types of beer. The only way for an establishment to do so at present is to have an on -sale license, which allows sales of all types of liquor. You will notice that the wording of the Statute states that a city "may by ordinance" (emphasis mine) allow this. Bill Hawkins and I discussed this and he gave the opinion that our ordinance, as written, does not allow for this. He also stated that the language provided here would be sufficient to make this change, should the Council wish to do so. Options 1. Motion to Approve 1St Reading. 2. Motion to Deny 1st Reading. Recommendation Option 1 • • • • CITY OF LINO LAKES ORDINANCE NO. 05-04 AN ORDINANCE AMENDING THE LINO LAKES CITY CODE, BY ADDING SUBDIVISION 3A TO SECTION 701.02, LIQUOR AND BEER LICENSING, TO ALLOW THE SALE OF STRONG BEER WITHOUT AN ADDITIONAL LICENSE WHEN LICENSE HOLDER ALREADY HAS BOTH A WINE LICENSE AND A 3.2% BEER LICENSE IN LINO LAKES, AS PROVIDED FOR BY MINNESOTA STATUTES The City Council of the City of Lino Lakes, Anoka County, Minnesota does ordain: The City Code of the City of Lino Lakes, Section 701, Liquor Licensing (under Section 700, Liquor and Beer), is amended as follows: 700 Liquor and Beer 701. Liquor Licensing 701.01 Subdivision 1. Provisions of State Law Adopted. The provisions of Minnesota Statutes, Chapter 340, with reference to definitions of terms, applications for license, granting of license, conditions of license, restriction on consumption, provision of sales, conditions of bonds of license, hours of sales, and all other matters pertaining to the retail sale, distribution and consumption of intoxicating liquor, are hereby adopted and made a part of this chapter as if fully set out herein. Subdivision 2. City May be More Restrictive Than State Law. The Council is authorized by the provisions of M.S.A. § 340A.509, as it may be amended from time to time, to impose, and has imposed in this Chapter, additional restrictions on the sale and possession of alcoholic beverages within its limits beyond those contained in M.S.A. Chapter 340A, as it may be amended from time to time. Amended by Ordinance No. 13 -02, 10/28/02 701.02 License Required. Subdivision 1. General Requirements. No person, except a wholesaler or manufacturer, to the extent authorized under state license, shall directly or indirectly deal in, sell or keep for sale in the city any intoxicating liquor without first obtaining a license to do so as provided in this chapter. Liquor licenses shall be of six kinds: (1) On -Sale; (2) On -Sale Wine; • (3) Off -Sale; (4) Club License; (5) Sunday On -Sale; and 6) Temporary Set -Up License. Amended by Ordinance 3 -83, passed 7/11/83. Subd. 2. On -Sale License. On -Sale licenses shall be issued only to hotels, clubs, restaurants and exclusive liquor stores and shall permit on -sale of liquor only. Subd. 3. On -Sale Wine License. On -Sale Wine License shall be issued only to restaurants meeting the qualifications of Minnesota Statutes, Section 340.11, Subd. 20, and shall permit only the sale of wine not exceeding 14% alcohol by volume for consumption on the licensed premises only in conjunction with the sale of food. Subd. 3a. Strong Beer Sales in Conjunction with Wine and 3.2% Beer Licenses. Licensees who hold both an on -sale wine license and an on -sale 3.2% malt liquor license and whose gross receipts are at least 60% attributable to the sale of food may sell intoxicating malt liquor (strong beer) at on -sale without an additional license, as allowed by Minnesota Statutes, Section 340A.404, subd. 5. Amended by Ordinance 05 -04, passed )0 /04. Subd. 4. Off -Sale License. Off -Sale licenses shall be issued only to exclusive liquor stores and shall permit off -sale of liquor only. Subd. 5. Club License. Club licenses shall be issued only to incorporated clubs which have been in existence for fifteen years or more, or to congressionally chartered veterans' organizations which have been in existence for ten years, and shall permit on -sale of liquor to members and bona fide guests only. Subd. 6. Sunday On -Sale License. Sunday On -Sale licenses may be issued to any hotel, restaurant, or club which has facilities for serving at least thirty guests at one time and which has an on -sale license and shall permit on -sale of liquor on Sunday in conjunction with the serving of meals. Subd. 7. Combination License. A combination On -Sale and Off -Sale License shall be issued only to an exclusive liquor store. Subd. 8. Temporary Set Up License. A one -day intoxicating liquor consumption and display permit may be issued to any non -profit organization in connection with a social activity occurring within the city and sponsored by the organisation. No more than ten such licenses shall be issued in the city in any year. The fee for such license shall be $25.00. A permit shall allow consumption or display of intoxicating liquor and the • serving of liquids for the purpose of mixing with intoxicating liquor, but shall not allow the sale of intoxicating liquor. This permit shall be valid only for the day indicated on it. No permit issued pursuant to this subdivision shall be valid unless first approved by the Commissioner of Public Safety. Amended by Ordinance No. 3 -83, passed 7/11/83. Subdivision 9. Licenses Reserved. Of the number of on -sale liquor licenses that the City is allowed to issue under Minnesota Statute 340A.413, three licenses shall be reserved for the following uses in the specified locations only: two shall be issued only to restaurants or hotels with restaurants in the Town Center area at Lake Drive and I -35W; one shall be issued only to a restaurant or a hotel with a restaurant in the I -35E and Main Street business area. These areas are shown on the map in Section 701.11. These restaurants shall have facilities to serve meals at tables to the general public and have seating capacity to serve a minimum of 50 guests at one time, and at least 50% of gross revenue shall be from the serving of food and non - alcoholic beverages. The City may require a statement signed by an independent certified public accountant attesting that the establishment meets this revenue requirement. Amended by Ordinance No. 13 -99, passed 6/14/99 This ordinance is effective upon passage and publication according to the Lino Lakes City Charter. Adopted by the Lino Lakes City Council this day of 2004. ATTEST: Ann Blair, City Clerk John J. Bergeson, Mayor • AGENDA ITEM 4b • • STAFF ORIGINATOR: Dan Tesch, Director of Administration MEETING DATE: 8 March 2004 TOPIC: Consider Contract Settlement for AFSCME VOTE REQUIRED: 3/5 BACKGROUND: AFSCME represents our clerical and technical employees. As with all other employee groups, we are recommending an annual adjustment of 2 %, with certain market adjustments. When analyzing market conditions, we look at twin cities metro Group VI cities (population 10,000 — 25,000). A salary spreadsheet is attached. This approach to salary implementation is the approach we have taken for several years, and is the approach we are taking as we continue to negotiate our remaining union contracts. In addition to wages, we have agreed to the following contract amendments: • Request for job analysis will be responded to within 90 days. • 2004 Family Insurance contribution of $660.28, plus half the increase in the premium for 2005. • Establishment of a Post Retirement Health Savings Plan (employee funded). OPTIONS: 1. Approve the proposed two -year 2004 -2005 contract. 2. Decline to approve the proposed 2004 -2005 contract. 3. Return to staff for further review and/or action. RECOMMENDATION: 1. Option #1: Approve the proposed 2004 — 2005 contract. J:W FSCME\2004 \Greensheet.doc • • STAFF ORIGINATOR: CITY COUNCIL MEETING DATE: TOPIC: ACTION REQUIRED: BACKGROUND AGENDA ITEM 7B Mike Grochala March 8, 2004 Consideration of Resolution No. 04 -31 Comprehensive Plan Amendment Consideration of Resolution No. 04 -32 Preliminary Plat for Marshan Estates Comprehensive Plan Amendment 4/5 vote Preliminary Plat — 3/5 vote The proposed project is located adjacent to Marshan Lane. The 4.94 -acre parcel is physically divided by the existing Marshan Lane. However, the parcel, including Marshan Lane, is all one property. Mr. Clyde Rehbein, the applicant, originally applied, in fall of 2001, for a Minor Subdivision to split -off the portion of the property lying north of Marshan Lane into a separate lot. However, the proposed split required the extension of sanitary sewer and water. Subsequently, the applicant submitted a petition for the installation of sewer and water facilities, signed by four of the nine existing property owners along Marshan Lane. In October of 2001, the City Council ordered preparation of a feasibility study to extend sanitary sewer and water utilities along Marshan Lane. In July 2002, the City Council ordered a public hearing to consider the proposed improvements. Following the meeting, the City received a petition against the proposed assessment, as provided for in the City Charter, and no further action was taken. Since that time, City staff has held several neighborhood meetings to discuss the proposed improvements and address cost issues. Since there continued to be interest by some of the residents, in addition to the applicant, for sewer and water the City authorized preparation of plans and specifications in July of 2003 for the utility improvements. The intent was to provide a more accurate and up to date estimate of the project costs and allow the city to address, more accurately, the possible financing scenarios. Additionally, staff became aware of possible on -site septic system issues developing along the street and believed that it would be beneficial for the city, from a public health standpoint, to pursue the extension of utilities. During this lengthy process the City's Comprehensive Plan was approved by Metropolitan Council and the City adopted a new subdivision and zoning ordinance as well as a growth management ordinance. Staff have since noted that while the City Council Marshan Estates March 8, 2004 • property is zoned R -1, Single Family Residential, lies within a Stage One Growth Area (1998 - 2010), and within the existing Metropolitan Urban Service Area (MUSA), the property is guided low density unsewered residential. Additionally, due to changes in the subdivision ordinance all subdivisions of sewered residential lots must be platted. • • Therefore, Mr. Rehbein, is now requesting a Comprehensive Plan Amendment to change the land use designation from Low Density, Unsewered to Low Density, Sewered. Additionally, the applicant is requesting Preliminary Plat approval for a 5 -lot subdivision (4 new lots) which includes the property located on both the north and south sides of Marshan Lane. This review is based on the following submittals: 1. General Location Map 2. Boundary and topographic Survey of Marshan Estates, prepared by Glenn Rehbein Companies, and dated December 18, 2003. 3. Preliminary Plat of Marshan Estates, prepared by Glenn Rehbein Companies, dated March 1, 2004. 4. Preliminary Grading, Drainage, and Erosion Control Plan, Marshan Lane, prepared by Glenn Rehbein Companies, dated December 18, 2003, revised January 6, 2004. 5. Preliminary Grading Plan Notes and Details, Marshan Lane, prepared by Glenn Rehbein Companies, dated December 17, 2003. 6. Preliminary Sanitary Sewer and Watermain Utility Improvements, prepared by TKDA ANALYSIS Project Overview Project Data: Total Site Area Total Number of Lots Gross Density Existing Land Use 4.82 acres 5 Tots & 6 outlots 1.04 units per acre (1.24 units per acre if future residential subdivision of Lot 1, Block 1) The project consists of a 4.94 -acre parcel that is currently in residential use. Surrounding land uses include residential to the east, south, and west, with the City's civic complex and proposed Legacy project north of the existing residential. City Council Marshan Estates March 8, 2004 2001 Land Use Plan: Zoning The project site is currently zoned R -1, Single Family Residential. The R -1 District is intended for development of single family detached homes on lots served with public sewer and water (Sec. 6, subd. 1.A). The project is located within the designated shoreland district of Marshan Lake. The shoreland district extends 1000 feet from the Ordinary High Water Level (OHWL) of • public waters. • Comprehensive Plan Amendment: The 2001 Comprehensive Plan guides this area for low density unsewered residential and mixed use land uses. The project area lies within the Stage 1 Growth Area (1998- 2010) and within the Metropolitan Urban Service Area (MUSA). The applicant is requesting a change in the land designation from unsewered residential to sewered residential for that part of the property lying south of the north line of Marshan Lane (Lots 1 -4, Block 2). Based on the possible extension of public utilities to service all properties along Marshan Lane, staff is recommending that the amendment include adjacent Low Density Unsewered Residential property adjacent to Marshan Lane. The existing Mixed Use designations would remain unchanged. Comprehensive Plan The 2001 Comprehensive Plan guides this area for low density unsewered residential, and mixed use land uses. The project area lies within the Stage 1 Growth Area (1998- 2010) and within the Metropolitan Urban Service Area (MUSA). The following table provides an overall summary of the Land Use change based on the total acreage of the proposed development and existing residential uses guided as low density unsewered residential: Comprehensive Plan (2001) Site: North of Mashan Lane Mixed Use Site: South of Marshan Lane Low Density Unsewered Residential North Low Density Unsewered Residential, and Mixed Use East Low Density Unsewered Residential, and Mixed Use South Low Density, Unsewered Residential West Low Density, Unsewered Residential, and commercial west of Lake Drive Zoning The project site is currently zoned R -1, Single Family Residential. The R -1 District is intended for development of single family detached homes on lots served with public sewer and water (Sec. 6, subd. 1.A). The project is located within the designated shoreland district of Marshan Lake. The shoreland district extends 1000 feet from the Ordinary High Water Level (OHWL) of • public waters. • Comprehensive Plan Amendment: The 2001 Comprehensive Plan guides this area for low density unsewered residential and mixed use land uses. The project area lies within the Stage 1 Growth Area (1998- 2010) and within the Metropolitan Urban Service Area (MUSA). The applicant is requesting a change in the land designation from unsewered residential to sewered residential for that part of the property lying south of the north line of Marshan Lane (Lots 1 -4, Block 2). Based on the possible extension of public utilities to service all properties along Marshan Lane, staff is recommending that the amendment include adjacent Low Density Unsewered Residential property adjacent to Marshan Lane. The existing Mixed Use designations would remain unchanged. Comprehensive Plan The 2001 Comprehensive Plan guides this area for low density unsewered residential, and mixed use land uses. The project area lies within the Stage 1 Growth Area (1998- 2010) and within the Metropolitan Urban Service Area (MUSA). The following table provides an overall summary of the Land Use change based on the total acreage of the proposed development and existing residential uses guided as low density unsewered residential: to City Council Marshan Estates March 8, 2004 Land Use Designation Pre Amendment Post Amendment Avg. Density Units /ac. Acres # Units MUSA (acres) Avg. Density Units /ac. Acres #Units MUSA Low Density, Unsewered Residential .98 8.19 8 8.19 0 0 0 0 Low Density, Sewered Residential 0 0 0 0 1.34 11 8.19 8.19 Traffic Lake Drive (CSAH 23) is designated as an "A" minor arterial roadway, with Marshan Lane designated as a local street. The proposed land use change would allow for the potential of five new single family residences on the street. Any new single family development within the amendment area will have minimal impact to the system. Wastewater Approval of the amendment will allow for the connection of existing properties to the municipal sanitary sewer system. An existing City trunk sanitary sewer is located at the intersection of Town Center Parkway and Lake Drive (east side) and is proposed to be extended to service the area. The amendment area lies within Sewer Service District 2, which has the capacity to carry the anticipated increase in flows. Water Approval of the amendment will allow for the connection of existing properties to the municipal water system. An existing City trunk water main is located at the intersection of Town Center Parkway and Lake Drive (east side) and is proposed to be extended to service the area. The existing system is capable of servicing the amendment area. Preliminary Plat: Lot Size. The minimum lot size of the R -1 District is 10,800 square feet of buildable land: All lots exceed this provision, ranging from .47 acres to 1.11 acres. The lot sizes are generally consistent with the existing Tots in the neighborhood. Lot Depth. The minimum lot depth is 135 feet. All lots meet or exceed these provisions. Lot Width. The minimum lot width is 80 feet for standard lots and 100 feet for corner Tots. All lots meet or exceed these standards. Outlots. There are six outlots included in the proposed subdivision. During the preparation of the plan and discussion with the abutting property owners, it became apparent that there were conflicts between the legal descriptions, monumentation, and • • • City Council Marshan Estates March 8, 2004 occupation lines. The proposed Outlots are intended to correct these irregularities. The parcels are proposed to be deeded over to the abutting property owners. It was also noted in a neighborhood meeting that the east line of Lot 1, Block 1 needed to be shifted westerly to match the existing monumentation and occupation lines. This adjustment has been made in the revised preliminary plat, dated March 1, 2004. By doing this, the proposed boundary of the plat will establish the framework for deed corrections to individual properties north of Marshan Lane. Setbacks. The required setbacks established in the R -1 District are the greater of the following: 40 feet (Collector or Arterial Street), 30 feet (Local Street), 30 feet (front yard), 30 feet (rear yard), and ten feet (side yard - principal building). The lots have adequate dimensions to meet required setbacks. Note: the existing attached garage on Lot 4, Block 1 encroaches approximately 10 feet into the street setback area. This is a preexisting condition created when the road right -of -way for Marshan Court was deeded to the City in 1995. Both the house on Lot 4, Block 2 and the house located immediately to the east were constructed prior to this dedication. Street and Block Design. Marshan Lane and Marshan Court are existing streets, and no changes are proposed. The plat does provide dedicated right -of -way for Marshan Lane and Marshan Court. The plat also provides 20 feet of additional right -of -way for Lake Drive in conformance with City and County requirements for arterial streets. Access control dedicated to Anoka County is also shown on the plat along Lake Drive. Grading and Drainage. A grading plan has been submitted and is subject to the review and approval of the City Engineer. His comments are attached. The development as proposed is to be custom graded on a lot -by -lot basis. Individual lot purchasers and /or builders will be required to submit a site - specific grading plan as part of the building application. Utilities. Utility plans are being prepared by the City Engineer, TKDA. Both sewer and water are proposed to be extended from the Lake Drive/Town Center Parkway intersection. Drainage and Utility Easements. Drainage and Utility easements are proposed being five feet in width at adjoining lot lines, and 10 feet in width at adjoining street lines and rear lot lines, as required. A 50 -foot drainage and utility easement adjacent to County Ditch Number 10 is also provided. Parkland Dedication. Staff is recommending 100% cash payment in lieu of parkland dedication. However, staff would also recommend dedication of a 10 -foot wide trail easement adjacent to Lake Drive, which would overlay the required 10 -foot drainage and utility easement. City Park and Trail plans identify a proposed future trail along Lake Drive. Additionally, provision of this easement allows for flexibility with future Lake Drive improvements. City Council Marshan Estates March 8, 2004 • Floodplain. Portions of the site lie within a Flood Plain Zone A, which follows County Ditch Number 10. RCWD has established the flood elevation at 886.0. The City's Floodplain Management Ordinance requires that principal structures be located no lower than one foot above the regulatory flood protection elevation. The City's Subdivision Ordinance requires that proposed basements be four (4) feet above the water table (normal water level) and two (2) feet above the design flood levels of ponding areas. All proposed buildings are outside the Flood Hazard Area. • Shoreland Requirements. The proposed development lies within the Shoreland Overlay District of Marshan Lake, which is classified as a Natural Environment Lake. Impervious surface coverage of lots within the Shoreland District of a Natural Environment Lake cannot exceed 30% for residential development. Upon build -out of the proposed residential lots the impervious surface coverage is estimated to be approximately 20 %. Due to the size of the lots and the minimal impervious surface coverage, stormwater control and water quality treatment is not required provided Best Management Practices (BMP) are incorporated to the maximum extent possible. To insure adequate infiltration and treatment of stormwater runoff prior to entering County Ditch number Ten, staff is recommending a 20 -foot conservation easement be provided along the southern boundary of Lots 1 -4. This easement lies within the proposed 50 -foot drainage and utility easement. City has received a response from Tom Hovey, MN /DNR Area Hydrologist, in which he indicates that the project is consistent with shoreland guidelines. Tree Preservation. Since the site is so heavily wooded, the City's environmentalist has noted that the existing trees should be pruned and /or thinned to conform to the National Fire Wise Standards. A tree preservation plan will be required in conjunction with each individual building application. Lot 1, Block 1 Development. Lot one, Block one is identified as a potential future business site on the preliminary plat. The lot is guided mixed use and was included in the original Calthorpe Town Center Master Plan. However, due to access limitations to Town Center Parkway, it may not be possible to develop in this way without further expansion into the existing residential area to the east. Staff has determined that the property is of sufficient size to be subdivided into two residential lots if the commercial /mixed use option is not feasible. Rice Creek Watershed District (RCWD). The developer has made application to RCWD for approval of a Land Development Plan. RCWD states that because the proposed impervious area of the project is less than one acre in size, they will not require water quality treatment, noting most drainage will infiltrate in the pervious rear lot areas. The project was reviewed at the January 28th meeting, with a CAPROC (Conditional 410 Approval Pending Receipt Of Changes) being issued. RCWD notes that Best Management Practices (BMPs) should be incorporated to the maximum extent possible. • • City Council Marshan Estates March 8, 2004 Anoka County. The Anoka County Highway Department has completed a review of the proposed project. The proposed Lake Drive right of way and access control dedication are sufficient. No improvements to Lake Drive are required for this development. Growth Management: Growth Management, Units/Year: The comprehensive plan and the growth management policy establish a specific number of dwelling units of residential growth for stage one (prior to year 2010). The goal is 147 per year. The City Council has the flexibility to exceed the limit by 20% (29 units) in a year without amending the comprehensive plan. The following table shows the status of the staging plans for final platting new residential units, including the proposed Marshan Estates. PROPOSED PROJECTS Development Name Prelim Plat Phasing plans by year (lots /units to be final platted) year end 2002 2003 2004 2005 2006 2007 2008 2009 approved prelim. plats 103 51 52 Stoneybrook 2nd Addn Century Farm North 249 56 65 52 43 33 Keefe: Preliminary Plat 1 1 Morton (minor subdiv) 1 1 Ravens Hollow 56 56 Haley Manor (10 new lots) 10 10 Crystal Cove (proposed) 3 - 3 Millers Crossroads 152 22 47 51 32 Lakeview Estates (2 new) 2 2 Snell (minor subdivision) Pheasant Hills Pres. 13th 1 1 Proposed Justin's Preserve 1 1 M`arshan, Estates.:a"�� Pheasant Hills 12th (Island) 8 total remaining of 147 annually 2003 -09 TOTAL 1029 maximum 52 249 1 56 10 3 152 2 1 1 8 51 148 174j 103 -1 -27 44 75 72 114 33 8 0 0� 541 147 147 As shown in the table, the goals for both 2003 and 2004 have been exceeded. The addition of four lots for Marshan Estates in 2004 would put the total at 27 over the target, or 18.4% over. This would fall within the allowable 20% range. ENVIRONMENTAL BOARD The City's Environmental Board reviewed the application on January 28, 2004, and recommended approval. Their comments are attached and, where applicable, have been incorporated into this report. PLANNING AND ZONING BOARD The Planning and Zoning Board reviewed the request at its February 11, 2004 meeting. The board recommended approval of the Comprehensive Plan Amendment and the Preliminary Plat with conditions. The board's conditions of approval are incorporated into the staff recommendation. • City Council Marshan Estates March 8, 2004 FINDINGS Comprehensive Plan Amendment 1. The proposed land use amendment lies within an area designated as a Stage 1 (1998 -2010) Growth Area and is within the existing Metropolitan Urban Service Area (MUSA) 2. The proposed land use amendment will allow for infill development. 3. The proposed land use amendment will allow the extension of public utilities to provide for the eventual need to phase out existing on -site private utilities. Preliminary Plat 1. The proposed plat is consistent with the Comprehensive Plan. 2. The proposed plat is consistent with City infill policies. The project lies within existing MUSA, the cost of infrastructure improvements are covered by the developer and charges to individual properties upon connection. 3. With the required turn lane improvements to Lake Drive the roads serving the proposed development are capable of serving the development. 4. The City's Water system is adequate to service the proposed development. 5. The City's Waste Disposal System is adequate to service the proposed development. 6. The proposed plat provides sufficient right -of -way and easements for public street and utility purposes. 7. The proposed preliminary plat meets the requirements of the City's zoning ordinance and subdivision ordinance. 8. The proposed plat will resolve some existing boundary discrepancies between the subject property and existing single family residential lots. RECOMMENDATION City staff, the applicant, and neighborhood residents have been working together for the past two years to not only address utility extension issues, but also resolve long standing property boundary inaccuracies. Approval of the Comprehensive Plan Amendment and preliminary plat would allow for resolution of many of these issues. Comprehensive Plan Amendment Staff recommends adoption of Resolution No. 04 -31 Approving the Comprehensive Plan Amendment. Preliminary Plat Staff recommends adoption of Resolution No. 04 -32 Approving the Preliminary Plat, • with the following conditions: City Council Marshan Estates March 8, 2004 • 1. Plat boundary shall be adjusted along the easterly lot line of Lot 1, Block 1 to correspond with existing occupation lines and monumentation. 2. A 20 feet wide conservation easement shall be provided, adjacent to County Ditch 10, across Lots 1 -4. 3. The City Council orders the sanitary sewer and water improvements. 4. Building Permit applications shall include a tree preservation plan and a grading plan in conformance with the approved grading plan. 5. Tree cover will be evaluated against Firewise requirements (le; trees should be thinned) subject to review by the City Forester. 6. The Developer shall enter into a Development Contract with the City. 7. The Developer shall provide a 10 -foot wide trail easement adjacent to Lake Drive, which would overlay the required 10 -foot drainage and utility easement. 8. Parkland dedication shall be in the form of cash payment in the amount of $6,600. 9. Applicant shall provide Quit Claim Deeds to adjacent property owners for the Outlots. ATTACHMENTS 1. Resolution No. 04 -31 2. Resolution No. 04 -32 3. General Location Plan • 4. Boundary & Topographic Survey 5. Preliminary Plat 6. Preliminary Grading, Drainage, & Erosion Control Plan 7. Preliminary Sanitary Sewer & Watermain Improvements 8. Comprehensive Plan Land Use Map 9. Proposed Comprehensive Plan Amendment Map 10. Memo from City Engineer, dated February 5, 2004 11. Memo from City Environmental Specialist, dated January 30, 2004 • City Council Marshan Estates March 8, 2004 • CITY OF LINO LAKES RESOLUTION NO. 04-31 RESOLUTION APPROVING AMENDMENT TO THE COMPREHENSIVE PLAN (Marshan Estates) WHEREAS, the City of Lino Lakes has adopted a Comprehensive Plan to guide community growth in a rational and responsible manner through 2020, and WHEREAS, MN Statutes 462.355 authorizes the governing body to amend the comprehensive municipal plan, and WHEREAS, an amendment to the plan is required to allow the proposed provided public utilities to service existing and future residential properties along Marshan Lane, and WHEREAS, the City of Lino Lakes Planning and Zoning Board held a public hearing on February 11, 2004 and recommended approval of the Comprehensive Plan amendment, • NOW, THEREFORE, BE IT RESOLVED that the City Council of Lino Lakes hereby approves the following amendments to the 2001 Comprehensive Plan as shown on the attached Exhibit A and described as follows: 1. Change the Land Use designation of 8 properties, adjacent to Marshan Lane from Low Density, Unsewered Residential to Low Density, Sewered Residential. Adopted by the Lino Lakes City Council this 8th day of March, 2004 John J. Bergeson, Mayor ATTEST: Ann Blair, City Clerk • • • • • City Council Marshan Estates March 8, 2004 CITY OF LINO LAKES RESOLUTION NO. 04 -32 RESOLUTION APPROVING THE PRELIMINARY PLAT FOR MARSHAN ESTATES WHEREAS, the City has received an application for preliminary plat approval for property currently described to -wit: Exhibit A and WHEREAS, the applicant is proposing to subdivide the property into five parcels and 6 Outlots described as: Lots 1 Block 1, Marshan Estates Lots 1 — 4, Block 2, Marshan Estates Outlots A,B,C,D,E,F ; and WHEREAS, the preliminary plat approval request is based on the following submittals: 1. Boundary and topographic Survey of Marshan Estates, prepared by Glenn Rehbein Companies, and dated December 18, 2003. 2. Preliminary Plat of Marshan Estates, prepared by Glenn Rehbein Companies, dated March 1, 2004. 3. Preliminary Grading, Drainage, and Erosion Control Plan, Marshan Lane, prepared by Glenn Rehbein Companies, dated December 18, 2003, revised January 6, 2004. 4. Preliminary Grading Plan Notes and Details, Marshan Lane, prepared by Glenn Rehbein Companies, dated December 17, 2003. 5. Preliminary Sanitary Sewer and Watermain Utility Improvements, prepared by TKDA WHEREAS, at their meeting on February 11, 2004, the Planning & Zoning Board conducted a public hearing and recommended approval of the preliminary plat subject to the conditions listed in the meeting minutes; and WHERAS, the proposed preliminary plat meets the requirements of the City's zoning ordinance and subdivision ordinance subject to certain conditions of approval. NOW, THEREFORE, BE IT RESOLVED that the City Council of Lino Lakes hereby approves the preliminary plat for Marshan Estates subject to the following conditions: 11 City Council Marshan Estates March 8, 2004 • 1. The City approves the Comprehensive Plan Amendment to change the land use from Low Density Unsewered Residential to Low Density Sewered Residential. 2. The City Council orders the sanitary sewer and water improvements. 3. A 20 feet wide conservation easement shall be provided, adjacent to County Ditch 10, across Lots 1 -4. 4. Building Permit applications shall include a tree preservation plan and a grading plan in conformance with the approved grading plan. 5. Tree cover will be evaluated against Firewise requirements (i.e.; trees should be thinned) subject to review by the City Forester. 6. The Developer shall enter into a Development Contract with the City. 7. The Developer shall provide a 10 -foot wide trail easement adjacent to Lake Drive, which would overlay the required 10 -foot drainage and utility easement. 8. Parkland dedication shall be in the form of cash payment in the amount of $6,600. 9. Applicant shall provide Quit Claim Deeds to adjacent property owners for the Outlots. • • • • Passed by the Lino Lakes City Council this 8th day of March 2004. John J. Bergeson, Mayor ATTEST: Ann Blair, City Clerk 12 • n ; . 4�A° 2 " A iN Os TO, Oa, apAbli N 4 pw O III aB Neml n PI 1- < y w N AYMNOIN *rw 31tis — N3AY- CC W F- W V 0 z .J • 0 713 .4N32-1N" Nd3SOP LNr1S p pp �d � agi� ■ S { � _G ig 3 u� � ti � 1 �+ A ' 3g3 i/ IJ� u� 9 V1OS3NNIN 'OM ONI1 \ NI38H321 3010 • 3NV1 NVHSeIVW , 111 110303 NOISONI OW DNB N 9 INIONENJ J . PRELIMINARY GRADING, DRAINAGE AND EROSION CONTROL PLAN G HI° SCALE F�L GRC FIELD # • �I- ,.�, COPY -Prcvu ua_: � -9,7 -r / • - _ ,.I - 11- •,` . •i``, yo` r ,. r.. ...,,, ,// 1 / .r cp.- -- hen, th• north j II 4 6,.s. iidi I lit 111 g 1 y` `\ \ ...S14 .1 l .aa ,I. fir` 1 r \ o �` 1 1 \ 1- -� m� a m me I I 1 ��' me \\ Ilr + , i . or oye `� 1°)-(3-1. — ri 1 % EyISSEc E �tf,+srnrs' \ I 1 9 ' . •, p°, ' e1J 8. 1 ,A. ezls11 I �9's G. 11 1 ,/ X68:' \ % �' �`, \ i 811. , 1 \ -567.07`00 E' OUTLQT -C- -.\ O 1 1 1 526.24 162 .'416):-'.4 I .' 1 r/ ''s sog (t1NE�- - -� - -- 1 -I,_0 .OT_ _ ` .. - Lt2�' •.. ••.. •..:.••.::• ..$a emu, �•p/ +1 1 i - - --�' - >+ * -- ::::i. 106 ��� ._ .- '�. �;- .o! '.- • 1 T -- gas safiarroo'E c. s^Z,...• • :� • �r y I yds' , s6 ' _.•. +=1... •• ;�_e • a 566 ;6'00"E \ lirla 1 P' .. _ ':- r - ' 1110 &I'S �, '1 212.56 ,' \ • \ - _ 'r ® '� I - ( 1 - -- -��Y 1 1 - ,� - - -7 / am3 .� 4 \ 1 r Lfi1V Ptt r10. -_ u 1 - 1 JS r li :1L7.� 1 \,‘ ` a e f~L1., '+ ,, ` 1'8.03 „ l.- i + i 1 i .A, u, ,,,,, i -Jo. 4Pt4 :r3..-.3 <u e\ � ''''is, 1 +S°1 n41;4 444 _ G� i ,f `- / -' `:;.6�'5b 34°E.. -_ F 1 1 / tee ` 1 a 1 , , 1 ,L -, .. N'': ::`ldl" j .` II +i!',111',<, , 3 1 1 .,I i QUTj,OT i , eZi.1. 1 f 1 _'�r , 1. I /.•1x. • d' �.. 41n 1\ •i'i oe ' . r .. /,.. .1 , ,1.71...,_„-.. ti: 1 6kL f•$ 1 1 0 +•.L)'r•taY _ 1 I .i _ a • `,'b4s'� _ -J!� I A90 I ' U I1- Exlp j6E '� s,.' , . .:.'t II � � i. 7 -�ln�� F\i y ` _ -- yl, ' all I r 1 ., / "p ! 1 <� 1�o d /' ..1 '9'" `.,in 1.. ` ...3 1' \ ° / Ark 'IL �,. •\ �w`2 1 / N 50 ,, . f 1 +.9 1' ` ' . / -'1,"-.7,... / O //r --h. I `. t. 1 r /1' /1b�� Q��p'N�{� 1 / 1 i -- \ i ' B7�� ?I/!r lrr$ r/ 7 � 11 r -- r r 1 �6 - -- -_ -- '1 0o (' 11. "'i - ▪ -7-°. II i \` \\ ' / `\ ' l ` +' 'Ji- r7- ---- - I. ` .Z °asa - --- ? -: ! 1J. -'c. , '- °R,UN.Ic �' ` \` :of. ‹:� -- ,,','AOUn",•• -y:-? -; '•" ; ,,''1 r' - REC IVED 1 1 aaz- -- -ems'' - 1�a n >; \} J N 4 1 I 1 ,1 - aso-- - - - - -- - - -9�' .* -b'� •-4 \' `It' ��. ' .a 0 7.200 c.. q l o 1 1 ` 1- sea- 0.1, � .. \ 2 'i. \ /' � \ ' pa i d o w• .' • CITY OF LINO Es I I , ; - 886 - „s ue- -.:;-&.74 Lp \ a'rsi c ; `2 • LAK 1 L.,,:',...".5:;:::::.-------., ' J•;r: - 'toy 68s - •cfG.'3`3% -� „.fy 9A” y,-=� \•,,r. �'. - \\ .1`Q. `-. _ / }r A3 �.O y• VO S • / 1h1 - 9 n 100YEARELEV.888 O Q �p O 1a 'I's -- n h oFw.ELEV 8833 •a ��` '�, ., -; -- _I _ 01 01 CO CO r 1 apPlitomi 1111 1,11 1 fig 11 d IUhIIIIIIIIIUH 1111111111111111111111111I1 11111111111 111111 11 11111111M11111111 AMR 1111111111r PVT , 111111EME ! 1 110111111110111111110 MINI El t IIIWI IJ1IUIIIIIIIOI IIIIIIllIH dill ILiIImiIUuhIniMllff 11114! 1 1 11 IliNul 11111111111 1111010111011111111 1111 11111111111111 III 1111111110111111 lIIfl0Ll1 Ii1IlIIJIIIIIJi1iJIIJIIJ) NI 11111111 Ilif IlllllIHlflhlllllllllII iiiiolaihIIIIllliIi 11111 molt . IIIUuIOhIH IIIQWiIiI1II1tL!EI!iIflI lilulilIll " llllllllllllllll 1111-111111 11111 111 11111111111111 ThIIIdII 1111111111111 1111111111111111111 PIM 111110 IIJi il 11111 fill IlIlilill 111 11 1•11[11111011 1111111ENINN 111111EEEE Z 1§. EE 1 d 01 cp To io C O • W 72 co Ti co re co To it 8 0 c 'a y 6. ;a G. H a, � 3 U a, m o c▪ — c re v».N„.o l . a) (1)'a, ��, mm ma,••m m *3 'v H �N N G a 0 it C �N L C co C C v H Q co d o = d'iao E aim EN a: � ° ' 0R''L0 x o° aoo =7 Wev=5 -1 -1 222aaax 1 Prepared March 3, 2004 • V3 W c Q 0 S a m a y ce a.a m 3i c N NZ'. N 0) 0 t U 0 ° n 'a�lrJ g ri ri JID Li 11 *� fat+ - =•. 6 0) W ' ' ,.4.-ANSitr.,c- VA ,,,,"::_j":::::i' _ fit,,V0,-XJA&Rkit riii,"6., it F5 t. r (Q 4tY $ �/ ifS` ' � kK. i,�. WI y 4" iitl 0 � t:* Iti iti Map x� 0 V ` iii /i.� vo bhil /.�.,_' ,} 11t4IA! _ MIR 111111111r1P ' Maw lik 1.4 . Prepared March 3, 2004 Memorandum DATE: February 5, 2004 TO Mike Grochala FROM James E. Studenski, City Engineer RE: Marshan. Estates Attached is the TKDA review dated February 4, 2004, of the submitted documents for the Marshan Estates project. The following comments must be addressed prior to final approval given for this project. The project is in general conformance with the City of Lino Lakes standards. Also attached for your information is an 11x17 copy of the Preliminary Marshan Lane Sanitary Sewer and Watermain Improvements plan. Please contact me with any questions. 1; 600 Town Center Parkway, Lino Lakes, Minnesota 55014- 1182 , ` Phone: 651 - 982 -2400 • Fax: 651- 982 -2499 • TDD: 651- 982 -2410 TKDA ENGINEERS • ARCHITECTS • PLANNERS • MEMORANDUM To: James Studenski, City Engineer Reference: Marshan Estates (Marshan Lane) 1500 Piper Jaftray Plaza 444 Cedar Street Saint Paul, MN 55101 -2140 (651) 292 -4400 (651) 292 -0083 Fax www.tkda.corn Copies To: City of Lino Lakes, Minnesota From: Scott A. Brink, P.E. Date: February 4, 2004 Comm. No. 12976 -002 Routing: The City of Lino Lakes has received plans providing for a Preliminary Plat and improvements to the properties bordering Marshan Lane. Marshan Lane is essentially a short dead end street, extending easterly from Lake Drive, just south of Town Center Parkway. The street is just under 800 feet in length and serves existing residential properties. The proposed plans provide for re- platting the roadway and properties in order to provide for the construction of additional single family residential units. The following has been received for review: 1. Boundary and Topographic Survey of Marshan Estates, prepared by Glenn Rehbein and Associates, and dated December 18, 2003. 2 Preliminary Plat of Marshan Estates, prepared by Glenn Rehbein and Associates, dated January 6, 2004, and received by the City of Lino Lakes January 7, 2004. 3. Preliminary Grading, Drainage, and Erosion Control Plan, Marshan Lane, prepared by Glenn Rehbein and Associates, dated December 18, 2003, revised January . 6, 2004, and received by the City of Lino lakes January 7, 2004. Preliminary Grading Plan Notes and Details, Marshan Lane, prepared by Glenn Rehbein and Associates, dated December 17, 2003, and received by the City of Lino lakes January 7, 2004. Sanitary sewer and water are currently not available to the existing properties on Marshan Lane. As part of the proposed improvements, preliminary plans providing for the extension of sewer and water to Marshan Lane were initiated in the fall of 2003 by the City of Lino Lakes. This review; therefore, considers the proposed plat and improvements, along with the extension of utilities under a separate plan. Preliminary Plat Additional right-of-way (20 feet) is shown dedicated along Lake Drive (Lot 1, Block 1). Along with 10 feet of platted drainage and utility easement, this may be adequate as further explained in this memorandum under the sewer and water comments. However, the plat shall be subject to the review and approval of Anoka County. In addition to the added property needed for the utilities, it is likely that Anoka County will also require dedication for eventual future roadway improvements, including widening. An Employee Owned Company Promoting Affirmative Action and Equal Opportunity Marshan Estates City of Lino Lakes, Minnesota Page 2 February 4, 2004 The Preliminary Plat does show drainage and utility easements around the platted properties per City of Lino Lakes standards. This includes 5 -foot easements along all side property lines and 10 foot easements across the front and rear of all properties. A drainage easement is also provided adjacent to. County Ditch 10 on the south boundary of the plat. Sanitary Sewer and Water 1. Plans for extending sanitary sewer and water to Marshan Lane have been initiated by the City and are therefore not included as part of the plans submitted by the Developer. However, comments are being provided herein to address specific issues related to the Developer's submittal. 2. The closest available utilities are 10 -inch diameter water and 12 -inch diameter sanitary sewer mains at Town Center Parkway, a distance of less than 400 feet north of Marshan Lane. It is proposed to connect directly to the existing facilities by extending mains southwesterly along the east side of Lake Drive to Marshan Lane, and further extending mains easterly to the end of Marshan Lane. 3 For the watermain, it is proposed to extend 12 -inch diameter pipe along Lake Drive in accordance with the City's Comprehensive Plan. The 12 -inch main would then terminate at Marshan Lane, a 12 -inch stub to the south to be provided for a future connection, and 8 -inch main then extended easterly to the end of Marshan Lane. Individual services would then be provided for the individual parcels along Marshan Lane (for both existing and proposed single family units). For the sanitary sewer, it is proposed to extend PVC sewer pipe to Marshan Lane in a similar fashion. The size of the sewer main has not yet been firmly determined, and can be further explained as follows: • The depth of the sanitary sewer at Town Center Parkway is approximately 19 feet deep. However, the ground elevation drops as much as 11 feet from Town Center Parkway to the end of Marshan Lane, thus raising concerns regarding the depth/cover and invert elevation of the main by the time it reaches the termination point (a total distance of approximately 1100 feet). For the majority of properties on Marshan Lane (including-the three proposed new units on the south side of Marshan Lane), gravity flow from the homes to the sewer does,not appear to be a concern. However, the three existing units along the south and east sides of Marshan Court are situated at lower elevations, and the lowest floors of these three properties cannot be served sanitary sewer by gravity. Preliminary design of the sanitary sewer places the invert of the sewer at an elevation of 890.5 (plus or minus) at its termination at Marshan Court and the end of Marshan Lane. The • low floor elevations of the three properties are as follows: 580 Marshan Lane - 888.97 590 Marshan Lane - 888.78 600 Marshan Lane - 889.01 Therefore, an ejector or lift would be required to service the lowest floors of these three properties. Marshan Estates Page 3 February 4, 2004 City of Lino Lakes, Minnesota An 8 -inch diameter sewer is adequate in size for the proposed improvements and area served. However, upsizing of the pipe to further flatten grades and gain additional depth can be done. However, ejectors would still be necessary for the properties as mentioned above. A sewer stub for eventually extending the sewer further south beyond Marshan Lane may not be necessary for the following reasons: • In accordance with the City's Comprehensive Sewer Plan, it is not anticipated that a significant amount of additional area would require collection from this extension. In addition, the current Marshan Lake Industrial Park (Panattonni), located just to the south of Marshan Lane, has extended sewer to the east side of Lake Drive for future collection of those properties. • An extension of sanitary sewer further south would require crossing County Ditch No. 10, which is immediately south of Marshan Lane. According to the survey provided, the bottom of the ditch is 5 feet below the sewer invert at Town Center Parkway. If sewer were to be extended to the south of County Ditch 10, a small lift station would be needed, according to the survey information provided. The alignment and location of the water and sewer along Lake Drive has not yet been firmly determined, pending completion of the utility design and review by Anoka County. However, it appears additional right -of -way and/or utility easements will be necessary to construct the utilities, and will be required by the County. The existing right -of -way currently extends 40 feet from the center of Lake Drive. It is recommended at this time that at least 30 feet be provided. Per the plans provided, 20 feet of additional right -of -way is provided along with the 10 foot standard drainage and utility easement. This may be adequate. However, the actual required amount of dedication will be subject to the review of Anoka County, including their review of the Preliminary Plat and proposed Utility Plans. A permit from the County will also be required for any work within the County right- of -way. The sanitary sewer and services must be placed a minimum distance from existing wells per Minnesota Department of Health requirements. Grading Plan 1 The proposed site development results in grading (disturbing of property) of over 1.0 acre. The development shall therefore be subject to the requirements of NPDES (National Pollution Discharge Elimination System) as most recently adopted by the Minnesota Pollution Control Agency (MPCA) and the City of Lino Lakes. A Stormwater Pollution Prevention Plan (SWPPP) will also be required. Because the site is less than 23 ,acres, a review and approval of the Rice Creek Watershed - District (RCWD) will not be required. Marshan Estates Page 4 February 4, 2004 City of Lino Lakes, Minnesota As part of the NPDES and SWPPP requirements, at least some measure of stormwater treatment must be provided, subject to the review and approval of the MPCA. For the portion of property disturbed as shown on the Grading Plan, it is recommended that the grading be adjusted to provide for detention or infiltration as may be required by the MPCA, prior to discharging to the County ditch. . Silt fence and erosion control measures are provided on the Plans. No soil or geotechnical report is provided. Any imported material for the site shall be subject to the approval of the City Engineer. In addition, floor elevations for the proposed housing units must meet the requirements of the City of Lino Lakes as follows: The lowest building opening must be a minimum of 1 -foot higher than detention basin emergency overflow elevations. Basement floor elevations must be at least 4 -feet above the normal water elevation and 2 -feet above the design flood level (for consideration of County Ditch 10 and any infiltration basins that may be required). The low floor elevation shall also be subject to the level of subsurface groundwater elevations. Memo Environmental To: Michael Grochala From Marty Asieson Date: January 30, 2004 Re: Recommendations of the January 28, 2004 Environmental Board Meeting The Environmental Board met on January 28th, 2004 and made the following recommendations: Marshan Estates Land Cover The developer needs to submit a detailed tree inventory and follow the subdivision ordinance for Tree preservation plans. In addition, the developer should remove /prune any remaining trees to conform to National Fire Wise Standards (Attachment 1). Pre- existing conditions should include Lino Lakes MLCCS. Soils There should be no importing or exporting of soils without City approval The developer should include a plan for soil compaction prevention. Surface Water Would like RCWD input on impact mitigation. The Environmental Board would like to see a minimum buffer to include at least the designated drainage easement area, and should include a distance of 50 feet from the ditch. ` The City native seed specification should be used to replant in this buffer area Signage should be used in this easement area The signage should say "no cutting, or removal of vegetation, no :fill or debris." Developer should submit the required NPDES control measures and best management practices to be used with particular emphasis on the ditch. Ensure the developer is complying with the City Shoreland Management Overlay Ordinance in not exceeding 30% impervious. Downspouts from roofs should be directed to pervious yard areas: • Page 1 Additional Comment This Environmental Board . review does not include the multi -use area. There is concem for the type of use that may be proposed for this area Motion by Grundhoffer to approve Marshan Estates with Environmental Board comments and recommendations. The motion was 2 1'd by O'Dea. Motion was approved with all in favor. Justin's Preserve Tree Preservation A tree preservation plan should be submitted following the City Tree Preservation Ordinance. • Soils Importing or exporting of soils without City permission should be prohibited. Surface Water Create rain gardens to capture extra impervious runoff. Direct runoff from roofs to yard and /or rain gardens. Habitat Concerns Inform property owners of shoreland ordinance and of the benefits of leaving the trees (both alive and dead) as habitat. Other Non - Related Environmental Elevation on plan for future house and lowest floor elevation should be corrected. Motion to approve with staff and Environmental Board recommendations and comments made by O'dea, 2nd by O'Dea. All were in favor, motion approved. • Page 2 o Z o a o Z L I S••-• CC O " c 0 O.c :E 2�1-� U c__, ai g o 5 w Y Y E U�9 8 8 8 •1 E te 11 a) 11 ¢ O m E > 2 15 0 - -- ci > > u- I E E E 6 5 CZ 000 •• C. •• t.. C.. C• •• c• c. c• n c- .. C.'S CV CV CV LO co .4- 8 CD MI z. t y C 0 S - A u, g r 2 O c O0. o C c to e C t 1-_ C C6 E ca C• C• C• C• C• C• c• c• c• c• c• c• TOTAL STRUCTURAL HAZARD HOME FIRE RISK CALCULATION O N et c C 4) CI us c o vs :a .0 C/) CO N 'P. 1 is � = �� E aEi 3= m o� •ai E 1m -°�.°c o 1 a) m 0'•o� EZ m y St E >+E L.E'4lrEZ E 0 u) i- T V '61 V rrr p CA O Ch O CO O 'd' C0 0 2 w E to a) "a ..a.. ° N a' U t L; c° m e oo rn o 0 t @a o� 'E'i -u-o r� 8wo NN .0 N N 0 C,7 ° CO Vol LL/ C a V A Cq 14 0 C O s N a o m 0 if a � 0 •� g N 5 tS N = $ � _ g t7i �i N O 5. r I.. c- co c) N Z Z c. f- = 2 3 O d C. C• C• C• C• h C• C. c-- C• C• co- c-- C• c-- C• C• C• C• C• C`- N. C• C. h C. C C. - c• C• co- C. et' In . CD N- oti r r r r r C O E; - N U P CO 2 V 8 MI 9 2 O O c E 0 a ) >,o 00 I- o U msEEoo N m.0 O•� 0 c = 0 ca Qm .° 0 Q '(� a y 'p 'AO O CA otf O E c R N Cg ? CD 0 C is 0oj>•• Cov 6 d)vv�. V N A V o t E CL 0 < ZO N CA „ 8} 0 Q p, 0 ,> > 5 N m C C > m CDU -U._ ¢-, U cn= . . 00 'a te 0) C O U C• C. Y C• C• W C• C... C`• c• C. C- < C• C. Cl. C. C• V) •• ■ •• C• CO C. C• 0 0 0 d O an CO •• t? 103 O m 2 Z L o N C off¢ C• C• C• C. CA `r' N N (ADDRESS ( Landowner Home • Waypoint 'EVALUATOR_ (DATE GPS UNIT # (GPs - LAT(X) 2 0 z 0 1 a 0 O N 10 Ch O III III I II O P) lt) O LOU) 1C) O O N N r (0 O O 1t) IC) 1 '0-0 II I PC3 R 8 5, p o I i m 0 `g{� 10 _ C N CO '�ij t �7, S. ° O N 2 2 E as .........0 Z QN ij F a 7 as �sQ. N 1L� .Q� C 13 -O to O' ° - C i!0u o v z r) 5 m �, ()7E 88 8`"1 -£Rwg\ IJJ -'W p 0 O Z_. 9Sgg- NbvOJ�cD Y Z `3`-S O� c >O m= >JcoM >MJOE >3if -3W cc C• N C• cc C• C• C. C• 2 C• c. U) H 0 C• C• C. 0 C• C• C• N 0 C• C• C9 CA CO O 0) t0 13 N g �0 X115 § w� m (tLl�n.� vii U ° $ cV°a3 a. Z Z y3) d m m g o S i2 g to �`'5 2 _ �L hS N 080EU Z�)° --000O 0 c- C• c- C• C• C• C• C• C• eC C• C- c- C• C• C• C• c- • P• to CD t� Ca 0) Or r r AGENDA ITEM 7 C STAFF ORIGINATOR: Jeff Smyser C. C. MEETING DATE: February 11, 2004 TOPIC: Resolution No. 04 -02 Allocation of MUSA Reserve Acres and Preliminary Plat Justin's Preserve, White Pine Road VOTE: 3/5 BACKGROUND Carpenter Homes has requested approval of a preliminary plat for Justin's Preserve. Under the current subdivision ordinance, the creation of new lots on city sanitary sewer requires a plat rather than a minor subdivision. The project involves splitting an existing fourteen -acre parcel. The plat includes a neighboring parcel. A portion of the land will be added to that neighbor's lot. This application highlights an unusual situation that should be corrected. The existing house on the large property, 171 White Pine Rd., is connected to city sanitary sewer and water. However, it is not within the MUSA. It should have been included in MUSA when it connected to the utilities. This also is the case with the existing 90' x 170' lot at 173 White Pine Rd (which is being included in the plat). Neither of these properties is in the MUSA although both are connected to utilities. This should be resolved now by allocating MUSA reserve. The area being platted includes 4.4 acres of upland. To accommodate the proposal, the following approvals are necessary: 1. Allocation of 3.7 acres of MUSA reserve 2. Preliminary plat The P & Z Board reviewed a plat in December and recommended approval. The applicant then reconfigured the plat and resubmitted it. In January, the P & Z recommended approval of the second plat, which is before the City Council now. ANALYSIS The following is a summary of the of the proposal: Gross Site Area 14.3 acres Upland Area 4.4 (approximation) Total Lots 3 Gross Density 0.21 units /acre Net Density 0.68 units /acre • Justin's Preserve page 2 Comprehensive Plan, Land Use and Zoning The table below identifies the existing land use and zoning as well as guided land uses for the area. Location Existing Land Use Guided Land Use Existing Zoning Site residential Low Density Sewered Resid. R -1 North Baldwin Lake Public /Semi- Public PSP South residential Low Density Sewered Resid. R -1X East residential Low Density Unsewered Resid. R -1 West regional park reserve Public /Semi- Public PSP Growth Management: MUSA Reserve: The comprehensive plan and the growth management policy establish a specific number of MUSA acres for residential growth for stage one (prior to year 2010). The MUSA reserve was calculated based on a specified amount of growth in specified areas. That estimate did not anticipate growth resulting from creating new lots on existing sewered property. The Growth Management policy designates 36 acres of MUSA reserve for residential development each year. The City Council has the flexibility to exceed the limit by 20% (7.2 acres) in a year without amending the comprehensive plan. The residential MUSA reserve for 2003 has been allocated. There are 3.7 acres remaining for 2004. The table at the end of this report lists the residential MUSA reserve status. The site is guided and zoned for sewered residential uses, and it is in a Stage 1 (pre -2010) area. The Justin's Preserve site includes approximately 4.4 acres of upland. Both existing homes are connected to the municipal sanitary sewer and water. However, neither is in the MUSA. The City allocates MUSA reserve based on the upland area of a site. The Justin's Preserve plat upland area is as follows: Though the upland of 4.4 acres is greater than the 3.7 acres remaining for 2004, the property is such that there cannot be additional lots created. The extra upland (0.7± acre) is isolated behind gross area (acres) upland area (acres) Lot 1 3.6 2.1 Lot 2 8.4 1.5 Lot 3 2.3 0.8 total 14.3 4.4 Though the upland of 4.4 acres is greater than the 3.7 acres remaining for 2004, the property is such that there cannot be additional lots created. The extra upland (0.7± acre) is isolated behind • Justin's Preserve page 3 house sites and wetlands, with no access or road frontage to it. The 3.7 acres of MUSA reserve will be sufficient to include the house sites. Alternatively, the City could use the allowable flexibility to exceed the annual goal of 36 acres by up to 20 %: in this case, 0.7 acre. This is not necessary, since the 3.7 acres is adequate. Growth Management, Units/Year: The comprehensive plan and the growth management policy establish a specific number of dwelling units of residential growth for stage one (prior to year 2010). The goal is 147 per year. The City Council has the flexibility to exceed the limit by 20% (29 units) in a year without amending the comprehensive plan. The goal for 2004 has been exceeded. However, one more lot for 2004 would be a minor increase and still fall within the allowable 20% range. The table at the end of this report shows the status of the staging plans for final platting new residential units. The option is to deny the application because it exceeds the 147 limit. This would prevent the property owner from selling a lot until 2005. Preliminary Plat Lots: The minimum lot size in the R -1 zone is 10, 800 sf of upland. As listed above, all lots meet this minimum. (The minimum 10,800 sf is 0.25 acre.) Shoreland: Baldwin Lake is a "recreational development" lake under the shoreland overlay ordinance. Minimum lot size is 20,000 sf (0.46 acre) with an 80' lot width. The proposed lots exceed these. Structures on sewered lots must be set back 75' from the ordinary high water level of 883.1. The proposed house pad meets this requirement. Streets, Access: No new streets are needed. A new driveway will be needed for Lot 1. The driveways must be five feet from a property line. Parks: The subdivision ordinance includes park dedication requirements. Park dedication is $1665 per residential unit, less any land dedication. There is no land dedication needed, so the park dedication will be $1665. Anoka County owns property that abuts the road on the west side of Rohavic Oaks 2nd Addition. The Anoka County trail map shows a future trail connecting to White Pine Road west of the site of the proposed plat. The proposed new house lot will not affect that future trail. Utilities: The existing houses are connected to city water and sanitary sewer. The new house will connect as well. Grading and Stormwater Management: Wetlands cover the northern portion of the site. Drainage and utility easements will cover the wetlands. Easements also will be platted along all the property lines that do not run into wetlands. The Rice Creek Watershed District has issued a • Justin's Preserve page 4 conditional approval of the first plat application, which the P & Z Board saw in December. The new plat, dated January 16, 2004, should be submitted to RCWD for re- examination. Power Line Easement: There is an existing power line running along the southern edge of the property. There was a blanket easement over the entire property. The applicant worked with the power company to confine that easement. This will need confirmation for final platting. ENVIRONMENTAL BOARD The Environmental Board reviewed this application on January 28. Recommendations are attached. CONDITIONS OF APPROVAL Approval of the project should include the following conditions: 1. Lot 1 shall connect to city sanitary sewer and water. 2. Issues discussed in the City Engineer review memo must be addressed to his satisfaction. 3. Park dedication of $1,665 shall be paid. 4. Prior to approval of the final plat by City Council, the applicant shall submit proof that the powerline easement has been confined. 5. The new plat dated January 16, 2004, must obtain approval by the Rice Creek Watershed District prior to final plat approval by the City Council. OPTIONS. 1. Approve Resolution 04 -02, which includes approval of both the allocation of 3.7 acres of 2004 MUSA reserve and the preliminary plat, with conditions. 2. Return to staff with direction. RECOMMENDATION Option 1 -J 0 O N In N I� O O N. LO O Cf) N In N co N O N tt 0) 0 0 N CO 0 0 N 0 0 N CO O 0 Lt) O O 0 0 N O 0 z 0 a 0 0 J J 2 a 1- z W 0 N W CC O O O (o O O O 0) a) O O 0) O O 0) 0) T 10 0) O 0) a) O N (f) O r) O 0) N co T ca O 2 .ca a a) C O s t O z a) as 0 0 0 2 w a al cc Justin's Preserve O 0) O (0 CO (0 N N. a) 0) z 0) 1- O -J 2003 -09 TOTAL max. 1029 N O r- N r CO 0 T Co N T N r T CO r � Phasing plans by year (lots /units to be final platted) CA O O N O ao O O N O O O N CO CO C) CO co 0 0 N c) .1- N c') Lt) ti in O 0 N N L0 T to CO r r r tt O O N ((00 r- LOO v r ti T O O N N 10 CO T 10 O r CO N N N T T pp CP year end 2002 T Ln T Lt) Z+ E .0) L n co O 0) r- tO N N r T 'I' CO Development Name and Phases Stoneybrook 2nd Addn Century Farms North Keefe: preliminary plat Morton (minor subdiv) Ravens Hollow Haley Manor (10 new Tots) Crystal Cove (proposed) Millers Crossroads 1 Lakeview Estates (2 new) Snell (minor subdivision) Pheasant Hills Pres. 13th a) U O 0 O Q 1Justin's Preserve IMarshan Estates Pheasant Hills 12th island G y.. N r's \° N N °. CD O 0 N c 0- To "" T o O Q) O 0'- 0)- C c w a c 0 Tel (d N E E X N O a) a) 0 CITY OF LINO LAKES RESOLUTION NO. 04-02 RESOLUTION APPROVING THE ALLOCATION OF 3.7 ACRES OF MUSA RESERVE AND A PRELIMINARY PLAT FOR JUSTIN'S PRESERVE WHEREAS, Carpenter Homes submitted an application for a preliminary plat, and; WHEREAS, the Lino Lakes City Council makes the following findings: Findings 1. The site includes 14+ acres on the south side of Baldwin Lake on White Pine Road. It includes current addresses 171 White Pine Rd. and 173 White Pine Rd., and its current PIDs are 31 31 22 24 0005 and 31 31 22 24 0004, respectively. 2. The existing houses on the site are connected to municipal sanitary sewer and water but the site is not within the Metropolitan Urban Service Area (MUSA). 3. The City's growth management policy, described in Ordinance No. 01 -03, establishes a goal for MUSA reserve allocation for each year, with some flexibility. There are 3.7 acres of MUSA reserve remaining for year 2004 without exceeding this goal. 4. The City's growth management policy, described in Ordinance No. 01 -03, establishes a goal for residential growth each year, with some flexibility. While this goal has been exceeded, the approval of one new lot in the Justin's Preserve application would be within the discretionary flexibility limits provided by the policy. 5. The Planning & Zoning Board held a public hearing on the application on February 11, 2004. NOW, THEREFORE, BE IT RESOLVED that the Lino Lakes City Council hereby allocates 3.7 acres of MUSA reserve to Justin's Preserve. BE IT FURTHER RESOLVED that the Lino Lakes City Council hereby approves the preliminary plat subject to the following conditions: 1. Lot 1 shall connect to city sanitary sewer and water. 2. Issues discussed in the City Engineer review memo must be addressed to his satisfaction. 3. Park dedication of $1,665 shall be paid. 4. Prior to approval of the final plat by City Council, the applicant shall submit proof that the powerline easement has been confined. 5. Approval by the Rice Creek Watershed District must be obtained prior to final plat approval by the City Council. 6. This approval is based on the following plans and related information: Preliminary Plat (Existing Conditions and Preliminary Plat), 1/16/04 Preliminary Grading, Erosion Control and Utility Plan, 1/16/04 Adopted by the Lino Lakes City Council this day of , 2004. John J. Bergeson, Mayor ATTEST: Ann Blair, City Clerk Resolution 04 -02, page 2 Memorandum DATE:. February 5, 2004 TO Jeff Smyser FROM: James E. Studenski, City Engineer RE: Justin's Preserve Attached is the TKDAreview dated February 4, 2004, of the submitted documents for the Justin Preserve site. The project is in general conformance with Lino Lakes requirements. The following comments must be addressed prior to final approval , given for this project. Please contact me with any questions. 600 Town Center Parkway, Lino Lakes, Minnesota 55014 -1182 r. Phone: 651.-982-2400 • Fax: 651 -982 -2499 • TDD 651- 982 -2410 TKDA ENGINEERS • ARCHITECTS • PLANNERS MEMORANDUM To James Studenski, City Engineer Reference:: Justin's Preserve 1500 PiperJaffray Plaza 444 Cedar Street Saint Paul, MN 55101 -2140 (651) 292-4400 (651) 292 -0083 Fax www.tkda.com Copies To City of Lino Lakes, Minnesota From: Scott A. Brink, P.E. Date: February 4, 2004 Comm. No. 12976 -002 Routing: A review memorandum for this development was previously prepared and dated December 4, 2003. Since that time, additional documents have been received as follows: 1 Existing Conditions and Preliminary Plat by E.G. Rud and Sons, Inc., dated January 16, 2004, and received by the City of Lino Lakes January 17, 2004 2 Preliminary Grading, Drainage, Erosion Control, and. Utility Plan by Plowe Engineering, Inc., dated January 16, 2004, and received by the City of Lino Lakes January 17, 2004. The property is located along the south side of Baldwin Lake adjacent to White Pine Road, about 900 feet west of Laurere Avenue. The proposed plat and development essentially splits an existing 14.2 acre parcel of property into three parcels, Lot 1 (3.6 acres), Lot 2 (8.4 acres), and Lot 3 (2.3 acres). The previous submittal provided for splitting the parcel into two lots of approximately 2.2 acres and 11.8 acres. The total area of the property is slightly larger (0.3) from the previous submittal, as an existing house along White Pine Road has been added to the property. It is proposed that existing single family homes will remain on Lots 2 and 3 while a new single family home will be constructed on Lot 1. The following review comments are provided: The proposed subdivision will require the review and approval of the Rice Creek Watershed District. (RCWD). Rules indicate that any subdivision of property over 5 acres in size requires a permit from. RCWD. A First Floor Elevation (Nr'E) of 890.0 for the new home is proposed. A low floor lowest opening elevation of 989.6 is provided on the Plan, and appears to be in error (should be 889.6 ?) and must be revised accordingly.. The 100 -year High Water Elevation of Baldwin Lake is identified as 885.30 according to the survey provided. The City's minimum building elevation floor elevation (including basement), must be the greatest of the following: 2 feet above the Design Flood Elevation, 4 feet above the water table, or 1 foot higher than the emergency overflow elevation. The elevations provided, therefore, would meet requirements based on Baldwin Lake flood elevations. However, the groundwater elevation is not known, and the lowest floor elevation would need to be 4 feet above the water table as required_ In addition, the edge of the existing wetland bordering the future home site is • An Employee Owned Company Promoting Affirmative Action and Equal Opportunity Justin's Preserve Page 2 February 4, 2004 City of Lino Lakes, Minnesota at an elevation of roughly 887 -888 feet according to the survey, and an Ordinary Water Elevation (OHWL) of 887.59 has been determined by the Applicant's Engineer. However, the extent of the wetland's bounce or potential. High Water Elevation (HWL) is not known or shown on the Plan. Therefore, further documentation must be provided to show that the floor and building elevations proposed will meet City regulations in relation to the wetland. The Contractor shall be responsible for obtaining an NPDES Permit and Storm Water Pollution Prevention Plan in accordance with State of Minnesota Law. This will also require providing to the City a copy of the Stormwater Pollution Prevention Plan (SWPPP), required as part of the NPDES submittal.. If the actual area of property to be disturbed is less than 1 -acre, an NPDES permit will not be required. However, the Applicant would be required to demonstrate on the Plan accordingly. Also, because of the close proximity to Baldwin Lake, and the existing wetland immediately adjacent to the proposed home site, sedimentation and erosion control measures must be fully implemented and enforced per City of Lino Lakes and RCWD requirements. Drainage and utility easements are provided adjacent to property lines and over wetland areas in accordance with City requirements. These easements shall also be provided on the Final Plat. Additional notes and details shall be included with the Plans providing for adherence to the standards and requirements of the City of Lino Lakes. This shall include standard details for watermain and sanitary sewer services and appurtenances, and notes referring to utility construction requirements of the City of Lino Lakes and Utility Specifications of the City Engineer's Association of Minnesota (CEAM) as applicable. The proposed subdivision and construction must adhere to Floodplain and Shoreline Management requirements of the City of Lino Lakes as applicable. A heavy dark line is shown extending across the existing wetland on Lot 1 between the proposed new house and the south property line. It is unknown or not noted what this line is. Memo Environmental To: Michael Grochala From Marty Asleson Date: January 30, 2004 Re: Recommendations of the January 28, 2004 Environmental Board Meeting The Environmental Board met on January 28th, 2004 and made the following recommendations: Marshan Estates Land Cover The developer needs to submit a detailed tree inventory and follow the subdivision ordinance for Tree preservation plans. In addition, the developer should remove /prune any remaining trees to conform to National Fire Wise Standards (Attachment 1). Pre- existing conditions should include Lino Lakes MLCCS. Soils There should be no importing or exporting of soils without City approval. The developer should include a plan for soil compaction prevention. Surface Water Would like RCWD input on impact mitigation. The Environmental Board would like to see a minimum buffer to include at least the designated drainage easement area, and should include a distance of 50 feet from the ditch. The City native seed specification should be used to replant in this buffer area. Signage should be used in this easement are a:. The signage should say "no cutting, or-removal of vegetation, no fill or debris." Developer should submit the required NPDES control measures and .best management practices to be used with particular emphasis on the ditch. Ensure the developer is complying with the City Shoreland - Management Overlay Ordinance in not exceeding. 30% impervious. Downspouts from roofs.. should be directed-to pervious yard areas. • Page 1 _Additional Comment This Environmental Board review does not include the multi -use area There is concern for the type of use that may be proposed for this area Motion by Grundhoffer to approve Marshan Estates with Environmental Board comments and recommendations. The motion was 2nd by O'Dea. Motion was approved with all in favor. Justin's Preserve Tree Preservation A tree preservation plan should be submitted following the City Tree Preservation Ordinance. Soils Importing or exporting of soils without City permission should be prohibited. Surface Water Create rain gardens to capture extra impervious runoff. Direct runoff from roofs to yard and /or rain gardens. -Habitat Concerns Inform property owners of shoreland ordinance and of the benefits of leaving the trees (both alive and dead) as habitat. Other Non - Related Environmental Elevation on plan for future house and lowest floor elevation should be corrected. Motion to approve with staff and Environmental Board recommendations and comments made by O'dea, 2"d by O'Dea. All were in favor, motion approved.. Page Id I Ada% pinion ��`•IAL'OIlIM LAR£ � j � ,0' Ettanz o ml aeorp QQ OQ �'OBi'L1 °2�9Gfdf. aDOD �Op AI' 414.4* Amon ODA @acv �I II 1•1saa I���i►� 1 S ANOKA COUNTY VEY 1 R DRAWN SEP. 1974 REVISED REVISED NOV. 1978 REV. REV. MAR.i980 REV. REV. SEP.1981 REV. REV. DEC.1982 REV. REV. JULY1985 REV. REV. DEC. 1985 REV. JAN. 1887 REVISED NOV. 1994 MAY 1988 REV. JUG 1997 AUG. 1989 REV. FEB. 1991 REV. JULY 1998 FEB. 1992 REV. AUG. 1989 FE 1993 REV. SEPT. 200 MAYS 1994 REV. MAY 2001 REV. JULY 2002 SCALE In 1 500' 0 V4 1/g MILE 3/4 LOCATION MAP PROPOSED LAND USE PLAN LINO LAKES COMPREHENSIVE PLAN .r; • Manufactured Home Park Stage 1 Growth Boundary Public /Semi - Public MUSA Line Low Density Unsewered Residential r Low Density Sewered Residential 1111 giitiii111tt11z! Medium Density Residential ZONM G MAP -,..e.!4•6,1,i..••.-4 • EXISTING CONDITIONS and PRELIMINARY PLAT JUSTIN'S PRESERVE CITY OF LINO LAKES FOR CARPENTER HOMES PROPERTY OWNERS DEANNA HAEG STEVE and JULIE PASELL PROPERTY DESCRIPTION • A piece of land situated 00 Lot 2 of Section 31, Townsldp3l, Range 22. Anoka County. LIlnneeota, deeor0ed ae commencing at a stake on the south kn. of saki Lot 2 distant 305 feel West of the southeast comer at sold Lot 2: thence West on the eouth line of Lot 2 a distance of 730 feel to a point: thence North 460 feet to a point on the Meander Una of Sold Lot 2: thence following said Meander Line of cold Lot 2 to a stoke en saki We: thence South 900 feel to the place of beginning. Hereby mauling t0 eenwp the Share of the Lake and the water thereof Sub Servient to the land described. e ZONING JNFORJLATION PROPERTY O ZONED R SOME MAALY F®Qn1AL 1 90100039 PEA 010 FROM 4o 115E NNE PNE 90104 . NOUSE s0E 70 NET amAGE 0106 5 FEST Wit TARO 30 MET GRAPHIC SCALE 104 Sat 0asMe1 401 542E - 10.000 WARE FEET I MMIRI LOT NOM • 00 STET AT 600/1110 953 400 • 0-\°' / / . / / (11 1001 ) 1 fob • 00 ft. 10 ^ BLOCK ONE awoken it raiwo awaTM.mnM 6ST LAND nor 11• r- t essoeMIHNI AIII " rk 2 840.00 - B89M8 QT S: ROHA OAKS CERTIFICATION I fn-.by o.dlly Not Ito sums plan. or wort *140 .35*4.M and Mmt 1 am r 5/041000 toad S.my. antler Me law of 00 Sete of Mw 04, ER10 Wm. _ 4R.a4.b.tIon N- 47610 d 6. RUD 4 60N6, INC LAND MAMMAS 9180 1.6341(47014 ANL NO. COWLS 011490. PIINhI980TA 66014.8626 TAIL 180- 186.6666 - 43 201 Ag, VICINITY MAP LEGEND: • Bohol. m.e.a.n0 f.04 -Doom.. 3 tool contour hI.1a 01040 vertical Oahoe 0000.. ladsOse Spot Ef.m0. •41s. 0.04.0.0.041..0 0000lp Owmwd 0Yw wet Pear Peke • ® Wades Prepmed El.wkbn rrm TYPICAL EASEMENTS. 4(1* 1 ROHAVIC 1 OAKS SURVEY NOTES TOTAL AREA • 11.104 ACM 045.1010 0030AIION COUPLED BY GAin 501010E ANO ASSG0A5Ek. (44.01.1 NO3) MO WMIWY COMPLETED 015.0. Roo MO 5015 9 5!01001050 CP 500E • - .nia°uZi- C ®P Y Job No. 03 78P S?ROJ103770 JURTIN'R PRPEBRYe'aASE2.oWR, 1/16/200412:48 :15 PM, JJY N v �) Z 0 'm K m -i °y i J L I. i / / ` 1 ./ /./ ^1 goo °P 1 z 0 I \ e 46 ca co \ \. \ \�eeo c Ac) 89.2 EXIST)NQ BIT. DRIVEWA , fo be relocated) �1Q 1;= X64 Ergo' E _ gO D 1 J.0 40 137.00 . "Mk b lI 1711 1 z ®� "l; t IV ii • a ° ° o °, o.wa °o o � S t ���7 • u$ °oB'�an ;o a ' jai (( ;1 I!JNNn^Nag FETiJ d 5j L f C� i Z• Li 4,� i. .cam v 4°1 !h' O • z O z 0 z STAFF ORIGINATOR: CITY COUNCIL MEETING DATE: TOPIC: AGENDA ITEM 7D Michael Grochala March 8, 2004 1st Reading, Ordinance No. 04 -04 - Rezoning to Planned Unit Development; Resolution No. 04 -33 - Development Stage Plan /Preliminary Plat Approval; Legacy at Woods Edge ACTION REQUIRED: Simple Majority BACKGROUND In 1998 the City of Lino Lakes, following award of a Metropolitan Council Livable Communities Planning Grant, retained the services of the Calthorpe Associates to design a Master Plan for the City's Town Center District. The purpose of the Lino Lakes "Town Center" development is to provide for the orderly and integrated development of a high- quality Town Center which includes a mix of shops, offices, entertainment, housing, recreation, community facilities, and open space. The mix of uses is designed to implement the principles of the Livable Communities Act and the City's Comprehensive Plan by creating a Town Center for the community and providing more diverse, life -cycle housing— including affordable and rental housing— within an active and interesting pedestrian- oriented community. The development is a cooperative effort that will leverage public and private investment to create sustainable value, ecologically, economically and culturally. The City has concentrated its efforts to implement this plan on the and located adjacent to the Civic Complex, of which, approximately 6.7 acres has been reserved for the Chain of Lakes YMCA. PROJECT LOCATION The 48.84 acre property is located in the southeast quadrant of the Interstate 35 /Lake Drive Intersection. It is bounded on the west by Lake Drive, on the north by I -35W, on the east by Rice Creek Regional Park, and on the south by the Civic Complex and the Marshan Lane residential area. The Civic Complex, an additional 10.01 acres, is included in the plat. City Council Legacy at Woods Edge March 8, 2004 PROJECT SUMMARY The Hartford Group, Inc., based in Eden Prairie, Minnesota is requesting approvals to allow for the development of the property consistent with the Calthorpe Master Plan and Town Center Design Standards. In total, the Legacy at Woods Edge project is proposed . to allow up to 348,000 square feet of office, retail, and service uses. In addition, approximately 450 multi - family residential units are proposed for the development. The residential units provide a variety of housing options and include townhomes, work force or income - qualifying rental housing, senior housing and for -sale condominiums. The Hartford Group as obtained purchase agreements with both the City owned land as well as the northern 29 acres of the site, which is privately owned. ANALYSIS This review is based on the most current submittal, consisting of the following plans: 1. Boundary, Topographic and Tree Inventory Survey, prepared by E.G. Rud and Sons, Inc., received November 10, 2003 2. Preliminary Plat, prepared by E.G. Rud and Sons, Inc., dated February 16, 2004. 3. Master Site Plan, prepared by Hartford Group, Inc., dated February 6, 2004. 4. Master Grading Plan, prepared by Hartford Group, Inc., received November 10, 2003. 5. Master Landscaping Plan, prepared by Hartford Group, Inc., dated February 6, 2004. The following plans were prepared by the City's Engineering Consultant Short, Elliott, Hendrickson, Inc.: 1. Sanitary Sewer and Water Plan, dated February 1, 2004 2. Site Grading and Erosion and Control Plan, dated February 1, 2004 3. Storm Sewer Routing Plan, dated February 1, 2004 4. Preliminary Storm Sewer Plan, dated November 25, 2001 5. Existing Drainage Plan and Storm Water Calculations, dated November 25, 2001 6. Preliminary Street Grading Plan, dated February 1, 2004 7. Street Lighting Plan, dated February 1, 2004 8. Preliminary Streetscaping Plan (Areas 1 through 4) dated November 25, 2001 Project Data: Total Site Area: 42.05 acres (58.82 including Civic Complex & YMCA) Upland Area 34.55 acres Number of residential units: 450 Commercial sq. ft. 348,492 sq. ft. 0 Net Residential Density: 13.02 units per acre City Council Legacy at Woods Edge March 8, 2004 Environmental Assessment Worksheet (EAW) Minnesota Rules Chapter 4410.4300, subpart 32 requires the preparation of an EAW for mixed residential and industrial - commercial projects of this size for 3rd or 4th class cities. Subsequently an EAW was prepared. The EAW was reviewed by the City's Environmental Board on November 6, 2003, and approved by the City Council for distribution and comment on November 10, 2003. The required 30 -day public comment period ended on December 24, 2003. The Environmental Board recommended approval of the Record of Decision and a finding of no significant impact at its January 21, 2004 meeting. A determination of No Significant Impact was made by the City Council on February 9, 2004. Existing Land Uses The southerly end of the site is developed with the Lino Lakes City Hall complex that includes the City Hall offices, police station, and an early childhood learning center. Two existing businesses are located along the west side of the site. The Lino Lakes State Bank and Fairview Clinic have frontage along Lake Drive (CSAH 23), but receive access on Village Drive, which is a backage road connected to Town Center Parkway. The northern portion of the site is currently occupied by Arctic Sandblasting Company and one single - family residence and is bound by I -35W on the north, the Rice Creek Chain of Lakes Regional Park on the east and CSAH 23 on the west. This privately held business has been in operation since 1975. The commercial business consists of several structures, service roads, and includes a large semi - tractor trailer storage area. Access to the business is along a service road that intersects with Lake Drive north of Fairview Clinic near the I -35W access ramp. Both the business and existing single - family residence will be removed as part of the development project. Adjacent Land Uses The southern property line for the proposed development is bordered by the Rice Creek Chain of Lakes Regional Park and a small residential development consisting of seven single- family dwellings. The eastern property line is bordered by the Rice Creek Chain of Lakes Regional Park. Land uses on the west side of Lake Drive include an Amoco service station, limited residential development, and undeveloped property that is currently zoned for commercial development. The northern side of the project area is separated from existing commercial and industrial uses by I -35W. Comprehensive Plan The City's 2001 Comprehensive Plan guides the property for Mixed Use Development. The plan specifically states the following: "The southeast quadrant of the I -35W /Lake Drive interchange represents the Lino Lakes City Council Legacy at Woods Edge March 8, 2004 Village area. The Village is intended to integrate a mixture of commercial, medium and high density residential and public land uses in an attractive and cohesive design." The plan is intended to emphasize the following objectives 1. A 65 -acre complex of buildings in a controlled setting. 2. An integrated mix of uses that responds to residents' needs. 3. A gathering place that creates a sense of community, civic identity and pride. 4. A place that defines the unique character of the community. 5. An economic development initiative to increase the value of the commercial tax base. 6. A distinctive, consistent architectural style that promotes high quality, aesthetically pleasing commercial buildings. The plan provides for a residential density of between 10 and 24 units per acre within mixed use districts. The proposed mix of residential and commercial, civic, and recreational uses are consistent with the Comprehensive Plan and the Village Master Plan. Zoning The property is currently zoned LB, Limited Business District. The City's Zoning Ordinance provides for mixed -use development through the use of the Planned .Unit Development process. Additionally, The eastern and southern portions of the site are located within the designated shoreland zoning districts for George Watch Lake and Marshan Lake. The Shoreland District extends 1,000 feet from the Ordinary High Water Level (OHWL) of public waters. Growth Management Ordinance The City adopted Ordinance No. 01 -03, creating a Growth Management Policy in January of 2003. Section 2, Subdivision 16 of the Ordinance specifically exempts the "Village" area from the provisions of the policy. Design & Development Standards The Design and Development Standards are proposed as the regulating zoning standards for the Legacy at Woods Edge development. The standards establish the use, site layout, site amenity and architectural control guidelines for the Planned Unit Development. The Development Standards were prepared by Calthorpe Associates as part of the "Village" Master Plan process completed in 2000. Staff has revised the standards to reflect the proposed Legacy at Woods Edge project. The majority of changes relate City Council Legacy at Woods Edge March 8, 2004 specifically to Chapter 4 Residential District Standards, due to the elimination of single family residences within this area. Additionally, Chapter 3.8 Project Identity & Signage, and Chapter 5, Public Improvement Standards have been removed. Signage requirements will need to be completed and approved before final plan /final plat approval and incorporated into the standards. The public improvement section was removed because the City is designing all public improvements. Master Site Plan The Master Site Plan and its associated Site Development Summary provides the framework from which development will need to conform to. The plan referred to as the "Regulating Plan" within the development standards specifies the essential physical features for the development including: Streets A minimum framework of streets is required as presented in the master plan. Town Center Parkway, including the traffic circle, Village Drive and the roads surrounding the "Community Green" have been established with specific design standards. The proposed street layout is generally consistent with the Calthorpe Master Plan. Build -to Lines Build -to Lines define locations where buildings must be built within a certain distance of the public right -of -way. Bringing building fronts close to the edge of streets enhances the continuity, attractiveness and intimacy of pedestrian spaces. The build -to line defines a location at which 1) a certain minimum percentage of the block length must contain buildings, and 2) those buildings must be built within a maximum distance from the right -of -way. As represented by the building layout on the Master Plan, build -to lines extend along Town Center Parkway, Village Drive, and around the Community Green. A minimum of 50 to 70 percent of the block must have buildings, parks, or plazas adjacent to the build- to lines. In commercial and mixed use areas buildings may be setback no greater than 5 feet from the right -of -way line. In residential districts, buildings adjacent to build to lines can be setback no further than 15 feet. The proposed development conforms to these requirements. Required Building Entries The Regulating Plan identifies the location where major building entries must be provided to create important pedestrian and visual connections. These entries are located at important corners or intersections. An important entry provided for in the proposed plan is located mid block on both sides of the community green. This location City Council Legacy at Woods Edge March 8, 2004 is the primary access point to upper story residential units and provides an important link between the parking areas and the community green. Gateways Entrances to the Woods Edge development should be marked by distinctive features that announce your arrival at the Town Center. These locations are indicated on the Regulating Plan. Site Development Summary The associated development summary provides the connection between the site layout and the intended use and size of individual buildings. Buildings 6, 7, 10, 16 and 17 represent the mixed commercial /residential structures. Open Space Three types of Open Spaces are proposed within the Woods Edge development. These spaces provide recreation and relaxation space and functions as natural edges to the development. In addition to on -site open space, the site provides unparalleled opportunities for recreation due to its proximity to the Rice Creek Chain of Lakes Regional Park, located immediately to the east and south. The project will provide pedestrian /bicycle trail links into the regional park system. Accessible Commons The residential district must provide a minimum acreage of Accessible Commons equal to 10 percent of the District land area. Located within the center of the townhome area the commons is a neighborhood- oriented open space intended to provide limited recreation and gathering areas. The specific size, location and improvement of the commons area will be reviewed in conjunction with any proposed residential development in this area City Parks & Plazas An approximately one acre community green is provided for in the heart of the development. This space provides for a public gathering area adjacent to the retail, office, higher intensity uses within the Mixed Use District. Natural Resource Area Natural Resource Areas protect valuable natural features while allowing pedestrian access along trails. The majority of the Open Space within the Woods Edge project falls within this category. As part of the site development, approximately 9 acres of the site, comprising approximately 6.5 acres of wetland, will be preserved in its natural state. The wetland City Council Legacy at Woods Edge March 8, 2004 area, located along the northeastern boundary of the site is part of an 87 acre wetland complex that separates the site from George Watch Lake. Additionally, changes in site design have allowed for the opportunity to preserve approximately 1.6 acres of woodlands in the southeastern portion of the project in conjunction with the future YMCA development. Master Landscaping A revised master landscaping plan has been submitted that defines tree quantities, types and locations, typical landscaping details and proposed ground covers. The plan calls for a mixture of shade and ornamental trees, shrubs and perennial plantings throughout the development. The plan does provide for landscaped "connected walkways" that link the parking areas with building entrances most notably between buildings 16 and 17 leading to the future YMCA. Appropriate locations should be identified for native plantings such as along the existing wetland in the northeastern portion of the site. The environmental board has provided a recommendation for proposed tree types as part of their review (attached). Streetscapinq Plan SEH has prepared a preliminary streetscaping plan in accordance with the Calthorpe Design Standards. Streetscaping is one of the most essential elements to provide a welcoming pedestrian friendly environment. The proposed elements include landscaped medians, boulevard trees, decorative lighting and decorative pavers throughout the development. Also included in the plan is the preliminary design for the community green that will combine both seasonal gardens, a central green space and plaza area. Street furniture and other amenities will be incorporated as the project develops. Further articulation of the design will take place during the preparation of the feasibility study as well as during the preparation of plans and specifications. Proposed features will need to be evaluated based on cost, timing, as well maintainability of the improvements. Traffic /Circulation Access to the proposed development is provided via the Lake Drive/Town Center Parkway intersection. As shown on the Master Site Plan, Town Center Parkway will need to be widened to a four lane section and then taper to a two lane section north of the Civic Complex. A traffic circle is proposed within in the center of the development to promote the efficient flow of traffic at this main intersection. One -way streets are proposed circling the village green. While the City's Subdivision Ordinance establishes minimum Level Of Service (LOS) requirements for roadways outside of proposed developments, the requirements do not City Council Legacy at Woods Edge March 8, 2004 apply to the I -35W /Lake Drive and I -35E /Main Street interchanges. However, the ordinance does require examination of development impacts and a plan to resolve identified deficiencies. The City's engineering consultant SEH has completed a traffic analysis for the site to evaluate traffic impacts both internally and externally of the site. A summary of the traffic analysis prepared by SEH, dated February 11, 2004 is attached. As part of the study AM and. PM Peak Hour trip generation rates were developed for the proposed development as well as the existing facilities (City Hall complex, Fairview Clinic, and Lino Lakes State Bank). Trips to /from each building have been assigned to the street system within the development. This provided a tabulation of traffic volumes at various locations within the development, as well as at the intersection of Town Center Parkway and Lake Drive (CSAH 23). According to this analysis, the Peak Hour traffic volume is 1,155 trips, which occurs from 4:30 -5:30 p.m. Based on the traffic analysis, a concept transportation improvement plan was developed for the Town Center Parkway and Lake Drive intersection. On Town Center Parkway, the plan includes three outbound lanes to separate left turn, through, and right turning traffic and also includes two inbound lanes. Signalization of this intersection would also be necessary to maintain acceptable levels of service. According to the 2020 Traffic Volume Forecast in the Lino Lakes Transportation Plan, traffic volumes on Lake Drive are anticipated to increase to over 17,000 trips per day. Regardless of the proposed development, improvements to Lake Drive are expected in the future. However, to accommodate the full development of the Legacy at Woods Edge Development, several additional improvements to Lake Drive will need to be made in the short term. The concept transportation plan has proposed the construction of two southbound left turn lanes between the intersection of Town Center Parkway and the 1 -35W bridge. Furthermore, traffic signals at Town Center Parkway and both ramps to 1 -35W are anticipated. To signalize the south ramp intersection, the existing off ramp and on ramp intersections, which are now separated, need to be aligned to a single intersection, which would require the reconstruction of approximately 400 -feet of the on ramp. A meeting was held on January 29, 2004 with the Mn /DOT Area Engineer and Mn /DOT traffic and freeway modeling staff to review the analysis. Mn /DOT indicated that no further analysis was required. However, the Federal Highway Administration (FHWA) has requested documentation that demonstrates traffic will not back up onto mainline I 35W. As detailed in the attached traffic operations analysis the I -35W /Lake Drive interchange area will perform at acceptable levels of service (LOS D or higher) through 2010 with the proposed improvements. The analysis also demonstrates that queue lengths (the distance of vehicle stacking at intersections) will not back onto the I -35W mainline. City Council Legacy at Woods Edge March 8, 2004 The City will be resubmitting the preliminary plat to Mn /DOT for further review. The resubmittal is needed to identify the area of right -of -way within the plat that is needed to accommodate the ramp realignment. Additionally, the City will still need to present the traffic simulation models to Anoka County and Met Council. This will be scheduled in the near future. The proposed Lake Drive improvements will require the acquisition of right -of -way along Lake Drive. The proposed improvements and extent of right -of -way acquisition will be evaluated further as part of the feasibility study for the project. Staff is also continuing to work with Anoka County and Mn /DOT regarding possible cost participation. Parking. The development, standards establish parking requirements through the use of shared parking standards. By recognizing that peak parking demand occurs at different times for different land uses, shared parking facilities help minimize the amount of land and expense devoted to parking lots. Additionally, on- street parking has be included in the development plan were possible. A parking analysis was completed to determine if the site plan has provided adequate parking space for the proposed level of development. The analysis segmented the site into four zones to compare the availability of parking spaces for commercial and office uses to the potential demand within each zone. Based on the analysis, Block 1 was short approximately 15 spaces. However, staff is evaluating the availability of the Civic Complex parking lot due to its close proximity to this area. Otherwise, the site has adequately addressed the parking demands within each zone for commercial/office uses. Residential parking is proposed to be provided entirely underground throughout the mixed use areas of the development. However there appears to be a 10 stall short fall in Block 3. The parking analysis will have to be revisited on a case by case basis with future development on the site to insure the needs of different land uses are satisfied. Adjustments of allowable square footages and /or residential units may be required during individual site and building plan reviews. Architectural Standards Another key component of the project is the establishment of architectural standards. Architectural Standards for the proposed development fall into four Categories: 1. Facade Transparency. Facade Transparency guidelines help strengthen the relationship between buildings and the street and increase public safety by placing "eyes" and activity on the street. Materials and Methods of Construction. Buildings shall support regional traditions and maintain a level of craft in the process of construction. Wood, masonry, and stone are appropriate building materials. City Council Legacy at Woods Edge March 8, 2004 3. Building Scale and Definition. These guidelines are intended to create buildings with a human scale, making the development more pedestrian - friendly and a pleasant place to walk. Energy Conservation and Climatic Response. The effects of the Minnesota climate can be mitigated through intelligent building design configuration and landscape treatments. The requirements contained within these categories will be incorporated into the building design throughout the development. Master Grading and Drainage and Erosion Control Plan The City's engineering consultant SEH, Inc., has prepared a preliminary Grading, Drainage and Erosion Control Plana Runoff from the site currently drains to the south and east and ultimately discharges to Marshan Lake and George Watch Lake. The development proposes to construct a drainage system within all the street improvements and parking areas to convey runoff to proposed ponding areas and infiltration cells (green space or underground storage chambers). Subsurface chamber technology takes advantage of the soil's inherent filtration and renovation capabilities to store and treat storm water runoff while providing the flexibility to plan for additional buildings and green space. To maximize pollutant removal efficiencies, the water quality control structures will be designed and constructed according to NURP, the City of Lino Lakes, and Rice Creek Watershed District standards. Storm water rate control and treatment will occur prior to any storm water being discharged to receiving water bodies. Therefore, water quality in the receiving waterbodies will not be adversely impacted. Treated storm water will either be naturally infiltrated into the groundwater or will be discharged to existing wetland basins located on and /or adjacent to the site. Water from these wetlands eventually will enter George Watch Lake, Marshan Lake, and the ` remainder or the Rice Creek Chain of Lakes system. Master Utility Plan The development is proposed to be serviced with public sanitary sewer and water utilities. The sanitary sewer service will be provided by the existing trunk sanitary sewer main that runs within both Town Center Parkway and Village Drive. The sanitary sewer laterals will be extended through the site. Water service will be provided by the existing trunk water main that runs within both Town Center Parkway and Village Drive. The water laterals will be extended through the site. A trunk line will be extended northerly across I -35W to provide a planned improvement to the City's water system. 10 City Council Legacy at Woods Edge March 8, 2004 Master Lighting Plan SEH has prepared a preliminary lighting plan for the public streets consistent with the Calthorpe Design Standards. Decorative lighting will be used throughout the development. Private lighting for internal parking areas will be reviewed in conjunction with proposed development. In accordance with the design standards lighting shall not exceed .4 foot candles at the property line and must contain a 90 degree cutoff angle. A lighting plan prepared by a qualified lighting consultant shall be submitted for review and approval by the City. Development, Ownership and Management The Hartford Group will be the Legacy at Woods Edge master developer, and will contract with sub - developers to develop phases of the project. Sub - developers may be affiliated Hartford entities. The rental housing is proposed to be developed and owned by affiliates of the Hartford Group. The townhome and commercial locations are proposed to be developed distinctly by Hartford affiliates or separate sub - developers. The sub - developers for Legacy at Woods Edge have not been finalized at this time. Residences are proposed to be market -rate, with up to a twenty percent affordable component included. The Hartford Group's market studies will determine initial pricing, with flexibility to adjust to market changes. The Hartford may retain ownership, development, and management, or contract for development and management, or sell parcels. The rental /owner occupied housing mix and affordability percentages shall be subject to and incorporated the Development/PUD agreement between Hartford and the City. Market Analysis The proposed project represents the maximum intensity of development, due to physical and transportation constraints, that can be accommodated on the site. The Hartford Group has commissioned a study, which is nearing completion. The results of the study shall be incorporated into an economic feasibility study that will be required for review by the City prior to Final Plan /Plat approval. Shoreland Requirements The . Rice Creek Chain of Lakes Regional Park boundary separates the project area from the OHWL of George Watch Lake and Marshan Lake by approximately 800 -feet and 250 -feet, respectively. Given the distance separation and forested nature of the regional park property, no visual impact to the public water bodies is anticipated. Additionally, there will be no disturbance of Shore Impact Zones. Both George Watch Lake and Marshan Lake are classified as Natural Environment Lakes. Impervious surface coverage of lots within the Shoreland District of a Natural 11 City Council Legacy at Woods Edge March 8, 2004 Environment Lake cannot exceed 60% for commercial /industrial development and 35% for multi - family residential. The proposed impervious surface coverage within the Marshan Lake Shoreland District is classified as commercial development and has been calculated to be approximately 43% of the total area within the Shoreland District boundary. No impervious surfaces are proposed within the designated Shoreland District of George Watch Lake. The height of structures within the Shoreland Districts shall be limited to thirty -six feet. Preliminary Plat The preliminary plat, as submitted, proposes 13 lots, including the Civic Complex and future YMCA parcels and 3 outlots. There are no specific lot size standards provided for within the Design Standards. The lot sizes proposed conform to the building arrangements set forth in the Master Site Plana Street Right- of -Wav Adequate street right -of -way is provided for in the plat consistent with the Master Site Plan. Right -of -way to accommodate the realignment of the northbound I -35W ramp on Lot 1, Block 2 has been incorporated into the revised plat. Access Control Access control, dedicated to Anoka County, and the Minnesota Department of Transportation (Mn /DOT) were applicable is shown on the revised plat. Drainage and Utility Easements Drainage and utility easements will be required. Typically, drainage and utility easements at least 10 feet wide are required along exterior lot lines and centered on interior lot lines. However, due to the nature of the development, in consideration of build to lines, these types of easements are not practical. Easements will be required around the 100 year flood elevation for all wetlands and stormwater drainage basins. Additionally easements will be required centered on all stormwater and utility lines not located within public right -of -way. The width and locations of such easements have been determined by the City's Consulting Engineer and are incorporated into the preliminary plat. Ingress and Egress easements, by separate instrument, will also be required to provide for shared parking throughout the development. 12 City Council Legacy at Woods Edge March 8, 2004 Park Dedication The revised plat identifies the "Community Green" as Park. Additionally, the preservation of natural environment areas is included as part of the Design Standards. Outlot B is identified as the primary preservation area. Anoka County parks, as part of the EAW comments, requested that this portion of the project be held under public ownership. As indicated on the plat, Outlot B will be dedicated to the public. Existing Easements of Record The preliminary plat references two roadway easements per Anoka County half section maps that run east -west across the northerly portion of the site. Title work should be prepared to verify the status of these easements. If they are existing easements of record they will need to be vacated or otherwise terminated. Individual Site Development Upon approval of the Rezoning and Development Stage Plans individual site development will be reviewed in accordance with the adopted standards. The request for Site and Building Plan approval for the Regent at Lino Lakes (buildings 6 and 7), previously reviewed by the Planning & Zoning Board, has been removed from consideration at this time to allow for further refinement and evaluation of potential uses. City Advisory Board Reviews Environmental Board The Environmental Board reviewed the proposed development on January 28, 2004 and recommended approval with recommendations to be incorporated into the site landscaping and operation /maintenance agreement. Their comments are attached. Park Board. The Park Board reviewed the proposed development on February 2, 2004. Staff will continue to work with the Park Board during final design of the "community green" and during review of the residential component of the development. Planning and Zoning Board The Planning and Zoning Board reviewed the request at its February 11, 2004 meeting. The board recommended approval of the Rezoning and the Development Stage Plan /Preliminary Plat with conditions. The board's conditions of approval are incorporated into the staff recommendation. City Department Reviews CEPTED. A preliminary CEPTED review was completed, dated November 16, 2003 and is attached for your review. 13 City Council Legacy at Woods Edge March 8, 2004 Public Services Community Development staff is working with the public services department on issues related to maintenance, snow plowing etc. Minor roadway geometric changes will be made during the final design process. Staff is anticipating addressing maintenance impacts as part of the economic review of the process prior to final plan /final plat approval. Centennial Fire Department Community Development staff has worked with the Centennial Fire Department to address Emergency Vehicle Access and routing. The proposed design incorporates their modifications Agency Reviews Rice Creek Watershed District (RCWD). The RCWD reviewed the Grading Plan and Stormwater Management Plan at its January 28, 2004 board meeting. The board approved a CAPROC (Conditional Approval Pending Receipt Of Changes) with nine conditions. Detailed plans and specifications will be required prior to commencement of roadway and /or storm sewer infrastructure improvements. Anoka County Plans have been forwarded to Anoka County for review. Conditions of approval will include the requirements set forth by Anoka County. Minnesota Department of Transportation (Mn /DOT) Plans have been forwarded to Mn /DOT for review. Staff reviewed the traffic simulation with Mn /DOT officials on January 29, 2004. Further evaluation with Mn /DOT will take place as part of the Feasibility Study and public improvement plan development. FINDINGS Rezoning to Planned Unit Development. The City shall consider possible adverse effects of the proposed amendment and its judgement shall be based upon, the criteria established in Section 2, Subdivision 1.E. of the Lino Lakes Zoning Ordinance. 1. The proposed rezoning is consistent with the specific policies and provision of the City's Comprehensive Plan. 2 The proposed mixed use development is compatible with present and future land uses of the area. 3 The proposed development conforms to all performance standards contained within the zoning ordinance. 4. The proposed use can be accommodated with existing public services and will not overburden the City's service capacity. 5. Traffic generation by the proposed use is within capabilities of streets serving the property subject to the roadway improvements proposed for the development and Lake Drive. 14 City Council Legacy at Woods Edge March 8, 2004 Development Stage Plan Approval. Staff makes the following findings with regard to the Development Stage Plan Review Criteria as established in Section 2.8.d of the City's Zoning Ordinance: 1. The developer will be required to submit an Operation and Maintenance Agreement to insure adequate property control is provided to protect the individual owners' rights and property values and the public responsibility for maintenance and upkeep of the development. 2. The proposed street improvements, including those proposed for Lake Drive, will not create congestion or dangers and is adequate for the safety of the proposed project residents and the general public. Open space as required in the development standards is provided. The architectural framework as provided for in the design standards will insure compatibility with the surrounding area. 5. The drainage and utility system plans are being designed by the City's consulting engineer and are in accordance with city requirements. 6. The developer will be required to submit a development schedule to insure a logical development of the site which will protect the public interest and conserve land. RECOMMENDATION The intent of the rezoning Wing to Planned Unit Development and the approval of the Development Stage Plan is to establish the overall regulatory framework, unique to the development, while allowing flexibility for individual site design. It is anticipated that modifications to building size, number and placement will happen as the project develops. However, such modifications will be subject to the requirements set forth in the Design Standards. There are several steps in the process that will commence following approval of the rezoning and Development Stage Plan. These include, but are not limited to, preparation and evaluation of the public improvement feasibility study, financial analysis, operation and maintenance agreement and the development agreement. These items will need to be completed and approved in conjunction with the final plan approval. Generally, the proposed development is consistent with the original Calthorpe Master Plan and Design Standards. The Hartford Group has been very receptive to design modifications to insure a high quality development. There are some further changes and clarifications that need to be incorporated into the final plan as suggested in this report. Additionally, design items such as the streetscaping element will go through further modification and review as part of the Public Improvement Design process. 15 City Council Legacy at Woods Edge March 8, 2004 Rezoning to Planned Unit Development Staff recommends approval of Ordinance No. 04 -04 rezoning the property from LB, Limited Business to Planned Unit Development and approving the corresponding development standards. Development Stage Plan (Preliminary Plat): Staff Recommends approval of Resolution No. 04 -33 Approving the Development Stage Plan and Preliminary Plat subject to the following conditions; 1. The following modifications shall be incorporated into the Preliminary Plat: a. Title work should be prepared to verify the status of existing roadway easements i.e., public or private. If it is determined that they are public easements they shall be vacated in accordance with city and state requirements. 2. A development phasing plan shall be submitted for review and approval by the City. 3. A feasibility study shall be prepared for the installation of Public Improvements. Such feasibility study shall include estimated costs and proposed assessments to benefiting property owners. 4 Developer shall provide and Economic Feasibility Study of the proposed project for review by the City. Developer shall provide an Operation and Maintenance Agreement for the development covering both Public and Private Improvements for review and approval by the City. Developer shall enter into a development contract with the City. Acquisition by the City of parcels adjacent to the site required for proposed Lake Drive improvements. Requirements for project identity and signage will need to be established in conjunction with final plan /final plat approval. 9. The proposed Lakes Drive improvements will be subject to review and approval by Mn /DOT and Anoka County. ATTACHMENTS 1 Ordinance No. 04 -04 16 City Council Legacy at Woods Edge March 8, 2004 2. Resolution No. 04 -33 3. General Location Map 4. CEPTED Report dated November 16, 2003 5. Traffic Operations Analysis 6. Environmental Board Recommendation 7. Preliminary Plat, prepared by E.G. Rud and Sons, Inc., dated February 16, 2004. 8. Master Site Plan, prepared by Hartford Group, Inc., dated February 6, 2004. 9. Master Landscaping Plan, prepared by Hartford Group, Inc., dated February 6, 2004.. 10. Sanitary Sewer and Water Plan, prepared by SEH, Inc. 11. Site Grading and Erosion and Control Plan, prepared by SEH, Inc. 12. Preliminary Street Grading Plan, prepared by SEH, Inc. 13. Preliminary Streetscaping Plan, prepared by SEH, Inc. 14. Lino Lakes Town Center Design & Development Guide 17 City Council Legacy at Woods Edge March 8, 2004 CITY OF LINO LAKES ORDINANCE NO. 04 -04 AN ORDINANCE AMENDING THE ZONING ORDINANCE OF THE CITY OF LINO LAKES BY REZONING CERTAIN REAL ESTATE FROM LB, LIMITED BUSINESS DISTRICT TO PUD, PLANNED UNIT DEVELOPMENT The City Council of the City of Lino Lakes, Anoka County, Minnesota does ordain: SECTION 1. FINDINGS The City Council makes the following findings regarding the application for rezoning the property described below, based on the factors listed in Section 2, Subd.1E of the Lino Lakes zoning ordinance: 1. The proposed action has been considered in relation to the specific policies and provisions of and has been found to be consistent with the official City Comprehensive Plan, as the site is guided for mixed use. The proposed use is or will be compatible with present and future land uses of the area. The site is guided for mixed use. Land in the area of the site is already developed with commercial uses or designated for such use. Subject to the conditions of site and building plan /conditional use permit approval the site is compatible with existing commercial and residential uses as well as future commercial and residential. 3. The proposed use conforms with all performance standards contained within the city's zoning ordinance and is subject to the Design Guidelines attached hereto. The proposed use can be accommodated with existing public services and will not overburden the City's service capacity. Existing sanitary sewer and water services are available to the site and will not overburden existing public services. Traffic generation by the proposed use is within capabilities of streets serving the property in conjunction with the public improvements proposed. The Zoning Ordinance of the City of Lino Lakes, Anoka County, Minnesota, passed by the City Council on March 10, 2003 is hereby amended by rezoning from LB, Limited Businsess to PUD, Planned Unit Developnment District pursuant to the provisions of the Zoning Ordinance of the City of Lino Lakes, the following described real estate: [EXHIBIT A TO BE INSERTED] 18 City Council Legacy at Woods Edge March 8, 2004 SECTION 2. DISTRICT PROVISIONS A. Development of the property shall be subject to the Lino Lakes Town Center Design & Development Guide, attached hereto as Exhibit B and made a part hereof. Unless otherwise specified herein the development shall be subject to the provisions of the Lino Lakes Zoning Ordinance and all other applicable chapters of City Code. SECTION 3. As above amended, said Zoning Ordinance shall stand as initially passed and previously amended. SECTION 4. This ordinance shall be in force and effect from and after its passage and publication according to the Lino Lakes City Charter. Passed by the Lino Lakes City Council this 22nd day of March, 2004 John J. Bergeson, Mayor ATTEST: Ann Blair, City Clerk 19 City Council Legacy at Woods Edge March 8, 2004 CITY OF LINO LAKES RESOLUTION NO. 04 -33 RESOLUTION APPROVING DEVELOPMENT STAGE PLAN/ PRELIMINARY PLAT FOR LEGACY AT WOODS EDGE WHEREAS, the City has received an application for Development Stage Plan Approval /Preliminary Plat in conjunction with a request for rezoning certain real estate to Planned Unit Development. Said property is legally described as: Exhibit A and WHEREAS, the Development Stage Plan and Preliminary Plat approval request is based on the following submittals: 1. Boundary, Topographic and Tree Inventory Survey, prepared by E.G. Rud and Sons, Inc., received November 10, 2003 2. Preliminary Plat, prepared by E.G. Rud and Sons, Inc., dated February 16, 2004. 3. Master Site Plan, prepared by Hartford Group, Inc., dated February 6, 2004. 4. Master Grading Plan, prepared by Hartford Group, Inc., received November 10, 2003. 5. Master Landscaping Plan, prepared by Hartford Group, Inc., dated February 6, 2004. And the following plans prepared by the City's Engineering Consultant Short, Elliott, Hendrickson, Inc.: 1. Sanitary Sewer and Water Plan, dated February 1, 2004 2. Site Grading and Erosion and Control Plan, dated February 1, 2004 3. Storm Sewer Routing Plan, dated February 1, 2004 4. Preliminary Storm Sewer Plan, dated November 25, 2001 5. Existing Drainage Plan and Storm Water Calculations, dated November 25, 2001 6. Preliminary Street Grading Plan, dated February 1, 2004 7. Street Lighting Plan, dated. February 1, 2004 8. Preliminary Streetscaping Plan (Areas 1 through 4) , dated November 25, 2001 and WHEREAS, at their meeting on February 11, 2004 the Planning & Zoning Board conducted a public hearing and recommended approval of the Development Stage Plan and Preliminary Plat subject to the conditions listed in the meeting minutes; and 20 City Council Legacy at Woods Edge March 8, 2004 WHEREAS, the proposed Development Stage Plan and Preliminary Plat meets the requirements of the City's zoning ordinance and subdivision ordinance subject to certain conditions of approval. NOW, THEREFORE, BE IT RESOLVED that the City Council of Lino Lakes hereby approves the Development Stage Plan for the Legacy at Woods Edge Project and the Preliminary Plat titled Village No. 2 subject to the following conditions: 1. Approval of the Rezoning to Planned Unit Development. Title work should be prepared to verify the status of existing roadway easements i.e., public or private. If it is determined that they are public easements they shall be vacated in accordance with city and state requirements. 3. A development phasing plan shall be submitted for review and approval by the City. 4. A feasibility study shall be prepared for the installation of Public Improvements. Such feasibility study shall include estimated costs and proposed assessments to benefiting property owners. Developer shall provide an Economic Feasibility Study of the proposed project for review by the City. Developer shall provide an Operation and Maintenance Agreement for the development covering both Public and Private Improvements for review and approval by the City. Developer shall enter into a development contract with the City. Acquisition by the City of parcels adjacent to the site required for proposed Lake Drive improvements. 9. Requirements for project identity and signage will need to be established in conjunction with final plan /final plat approval. 10. The proposed Lakes Drive improvements will be subject to review and approval by Mn /DOT and Anoka County. 21 City Council Legacy at Woods Edge March 8, 2004 Passed by the Lino Lakes City Council this 8th day of March, 2004. John J. Bergeson, Mayor ATTEST: Ann Blair, City Clerk Lino Lakes Town Center Design & Development Guide Lino Lakes, Minnesota Calthorpe Associates DRAFT - 2/6/04 Calthorpe Associates Table of Contents Chapter 1. Introduction FIGURE 1: CONTEXT MAP 5 FIGURE 2: SLUE PLAN 6 1.1. PURPOSE 7 1.2. CONTEXT 7 1.3. PROJECT DESCRIPTION & DESIGN CONCEPTS 8 1.4. ORGANIZATION 8 Mixed Use Districts 8 Commercial Districts 8 Civic Districts 8 Residential District 9 Open Space District 9 1.5. GOALS 9 Economic Development 9 Land Use 9 Community Design & Architecture 10 Infrastructure 10 Administration ` 10 CHAPTER 2. GOVERNING PLANS FIGURE 3: THE LAND USE PLAN 12 FIGURE 4: THE REGULATING PLAN 13 2.1. THE LAND USE PLAN 14 22. THE REGULATING PLAN 14 Required Streets 14 Build -to Lines 14 Landscaped Frontages 15 Required Building Entries 15 Gateways 15 CHAPTER 3. COMMERCIAL, MDOD -USE, & CIVIC DISTRICT STANDARDS 3.1. ALLOWABLE USES 16 3.2. DEVELOPMENT INTENSITY 19 Commercial & Mixed Use 19 Residential Uses 19 3.3. BUILDING MASSING & PLACEMENT 20 Building Orientation and Setbacks 20 Front Setbacks 20 Building Height 22 Minimum Height 22 Maximum Height 22 3.4. ARCHITECTURAL STANDARDS 23 Facade Transparency. 23 Street- Facing Facades along Build -to Lines •or within Street Setbacks 23 Facades not along Build -to Lines or within Street Setbacks from Table 3 23 Building Entries and Windows 23 Building Scale and Definition 24 Structural Legibility and Articulation 24 Base and Top Treatments 24 Roof Form /Rooftop Equipment. 24 Materials and Methods of Construction 25 Energy Conservation and Climatic Response 26 Other Structures 27 Service Areas 27 Fences & Walls 27 3.5. PARKING REQUIREMENTS 28 Parking Requirements & Shared Parking 28 On -Street Parking 29 Parking Lots 29 Parking Dimensions 29 Landscaped Frontages 30 Connecting Walkways 30 Tree Planting 31 Parking Structures 31 Bicycle Parking 31 3.6. LANDSCAPING REQUIREMENTS 32 Site Planning to Preserve Natural Assets 32 Landscaped Frontages 32 Connecting Walkways 33 3.7. ON -SITE LIGHTING 34 Intensity and Direction of Lighting 34 Lamp Color and Consistency 34 Types of Lighting Applications 34 Bollards 35 Submittal Requirements and Design Review 35 CHAPTER 4. RESIDENTIAL DISTRICT STANDARDS 4.1. ALLOWABLE USES 36 4.2. DENSITY AND DIVERSITY 37 Housing in Residential Districts. 37 Adjustments to District Boundaries 37 Variation in Housing Mix 37 4.3. BUILDING MASSING & PLACEMENT 38 Site Grading 38 Building Height 38 Building Orientation 38 Building Frontage 38 Porches, Stoops, & Other Entry Features 38 Units with Individual Entrances 39 Attached Products with Shared Entries 39 Garages 39 Parking for, Townhomes, and other Residences with Individual Unit and Garage Entrances. 39 Parking for Attached Residences with Shared Unit and 40 Residence and Garage Setbacks 41 4.4. ARCHITECTURAL STANDARDS 42 Facade Transparency 42 Front Doors 42 Windows 42 Garage Door Treatments 42 Building Scale and Definition 43 Articulation 43 Roof Form 43 Materials and Methods of Construction 43 Energy Conservation and Climatic Response 43 Buildings 43 Driveway Paving 44 Other Structures 44 Service and Loading Area Screening 44 Fences and Walls 44 4.5. PARTING REQUIREMENTS 45 4.6. PUBLICLY- ACCESSIBLE COMMONS 46 IMO r— € 3 s f m l M1 R i } ,.r Anoka County Lino Lakes, MN Source: Anoka County, Mn /DOT, USGS, MNDNR, and SEH. CITY... i',, OF IN KE County Location Map.mxd 0611612003 bd aw 5EH UTM, Zone 15, Meters NA083 Legacy at Woods Edge General Development Location Map Figure 1 'BUILBINB TYPE OUNYARY J Jn►►mnnmum► v 0 �}} D IMIE3111111A D 1 Co1NnWalAkocay/015co 2 C.nm.dWR.t.5Omra 3 Camm.daUR.,0O0o. 4 . CommndallRalo002ca . A 5 - Comm.nia'RaaUOmo. • 0 ' Cmunwdart+rawHp+Wq 7 . Comm.NWRaa5C51o. -. Commraa1Rad05Eo 0 Comm.wUR.niuomta 13.700 . 1 5,500 1 4,400 1 8.720 1 3,000 1 74700 1 22.002 1 0.000 1 5,503 1 10 Crnmrda0R.t.IWOn1lm4l0 11 Commercial a 12 C...n.da 17 Commvda 14 Comm.dM 15 7o.n4wm.. 1 12700 13,700 NA 3 4500 23,500 HA 2 4.403 ..lm NA 3 4700 20,100 . NA 3 7.000 11,750 NA 4 74700 25.712 07 4 77.022 77.002 35 2 5.500 11.000 NA 3 5500 15500 2.4 74.000 1 4 34.000 74.000 e0 10,0 0 1 3 10.500 20,503 NA 10,000 1 3. 10.000 30,003 NA t42O0 1 3 10,200 30,550 Wk 14000 1 3 10.0 0 30500 RA NA NA 145. NA NA 100 • 15 CanmanAWRe 2010cyHgWlp 17 C.nm.dalRNUVONIANNA ah, 70,300 1 17,000 1 15 YMCA 15 Existing FWVIw 20 E&Wino Bank 21 EAnt4o C5y HW 22 Ea.5na Early Cheolmd Carter 23 EWe05 Polk. Maori NA 11A NA NA NA NA NA NA NA NA NA NA 20.,052 4 20,500 70.003 30 1 17,000 17.500 52 HA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA . NA NA NA NA NA 50a.112 344412 450 SENIOR WORKFORCE - , e CHAPTER 1. INTRODUCTION 1.1. PURPOSE The purpose of the Lino Lakes Town Center District is to provide for the orderly and integrated development of a high - quality Town Center which includes a mix of shops, offices, entertainment, housing, recreation, community facilities, and open space. The Town Center is intended to offer citizens a place to enjoy an active street life, community activities, and small town downtown qualities. The Town Center standards are the regulating zoning standards for the Town Center District.. Other standards in the zoning ordinance or other regulatory controls notwithstanding, where there is conflict between the Town Center standards and specific elements of the other City ordinances or regulations, the Town Center standards shall prevail. Where there is no conflict and when the Town Center standards do not address a specific instance, other City standards shall apply. In the Design and Development Guide, the words "shall" or "must" specifies mandatory requirements. The word "should" is suggestive and describes what is preferred. 1.2. CONTEXT The Lino Lakes Town Center site is situated near the northeastern edge of the Twin Cities' rapid urbanization area. As a "gateway" to the region and a crossroads of both the urban and rural, the Town Center area gains its identity from rural lands, while looking toward regional job centers for its citizens' livelihood. The Development Standards seek to combine the best aspects of a small town downtown with strong visual and ecological connections to the natural environment. Within Lino Lakes, the Town Center will meet a long- sought desire to create a true center for this maturing community. With good regional access and visibility, the Town Center's location at the Lake Drive and Interstate 35W interchange can harness the market forces needed to create a true downtown, one in which a range of retail, entertainment and cultural needs can be met. See Figure 1, the Context Map. DRAFT — 2/6/04 7 PAGINATION TO BE ADJUSTED Interchange improvements are planned. Abutting the Town Center, Lake Drive will be a 4-lane highway and narrow quickly to its existing rural highway cross- section. Pedestrian connections to the Town Center will extend from surrounding uses, including office and commercial uses west of Lake Drive, residential neighborhoods to the south , and the Rice Creek Chain -of -Lakes Regional Park Preserve. 1.3. PROJECT DESCRIPTION & DESIGN CONCEPTS These Development Standards provide for the orderly and integrated development of a high - quality Town Center for Lino Lakes, near the junction of Lake Drive and Interstate 35W. The Town Center represents an opportunity to create a place with an active street life and a vibrant and recognizable heart for the Lino Lakes. The Town Center will be a place for citizens to engage in community life and enjoy the small town qualities that make Lino Lakes unique. A mix of shops, offices, entertainment, housing, recreation and community facilities will be brought together to create a preeminent place. Throughout the Town Center, development will emphasize comfortable walking environments. As with classic American towns, tree -lined streets and buildings sited at the sidewalk with frequent entries and windows will create an interesting pedestrian environment. A Community park and other attractive gathering spots also play a special role. A village green will be a focal point for Lino Lakes, and will be framed by retail shops,.and multi-story housing.. The addition of housing to the mix of land uses will ensure that the Town Center sees around- the -clock activity and vitality. Housing also offers important opportunities for seniors and other citizens, who may value locations where conveniences are close at hand and a car is not necessary. The Town Center also affords a unique choice for residents who chose to work from their homes, but want to be a part of and near a "downtown" and have access to commercial services. The Town Center abuts the Chain -of -Lakes Regional Park, offering unparalleled opportunities for wilderness within blocks. of homes and businesses. Within the Town Center, the region's natural and scenic qualities shall be preserved and emulated. Building and landscape materials will also convey a regional "sense -of- place:" The Regulating Plan (Fig. 4) shows the framework of parks, open space, wetlands, swales, and other natural features. The location of many of these features is not fixed, but will vary depending on where buildings, parking lots, and other development occurs. 1.4. ORGANIZATION The Design and Development Standards are organized by the following categories. Commercial District (Red) Allow a range of retail, office, and other commercial uses, within an environment that is highly oriented to the pedestrian. Mixed Use District (Orange) A range of first -floor retail, office and other commercial uses are required, within an environment that is highly oriented to the pedestrian. Upper -story residential uses are also permitted. DRAFT — 2/6/04 8 PAGINATION TO BE ADJUSTED Civic District (Blue) Allow community facilities such as libraries, City Hall, and community recreation such as YMCAs. Residential District (Yellow) Housing. Allow a variety of townhome units, as long as parameters for density, design and common open space are met. Ground Floor Retail or Office Space. In the residential subdistrict (Residential -X) , ground floor retail or office space is also encouraged, to enliven streets adjacent to parks and provide transition zones between the Residential District and other Districts. Commons. A minimum area of publicly - accessible commons (parks or other community recreation areas) is also required in the Residential District, including Residential -X;. the location and design are flexible. Open Space District Open Space District includes parks and natural resource areas. They create a hierarchy of open space within the project area, ranging from a formal park or green to undisturbed landscape and habitat areas. Further discussion and schematic design for parks are in Chapter 5, in the section on Open Space Districts: Parks and Natural Resource Areas. Parks. Linear parks are planned in the median of the major streets in the Town Center. Another small park occurs in the center of the traffic circle in this area. A larger, triangular park is planned adjacent to the Mixed -Use District. Natural Resource Areas. A natural resource area adjacent to the regional park is a valuable habitat area which will be protected in its natural state to safeguard ecological processes and wildlife. It contributes to a greenbelt of native landscape along the perimeter of the site. 1.5. GOALS These Development Standards support the following goals: Economic Development • Create a setting that supports the long -term viability of the Town Center. • Optimize job growth, residential opportunities, and tax revenue for the City of Lino Lakes through the creation of an integrated and balanced project. Land Use • Concentrate development at intensities that bring within walking distance the diverse activities that comprise an active downtown or town center. • Provide a complementary mix of land uses, including retail, entertainment, civic facilities, employment, housing, and community open space. • Integrate community- serving open spaces and amenities throughout the Town Center, and make connections to the Chain -of -Lakes Regional Park. • Encourage diverse housing opportunities within the Town Center. DRAFT — 2/6/04 9 PAGINATION TO BE ADJUSTED Community Design & Architecture • Site and design buildings and landscaping for convenient walking distances, enhanced pedestrian routes, and human comfort and safety. • Avoid pedestrian routes dominated by parking lots or blank walls. • Encourage architectural diversity. Emulate Minnesota's architectural traditions and scenic beauty. • Encourage energy conservation through architectural features, such as shading devices, natural ventilation, and interior daylighting. • Maintain high standards of quality in the construction of building and site features. • Respect adjacent residential neighborhood and emphasize compatibility through design. Infrastructure • Provide streets that create comfortable walking environments while also allowing safe vehicular movement. • Establish a network of interconnected local streets throughout the Town Center and extend pedestrian connections to surrounding areas. • Generate less automobile traffic than development with segregated land uses by bundling complementary destinations within a walkable district, and by encouraging transit use. • Make new information technologies part of the Town Center's infrastructure and encourage its integration within civic and private uses. • Utilize naturalized, low -cost solutions for drainage throughout the area and avoid "concrete, . iron, and steel" solutions. Administration • Strive for the timely and orderly implementation of the Town Center through clear, concise standards. • Establish standards that are consistent with the City's Comprehensive Plan • Continue to address community concerns as expressed through letters, public comments, and workshops. DRAFT - 2/6/04 10 PAGINATION TO BE ADJUSTED 11 PAGINATION TO BE ADJUSTED Land Use Plan for Legacy at Woods Edge Lino Lakes, Minnesota 15 42rn;Irnlnlluiii i i us 10 SITE SUMMARY LEGACY AT WOODS EDGE - LINO LAKES, MN O4 BLOCKS NUMeOA 001021G TYPE I,uruaum[inw� 21 \ , N >illl!iII�N >!li;ll!IFS HNki; D ! , �` II 1 j{�� 23 4rh; ) North 12/2!2003 MINIMUM MA0A011 00070000 AMMNUM 0U*DN0 NIMOER NUMBER SF Sr 20510220/10 FOIVP01107 FLOORS FLOORS 0O140000ML COWffiRCIAI. UNITS 1 onemrt NCINNA ONNA 15.700 13.000 13.710 NA 2 ConuNt0201FATMm 2000 2500 25000 NA Comer1.14105N00A0 4.400 4.400 0.000 CuNNAN01WLM1A0 0.700 2100 20.100 NA 5 0027711•12280021011052• 1800 3800 11.700 00 0 Cam2Ide01o5M1ue.0 10.500 22100 70.100 01 7 Coo... 4RabM011m 2:002 300: 220M 55 0 032030le090.25070 0300 5000 11000 NA 9 CurtmorciA147801209. 5,000 1 5000 10500 NA 70 CammnN0M001100 1Ilucne 54100 0 a 34.000 340M ee 11 ComuerW 10.000 1 a 01100 30000 NA B 12 CMmmro4l 10.000 1 3 12000 30.000 NA 13 CO20301 tl 10700 3 10300 30.000 NA 19 Co1m00N 10.000 1 3 40000 30.000 M 15 10122371• HA NA NA M NA 100 10 CommemNJRONNOWNelllouu,p 20.000 1 4 20.300 30.000 0e N CommordWObNOb0YNUrvy 17.000 1 • 11000 11.000 32 10 YMCA NA NA NA NA NA M 10 CANNA, FIANNA NA NA NA NA NA IN 20 ENNA02N1A NA NA CA NA ran 34e 31 EMU50 ON loll NA NA NA la NA ras 22 E*MM Emir CO20m Calor 11A NA NA M CA 714 23 Ennn0 Poll. L UNN NA NA NA NA NA NA 200X1 704,002 340,401 450 INMBa2o TYPE SUNAM2Y SENIOR 0/O211110110E 14111.11-FA02Y 10500000000 Figure 3 12 Legend - Residential - Residential -X - Commercial - Mixed Use - Open space - Civic CITYy `'j!At 0F IN KE Regulating Plan for Legacy at Woods Edge Lino Lakes, Minnesota -- - - -'_ I r yr. err__ • rV ' 1�(Illliillfllillllllllli L' �\ 11+1111-1-1111111i11111-Ft NEAR 0 iI 1 j North Figure 4 13 _ Legend Build to Line 70% Required °b Architecture Features 50% Required Required Streets Project Identity Features Major Entry CHAPTER 2. GOVERNING PLANS Development in the Town Center is governed by the Land Use and Regulating Plans, described below, as well as by the standards in the following chapters. 2.1. THE LAND USE PLAN Figure 3, the Land Use Plan, spells out the basic arrangement and extent of activities within the Town Center. The land uses shown in the Land Use Plan, correspond to the Mixed Use, Commercial, and Civic District, which have one set of design and development standards; and the Residential District, which has another set of design and development standards. The boundaries shown on the Land Use Plan are approximate. As long as development conforms to the regulating plan, boundaries may change based on detailed site analysis and revised regulations for the protection of environmental assets. The Land Use Plan ensures mixed use and shows specific boundaries for the Residential District. However, residences may also be built as upper -story housing over ground -floor retail or office in the Mixed -Use District, as long as the minimum number of units is built. The minimum and maximum numbers of residential units are assigned in the Lino Lakes Comprehensive Plan, Minor adjustments to the Land Use Plan are permitted at the discretion of the City Council, if the Council finds they are consistent with the intent of the Development Standards. Adjustments are subject to review and reversal by the City Council. Significant adjustments will require amendment to this land use plan and design standards. 2.2. THE REGULATING PLAN Figure 4, the "Regulating Plan," specifies essential physical features for the Town Center area, including required streets, "Build -to Lines," building entrances, gateways, , and landscaped frontages. Required Streets A minimum framework of required streets is shown in Figure 4, the Regulating Plan.. The design of streets must conform to the standards set forth in the Regulating Plan. Parking lot drive aisles are not considered streets. Build -to Lines Build -to Lines define locations where buildings must be built within a certain distance of the public right -of -way. Bringing building fronts dose to the edge of streets enhances the continuity, attractiveness and intimacy of pedestrian spaces. The build -to line defines a location at which 1) a certain minimum percentage of the block length must contain buildings, and 2) those buildings must be built within a maximum distance from theRight of Way. The Regulating Plan shows the location of Build -to Lines, which require either 50 or 70 percent of the block to have buildings, parks, or plazas. Specific regulations for Build -to Lines are: • Build -to Lines occur at the edge of the dedicated right -of -way, where private property meets a publicly- accessible street or path. DRAFT — 2/6/04 14 PAGINATION TO BE ADJUSTED • For each block, a minimum percentage (50 or 70 percent) of the linear length of the build -to line must have a building front, park, or plaza, as specified on Figure 4, the Regulating Plan. The minimum build -to requirement is measured as a percent of each "block." A block is defined as a continuous street segment, delimited by two cross streets (not driveways) or where theroadway makes a significant change in direction. If a non - required street is added and bisects a build -to line, the build -to requirements govern each separate segment. • To contribute towards meeting the Build -to requirement, building facades must be set back no more than 5 feet from the public right of way in the commercial and mixed use districts and no more than 15 feet in the residential district. • Parks or plazas may be used to satisfy up to 20 percent of the build -to requirement, and must be landscaped with shade trees and furnished with seating areas. (In other words, 20 percent of the 50 or 70 percent requirement may be parks or plazas. For example, for a 70 percent build -to requirement along a 500 -foot long block, 350 feet (70 percent of 500 feet) would have to have buildings, parks, or plazas, and the parks or plazas could not constitute more than 70 feet of frontage (20 percent of 350 feet). • Parking lots, driveways, loading zones, and other vehicular areas do not count towards the minimum build -to requirement. Such areas, with the exception of driveways and curb cuts, must be screened as described under "Landscaped Frontages" in Chapter 3. Standards for Build -to Lines and associated elements such as minims building height, building frontage, and building entry and window placement and frequency are described in greater detail in Building Massing and Placement Standards (for the Mixed -Use, Commercial, Highway Commercial, Civic, and Residential District, Chapters 3 and 4. Landscaped Frontages Landscaped Frontages shall be used to extend a sense of enclosure to the street in locations where street - facing buildings are not *required. Landscaped frontages will also screen views of parking lots and loading areas, and will help establish a unique project identity. Required Building Entries The Regulating Plan shows locations where major building entries must be provided to create important pedestrian and visual connections. These entries are located at important corners or intersections, typically where a larger store would locate, where pedestrian and automobile activity is high, or where buildings face onto public parks. Placing entries at these locations helps ensure that the buildings relate to the street and that pedestrians have a direct route of entry to the buildings. Pedestrians passing through these entries establish a "critical mass" of activity at major corners and near parks. Although building tenants typically will also need an entry from the rear parking lot, they are prohibited from closing off or locking up the street - facing entry to simplify their security and layout needs. Gateways Entrances to the Town Center shall be marked by distinctive features that announce the Town Center and foster a memorable sense of arrival. DRAFT - 2/6/04 15 PAGINATION TO BE ADJUSTED CHAPTER 3. COMMERCIAL, MIXED -USE & CIVIC DISTRICT STANDARDS 3.1. ALLOWABLE USES Table 1 indicates allowable land uses, both permitted (P) and conditional (C), in each of the land use Districts designated on the Land Use Plan. Conditional uses are expected to meet special requirements in their design or on -going operation The Mixed -Use, Commercial and Civic Districts predude uses that would likely detract from their compact and pedestrian - friendly character. In Mixed -Use Districts, community- and neighborhood- serving retail stores (such as full- service grocery, drug and hardware stores), entertainment uses, restaurants, and specialty shops are preferred. Upper -story housing is also allowed in Mixed -Use Districts over retail or office, and is subject to the standards for the Mixed - Use Districts, rather than the standards for the Residential Districts. Florist Thee:er tbehirdj Apartments Commercial and Mixed Use Districts. Building entries and windows shall line streets to create a `Main Street" pedestrian friendly character. sidewalks and within setbacks in at the street. DRAFT — 2/6/04 y Activity. Outdoor seating and cafes are encouraged on the Commercial and Mixed -Use District, to increase activity and interest 16 PAGINATION TO BE ADJUST'ED SECTION 3.1 ALLOWABLE USES Table 1. Allowable Land Uses in Mixed -Use Commercial, Commercial /Residential an Allowable Land Use Comm ercial Mixed Use Civic Commercial Uses Amusement enterprises including billiard halls, pinball & video arcades, but exclude driving ranges, miniature golf courses, and go- cart tracks. [1] C - - Bars and cocktail lounges. [2] C C - Cinemas, theaters and auditoriums, except sports assembly, exhibit halls, and convention halls. P - - Dance halls and discotheques. [2] C - - Eating places /restaurants: • With outdoor seating areas [4] • With drive - through or drive -up facilities [5] • With entertairument, bar or cocktail lounge. [2] P C C C P C - C - - - - Finance services including banks, savings & loans, credit services: • With drive - through or drive -up facilities [5]. C C - Drive-through or drive -up services not listed elsewhere [5] C - - Finance, insurance & real estate services, including security & commodity brokers & dealers, insurance & real estate agents, and brokers; not including banks, savings & loans, & credit services. P P - Food stores, including supermarkets, meat & fish stores, fruit & vegetable stores, candy stores, bakeries, health food stores, and catering establishments. P P - Convenience stores. • With gas pumps P - P - - - Furniture & home furnishing retail sales, ind. household appliances, electronic equipment & office furniture. Must be less than 40,000 s.f. footprint. P P - • Garden supplies, excluding hay, grain Sr bulk feed sales and storage. Must be less than 40,000 s.f. footprint. P P - General merchandise retail, including but not limited to: variety, hardware, and dry goods stores, but excluding vending machine operators and direct selling organizations. Must be less than 40,000 s.f. footprint. P • P - Miscellaneous retail trade including florists, tobacco shops, newspapers & magazines, camera & photo supplies, gifts, optical goods, pet sales & supplies, books, stationery, art & hobby supplies, antiques, stamps & coins, jewelry sales & minor repair. P P _ - Health clubs and gymnasiums. P - P Indoor recreation including ice and roller skating rinks, and bowling alleys. C - - TABLE 1 NOTES: P = permitted use. C = conditional use. [1] Driving ranges and other amusement enterprises are prohibited because of their land - intensive nature. Hours of operation may be imposed as a condition of a conditional use permit. [2] Establishments that serve alcohol, and /or feature amplified music are conditionally permitted if they are at least 50 feet from residences. DRAFT — 2/6/04 17 PAGINATION TO BE ADJUSTED Table 1 (continued). Allowable Land Uses. Allowable Land Use Commer- vial Mixed Use Civic Personal services including clothes laundering, photographic services, barber & beauty services, dry cleaning and shoe repairs, but excluding industrial laundering. P . P - Professional services including medical & health offices & clinics, engineering & design services, legal and counseling services, but excluding laboratories, hospitals, sanitariums and rest homes. P P - Laboratories, hospitals, sanitariums, and rest homes. - - - Public & Quasi - Public Uses Indoor recreation facilities - - P Outdoor recreation facffities (floodlighting not to exceed 0.5 foot - candles at the property line of adjacent residential uses); . - - P Concession stands (not exceeding 500 square feet); P P P Community- serving centers & facilities, including daycare and senior, recreation & teen centers. P P P Cultural facilities including auditoriums, libraries and art galleries. P P P Semipublic facilities and institutions laddng sleeping accommodations, induding the following: churches and other religious institutions, non -profit social service organizations, philanthropic and charitable institutions, private clubs and lodges. P C P University, college, community college, and professional schools (except truck driving schools). P P P Residential Uses Residential units above ground -floor commercial space (e.g. retail or employment), including "live work units." - P - Residential units meeting a civic purpose and managed by a public or quasi -public entity, such as senior apartments or assisted living. - P - Temporary Uses Christmas tree or pumpkin lot sales, not to exceed 45 calendar days-per year per type of sale. P P P Farmers' markets induding the sale of vegetables, fruit, baked goods, and other agricultural products, once a week and limited to 6 hours per week [3] P P P Art fairs & festivals. C C C Temporary outdoor display and sales of merchandise associated with principle use C C - Other Uses - - - Other uses that, in the judgment of the City Council, as evidenced by resolution in writing, are similar to and no more objectionable than any of the uses set forth in this section, and that meet the intent of the Development Standards. C C C [3] The City Planning Department may establish administrative standards. [4] Outdoor seating may occur between buildings and within allowable building setbacks (see Table 3). Outdoor seating may also occur on sidewalks within street rights -of -way, provided that there is a clear passage for pedestrian movement that is at least 6 feet in width. [5] Refer to the diagram on page 20 for guidance on siting drive - throughs. DRAFT - 2/6/04 18 PAGINATION TO BE ADJUSTED 3.2. DEVELOPMENT INTENSITY Development densities in Commercial and Mixed Use Districts A 1 Commercial/Grocery/Office 2 Commercial/Retail/Office 3 Commercial/Retail/Office 4 Commercial/Retail/Office 5 CommerdaVRetall /Office 6 Commercial/Retail/Housing 7 Commercial/RetaIVOf ice 8 Commercial/Retail/Office 9 Commercial /Retail /Office 13,700 8,500 4,400 6,700 3,900 28,700 22,092 5,500 5,500 1 3 2 3 3 4 4 2 3 13,700 8,500 4,400 6,700 3,900 26,700 22,092 5,500 5,500 13,700 NA 25,500 NA 8,800 NA 20,100 NA 11,700 NA 26,700 67 22,092 55 11,000 NA 16500 NA 10 Commerdal/Retail /Office HousIng 34,000 1 4 34,000 34,000 68 11 Commercial 10,000 1 3 10,000 30,000 NA B 12 Commercial - 10,000 1 3 10,000 30,000 NA 13' Commercial 10,200 1 3 10,200 30,800 NA 14 Commercial 10,000 1 3 10,000 30,000 NA 15 Townhames NA NA NA NA NA 190 18 Commercial/Retail/Office/Housing 20,800 1 17 Commercial/Retail /Office/Housing 17,000 1 18 YMCA NA NA 19 Existing Fairview NA NA 20 Existing Bank NA NA 21 Existing City Hall NA NA 22 Existing Early Childhood Center NA NA 23 Existing Police Station NA NA 208,992 4 20,800 20,800 38 4 17,000 17,000 32 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 208,992 348,492 450 'BUILDING TYPE SUMMARY 450 SENIOR WORK FORCE MULTI - FAMILY TOWNHOMES The total number of units, the maximum number of floors, and the square footage may be shifted around within an individual block as long as the total square footage and number of units remain the same in the block Adjacent buildings shall not differ by more than two floors. Residential Uses Placement. Residential uses are permitted above commercial uses in the mixed use district. However, except for entry lobbies, residential uses shall not occur on the ground floor of buildings in Mixed -Use Districts. DRAFT - 2/6/04 19 PAGINATION TO BE ADJUSTED 3.3. BUILDING MASSING & PLACEMENT Building Orientation and Setbacks Front Setbacks AIong Build -to Lines. Where the Build -to Lines are shown on the Regulating Plan (Figure 4), buildings shall be sited at or within five feet of (and facing) a street or plaza and shall occupy a minimum percentage of each block's linear street frontage (at least 50 percent or 70 percent, as noted in the Regulating Plan). Table 3 shows minimum and maximum setbacks from the public right -of -way for buildings along Build -to Lines. r- r =1 _/ _ 1X- ftit9,,n- .)!hinted ^`1I eet \ h . hi i� r. .. ,Ilral tltAiliti3. "• -yam Kr si •a Ba ld:m1 Enhance Building Orientation. Buildings shall be sited close to streets, with doors and windows facing the street. Parking lots along street frontages shall be minimized. Buildings set back from the street, beyond the allowable setbacks shown in Table 3, are prohibited along Build -to Lines; elsewhere their entrances shall be connected to the street with landscaped connecting walkways. drive-in entry from tear of lof drive -in Mat Imputing 1 curb cut, 1 -way drive, 14' width driveway cuts in front of building Drive - throughs in Mixed Use and Commercial Districts_ Drive- throughs, such as for fast food restaurants and banks, are acceptable in Mixed -Use and Commercial Districts only if they maintain a continuous street frontage. Buildings shall have direct pedestrian connections to the sidewalk and the primary entrance facing the street (left). Driveways shall not come between the sidewalk and building entrances (center). Multiple curb cuts are prohibited (right); only one curb cut is allowed per building, not to exceed 14 feet in width (left). Additional vehicle entries are acceptable from rear parking lots entrances on non pedestrian oriented streets (left). Drive- through windows shall be located to the side or rear of the building. Other, more "standard" drive- through configurations are acceptable in Highway Commercial Districts. Where Build -to Lines do not Govern. For locations where there are no Build -to Lines, buildings must be sited in one of the two following ways: • Within the minimum and maximum setbacks from a street as shown in Table 3, or DRAFT — 2/6/04 20 PAGINATION TO BE ADJUSTED • Set farther back from the street, but with their primary entrances connected to the street with a landscaped walkway. Landscaped walkways are discussed in the section on Landscape Requirements, below. While it is recommended that front facades and entries face towards streets, side -on orientations are acceptable if the side elevation is within 20 feet of a street right -of -way and windows and entrances constitute at least 30 percent of the facade length. Table 3. Setback Requirements (Me District Front Setbacks [1, 2] r , - - -, Setbacks at Side Streets [3] Rear Setbacks [3] Along Build -to Lines Where Build- to Lines do not Govern [4] Along Build -to Lines Where Build- to Lines do not Govern Min. Max. Min. Max. Min. Max. Min. Max. Minimum only Commercial 0 feet 5 feet 0 feet 15 feet 0 feet 5 feet 5 feet 10 feet 5 feet Mixed Use 0 feet 5 feet 0 feet 5 feet 0 feet 5 feet 5 feet 10 feet 5 feet Civic 0 feet 5 feet N/A N/A 0 feet 5 feet N/A N/A 5 feet backing against other non- residential buildings; 10 feet backing against residential buildings Parking Structures 0 feet 5 feet [5] 20 feet 30 feet 10 feet 15 feet [5] 5 feet 10 feet . TABLE 3 NOTES: [1] Projections. Awnings and canopies may project up to 10 feet into the public right -of -way, but must be at least 9 feet above finished grade. Bay windows, decorative roofs, and other architectural features may project up to 3 feet into the public right -of -way, but may not exceed 50 percent of the length of each building facade and must be at least 12 feet above finished grade. Projections may never extend directly above a roadway, because they could interfere with traffic and parking of tall trucks. [2] Arcades. Arcades shall have a minimum clear height of 10 feet from finished grade and a minima clear width of 8 feet. [3] Side and Rear Setbacks. Pedestrian paths and features shared by adjacent properties, such as plazas and shared driveways, are permitted within side and rear setbacks. [4] Walkways. Alternately, if buildings are not located at or within the allowable setback from the right -of- way shown in Table 3, their entries must be connected to the street with Connecting Walkways. [5] Parking Structures. Parking structures are allowed along Build -to Lines if the ground floor contains retail or offices along the street. Parking garages without these uses are not permitted within twenty feet of any street. [6] Interior Setbacks. Setbacks between adjacent buildings are governed by Fire Code and other 'requirements for adequate clearance for fire safety and emergency access. DRAFT — 2/6/04 21 PAGINATION TO BE ADJUSTED VarfidIieeghtParapet `. • . 3Tinar Patti et Projection Measurement of Minimum Height. As shown here, minimum height (H) is measured at the tallest point of continuous height; that is, excluding minor projections of parapets, cupolas, or other minor height projections Building Height Minimum Height Where Build -to Lines are shown along the Regulating Plan, street - facing buildings must be at least 20 feet high along the street - facing facade. (In locations wherebuildings are more than 20 feet from build -to lines, buildings do not have to meet this requirement.) Minimum building height is measured relative to the finished grade. As shown in the diagram, minimum height is measured to the highest point of the roof, excluding minor lengths of parapets, cupolas, or other discontinuous projecting features. Continuous parapets or false fronts and peaked or sloped roofs do qualify towards meeting the minimum height. Maximum Height In all locations, the maximum allowable building height is 45 feet, measured at the tallest part of the building. Minor Projections. Minor projections and special architectural features such as clock towers, bell towers, cupolas and ornamental portions of parapet walls may extend up to 10 feet above the maximum height, provided they make up no more than one third of the length of a building's facade. DRAFT — 2/6/04 22 PAGINATION TO BE ADJUSTED 3.4. ARCHITECTURAL- STANDARDS Facade Transparency The following guidelines help strengthen the relationship between buildings and the street and increase public safety by placing "eyes" and activity on the street. Street - Facing Facades along Build -to Lines or within Street Setbacks For buildings which contribute to frontage along Build -to Lines, or that are within the setbacks shown in Table 3: Street - facing building facades shall not have a section of blank wall exceeding 30 linear feet without being interrupted by a window or entry. • At least 60 percent of the linear length of street - facing facades must contain windows doors, or arcades at all levels (stories). Clerestory windows or other high, non - eye -level windows do not count towards the 60 percent requirement. • Along Build -to Lines, the ground floor of parking structures must contain shops or other inhabitable spaces. (See Parking Structures in Section 3.5.) • Garage doors or entrances to parking structures shall not occupy more than 30 feet of street - facing facades within each block. Facades not along Build -to Lines or within Street Setbacks from Table 3: For buildings that do not contribute to frontage along Build -to Lines or which are not within the setbacks shown in Table 3: • The primary building entry and windows shall be visible from a street(s). • The main entrance(s) shall open directly onto a publicly- accessible Connecting Walkway. This walkway shall connect directly to the sidewalk or pedestrian walkway of an adjacent street. • Building facades that are visible from the street shall not have a section of blank wall exceeding 30 linear feet without being interrupted by a window, entry, or a section of lattice with vines. See the discussion on Connecting Walkways for further guidance. Building Entries and Windows Entries. Building massing shall be used to highlight the location of building entries. Primary pedestrian entries shall be clearly expressed and be recessed or framed by a sheltering element such as an awning, arcade, porch, or portico. Greater height may be used to accentuate entries in the form of tower elements, tall openings, or a central mass at an entry plaza. Reveals. Windows and doors must be recessed at least two inches from walls or exterior trim to create shadow for visual interest. DRAFT — 2/6/04 23 PAGINATION TO BE ADJUSTED NM NM Transparency. Buildings shall have frequent doors and windows. Building Scale and Definition The guidelines in this section are intended to create buildings with a human scale, making the Town Center more pedestrian - friendly and a pleasant place to walk Structural Legibility and Articulation Facade articulation is required. Building fenestration (windows and doors) and changes in mass shall relate to structural system(s) and the organization of interior space. Vertical architectural features such as columns and piers help articulate building mass. Base and Top Treatments Unless an exceptional quality of design and materials is demonstrated, building facades must have three recognizable elements: a base, middle, and top. Base. The design of the base shall visually support the building. The base must be 1 to 4 feet in height and must be defined by (but not limited to) one or more features such as: • Thicker walls • Richly textured materials (e.g. tile or masonry treatments) • Special materials such as ceramic tile, granite and marble Top. The top shall create an attractive profile for the building and must be defined by (but not limited to) one or more features such as: • Cornice treatments • Roof overhangs with brackets • Stepped parapets • Richly textured materials (e.g. tile or masonry treatments) Roof Form/Rooftop Equipment • A variety of roof forms are permitted. Changes in roof form must correspond with a building's structural.bays and massing. Mechanical equipment must be integrated into the overall mass of a building and screened behind parapets or recessed into hips, gables, parapets or similar features. Plain equipment boxes are not acceptable. DRAFT — 2/6/04 24 PAGINATION TO BE ADJUSTED 0.2 " 111111111111 DD Massing: Along build -to lines, building massing shall vary and help highlight entries. "Big Box" Buildings. Even away from build -to lines, the entries to large, boxy buildings shall be defined through building massing, landscaping, or architectural features such as trellises. Screening. Rooftop equipment shall be screened from the line of sight of pedestrians and integrated into the design and massing of the roof form. Materials and Methods of Construction Buildings shall support regional traditions and maintain a level of craft in the process of construction. Wood, masonry, and stone are appropriate building materials. Consistency. Exterior materials and finishes shall convey a sense of integrity and durability. Buildings must incorporate consistent, pedestrian-scale textures and details on all sides that are visible from public streets and pedestrian pathways. Glass. Clear glass must be used for windows and doors; mirrored glass• is prohibited. Glass curtain walls are discouraged. Simulated Materials. Materials that are visibly simulated or prefabricated are prohibited. Scored plywood (such as "T 1 -11 ") is prohibited. DRAFT — 2/6/04 25 PAGINATION TO BE ADJUSTED Proper Application and Detailing. Materials must be properly applied and correctly detailed, especially at the base of buildings, along cornices, eaves, parapets or ridge tops, and around entries and windows. Material changes must not occur at external corners, but may occur at "reverse" or interior corners or as a "return" at least four feet from external corners. Proper Application and Detailing. Material changes shall occur at interior or reverse corners (a), or as a "return" of at least four feet from exterior corners (b). Material changes shall not occur at external corners (c). Prohibited Preferred Consistent Application on Facades. All sides of buildings that face streets, parks, or other pedestrian - oriented areas shall have the same level of architectural detail and fenestration (windows.) Entries at corners should address both sides. Energy Conservation and Climatic Response The effects of the Minnesota climate can be mitigated through intelligent building design, configuration, and landscape treatments. The following approach will also foster a regional "sense of place." Daylighting. Daylighting techniques minimize the need for electric lighting and can reduce peak - hour energy consumption by as much as 20 percent. While windows are the most common form of daylighting, light from windows rarely penetrates more than about 20 feet. Additional daylighting can be obtained with clerestories, lightshelves, and skylights. Ventilation and Thermal Mass. To lessen dependence on air conditioning, natural cross ventilation should be maximized. Operable windows, transoms, doors, and vents are preferred to facilitate airflow across a space. These openings are especially useful on sides facing toward and opposite prevailing winds. Passive Heating and Cooling. Site and building design shall consider passive heating and cooling strategies such as deciduous tree plantings that provide shade in the summer and sun in the DRAFT — 2/6/04 26 PAGINATION TO BE ADJUSTED winter. Heat - retaining thermal mass (such as concrete or brick) designed into building walls or columns absorbs heat during the day and radiates heat at night. Building design that shades openings reduces direct heat gain during the day. Shading elements can also add dimensionality to building facades. Eaves or awnings can be sized to shade windows in the summer but admit sun in the winter when the sun is lower in the sky. Pedestrian Shelter. Building exteriors shall provide pedestrians shelter from the sun, rain, and snow. Awnings, entry porticos, arcades, and overhanging eaves are particularly appropriate at pedestrian pathways. Garden structures such as trellises and arbors (with or without vines) shall be used to shade pedestrian routes and seating areas. Other Structures Service Areas Service areas are places where truck loading takes place, refuse is stored, or mechanical equipment is mounted. Service areas must be located away from and screened from view of streets, parks, and plazas, and landscaped walkways. Appropriate screening strategies include vine- covered walls or fences, trellises, arcades, dense landscaping reaching a height of 6 feet, or some combination thereof. Where service areas cannot be avoided along a street, park or plaza, they must be recessed within a building's envelope. Trash dumpsters shall be enclosed on four sides. On grade mechanical or electrical transformers shall be screened from view. Fences & Walls .Walls and fences within view of streets, parks, or plazas must be constructed out of attractive, long- lasting materials, such as wood, wrought iron, masonry, or stone. Chain link and wire fencing must not be used. Walls and fences must not exceed 42 inches in height within 20 feet of streets, parks, and plazas. DRAFT — 2/6/04 27 PAGINATION TO BE ADJUSTED 3.5. PARKING REQUIREMENTS Parking Requirements & Shared Parking Development shall provide the maximum number of parking spaces called for in Table 4, and according to the standards below. Parking requirements are based on a building's net floor area (gross floor area minus shared space for circulation and mechanical uses). Table 4. Peak and Shared Parking Land Use Single Use Peak Hour Demand (spaces) v Percentage of Peak Demand for Key Times [1] Weekdays Saturdays 10 AM 1 PM 5 PM 8 PM 10 PM 10 AM 1 PM 5 PM 8 PM 10 PM Retail 4/1,000 sf 50 75 75 65 25 50 100 90 65 35 Office 3/1,000 sf 100 90 50 5 5 15 15 5 0 0 Restaurant 8 /1,000 sf 20 70 70 100 95 5 45 60 100 95 Cinema 1/3 seats 0 60 60 85 85 0 70 70 100 100 Health Club 4/1,000 sf. 10 80 100 30 10 60 80 60 30 10 Hotel 1 /room 45 30 60 90 100 40 30 60 90 100 Residential 2/2+ BR unit; 1.5/<2 BR unit 85 80 85 95 100 70 65 75 95 100 TABLE 4 NOTES: [1] Source of peak demand percentages is the Urban Land Institute's Shared Parking Standards, 1983. Different uses (such as retail, office, and entertainment) shall share off -street parking spaces, particularly in Mixed -Use Districts, and the maximum number of spaces shall not exceed 125 percent of the combined peak demand as derived with the shared parking calculation. By recognizing that peak demand occurs at different times for different land uses, shared parking facilities help minimize the amount of land and expense devoted to parking lots or garages. The Urban Land Institute's Shared Parking Standards (cited below), or equivalent, shall be used to calculate the total number of shared parking spaces. To determine shared parking demand, two or more uses would be added for each hour of the day, for both weekdays and for Saturdays, to see which hour produces the highest parking demand. The following steps shall be used to determine the required minimum number of spaces for mixed -use areas. 1. Note the peak hour demand (above) parking space requirements for each individual land use. 2. Determine the parking demand for each individual land use for given times, i.e. weekdays and Saturdays at 10 AM, 1 PM; 5 PM, 8 PM, and 10 PM. 3. Determine the aggregate parking demand for these given times by summing the demand of the various land uses for each given time. 4. Determine the minimum shared parking space requirement by noting the largest of the aggregate parking demand figures. On -street parking spaces shall be used to help meet this requirement. For more information, see the Urban Land Institute's 1983 publication, Shared Parking, and the Institute of Transportation Engineer's Shared Parking - Planning Guidelines. DRAFT — 2/6/04 28 PAGINATION TO BE ADJUSTED On-Street Parking With the exception of Lake Drive and entry roads where parallel parking operations would adversely impact traffic flow,. all streets must have on-street parking. On-street parking shall be counted towards the parking requirement of adjacent buildings on the street side abutting the uses. Parking Lots Parking Dimensions Standard parking space dimensions shall have a length of 19 feet, which indudes a two-foot overhang, which may be planted, and width of 9.0 feet. For other dimensions associated with parking lots, see the accompanying diagrams.. .ar 9 Perkiq ki ,Spece Ow rhang ., g nikc , ili , *NIN 2', 1..P., ',. • .0 Proposed "Spat Size wiTrce W-e I AdJi: ;Cornpac: Space', s s 'pe — 1 27-0" o. 4Typ ) 1"=novirie a IS' Space (=rom =ace. C.X Cu -3 tO Shrubs) ror Lw. 'rozl-� f;re•tind - - \ ti: \ .. • s \ _ \ • , •,j; _ \ 1 \ ".. ., '`' ..7.-4.- % \ *. ; '' ,..." ..0. it.', 1 1, \ -•'.. \ -7, 1# '14. s 1.'; V . -. \ 1,0 `• I, • ...0.2.. . \ - ,-Accent Trmo \ .. S. \ \ ....>7;:.,•..... %,e\ / In Colter .(Typ.ii r:" 1\ 5 \ \ , s . ...;......%, . "-"'_/ ''. \ 0 %.,..:,... ....77,.....-1",,,' .'.. e \ • \ S ▪ silt:* r`P.5)- 2.-5,,.;". -'1. "."--7 \ s \ 1 \ 1 - f" ‘, t,.. \ s 'r ‘ 2.-$ \ \ s • -• f:k s s . .... s • u id Cower • Edge Cf arb Cyp.) *Nom: Grra.nd er Linder Car everhang Bc i Di-rabic Pros:ram sea: imy. 1 c,-vv Fvorgi oe,. Sh 1,b Nat in Dm: long Aral. DRAFT — 2/6/04 No Grourd Cover \ Undzr Car Overhang To Ez.. a DJrab lo Isr-cmre Varietil. Low Evergrwn • Sh,ub Not in Overl-ang Area 29 PAGINATION TO BE ADJUSTED Parking Lot Trees. Parking lots shall include shade style shade parking tree planting of at least one tree for every 10 parking stalls. Trees should be protected by curbs. Parking Lot Landscaped Frontages Where parldng lots abut streets, a landscaped frontage shall be provided on the parcel, adjacent to the sidewalk. Landscaped Frontages are also required where parking lots abut Lake Drive or 35W. The landscaping shall meet the requirements outlined in Landscaped Frontages in Section 3.6 Landscaped Frontages are not required when parking lots are sited behind buildings or plazas. Landscaped Frontages. Where parking lots abut streets, landscaped frontages are required. See the section on Landscape Requirements. Connecting Walkways Across Large Parking Lots. Parking lots shall not exceed 300 spaces without being segmented by Connecting Walkways, Landscaped Frontages, or buildings. Linking Building Entrances to Sidewalks. Where building entries do not abut a street, Connecting Walkways are required to link the building entrance to street sidewalks. This configuration is most likely for large anchor store tenants who require parldng lots in front of building entrances. See Connecting Walkways in the section on Landscape Requirements for further guidance. DRAFT — 2/6/04 30 PAGINATION TO BE ADJUSTED Landscaped Connecting Walkways. Landscaped connecting walkways are required in large parking lots and to connect buildings set behind parking lots to streets. Walkways shall be integrated with drainage and stormwater management features. Tree Planting For parking lots, a mi_n;,,,um number of shade trees are required, equivalent to one tree per 10 parking stalls. Trees in parking lots shall be spread throughout the parking area. Parking lot islands must be landscaped to include trees and additional plantings. Trees planted along Connecting Walkways and adjacent Landscaped Frontages may also contribute to the one - per -10 requirement for parking lots. Trees must be set into a tree well and protected by bollards or tree guards, or otherwise protected. Refer to the discussions on Landscaped Frontages and Connecting Walkways in Section 3.6, Landscape Requirements), as well as the discussion on Street Paving and furnishings in Section 5.1 Streets. Segmented Parking Lots Parking lots shall have no more than 300 spaces without being segmented by Connecting Walkways, Landscaped Frontages, or buildings. Parking Structures Parking structures or garages may be provided in Non - Residential Districts, subject to the following restrictions: • Buildings combining structured parking with ground -floor retail, office, or other uses are permitted and encouraged. • Parking structures are prohibited along Build -to Lines unless retail occupies the ground floor facing public streets. • Above ground parking structures, whether stand -alone or combined with other uses, shall meet the front, rear, and side setbacks shown in Table 3 and discussed above. • Above ground parking structures are prohibited within 40 feet of a residence. • Parking structures may not exceed 45 feet in height. Bicycle Parking Bicycle parking must be provided in easily accessible locations in all Districts. One bicycle space shall be provided for every 10,000 square feet of building gross floor area. Bicycle parking should be visible from storefronts or office building front doors, in order to improve security for parked bicycles. See also the discussion on Street Paving and Furnishings in Section 5.1, Streets. DRAFT — 2/6/04 31 PAGINATION TO BE ADJUSTED 3.6. LANDSCAPING REQUIREMENTS Site Planning to Preserve Natural Assets While the network of required streets is fixed, many siting decisions remain for other streets and for buildings. Views & Vistas. Site planning shall recognize the role that street alignment and topography contribute to visual prominence. High points on the land and vistas along common routes provide unique opportunities to site important buildings, building entrances, plazas, and monuments. Doing so will add recognizable landmarks that can make the Town Center a memorable place. Grading. Site planning shall minimize grading when locating streets and buildings. When areas with slopes must be graded, "landform" grading techniques shall be used and slopes exceeding 1:3 shall be avoided. Rounded forms that use concave and convex shapes help conceal cuts by presenting a more "natural" look. Varied slopes also disperse drainage flows, reducing the potential for erosion and allowing more percolation. Concentrating drainage in concave swales also enhances on -site stormwater retention and minimizes the need for large detention areas off- site. If required, any retaining wsll s shall not exceed 5 feet in height. Structural soils should be incorporated into tree planning areas that have limited root space to enable longer lived, faster growing and healthier trees in these areas. Landscaped Frontages (See city landscaping pallet for accepted species) A: ten -foot wide landscaped buffer must be placed where parking lots abut local and surrounding streets, induding along Lake Drive. However, care shall be taken to design and site the buffers such that they do not provide ambush points or obstruct views. The buffer must include at least one of the following: • A low fence or wall of between 24 to 36 inches high, within 3 feet of the street's sidewalk, and trees planted not more than 30 feet on- center; • A "hedgerow" of trees planted not more than 30 feet on-center, combined with shrubs. • A trellis supported by posts not more than 15 feet apart on center, within 3 feet of the street's sidewalk, and trees planted not more than 30 feet on- center; or • An equivalent feature that screens views of parked cars and defines the street spatially. Along Interstate 35W frontage, there is a metal security fence. Planting to screen the security fence along 35W is required. Chainlink and cyclone fences are strictly prohibited. [i) FencelWell ar.W .Y —ri r. ti CI .iiu.-- ■I ir true'.'" n (ft. n J. — Tr llls Allowable Landscaped Frontages. Along parking lots and other gaps in the building frontage along streets, Landscaped Frontages are required and may be in the form of trellises, fences, walls, or tall landscaping. DRAFT — 2/6/04 32 PAGINATION TO BE ADJUSTED 141.21 Fence and Wall Treatments. Fences may be of metal or wood, and shall not exceed three feet in height. Walls shall be made of stone or brick, with additional optional wooden, landscaping, or sculptural elements possible. The solid portion of the wall shall not exceed 3 feet in height. 3 ;L. r1 -m. FZ- %. LIP.11(101" r• f: Hedge Treatments. Tall, columnar trees or hedges shall be planted not more than 30 feet on center, and may also be combined with walls or fences. Connecting Walkways Connecting Walkways must meet the following minimum requirements: Width and Clearance. The width of the paved walking surface must be at least six feet clear. Any covered structure such as a trellis must have at least 10 feet clear height, but must not obstruct visibility or provide hiding or ambush places. Paving. Connecting walkways must be paved with a special paving or concrete in a pattern or color that contrasts with the surrounding pavement, as specified under Public Improvements. Tree Planting. Connecting wakways must be planted with either shade trees spaced approximately 30 feet on center or a shade structure such as a trellis with climbing vines. Lighting. Connecting walkways must be equipped with lighting on one side, at least 3 feet in height in order to be visible in deep snow drifts or snow banks. Lighting standards spaced a maximum of 30 feet apart, and a maximum of 15 feet tall, are recommended. • DRAFT — 2/6/04 33 PAGINATION TO BE ADJUSTED 3:7. ON -SITE LIGHTING The following standards apply to on -site lighting, including lighting of signs, structures, landscaping, plazas, parking, and service areas. Streets must be lit by lamp standards; refer to the standards in Chapter 5, Public Improvement Standards. Intensity and Direction of Lighting All lighting fixtures, including spotlights, electrical reflectors, and other means of illuminating signs, structures, landscaping, parking, loading, and similar areas, shall be focused, directed and arranged to prevent horizontal glare or direct illumination on adjoining property or streets. A 90 degree cut off must be used to direct light toward walls and landscaping to avoid shining light up into the sky. Indirect illumination of neighboring residential properties or uses by any on -site lighting shall not exceed 0.4 foot candles at the property line, as measured horizontally and vertically from the adjacent grade to a height of 14 feet. No mercury vapor utility yard lights or other light fixtures with high intensity discharge lamps or bulbs, which are not designed to limit or control light direction or which do not shield the light source from view of neighboring residential properties, shall be permitted. Lamp Color and Consistency Subsequent to the adoption of this ordinance, the City is expected to develop a unified lighting plan for the Town Center. Lamp types shall be selected to enhance color recognition within three zones: along streets and walkways, within parks and plazas, and within parking lots. Within each of these zones, lamps of similar type and color shall be used, with the conversion of non- conforming existing lamps encouraged over time. Types of Lighting Applications Architectural. Accent lighting of architectural features is encouraged to highlight building massing and rhythm and enhance the pedestrian environment. Accent lighting shall not be a source of glare, reflected glare, or excessive light, especially when viewed from residences and streets, walkways or open spaces. The following specific standards apply. Building Entries. Building entries with high activity levels shall be illuminated. Appropriate treatments include: bathing entry surfaces and doorways with light, allowing the building interior light to glow through glazing, or using decorative lighting fixtures to announce entries. Service Areas. Building- mounted downlight fixtures, in combination with pole fixtures, are preferred for the illumination of building service areas. Such fixtures do not cause glare or light leakage beyond the service areas. Landscaped Frontages. Regular uplighting of walls or other structures in Landscaped Frontages shall occur throughout the. Town Center and must be coordinated to create a consistent and dramatic effect. Landscaping and Furnishing. Uplighting is recommended for all landscaping and furnishings (in both public and private areas) that require accenting (such as specimen trees and shrubs and sculptural features). Specific areas include streets, parks, and plazas. Landscaped Walkways. Landscaped Walkways and other pedestrian paths — unless adjacent to a building that provides adequate lighting — shall be lit by pole or bollard type fixtures that are DRAFT - 2/6/04 34 PAGINATION TO BE ADJUSTED human - scale, typically not to exceed 16 feet or 4 feet in height, respectively. However, lighting must be at least 3 feet in height in order to be visible in deep snow drifts or snow banks. Seating Areas. Where intimate environments are desired (e.g. seating areas in parks and plazas, and some pedestrian walkways), light bollards and other forms of indirect illumination are appropriate. Bollards Lighting bollards are recommended for illuminating pedestrian walkways, parks and plazas. Bollards must have a diameter of approximately 8 inches and a height of between 3 -4 feet, to avoid being obstructed by snow. Around the light source near the top of the bollard, horizontal louvers must be used to stylistically complement the luminaries and direct light downward. Concrete finishes shall not be used for lighting bollards. Submittal Requirements and Design Review A lighting plan prepared by a qualified lighting consultant shall be submitted for design review All lighting and their methods of installation shall be reviewed and approved by the City. Each owner /tenant will be responsible for the design, fabrication, and installation of lights on private property. Owner /Tenant shall submit three (3) sets of professionally executed sign drawings for approval by the Planning Department. These drawings shall be of a scale of 1/8 ":1' or larger, showing light locations, size, layout, design, lamp colors, and materials. The Owner /Tenant shall meet all City permit and fee requirements for lights prior to installation of any light. DRAFT — 2/6/04 35 PAGINATION TO BE ADJUSTED CHAPTER 4. RESIDENTIAL DISTRICT STANDARDS 4.1. ALLOWABLE USES Housing. The Residential District permits a range of owner occupied housing types at moderate to .high densities, including attached and /or stacked residences, such as townhouses and condominiums. Ground -Floor Office and Retail. In the Residential -X District (shown in the Land Use Plan), ground -floor office, retail, or live /work space is permitted and encouraged in multi-story residential buildings, in order to create a more active presence along certain streets. (Live /work units are multi-story residences with a small street - facing storefront or office space for home offices.) Neighborhood Open Space. A minimum area of Publicly - Accessible Commons (a shared open space) is required in the Residential District to provide community areas for gathering, sports, relaxing, and people- watching. See Section 4.6, Publicly- Accessible Commons. Residential Streets. Frequently- spaced street trees, modest setbacks, and street facing homes with porches create an interesting, pedestrian friendly residential neighborhood. 36 DRAFT — 2/6/04 4.2. DENSITY AND DIVERSITY Density and Housing Targets The intention of the following density and unit count ranges is to allow variation in housing type, while ensuring a minimum level of residential development within the Town Center. Housing in Residential Districts. Net Developable Acreage. Net Developable Acreage is the total buildable area within a Residential District and includes publicly - accessible commons and local streets that serve the housing. It does not include environmentally constrained land such as wetlands or forested areas or required streets that serve the greater Town Center. Number of Housing Llnits. In the Residential District, the net density will be a minimum of 10 units /acre, and a maximum of 24 units /acre, not to exceed 190 units. NOTES: • Density Applicability. Density limits apply only to units built in the Residential District. They do • not apply to units built in Mixed -Use Districts. Adjustments to District Boundaries Minor Residential District boundary adjustments may be allowed following further environmental analysis or for other reasons, as long as the density range and maximum number of units is observed. Variation in Housing Mix Within the Residential District, a minimum of two housing models and architectural treatments is required as follows: Facade Treatment. At least two e€ unique architectural treatments for each housing model is required. The architectural treatments must differ in each of three categories: a) facade color, roof color, or siding material; b) window pattern and trim detail; and c) porch, entryway, or balcony detailing. Identical buildings shall not be adjacent to or across the street from each other. DRAFT — 2/6/04 37 4.3. BUILDING MASSING & PLACEMENT Site Grading Site planning shall minimize grading when locating streets and buildings. When areas with slopes must be graded, "landform" grading techniques shall be used and slopes exceeding 1:3 shall be avoided. Rounded forms that use concave and convex shapes help conceal cuts by presenting a more "natural" look. Varied slopes also disperse drainage flows, reducing the potential for erosion and allowing more percolation. Concentrating drainage in concave swales also enhances on -site stormwater retention and minimizes the need for large detention areas off - site. If required, any retaining walls shall not exceed 5 feet in height. Building Height Residences and garages, including residences built over first -floor commercial, shall not exceed 45 feet in height as measured from finished grade. Chimneys, vents, cupolas, ornamental parapets, and other minor projections may exceed these height limits by up to 3 feet. Building Orientation Orientation. The primary entry of every dwelling shall face and be accessible from a street or Publicly - Accessible Commons or open space. Each primary entry shall be recessed no more than 6 feet behind the face of the primary facade. Rear yards shall not face onto streets, open space, or Commons. See additional standards under "Publicly- Accessible Commons." Building Frontage L Where build -to lines govern, entries must face the street 70 percent of the block length must have building fronts, parks or plaza within the required setback area. 2. Where build -to lines are shown on the Regulating Plan, buildings shall face the street and shall occupy a minimum percentage of each block's linear street (at least 50 percent or 70 percent, as noted in the Regulating Plan, within the required setback area. 3. Buildings shall be sited a minimum of 5 feet and a maximum of 15 feet from the public right -of -way. Porches, Stoops, & Other Entry Features All units must have a porch, stoop, or lobby, as described below. Porches. Porches create a transition zone between the private space of the home and the public space of the street. Porch roofs must be supported by columns or posts, rather than being cantilevered. Side porches and wrap- around front /side porches are encouraged at comer lots to help provide interest and variation for the corner side building elevation. Stoops. Stoops are a simpler transition zone than porches. They are typically not covered, but are a set of steps with a wider stair or landing at the top, and typically are made of stone. Attached Product Entrances. Individual entries to ground -level apartments (rather than shared entries) are encouraged, to create greater connections to the street. DRAFT — 2/6/04 38 Units with Individual Entrances This guideline applies to townhouses and other products that have individual, private entrances to each unit. Porches and stoops for such units may extend up to 6 feet into the setback. Attached Products with Individual Entrances. All duplexes, townhouses, and other attached products with individual street -level unit entrances must have a porch or a stoop. Porch Dimensions. All porches must have a minimum depth of 6 feet clear. A porch must make up a minimum of 30 percent of the width of a building's primary front or 10 feet clear, whichever is larger. Stoop Dimensions. Stoops must be proportionate to the scale of the entry. Q II� da...0 11.:13 n... LTd -� ,.nr� —r— , A A A Entries Entries . Entries Street Facing Entries. Where build -to lines govern, multi family homes shall have entries and windows oriented to the street. Attached Products with Shared Entries Porches or stoops are required where entrances are shared by different units, such as at apartment buildings. Porches may extend up to 10 feet into the front setback. Buildings with 4 or Fewer Units. Shared entries must have a porch with a minimum 10 feet width and a minimum 6 -foot depth. Interior building lobbies must have generous windows facing the adjacent street or Commons. Garages Parking for Townhomes, and other Residences with Individual Unit and Garage Entrances. Residences with individual unit entrances must provide garaged parking as follows: • Garages may be either attached to or detached from the primary residence. Underground parking garages are preferred. Residences with individual units and garage entrances may not have garage doors facing the street. Parking for Attached Residences with Shared Unit and Garage Entrances. Parking for attached residences with shared unit entrances, such as apartment buildings, shall be provided in one of the following three ways. See the diagram below. DRAFT — 2/6/04 39 • Parking provided within the ground floor of the residence, behind a street -facing living space, retail, or home office space that is at least 15 feet deep. • Parking depressed underneath the living space of the residence, such that the first floor of the living area is no more than 5 feet above the finished grade of the sidewalk. • Parking provided to the rear of the residence structure and away from any-streets, either as surface parking, in carports, or in structured parking garage. Priin.w.mrxmob. ✓ ww• nano spa m Mom alert mwmwn 15 depth a.rwWn� aalwmwws ..n.m parking >r w ar posy Parking for Attached Residences with Shared Unit and Garage Entrances. Parking for attached - residences shall reduce the visibility of vehicles from the street by using one of the three techniques shown here. Landscaping for Alley - Accessed Garages. The rear setback for alley- accessed garages provides back -up and turn - around clearance for cars. Alley - accessed garages must have landscaping and tree planting between adjacent garages. DRAFT — 2/6/04 40 - Residence and Garage Setbacks The following table summarizes minimum and maximum setbacks for residences and garages. Table 7. Residence and Garage Setbacks (measured from lot line unless otherwise noted) Setbacks._ :. '�1f�P Caf'}19n11r0. ' StructQre Residence Setbacks Street- facing: setbacks._:.; Rear .. Setbacks • Attached residences with individual unit • entrances Attached residences with a1iared unit :; :: • entrances • Garage Setbacks :15' min. from centerline of alley,. or 15'm from rear property line when no alley 5'. on each side of . structure, -0'. ' . _.•between attached.. units in on e -structure. 5' on each side of structure. Garages or parking lots for townhomes, or other attached : units with individual unit entrances Garage or parking lots • for attached units with . shared unit entrances .. • If parking is adjacent to the street, it must be tucked under residences such that the level of residences is not more than 5' above_ street grad e. Garage entrances are limited to one doorway of less than 22' in width.:.. [5] 12' min from centerline of alley, or 3' min. from rear property line lino alley :: 75' on each side of 'separate garage 'structures, 0' between attached `- :garages in one stricture` 5' on each side of garage structure, or lot. NOTES: [1] Projections. Bay windows, fireplace elements, and balconies may extend into the front setback up to four feet, for a width not more than 10 feet. The maximum extension of a projection into a side yard is 3 feet. [2] Depressed Parking. Where a high water table prevents depressed parking, at -grade structured parking must be placed at the rear of the structure with residential uses lining the front facade to finished grade. DRAFT — 2/6/04 41 4.4. ARCHITECTURAL STANDARDS Facade Transparency .Front Doors All unit entries must be clearly marked through articulation, porches, greater massing or thickness, or recessed entries. Front doors must have a substantial, high- quality appearance. Plain, flat doors are prohibited; raised panel doors are required. Doors must have dear glass panes or generous adjacent windows, in order to allow occupants to look out before opening the door and to strengthen the relationship between the private residence and the public street. (a) Prohibited (b) Acceptable (c) Acceptable Front Doors. Residential front doors shall have clear glass panes set in the door (b) or adjacent windows (c), and shall have raised panels rather than being plain (a). Windows Coverage and Orientation. All street - facing facades must have windows covering at least 25 percent of the facade's area. Windows of the living room, dining room, or family room must face the street. Recesses. Windows and doors must be recessed at least two inches from walls or exterior trim to create a shadow line for visual interest. Materials. Horizontal "slider" windows and window frames with metallic finishes are not permitted; vinyl or other finishes with an appearance of painted wood are acceptable. Mirror or tinted glass is not allowed. Garage Door Treatments All residential garage doors shall consist of articulated panels 42 DRAFT — 2/6/04 Building Scale and Definition Articulation All Residential Products. The front facade of all residential buildings must be articulated with porches, bay windows, or balconies that face the adjacent street, park, or open space. No wall shall have a blank, uninterrupted appearance exceeding 20 feet in width without a window, recessed panel, lattice, trellis, change in texture or plan, or equivalent treatment. To insure visual interest and appropriate scale, windows, doors, and eaves must have reveals and recesses. Attached Products. The front facades of attached products shall read as a series of distinct vertical building forms or "bays" along a "street wall." The overall composition of the main building shall highlight proportion and rhythm among a series of bays and the overall building mass. Pilasters, columns, reveals, fenestration, and other details may be used to achieve this effect. Roof Form All townhome residential buildings must have hipped or gabled roofs. Flat roofs are allowed provided they are accompanied by an ornate cornice or similar features. Materials and Methods of Construction • Materials. New buildings shall support regional traditions and maintain a level of craft in the process of construction. Exterior finishes shall be primarily of wood, brick, stone or stucco. Vinyl, aluminum and metal siding are prohibited Application. To avoid an "applied" look, material changes must not occur at external corners, but may occur at "reverse" or interior corners or as a "return" at least 6 feet from external comers. Scored plywood (such as "T 1 -11 ") must not be permitted. Refer to the diagrams in Section 3.4, "Materials and Methods of Construction," in Chapter 3. Side Elevations at Corner Lots. The street -side elevation of any residence located at a street corner or siding onto open space or publicly- accessible commons (including single - family, attached, and multi-family units) must have the same materials, finishes, and level of detail as the front elevation, with multiple windows. Additional Architecture Features. The following features are encouraged: • Rooftop patios and gardens on flat roofed attached unit buildings. • Corner balconies on street facing facades and multi-level buildings to encourage • container gardens and planters. Energy Conservation and Climatic Response Buildings Building design shall respond to hot summers and cold winters with deep recesses and overhangs, and pitched roofs. A porch shall protect entries, particularly the front door. Principal rooms shall have windows on two sides, whenever possible, to provide balanced daylighting and DRAFT — .2/6/04 43. to facilitate natural cooling and ventilation. Homes should be oriented so that a majority of primary living spaces receive direct sunlight, and incorporate overhangs, awnings or trellises that allow the low winter sun to penetrate the unit, while blocking the high summer sun. Driveway Paving Concrete driveways are preferable to asphalt paving.. Turf blocks. Turf blocks are masonry unit paver blocks which are planted with turf to create the appearance of a lawn or grassy strip and allow stormwater infiltration, but which can support occasional vehicle use. They are appropriate for secondary emergency access rights -of -way, driveway medians, and other surfaces that do not experience regular use. Other Structures Service and Loading Area Screening Large residential buildings often contain service areas or loading docks. Screening of such areas shall meet the same requirements as described in the section on Service Areas in Chapter 3, Mixed -Use, , and Civic District Standards. Fences and Walls Fences are allowed within the residential neighborhood: "privacy" fences, wrought iron fences and "picket" fences. In no case are cyclone, chain link, or wire fencing allowed. No fence may be constructed in a drainage utility easement without an encroachment permit from the City. Privacy Fences and Privacy Walls. Privacy Fences are allowed only to separate patios of adjacent units and shall not enclose entire area. They may be up to 6 feet high and shall be built with attractive, long - lasting materials, such as wood, masonry, or stone. Hedges may be used as an alternative to a privacy fence provided it meets the privacy fence requirements. Picket Fences. Picket fences shall be not more than 42 inches in height, and shall be primarily wood or wrought iron with the exception of comer posts and gate posts, which may be masonry or stone. Picket fences shall not be solid and must be at least 50 percent visually permeable. An alternative to a picket fence is a hedge, which shall be maintained at a maximum height of 42 inches. Picket fences or hedges may be located at the back of sidewalk along the front or exposed side of a lot. They may also be located along the rear property line of those lots that back onto open space areas. DRAFT — 2/6/04 44A i T01. TO ✓h ,` I 'IJS T ED % 20 Ivan , Depth of Lot = D t D/2 Max. Street Side Interior Side Privacy _ _ _ Picket 6' Max. 3' - 6' Max Residential Fence Options. Picket and privacy fences, restricted to the building envelopes shown here, create a dear delineation of public- oriented and private housing spaces on housing lots. 4.5. PARKING REQUIREMENTS Visitor parking and additional resident parking, including any associated with at -home offices such as live /work units, shall be accommodated with on -street parking. Table 8 shows the off- street parking (garage or rear parking areas) requirements by bedroom. Table S. Street Residential District Parkin Housing Minimum Required Off-Street Parking Townhouse 2 Per Unit Other Product 1 Bedroom - 1 per unit 2 Bedroom - 1.5 per unit 2+ Bedroom - 2.0 per unit Accessory None. On -street parking is sufficient. Live/Work and other Products with home Same as for the housing type; Visitor accommodated on-street. 45 DRAFT — 2/6/04 : >1'MONT TO BE .A_DJU TEi ' 4.6. PUBLICLY- ACCESSIBLE COMMONS Minimum Area. The Residential District must include a minimum acreage of Publicly - Accessible Commons equal to 10 percent of the District land area. The Commons are a landscaped gathering area similar to a park or open space and may be public or privately owned but must be accessible to the general public. However, no more than 5,000 square feet may be used by a private community recreation facility structure such as a pool or clubhouse. Jn i Publicly Accessible Commons. The diagrams show possible configurations of Commons. 411 sides of the Commons must be at least 60 feet long. Adjacent residences must front onto the commons along at least 2/3 of the perimeter, although side -ons are acceptable at street corners; any remaining perimeter must be a Natural Resource Area. A street is required along at least one side and along at least 1/4 of the perimeter; any remaining perimeter must have walkways. Homes that face onto walkways (rather than streets) must have alley- loaded parking. DRAFT - 2/6/04 46 P • T' c �N TO yE ADJUSTED Officer Mike Rumpsa Lino • Lakes Police Department CPTED Review '• 11 -16-03 :MarshanTownhdmes • I. have reviewed the plans, and have one recommendation. House numbering needs to be clear and un cluttered. • -A sign indicating what units are. in each individual building should be located at each of the buildings. House numbers on row mail boxes does not work for emergency response personnel • • :)✓RP are driving code to emergency situations and in many cases in the dark. By installing a sign at the entrances of each building, ERP will find the address quickly without wasting time. Department of Public Safety • ;POLICE David'J. Pecchia Public Safety Director / Chief of Police • • ['he Village The underground parking roadway that connects Town Center Parkway with Unit #17 has to be built so that motorists will not be tempted to take a left from the underground parking onto Town Center Parkway .The driveway, should only be a • right rum in only ,Addressing the plat needs to be done in a way that keeps it - -simple. Each •bualding :.. ;entrance should have a sign indicating what addresses are in each complex. • On street parking will have to done in a way that will not obstruct driveways and °.' • intersections.: - Signage and road paint should be utilized. • Secured buildings could become a problem to law enforcement. Responding to • critical *call could be delayed if the police are not able to enter a locked door. Each secured building should have some sort of key or code that Police and fire • can use to gain access to the building •' Surveillance cameras should be utilized in the underground parking area: . Access points to the garage should be keyed and/or proxy cards �. The traffic flow in unit .# 10 appears that it will follow close to the building and • around a median. If the median was shortened, traffic would not have to back . around within the paring lot. :• ::. Snow removal will be an issue in this devel • -Snow will have to be removed and stored in areas that would not impede traffic and pedestrians • 'Snow will`also have to be removed to prevent retail areas becoming targets of . criminal activity due to lack of surveillance :' 640 Town Center Parkway • Lino Lakes, Minnesota • 55014 -1182. Public Administration /Records: •.651- 982 -2300 • Fax 651- 982 - 2399 i • SEH MEMORANDUM TO: Bob Moberg, PE, Project Manager FROM: Heather Kienitz, PE, Transportation Engineer DATE: February 11, 2004 RE: City of Lino Lakes Legacy at Woods Edge — Traffic Operations Analysis SEH No. A- LINOL0304.00 14.00 Traffic operations were evaluated at three intersections along CSAH 23 (Lake Drive) in the City of Lino Lakes. The evaluation was conducted to learn the operational impacts of the Legacy at Woods Edge development and the proposed roadway improvements. The three intersections reviewed include: • Lake Drive and Southbound I -35W Ramps • Lake Drive and Northbound I -35W Ramps • Lake Drive and Town Center Parkway These intersections were modeled using traffic simulation software to determine traffic operations under the existing and proposed geometrics and intersection control. The proposed improvements used for the analysis are shown on the preliminary plat that was submitted to the City in December 2003. These improvements are considered to be interim until the Lake Drive bridge over I -35W can be replaced. PM peak hour traffic volumes were used in the analysis because this hour experiences the highest traffic volumes in the existing and forecast years. As part of the approval process on this project, Mn/DOT required four sets of analyses: Existing 2003 — Analysis of the existing geometrics, intersection control and traffic volumes was used to establish baseline traffic operations. 2005 No -Build - Analysis of the existing geometrics and intersection control was conducted with 2005 forecast traffic volumes including full build -out of the development to determine traffic operations at the year of opening if no improvements were made to the existing system. 2005 Build — Analysis of the proposed geometrics, intersection control and 2005 forecast traffic volumes including full build -out of the development was conducted to determine traffic operations at the year of opening. 2010 Build A "horizon year" analysis was required to determine the year at which the proposed geometric and intersection control improvements would fail. Mn/DOT staff typically requires a 20 -year forecast for the horizon year analysis. In this case, during discussions with Mn/DOT staff it was agreed that a "failure date" would likely occur prior to a 20 -year timeframe due to the capacity constraints presented by the existing Lake Drive bridge over I -35W, as well as those on mainline I -35W itself. Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St. Paul, MN 55110 -5196 SEH is an equal opportunity employer 1 www.sehinc.com I 651.490.2000 1 800.325.2055 1 651.490.2150 fax City of Lino Lakes Legacy at Woods Edge — Traffic Operations Analysis February 11, 2004 Page 2 The 2005 forecast traffic volumes were determined by applying a 1.5 percent per year growth rate to the existing traffic at the ramp intersections and adding the full build -out development traffic to those volumes. The 2010 forecast traffic volumes were determined by applying the 1.5 percent per year growth rate to all volumes including the development volumes. The traffic volumes used in the analysis are consistent with those discussed in the October 23, 2003 memorandum from Glen Van Wormer. The existing and forecast turning movement volumes used in the analysis are attached. Traffic Operations Analysis The evaluation of traffic operations is based on calculations of the volume to capacity ratio (V /c) ratio and average delay per vehicle in seconds per vehicle (s /veh) for intersections. These calculations result in a measure of Level of Service (LOS). The LOS of an intersection is graded on a score of "A" (least delay per vehicle) to "F' (most delay per vehicle). Most major roadways in the Minneapolis /St. Paul metropolitan area typically operate at levels of service in the range of D to E during evening rush hours. A LOS of D is generally acceptable for design. Simulation was used to model traffic over the PM peak hour to determine the average delay per vehicle and the related LOS for each intersection and approach. Another critical element of traffic operations analysis is queuing — the distance that approaches to an intersection "back -up" with vehicles. Simulation reported the maximum queues for the intersections and the animation was reviewed to determine how the queues impacted operation. The LOS for the intersections analyzed are shown in Table 1 and the maximum queues as compared to available or proposed storage are shown in Table 2 (attached). Also reviewed were critical lane volumes per the methods in the Mn/DOT Traffic Signal Timing and Coordination Manual. This analysis reviews the critical turning movement volumes at intersections for the purpose of determining the general capacity sufficiency of a signalized intersection. Existing 2003 Turning movement volumes conducted by Mn/DOT on December 3, 2003 at the I -35W ramp intersections with Lake Drive were used in conjunction with turning movements obtained from trip generation for the existing development in Legacy at Woods Edge and the existing gas station in the southwest quadrant of the interchange. A field review of existing traffic operations was conducted during the PM peak hour on Tuesday January 20, 2004. The simulation of existing traffic operations showed results similar to the field review. The Northbound I -35W ramps are currently offset at Lake Drive. The Northbound I -35W exit ramp showed a maximum standing queue of 12 vehicles during the field observation and the simulation showed a maximum standing queue of 7 vehicles or 140 feet. The existing LOS for the exit ramp approach to the intersection is LOS A. It was observed in the field that the exiting vehicles do receive gaps in traffic caused by the platooning of vehicles from the traffic signal at Apollo Drive and Lake Drive. These gaps allow the exiting vehicles to make their movements without excessive delay. The LOS for the approaches to each of the three intersections is at LOS C or better. 2005 No -Build This analysis showed system failures under the 2005 Build forecast traffic volumes and existing geometric and intersection control conditions. The intersection of Lake Drive with the Northbound I -35W City of Lino Lakes Legacy at Woods Edge — Traffic Operations Analysis February 11, 2004 Page 3 exit ramp showed LOS F at the exit ramp approach. Based on Mn/DOT design manuals the exit ramp must have sufficient deceleration distance for vehicles to exit the freeway safely and come to a complete stop. The queue for this approach extends into the deceleration area exceeding the available storage. The Town Center Parkway approach to Lake Drive also operates at LOS F with two -way stop control at the intersection and existing geometry. 2005 Build This analysis assumes the proposed interim geometric improvements and traffic signals with coordinated timings at each of the three intersections. The Northbound I -35W entrance ramp was realigned to oppose the exit ramp. The LOS for the approaches at each of the intersections is LOS D or better as shown in Table 1. The maximum queues from Table 2 show that some approaches did exceed proposed storage. It is important to note that the table shows the maximum queues experienced over the analysis hour, not the average queues. It is important to note the maximum queues to provide an accurate account of what may occur at some point during the peak hour on the system, however they are not always an indicator of how the system will operate throughout the entire analysis hour. This is why review of the animation should accompany a summary of queues. The average queues reported by the simulation are also helpful in understanding traffic operations. The 2005 Build traffic operations at each of the intersections are summarized below. Lake Drive and the Southbound I -35W ramps: The northbound left-turn lane had a maximum queue that exceeded the proposed 150 -foot storage lane. Review of the animation showed this will not interfere with system operations during the analysis hour. It should be noted that the average queue reported by the simulation program at this location is 40 feet. Lake Drive and Northbound I -35W ramps: Analysis showed that the southbound left turn lane had a maximum queue that exceeded the proposed 150 -foot storage lane. Review of the animation showed this will not interfere with system operations during the analysis hour. It should also be noted that the reported average queue at this location is 61 feet. The table also shows that the maximum queue for the northbound through lane exceeds the proposed storage between Town Center Parkway and the northbound ramps. The animation showed that this queue was not a "standing" queue that blocked the intersection of Town Center Parkway. Instead the queues cleared quickly and did not block the intersection. The reported average queue at this location was 267 feet, which is less than the proposed storage. A review of the volume to capacity ratios and critical lane volumes also showed acceptable operation. Lake Drive and Town Center Parkway: The analysis showed that the southbound dual left turn lanes had maximum queues of 203 and 215 feet, respectively. These queues exceed the proposed 180 -foot storage lanes. The reported average queues for these lanes were less than 150 feet, which is less than the proposed storage. Review of the simulation showed that the queue did not interfere with system operations over the analysis hour. Table 2 also shows that the westbound left and right -turn lanes exiting the development have maximum queues that exceed the 275 feet of proposed storage between Lake Drive and Village City of Lino Lakes Legacy at Woods Edge — Traffic Operations Analysis February 11, 2004 Page 4 Drive. The average queues reported for the left and right turn lane are 144 and 222 feet respectively. The animation showed that this queue is not typically a "standing" queue as it cleared quickly the majority of the time but at times over the analysis hour it did block Village Drive. A review of the volume to capacity ratios and critical lane volumes also showed acceptable operation of the Lake Drive/Town Center Parkway intersection. 2010 Build This analysis assumes the proposed interim geometric improvements and traffic signals with coordinated timings at each of the three intersections. The Northbound I -35W entrance ramp was realigned to oppose the exit ramp. The LOS for the approaches at each of the intersections was LOS D or better, however, the other tools used to measure traffic operations show 2010 to be the date of failure. The primary reason for the failure at this date is the lack of capacity on Lake Drive. Due to the existing bridge over I -35W, Lake Drive traffic is forced into a single lane in each direction. The Town Center Parkway and Northbound I -35W ramp intersections experience queue and capacity problems because of the need for additional capacity on Lake Drive. As part of the analysis the signal timings and coordination were optimized, however this could not mitigate the capacity deficiency on Lake Drive. The forecast traffic volumes on Lake Drive and the I -35W exit ramps must compete for signal time. At the intersection of Lake Drive and the Northbound I -35W ramps, the exit ramp and the northbound through and right -turn lanes have maximum queues that exceed proposed storage. Specifically, the Northbound I -35W exit ramp experiences a maximum queue that extends into the deceleration area for the exit ramp. This is not acceptable to Mn/DOT or the Federal Highway Administration due to the potential to impact freeway operations. In addition the volume to capacity ratios for the left and right turn lanes on the exit ramp — 0.85 and 0.95 respectively — are nearing 1.0, which indicates capacity problems. The approach queues for northbound Lake Drive at this intersection extend to the Town Center Parkway intersection and the animation shows that it will interfere with intersection operations. The northbound through lane has a volume to capacity ratio of 1.02, which indicates capacity problems. The critical lane volumes at this intersection also show the potential for a capacity problem as they are near volume limits for acceptable operations. Meeting with Mn /DOT A meeting was held January 29, 2004 with the Mn/DOT Area Engineer and Mn/DOT traffic and freeway modeling staff to review the analysis and results discussed above. Mn/DOT staff did not request any additional analysis. The need for an Interchange Access Request (IAR) was discussed due to the proposed realignment of the Northbound I -35W entrance ramp with the exit ramp. An IAR is required by the Federal Highway Administration (FHWA) if a new interchange is proposed or if an existing interchange configuration is proposed for modification (i.e. converting a diamond interchange to a cloverleaf). The Mn/DOT Area Engineer contacted the local FHWA representative regarding this issue. FHWA stated that an IAR would not be necessary. FHWA also stated that documentation must be provided that shows traffic will not back up from the ramps onto mainline I -35W and that FHWA needs to review the modeling results. City of Lino Lakes Legacy at Woods Edge - Traffic Operations Analysis February 11, 2004 Page S hnk Attachments c: Glen Van Wormer, SEH c:\seh projects o1\030400 \wotdhmobergmemo- 02- 11- 04.doc Table 1 Control Delay and Level of Service (LOS) Results from SimTraffic Lake Drive @ 2003 Existing 2005 No -Build 2005 Build 2010 Build Cycle Length (sec) - - 100 100 I-35W SB Ramps Intersection WB NB SB Delay (s /veh) 16.0 2.0 5.0 LOS C A A Delay (s /veh) 30.0 3.0 5.0 LOS D A A Delay (s /veh) LOS 12.2 B 39.0 D 10.4 B 8.8 A Delay (s /veh) 12.5 37.1 11.0 8.8 LOS B D B A I-35W NB Ramps Intersection EB NB SB Delay (s/veh) 9.0 2.0 1.0 LOS A A A Delay (s /veh) 2.0 5.0 LOS A A Delay (s /veh) LOS 22.2 C 33.9 C 18.7 C 17.1 C Delay (s /veh) 28.3 41.2 27.2 17.9 LOS C D C B Town Center Parkway Intersection EB WB NB SB Delay (s /veh) 13.0 16.0 2.0 4.0 LOS B C A A Delay (s /veh) 3.0 16.0 LOS A C Delay (s /veh) LOS 30.3 C 38.8 D 36.3 D 28.2 C 26.5 C Delay (s /veh) 32.0 46.7 40.2 24.2 30.9 LOS C D D C C LOS Summary.xls 2/11/2004 0) a E E 07 2 0 CO CO • C] CO CO N N 0 0 3 0 N E co O) E 0 2 o r � 0 Lo CO CO CO CO 0 r CO C(`) N.N 'I'° MII. Proposed STORAGE (ft) 300 300 00 CO 800 800 535 400 500 500 150 800 200 200 tnOOOOOO N N N N co N v O b 2005 No -Build Maximum Queues (ft) N co O 80 120 NN 40 CON CO 2003 Existing Maximum Queues (ft) 60 40 40 0 60 40 140 60 20 20 80 40 0 CO0 0 000 Existing STORAGE (ft) c M 50 750 800 800 535 200 500 500 800 200 200 NNN cocci L ., Lake Drive J QJI- 2 SB R EB LT R NBT SB T EB LT JI- CC 3 JF - CC z JJI- I- N I -35W SB Ramps I -35W NB Ramps Town Center Parkway Lake Drive (CSAH 23) It rn «1 1 406 1 333 1 - 472 0 rn 4 — r 126 78 20 4J `l t 661 3641 r 0 17 co It 1 �► 366 1 45 t_ 2003 AM Volumes 10 204 I -35W SB Ramps 257 Driveway 50 177 80 —_ 1 t r 253 1 It 1 17 1 407 1 22 50 20 30 4 16 428 4— rh 14 3 5 99 (40) I -35W NB Ramps 22 Town Center Parkway tr 301 2631 38 It (331) 64 TM Volumes 2003 Ex Balanced AM 2/11/2004 339 20 Lake Drive (CSAH 23) 2003 PM Volumes +J 1 4 291 1 381 1 li IT n CO CD CO CO CD N CO ct CO IT CO CD N CD sr CO 1 4 310 1 118 47 T 48 1 818 1 - 1L 4•r 10 124 I -35W SB Ramps I-35W NB Ramps 499 Driveway 80 80 20 310 —4 189 1 1 556 1 91 CA n rn v v CD IT � ' CO NI. CD 60 , 378 1 61 60 5 15 433 CO Co C[1 • LO IT 74 40 209 T 201 513 1 20 (553) (40) 114 Town Center Parkway 86 TM Volumes 2003 Ex Balanced PM 2/11/2004 415 20 Lake Drive (CSAH 23) 2005 Build PM Forecast ,1 l 4 303 1 551 co co c 114 L u7 <D CO N It co CO 1 (O CD N 542 I 123 643 322 321 — - ► Z 10 191 I -35W SB Ramps 112 I 1,101 I - t 891 1 188 CO CD CD N Co O «J I 4 601 393 I 410 Driveway 93 80 20 60 5 15 658 ♦— 486 13 250 41 Tr 20 1 533 1 221 1 It (774) 311 (40) I -35W NB Ramps 749 Town Center Parkway 636 TM Volumes 2005 PM 2/11/2004 Lake Drive (CSAH 23) 2010 Build PM Forecast 1T o 0) N CO Ch N ,I 1 326 1 594 1 - 447 20 692 Driveway 91 4— • '1 83 123 121 1 1,186 1 - 584 1 133 347 345 10 206 I -35W SB Ramps 1 -35W NB Ramps 0 CI N CD � r IT 01 CO N CD 01 4J 1 �► 1 64 1 423 1 442 20 86 65 5 16 721 1 - -► _3 4- r Tr 960 1 203 1 524 5 282 336 22 1 Tr 574 1 238 (834) (40) 811 Town Center Parkway 685 TM Volumes 2010 PM 2/11/2004 Environmental Memo To: Michael Grochala From Marty Asleson Date: January 23, 2004 Re: Environmental Board Recommendations /January 21, 2004 The Environmental Board made the following recommendations at the January 21, 2004 Environmental Board meeting: • Landscaping: • All tree - planting areas should have planting holes prepared as per illustration. All planting areas where soil compaction is necessary because of buildings and pavement should use CU structural soils or some other method to allow for suitable root growth). It would be better to plant smaller trees in CU, soils than larger trees in compacted soils. • Species selection should combine appropriate native /indigenous species that complement the native landscape and architectural features. Suggest some flexibility in street tree planting specifications in order to add ,possible traffic calming features (species and spacing) to the landscape. All trees should be zone 4 species. Desirable species for Legacy: • Oaks ( Red, Northern pin, White, Burr and Swamp white) • Page 1 • Red maple /Acer rubrum (North woods, Red maple, Autumn spire, Fire dance, North fire, Red sunset): • Autumn blaze (do not over use) • Birch ( River, Paper) Common hackberry • Thomless Cockspur Hawthorn • Green ash ( Green, Bergeson, Marshall's, Patmore, Summit) Honeylocust/Thomless • Larch • Flowering crab (Dolgo, Donald Wyman, Flame, Indian magic, Kelsey, Pink spire, Radiant, Red splendor, Snowdfirt, Sparkler, Spring snow, • Quaking aspen • Linden ( American, Redmond) • Elm ( Discovery, Accolade, or other disease resistant zone 4 elms) • Pines ( White, Red, Austrian along freeway if pines are planned there) • Spruce (white) All shrubs should be zone 4 suitable and non - invasive. It is encouraged to use native flower and ground cover plants as much as possible. The use of cultivars should be permitted as long as such cultivars are non - invasive. • • All native seed areas should approximate the City specifications for seed. . It is encouraged to use potted plants and/or plugs as much as possible. • Vines. The Environmental Board has stated an interest in the use of vines on building surfaces. All planting areas should have available water. Plantings on poles should have available water. Electricity for accent lighting should be available throughout the planting areas. Trails All future trail extensions should be placed off -of eco- edges. Site soils Any soils that are not intended to be compacted should be protected from unnecessary compaction (infiltration areas, pond and park areas). Pursue a conservation easement on the SE corner of the project. • Use landscape lighting only in the common areas, interior to buildings. Use solar powered lights if possible. In addition, the Environmental Board wished to carry forward previous recommendations made during the review process. These recommendations included: Best management practices for surface water quality should be initiated and integrated into the predicted phosphorous exports for the site. Best management practices should include periodic and timely sweepings to capture sediment laden • Page 2 phosphorous on impervious surfaces. A vacuum type sweeper is a better tool for removing phosphorous deposits on impervious surfaces. Best management practices should also include the elements sited in the plan for Market Place north of 35W. All lighting should be constructed in accordance with the requirements of the Lino Lakes Zoning Ordinance. In all cases, city standards for tree preservation should be implemented. If trees are moved, than storage area needs to be designated until the planting areas are ready. (Usually tree removal happens before initial grading operations). Motion by O'Connell, second by O'Dea to recommend approval of the Legacy project with above recommendations. All were in favor. Motion passed.:` • Page 3 m „ m mown N .< ESN Ga EE MEE -o 0 S N 5 LANDSCAPE PLAN OP § 4 1/1 m _ m O m Pi - 1 n -+ i i 7 m 99 a " E Er _ J m Q o !AA 2 T ! l u ij Tj E 1pii.. F b 21 \NO \2210A0.10600 O A@ 02-01-44 ME .t00 pm USW 9102001E • : c\rz9WxaMws91WV9wset 2Y*Vm \002004 WOW,, c\v9W+01\930201\21V+1222*. �sV19VN91.W2320RW1m2. 1WowP.\ 00 \Wt.. 2V20 w.02 \222501wwu021.12 . 3Oa3 Sa00M ld AOV031 -, 01-20-. ws cVmW .1a.\musmynau owwW MORD many -m -IN UNO -s*c rVKoW \w092.1*au om.\HAM , mvav- o,aVAP-P*ww xytaW00,030501VnW Val. ky...n\owmi\mW+O+vt. ▪ 1 '•uanauSNOO 30- z Z �r OD —i D m (p • as SaOOM ld AOVJ3 =NIMBI NT N> Col PR Fi o OZ N 0 z 0 4tt i1 a Iii row mieudort [ a� 1 3 a O A 9 z ca$ 0 b a R O z co A acme 9943 S400M 1`d AOV9 XI r Z 0{ zm m a Z Z a o � oZ 5.• 110 W Z� O Z G) �g 1 erlfgv k -.'.7-,..-1--a.A_ •,..,-;--7-,...-.3..-Zf- ■..... ,„.,... Il iyforpy0:00 -, Tt4i"&k7,41MZ:: A t:at:MN:IL •■ $. 1111111-11111 11111 11111111 Area 1 Plan & Section Hartfcrd Group Inc. Lino Lakes, Minnesota ,L,,,-,..^.7.r.y*L.S71-.L1 woo _. • WN � &� ■■ 2' ■m ■■ L' snot- 131111 ! ■■ ■ ■, �¥ ■, �r nNi ■f !PM 1111111111111 " moo moos !p■■ ■ ed if � ■ ■■# P. 1■■ ■■ ■ �►< aims' i■ ■# �■■�� ■ �►i i W■1 � ■ ■# 1111111111 � ■ e , ne# M�1►7 MINN 1121•12, Inn* i■# 1111111111 � ■ ■& �� o■{ �■ �■■ ■■ f ■ 11121111 gods �■ � moss gismo k� # 1111.1111.1 111111111111 111511•W small ess A mgr\ ipso ipso 2�.! �■� �■ mom■; 4 A 2 Plan & Section Lino Lakes, Minnesota Hartford Group Inc.