Loading...
HomeMy WebLinkAbout10/04/2010 Council PacketWORK SESSION AGENDA CITY OF LINO LAKES October 4, 2010 CITY COUNCIL WORK SESSION Community Room (not televised) 5:30 P.M. 1. Organizational Review 2. Public Safety Director Search 3. Comprehensive Plan Review 4. Storm Water Utility Update 5. Set Budget Work Session 6. Odd Year Elections 7. Council schedule for December Review Regular Agenda Adjourn to follow on Friday WS — Item 1 WORK SESSION STAFF REPORT Work Session Item 1 Date: October 4, 2010 To: City Council From: Jeff Karlson, City Administrator Re: Scope of Organizational Review Background Mayor Reinert asked me to outline the scope of the organizational assessment if staff were to perform an internal analysis of the organization. When formulating and then implementing an organizational review process, the most important considerations are: (1) what needs to be changed; (2) why are the changes needed; and (3) what specific benefits will changes produce. There are many different strategies and methods for analyzing organizations. A very helpful framework is to think of the process as managing change, which involves problem solving. I think the best approach is to implement a mix of strategies. When we're talking about the scope of the organizational review and subsequent change strategies, this can vary from minor "tweaking" to a complete transformation of the entire organization, which of course involves people. Therefore, before jumping into this process, I think it is important that we have a clear sense of mission or purpose that describes what the City is striving to accomplish. The organizational analysis will at various times focus on defining the problems (or opportunities) that need to be solved, on identifying change strategies to solve those problems, and on finding ways to make the required changes. The change problem is often expressed, at least initially, in the form of a "how" question. That leads to the "what" questions. What are we trying to accomplish? What changes are necessary? Then we'll have to ask the "why" questions to get at the ultimate purposes or functions and to open the door to finding new and better ways of doing them. Much of what we accomplish in our analysis will be done on the fly. We'll simply jump into it and hope for the best results. We will have to be flexible as we go through this process. Following are a few basic guidelines for us to keep in mind in the context of organizational change: 1. Communicate to employees openly and honestly the potential need for change. In other words, set the stage for change. Appreciate that employees will react differently to change. 2. Get as much feedback as practical from employees, including what they think are the problems and what should be done to resolve them. 3. Know why we're making any changes. What goals do we hope to accomplish? 4. Keep perspective. There is no "silver bullet" that will completely turn the organization around and make things better for everyone all the time. 5. Keep focused on delivering services to the residents as cost effectively and efficiently as possible. 6. Successful change must involve management staff and the City Council. 7. Include closure in the plan. Components of the organizational assessment would include the following: 1. A benchmarking study of city positions to see how Lino Lakes compares with other cities of similar size and characteristics. 2. A review of the City's organizational structure, which would include going over job descriptions with the department directors and individual employees to determine if their job descriptions still reflect the duties and responsibilities they perform on a regular basis. This will expose any redundancy in the organization. 3. An examination of the City's internal processes and systems. This drills down to the how, what, and why questions. How do we change from System Y to System Z? How do we get people assume more responsibility, to be more creative? What are we trying to accomplish? What changes are necessary? What indicators will signal success? What standards apply? What measures of performance are we trying to affect? Why do we do what we do? Why do we do it the way we do it? Asking "why" questions gets to the ultimate purposes of people. The term "system" can be defined as an arrangement of resources and routines intended to produce specific results. In that context, you look at both the "hard" systems (e.g., computer -based information systems) and the "soft" systems (e.g., compensation plan, appraisal system). One additional component might be to hire a consultant to administer an organizational assessment instrument, which generally involves personal interviews, surveys, and questionnaires to identify positive and negative influences, to provide a "gap" analysis, and to impart directional recommendations. There are many organizational assessment tools that would provide information as to how well the City's critical elements are working together to achieve its strategic goals and missions. Two basic questions that organizations often ask are: "How do we know that resources are being properly allocated, and how can we better utilize our limited resources." It's these two questions that should move us to examine the whole issue of what the important elements are which contribute to organizational success. Requested Council Direction Staff is seeking further direction from the Council. WS — Item 2 WORK SESSION STAFF REPORT Work Session Item 2 Date: 4 October 2010 To: City Council From: Dan Tesch, Director of Administration Re: Public Safety Director Search Background Per council direction, the following is an outline of the process with options for filling the vacant Public Safety Director position. We will be using the standard recruitment/hiring process that we would use for a department head. The City Administrator and I met with Interim Public Safety Director on 28 September to discuss the process for filling the vacant director position. Option A. Appoint the Interim Public Safety Director as Director — evaluate the Captain position. Option B. Conduct an internal recruitment process. Option C. Conduct an external recruitment process with a consultant. Option D. Conduct an external recruitment process using in -house staff. The details of Option D are as follows: Recruitment: We will prepare an employment packet which will include a community and position profile. Advertise: We would advertise the position with: MN POST Board League of MN Cities Web Site Minnesota Chiefs Association The City's web site 1 Screening: Staff will screen the applicants and determine a logical number of semi- finalists (generally 6 -10). Interviewing: The City Administrator, myself and another department director will conduct first round interviews and provide the council with a logical number of finalists (generally 3 -5). At the same time, a panel representing patrol officers and supervisors will also be interviewing candidates and provide feedback to the directors. Testing: Finalist would be tested for leadership skills, critical thinking and aptitude as well as psychological testing. Options: PDI Martin - Macalister Human Resources Consultants Selection: The City Council, City Administrator (and others if the council would like) will interview the finalists and make a selection based the interviews, test results, background and reference checks. Time line: After meeting with Interim chief Strege, we recommend that recruitment begin after the first of the year. From the start of the advertisement to start date is generally 10 -12 weeks. Requested Council Direction Council direction as to the process for selecting a new Public Safety Director Attachment(s) None 2 WS — Item 3 WORK SESSION STAFF REPORT Work Session Item 3 Date: Council Work Session, October 4, 2010 To: City Council From: Michael Grochala Re: Comprehensive Plan Review Background The City Council reviewed proposed changes to Land Use and Housing chapters of the draft 2030 Comprehensive Plan at the August 11, 2010 work session. The council proposed the following changes: • Chapter 3, Land Use Plan (pages 26 -27). Modification of the proposed statement within the Growth Management Policy establishing an annual average of 230 new residential dwelling units per year. The council reduced the maximum number of residential units allowed in any one year The proposed language now reads: "The City will plan to accommodate an annual average of 230 units per year over each 5 year phasing period not to exceed 345 units in any one year. At the end of the 5 year phasing period unallocated units will be averaged out over the next five year phase. " • Chapter 4, Housing Plan (pages 10 -11). No additional changes were proposed. The proposed Land Use Plan changes are intended to address council concerns regarding establishment of hard growth cap, providing development flexibility, managing pace of growth, and maintaining even grow from year to year while still accommodating the growth forecasts. Upon final approval of the Comprehensive Plan the city's existing Growth Management ordinance would be amended to incorporate these changes. Staff submitted the proposed language to Metropolitan Council staff for preliminary review on August 25, 2010. The City has been informed that the proposed modifications would not change Metropolitan Councils official review of the plan. Therefore the proposed changes would not require additional review and approval by the Metropolitan Council. 1 Council Direction 1. Staff is requesting council direction to place adoption of the 2030 Comprehensive Plan on an upcoming City Council meeting agenda for consideration. Attachments 1. Chapter 3, Land Use, proposed amendment 2. Chapter 4, Housing, proposed amendment 2 Based on its analysis, the Metropolitan Council's new affordable housing goal for Lino Lakes is to create 560 new affordable housing units between 2011 and 2020, which represents 35 percent of forecasted household growth. Based on the 2030 future land use map and the minimum proposed residential densities (i.e., 7 units per acre for high density and 8 units per acre for selected mixed use areas), the City has the capacity to accommodate the affordable housing goal. The level of affordability is important to understand when assessing the amount of current affordable housing and the price point for new units to meet this goal. According to Metropolitan Council 2007 Affordability Limits, the area median income for the seven -county Minneapolis -St. Paul (MSP) area adjusted by HUD to be applicable to a family of four is $78,500 in 2007. Eighty percent of the median household income is $62,800; 60 percent is $47,100 and 50 percent is $39,250. Applying an interest rate on a 30 -year fixed -rate home loan of 6.2 percent for 2007 and other payment factors to the 80 percent area median income, yields an affordable purchase price of $206,800 in 2007. According to Anoka County Assessor's data there are 779 homesteads, or 13 percent of total 2007 households, that fall under this 80 percent purchase price limit in Lino Lakes. The price point for an affordable home at 60 percent of area median income drops to $152,000. There are currently only 82 existing homesteads, or 1 percent of total 2007 households, in Lino Lakes at or below $152,000 (Anoka County assessor's data /GIS). It is the new 60 percent measurement that will be required for the potential affordable housing units anticipated between 2011 -2020 in Lino Lakes. Achieving this new affordability goal will be very difficult without the funding tools that have in the past been offered by the Metropolitan Council and other agencies. Future Affordable Housing A ert• s To provide eppertenities for affordable housing in the community, the City is taking the appropriate regulatory measures within the Comprehensive Plan by guiding areas for higher density housing and including policies to prereete- integrate affordable housing in all residential land use districts. These regulatory measures represent one of the City's most effective tools encourage for the development of affordable housing. To meet affordable housing goals, the City has planned for potential new growth with a variety of residential land use types and densities for te- -preniete the development of life -cycle and affordable housing across the city. The city's future land use plan can accommodate the goal of 560 High Density and Mixed Use units at a minimum density of 7 units per net acre by 2020 incrccsc appo tics€er e#erdable -litc -etele #reusing in- theeemniunity; While the City is doing its part in creating a regulatory land use plan to guide areas for higher density housing, which is where most affordable housing will likely occur, barriers to development of affordable housing still exist in Lino Lakes and the region. Some of these barriers are beyond the City's control, including the following: • Steady increases in land prices and construction costs. • Physical limitations of land due to wetlands, poor access, poor soils that would increase the cost of land development or construction. • State, county and local tax structures. There are some significant barriers to construction of new affordable housing, and the above list includes just a few of these barriers. Despite these difficulties, the provision of affordable housing is an important effort that cities undertake. The most effective role Lino Lakes will have in the provision of affordable housing is its regulatory tools, including land use and zoning regulations that do not impede the construction of affordable housing. Many of these tools can be used to encourage developers. Flexibility, through the use of the Planned Unit Development (PUD) 4 -10 process, may be provided to encourage the construction of affordable housing.. 5.1341a&{-a5{ setback-an gFeen arca f equtfefner tf�efeastrtg density, er fedtteif g fccs. Acknowledging the regional housing goals established by the Metropolitan Council does not commit the Citv of Lino Lakes to provide funding for housing. The City will continue to investigate means to pursue the goals in its comprehensive plan. However, this should not be interpreted as a commitment to use Citv funds to overcome the financial obstacles to life cycle and affordable housing. Housing Implementation Strategies and Recommendations The following Housing Action Plan identifies efforts Lino Lakes will pursue to create opportunities to maintain the existing housing stock, and to provide increased housing options for future residents. These strategies are based on goals and strategies for Community, Neighborhood and Residential development developed by the Citizen Vision Committee. The strategies are designed as a resource tool for specific measures the City can effectively undertake and enforce while others are designed as tools to encourage developers to incorporate affordable housing into future development. As future subdivisions are proposed, the City will use these resources and implement the strategies in working with developers to create new affordable housing opportunities. Many of these items are things the City itself can do, while others will occur through partnerships the City will seek to provide for and maintain housing quality and increase affordable housing opportunities. To ensure housing development is compatible with existing and adjacent land uses and provides accessibility to key community features and natural amenities (Goal 3), the City will: • Offer incentives to developers who provide for affordable housing units while conserving environmentally sensitive sites, such as density bonuses, expedited permitting processes, or reduced fees. • Pursue funding opportunities to increase the affordability of housing units within conservation subdivisions. • Pursue funding opportunities to incorporate green building techniques within affordable housing developments. • Encourage innovative low impact development to preserve open space or natural features. • Ensure that all new housing, including high density, adheres to the highest possible standards of planning, design and construction feasible. • Promote development of neighborhoods that incorporate housing in a range of densities and affordability limits in close proximity to shopping, services, daycare, and medical services. Safe access to parks and schools, and the ability to walk, bike or have access to transit should be part of the design. To improve the availability of affordable housing and enhance opportunities for senior housing (Goals 5 and 6), the City will: • Seek housing developers to work cooperatively with the City to construct affordable units. • Create an incentive based program or Residential Planned Unit Development Ordinance that includes density bonuses for construction of affordable housing. This allows an increase in density, beyond the underlying zoning, if the development includes affordable housing. 4 -11 Growth Management Policy In addition to the tools described above, the Comprehensive Plan Advisory Committee discussed the development of a revised Growth Management Policy for the city. The Growth Management Policy should provide a clear basis for efficient development staging as well as flexibility to respond to market conditions. The new policy must work in conjunction with the staging plan to establish the criteria for moving from one staging area to another. The 2989 Growth Management Policy will include the following elements: 1. The City will create a fully integrated Comprehensive Plan and keep it up to date with biannual reviews. The City will perform an intensive review at least once every five years to ensure the plan addresses changing needs and conditions. 2. The Comprehensive Plan will include a staging plan defining development staging areas sized to accommodate forecasted growth. 3. The City will monitor the ten -year staging areas and annually determine if adequate land remains available. 4. All development must be located within the current ten -year staging area unless a Comprehensive Plan amendment is approved that redefines the current ten -year staging area. 5. All development must be phased within each ten -year staging area in accordance with the staging plan unless the City Council determines, by resolution, to redefine the location of the current five -year phase. 6. Prior to reaching the time threshold for the next ten -year staging area, or five -year phase within a ten -year staging area, depicted on the staging plan, the City Council will determine by resolution if the next area is to be opened to development. The following criteria will be used to determine where and when to open up the next ten -year staging area, or five -year phase within a staging area, in accordance with the timing indicated on the staging plan: a. Adequate infrastructure must be available to support development. Appropriate analysis will determine if adequate infrastructure is available and what utility extensions and transportation improvements are required to support new development. If infrastructure is not available and cannot be made available in a timely manner to support expanding into the next ten -year staging area or five year phase within a staging area, the city may refrain from opening up the next staging area, or portions thereof. b. Different areas of the city can be considered independently. A decision to open one area of the city to development does not automatically open a different area of the city. Decisions to open new areas to development should clearly define and map the area being opened. c. This process does not require a comprehensive plan amendment because it is in accordance with the timing indicated on staging plan. 7. The following criteria will be used to determine if the city should allow a specific development project to occur early in a ten -year staging area, or five -year phase within a staging area, prior to the timing indicated on the staging plan. 3 -26 a. The proposed development must be located within both the current and the next ten - year staging area, or five -year phase, or located adjacent to the current staging area. b. The proposed development must be master planned. Small, piecemeal developments do not justify redefining the ten -year staging area, or five -year phase. c. The proposed, master planned project must provide discemable public values. d. Adequate infrastructure must be available to support development. Appropriate analysis will determine if adequate infrastructure is available and what utility extensions and transportation improvements are required to support new development. e. There must be a commitment that the development will pay its proportionate share of infrastructure improvement costs associated with development. All development must adhere to the Resource Management System Plan, including all its components, as this plan provides a conservation design framework for growth within the city. 9, standards in subsequent ordinance updates to ensure quality development that minimizes negative impacts on natural and cultural features of the community. 9..,10. The City will plan to accommodate an annual average of 230 units per year over each 5 year phasing period not to exceed 345 units in any one year. At the end of the 5 year phasing period unallocated units will be averaged out over the next five year phase. Relationship to Met Council Development Framework In addition to guiding Lino Lakes' future growth, the land use plan also relates to growth and development in the region as a whole. As part of the seven -county metropolitan area, Lino Lakes must accommodate its share of the region's growth. The Comprehensive Plan must demonstrate the City's capacity to absorb this growth and that the regional infrastructure, including the transportation and sewer systems, will be used efficiently. The Metropolitan Council has developed objectives and policies for cities in the metropolitan area to ensure efficient use of the region's infrastructure, including the following policies: 1) Policy 1: Work with local communities to accommodate growth in a flexible, connected and efficient manner. 2) Policy 2: Plan and invest in multi -modal transportation choices, based on the full range of costs and benefits, to slow the growth of congestion and serve the region's economic needs. 3) Policy 3: Encourage expanded choices in housing location and types, and improved access to jobs and opportunities. 4) Policy 4: Work with local and regional partners to reclaim, conserve, protect and enhance the region's vital natural resources. The City has prepared a plan that responds to community goals and to the Met Council's strategies for developing communities, as outlined in the Regional Development Framework. Lino 3 -27 WS — Item 4 WORK SESSION STAFF REPORT Work Session Item 4 Date: Council Work Session, October 4, 2010 To: City Council From: Michael Grochala Re: Storm Water Utility Ordinance Background At the September 7, city council work session, the council requested further discussion on the proposed storm water utility and directed staff to prepare a more detailed budget. A copy of the existing budget line items and the proposed storm water utility budget is attached. Council Direction Staff is requesting council direction regarding further consideration of the utility. Attachments 1. Storm Water Utility/ General Fund Budget 1 CITY OF LINO LAKES STORM WATER UTILITY (603 -) BUDGET DETAIL Object Code 4101 -000 Salaries 10% of Street Superintendent 15% of Environmental Coordinator 35% of Natural Resources Specialist 85% of General Maintenance Worker 4211 -000 Maintenance Supplies Materials /Misc Supplies Currently Budgeted in Account: 101 - 430 -4101 101- 461 -4101 101 - 461 -4101 101- 430 -4101 2010 2011 79,783 79,783 101- 461 -4211 500 20,000 4300 -000 Professional Services 4304 -000 Municipal Engineer - General Engineering 101 - 417 -4410 4330 -000 Travel & Tuition 101 - 461 -4330 4340 -000 Printing & Publishing Public Education Materials /Misc Supplies 45,000 60,000 1,000 1,000 9,000 4410 -000 Contracted Services 101 - 430 -4410 30,000 50,000 4421 -000 Contracted Storm System Maint 101 - 430 -4421 125,000 195,000 (Annual SWMP includes $18,000 Project Engineering) 4910 -000 Operating Transfers - 57,500 Annual Equipment Replacement 5000 -000 Capital Outlay 1 STORM WATER UTILITY (603 -) Description CITY OF LINO LAKES Object Budget Requested Adopted Increase/ Code 2010 2011 2011 Decrease PERSONAL SERVICES SALARIES 4101 -000 79,783 79,783 OVERTIME 4102 -000 0 0 ON CALL 4105 -000 0 0 TEMPORARIES 4106 -000 0 0 WELLNESS PROGRAM 4108 -000 0 0 PERA 4121 -000 5,784 5,784 FICA/MEDICARE 4122 -000 6,103 6,103 ICMA EMPLOYER 4123 -000 0 0 HEALTH INSURANCE 4131 -000 11,014 11,014 LIFE & DISABILITY INSURANCE 4133 -000 337 337 DENTAL INSURANCE 4134 -000 696 696 REEMPLOYMENT INSURANCE 4141 -000 0 0 WORKER'S COMPENSATION 4151 -000 5,929 5,929 109,646 109,646 SUPPLIES OFFICE SUPPLIES 4200 -000 0 0 MAINTENANCE SUPPLIES 4211 -000 500 20,000 SMALL TOOLS 4240 -000 0 0 500 20,000 OTHER SERVICES AND CHARGES PROFESSIONAL SERVICES 4300 -000 0 0 MUNICIPAL ENGINEER 4304 -000 45,000 60,000 TELEPHONE 4321 -000 0 0 POSTAGE 4322 -000 0 0 TRAVEL & TUITION 4330 -000 1,000 1,000 PRINTING & PUBLISHING 4340 -000 0 9,000 INSURANCE 4360 -000 0 0 AUTO INSURANCE 4363 -000 0 0 UNIFORMS 4370 -000 0 0 ELECTRICITY 4381 -000 0 0 UTILITIES (WATER /SEWER) 4382 -000 0 0 HEAT 4383 -000 0 0 RENTED EQUIPMENT 4415 -000 0 0 SUBSCRIPTIONS & DUES 4452 -000 0 0 46,000 70,000 CONTRACTUAL SERVICES CONTRACTED SERVICES 4410 -000 CONTRACTED STORM SYSTEM MAINT 4421 -000 OTHER OPERATING TRANSFERS CAPITAL OUTLAY EQUIPMENT TOTAL STORM WATER FUND 30,000 125,000 155,000 50,000 195,000 245,000 4910 -000 0 57,500 0 0 0 0 0 57,500 0 5000 -000 0 0 2 0 311,146 311,146 0 502,146 502,146 0 0 0 WS — Item 6 WORK SESSION STAFF REPORT Work Session Item #6 Date: October 4, 2010 To: City Council From: Julie Bartell, City Clerk Re: Odd Year Elections Background Chapter 4.01 of the Lino Lakes City Charter establishes that "A regular municipal election shall be held on the first Tuesday after the first Monday in November of each odd numbered year...". The rationale for holding a municipal election exclusive of the even - year state and federal level elections is not clearly stated in the city's records. Costs. The proposed budget for the city's cost of the 2011 election is $14,060. A change to even year would save that bi- yearly expense in its entirety. A change would also mean that the staff time devoted to elections during those odd years could be directed to other work. Charter Amendment. A change to the election year would require an amendment to the city charter. The amendment process is governed by state statute which provides more than one method by which a home rule charter can be amended: 1) Petition — a petition meeting the requirements of state law can be submitted by citizens and the question would be brought to the voters; 2) Amendment proposed by the council — the council may propose an amendment by ordinance and, after review by the charter commission, may present it to the voters; 3) Upon receiving a recommendation from the charter commission, the council may enact a charter amendment by ordinance with an affirmative vote of all council members (with a post approval waiting period of 90 days). Terms of Office. Any change to the municipal election year would obviously result in a question regarding the terms of office for the council members and mayor. Changing the election year may result in either the addition or loss of one year to the terms, possibly impacting both sitting council members and those individuals who are up for election/reelection. Requested Council Direction Staff is presenting the idea of pursuing a change to the city's current practice of odd -year municipal elections as a possible cost savings and efficiency measure and requests direction from the council regarding your interest. If the interest is present, the council should discuss the form of charter amendment that could be pursued. Staff would then be able to put together a possible schedule for either a council vote or inclusion of a question on the 2011 ballot. WS — Item 7 WORK SESSION STAFF REPORT Work Session Item #7 Date: October 4, 2010 To: City Council From: Julie Bartell Re: December Council Schedule Background The council has sometimes chosen to change the city council meeting schedule in December due to the holiday season. The December council meetings are currently scheduled for December 13 and 27. Requested Council Direction If the council wishes to change any meetings in December, staff requests that the date be determined so that proper notice and staff preparations can occur. Attachment(s) 2010 City Council Meeting Calendar 1 Lino Lakes City Council - 2010 Meeting Calendar = City Council Meeting, 6:30 p.m. (2 "d & 4th Monday), Council Chambers = Council Work Session, 5:30 p.m. (1St Monday), Community Room = Work Session, 5:30 p.m.; Council Meeting, 6:30 p.m. (4th Monday), Council Chambers = Packets for Work Session and /or Council Meeting are distributed January 14 15 16 22 23 29 30 April February Ma March June 11 12 13 14 15 July October August Tu We Th Fr 3 4 5 6 0 11 12 ..............12........_13 14 17 , 19 20 21 24 26 27 28 November 13 14 1516 23 30 7 1415 16 21 28 29 30 3 Th 4 r 9 10 11 12 13 18 19 20 27 23 24 September December 16 17 18 23 25 30 c -trot. b u -66x0 `lLC k. Se ss t 6'n 10 / 2110 • Other 2011 Budget Requests Requested Budgeted Charter Commission $ 6,745 $ 1,500 Alexandra House 11,148 Anoka Co. Mediation Services 2,171 Totals $ 20,064 $ 1,500 • • • August 9, 2010 The Honorable Mayor Reinert Council member Kathi Gallop Council member Jeff O'Donnell Council member Dave Roeser Council member Rob Rafferty Julie Bartell, City Clerk Dan Tesch, Acting City Administrator Subject: Charter Commission 2011 Budget Dear Mayor Reinert, Please accept the attached Charter Commission 2011 budget for consideration and approval by the City Council. The Commission has used budget detail item numbers based on previous budgets. Also, the budget workbook shows historical Commission budgets and actual expenses. • Finally, justification for each budget item is included in the item detail notation. • The City has the authority to allocate more funds than the State minimum for the Charter Commission to effectively manage its business. It is the opinion of the Charter Commission that this budget represents a fair and accurate accounting of the Charter Commission needs for the year 2011. Cordially, Caroline Dahl, Chair Lino Lakes Charter Commission Enclosures 2 • • CITY OF LINO LAKES Budget History w E • 8 N immo O 0 O 0 0 0 O O 0 O 0 O O O O O 0 O O 0 O O O O o o o O 0 O O 0) O (5 (0 C (7 N ffl 63. 64 s, 63 64 64 6S- "a5 O g) C -6 2) a) N O E 0 0 0 0 0 0 O O O O O O O O O O O O O O O O O O O o o o o O D) h (0 O N N • (0 N M (0 r O r 0) co co co N er co O co n O (D CO 0 • CO O CO •- 0 (n O CO N M • CO r- M N (n co M ,— 0) r r 69. 69 64 69 69 691 69 64 69 69 69 69 69 69 69 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 • O O O O O O O O O O O O O O O m O) M 4 O O M O 4. O M N N O r M C (0 60 ' D) 0 (n co 0) N. O (b CD O (I) M M O CO O O W (C) M M W 0 .7 CO CO X U) C■ I- r- N r- N CO (f) N W To 7 0 Q a) Amended Bud 69 69 64 69 69 69 64 E9 69- 69 614 69 69 69 64 0 0 0 0 0 0 0 O 0 0 0 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O U) O O O co co O O O O 0 O O u) h (n O O N N O I - It 0 eF CD (n to CO C ' N- N e!' et () CO (O U) N 0) N r r e- N- (n N 69 69 69 E9 69 69. 69 64 69 69- 64 69 69 69- 69 0 O 0 O 0 0 0 O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 c 6 0 0 0 0 0 0 (ri 6 0 0 a) in u _ ) ) 0 0 0 0 0 0 0 (n N. 0 0 0 N N O 1- N. O er (O U) (n co_ O N r N O eY (0 CO (D (f) N M N 1- r r- N 4) (. 7 m TS a) 0 a Q 69 69 69 69 64 69 69 69- 64 69 69 69 69 69 69 to Co h c0 0) O N 0) et ([) C0 I- (n C) a) 0) 01 0) 0) 0) 0 O 0 O 0 O 0 O 0 0 i 0) 0) m 0) 0) 0 (0 0 O 0 0 0 0 N O CS/ • • • Budget Detail for 2011 N 0) W F 0 z U 720.00 Currently performed by a non -paid Commissioner Advice, input, research for ongoing Charter issues 0 a3 c 0. cu o O. N aa, O N N C ▪ 0 m U o ?? d c o C w a) E • o > E .4) U O O E c r c O 0 -0 O V`o pia • E0 0) — 16 a m U g c c w- 0 CO O O. m Ln • >,Eo a) o As required, public notices in official publications O O O O O O O O O O (() O O O h N O N t,- 1n (R IA /A E9 iR 4300 -000 Professional Services O O O Ea U m 0 O L 5 O d) 0) c m E 0 a) a 0 _ N t 7 c D1 N C a) c E • 0 N co • O N LL c O 0 d 0 O O O O O O O O O O r er O N m U) E m Q m O T0c • (a c N O C m aLL O O O 0 O S m L c U) O y m • E 0° N c 0 O m E (6 co m L U m 340 -000 Printing & Publishing 4322 -000 Postage O 0 O r) City Authorization for Charter Commission Expenses M The members of such commission shall receive no compensation, but the commission may employ an attorney and other personnel to assist in framing such charter, and any amendment or revision thereof, and the reasonable compensation N a N w >, co 5 To c N y co w E m U T •O E O c L O c m H c f0 p 0 E E m ° N E N - •c m C U O 7 CO m c a E .0 O L.+ tOn (a H >. 0) N d U as m O w [0 L O C ct m O ›, .c • 'O O 4) m C N 0 N 0 CO O 0) T C O m XX C L a) c O 3 ~ O C in O. _ > N O C .V N a) to m L E U 'O a 0 U E X c co U w N O a) >. r O L m c U y O t 0 > _ m (a • N 0. U 0 U authorize such additional charter commission expenses as it deems necessary. Other statutory and charter provisions requiring budgeting of, or limiting, expenditures do not apply to charter commission expenses. The council may levy a tax in excess of charter tax limitations to pay such expenses. HIST: (1270) RL s 750; 1907 c 216 s 1; 1947 c 406 s 1; 1959 c ✓ CO LO 0 LO U 0)) O) 0 t (a CO se- 1,- 0) N W O O U co rn U) CO CO O • Alexandra • • ■ Working to end domestic H and sexual violence. ouse April 30, 2010 Daniel Tesch, Interim City Manager City of Lino Lakes 600 Town Center Pky Lino Lakes, MN 55014 Dear Mr. Tesch: : 763 - 780 -2332 r `t : 763 - 780 -2330 763- 780 -9696 www.AlexandraHouse.org P.O. Box 4903.9 Blaine, MN 55449 -0039 V14\S vLi) Alexandra House respectfully requests that the City of Lino Lakes allocate $11,148.00 to support services provided to Lino Lakes residents by the Alexandra House Community Program. Each year, Alexandra House assists and supports Lino Lakes residents who are victims of domestic and sexual violence in multiple ways. Our services not only help them work through their immediate crisis and safety needs, but assist them in moving beyond the abuse to achieve long -term safety. Community Program services include safety planning, assistance in filing protection orders, legal representation during protection order proceedings, crime victim advocacy immediately following a domestic or sexual assault and throughout the criminal court process, advocacy and support provided to patients at Mercy and Unity Hospitals and clinics, support groups, legal clinics, information and referral services and follow -up /outreach services. In 2009 a total of 28,092 advocacy and support services were provided to victims of domestic and sexual violence by our Community Program. Of those services, Lino Lakes residents received 1,528 or 4% of total services. Attached please find a budget that details a three -year average of services provided to Lino Lakes residents, the total cost of providing those services, and the portion of those costs we are requesting the City of Lino Lakes financially support. Domestic violence, dating violence, sexual assault, and stalking are serious crimes that impact the public health and safety of every community in this country. Studies indicate that more than three million women in the United States become victims of domestic violence each year. Young women ages 16 -24 are disproportionately affected, as they experience the highest rates of relationship violence, according to a May 2001 Department of Justice report. On average, almost 500 women are raped or sexually assaulted each day in this country. In 2005, over 61,000 Minnesota residents were sexually assaulted. • • • Domestic and sexual violence are serious crimes that impact the public health and safety of every community in this country. Research shows a well- coordinated and multidisciplinary approach is one of the most effective means of reducing domestic and sexual violence. Alexandra House partners with nearly all law enforcement agencies in the county, including the Lino Lakes Police Department along with city and county prosecutors, to achieve this type of multidisciplinary response that holds offenders accountable, ensures victim safety, and ultimately, works to reduce the incidence of these crimes of violence in Lino Lakes. Domestic violence is a public health and safety issue, and we believe local government has a role to play in assisting victims of domestic and sexual violence live in a safe environment. In 2008, law enforcement, probation, and court costs to arrest and process domestic violence abusers cost Anoka County approximately $3,392,404. The funds we are requesting from Lino Lakes, as well as from each city in the county, help victims and their children transition to a life free from violence and fear. Given the state of our economy, we, along with local government and many others, have faced challenges in ensuring those who most need our help are able to access it, particularly those who are seeking safety and struggling to maintain stability. Lino Lakes' financial support in 2010 was greatly appreciated. Your financial support coupled with a financial commitment on the part of many municipalities, allowed us to continue providing critical services to victims of domestic and sexual violence. Should you have any questions regarding this request, please do not hesitate to contact me. I would be pleased to attend a city council meeting to further discuss this funding request and respond to any questions you may have. Thank you very much for your consideration. Sincerely, —1 l Connie Moore Executive Director Cc: Jeff Reinert, Mayor David Pecchia, Police Chief City Council Members: Jeff O'Donnell Dave Roeser Rob Rafferty Kathi Gallup • ALEXANDRA HOUSE, INC. City of Lino Lakes Services Provided Services Provided in 2009 Protection Order Filings 10 Civil Legal Information Advocacy 278 Child Support Advocacy 17 Civil Court Hearings 15 Crisis Line 219 Legal Representation on OFP's 10 Family Law Info Sessions / Legal Clinics 1 Arrest/Non- Arrest Victim Follow up 46 Criminal Court Information & Advocacy 552 Criminal Court Hearings Attended 45 Community Support Groups 3 Safety Planning 92 Follow Up Support and Advocacy 49 VP - One on One Teen Advocacy 16 VP - Teen Support Groups 45 VP - Choose Respect Program 26 VP - Presentations 101 VP - Lino Lakes Juvenile Shelter Group 1 Interpreters 1 Hospital Advocacy 1 TOTAL 1,528 Budget 1 -1 -2011 to 12 -31 -2011 Amount Total services provided by Alexandra House, Inc. Community Program (3 year average) 27,392 3 Year average of services provided to City of Lino Lakes 1168 City of Lino Lakes percent of total services provided 4% 2011 Community Program Budget $ 747,000 Amount charged to City of Lino Lakes $ 31,852 Amount paid by other sources $ 20,704 REQUEST AMOUNT $ 11,148 • • • May 27, 2010 Gordon Heitke City of Lino Lakes 600 Town Center Pkwy Lino Lakes, MN 55014 Dear Gordon: Mediation Services for Anoka County Creates Peaceful Solutions I am again requesting that you include Mediation Services in your 2011 City of Lino Lakes budget to provide professional dispute resolution services, referral, and conflict resolution education to your community as you have in the past. This amount of this request is $2171.00, which has remained unchanged since 2008. Our own budget has been trimmed in reaction to state and other funding cuts, but this request is critical to maintaining our quality services for your community. Mediation Services for Anoka County, a non profit organization utilizing trained and supervised volunteer mediators, celebrates 23 years of providing free or low cost conflict resolution services to your community. In 2010 our agency did the following for your residents: 7 Students in the Peaceful Alternatives Class 2 Shared Parenting Cases 3 Community Cases 7 Restorative Justice Cases 289 Information and Referral Cases 308 Total city residents served (Cost of potential litigation would be a very expensive alternative.) Please contact me at 763 - 422 -8878 if you have any questions or visit our updated website: www.mediationservice.org. I am also available to attend a budget or township council meeting and explain our services and referral process. You are also welcome to visit our agency. We're here to serve you and hope you make use of MSAC as a resource to help your residents create peaceful solutions to conflict. Sincerely, Kathi Jen Executive Director kathieamediationservice.org 2520 Coon Rapids Blvd. Suite 100 Coon Rapids, MN 55433 phone: 763 -422 -8878 fax: 763 - 422 -0808 www.mediationservice.org A United Way Community Partner CD 2 2 CD 3 0 \ \ m/ cn FiJITuf?OOJV s m G) o E. co o 0 z o z m 0 0 CU CD v C CD C") 5 O co a 3 co ;uawdolanaa Riiunwwoo TuewdoleAecl C cn CD CD cn CD cn sio ;an gsui ao.►oj Jo asn pue suuBa.it3 vi �z of CD Pi, CD b 0 O co 0 UOSJanIPH ui pd c7 H Fj VI FIT y d ( CD 0 m o 4 C, 0 0 cn =° g y vo 0 CD N cn Co y a ac CD cD M CD Pd g m 0 c 0 a CD NN < n • v� CD Ro 0 CD 03i1od saILj Olin 6002 'Jag w amp N a2:1vO8 N21Vd -Q - at) CJ4 a) 0 x a, �. rnm E = 3 > L/ z K xm. CD < m0 N N o Z O O r (D � D m CD GI mm m CD n Z v F). 1 m m ( m = co 3 -0 I- 5'o xi0 0_ o rn0 (D m Z X. 1-5 rt N Q eL (. 0 0 0 0 —h cal n aJ Q4 (D • • • 2010 Budget Forecast Through 9/30/10 Revenues Favorable/ (Unfavorable) Taxes $ (23,834) Prop Taxes $ (150,000) Excess Tax Increment - Dist 1 -9 126,166 Licenses & Permits (91,879) Liquor Licenses 4,276 Contractors Licenses (7,000) Other Licenses 345 Lodging Tax 38,000 Building /Constrution Permits (125,000) Other Permits (2,500) Intergovernmental 14,152 MSA 17,652 Police State Aid (3,500) Charges for Service (30,000) (30,000) Fines /Forfeits (10,000) (10,000) Interest Income (35,000) (35,000) Miscellaneous (18,000) Cable TV 2,000 Centennial Gas (20,000) Operating Transfers (50,000) (50,000) Total Revenues $ (244,561) • • 2010 Budget Forecast Through 9/30/10 Expenditures Favorable/ (Unfavorable) Mayor /Council $ (5,000) Pers Svcs 8,000 Prof Svcs (13,000) Admin 119,000 Pers Svcs 108,000 Prof Svcs 10,000 Contractual 1,000 Elections 5,000 5,000 Cable TV 500 500 Charter - Seniors 3,000 3,000 Finance 5,727 Pers Svcs 20,000 Supplies Prof Svcs 2,000 Contractual (16,273) Legal (5,000) (5,000) Econ Dev (36,100) Marketing - Lodging Tax (36,100) Planning /Zoning (15,000) Services 5,000 Contractual (20,000) Engineering 50,000 Contractual 50,000 Comm Dev 1,000 Prof Svcs 1,000 Environmental 5,000 Pers Svcs 3,000 Other 2,000 • • • 2010 Budget Forecast Through 9/30/10 Favorable/ (Unfavorable) Solid Waste 1,000 Pers Svcs 1,000 Forestry 6,500 Pers Svcs 1,500 Other 5,000 Bldg Insp 22,000 Pers Svcs 20,000 Other 2,000 Police 210,000 Pers Svcs 210,000 Fire Streets 10,000 Pers Svcs 5,000 Supplies 15,000 Services (10,000) Fleet 100,000 Pers Svcs (5,000) Supplies 95,000 Prof Svcs 10,000 Govt Bldgs 52,500 Pers Svcs 12,500 Supplies 10,000 Prof Svcs 30,000 Parks 9,000 Supplies 4,000 Services 5,000 Recreation (5,000) Pers Svcs (5,000) Contingency 74,351 74,351 Total Expenditures $ 608,478 Total Forecast Budget Surplus /(Deficit) $ 363,917 • • Tax Levy Recap: 2011 Preliminary Tax Levy as Proposed 2011 Adopted Preliminary Tax Levy Budget Adjustments Needed to Balance 2011 Budget Department Director's Proposed 2011 Budget Cuts: $ 9,182, 376 8,660,000 $ 522,376 Revised Eliminate Public Works Superintendent (Retirement) $ (109,263) Eliminate Natural Resource Specialist (Eliminate) (69,625) Create Streets Supervisor 90,822 Add - Two Seasonal Positions 15,000 Eliminate Senior Coordinator (Retirement) (34,779) Two - Patrol Officers (Vacant) (175,186) CSO (Vacant) (21,477) Fund Balance Reserve from 2010 Budget (100,000) Capital Equipment Levy Reduction (100,000) Energy Savings - Building Retrofits (10,000) Health Insurance* (57,723) $ (572,231) *Health Insurance Reduction 2011 Budget $ 749,870 2010 Budget (648,321) Eliminated/Vacant Positions (43,826) IITotal Health Insurance Reduction $ 57,723 • • rums' 0 (3- Z 0 0 z 0 u_ • 00 00 0 00 (.0 71- 71- cirt rfl Sind 1V101 CU v.) 0 0. 0 3- • • i 0 0 0 0 0 0 O 0 L() M rl Q) iN Lri M ri M M M N N N N N S,313 1V101 0 N 0 0 N 01 0 0 N 00 O 0 N 0 0 N Ln 0 0 (-.1 0 0 N M 0 0 N N 0 0 N c-I 0 0 N • • • J 1- 0 1- t1 W J 0 2 J O 1- V 0 Ln O Ln I� LD lD Ln 5,313 1VI01 a, 0 a N p L tl 0 0 N 01 O O 00 O 0 N N 0 0 N 0 O LJJ N 0 0 N 0 0 0 0 N O O N c-I O 0 o � N Th Budget Detail for 2011 N w 0 z Object Code Currently performed by a non -paid Commissioner 0 0 0 N n fH Professional Services a a)0 ,_ o U T 0 .0 rn a) c E . o_ rn m do c C - o C w m o g O E L H U .f0 o E «, c' a) o O -o o o o m ma Q .c _ 'O p� 0 ti C U 0 a a) co > a) T E -o N c as 0 Q 0 0 0 0 0 N As required, public notices in official publications o o 0 O O 0 o ui o o N O N 1- 4A. V! O 0. 0 0 N w O 5 O O CD o h a M 7 d3 CO v L O O U 0 0 ca O O O ti O 0 0 0 Cr 00 (Ii y} N O) C O f0 L U 0 O 0 0 U a E O co CL C O O 0 F 0 ya N _ as w + 0 C 07 .c N G co o) a) . c c E a y o cu m v°), °) a aci CO 3 i E a a) 0 ft O) of ED. O a!S o Z c 0 RS Z m 0 j 0 C C N 0 cf) 16 LL < O U. iL 0. J X O o O 0 O 0 O 4 0 N 9 M 2 CO co Cl co d d V vY co co t U 0 M O C a) T E C O as O f6 C C 0 N T 0 6 0 O r 2 E L _ 0 U CY CO O T L `o (6 E N a) O C 0) (0p .N O C N_ a E E ' ca m o E .0 E .c U 0 U 0 .O a) p j O a i� N o .613 o c RS m O O 0 N 0 0 E ac !O O a) 9 +. 11 0 O I amendment or revision thereof, and the reasonable compensation ‘-5 U a)( E m w ` O A` U 4= TI't. 2" 03 O1 .0000 pi o C >' 0 N'. N I O a) o p (p E O O L C i C '�: C cos) O 'Vl C V O 7. 0 p O. >' c ' mE E `c° o is> 2 i c a,,_ m E ax v T O 0 N O. 'c DI c L @ a) O L 7 U a5 0 C L E 0_ 0 a C; U W .- O w N _ N w E 72 N!. N T CO N N y 0 .0 E 0. 1L- a D .L... 0 , o N co 0 o L'- L 0 0 m! N7, ) 0 U ` C co 0 O C 0, F. W, C 0 N. 0 cLi o o w a) c..) c .0 :°.'' E ai CO rn 0 c c o y_ o.! a) w m fl o o m', a`) o y O C T c Li _ N m -0 a) c o o j o c ∎_ 0 C L h C O O '1;::) L'6 "6 �.'�I W Li C OO' N to = ', U a) .S E 8 U � ; .n o 12 co w a) o x o w caii 2 v�v m 0 L' 0 0 0 w 0' C C) 0 o c o Y 0 I N C U N ', E C N O F- '.') ■ > 'C � f06 O' 0 S O co C 0. 0 0 U m 'C ° 0 ° 0 ss CITY OF LINO LAKES x 0 Budget History o 0 O 0 o 0 o o o o 0 • Amended Budget • Actual Expenses 0 0 O 0 ti H 0 0 0 8 a 0 0 v .ri 0 0 0 0 ti 2005 2006 1998 1999 2000 2001 2002 2003 200 O 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 O 0 O O O O O 0 O O O 0 O O N (O O CN- N st (O N M CO N O 1� M co co 10 N ,ct (O 0 co 1. v O (0 co 0 co O) c0 N 6) O co N M • O M N 10 (n M M Eft Ea- Ea- EA Eft Eft Eft El, Ea- Eft Ea- Ea- Ea- Ea- Eft En 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 tc m M 1- O o0 (0 V aD M 0 (Ni O (0 0 C co co 0 O 0) 0 co O N O co (0 0 fU co co O co O co O co � co co co O M CO CO LS N N c.. N M (n N W o Amended Bud Eft Eft Eft Ea- Eft EA Eft Eft Eft Eft EA Eft Eft Ea- Eft 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 r O 0 0 _0 0 0 0 0 0 0 0 (Ei o 0 o 0 (C) in O O o 0 o 0 0 O N In o o N N O N N 0 V (O (n (n CO CO et N N tA V V (n (O (O (n N M N ,- r .- N U7 N Eft Eft Eft EA Eft Eft Eft Eft CO Eft Eft Eft Eft Eft Eft O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O ^-) O O O O O O O O O O O (n O O O 0 4) O M 0 0 0 0 0 0 0 (n N 0 O 0 N N 0 N N 0 MI (O (n (n CO CO N N CV ✓ 'D V (n (n O (n N M N T .- T N (n N 7 m 0 0 D Q Ea- Eft Eft Eft Ea- Eft fa- Eft 69- Eft Eft Eft Eft Eft Eft • 01 01 N N N N N N N N tV s I-U r Yet! 1-(5// tD # Lino Lake Minnesota (77 Employee) HSA type Plan Monthly - Plan Cost Monthly - Employee Contribution Monthly - City Contrib. to Sev. Account CURRENT POLICY Monthly - City Contribution 2 Single - ($3,000 deductible) $338.16 $338.16 $0.00 $62.50 19 Family - ($6,000 deductible) $949.61 $880.33 $6928 $125.00 # 25/80 type Plan Monthly - Plan Cost Monthly • City Contribution Monthly - Employee Contribution 28 Single $549.96 $549.96 $0.00 10 Family $1,542.79 $1,01823 8524.58 # Option Waived Monthly - Plan Cost Monthly - City Contribution Total Annual- HSA Single Policy $9,615.84 Annual - HSA Family Policy $229215.24 Annual - 25/80% Single Policy $171.887.52 20 Employee - Opts out $507.88 Annual - 25/80% Family Poicy $122,187.60 Annual- Option Waived $121,89120 Total $654.497.40 # Lino Lake Minnesota (77 Employee) HSA type Plan Monthly - Plan Cost Monthly - Employee Contribution Monthly - City Contrib. to Say. Account HSA ONLY POLICY Monthly - City Contribution 28 Single - ($3,000 deductable) $338.18 $338.16 $0.00 $62.50 29 Family - ($6,000 deductable) $949.61 $880.33 $69.28 $125.00 # Option Waived Monthly - Plan Cost Monthly - City Contribution Annual - HSA Single Policy $134.621.76 20 Employee - Opts out $288.62 Annual - HSA Family Poky $349.854.84 _ Annual - Option Waived $69.268.80 Total $553,745.40 Lino Lake Minnesota. (77 Employee) 25/80 type Plan Monthly - Plan Cost 25180 ONLY POLICY Monthly - City Contribution Monthly - Employee Contribution 28 Si $549.96 $549.98 $0.00 29 Family $1,542.79 $1,018.23 $524.56 2 Option Waived Employee - Opts out Monthly - Plan Cost Monthly - City Contribution Annual 25/80% Single Policy $184,786.5 $507.88 Annual - 25/80% Family Policy Annual - Option Waived $354.344.04 $121,891.20 $651.021.80 • City of Lino Lakes COMMUNITY DEVELOPMENT DEPARTMENT FUNCTIONAL OVERVIEW • 10/15/2010 • Wk. Scssj�c� to 1Zi��o COMMUNITY DEVELOPMENT DEPARTMENT The Community Development Department is responsible for providing services in the areas of Planning and Zoning, Building and Inspections, Economic Development, Engineering, Environment, Forestry, and Solid Waste. The goal of these functions is to promote livability and economic vitality for Lino Lakes residents and businesses, as well as preserve and enhance the city's natural environment. Under the coordination of the Community Development Director, this department's role includes both long -range and short-range planning to manage growth and provide adequate infrastructure. Staff responsibilities are often interconnected and interdependent, particularly in the following areas: CUSTOMER SERVICE A key component of this department is responding to public inquiries over a broad range of topics regarding city regulations and operations. Requests for information regarding city properties and land use are administered through Community Development. Property inquiries often require a review of historical, existing and proposed property information including but not limited to zoning, land use, floodplain, permits, ownership, conforming and non - conforming uses and accessory uses, permitted uses, conditional uses, buildings, development and performance agreements, fees and escrow information. • ADVISORY TO CITY COUNCIL Staff attends City Council meetings and work sessions to provide technical expertise regarding all Community Development related activities. Staff responds to City Council directives and initiatives, provides education and research, and creates reports to present applicable materials and relevant information to enable the City Council to make informed decisions. Staff makes recommendations to the City Council based on applicable state law, city ordinances, city code, and policy. • ADVISORY TO BOARDS AND COMMITTEES Staff acts as a liaison to the City Council by attending advisory board meetings, task forces, public open houses and special committee meetings. Agendas and reports are prepared for the Environmental Board, Planning and Zoning Board, and Economic Development Advisory Committee. Staff presents applicable materials and relevant information for review. Staff transcribes and maintains meeting minutes of advisory boards as required by law. CAPITAL IMPROVEMENT PROGRAMMING The Capital Improvement Program (CIP) brings together plans for capital expenditures for the city's streets, water system, sanitary sewer system, and water resources. The CIP is generated by the Community Development Department. Although the CIP outlines projects for the next five years, each project needs specific review and approval from the City Council. The CIP is reviewed and updated annually. 2 • CITY -OWNED PROPERTY MANAGEMENT The Community Development Department is responsible for tracking and maintaining property data including right -of -way, easements, public use properties, property tax exemptions, and other miscellaneous recorded documentation pertaining to specific parcels. Annual reports are processed through this department. PROJECT MANAGEMENT Ongoing development projects are administered through Community Development. Staff responsibility includes ensuring that all phases of projects adhere to regulations and that all fees associated with projects are collected and accounted for. Development Agreements and Stormwater Maintenance Agreements are prepared and implemented. Escrow accounts are established and remain open until staff determines that all conditions and improvements have been completed. MAPPING City maps are updated and maintained through the Community Development Department. Maps that are available to the public include Parcel and Street City Map, School District Map, Voting Precinct Map, Zoning Map, Land Use Maps, and Comprehensive Plan Maps. Communication with Anoka County and other jurisdictions is necessary to keep information up to date. RECORD RETENTION • Staff is responsible for maintaining a record retention system that provides for access to property data for future use and reference. Effective organization and storage of plans, documents, applications, and permit and licensing information is essential when making decisions regarding land use and development as well as construction, maintenance, and capital improvement projects. Electronic filing is used to expedite access to historical information. • TECHNOLOGY Implementing and improving technology is an ongoing effort to efficiently manage property information by use of tools such as the Geographic Information System (GIS), web -based management systems, and permit tracking systems. GRANTS Staff makes application for a variety of grants that are available to cities for infrastructure development, land use development, solid waste and recycling, planning, engineering and design. 3 • PLANNING AND ZONING Overview: Planning staff oversees all land development within the city. Staff prepares and implements the city's Comprehensive Plan, which guides land use, zoning, sewer extension, transportation, and community facility improvements or anticipated changes to carry out the vision for the community's future. Staff advises the Planning & Zoning Board and City Council on all planning and land use issues. The planning division reviews plats and other land subdivisions, site plans for commercial and industrial buildings, rezoning requests, variances, conditional use permits, and other land use issues. Essential Functions include: CUSTOMER SERVICE A key component of this department is providing assistance to the public regarding land use, zoning, flood plain, and development inquiries. Staff is responsible for interpreting codes and regulations to provide accurate and updated information to residents, developers, realtors, assessors, and the general public. Counsel is provided in person at city hall as well as by phone, email and the city website. Prompt and accurate response to inquiries is essential to ensure the health and welfare of the residents, businesses and visitors of our community. Staff is responsible for responding to complaints and nuisance issues in an effective and timely manner. 41/ LONG RANGE PLANNING Staff provides long range planning assistance to establish goals and priorities for the City. The city's Comprehensive Plan is coordinated through this department. Staff responsibilities include maintaining and updating all components of the plan including Land Use, Housing, Natural Resources, Economic Development, Parks, Surface Water Management, Water and Sanitary Sewer, Transportation and Community Facilities. Staff insures that city initiatives, policies and infrastructure improvements are consistent with the Comprehensive Plan. • SHORT RANGE PLANNING Staff undertakes projects that are initiated by advisory boards and/or city council to address implementation of the comprehensive plan, changes in state law, or city policy changes. These projects include, but are not limited to, ordinance amendments, special reports, and small area master plans. CODE ADMINISTRATION/ENFORCEMENT Staff oversees the implementation of the Comprehensive Plan through the administration of "Official Controls" These controls include chapters of the City Code including Zoning, Subdivision, Floodplain, Signage, and Shoreland Management. Staff is responsible for keeping the codes updated and in conformance with state law and the city's comprehensive plan. Planning staff serves as the primary personnel for code enforcement activities. These activities include complaint response, code interpretation, conflict resolution, and enforcement action. 4 • • Staff coordinates enforcement activities with the building inspection department, public safety and city attorney. INTERGOVERNMENTAL COORDINATION Planning staff is responsible for reviewing planning studies, reports and projects prepared by adjacent jurisdictions including towns, cities, counties, watershed districts, Metropolitan Council, state and federal government to address compatibility with local, state, regional and federal plans and policies. Staff also works in cooperation with jurisdictions such as Anoka County and the Rice Creek Watershed District to prepare special planning and feasibility studies in areas of joint interest. Staff also provides the public with development assistance when intergovernmental coordination is required. DATA TRACKING Staff tracks growth and maintains data regarding floodplain information, U.S. Census and demographics, platting, geographic data, and permitting data. Staff coordinates with other jurisdictions to ensure current and accurate information for residents, appraisers, developers, other city departments, financial institutions and public agencies. LAND USE APPLICATION REVIEW Staff provides pre - application assistance to potential applicants to help guide project design to promote consistency with city policies and goals. Staff reviews all land use applications and submittal documents for plats, planned unit developments, subdivisions, conditional use permits, site plans, variances, comprehensive plan amendments, rezoning, conditional use permits, and interim use permits. Staff may attend neighborhood meetings, informational open houses and multi jurisdictional meetings to facilitate the applicants and /or public's understanding of a process or development. Staff writes detailed findings and makes presentations at Planning & Zoning Board and City Council meetings. CURRENT PROJECTS INCLUDE: • Comprehensive Plan Update • Special Area Management Plan (Army Corps and Rice Creek Watershed District) • CSAH 34 (Birch Street) Corridor Study • Alternative Urban Areawide Review (AUAR) Update • Redevelopment /Underutilized Properties Task Force • Zoning & Subdivision Ordinance Updates • Otter Lake Road Extension Study 5 • • ECONOMIC DEVELOPMENT Overview: Economic Development promotes commercial and industrial development activity within the city to stabilize the city's economic tax base, create jobs, and provide residents with the opportunity to shop locally for goods and services. The department promotes the city and its businesses, works with local businesses and organizations to strengthen the business climate, assists landowners, building owners and developers in marketing vacant commercial and industrial properties, and coordinates the city's incentive program. Essential Functions include: BUSINESS DEVELOPMENT Staff contacts prospective business owners and developers, responds to inquiries, and provides information on city plans, economic development initiatives, available properties, zoning regulations, taxes, and demographics. Staff initiates and attends pre - application meetings with commercial/industrial developers to facilitate and streamline each development process. Staff markets and administrates sale of city -owned properties. PUBLIC RELATIONS Staff serves as representative of the city at functions to maintain communication between the city and business community, and serves on the Board of Directors of the local Quad Area Chamber of Commerce. Staff coordinates the annual business expo, acts as city liaison to Blue Heron Days, and organizes and attends groundbreakings and ribbon cuttings for new business. Staff develops presentations for the promotion of economic development in the city. BUSINESS RETENTION PROGRAM Staff maintains an ongoing dialogue and support for local businesses, building owners, and landlords. Staff provides information to business owners to promote and assist expansion. MARKETING Staff communicates directly with land owners, developers, land brokers and end users regarding economic development opportunities within the city. Staff writes, designs and oversees pre -press production of marketing brochures, packet material, and press releases. Staff provides support to all city departments for effective promotion of city services. CONVENTION AND VISITORS BUREAU Staff serves as city designee to the CVB board of directors. Staff provides input into design and content of marketing material and represents city's interests on Board of Directors. Staff develops and maintains information on CVB's website. Staff meets with non - profit, profits and civic groups to promote opportunities to foster regional events in the city. 6 • • • BUSINESS DATA DEPOSITORY Staff maintains a roster of city businesses and a website of commercial /industrial land and buildings that are for sale or lease. Staff maintains demographic data, census data, and provides data to MNPro and Metro MSP economic development websites. ECONOMIC DEVELOPMENT AUTHORITY (EDA) /EDAC LIASON Staff serves as representative and recording secretary to the Economic Development Advisory Committee (EDAC) and the Economic Development Authority; develops agendas, prepares materials and minutes for presentation to EDAC, EDA and City Council. Staff prepares and coordinates with EDAC the development of its 5 -year Strategic Plan and 1- year action plan and develops strategies to implement those plans. The plans serve as the basis for the City's economic development initiatives. DEVELOPMENT ASSISTANCE PROGRAMS The city offers multiple economic development tools to encourage and attract new business and jobs into the community. Tax Increment Financing (TIF) and tax abatement are two of the financial tools used by the city. Staff negotiates development contracts with commercial and industrial developers, initiates required procedural activities of the Economic Development Authority and City Council, and develops schedules to keep each project on course. Staff coordinates necessary documents for the closing and/or financing of properties. PROGRAM REPORTING Staff monitors businesses for business subsidy compliance and completes annual reports to the Department of Employment and Economic Development. CITY NEWSLETTER Staff coordinates, writes, edits, and designs pre -press production of the City Newsletter. Newsletters are prepared on a quarterly basis. PLANNING ASSISTANCE Staff participates in long -range, short term and master planning projects to work with development interests to design projects that meet the City's commercial/industrial goals. Staff undertakes a number of projects initiated by advisory boards and/or city council to address implementation of the comprehensive plan, changes in state law, or city policy changes. These projects include ordinance amendments and small area master plans. CURRENT PROJECTS INCLUDE: • Legacy Project — researching options and working with banks, brokers and Anoka County to identi.bi opportunities for development of the properties. 7 • • • • Developing and updating marketing materials; identifying priority markets and targeting specific commercial, manufacturing and medical manufacturing companies; assembling contact information and distributing mailings. • Otter Lake Road Extension Study - Working in partnership with local landowners /brokers and Anoka County Transportation planned to begin Phase 1 of Otter Lake Road extension and development of commercial corner on County Road 14. • Coordinating marketing opportunities along I -35E corridor with Connexus Energy and MN Dept of Employment and Economic Development. • Redevelopment /Underutilized Properties Task Force - Staff is working in conjunction with planning staff to inventory non - conforming and blighted properties for use by the EDAC Redevelopment Task Force in considering changes to city policy and ordinances as directed by Council. • Researching development of motorsports facilities and contacting community leaders in cities with existing facilities. 8 • BUILDING AND INSPECTIONS Overview: The Building Department is responsible for safeguarding the public health, safety, and general welfare by reviewing and inspecting all new construction, remodeling and repairs in accordance with the State Building Code and City regulations. Staff issues all construction permits, city contractor licenses and Certificates of Occupancy. The Building staff is also responsible for enforcing sign, nuisance, housing maintenance, rental licensing, and land use ordinances. Essential Functions include: CUSTOMER SERVICE Staff provides information to property owners, contractors, and the general public on building code requirements. Staff offers educational material and conducts educational seminars to assist the general public and enhance the public's knowledge of building requirements. PERMITS Staff issues building permits according to MN State Building Code requirements for new construction, residential and commercial improvement projects, and residential and commercial repair. Permit process includes, application review, plan review, fee calculation, contractor license verification and permit issuance. Building plan review is completed to verify conformance with city and state building requirements. Staff processes all fees and escrows associated with permits and retains escrow money until all building requirements are adhered to. PROTECTIVE INSPECTIONS Inspections are scheduled and performed through this department to ensure that all permitted work is completed according to the state building code, federal and state laws, and city ordinances. Staff is responsible for issuing citations for any building code violations and issuing fees accordingly. SSTS PROGRAM Staff is responsible for processing and administering the Subsurface Sewage Treatment System (SSTS) program. There are approximately 1,900 on -site septic systems in the city that must comply with MN Rules. The public education program includes resident handouts and updated information on the city's website. RENTAL HOUSING The city requires licensing and inspection of all multi - family rental units. Staff is responsible for implementing the licensing process and providing annual inspections of all rental housing units. CODE ENFORCEMENT Staff assists in the administration and enforcement of the city's subdivision, zoning, sign, shoreland, flood plain and nuisance ordinances, and administers and enforces sections of the city code pertaining to rental housing and hazardous buildings. 9 CONTRACTOR LICENSING • Staff reviews contractor licensing prior to conducting work in the city. City issues licenses for all non -state licensed contractors per city code. Applications, fees and submittal documents are processed and licenses are issued through the building department. • • 10 • • • ENGINEERING Overview: Engineering is currently a contracted service that provides input during the planning and construction of development. Staff approves grading, storm water and improvement plans, reviews and approves maps, plats and easements, and responds to customer inquiries. Its major responsibility is to ensure that municipal water, streets, sewers and storm sewers are constructed according to city specifications. Engineering staff manages the city's capital improvement program projects, conducts special studies and investigations, and assists with water resource development. Essential Functions include: PUBLIC IMPROVEMENTS The Engineering Department is responsible for virtually all City public improvement projects. Projects are administered by the department from inception to completion and, in the case of special assessment projects, through assessment. Projects include all publicly owned facilities including sanitary sewer, storm sewer, water main, wells, water treatment, streets, park development, sidewalks and trails. The department administers the construction contracts and inspects to ensure the projects are constructed in accordance with city specifications. The department also provides inspection services for all developer installed public improvements. PLAN REVIEW Staff assists with review of land use applications to ensure that all infrastructure requirements are being met. Staff may attend neighborhood meetings, informational open houses and multi - jurisdictional meetings to facilitate the applicants and/or public's understanding of a process or development. Staff thoroughly reviews proposed development and writes detailed findings; makes presentations at Planning & Zoning Board and City Council meetings INTERAGENCY COORDINATION The Engineering Department coordinates with many Federal, State, County, other local agencies and other city departments in areas related to transportation, utilities, watershed management, pollution and the environment. 11 • ENVIRONMENT /FORESTRY /SOLID WASTE Overview. Environmental/Forestry/Solid Waste staff performs numerous functions to ensure that the city's natural resources are preserved and enhanced as this community matures. Functions vary from preventing storm water pollution and conserving the city's water supply, to recycling and insect and disease control, all with the goal of promoting environmental sustainability. Essential Functions include: ENVIRONMENTAL BOARD LIASON Staff serves as liaison to Environmental Board, prepares reports and presents at meetings, and assists with carrying out the goals of the Environmental Board. PUBLIC EDUCATION AND ASSISTANCE Staff coordinates environmental education and offers programs in schools and courses to the general public. Staff provides information to the public via handouts and the city website. Staff coordinates and participates in city events such as Earth Day, Recycling Day and Arbor Day. This department also assists the public with a variety of issues including disease control, storm water pond quality, water quality improvements, native plantings, rain gardens, and weed control. NPDES PROGRAM •Staff is responsible for coordinating storm water pollution prevention programs in accordance with the city's National Pollutant Discharge Elimination System (NPDES) Phase II permit. These activities include Public Education and Outreach, Public Participation and Involvement, Illicit Discharge Detection and Elimination, Construction Site Storm Water Runoff Control, Post Construction Storm Water Management, and Municipal Pollution Prevention/Good Housekeeping. • SHORT RANGE PLANNING Staff undertakes a number of projects initiated by advisory boards and/or city council to address implementation of the comprehensive plan, changes in state law, or city policy changes. CONSERVATION AREA MANAGEMENT Inspects, manages and enforces over 170 acres of city owned conservation areas. Activities include location and maintenance of boundary signage, mapping, vegetative management, and encroachment enforcement. CODE ENFORCEMENT Staff assists in the administration and enforcement of the city's nuisance ordinance including weeds and diseased trees. Activies include complaint response, site inspections, enforcement notices, resinspection, ordering of work if not resolved and billing procedures. 12 FORESTRY • Staff coordinates and supervises annual tree plantings on public properties, parks and boulevards, reforestation contract plantings, and special projects such as FireWise to promote safe and sustainable forest management within the city. • • Areas of forestry include: Tree Preservation: Staff reviews building development plans to ensure preservation of trees in tree protection areas. Assistance is provided to homeowners and builders to protect existing trees or coordinate tree mitigation. Tree Trimming and Hazardous Tree Removal: Staff supervises and participates in tree initiatives including trimming, removals, chemical treatment for insects, disease and nutrient problems. Staff coordinated trimming of approximately 500 boulevard trees in 2009. Boulevard Tree Plantings: Staff plans, bids and contracts annual plantings of boulevard trees for new properties and replacement of existing trees. Tree Disease Control: Oak Wilt Program: Staff works with residents on education of identifying incidents and controlling oakwilt infections that occur in the city. Staff coordinates disease control efforts. Emerald Ash Borer: Staff is currently working with the Environmental Board on preparing a Preparedness Plan for the Emerald Ash Borer problem. Future initiatives include identifying infestations and working with the public on control. SITE MAINTENANCE AND INSPECTION Staff coordinates with maintenance crews in the restoration of public wetlands, ponds and wetland bank areas, involving a number of activities including site preparation, seeding chemical controls, burning, mowing, and erosion control. Staff inspects sites for compliance, public stormwater infrastructure and proposes maintenance recommendations, wetland and drainage easement encroachments, monitors vegetation reestablishment and inspects for completeness. GIS Staff maintains the Geographic Information System data base and mapping for forestry including rare plant and animal populations, restoration areas, diseased trees, and well head protection. SOLID WASTE Staff administers and oversees Solid Waste Removal and Licensing in the city. Staff reviews applications for waste haulers, collects fees, and issues licenses according to city ordinance. Staff administers the recyling program in the city, and implements reporting requirements for receipt of SCORE funding. 13 • PROJECT MANAGEMENT Staff assists with local project initiatives and coordination with adjacent jurisdictions. • LAND USE APPLICATION PLAN REVIEW Staff assists in the review of plans for new developments, subdivisions, building and other land use submittals to insure conformance with the city's environmental requirements. Staff works with neighborhood groups and associations, Rice Creek Watershed District, Vadnais Lake Area Water Management Organization (VLAWMO) and other entities regarding the implementation of projects and conservation development within new subdivisions. CURRENT PROJECTS: • Special Area Management Plan (SAMP) with Army Corp and RCWD • Wollens Park Wetland Restoration /Banking Program • Rice Lake Subwatershed Rain Garden Retrofit • Stormwater Management Ordinance • Emerald Ash Borer Management Plan 14 �tsW��u e) Wk. seSs� 1-.1 0 0 N 1 $ 25,438 d' lD US 00 rn 0) lD + o 1 4.34 I 4.64% 0 Ii N <D 0 lD N $ 585,645.00 $ 143,045.00 0 d M II) N N r-1 t/? $ 869,543.00 $ 611,083.00 $ 149,689.00 I $ 119, 751.00 I $ 880,523.00 O O 0 0 0 l0 in- O O 0 O t/) O O 0 0 0 u) tn. O O 00 u) N u) t/. $ 500.00 0 O O 0 0 4 tn. $ 100.00 O O • 0 u) r-i to O o • u) N t/. $ 250.00 I O O 0 0 0 r-i tR O o 0 in N in- I oo'ooz' _ - $ O O 0 0 ct tn. O O 0 0 u) in. O O 0 0 N "1 $ 25,458.00I o0 n 0 t!? Proposed 2011 Budget 'Circle Pines City 'Total Revenue 'Hazardous Materials Storage I 'Total Charges for Services 1 Total Fund Revenue 2011 Budget Centerville Circle Pines Lino Lakes Total 2005 Runs 134 253 622 1,009 2006 Runs 148 225 620 993 2007 Runs 155 233 604 992 2008 Runs 176 254 594 1,024 2009 Runs 153 227 578 958 Total 766 1,192 3,018 4,976 Five Year Average 153,20 238.40 603.60 935.20 Market Value per Anoka County 387,124,300 431,607,300 2,148,363,200 2,967,094,800 Market Value divided by 1,000,000 387.12 431.61 2,148.36 2,967.09 Population per Met Council 3,881 5,279 20,305 29,465 Population divided by 100 38.81 52.79 203.05 294.65 CALCULATION Five Year Average of Runs 153.20 238.40 603.60 995.20 Market Value divided by 1,000,000 387.12 431.61 2,148.36 2,967.09 Population divided by 100 38.81 52.79 203.05 294.65 Total 579.13 722.80 2,955.01 4,256.94 Percentage of Total 13.6% 17.0% 69.4% 100.0% 2011 Budget Miscellaneous Calculations $ 611,083 $ 880,523 2 Centerville Circle Pines Lino Lakes Total Cost per resident 30.86 28.36 30.10 29.88 Cost per 100,000 valuation 30.93 34.68 28.44 29.68 Centennial Fire District Budget 2011 2009 Final 20 0 2011 Expenditures $ 199,881 101 Full -time Salaries 4 I $ 187,917 $ 198,374 102 Fire Officer Salaries $ 20,550 $ 26,700 $ 28,800 103 Overtime Wages $ - $ 3,500 $ 3,500 $ 38,000 $ 52,000 105 Fire Incidents $ 28,021 $ 43,000 106 Rescue Incidents $ 55,924 $ 48,000 107 Weekly Training $ 31,045 $ 25,000 $ 30,000 108 Maintenance Drills $ 15,852 $ 12,000 $ 12,000 109 Fire Prevention Wages $ 6,763 $ 10,000 $ 10,000 112 Medical Class Instructor Salary $ - $ - $ - 120 Payroll Taxes $ 39,108 $ 32,000 S 40,000 130 Payroll Benefits $ 33,779 $ 32,000 $ 36,000 $ - 142 Unemployment $ - $ - ' 150 Workers Comp Insurance $ 23,768 $ 25,000 $ 39,000 180 Relief Association $ 25,000 $ 25,500 $ 25,500 Total Personnel $ 467,728 $ 481,074 $ 514,681 Supplies $ 3,000 $ 2,100 $ 1,000 $ 16,000 201 Office Supplies /Printing $ 3,343 $ 6,000 202 Bld Cleaning Supplies (Toiletry, soap, mops) $ 2,178 $ 2,300 203 Batteries (AA, AAA, C, D, 9V) $ - $ 1,400 204 Small Tools /Equipment ( <$5000) $ - $ 12,000 205 Fire Pagers $ - $ - $ 1,800 $ 12,000 $ 500 $ 2,700 $ 2,000 $ 15,200 $ 1,500 212 Fuel and Lubricants (17 Vehicles) $ 10,678 $ 15,000 213 Vehicle Cleaning Supplies(soap, towels, squeegees) $ 65 $ 500 216 Medical Supplies /EMT Supplies / Books $ 3,008 $ 4,000 217 Community Orienting Supplies $ 1,468 $ 3,000 218 Uniforms /Coat/Pant/Boots /Badges /Pins $ 9,284 $ 17,000 219 Misc. Supplies $ 2,292 $ 1,000 Total Supplies $ 32,316 $ 62,200 $ 57,800 Contracted Services 301 Accounting & Audit Services (Circle Pines) $ 10,865 $ 10,000 $ 11,000 302 Recruiting / Retention / Backgrounds $ - $ 2,000 $ 2,000 307 Fire Consulting ( $ - $ - $ - 308 Medical Physicals /Fit Testing OSHA $ 4,678 $ 5,600 $ 5,600 320 IT Service (Roseville IT) 1 $ 7,867 $ 8,000 $ 13,000 $ 400 321 Communincations (Station Phones /Cell) $ 11,285 $ 16,000 322 Postage / Shipping $ 433 $ 400 331 Training / Travel / Meals / Banquet $ 33,180 $ 14,000 $ 19,000 349 Legal Advice / Attorney $ 165 $ - $ - 350 FIRE- Publishing /Printing $ - $ - $ 600 $ 23,000 $ 22,000 $ 1,000 361 Prop and Liabilty Insurance $ 22,069 $ 24,000 380 Utilities $ 20,576 $ 27,000 385 800 mhz Radio User Fees $ 2,410 $ 2,000 Total Contracted Services 1 $ 105,662 $ 108,867 $ 105,600 Maintenance 401 rBld and Ground Maintenance $ 13,651 $ 10,000 $ 10,000 403 SCBA Maintenance /Recertification 1 $ 2,000 $ 2,000 404 Vehicle Maintenance /Pump Certification $ 34,460 $ 40,000 $ 35,000 405 ,Equipment/Small Tool Maintenance $ 6,103 $ 5,500 $ 4,500 406 IOffice /Software Equip $ 2,776 $ 2,000 $ 2,500 407 Radio / Pager Maintenance $ - $ 800 $ 800 412 !Common Area Charges P $ 16,306 $ 15,402 $ 14,500 433 Dues /Memberships /Licenses/Code Publications $ 865 $ 2,500 $ 1,900 $ 1,200 $ 4,000 $ 500 435 Subscriptions & Books r $ 1,117 ; $ 1,200 490 Safety Camp (Out) $ 3,695 $ 6,000 495 Miscellaneous Maintenance $ 20 $ 1,000 Total Maintenance $ 78,993 $ 86,402 $ 76,900 I I Capital Outlay ( >$5000) 570 Equipment 1 $ 66,927 $ 16,000 $ 16,000 $ 10,000 950 Total Contingency $ 20,000 $ 15,000 i Capital Equipment Replacement Fund $ 100,000 $ 100,000 $ 125,000 Total Operating $ 871,626 $ 869,543 $ 905,981 Revenue Fees for Service: Fire /Medical Classes $ 12,265 $ 5,000 $ 6,000 Interest $ 424 $ 750 $ 400 Safety Camp (In) $ 4,781 $ 6,000 $ 4,000 North Ambulance Lease Agreement $ - $ - $ 5,258 Donations /Grants $ 16,306 $ 500 $ 500 Other I $ 12,986 $ - $ 4,000 Fire Prevention visits, tours, displays ($75 per hour) $ 150 $ 100 Plan Review Fees: Fire Suppression System ($3 per head, 30 per riser) $ - $ - $ - Fire Alarm / Detection System ($3 per device, 35 per panel) $ - $ - $ - Flammable/Combustible Storage $ - $ - $ 150 Hazardous Materials Storage $ - $ - $ 250 Daycare / Homecare Inspections ($50 per) $ - $ 250 $ 250 Parades, Carnivals, Amusement Displays ($100) $ - $ 200 $ - Bum Permits $50.00 X 30.00 $ 500 $ 1,500 $ 1,000 Pyrotechnics / Fireworks display ($100) $ - $ 200 $ - Fireworks Permit - Retail Display $ - $ 150 $ - Temporary Membrane, Structure, Canopy $ - $ 250 $ 250 greater than 400 square feet. $50 per structure. $ - $ - Commercial Fire Inspection (50 x $125) $ - $ 6,250 $ - Response Guideline (Min per hour) Response to vehicle fires on c'ty, county, and state $ - f roads, highways, and freeways (7 x $300). I $ - $ 2,100 $ 1,200 Hazardous Materials Spill / Clean -up ($300.00 per hr.) $ - $ 600 $ 400 Response to underground gas line emergencies h t by contracto $ - (20 x $150 per hour. Min one hour) $ - $ 3,000 j $ 500 Illegal burning (4 x $300 per hour) I $ - $ 1,200 $ 1,200 Revenue I $ 47,261 $ 28,100 4 $ 25,458 Total Operating I $ 841,443 $ 880,523 Personnel Supplies Contracted Services Maintenance Capital Outlay $ 514,681.00 $ 57,800.00 $ 105,600.00 $ 76,900.00 $ 16,000.00 Full Time $ 199,881.00 Part Time $ 242,550.00 The capital equipment plan is based on the following: Fire Pumpers will be replaced after 21 years. Fire Tankers will be replaced after 26 years. Rescue vehicles will be replaced after 20 years. Grass trucks will be replaced after 21 years. Staff Vehicles 7 years $ 125,000.00 Year Cost Income 12131 Balance 2007 $ 100,000 5 $ 540,303 $ 644,015 $ 709,015 ( $ 834,015 $ 929,015 5 1,054,015 $ 864,015 $ 989,015 $ 514,U1` $ 189,015 2008 $ 100,000 2009 • - - e e , $ 27,570 $ 100,000 _ _ ... _ _ 2010 - - " , e $- 367009 $ 100,000 - - - . - - - - - .. ..I 2011 $ 125,000 2012 Ford Explorer, Duty Officer (1998) $ 30,000 $ 125,000 2013 $ 125,000 2014 Rescue (replaces 1993 Rescue) $ 105,000 $ 125,000 Rescue (replaces 1993 Rescue) $ 105,000 Rescue (replaces 1997 Rescue) $ 105,000 2015 $ 125,000 2016 Safety Education Van (replaces 1995 van) $ 30,000 $ 125,000 Inspectors Vehicle (replaces 2010 pickup) $ 35,000 Chiefs Vehicle (replaces 2009 SUV) $ 35,000 Tanker (replaces 1991 Tanker) Relief Assoc $ 250,000 Tanker (replaces 1991 Tanker) Relief Assoc $ 250,000 2017 Pumper (replaces 1996 Pumper) $ 450,000 $ 125,000 2018 Utility 12 (Purchased with Relief money ?) Expedition $ 150,000 $ 35,000 $ 125,000 $ 129,015 6 x 6, snowmobile, trailer, boat ? 2019 $ 125,000 $ 254.015 $ 3/9,015 $ (145,985) $ (20,985) $ 34,015 2020 $ 125,000 2021 Pumper (replaces 2000 pumper) $ 650,000 $ 125,000 2022 $ 125,000 2023 Inspectors Vehicle (replaces 2016 pickup) $ 35,000 $ 125,000 Chiefs Vehicle (replaces 2016 SUV) $ 35,000 2024 Pumper (replaces 2002 pumper) $ 500,000 $ 125,000 $ (340,985) $ (215,985) $ (90,985) $ 34,015 $ 159,01: $ 104,015 $ 229,015 I 2025 $ 125,000 2026 $ (746,895) $ 125,000 2027 $ 125,000 T 2028 $ 125,000 2029 Grass /Utility (replaces 1994 Utility) $ 60,000 $ 125,000 Grass /Utility (replaces 1994 Utility) $ 60,000 Grass /Utility (replaces 1994 Utility) $ 60,000 2030 $ 125,000 Year Cost , $ 100,000.00 Income 12131 Balance 2007 $ $ 100,000 $ 44[ 2008 100,000 $ 540,30' 2009 Chiefs Vehicle (replaces 2004 SUV) 1 $ 27,570 $ 100,000 $ 644,01 2010 Inspector Vehicle (replaces 2004 pickup) $ 35,000 $ 100,000 $ 709,01 $ 100,000] $ 809,01 2011 2012 Ford Explorer, Duty Officer (1998) $ 30,000 $ 100,000 $ 879,01 2013 $ 100,000 $ 979,01 2014 Rescue (replaces 1993 Rescue) $ 105,000 $ 100,000 Rescue (replaces 1993 Rescue) $ 105,000 Rescue (replaces 1997 Rescue) $ 105,000 $ 764,015 2015 $ 100,000 $ 864,015 2016 Safety Education Van (replaces 1995 van) $ 30,000 $ 100,000 Inspectors Vehicle (replaces 2010 pickup) $ 35,000 Chiefs Vehicle (replaces 2009 SUV) $ 35,000 Tanker (replaces 1991 Tanker) Relief Assoc $ 250,000 Tanker (replaces 1991 Tanker) Relief Assoc $ 250,000 $ 364,01` 2017 Pumper (replaces 1996 Pumper) $ 450,000 $ 100,000 $ 14,01 2018 tility 12 (Purchased with Relief money ?) Expedition $ 200,000 $ 35,000 `.. 100,000 $ (120,985 6 x 6, snowmobile, trailer, boat ? 2019 $ 100,000 $ (20,985? 2020 $ 100,000 $ 79,01` 2021 Pumper (replaces 2000 pumper) $ 650,000 $ 100,000 $ (470,985) 2022 $ 100,000 $ (370,985) 2023 Inspectors Vehicle (replaces 2016 pickup) $ 35,000 $ 100,000 $ (340,985) Chiefs Vehicle (replaces 2016 SUV) $ 35,000 2024 Pumper (replaces 2002 pumper) $ 500,000 $ 100,000 $ (740,985) 2025 $ 100,000 $ (640,985) 2026 $ (3,546,895) $ 100,000 $ (540,985) 2027 $ 100,000 $ (440;985) 2028 $ 100,000 $ (340,985 2029 Grass /Utility (replaces 1994 Utility) $ 60,000 $ 100,000 $ (420,985 Grass /Utility (replaces 1994 Utility) $ 60,000 Grass /Utility (replaces 1994 Utility) $ 60,000 2030 $ 125,000 $ (295,98 N C) 0 0 C O u_ U N (1) 0 O 2 Lino Lakes U c c N N O cC lf) U C O V O 2 N EA O Efl (O 0) N- 05 cc) Efl 69. Conservation O co Efl ►t) N Eft U N Q 0 ti oo O N- F- C) ER Public Works O Efl 0) Efl co co N N E9 v U_ O 00 rn M M N N Cc"; ER N CD O U) Efl c a t U N Q 0 ct_ . • . • ■ Public Works ! Parks /Rec Conservation ■ Comm Devel • Mayor /Council a U C C LL • ▪ Bld Inspection SI oo 0° o °0 00 00 00 0 0 0 0 0 0 0 0 0 oo 0 0 0 0 0 in 0 Un o L.n o in M M N N .- ri1 in [h VT V} in V} pJ Circle Pines Public Works ER- 0o co O ER a) O N EA ti N- C) C) Efi Gen Gov /Adr EO C) C) O H3 Gen Gov /Admin U U TD N 2 U N cc a • Public Works 1 O O O O O O O O o 0 o o O O O O O O O O O O O O O O O 0 0 0 o o Oar O N. o O v° O O 0 ,--I in an In to LT an to to to U v CC C0 N CL Public Works v LL al U 0 a Gen Gov /Admin Centerville 0 tri co F— o E9 Public Works 0 0 CO Cal EFT 67: co to 0 0 N- EFT E -c 0 0 C (N E9 • Gen Gov /Admin Public Works $1,200,000.00 $1,000,000.00 „ . o 0 0 0 o o c? p O o o 0 o 0 o 0 0 0 ci 6- d o o o o oo Lo .1- (-.4 0 0 0 • a. -o 0 U) THE COST OF A PAID ON -CALL FIREFIGHTER 0 0 0 0 0 0 0 0 00000000 0 0 0 0 0 0 0 0 a a o 0 a o 0 0 0 0 0 0 0 o a a o o o o o o 0 0 o00L()IC)000 IC) IC) - IC)0Irio0o IC)LI)00LI)Iritfi ' LS) IC) CO - IC) o o cc Cr.) Cr) — N It) N O) N- U) It) N N O) 0 CO N- N c) r CO CO LC) 69 69 69 Efl 69- Eft 69- E9 69 69 69 69 EA 69 69 69 69 69 69 Efl 69 69 ffl V) td a) N C "O +r .- to c6 O C N () E -I (n 0 C I U LO To -0 a u?t O �J(n C �� 'E _ =H0 cn •v co O O O O c13 2 C ca LE .E v) O co c'3 p .R N N W U C L_ L W D) L a.U22OmLLW m o_(n(nf--mmZm F— LLLL WUUma.