HomeMy WebLinkAbout03/12/2014 P&Z Minutes
APPROVED MINUTES
CITY OF LINO LAKES
PLANNING & ZONING BOARD MINUTES
1 . CALL TO ORDER AND ROLL CALL
Chair Tralle called the Lino Lakes Planning and Zoning Board meeting to order at 6 :30
p.m . on March 12, 2014 .
2 . E LECTION OF CHAIR AND VICE CHAIR
Mr. Root nominated the current chair and vice chair for 201 4 .
The board re -elected Paul Tralle as Chair and Michael Hyden as Vice Chair for 201 4 by
unanimous vote.
3. A PROVAL OF AGENDA
T he Agenda was a pproved as presented .
4 . A PPROVAL OF MINUTES
Febr uary 12 , 2014
M r. Hyden made a MOTION to approve the February 12 , 2014 Meeting Minutes.
Motion was supported by Mr. Evenson . Motion carried 6 - 0 . (Tralle abstained.)
5 . OPEN MIKE
Chair Tralle declared O pen M ike at 6:31 p.m .
D ATE : March 12 , 201 4
TIME STARTED : 6 :30 P.M .
TIME ENDED : 8 :17 P.M.
MEMBERS PRESENT : Charles Evans, Neil Evenson, Michael Hyden (Vice
Chair), Perry Laden, Lou Masonick, Michael Root ,
Pa ul Tralle (Chair)
MEMBERS ABSENT : None
STAFF PRESENT : Katie Larsen , Jason Wedel
Planning & Zoning Board
March 12, 201 4
Page 2
APPROVED MINUTE S
There w a s no one present for Open Mike.
Mr. Hyden made a MOTION to close Open Mike at 6 :32 p.m. M otion was supported by
M r . Laden . Motion carried 6 - 0 . (Tralle abstained.)
6 . ACTION ITEMS
A. CONTINUED P UBLIC HEARING to consider a Rezone and Preliminary Plat
f or a three -lot residential subdivision to be called Talan Ridge located at 260
Linda Avenue
K atie Larsen, City Planner, presented the staff report .
Ms. Larsen reviewed the items discussed at the last meeting. Staff pointed out the
difficulty of balanc ing the desires of the neighborhood with the r ights of the pr operty
owner.
Jaso n Wedel, City Engineer, addressed some of the concerns of the neighborhood
regarding stormwater management and drainage issues. Mr. Wedel stated that soil
borings done by the developer show that groundwater levels meet requirements. Staff has
discussed the drainage issues on Linda Ave nue and Laurene Ave nue and the city plans to
make improvements to that area in 2014 . G rading work will be done in the right of way
along the ditc h line of Laurene Ave nue and t he c ity will work with property owners.
Staff will study the area to determine what the final improvements will be. Staff noted
that the proposed ponding exceeds the city’s standards. Mr. Wedel expla ined the
infiltration pr ocess.
Ms. Larsen noted that the developer will need to delineate the existing wetland in order to
develop the third lot, which w ould not occur until the spring.
Staff specified that the board will take action on the Rezone and Prel iminary Plat only.
Th e Final Plat s will be reviewed at future meeting s . Staff recommended approval of the
Rezone and Preliminary Plat . Staff noted that the developer plans to make improvements
to the existing house on Lot 2.
Applicant Pat J udge, 3128 Priest Lane, Mound, M N, was present for questions . Mr.
Mattke, surveyor, was also pres ent for questions. The applicant and surveyor understand
the recommendations of staff and that the re is a chance that this project may result in only
two lots.
Chair Tralle declared the Pu blic Hearing open at 6 :54 p.m.
Lara Verrecchio, 250 Linda Ave nue , distributed a photo from March 10 , 2014 showing
standing water at the corner of Linda Ave nue and Laurene Ave nue. Ms. Verrecchio
asked if the city’s water management project for this area w ould include the culvert issue
at 260 L aurene Ave nue . She also wondered if the newly proposed houses would be
Planning & Zoning Board
March 12, 201 4
Page 3
APPROVED MINUTE S
approximately the same size in comparison to the existing house on the property,
commenting that it would be less of an issue if the new houses w ere as small as the
existing house.
Tom Brunner , 270 Linda Ave nue , asked that the board members take a look at the lots in
this area. He stat ed that th is area has been a problem for many years. He said that the
ponding area has changed and since one p ond was filled in, he now gets flooding on his
property. He is concerned about overflow to the south going onto his property. His
septic tank previously flooded. He d oes not agree with the lot width of the newly
proposed lots. He is c oncerned about whe re water is going to go if two more lots are
developed. He stated that this area is very low and flooding occurs frequently. He asked
that this area be looked at in May or June.
Connie Grundhofer, 235 Linda Ave nue , commented that the lots to the north o n Laurene
Ave nue a re large lots and the lots to the south are rural. She said this gives the area a
relaxing, country feel. She pointed out that if this project is approved there would be six
homes on the south side of the street and three homes on the n orth. She stated that the
neighbor directly across from the property was unable to attend the meeting, but was
concerned about drainage. Ms. Grundhofer stated that the neighbors were not in favor
when the sewer installation occurred. They understood tha t the sewer installation was for
Fox Trace. She said the neighbors like the big lots and country feel. She distributed a
document showing a delineation of a pond in 2 001 . She stated that the previous owner of
the property was filling in the pond area. She asked for the board to consider consistency
as the residents on Linda Avenue want to keep their large lots.
Chair Tralle not ed that two of the neighboring propert ies are approximately ½ acre in
size.
Paul Whaley, 6200 Laurene Ave nue , agreed with Ms. Grundhofer and Mr. Bru nn er t hat
the proposal is inconsist e nt with the neighborhood and will lower property values. Mr.
Whaley was concerned about increased drainage if two new homes are built. He
e xplained some of the drainage issues in the area and expr essed concern about narrow lot
lines. He suggested that this project be delayed unti l the snow has melted. Mr. Whaley
asked what the process is for the neighbors to continue to try and get this project stopped.
Judy Brunner, 270 Linda Ave nue , agree d wit h the previous comments. She stated
concern that no curb or gutter is proposed. She is worried about future drainage issues.
She noted that the property to the s outh is not just wetland, but is used and enjoyed by her
children and grandchildren. She do es not think this should even be considered until curb
and gutter are in place. Sh e asked that the board consider not just the sizes of the lots, but
the layout of the houses and how close together the proposed houses will be. She
u nderstands that this a rea ha s a high water table , but w ants to be able to use their property
without dealing with increased water issues. She is concerned about water runoff onto
her property .
Planning & Zoning Board
March 12, 201 4
Page 4
APPROVED MINUTE S
David Berg, 283 Linda Ave nue , s poke on behalf of property owner Anthony Czeck . M r.
Berg agreed with all of the previous comments a nd does not understand how this will
work. He said that flooding is terrible and needs to be addressed. He feels t hat this area
must be left alone.
The board addressed the resident concerns:
Mr. Wedel stated that the city project proposed for this year would include revisit ing the
ditch system that runs along Linda Ave nue and Laurene Ave nue . He explained that the
area would be surveyed to determine issues with the culvert and address what
improvements need to be made.
Chair Tralle addressed that this are a includes a variety of lot sizes , noting that all three of
the proposed lots will be larger than existing lots across the street. He suggested that the
residents look at the map of the area on the A noka County website to view the
incons istency of lot sizes.
Chair Tralle pointed out that the existing houses vary in design and age, and that people
have a right to choose what they build on their property. If a house meets code
requirements, th e n it ca n be built.
Mr. Wedel address ed how the water will flow from the proposed pond. The pond is
designed to h andle a 100 year flood. Developers have to meet requirements for runoff
and what is proposed will not exceed the existing runoff . The site will be inspected by
the city for conformance with design.
Chair Tralle explained that residents can attend the City Council Meeting for this item to
state their case. He reminded the audience that the P&Z board is an advisory board to the
council, and that th e board members a re also city residents whose role i s to look out for
the best interest of the city. Mr. Tralle stated that the city must allow a property owner to
utilize their land as allowed by regulations.
Judy Brunner reiterated her concern for the distance between the proposed houses. She
pointed out that the property owner purchased a rural lot and she does not think that
rezoning the property to residential is in the best interest of the neighborhood for many
reasons.
Staff displayed a proposed footprint f or the houses .
Staff pointed out that the adjacent parcel to the west was rezoned to single family
residential in order for the property to be subdivided. Staff reminded the board that the
proposed zoning is cons istent with the c ity’s compre hensive plan and meets performance
standards, giving the property owner the right to rezone.
Staff noted the location of existing utilities and stated that the proposed lots will be
required to hook up to city sewer and water .
Planning & Zoning Board
March 12, 201 4
Page 5
APPROVED MINUTE S
Board member comments inclu ded:
• Concern with timing of the process. Would it be beneficial for the city to
postpone this project until spring?
• The project has been reviewed by city staff and they need to trust staff’s review .
Staff described that the preliminary plat would likely go before the City Council in April,
the final plat for the 1st Addition around June and the 2 nd Addition around July or
August.
Staff explained that the only unresolved item is the wetland delineation boundary from
the Rice Creek Watershed District, whi ch does not affect Lot 1. Staff reiterated that the
property has been surveyed and elevations have been determined. The RCWD has no
opposition to the first proposed lot.
Mr. Wedel stated that delaying the project would not change staff’s review . The
de veloper has provided all necessary information to make a de cision on the first proposed
property . The developer has submitted a survey, existing and proposed contours , and
plans for e arthwork to raise the house pads.
Ms. Larsen stated that staff has r evi ew ed all of the required information and there is no
basis for the city to delay taking action on the Preliminary Plat. She reminded the board
that since the last meeting, staff has received design information for the creation of
swales and ponding areas and the developer has fine tuned the drainage plan and
provided soil borings.
Ted Mattke, Mattke Surveying, d eveloper and surveyor, stated that he is a resident of
Lino Lakes and has been doing plats in the city for many years. He is a l icensed surveyor
and professional engineer. He desc ribed how the proposed improvements to the lots will
improve drainage in the area. He e xplained how the ponding area will be excavated and
improved. He anticipates that wetland delineation will be completed by the end o f April
and they will survey the area right away to present to the city. Mr. Mattke explained how
the proposed improvements for drainage will take place.
Mr. Judge , applicant, does not see a reason for the city to delay this project. He has
submitted al l required information necessary for the preliminary plat to be acted upon.
He stated that there are no wetland or drainage issue s with the preliminary plat. He
explained that they submitted s oil borings and went out of their way to show that
drainage is acceptable with the first proposed lot. He understands the concerns of the
residents . He stated that he would not do this project if he t hought he would be doing
hardship to the neighbors.
Paul Whaley said that a previous proposal for six lots was de nied about 14 years ago . He
reiterated his concern for drainage and flooding as well as the value of his property. He
is in favor of tabling the project.
Planning & Zoning Board
March 12, 201 4
Page 6
APPROVED MINUTE S
Mr. Wedel stated that the pond design has been addressed sufficiently.
Tom Bru n ner added that he has lived at 270 Linda Ave nue for 3 5 years. He restated his
concern of the wetlands and increased drainage issues. He is opposed to the project. He
does not want to see the property drowned.
Connie Grundhofer stated that she was told by an employee of the RCWD that wetland
delineations are done between May 1 and Oct ober 1 . She explained that the delineation
handout that she distributed was from 2001 and was told by an employee of the RCWD
that d elineations are only good for 5 years. She distributed t he document to show what
was delineated in the past. She expressed concern that the proposed lot frontages are
inconsistent with the area.
Judy Brun n er reiterated that the neighborhood has issues with the proposed building on
the lots, not that they wo uld be unkind or unwelcoming to new residents.
Mr. Masonick made a MOTION to close the Public Hearing at 8 :03 p.m. Motion was
supported by Mr. Hyden . Motion carried 6 - 0. (Tralle abstained.)
Mr. Evenson made a MOTION to recommend approval of rezoning the property at 260
Linda Avenue from Rural to R -1, Single Family Residential , based on the following
conditions of approval to be met prior to final plat :
1. All comments from the City Engineer letter dated March 5, 2014 shall be addressed.
2. All comments fr om Environmental Coordinator letter dated February 3, 2014 shall be
addressed.
3. A Land Use Application for final plat shall be submitted by the developer.
4. A Development Contract shall be drafted by the City, executed by the City and the
developer and record ed with Anoka County in conjunction with the final plat.
5. The final plat shall be resubmitted to Anoka County Surveyors Office for review after
City Council approval.
6. A wetland delineation shall be completed and approved by RCWD prior to any final
platting of the proposed Lot 2, Block 1 Talan Ridge.
7. The Developer shall provide the City and RCWD with an as -built grading plan prior
to issuance of any building permits.
8. Sheet 1 -Certificate of Survey:
a. Revision number and date shall be included.
9. Sheet 2 -Resources Inventory:
a. Revision number and date shall be included.
10. Sheet 3 -Preliminary Plat:
a. Revision number and date shall be included.
b. The Total Upland calculation 57,828 s.f. does not equal the upland areas shown
on the individual lots. Please revise.
Planning & Zoning Board
March 12, 201 4
Page 7
APPROVED MINUTE S
c. The House P ads for proposed Lot 1 and Lot 3 shall be revised to reflect a typical
house floor plan (e.g., 60’ x 40’).
d. The proposed impervious surface calculations for each lot shall be provided.
11. Sheet 4 -Preliminary Grading, Drainage & Erosion Control Plan:
a. See City E ngineer letter dated March 5, 2014.
b. Revision number and date shall be included.
c. The House Pads for proposed Lot 1 and Lot 3 shall be revised to reflect a typical
house floor plan (e.g., 60’ x 40’).
d. Construction details for the storm water ponding area shal l be submitted.
e. Soil erosion and sediment control measures shall be shown.
f. “No Encroachments” text shall be removed.
g. Location of soil borings shall be identified.
h. Existing Water Table shall be revised to 896 +/-.
12. Sheet 5 -Preliminary Utility Plan:
a. Revision number and date shall be included.
b. The existing house shall hook up to the municipal water system prior to issuance
of any building permit.
c. The existing well shall be properly capped and abandoned or disconnected from
the house if used for irrigation purpo ses prior to the issuance of any building
permit.
13. Sheet 6 -Landscaping Plan:
a. Revision number and date shall be included.
b. Storm water ponding area shall be shown.
c. Landscaping plan for ponding area shall be provided.
14. Tree Preservation and Mitigation Plan
a. Revi sion number and date shall be included.
b. Storm water ponding area shall be shown.
c. Are the 12’ and 36’ Willow trees going to be removed?
d. The developer shall submit a complete Tree Preservation and Mitigation Plan in
full compliance with the tree preservation and mitigation ordinance prior to
approval of the final plat.
e. Fencing, tree preservation measures and erosion control shall be installed by the
developer and inspected by the City prior to any soil disturbance.
Motion was supported by Mr. Laden. Motion carried 5 -1 (Masonick vo t ing nay. Tralle
abstained.)
The Board asked the developer to respond to Condition N o. 14C.
Mr. Mattke stated that they do not anticipate removing the large Willow trees, but they do
anticipate removing a broken River Birch tree on the SE corner of the property that is in
poor condition .
Mr. Evenson made a MOTION to recommend approv al of the Preliminary Plat for a
three -lot residential subdivision to be called Talan Ridge located at 260 Linda Ave nue ,
Planning & Zoning Board
March 12, 201 4
Page 8
APPROVED MINUTE S
based on the condition of ap provals as previously listed. Motion was supported by Mr.
Root. Mo tion carried 5 -1. (Masonick vot ing nay. Tralle abstained.)
Mr. Laden not ed that it c ould be helpful for neighbors to organize as a group and
consolidate speakers , or even sign a petition , before going to the City Council Meeting on
April 14th.
6 . DISCUSSION ITEMS
A. Project Updates
Katie Larsen, City Planner , provided an update of current city projects .
Staff agreed to speak again with the police department about posti ng spee d limit sign s on
Old Birch Street .
Chair Tralle asked about Lennar Next Gen housing. Ms. Larsen stated that the city
currently allows for accessory apartments in all residential zones of the city.
7 . ADJOURNMENT
M r. Laden made a MOTION to a djourn the meeting at 8 :17 p .m. Motion was supported
by M r. Hyden . Motion carried 6 - 0 . (Tralle abstained.)
Respectfully submitted,
Dawn Bugge
Community Development Ass istant