1. Plan Overview
2. Land Use Map
3. Staging Map
4. Growth Management
5. Resource Management System Plan
6. Implementation
7. Set Next Meeting Date
CITY OF LINO LAKES
PLANNING & ZONING BOARD MINUTES
DATE
TIME STARTED
TIME ENDED
MEMBERS PRESENT
MEMBERS ABSENT
STAFF PRESENT
: September 10, 201
. 6:31 P.M.
: 10:08 P.M.
Michael Hyden, Perry Laden, Robert Nelson,
Brian Pogalz (Vice Chair), Rob Rafferty, Michael
Root, Paul Tralle (Chair)
: None
: Paul Bengtson, Michael Grochala, Jeff Smyser, Jim
Studenski
I. CALL TO ORDER AND ROLL CALL:
Chair Tralle called the Lino Lakes Planning and Zoning Board meeting to order at 6:31
p.m. on April 9, 2008.
II. APPROVAL OF AGENDA
The agenda was approved as presented
III. APPROVAL OF MINUTES:
July 9, 2008
Mr. Laden made a MOTION to approve the July 9, 2008 Minutes. Motion was supported
by Mr. Hyden. Motion carried 4 - 0. (2 abstained)
IV. OPEN MIKE
Chair Tralle declared Open Mike at 6:34 p.m.
There was no one present for Open Mike.
Mr. Pogalz made a MOTION to close Open Mike at 6:35 p.m. Motion was supported by
Mr. Root. Motion carried 6 - 0.
V. ACTION ITEMS
A. Recommendation to the City Council regarding approval of the Draft 2030
Comprehensive Plan
DRAFT MINUTES
Planning & Zoning Board
September 10, 2008
Page 2
Jeff Smyser, City Planner, presented the staff report. Mr. Smyser explained the process
that led to the drafting of the 2030 Comprehensive Plan. Mr. Smyser stated that the draft
plan was well received by the other boards, and a few minor corrections were suggested.
Ciara Schlicting, Bonestroo consultant firm, provided an overview of the Comprehensive
Plan and pointed out some of the proposed corrections. Ms. Schlicting's presentation
included key components of each chapter as well as implementation plans to support the
visions, goals & policies.
One suggested modification was the extension of the trail along Elmcrest Ave. Ms.
Schlicting added that staff recommended additional designated bike routes along Sunset
& County Road J per citizen comments. She also pointed out some corrections that
should be made to the Future Roadway System maps.
As a result of the joint meeting of the Environmental Board and Park Board, a text
revision was recommended in Chapter 11 regarding the city taking over the tile system
west of 20th Avenue.
Board Members requested additional information regarding the Urban Reserve
designation. Ms. Schlicting stated that most growing communities currently use Urban
Reserve as a designation. She noted that Met Council began using the designation of
Urban Reserve during the 1996 regional framework, and she is not aware of any legal
challenges regarding the use of Urban Reserve. She explained that the key benefit of
Urban Reserve is to keep larger parcels intact so that master planning can be done to
achieve the goals of the plan. She explained that if large parcels are carved into smaller
lots, then it becomes more difficult to provide necessary services that interconnect to
other parcels.
Board Members discussed development and staging. Ms. Schlicting described that
although there would be no cap on development, staging areas would allow for projected
growth that could be accommodated for in each staging area. She noted that the issue of
rate versus quality of development was discussed at length by the Comprehensive Plan
Advisory Panel.
Mr. Smyser stated that page 3 -25 of the 2030 Draft Comprehensive Plan contains the
Growth Management Policy Framework Outline. He explained that when the city
approaches the 10 -year threshold to when the next staging area would begin, the City
Council would need to determine whether or not the city is ready to open up that next
staging area. He explained that inadequate infrastructure may determine that new
development areas are not ready for development. He noted that development within a
staging area would require a Comprehensive Plan Amendment prior to the designated
time.
Mr. Tralle opened the Public Hearing at 7:30 p.m.
Doug Koppy, 6689 East Shadow Lake Dr., and Bill Princeton, 7023- 256th St., were in
attendance to represent the Rice Creek Snowmobile Trail Club. They asked if the city
DRAFT MINUTES
Planning & Zoning Board
September 10, 2008
Page 3
had considered the existing snowmobile trails that are present in Lino Lakes. They stated
that it appears that some of the proposed city trails go over the snowmobile trails that
have existed for 25 years. They noted that these are DNR sponsored trails. Mr. Koppy
distributed a map of the existing snowmobile trails. He was concerned that the city
would be taking the existing trails away. He added that Mr. VonDeLinde (Anoka County
Parks Dept.) is aware of the existing trails. He stated that the city's map is not definitive
enough to show the exact location of the trails, but the location of city trails has caused
the club problems in the past. He stated that they would like to be involved in
discussions of trail locations. He added that some areas of the city include snowmobile
trails that run alongside of paved trails.
City Staff responded that the majority of the snowmobile trails in the city are within the
regional park, and are therefore not under the city's jurisdiction. Mr. Grochala said that
the city did consider this issue when locating the trail behind the YMCA in Lino Lakes.
Staff noted that language would be added to the plan recognizing snowmobile trails.
Dan Waldoch Jr., 559 Lois Ln., Lino Lakes stated he is a 58 -yr. resident. Mr. Waldoch
was present to discuss the proposed change for 1001 Main St. He noted that these
properties are in an estate and to settle the trust they will be sold in the future. He stated
that they are currently zoned with a 10 -acre minimum to provide a number of buildable
sites. He said that the new proposed Urban Reserve will reduce it to two conforming lots
and one non - conforming lot. He added that this will reduce the value of the parcels. He
requested that the minimum lot size does not change and thanked the board for their
consideration.
Jeff Joyer, 8174 Lake Drive, stated he has been a resident since 1978. He noted that his
parcel is the "front door" to the Waldoch Farm/Center. Mr. Joyer spoke about three
groups of parcels. He thanked the board for this amazing process and noted that he was a
former Planning & Zoning Board Member & task force member. Mr. Joyer commended
the board's efforts. Mr. Joyer distributed a handout he had created showing the location
of the parcels he referred to as "Parcel A," "Parcel B," and Parcel C," in addition to the
Family Trust parcel. He noted that staff had spent a number of hours with his family
describing the proposed impact to these parcels. Mr. Joyer explained the size of the
parcels and the use of the land, as well as the history of owners. He noted that utilities
are currently at the intersection of Lake Dr. & Main St. He stated that with each plan
revision, the parcels have been rezoned and the required lot size has increased. He was
concerned that the next generations will not have an opportunity to build. He said the
current proposed plan pushes development too far into the future and noted it was a bit of
a shock to discover the recent change to his site.
Mr. Joyer explained that three years ago they proposed to add a year -round retail center
to their existing garden center, and were told by the city that it would only be possible if
they brought in sewer and water and fire suppression throughout the greenhouses. He
stated that today they are faced with the fact that they cannot build commercial without
sewer and water, and that utilities will not be available until after 2030. He stated this
makes it difficult to have a viable growing business or for the next generation to continue
in a viable manner. He said this is creating an environment with few options for owners
to build and grow. He offered a solution could be to allow a 30 -acre parcel in the Urban
DRAFT MINUTES
Planning & Zoning Board
September 10, 2008
Page 4
Reserve to have commercial. He pointed out that all three parcels directly adjoin the area
where sewer will be provided. He wondered how the council proposes to provide utilities
to existing properties without the extension to a new commercial development. He stated
that a very abrupt line has been drawn along these parcels.
Mr. Joyer stated that he would prefer to develop on his property prior to the proposed
staging timeline, and provided specific recommendations for staff and the board to
consider for each of the three parcels. He noted that he had discussed these
recommendations with staff and he would welcome an option for change. Mr. Joyer
added that the parcel that is held in a family trust has been pastured and farmed for 92
years, and that this is not necessarily a practical solution for the future.
Michael Grochala, Community Development Director, provided some insight to the
process leading to the proposed changes to these parcels. Mr. Grochala noted that the
2007 map referenced by Mr. Joyer is the full build map included within the draft plan.
The full build map identifies the Joyer property as future commercial and high density
residential. In the short term (2030 Plan) the area is shown as Urban Reserve.
The location of the Urban Reserve was determined by evaluating the staging plan. Both
the development forecasts and the sanitary sewer capacity was analyzed to guide the
location of the stage 1 and stage 2 lines. He explained that there are five sewer districts
in the city, each with sub - districts. Staging in each sewer district is planned to ensure
there will be sewer capacity and to ensure a rational development sequence. He pointed
out that the Joyer property was located in Sewer District 2. The City does not currently
have capacity within the system to service all of district 2.
He noted that staff identified the areas that have the existing necessary infrastructure for
development. The plan is to bring a trunk reliever up the west side of the city that will
free up capacity in the rest of District 2. Without the reliever, capacity is limited to the
point that only the Stage 1 area can be served. He explained that the sod farms would
need to develop in order to allow for expansion into the Waldoch area. He added that the
plan is to reserve capacity for existing unsewered neighborhoods prior to allocating
service to new development areas. He pointed out that the Waldoch property and the
Joyer property will be serviced by separate lines, and the city is not projecting enough
growth to bring utilities to all this land in the foreseeable future.
Mr. Grochala pointed out that keeping these properties Urban Reserve at one unit per
forty acres would alleviate conflict as future development occurs. He noted that staff
would have no issue with moving Parcel C, as identified, into the Stage 1 growth area, as
it is immediately adjacent to the utilities from the Pine Glen subdivision. He noted that a
review of the Comp Plan every two years could provide opportunity for revisions if
development, such as the sod farms, should occur earlier than anticipated.
Board Members voiced their understanding that reserving capacity is one of the
mechanisms to control growth before it is ready to occur. Development at this location
will be dictated by what develops to the south, and that although a parcel may be moved
from Stage 2 to Stage 1, development will still not occur until utilities are present.
DRAFT MINUTES
Planning & Zoning Board
September 10, 2008
Page 5
Mr. Smyser explained that capacity for utilities is of utmost importance and that the
problem with the last plan was that it did not consider the availability of service to areas.
The city is trying to avoid misleading property owners, and reiterated that the
expectations of the past could not be fulfilled, so staff is trying to avoid creating this
problem again.
Mr. Tralle called for a 10- minute recess at 8:35 p.m.
Mr. Tralle reconvened the meeting at 8:48 p.m.
Board members discussed the proposed revisions to the parcels.
Staff explained that the need for fire suppression for the expansion of retail space at the
garden center is a state fire code requirement. Regarding the staging areas, staff noted
that a city always has to identify needs and draw a line, as development drives the
installation of a pipe. Staff pointed out that a residential area along Orange St. and Maple
Street with lots of around 10,000 sq. ft. with on -site sewer systems will require sewer
service soon from a public health standpoint. The city needs to plan for service to that
area.
Board Members further discussed the Urban Reserve designation. Some members
thought that Parcels A & B should be designated at one unit per ten acres versus
permanent rural. They were reminded that any parcel designated as Urban Reserve will
remain as such until someone comes in with a development proposal. Staff noted that
most property owners will wait to develop when sewer is available.
Board Members asked if staff had considered cluster developments. Staff replied that
clustering works well in permanently unsewered areas. But, as soon as a cluster system
is created, it becomes difficult to finance service to adjoining parcels when necessary,
which sometimes causes a donut hole for infrastructure. Staff reminded the board that
part of the city's growth management strategy is to provide a fully functional system.
Staff reiterated that the Urban Reserve designation is just a holding area for development.
The whole point of long term planning for full build out is to avoid these types of issues
and problems in the future.
Board members discussed the consideration of reducing the Urban Reserve requirements
to one unit per ten acres. Those in favor of reducing the requirements stated that they
understand the value of master planning, but acknowledge that it may cause limitations to
families. Those against changing the requirements stated it would complicate things for
the city, pointing out that this issue was discussed for a long time during the Comp Plan
process. Board members stated that they understand that Urban Reserve is just a
designation, and that the point is to maximize planning for optimal path for roads,
neighborhoods and businesses although it may be a burden to some land owners.
Staff reminded the board that there are areas in need of service, and the city would be
remiss if they are not trying to service an area that could be a public health hazard. Staff
explained the need to plan efficiently based on public, health, welfare and safety, and the
need to deal with existing homes rather than future potential homes.
DRAFT MINUTES
Planning & Zoning Board
September 10, 2008
Page 6
Board Members asked if Parcel B could be changed to Mixed Use. Ms. Schlicting
replied that a Mixed Use designation would provide for flexibility.
Mr. Grochala reiterated that they could amend the staging of Parcel B, but that
development will drive the timing regardless.
Board members were concerned that the Waldoch Farm could not expand their business.
Staff pointed out that in order to expand, a business needs to be consistent with the full
build plan of the city. Mr. Joyer's property is currently guided medium density, which
means the existing business is in conflict with city's existing comprehensive plan. The
proposed plan will eliminate this conflict. Once again, staff reminded the board that the
current fire and building code requirements include a sprinkling suppression system for a
retail business. In addition, the current city code states that no future commercial
development is allowed without utilities.
Mr. Laden made a MOTION to amend the 2030 Comp Plan by changing the Full Build
Land Use designation of Parcel A from Commercial and High Density Residential to
Mixed Use. Motion was supported by Mr. Hyden. Motion carried 6 -0.
Mr. Nelson made a MOTION to amend the 2030 Comp Plan by changing the Staging
Plan designation of Parcel B from Stage 3 to Stage 2. Motion was supported by Mr.
Rafferty. Motion carried 6 -0.
Board Members questioned if there would be any impediment to the city if this parcel
was added to Stage 2. Staff explained that accommodations would have to be made to
keep within the agreed upon growth forecast.
Motion failed 3 — 4. (Hyden, Laden, Pogalz and Rafferty voting nay.)
Mr. Laden made a MOTION to amend the 2030 Comp Plan by changing the Staging Plan
designation of Parcel C from Stage 3 to Stage 1. Motion was supported by Mr. Hyden.
Motion carried 6 -0.
Deb Waldoch, 559 Lois Ln., commented about the sewer line near the end of Main St.
near the Waldoch farm. Mr. Grochala explained that the existing sanitary sewer line is
there, but that the depth of the line is too shallow to serve the Waldoch area. Area 2C,
the Waldoch area, would require a new lift station in order to be developed.
Board Members asked why the lift station in Pine Glen was designed to provide for a
small area only. Mr. Studenski explained that the system is made up of trunk lines and
service lines. He explained that large pipes run on Lake Drive and Main Street, and that
the elevations of land cause a difference in the location of service. Cost & feasibility is
considered with each service pipe.
Mr. Nelson made a MOTION to recommend changing Urban Reserve to a density of one
unit per ten acres. Motion was supported by Mr. Tralle.
DRAFT MINUTES
Planning & Zoning Board
September 10, 2008
Page 7
Mr. Laden pointed out that after many meetings and work of the Comp Plan Advisory
Panel, the board is drastically changing something that the panel had agreed on.
Motion carried 4 -3. (Hyden, Laden and Pogalz voting nay.)
Mr. Rafferty made a MOTION to close the Public Hearing at 10:00 p.m. Motion was
supported by Mr. Pogalz. Motion carried 6 -0.
Mr. Nelson made a MOTION to recommend approval of the Draft 2030 Comprehensive
Plan as amended to the city council. Motion was supported by Mr. Root.
Mr. Smyser added that a resident came into city hall earlier that day and requested a
revision to move a three -acre parcel and a one -acre parcel into Stage 1 growth area. Mr.
Smyser stated that staff is comfortable with the requested change because the sewer pipe
is near and the additional few homes would not create a capacity problem.
Mr. Rafferty made a MOTION to amend the motion on the table to include the revision
of the staging plan to include two small parcels on Birch St. into Stage 1. Motion was
supported by Mr. Tralle.
Mr. Rafferty thanked city staff and the P &Z Board members.
Mr. Rafferty stated that he is not comfortable with the openness of the plan, but is in
favor of the previous type of plan. Mr. Rafferty has a reservation to express a positive
vote, but will do his best to ensure that the plan is everything it should be.
Motion carried 5 — 1. (Rafferty voting Nay.)
VI. DISCUSSION ITEMS
A. None
VII. ADJOURNMENT
Mr. Nelson made a MOTION to adjourn the meeting at 10:08 p.m. Motion was
supported by Mr. Laden. Motion carried 6 -0.
Respectfully submitted,
Dawn Bugge
Community Development Assistant
DRAFT MINUTES
Lino Lakes 2030 Draft Comprehensive Plan Revisions
Introduction
The Lino Lakes 2030 Draft Comprehensive Plan was presented to the Comprehensive Plan
Advisory Panel at several meetings during August of 2008 to obtain the panel's input on the draft
plan. The Advisory Panel supported the overall content of the draft plan, but suggested several
minor revisions. Following the Advisory Panel review, the draft plan was presented in August to
the City's Environmental Board, Park and Recreation Board, and Economic Development Advisory
Committee for their review and input. The plan was also presented at a public open house held
on September 3`d. On September 10th, the plan was presented to the Planning and Zoning Board
for review and recommendation for approval by the City Council. The Planning and Zoning Board
suggested several revisions to the plan, but voted to recommend the plan for Council approval.
Based on input received from the Advisory Panel, the Environmental Board, the Parks and
Recreation Board, Economic Development Advisory Committee, the Planning and Zoning Board,
and the public, a number of revisions were made to the draft plan provided previously to the
Council. These revisions are summarized below.
Chapter 3: Land Use Plan
1) Rural Land Use category name changed to Permanent Rural on all land use maps
and text referencing this category throughout chapter.
2) Increased allowable density within Urban Reserve from 1 unit per 40 acres to 1 unit
per 10 acres, which is consistent with current practices. References to 1 unit /40
acres eliminated and changed to 1 unit /10 acres throughout this chapter.
3) Figure 3 -2 Full Build Out Future Land Use Map: Parcel east of Lake Drive and north
of Main Street that is currently guided for Commercial(18.6 acres) and High Density
Residential (16.3 acres) changed to Mixed Use (Page 3 -12). Revised Figure 3 -2 is
attached and the changes are summarized below:
Previous Full Build Future Land Use Revised Full Build Future Land Use
1
4) Figure 3 -3 2030 Future Land Use Map: Parcel (3.5 acres) south of CSAH 14 guided
for Urban Reserve taken out of Urban Reserve, guided as Medium Density
Residential (Page 3 -13). Revised Figure 3 -3 is attached and the changes are
summarized below:
Previous 2030 Future Land Use
2.4 a)
f4
I I
m m
Revised 2030 Future Land Use
2 a
Cb
_O
m
This change is also reflected on Figure 3 -4 Utility Staging Map, as the parcel was
changed from Stage 3 Planned Service Area to Stage 1 Planned Service Area (Page
3 -23). Revised Figure 3 -4 is attached and the changes are summarized below:
Previous Utility Staging
Revised Utility Staging
■■;;111 ■...
Oak Ln. • •• -•
•.. .. ■ •
•
•
•
•
2
5) Figure 3 -3 2030 Future Land Use Map): Parcel (1.6 acres) south of Birch Street
guided for Urban Reserve taken out of Urban Reserve, guided as Low Density
Residential (Page 3 -13). Revised Figure 3 -3 is attached and the changes are
summarized below:
Previous 2030 Future Land Use
Revised 2030 Future Land Use
This change is also reflected on Figure 3 -4 Utility Staging Map, as the parcel was
changed from Stage 3 Planned Service Area to Stage 1 Planned Service Area (Page
3 -23). Revised Figure 3 -4 is attached and the changes are summarized below:
Previous Utility Staging Revised Utility Staging
U
6) Added clarification to descriptions of Medium and High Density Residential that
these areas will be served by municipal sewer and water (Page 3 -15).
7) Clarified Utility Staging requirements to state that development outside of the
current staging area will be limited to 1 unit per 10 acres. Development will be
limited to 1 unit per 10 acres until municipal sewer and water services are available
(Page 3 -22).
8) Revised titles of Tables 3 -5 and 3 -6 to "Capacity for New Households" and "Capacity
for New Employment" (Page 3 -24). Tables also appear in Chapter 4: Housing Plan
(Page 4 -14) and Chapter 5: Economic Development (Page 5 -11).
9) Reduced number of Mixed Use acres in Table 3 -5 to include only Mixed Use acres
dedicated to residential uses.
3
10) Added the following statement to the official controls strategies in the
Implementation Section (Page 3 -28): "A zoning district or districts will be established
as 'holding zones.' These holding zones are acceptable in all land use categories
until development occurs. The site will then be zoned to the district appropriate to
the land use category." This statement was also added to the official controls
discussion in Chapter 11: Implementation (Page 11 -1).
11) Changed the reference from land use map to Comprehensive Plan in the first official
controls strategy (Page 3 -28). The statement now reads "Update the zoning map to
eliminate inconsistencies with the Comprehensive P /an. "This statement was also
revised in Chapter 11: Implementation (Page 11 -1).
Chapter 4: Housing Plan
12) Added housing unit totals in each community to Charts 4 -2, 4 -3, and 4 -4 (Page 4 -5
through 4 -7).
13) Revised implementation strategy concerning the completion of a senior housing
market study to state that the City will cooperate with developers or other agencies
to assess senior housing needs in the community as appropriate (Page 4 -19). Same
strategy is also revised in Chapter 11: Implementation (Page 11 -4).
Chapter 6: Transportation Plan
14) Added reference to new roadway from CSAH 54 /CSAH 34 intersection to Main Street
(Page 6 -12).
15) Added reference to the need for improvements prior to 2030 for CSAH 34 from
CSAH 49 to CSAH 54, and statement that the County and City will initiate a special
study in the fall of 2008 to determine the appropriate design (Page 6 -13).
16) Several changes to Figures 6.6 Traffic Forecast (Post -2030 Full Build -Out) and 6.7
Future Roadway System (Post -2030) were made and these revised maps are
attached. Major changes are related to:
o moving Peltier Lake Drive to the east,
o correcting the classification of 77th St E to a local road (verses a collector), and
o including an extension of Elmcrest from 80th St E to the City of Columbus
Chapter 10: Planning Districts
17) Removed reference to transferring jurisdiction of ditch and clay tile system, west of
20th Avenue, to the City (Page 10 -29).
4
MEMORANDUM
DATE: September 26, 2008
TO: City Council
FROM: Michael Grochala, Community Development Director
RE: 2030 Comprehensive Plan Review
Our first council work session to review the draft Comprehensive Plan is scheduled for 5:30
p.m., Monday, September 26, 2008 at City Hall in the Community Room. Enclosed for your
review are the following meeting materials:
1. Agenda
2. Revisions Memo
3. Revised Maps
• Fig. 3 -2, Full Build Out Future Land Use Map
• Fig. 3 -3, 2030 Future Land Use Map
• Fig. 3 -4, Utility Staging Map
• Fig. 6.1, Roadway Network
• Fig. 6.3, Proposed Functional Classification System
• Fig. 6.4, 2030 Traffic Forecasts
• Fig. 6.5, Future Roadway System (2030)
• Fig. 6.6, Post -2030 Traffic Forecasts
• Fig. 6.7, Future Roadway System (Post 2030)
• Fig. 6.8, Transit Service and Facilities
4. Draft P & Z minutes from the September 10, 2008 Public Hearing
PLEASE REMEMBER TO BRING your copy of the draft Comprehensive Plan which was
distributed at the September 2, 2008 work session.
S: \Community Development \Comp Plan Process \COUNCIL REVIEW\9 -29 -08 Work Session\MEMO 9 -29 -08 WS.doc
ai
in
Main
80th St. E
5
i
Oak Ln.
Peltier
Lake
EEO
George
Watch
Lake
Marshan
Lake
Peltier
Lake
L City of C
lllll MUM
Rice Creek
Chain of Lakes Centerville
Regional Park Reserve Lake
Rice
Lake
nm
Reshanau
Lake
Birch St.
h St.
1 Baldwin
Lake
l
2
0
2
Cedar
Lake
Amelia
Lake
Ash St.
Otter
Lake
Full Build Out Future Land Use Map
City of Lino Lakes 2008 Comprehensive Plan Update
-rigum 3- L
•j _,, 1 Municipal Boundary MO Industrial
L----\ Permanent Rural Civic /Institutional
Low Density Residential Park/Open Space
N Medium Density Residential Private Airfield
Ell High Density Residential Right -of -Way
4,000 0 4,000 MO Commercial Open Water
FeetPrepared by Bonestrc
r" r Mixed Use K: /acivewod✓Gisserver 0 00 586- 06001 -O linolakescomplan/Full build oul.m.
C I T 0
[IN KE5
September 22, 200
L
Rondeau
Lake
Peltier
Lake
140
L-
1
1
George
Watch
Lake
Peltier
Lake
Marshan
Lake
Lake
Centerville
•
��li�,i.ap �
loin i.M/ .A (♦ —
,°ill
Reshanau
Lake
i_ ••_Liil
Birch St.
64th St*E
Cedar
Lake
Amelia
Lake
Ash St.
Otter
Lake
2030 Future Land Use Map
City of Lino Lakes 2008 Comprehensive Plan Update
4,000 0
jam j Municipal Boundary
Permanent Rural
Urban Reserve
Low Density Residential
Medium Density Residential
4,000 MN High Density Residential
Feet ® Commercial
f
-N9ure 3 -3
fallS Mixed Use
Industrial
NI Civic /Institutional
NI Park/Open Space
Private Airfield
Right-of-Way
Open Water
CIT_
LNCE�
September 22, 200
Prepared by Bonestro
K: /arty vwork/Gisserver /000586 - 06001 -0 linoIakescomplan203011u.rry
JLIl.•4•.sf_tf.il tl lulu •a11.J1. -au JUL" i- • -a•J,y a1. lam.• i- •- L:11L \LJll21ALl1L.lLAtJ • • :._aw.•a.NlYliiit7il�ryt .•• /�jjL YIJIYL�IY AVLLll SAI J-PA. AAA O.
ILI
AP•••
cA
53
•
153
•
•
•
4
•
•
•
1
•
Lilac St
•
•
•
•
Elm St:
14
23 • "�•
••
•
Marshan
• Lake
•
f
•
Peltier
Lake .
JUU•Li...-v-WV, •Jlt AYa3nl1.A• •,JUll•
•
•,•••
Q
• • ••
•
i.
•
•
•
•
:
City o
t01:1" •,q
•
r'
Rice
.• Lake
Rice Creek
Chain of Lakes
Regional Park Reserve
• •
Centerville
Lake
9.• •
•
•
Reshanau
Lake
t
i
•
3.
C i
• • ti
•
•
•
r
Baldwin :
Lake •
• re
• C
O
a
s 07
• 'O
Birch St.
•
•
: •
•-•-•-• r S
Amelia
Cedar :•4••1,ake
Lake _% •
• 2 '.
o AshySt. 1- .. ..
_ L Otter
.••
: Lake
i •._•_a•A.."•1,”•.3l▪ r- auL.•u.a -u sa.a..JU.IUAU.aAa•u•u •i.•_aL ▪ rrr111-•-ru7-r••111111-671vTrr rIls- •••▪ •r•r
:4••••
•''
:34
•i
Utility Staging Map
City of Lino Lakes 2008 Comprehensive Plan Update
L\
N
4,000 0
4,000
Feet
••... j Municipal Boundary
,.,5 Stage 1 Planned Service Area (2008 -2020)
h,,; Stage 2 Planned Service Area (2020 -2030)
Stage 3 Planned Service Area (Post 2030)
No Service Area
Figure, 3• 4
MCES Interceptors
NM Regional Park Reserve
Wetlands
Open Water
Right -of -Way
cir O
[IN( L KE
September 22, 200
Prepared by Bonestrc
K /activework/Gis_server /000588- 06001 -0 li nelakescompla n/stag irg.m)
53
Columbus
pW
2
140
ROOD
\AIS IV"
CARL ST
OAK LN
771)$' ST W
w
W ■R
z'
7
� EOF, ?E 0'4.,:H LA
77TH ST E
o_.
F =
WJ
cr
APOLLO DR
ELM ST
MAIN ST
Ceritervifle
80TH ST E
84
4
BIRCH ST
HOLLY DR E
LINDA AVE'.
PINE RD
AMELIA LAKE
HOLLY DR
Shoreview
North Oaks
A84
T_ILE LAM
White Bear Twp
5Al /■
EI4
Roadway Network
City of Lino Lakes 2008 Comprehensive Plan Update
Freeway Lakes
CSAH Streams
County Road School Open Space/ City Parks
Municipal Roads County Parks
4,000 0 4,000 Lino Lakes City Limits
Feet
Figure 6.
C I T Y U
KE�
June 30, 200
Prepared by SRF Consulting Group, In
INMaps15833 \mxd \FinalFigures \Figure 6- 1_IOadway_,network m "
Columbus
@FORCE W TGH1A,k£
CE UTERI/IL LE Lase
LINDA AV
PINE RD
North Oaks
Proposed Functional Classification System
City of Lino Lakes 2008 Comprehensive Plan Update
® Existing Full Access Interchange
® Existing Partial Access Interchange
(Future Full Access)
• Future Full Access Interchange
N
4,000
0 4,000
Feet
111111111.111111111111
Principal Arterial
A Minor Reliever
A Minor Expander
A Minor Connector
B Minor Arterial
Major Collector
Minor Collector
Local
Future Roadway
White Bear Twp
Lakes
School Open Space/ City Parks
County Parks
Lino Lakes City Limits
[IN
Figure 6.:
KEc
Prepared by SRF Consulting Group, In
i'\ Maps\ 5833 \mxd\Summe.ryFigures\Figure, 6.3 „FFC.rro
Columbus
1000
000
24
10500
140
53
800 OAK LW
00'3
3000
MARl4,1, LAKE
ttl ST
3200 4900
0
0
co
0
14200
TeT
C;ircie
Pities
BIRCH ST
16900
F-
" 2600
CN A LE 1,.,E
•-
tj
15900
4400
41000
WW1
84
700
4000
HOLLY DR E
2400
0 LINDAAVE
' Cr WHITE PINE RD
z
g
0 o
49
: 'cij3C
14900
Shoreview
r§
10900
62ND
2500
L Et, AP L E
12
4
WI/ KJKSCJ:!
21
North Oaks
1;
300
'EF ,4KF
H ST E
0
White Bear Twp
2030 Traffic Forecasts (AADT)
City of Linn Lakes 2008 Comnrehensive Plan Undate
® Existing Full Access Interchange 320 - 1,999 Lakes
Streams
Existing Partial Access Interchange 2,000 - 10,000
Future Full Access Interchange 10,001 - 20,000
imil■ 20,001 - 40,000
40,001 - 66,000
4,000 0 4,000
Feet
School Open Space/ City Parks
County Parks
Lino Lakes City Limits
Figure 6.4
C t T 0 1
KEc
June 30, 2001
Prepared by SRF Consulting Gmup, Inc
J \Maps \5(<33 \Summan/Figures1Figure_6-04...2030_volumes.mx,
Columbus
The appropriate design of CSAH 34 will be
determined through a special study to be
conducted by the city and county in fall 2008.
North Oaks
r
H ST E
1
I 1I,IAKL
i
i
White Bear Twp
Future Roadway System (2030)
City of Lino Lakes 2008 Comprehensive Plan Update
® Existing Full Access Interchange Recommended Lanes*
Existing Partial Access Interchange Six -Lane Divided
Four -Lane Divided
/ \ ® Future Full Access Interchange
Two -Lane
N
4,000 0 4,000
Feet
For Major and Minor Collectors, Minor
Arterials and Principal Arterials except
I -35W and I -35E
INS
Lakes
Streams
School Open Space/ City Parks
County Parks
Lino Lakes City Limits
Figure 6.5
June 30, 200
Prepared by SRF Cunsutting Group, In'
•J Maps\ 5833 \mxd \SumrnaryFigures\Figure_6 - 052030„ lanes. rn.%
Columbus
77TH ST E
7,000
FELTIEP L4KE
O
HOLLY D'' E
2,400
11200
Shoreview North Oaks/
NAL () EA
E f 4KF
,White Bear Twp
Post - 2030 Traffic Forecast (AADT, Full Build -Out)
City of Lino Lakes 2008 Comprehensive Plan Update
® Existing Full Access Interchange
® Existing Partial Access Interchange
(Future Full Access)
® Future Full Access Interchange
N
4,000 0 4,000
micimmommo Feet
320 - 1,999 Lakes
2,000 - 10,000 Streams
10,001 - 20,000 School Open Space/ City Parks
20,001 - 40,000 County Parks
40,001 - 73,000 Lino Lakes City Limits
Figure 6.6
[IN Q KE(
June 30, 200
Prepared by SRF Consulting Group, In
J:1Maps\ 5833' d\SummanyFigure;\Fgure_6. •08_F8. volumes.nu
28
Columbus
.4(E RD
— 1,000
o
0 E.
C:t
O
;000
0
9 000
3,400
140
53
ROAD
AK LN
do°
0
0
0
APO
MAIN ST
13,100
41
36,000
9,
P 111(.=,:S
100
43'
LIND
\M-Illt5
I
Shoreview
15,900 CO
• §.1 ;14
8
i--
- 2,600
400
HOLLY DR E
2,400
62ND $
2,500
9,600
isle)11 7
North Oaks
H ST E
White Bear Twp
Future Roadway System (Post-2030)
City of Lino Lakes 2008 Comprehensive Plan Update
® Existing Full Access Interchange Recommended Lanes*
ED Access Existing Partial Acss Interchange Six-Lane Divided
(Future Full Access)
Four-Lane Divided
• Future Full Access Interchange
-- Two-Lane
N #,### Traffic Forecast 2030
' For Major and Minor Collectors, Minor
Arterials and Principal Arterials except
4,000 0 4,000 1-35W and 1-35E
Feet
Lakes
Streams
IIIIII School Open Space/ City Parks
County Parks
. ' Lino Lakes City Limits
Figure 6.7
0 '
C I Y
IIN , 'AKE(
June 30, 200;
Prepared by SRF Consulting Group, In;
JAMapst5833 tmxd1SummaryFigurestrigure_6-07;;FB_Ianessrix
53
ROAD
J
a l
Nur
W
N
• I',
Columbus
W'
c
0
—4
\,OIS
CARL ST
x
153
lit
77TH ST W
77TH ST E
0
5 a
WF
4
BIRCH ST
•
a
c LINDA AVE
11 WHI E PINE RD
I °% .
F
eview
62ND ST`
•
HOLLY DR N
North Oaks
COWRY
84
80TH ST E
Hug
White Bear Twp
Transit Service and Facilities
City of Lino Lakes 2008 Comprehensive Plan Update
Park & Ride Locations
4,000 0 4,000
i Feet
Active
BPlanned
IMAM Bus Service
X Surfside Seaplane Base/
Lino Air Park
Lakes
Streams
School Open Space/ City Parks
County Parks
Lino Lakes City Limits
Figure 6.8
CITY
LN.i K.
June 30, 2001
Prepared by SRF Consulting Group, Im
J:Maps\5833 \Hued \SummaryFigures\Figure 6- 8_transy.mx