HomeMy WebLinkAbout09/24/2008 Environmental Board MinutesENVIRONMENTAL BOARD MEETING SEPTEMBER 24, 2008
CITY OF LINO LAKES
APPROVED MINUTES
DATE : September 24, 2008
TIME STARTED : 6:40 P.M.
TIME ENDED : 8:20 P.M.
MEMBERS PRESENT : Mary Jo O’Dea, Barbara Bor, Paula
Andrzejewski, Pamela Hartley, Kim Brouillet
and Martha DeHaven
MEMBERS ABSENT : Peter Brown
STAFF PRESENT : Environmental Coordinator Marty Asleson
1. CALL TO ORDER
Ms. O’Dea called the meeting to order at 6:40 p.m.
2. APPROVAL OF MINUTES
July 31, 2008
Ms. O’Dea had a change on page 3, 2nd paragraph: change the word Hurtles to
Hurdles. 8th paragraph: change For those who to Those who. Change lilly to lily.
Change homeowner to homeowners.
Mr. Andrzewski had a change on page 3, 5th paragraph: change thet to they. Page
4 delete paragraph three.
Ms. Hartley made a motion to approve the July 31, 2008 minutes with changes.
Ms. Bor seconded the motion. Motion carried unanimously.
3. APPROVAL OF AGENDA
Add to Discussion Item C: Roseville recycling subgroup stated Ms. Bor
Ms. Andrzejewski made a motion to approve the agenda. Ms. Brouillet seconded
the motion to approve the agenda. Motion carried unanimously
4. OPEN MIKE
Open mike closed at 6:41 p.m.
5. ACTION ITEMS
None.
1 DRAFT MINUTES
ENVIRONMENTAL BOARD MEETING SEPTEMBER 24, 2008
6. DISCUSSION ITEMS
A. Green Building, Cindy Ojczyk
Ms. Ojczyk was present to discuss green building and remodeling as well as
present her power point presentation.
Ms. Ojczyk stated she is a Lino Lakes resident and has two businesses. One
business is Simply Green Design and the second business is Verified Green.
She went on to discuss elements of green design such as the following:
Sustainable Design: “Meeting the needs of the present without compromising the
ability of future generations to meet their own needs.” Definition by the 1987
Bruntland Commission
Buildings are one of the heaviest consumers of natural resources and account for a
significant portion of the greenhouse gas emissions that affect climate change
There are 31,500 tons of construction waste and 3,000,000,000 tons of raw
materials used in construction annually in the US
There are many reasons for building green such as: fire safety, structural
integrity, means of egress, light, ventilation, heat, water, sanitation, electrical
power and gas. She stated Minnesota builds great buildings compared to other
states.
There are risks to future generations such as: climate impact, embodies energy,
pollution, toxicity of materials, purification of Water, Heat Island Effect,
externalized costs of society, resource depletion, dependence of non-renewable
energy, loss of habitat, loss of biodiversity, loss of agricultural land and increased
transportation.
Value Lessons from Green Commercial Buildings
- Increased profitability energy, water storm water
- Increased durability
- Healthier occupant & environments = decrease sick leave
- Marketing niche for attracting employees and tenants
Five Key Concepts:
-Energy Efficiency
-Water Conservation
-Site & Community Impact
-Indoor Environmental Quality
-Resource Efficiency
2 DRAFT MINUTES
ENVIRONMENTAL BOARD MEETING SEPTEMBER 24, 2008
Commonalities of Green Building Programs:
Mostly voluntary
Checklist based
Prerequisites & optional credits
Integrity of Building:
Third party verification
Training prior to use
Documentation of installation & process: photos, receipts, signatures
Commercial:
The State of Minnesota Sustainable Building: Buildings, Benchmarks & Beyond
U.S. Green Building Council
LEED for New Construction
LEED for Existing Buildings
LEED for Commercial Interiors
LEED for Schools
LEED: Leadership in Energy & Environmental Design
Residential:
mngreenstar (logo) MN GreenStar – January, 2008 Creation of MN GreenStar
the non-profit organization
Minnesota green communities – a national program for affordable housing
Green Community:
LEED for Neighborhood Development
MN GreenStar Cities Initiative:
-Provide a “pathway to sustainability” – cost-effective and pragmatic best
practices for local governments to achieve superior outcomes in a broad range of
sustainable practices, focusing on energy and including water, building,
transportation, and development.
-Help direct local governments to tools for financial, educational, and technical
assistance.
Green Building Process – Prerequisites:
-Submit all required documentation for a plan review prior to start or construction
- List of items from GreenStar
Green Star offers optimal credits for such things as insulation and overhangs on
homes.
Process - Preconstruction Plan Review & Registration:
-Construction Drawings
- Specifications
-Safety testing results: radon, CO
-Preliminary checklist
3 DRAFT MINUTES
ENVIRONMENTAL BOARD MEETING SEPTEMBER 24, 2008
-Energy modeling or testing: blower door, infrared
- Erosion control plan
- Waste management plan
- Site plan
-Landscape plan
-Water conservation plan
Process can be easy or hard. Depending on strategies that are applied.
Look at adding investment and time:
Process:
On-site verification and documentation, rater verification performance testing,
photographs, signatures, receipts and invoices.
Cost of GreenStar Certification: Take a $300,000 new construction home and
make it a LEED certified home would cost $8,500.
Homeowner Benefits:
Water and energy go down, carbon monoxide, radon, etc. go down. Increased
borrowing opportunities, increase selling opportunities, increased risk
management and align with personal values.
Contractors Benefits: Home Energy Rating System Index
Community Benefits:
Reduced water, energy, waste
Decrease storm water & heat island affect
Healthier buildings: radon, CO, VOC
Decreased pollution from auto transit
Building to future standards
Product and Manufacturer responsibility
Why Green: Accountability of people to the plant.
Ms. Bor stated there is a mixed use proposed development on the east side of the
city. It seems that there is opportunity before preplanning to work with city staff
to at least consider incorporating.
Mr. Asleson stated the biggest problem is the building code is black and white.
Ms. Bor stated she is not sure how it will get developed or by who at this point
but it would help to know what staff will suggest to the developer to further
advance the green concept to city building.
4 DRAFT MINUTES
ENVIRONMENTAL BOARD MEETING SEPTEMBER 24, 2008
Ms. Brouillet recommended having a development day to inform staff of Green
Building opportunities
Mr. Asleson stated that builders are not always on the same page.
Ms. Ojczyk stated there will be green building training in the near future.
Ms. Bor stated the concept is when builder’s come to city, they know the process.
She stated at the time when applying for a building permit they have already
invested in plans and by then it is almost too late.
B. Blue Heron Days Parade wrap-up
Ms. Hartley recommended additional volunteers to help with garbage pick up.
She suggested dividing volunteers up and having a few start where the parade
ends and a few start where the parade begins and work toward each other.
Ms. Bor suggested next year the board should have a visible banner and brighter
colored shirt.
C. Recycling Reports
Mr. Asleson stated the oil recycling station at1189 Main Street has been shut
down due to pcbs that were dumped into our tank. Mr. Asleson stated he filed a
police report for vandalism.
Other recycling and solid waste issues: Shoreview recycling subgroup will be
tabled until our next meeting:
Ms. O’Dea stated she would like to see parameters for families on their water
bills to be able to understand water usage for a family of four or five, etc. Ms.
Bor stated an article should be put in the Lino Lakes Newsletter and/or website.
Mr. Asleson stated we will look into having information in the upcoming
newsletter.
Blue Thumb Update – Add this item to next meeting agenda.
7. ADJOURN
It was noted that the next meeting of the Environmental Board will be on October
29, 2008.
There being no further business, Ms. Brouillet moved to adjourn at 8:20 p.m. Ms.
Andrzejewski seconded the motion. Motion carried unanimously.
5 DRAFT MINUTES
ENVIRONMENTAL BOARD MEETING SEPTEMBER 24, 2008
Transcribed by:
Lisa Hogstad
Community Development Secretary
6 DRAFT MINUTES