HomeMy WebLinkAbout05/04/2010 Environmental Board MinutesENVIRONMENTAL BOARD MEETING MAY 4, 2010
DRAFT MINUTES 1
CITY OF LINO LAKES
APPROVED SPECIAL BOARD MEETING MINUTES
DATE : May 4, 2010
TIME STARTED : 6:30 P.M.
TIME ENDED : 8:03 P.M.
MEMBERS PRESENT : Mary Jo O’Dea, Barbara Bor, Paula
Andrzejewski, Peter Brown, Martha DeHaven
and Steve Heiskary
MEMBERS ABSENT : None
STAFF PRESENT : Environmental Coordinator Marty Asleson
1. CALL TO ORDER
Ms. O’Dea called the meeting to order at 6:30 p.m.
2. Swearing in of Board Members
The following Environmental Board Members were sworn in by Mayor Jeff
Reinert:
1. Barbara Bor – Reappointed
2. Peter Brown – Reappointed
3. Stephen Heiskary – Newly Appointed
3. APPROVAL OF MINUTES
N/A
4. APPROVAL OF AGENDA
Mr. Brown made a motion to approve the agenda. Mr. Heiskary seconded the
motion to approve the agenda. Motion carried unanimously
5. OPEN MIKE
Open mike closed at 6:37 p.m.
6. ACTION ITEMS
A. Environmental Ordinance Review
ENVIRONMENTAL BOARD MEETING MAY 4, 2010
DRAFT MINUTES 2
Mr. Asleson presented Agenda Item 6A regarding Environmental Ordinance
Review. He stated this Ordinance will go before the Planning and Zoning Board
on May 12 for Public Hearing.
Ciara Schlichting, AICP and Kate Lamers, ASLA from Bonestroo will be
reviewing the draft ordinance.
Ms. Schlichting stated the purpose of this meeting is to review language of the
draft ordinance. She stated Bonestroo and City staff are running on a parallel tract
with the Planning & Zoning Board.
Ms. Schlichting will start by discussing background and then continue with the
overview.
Attachment 1: Site and Layout Performance Standards are new and therefore are
not replacing any other standards.
Attachment 2: Landscaping and Tree Preservation Standards will replace existing
standards.
She stated they want to incorporate the standards into the new ordinance.
Ms. Schlichting presented background information and the new ordinance
language that is building on the Resources Management Plan, the Lino Lakes
Parks, Trails and Greenways Plan and Surface Water Management Plan.
She stated RCWD gives examples of site design guidelines and puts them out as
guidance tool. Techniques have many different names such as: low impact
development design with nature, sustainable development and conservation
design.
She stated there is flexibility in the development code and cited conditional use
permits, planned unit development, variances and code revisions as examples.
Overview of Site Layout Performance Standards.
There are 3 major components of the Site Performance Standards
1. Natural Resource Protected Areas
2. Natural Resource Conservation Areas
3. Natural Resource Corridor Enhancement Areas
She stated the design of the Surface Water Management System shall be based on
preserving pre-development hydrology and environmentally sensitive areas to the
extent practical in accordance with the minimum performance standards.
ENVIRONMENTAL BOARD MEETING MAY 4, 2010
DRAFT MINUTES 3
ESAs shall be identified and categorized through the site planning process.
Natural Resource Protected Areas: streams, lakes, wetlands, wetland preservation
corridor
Natural Resource Conservation Areas: wetlands, natural and semi-natural areas
and the 100 year floodplain
Natural Resource Corridor Enhancement Area: potential linkage for wildlife
corridors
Categorize sensitive areas as same language in the park plan.
She continued the review with the Wetland Buffer and Upland Habitat
Requirements, Disconnect and Distribute Stormwater, and Reduction of
Impervious Cover.
Ms. Bor questioned what is defined with reduction to parking, etc. Ms.
Schlichting stated staff does not have an answer at this time. She stated we now
have parking requirements. If a developer decided to reduce impervious surface
then it might be an option to allow three stalls per 1000.
Ms. Schlichting briefly gave an overview of Landscaping and Tree Preservation
Standards.
Ms. O’Dea stated the Board will review this document section by section. She
stated the tree ordinance is very specific. When dealing with ordinances or
statutes that are very specific it makes it easier to deal with. The Board would like
all requirements to say A B & C regarding site performance layout with minimum
requirements and language to discuss. She stated incentives are what developers
looked for when they developed the Foxborough site. If incentives are not listed
in the document stating this is why it is a good thing to do it creates a problem.
Ms. Bor stated there are many rural properties throughout the City. If a property
owner were to alter drainage, it could affect other properties. Is there some way to
consider entire reference regarding this section? Mr. Heiskary stated there is a
pre-hydrology plan submitted right up front from a developer. Ms. Schlichting
stated in regards to water leaving a site, there will be no more than what it was
before the construction. Mr. Asleson stated stormwater is referenced in the
Stormwater Management Plan. We would like a developer to improve the current
drainage, not necessarily change.
Ms. Bor questioned to what extent practical really means in the Environmental
Sensitive Areas. Mr. Brown questioned if there is anything that is going to cause
ENVIRONMENTAL BOARD MEETING MAY 4, 2010
DRAFT MINUTES 4
problems such as a red flag what is the comfort level with this. Mr. Asleson
stated it will still be okay to cut your own trees down.
Ms. Bor questioned Item 2B. 1. Would this require a developer to conduct a
natural and endangered species study. Mr. Asleson stated yes.
Ms. Bor wanted to confirm 3C which states a minimum setback of 10 feet which
equates to a buffer on buffer.
Natural Resource Conservation Areas, Subsection B. Top of Page 4.
Ms. Bor stated at this time best practices will be used. Ms. Schlichting stated
there is research RCWD put together. It is better than what we have today but not
everything that RCWD requires. Ms. Schlichting stated there is a minimum and if
we can get more we will try. Mr. Brown questioned who decides this. Mr.
Smyser emphasized that Mother Nature does not design by numbers. We are
trying to approach review of the development of the site in that way. What we
plan to do, and you are not seeing yet, is outline the process of developing
projects. Ms. Schlichting referred to the handbook for conservation development;
if you are going to protect something you need the developer to design the site in
such a way that everyone is satisfied. Ms. O’Dea stated this is not defined. There
is a variable buffer stated Mr. Asleson. It was suggested that this is vague
language and may want to add wording and recommendations. Mr. Asleson stated
we should add a range of buffers to work with.
Ms. Bor stated to add a collaborative decision of what the buffer would be. Mr.
Smyser stated the City has ordinances that go from here to here. That part of it
will be covered in a different section. The process will be described in the
platting process or the PUD section. When something is developing we will have
certain groups looking at certain areas based on expertise.
Mr. Heiskary stated there is not a lot of science in the minimum numbers. The
idea of the minimum gives the developer the idea they have to do at least this.
Ms. Bor questioned if the Total Maximum Daily Load (TMDL) is referenced in
the stormwater ordinance? Mr. Asleson stated yes.
Natural Resources, Page 5
Ms. Bor questioned the accountability if a tree dies within 3 years of planting,
who is responsible. Mr. Asleson stated there are agreements with private pond
holders, the City can come in and assess or take care of the problem if owner does
not. Mr. Smyser stated if they are on an outlot or easement the City has the right
to access.
ENVIRONMENTAL BOARD MEETING MAY 4, 2010
DRAFT MINUTES 5
Disconnect and Distribute Stormwater, Page 6. Reduce Impervious Cover.
Ms. Bor questioned the threshold. Ms. Schlichting stated staff is going through
zoning districts regarding impervious surfaces. Percentage results are determined
by a study done by RCWD. Mr. Smyser stated the impervious surfaces will be
lowered based on this study.
Landscaping and Tree Preservation Standards, Attachment 2.
Section 8. Page, 7. Boulevard Tree Requirements. Mr. Heiskary questioned
adding wording regarding removal of Ash trees on City and private property. Mr.
Asleson stated we have an ordinance that covers this. Ms. Schlichting stated at
this point all Ash trees are currently prohibited.
Section 15, Page 15 – Tree Protection During Construction. It was stated this is
determined by routine site inspections.
Ms. Bor stated this extends beyond the final platting. The non-compliance still
applies down the road stated Ms. Schlichting. Mr. Asleson stated when complete
it will then become the property of the owner.
It was stated the Planning & Zoning Board will work collaboratively with the
Environmental Board on comments.
It was stated the Board will see this document again in the form of track changes.
7. DISCUSSION ITEMS
A. Arbor Day
There will be an Arbor Day celebration at Rice Lake Elementary on May 5
and at Lino Lakes Elementary on May 7.
8. ADJOURN
It was noted that the next meeting of the Environmental Board will be on
Wednesday, May 26, 2010 at 6:30 p.m.
There being no further business, Mr. Brown moved to adjourn at 8:03 p.m. Ms.
Andrzejewski seconded the motion. Motion carried unanimously.
Transcribed by:
Lisa Hogstad
Community Development Secretary