HomeMy WebLinkAbout12/14/2005 P&Z PacketCITY OF LINO LAKES
PLANNING & ZONING BOARD MEETING
Wednesday, December 14, 2005
6:30 p.m.
City Council Chambers
(scheduled to be televised on Ch. 16)
AGENDA
I. CALL TO ORDER AND ROLL CALL
II. APPROVAL OF AGENDA
III. APPROVAL OF MINUTES: November 9, 2005
IV. OPEN MIKE
V. ACTION ITEMS
A. CONTINUED: Planned Unit Development Final Plan for the Chain of Lakes
YMCA, 7690 Village Drive — Paul Bengtson
B. CONTINUED: PUBLIC HEARING to Amend the Planned Unit Development
for Legacy at Woods Edge to include signage criteria — Paul Bengtson
C. PUBLIC HEARING for a Conditional Use Permit to allow an automobile and
truck repair facility, Pomp's Tire, to be located at 7385 Apollo Court — Paul
Bengtson
VI. DISCUSSION ITEMS
A. 49/J Draft Report
B. Requiring sidewalks in subdivisions
C. Meeting Rules
VII. ADJOURN
AGENDA ITEM V.A.
•
STAFF ORIGINATOR: Paul Bengtson
P & Z MEETING DATE: December 14, 2005
TOPIC: Final Plan
YMCA
Legacy at Woods Edge
BACKGROUND
The Rice Creek Chain of Lakes YMCA has applied for a Planned Unit Development final plan for a single
tenant health club within the Legacy at Wood's Edge project located on the southeast quadrant of Interstate
35W and Lake Drive. The final plan consists only of the building plans for the YMCA, as the lot on which it is
proposed to be built was already platted as part of the Village No. 3 final plat.
The City of Lino Lakes formed a partnership with the Greater Saint Paul YMCA in 1998 to assist in the
construction of a YMCA in Lino Lakes. In 2005 a contract was approved whereby the city agreed to provide 6.7
•acres of land, $1.5 million for construction, plus utilities to the site in exchange for a YMCA of approximately
50,000 square feet that includes a teen center, gym, indoor pools, cardiovascular /strength training area, aerobic
studio, family program space and a child care area. In return, the YMCA agreed in part, to adhere to the
principles of the Town Center Design Guidelines.
This item was continued at the November 9th regular meeting and since this time the applicant has submitted
some revised drawings for staff review. These drawings did not encompass a complete submittal and therefore
a complete review could not be completed by staff. The staff also held the inaugural meeting of the Legacy
Architectural Review Committee. Board members Laden, Root, and Tralle attended and through a discussion
with city staff compiled a list of comments for the applicant. This letter is included as an attachment to this
report. Unfortunately the city does not have reproducible copies of the submitted plans. They will be available
for review at the meeting or at City Hall at any time.
Staff is recommending that this item be continued to the January 11, 2006 meeting so that they applicant has
time to address all of the comments they have received. The applicant was mailed a notice of extension for the
review period which would now expire on February 8, 2006. This means that barring the applicant granting the
city an extension the board would have to make a recommendation at the January 11t h meeting and the City
Council would have to act on the item at the January 23`d meeting.
ATTACHMENTS
• 1. Legacy Architectural Review Committee Notes from December 6, 2005.
•
CITY "
l ( F
[INL.\ C _ KES
December 7, 2005
Tim Staley
YMCA of Greater St. Paul
2125 E. Hennepin Avenue
Minneapolis, Minnesota 55413
RE: Chain of Lakes YMCA — 7690 Village Drive — Lino Lakes
The Community Development Department recently initiated an informal Architectural
Review Committee to review Legacy at Wood's Edge projects. This informal review is
intended to allow staff a chance to discuss the architectural design of proposals with a
sampling of the Planning and Zoning Board. This is an attempt to gather some additional
feedback, and to allow the applicant to attempt to address any outstanding issues prior to
the item being heard at the Planning and Zoning Board regular meeting.
The first meeting of this committee was held December 6, 2005 at City Hall. In
attendance were Planning and Zoning Board members Perry Laden, Michael Root, and
Paul Tralle; city staff members Michael Grochala, Mary Alice Divine, Jeff Smyser, and
Paul Bengtson.
The following comments were generated at this meeting:
1) The consensus of the members in attendance was that the north wall was a solid
improvement over the original proposal.
2) The consensus of the members in attendance was that the corrugated metal siding
proposed for the child care and teen/senior center portions of the building would
not be compatible with the rest of the Legacy at Woods Edge development.
3) The consensus of the members in attendance was that the single story portions of
the building need to very clearly follow the base /middle /top approach that is
dictated by the design standards. They wanted to encourage the architect to use a
mixture of masonry materials for the base; a mixture of masonry materials or
EIFS /Stucco for the middle/ and to provide a strong cornice element that is not
just metal flashing.
600 Town Center Parkway, Lino Lakes, Minnesota 55014-1182
Phone: 651- 982 -2400 • Fax: 651 -982 -2499
•
•
4) The consensus of the members in attendance was that the awnings proposed over
the windows on the northwest and southwest corners of the single story structure
and the southwest corner of the concrete panels were a positive addition; though it
is preferable they be functional and provide shading in the summer.
5) The consensus of the members in attendance was that the polycarbonate material
proposed for the awnings and the entry did not properly convey durability as is
required by the design standards.
6) The consensus of the members in attendance was that the entry needed to be
strengthened to clearly indicate to visitors where the main entrance is for the
building, as well as to convey durability and massing that is on scale with the rest
of this structure and the surrounding development.
7) The consensus of the members in attendance was that the concrete panels need to
stay with darker, warmer colors. Specifically they encouraged the use of the
red /brown color proposed for the north and south end for the entire building.
8) The consensus of the members in attendance was that additional articulation
within the concrete panels is desired, whether it is scoring, corduroy, or insets.
If you have any questions in regards to these comments please feel free to contact me at
(65 1) 982 -2426.
Paul F. Bengtson
Associate Planner
CC: Mark Wentzell, AIA
Maria Manion
Ankeny Kell Architects
Patrick Sarver
Hartford Group
AGENDA ITEM V.B.
• STAFF ORIGINATOR: Paul Bengtson
P & Z MEETING DATE: December 14, 2005
TOPIC: PUD Amendment — Signage Criteria
City of Lino Lakes
BACKGROUND
The original signage criteria for the Legacy at Wood's Edge were removed prior to approval of
the master plan. This was done so that the developer and city could create signage criteria that
would address the advertising needs of the master developer and future tenants; and be
enforceable by city staff. Staff s approach of involving the developer throughout the crafting of
these criteria has lengthened the process, but should result in a more comprehensive product. As
such, staff is recommending that the Public Hearing be continued to the January 12, 2005
Planning and Zoning Board meeting.
OPTIONS.
1. Continue the public hearing to the January 12, 2005 regular meeting.
RECOMMENDATION
Staff recommends continuing the public hearing.
STAFF ORIGINATOR:
P & Z MEETING DATE:
TOPIC:
BACKGROUND
AGENDA ITEM V.C.
Paul Bengtson
December 14, 2005
PUBLIC HEARING: Conditional Use Permit — Auto Repair Facility
Site Plan Review — Pomp's Tire
Pomp's Tire has requested approval of a Conditional Use Permit to allow an Auto Repair Facility and Site and
Building Plan Review for a 30,870 square foot tire warehouse / installation facility at 7385 Apollo Court.
ANALYSIS
Comprehensive Plan, Land Use and Zoning: The table below identifies the existing land use and zoning
as well as guided land uses for the area.
Location
Existing Land Use
Guided Land Use
Existing Zoning
frte
Vacant
Industrial
Light Industrial
orth
Prison
Public / Semi - Public
Public / Semi - Public
South
Contractor's Office
Industrial
Light Industrial
East
Multi - Tenant Retail
Industrial
Light Industrial
West
Single Family Residential
Low Density Unsewered Residential
Rural
The comprehensive plan guides the site for Industrial use. The site is within the stage 1 (pre -2010) growth area
and within the existing MUSA boundary. Public water and sanitary sewer are available within Apollo Court.
Conditional Use
The applicant is proposing to do tire installation on both commercial and small vehicles. This use is considered
Automobile and truck repair and is listed as a conditional use within the LI (Light Industrial) zoning district.
The requirements for Automobile and truck repair are as follows:
•
2. Automobile and truck repair provided that:
a. The architectural appearance and functional plan of the building and site shall not be so
dissimilar to the existing buildings or area as to cause impairment in property values or
constitute a blighting influence within a reasonable distance of the lot.
b. All building materials and construction including those of accessory structures must be in
conformance with Section 3, Subd. 4.D. of this Ordinance.
•
•
c. Not less than twenty -five (25) percent of the lot, parcel or tract of land shall remain as
landscaped green area according to the approved landscape plan.
d. The entire area other than occupied by buildings or structures or planting shall be
surfaced with bituminous or concrete which will control dust and drainage. The entire
area shall have a perimeter curb barrier, a storm water drainage system and is subject to
the approval of the City Engineer.
e. All buildings shall provide an interior location for trash handling or an enclosed trash
receptacle area in conformance with the following:
1) Exterior wall treatment shall be similar and/or complement the principal building.
2) The enclosed trash receptacle area shall be located in the rear or in a side yard
which is not abutting a street.
3) The trash enclosure must be in an accessible location for pick up hauling vehicles.
4) The trash enclosure must be fully screened from view of adjacent properties.
f. All painting must be conducted in an approved paint booth. All paint booths and all other
activities of the operation shall thoroughly control the emission of fumes, dust or other
particulated matter so that the use shall be in compliance with the State of Minnesota
Pollution Control Standards, Minnesota Regulation APC 1 -15, as amended.
g.
The emission of odor by a use shall be in compliance with and regulated by the State of
Minnesota Pollution Control Standards, Minnesota Regulations APC, as amended.
h. All flammable materials, including liquids and rags, shall conform with the applicable
provisions of the Minnesota Uniform Fire Code.
i. All outside storage shall be prohibited except the storage of customer vehicles waiting for
repair.
j•
Off - street parking shall be in conformance with Section 3, Subd. 5. of this Ordinance and
a loading area or berth shall be provided in conformance with Section 3, Subd. 6. of this
Ordinance.
k. All conditions pertaining to a specific site are subject to change when the Council, upon
investigation in relation to a form request, finds that the general welfare and public
betterment can be served by modifying the conditions.
Staff finds that with the exception of requirement `e' involving the trash enclosure, the proposed plans meet all
of the conditions for the use. Further discussion in this report and a staff recommended condition of approval
address the trash enclosure deficiency.
Setback Requirements
•
Principle Building
Local Street:
Apollo Court
Jon Drive
74th Street
Side Yard:
South Property Line
East Property Line
Required
30 feet
10 feet
Proposed
65 feet*
178 feet
259 feet
185 feet
168 feet
Parking Lot
Required
15 feet
5 feet
Proposed
38 feet*
178 feet
103 feet
105 feet
15 feet
*The future right of way location for the cul -de -sac is not currently indicated on the plan. Staff would need to verify that the setbacks
would still be maintained once the final location of the right of way is determined.
The proposed building meets or exceeds all of the setback requirements for the LI (Light Industrial) zoning
district; including the minimum setback from residential districts of 75 feet and the setback requirement
between buildings of 1/2 the sum of the building heights of the two buildings. (Even if the 45 foot maximum
height was used the setback between buildings would be maxed out at 45 feet, this proposal is well in excess of
45 feet from the buildings to the east and the south.
Building Materials
•To meet the recently approved architectural design standards for the city, the applicant is proposing a mix of
brick/masonry materials and EIFS. Ordinance Number 07 -05 which revised the commercial design guidelines
requires the following limitations on EIFS type wall finishes:
Wall Face
Elevation
EIFS
Maximum
Allowed
Proposed
Front
South
30%
20%
Sides & Rear
South
60%
56%
West
60%
54%
North
60%
56%
East
60%
55%
These percentages clearly conform to ordinance 07 -05. Furthermore, the EIFS is no closer than 7 feet 4 inches
to the ground, which clearly exceeds the minimum of 4 feet required by the new ordinance.
The roof is proposed to be constructed of a metal product. All of the proposed materials meet the requirements
of the zoning ordinance.
•
The only portion of the new design guidelines that are not being completely met is the following requirement:
•
Buildings shall have a well- defined base, middle and top. The base should appear visually
distinct from the middle and top part (cornice) of the building through the use of a change in
building materials, color, window shape or size, an intermediate cornice line, sign band, an
awning, or similar techniques.
The project lacks a significant top, staff is including a condition of approval that would require the inclusion of
a cornice element sufficient in size and constructed of durable materials.
Building Height
According to the Zoning Ordinance, no building within the LI (Light Industrial) zoning district may exceed 45
feet in height. At approximately 22 feet in height, the proposed facility complies with the ordinance.
Landscaping
The landscaping plan is generally compliant with city requirements with the exception of some material
changes, boulevard trees, and the required buffer.
The LI (Light Industrial) district requires side and rear lot lines adjacent to residential or commercial districts,
public right -of -way, a landscape buffer area not less than 40 feet in depth containing an effective mix of
screening including landscaping, planting, berming, or fencing.
The submitted plans indicate a berm along the southern half of the west property line that along with the
proposed landscaping should provide a substantial screen to the west, but the northern half of the west property
line and the north property line appear to be lacking in appropriate screening.
Staff notes that this berm was part of the mass grading plan that was approved for this entire industrial
development by Conditional Use Permit. Each individual property within the project has been reviewed based
on that grading plan as they have developed, so not all of those improvements have been completed until such
time that development occurs. In this case there is not berm on the western property line at this time and it
would need to be completed as part of this project not only for the purposes of grading and drainage, but also
for the screening it will provide.
An inspection of the existing site by staff proved that there are a number of existing trees that might provide
some screening of the building, but their location must be verified. If they are located on the property and not
within the roadway easement, staff can consider them as part of the buffer. The applicant will need to submit a
revised landscape plan (and if necessary a grading plan) that addresses the need for a 40 foot wide screening
buffer. This will need to be submitted prior to the item being heard by the City Council.
•
This application has drawn the attention of neighboring property owners and has brought to light issues with the
screening of the Summit Fire building to the south. Staff is working towards addressing that issue at this time.
As always, all sodded and landscaped areas shall require irrigation. The environmental board has specifically
requested that all berms be irrigated as well to ensure survival of planting materials.
Green Area
The LI (Light Industrial ) zoning district requires that impervious surface coverage not exceed 85%. . Plans
currently show a total of 5.9 acres of impervious surface within the 8.9 acres of land equaling approximately
66% impervious surface coverage. Well within the allowable standards.
Access /Circulation
Access to the site is via two exit/entry drives from Apollo Court. Staff has reviewed access to this site and all
the other lots within this industrial park as a part of the minor subdivision that created this lot as well as the
Apollo Court street alignment. The applicant has submitted an exhibit that clearly depicts proper truck
circulation for the site.
The cul -de -sac depicted is within a temporary road easement that was granted as part of the minor subdivision
that created this lot. The city is requiring full right of way dedication or permanent roadway easements for the
entire length of Apollo Court. This will be worked out with the applicant and shall be shown correctly on
revised plans prior to this item being heard by the City Council.
Apollo Court will also need to be completed to city standards prior to it's acceptance by the city, this includes
the entire length of Apollo Court of which none has been accepted by the city at this point.
Pedestrian Circulation
*Minimal sidewalks are provided within the site due to the use of paving adjacent to many of the building's
doors. The exception is the access from the parking areas to the main entrance.
Lighting
The photometric lighting plan submitted is in conformance with the standards of the zoning ordinance;
however, the fixtures included do not meet city standards for shoebox, downcast lighting. A condition of
approval has been included requiring compliance with city standards in this regard.
Parking
This facility will be required to provide parking per the parking standards as listed below.
Parking
Factor
Code
Requirement
Spaces
Required
Spaces
Provided
1,840 s.f.
Office: 3 spaces plus one for each 200 s.f.
13
13
29,030 s.f.
Warehouse: 1 space for each 2,000 s.f.
15
15
30,870 s.f
28
28
The project is provided exactly the required amount of parking based on the zoning ordinance.
•
Signage
•The submittal includes minimal signage, and with the recent amendments to the signage ordinance would be
well within the regulations. All signage will be reviewed at time of building permit and will be required to meet
the requirements of the signage ordinance.
Trash / Mechanical Equipment
The trash enclosure is set away from the building towards the north end of the driveway. This location directs
the opening to the cul -de -sac making it quite visible and difficult to properly screen. Staff is recommending a
condition that it be moved to a location closer to the main structure; that it be constructed of complementary
materials; and that the opening be directed away from the cul -de -sac.
Engineering
The City Engineer has thoroughly reviewed the submitted plans and his comments are attached in memorandum
form. A condition of this approval will require compliance with these comments.
The Rice Creek Watershed District has completed a review of the overall industrial park; as well as issued a
CAPROC (Conditional Approval Pending Receipt of Changes) for the Pomp's Tire facility.
OPTIONS
1. Recommend approval of the Conditional Use Permit for Pomp's Tire
2. Recommend denial of the Conditional Use Permit for Pomp's Tire
3. Return to staff with direction.
RECOMMENDATION
Staff recommends approval of the request subject to the conditions of the conditional use as listed within the
body of the staff report, as well as the following conditions related to the development of the site:
1. A performance agreement must be executed between the developer and the city prior to issuance of
building permits.
2. Issues discussed in the City Engineer review memo must be addressed to his satisfaction.
3. All lighting fixtures must be shoebox, downcast fixtures in accordance with the requirements of
Subdivision 4, Section F of the zoning ordinance.
4. The trash enclosure must be relocated, properly screened, and constructed of complementary materials
as required by Section 8, Subdivision 1.
•
•
•
5. A revised landscape plan must be submitted by the applicant depicting conformance with the buffer
requirements of Section 8, Subdivision 1. This revised landscape plan must also address all of the
comments of the environmental board and must be submitted prior to the City Council review of the
proj ect.
6. A revised site plan depicting the full right of way width for Apollo Drive must be submitted by the
applicant. This must be submitted prior to the City Council review of the project.
7. The entire length of Apollo Court must be completed to full city standards prior to the project receiving
a Certificate of Occupancy.
8. A revised building elevation depicting a cornice element of appropriate scale and constructed of durable
materials must be submitted by the applicant prior to the City Council review of the project.
9. All landscaped and planted areas, including any berm plantings, must be irrigated.
ATTACHMENTS
1. Environmental Board comments from the November 30, 2005 regular meeting.
2. City Engineer memorandum dated December 9, 2005.
3. Pomp's Tires packet received November 14, 2005.
Recommendations
Lino Lakes Environmental Board
November 30, 2005
The following recommendations were made at the November 30. 2005
Environmental Board Meeting:
Pomp's Tires
Landscape
• There should be no exporting or importing of soils from this site without
City Approvals. Wetland soils should be stockpiled and used in the
constructed wetland and infiltration areas.
• All infiltration, management pond and surface water swale areas should
be planted with a City specified native seed mix (not the MNDOT
specification). A City approved contractor should be hired to install, and
maintain the native plant areas for a minimum of 3 to 5 years. Seed
verification should be made with the City Environmental Coordinator prior
to planting.
• All turf areas should be irrigated. All turf areas should have top soil
thoroughly tilled into the subsoil as deep as possible. This should be a
check list item that is inspected by environmental prior to sodding. There
is no indication on the plan as to what will be growing in the open area to
the south. If this area is going to be mowed like a sodded landscape is
mowed, than it should be shown as sod with irrigation. Otherwise this are
should be seeded with the City native upland seed mix and placed under a
3 -5 year initial start-up contract with an approved landscape company.
This contract should include one burn at the end of 3 years.
• A proposed berm area on the western side of the project is intended to
screen the residential area to the west. This berm should be irrigated, in
order to support plantings on the berm.
• In the tree planting pallet, Green Mountain Sugar maples should be
changed. Red maple, Hackberry, Red or White /Burr oaks should be
substituted for the Green Mountain maples.
• On the upland portions of the pond areas that are to be seeded with the
City native seed mix, the developer should plant tree species that would
tolerate native plant management. I would suggest changing the Niobe
Weeping Willows to Oak species.
• Apollo Court should have boulevard trees planted every 50 feet. Suggest
planting oaks in this area.
•
•
•
• In the foundation planting schedule, I would suggest changing the Dwarf
Amur maple to some native species that is not on the state invasive listing.
Tree Preservation
• Although there are several stamped trees on the plan that appear to be
significant trees, there is no identifying codes as to what these trees are,
or whether they are intended to be removed or saved. If they are to be
saved they should be indicated as such on the plan and a detail on
appropriate tree protection measures shown. All tree protection measures
must be implemented prior to soil disturbance.
Lighting
• The photometric plan shows the light "zeroing -out" at the property line.
Security light fixtures do not appear to meet the City standard. Lights
should meet the City standard.
Erosion Control
• The erosion control plan must be on site. The developer should indicate
the place where the erosion control plan under an approved NPDES
permit will be found on site. All required weekly and post rainfall event
inspection reports must be located with the erosion control plan. The
developer should indicate the site NPDES site supervisor and contact
number.
• Rock entrances must be replaced or added to if rock pore spaces become
filled. Any area storm water catch basins must be protected with an
approved sediment containment device (no hay bales) such as the Royal
lnfrasafe debris collection device.
Tire Storage
• There should be appropriate storage of used tires so that they remain dry
(mosquito breeding concerns) and are out of sight.
Motion to approve staff with Environmental Board recommendations by
Bauman, second by Bor. All were in favor.
•
•
•
Memorandum
DATE: December 9, 2005
TO: Paul Bengtson
FROM: James E. Studenski, City Engineer
RE: Pomp's Tire
Attached please find a TKDA review dated December 9, 2005 of the submitted items
for the Pomp's Tire project.
Contact me at 651/982 -2430 with any questions, thank you.
600 Town Center Parkway, Lino Lakes, Minnesota 55014 -1182
Phone: 651 -982 -2400 ® Fax: 651 - 982 -2499
TKDA
ENGINEERS • ARCHITECTS • PLANNERS
•MEMORANDUM
•
To:
Copies To:
James E. Studenski, P.E.
1500 Piper Jaffray Plaza
444 Cedar Street
Saint Paul, MN 55101-2140
(651) 292-4400
(651) 292-0083 fax
www.tkda.com
Reference: Pomps Tire
Site Plan Review
City of Lino Lakes, Minnesota
From: Thomas Prew, P.E. Proj. No.: 13265.002
Date: December 9, 2005 Routing:
The following storm sewer review is based on these submittals:
1. Midstates Tire and Tool, Inc. Utility Plan prepared by Metro Land Surveying & Engineering, dated
November 11, 2005.
2. Midstates Tire and Tool, Inc. Grading Plan prepared by Metro Land Surveying & Engineering, dated
October 10, 2005.
Streets
1. This project will complete the cul -de -sac for Apollo Court. Two driveways would be connected to it.
2. Right -of -way for the cul -de -sac will be platted.
Sanitary Sewer
1. The sanitary sewer which crosses this property has never been officially accepted by the City.
Record Drawings of these existing utilities (sanitary sewer and water) must be provided.
2. Existing manholes will be raised to finished grade.
3. A 6 -inch wye is planned to connect to the existing sanitary sewer.
Watermain
1. New watermain and three hydrants will be constructed.
Drainage and Storm Sewer
1. Drainage and storm sewer reviews are attached.
Miscellaneous
1. Construction Record Drawings (As- Builts) must be submitted once all improvements have been
completed.
An Employee Owned Company Promoting Affirmative Action and Equal Opportunity
TKDA
ENGINEERS • ARCHITECTS • PLANNERS
4111 MEMORANDUM
To:
Copies To:
James E. Studenski, P.E.
Reference: Pomps Tire
From: Connie J. Taillon, P.E. Proj. No.:
Date: December 2, 2005 Routing:
The following drainage review is based on these submittals:
1500 Piper Jaffray Plaza
444 Cedar Street
Saint Paul, MN 55101 -2140
(651) 292-4400
(651) 292-0083 Fax
www.tkda.com
Drainage Review
City of Lino Lakes, Minnesota
1. Geotechnical Evaluation Report prepared by Braun Intertec Corporation, dated October 26, 2005.
2. Midstates Tire and Tool, Inc. plan set prepared by Metro Land Surveying & Engineering, dated
November 9, 2005.
3. Existing and Proposed HydroCAD models prepared by Metro Land Surveying & Engineering, dated
November 2, 2005.
4. Proposed drainage plan prepared by Metro Land Surveying & Engineering, dated November 2, 2005.
Drainage Review Comments:
• 1.
Include off -site drainage entering the proposed pond via an existing culvert located under Jon
Avenue. Include this drainage in the hydrologic analysis of the site.
2. Use a curve number of 100 for the dead storage area of the wet pond and wetland in the HydroCAD
model.
3. The n value for the existing 24" culvert under 74th street should be increased to 0.024 for corrugated
metal pipe.
4. Define infiltration only above the normal water level for the proposed detention pond.
5. Based on the infiltration guidance document prepared by RCWD, an infiltration rate of 0.25in/hr
(.0003472 ft/min) should be used for Type B soils
6. Update the plans to reflect the sharp- crested vee weir defined in the HydroCAD model for Pond 2P
and Pond 3P.
7. Include the sharp- crested vee weir detail in the plans as dimensioned in the proposed conditions
HydroCAD model for Pond 2P and Pond 3P.
8. Include details of the pond outlet baffle and bale check in the plan.
9. The high water levels indicated in the grading plan is inconsistent with the high water levels
summarized in the HydroCAD model. Update the plan to reflect modeling results.
10. Expand the easement at the south corner of the proposed detention pond and add easement along
storm sewer from the cul -de -sac to the proposed detention pond.
• 11. Submit a copy of the RCWD 05 -117 permit, RCWD 04 -100 permit, and the NPDES permit.
An Employee Owned Company Promoting Affirmative Action and Equal Opportunity
TKDA
ENGINEERS • ARCHITECTS • PLANNERS
• MEMORANDUM
To:
Copies To:
James E. Studenski, P.E. Reference: Pomps Tire
From: Connie J. Taillon, P.E.
Date: December 8, 2005
Proj. No.:
Routing:
The following storm sewer review is based on these submittals:
1. Midstates Tire and Tool, Inc.
November 11, 2005.
2. Midstates Tire and Tool, Inc.
October 10, 2005.
1500 Piper Jaffray Plaza
444 Cedar Street
Saint Paul, MN 55101 -2140
(651) 292-4400
(651) 292-0083 Fax
www.tkda.com
Storm Sewer Review
City of Lino Lakes, Minnesota
13265.002
Utility Plan prepared by Metro Land Surveying & Engineering, dated
Grading Plan prepared by Metro Land Surveying & Engineering, dated
Storm Sewer Review Comments:
1. Please submit storm sewer calculations and a storm sewer drainage map for review.
2. Include roof drainage in the storm sewer design calculations.
Include rim and invert elevations for all catchbasins and manholes on the plan.
• 3.
•
An Employee Owned Company Promoting Affirmative Action and Equal Opportunity
Di
1
11
Nortneosl comer of the Southeast
22. ter Section }t, Ronge
0
0I
I
_,�
1
e' ,
_e
= °
1
I
--
y. innesot
NORTH . 18. OF TWP. 3 . RNG. 22. QUARTER 22, MOka County. Minnesol
r NORTHWEST CORNER OF -- -
SOUTHEAST QUARTER OF OF SEC. 18. TWP. 31, RNG. 22�
SEC. Ifi
"w
I RCP 596.07 588.22'57
561 18 2099.64
74TH
N8r22'57 "E I ° - - - - _ _ -�1.,
/
AND /
�.
1 //,'
/
30 I20 I
-
fii
al
rrj ,"
fr
`�
(
t
STREET VACATED BUT DRAINAGE / '/ -- --
UTILITY EASEMENT 75 ST1Ll IN EFFECT. L PE ,,,,,. 696.19
7
33
--
te' \ / /
P\ry
\ /
J / I • /
#
2- paQT`P \\ PARCEL G
+;
cg
11��
//� / PARCEL G PER SCHEDULE A OF TITLE PREPARED BY CHICAGO TITLE
,/
CC
_ La
r <
O
O
Z Q
=5 La
F
NW �I
to
3 O
IN°
900.911
- - - J
j
Lam/
_I
1
1. EFFECTIVE
/ INSURANCE COMPANY, CASE NO 230281, EFFECTIVE DATE MAY 27 2003
/ Thot Dort of the Southeast Quarter of Section 18, Township 31, Range 22. Moko
a0 ti0 County, Minnesota. tlescribetl os commencing of (50 Northeast corner of said Southeast
• .\\, 44‘1,(3/ / Quarter: thence South 88 degrees 22 minutes 57 seconds West. assumed bearing, along
$. F\ 1. 1.. the North line of sold Southeast Ouorler 0 distance of 2099.84 feel to the point of
/ F ype5lY2P h ^/ • beginning of the parcel to be described; .7 (hence South 01 degree 37 mules 03
. cj 0. seconds East o distance of 648.37 feet: (hence South 88 degrees 22 minutes 57
P I. P / seconds west 70.00 feet: thence South 01 degrees 37 minutes 03 seconds East 16.00
p�E"1\ 0� ' feet: thence South 88 degrees 22 minutes 57 seconds West 131.85 feet: thence South
O' / 50 degrees 20 minutes 29 seconds West 203.19 feet: thence South 80 degrees 18
/ W minutes 27 seconds west 225.00 feet to the West line of soil Southeast Quarter:
hence North 00 degrees 01 minuses 09 seconds East, along sold west line minutes feet
// W to the North line of soil Southeast Guor ter: thence North 85 degrees 22 minutes 57
1.0 seconds Eosl. Wong said North line, 561.18 feel to the point of beginning.
/
/ / ? Q'� m NOTES
g
01
W
¢
/A
�I Oo /
o V Stl,V /, 1
900.
1
1/ _ O O =N 1.) EASEMENTS SHOWN ARE LISTED IN SCHEDULE 8 OF NILE COMMITMENT PREPARED BY
_ pi Z O CHICAGO TITLE INSURANCE COMPANY, CASE Na 230281
/ �° c. a = 2.) UTILITIES SHOWN ARE FROM THE CONSTRUCTION PLANS
a co 3.) WETLAND LOCATION TAKEN FROM DRAWING BY METRO LAND SURVEYING AND ENGINEERING
PARCEL G ' z
/ O a DATED 1/12/01
AREA INCLUDES EASEMENTS
AND RICHT OF WAY y 0 a
579102 SgFtt j
9.62 Acres± ^7� ' / j
/ m
' /, nE
/ y LEGEND
5
c
KELLER
N 216 STATE ROAD 55
KAUKAUNA, WI 54130
t �,
W
1 C�
CO
1
,/�
e
W
7.
0 W
6 C
O
5 W
1
I6?
33
I
I
/
/
/
�/
-,
/
"//
IV/
30 ((x/20
/
-
T
i!/
5".
Go
-
L'
-1 /
/
• Denotes w ens lauad
/ z on monument
a a Denotes iron monument set
Z - • - Denotes Wet land tine
H 'w-- Denotes donilary line
■
\I
r c _
r ii North linen of the of Southsost quarter the
.V quarter of
Section 18, Township 31, Ronge 22 is
Y- N 4 assumed to bear N88° 22' 57"E.
Q W O. _
-...-4s ._ O `�`
D d
e
as .�O
z O� /6
Oa r1 �,il�� / �v WAIERMAIN�
1 I 1----
W
,
f
1" i
_.-,: 1
SAN SAN--w-
MARW STREET S
-
e
M
O
I
1
-- S�N
131.85 SANITARY SEWER /'
S88°22'S7" ° •
°' " y ~
'
',,�
$
225.00 g 7" /��•'�' / /��; if •
8 _
TEMPORARY • - 9� - - -•- n °`'."°. -
I s ROADWAY / q�°Cti 1 p:c'-
EASEMENT PE 6a / � /F - �..---- - ,._,. -.--, "a..
DOG. N0. ® ey /i' /
1558612 y- /
/ /
/ /
MIDSTATE TIRE AND TOOL
APOLLO COURT / JON ST.
_ LINO LAKES. MN
CERTIFICATE OF SURVEY
a / /
V / / / J /
[ / / s'��/ / P.(_F�
/ / �� 7' / \a0�
/ 7' -/ / A r,. •\
OLPPO
LIMO
r....
1650�ODI
>e
11 -11 -05
.ern r
GRADING NOTES
PROPOSED CONTOLIRS REPRESENT 5116I5HED SURFACE ELEvATIONS, SPOT
ELEVATIONS ALONG PROPOSED CURB DENOTE TOP AND BACK OF CURB.
EXISTING UTILITIES SHOWN C. THESE PLANS ARE BASED ON RECORD
DRAWINGS AND, WHERE POSSIBLE. MEASUREMENTS TAKEN IN THE FIELD
THE INFORLTATIoN IS NOT TO BE RELIED ON AS BERTG ExACT OR COMPLETE.
CONTRACTOR SHALL CONTACT THE APPROPRIATE UTILITY COMPANIES AT
LEAST 48 HOURS PRIOR TO EXCAVATION, TO REOUEST EXACT FIELD
LOCATION OF UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR
RELOCATING ALL EXISTING UTILITIES wHiCH CONFLICT WITH THE PROPOSED
IMPROVEMENTS SHOWN 014 THE PLANS.
CONTRACTOR TO CALL. GOPHER STATE ONE CALL (1-800-252-1166) 48
HOURS PRIOR TO EXCAvATION FOR LOCATIONS OF UTILITIES.
CONTRACTOR REWIRED TO PROTECT THE TREES TO BE SAVED. SHOULD
ANY 10018110N OF THE TREE BRANCHES RE0LI1RE REMOVAL TO PEWIT
OPERATION OF THE CONTRACTOR'S EOuiPmENT, THE CONTRACTOR SHALL
OBTAIN THE SERvICES OF A PROFESSIONAL TR2404140 SERvICE To TRIM THE
TREES SHOuLD THE CONTRACTOR'S OPERATIONS RESULT IN THE BREAKING
OF ANY LIMBS. THE BROKEN LIMBS SHOuLD BE REMOVED immEDIATELY AND
CuTS SHALL SE PROPERLY PROTECTED To miNAKZE ANY LASTING DAmAGE.
NO TREES SHALL BE REMOvED vATHOUT AuTHO01ZATION BY THE ENGINEER.
COSTS FOR TRKRAING SERVICES SHALL BE CONSIDERED INCIDENTAL TO THE
GRADING CONTRACT
CoNTRACTOR SHALL STRIP, 5TOCKP1LE AND RE-SPREAD SUFFICIENT T08500.
PROvIDE A 4010110100 FOUR INCH DEPTH TO ALL DISTURBED AREAS TO BE
SODDED OR SEEDED.
THE FiNISHED WILDING SuSGRADE ELEvATION SHALL NOT VARY BY MORE
THAN Gm FEET AElOvE OR BELOw THE PRoPOSED ELEvAnoN sTREET OR
PARKING AREA SUBGRADE ELE0AT1ON SHALL NOT vARy BY MORE THAN
Dos FEET ABOVE OR BELOW THE PRESCRIBED ELE6AT1ON. AREAS TO
RECEIVE TOPSOIL SHALL BE GRADED TO wITHIN 0.10 FEET OF THE REWIRED
ELEvATION UNLESS DIRECTED OTHERvASE BY THE ENGINEER. TOPSOIL SHALL
BE GRADED TO wITHIN INCH OF THE SPECIFIED THICKNESS,
THE CONTRACTOR SHALL COMPLY WITH THE REOLIIREMENTS OF THE
MINNESOTA 801160044 CONTROL AGENCY - NATIONAL POLLUTANT
DISCHARGE ELBAINATION SYSTE14 (NPD(S) PER141T. CONTRACTOR SHALL BE A
CO-APPUCANT 61TH THE OMER. THE CONTRACTOR SHALL COMPLETE THE
REoUrRED INSPECTION REPORTS AND BE RESPONSIBLE FOR LTAINTENANCE OF
THE EROSION CONTROL DEVICES.
TOLERANCES,
I. THE BUILDING SUBGRADE FINISHED SURFACE ELEvATION SHALL NOT
vARY BY MORE THAN 0.30 Ft ABOVE, OR 0.30 FT. BELOW, THE
PRESCRIBED ELEVATION AT ANY POINT SHERE MEAS11RE1AENT IS MADE.
2. THE STREET OR PARKING AREA SUBGRADE FINISHED SURFACE
ELEVATION SHALL NOT vARY By MORE THAN 005 FT ABOVE. OR 040 FT
BELOW, THE PRESCRIBED ELEVATION OF ANY POINT WHERE MEASUREMENT 15
mADE.
3 AREAS wHICH ARE TO RECEivE TOPSOIL SHALL BE GRADED TO wiTHIN
0.30 FT. ABOVE OR BELOw THE REQUIRED ELE0AT1ON. LINLESS DIRECTED
OTHERRISE BY THE ENGINEER.
4. TOPSOIL SHALL BE GRADED TO PLUS OR LTINUS INCH OF THE
SPECIFIED THICKNESS.
muNTENANCE
5. THE CONTRACTOR SHALL PROTECT NEwLy GRADED AREAS FROM
TRAFFIC AND EROSION. AND KEEP AREA FREE OF TRASH AND DEBRIS.
2 CONTRACTOR SHALL REPAIR AND REESTABLISH GRADES IN SETTLED,
ERODED AND RUTTED AREAS TO SPECIFIED TOLERANCES DURING THE
CONSTRUCTION, IF REDuIRED, AND DuRING THE WARRANTY PERIOD, ERODED
AREAS wHERE TURF IS 70 BE ESTABLISHED, SHALL BE SEEDED AND
MULCHED
3. INHERE COMPLETED COMPACTED AREAS ARE DISTURBED BY
SUBSEQUENT CONSTRUCTION OPERATIONS OR ADvERSE wEATHER,
CONTRACTOR SHALL SCAR1F8, SURFACE, RESHAPE AND COMPACT TO
REWIRED DENSITY PRIOR TO FuRTHER CONSTRuCT1ON
AFTER SITE GRADING IS COMPLETED, IF EXCESS OP SHORTAGE OF SOIL
TAATERIAL E01STS, THE CONTRACTOR SHALL TRANSPORT ALL EXCESS
MATERiAL OFF THE SITE TO AN AREA SELECTED BY THE CONTRACTOR, OR
NAPORT SuITABLE MATERIAL TO THE SITE
A 2000 FIBER BLANKET SHALL BE FURNISHED AND PLACED IN AREAS
wHERE THE SLOPE EXCEEDS 341.
THE CONTRACTOR SHALL COMPUTE DEWATERING AS REQUIRED TO
COMPLETE THE SITE GRADING CONSTRUCTION.
THE CONTRACTOR SHALL COMPLY WTI THE REOUIREMENTS OF THE
MINNESOTA POLLUGON CONTROL AGENCY - NATIONAL POLLUTANT
DISCHARGE EULTINATION SYST(N (101.005) PEWIT_ THE CONTRACTOR SHALL
BE REOUHRED TO SE A CO-APPL■CANT VCR THE OWNER THE CONTRACTOR
SHALL COMPLETE THE REOUIRED INSPECTION REPORTS, THE CONTRACTOR
SHALL BE RESPONSIBLE FOR MAINTENANCE OF THE EROSION CONTROL
DEVICES. A Cot, OF THE PERLTIT CAN BE OBTAINED FROM. THE ENGINEER.
ALL MATCH POINTS AND PAvEMENT PATCHES TO BE SAWCUT AT FULL
DEPTH.
U ALL EROSION CONTROL LTEASuRES MUST BE INSTALLED PRIOR TO
COMMENCEMENT OF GRADING OPERATIONS AND BE MAINTAINED UNTIL ALL
E051URBED AREAS ON THE SITE HAvE BEEN RESTORED
• TEmPORARY EROS1014 CONTROL (HAY BALES OP APPROVED
E0U10AL(NT) TO BE PLACED AROUND 5T080 DRAIN STRUCTuRES DURING
CONSTRUCTION (REF(R TO DETAIL)
w 5ED144ENT SHALL BE REMOVED rRom ALL 5E010E67 CONTROL
DEvICES AS NECESSARy AND muST BE REMOVED IF DESIGN CAPACITY HAS
EEEN REDUCED BY 500
X 1 sTABILIZED CONSTRUCTION ENTRANCE SHALL BE INSTALLED AT
THE BEGINNING or CONSTRUCTION be mAINTAINED FOR DURATION OF
PROJECT
5. ALL SLOPES 3:1 OR STEEPER. NOT TO BE SODDED AND GREATER
THAN 8 FEET iN HEIGHT, SHALL HAVE EROSION CONTROL FABRIC INSTALLED
20k--05 L
CF was
STORM DRAIN NOTES
CATCH BASINS SHALL NOT BE BACKFILLED 4.0041 FABRIC WRAP IS
INSPECTED BY THE CiTy.
TRASH GUARDS SHALL SE PLACED ALL STORM DRAINS AND CULVERTS
PROVIDE CLASS 111 R1PRAP RATH FILTER FABRIC FOR 04.1 PIPE OUTLETS.
THE LAST THREE SECTIONS OF CONCRETE PIPE SHALL BE RED, INCLUDING
APRON, FOR CONCRETE PIPE LESS THAN 46-INCH DIAMETER. ALL
SECTIONS SHALL BE BED FOR CONCRETE PIPE 07 413-11100 DIAMETER OR
LARGER
INFILTRATION BASIN NOTES
GRADING SEOuENCE - ROUGH GRAERNG SHALL BE DONE IN CONJuNCTION
WITH THE REST Of 1HE 54TE. ExCAvATE WITHIN 0 0.3 08 F1N1SHED
GRADE. WITH LIGHT OR RUBBER-BRED EQUIPMENT. FINAL GRADING OF
BASIN SHALL BE DELAYED UNTIL REIAAINDER OF SITE IS F1N1SH GRADED AN0
SEEDED NO OVER-EXCAVATION OF BASIN AREA 15 ALLOWED AFTER
FINISH GRADING: TILL THE BASIN FLOOR TO A 611NI1A08 DEPTH OF E INCHES.
1419 TOPSOIL VATH ON-SITE SANDy SOILS IN A RATIO OF 50/50. OR AS
DIRECTED BY THE ENDNEER NO EOutPLTENI MAY BE DRIVEN ACROSS THE
BASIN FLOOR AFTER GRADING AND TURF ESTABLISHmENT OPERATiONS ARE
CoTAPLETE.
EROSION CONTROL - PLACE SILT FENCE AROuND BASIN AREA IMMEDIATELY
AFTER ROUGH GRADING IS FINISHED. LIAINTAIN UNTIL FINISH GRADING AND
TuRF ESTABLISHMENT WORK IS DONE AND VEGETATION IS ESTABLISHED AND
GRovANG.
TuRF ESTABLISHMENT - SEED MTH Gay APPROvED mIXTURE. IN
ACcORDANCE vATH COY REQUIREMENTS
VEGETADON IN PONDS AND INFILTRATION AREAS SHALL BE RESTORED WITH
DEEP-ROOTED NATIVE vEGETATION (48/007 mix 310061 OR SUITABLE
WETLAND SEED EQUIVALENT) RE-VEGETATION SHALL COmmENCE WITHIN 14
DAYS OF FINAL GRADING
ATANAGELTENT PONDS SHALL BE SEEDED wiTH 04N001 mix 270 PER THE L4NDOT 2003
DISTRICT SEEDING RECOIAMENDATIONS PUBLICATION MEANS AND mETHODS OR EOUAL
APPRROVED BY A LANDSCAPE ARCHITECT PRIOR TO THE PURCHASE AND INSTALLATION
EROSION CONTROL NOTES
ALL EROSION CONTROL mEASuRES MUST BE INSTAu.ED PRIOR TO
COMMENCEMENT OF GRADING OPERATIONS AND BE maiNTAINED unril. ALL
DISTURBED AREAS ON THE SITE HAvE BEEN RESTORED.
TEMPORARY EROSION CONTROL TO BE PLACED AROUND STORm DRAIN
STRUCTURES DURING CONSTRUCTION (SEE DETAIL).
SEDIATENT SHALL BE RELTOVED FROM ALL SEDILTENT cONTROL DEVICES AS
NECESSARy AND MUST BE REMOVED IF DESIGN CAPACITY HAS BEEN
REDUCED BY FIFTY PERCENT.
A STABILIZED CON5TR0CTION ENTRANCE SHALL BE INSTALLED AT THE
BEGINNING OF CONSTRUCTION AND mAINTAINED FOR DuRATION OF PROJECT.
ALL SLOPES 3:1 OR STEEPER, NOT TO BE SODDED AND GREATER THAN
EIGHT FEET IN HEIGHT, SHALL HAVE EROSION CONTROL FABRIC INSTALLED.
CONTRACTOR SHALL SEED AND MULCH ALL DISTURBED AREAS NOT TO BE
SODDED SEEDING SHALL BE PER MADOT SPECIFICARON 3876 APPLIED AT
A RATE OF FIFTY POUNDS PER ACRE SEEDING IN POND AND INFILTRATION
AREAS SHALL BE miXTURE 3100121 (NATIVE WET TALL) IN ACCORDANCE
BITH (MOOT SPECIFICATION 3876 APPLIED AT A RATE CIF 82 POUNDA PER
ACRE MULCH SHALL BE PER MADOT SPECIFICATION 3882, TyPE 2. THE
MULCH SHALL BE APPLIED IN ACCORDANCE WITH (MOOT SPECIFTCATioN
2575.3, FT. MuLCH TO SE APPLIED AT A RATE OF TWO TONS PER ACRE
MULCH SHALL BE ANCHORED WITH A 0450, CLODBUSTER OR OTHER
APPROVED EOuIPMENT.
SEDIMENT SHALL BE REMOVED FROM ALL SEDImENT CONTROL DEVICES AS
NECESSARY AND MUST BE REmOvED IF DESIGN CAPACITy HAS BEEN
REDUCED By FIFTY PERCENT
LEGEND
8800
•
• • B
•
A
VI
OZ
0 0
<-3
z Z0
Z ct z
< ■-• L.0 Z
CC ;7' 0<
,07-■ -Un"'
OC 0 CD
E z
tr)
o a
!-!
o
0
o
JAL 7.1A7
1650.001
10/06/05
01,0
6.1
ETAINING
.EXI;i11::-.,. • - ,
LIT LI T, I
r:H.:01:ENT
4 44510
4- Att.
TfgjT
5" 10455-411
CD:"..-TPUC 711,,J „:
• T ,
. - - -,
V.A. ''• •/
'-'‘',"
,Z„..,,, • t• t.:-,•1.-
t.,
.,?' ....1;
. .
'.
'. '. f i/ N ).il.i ,A
K :
..:'\ 7A,, /. .V E: ; (4
-"/ <.---ri., t,-, ..t,
- ..,:tt•-, .
''...tg.
'
,,,,g7 tt''...:••. ..., ,.-."!,ct
•••=„0...--.3 ...... • citt- tt
I
•I:
I 4--
1J.
•
— —
-7:
F.'.7.•
; • ,_••••• ; 7 "
G. N.c:11
1." Pi
I NOV 4 200
,• • ,
1 r, T
e
LEGEND
PrO,DDLD:
UTILITY NOTES
CONTRACTOR SHALL PELL VERIFY LOCATIONS AND ELEVATIONS OF EXISTING
UTtLiT■ES AND TOPOGRAPHIC FEATURES PR10R TO THE COMMENCEMENT OF
SITE GRADING. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY ENGINEER 0,
DISCREPANCIES OR VARIATIONS FROM THE PLANS.
ALL EXISTING 4TI41e LOCAIIONS SHOWN ARE APPROXIMATE, CO14IA01
"G00,54 STATE 0110 CAL" 1S5-,-454-0002) 502 u1141TY LOCATIONS 45
NOuRS PRIOR TO EXCAVAPON.
UTILITY CONSTRUCTION SHALL CONFORM TO THE CURRENT EDITION Cr
'STANDARD SPECIFICATIONS FOR WATERMAIN AND SERVICE LINE
INSTALLATION ANC, SANITARY SEWER AND STORM, 04455 INSiALLATON" AS
PRERARED BY I< OTT ENGINEERS ASSOCIAMON 07 4141155014
SASINS Anc mANHOLES 14 PANED AREAS TO SE SuLARED 0.0, FUT,
CATCH BASANS IN GUTTERS TC BE 550050 0.15 FEET PER DETA,LS
ELEVATIONS SHOAT: ON PLAN 00 NOT REFLECT SUMPED ELEVATIONS
ALL FIRE HYDRANTS SHALL BE E.CYLATED ,VE FEET BEHiND 01,04 OF CURS
LINLESS 01HER010E NOTES.
TYPICAL HYDRANT CONSSTS OF: HYDRANT, GATE VALVE, 2.5 FEET OF SIX
DIF IN,CERMAiN AND ANY HYDRANT EXTENSiON. ExTENSIONS 73 BE
,NCIDENTAL.
HyDRA, T: BE WATFROUR PACE WS-V. EuR,
VALVE:. 5,ALL RESN.EHT sTal CAT: - mcELLER ATS7G-TC EOUN,.:
11101,AU0 ,EET OF N5 0000550 0551' AL, 041ER1147,0.
55 1 4 0= EY.7, REV,RE0
A OF E10,4E511 410-01 SEP,ATICN TO SAN'TA, 7:E021'
777 57011.' DR0,1 L:NES.
VIATER,,,, ID EL 1,47,,,LED ALD,,r, 7HE ROAD CENIERL,NE. 0.7710E0,
PIPE 7T1' MA,NPACI,ERS SPECP■CAliONS, ,11S14L4 FENCeS
A PICHET OT VERGsA, sERARAxe, At,' Tr, FH7
10 HOR■ZONTAL SEP,RACON xTDUIRED FOR ALL ,TC11E4 CNLECT
T,HEPIPSF NCTEE.
*5-004- AL*5Si'401:i4'3L-100'14114- 5.4-
I
z
1/1
OZ 1
00 1
Z
0‘,,2
,61a.
i
1>-
W
0
—J
<
in
<
50
JAL 1 JAL
1650.001
1 1 /1 1 /0 5
C1.1
Am no
•
•
•
BUFFERYARD / BERM PLANTING SCHEDULE
SYM
KEY
COMMON NAME
BOTANICAL NAME
SIZE
OTY.
NOTES
BH
Black Hills' Spruce
Picea glauca densale'B.H.'
5' BB
9
Fully branched to around
c.>
FS
Cutleat Staghom Sumac
Rhus lvphine 'Latinate'
#5 cont.
17
Plant 10' on center
Ett
GA
'Summit Green Ash
Fraxinus pennsyloenice 'Summit'
2" BB
3
Single straight leader
0
NP
Norway (Red) Pine
Pinus resinosa
5' BE
6
Fully branched to around
PK
Northern Pin Oak
(Duercus ellipsoidalis
2" BB
2
Single. straight leader
RT
'Isenti Redtwia Dogwood
Gornus sericee 'Isanti
#5 cont.
19
Plant 6' on center
'
SM
'Green Mountain' Sugar Maple
Acer saccharum'Green Mountain'
2" BB
3
Sinole, straighl leader
TOTAL
17
TOTAL TREES
22
H0.32
06 1/4
ADDITIONAL SITE TREES PLANTING SCHEDULE
SYM
KEY
COMMON NAME
BOTANICAL NAME
SIZE
OTY.
NOTES
BH
'Black Hills' Spruce
Picea glauca densata 'BH'
6' BB
3
Fully branched to around
c.>
RD
Red Oak
Ouercus rubra
2" BE
2
Single. straight leader
RM
'Autumn Spire' Red Maple
Acer rubrum 'Autumn Soee'
2" BB
3
Single. straight leader
0
SS
'Spring Snow Crabapple
Malus 'Sarin° Snow'
1.5" BB
4
Single leader
NW
'Niobe' Weepinc Wihow
Salhx alba 'Tristi5
2" BB
5
Sinole leader
TOTAL
17
Note
•
NMa:
r.c■1 IN eau
h%erepa:liivc,prithe- pear. orn
u-. 00� ry 90} Oa
500
SOD
If
Typical Deciduous Tree Planting Detail
No swe
le
Memel bee tem
ralopa
�.eai�`�.�.alaae
Mich ente�;lwaawpeeh,
iheer am.mise
Mrbvp. Menges m,
3eac.o, mat,. a:gae
I.
006.,
pY
."- -•—ens
0,
006
• Name ym.arddbawan�<<,xnlael.,
•
Typical Shrub Planting Detail
retinmser is es ....es
easel
11, a, age
{tea mammal.. memo
:r.e,er01 -ame
Irs meaaml
11.11∎0: mgeeoM
Nm 10 Sole
PLANTING NOTES:
Comm., 5003 e! a one year guarantee on an plant meteruk .The
the meal planting. on Repacement bent materials t
s or
ls all also have a one 1550
gumaweenommanung open pantnp.
All proms are to M northern gown and handy.
Plants b ...Ma as per standard MN planting sabires.
Use 01.51.0 100 011 01 000011 naleml in tree Meriting roles and shn0 beds.
ins deuhs Por cep).. use a soil ma PI 1.1-1. 03010aed topsoa, sand,
peat moss) tor per.. and annual beds. metalled at a means. hewn of 12"
Contractor shell verity toe:awns me ell melee poor to in.11atnn of pens.
Mind areas :hall bn gnawed vMh an emanated unomprou. spiMar system.
NI landscaped areas shall M impaled Mai either spay heads or with 'leaky pipe'.
Staking of Pees a optanok. repts..n If net plumb aer one year.
Wrap all mmootheerhed trees and Imes at lop and 50000 Remove ey 0001.
Open top of Munap en BB m0erul0 remove pot an potted pads, spat and break
apart peal pots
Pane plants as necessary per standard nursery 0,50 .
The Owwnersnall he reeperatk Ica manurarre alter to Owners acceptance of
Ina warn
Puna :haul he ....R panted open aM+st at 4e. Properly Mel on metered
u necessary lampoary artly).
Xi resumed areas are In be saber sodded or seeded 0z Mad. 5. shun be
nonnem grown a..rdy.
Pansy beds for shrubs a0M Mve 5.5'veacal teach poly ed91pe Romer.
.00 grade). Md wen smooth Navas see amsca. Alen furtMipth and M Pl ulcd
an nob hyll.PenO.
Shredded ..woad morph Nan M pre .M arhurb.0 Imaged Peen al a dean
Or and a diameter o13' Meeker.
SOD 'SEEDING NOTES:
Sob mans are to Impaled with an aubmaled IMp01 5 system
Areas bislurbeb try Nee worUgaaing (banns and level areas) shalt. seeded
wltn MNDot Ma %330
Pond edges 141 slopes) anon be Seeded with M100 Me 0310.
C1.2
•
•
)\I'fr114 L VA fle7h1 Atedot46 Joel z L. b47
ewe- 1.,e; i1 tit11-osi
• 6 a,/ 1.014/7 t t F 4-
t
NCTV
•
T
.maw
ROM PLAN
SaL
Ol5m areas -2,500 sq. R.
Reyir Garage —9,000 sq. ft
Swage -21, 210 sq. A
EIELEINIYE PUN
Keller
rastz
ossatailaSsaabsda
0
0
rat
L
V)
mtt
E. co,
Ls. mow
6
SCO! �IGHTNOT.
I.
.NOT FOR CONSTRUCTION`
RVISIMS
r14.4.9197.
e
CPAii
ersmrroa,
SPERVISON
PROJIMMART
CONTRACT
sheen
A1.0
Nov 0 9 200;
•
•
2.0E9 S.: EkiERIOR 1115114:021. SiSTED - (542)
3500 2!. TOTAL AREA - (:025)
1/7:12 MDR
1,017 S r E1100101 2250205I25 '7‘113S11 STSFELI - (SEFI)
I.E22 S.F. Mo. - (l005)
D.I.F Sr\
WEST ELEVATION
ABUTTING PROP. ZONED RES.
A2.0 .•
MONT E.O.IION
575 55. EXTERIOR INSULATION 05E52 SESTEU - (209)
1%54 S.F. TOTAL AREL - (MO%)
1aw a
41),12-22-2,-.2241422=2A4=r4=2,2=.12.2)(12..22=1:224.2)&21,(121,-)222224=22.1.12M1%)(422222,-: 42.t2(4, (21
--------
ARE
/ FLUTED SLOE%
(2) EMS PRE
RV. BLOCK
ItScr'
1.550 S.F. EXTERIOR 51201A00N OM; SISTFAI - (56%)
2.525 S.F. TOW. AREA - (1005)
TINED EDO; SILL
SOUTH ELEVATION (FRONT)
A2.0
--STuJDRIL SEAR ROOF V■STELI
—EVE. ilirAPLIT
• E` ;
LE BLOC%
1/2:12 PITCH
o.
CUL; AMMON
2.152 S.F. 10107400 1050*505 IPISK 50010, -
0000 SS. TOTAL ISE1 - (10022)
,—STRIEWOC SEM: ROCS MST;
I I •■
NORTH ELEVATION
(2) ROWS IRE
02.0
I
1111111111111111=111 11111111111111111111111111MIMIIIIIINIMMMIN
—00111.1SPOOT
4011 (2) 622.01 2.222
\ FLUTED SLOP:
FRET BLOCL
1—.LIOAWSPOUT
EAST ELEVATION
ABUTTING PROP. ZONED COMM.
A2.0)
Keller
PLANNERS lalICHITECTS 1111111.5ERS
Roans luome
MINNESOTA
IV;
5
0
"COPYRIGHT NOTICE"
"NOT FOR CONSTRUCTION"
REVISIONS
W RO-eCa
5/115,717012.
SPERVI501%
P REU911.191.5,
COWIELOCT WO,
15-eJec, FOR .C.CANSIT41.710u.
•
A2.0
NOV 0 9 2005
MOV 1.1 4 20015,
UT?
•
•
RUUD LIGHTIWG
• ' - ' ' . . ^ ` . ^ ^ ^ ^ L. .......................
...................... .
......................... ..
— �.^^^^^~^`^`^^^~^^^^^^^^^^Y` ^^^
^;,`^.~^...^..^.^^`^^.^^.^^"~ ..^^
^^.^^`1^`^^^........`.^.^.^^.^LL^^.^
^^^^`.~6^^`~``..`^^^`.`.^^.^.^^�^^^^
^..^^^.. ^...^^^`^.^...^.^`^^.*^L‘^^^^
.................. ...
^ ^�N��� ^^^^~`^`^``~^^``^
^ ``^`^^ .`.`.^`.^^.^`^ ^`^.^
^ `^`^~^ ^^^^^``~L^`~`^r
~ ^ ^~^^~^^^^
• ■
` ^
..........
^^^^^`^``~^
...........
..........
^^^^^~~~^
• ^^^^
..........
^ ^^^^^^^^
`^^^^^~`
~^^
^.^
^ ``^^^^^`
` ~^^^^`^^
.........
^^^
...
^^
^~^`^^^^^^`^^~^^
.....................
``^^^^```^^^^`^^^~`
.`^`^^.^....^.^^
^`^^^^``^`^~^``^^^
^ ^^
..`^^^^.^`^^`.
.^`^..�...�
`^`^^^`''_^.��^
^ ~^
L.
............. .....
^ ^
^ ^
^^
^ ^
..
^ ^
• `^`^^^`^^^^
...........
• ^^^~^^^~^`
^ ^~^^`^^
^ `~^~^~
` ~^^^^`^
^^^^^^
^ `^^^
11.617i1aol 006 11:2E F.
FIXTURE; ARE MOUNTED 113' AFG
����Cts
19 L1.9.1.11
\;i:2~1�" ~
RUUD LIGHTING
�=� LISA ^����~��°_
Da t611O/ 31/9049 Scale. 1.046 La CuL L16 .17 .91,110
� results �� fat =
146 -b; kit
AGENDA ITEM VI A
STAFF ORIGINATOR: Jeff Smyser
P & Z MEETING DATE: December 14, 2005
TOPIC: Discussion of Draft 49/J Study
BACKGROUND
The Study
We have been working the past year on a study of the land and infrastructure around the
intersection of Hodgson Road (CSAH 49) and County Road J (Ash Street). The goal is a
planning document that will be adopted by the City Council as the guide for development
of the area. We are providing a draft report to bring the P & Z up to date and to stimulate
discussion. This draft is unfinished and in no way should it be considered a final report.
We held a neighborhood meeting in March and discussed an initial concept plan. We
received good information and comments from the land owners and residents in the area.
This input was very important and helped guide revisions to the concept plan, which is
not to be considered the final version. The attached draft, unfinished report provides
background information and traces the planning process.
Staff is not making recommendations for a final plan at this tune. That will come after
more discussions with developers, land owners, the P & Z, and City Council. Ultimately,
the City will need to make decisions on alignments of and the means of providing water,
sanitary sewer, and the internal roads needed for proper access and circulation.
Municipal water and sanitary sewer are Lino Lakes issues exclusively. However, the
roadway system is not. While it is up to the City to provide internal roads, Hodgson and
CR J are county roads. Because CR J is the border of Anoka and Ramsey Counties, it is
managed jointly by the two counties. We are working with the counties and the City of
Shoreview for solutions to the transportation infrastructure issues. We have prepared a
traffic study for the area but have not yet discussed it with the other players.
The draft 49/J report is written in a straightforward format intended to provide the
important information efficiently. Additional information will be added and revisions
made as needed. This is a work in progress. Additional information is coming in daily.
Throughout the process new information often has required serious rethinking of what
seemed earlier to be the best course of action on a particular issue.
•
•
•
•
Growth Management Issues
Lino Lakes has a growth management policy that limits the number of new housing units
to be platted each year. We have nine units left unclaimed for year 2006 and 82 for 2007.
If we need infrastructure and development would provide it, we would need the
development to occur.
One question we have not faced is how to count assisted living units, which generate little
traffic, wastewater, and other infrastructure impacts.
Development Proposals
Several landowners in the area want to develop their properties. Staff have had several
discussions with both of these developers throughout the planning process for the 49/J
study project. Because the infrastructure issues are not yet resolved, these developers
have not submitted development applications.
We have met with other landowners as well to discuss the potential for planning future
development on their properties. Two developments in particular are ripe.
The Jensen family owns the 17 acres north of the northwest corner of Hodgson and CR J.
They are working with a developer to create a senior complex that would include several
types of senior housing such as independent living townhomes and cottages as well as a
larger building with assisted living units. We have included some material from this
developer with this packet. Please note that this material was created by the developer
and has not received official or unofficial endorsement by the City.
The property owners of the northwest corner of Ware Rd. and CR J are interested in
creating a new townhome neighborhood.
RECOMMENDATION
Staff is seeking comments from the P & Z.
•
CSAH 49 & CR J
Hodgson Road & Ash Street
Master Plan
City of Lino Lakes
•
DRAFT DECEMBER 8, 2005
•
•
•
Table of Contents
BACKGROUND
Master Plan Study Objectives
Study Area
Roads
Existing Land Uses
Comprehensive Plan Proposed Land Uses and Zoning
Park Plan
DEVELOPMENT ISSUES
Roads, Access
Water Main
Sanitary Sewer
Wetlands, Water Table
CONCEPT PLANS
MASTER PLAN
DRAFT December 8, 2005 Hodgson/CR J Master Plan page 1
•
•
•
BACKGROUND
In August of 2004, the City of Lino Lakes began a master planning process for the area
surrounding the intersection of Hodgson Road and County Road J. The intersection of
Hodgson Rd. and CR J is an important gateway into Lino Lakes, but the current
appearance of this location needs improvement. While this has been known for some
time, landowner interest in redeveloping the restaurant site on the northwest corner
catalyzed the master planning project and focused attention on the area. The area is
dominated by parking lots and automobiles. The restaurant/bar is boarded up, and other
lands are vacant. In order to address these deficiencies, redevelopment of some parcels is
as important as developing unused or underused properties.
Northwest corner of Hodgson /CR J intersection, viewed from the north
Northwest corner of Hodgson /CR J intersection
Northeast corner of Hodgson /CR J intersection
photos by Landform
DRAFT December 8, 2005 Hodgson/CR J Master Plan
page 2
•
•
•
However, a number of shortcomings must be corrected in order to support development.
The Hodgson/CR J intersection functions poorly at peak periods. Very little traffic at this
intersection is generated by business in the area, and traffic will continue to increase.
The area lacks sufficient internal roadways, and access to existing arterial and collector
roads is unplanned and random. Any business expansion will require extensive site
planning. This includes safe access to the major roads that currently are the only roads.
An overall road and access plan is needed.
There is no public water or sanitary sewer service available to most of the study area.
The intersection area is a hole in an area where utilities exist to the north, west, east, and
in Shoreview to the south. Solutions have been suggested, such as new trunks down
Hodgson Road or Laurene Ave. in the Rohavic Oaks neighborhood. However, the City
has not addressed how to serve this area with utilities. Existing homes and businesses
have onsite wells and individual wastewater treatment systems, which are not sufficient
to support contemporary development. Any expansion of the businesses will require
municipal utilities.
In addition to these infrastructure issues, development planning for the area should
include gateway elements. The visual appearance of this entrance to Lino Lakes should
be considered in the overall planning. At the outset of the project, the list of objectives
included design of the gateway elements for this entrance to the community. The
gateway idea has expanded to become a project of its own, to address other gateways and
possibly the design of a consistent gateway theme.
It is very important to note that there are several viable commercial businesses within the
study area. One of the challenges of the study is to plan both for current and future use of
land in the area. To be clear, this planning study is not an attempt to relocate existing
businesses. However, there are a number of issues to be resolved for the existing
businesses as well as for future development or redevelopment.
Master Plan Study Objectives
• Plan for redevelopment of 49 Club corner and potentially other sites
• Identify appropriate land uses (present & future) in study area
• Plan for road improvements to provide good access and circulation
• Identify routing & phasing solutions for utilities to facilitate future
development
• Propose gateway design elements
DRAFT December 8, 2005 Hodgson/CR J Master Plan page 3
• Study Area
•
The study area includes approximately 37 acres of land in the southwest part of Lino
Lakes. Starting at CR J (Ash St.) on the south, the study area runs '/ mile north along
Hodgson Rd. (CSAH 49). The primary study area includes a triangular area on the west
side of Hodgson of about 17 acres. On the east side of Hodgson, the primary study area
includes 20 acres, but out of necessity the study looked at land extending to Ware Road.
i
Primary
Study
Area
E
map by Landform
DRAFT December 8, 2005 Hodgson/CR J Master Plan page 4
•
•
Roads
Hodgson Road (CSAH 49) is an arterial road that runs from Lino Lakes south into central
St. Paul. County Road J, (CSAH 1, CSAH 32 or Ash Street), is an arterial running across
much of Anoka County, from State Trunk Highway 65 on the west to I -35E on the east.
Co. Rd. J forms the boundary between Lino Lakes and Shoreview. It also is the
boundary of Anoka County and Ramsey County, which share responsibilities for CR J.
Existing Land Uses
The study area includes a variety of residential and commercial uses. A garden center,
used auto lot, and auto repair business line the east side of Hodgson Rd. The auto sales
business owner has acquired a five -acre lot immediately east of the existing sales lot. On
the periphery of the study area, several single family homes exist on large, rural lots
without water or sanitary sewer services.
A closed bar /restaurant sits on the corner of Hodgson Rd. and CRJ. North of that is an
insurance office and a liquor store in separate buildings. A 17 -acre parcel north of those
lines the west side of Hodgson.
Several existing neighborhoods border the study area: Woodridge Estates and Blomquist
Addition to the west, Rohavic Oaks to the north, as well as the homes south of CR J in
Shoreview.
IPThe figures below show these uses.
DRAFT December 8, 2005 Hodgson/CR J Master Plan page 5
•
•
•
Discussions with property owners at a March open house and throughout 2005 were a
vital part of the study. Some want to develop their site, some want to continue the
existing use for now, but have plans for future development. Others have no plan to
change their use of their site.
Existing Land Uses, General Overview
2.5 acre residential
Residential
Large lot, rural
residential
Commercial
4-
LANDFOItM o mo. zoo
Lino Lakes County Road J Masterplanning Study
January 20, 2005
LN04004
DRAFT December 8, 2005 Hodgson/CR J Master Plan page 6
•
•
•
Existing Land Uses, Specific Properties
garden
center sales
liquor store •
insurance office -•
closed restaurant/bar
auto
sa es
auto repa
single homes
App p S" U
U 'tOT
Comprehensive Plan Land Use Map and Zoning
The Lino Lakes Comprehensive Plan guides the study area for Mixed Use, Commercial,
and Medium Density Residential. The area is entirely within the Stage 1 (pre -2010)
development area. The primary study area is within the existing MUSA. The 20 acres on
the west side of Ware Road is not within the current MUSA.
The zoning of the study area includes General Business and Rural, with R -1X Single
Family Executive zoning to the west.
South of CR J, in the City of Shoreview, land is guided and zoned for single family
residential except for the commercial land at the corners of Hodgson and CR J.
DRAFT December 8, 2005 Hodgson/CR J Master Plan page 7
•
•
Proposed Land Use Plan, Lino Lakes Comprehensive Plan (Detail)
NSITY
ED
NTIAL
Co. Rd. J (Ash St.)
l
NI_
I
L
l
I
Commercial
Office
11 H
Residential
Nr11141
1
4
City of Shoreview Comprehensive Plan Land Use Map (Detail)
(Lino Lakes and Shoreview maps are shown at approximate scale.)
DRAFT December 8, 2005 Hodgson/CR J Master Plan page 8
•
•
•
Lino Lakes Zoning Map (Detail)
Planned Unit
Development
(single family)
Co. Rd. J (Ash Street)
j 1
in,m INN
mill I=
ELM MI
City of Shoreview Zoning Map (Detail)
(Lino Lakes and Shoreview maps are shown at approximate scale.)
DRAFT December 8, 2005 Hodgson/CR J Master Plan page 9
•
•
•
Park Plan
The Parks, Natural Open Space /Greenways and Trail System Plan shows a potential trail
crossing the northern part of the study area and continuing to the west. It is unlikely that
this could be implemented because of the existing Woodridge Estates neighborhood.
The parks plan also shows Natural Resource Protection Areas in the northeast area.
These are wetland areas that will be protected by existing wetland law or may be
important plant communities. The Natural Resource Conservation Areas in the northeast
and northwest portions of the study area are uplands with features that have high
ecological value. These areas should be examined for the potential for protection. A
Natural Resource Enhancement Corridor is shown to indicate that an area could be
considered for a trail to connect the two other areas.
Preliminary Park,Greenway& Trail System Plan (Detail)
DRAFT December 8, 2005 Hodgson/CR J Master Plan
page 10
•
•
•
Environmental Issues: Wetlands, Water Table
Wetlands exist in the area between Hodgson and Ware Roads, and the water table in the
overall study area is shallow. The shallow water table constrains some development
options that would require below -grade construction. Wetlands create some challenges
for routing roads and utilities.
However, the wetlands also can be viewed as the basis of an open space amenity area that
can be incorporated into site designs. Proper buffering of the wetlands can protect water
quality and enhance the quality of these open spaces. This perspective fits with the City's
conservation development philosophy, whereby new development would create
significant public values beyond those achievable under conventional development
.,T,
. ,t. of OF 111R " 1'5 6"N 1,1
1. � �f >aern
''''
�.. r ' sift !v'6 I sift
9'i '• 437,i".l iniu r
/111 111 VIIR Alt :1—%. Tili 4111
Rrit4AiK sIc_ d
VII
LANDFORM w
Wetland Inventory
Lino Lakes County Road J November 11, 2004
Masterplanning Study LN04004
DRAFT December 8, 2005 Hodgson/CR J Master Plan page 11
•
•
•
DEVELOPMENT ISSUES
Land Use
The existing land uses are illustrated in the previous figures. Any development of the
study area must recognize the existing neighborhoods of Woodridge Estates, Blomquist
Addition, Rohavic Oaks, and Ware Road residents in Lino Lakes as well as the existing
residential development south of CR J in Shoreview. These will continue as stable
residential neighborhoods. Design of new development must take into account potential
impacts on the neighbors.
Also noted previously, some property owners want to develop their site, some want to
continue the existing use for now, but have plans for future development. Others have no
plan to change their use of their site.
For example, a garden center and an auto sales business exist on Hodgson Road. Both
these businesses are are consistent with the comprehensive plan future land use map: the
sites are guided for commercial use. The garden center owner wants to continue the
business on the site and hopes to construct a new retail building. The location and size of
this building has yet to be determined. Immediately to the south, the auto sales lot owner
plans to continue doing business on the site.
However, either one of these two sites could be redeveloped. The garden center has
several buildings, but the entire site could be redeveloped either for expansion of the
garden sales business or for a completely different use. The auto sales property is mostly
undeveloped and could be used for a variety of things, including auto sales.
Land at the northwest corner of CR J and Ware Road is owned by a developer hoping to
create a small townhome development on the site. This is consistent with the
comprehensive plan future land use map, which guides the site for medium density
residential use.
On the west side of Hodgson Road, a developer is assembling land for a project that
would include redeveloping the northwest corner of Hodgson/CR J with new retail uses.
It also would create a senior housing campus on 17 acres to the north of the retail area.
No specific plans have been offered on the other properties in the study area.
The important point is that road, utility, and development plans for the area should
provide for future development as well as allow for the existing businesses to continue on
the site. Planning for both possibilities at the same time poses challenges.
DRAFT December 8, 2005 Hodgson/CR J Master Plan page 12
•
•
•
Roads, Access
Creating new local access and circulation is vital to development in the study area.
Creating new road alignments must address three issues: access and circulation,
development parcel size, and road right of way width.
Hodgson Road
Ware Road
primary study area
roads
Access and Circulation: The figure above shows the roadway system in the area.
Hodgson Road and CR J are the only two roads providing access to the primary study
area. Ware Road on the east provides access to the general area as well. However, no
local streets exist to provide access within the study area.
The intersection of Hodgson and CR J functions poorly now at peak periods. Traffic will
continue to increase, further degrading traffic conditions at the intersection. This traffic
is generated outside of the study area. Development within the area will require good,
safe access and circulation. Planning for the study area must acknowledge that the
intersection must be improved. This requires improvements to Hodgson Rd. and CR J,
but also requires designing clearly defined access points and internal circulation within
the study area.
DRAFT December 8, 2005 Hodgson/CR J Master Plan page 13
Access management is an important aspect of planning new road alignments. A number
of studies have demonstrated a relationship between the number of full access points on
major roadways and the number of crashes. Managing access to the arterial roads in the
study area supports several goals, including: maintaining an acceptable level of mobility
on the roads; reducing the potential for safety problems; promoting appropriate property
access; and facilitating cooperation between different agencies and jurisdictions.
The Anoka County Highway Department has adopted access spacing guidelines for
intersections on county roads. The table below lists spacing for minor arterial roads.
• Anoka County Highway Dept.
Functional
Class
Route
Speed
(mph)
Area or
Facility
Type
Primary Full
Movement
Intersection
Conditional
Secondary
Intersection
Signal
Spacing
Private
Access
Minor
Arterial
50 -55
Rural
'h mile
1/4 mile
'/s mile
subject to
conditions
40 -45
Urbanizing
1/4 mile
1/8 mile
'/ mile
by
exception
or deviation
< 40
Urban Core
1/8 mile
300 -660 feet
'/ mile
subject to
conditions
Source: Anoka County Highway Department Development Review Process Manual,
2003
Both Hodgson Road and CR J are classified as minor arterials. The speed limit is 50 mph
on Hodgson north of CR J, but 45 mph to the south in Ramsey County. On CR J, the
speed limit is 35 mph at the Hodgson intersection. The speed limit increases to 50 mph
approximately 2,000 feet to the west and about 2,600 feet to the east of Hodgson Rd.
Defining the access points also includes recognizing that access to the arterial roads will
be limited. The intent is that access to land will be via the new local roads rather than
with individual driveways onto Hodgson and CR J.
One of the important benefits of creating new access points will eliminating existing
driveways that now access the arterial roads. If internal roadways are created, there
would be one access to Hodgson from each side. There also would be one access to CR J
between Hodgson and Ware, and one access between Hodgson and Woodridge.
Approximately 15 existing driveway access points on Hodgson and CR J would be
reduced to four access points: three at public road intersections and one parking lot
access (the CR J access west of Hodgson). This reduction from 15 individual, random
driveways to four properly designed access points would be a significant public safety
improvement .
Parcel Size: In addition to access needs, road alignments should allow for the
creation of parcels of property that are large enough to develop. The parcels must
accommodate buildings, parking, access drives, and site amenities such as landscaping or
DRAFT December 8, 2005 Hodgson/CR J Master Plan page 14
•
other features. The street system must take into account existing uses as well as the
potential for future development.
Road Size: Road rights of way must be large enough to accommodate vehicle
movement, pedestrian sidewalks or trails, utility easements, and landscaping. While it is
possible to have utilities in separate easements, this uses additional land. It is most
efficient to include utilities in the road rights of way.
Utilities: Water and Sanitary Sewer
If the area is to develop, it must have municipal municipal water and sanitary sewer
service. Providing these utilities to the study area poses numerous challenges. The
figures below shows the location of existing municipal utilities.
Location of Existing Municipal Utilities
•
Imo Location of Lino Lakes Water and Sanitary Sewer Trunk Lines
• • • • • • • • • • Sanitary Sewer Served By Shoreview System
DRAFT December 8, 2005 Hodgson/CR J Master Plan
page 15
•
•
•
Several potential locations for utility service connections have been considered:
• Shoreview
• Ware Road
• Woodridge Lane
• White Pine Road, approximately '4 mile to the north of the study area, on the
west side of Hodgson Road
• Ravens Court, approximately 1/8 mile north of the study area, on the east side
of Hodgson Road
There are several common issues for water and sanitary sewer service in this area. For an
area that lacks both utilities, it is financially cost effective to plan both in the same
alignment. This avoids the need to acquire easements for separate alignments, and both
can be constructed at the same time. However, there are some issues that apply to one
but not to the other. In particular, the need to loop the water system. Issues for utility
service are described below.
Water Main
All the properties in the area with existing uses have individual wells for water. Homes
on Woodridge Lane have municipal water, but there is no service between the Woodridge
Estates neighborhood and Ware Rd.
The City of Lino Lakes has recognized the need to connect its two trunk lines in
Woodridge Lane and Ware Rd. The loop is needed in order to provide adequate water
service, particularly fire protection. Both trunks end near the Hodgson/CR J area, which
raises the possibility of inadequate flow. Looping the system allows for better flow and
water pressure. Looping also provides alternative service if water is interrupted from one
direction.
Shoreview: The Cities of Lino Lakes and Shoreview have a water interconnect at
Woodridge Lane. In the past, this interconnect provided ongoing, supplementary water
availability. Shoreview has closed this connection. It is available for emergency water
service, but not available on an ongoing basis. This has increased the importance of
looping the Lino Lakes system.
Woodridge Lane: Connecting to the Woodridge Lane pipe on the west of the study
area is more difficult. There is no corridor between existing homes for a utility easement
to connect to the Woodridge Lane utilities. The water loop could run along CR J, then
turn north through new development in the study area. The CR J right of way is 100 feet
wide in this location (50 feet on each side of the centerline). There are numerous private
utility services in this right of way such as natural gas, electricity, cable tv, and fiber
DRAFT December 8, 2005 Hodgson/CR J Master Plan page 16
•
optics. Running a new water pipe would require moving these utilities or acquiring a
new easement. Moving the private utilities would be exceedingly expensive. The
remaining option is to purchase new easement outside of the existing road right of way
for a water trunk line.
White Pine Road: There is service available in White Pine Road, about 'A mile north
of the study area. Connecting to this would require either an easement through the
Rohavic Oaks residential properties or running along Hodgson to Rohavic Lane, and
running the pipe in Rohavic Lane and Laurene Ave. There is no location for a utility
easement between the home lots. This route would not immediately address the need to
loop the water system between Woodridge and Ware, though it could provide a loop from
Woodridge. The Ware Road trunk could be connected to this new trunk when
development fills in the gap.
In addition, the comprehensive plan guides the Rohavic Oaks neighborhood as
Unsewered Low Density Residential and the City has received only one inquiry from this
neighborhood about utility service. Without property owner participation, there would be
insufficient funding for utilities and road reconstruction.
Ravens Court: Connection to the Ravens Court water is possible. However, this would
not immediately address the need to loop the water system between Woodridge and
Ware, though it could provide a loop from Woodridge. The Ware Road trunk could be
connected to this new trunk when development fills in the gap.
Ware Road: As property develops along Ware Road, the trunk can be brought from
that side. The Ware Rd. properties are undeveloped, so the opportunity exists to plan
utility service alignment as land develops. However, it will be necessary to provide the
water loop to Woodridge as development is planned.
Preferred Options (PRELIMINARY): It is necessary to loop the water system. The area
between Ware and Woodridge is largely undeveloped or underdeveloped. This area
offers the best route for a new utility alignment to provide water looping. Therefore, the
preferred option is to plan a water trunk either between Ware Road and Woodridge Lane
or between Woodridge and Ravens Hollow
With the first option, a trunk would run from Ware Rd., through the study area within
new development, along property lines, and cross Hodgson. On the west side of
Hodgson, the water service would go through new development, south to CR J, then
connect to the existing Woodridge Lane trunk. This likely would require an additional
easement along CR J.
With the second option, the trunk would run from Woodridge, along CR J in a new
easement, and through the new development. Then it would run up Hodgson to the
Ravens Hollow development, crossing Hodgson at some point.
DRAFT December 8, 2005 Hodgson/CR J Master Plan page 17
•
•
•
The City needs to loop the water even if no new development occurs. New development
provides new easements because it needs utility service. If no new development occurs,
the City faces the need to acquire new easements solely at City cost.
Sanitary Sewer
The majority of properties in the study area have onsite septic systems for wastewater
treatment. Only a few properties in the area have municipal sewer service . These are all
west of Hodgson. They include homes on the north side of CR J, the closed
bar /restaurant site, the existing insurance building, and the existing liquor store.
Shoreview: The properties with sewer service are served by a special service pipe that
connects to the City of Shoreview sewer system. Shoreview has stated that it will not
plan to accommodate additional Lino Lakes development through this service line.
Therefore, service for the study area must be provided from one of the Lino Lakes pipes.
Woodridge Lane: As noted in the description of water service, there is no corridor
between existing homes for a utility easement to connect to the Woodridge Lane utilities.
Connecting to this sewer line would require an easement along CR J that would be larger
than a water line easement.
White Pine Road: Also as described above, there is service available in White Pine
Road, about 1/ mile north of the study area. Connecting to this would require running the
pipe in Laurene Avenue and Rohavic Lane. It also would require either an easement
through the Rohavic Oaks residential properties or running along Hodgson to Rohavic
Lane. In addition, the comprehensive plan guides this neighborhood as Unsewered
Residential (no utilities to be provided) and the City has not received only one inquiry
from this neighborhood about providing utilities. Without property owner participation,
there would be insufficient funding for utilities and road reconstruction.
Ravens Court: Connection to the Ravens Court sanitary sewer is possible,
depending on depth issues and the potential need for a lift station.
Ware Road: As property develops along Ware Road, the trunk can be brought from
that side. The Ware Rd. properties are undeveloped, so the opportunity exists to plan
utility service alignment as land develops. The Ware Road trunk is relatively shallow.
Depending on grade elevations for new development, a lift station may be needed.
Preferred Option: ....................... to be determined along with water service, likely will
use the same alignment and easements
DRAFT December 8, 2005 Hodgson/CR J Master Plan page 18
•
•
•
Concept Plans
The study produced several concept plans. These concept plans were intended to provide
a basis for discussion as the study progressed. An initial plan was presented to a
neighborhood meeting on March 22, 2005. This plan intended to accomplish the
following:
• preservation of natural resource areas
• allow for phased development and utilities (connect to utilities in Ware Road)
• good access and circulation
• provide access for new development
• provide for stormwater treatment and management
• conservation development: create significant public values beyond those achievable
under conventional development, including:
• preserving natural habitat
• creating more open space for natural habitat, neighborhood recreation and
trails
• design quality, well - landscaped neighborhoods
The March concept plan also attempted to address gateway design issues. This included
keeping the corner buildings close to the street comers and other elements to create a
human scale environment, friendly to pedestrians and bicyclists. A major trail along
Hodgson is an important part of the City's Parks and Trails Plan. Residential
development in the area should have easy walking and biking access to this transportation
trail and to new businesses as well.
By its very nature, a concept plan is inexact, a collection of ideas. The concept plan is
not intended to eliminate existing businesses. Rather, it is intended to generate
discussion by showing a general land use design with some specifics, such as road
alignments and access points. The design of individual parcels will be up to the land
owners. However, because infrastructure design is the driving force of the study,
individual parcel design must take into account the infrastructure needs for the larger
study area.
The March concept plan generated a very informative discussions and helpful input from
landowners and residents. Several business owners didn't see their businesses pictured
on the concept plan and worried that the City was trying to drive them out. They stated
they intended to remain on their site, even expand their existing businesses. This
misunderstanding enforced the need for further communication and led to several
conversations and letters clarifying the goals of the study.
The March concept plan is shown below.
DRAFT December 8, 2005 Hodgson/CR J Master Plan page 19
•
•
March 2005
CONCEPT PLAN
J
It
Lr1NL)FL)RM
COJNTY ROAD J REDEVELOPMENT MASTER PLAN
CITY ar Lwo Lt is
MaecH 22, 2005
DRAFT December 8, 2005 Hodgson/CR J Master Plan
page 20
•
•
•
The discussions also led to a second set of concept plans. In fact, the second round
resulted in two concepts in June 2005. Knowing that some of the existing businesses
planned to remain led to realigning the new roads to follow existing property lines. This
provides for new road and utility corridors without breaking up existing properties. It
avoids breaking up both the garden center and auto sales lot, each of which includes
several contiguous tax parcels. Expansion is possible, and the new road and utility
corridors provide access to utilities and to Hodgson and CR J. Concepts A and B differ
in the specific alignments of the internal roads. The alignments result in different
approaches to designing the land at the northwest corner of CR J and Ware Road. The
actual layout of that site has yet to be determined by the developer there. However, both
Concepts A and B provide a corridor to Ware Road for utilities, through the development
site.
It would preferable to align the new road access to CR J with the existing Kent Street in
Shoreview, as in Concept B. However, aligning it with the property boundary is
acceptable, even though it creates an offset. The likelihood of a median in CR J makes a
full access there somewhat questionable. Though both concepts show a full access, this
has yet to be determined.
The June concept plans led to further, more detailed planning and discussions with land
owners. On the west side of Hodgson, one developer is assembling a plan to redevelop
the sites with existing buildings and develop the 17 acres to the north. This would
include new retail as well as a senior housing campus. The land owner at the northwest
corner of Ware Road and CR J is pursuing a townhome development. If utilities for the
study area connect to Ware Road, this townhome development would include a corridor
for the water and sanitary sewer.
The June concept plans also formed the basis of discussions with the Anoka County
Highway Dept., Ramsey County Public Works., the City of Shoreview City Engineer,
and Lino Lakes staff. All agreed that the Hodgson/CR J intersection needs improvement,
and a collaborative solution is needed. Anoka County Hwy. is putting together a plan for
the intersection. Lino Lakes is preparing a traffic study. Ramsey County contributed
data for the study. All jurisdictions will need to examine funding possibilities and
cooperative planning.
DRAFT December 8, 2005 Hodgson/CR J Master Plan page 21
•
•
•
June 2005: CONCEPT A
LANDFORM
l�
L.o.,d
• gamuts
wohrjne
—▪ ...mow
b
l
Lino Lakes County Road J Masterplanning Study
0 100 200 404 Feet
June 13, 2005
LN04004
DRAFT December 8, 2005 Hodgson/CR J Master Plan page 22
•
•
June 2005: CONCEPT B
LANDFORM
Legend
s —
�� qv tilm
• _..,_,.
..e./J..
Lino Lakes County Road J Masterplanning Study
o 100 zoo 4oFeet June 13, 2005
LN04004
DRAFT December 8, 2005 Hodgson/CR J Master Nan page 23
•
•
FINAL MASTER PLAN TO BE DETERMINED
DRAFT December 8, 2005 Hodgson/CR J Master Plan page 24