Loading...
HomeMy WebLinkAbout07/11/2007 P&Z Packet• CITY OF LINO LAKES • • PLANNING & ZONING BOARD MEETING Wednesday, July 11, 2007 6:30 p.m. Council Chambers (Scheduled to be televised on Ch. 16) Please be courteous and turn off all electronic devices during the meeting. AGENDA I. CALL TO ORDER AND ROLL CALL II. APPROVAL OF AGENDA III. APPROVAL OF MINUTES: May 9, 2007 and June 13, 2007 IV. OPEN MIKE V. ACTION ITEMS A. CONTINUED PUBLIC HEARING for a Preliminary Plat for an eight lot residential subdivision to be called Grandview, 7330 Lake Drive, Royal Oaks Realty — Paul Bengtson B. PUBLIC HEARING for a Conditional Use Permit for a Rural Residential Planned Unit Development to be called Moon Marsh, 8300 East Rondeau Lake Road — Jeff Smyser VI. DISCUSSION ITEMS A. Update on Comp Plan Process VII. ADJOURN Meeting guidelines on reverse side. City of Lino Lakes Planning & Zoning Board MEETING GUIDELINES Open Mike — The purpose of a Board Meeting is to accomplish the business of the city. When presenting at a meeting please remember to be respectful, and follow these guidelines: • Please address the meeting chair. • State your name and address for the record. • Please observe a 4- minute limit. • The topic must relate to city business. • Open Mike is for items not on the agenda. • A spokesperson must represent a group of five or more — groups will have 8 minutes. • The Presiding Officer may limit duplicative presentations. • Remember, the meeting is to discuss city business only. Public Hearing - Held as a separate item of business on the agenda. The public hearing segment is your opportunity to tell the Board how you feel about issues scheduled to be heard. Typically, a hearing follows these steps: • The Presiding Officer (Chair or Vice - Chair) will announce the proposal to be reviewed and ask for the staff report. The presiding Officer shall maintain strict order and etiquette at all meetings. • Staff will present their report on the proposal. • Board members will then ask City Staff questions about the proposal. • The Presiding Officer will then open up the public hearing for anyone present who wishes to comment on the proposal. This is the time for the public to make comments or ask questions about the proposal. Comments should be limited to four (4) minutes unless further time is granted by the Presiding Officer. All comments should be directed to the Board as a body and not to any individual Board Member or City Staff Member unless permission is granted by the Presiding Officer. No person shall be permitted to enter into any discussion, either directly or through a member of the Board without the permission of the Presiding Officer. • After everyone in the audience wishing to speak has given his/her comments, the Presiding Officer shall close the public hearing. • The Board will then discuss the proposal. No further public comments are allowed. • The Board will then make a recommendation(s) and/or a decision. When you are called upon for your comments, please step to the microphone at the podium and state your name and address for the record. Occasionally, the Board may continue a hearing to another meeting before taking action. Meeting Etiquette The Planning & Zoning Board must preserve order and decorum while the meeting is in session. A resident shall not, by conversation or otherwise, delay or interrupt the proceedings or the business of the Board, nor disturb any resident or Board Member while speaking or refuse to obey the orders of the Board. • • • CITY OF LINO LAKES PLANNING & ZONING BOARD MINUTES DATE TIME STARTED TIME ENDED MEMBERS PRESENT MEMBERS ABSENT STAFF PRESENT May 9, 2007 6:31 P.M. 10:21 P.M. Michael Hyden, Perry Laden, Robert Nelson, Brian Pogalz (Vice Chair), Rob Rafferty, Paul Tralle (Chair); Michael Root None Paul Bengtson, Jeff Smyser & Jim Studenski I. CALL TO ORDER AND ROLL CALL: Chair Tralle called the Lino Lakes Planning and Zoning Board meeting to order at 6:31 p.m. on May 9, 2007. II. APPROVAL OF AGENDA The agenda was approved as presented III. APPROVAL OF MINUTES: Mr. Rafferty made a MOTION to table the approval of the April 11, 2007 Minutes to the meeting on June 13, 2007. Motion was supported by Mr. Pogalz. Motion carried 6 - 0. IV. OPEN MIKE Chair Tralle declared Open Mike at 6:32 p.m. There was no one present for Open Mike. Mr. Tralle closed Open Mike at 6:32 p.m. V. ACTION ITEMS A. Variance to the local street setback to allow for a covered porch addition at 8020 Danube Street, James Schally Mr. Bengtson presented the staff report. DRAFT MINUTES Planning & Zoning Board May 9, 2007 Page 2 Staff recommended approval of the variance request. The applicant, Mr. James Schally, was not present at the meeting. Board Members discussed the necessity of the roof and the intent of the porch. Mr. Pogalz made a MOTION to recommend approval of the Variance to the local street setback to allow for a covered porch addition at 8020 Danube Street. Motion was supported by Mr. Laden. Motion carried 6 - 0. B. CONTINUED PUBLIC HEARING for a Conditional Use Permit for earth material storage at 6644 20th Avenue, Royal Oaks Realty Mr. Studenski presented the staff report. Mr. Studenski stated that resident Julie McNeely, 6687 20th Ave., was unable to attend the meeting but asked staff to forward her comment to the board that she is against the proj ect. Staff stated their review was based on the 14 conditions of the Zoning Ordinance for Earth Moving and Land Reclamation. Staff reminded the board of the petitions against the project that were submitted at the April meeting. Mr. Studenski explained that the city had received a review from the Anoka County Highway Department earlier that day. He clarified that neither the county nor the city would require the additional 27 feet of right -of -way for this request. He stated that County comments included: moving the driveway as far to the north as possible, adding a culvert, and constructing north and south bound turn lanes and a bypass lane. The City contacted Anoka County after receiving the letter, and was informed by Randy Bettinger at Anoka County that road improvements will be required regardless of the number of trucks per day, but the required combination of lanes still needs to be determined. Mr. Studenski added that drainage calculations would be required to determine how drainage would affect the county road and that a Haul Permit is required by the county. Mr. Studenski explained that the deadline for this application is June 6, which requires action by the P &Z Board at this meeting. He added that the applicant did not see a rationale to extend the item. Mr. Studenski noted that the Rice Creek Watershed District does not require a permit, but will monitor the site. Mr. Studenski stated that the applicant had already addressed a number of issues and conditions since the previous meeting. Staff explained that the dirt pile had been moved to a location more than 50 feet away from any existing trees. The applicant submitted a Storm Water Pollution Prevention Plan (SWPPP), filled the house foundation, abandoned the septic system, cleared and removed debris and objects from the site, added a fenced barricade to the driveway entrance, and added a dirt berm to the northern access. Staff recommended approval of the Conditional Use Permit subject to the 13 conditions listed in the staff report. DRAFT MINUTES • • • • Planning & Zoning Board May 9, 2007 Page 3 Mr. Nelson referred to Condition No. 12, and asked what would happen if the county decided to allow a variance that the city did not agree with. Staff replied that the county will have their own requirements. Mr. Studenski stated that the city could amend the conditions of approval to address this. Staff confirmed that the existing stockpile is currently 22 - 24 feet high. Mr. Pogalz asked why the trips per day were reduced from 50 to 25 trips per day. Staff said they had reduced the number in response to resident and Planning and Zoning Board Member concerns. Mr. Laden pointed out that the ordinance requires that an applicant specify a completion date, and asked if a completion date had been addressed. Mr. Studenski replied that development is anticipated on the site in the near future and, due to the limited amount of activity that will occur, staff had not requested a specific completion date. Staff noted that the board could recommend a deadline date, but that all CUPs are reviewed annually. Applicant, Mike Black, Royal Oaks Realty, 1000 County Road E, Suite 150, Shoreview, MN, reiterated that the zoning ordinance allows this use in any zoning district. He stated that conditions are required for a CUP in order to make the use compatible with neighboring properties. Mr. Black described that Royal Oaks Realty is a land development company, Royal Excavating is their sister company, and Imperial Homes is the home building company and they all work together. He explained the intent of their request is to stockpile dirt for their own company and that dirt will not be sold to other companies. He said they presume that some weeks there may be no trucks accessing the site, and explained that they will access the stockpile when there is final grade work being done. He noted that they never intended to be hauling material in and out on a daily basis, and only when there is a bigger job would they possibly meet the maximum trips per day. He thanked the board members that were able to visit the site. He stated that they have tried to meet a number of staff's recommendations since the last P &Z meeting, and they should not have a problem adhering to staff's conditions of approval. He stated that he spoke with Randy Bettinger of Anoka County earlier that day regarding the county review. He was told by Mr. Bettinger that the County is offering comments, but not necessarily requirements. He said Mr. Bettinger stated that the county does not require the road improvements. Mr. Black spoke of the possibility of moving the entrance. He said he is concerned about the road recommendations, but added that Mr. Bettinger told him that if the city does not require this, then the county does not require it. He would like an opportunity to discuss the county's recommendations with city staff and the county. Mr. Nelson commented that he believes that the term grading means a one -time earth moving. Mr. Laden believes the intent of the ordinance is for a temporary use, and that a final grading plan and a project completion date are required. Mr. Black stated that the property is guided for medium density residential and that they hope to develop in two to five years or sooner. He explained that once there is a DRAFT MINUTES Planning & Zoning Board May 9, 2007 Page 4 development application, the use will stop. He added that they would not go through with the application if the county required the turn lane changes. Mr. Laden said he believes that to allow storage means something will be stored and will stay there. Mr. Black informed the board that the majority of the dirt came from Centerville and that only black dirt will be stored on the site. Mr. Rafferty asked Mr. Black to consider how he would feel if he were a neighbor. Mr. Black reminded the board that this would be a conditional use in which staff can apply conditions in order for the property owner to use the property in a certain way. Mr. Black reiterated that dump trucks will not be accessing the site every day and he feels a cap of 25 trips per day is feasible. He estimated, on average, possibly 10 trips per day once a week would access the site. Mr. Nelson suggested limiting the number of trips per day to a monthly threshold instead of a daily threshold. Chair Tralle opened the Public Hearing at 7:27 p.m. Mrs. Patrice Carpenter, 6748 20th Ave., said she stated concerns at the last meeting. She said the applicant has been a good neighbor and has been making a lot of improvements. Her concern is that he didn't get permission prior to the stockpile placement and movement. She is concerned about the issue of the turning lanes and that moving the driveway north would be a lot closer to her. She said there is a blind hill heading north on 20th, so if they moved the driveway to the north then turn lanes would be necessary. She stated there is no need for turn lanes if the driveway stays in its current location. She understands the site is rural and she is used to dirt, but doesn't know when the dirt will be flying around. She feels there is no way to vegetate anything with all of the earth movement. She does not feel the height of the dirt pile makes a difference. She informed the board that flying dirt is a nuisance. She was relieved to hear the dirt came from Centerville. She said she would really not like the use here and would have liked it more if the applicant had asked permission prior to them doing it. Mrs. Carpenter recommended that the board not approve the request and asked that the pile of dirt be moved. John Pignato, 6709 20th Ave. S., stated that there are no turn lanes in Centerville, and that all kinds of traffic is going there now, just not so many dump trucks. He said they have been putting up with semi - trucks and earth moving equipment for a long time because of new businesses in Centerville, noting this is just another straw in the camel's back. He feels that they will be accessing the site more often than Mr. Black has suggested. He stated that dirt is blowing and there is mud on the road. He stated that he is against the application and hopes the board denies it. Mr. Tralle asked Mr. Black to address some of the concerns. DRAFT MINUTES • • • • Planning & Zoning Board May 9, 2007 Page 5 Mr. Black said that they will Hydro -seed the stockpile to establish vegetation and reseed as necessary. He added that they have a truck for watering and they will sweep as needed to clean and maintain the road. He said they do not have a problem with a gravel driveway as it is almost there by now. He anticipates they will be moving the dirt small sections at a time. He is willing to create a new driveway to within 30 feet of the property line if it is required. He added, however, that trees there currently act as a buffer, so if the drive is relocated north of the trees the buffer will be lost. Mr. Nelson suggested the possibility of adding a stipulation for use at three to four years and capping the allowable trips per month. Mr. Black said that sounded reasonable, but was not sure if the attorney would agree with adding a completion date. Mr. Black said he understands they are trying to find thresholds of compatibility. He reiterated that the use is not intended, and was never intended, to be a constant moving activity, but simply supplemental material available for nearby construction sites as need be. He asked the board to consider a one year allowance to prove that it will be a compatible use with the neighborhood. Mr. Pogalz made a MOTION to close the Public Hearing at 7:47 p.m. Motion was supported by Mr. Hyden. Motion carried 6 - 0. Mr. Pogalz reiterated his comments from the last board meeting. He stated that the property is zoned rural, which allows more flexibility to the property owner. He added that it could be a lot worse if the property was used for farming. He pointed out the this sounded like an example of NIMBY — Not In My Back Yard, which means that residents are okay with things as long as it's not in their back yard. He added that turn lanes sound okay because the county may require them with development. He suggested they look at this use as a distribution center somewhat like Schwan's. He feels they are putting good limits on a use. He noted that normal construction operations happen as areas develop. He added that the use would go away in a few years as the land would be more valuable with homes rather than dirt on it. He stated he is in favor of approving the CUP. Mr. Rafferty made a MOTION to recommend denial of the Conditional Use Permit for earth material storage at 6644 20th Avenue. Motion was supported by Mr. Laden. The following role call vote was taken, Nelson: No, Root: Yes, Rafferty: Yes, Hyden: No, Pogalz: No, Laden: Yes, Tralle: Yes. Motion carried 4 -3. Mr. Studenski asked for the board's rationale for denial, which he stated is necessary when an application is forwarded with a recommendation for denial. Mr. Root stated the use is too intense for the roads and a nuisance for the neighbors. Mr. Rafferty believes this use is not what the ordinance intended. Mr. Tralle does not agree that there is no end in site, he is disturbed that they did not ask permission prior to use, and he does not feel they can monitor the amount of traffic. Mr. Laden stated it does not meet ordinance requirements without an end date. He considers it to be an off -site delivery business that would not be allowed in a rural zone. DRAFT MINUTES Planning & Zoning Board May 9, 2007 Page 6 Mr. Nelson suggested putting a new motion on the table to include a completion date for the use. Mr. Tralle stated that a motion had already been passed for the application. The board took a 10- minute recess at 7:57 p.m. The meeting reconvened at 8:08 p.m. C. PUBLIC HEARING for a Conditional Use Permit for earth material excavation and storage at 6497 12th Avenue, A.I.T. Mr. Studenski presented the staff report. He added that Anoka County does not require any permits for activity from this site as the site does not directly access onto a county road. He stated the deadline for this application is June 7, so the City Council would have to take action at the May 19 meeting. Therefore, the board would have to take action at this meeting to meet the time frame. Mr. Studenski described the site layout per the exhibits included in the staff report. He noted that they will only access the westernmost pile across the ditch if it becomes necessary to obtain the required amount of fill. Mr. Studenski said that the Rice Creek Watershed District (RCWD) has not taken action on the project at this time. He said the applicant does not intend to move any trees on either site. He explained that the activity going in and out of The Preserve site will be intense at some time regardless of where the dirt comes from. He added that this is possibly the shortest truck route possible to the site. Mr. Studenski reviewed the conditions of approval that staff suggested for this application. He added that Condition 15 will be changed to read that no permits are required by Anoka County. Mr. Studenski stated that the ponds will be monitored to discharge water prior to reaching the ditch. He does not anticipate issues and added that the city and RCWD will monitor the flow. Mr. Studenski said that pumps will run continually in order to work effectively. Board members discussed the possibility of using flags and limiting the speed of trucks in order to help with traffic flow. Staff stated that traffic activity on Birch St. will be monitored and that flagging will be required if determined to be necessary for safety. Board members discussed the proposed ponding areas, including slopes, pond depths and vegetation. Mr. Studenskin explained that the applicant will vegetate according to city specifications. He said that one pond will be very shallow and the one to the west of the house will be 18 -20 feet below the water table. He noted that the smallest pond is the least desirable and most expensive to excavate, therefore the specific process of excavation will be determined by the contractor. DRAFT MINUTES • • • • • • Planning & Zoning Board May 9, 2007 Page 7 Board members wondered why the ponds did not include a bench for safety reasons. Mr. Studenski explained that the applicant is not creating any water storage areas and the ponds will not be designed to be long -term. Mr. Studenski informed the board that caution signs are typical with development, and signs will be placed along Birch St. so it is not necessary to include this as a condition. Applicant, Mr. Brian Bourassa, MFRA Engineering, Plymouth, MN, and Adam Parker, hydrologist, answered questions for the board. Mr. Bourassa stated that berms around the dewatering equipment would be a great idea. He explained that the material they are going after is sandy material for building roads and house pads, and they will need an estimated 50,000 to 60,000 cubic yards for The Preserve site. Mr. Bourassa said he lives in the area and is aware that traffic is difficult. He likes the idea of warning signs on Birch St. and 12th Ave, and is open to staff's recommendations regarding flagging. Mr. Bourassa showed the board members the location of the temporary storage on the site. He noted that the Environmental Board had suggested a specific seed mix for vegetation, and he will work with Marty Asleson at the City. He said he didn't show a bench because there is no development plan there, but realizes at some time a bench will probably be required. He noted that the water level in the ponds is estimated to remain what it is today. He said they do not anticipate accessing the third excavation site. He described that if they use six to eight 12 -yard trucks to haul the estimated 50,000 cubic yards of dirt during haul hours, it would take 13 days if everything ran perfectly. Realistically, they estimate it will take four to six weeks to haul the dirt for The Preserve. Mr. Parker explained to the board the dewatering process that will be used on the site. He explained that a number of engineers on staff will help determine the best vegetation and will follow the city's recommendations. He explained that SWPPPs will limit dust and keep topsoil in place. Board members expressed concern about water levels, safety of the excavation site and street clean-up and maintenance. Mr. Parker remarked that the vegetation used will be selected to handle the water levels, with only three to four foot fluctuations expected. Mr. Bourassa added that there will be no discharge from these basins and expects there to be less water or the same as there is today. Mr. Bourassa stated that silt or snow fencing will be used for safety. He explained that they are proposing a rock trench entrance to knock dirt off the wheels, a silt fence to prevent erosion from the pile, and will comply with requirements regarding street sweeping. Mr. Pogalz pointed out that the application is for an expected use of 90,000 cubic yards, with 50,000 going to The Preserve. He asked if the excess material will be sold to another developer or development and why they should allow him to take the material off site. He asked why they couldn't just take the 50,000 to 60,000 for The Preserve. Mr. Bourassa replied that the purpose is to haul the excess material to a different site. DRAFT MINUTES Planning & Zoning Board May 9, 2007 Page 8 Mr. Bourassa suggested the board could but a sunset period on when the site needs to be cleaned up. He went on to say if there is a market for the material, and they think there is, they propose to sell it. Mr. Pogalz pointed out that a timeline of four to six weeks is expected for The Preserve, with an extra four to six weeks to access additional sites. Mr. Bourassa clarified that additional trucks may be used for the other sites. Mr. Tralle stated that if they are going to have to put in a bench eventually, then it should just go in now. He asked what the restoration plan is for the area. Mr. Bourassa replied that the property owners, the Lamottes, see the ponds as a buffer to the future growth area. Mr. Tralle asked what the estimated truck traffic would be on a normal day. Mr. Bourassa replied that they expected six to eight trucks to haul all day long for roughly four to five weeks. Mr. Tralle opened the Public Hearing 9:06 p.m. Bill Combs, 6496 N. Trappers Crossing, said his property is on the comer lot directly behind the large stockpile site. He was concerned about safety issues. He said he has young boys and a dog that play on the Lamotte property and he is not convinced of safety with the proposed silt and storm fencing. He was concerned about how close to his property line the pond would be and how big it would get. He was concerned for the safety of his children and other children. Mr. Bourassa responded that the start of the grade is maybe 10 -15 feet north of property line. He anticipated water elevation to be maybe 120 feet north of his back property line. Joe Knudsen, 6525 White Oak Rd., stated concerns about trucks exiting on 12th Ave. and asked how close to the road the proposed stockpile would be. He was concerned it would be near development. Mr. Bourassa explained that the temporary stockpile of sand and dirt would be stored north of the trees and west of 12th Ave. Mr. Knudsen also expressed concern about the number of trucks and truckloads that would be used. Mr. Pogalz estimated that in a ten -hour day, approximately 240 truckloads could be hauled per day for 28 days. Mr. Knudsen stated concern for damage that may be done to the road. Mr. Studenski replied that they applicant would be required to replace any damage in kind with what is there now. Tim Renslow, 6586 Pheasant Run South, requested a confirmation of the proposed truck route. Mr. Bourassa explained the route to be used. Mr. Renslow added his concerns included dust, noise, and safety for children. He was very concerned that many of the families in the area have small children that may get hurt. Mr. Tralle replied that they are not disregarding the issues. DRAFT MINUTES • • • • • Planning & Zoning Board May 9, 2007 Page 9 Mr. Renslow added that he is concerned about the condition of Pheasant Run S. Mr. Tralle responded that they can reduce truck speed and the applicant will clean the roads on a daily basis. Mr. Pogalz explained that Pheasant Run S. will see just as much traffic regardless of where the dirt will come from as it has to come from somewhere. He added it is probably better that it come from a nearby site as it would happen faster. Ben Peterson, 6441 Royal Pines Place, stated his property is directly south of the southern property line. Mr. Peterson requested that they put the snow fence around the entire property. He asked how many backhoes and diggers would be used and if they would be using bobcats. He wondered how many water pumps would be used. He wondered once they start digging dirt out of the ponds, how long will it take to dry until it can be hauled away. He asked how lon the project would actually last. He stated he has concerns about traffic, especially on 12 Ave. He noted that the property owner has planted great trees on the property and wondered if he could line the southern property line with trees, adding that he would be willing to help out if needed. Mr. Bourassa believes the operation will consist of one backhoe and one dozer accessing one pond at a time. He does not anticipate the use of bobcats, but one front endloader may be used. He estimated that one pump at a time will be used for dewatering. He stated that they propose to place silt or snow fence around excavation areas as shown on the plan for safety measures. Mr. Tralle pointed out there is a wetland area between Mr. Peterson's house and the excavation area. Mr. Peterson added that an increase of trucks might add curiosity to kids and he is concerned about their safety. Shari Livingston, 6574 Pheasant Run South, and father Larry Stinksy, stated concerns about the amount of truck traffic on Pheasant Run S. He stated there is a park where the truck traffic will be going through. He is especially concerned about times when kids are coming home from school or accessing the park. He added that cars always parked on the street, making it a hazard. He distibuted photos to the board of standing water in the drainage ditch behind the house, adding that the photos were taken after one day of heavy rain. Rick Reibel, 6535 Pheasant Run South, was concerned about the safety of children. He doesn't believe the lanes are very wide on the road, and with community sports there are often kids on the street by the park and riding bikes. He pointed out that their neighborhood includes diverse neighbors that may have issues with understanding signs. He was concerned about the environmental impact of the surface water drainage system. He stated concern about high water levels on Black Duck Drive to the north. He would like to see an independent report of the environmental water impact table, stating that they should be able to provide numbers with a hydrologist on board. He is concerned about cranes and Canadian Geese that nest in the drain field each year. He has concerns DRAFT MINUTES Planning & Zoning Board May 9, 2007 Page 10 about drinking water, heavy loaders possibly degrading Pheasant Run, vibration, and if there are contingency plans for operating damages. Mr. Studenski stated that any activity adversely affecting neighbors is the responsibility of the applicant. He added that the city will monitor truck traffic, and if issues occur they will be addressed. Mr. Hyden reiterated that the RCWD is involved in monitoring this project. Mr. Parker addressed hydrology questions. He explained that the DNR is the authority and they will work closely with them. He said that runoff will go through other wetlands before reaching the ditch. Mr. Laden made a MOTION to close the Public Hearing at 9:38 p.m. Motion was supported by Mr. Nelson. Motion carried 6 — 0. Mr. Laden said he was concerned about the truck traffic being allowed next to a city park during hours when activities are occurring with children and on- street parking. That's where he sees greatest danger. He proposed limiting or eliminating truck traffic during evening hours. Board Members agreed to amend Condition No. 12 to read Monday — Friday 7 a.m. to 5 p.m. Mr. Rafferty said he is concerned about city streets but is not sure they can contain people from development that is already approved. Mr. Rafferty suggested adding a condition to reduce the speed of trucks to 20 mph. Board Members agreed to add Condition No. 18 to say that trucks will be limited to a maximum speed of 20 mph. Board Members agreed to add Condition No. 19 to say that the city will monitor traffic and define traffic signage to include the necessary use of flagmen and hauling signage at the contractor's expense. Mr. Studenski confirmed that neighbors would be notified of work to be done and that a neighborhood meeting would be held. After discussion about the silt/snow fencing, Mr. Bourassa agreed to use snow fence instead of silt fence, and to continue the fence southward until it reaches the wooded area. Mr. Pogalz specified that the board is considering a CUP for excavation, storage and transporting of material and asked if anyone could explain the difference between this application and the Royal Oaks Realty application that was previously denied. Mr. Studenski stated that both applications consist of on -site material being taken off site, and the differences include the site of destination, what is to be removed, the time frame and the restoration plan. Staff reminded the board that with this application, the use will not continue on indefinitely, they know that this will be a concentrated effort once activity is DRAFT MINUTES • • Planning & Zoning Board May 9, 2007 Page 11 • started, and they will not have random material coming in and out for an undetermined • time frame. Mr. Pogalz stressed that the same restrictions should be applied to this site as were proposed for the other site. He does not see enough of a difference in applications to vary the conditions for daily watering, erosion control, fencing, and vegetation within 24 hours. He asked board members for feedback. Mr. Tralle pointed out that this application is different because the applicant came before the board legitimately before starting activity, the dirt is being used in Lino Lakes, and the use has an end date. Mr. Studenski added that this is a concentrated effort in that when they are doing the excavation it will be continually hauled off the site. Mr. Tralle stated that the board will no longer speak of the Royal Oaks Realty request because that is a separate application that the board already took action on. Mr. Studenski clarified that there will be a time that the topsoil will be at the storage site, which will be part of the SWPPP. Board Members agreed to add Condition No. 20 to say that the stockpile area will be limited to a maximum height of 25 feet. Board Members agreed to add Condition No. 21 to say that areas that will not be worked on within 48 hours are required to be hydro- seeded. Mr. Nelson pointed out that 50,000 cubic yards of material will remain local, while 40,000 cubic yards will go offsite, which makes the use more like a distribution center with an excessive number of trucks. He was concerned that the hauling of the extra 50,000 cubic yards will go on for five to seven months in a residential area, while they were previously concerned about a rural area. Mr. Laden reiterated the biggest difference is this application has an end date. Board members pointed out the similarities between this application and the application that was previously denied under Item 5B, however the majority of board members agreed that enough differences were merited. Mr. Laden made a MOTION to recommend approval of the Conditional Use Permit for earth material excavation and storage at 6497 12th Avenue based on the following conditions of approval: 1. A Stormwater Pollution Prevention Plan (SWPPP) in accordance with Minnesota Pollution Control Agency (MPCA). The SWPPP must contain the name and a 24 -hour telephone number of the responsible manager of the SWPPP. All references to MNDOT seed mix must be changed to the City native seed mix. DRAFT MINUTES Planning & Zoning Board May 9, 2007 Page 12 2. Silt fence must be added around the excavation for safety reasons. 3. Properly fence and barricade entrances to prevent the general public from depositing garbage or refuse. 4. Must provide a tree preservation plan or limit excavation of material to a minimum of 50 feet from any trees. 4. All truck hauling activity must exit the site on 12th Avenue South and go north to Birch Street. 5. All City streets where hauling activity occurs will be video taped previous to excavation commencing at the site. The applicant will be responsible for repairing any damage to City streets caused by the hauling activity. 6. Previous to any activity on the site the applicant will be required to hold a neighborhood meeting to notify affected property owners along the haul route and within one - quarter of a mile of the site. 7. Maximum slope on any excavation shall be a 1 to 1 and in such condition as not to be dangerous because of sliding or caving side slopes. 8. Only topsoil will be allowed to be brought into the site. 9. A rock trench entrance shall be installed and maintained at all times. 10. Dust and wind erosion must be confined to the site and be controlled by watering the driveway as necessary. 11. Street sweeping shall occur as necessary. 12. All construction activity shall be limited to the hours set as follows: Monday through Friday 7:00 a.m. to 5:00 p.m. Saturday 9:00 a.m. to 5:00 p.m Sunday and Holidays No working hours allowed 13. Reimburse the City for the cost of periodic inspections by the City for the purpose of determining that the terms under which the permit has been issued are being complied with. 14. Post a form of security to the City, conditioned to pay the City the cost and expense of repairing or cleaning any highways, streets, or other public ways within the City made necessary by the special burden resulting from transporting thereon by the applicant material to or from the site, the amount of such cost to be determined by the Council; and conditioned further to comply with all the requirements of this Ordinance and the particular permit, and to save the City free and harmless from all suits or claims for damages resulting from the negligent excavation, removal, DRAFT MINUTES • • • Planning & Zoning Board May 9, 2007 Page 13 • storage, or filling of rock, sand, dirt, gravel, clay, or other like material within the City. 15. No permits are required by Anoka County. 16. Permits from the Rice Creek Watershed District must be submitted to the City prior to any activity. All activities on the site must comply with the Rice Creek Watershed District requirements. 17. All excavation, erosion and sedimentation control, final site grading, and restoration shall be completed by November 1, 2007. 18. Trucks will be limited to a maximum speed of 20 mph. 19. The City will monitor traffic and define traffic signage to include the necessary use of flagmen and hauling signage at the contractor's expense. 20. The stockpile area will be limited to a maximum of 25 feet high. 21. Areas that will not be worked on within 48 hours are required to be hydro - seeded. Motion was supported by Mr. Rafferty. Motion carried 5 - 1. (Pogalz voting No) D. CONTINUED PUBLIC HEARING for a Conditional Use Permit Amendment for a building addition at 415 Lilac Street, Molin Concrete Mr. Bengtson presented the staff report. He noted that since the last meeting the applicant has submitted revised plans regarding details to the office footprint and showing the wetland enhancement area as a second phase. Staff recommended approval of the Conditional Use Permit Amendment subject to the seven conditions listed in the staff report. Applicant, Randy Molin, Molin Concrete, stated that they have met all previous landscaping requirements. Mr. Tralle reopened the Public Hearing at 10:18 p.m. There was no one present to speak. Mr. Laden made a MOTION to close the Public Hearing at 10:19 p.m. Motion was supported by Mr. Rafferty. Motion carried 6 - 0. Mr. Hyden made a MOTION to recommend approval of a Conditional Use Permit Amendment for a building addition at 415 Lilac Street. Motion was supported by Mr. Nelson. Motion carried 6 - 0. DRAFT MINUTES Planning & Zoning Board May 9, 2007 Page 14 VI. DISCUSSION ITEMS A. Comprehensive Plan Update Mr. Smyser summarized that the Comprehensive Plan Advisory Panel met on April 18 to review the draft goals and strategies. He said that the draft was reviewed by the Environmental Board and the Park Board, and will go to EDAC at their Thursday meeting. He said that comments will be brought to the next Advisory Panel Meeting on May 16 and a draft will go to the first Council Work Session in June. He added that they are running on the original schedule and asked for comments from the Board. Mr. Laden said he thought the meeting on April 18 was particularly productive. VII. ADJOURNMENT Mr. Rafferty made a MOTION to adjourn the meeting at 10:21 p.m. Motion was supported by Mr. Pogalz. Motion carried 6 - 0. Respectfully submitted, Dawn Bugge Community Development Assistant DRAFT MINUTES • • • • • CITY OF LINO LAKES PLANNING & ZONING BOARD MINUTES DATE TIME STARTED TIME ENDED MEMBERS PRESENT MEMBERS ABSENT STAFF PRESENT : June 13, 2007 6.32 P.M. 7 02 P.M. . Michael Hyden, Perry Laden, Robert Nelson, Brian Pagalz (Vice Chair), Rob Rafferty, Paul Tralle (Chair); Michael Root • None . Paul Bengtson & Jeff Smyser I. CALL TO ORDER AND ROLL CALL: Chair Tralle called the Lino Lakes Planning and Zoning Board meeting to order at 6:32 p.m. on June 13, 2007. II. APPROVAL OF AGENDA Mr. Smyser requested to add a discussion item to summarize the City's MEI Award. III. APPROVAL OF MINUTES: April 11, 2007 Mr. Laden made a MOTION to approve the April 11, 2007 Minutes. Motion was supported by Mr. Nelson. Motion carried 6 - 0. May 9, 2007 Mr. Tralle requested that the board table the minutes in order to review the videotape from the May meeting. Mr. Rafferty made a MOTION to table the May 9, 2007 Minutes to the July 11, 2007 Planning & Zoning Board Meeting. Motion was supported by Mr. Root. Motion carried 6 -0. IV. OPEN MIKE Chair Tralle declared Open Mike at 6:35 p.m. DRAFT MINUTES Planning & Zoning Board June 13, 2007 Page 2 There was no one present for Open Mike. Mr. Rafferty made a MOTION to close Open Mike at 6:36 p.m. Motion was supported by Mr. Pogalz. Motion carried 6 - 0. V. ACTION ITEMS A. Final Plat for a four lot residential subdivision to be called Golden Acre, 547 Lois Lane, Tim Anderson Mr. Bengtson presented the staff report. Staff recommended approval of the Final Plat. Mr. Tim Anderson, Applicant, was present. Mr. Pogalz made a MOTION to recommend approval of the Final Plat for a four lot residential subdivision to be called Golden Acre at 547 Lois Lane. Motion was supported by Mr. Root. Motion carried 6 - 0. B. PUBLIC HEARING for a Preliminary Plat for an eight lot residential subdivision to be called Grandview, 7330 Lake Drive, Royal Oaks Realty Mr. Bengtson presented the staff report. Mr. Bengtson explained that the Public Hearing Notice was not printed in the Quad Press, therefore the board would need to continue the Hearing to the July meeting. Mr. Bengtson explained that the City of Lino Lakes would be the enforcing authority over the conservation easement. Mr. Mike Black, Royal Oaks Realty, Applicant, was present. Mr. Laden commented that it is exciting that this connection is being made and he commended Mr. Black on his efforts. Chair Tralle opened the Public Hearing at 6:46 p.m. Mr. Myron Nickerson, 4080 99th Ave, spoke as a member of Gethsemane Church. Mr. Nickerson recommended approval of the plat stating that they would like to see the road go through. J.P. Houchins, 7284 Stage Coach Trail, requested a plat map to show his neighbors. Mr. Black provided him with plans for the development. Mr. Rafferty made a MOTION to continue the Public Hearing for the Preliminary Plat for Grandview at 7330 Lake Drive to the July 11, 2007 meeting. Motion was supported by Mr. Hyden. Motion carried 6 - 0. VI. DISCUSSION ITEMS DRAFT MINUTES • • • Planning & Zoning Board June 13, 2007 Page 3 A. Summary of MEI Award Mr. Smyser explained that the City of Lino Lakes received an award on May 17, 2007 from the Minnesota Environmental Initiative for the best environmental project in the Green Building and Development category for the Lino Lakes I -35E AUAR. Chair Tralle thanked City Staff for their work on the AUAR and said they should be proud of it. Mr. Root suggested the city enter next year for conservation development. B. Update on Comprehensive Plan Mr. Smyser explained that on May 16, the Advisory Panel further discussed the goals and policies. On June 4, the City Council discussed the draft goals and policies at a Work Session. Mr. Smyser stated that points raised by the City Council included the building cap, conservation development, monitoring the Comp Plan's process over time, as well as Council's involvement in the process. Mr. Smyser noted the next meeting of the Advisory Panel will take place on June 20, 2007. In addition, on July 18, 2007 the city will host a roundtable discussion with developers. Mr. Smyser summarized additional upcoming meetings. VII. ADJOURNMENT Mr. Laden made a MOTION to adjourn the meeting at 7:02 p.m. Motion was supported by Mr. Rafferty. Motion carried 6 -0. Respectfully submitted, Dawn Bugge Community Development Assistant DRAFT MINUTES • • • AGENDA ITEM 5.A. STAFF ORIGINATOR: Paul Bengtson P &Z MEETING DATE: July 11, 2007 TOPIC: Public Hearing: Grandview Preliminary Plat BACKGROUND Royal Oaks Realty has requested approval of an 8 lot residential subdivision to be known as Grandview. The subject site includes the outlot east of Gethsemane Church, and the parcel occupied by the parsonage house. The parsonage house lot and the previously granted roadway easement that would connect the Shores of Marshan Lake and Marshan Meadows subdivisions via Stage Coach Trail will both be slightly altered to allow the development of 8 total lots while still meeting all zoning ordinance requirements. The project was brought before the Planning and Zoning Board at the June 13th meeting, with some discussion and the public hearing opened and continued to the July 11th meeting. The only modification or correction that needs to be made is the question about the option of placing docks on Marshan Lake. ANALYSIS The following is a summary of the proposal: Site Area 3.76 acres Net Acreage 3.67 acres Total Lots 8 Gross Density 2.13 units /acre Net Density 2.18 units /acre Comprehensive Plan, Land Use and Zoning: The table below identifies the existing land use and zoning as well as guided land uses for the area. Location Existing Land Use Guided Land Use Existing Zoning Site Vacant Low Density Sewered Residential R -1 (Single Family Residential) North Residential Low Density Sewered Residential R -2 (Two Family Residential) South Residential Low Density Sewered Residential R -1 (Single Family Residential) East Marshan Lake N/A N/A West House of Worship Public / Semi - Public R -3 (Medium Density Residential) • Growth Management, MUSA Reserve: The subject site is currently located within the MUSA boundary area. • • Growth Management, Units/Year: The table attached to this report shows the status of the staging plans for final platting of new residential units. The seven new units of Grandview would fit within the policy of 147 per year and so could be final platted immediately. Preliminary Plat Shoreland Ordinance: The subject site is adjacent to Marshan Lake, which is considered a Natural Environment Lake and therefore is subject to the more restrictive Shoreland Ordinance Requirements for Lot Dimensions, Impervious Surface Coverage, and Setbacks as listed below: Lot Area Lot Width Impervious Surface Coverage Setback from OHWL Abutting Non - Abutting Abutting Non - Abutting 20000 10800 80 80 30% 150 feet Lots: The lots will vary in depth from 135 feet to 260 feet (along the shoreline), and the widths will range from 80 feet to 86 feet. The lots located along Marshan Lake exceed the shoreland ordinance required 20,000 square feet of upland, and the western lots all exceed the 10,800 square foot R -1 requirement. The parsonage lot will be reduced in size to allow the other three lots west of the proposed street to meet all subdivision standards. Setbacks: The submitted plans depict all required setbacks, including the 150 foot setback from the Ordinary High Water Line as required by the Shoreland Ordinance. This setback is measured to any improvement attached to the single family dwelling, including decks and/or patios. This means that the northeast lot (indicated as Lot 1, Block 2) will be very limited in that regard. Impervious Surface Coverage: The lots will all be required to comply with the 30% Impervious Surface Coverage requirement of the Shoreland Ordinance as they develop. Streets: Stage Coach Trail will extend from the southern border to the northern border connecting The Shores of Marshan Lake and Marshan Meadows. The alignment of the street is proposed to vary slightly from the current easement granted by the church. This was necessitated by the requirement to provide 20,000 square feet of upland for each lot along the shoreline and will allow a seamless connection with the existing rights of way on either side of the project. This proposal will require the approval of an easement vacation that will need to accompany the final plat to the City Council. • Conservation Easement: A Conservation Easement was supplied by the developer for Marshan Meadows and it is the city's intention to have this continued along the rest of Marshan Lake with any new development. Several rare species may exist in the area: Forsters' tern, a water nesting bird, and Blanding's turtle; which are on the threatened and endangered species lists. The conservation easement coincides with the drainage and utility easements required by the subdivision ordinance, both being 10 feet beyond the wetland edge. The conservation easement will include additional restrictions such as no mowing or dumping of clippings. There should also be a special packet of educational information supplied to homeowners and monuments at the easement boundary of all lake lots. At last months meeting it was stated by staff that the conservation easement would prohibit docks on the lake, which was incorrect. The documents do not specifically prohibit docks, but the likelihood of any docks being constructed is pretty minimal. This is a very shallow body of water so the use of motorized boats is nearly impossible, and the distance that the docks would have to extend would make them quite cost prohibitive. The changes in water levels would also require the deck of the dock to be elevated to the extent that wildlife would be able to cross under and possibly even use any docks as part of their habitat. Park Dedication: The current subdivision ordinance includes park dedication in the amount of $2075 per residential unit, less any land dedication. There is no land dedication needed, as Marshan Park is nearby. 411 Utilities: Sanitary sewer and water are stubbed to the property line on both the north and the south. The appropriate easements are platted for the connection of the church to the services that will be constructed as part of this plat. These and other issues discussed in the City Engineer review memo must be addressed to his satisfaction. Grading: The grading plan has been reviewed by the City Engineer and his comments will need to be addressed to his satisfaction prior to the site being developed. Environmental Board The Environmental Board reviewed the application on May 30th, there recommendations are attached. • • RECOMMENDATION Staff is recommending approval of this request, subject to the following conditions: 1. All lots in the plat must agree to connect to City utilities. The City will not approve the final plat without legally enforceable assurance that all properties will connect. 2. Issues discussed in the City Engineer review memo must be addressed to his satisfaction. 3. A development agreement between the city and the developer must be executed prior to the issuance of any building permits for the site. 4. Park dedication must be paid in accordance with the city's fee schedule. 5. A conservation easement shall be granted over the drainage and utility easement within the lots fronting Marshan Lake. Easement restrictions shall be defined prior to city council approval of the final plat. 6. The Rice Creek Watershed District must review the project prior to building permits being issued by the city for any new construction. 7. A boulevard tree shall be provided for each lot frontage. • 8. The existing roadway easement shall be vacated by the City Council prior to the approval of the final plat. • This review is based on the following plans and information: City Engineer Comments dated June 8, 2007 Environmental Board Comments from May 30, 2007 Grandview Plan Packet received May 14, 2007 • • LOTS /UNITS as of June 21, 2007 Development Name approved prelim. plats Prelim Plat Phasing plans by year (lots /units to be final platted) 2006 2007 2008 2 year end 2002 2003 2004 2005 Stoneybrook 103 51 2nd Addn 0 52 Century Farms North 249 56 65 52 43 33 Keefe: prel plat, not final plat 1 1 Morton (minor subdiv) 0 1 0 Ravens Hollow 56 0 56 Haley Manor (10 new lots) 10 10 0 Crystal Cove 3 3 0 Millers Crossroads 152 22 47 51 32 Lakeview Estates (2 new) 2 2 Snell (minor subdivision) 0 1 Pheasant Hills Pres. 13th 1 1 Justin's Preserve 1 1 Marshan Estates 4 4 Rice Creek Church duplex 2 2 Rice Church: Oakwood View 10 10 Junes Addn 2 2 Highland Meadows East 2nd 18 18 Marshan Townhomes 2nd 23 Pheasant Hills 12th island 8 8 West Shadow Ponds 2nd Add 1 1 Vaughan Addition 5 5 Angie's Acres (1 new) 1 1 Marshan Lakeview (2 new) 2 2 Marshan Meadows 20 20 Pine Glen 72 40 32 Cavegn (1 new lot) 1 1 Golden Acre (3 new lots) 3 3 Fran's Estate (1 new lot) 1 Cox Estate (1 new lot) 1 1 Grandview 7 new 7 Moon Marsh 3 new 3 total 51 148 176 171 141 77 remaining of annual 147 remaining of 1029 units for pre -2010 -1 -29 -24 6 70 147 • Memorandum DATE: June 8, 2007 TO: Paul Bengston FROM: James E. Studenski, City Engineer RE: Grandview Attached is a TKDA review dated June 8, 2007 for the Grandview Project. The attached review lists significant issues that must be addressed prior to preliminary plat approval. A copy of this review has been sent to Mike Black at Royal Oaks Realty. IIIContact me with any questions, thank you. • 600 Town Center Parkway, Lino Lakes, Minnesota 55014-1182 Phone: 651 - 982 -2400 • Fax: 651 - 982 -2499 TKDA • ENGINEERS - ARCHTECTS - PLANNERS • • MEMORANDUM 444 Cedar Street, Suite 1500 Saint Paul, MN 55101 -2140 (651) 292 -4400 (651) 292 -0093 Fax www.tkda.com To: James E. Studenski, P.E. Reference: Grandview Copies To: • Site Review - Preliminary Plat City of Lino Lakes, Minnesota From: Thomas D. Prew, P.E. Proj. No.: 13810.004 Date: June 8, 2007 Routing: The following review is based on these submittals: 1. Grandview, Aerial View, Resource Inventory and Certificate of Survey, Preliminary Plat, Grading Plan, Utility Plan, and SWPPP submitted by E. G. Rud and Sons, Inc., received by the City of Lino Lakes May 14, 2007. Significant issues with the project to be addressed prior to Preliminary Plat approval. 1. Please see the attached Drainage Review, there are a number of items that need to be addressed prior to Preliminary Plat approvaL Items to be addressed prior to final approval: 1. The Public Works Department should verify that the hydrant at the end of the 6 inch line near the Parsonage is suitable to be salvaged and reinstalled. 2. The 6 inch sewer stub to the church should have the clean -out removed and a manhole added at the west end of the pipe. 3. The existing Utility Easement on Lot 14 in Marshan Meadows should be shown on the Plan. 4. Plans must reference City standards and details for any work to be completed in right -of -way. 5. Existing sanitary sewer and water services to the parsonage should be shown on the Utility Plan. 6. A written agreement from the property owners to the north will be required for the off -site grading. 7. Confirm that the house set -backs and side yard easements meet City Code for the existing house on Lot 4 Block 1. The size of this lot was reduced from previous submittals. 8. The existing street right -of -way will need to be formally vacated. This requires a petition and public hearing. An Employee Owned Company Promoting Affirmative Action and Equal Opportunity TKDA • ENGINEERS - ARCHITECTS • PLANNERS MEMORANDUM To: Thomas D. Prew, P.E. Copies To: James E. Studenski, P.E. Reference: Grandview Proj. No.: From: Connie J. Tail lon, P.E. Routing: Date: May 23, 2007 444 Cedar Street, Suite 1500 Saint Paul, MN 55101 -2140 (651) 292-4400 (651) 292-0083 Fax www.tkda.com Drainage Review City of Lino Lakes, Minnesota 13810.004 The following drainage review is based on these submittals: 1. Grandview Preliminary Grading, Utility, and SWPPP Plans submitted by Plowe Engineering, dated May 14, 2007. 2. Grandview Drainage Calculations submitted by Plowe Engineering, dated May 14, 2007. 3. Geotechnical Report submitted by Braun Intertec Corporation, dated August 27, 2004. • The following are significant issues that must be addressed prior to Preliminary Plat approval: 1. Submit a Geotechnical Report for review. The lowest floor elevation is required to be 4 feet above the seasonal high ground water elevation. 05/23/07 The Geotechnical Report does not indicate the seasonal high ground water elevations for the site, which is identified as the mottled soils or highest anticipated groundwater table. Provide documentation indicating the seasonally high groundwater. 2. Provide detailed watershed maps at a legible scale. Include existing contours on the existing conditions watershed map. 05/23/07 This item has been addressed. 3. Clarify why the watershed boundaries for subcatchments 1 and 2 differ between existing and proposed conditions. 05/23/07 This item has been addressed. 4. Provide justification for the time of concentration values in the HydroCAD model under existing and proposed conditions. 5. Since disturbed pervious areas are typically compacted during grading operations and will be restored with topsoil, a curve number that corresponds to Type B soils should be used for all disturbed pervious areas in the proposed conditions model. 05/23/07 This item has been addressed. • 6. Existing and proposed rates may change due to modifications of the model based on comments 4 and 5 above. Rate control requirements will be reviewed when the updated models are re- submitted. An Employee Owned Company Promoting Affirmative Action and Equal Opportunity • • Grandview Page 2 May 23, 2007 Drainage Review City of Lino Lakes, Minnesota 7. The water quality volume in the proposed pond may change based on comments 4 and 5 above. The water quality volumes will be reviewed when the updated calculations are re- submitted. Additional Comments 05/23/07 8. The 100 -year elevation of the pretreatment basin/biofiltration basin is required to be 2 feet below the low floor elevation of the existing parsonage. The following are minor plan, calculations, and drafting corrections that must be addressed prior to final approval: 1. Minimize the grading necessary to accommodate the outlet pipe for the proposed stormwater pond. 05/23/07 This item has been addressed. 2. The cinched line which runs northwest to southeast through Lots 1-4, Block 2, is labeled as a survey line and also a Drainage and Utility Easement. Please clarify. 05/23/07 This item has been addressed. 3. Please clarify the location of the rear yard Drainage and Utility Easements for Lots 1-4, Block 2. 05/23/07 This item has been addressed. 4. The Drainage and Utility Easements for Lots 2 and 3, Block 1, should include the 100 -year elevation, plus an additional 10 foot easement beyond the 100 -year elevation of the proposed stormwater pond. 05/23/07 This item has been addressed. 5. Show the location of the 10 foot wetland buffer on the Plan. 6. The Grading Plan currently shows silt fence where there appears to be no grading. To minimize disturbance near the lake, relocate the silt fence to the grading limits of the site. 05/23/07 This item has been addressed. 7. Show a defined swale along the north property line of Lot 1, Block 2, to ensure that runoff remains on -site. 05/23/07 Permission must be obtained to perform necessary grading outside of the project limits. 8. Show and label the 150 foot setback from the Ordinary High Water Level of Marshan Lake on the Grading Plan. 05/23/07 This item has been addressed. 9. It is highly recommended that disturbed areas within 200 feet of Marshan Lake be stabilized with erosion control blanket within 7 days of not being actively worked. 10. Show the location of the rock construction entrance and inlet protection on the Plan. 11. Label the overflow elevation (to the stormwater pond) of the Infiltration Basin on the Grading Plan. 05/23/07 This item has been addressed. 12. Label the orifice diameter on the Pond Outlet Skimmer detail. Grandview Page 3 May 23, 2007 Drainage Review City of Lino Lakes, Minnesota 05/23/07 This item has been addressed. 13. Update the high water level labeled on the Utility Plan for the proposed pond. 05/23/07 This item has been addressed. 14. Include a curve number of 100 in the HydroCAD model for areas with open water. 15. All City maintained storm sewers, including pond outlet structure pipes, are required to be a minimum of 15 inches in diameter. 05/23/07 The pond outlet pipes are required to be a minimum of 15 inches in diameter. All city maintained storm sewer is required to be RCP. 16. Include notes on the Plan incorporating the following: 1) the infiltration area should not be excavated to final grade until the contributing drainage areas have been constructed and fully stabilized, and 2) final excavation of the infiltration areas should be completed using light tracked equipment to avoid compacting the basin floor. 17. To provide a well aerated, highly porous surface, it is recommended that the soils of the Infiltration Basin floor be loosened to a depth of at least 12 inches prior to planting. 18. It is hi • hly recommended that plants be used over seed in the Infiltration Basin. Fluctuating water levels following seeding can cause seed to float and be transported downstream of the Infiltration Basin. In addition, it may take up to two growing seasons to establish the function and aesthetic value of mature vegetation using seeds. 05/23 /07 This item has been addressed. 19. Submit a copy of the NPDES permit for the City's records when available. 20. Approval from Rice Creek Watershed District (RCWD) is required. Submit a copy of the RCWD approved permit when available. Additional Comments 05/23/07 21. Provide a 6 inch minimum clearance between the top of orifice and top of weir wall in the pond outlet structure. 22. A skimmer structure is required at the outlet of the biofiltration basin. 23. Label the storm sewer sizes, inverts, and slopes on the Plan. 24. Capture and route runoff from the south end of Stagecoach Trail to the proposed biofiltration basin. 25. It appears from the Grading Plan that runoff from the proposed Stagecoach Trail may flow off -site to the north; however, the proposed drainage area map (subcatchment 4) shows the northern area flowing south and ultimately to the pre - treatment basin. Please clarify. • • • Memorandum ENVIRONMENTAL To: Paul Bengtson From: Marty Asleson Date: May 31, 2007 Re: May 30, 2007 Environmental Board Recommendations The following recommendations were made concerning Grandview. 1. Sizing must be verified for volume storage, runoff rate and infiltration requirements on proposed infiltration and storage ponds. 2. All infiltration areas must be protected from construction as part of the Storm Water Pollution Prevention Plan. 3. All infiltration, pond, and disturbed wetland areas must be planted with the City native seed mix and managed by a company listed with the Minnesota DNR as recommended for such work for a period of at least 3 years. 4. Plan should show access for pond and infiltration area maintenance. 5. Suggest that all houses direct runoff from impervious to pervious grass areas through the use of downspouts. 6. A temporary sediment pond should be installed somewhere on the site that will accept construction water from storm events. 7. Developer shall prepare brochure for new home owners. The brochure should discuss the importance of water treatment and that some areas may be a bit wet after a storm. Other information should include Shoreland Overlay district restrictions on vegetation removal. City will review and approve document before being given to homeowner. 8. The developer has submitted a Storm Water Pollution Prevention Plan (SWPPP). The SWPPP must be approved and implemented prior to the commencement of a grading permit. A number of modifications to the SWPPP have been identified and will need to be incorporated into the final plan as identified in the attached SWPPP memo. 9. Developer should check with the Minnesota DNR on how to develop with National Heritage concerns in the area. • • • ENVIRONMENTAL 10. Because of the rare features concerns and the shoreland overlay district, a conservation easement should be drafted that is contiguous with that of Marshan Meadows. Literature shall be given to new residents notifying them of the easement and the reasons for it. Literature will be reviewed and approved by the City. Conservation easement signs should be placed along the easement line with at least one sign per frontage of easement. The sign should state that "no cutting, planting, filling or excavating should occur within the easement." 11. No soils should be imported or exported without city approval. 12. Verify delineation. Motion to forward recommendations by Ms. Bor, 2nd by Ms. Brouillet. All were in favor AERIAL LAYOUT GRANDVIEW 1100R: ROYAL OAKS REALTY (DEVELOPER) 1000 COUNTY ROAD E. WEST, SUITE 150 SHOREVIEW MN 55126 PHONE: (651)- 483 -5518 OWNER: GETHSEMANE UNITED METHODIST CHURCH :7330 LAKE DRIVE LINO LAKES :MN;55014 PROPERTY DESORPTION Tracts B and C, REGISTERED LAND SURVEY NO. 182, Anoka County, Minnesota • CmE. G. RUD a SONS, INC. 'an Professional Land Surveyors 6776 Lake Drive NE, Suite 110 Lino Lakes, MN 55014 Tel. (651) 361 -8200 Fax (651) 361 -8701 NOTES • - Field surrey was completed by E.G. Rud and Sons, Inc on 02 -05-07 to include the location of the OHWL - - Wetland located by E.G. Rud k Sons on 2 -05 -07 Wetland delineation completed by Earth Science Inc (651) -674 -6210 Jan 07. Field verified and approved by Watershed on 1 May 07. - Bearings shown are on Anoko County datum. - Curb shots are token of the top and back of curb. This survey was prepared without the benefit of title work. Additional easements, restrictions and /or . encumbrances may exist other than those shown hereon. Survey subject to revision upon receipt of a current title commitment or an attorneys title opinion. N� GRAPHIC SCALE eD 0 b ee Ne) (7H FEET ) 1 iaoh - BD ft BENCHMARK At gage slte, a 60d space, 1.0 feet above ground, on Northwest side of 0.5 foot ash tree at the intersection of wooden romp for dock. Elevation = 886.37 (N.G.V.D. 1929) DEVELOPMENT DATA - Total Plat areo = 3.76 Acres - Upland within plot = 3.67 Acres (98X) sin LEGEND ▪ • DENOTES IRON MONUMENT FOUND AS LABELED o DENOTES IRON MONUMENT SET, MARKED RLS# 25341 m DENOTES SANITARY SEWER MANHOLE xC DENOTES HYDRANT Lx pQ DENOTES GATE VALVE E DENOTES 12- CUP ® _DENOTES WELL m• DENOTES SANITARY STUB DENOTES WATER STUB m DENOTES TELEPHONE BOX #. DENOTES WETLAND AREA �"":• DENOTES EXISTING CONTOURS : ease DENOTES EXISTING SPOT ELEVATION —:—.— DENOTES FENCE • WW1 DENOTES BRUSH UNE DENOTES FLOOD ZONE LINE — — — DENOTES SOIL LINE DENOTES. WETLAND LINE DENOTES OHW LINE DENOTES CONCRETE SURFACE DENOTES BITUMINOUS SURFACE DENOTES GRAVEL SURFACE Imo' •._ : 9 DRAWN RV, 'AMA CHECK BY. DNO JOB NQ 06543PP IDATE 05 -14-07 ONG NO PRE-PLAT-.31 SCANNED ❑ 2 3 NO. DATE DESCRIPTION BY VICINITY MAP SEC. I7, TWP. 3L RNG. 22 ANOKA COUNTY, MINNESOTA NOT TO SCALD GUIDING - Property guiding Low Density Single Family. MUSA - Property falls within the MUSA. - No MUSA amendment proposed ZONING - Property is Zoned R -1 ZONE RI MNMUM BUILDING SETBACKS Front = 30.00 feet Rear = 30.00 feet Side = 10.00 feet (house) Side = 5.00 feet (garage) Lake (OHW) = 150.00 feet ZONE R I M IMUM LOT STANDARDS Lot Area = 10,800 sq. ft. = 20,000 sq. ft. (upland) shorelond lot Lot Depth = 135.00 feet Lot Width = 80.00 feet Lot Width = 700.00 feet (comer) CERTIFICATION I hereby certify that this survey, or report was prepared by me or under my direct supervision and that 1 am a duly Registered Land Surveyor under the Inws of the State of Minnesota. RECEIVED MAY 1 4 2007 CITY OF LINO LAKES DANIEL 4OBERM1 Date: .a,6 i//0 7 License No. 25341 P P RESOURCE INVENTORY /CERTIFICATE OF SURVEY GRANDVIEW 4111/OR: ROYAL OAKS REALTY (DEVELOPER) 1000 COUNTY ROAD E. WEST, SUITE 150 SHOREVIEW MN 55126 PHONE: (651) -483 -5518 S Y� OWNER: GETHSEMANE UNITE D METHODIST CHURCH 7330 LAKE DRIVE UNO LAKES MN 55014 NORTH UNE OF GO4FJINMENT LOT 4. SOUTH _LINE OF CO KENT LOT 3, & SOUTH U!$:.�• ,n „____LINE OF 1HE OF IAARSi4AN- MEADOV6 .ml I • 'r'. I _ ZT D Rof , F Pµ�Y .sw , ,„w•• -.. 1 • A A f\ /� k" 1 20-1.26 102 / 1 .ao nsnetP z..,c / . fil ' -.WA' c+a. iI� Jam, -... •1.0. it "••-• 0 • - 6 'i. 137.7 %9m j. �'iiaa 0c `PSPl ,- pu8 L_ ZpN --a A !. .1 Y om."" p i 1 - 1 1 \ trbl, .651° 1 1 WA./ c 2 sNC' `, I .t ^` ..,,,ee. I , i l,7r .: OW pEP16� ,'1 5 ' 1 4f7 4e • 1 PROPERTY DESCRIPTION Tracts 8 and - 0, REGISTERED LAND SURVEY NO. 182. Anoka County, Minnesota ' tv±� os \ �at`cF 19 \ % a ,y� aT ,:;:W.„.., kVL LOCATION OF YE1LAN0 DELINEATION "- -BY EARTH SCIENCE JAN. 2007. .., .,.om \a7 ,..--LOCATION OF 083.3 OHW LINE m0 oM' m 2 ma w wmZ.o CIL A' t7 Z A Z N ° 9 V41 a, r w 0 N N I m O O O area u �� a �,� „' i°". - • io"` .., ` +:ate 141 / 1 R,, I "'„ Zoo SN lDW �I 0,9AL s \ . a69M \ \ e �•, \ \ fr/ • \ f \i ma 7 !t a <mz j �o c)ac• --1i- j� _e1Q \C" e`7.- "�I / 4 r -7 CKF.. G. BUN a SONS, INC. 1n Professional Land Surveyors 1N�,, „doom 6776 Lake Drive NE, Suite 110 Lino Lakes, MN 55014 TeL (651) 361 -8200 Fax (651) 361 -8701 M loot;° 1 l/ - -7 NG CZ 1 avP eo ..._ m 410-zr M5 54'26"8 thi , 4‘45, SE • r. 1 • 1 / .. 1 1 -) 1 1 / 1 r- . r- L- .• I I F °.. n 5 I Ow 00µ5 I I I NOTES - Field survey was completed by EC. Rud and Sons, Inc on 02 -05-07 to include the location: of the OWL. - Wetland located by-EG. Rud & Sons on 2 -05 -07 - Wetland delineation completed by Earth Science Inc. (651) -674 -6210 Jan 07. Field verified and approved by Watershed on 1 May 07. - Bearings shown are on Anoka County datum. - Curb shots are taken at the top and back of curb. This survey was prepared without the benefit of title work. Additional easements, restrictions and/or encumbrances may exist other than those shown hereon. Survey subject to revision upon receipt of a current title commitment or an atto■ey's title opinion. „OW o9 u ; r_M f4 AL IL I DRAM BO NAA JOB 1.10: 06543PP I 1141E 05 -74-07 PECK BY DIM DWG NO PRE- PLAT -3I SCANNED ❑ 2 3 N0. DATE DESCRIPTION BY a NORTH GRAPHIC SCALE 20 ( IN /Err ) 1 bleb - 40 ft. BENCHMARK At gage site, o 60d spike, 1.0 feet above ground, on Northwest side of 0.5 foot ash tree at the intersection of wooden ramp for dock Elevation = 886.37 (N.G.V.D. 1929) DEVELOPMENT DATA - Totd Plat area = 3.76 Acres - Upland within plat = 3.67 Acres (98X) LEGEND • DENOTES IRON MONUMENT FOUND AS LABELED o DENOTES IRON MONUMENT SET, MARKED RLS/ 25.341 ® DENOTES SANITARY SEWER MANHOLE TX DENOTES HYDRANT pd DENOTES GATE VALVE DENOTES 12- CLIP 9 DENOTES WELL [ , DENOTES SANITARY STUB m DENOTES WATER STUB DT DENOTES TELEPHONE BOX JW. DENOTES WETLAND AREA DENOTES EXISTING CONTOURS k csr_s DENOTES EXISTING SPOT ELEVATION — — DENOTES FENCE rY-YM DENOTES BRUSH UNE 1 DENOTES FLOOD ZONE UNE DENOTES SOIL LINE DENOTES N£TLAND UNE DENOTES OHW UNE DENOTES CONCRETE SURFACE DENOTES BITUMINOUS SURFACE DENOTES GRAVEL SURFACE VICINITY 114,P SEC. 17, TWP. 31. RNG. 22 ANOKA COUNTY, MINNESOTA (JOT TO SCALE) GUIDING - Property guiding Low Density Single Family. MUSA - Property fails within the MUSA. - No MUSA amendment proposed ZONING - Property is Zoned R -1 ZONE RI MINIMUM BUILDING St i t3ACKS Front = 30.00 feet Rear = 30.00 feet Side = 10.00 feet (house) Side = 5.00 feet (garage) Lake (OHW) = 150.00 feet ZONE R I MINIMUM LOT STANDARDS Lot Area = 10,800 sq. ft. = 20,000 sq. ft. (upland) shoreland tot Lot Depth = 135.00 feet Lot Width = 80.00 feet Lot Width = 100.00 feet (comer) CERTIFICATION I hereby certify that this survey, plan or report was prepared by me or unde my direct super-vision and that I am o duly Registered Land Surveyor under the la of the State of Minnesota. DANIEL W. OBERMILLER Date: r5 7/4`07 License No. 25341 PP PRELIMINARY. PLAT OF EXISTIN CHURCH BUILDIN • • GRANDVIEW ROYAL OAKS REALTY (DEVELOPER) 1000 COUNTY ROAD E. WEST, SURE 150 SHOREVIEW MN 55126 PHONE: (651)- 483 -5518 BLDG i 4 A ,- :: I I A A' /-1 I \ .e 41 1 1 Y r OWNER: GETHSEMANE. UNITED- METHODIST CHURCH 7330 LAKE. DRIVE LINO" LAKES MN 55014 NORTH UNEIOF GOVERNMENT LOT 4, SOU1H — UNE - OF GO' EERRNUENT LOT 3, AC SOU1H / OF THE PLAT OF MARSHAN MEADOWS ;.e"" • lit --r— 137.7 75.0. PROPERTY DESCRIPTION Tracts B=and C, REGISTERED. LAND SURVEY NO. 182, Anoka County, Minnesota. ae "at - A ry r. 1 A r Is:, 1\r,, /I I 1 1 1 1/1/I �•' I L' / 1L� l/ .r♦/ �•-^"'� ~•'., Nar58.04.1r 417,41 a 1 I '1 /14,460 sf. e I 10,820 st IMt UTIt:` EASD ;I. 1 / 1 L„ .` i4L . -BY EARTH SCIENCE JAN. 2007. .--- LOCATION OF 883.3 OHW LINE 1 i Ir r. am LOCATION OF VIE1LAl D DEL8IE TION \ • -6 0. 13075 sf, .TOTRL: 10,896 sf„ ' 'S . XX POND E({SD 'a 2 �:ii >n P f t 1 .4 1; 1sDO1'ti_ 20451 sf. (to wetland One) 11 20,725 sf.. . - (to Ut{ # tine) 4' -(222.85 54.26'B www.eglud.com SO E.G. RUD a SONS, INC. Professional Land Surveyors 6776 Lake Drive NE, Suite 110 Lino Lakes, MN 55014 TeL (651) 361 -8200 Fax (651) 361 -8701 i ; 1 1 < _ 1 1 L_ - ♦/ h ' ♦ r- `r 1-- 1 NOTES Field survey was completed by EG. Rud and Sons, Inc. on 02 -05 -07 to include the location of the OHWL - — Wetland !coated by E.G. Rud & Sons on 2-05-07 - Wetland delineation completed by Earth Science Inc. (651) - 674 .-6210 Jan 07. Field verified and approved by Watershed on 1 Moy 07. — Bearings shown are on Anoka County datum. — Curb shots are token at the top and bock of curb. This .survey. was prepared without the benefit of title work Additional easements, restrictions and /or encumbrances may exist other than those - shown hereon. Survey subject to revision upon receipt of a current title commitment or an attorney's title opinion. A .• A r 1 •• r 1 A •• 1, hi rl I \I I I r I I \ ♦/ I l r -\ I Y PP- DRAM BT: NAA .108 Na 06543P I DATE 05 -14-07 CIIECK 85 DSO DSC NO PRE- PLAT -31 SCANNED ❑ 3 Na DATE DESCRPDON BY GRAPHIC SCALE O m a s I40 ( IN i$Ft' ) 1 hash - 40 tL TYPICAL DRAINAGE E UTL JT1' EASEMENTS J 1 L Being 5 feet in width, unless otherwise indicated and adjoining side lot fines, and rear lot tines and 70 feet in width and adjoining street tines, DEVELOPMENT DATA — Total Plat area = 176 Acres — Upland within plat = 167 Acres (98Z) — 8 Proposed Single Family Lots — Single Family Lots = 3.26 Acres — Streets = 0.45 Acres — Average Lot Size = 17.7881 sf — Density = - 212 Lots / Acre LEGEND • DENOTES IRON ;40NUM£NT FOUND .AS LABELED o .- DENOTES IRON MONUMENT SET, MARKED RLS# 25341 - @ DENOTES SANITARY SEWER MANHOLE 7d DENOTES HYDRANT 14 DENOTES GATE VALVE DENOTES 12- CUP e DENOTES WELL to DENOTES SANITARY STUB 9 DENOTES WATER STUB m DENOTES TELEPHONE BOX AML DENOTES WETLAND AREA DENOTES EXISTING CONTOURS o w1A DENOTES EXISTING SPOT ELEVATION DENOTES FENCE %W■ DENOTES BRUSH LINE DENOTES SETBACK UNE DENOTES WETLAND UNE DENOTES OHW UNE DE1401E5 CONCRETE SURFACE DENOTES BITUMINOUS SURFACE DENOTES GRAVEL SURFACE 7 tn'-t' clh-4 VICINITY MAP SEC. 17, TWP. 31, 12NG. 22 ANOKA COUNTY, MIJ.SOTA NOT TO SCALD GUIDING — Property guiding Low Density Single Family. MUSA — Property fulls within the MUSA. — No MUSA amendment proposed ZONNG — Property is Zoned R -1 ZONE R I MNIMUM BUL_DNG SC 1 BACKS Front = 30.00 feet Rear = 30.00 feet Side = 10.00 feet (house) Side = 5.00 feet (garage) Lake (OHW) = 150.00 feet ZONE R I MINIMUM LOT STANDARDS Lot Area = 10,800 sq. ft. = 20,000 sq. ft. (upland) shoreland lot Lot Depth = 135.00 feet Lot Width = 80.00 feet Lot Width = 100.00 feet (comer) BENCI —IMARK At gage site, o 60d spike, 1.0 feet above ground, an Northwest side of 0.5 foot ash tree of the i" - - - -- of wooden ramp for dock Elevation CERTIFICATION I hereby certify that this survey, plan or report was prepared by me or uncle my direct supervision and thot 1 am a duly Registered Land Surveyor under the I of the State of Minnesota. DA IEL W. OBERMILLER Date: Sf /41) License Na. 25341 PP3 PRELIMINARY. GRADING CRANDVIEW 1113R: ROYAL OAKS REALTY (DEVELOPER) OWNER: GETHSEMANE UNITED METHODIST CHURCH 1000 COUNTY ROAD E. WEST, SUITE 150 7330 LAKE DRIVE SHOREVIEW MN 55126 LINO LAKES MN 55014 PHONE: (651)- 483 -5518 1 1 1 1 ,..00 ,1431 1 .e«� 1 ,..1 ,, 1 • 4 A` rs. e, 4 4 A le I/' J V I / ; F .' . F -f 9%I +. - ! �.py._}.Ni 4 r a.. � '- -- -- =;ginJ ` -- = '�___L.. , m veM•» NORTH LINE of OO9ERNIAENT LOT 4. SOUTH l/ UNE OF LOT 3, le SOUTH Ulf-. OF THE KAT OF UARSHAN MEADOWS .•'' EXISTIN CHURCH BUILDIN igoar am PROPERTY DESCRIPTION Tracts C, REGISTERED LAND SURVEY NO. 182, Anoka County, Minnesota BENCI- IMARK At goge site a 60d spike, 1.0 feet above ground, on Northwest side of 0.5 foot ash tree at the Intersection of wooden ramp for dock. Elevation = 886.37 (N.G.V.D. 7929) .i ,°So" 1,1,1 V tD' sO st-s1 et .0 ,. . s e �i.A. ., , . LOCATION OF WETLAND DEUNEA1ION /�--BY EARTH SCIENCE JAN. 2007. **ys. .µ0� • ,— LDCanoN OF rIe3.3 oHW IJNE Yi TA al .es1A 4 Z Z • A r.$ zN 1D. oo tin. q:o Z AO Z, �Vf G < aw . - NNN fn o0 (gyp J v�r AIL. owe .a /s(+// / // LDG. rrOf4 • eseo ag1 WIN- F23 ,....._ . I.. ▪ -r .,3 0.P' 1 —� er1 \ate 2fi' aN.:1 061 µ E.G. RUD a SONS, INC. Professional Land Surveyors 6776 Lake Drive NE, Suite 110 Lino Lakes, MN 55014 Tel. (651) 361 -8200 Fax (651) 361 -8701 1 1 / 1 1 L- ./ SE. • I 11/ 1 / •1 F( I- -/ / Al I\ I I/ 1 1 1 .. I I/ 1 1• NOTES Field survey was completed by E.C. Rud and Sons, Inc. on include the location of the OHWL Wetland located by £G.-Rud & Sons on 2 -05-07 02 -05-07 to Wetland delineation completed by Earth Science Inc. (651)-674-6210 Jan 07. Field verified and approved by Watershed on 1 May 07. Bearings shown are on Anoka County datum. Curb shots are taken of the top and bock of curb. This survey was prepared without the benefit of title work. Additional easements, restrictions and /or encumbrances may exist other than those shown hereon. .Survey subject to revision upon receipt of a current title commitment or an attorney's title opinion. ZONE R MNMUM BULLRING SETBACKS Front = 30.00 feet Rear = 30.00 feet Side = 10.00 feet (house) Side = 5.00 feet (garage) Lake -(OHW) = 150.00 feet ZONE RI MNIMUM LOT STANDARDS Lot Area = 10,800 sq. ft. = 20,000 sq. ft. (upland) shoreland lot Lot Depth = 135.00 feet Lot Width = 80.00 feet Lot -Width = 100.00 feet (comer) NORTH GRAPHIC SCALE so 40 wo ( Di FEET ) 1 arch - 40 R. PROPOSED I -IOUSE PAD INFORMATION --.-Denotes proposed finish grade 0 front of garage. Garage floor M 0.3' above this Nev. `-- Denotes house style. (W0- walkout)(FLAT)(L0= lookout) (Assumed 12 en bent depth proposed) Denotes suggested amount to drop garage Denotes finish grode 0 rear of home. Finished bent floor is ab , ove this dev. on walkout homes and 2.5 below this elevation on lookout late. NOTE Lihdmum• Lowest Floor to be 2' feet above HWL or 4' feet above NW.. of adjacent ponds, and lowest opening to be 1' foot obis a controlling EOF. TYPICAL DRAINAGE E UTILITY EASEMENTS II I6'd II J L Being 5 feet in width, •unless otherwise indicated, and adjoining side lot tines, and rear lot lines and 10 feet In width and adjoining street lines, DRAIW4 Br NU 'JOB N0: 0654.1*P I DATE 5 -14-07 CHECK Br DWD DVC AID! P1 - PUT -3I SCANNED ❑ I 2 3 N0. DATE DESCRIPTION BY I hereby certify that this pion was prepared.. by me or under my direct supervision anal that 'I on 0 •ddy Liemned Professional Engineer I�e�v the � ' /�or Minnesota. *0Rn. NSEL 5/14/07 ucENSE g 43963 0ATE: PLDWE. ENGIN EEtRIIY6 Ae Ldm LAWS Nis SLOE La+a LO33. rot 3011 Nevi 13m 125-10 • NW OLD 12c® VICINITY MAP SEC. n. TWP. 31. RNG. 22 ANOKA COLNT7, MINNESOTA NOT TO SCALD LEGEND • DENOTES IRON MONUMENT FOUND AS LABELED • DENOTES IRON MONUMENT SET; MARKED RLS# 25341 19 DENOTES SANITARY SEWER MANHOLE )Y6 DENOTES HYDRANT pQ DENOTES GATE VALVE DENOTES 72' CMP 0 DENOTES SANITARY STUB ® DENOTES WATER STUB ID DENOTES TELEPHONE BOX Its DENOTES WETLAND AREA DENOTES EXISTING CONTOURS DENOTES EXISTING SPOT ELEVATION DENOTES FENCE (*-w1 DENOTES BRUSH LINE e DENOTES WELT. ❑ DENOTES SILT FENCE s 23xas `''tJ DENOTES DENOTES DENOTES DENOTES 411 DENOTES G DENOTES DENOTES DENOTES DENOTES EMERGENCY OVERFLOW (EOF) PROPOSED STORM LINE WETLAND LINE OH W UNE STORM STRUCTURE/WRAP PROPOSED CATCH BASIN CONCRETE SURFACE BITUMINOUS SURFACE GRAVEL SURFACE DENOTES POND LINER UP TO 890 CONTOUR CERTIFICATION I. hereby certify that this surve or report was prepared by me my direct supervision and that a duly Registered Land Surveyor the {IFws of the Sate of Minnesota RECEIVED MAY 1 4 2007 Pion r . -r OF LINO LAKES under DANIEL W. OBERMILLER Date: 6.1/4 07- License No. 25341 C GRANDVIEW UTILITY PLAN PRELIMINARY City of Lino Lakes, Minnesota GENERAL NOTES • The Information .horn on the drawings, concerning type and location of existing utgfti a is not guaranteed to be emanate or all Mimi.. The contractor is responsible for mating his own determination as to type and location of utilities as nemasoay to ovoid damage to thew ut11tios. • Contact Gopher State Ole-C® at (651) 454 -0002 for mdsting utility location. • The contractor shoe field verify else, elevation, and locatkm of existing sanitary sewer. storm sewer. and wat•mrain and notify Engineer of my discrepancies prior to the start of Installations • installations shall conform to the City Engineers Association of Minnesota (CEAM) Standard Utility Specifications (1999 Edition) and the City's Standard Specifications • Contractor shill notify City of Lies Lakes Engineering Deportment at (651) 982 -2400 o minbman of 24 hours prior to the interruption of any sewer or water services to existing hones or businesses. WATERMAIN NOTES • Maintain a minimum of 7.5 test over all watermain pipe. • Wotermoln shall be r DP Class 52 (minimum). • Combined water service to church lot shill be 6" DIP Class 52 (minimum} • Hydrant Ieods that b. 6' OP Class 52 (minimum). • Domestic Service Lines shall be 1' copper (type 14 • Field verily etre and location of existing watermon arid notify engineer of any deawpanefc prior to any installations • Provide preformed insulation, PPG Foormglass or approved equal where sanitary serer or storm sever mosses within 18' of watermaK • Waterman bends. tees. fittngs and hydrant leads shall be thrust restrained with •M0go -urge or approved *qua/ SANITARY SEWER NOTES • Sanitary sewer pips dal be PVC 5DR 35, unless otherwise noted. • Field verify size, elevation, and location of existing sanitary sewer and notify sonnets of any dleorepand.s prior to any nstatatbns. • Sere Service to Church lot to be 6' PVC Schedule 40, and o6 other sanitary sewer services Mall be 4' PVC Schedule 40 (to be Motioned from the downstream 1111). STORM SEWER NOTES • Storm sewer dhoti be RCP (dam 9 minimum) or HOPE as shown. • Fldd verify sire, elevator, and location of existing storm ewer and notify engineer of any dleoepandss prior to any neta9otlaa. • Storm sewer lengths include the laying length of the apron. • � � bodf 6 TU 23 of HDPE pipe n CURB NOTES • Bock-tieing of curbs with an-site materials is incidental to the curb construction. • Cub and gutter sham shag be D412 unless otherwise noted on plans STREET 11111 BITUMINOUS NOTES • Sow -cut existing bitumnoue and concrete nab to provide butt -Font • Removal and disposal of existing street materials as required for construction purposes in incidental. • Restore disturbed street to existing or better section as approved by engineer. • Contractor shah use traffic control measure. (in accordance with the 'Minnesota Manuel of Uniform Traffic Contrd Denims') as necessary whenever grading. utility, or paving operations encroach onto adjacent streets LEGEND — I — Existing Watermon — I — - Proposed Watermaln —> — Existing Sankey Sewer —> — Proposed Smfiory Sewer —» — Existing Slum Sewer —X.— Proposed Stan Sewer ® Existing Sanitary Manhole Q Proposed Sanitary Sewer Manhole ZC Existing Hydras Proposed Hydrant ❑ ® Existing Storm Sewer Manhole /Apron ❑ ® Proposed Caton Basin/Storm Sewer Manhole Q Existing Flared- -End section • Proposed Find -End Section pj Existing Gat. Valve tg Proposed Gate Volvo -011W— Foisting Overhead Wire — T— Edsthg Telephone Line a�> Existing Utility Pole NORTH UNE I OF GOVERNMENT LOT 4, SOUTH __UNE OF GOVERNMENT LOT 3, & SOUTH UNE / OF THE PLAT OF MARSHAN MEADOWS 1 1 A A /1 1- -1 / t 1 ,/, • 1 1 / 1 I- /V -1 i — - — — —J C PVC CAP _SL _t P 91V 1!91.52* �[II� r-s 1 F ! 1 1 1 . L CLEAN -OUT- RIM 899.50 NV B91UN r DI PLUG r �f. EASING HTDRANT AND VALVE PROP SAN MR 2 RDA 899.15 9NV 11110.85 t•••f n AIN1 A • r- A ri /- 1 \/ 1 1- - /_t 1 '1 1 1 1 I L- ./ 1 L/ \/ Wf0EWT TO COSTING. Er DP WA1ERINUN W/ CATE VALVE 1. x r 1 e / / I /1/ 0 GATE V \ :1111L � `, \, r- -LOCATION OF 853.3 OHW UNE r7 r I ! lVlt 9 9 x,0hs pD O\ S \ O . ce o f ' o+ a 01( F\re6015 N 9 t 4'p dee\ � °Q P odot LOCATION OF WETLAND DELINEATION —BY EARTH SCIENCE JAN. 2007. • 9 L — SIDEWAi.K SCE OF - 7 PAST 'JfT. PLAO SERNCES. SDEWALK (7YP) lk 0 c :O 1\ In N 5d 0° co 0 co Z 40 0 o u � i " 4 C � C CO pa 10j1 N co \ r LT N N VI 0 �xs� \ \ISALVAVAGED (AD VAL /1 I !C / 1 \/ L_ fs 3 9 \ _ 11 9 _ . 1 40 11 I \J (..... _. , ,, / /' ___ . 1\ ti ' 1 ▪ ▪ es I 11'' / "h —' _/ / I �i POWEILE 1060. or gci0l�i - - -.- -- t4 T r I REMOVE ROWING ar W4SERWW BDiD AND 6 S j iii hit r� r- 1-r 1-- 1 1 -. SA .� r- r 1 1-- \� 6951391 SERER w1x -- -PRORSNN.*p, 1 RIN 590.515 a'1 N 981.40 '1♦NV our 081.20* L I Bodr1 o w oP ) / DRAWN BY. DESIGN B1 BAB.. GCS. CH= BY: PRO4. N0. C.C.S. 07 -1131 ORIGINAL DATE FEBRUARY 9, 2007 REALTY ROYAL OAKS 1000 MINTY RD EWES SHOREVIEIL MN 55126 PRONE (651) 483 -5511 \ EMm191G HYDRANT AND VALVE BITS PUNNING k 51401118120112 PLOW! 6776 LAKS DIOVS 50QS 110 LINO L AU& MN 5501. PHONE (651) 961 -82 PAX: (651) 361 -6701 EXIST. HSE A A A r-. / 1 1-011 I 1\ /I /1 1-( I --1 /1 1 \I A 1 / t 1 I / 1 / l / 1 I / 1 1 5 L / 1 NORTH 1 INCH w 30 FEET C2 GRANDVIEW STORM WATER POLLUTION PREVENTION [ S WPPPI PLAN City of Lino Lakes, Minnesota GENERAL EROSION AND SEDIMENT CONTROL INSPECTIONS AND MAINTENANCE 1. The Permtttee(s) (either the owner or operator) must routinely inspect the construction site once every seven (7) days during Dative construction and within 24 hours after a rainfall event greater than 0.5 Inches in 24 hours 2. At inspections and maintenance conducted during construction must be recorded in writing and these records must be retained with the SWPPP In ocoordonce with RECORD DETENTION. Records of each Inspection and mdntenonce activity shag Include aha8 include a. Date and fine Inspections b. Noma of persm(s) conducting inspection; c Findings of Inspection, Including recommendations for corrective action; d. Corrective actions taken (Including dotes, times. and party compietng maintenance activities); e. Date and amount of rainfall events greater than 1/2 inch (0.5 inches) in 24 had; and L Documentation of changes mode to the SIYPPP. 3 When ports of the constructon efts how undergone final etabnizatbn, but work remains on other parts of the site, inspections of the stob0osd aim may be reduced to once per month. When work has been suspended due to froze, ground conditions, the required Inspections and maintenance must take place as soon ors runoff occurs at the efts or prier to resuming construction. whichever comes first. 4. M erosion prevention and sediment control BLIP. most be inspected to ensure integrity and effectiveness. M nonfunctional BAPS must be repaired, replaced, or supplemented with functional BMPs The Permltee(s) must investigate and comply with the following inspection and maintenance requirements e M silt fences must be repaired replaced, or supplemented when they become nonfanetiond (develop tears, detach from posts. post become dislodged from ground, etc) or the sediment noshes 1/3 of the height of the fence. These repairs must be mode .ithn 24 hours of discovery, or as man 0s the field conditions agma proem b. Temporary and pennmsnt sedimentation ponds must be droned and the sediment removed when the depth of the sediment collected In the basin reaches 1/2 the storage volume. Drainage and removal must be completed widen 72 hours of discovery or as soon m field conditions allow access. e Surface waters, Including drainage ditches and conveyance systems, must be repeated for evidence of sediment being deposited by erosion. The PennItete(s) must remove all deltas and sediment deposited in sumom waters. Indud,g drainage ways catch brine, and other draooge systems. and restedglze the areas when sediment removal reautts in exposed .W. The removal and stabilization must take place within sewn (7) days of discovery unless precluded by legal, regulatory, or physical constraint. The Permitee Mae use all reasonable efforts to obtain access If precluded, removal and stabilization must tats place within sever .11 moot, regional states andrfedwl authorities and�recea,g any responsible applicable permits, prier to conducting any work d Construction site vehicle eat locations must be Inspected far evidence o8 -she - sediment tracking onto paved surfaces Tracked Indolent must be removed eon an off-site paved enlaces, within 24 hours of discovery, or R applicable, within a shorter time s The Permittee(s) are responsible for operation and maintenance of temporary and permanent water quality management RMPS as well as dl erosion prevention ond sediment control BMPS for the duration of the conshuctkan work at the site The Penntttee(e) an respectable until another Pennttee has assumed contra over areas of the site that hove not been finally stabilized or the site has undergone fad stab6sation, and a Notice of Termination has been submitted to the MPCA (see TERMINATION C COVERAGE). f. if sediment escapes is construction sits off-site accumulations must be removed In o manner and at a frequency sufficient to minimize off-site impact. (e.g., fugitive sediment in streets could be washed Into •norm sewers by the next rain and /or pose a safety hazard to users of public farads). 5. M 'filtration areas must be inspected to ensure that no sediment from ongoing construction activities is reaching the infiltration area and these areas are protected from compaction due to construction equipment driving Dross the Infiltration area POLLUTION PREVENTION MANAGEMENT MEASURES The Pormltee(s) Mae implement the following pollution prevention management measures an the site I. Solid Waste Collected sediment, asphalt and concrete millings, Booting debris, paper, plastic, fabric, construction and demolition deb. and other wastes oust be deposed of properly and must comply with MPCA disposal requirements 2. Hazardous Materials OE, gasoline, point and any hazardous substances moat be property stared, including •eeandary containment to prevent spies leaks or other discharge Restricted access to storag. areas must be provided to prevent vandalism. Storage and disposal of hmordo o waste nest be in compliance with MPG* regulations. 3 External washing of trues and other construction vehicle must be limited to 0 defined area of the site Runoff must be contained and waste property deposed of. No ongne degreasing is allowed on site DE-WATERING AND BASIN DRAINING 1. Dewotertng or basin draining (e.g., pumped discharges. trench/ditch cuts for drainage) related to the conatructl= actl*ty that may have turbid or sediment laden discharge water must be discharged to a temporary or permanent sedimentation book, on the project site whenever possible. If the water carrot be discharged to sedimentation bas, prior to entering the surtoa water, it must treated with the appropriate BMP, such that the discharge dos not dwasely affect the receiving water or downstream landowners. The Pem tttee(s) rust ensure that discharge points ore adequately protected from erosion and sixr. T. discharge must be dispersed over noturd rock riprap, sand bogs plastic sheeting or other °scented energy dsngotion measure.. Adequate sedimentation control measures are required for discharge water that contains ausponded solids 2. M water from dewaterng or basin draining activities must be discharged in a manner that does not sous nuisance conditions. erosion in receiving channels or on ...lope properties r inundation in wetland. causing slgnifko t adverse Impact to the wetland AMENDMENTS TO SWPPP The Permittee(s) must amend the SWPPP as necessary to include odditiond requirements, such m additional or modified BMPs, designed to correct problems ktenUfied or address situations whenever. 1. There a a change in design, construction, operation, maintenance, weather r season conditions that has a significant effect on the discharge of pollutants to surface waters or underground water; 2. Inspections or investigations by site operators, toad, state or federal officials indicate the SWPPP is not effective in eliminating or significantly minimizing the discharge of pollutants to surfer* water or rmdrgro red waters or that the discharges are causing water quality standard ezceodances, or 3. The SWPPP Is not achieving the general objectives of controlling pollutants r storm water discharges associated with construction activity; or tie SWPPP is not consistent with the terns and condition of the permit 4. At any fkne after permit coverage a effective, the MPCA may determine that the project's stem water Recharges• may cause, hove reasonable potential to cause, or contrbute to no- attainment of any applicable water quality standard - N MPCA makes such a determnotion, the MPCA .81 notify the Permittee(a) a writing. in response, the Permttes(s) must dewlap a supplemental BMP cotton pion or appropriate 511PPP amendment. describing SWPPP modifications to address the Identified 0000000 and =bait information requested by the MPCA, which may naiad. an individual permit application. If MPCA's ,mitten notification requires a response, theme to respond within the specified tfinefrrne constitutes a permit violation. FINAL STABILIZATION The Permltee(s) must ensure find stabilization of the site The Pemdtee(s) most submit o Notkoe of Termination within 30 days after fad stabilization le complete. or another owner/operator (Permlttee) has assumed control over di areas of the site that have not undergone final stabilization. Find stabilization can be achieved in one of the following ways 1. M soil disturbing at the site hove been completed and ail soils most be stabilized by a onlorrn perennial vegetative cover with o density of 70 percent over the entire previous surface ores, or other equivalent means necessary to prevent cog fakers under ewive .eond/feons and: a M drainage ditches, constructed to drain water from the site after construction is complete, must be stabilized to preclude erosion; b. M tempo synthetic, and structural trod= prevention and sediment contra Best Management Plow (such as elt fence) mud be removed as poi of the site final stabilization; and c The Pennitee(s) must dem out all sediment from =san d y0es a from Maim sedimentation aim that ore to be used as permanent water quality management basins Sedknent must be stabilized to prevent It from being wasted bock Into the basin, conveyance and drainage ways discharging off-site or to surface waters The dean out of permanent basins must be sufficient to return the basin to design capacity. 2. For residential construction only,- find stabilization nos been achieved when temporary erosion protection and down gradient perimeter - control for individual lots has been completed and the residence hos been transferred to the homeowner. Additionally, the Permits. must distribute the MPCA 'homeowner fact sheet' to the homeowner to inform the homeowner of the need for, and benefit. of, find stobltratlon. RECORD DETENTION The SWPPP, all changes to ft, and 'inspections and maintenance records must be kept at the site during construction by the Permtee who has operational control of that potion of the sits The SWPPP. can be kept In either the field off of in an on -site vehicle. M owner(s) must keep is SYPPP, along with the fo0owng additional records, on flee for three (3) years offer submitted of the NOT os outlined in TERMINATION OF COVERAGE This does not ,elude any records after eubmlttd of the NOT. 1. My other permits required for the project 2. Records of all Inspection and maintenono conducted during construction 3. M permanent operation ond maintenance ogreements that have been implrnoted, including d right of .oji contracts, covenants and other binding requirements regarding perpshud maintenance, and 4. M required calculations far design of the temporary and permanent storm water management systems TERMINATION OF COVERAGE 1. Permittee(s) wathbg to terminate coverage under this permit must submit a Notice of Termination (NOT) to the MPG Compliance with the permit is required ono NOT is submitted The Permittee(e) authorization to discharge under the permit terminates at midnight of the -day the NOT is signed_ 2. All Pentnttee(s) must submit a NOT within thirty (30) days after one or more of the following conditions have been met e F,d Stabilization hos been addend on all portions of the sate for which the Permit, ls responeble (indudmg the removal of all tempo erosion control measures such as sot fence, and it applicable returning agricultural land to its pre construction agricultural osek - b. Another owner/operator (Permitee) has roomed control according to Part IL8.5 of SPCA Penn9 No. NN 8100001 over an areas of the site that have not been (Wally stabilized or e Far rshde ntil construction only, temporary erosion protection and down gradient perimeter control for Individual lots has been competed and the residence hos been transferred to the homeowner. Additionally, the Permits must distribute the MPCA's 'homeowner faetaheel' to the homeowner to inform the homeowner of the need for, and bene0ts.of, 1,d stobotzotlon. SITE SPECIRC EROSION AND SEDIMENT CONTROL BTiE ONION A) PROJECT NAME: GRANDVIEW B)- PRDJECT LOCATION: Between tte dead ends of Stagecoach True behind Gefhsemany Church. CJ PROJECT DESCRIPiIOtF Ws project MB coneat of the construction of oeven single -foray homes and a public: Most had surface run -off Is routed to a pre - treatment basin, Midi Is to be lined to present water infiltration. Th0 basin wB overflow to bin-filtration basin which has on underdron and a controlled outlet Soil disturbing activities will include: installation of o rock construction entrence Installation of set fence where surface run-off leaves site vibe grading, to include the Import of material and export of unsuitable sole wotennan, sanitary sewer, and storm sew installation; building .00100tion including foundation nrmrat1oa parking lot and roodwoy construction; and preparation for turf restoration. E) PERCENTAGE HARD SI_MFAC0 2'Z F) SITE ARFA$ 0) TOTAL 01511/1985 AREA' 4.35 ACRES H) 111 1 • Jr. e!. m r • . .. nn • w•: 11• •. .. _ J: 0. • Prior to any grading opratone, the contractor shoo Install a rock construction entrance and perimeter slit fence as shown on plan. (Contact City and /or County to Inspect erosion control measures prier to grading operations, If necessary.) Additional set fence may be necessary R local conditions require • Provide W m (or approved equal) to 00 acting storm viewer inlets that wog receive run-off during site construction. Provide Met protector for ail proposed storme Inlets within 24 hours of structure natdation. Met protection to remain sewer , place until site has Men .tablaed. • Remove topsoil from sib and pace in temporary ...pie l000tnn (as determined by Owner). Seed etoo plc with temporary Bead ma and nwd. with weed-free straw If stsclp1n is to remain k, place for more than three (3) days • Perform site grading on an aeo-by -area bola to minimize uncompleted areas As each area is completed o0 exposed sole must have temporary erosion control protection or permanent cover according to the following tare table TYPE OF SLOPE Steeper than ::1 7 days 10:1 to 31 14 days Flatter than 10.1 21 days (• Marinas., Usna an area acrt remain cow whwn the wino Is not acU,eey balm; corked) Al sod seed mulch and fertilizer shoe conform with the following MnDOT specifications as modified below. ITEM BEFORE CONSTRUCTOR AFTER CONSIRBC110N TOTAL SITE AREA 3.29 ACRES TOTAL ESTIMATED IMPERVIOUS 0 ACRES 0.89 ACRES TOTAL ESTIMATED PEfMOUS 3.29 ACRES 240 ACRES 0) TOTAL 01511/1985 AREA' 4.35 ACRES H) 111 1 • Jr. e!. m r • . .. nn • w•: 11• •. .. _ J: 0. • Prior to any grading opratone, the contractor shoo Install a rock construction entrance and perimeter slit fence as shown on plan. (Contact City and /or County to Inspect erosion control measures prier to grading operations, If necessary.) Additional set fence may be necessary R local conditions require • Provide W m (or approved equal) to 00 acting storm viewer inlets that wog receive run-off during site construction. Provide Met protector for ail proposed storme Inlets within 24 hours of structure natdation. Met protection to remain sewer , place until site has Men .tablaed. • Remove topsoil from sib and pace in temporary ...pie l000tnn (as determined by Owner). Seed etoo plc with temporary Bead ma and nwd. with weed-free straw If stsclp1n is to remain k, place for more than three (3) days • Perform site grading on an aeo-by -area bola to minimize uncompleted areas As each area is completed o0 exposed sole must have temporary erosion control protection or permanent cover according to the following tare table TYPE OF SLOPE Steeper than ::1 7 days 10:1 to 31 14 days Flatter than 10.1 21 days (• Marinas., Usna an area acrt remain cow whwn the wino Is not acU,eey balm; corked) Al sod seed mulch and fertilizer shoe conform with the following MnDOT specifications as modified below. ITEM MoDOT SPECI 1CAT10N/NOTES Sod 3878 Seed 3878 For pending areas (above NWL) MnDOT Mature 350 (at 84 bs /acre) • For turf eatablishme*t MnDOT Mature 280 (100 bs /aloe) MnDOT tincture 270 (120 but /Doe) Temporary Fall cover Spring/summer 1 -2 yeas cow 2- 5 tears rover 141001 Mature 1008 (10D bs /ice) MnDOT Mature 110 (at 10D m. /Dore) MnDOT Mature 150 (at 40 Ibs /acre) - MnDOT Mixture 190 (at 80 Ibs /acr•) •• For bio- fltratlan basin MnDOT Mixture 328 (at B8 b. /awe) Muich 3882 (Type 1 - Das Anchored) Fertilize - 3881 Wood Fiber Blanket 3885 (Category 2) w To reduce weed establishment mow 2 to 3 times (30 days apart) during the 1st war with the mower deck about 6' - 8' off the grand. Mow one time during the 2nd year before weeds set thole seeds Burn or mow once every 3-5 years following the Mid 2 yearn of maintenance to remove dead pi4M material and Mimed. new weed • Mow a minimum of once per 2 weeks the contractor shall pay special attention to nt .d)ocent property ems and make sure the erosion control practices apiece in those areas prevent migration of sediment onto odjoeent properties. If any dopes appear to be foiling, oddltiond Wt gents biomes and erosion control blanket Mali be added m needed The contractor shag mortar and repair an at fence (including the removal of �accumulated sediment) until vegetation k established and the site a stabilized. (See INSPECTIONS AND MAINTENANCE). • -Provide rip -rap at at pip outlets within 24 hours of pipe Installation. • Mato, s01 fence, ncludng the removed of accumulated aedbment, through completion of budding 00 0tructlon. Set fence to be removed only after mmpletlon of building construction and upon establishment of vegetation. • Fled grads swab areas upon stabilization of upstream rem. • 5d a9 disturbed drainage areas, adudmg sewer pond overflows around storm sew flared -end section, and off - street catch basins • install underground unities (water, sanitary sewer. storm sewer) In a mower that minimizes others. impacts to the stormwotr BMPs. • Provide temporary mulch over an pervious areas • Upon grading completion the contractor stag provide native topsoil, seed and mulch anchored with a straight set date with, 48 hours of final grading. • Excess son should be treated 111e other exposed .ol and stabilized with, 72 hours My son stockpiles to how sill fence placed around perimeter. • Adjacent streets sae but kept dean of construction materiels dirt, and other =desirable materials. When materials or debris how washed /flowed onto ad)ocent streets It is the Contractors responablity to sweep /scrape streets as necessary or as directed by the City. EROSION CONTROL fir-MIMES STRUCTURAL PRACTICES 1. 509 Fence - wit be Installed prior to any grading actMtlee along the perimeter of those portions of the site wt. are downstream of etmm water rem -off. 2. Storm Water Management - Storm water drainage will be provided by nub and gutter. storm sewer and catch basin. Run-off Is to be caroled and routed to pre - treatment and Mho- nitration begins 3. Stone Sew Outlet Protection - such on rip -rap and geotextle Star fabric coal be installed at storm sewer outlets as a pennonent erosion control MOWN 4. Rack Construction Entrance - shall be used at all locations where combustion vehicles leers MR. onto had surface roads S Storm Sewer inlet Protection - Moil be used at all CB. to prevent site sediment from waehing Into pending bosh. OTHER COORROL.6 1. Construction Waste Materials - M waste materials generated as a resdt of site construction shag be collected -and removed =cording to all local and /or state waste management regulations by o licensed solid waste management company. The contractor wig snare that all site personnel are Instructed in these practices. 2. Hazardous Wastes - Al hazardous waste materials shall be stored properly to prevent spills and vandalism. When necessary, hazordous wastes will be disposed of in the manner specified by lotol and /or state regulation or by the manufacturer. 3. Sanitary Waste - M sanitary waste will be collected fern the portable ,alts by a local, =eased water management company, as required by local regulation. 4. Offsite Vehicle Tracking - A .rack construction entrance has been provided to help reduce vehicle tracking of sediments The paved street adjacent to the site entrance shill be .rapt on an ors- needed basis. or as determined by the City. Dump trucks hauling loose materials (send, *set. .tc) "to and /or from th• site shag be covered with a tarpaulin. 5. Vehicle Cteo,ng - No engine degreasing Is allowed on-site. External washing of vehicles to be confined to a defined area ('bons yard) on -sits The bone yard Is to be at least 50 feet from any.storm den Inlet and shag drain to a temporary pit of adequate volume to hold all liquid and waste concrete materials generated during washout operations Hardened concrete shag be broken up and disposed of as required by local regulations. If necessary, place sit fence around bone yard area to ensure no sediments enter any storm water basin or storm sewer Met lOP6CITM MD 'AMBIANCE PBDCEOURS3 (Also aim Impactors old MWdeeence iedr YINERAL BROWN MD fIBtT CONTROL) The following are the inspection and maintenance practices that will be seed to maintain erosion and sediment controls • M control measures all be kopeeted at least once each weak and following any storm ewe of 0.5 Inches or greater. • M measures will be maintained In good working order, N a repair is necessary, t will be Initiated within 24 hour. or report • Built up sediment ell be removed from sat fence when it has reached one -third (1/3) the height of the fence. • 59t fence will be Inspected for depth of sediment, tears, to see If the fabric is securely attached to the fence pmts, and to see that the fence pasts are firmly In the ground • Tempo seeding and planing .91 be inspected for bare spots, - washouts, and healthy growth. • A maintenance report WI be mode after each Inspection M NPDES permit a required for construction. Permit is to name, on-site at al tine. The Owner and Contractor coq oversee and be responsible for bopkrnentatbn of SYRPP, and w10 be reopensble for erosion control measures orate until final stablbation has been achieved and a Notice of Termination (NOT) has been fated with the MPCA. The Contractor and Owner shall make available to the City end watershed a fist of contacts to be notified If repels and/or maintenance to site erosion control measures on required Contractor to provide designoted concrete truck washout area with appropriate elgnoge at booboo shown (r location approved by Engewsr). Washout area is to be a minimum of 50' from storm areas, dddos. ponds or rainwater garden areas. Do not allos nn -off fron this ono by constructing o temporary pit or brined area large enough for liquid and mild mete After waste concrete is set break -up and dispose of Prop•nfp Contractor to provide phased traffic control (i accordance with the 'M,neeoto Monad of Untform Traffic Control Dedoen' as necessary whenever greeting, utility work, paving operations, and final tun restoration encroach within right- of-way or onto docent 'beets. M BMPs nest be mokso,ed with proper function until all site work has been eorpteted and site has undergone find stabilization. Contractor to provide toped] etoekpee at beatlon designated by owner. Stodepae location(s) to be surrounded by Mt fence. If etadkpbe is to be apiece longer Ulm 72 hours, provide seed and mdch. DRAWN BY: BNB. CHCim BY: C.C.S. DESIGN BY C.C.S. PROD. N0. 07 -1131 ORIGINAL DATE FEBRUARY 9, 2007 REVISION DESCRIPTION S 0 a O Z ROYAL OAKS REALTY 1000 COUNTY RD E,IIES SROREYIEw, MN 55128 PHONE (851) 483 -5518 5176 PLANNING d ENGINEERING PLOWE ENGINEERING, INC 8778 LUE DRIVE SUITE 110 LINO I.AA7R, MN 55014 PHONE (851) 361 -825 PIZ (851) 381 -8701 C3 • RAN DVIEW � STORM WATER • POLLUTION PREVENTION PLAN [SWPPPI City of Lino Lakes, Minnesota • WIMCO INLET PROTECTION NOT TO SCALE 5' NOTE THE CONTRACTOR. AT HIS OPTION, MAY SUBSTITUTE A GEO1EXISE FABRIC, SPEC. 3601 FOR THE GRANULAR FILTER BLANKET UNLESS OTHERWISE SPECIFIED IN THE PLANS THE FABRIC SHOULD COVER THE 6606 OF THE RIPRAP. RIP -RAP OVERFLOW NOT TO SCALE 6' MINIMUM WASHED ROCK BOCK CONSTRUCTION ENTRANCE NOT TO SCALE 1X- 20' SEE SEC. A-A WIR 5$ N ROTE: TE CQ4IRAC10L AT NS OP10L MAY S ESSNS A CEOIECRE FABRIC SPEC Ma FO 1• 06166 * 6110 BIAIBRF LINES =MUSE BPEEFIED 01 110 PLANS DIE FABRIC SWARD COVER TIE AREA 6 AE WRAP AND 561DD UNDER 1FE OBVERT APRON 3 FEES. RIP -RAP DETAIL NOT TO SCALE NOTES - ALL JOINTS SHALL BE SOLVENT WELD EXCEPT AS NOTED. - ALL PIPE TO BE SCHEDULE 40 SERVICE CLEAN OUT 2' X r WOOD OR STEEL POST 7 -7- 0.0. WORE MESH REINFORCEMENT, STD. FIELD FENCE 116. 30' HIGH, MAX. MESH SPACING OF 6' AND MIN. 14 -1/2' GAUGE WINE 45 OPTIONAL GEOTEXIILE FILTER FABRIC - OVERLAP 6' AND FASTEN AT 2' INTERVALS. LAY FABRIC N TRENCH. FABRIC ANCHORAGE TRENCH. BACKFILL TRENCH WITH TAMPED NATURAL SOIL O600140N OF RUNS EXTEND NIff 11E5N INTO TRENCH SUPPORT.POST ANCHORAGE 64-51111 SOL 11 f_ NOTES: 1) WIRE ME54 15 NOT REQUIRED. 2) CONTRACTOR I5 RESPONSIBLE fOR REMOVAL OF ALL EROSION CONTROL MATERIALS FOLLOWING TURF ESTABLISHMENT. EROSION CONTROL MICE NOT TO SCALE NOT TO SCALE FANGED CRA1E ELEV= 890.10 TOP WALL= 689.75 10' DIAM. ORIFICE INV 886.75 WEIR WALL — / PLANT MATERNAL TOLERANT OF / INUNDATION AND DROUGHT (NATIVE PLAN15 RECOMMENDED) OR USE MnDOT SEED MIXTURE 328 (RATE =88 LEIS /ACRE) Il =-71,1141110-- ,� WELL- GRADED PLANING MEDUM (SEE NOTE 11) AGGREGATE (SEE NOTE 12) NON -WOVEN GEOIEXITIE (MnDOT TYPE 1) OVER AGGREGATE r PERFORATED DRAIN W/ SOCK NV 886.25 (EXTEND. TO MANHOLE) 6' DRAINTILE INV 886.25 (ENNUIS THIS SIDE OF W06 WALL) STABILIZATION BLANKET (SEE NOTE 13) 18' WELL-GRADED PLANTING MEDIUM (SEE NOTE 11) N-SIILI SOBS AGGREGATE BED W/ 6' PERFORATED DRAWEE W/ SOCK (SEE DETAIL AT LEFT) HAAN NOTES, 1. WELL- GRADED PLANTING MEDIUM TO BE COMPRISED OF (81 VOLUMEx 40X SEMI -COURSE WASHED OR NATIVE SAND 30X MnDOT GRADE '2 COMPOST 305 NATIVE TOPSOIL 2. AGGREGATE SHALL BE THE FOLLOWING` 1' -7S DOUBLE WASHED STONE -OR_ 1/4' -1/2' WASHED RIVER RUN PEA GRAVEL 3. STABNZATION BLANKET TO BE SUITABLE FOR SEEDING (E.G. STRAW- COCONUT BLANKET). 4. NO MINING OF SANDY SOBS ALLOWED N BASIN. 5. FINAL GRADE ONLY UPON STABILIZATION OF UPSTREAM AREAS. 5. MO-FILTRATION BASIN TO REMAIN UNLINED. 7. PROTECT BASIN FROM RUN -OFF DURING LOT CONSTRUCTION ACTIVITIES. CONSTRUCT BASIN ONLY UPON STABILIZATION OF UPSTREAM AREAS 8. USE NON - PERFORATED DRAWEE OUTSIDE OF BASIL RIO- FILTRATION BASIN NOT TO SCALE 1/2' DP. GRA1E G,LLVA1® S LANG HINGES MBAMOR 1/2' 1/4' Nom 6Y 1 I/Y YAM BY 56 5/8' LONG 0400. PLATE 1/2' OAMEIFI, B' LONG 1FWEADED- ANCHOR ISLE WON 1 1/4' FLAT WASHER AND NR N 4 LOCATORS 51011 BAND 1/4' 14401 67 1 1/2' MODE BY 7-B 5/8' LON0 MAPPED AROUND AND WELDED TO 57EE. ROLOS CONCRETE OUTLET STRUCTURE NO SCALE 57 518• STEEL ROOS 4 0.C. EACH WAY BELD AT EACH INTERSECTION STEEL PLATE 1/4' THICK MELDED TO STEEL R006 TYPICAL. 4 LOCATIONS TOP VIEW DRAWN BY: B.J.B. CHCKD BY: C.C.S. DESIGN BY CGS PROD. 140. 07 -1131 ORIGINAL DATE MAY 14. 2007 • 5 a O 1 -z2 W ROYAL OAKS REALTY 1000 COUNTY RD $141S1 0110REVIEW, MN 55128 PHONE (851) 483 -5518 SITE PLANNING & ENGIIEERNG ��PIRB//RBL�p�O�eW,p��B �pE� LNNINLLWNL INC. 6778 LAKE DRIVE Suitt 110 IO4O LAKES, MN 55014 PROBE (651) 381 -8210 FAX (651) 361 -6701 C4 • STAFF ORIGINATOR: P & Z MEETING DATE: TOPIC: BACKGROUND AGENDA ITEM V B Jeff Smyser July 11, 2007 PUBLIC HEARING: Conditional Use Permit for Planned Unit Development and PUD Development Plan/Preliminary Plat Moon Marsh, Brian Wessel Mr. Brian Wessel has submitted a proposal for a rural development called Moon Marsh. The proposal includes four residential lots on 25 acres of property. Mr. and Ms. Wessel currently reside in the existing home on the site. The project would create three more residential lots with a private loop road, a community sewage treatment system, and 12 acres of open space . Though the normal density in rural areas is one lot per ten acres, the zoning ordinance allows for up to eight units on forty acres in a PUD with a common septic system. (This translates to four units on the 25 -acre Wessel site.) This is allowed only in areas outside the growth areas defined in the Comprehensive Plan. The purpose is to provide for some development that preserves open space in areas that will not have municipal utilities. The zoning ordinance defines two types of PUD: rezoning and conditional use permit. A rural residential PUD can be approved as a conditional use permit. The site is within the area analyzed by the I -35E Alternative Urban Areawide Review (AUAR). The AUAR's mitigation plan requires some information and review criteria that are not normally applied to development projects elsewhere in the community. ANALYSIS The following summarizes the project proposal: Gross Site Area 25.3 acres Upland Area 11.1 acres Lots 4 Gross Density 0.16 units /acre Net Density 1.26 units /acre • • Moon Marsh page 2 Comprehensive Plan, Land Use, Zoning Location Existing Land Use Guided Land Use (Comp. Plan) Zoning Site rural residential Rural Rural North rural residential City of Columbus: Rural Res. /Agricul. City of Columbus: Rural Residential South regional park reserve Rural Rural East regional park reserve Rural Rural West rural Rural Rural Comprehensive Plan: The Comprehensive Plan guides the project site for Rural land use. The site is outside of both Stage 1 (pre -2010) and Stage 2 (pre -2020) growth areas and is well outside the Metropolitan Urban Service Area (MUSA). The Comprehensive Plan includes a policy stating that "density incentives may be considered in conjunction with a rural cluster subdivision that produces permanent open space." Another policy is to "promote rural residential clustering as a means of preserving greater amounts of open space or agricultural active lands." To implement these, the zoning ordinance provides for a rural residential PUD with a common septic system. A rural PUD must have at least 50% open space. The proposal includes 51% open space (Outlots C, D, and E). Rural residential PUDs are only allowed in areas such as this that are outside of planned growth areas. This is because growth areas are planned for municipal utilities and should be reserved for urban density growth. Rural lots of 10 acres are a way to hold areas for more dense development when utilities are available. In an area where there will be no utilities, even long term, there is no need to protect efficient service provision. The most important issue is ensuring enough land for onsite septic systems. A common treatment area ( drainfield) is an option that eliminates the need for primary and secondary drainfield areas on each lot. Growth Management: The Growth Management Policy (Ordinance No. 24 -04) limits the number of dwelling units that can be approved for platting annually. There are fewer than 80 units approved for 2007, leaving about 60+ for this year. The Moon Marsh project would create three new lots. The project includes several nature- friendly design elements, but this is not a "conservation development" as we typically use the term. It does not have a formally adopted stewardship (management) plan. Because we have ample units remaining for 2007 and this project creates only three new lots, there is no need to exempt the project from the annual limit. Zoning: The site is zoned Rural. The normal lot size requirement is 10 acres, and there are shoreland requirements to consider. However, a rural residential PUD with a common septic system can have up to eight units per 40 acres, or four per 20 acres. There is a minimum lot size of 25,000 sf for such a project. • • • Moon Marsh page 3 Shoreland: Shoreland overlay zoning covers land within 1000 feet of the Ordinary High Water Level (OHWL) of Rondeau Lake, classified as a "natural environment lake ". A shoreland overlay also applies within 300 feet of Rice Creek, but the creek is about 500 feet to the east. The OHWL for Rondeau Lake has not been determined. Lacking a specific determination, examination of the treeline often is used as the alternative method. The treeline is 100 -150 feet west of the road. By this reckoning, the Wessel property is within the shoreland overlay. However, shoreland requirements will have little effect on the site. Since all the proposed home sites are on the eastern part of the property, shoreland setbacks from the OHWL will not affect the proposal. The nearest building site will be more than 400' from the public roadway, well beyond the required 150' setback from the OHWL. There are no lakeshore lots, so visibility from the lake is not an issue. The shoreland ordinance was written well before current community septic systems technology, so lot sizes addressed only individual septic systems and municipal utilities. The current technology treats wastewater better than the typical public treatment plant. We are considering the "sewered" lot size in the shoreland ordinance as the appropriate one. There are no steep slopes on the property, so erosion down a bank into the lake or anywhere else is not a significant issue. In fact, very little site disturbance is proposed on the western part of the site. The ends of the private loop road and some culvert work are the only excavation activities near East Rondeau Lake Road. The site drains into Rice Creek and then to Peltier Lake and the chain of lakes, so water quality issues are pertinent. There are rain gardens designed into the project. The City has requirements for minimizing erosion that apply to all construction projects. In addition, the Rice Creek Watershed District examines and regulates impacts on wetlands and water quality. We forwarded the initial submittal to the MnDNR in January. An e -mail from MnDNR states they have no concerns and have the following comments: Rural Zone Shoreland: (sewered, nonriparian lot) PUD with common septic Proposed PUD lot size minimum 10,800 25,000 sf 33,000 sf to 93,000 sf lot width 330 = 80' 100' 250'+ along private road building setbacks from street rear lot line side lot line 30' 10' 10' Y�54= 25' same as zoning at project periphery 25' from private road 30' 15' from OHWL 150' bldg. height 35' 36'� t' per underlying reqs. impervious max. 65% 30% :' <20% (estimated) min. open space tt � � � ���, -�.� 50% 51% Shoreland: Shoreland overlay zoning covers land within 1000 feet of the Ordinary High Water Level (OHWL) of Rondeau Lake, classified as a "natural environment lake ". A shoreland overlay also applies within 300 feet of Rice Creek, but the creek is about 500 feet to the east. The OHWL for Rondeau Lake has not been determined. Lacking a specific determination, examination of the treeline often is used as the alternative method. The treeline is 100 -150 feet west of the road. By this reckoning, the Wessel property is within the shoreland overlay. However, shoreland requirements will have little effect on the site. Since all the proposed home sites are on the eastern part of the property, shoreland setbacks from the OHWL will not affect the proposal. The nearest building site will be more than 400' from the public roadway, well beyond the required 150' setback from the OHWL. There are no lakeshore lots, so visibility from the lake is not an issue. The shoreland ordinance was written well before current community septic systems technology, so lot sizes addressed only individual septic systems and municipal utilities. The current technology treats wastewater better than the typical public treatment plant. We are considering the "sewered" lot size in the shoreland ordinance as the appropriate one. There are no steep slopes on the property, so erosion down a bank into the lake or anywhere else is not a significant issue. In fact, very little site disturbance is proposed on the western part of the site. The ends of the private loop road and some culvert work are the only excavation activities near East Rondeau Lake Road. The site drains into Rice Creek and then to Peltier Lake and the chain of lakes, so water quality issues are pertinent. There are rain gardens designed into the project. The City has requirements for minimizing erosion that apply to all construction projects. In addition, the Rice Creek Watershed District examines and regulates impacts on wetlands and water quality. We forwarded the initial submittal to the MnDNR in January. An e -mail from MnDNR states they have no concerns and have the following comments: • • Moon Marsh page 4 1. The proposed density falls easily within the statewide guidelines for development in shoreland areas. This entire parcel is within the shoreland district of Rondeau Lake. 2. The preservation of the open space, the filtration basins, and the curbless road section help lower this project's impact on the landscape. 3. The community septic system is not a concern if it will be monitored and maintained on a regular basis by a responsible party that has experience in the upkeep of similar utilities. Alternative Urban Areawide Review (AUAR): This site is within the area analyzed by the I -35E Corridor AUAR. Development within the area is subject to the mitigation plan adopted with the AUAR. The mitigation includes some specific, quantified requirements, but many of the requirements are means of achieving the best results possible, depending on the site. Conservation Development Framework: The Conservation Development Framework provides the foundation for most of the conservation objectives within the AUAR area. Implementation of the Framework will: conserve the most ecologically significant natural resources within the AUAR area (in particular, the "core" and "outlier" habitats); protect ecologically significant natural resources from adjacent land uses by implementing buffering; and connect ecologically significant natural resources via multi- functional greenway corridors. The goals of the Conservation Development Framework will be pursued through a variety of methods. The maps in the AUAR provide summary information and guidance. For example, the Minnesota Land Cover Classification System map (AUAR Fig. 10 -1) shows several cover types. The upland area where the new lots would be are classified as planted or cultivated vegetation, relating to the agriculture that has occurred. The existing driveway and house site show as artificial surfaces and associated areas. The western part, which corresponds to the large Outlot D wetland, is herbaceous and there are small forest areas where the wetlands are in the proposed Outlots E and C. These latter areas hold promise for preservation and merit special attention. The Wetland/Aquatic and Upland Habitats map (AUAR Fig. 10 -2) show the west wetland area as core wetland 7 aquatic habitat. It is these core areas that we want to preserve. Large core habitat areas can provide habitat for a wide range of wetland - dependent and aquatic species as well as rare natural features. Therefore, the larger wetland area as well as the other outlots will be protected with a conservation easement. This will preserve land adjacent to larger, off -site greenway areas to the east and south, which are part of the regional park. The conservation easement should provide for the possibility of future restoration work. Water quality, stormwater management, erosion and sedimentation: The AUAR includes analyses of surface water runoff issues which lead to requirements for including Moon Marsh page 5 infiltration elements and other techniques. It also includes estimated stormwater management recommendations for specific development areas. These estimates in the AUAR cannot be considered strict requirements because they were broad and based on general soil types and assumptions about impervious areas related to development. However, they do provide some guidance . The most general estimate is that 0 % -5% of the developable area would be needed for stormwater management (AUAR Fig. 17 -3). On a little less general estimate, the Moon Marsh site is labeled development area A -FR, with an estimated need of 0.13 acre (5660 sf) for stormwater management (AUAR Table 17 -5). The specific analysis and design for the project includes 4200 sf as infiltration basins. This falls within the broad estimate range and considering the scale of the site, is comparable to the less broad estimate. The AUAR requires that runoff rates will be at or below pre - development conditions. This is a standard requirement everywhere in the city, enforced on all projects. The AUAR also requires that runoff volume be no more that 150% of pre - development runoff. This is being reviewed. The groundwater elevation will determine how the proposed infiltration basins will function, which may affect the runoff volume. This will be analyzed as the project is reviewed further. Archaeological Survey: A Phase 1 archaeological survey was completed for the site and submitted with the project, as required by the AUAR. Records include an identified site to the east, but only low density artifact scatter was found on the Wessel site. The survey investigator does not recommend further evaluation. Rare Plant Survey: The AUAR mitigation plan states that due to the incidence of rare plant species in nearby wetland habitats, the City will require rare plant surveys and the mapping of rare plant locations prior to disturbance of areas of certain soil characteristics. The project site includes these soils. A rare plant survey is required and was performed on June 26. Several of the higher quality wetland habitats within the site contain suitable habitats for select rare plant species. However, no state- listed or otherwise rare plant species were detected. Planned Unit Development Section 2, Subd. 10. of the zoning ordinance includes the PUD standards. The zoning ordinance provides for two types of PUD. We have used a rezoning PUD on mixed use projects and others with exceptional design issues such as conservation developments in urbanized areas (with city utilities). We also have a provision for a conditional use permit for a PUD. A rural residential PUD is specifically designated for the conditional use permit PUD option. It is important to review the purpose and intent of a PUD. Subd. 10. PUD, Planned Unit Development. A. Purpose and intent. The purpose of this section of the Zoning Ordinance is to provide for the grouping of lots or buildings for development as an integrated, coordinated unit as opposed to traditional parcel by parcel, piecemeal, or sporadic approach to development. • Moon Marsh page 6 This section is intended to introduce flexibility of site design and architecture for the conservation of land and open space through clustering of Tots, buildings and activities, which promote the goals outlined in the Comprehensive Plan or serve another public purpose. It is further intended that planned unit developments are to be characterized by central management, integrated planning and architecture, joint and common use and maintenance of parking, open space and other similar facilities, and harmonious selection and efficient distribution of uses. ... The PUD, by allowing deviation from the strict provisions of this Ordinance related to setbacks, heights, lot area, width and depths, yards, etc., by conditional use permit or a mixture of uses by rezoning to a PUD District, is intended to encourage: 1. A development pattern in harmony with the objectives of the Comprehensive Plan. 2. Innovations in development that address growing demands for all styles of economic expansion, greater variety in type, design, architectural standards, and siting of structures through the conservation and more efficient use of land in such developments. 3. The preservation and enhancement of desirable site characteristics such as existing vegetation, natural topography and geologic features and the prevention of soil erosion. 4. A creative use of land and related physical development which allows a phased and orderly transition of varying land uses in close proximity to each other. 5. An efficient use of land resulting in smaller networks of utilities and streets thereby lowering development costs and public investments. 6. Promotion of a desirable and creative environment that might be prevented through the strict application of City zoning and subdivision regulations. C. Rural Residential Planned Unit Development Requirements. 1. Purpose. It is the intent of this section to establish special requirements for the granting of a conditional use permit for rural (without City water or sanitary sewer) residential conservation subdivision PUD project in order to promote: a. Preservation of productive land for agricultural use. b. Preservation of wildlife habitat and unique natural resources. c. Reduction of negative impacts on the environment d. Creation of common open space that provides a unified landscape for the use and enjoyment of the neighborhood community and/or the general public. e. A variety of rural residential lot sizes, configurations, and neighborhoods. Density: Normal density in the Rural land use category is one unit per ten acres. However, the PUD standards allow eight units per forty acres in a subdivision that is served by a community sewer system that is approved by the Minnesota Pollution Control Agency (MPCA). • • • Moon Marsh page 7 Lots: The lots are clustered to avoid wetland impacts and provide efficient access to the community septic absorption field. The effect is a small neighborhood that is so isolated from the public road it will not even be visible. With the 10' easement around the wetlands, the house pads on a couple lots are within about 11' of the easement. It likely is possible to move the pad on L B3 to the northwest to provide more use of the yard around the house without encroaching on the easement. Similarly, the pad on L2 B2 could move slightly to the south. While retaining the windrow of trees is desirable, many of the trees will be lost anyway when the septic tanks are installed on the south side of the lot. The pad locations should be re- examined and, if possible, moved to allow more distance from the easements. The new pad locations must be shown on plans prior to construction. One outstanding issue is the groundwater elevation. Submitted data is somewhat inconsistent. Low floor elevations and stormwater facilities are compared to groundwater level. Floor pads must be four feet above groundwater, and the bottom of ponds and infiltration basins must be above groundwater enough to function properly. While we can agree on a `worst case scenario' elevation to determine house pad elevations, this level needs to be compared to the submitted grading plan and analyzed for stormwater management purposes (see below). Water: Each home will have individual wells for water. The wells must meet minimum separations from septic system facilities. This will be addressed with well permits from the MN Dept. of Health. Sewage Treatment: The development uses a sophisticated sewage treatment system that includes both individual treatment and a community mound. Most treatment will occur within the multiple tank- and - treatment facilities on each lot. This allows for monitoring and maintenance of individual lots without interfering with the elements of the system used by all lots. It also minimizes the treatment that is needed in the common mound absorption field. total acres wetland acres upland acres Lot 1, Block 1 2.63 0.48 2.15 Lot 1, Block 2 2.00 1.13 0.87 Lot 2, Block 2 2.00 1.24 0.76 Lot 1, Block 3 2.00 0.90 1.10 Outlot A (septic site) 1.03 0.00 1.03 Outlot B (private road) 2.78 0.32 2.46 Outlot C 2.10 1.31 0.79 Outlot D 6.43 6.20 0.23 Outlot E 326 2.52 0.74 E Rondeau Lk Rd ROW to be dedicated 1.05 0.09 0.96 total 25.28 14.19 11.09 With the 10' easement around the wetlands, the house pads on a couple lots are within about 11' of the easement. It likely is possible to move the pad on L B3 to the northwest to provide more use of the yard around the house without encroaching on the easement. Similarly, the pad on L2 B2 could move slightly to the south. While retaining the windrow of trees is desirable, many of the trees will be lost anyway when the septic tanks are installed on the south side of the lot. The pad locations should be re- examined and, if possible, moved to allow more distance from the easements. The new pad locations must be shown on plans prior to construction. One outstanding issue is the groundwater elevation. Submitted data is somewhat inconsistent. Low floor elevations and stormwater facilities are compared to groundwater level. Floor pads must be four feet above groundwater, and the bottom of ponds and infiltration basins must be above groundwater enough to function properly. While we can agree on a `worst case scenario' elevation to determine house pad elevations, this level needs to be compared to the submitted grading plan and analyzed for stormwater management purposes (see below). Water: Each home will have individual wells for water. The wells must meet minimum separations from septic system facilities. This will be addressed with well permits from the MN Dept. of Health. Sewage Treatment: The development uses a sophisticated sewage treatment system that includes both individual treatment and a community mound. Most treatment will occur within the multiple tank- and - treatment facilities on each lot. This allows for monitoring and maintenance of individual lots without interfering with the elements of the system used by all lots. It also minimizes the treatment that is needed in the common mound absorption field. • • • Moon Marsh page 8 There is a minimum amount of flow that must occur for the overall system to operate properly. We will need to require pumping of individual tanks if only one home is built at first. The details will need to be determined. Wetlands and Stormwater Management: The Rice Creek Watershed District (RCWD) has approved the delineation of the wetlands on the site and the mitigation plan. The wetland complex to the east of the site, which corresponds with Rick Creek, is DNR protected wetland 740W. Wetland #4 in the southeast corner of the Moon Marsh site is part of this complex. The proposal would fill 4200 sf of wetland along the roads and mitigate this with 4200 sf of new wetland and 4200 sf of public value credits in the form of infiltration basins. The design and implementation must comply with RCWD requirements. Two infiltration basins are proposed, one on the north side of the site along the road, one on the south side. These are being reviewed to determine if the soils and basin designs will function properly. The groundwater depth is relevant to this analysis. Drainage and utility easements will be established that cover and extend 10' beyond the wetlands, in accordance with City requirements. Conservation easement locations will correspond to these drainage and utility easements. F000dplain: The FEMA floodplain map shows much of the site within the 100 -year floodplain. The RCWD has determined the 100 -year elevation to be 887.5. Lowest floor elevations are at least two feet above this in accordance with City policy. There will be minor floodplain fill which will be addressed by excavating an area of equal volume to compensate (compensatory storage). Roads, Access, Traffic: The proposal extends the existing driveway on the south part of the site to become a private loop road with another access onto East Rondeau Lake Road. This private road serves all four lots. Because heavy vegetation can block sightlines, a certain area should be cleared where the loop accesses East Rondeau Lake Road. The right of way for the east 33 feet of East Rondeau Lake Road will be dedicated with the plat. The road is an easement now. This will be clarified with the title search that will be necessary for a final plat. The creation of three new residential lots will not create a traffic generation problem. Park Plan and Dedication: The parks plan shows Natural Resource Protection Areas corresponding to the locations of wetlands as revealed by the wetland delineation.. These are wetland areas that will be protected by existing wetland law or may be important plant communities. They will be covered by a conservation easement as well as a drainage and utility easement. • • • Moon Marsh page 9 The Natural Resource Conservation Areas are uplands with features that have high ecological value. These areas should be examined for the potential for protection. The rare plant survey found no rare species in the uplands on the site, and most of these areas have been disturbed by past use. Park dedication will be cash in the amount of $2075 for each of the three new lots, for a total of $6225. ENVIRONMENTAL BOARD ACTION The Environmental Board reviewed the project on June 27th. Their comments are attached. Overall, the Environmental Board was positive about the project. OPTIONS 1. Open public hearing, take comment, continue public hearing to August 8th. 2. Recommend approval of application. 3. Recommend denial of application. RECOMMENDATION Option 1: continue public hearing to allow for submittal of additional information. Outstanding issues include: • Function of infiltration basins relative to groundwater elevation. • Runoff rates and volume based on function of infiltration basins. • Low floor elevations relative to ground water elevation, and grading plan revisions. • Minimum flow for community sewage absorption system. • Location of house pads relative to easements and other features. • Other issues raised by engineering review. The following conditions of approval should apply when the project is approved: 1. The onsite sewage treatment system shall comply with all requirements of MN Rules 7080 and all other applicable laws. 2. A monitoring and maintenance plan for the community sewage treatment system must be prepared and submitted to the City before site work commences or prior to • Moon Marsh page 10 final plat approval, whichever comes first. In addition, there must be an arrangement for pumping the tank until the required minimal flow for the overall system is achieved. 3. The right of way for the east 33 feet of East Rondeau Lake Road shall be dedicated with the plat. 4. Park dedication shall be paid in accordance with City policy in effect at the time of preliminary plat approval by the City Council. 5. A permit shall be obtained from the Rice Creek Watershed District prior to site work and the project must comply with all permit conditions. 6. A conservation easement covering Outlots C, D, and E shall be dedicated to the City. The conservation easement shall provide for the possibility of future ecological restoration work, to be determined by future agreement between property owners and the City. Specifics conditions of the easement shall be listed in an easement document and reviewed prior to approval of the final plat. 7. Homeowners' association documents shall be submitted for City review prior to final plat approval. The declaration of covenants, restrictions, easements, or other documents must provide for the common ownership, protection, and maintenance of the outlots, private road, community septic system, and other elements necessary to the health, safety, and welfare of the general public and the residents of the project. Homeowners' association documents must include recognition of the conservation easement. 8. possible other conditions... This review is based on the following submittals, received January 16, 2007: 1. Preliminary Plat, 6/04/07, rec'd June 8, 2007 2. Existing Conditions, 6/1/07, rec'd June 8, 2007 3. Street Plan and Profile, 6/1/07, rec'd June 8, 2007 4. Street Cross Sections, 6/1/07, rec'd June 8, 2007 5. Storm Water Pollution Prevention Notes, 6/1/07, rec'd June 8, 2007 6. Notes and Details, 6/1/07, rec'd June 8, 2007 7. Archaeological Survey Report, November 21, 2006, rec'd January 18, 2007 8. Rare Plant Survey Results Letter From Critical Connections Ecological Services, June 28, 2007 • • • ti N CD co to co N O O O O Preliminary Plat LOTS /UNITS as of 6/21/07 O N L) CI) N T- T- CD tf) O r CY) (NJ LC) N- N T- T- T- N O T- N co r) N co T- LC) T- N O N N I� CO co Ni r) M N CV Or N LX) T- 0 O r- N 00 T- CO N CO r- tf) T- 0 CD T- O CD to 0 0 47 r- d' N N tc) O to = 0 0 r C7 N N N T- = In CO O T- O 249 r- O CD 10 O T- r) 152 N O T- T- •cr N O T- N CO r OJ T- 10 T- N O N 72 Stoneybrook C . 13 Q 0 N Century Farms North Keefe: prel plat, not final plat Morton (minor subdiv) • O O 1 N > IQ Haley Manor (10 new lots) Crystal Cove Millers Crossroads Lakeview Estates (2 new) 1 Snell (minor subdivision) Pheasant Hills Pres. 13th Justin's Preserve Marshan Estates Rice Creek Church duplex Rice Church: Oakwood View Junes Addn Highland Meadows East 2nd Marshan Townhomes 2nd Pheasant Hills 12th island West Shadow Ponds 2nd Add Vaughan Addition Angie's Acres (1 new) Marshan Lakeview (2 new) Marshan Meadows Pine Glen • • c*) T c�) T C) r ti r t0 ti 115 T th ti 0 a) 0) N W CO LL O n) a) c6 W X 0 0 u) -o 0 Moon Marsh R O tD 0) L. O Tti o rn C N C O 4— M- O O m O) C C • C C CD 4) U) O N • • • Memorandum DATE: July 5, 2007 TO: Jeff Smyser FROM: James E. Studenski, City Engineer RE: Moon Marsh _Ts c Attached please find a TKDA Review dated July 3, 2007, of the submitted documents for the Moon Marsh Project. Please note that incomplete items exist that must be addressed prior to preliminary plat approval. Contact me with any questions, thank you. 600 Town Center Parkway, Lino Lakes, Minnesota 55014-1182 Phone: 651 -982 -2400 • Fax: 651- 982 -2499 •TKDA • ENGINEERS • ARCHITECTS • PLANNERS MEMORANDUM 444 Cedar Street Suite 1500 Saint Paul, MN 55101 -2140 (651) 292 -4400 (651) 292 -0063 Fax www.tkda.com To: James E. Studenski, P.E. Reference: Moon Marsh Copies To: CUP Site Review City of Lino Lakes, Minnesota From: Thomas D. Prew, P.E. Proj. No.: 13810.002 Date: July 3, 2007 Routing: The following review is based on these submittals: 1. Moon Marsh Preliminary Grading, Drainage, and Erosion Control Plans submitted by Hult & Associates, Inc., dated June 1, 2007. 2. Moon Marsh Preliminary Plat, prepared by Hult & Associates, Inc., dated June 4, 2007, received by the City of Lino Lakes June 8, 2007. 3. Letter from Interstate Geotechnical Engineering dated May 24, 2007, received by the City of Lino Lakes June 8, 2007. 4. Letter and product literature for a Multi-Flow waste water treatment system, from S -P Testing Inc. dated March 9, 2007 received by the City of Lino Lakes on June 8, 2007. Incomplete Items: 1. A complete septic system design is required to be submitted for review. We have an unsigned percolation report, but not a site design. 2. An existing conditions plan is required to be submitted for review. 3. A letter report was included but not the soil boring logs. 4. See attached drainage review dated July 3, 2007. Additional Comments: 1. Please note this is a private project City engineering standards are not being met (20 foot gravel road and community septic system for lots less than 10 acres); therefore the city will not take ownership of the improvements made to this project Items to be addressed prior to final approval: 1. A field review of the site distances at the two intersections will be needed to confirm tree clearing and any advanced warning signs that might be necessary. I 2. The additional treatment shown for the septic system may or may not be required for this system. We will not know until a full site evaluation is submitted. If the additional treatment is required, the system would be a "performance" type system. Because the City has not specifically adopted the performance section of Minnesota Rules 7080, they are not permitted. An Employee Owned Company Promoting Affirmative Action and Equal Opportunity Moon Marsh Page 2 7/5/2007 CUP Review • City of Lino Lakes, Minnesota 3. The road should be paved for a distance of 50 feet from Rondeau Lake Road. Drainage Review: 1. See attached drainage review dated July 3, 2007. • TKDA • ENGINEERS • ARCHITECTS • PLANNERS MEMORANDUM To: Thomas D. Prew, P.E. Reference: Moon Marsh 444 Cedar Street Suite 1500 Saint Paul, MN 55101 -2140 (651) 292-4400 (651) 292-0083 Fax www.tkda.com Copies To: James E. Studenski, P.E. Drainage Review City of Lino Lakes, Minnesota From: Connie J. Tail Ion, P.E. Proj. No.: 13810.002 Date: July 3, 2007 Routing: The following drainage review is based on these submittals: 1. Moon Marsh Preliminary Grading, Drainage, and Erosion Control Plans, and Storm Water Pollution Prevention Plan submitted by Hult & Associates, Inc., dated October 4, 2006. 2. Moon Marsh Drainage Report submitted by Hult & Associates, Inc., dated January 2007. New comments are in bold and identify items that need to be addressed. The following are significant issues that must be addressed prior to preliminary plat approval: 1. Submit a geotechnical report summarizing the seasonal high water mark which is identified as the mottled soils or highest anticipated waxer table. The lowest floor elevation is required to be 4 feet above the seasonal high waxer mark. It appears from the percolation report that mottled soils have been encountered in the test area between 12" to 20" below the ground surface. 06/19/07 The Geotechnical Report indicates that groundwater was found in the vicinity of 886± to 888.5 ±. The report goes on to state that `it is unlikely that this investigation has found groundwater at its highest leveL Most likely, maximum groundwater on the site is equivalent to the ordinary high water level (not short term flood level) of the vicinity wetland'. A seasonal high water mark has not been identified in the report and will need to be submitted. Based on the groundwater levels determined in the Geotechnical Report, Lots 1 and 2, Block 1, does not meet the City's minimum low floor requirement as stated in comment 1 above. 2. The filtration areas may not be feasible due to the presence of mottled soils near the surface which indicates high ground water levels. Groundwater could affect the efficiency of these systems. 3. Submit existing and proposed watershed maps and label each subwatershed so that the map corresponds with the HydroCAD model. 06/19/07 This item has been addressed. 4. Identify the location and elevation of the outlet and emergency overflow for all wetlands. Low openings are required to be a minimum of 1 foot above the emergency overflow elevation. 06/19/07 It appears that the emergency overflow for wetland No. 1, at the north end of the site, is located at the low point of the proposed road at station 19+00. The new overflow created by the construction of the road appears to be at a higher elevation than the overflow elevation for this wetland under existing conditions. Identify the overland emergency overflow Moon March Drainage Calculations Review II City of Lino Lakes, Minnesota 1 July 3, 2007 elevation for wetland No. 1 located at the north end of the site on the Plan and ensure that the low opening of the existing home located north of the site is a minimum of 1 foot above the new emergency overflow elevation. Label the emergency overflow elevation for wetland No. 3 and wetland No. 4 on the Grading Plan. 5. Supply design computations for the proposed culverts connecting the wetlands at the north and south end of the site. Show that the proposed high water levels of the existing wetlands are equal to existing high water levels. 06/19/17 This item has been addressed. See below for additional comments regarding the model. Additional Comments (06/19/07) 6. The sum of the total wetland area defined in ponds 1013 and 12P of the model should equal the wetland area of the existing wetland defined in pond 11P. For example, the area of the wetland at elevation 888 under existing conditions in pond 11P is 10.1 acres; however, the sum of the area at elevation 888 under proposed conditions for ponds 10P and 11P is 17 acres. 7. The filtration basin 2P and 4P outlet device routing is not consistent with the outlet structure detail on Sheet 7. The 12 inch horizontal orifice/grate should be routed through a 12 inch diameter outlet, not the 4 inch diameter pipe as currently modeled. In addition, the 4 inch outlet should be a 6 inch outlet at a 0.0% slope, with the length as labeled on the Grading Plan and outlet structure detail. Update for consistency. Runoff rates will be checked when the revised model is submitted for review. 8. Identify the HWL and location and elevation of the emergency overflow for all culverts on the Plan. Low floors are required to be 2 feet above the 100 -year elevation of all culverts. The following are minor plan, calculations, and drafting corrections that must be addressed prior to final approval: 1. The low opening of Lot 1, Block 3 is required to be 1 foot above the emergency overflow of filtration basin 2. 06/19/07 This item has been addressed. 2. A 10 foot buffer of undisturbed vegetation is required from the delineated edge of the existing wetlands. Show the wetland bnfFer on the Plans. If grading occurs within the buffer, the area shall be restored with native vegetation. 06/19/07 This item has been addressed. e3. Include notes on the grading plan incorporating the following: 1.) complete impervious area construction and stabilize pervious areas prior to introduction of stormwater into the filtration practices, and 2.) final grading of the filtration areas should be completed using light tracked equipment to avoid compaction of the basin floor. 13810.002 Moon March Drainage Calculations Review City of Lino Lakes, Minnesota 06/19/07 This item has been addressed. July 3, 2007 4. To provide a well aerated, highly porous surface, the soils of the filtration basin floor should be loosened to a depth of at least 12 inches prior to planting. 06/19/07 This item has been addressed. 5. It is highly recommended that mature plants be used over seed in the filtration basins. Fluctuating water levels cause seed to float and be transported downstream of the filtration basins. In addition, it may take up to two growing seasons to establish the function and aesthetic value of mature vegetation using seeds. 6. Label the normal water level and high water level of the existing wetlands on the Plan. 06/19/07 This item has been addressed. 7. Label the inverts and size of the existing culvert located under the existing gravel driveway. 06/19/07 This item has been addressed. • a. • Submit a copy of the NPDES permit for the City's records when available. 9. Approval from Rice Creek Watershed District (RCWD) is required. Submit a copy of the RCWD Permit when available. Additional Comments (06/19/07) 10. Use the existing culvert length and invert elevations for the outlet of wetland No. 1 in the existing conditions model 11. Clarify why the watershed area flowing to the east under proposed conditions (subcatchment 6S) has a longer time of concentration than under existing conditions ( subcatchment 7S). 12. Provide a berm north of the low point of the ditch located on the north side of the proposed road at station 6 +50 that will fully contain the 100 -year storm event. Label the elevation of the top of berm on the Grading Plan. 13. Show the location of soil borings 5 - 7, and label all soil boring numbers on the Grading Plan. 14. Clarify how the off -site watershed boundary to the north was determined. 15. Label the Rice Creek floodplain elevation of 887.5 on the Grading Plan. 13810.002 • Environmental Memo To: Jeff Smyser From: Marty Asieson Date: June 28, 2007 Re: Environmental Board Recommendations of the June 27, 2007 Environmental Board Meeting The Environmental Board made the following recommendations conceming the Moon Marsh application at the June 27, 2007 Environmental Board Meeting: 1. This development , although not called a "conservation development', should employ the guidelines of the AUAR. 2. A conservation easement containing no-mow , dumping, cutting, building in, or filling in , and naming the City as the easement holder with the right to perform restoration work in the easement. This easement should be written from the wetland edge and cover as much as possible of the area shown in Attachment 10. Signs should be posted on the easement line , describing the easement , every 50 feet 3. SMA's within the AUAR and therefore in Moon Marsh must have: • No more than 20% of their surface as permanent open water, the remaining surface area of each SMA shall contain mesic prairie or wet prairie communities to maximize the infiltration and water quality treatment capacities of the system • Design high water levels (100 -year) less than or equal to 2.5 feet above the normal water level or lowest outlet invert • Side slopes that are less than or equal to 6:1. horizontal to vertical and 10:1 safety bench at the normal water level per RCWD requirements. • Post development runoff release volumes should be no less than 80% and no greater than 150% of existing conditions runoff volumes. These standards must be verified by our City Engineer 4. RCWD CAPROC Items are addressed including and particularity: Geotechnical soil borings at proposed BMP location in order to determine depth to the water table. This is important in that the designer is calling these infiltration ponds. Infiltration ponds designed into the groundwater are not infiltrating anything other than possible contaminants to the ground water. Adequate separation (3 ") must be shown between the pond bottom and the ordinary high ground water. A number of Wetland, Erosion and sediment control, Administrative, findings and stipulations as outlined in the CAPROC Attachment • Page 1 • • 5. there is enough indication that there could be rare plants on part of the property, and the property should be surveyed to verify the presence or absence of rare plants. The area on the Wessel property that would be of concern is indicated on Attachment 10. 6. Suggest placing the buffer of the westem most wetland in Conservation easement since this forms part of the City Greenway system (Attachment 11). New wetlands constructed on the site as well as buffer areas should be planted with the City native seed mix. 7. Rain gardens proposed on the site should be designed with a low maintenance (unless there is agreement with new homeowners to manage something different) Maplewood - type of design. Design of these gardens should be submitted to the city as well as a perpetual maintenance plan. All designed ponds and infiltration features must have at least 3 -feet of sand separation between the ordinary high ground water level and the bottom of the structures. 8. Community drainfield should be approved by Anoka County Environmental 9. It is recommended that a temporary sediment pond be constructed to capture surface water runoff during construction. All proposed infiltration, wetland and rain- garden soils must be protected during construction. Suggest construction of new surface water features after major construction is complete. Features should be constructed with low impact/compaction, track -types of equipment and fenced off prior to construction. All soils determined to be more compact after construction than prior to construction in drainage/ surface water infiltration or management area will be loosed to pre - construction conditions. It is also recommended that all new yard soils have top -soil incorporated into the subsoil and tilled as deeply as possible. No soil may be imported or exported with out City approval. 10. . Recommended changes to the SWPPP are submitted to the City Engineer to make changes to the documents submitted. Changes should include City native seed mix in all final grade stabilization, and installed by a DNR listed contractor. • • COMPREHENSIVE PLAN PROPOSED LAND USE, (detail) • • • ZONING MAP (detail) • • I I: la, - • - • COMPREHENSIVE PLAN PROPOSED LAND USE, AUAR BORDER, AND FUTURE ROADS (detail of AUAR Figure 6 -2: Scenario 1) MOON MARSH SITE AUAR STUDY AREA • • EAST RQk DEAUfLAKE ROAD CITY OF LINO LAKES Ci • • PESCRIPT/ON OF EXISTING PROPERTY: That part of the Northwest Duarter of the Northwest Duarter, Section 2, Township 31 North, Ronge 22 West, Anoka County, Minnesota. lying South of the North 550 feet thereof and lying easterly of the center line of East Rondeau Loke Drive as descrbed on a Warranty Deed recorded in Book 555 of Deeds, poge 395. Subject to East Rondeou Lake Drive along the west line. Subject to and together with arty other valid easements, restrictions and reservations. AND That port of the North 550 feet of the Northwest Ouorter of the Northwest Ouorter, Section 2, Township 31 North, Range 22 West, Anoka County, ►tmnesota, lying easterly of the center Fine of East Rondeau Loke Drive as described on a Warranty Deed recorded in nook -555 of Deeds: page 395. Subject to East Rondeou Loke Drive along the west lime. Subject to and together with any other valid easements, restrictions and reservations AND The South 32D feet of the North 955 feet of the West 8D feet of the Northeast Duarter of the Northwest Ouorter of Section 2, Township 31 North, Range 22 West, Anoko County, Minnesota together with all hereditaments and appurtenances belonging thereto. OWNER/DEVELOPER BRIAN WESSEL 6300 EAST RONDEAU LAKE DRIVE HUGO, MINNESOTA 55038 TOTAL ACRES: 2528 t AGFes NUMBER OF LOTS 4 NUMBER OF OUTLOTS: 5 2,1 DD t (-tt I OF ROAD SURVEYOR, ENGINEER & WETLAND SPECIALIST: HULT & ASSOCIATES, INCJMFRA --- - - - - - -- __ _.._ _-- P.O. BOX 37 FOREST LAKE, MINNESOTA 55025 651-464 -3130 VERTICAL DATUM: NGVD -1829 ZONING: EXISTING: RURAL PROPOSED: Rural Residential Planned Unit Devebprnent MINIMUM BUILDING SETBACKS: FRONT: 25 I-tt SIDE 15 rtt V1E TLAND: 16.5 •-tt 1 AREA TABLE LOT DESIGNATION OVERALL AREA: WETLAND AREA-. UPLAND AREA LOT 1 BLOCK 1 114.500 S.F. 12.53 AC.) 21,000 SF. (0.4B ACJ 93,500 SF. (2.15 AC.) LOT 1. BLOCK 2 57,000 SF. 12.00 AC.) 49,100 S.F. 11.13 AC.) 37.90D S.F. (0.57 AC.) LOT 2. BLOCK 2 57.000 S.F. (2.00 AC.) 53.800 SS. J1.24 AC.) 33.200 SF. (0.76 AC.) LOT 1. BLOCK 3 87.000 S.F. (2.00 ACJ 39,100 S.F. (0.90 AC.) 47.900 S.F. (1.10 AC.) OUTLOT A 45.100 S.F. (1.03 AC.) 0 S.F: 10.00 AC.) 45.100 S.F. 11.03 AC.) OUTLET B 121.100 S.F. (2.7B AC.) 13.900 SF. 10.32 ACJ 107.200 S.F. (2.46 AC.) OUTLET C 91,500 S.F. (2.10 ACJ 56.900 S.F. (1.31 AC.) 34.600 55. (0.79 AC.) DUTLOT D 280.300 S.F. 16.43 AC.) 270.100 (6.20 ACJ 10.200 (0.23. AC.) OUTLET E 142.000 S.F. 13.26 ACJ 109.800 S.F. (2_52 AC.) 3220D SF. (0.74 AC.) E. RONDEAU LK. DR R.D.W. 45.900 S.F. (1.05 AC.) 3.BD0 S.F. (0.09 AC.) 42.10D S.F. (0.96 AC.) TDTAL 1,101.400 SF. 125.28 AC.)_ 617.500 S.F. 114.18 AC.1. 483.900 S.F. (11.10 AC.) P" OF P � MOON MARSH AT LINO LAKES 52t -s PART OF THE NWU4, SEC. 2, T3IN., R22W., ANOKA CO., MN. S8r45'17 -S 912.46 NORTH L Nw1 /4- NIt7 /4 1 I€ SECTION 2,T.31N_R.221r. 975* P.C. Bas 37 Forest L. I.1 55025 Phone S51.464.3130 Fan b'51.464.46Z2 E -mot tedlenba.com 6491 r • AC. �` '.�.. �. %.i.J_l,✓.J� ' 'jsi.iJ OUTLOT C '- 1, 1��,w�t?u r �( '" r Y i it 1 (COVERED BY DRAINAGE try \ • / p /w �._ } '7' AND UTILITY EASEMENT) _ �r y ;2 ` J r1 - r ▪ 4991 W'ETLA'ND F3 1 1 (D9 AG) AL 1 1-1 vvo ^ \saa f :::.:C"', - \1 ' HULT 6 HULT & ASSOCIATES, INC. Surveyors, Engineers & Wetland Specialists 1 hereby certify that ads annex plan er report was prepared by me re under my eked arpervhien and that I am a drily Limrsed Lad Sa eyor under the b.s of the Slete of ICemesnla. DATE 06/D4/2007 AiS003A1E5. IC. by DALE F. FffREISER, Minnesota Licensed Lard Sw,reyer DALE F. NEBE SON Wm. Lc Na. 13590 z N OP o H 0 / ep:eL / SW-45T / rR. /4 44" Esse- / i OUTLOT E (CDVERED BY DRAINAGE! AND UTILITY EASEMENT) WEILAND pi ,132.300 F.) (3A AC) A. SOUTH UNE NW1 /4- Nwt /4-. SECTION 2, T.31N_,R.22R N89'41'10'W� - -T - --FdAID SP'RLr 490.54 952* N ( EAST ONE 14111 /4- Nw1 /4, - - SE27I0 Z,I.31N..R.2211. 100 GRAPHIC SCALE D 100 1 NCH = 100 FEET 200 DRAINAGE AND UTILITY EASEMENTS SHOWN THUS: 5 �I II J JLS L f 1 BEING 10 Fit I IN WIDTH AND ADJOINING STREET LINES, REAR LOT LINES AND PLAT BOUNDARY LINES, AND 5 FEET IN WIDTH AND ADJOINING SIDE LOT LINES, UNI FRS OTHERWISE INDICATED, AS SHOWN ON THE PLAT. LEGEND • DENOTES IRON PPE MONUMENT FOUND DENOTES APPROXIMATE 186E UNE � r PER AERIAL PHOTO '-11 DENOTES REMAND AREA DELNEAIED `.y, 1 87 NU1_7 k ASSOCIATES, INC. DENOTES PROPOSED 50 FT X10) FT NOOSE/ CARAIX LOCATION VICINITY MAP SEC. 2 T.31N., R.22W. ANOKA COUNTY, MINNESOTA RECEIVED JUN 0 8 2007 CITY OF LINO LAKES RONDEAU LAKE STREET, GRADING, DRAINAGE AND EROSION CONTROL PLANS for Moon Marsh at Lino Lakes Lino Lakes, Minnesota VICINITY MAP i:RAPt1C SCALE ,rsH.TODDF NORTH BOTH STREET EAST Index of Sheets 1 Title, Location, and Index 2 Existing Conditions 3 Street Plan and Profile 0 +00 to 12 +00 4 Street Plan and Profile 12 +00 to 20 +84 5 Street Cross Sections 6 Storm Water Pollution Prevention Notes 7 Notes and Details I hereby certify that this plan _eat tam by me or under my meet separation and tusk am l' emay Csesoed P tale .ond En.rea under the foes of the State a iinnaota. Smnolrre Notre MAIL DOI.EZAL Dsaned 1RK Dream 1RK Date 10/4/06 HULT & ASSOCIATES, INC. PO Box 37 Forest Late, MN 55025 ph: (651) 464.313E fa= (651) 464-4822 emelt: huIt,udra.com Brian Wessel Line Lakes., MR Prineet Moon Marsh at Lino Lakes Lindaims.AS Sheaf Me Notes and details Sheet HILT NILE Et: D4229 RECEII JUN 08 C'ITY OF UNC ;.••• ; jt X -; -t. F 1.33 _ PI \ 1 , ", , r. ., .--,. .t.- :- . .,.i _. 6.-,.•,,P . : , . , " 6.,.,, -, 0• 6. „.. . . 1 ,. ▪ . - 1. •I-s ._ - ..„.,. 4 7A s .: 1.. P . 2- -.• ' .\ . . . ... . ., . ".- ., ...1 .„•.,1 ..-, .P ... , —', '....1... .1 .,, „., ; _ .,• ,. „_ . DEAU LAKE DR EAST RON r — ii3 14j--__ . / — L - ...e•-, ,. • :. ,. - -- .: _„.-..:., \ . .- -■ , •- .•■t ...i . ..:. .„ .„ •."•-. - 4 ,P 4, 1.—. .4/ . ` , .; 4, .•. . • ■ .. / t... .,' .i - ( 1 0:A c) 1 . a ' -, - .--.., ,_...., . -, — ..,. •••• P ,-- P. P •--- .; ▪ . f „• . P ., _. ..: .. .., r .. 10 . . • . 1 .,'. ' , . 1 . • ,- . , - .. . - i , " :): , ..• •-.7-= .Ph-) 1 . .1 ,... T ,...1 - , , 7. .-. 2- .. 4 .. . , ! • . .• • . . . J O t s -`• . 7 e- . ,1 & \ •F , .._ • i _ ,, -„i,, _ ...,_ ._.- ,- ---5- 9..7. : -” - --- .„- .? .?- . : - " r ._ - : .. 1 J .• _.. • , . -"..-"5 .....:.--4 ....--;,.."...) .'.”. ): ? I'.- ... .! ) ..• , ) ... , :, •- - • - ---..8._.., t ,.. ; , - t..; . . 7i :1P r' 1 l , - r` '.4.0-**'7**?."./ .. -}P - 7 •-' . - 1.' (; "/ -- 1 - .,../ 1 ...-. --5( - _ ,1f' . P .X ..y-_,• I. , / Ij :7• ? f,.t. .:.t .„.:.,..s r: - ., -.-.,r. ;E E 0i T, i-0- .- N. P \ , ' t , " -. i , : I P ■ ■ / WETLAND -- (132,300 l.) . (3.0 A) , .. I:r j / •. ,; . .i.(-..., .v --1 1• 3•:-•-Ci N - •?••0. . O •/ -: 1 1 • I ▪ , ) 7 :; . • -I 7 1- ,: - - , , rm_ (09 A0) .Y 2 . ., .- . • .. ' ) . ,- ^ - r , 2 \ -cr r 1'.-11.-1.-, .._ fl:i• ,-‘- 1 - / PrrY 1 ''kl r-, I .-, , • ,..... •-•-/-1 ■• , z ,, '-," .--r--•,•-• - ' •--.^(--". ' 7 '' , ' - 1' y---7,.:■ v ---894_ ,- ...„ ...,) -,,.. LEGEND 888- EXISTING CONTOUR WETLAND DELINEATION AL WETLAND A._ WETLAND HATCH 25 50 IDO SCALE IN Revision: Na Date Br Remarks I hereby eeriffy WI this Or was snowed by se cr w my Srecl smereeksi one that I om buty Uteeosee Protesiond EJVilear under the' of the Stott of Ifirmesota Sionature Nome MA DCLUAL Bole VI /rir Lieerse £2004 Desired upp Drown 1/FD Dole 2/16/07 Checked Aoormed EILIT ASSOCIATES, INC. PO Esor 37 Forest Lake, MN ggrrA pit: RBI) 4:4-3s3: fez 51) 44-4 malt: hultemtre_oom Viethend Stse=zresft Chet Brian Wessel Projed MOOR Marsh at Lino Lakes Lim Lake: MII Sheet Mit Existing Conditions 2 / / 7 HILT HLE D4M 900 890 880 0 25 50 S ALE 100 IN CLEAR CUT TREES AND BRUSH FOR SIGH J 200 }- ±_ r, 52 LS. 16' RCP i - -INY. N. 884.34 INV. S 884.12 BBB Al 1 Li Q CURVE ,..' c RADIUS 25D-Fl In - r/ --P i /-.i rn �1 0 AFT ti112 raCJ `3:1- J 6 6 6J / 1 /! • • AB • • Jam_ / �_� / . \ n.:- 7001 SF_ WETLAND - IMPACTS LEGEND EXISTING CONTOUR WETLAND DELINEATION WETLAND TREELINE CLEAR CUT TREES/BRUSH 10' WETLAND BUFFER RIP RAP STORM SEWER SILT FENCE D 2.00k 44 LF- 1r RCP r1V. PL 887.70 - INY. 5. 687.50 10' VIETLAND BUFFER-- - (TV) n + EXISTING CUP DRIVEWAY CULVERT - . .,ri TO SE REMOVED �" :4.-74,TC : 4k • SILT FENCE - __GAS 4•_ _.� _ .� / / 0) CO / / W 1 20D LF. 6 DRAW TILE O 686.0 1 / 2D LF. 12' J EOF / HOPE • 0.5>; (RIR - FLS. B85.9D 1 ; • .9 �t°qc `s". Q FILTRATION BASIN 4P AREA= MOD SF. (PVC CREDITS) BOTTOM 66750, NNL -DRY 100 -YEAR NVIL =858.8 TOP BERM=B89.D TCH BASIN -I M BB9.00 /NV. 866.00 �w4 4� ¢ ti e9GTrGr�' `•y l (3'30 O 4./!r. 685 rJ O 0 ID 0 n m e_ a ONG J la or -G9 3 11• ce\ 5 • • • / Se/ N NOTE: 1. COMPLETE JMPER IE 15 AREA CONSTRUCTION AND STABILIZE PERVIOUS AREAS PRIOR TO INTRODUCTION OF STORMWATER INTO THE FILTRATION PRACTICES_ 2. FINAL GRADING OF THE FILTRATION AREAS SHOULD BE COMPLETED USING LIGHT TRACKED EOLRPTMENT TO AVOID COMPACTION OF THE BASIN FLOO- 0 + N 0 0 eV m 0 W W 900 890 880 O 0 00 ^,n 0 • O CO ▪ CD m m ro m 0 Lao 00 CO. en rD m co • m m O ret 0 m x, O of 0 m OCD 0+00 0+ 50 1 +D0 1 +50 2+00 2 +5D TIE LOCATCNS OF E STB= UNDERGROUND MITES ARE SHORN N AN ARPIN/BRA E NAY ONLY. THE ExGVA1NG CONTRACTOR 47ALL D``TE RE 1HLEXA'T =MR A110N of ALL ExST00 wants BEFORE NOTES: C 0M1m10NC ROM 1E AGREES TOW FULLY RMPONSIBLE FOR ANY AND ALL DAMAGES Ti110N MIGHT PE O¢Jt9O ED BY NES FArui E 1D ExACTLY LOCA1E AND PRISERVE ANY Alm ALL Uttffi ORDLMO moms. 3+00 3+50 1. ALL MOPE STALL £ DUAL RAU_ 2 PIPE LENGTHS NnuME FLARED END SECTIONS 4+00 4+50 5+00 5+50 6+00 6+50 7 +00 7+ 5D 5+00 5+50 9+ CID 9+50 10+00 10+50 Gm 11 50 12 +00 RECEIVED JUN 0 8 2)07 CITY OF LINO LAKES Revisions Ns_ Dote By Ramona ? ,11/117 KIS FER Orr CZINENTS PER Ow =RENTS I hereby corbiy that this pipe wLS prepaed by me a under my trod s .and tirot I as o 6dy lammed Frok=101d EnQoio under We bows of the State of IWmoolo. SommVure Nome ILARC DOLEZAL Into 2/16/07 License ! «c Deeiwa6 IRK Dro.o 118 Dote I0 /4/06 Checked Almrrne6 HL:LT & ASSOCIA'IES, INC. R.n+enare [_.nrwnrws PO Box 37 Forest Lake, MN 55025 ph: (551) 454 -313D tax; 1651) 454-0822 SInaiL hulterrrfra-eom ▪ Ihrofirenkt Cheat Brian Wessel Moon Marsh at Lino Lakes Lk Lakes, NON Sheol Idle Street Plan and Profile 0 +00 to 12 +00 Sheet HILT FILE Na.: 14. 211 r ..,.J — - - �♦ �(. I ') ♦a ,I�I. !' d�l, t .I�I. ♦9` _) WETLAND #1 Ail. ' !:J • (56,628 S_F.) a ♦�' �' (1.3 AC.) i4 �Yr, Alt •! 892 BBB H84 892 883 884 • 892 BBB 884 5+00 -2D 0 4+00 20 392 BBB 884 896 822 BBB 822 sae 8164 11+00 17+00 -20 20 10+00 -20 892 892 BBB CD 0 -20 3+00 20 892 384 892 BBB B54 • -20 2+00 2D -2D .0 at on 0.0 'co 1+00 20 884 832 BBB 884 884 888 584 892 588 884 1392 BBB 3134 2D 9+00 -20 8+00 20 .0 0 ,O2 ci ID 0 -20 0 20 7+00 892 892 -2D 0 20 888 884 -20 0 20 6+00 BEM Zii7 (7 884 .0 0,0 ed .6 00 -2D 0 20 825 892 888 892 BBB 884 592 BBB 584 392 BBB 884 892 BBB 884 842 EIBB BM 892 BBB 884 852 • CC. 0.0 m 0 - 20 0 20 16+00 888 884 .0 m ai .6 m -20 0 15+00 20 892 BM 392 835 884 896 892 888 896 822 BBB - 20 14+00 2D -20 0 20 13+00 .0 m • -20 0 20 12+00 .0 . 0 40 0 0 02 -20 0 20 892 888 884 892 B88 884 892 888 1184 H92 888 884 H96 892 BBB 896 892 888 892 888 884 822 885 584 892 584 20+00 .0 71 .0 ai 02 02 -20 0 19+00 20 .0 ad on • .M to co 0 'ID - 2D O 20 18+00 0 O ea n: 1:192 BBB 884 H92 BBB 884 892 BBB - 20 0 REC.EIV ED JUN 0 8 2007 CITY OF LJNO _AKES FIE:visions tea Date By Ramarict T 2 16/1/07 iPD PER Cm' CamENIS KIS KR Orr COsEeffS 1 hairy certily Mat bus Man was prepared by me cr weer my eked supervision o Mat 1 ma o duly "Lsettied Profeasime Engineer ur6 . the foes al be Stale of lionesota. Striatum None Dote 5/1/02 MARC DOLUAL Li=ense 1 42ErD4 Dmianed Maw Doke 10/4/19 Clices1 karma' HULT & .A_SSOCIATES, PO Boo 37 Forest Lake, IAN 55025 ph: (551) 4544130 tar (551) 464-4622 emalt: hultemfre-com Cheat Brian Wessel Pro* Moon Marsh at Lino Lakes Lint Laker., MR ShaK Tdit Street Grass Sections Shad HILT FILE E.: 04221 • • STORM WATER POLLUTION PREVENTION NOTES NOTE THE FOi1DVANG MINNESOTA POLLUTION CONTROL AGENCY (MPG) REQUIREMENTS ARE INTEGRAL TO THE APPUCATON FOR GENERAL STORM WATER PERMIT FOR CONSTRUCTION ACTIVITY (MNR100001). THIS SWPPP MUST BE KEPT DN THE CONSTRUCTOR SITE AT ALL TIES ALONG WITH THE REQUIRED INSPECTOR REPORTS � VESSEL 6300 EAST RONDEAU LAKE DRIVE HUGO, MN 55036 Pit (E51) 26D -0448 DINNERS RESPDK98A_fTY 1. OVERSEE' THE IMPLEMENTATION OF THE SIMPPP. 2. OVERSEE THE INSTALLATION, INSPECTION AND MAINTENANCE OF EROSION PREVENTION AND SEDIMENT CONTROL BMP'S BEFORE AND DURING CONSTRUCTION. Sfig2Q RACTORS THE CONTRACTOR SHALL PROVIDE NAMES AND ADDRESSES OF ALL SUBCONTRACTORS WORKING ON THIS PROJECT WHO WILL BE INVOLVED 811H THE MAJOR CONSTRUCTION ACTIVITIES THAT DISTURB SOIL THAT INFORMAT10N MUST 85 KEPT WITH THIS SWPPP. 4: • •' r. 9.J110, i;i Mall w!r.Ji: w. : _ tll h 1. ALL EROSION CONTROL MEASURES MUST BE INSTALLED PRIOR TO COMMENCEMENT OF GRADING OPERATORS AND BE MAINTAINED UNTIL ALL DISTURBED AREAS ON THE 517E HAVE BEEN RESTORED. 2. CONSTRUCTOR ENTRANCES SHALL BE SURFACED W111 CRUSHED ROCK AND DESIGNATED PRIOR TD CONSTRUCTOR (REFER TO DETAIL). 3 SPECIAL ATTENTION SHALL BE PAID TD STORM WATER DISCHARGE POINTS. THESE LOCATORS SHALL BE MONITORED DURING REQUIRED INPSECTONS. E ANY SEDIMENT HAS BEEN DISCHARGED FROM THE STE. R SHALL BE REMOVED AND THE AREA SHALL BE RESTORED. TEMPORARY EROSION CONTROL DEVICES AT DISCHARGE POINTS SHALL REMAIN IN PLACE UNTIL FINAL STABILIZATION OF UPSTREAM AREAS HAS BEEN ACHIEVED. 4. ALL EXPOSED SOIL AREAS WITHIN 200 UNEAL FEET or SURFACE WATER MUST HAVE TEMPORARY PROTECTION OR PERMANENT COVER TYPE OF SLOPE TIE (MAX THE AN AREA CAN REMAIN OPEN WHEN AREA !S NOT ACTIVELY BEING WORKED) STEEPER THAN 3:1 7 DAYS 10:1 TD 3:1 14 DAYS FLATTER THAN 10:1 21 DAYS 5. PIPE OUTLETS MUST CONTAIN RIP RAP WITHIN 24 HOURS OF CONNECTOR TO A SURFACE WATER. 6. STOCKPILE AREAS TO BE ENCIRCLED WITH SST FENCE. 7. ALL SLOPES 3:1 DR STEEPER, NOT TO BE SODDED AND GREATER THAN B HtL I A HEIGHT SHALL. HAVE EROSION CONTROL FABRIC INSTALLED ON SLOPE PER MNDOT SPEC 3885. VERIFY REST:RATON METHOD AND SEEDING MIXTURE 6. TEMPORARY EROSION CONTROL 1D BE PLACED AROUND STORM SEWER STRUCTURES DURING CONSTRUCTOR (REFER TO DETAIL). Ti. SEDIMENT SHALL BE REMOVED FROM ALL SEDIMENT CONTROL DEVICES AS NECESSARY AND MUST BE REMOVED IF DESIGN CAPACITY HAS BEEN REDUCED BY 50X. 10. SEDIMENT TRACKED OFF -SITE, AS A RESULT OF CONSTRUCTOR TRAFFIC, SHALL BE MINIM AND SWEPT ON A DAILY BASIS 'It. ALL DISTURBED AREAS SHALL BE RESTORED WITH SOD, 5 ®, WOOD FIBER BLANKET, DR PAVED SURFACE WITHIN 14 DAYS OF ROUGH GRADING 12. A COMPLETED STORY WATER PERMIT SHALL BE POSTMARKED AT LEAST 7 DAYS PRIOR TD COMMENCEMENT OF GRADING AC-FINITES. 13. THE CONTRACTOR SHALL FILE MPCA NOTICE OF TERMINATION AT COMPLETION OF SUBSTANTIAL TURF ESTABLISHMENT. SEQUENCE OF CONSTRUCTOR 1. OBTAIN ALL NECESSARY PERMITS, INCLUDING NPDES GENERAL STORMWATER PERMIT. 2. INSTALL ALL PERIMETER SEDIMENT CONTROL DEVICES, TEMPORARY SEDIYENTATDN BASINS AND ROCK CONSTRUCTOR ENTRANCES. 1 CLEAR AND GRUB SITE 4. CONTACT QTY/TDWNSHIP INSPECTOR FOR APPROVAL OF ALL 5EDIMEN7 00818OL DEVICES 5. ROUGH GRADE 6. INSTALL TEMPORARY EROSION CONTROL DEVICES AS NECESSARY. 7. STABILE DENUDED AREAS AND STOCKPILES WATH114 14 DAYS OF LAST CONSTRUCTION ACTIVITY IN THAT AREA B. INSTALL 541E IMPROVEMENTS (LE UTUTE5, STREETS. ETC). 4. COMPLETE GRADING AND INSTALL PERMANENT SEEDINGS AND PLANTINGS 111 ONCE ALL DISTURBED AREAS HAVE BEEN STABILIZED OBTAIN APPROVAL OF CITY/TOWNSiIP INSPECTOR. It CONTRACTOR 10 REMOVE ALL TEMPORARY EROSION CONTROL DEVICES AFTER ACCEPTANCE BY THE CRY/ TOWNSHIP. PEWAIERING AND BASIN DRAINAGE PE811111 E MUST ENSURE CONSTRUCTOR ACTV1TES THAT INVLLVE DEWAIERING AND /OR BASIN DRAIMNG ARE ADEQUATELY PROTECTED FROM 5805408 AND SCOUR. THE DISCHARGE MUST BE D?SPERgD OVER RIP RAP, SANDBAGS, PLASTIC SHEETING. OR OTHER ACCEPTABLE DISSPA110N MEASURES DEWATERING DISCHARGE SHALL BE FREE OF TURBIDITY. ALLOWABLE NON -STORM DISC7HARG'5 ALL NON -STORM WATER DISCHARGES SHALL BE DIRECTED TO A SEDIMENT BASIN PRIOR TO 0150-1 ARM_ ALLOWABLE NON-STORM DISCHARGES INCLUDE 1. OSQIARGES FROM FIRE FIGHTING ACTIVITIES 2. F1RE HYDRANT FLUSHING 3. WATER USED 70 WASH VEHICLES OR CONTROL DUST 4. WATER FLOWING FROM POTABLE SOURCES AND WATER LINE FLASHING 5. IRRIGATION DRAINAGE 6. EXTERNAL BUILDING WASH DOWN WHICH DOES NOT INCLUDE DETERGENTS 7. RUNOFF FROM PAVEMENT WASH -DOWN WHERE SPILLS OR LEAKS OF TOXIC OR HAZARDOUS MATERIALS HAVE N01 OCCURED (LINRFV= ALL SPILLED MATERIAL HAS BEEN REMOVED) AND WHERE DETERGENTS HAVE NOT BEEN USED B. AIR CONDITIONING CONDENSATE 1L SPRINGS AND UNCONTAMINATED WATER 10 FOLNDAICN OR F00TN DRAINS WHERE FLOWS ARE NOT CONTAMINATED WITH PROCESS MATERIALS SUCH AS SOLVENTS 11. DEWATERING DR BASIN DRAINING ACTMTIES INSPECTIONS AND MAINTENANCE 1. THE PERMITTEE (OWNER OR OPERATOR) MUST INSPECT THE CONSTRUCTION SITE ONCE EVERY 7 DAYS DURING ACTIVE CONSTRUCTION AND WITHIN 24 ROMPS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN 24 HOURS 2. MSPECT10K5 AND MAINTENANCE TO BE RECORDED M WRITING POLLUTION PREVENTION MANAGEMENT 1. THE PERMITTE5 SHALL IMPLEMENT THE FOLLOWING PO1UT10N PREVENTION MANAGEMENT MEASURES ON THE SITE 2. SLID WASTE SEDIMENC, ASPHALT AND CONCRETE MILLINGS, FLQATNG DEBRIS, PAPER, PLASTIC, FABRIC, CONSTRUCTOR AND DEMOLITION OEHRl5 AND OTHER WASTES MUST BE DISPOSED OF PROPERLY AND RUST COMPLY WITH MPCA DISPOSAL REOUIREMENTS. 3. HAZARDOUS MATERIALS: DILL GASOLINE, PAINT, AND ANY HAZARDOUS SUBSTANCES RUST BE PROPERLY STORED, INQ.LIDING SECONDARY CONTAINMENT, TO PREVENT SPILLS. LEAKS OR OTHER DISCHARGE RESTRICTED ACCESS 70 STORAGE AREAS MUST BE PRCMOED TO PREVENT VANDAIJSI. STORAGE AND DL5P0SAL OF HAZARDOUS WAS1E MUST BE IN CDMPUANCE WITH MPCA REGULATORS 4. EXTERNAL WASHING OF TRUCKS AND OTHER CONSTRUCTION VE14CLE5 MUST BE mum 1D A DEFINED AREA OF THE 517E RUNOFF MUST BE CONTAINED AND WASTE PROPERLY DESPISED OF. NO ENCRE DEGREASING 15 ALLOYED ON SITE FINAL STABLL.LZAT0N THE PERRITTEE MUST ENSURE FINAL STABILIZATION OF THE SITE FINAL STABILIZATION 15 ACHEVED WHEN TEMPORARY EROSION PROTECTOR AND SILT FENCE FOR INDIVIDUAL LD15 HAS BEEN COMPLETED AND THE RESIDENCE HAS BEEN TRANSFERRED TO THE HOMEOWNER ONCE THE SITE REACHES FINAL S1A31L12ATON, THE CONTRACTOR, OR GENERAL CONTRACTOR MUST COMPLETE AND SUBMIT A 'NOTICE OF TERMINATION.' Revisions Ne. Dote By Rem/eft B./R/07 JEW PER t71r COIYEN75 511 AT Xis nF>< 017 =MEWS I hereby cerWy that this Few Los prepared by me or caner my bred slpe.ision and that I an e ckiy [seere0 Profes iond Ender under the foes of the Slate of Mrmesote. Serrature Nome MARC Dina& Dote 2/16/67 Licensed 420W Desfped 1RX Drown Tier; Dole 7DJ4/06 One eied APWaWd r HL1 T ASSOCIATES, INC. s6r.e,erts PD Box 37 Forest Lake, MN 55026 ph: (6651)454.3136 fa>_ (651) 464 -437.2 malt: huttlffdrasom Med Brian Wessel Prvietg MOOn Marsh at Lino Lakes UM Lakes. MN D 50 10D 2DD RECEIVED JUN 0 8 2007 CITY OF LINO LAKES 400 SCAB IN r I nee Tian Storm Water Pollution Prevention Notes Shed WILT FILE NE.: ALM SITE GRADNG NOTES A DE CONTRACTOR MUST CONTACT ALL THE APPROPRIATE UTILITY COMPANIES AT LEAST 48 HOURS BEFORE ANY EXCAVATOR TD REOUEST EXACT FELD LOCATION OF UTILITIES IT SHALL BE THE RESPOKSIBIL1TT DF THE CONTRACTOR TO RELOCATE ALL EXISTING UTIl.RIES WHICH CONFLICT WWTH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS THE LOCATORS OF SMALL UTILITIES SHALL BE OBTAINED BY THE CONTRACTOR BY CALLING GOPHER STATE ONE CALL (1 -B00- 252 - 1166)_ B. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE 70 ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASES OF TIE PROJECT. THE CONTRACTOR WILL BE HELD SOLELY RESPONSIBLE FOR ANY DAMAGES TO THE ADJACENT PROPERTffS OCCURRING DURING THE CONSTRUCTION PHACFc OF THIS PROJECT. G SAFETY NOTICE TO CONTRACTORS N ACCORDANCE MTh GENERALLY ACCEPTED CONSTRUCTION PRACTICES THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPDHSNLE FOR CONDITIONS ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK THIS REOU6EUENT WALL APPLY CONTINUOUSLY AND ND7 BE LIMITED TO NORMAL WORKING HOURS. THE DUTY OF THE ENGINEER OR THE DEVELOPER TO CONDUCT CONSTRUCTION REVIEW OF THE CONTRACTOR'S PERFORMANCE 5 NOT INTENDED TO INOI.UDE REVIEW OF THE ADEQUACY DF THE CONTRACTOR'S SAFETY MEASURES N. ON OR NEAR THE CONSTRUCTION ME D. SHE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND /OR ELEVATION OF EXISTING UTUIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND, WHERE POSSIBLE, MEASUREMENTS TAKEN N THE FELD. THE INFORMATION IS NOT TO BE RELIED ON AS BERG EXACT OR COMPLETE E PRIOR TD PLACEMENT OF THE AGGREGATE BASE, A TEST ROLL WILL BE REO URED ON THE STREET AND PARKING AREA SUBGRADE THE CONTRACTOR SHALL PROVIDED A LOADED TANDEM AXLE TRUCK WTI A GROSS WEIGHT OF 25 TONS Tiff TEST ROLLING SHALL BE AT THE DIRECTION OF THE SOILS ENGINEER AND SHALL BE COMPLETED IN AREAS AS DIRECTED BY THE SOILS ENGINEER THE SOILS ENGINEER SHALL DETERMINE WHICH SECTIONS DE THE STREET OR PARKING AREA ARE UNSTABLE CORRECTION OF THE SUBCRADE SOILS SHALL BE COMPLETED N ACCORDANCE WITH THE REQUIREMENTS OF THE SOILS ENGINEER F. THE CONTRACTOR SHALL COMPLETE THE SITE GRADING CONSTRUCTION 114 ACCORDANCE WITH THE REQUIREMENTS OF THE OWNER'S SOILS ENGINEER_ ALL SOIL TESTING SHALL BE COMPLETED BY THE OWNER'S SOILS ENGINEER THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIRED SOIL ItSIS AND INSPECTORS WITH THE SOILS ENGINEER G. THE TREES AND OTHER NATURAL VEGETATION WITHIN THE PROJECT AND /DR ADJACENT TO THE PROJECT ARE OF PRIME CONCERN TO 1HE CONTRACTOR'S OPERATORS HE WILL BE REQUIRED TO PROTECT THE TRS5 WHICH ARE TD BE SAVED TO BE SURE 11147 EQUIPMENT 15 NOT NEEDLESSLY OPERATED UNDER NEARBY TREES AND SHALL EXERCISE EXTREME CAUTION 114 WORKING ADJACENT 10 TREES SHOULD ANY PORTION OF THE 1R5 BRANCHES REDUIRE REMOVAL 70 PERMIT OPERAT CN OF 7HE CONTRACTOR'S EQUIPMENT, HE SHALL OBTAIN THE SERVICES OF A PROFESIONAL TREE TRIMMING SERVICE TO TRIM THE TREES PRIOR TO THE BEGINING OF OPERATION. SHOULD THE CONTRACTOR'S OPERATIONS RESULT IN THE BREAKING OF ANY LIMBS, THE BROKEN LIMBS SHOULD BE REMOVED IMDMEDIATELY AND CUTS SHALL BE PROPERLY PROTECTED TO MINIMIZE ANY LASTING DAMAGE TO THE TREE NO TREES SHALL BE REMOVED WITHOUT AUTHORIZATION BY THE ENGINEER COSTS FDR TRIMMING SERVICES SHALL BE CONSIDERED INCIDENTAL TD THE GRADING CONSTRUCTOR AND ND SPECIAL PAYMENT WILL BE MADE K EXCAVATE TOPSOR FROM AREAS 70 BE FURTHER EXCAVATED OR REGRADED AND STOCKPILE IN AREAS DESIGNATED ON THE SITE. THE CONTRACTOR SHALL SALVAGE ENOUGH TOPSOIL FOR RESPREADING ON THE sin AS SPECIFIED. EXCESS TOPSOIL SHALL BE PLACED IN EMBANKMENT AREAS, OUTSIDE OF BUILDING PADS ROADWAYS, AND PARKING AREAS THE CONTRACTOR SHALL SUBMIT can AREAS, WHERE TURF L5 70 BE ESTABLISHED, ID A DEPTH OF 4 INCHES RESPREAD TOPSOIL IN AREAS WHERE TURF IS TO BE ESTABLISHED TD A MINIMUM DEPTH OF 4 INCHES L FINISHED GRADING SHALL BE COMPLETED. THE CONTRACTOR SHALL UNIFORMLY GRADE AREAS WITHN LIMITS OF GRADING. INCLUDING ADJACENT TRANSITION AREAS. PROVIDE A SMOOTH FINISHED SURFACE WITHIN SPECIFIED TOLERANCES, MTH UNIFORM LEVELS OR SLOPES 55TW5EN POINTS WHERE ELEVATIONS ARE SHOWN, OR BETWEEN SUCH POINTS AND EXISTING GRADES AREAS 11141 HAVE BEEN FINISH GRADED SHALL BE PROTECTED FROM SUBSEQUENT CONSTRUCTION OPERATION, TRAFFIC AND EROSION. REPAIR ALL AREAS THAT HAVE BECOME RU Jut BY TRAFFIC OR ERODED BY WATER DR HAS SETTLED BELOW THE CORRECT GRADE ALL AREAS DISTURBED BY THE CONTRACTOR'S OPERATION SHALL BE RESTORED 10 EQUAL OR BLI It14 THAN ORIGINAL CONDRIDN OR TO 711E REQUIREMENTS OF THE NEW WORK J. TOLERANCES 1. THE BUILDING SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY By M0RE THAN 030 F007 ABOVE, DR 0.3D FOOT BELOW. THE PRESCIBED ELEVATION AT ANY POINT WHERE MEASUREMENT IS MADE 2 THE STREET OR PARKING AREA SUBGRA0E FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.05 FOOT ABOVE, OR DAD FOOT BELOW. THE PRESCRIBED ELEVATION DF ANT POINT WHERE MEASUREMENT IS MADE 3 AREAS WHICH ARE 10 RECEIVE TOPSOIL SHALL BE GRADED TO W11H1N 0.30 F001 ABOVE OR BELOW THE RE0141RED ELEVATION, UN1 FPS DIRECTED OTHERRASE BY THE ENGINEER 4. TOPSOIL SHALL BE GRADED TO PLUS OR MINUS 1/2 INCH OF THE SPECIFIED THICKNESS. IL MAINTENANCE 1. RE CONTRACTOR SHALL PROTECT NEWLY GRADED AREAS FROM TRAFFIC AND EROSION, AND KEEP FREE OF TRASH AND DEBRIS 2 CONTRACTOR SHALL REPAIR AND REESTABLISH GRADS 114 SETTLED, ERODED, AND RUTTED AREAS TO SPECIFIED TOLERANCES. DURING THE CONSTRUCTOR, IF REQUIRED, AND DURING THE WARRANTY PERU, ERODED AREAS WHERE TURF 2 TO BE ESTABLISHED, SHALL BE RESEEDED AND MULCHED. 3. WHERE COMPLETE COMPACTED AREAS ARE DISTURBED BY SUBSEQUENT CONSTRUCTION OPERATIONS OR ADVERSE WEATHER, CONTRACTOR SHALL SCARQFY, SURFACE, RESHAPE, AND COMPACT TD REQUIRED DENSITY PRIOR TO FURTHER COMPACTION_ L AFTER THE SITE GRADING IS COMPLETED, IF EXCESS DR SHORTAGE OF SOIL MATERIAL EXISTS, THE CONTRACTOR SHALL TRANSPORT ALL EXCESS SOIL MATERIAL OFF THE SITE TO AN AREA CFI PCTED BY THE CONTRACTOR, OR IMPORT SUITABLE MATERIAL TO THE SITE M. WHEN THE SITE GRADING CONSTRUCTION IS COMPLETED, THE CONTRACTOR SHALL SEED AND MULCH THOSE AREAS AS DIRECTED BY THE OWNER THE SEEDING SHALL COMPLY MTh MN/D0T SPECIFICATION NQ. 3576 WITH 111E USE OF MN/DOT MIXTURE ND. 5DA AND APPLIED AT A RATE OF 10D POUNDS PER ACRE THE SEEDED AREA SHALL BE MUC7HLED. THE MULCH SHALL COMPLY WITH MN/DDT SPECIFICATION 3362, TYPE 1. THE MULCH MALI BE APPLIED AND ANCHORED N ACCORDANCE MN/D07 SPECIFICATION N0. 2575.3, Fl. MULCH SHALL BE APPLIED AT THE RATE OF 2 TONS PER ACRE. THE MULCH SHALL BE ANCHORED WITH A DISC. a006US1ER DR OTHER APPROVED EQUIPMENT. A WOOD FIBER BLANKET SHALL BE FURNISHED AND PLACED R AREAS WHERE THE SLOPE EXCEEDS 3:1. N. THE CONTRACTOR SHALL DETERMINE 711E LOCATION OF ANY HAUL ROADS THAT MAY BE REQUIRED TO COMPLETE THE SITE GRADING CONSTRUCTION. THE CONTRACTOR SHALL COMPLY Y67H THE REWIREMENTS OF THE GOVERNING AUTHORITY OF EACH ROADWAY. 7HE CONTRACTOR SHALL POST WHATEVER SECURITY, AND COMPLY WITH ALL CONDTIONS WHICH ARE REQUIRED BY EACH GOVERNING AUTHORITY OF EACH ROADWAY. O. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING TRAFFIC CONTROL DEVICES SUCH AS BARRICADES, WARNING SINS, DIRECTIONAL SIGNS FLAGMEN AND LIGHTS TD CONTROL THE MOVEMENT OF TRAFFIC WHERE NECESSARY. TRAFFIC CONTROL DEVICES SHALL CONFORM 7D APPROPRIATE MINNESOTA DEPARTMENT OF TRANSPORTATION STANDARDS P. DISTURBED AREAS WITHIN WETLAND MITIGATION AREAS AND ANY DISTURBED AREAS WITHIN THE WETLANDS SHALL. BE RESTORED W1114 6 TO 12 INCHES OF ORGANIC SOIS, PREFERABLY SOILS THAT WERE PREVIOUSLY REMOVED FROM WETLAND AREAS. SEEDING N THE WETLAND M1TGAT10N AREAS A80VE THE NORMAL WATER LEVEL SHALL BE CORPS OF ENGINEERS WET MEADOW SEED MIXTURE. DR MN/DOT SEED MIXTURE 328, DR APPDVED EDUAL THE SEED SHALL BE WATERED UNTIL A HEALTHY STAND OF GRASS 15 OBTAINED. 0. DISCHARGE OF OIL OR OTHER HAZARDOUS SUBSTANCES INTO THE STORM WATER IS SUBJECT TD REPORTING AND CLEANUP REQUIREMENTS IN CASE CF AN ACCIDENTAL SPILL THE MPCA SHALL BE NO Hr ELL) AT THEIR 24 -HOUR TELEPHONE NUMBER 351 -649- 5451. R THE CONTRACTOR SHALL COMPLETE DEWA1ERING AS REQUIRED TO COMPLETE THE SITE GRADING CONSTRUCTION. S THE CONTRACTOR SNAIL COMPLY WITH 711E REQUIREMENTS OF THE MINNESOTA POLLUTION CONTROL AGENCY - NATIONAL POLWTANT DISCHARGE ELMINATON SYSTEM (NPDES) PERMIT THE CONTRACTOR SHALL BE REQUIRED ID BE A CD- APPLICANT WITH THE OWNER. THE CONTRACTOR SHALL COMPLETE THE REQUIRED INSPECTION REPORTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF THE EROSION CONTROL DEVICES A COPY OF THE PERMIT CAN BE OBTAINED FROM THE ENGINEER IRBv1SioIR Nis Dote By Ramona 1 12norT' 1PD PER caraways 2 NAM/ KM PER ow Commons I hereby ec6Ty that this pike W� prepared by me v et under my _G oRmri situ one Mot I om 11 doiy Lkeo, Proless:Md Engineer under the foes of the Stole of M"eor_sota S1amhRe keen MARC DOLEZU1. Dote 3/5/07 License f 42004 Desimre1 105 Draw IRK Dote 10/4/00 Checked Approved CROSS SECTION NOT 10 SCAM WETLAND MITIGATION CROSS SECI7ON No see INDIVIDUAL STONES. EXCEPT THOSE USED PLR CHe40H0. SHALL NET 041544T LESS Awl 50 LBS. EAOL PLACE 0PR11P AROWN SIDM AND OVER 10P Cr FLARED ENO 60+5 NAND-PLACED WRAP. 1 FOOT DEEP N ACCORDANCE NTH LINDET SPECS mPRAP REDIARED Rae sl Pipe T4+.T6 54' t D. 2D-24 36 to 4e" 10-13 27- to 33' 6-I z4 & Lm 4-6 NOTE One CI_TG is appe®nateq 1.4 Ups RIP RAP DETAIL ND SLE FILTRATION BASINS 1 AND 2 SOLI MIXTURE. 30Z HAM 1D?SOL, 40S SEMI-COARSE WASHED (DR NATIVE} SAND, 3dS (ROOT GRADE 2 COMPOST =SDI 1D A DEPTH GI 12+ NOES PRIOR 1D PLANTING —NINOT SEED YQ 328 6' SATED PE PPE i/ SD X (CONNECT 1D CATCH BASIN) PROTECT BASINS FROM SEDIMENTATION AF ILH CONSTRUCTION FILTRATION AREA NO SCALE HULT & ASSOCIATS, INC. + Eame.eees PQ Box 57 Forest Lake, MN 65626 ph: (651) 464 -3130 fax: (651) 464 -4822 math huthgar1ha.eom + warmed Sb®fists Meal Brian Wessel Ciro Laker., MN 12 PIPE E 1t 1 tZ MA. BAIRN 6PILIE VARIABS OVERALL H BGITTIES T2) MA)99w IT 014. NYLOPLAZT RECO►W8JOLD ONLINE DRAIN OR DUAL OVERALL IHHLR4T W 120 ONLINE DRAIN FILTH 12n PIPE (CB 1 k 2) TWINE OR WIRE BALES PLACED DN EDGE, BUTTED TIGHT TWO STAKES IN EACH BALE AND EMBEDDED IN GROUND 10' MINIMUM DITCH SECTION FLOW "Zr 2"z2' WOOD STAKE OR REINF. BAR POINT A MAST BE HIGHER THAN POINT B BALE SECTION DITCH CHECKS TD BE INSTALLED AS NEEDED DR AS DIRECTED BY ENGINEER. DITCH CHECK Projed Moon Marsh at Lino Lakes Lire tams, MN NOTE THE ROCK ENTRANCES SHALL BE INSTALLED PRIOR TO THE START OF ANY SITE WORK THE ROCK ENTRANCES SHALL BE INSPECTED FOLLOWING EACH RAINFALL. MAINTENANCE OF THE ROCK ENTRANCES SHALL INCLUDE A TOP DRESSING OF NEW GRAVEL, OR REMOVAL AND REPLACEMENT OF THE GRAVEL AS NEEDED, TD KEEP THE ENTRANCE FREE FROM COLLECTED MUD. RDCB ENTRANCE DRIVE No 2' X 2' WOOD POSTS 7.7' D.C. DIRECTION DRAINAGE NGINEERING FABRIC (MIRAFI— ENVIRO FENCE DR APPROVED EOUAL) SILT FENCE DETAIL ND SCALE NEM MAL' L RACE 4 1Q'9L 00 NRtD21, 0AC. it DM NCI= AIL MEMO AREAS 1. 11E WED S e 4SSIRCADIN 6 FUSED 13 451136I1E MA AS 'ROUTINES bat Tibe tWt 001711$0.455 IT F GARS OE 0t47 Sm ERmM1 le • TYPICAL PRIVATE ROADWAY SECTIOA Notes and details