HomeMy WebLinkAbout07/31/2008 Env Bd Packet•
•
•
City of Lino Lakes
Environmental Board Meeting
July 31, 2008
6:00 p.m.
AGENDA
1. Call to Order
2. Approval of Minutes
May 28, 2008
3. Approval of Agenda
4. Open Mike
5. Action Items
A. Recommendation to participate with Rice Creek Watershed District and Reshanau
Lake Association in Water Quality Efforts.
6. Discussion Items
A. Recycling/Mike Larson of JR's Advanced Recyclers
B. Blue Heron Days Parade
7. Adjourn
•
ENVIRONMENTAL BOARD MEETING MAY 28, 2008
CITY OF LINO LAKES
MINUTES
DATE : May 28, 2008
TIME STARTED : 6:32 P.M.
TIME ENDED : 8:15 P.M.
MEMBERS PRESENT : Mary Jo O'Dea, Barbara Bor, Peter Brown
and Paula Andrzejewski
MEMBERS ABSENT : Pam Hartley, Kimberly Brouillet and Martha
DeHaven
STAFF PRESENT : Environmental Coordinator Marty Asleson
1. CALL TO ORDER
Ms. O'Dea called the meeting to order at 6:32 p.m.
2. APPROVAL OF MINUTES
April 30, 2008
Page three, first paragraph change Mr. to Ms.
• Mr. Brown made a motion to approve the April 30, 2008 minutes with change.
Ms. Andrzejewski seconded the motion. Motion carried unanimously.
3. APPROVAL OF AGENDA
Add additional items under Discussion Items:
B. Blue Heron
C. Solid Waste Recycling
Ms. Andrzejewski made a motion to approve agenda. Mr. Brown seconded the
motion to approve agenda. Motion carried unanimously
4. OPEN MIKE
Open mike closed at 6:35 p.m.
5. ACTION ITEMS
None.
• 6. DISCUSSION ITEMS
1 DRAFT MINUTES
ENVIRONMENTAL BOARD MEETING MAY 28, 2008
A. Resource Management Plan (RMP) and Rule Update /Jason Naber of FOR
Mr. Asleson stated Mr. Jason Naber from Emmons & Oliver Resources,
Inc. is working with the Rice Creek Watershed District (RCWD) on the
Resource Management Plan (RMP). Mr. Naber will review the RMP and
Rule Updates with the board.
Mr. Naber stated he has been a consulting engineer with RCWD on the
RMP. He stated this is a cooperative effort that began roughly a year and
'/2 ago. He stated this is the first time he has coordinated so closely with a
city.
He stated the Lino Lakes planning efforts are an integration of the RMP
(RCWD), Comprehensive Land Use Plan (City), TMDLs (RCWD) and
Surface Water Management Plan & Municipal Stormwater Permitting
(City), which will be fully integrated with Army Corps of Engineers 404
and allowing state permitting.
Ms. Bor questioned the standards of best practices vs. what gives a vision
to 2030.
Mr. Naber stated the state process will require implementing or adopting a
rule that implements this plan. An applicant that comes into the City of
Lino Lakes will be under the rule that we are adopting. Those rules stay
until it gets amended. He stated the RCWD requires permits for the
stormwater portion of an application. The TMDL program is being
administered by the Minnesota Pollution Control Agency (MPCA).
WHAT ARE THE OUTCOMES?
FUTURE CONDITIONS
Understanding Consequences and Constraints
Make Reasonable Predications
DEFINED LOCAL PERMITTING PROCESS
Stormwater Controls
Wetlands
Land Use & Ordinances
DEFINED FEDERAL PERMITTING PROCESS
Permit Review Guidance Document
Advanced Identification (ADID)
Special Area Management Plan (SAMP)
General Permit
2 DRAFT MINUTES
•
ENVIRONMENTAL BOARD MEETING MAY 28, 2008
WHAT ARE BENEFITS?
LAND OWNER
Site Layout Flexibility
Permitting Consistency & Efficiency
Realistic Expectations
WATERSHED DISTRICT
Planned for Future
Demonstrated Control Results
Non - Degradation
Meets No Net Loss
CITY OF LINO LAKES
Ecologically -based Controls
Stormwater Infrastructure Properly Sized
Parks and Open Space Coordination
Mr. Naber continued to review the main points for getting involved in this
project. He stated this is a watershed based concept of management.
Ms. Bor stated that the coordination with other cities is critical.
1111 Mr. Naber viewed maps with the board.
•
Map 2 Showed the Preliminary Full Build under RCWD 2007 Rules. This
map showed areas of capacity problems if the city is fully built out.
Map 3 Showed Full Build Out with RMP & 2008 Rules. This map
showed the wetland conservation corridor. He stated wetland areas are a
priority and they protect and preserve. Mr. Naber stated that restoration
projects can actually accommodate future development.
Ms. O'Dea questioned who would be conducting the restoration. Mr.
Naber stated the RCWD can put the restoration into a plan to become a
capital improvement project. He stated there is potential of city funding
and the RCWD can look at special assessment. Ms. O'Dea questioned
how restoration on private properties would occur. Mr. Naber stated there
would need to be cooperation from private land owners. Mr. Asleson
stated that there would be monetary incentives.
Ms. O'Dea stated in order to make this project successful, surrounding
cities would need to be open to the plan. Mr. Naber stated surrounding
cities have been invited to all the public meetings. He also stated
surrounding cities need to be supportive for the approval of this project.
3 DRAFT MINUTES
ENVIRONMENTAL BOARD MEETING MAY 28, 2008
Ms. Bor questioned if this plan would impact the lakes by 2030. Mr.
Naber stated certain shifts of the plan can be noticeable in a matter of years
Mr. Naber stated the Resource Management Units took a look from
nutrient loading from a 1 year storm and a 100 year storm.
A city that is fully developed does not want to lose wetland functions.
HOW IT WORKS:
RMP — Based Permitting Sequence — Developing Parcel
RMP - will provide use of landscape level information.
Wetland preservation corridor WCA — CWMP 404 -ADID
Stormwater Management Areas — Capacity needs — TMDL Standards.
Next stage — collection of site specific data - wetland delineation —
functional assessment — soil borings — T & E Survey.
Applying the Rule to define the actual WPC Boundary — RMP Rule
Defined WPC Boundary and Delineated Wetland Boundaries.
Ms. O'Dea questioned the concept of delineation. Mr. Naber stated this is
done at a remote scale and basically is done by soil mapping and
vegetation and then some ground checking. Hydrology requires years of
monitoring in some cases.
Ms. O'Dea stated the more that is accomplished to create the
predevelopment meeting atmosphere the better.
Mr. Naber continued his presentation:
MEETING PERMITTING OBJECTIVES
WETLANDS
Minimize Impacts
Buffers
High Quality Avoidance
MITIGATION
Quality, Type, Function
Replacement Location
STORMWATER MANAGEMENT
Rate and Volume Control
4 DRAFT MINUTES
•
•
•
•
ENVIRONMENTAL BOARD MEETING MAY 28, 2008
TMDL Compliance
WHAT ARE ENVIRONMENTAL BENEFITS
Wetlands
Lakes
Streams
Wildlife
DEVELOPMENT BENEFITS
Alternatives Analysis
Permitting Consistency
Site Layout Flexibility
Ms. O'Dea questioned if the full build out was flexible. He stated a way
to think about this is by doing one thing to offset another.
How is the RMP Implemented?
RCWD will adopt the Lino Lakes Resource Management Rule.
RCWD will provide ongoing assistance to the City and developers by:
Site Reviews
Early Coordination of Municipal Projects
Identification of Joint Projects
RCWD Comprehensive Plan Update
Project Feasibility Studies
Implement Plan
Capital Improvement Plan
Mr. Brown questioned how wetland banking works. Mr. Naber stated
there is an official process that needs to take place. There is an application
process through the Board of Water and Soil Resources for the credits.
Credits can be entered into a state wetland bank. He stated the State
encourages local planning.
B. Blue Heron Update
Mr. Asleson stated he visited Peltier Island after the storms of Sunday, May 25,
2008. He stated the birds are fine and nests were not harmed. He stated there are
approximately 45 — 46 nests occupied at this time.
C. Solid Waste Update
Mr. Asleson stated the goal for tonnage that the city is asked to meet by the county
standpoint just barely made it in 2007. Mr. Asleson stated he would like
suggestions from the board as to ways not to fall below its goal.
5 DRAFT MINUTES
ENVIRONMENTAL BOARD MEETING MAY 28, 2008
Add to next agenda: Recycling Tonage
Increase recycling tonnage.
Mr. Asleson stated there has been a tonnage loss due to not having a second fall
recycling day. Appliance recycling is free and truck set up is free for collection of
appliances.
7. ADJOURN
It was noted that the next meeting of the Environmental Board will be on June 25,
2008.
There being no further business, Ms. Bor moved to adjourn at 8:15 p.m. Ms.
Andrzejewski seconded the motion. Motion carried unanimously.
Transcribed by:
Lisa Hogstad
Community Development Secretary
6 DRAFT MINUTES
•
•
•
•
Agenda Item 5A
Environmental Board Meeting Date: July 31, 2008
Topic: Reshenau Lake Management Cost Sharing
Background:
Reshanau Lake is a 336 acre artificially created lake. The lake existed as a
wetland until the late 1960's and early 1970's. After this time the wetland was
dredged and took on the function of a shallow lake. In recent years residents
have experienced a decline in lake water quality. Efforts have been made in the
past to initiate rehabilitation of the lake.
Please see Attachment 1, Reshenau Lake Management Plan, (Curley -leaf
Pondweed Management) dated 4/8/2005 for a more comprehensive history of
lake property owners efforts, and memo from Mathew Kocian from the Rice
Creek Watershed District. Matt will attend the meeting on July 31st, to discuss
vegetation management and other lake management issues concerning
Reshanau Lake.
Request
Most of the effort at this time is centered around Curley Leaf Pondweed
management. See item VII of Attachment 1. Other management issues identified
are rough fish management, native plant restoration and shoreline restoration.
A projected budget for 2009 is around $40,000. If the City were to partner in the
effort to dean up Reshanau Lake, our cost would be 1 /3rd of the $40,000 or
approximately $13,000. City Staff are proposing to use Surface Water
Management monies for this purpose.
Recommendations
1. Recommend the City form a partnership with the Rice Creek Watershed
District and the Lake owners of Reshanau Lake to manage Reshanau Lake for
better water quality, and to use Surface Water Management dollars for the City
match
2. Other recommendations as per the Lino Lakes Environmental Board.
1. Reshenau Lake Management Plan, (Curley -leaf Pondweed Management)
2. Memorandum from Mathew Kociam, RCWD, 7/1/2008
•
RESHANUA LAKE MANAGEMENT PLAN
(Curly -leaf Pondweed Management)
4/8/2005
RICE CREEK WATERSHED DISTRICT
Reshanau Lake Management Plan
February 8, 2005
RESHANAU LAKE MANAGEMENT PLAN
Table of Contents
I. Introduction
Page 2
II. Problem Statement Page 2
III. Management Goals Page 2
IV. History /Summary of Existing Data Page 4
V. Situational Analysis Page 5
VI. Objective Page 6
VII. Budget and Timeframe Page 8
VIII. Organization Page 8
IX. Funding Page 9
X. Summary Page 9
List of Figures
Figure 1 Drainage area for Reshanau Lake
G: \Admin \Board \Agenda Paks \2005 Agenda Paks \2005 -04 -13 \Reshanau mgmt plan.doc l
•
Reshanau Lake Management Plan
L Introduction
During the summer of 2004, a number of residents, who own property on
Reshanau Lake, observed that the submerged aquatic vegetation (SAV)
growth that year was considerable and that the SAV growth had made the
Lake less desirable and less usable than previous years. The SAV that
dominates the lake is Potomogeton crispus (curlyleaf pondweed). On August
20, 2004, a meeting was held by individuals who own property on Reshanau
Lake to consider what options were available to make improvements to the
quality of the Lake. Representatives from The DNR and the Rice Creek
Watershed District were present and spoke about issues related to the Lake.
In summary, the Lake is not in a desirable state. No objective measurements
had been made on the Lake in some time; however, it is believed that the lake
could be improved through the efforts of a variety of individuals and
organizations. A lake management improvement partnership is being formed
with property owners on Reshanau Lake, other users of Reshanau Lake,
property owners in the contributing drainage area of Reshanau Lake, the Rice
Creek Watershed District (RCWD), and other governmental and regulatory
agencies with responsibility for Reshanau Lake. Figure 1 shows the drainage
area for Reshanau Lake.
On, October 2, 2004, a group of property owners met with a representative of
the RCWD and Department of Natural Resources (DNR) to begin the
preparation of a comprehensive plan to improve the quality of Reshanau Lake.
II. Problem Statement
Reshanau Lake is highly eutrophic (meaning that there is an excessive amount
of phosphorus and algae growth). The lake also has a high density of curlyleaf
pondweed growing throughout the basin. The curlyleaf pondweed has two
main problems: 1st it grows to the surface and creates a canopy that is nearly
impassable by recreational watercraft, 2nd it dies in late June to early July
which will send a pulse of total phosphorus (TP) into the water column that
triggers a nuisance algal bloom. This algal bloom turns the water dark green
and inhibits any type of water contact activity. The City of Lino Lakes owns a
park on the south shore that has a public swimming beach that gets very
limited use partially because of the nuisance algal blooms.
III Management Goals
The management goal set for Reshanau Lake is to reduce the abundance of
curlyleaf pondweed and increase the amount and diversity of native SAV
species. Another goal is to reduce the in -lake phosphorus concentration to 60
parts per billion (ppb). This phosphorus level would reduce the frequency and
duration of algal blooms and increase the recreational use of the lake.
G: \Admin \Board \Agenda Paks \2005 Agenda Paks \2005 -04 -13 \Reshanau mgmt plan.doc2
Figure 1: Reshanau Lake Watershed Boundary
fit I-.
0.2 0 0.2 0.4 Miles
Reshanau Lake Management Plan
• IV. History /Summary of Existing Data
Reshanau Lake was formed by dredging the swampy area, roughly where the
lake now exist, in the late 1960's and early 1970's. The material removed
from the lake was used to make what is now Chomonix Golf course and to
make build able lots on the lake's perimeter. For a number of years, the lake
was treated annually by a commercial applier but was discontinued for some
reason before 1995.
Over the years individual property owners have applied some chemical
treatments with marginal or no apparent success.
Attempts have been made over the years to form an Association of property
owners but have been unsuccessful.
In 1995 a study of Reshanau Lake was conducted by Montgomery Watson
(Attachment A), which provides some historical and benchmark data. This
report shows that Reshanau Lake is Eutrophic (high in nutrients) and does not
support swimming or other contact water activity according to Minnesota
Pollution Control Agency (MPCA) standards. The report also suggests that
the growth of the exotic curly -leaf pondweed contributes significant
phosphorus to the lake.
A summary of the 1995 lake monitoring report shows that the in -lake total
phosphorus (TP) levels averaged 110 ug /L during the growing season. TP is
the nutrient that drives algal productivity in most northern latitude states. This
nutrient is generally the limiting factor for plant growth. Since this nutrient is
often associated with man induced activities, it is almost always the nutrient
that lake managers target to reduce the frequency and duration of algae
blooms and to help control SAV growth. TP entering the lake is coming from
four primary sources. Theses sources are County Ditch 25 (CD25) which
enters on the east side of the lake, a small tributary creek which enters the lake
on the south side, internal cycling of TP from the die off and decomposition of
curlyleaf pondweed, and direct drainage from manicured lawn runoff and
possible failing septic tanks. The early summer TP levels are 70 pg /L and
peak at 140 µg /L in late July. This peak TP concentration coincides with the
die -off and decomposition of curlyleaf pondweed in the lake. Looking back at
the 1995 stream monitoring data also suggests that during the flashier stream
flow period of July and August TP export from CD 25 is higher. The
Chlorophyll -a (CHLA) concentration averaged 3911g /L during the growing
season and was at a low of 11 p.g /L in early June and peaked at 121 µg /L in
early August. CHLA measurement is a measurement of plant productivity in a
lake. All vascular plants produce CHLA and this measurement is related to the
amount of algae when a surface water sample is collected and analyzed.
CHLA concentrations generally increase with an increase in TP
concentrations. The CHLA cycle is also attributable to the die -off and
G: \Admin \Board \Agenda Paks \2005 Agenda Paks \2005 -04 -13 \Reshanau mgmt plan.doc4
Reshanau Lake Management Plan
decomposition of curlyleaf pondweed in the lake. Secchi disk transparency
(SD) is the surrogate measurement for the depth that light penetrates the water
column. This measurement is related to the depth of submerged aquatic plant
growth. Typically plants will grow to a depth of 1.5 times the SD reading. SD
readings can be affected by either sediment in the water column or by algae
growth as measured by CHLA. The SD mirrors the CHLA concentrations.
This suggests that water transparency is directly related to CHLA production
and reduction of CHLA concentrations will improve water clarity.
V. Situational Analysis
Currently, no formal or informal group exists which is capable of making any
decisions regarding the approval of any proposed plan regarding the Lake.
There are at least three options that are being considered.
1) To establish an Association of Property Owners on the Lake and collect
money to do whatever the group decides the money should be spent on.
2) To establish a "Lake Improvement District" (LID) which is a formal entity
recognized and approved by the county and the city, which allows for the
collection of funds through property tax bills, to be spent on studies and
projects which benefit the district. There are a number of issues to be
dealt with if we choose this option.
3) To ask the Rice Creek Watershed District to establish a "Special Taxing
District" to collect money to administer this plan.
In January 2005, a list of 153 property owners on Reshanau Lake was
obtained from the Anoka County Geographical Informational Services (GIS)
department. Recently, a mailing was sent to all of these property owners
which outlines what is being proposed in this plan. It is our intent to contact
and meet each of these property owners individually to obtain their approval
of this plan in the form of a signed petition to be presented to the Rice Creek
Watershed Board.
VI. Objective
The main objective is to form a cooperative effort between lakeshore property
owners and the RCWD to improve the overall water quality and aquatic plant
community in Reshanau Lake. Currently the lake is not a community asset
because of excessive algal blooms. With some remedial activities, the lake can
become an asset to the community and downstream water bodies.
G: \Admin \Board \Agenda Paks \2005 Agenda Paks \2005 -04 -13 \Reshanau mgmt plan.doc5
•
Reshanau Lake Management Plan
The plan proposes a goal that can be measured in quantitative terms such as a
"Tropical State Index (TSI). The TSI is a measurement used by lake managers
to describe a condition of a lake based on three variables: Total Phosphorus,
{(TP), nutrient concentration) }, Secchi Transparency {(SD), water clarity) },
and Chlorophyll -a {(CHLA), algae concentration) }.This measurement was
quantified during the 1995 study and was determined to be "68."
The MPCA (1990) classifies lakes based on TSI into the following categories,
1) lakes which fully support swimming, 2) lakes which partially support
swimming, and 3) lakes which are non - supporting of swimming.
The 1995 measurement for Reshanau Lake of "68" categorizes the lake as a
"lake which is non - supporting of swimming."
Assuming that no more recent data exists, and that quality of the lake has
probably not improved and likely decreased since the 1995 study, we propose
establishing a summertime TSI rating of less than 57.This would correspond
to a TP concentration of 60 ppb, SD of >/= 1.2 m, and a CHLA concentration
of < 25 ppb. Achieving a growing season average TSI of 62 or less would
characterize the lake as partially supporting swimming. Both the duration and
frequency of algal blooms would be reduced to less than 25% of the summer.
We would like to achieve this goal by 2008.
• The following activities were considered to varying degrees during the last six
months:
Harvest rough fish
Harvest curly leaf pondweed
Obtain benchmark data
Controlling the migration of rough fish from other lakes
Chemical treatments to try eradication of curly leaf pondweed
Shoreline restoration
Controlling lake elevations
Communication and education
Street and storm sewer issues
All of the above management practices alone will not significantly change the
water quality of the lake. A combination of management strategies will need
to be implemented over a period of time to achieve the desired results. It was
decided to focus on those activities we perceive to provide the greatest
potential for a positive impact on the lake and the surrounding watershed.
And, begin a more comprehensive program of monitoring the Lake and input
sources to identify areas to focus on in the future.
The specific strategies of the Plan are as follows:
G: \Admin \Board \Agenda Paks \2005 Agenda Paks \2005 -04 -13 \Reshanau mgmt plan.doc6
Reshanau Lake Management Plan
As appropriate, begin communicating to, and educating, individuals and
property owners in the Lake Reshanau watershed as to how their activities
may positively or negatively impact the quality of the lake and watershed.
Coordinate with the Public education coordinator from RCWD to distribute
literature about good housekeeping practices about preventing nutrients from
washing off into the lake. Conducting storm drain stenciling to further
awareness about the connection to the lake via storm sewers.
VII. Budget and Timeframe
This plan focuses on a three -year timeframe starting in the summer of 2006
and ending in the fall of 2008. It is expected that if these programs are
effective at improving the water quality of Reshanau Lake this plan may be
revisited and modified to reflect the current thinking at that time. However, if
at the end of three years or if it is determined that prior to the end of three
years, that these program are having no positive effect on Reshanau Lake,
they will be discontinued and no additional funding will be provided.
Line Items 2006 2007 2008
1) Fish Harvest $8,000
2) Chemical $60,000 $50,000 $40,000
Treatment
3) Monitor Lake and RCWD(in -kind)
inflows
4) Algae Treatment $1,000 $1,000 $1,000
5) Education and $500 $500 $500
Communication
Material
6) Aquatic plant RCWD (in -kind)
mapping — twice a year
Total
VIII. Organization
$69,500 $51,500 $41,500
A group of property owners have been operating as a "steering committee"
since the fall of 2004. They have been responsible for the compilation of this
G: \Admin \Board \Agenda Paks \2005 Agenda Paks \2005- 04- 13 \Reshanau mgmt plan.doc8
•
Reshanau Lake Management Plan
"Plan" with the assistance of RCWD staff and other affected entities. They
have been responsible for facilitating communications between the property
owners and RCWD. Their participation is voluntary and any property owner
on Reshanau Lake is welcome to participate.
IX. Funding
The Plan suggests that primary funding for these projects comes from the
individual property owners on Reshanau Lake either voluntarily or through
the formation of some sort of Taxing District such as a Lake Improvement
District (LID) or a special taxing district through the Rice Creek Watershed
District. The creation of these Taxing Districts would facilitate the collection
of funds and ensure greater participation.
Secondary funding for Plan projects will come from various governmental,
regulatory, benefiting entities of Reshanau Lake. Including, but not limited to,
the Rice Creek Watershed District, the City of Lino Lakes, the County of
Anoka, the DNR, and others to be determined.
X. Summary
The Reshanau Lake homeowners are asking that The RCWD review this Plan
to ensure that it is consistent with other lake management efforts within our
area and to advise and assist in the implementation of this plan. The Reshanau
Lake homeowners would like assistance in monitoring water quality,
documenting aquatic plant communities, monitoring inflow sources, and
securing supplemental funding.
While the primary focus of this plan is a three -year timeframe, we do not want
to close our eyes to other opportunities, which may present themselves now
and in the future, which may positively impact Reshanau Lake.
These include but are not limited to:
The possible acquisition of land for the construction of a holding
pond.
The use of mechanical and or electronic fish barriers
"Demo" Rain Gardens
Means of controlling lake elevation
Shoreline restoration projects
G: \Admin \Board \Agenda Paks \2005 Agenda Paks \2005 -04 -13 \Reshanau mgmt plan.doc9
Reshanau Lake Management Plan
I) Conduct intensive lake- monitoring program in 2005 to inventory current
conditions and propose specific strategies to mitigate problems. This
monitoring will include in -lake water chemistry, stream flows and
chemistry and lake SAV maps during June and August. This data will be
needed to get an approved lake management plan to the MN DNR to
implement a chemical treatment application for SAV beyond the 15 %
allowed under State law.
2) Early in 2005, contract with a commercial fisherman to harvest the rough
fish from Lake Reshanau and other Lakes in the watershed as determined
by the Rice Creek Watershed District. The necessary permits have been
secured and they are currently tying to locate the best location to conduct
the harvest(s). The rough fish population in the Chain of lakes is high.
These fish consume SAV and distribute phosphorus rich lake sediment
into the water column during feeding activities. The suspended sediment
reduces water clarity and increases available TP for algae growth.
3) Investigate the potential for placing a fish barrier on the outlet of the lake
at west shadow Lake road.
4) Chemically treat the entire lake with a herbicide to kill the non - native
curly leaf pondweed. Chemical treatment could begin in 2006 with annual
applications occurring each spring through 2008 to treat the residual
curlyleaf turions pending MN DNR approval of the Lake Management
Plan. After three years the treatments should be reconsidered in the hope
that native vegetation will have re- established itself and that the curly leaf
pondweed will have diminished to a point that widespread commercial
treatment will not be necessary.
5) Upon completion of the treatment for curly leaf pondweed and in
conjunction with the algae bloom resulting from the decomposition of the
curly leaf pondweed, we propose to commercially treat the algae with
copper sulfate.
6) If the above lake management strategies are successful there is a potential
for excessive growth of native vegetation. If growth of native plants
reaches nuisance levels a separate management plan will be written in the
future to address these issues.
In 2005, begin a comprehensive plan to monitor the Lake to determine what
impact these strategies are having on the existence of the non - native curly leaf
pondweed, and the re- establishment of native aquatic vegetation. In addition,
begin testing more specific measurements like phosphorus levels, chlorophyll,
dissolved oxygen, and water clarity to quantify progress.
G: \Admin \Board \Agenda Paks \2005 Agenda Paks \2005 -04 -13 \Reshanau mgmt plan.doc7
•
Reshanau Lake Management Plan
Facilitating adequate storm and sewer systems in the area
surrounding Reshanau Lake
All of these and others will require additional research to determine there
applicability to water quality issues and how and what funding may be available.
G: \Admin \Board\Agenda Paks \2005 Agenda Paks \2005 -04 -13 \Reshanau mgmt plan.doc10
MEMORANDUM
Rice Creek Watershed District
To: Marty Asleson
From: Matthew Kocian (763- 398 -3075)
Subject: Reshanau Lake — Curlyleaf Pondweed Control
Date: 7/21/2008
Background / Discussion
Reshanau Lake, located in Lino Lakes, MN, supports a substantial population of curlyleaf pondweed
(Potamogeton crispus). Curlyleaf pondweed is a non - native plant species that is characterized by its
unusual life - cycle. The submerged plant begins growing while ice is still present on lakes. It dies around
mid- summer, at which time the plant decomposes in the water column. It can grow in dense stands,
often outcompeting native plants. In cases where the density is very high, as in Reshanau Lake, the
decomposition of the plant material at mid - summer releases significant amounts of phosphorus. Excess
phosphorus fuels algal growth and can result in poor water clarity. Dense curlyleaf populations can also
inhibit recreation by forming surface mats.
Aquatic vegetation surveys in Reshanau Lake have found curlyleaf present at roughly 95% of survey
sites, and at all depths. Many sites exhibited high curlyleaf density. Very little native aquatic vegetation
was found during surveys.
Ongoing Control
Herbicides have been used to control curlyleaf pondweed in Reshanau Lake since 2005. Treatments
have been effective at controlling curlyleaf; each of the 130 monitoring stations does not support
curlyleaf after herbicide treatment.
In 2008, the cost of the chemical treatment was $35, 814. The cost of the treatment was split 50/50
between the Rice Creek Watershed District and residents of Reshanau Lake. The vendor responsible
for the treatment has warned of future price increases, as demand for the chemical increases.
•
•