HomeMy WebLinkAbout04/29/2009 Env Bd Packet•
•
•
City of Lino Lakes
Environmental Board Meeting
April 29, 2009
6:30 p.m.
AGENDA
1. Call to Order
2. Approval of Minutes
February 25, 2009
3. Approval of Agenda
4. Open Mike
5. Action Items
A. Surface Water Management Public Hearing
6. Discussion Items
A. Other Updates:
Earth Day
Recycle Day
Arbor Day
Emerald Ash Borer
7. Adjourn
•
•
•
ENVIRONMENTAL BOARD MEETING FEBRUARY 25, 2009
CITY OF LINO LAKES
MINUTES
DATE : February 25, 2009
TIME STARTED : 6:30 P.M.
TIME ENDED : 7:55 P.M.
MEMBERS PRESENT : Mary Jo O'Dea, Barbara Bor, Pamela Hartley,
Paula Andrejewski, Martha DeHaven and
Peter Brown
MEMBERS ABSENT : Kim Brouillet
STAFF PRESENT : Environmental Coordinator Marty Asleson
1. CALL TO ORDER
Ms. O'Dea called the meeting to order at 6:30 p.m.
2. SWEARING IN OF BOARD MEMBER
Mr. John Bergeson was present for the swearing in of Paula Andrzejewski.
3. ELECTION OF OFFICERS
There was a motion for Ms. O'Dea to continue as Chair and for Ms. Bor to
continue as Vice - Chair.
Mr. Brown made a motion to approve election of officers and Ms. DeHaven
seconded the motion. Motion carried unanimously.
4. APPROVAL OF MINUTES
December 17, 2008 minutes.
Ms. Bor made a motion to approve the December 17, 2008 minutes with minor
changes. Mr. Brown seconded the motion. Motion carried unanimously.
5. APPROVAL OF AGENDA
Additional item added by Ms. Bor regarding Environmental Board members
meeting to discuss environmental issues outside of a regularly scheduled meeting.
Ms. DeHaven made a motion to approve the agenda as is. Ms. Hartley seconded
the motion to approve the agenda. Motion carried unanimously
1 DRAFT MINUTES
ENVIRONMENTAL BOARD MEETING FEBRUARY 25, 2009
6. OPEN MIKE
Open mike opened and closed at 6:35 p.m.
7. ACTION ITEMS
None.
8. DISCUSSION ITEMS
A. Anoka Soil Water Conservation District/Rice Lake Stormwater
Retrofit/Nate Zwonitzer
Mr. Nate Zwonitzer from Anoka County Conservation District gave a presentation
to the Environmental Board members on the Rice Lake Stormwater Retrofit
Proposal.
Retrofit Goals consist of: Reducing the volume and pollutant load entering water
body of concern. Identify pollutant "hot- spots" within subwatershed: Prioritize
neighborhoods and project sites to maximize treatment per dollar spent and to
install retrofit projects.
Ms. O'Dea questioned why we want to reduce water. Mr. Zwonitzer stated when
you introduce impervious surfaces through new developments, we want to change
the way the water travels, not reduce it.
Step 1: Retrofit Scoping = Screen for retrofit potential, define retrofitting
objectives and identify preferred treatment options.
Step 2: Desktop Retrofit Analysis = Gather maps of stormwater practices, conduct
desktop search for retrofit sites and Prepare base maps.
Step 3: Retrofit Reconnaissance Investigation = Verify stormwater mapping and
Investigate Feasibility of Retrofit Sites.
Step 4: Retrofit Evaluation and Ranking = Compute volume and pollutant
reductions, compare results with restoration objectives and rank retrofit projects
according to effectiveness and cost.
Step 5: Subwatershed Treatment Analysis = (Evaluation and Ranking) Conduct
neighborhood consultations, develop retrofit screening criteria and create retrofit
project priority list.
Step 6: Finalize Designs = Obtain landowner approval, conduct bidding for
construction and assemble design packages.
2 DRAFT MINUTES
•
•
ENVIRONMENTAL BOARD MEETING FEBRUARY 25, 2009
• Step 7: Construction: Oversee BMP Installation. Conduct pre - construction
meetings and Inspect construction progress.
•
Step 8: Inspection, Maintenance and Evaluation = Provide maintenance training to
landowners and continued project tracking and monitoring.
Other Retrofit Types:
Pond modification
Roadway crossing storage
Conveyance system treatment
Parking Lots
Individual streets
Underground
Ms. O'Dea questioned who will pay for this? Mr. Asleson stated landowner
cooperation, cost share funds from Anoka County and State of Minnesota. Mr.
Asleson stated we don't have a stormwater utility fund at this time. Ms. Bor
questioned if there would be a tax break. Mr. Zwonitzer stated there is cost share
available up to $5,000. Ms. Bor questioned if this is a collaboration with the Rice
Creek Watershed District. Mr. Zwonitzer stated yes.
Mr. Brown questioned if residents could use pavers for their driveways. Mr.
Zwonitzer stated yes, but a very expensive option. The cost is $20 -$25 per square
foot. Mr. Zwonitzer stated if a resident was redoing their driveway, they could
install a trench grate which is flush with the new asphalt driveway and a rain
garden connected to that.
Mr. Asleson stated if Mr. Zwonitzer would come back when this project is further
along. Mr. Zwonitzer yes.
B. Updates
Recycle Bank
Mr. Asleson received information from Allied Waste regarding a RecycleBank
program. He reviewed the information with the board.
Ms. O'Dea questioned if this program is exclusive with Allied Waste. Mr.
Asleson state, at this time it is.
Earth Day
Mr. Asleson stated Earth Day will be celebrated on April 18. Wargo Nature
Center will be open to the public from 1:00 p.m. to 3:30 p.m. There will not be a
lunch or a petting zoo for volunteers this year.
3 DRAFT MINUTES
ENVIRONMENTAL BOARD MEETING FEBRUARY 25, 2009
Ms. Bor requested we look into purchasing new, brighter shirts this year for Earth
Day and Blue Heron Days clean-up. Mr. Asleson stated he would look into this.
Heron Task Force
Mr. Asleson stated there is an upcoming Heron Task Force meeting on February
26.
Water Resources Workshops Schedule
Shoreland Management — March 30, 2009: Mr. Brown will attend.
Landscaping for Wildlife — April 18, 2009: Mr. Bor will attend.
Water -Smart Landscaping — April 21, 2009: Martha DeHaven will attend.
Raingardens — May 2, 2009: Martha DeHaven and Pam Hartley will attend.
Additional Item: Environmental Board Meeting
Ms. Bor questioned if the Environmental Board does not have a regularly
scheduled meeting, would it be okay to get together and talk about newsletter
articles or discuss topics in depth without there being a violation of having a
quorum. Ms. Hogstad stated she would find out from the Administration
Department and let board members know.
7. ADJOURN
It was noted that the next meeting of the Environmental Board will be on March
25, 2008.
There being no further business, Ms. Hartley moved to adjourn at 7:55 p.m. Ms.
DeHaven seconded the motion. Motion carried unanimously.
Transcribed by:
Lisa Hogstad
Community Development Secretary
4 DRAFT MINUTES
•
•
AGENDA ITEM 5-A
STAFF ORIGINATOR: Tim Payne, Natural Resources Specialist
MEETING DATE: April 29, 2009
TOPIC: Public Hearing: Annual Storm Water Pollution
Prevention Program
VOTE REQUIRED: N/A
BACKGROUND:
In compliance with the provisions of the Clean Water Act, as amended, (33 U.S.C. 1251
et. Seq., 40CFR 122, 123 and 124, as amended et seq.); Minnesota Statutes Chapters 115
and 116, as amended, and Minnesota Rules Chapter 7001, the city adopted a Storm Water
Pollution Prevention Plan (SWPPP) and authorized its submittal to the Minnesota
Pollution Control Agency as part of the City's application for enrollment in the State of
Minnesota's General National Pollution Discharge Elimination System Phase II Permit
Authorizing the City's discharge of storm water.
As part of the SWPPP, the City must solicit public input at an annual meeting required
under the Public Education and Outreach Plan including:
• A presentation about implementation of the City's Surface Water Pollution
Prevention Program in 2008.
• Affording interested persons an opportunity to make oral statements
concerning the Storm Water Pollution Prevention Program.
• Consideration of relevant written materials that interested persons submit
concerning the Storm Water Pollution Prevention Program.
• Consideration of public input in making adjustments to the 2009
implementation plan for the Storm Water Pollution Prevention Program.
ANALYSIS:
According to the 1996 National Water Quality Inventory, stormwater runoff is a leading
source of water pollution. Stormwater runoff can harm surface waters such as rivers,
lakes, and streams which in turn cause or contribute to water quality standards being
exceeded.
Stormwater runoff can change natural hydrologic patterns, accelerate stream flows,
destroy aquatic habitats, and elevate pollutant concentrations and loadings. Development
substantially increases impervious surfaces thereby increasing runoff from city streets,
driveways, parking lots, and sidewalks, on which pollutants from human activities settle.
Common pollutants in runoff include pesticides, fertilizers, oils, metals, pathogens, salt,
sediment, litter and other debris are transported via stormwater and discharged —
untreated — to water resources through storm sewer systems.
The Stormwater Program for Municipal Separate Storm Sewer Systems (MS4's) is
designed to reduce the amount of sediment and pollution that enters surface and ground
water from storm sewer systems to the maximum extent practicable. Stormwater
discharges associated with MS4's are regulated through the use of National Pollutant
Discharge Elimination System (NPDES) permits. NPDES permits are legal documents.
Through this permit, the City is required to develop a Stormwater Pollution Prevention
Program (SWPPP) that incorporates Best Management Practices ( BMP's) applicable to
their MS4. Below is a list of the accomplishments of the City of Lino Lakes in
implementing identified best management practices ( BMP's).
2008 Best Management Practice Implementation and Accomplishments:
Public Involvement
• Storm Drain Stenciling: The City of Lino Lakes solicited volunteers to work with
RCWD to stencil/label storm drains. Public awareness was represented by the
placement of storm drain buttons on 136 storm drains.
• Stream Monitoring: Partnering with Stream Health Evaluation Program (SHEP), and
had volunteers from the community monitoring Hardwood Creek, Rice Creek and
Clearwater Creek.
• Stream Cleanup: Assigned several groups to clean up creek and tributary areas in the
City of Lino Lakes on Earth Day.
• Quarterly newsletter articles on residential clean-water initiatives to increase public
involvement in the following: resident BMP's for their property to improve surface
water runoff quality including pet -waste management, soil management, irrigation
management, water conservation, and impervious surface management.
• Distributed a Lino Lakes Recyclopedia that lists all of the appropriate recycling
locations, vendors for different products including hazardous waste.
• Prepared a display on recycling and good housekeeping practices for homeowners at
Earth Day.
• Maintained a kiosk of information on environmental issues such as recycling, water
quality improvement, forestry issues, and NPDES Phase II/MS4 fact sheets for
residents.
• Held an Arbor Day Celebration at Lino Lakes Elementary and hosted Tricia and the
Toones who tailored their entertainment/presentation to recycling and importance to
clean water issues.
• Became members of Blue Thumb with the Rice Creek Watershed District (RCWD).
• Worked on environmental education curriculum with the Centennial School District.
• Maintained a page on the City Website related to NPDES for MS4's and Best
Management Practices for residents.
Illicit Discharge Detection and Elimination
• Continued to maintain and update a GIS map and spatial database of the City's storm
sewer system.
•
•
•
• The City is implementing a Regulatory Control Program and Illicit Discharge
Detection and Elimination.
• The City continues to work with Rice Creek Watershed district on Illicit discharge
education for residents.
• City employees continue to attend and maintain NPDES certifications from the State
of Minnesota.
• The City of Lino Lakes has begun the implementation of recommendations within the
Minnesota Department of Health - Wellhead Protection Plan.
Construction Site Stormwater Runoff Control
• The City of Lino Lakes has adopted the following Ordinances Ordinance 03 -08
Section 3 Subd. 4 L & Subd. 11.; Subdivision Ordinance 04 -03; Surface Water
Management Plan Adopted December 2005. The City is evaluating revisions to the
above regulatory mechanisms and considering creation of a new ordinance.
• The City performs regular site inspection of all construction sites under NPDES
permits.
• The City also regularly monitors resident activities not under the jurisdiction of
NPDES requirements to ensure proper stormwater runoff control.
Post - construction Stormwater Management in New Development and Redevelopment
• The City monitors post construction runoff through regular site inspections.
• The City maintains structural and non - structural BMP's through requirements on the
construction of detention ponds (structural) and drainage swales (non - structural).
Pollution Prevention and Good Housekeeping for Municipal Operations
• Continue to train City Staff.
• The City sweeps all impervious surfaces twice a year. Street sweepings occur in early
spring as weather allows and again in the fall after leaf off and prior to hydrant
flushing.
• The City annnally inspects all structural pollution control devices such as trap
manholes, grit chambers, sumps, and other settling or filter devices and retains
inspection information.
• The City inspects 20% of the MS4 outfalls, sediment basins and ponds each year and
retains inspection information.
2009 Best Management Practice and Implementation Goals:
• Continue to utilize a full time NPDES inspector.
• Public education will be emphasized in 2009.
• Educate the general public through pamphlets or mailings.
• Educate contractors about site erosion and mitigation practices.
• Promote school or volunteer organizations participation.
• Educate City employees to identify improper disposal of waste.
Attached are the following figures:
1. The Storm Sewer Inspection Map shows the inspections completed over the
last five years throughout the City.
2. The 2008 Surface Water Management Project Location Map.
3. The Storm Water Inspection Form is used by the full -time NPDES Inspector
for response to complaints or to document any maintenance work.
RECOMMENDATION:
Staff recommends closing the public hearing.
•
•
•
STORM SEWER PIPES
inspection -areas
0 0 0 0
N N N N
APRIL 29, 2009
Mn.0.11.11.11■ 1. 0 .11.11.1.11.11 MUM 11 .11 .11.11 ■11.11 .11.11.11.11 ■11.1.1 /.0.n.1/.IM H11.1.11.11.11.0.11.11. 11. 11■UNI 1.11..11.11.11.11 .11.11.11.11.11.11.11.11.11.
■
■
•
are
II.n.n.n.u.nnI.u.n.u.na t.1,.II.,I.It ■II.II.
i
mum 1.11.11. Ion . 11.1. nom. 1.1 mil. 11.11.11.0.11. 11.11.11.11.0 .11.11.11.1 um. 1.. n.11.11.11.11.11.11.1mud'
I. 0.11.11.0.11 .11.11.11.
1.1.11.1/.II.11.11.11.11.1A
2r o 14
:111i,m, ii- 1 "11 , qI • .a7; 4.1m,—.I:4-mnW2ii , e IA1 . ' ipr 4IH,4mI•14:‘, , Ii J a ■
0,ft I i I
I r2
1.1.
z:A1:
1i i
ai1
.:i44n 1 ;76-1 ..-._:. ':".1.
2„ /ZI/
Ja4
1
1 1 .Ii i qII :. z . .
Afilli
mm y
rmv t
ispdiiii k , ..
1.4 PROJEC
1.1w1..ri
1.1
11..110111
11
▪ 1
153
PROJECT 9
4a-
.ip.9A 1-fiii
i v.
a•.4f .
f1b:11. .l
t: 1. ,
0M i
t i
P 1 ,711111.1711 1
Lm
1.1 J.i Vtv= .t *1.I.1.11l.1l1i1"p11pi
3 ii
11
11
53
ir
1 1, 1
1 5
1,6
■.pb
•
•
008 Surface Water Managment Project - Location Map
May 29, 2008
TKDA PROJECT NO. 14043.003
N
TKDA
ENGINEERS • ARCHITECTS • RUNNERS
•
City of Lino Lakes
Operation, Maintenance & Inspection
Report for Stormwater Management Ponds
Inspector Name:
Date:
Community:
Watershed:
Pond Type:
Pond Location:
Inspection Performed ,i' Maintenance Performed Maintenance Needed
Notes: rr pkowzS cJUQ�y Voi,. �� �pc�,`�s /, ;S/'
_ 9
• co-f tul.� lE
t,D J 1 �'i� 1G. "l U 1/- ",Li 74T . G-/ V l r
"f ur
C !1 f
.e
Sketch or attach basin map:
•
1. Embarkment and emergency spillway (Annual, After Major Storms)
1. Vegetation and ground cover adequate
2. Embarkment erosion
3. Animal burrows
4. Unauthorized planting
5. Cracking, bulging, or sliding of dam
a. Upstream face
b. Downstream face
c. At or beyond toe (downstream, upstream)
d. Emergency spillway
6.Pond, toe & chimney drains clear and functioning
7.Seeps /leaks on downstream face
8.Slope protection or riprap failure
9.Vertical /horizontal alignment of top of dam "As- Built"
10. Emergency spillway dear of obstructions and debris
11. Other (specify)
2. Riser and principal spillway (Annual)
Type: Reinforced concrete
Corrugated pipe
Masonry
1. Low flow orifice obstructed
2. Low flow trash rack.
a. Debris removal necessary
b. Corrosion control
3. Weir trash rack maintenance
a. Debris removal necessary
b. corrosion control
4. Excessive sediment accumulation insider riser
5. Concrete /masonry condition riser and barrels
a. cracks or displacement
b. Minor spalling (<1" )
c. Major spalling (rebars exposed)
d. Joint failures
e. Water tightness
6. Metal pipe condition
7. Control valve
a. Operational /exercised
b. Chained and locked
8. Pond drain valve
a. Operational /exercised
b. Chained and locked
9. Outfall channels functioning
10. Other ( ecify)
Perm9ent Pool (We)onds) (monthly)
((_)1Unde§irable ve etati�ie growth
9 9
2. Floating or floatable debris removal required
3. Visible pollution
4. Shoreline problem
ct�/Ufa
nsatisfactory
s /Unsatisfactory
Satisfactory /Unsatisfactory
•
• 5. Other (specify)
4. Sediment Forebays
1.Sedimentation noted
2. Sediment cleanout when depth < 50% design depth
5. Dry Pond Areas
.,Vegetation adequate
ndesirable vegetative growth
3. Undesirable woody vegetation
4. Low flow channels clear of obstructions
5.Standing water or wet spots
6. Sediment and / or trash accumulation
7. Other (specify)
6. Condition of Outfall into Ponds (Annual , After Major Storms)
1. Reprap failures
2. Slope erosion
3. Storm drain pipes
4,Endwalls / Headwalls
5. Other (specify)
7. Other ( Monthly)
• 1. Encroachment on pond or easement area
2. Complaints from residents
3.Aesthetics
a. Grass growing required
b. Graffiti removal needed
c. Other (specify)
4. Any public hazards (specify)
8. Constructed Wetland area (Annual)
1. Vegetation healthy and growing
% 2 vidence of invasive species
'3. Excessive sedimentation in Wetland area
Satisfactory /Unsatisfactory
Satisfactory /Unsatisfactory
Satisfactory/Unsatisfactory
Satisfactory/Unsatisfactory
Satisfactory/Unsatisfactory
Name: No Parcels Selected
SEH Data View Parcel Report
Address:
Pin:
cc t 1,5•, 26-0g
00-pstt �G 2 e --
;cription:
cip wed t4.: tic �' 1 i
,� { �� '� 1 pi c, w € / �.� s
rF e-cf yclz
//df.ii ��c.yc�l �% �~
t''tT■ D �ti -� ,� •� S fC "rl '�'�a --f' � �,t`� F [a.0 "� • Cr J � `.T
F` e_ I� -( t,Y,) 5.
•