HomeMy WebLinkAbout06/02/2010 Env Bd PacketCity of Lino Lakes
Environmental Board Meeting
June 2, 2010
6:30 p.m.
AGENDA
1. Call to Order
2. Approval of Minutes
April 28, 2010
May 4, 2010
3. Approval of Agenda
4. Open Mike
5. Action Items
A. Amendments to Zoning Ordinance and Subdivision Regulations chapter of the
City Code regarding Development in Environmentally Sensitive Areas, Tree
Preservation, Landscaping, Planned Unit Developments, and Platting.
B. Anoka County Ditch (ACD) 10 -22 -32 Historical Review and Future
Objectives /Doug Thomas/RCWD
6. Discussion Items
A. Peltier Lake Heron Colony
B. Emerald Ash Borer Update
C. Wollen's Park Wetland Bank Update
7. Adjourn
•
•
•
•
ENVIRONMENTAL BOARD MEETING
DATE
TIME STARTED
TIME ENDED
MEMBERS PRESENT
MEMBERS ABSENT
STAFF PRESENT
1.
2.
CITY OF LINO LAKES
MINUTES
APRIL 28, 2009
: April 28, 2009
. 6:33 P.M.
. 8:00 P.M.
: Mary Jo O'Dea, Barbara Bor, Paula
Andrzejewski, Peter Brown, Martha DeHaven
and Stephen Heiskary
: None
: Environmental Coordinator Marty Asleson
CALL TO ORDER
Ms. O'Dea called the meeting to order at 6:33 p.m.
Swearing in of Board Members — Postponed until May 4, 2010.
1. Barbara Bor — Reappointed
2. Peter Brown — Reappointed
3. Stephen Heiskary — Newly Appointed
3. APPROVAL OF MINUTES
December - Not included in packet.
February 24, 2010 — No Changes to the minutes.
Mr. Brown made a motion to approve the February 24, 2010 minutes. Mr.
Heiskary seconded the motion. Motion carried unanimously
4. APPROVAL OF AGENDA
Additional agenda items to be added:
Earth Day
Heron Rookery signage
Ms. Andrzejewski made a motion to approve agenda. Ms. Bor seconded the
motion to approve the agenda. Motion carried unanimously
5. OPEN MIKE
Open mike closed at 6:36 p.m.
DRAFT MINUTES
1
ENVIRONMENTAL BOARD MEETING APRIL 28, 2009
6. ACTION ITEMS
A. Surface Water Management Public Hearing /Tim Payne
Mr. Payne was present for discussion and review of his PowerPoint presentation
on Annual Stormwater Management Public Hearing.
He stated this meeting provides a forum for the City to present the purpose, goals,
and requirements of the SWPPP to educate, inform and encourage citizen to
provide input.
The NPDES (National Pollutant Discharge Elimination System) Stormwater
Permitting Program for MS4's (Municipal Separate Storm Sewer System) is
designed to reduce pollution that enters surface waters from storm sewers to the
maximum extent practicable.
NPDES Stormwater Permits are issued by the MPCA in three areas: construction
sites, industrial sites and municipalities (MS4's). Each type requires the
implementation of a Stormwater Pollution Prevention Plan (SWPPP). Lino Lakes
has adopted and implemented SWPPP includes six Minimum Control Measures
(MCMs). Mr. Payne presented the City accomplishments in implementing the
plan in each of the following MCMs for 2009:
1. Public Education and Outreach
2. Public Participation and Involvement.
3. Illicit Discharge Detection & Elimination
4. Construction Site Stormwater Runoff Control.
5. Post - Construction Stormwater Management (New & Redevelopment)
6. Pollution Prevention/Good Housekeeping
He continued his review with Pond Inspections and Inspection Zones. He stated
the City is divided into 5 inspection zones, with each zone being inspected on a
five year rotation.
He presented the 2009 Surface Water Projects. He stated only 5 out of 13 projects
were located in the scheduled inspection zone for 2009, the others scattered
throughout the City. He continued to review various project sites out of the 13.
He reviewed future projects outside of 2010 inspection zone as well as 2010 Best
Management Practice and Implementation Goals.
Ms. Bor questioned if there were homeowners doing the projects themselves. Mr.
Payne stated no, the 13 projects were City projects, not the homeowner's
responsibility.
DRAFT MINUTES 2
•
•
•
•
•
•
ENVIRONMENTAL BOARD MEETING APRIL 28, 2009
Ms O'Dea asked if anyone had questions.
Mr. Brown questioned if the practices presented are working. Mr. Payne stated
yes, overall the plan is working. Success in some areas of the plan is difficult to
measure.
Mr. Asleson stated if you take any one element out of what we have done and
look at end results you would see that it works. Mr. Brown stated do what we are
set out to do and we will see the results.
Mr. Heiskary questioned if the correction orders for construction sites have all
been completed. Mr. Payne stated yes, he tries to visit the sites weekly. Some
contractors are very responsive. Some need a little extra push. He stated in some
cases work was halted until contractors complied with the rules.
Mr. Asleson stated contractor's attitudes have changed with education. Mr.
Heiskary stated in the last five years things have really turned around. Contractors
are taking it seriously.
Ms. Bor stated it is accumulative process over time.
Ms. Bor questioned how it is decided as what a City is responsible for and what
the homeowner are responsible for. Mr. Payne stated the work completed in 2009
were all located on City owned property (ponds). Ms. Bor questioned if in 2010
they are more deficiencies located will they be flagged. Mr. Payne sated yes.
Ms. Bor questioned if RCWD is responsible for say a ditch and is there
collaboration. Mr. Payne stated yes.
Ms. Andrewjeski asked if they have been working with schools. Mr. Payne stated
yes, Centennial Middle School. Mr. Asleson stated there has been native prairie
restoration work and Trish and the Toon's educate students in regards to water.
Ms. O'Dea opened up the public hearing for anyone wishing to comment:
Open up for public comment
Open up for public comment
It was stated the deadline for a written comment is 30 days from today.
Public Hearing Closed.
Recommendation made by Mr. Brown to accept the report. Ms. Andrewjeski
seconded. Motion carried unanimously.
DRAFT MINUTES 3
ENVIRONMENTAL BOARD MEETING APRIL 28, 2009
Ms. Bor questioned if the information provided this evening will be on the
website. It was stated yes, it will be April 29.
B. Storm Water Ordinance Review/ Patrick McLarnon/TKDA
Mr. Asleson reviewed his staff report, Agenda Item 6B, on Storm Water
Ordinance with the Board. His recommendation is for staff to review
Environmental Board comments and suggestions and incorporate them into the
document.
Mr. Studenski stated there has been a great deal of staff effort that has gone into
this report. The Annual Storm Water Pollution Prevention draft is presented to
board members this evening. Overall the draft is very solid. A couple of areas
that are still being worked on are to make sure this document is consistent with
ordinances, zoning, etc. for submittal. Staff will be meeting with the Rice Creek
Watershed District (RCWD) to go over the draft with them.
Mr. Asleson stated there are many areas that need to be tied together in this draft. .
What we are looking for this evening is feedback on areas the board would like to
see improved upon. After this review, the document will go back to staff and then
be presented again at the next meeting. Mr. Brown questioned if staff has looked
at what other cities have done. Mr. Studenski stated yes. Mr. Brown questioned
if there is anything unique to the City of Lino Lakes. Mr. Studenski stated
uniqueness is that every project has water issues. He stated most of the projects
deal with 100 year elevation and ground water. Mr. Asleson stated all cities are
addressing the same issues.
Ms. O'Dea questioned how the board would like to review this document. Mr.
Studenski stated section by section. After each section, questions will be
answered. Ms. O'Dea questioned if the City is working with Anoka County Parks
as well as RCWD. He stated the critical parts are with RCWD.
Mr. Patrick McLarnon reviewed the Storm Water and Erosion and Sediment
Control Ordinance with the Board.
Chapter X Storm Water and Erosion and Sediment Control Ordinance
Section X.01 Statutory Authorization
Section X.02 Findings
Section X.03 Purpose
Section X.04 Applicability
DRAFT MINUTES 4
•
•
•
•
•
•
ENVIRONMENTAL BOARD MEETING APRIL 28, 2009
1. Storm Water Management
2. Erosion and Sediment Control
Ms. Bor stated for the average citizen who reads the document 10,000 sq. ft.
states as acreage and is EAW applicable here. Developer needs to be
conscience as to what is going into storm water. Ms. Bor stated a developer
may intentionally design a parking lot just under the threshold.
Section X.05 Definitions
Section X.06 Exemption
Ms. Bor questioned where CUP's fall into this Section. Mr. Studenski
stated it would be the same threshold.
Section X. 07 Incorporations by Reference
Mr. McLarnon stated engineering design standards will be developed to go
along with this section as well as the Minnesota Storm Water Manual and
RCWD Rules. Mr. Asleson stated they City's wants to implement RMP3
rules and may want to take this out of the ordinance.
Mr. Studenski stated the VALAMO area is using RCWD requirements and
they City is taking this on as our own and that they will encompass the
entire City. In other words, the City has the same requirements as RCWD.
Ms. O'Dea questioned if VALAMO has stricter regulations, do developers
have to meet that and the City's requirements. Mr. Studenski stated that is
correct.
Section X.08 Storm Water and Erosion and Sediment Control Performance
Standards
Ms. O'Dea requested a definition of bankfull discharge.
Ms. Bor questioned how this would relate in relation to high quality wet
lands to low quality wet lands. It was stated this would be included under
Rules for Resource Management Plan.
Page 13, Item J: Also requires privately owned infrastructure to have a
long term maintenance plan included.
Page 12, Item 7: Ms. Bor questioned the meaning of this. Mr. McLarnon
stated with residential development this will not go away, it will be
redistributed.
Page 15, Item 12: Ms. Bor questioned who follows up on site
management. Mr. Tim Payne he would look for this as well as a City
building inspector
Section X.09 Pollution Prevention
Section X.10 Inspections and Maintenance
Ms. O'Dea questioned if the City runs into contractors who do not comply
with the rules and items start falling through cracks what measures are
taken. Mr. McLarnon stated if a site is dormant for 30 days there are steps
to be followed.
Mr. Bor questioned what the consequences would be. A course of action
letter, starting letters, and finally work would need to be completed and
charged to private owner by city workers.
Section X.11 Plan Review Procedure
DRAFT MINUTES 5
ENVIRONMENTAL BOARD MEETING APRIL 28, 2009
Section X. 12 Financial Procedures and Enforcement Actions
Ms. O'Dea questioned the bottom of page 21 Emergency Action: States
determined by community, would this also be determined by the City?
Mr. McLarnon stated yes. He will document search and add City as well
as Community.
Ms. Bor questioned if any developers have given feedback on this
document? Mr. McLarnon stated no.
Mr. Studenski stated for the most part we have had this information
available.
This item will come before the board again. There is not action needed at
this time.
7. DISCUSSION ITEMS
A. Recycle Day/May 1
Board members were updated on the City's upcoming Spring Recycle Day.
Mr. Asleson mentioned he was not sure if the City Council will allow a Fall
Recycle Day this year.
B. Arbor Day
There will be an Arbor Day celebration at Rice Lake Elementary on May 5
at Lino Lakes Elementary on May 7.
Mr. Asleson stated Trish and the Toons will be performing at Rice Lake
Elementary.
C. Earth Day
There were roughly 250 people who participated in Earth Day events this year
on April 24. Ms. Andrzejewski and one of her Rice Lake Elementary 5th
grade students had a display table at Wargo Nature Center.
D. Heron Rookery
Ms. Bor questioned signage for Peltier Island. Mr. Asleson stated the
Highway Department makes the signs. We are on bottom of production, low
priority. We will eventually get them.
Ms. Bor stated the City Council showed interest in the progress and history of
what could still be done if anything. Ms. Bor stated she would put together a
sheet on progress.
It was stated there is a Girl Scout troop that would like to plant trees on the
island in August.
DRAFT MINUTES 6
•
•
•
•
•
ENVIRONMENTAL BOARD MEETING APRIL 28, 2009
8. ADJOURN
It was noted that the next meeting of the Environmental Board will be a special
meeting on May 4, 2010.
There being no further business, Ms. DeHaven moved to adjourn at 8:00 p.m. Mr.
Heiskary seconded the motion. Motion carried unanimously.
Transcribed by:
Lisa Hogstad
Community Development Secretary
•
•
ENVIRONMENTAL BOARD MEETING MAY 4, 2009
CITY OF LINO LAKES
SPECIAL BOARD MEETING MINUTES
DATE : May 4, 2010
TIME STARTED : 6:30 P.M.
TIME ENDED : 8:03 P.M.
MEMBERS PRESENT : Mary Jo O'Dea, Barbara Bor, Paula
Andrzejewski, Peter Brown, Martha DeHaven
and Steve Heiskary
MEMBERS ABSENT : None
STAFF PRESENT : Environmental Coordinator Marty Asleson
1. CALL TO ORDER
Ms. O'Dea called the meeting to order at 6:30 p.m.
2. Swearing in of Board Members
The following Environmental Board Members were sworn in by Mayor Jeff
Reinert:
1. Barbara Bor — Reappointed
2. Peter Brown — Reappointed
3. Stephen Heiskary — Newly Appointed
3. APPROVAL OF MINUTES
N/A
4. APPROVAL OF AGENDA
Mr. Brown made a motion to approve the agenda. Mr. Heiskary seconded the
motion to approve the agenda. Motion carried unanimously
5. OPEN MIKE
Open mike closed at 6:37 p.m.
6. ACTION ITEMS
A. Environmental Ordinance Review
ENVIRONMENTAL BOARD MEETING MAY 4, 2009
Mr. Asleson presented Agenda Item 6A regarding Environmental Ordinance
Review. He stated this Ordinance will go before the Planning and Zoning Board
on May 12 for Public Hearing.
Ciara Schlichting, AICP and Kate Lamers, ASLA from Bonestroo will be
reviewing the draft ordinance.
Ms. Schlichting stated the purpose of this meeting is to review language of the
draft ordinance. She stated Bonestroo and City staff are running on a parallel tract
with the Planning & Zoning Board.
Ms. Schlichting will start by discussing background and then continue with the
overview.
Attachment 1: Site and Layout Performance Standards are new and therefore are
not replacing any other standards.
Attachment 2: Landscaping and Tree Preservation Standards will replace existing
standards.
She stated they want to incorporate the standards into the new ordinance.
Ms. Schlichting presented background information and the new ordinance
language that is building on the Resources Management Plan, the Lino Lakes
Parks, Trails and Greenways Plan and Surface Water Management Plan.
She stated RCWD gives examples of site design guidelines and puts them out as
guidance tool. Techniques have many different names such as: low impact
development design with nature, sustainable development and conservation
design.
She stated there is flexibility in the development code and cited conditional use
permits, planned unit development, variances and code revisions as examples.
Overview of Site Layout Performance Standards.
There are 3 major components of the Site Performance Standards
1. Natural Resource Protected Areas
2. Natural Resource Conservation Areas
3. Natural Resource Corridor Enhancement Areas
She stated the design of the Surface Water Management System shall be based on
preserving pre - development hydrology and environmentally sensitive areas to the
extent practical in accordance with the minimum performance standards.
DRAFT MINUTES 2
•
•
•
•
ENVIRONMENTAL BOARD MEETING MAY 4, 2009
ESAs shall be identified and categorized through the site planning process.
Natural Resource Protected Areas: streams, lakes, wetlands, wetland preservation
corridor
Natural Resource Conservation Areas: wetlands, natural and semi - natural areas
and the 100 year floodplain
Natural Resource Corridor Enhancement Area: potential linkage for wildlife
corridors
Categorize sensitive areas as same language in the park plan.
She continued the review with the Wetland Buffer and Upland Habitat
Requirements, Disconnect and Distribute Stormwater, and Reduction of
Impervious Cover.
Ms. Bor questioned what is defined with reduction to parking, etc. Ms.
Schlichting stated staff does not have an answer at this time. She stated we now
have parking requirements. If a developer decided to reduce impervious surface
then it might be an option to allow three stalls per 1000.
Ms. Schlichting briefly gave an overview of Landscaping and Tree Preservation
Standards.
Ms. O'Dea stated the Board will review this document section by section. She
stated the tree ordinance is very specific. When dealing with ordinances or
statutes that are very specific it makes it easier to deal with. The Board would like
all requirements to say A B & C regarding site performance layout with minimum
requirements and language to discuss. She stated incentives are what developers
looked for when they developed the Foxborough site. If incentives are not listed
in the document stating this is why it is a good thing to do it creates a problem.
Ms. Bor stated there are many rural properties throughout the City. If a property
owner were to alter drainage, it could affect other properties. Is there some way to
consider entire reference regarding this section? Mr. Heiskary stated there is a
pre - hydrology plan submitted right up front from a developer. Ms. Schlichting
stated in regards to water leaving a site, there will be no more than what it was
before the construction. Mr. Asleson stated stormwater is referenced in the
Stormwater Management Plan. We would like a developer to improve the current
drainage, not necessarily change.
Ms. Bor questioned to what extent practical really means in the Environmental
Sensitive Areas. Mr. Brown questioned if there is anything that is going to cause
ENVIRONMENTAL BOARD MEETING MAY 4, 2009
problems such as a red flag what is the comfort level with this. Mr. Asleson
stated it will still be okay to cut your own trees down.
Ms. Bor questioned Item 2B. 1. Would this require a developer to conduct a
natural and endangered species study. Mr. Asleson stated yes.
Ms. Bor wanted to confirm 3C which states a minimum setback of 10 feet which
equates to a buffer on buffer.
Natural Resource Conservation Areas, Subsection B. Top of Page 4.
Ms. Bor stated at this time best practices will be used. Ms. Schlichting stated
there is research RCWD put together. It is better than what we have today but not
everything that RCWD requires. Ms. Schlichting stated there is a minimum and if
we can get more we will try. Mr. Brown questioned who decides this. Mr.
Smyser emphasized that Mother Nature does not design by numbers. We are
trying to approach review of the development of the site in that way. What we
plan to do, and you are not seeing yet, is outline the process of developing
projects. Ms. Schlichting referred to the handbook for conservation development;
if you are going to protect something you need the developer to design the site in
such a way that everyone is satisfied. Ms. O'Dea stated this is not defined. There
is a variable buffer stated Mr. Asleson. It was suggested that this is vague
language and may want to add wording and recommendations. Mr. Asleson stated
we should add a range of buffers to work with.
Ms. Bor stated to add a collaborative decision of what the buffer would be. Mr.
Smyser stated the City has ordinances that go from here to here. That part of it
will be covered in a different section. The process will be described in the
platting process or the PUD section. When something is developing we will have
certain groups looking at certain areas based on expertise.
Mr. Heiskary stated there is not a lot of science in the minimum numbers. The
idea of the minimum gives the developer the idea they have to do at least this.
Ms. Bor questioned if the Total Maximum Daily Load (TMDL) is referenced in
the stormwater ordinance? Mr. Asleson stated yes.
Natural Resources, Page 5
Mr. Bor questioned the accountability if a tree dies within 3 years of planting, who
is responsible. Mr. Asleson stated there are agreements with private pond holders,
the City can come in and assess or take care of the problem if owner does not.
Mr. Smyser stated if they are on an outlot or easement the City has the right to
access.
DRAFT MINUTES 4
•
•
•
ENVIRONMENTAL BOARD MEETING MAY 4, 2009
Disconnect and Distribute Stormwater, Page 6. Reduce Impervious Cover.
Ms. Bor questioned the threshold. Ms. Schlichting stated staff is going through
zoning districts regarding impervious surfaces. Percentage results are determined
by a study done by RCWD. Mr. Smyser stated the impervious surfaces will be
lowered based on this study.
Landscaping and Tree Preservation Standards, Attachment 2.
Section 8. Page, 7. Boulevard Tree Requirements. Mr. Heiskary questioned
adding wording regarding removal of Ash trees on City and private property. Mr.
Asleson stated we have an ordinance that covers this. Ms. Schlichting stated at
this point all Ash trees are currently prohibited.
Section 15, Page 15 — Tree Protection During Construction. It was stated this is
determined by routine site inspections.
Ms. Bor stated this extends beyond the final platting. The non - compliance still
applies down the road stated Ms. Schlichting. Mr. Asleson stated when complete
it will then become the property of the owner.
It was stated the Planning & Zoning Board will work collaboratively with the
Environmental Board on comments.
• It was stated the Board will see this document again in the form of track changes.
•
7. DISCUSSION ITEMS
A. Arbor Day
There will be an Arbor Day celebration at Rice Lake Elementary on May 5
and at Lino Lakes Elementary on May 7.
8. ADJOURN
It was noted that the next meeting of the Environmental Board will be on
Wednesday, May 26, 2010 at 6:30 p.m.
There being no further business, Mr. Brown moved to adjourn at 8:03 p.m. Ms.
Andrzejewski seconded the motion. Motion carried unanimously.
Transcribed by:
Lisa Hogstad
Community Development Secretary
DRAFT MINUTES 5
•
Agenda Item 5A
Staff Originator: Marty Asleson
Environmental Board Meeting Date: June 2, 2010
Topic: Amendments to Zoning Ordinance and Subdivision regulations Chapter
of City Code Regarding Development in Environmentally Sensitive
Areas, Tree Preservation, Landscaping, Planned Unit Developments,
and Platting
Background:
The Environmental Board discussed the site layout, landscaping, and tree
preservation standards on May 4. The P & Z discussed those and the
collaborative design process on May 12. Some revisions have occurred since
those meetings. The revisions are attached to this memo for discussions by the
Environmental Board on June 2 and the P & Z on June 9.
Since the late 1990s Lino Lakes has been pursuing a more environmentally
sound means of handling new development. The city's Handbook for
Environmental Planning and Conservation Development was printed in 1999.
We followed that with the 2004 Parks, Natural Open Space /Greenways and Trail
Plan. The I -35E Corridor Alternative Urban Areawide Review in 2005
established a "conservation design framework" for all development within the
study area. The draft new Comprehensive Plan further promotes the
conservation design principles laid out in all these documents. Chapter 2 creates
the Resource Management System Plan, establishing an open space system
that corresponds with Environmentally Sensitive Areas created by plans and
rules of the Rice Creek Watershed District.
Now the City is creating and amending official controls to implement the ideas
and plans. The subjects of the public hearing tonight are sections of the zoning
ordinance and subdivision regulations, the primary controls for regulating new
development. (A new stormwater management ordinance also is in the works.)
All the different ordinance requirements need to work together toward the goals
of preserving and creating a city wide greenway system through the identification
and protection of Environmentally Sensitive Areas.
The Rice Creek Watershed District is the governmental entity that regulates
wetland impacts and the public drainage ditch system. Extensive environmental
research by the District and Lino Lakes resulted in the creation of an overall
Environmentally Sensitive Areas (ESAs) map for Lino Lakes. The District's new
rule RMP -3 is designed to identify and protect ESAs on individual development
sites. The District's rules protect wetlands and include requirements for
stormwater design. The Lino Lakes ordinances are intended to provide
standards for aspects of development that are beyond the scope of the
Watershed District's authorities. In this way, the City and the Watershed
District's actions are partners in creating the citywide greenway system of ESAs.
City staff have worked with Bonestroo to prepare draft new site layout
performance standards and landscaping and tree preservations standards. All of
these are intended to apply to all new plats, site plans for
commercial /industrial /institutional uses, conditional use permits —in fact, all new
development in the city. The site layout performance standards are new. The
landscaping and tree standards would replace the existing sections of the zoning
ordinance.
The process for reviewing new development is as important as the regulatory
standards that must be met. While we have been practicing the collaborative
method for the past few years, the new process sections will codify those
practices into ordinance form. The new collaborative design sections of the
subdivision regulations would apply to all new plats and planned unit
developments. The PUD section of the zoning ordinance would refer to those
sections of the subdivision regulations. This will eliminate redundant and
potentially conflicting requirements in the current ordinance.
All these documents are drafts that are undergoing revision. It is likely the levels
of requirements now in the tables will be pared down. We also will need to clarify
some things. For example, tree preservation requirements for a development
project should be different from a builder getting a permit for a house and from a
homeowner removing a tree in his yard.
Recommendation:
Staff recommends discussion of the amendments, and make recommendation on
the material presented.
Attachments:
1. Transmittal Memo from Bonestroo
o Attachment 1: Draft Site Layout Performance Standards
o Attachment 2: Draft Landscaping and Tree Preservation Standards
2. Draft of part Chapter 1001 of City Code, Subdivision and Platting
§ 1001.020 CONCEPT PLAN
§ 1001.025 COLLABORATIVE DESIGN PROCESS
3. Draft of part of section of Zoning Ordinance
Section 2, Subd. 10.F. Procedure for Processing Planned Unit
Development
•
•
ATTACHMENT 1
• Memorandum 4 Bonestroo
•
•
To: Michael Grochala, AICP, Community Development Director, City of Lino Lakes
From: Ciara Schlichting, AICP
Date: May 26, 2010
Re: Draft Ordinance Language
The purpose of this memo is to transmit revised draft ordinance language for the Environmental Board to
review at their meeting on June 2, 2010 and for the Planning and Zoning Board to review at their
meeting on June 9, 2010. The proposed revisions are intended to address comments received from the
Environmental Board, Planning and Zoning Board, and city staff. No public comments were received
during the public hearing held May 12, 2010 (the public hearing is still open). The attachments to this
memo include the following:
Attachment 1: Site Layout Performance Standards
The Site Layout Performance Standards include four minor revisions. Since the revisions are minor only a
"tracked changes" version of the proposed language is being transmitted. The revisions are intended to
address the following comments:
1. The need to clarify that surface water management needs to be based on predevelopment
conditions.
2. Remove reference to tree preservation levels (e.g., Level T -1, T -2) since labeling the
requirements as "levels" was removed from the tree preservation standards.
Attachment 2: Landscaping and Tree Preservation Standards
The Landscaping and Tree Preservation Standards contain numerous minor revisions; therefore, both a
"tracked changes" and "clean" version of the draft ordinance language is being transmitted. The
revisions are intended to address the following comments:
1. Overall, the text was reorganized to make the language more "user friendly" and to simplify
administration of the standards. Most of these revisions did not result in substantive changes to
the standards. For example, the concept of "levels" was removed; however, the general intent of
the standards remain although the numbers (e.g., planting requirements) may vary slightly from
the previous version.
2. Require one canopy coverage percent (e.g., 40 %) for all uses rather than have two levels.
3. Increase the incentive (e.g., assigned canopy coverage value) to have more than two trees in an
interior parking lot island.
4. Increase minimum soil volume requirements for trees in a single or shared bed.
5. Clarify that existing lots with existing buildings can remove trees without triggering mitigation
requirements.
6. Clarify that the non - compliance measures also apply to tree preservation plans.
Attachment 1: Site Layout Performance Standards - REVISED May 26, 2010 Page 1
E. Site Layout Performance Standards. All uses shall comply with the requirements of this section.
1. Purpose. The City developed a Resource Management System Plan based on a water and
natural resource inventory and assessment and the vision, goals and policies developed through
the comprehensive planning process. The performance standards established in this section are
for the purposes of accommodating development that protects, conserves and enhances the
city's water and natural resources consistent with Comprehensive Plan goals.
2. Natural Resource Conservation. The two overall components of natural resource
conservation are the surface water management system and environmentally sensitive areas.
a. Surface Water Management System. The design of the surface water management
system shall be based on preserving predevelopment hydrology (i.e., existing surface water
runoff volumes and rates) and environmentally sensitive areas to the extent practical in
accordance with the following minimum performance standards:
1) Establish the wetland preservation corridor in accordance with watershed district rules.
2) Reduce the need for surface water management facilities by preserving and integrating
natural topography, soils and site drainage into the surface water management system
to the degree they can accommodate the additional flow and volume of water without
compromising water quality.
3) The preferred conveyance strategy is to transport wherever possible untreated and
treated runoff in conveyance facilities open to the atmosphere (e.g., swales, vegetated
buffer strips, energy- dissipating structures, etc.) rather than through enclosed pipes, so
• as to decrease runoff velocity, allow for natural infiltration, allow suspended sediment
particles to settle, and to remove pollutants.
4) Site grading shall be minimized to the maximum extent reasonable to minimize impacts
to environmentally sensitive areas.
5) The surface water management system shall be designed to meet the performance
standards in the Lino Lakes Stormwater Management Ordinance, Lino Lakes Stormwater
Design Manual & RCWD Rules.
b. Environmentally Sensitive Areas (ESAs). The design of the site shall be based on
protecting, conserving, and enhancing ESAs to the extent practical while allowing for
equitable economic return. ESAs shall be identified and categorized through the site
planning process.
1) ESA Identification and Categorization. During the resource inventory and site
analysis process for a property that has an ESA, all ESA features on the site shall be
identified on the resource inventory map. Landscape -scale ESAs are mapped and on file
with the City. Balancing the goals of natural resource protection and conservation with
land use goals requires prioritizing ESAs. ESA categories (i.e., Natural Resource
Protected Area) are listed in descending order from the highest to the lowest level of
priority. ESA features (i.e., wetland preservation corridor, natural areas, etc.) listed
under each category are not prioritized.
•
Attachment 1: Site Layout Performance Standards Page 2
a) Natural Resource Protected Areas. These areas include:
i. Streams
ii. Lakes
iii. Wetland Preservation Corridor (WPC): Areas designated as wetland preservation
corridor on the landscape -scale WPC boundary shown on Figure 1 in Rice Creek
Watershed District Rule RMP 3, as amended. The wetland preservation corridor
may include:
• Wetlands
• Natural and Semi - Natural Areas: Areas designated as Natural and Semi -
Natural Areas in accordance with Minnesota Land Cover Classification
System (MLCCS). Natural areas are comprised of more than 50% native
plants. Semi - Natural areas are comprised of less than 50% native plants.
• Floodplain: Areas designated as 100 -year floodplain and regulated under
the Lino Lakes Floodplain Ordinance.
b) Natural Resource Conservation Areas. These areas include:
i. Wetlands Non - contiguous to the WPC.
ii. Natural and Semi - Natural Areas: Areas designated as Natural and Semi- Natural
Areas in accordance with the MLCCS. Natural areas are comprised of more than
50% native plants. Semi - Natural areas are comprised of less than 50% native
plants.
iii. Floodplain. Areas designated as 100 -year floodplain and regulated under the
Lino Lakes Floodplain Ordinance.
c) Natural Resource Corridor Enhancement Areas: Corridors that provide
connections between environmentally sensitive areas to establish a more contiguous
and complete natural open space system.
2) Minimum Performance Standards for ESAs. The following are the minimum
performance standards that shall be used in the site planning process to maximize the
function and value of ESAs, to minimize adverse impacts to ESAs, and to allow
development activities that will provide equitable economic return.
a) Natural Resource Protected Areas. These areas shall be protected and
incorporated into new development to maintain the function and value of water
resources and associated upland habitat areas while allowing for passive
recreational use. Development within natural resource protected areas is largely
controlled, and where applicable, prohibited under established regulations. Specific
performance standards within a Natural Resource Protected Area are as follows:
i. Surface Water. Incorporate lakes and streams into the surface water
management system consistent with applicable watershed district, State of
Minnesota, and Federal statutes and rules (e.g., pre -treat runoff before
discharging into a lake or stream, volume control, and rate control).
•
1
•
1
•
Attachment 1: Site Layout Performance Standards Page 3
ii. Wetland Preservation Corridor. Establish the WPC in accordance with
watershed district rules. The delineated WPC will be established during the site
planning process.
iii. Vegetated Wetland Buffer. Establish an upland buffer of native vegetation
around wetlands within the WPC to maintain water quality and habitat.
Development is regulated in the following manner:
(a) The buffer shall average at least 50 feet in width, measure at least 25 feet
at all points, and meet the average width at all points of concentrated
inflow. The location of the buffer shall maximize the protection of ESAs.
(b) The vegetated wetland buffer and upland habitat area must meet the
requirements in RCWD RMP -3 and the Vadnais Lake Area Water
Management Organization, as amended
(c) Structures shall be setback a minimum of 10 feet from the edge of the
wetland buffer.
iv. Natural and Semi- Natural Areas. Conserve and enhance the function and
value of these areas for habitat, water quality, surface water management,
aesthetics, and passive recreational use.
(a) Suitable habitat for rare, threatened, or endangered species shall be
protected to the extent practical.
(b) The Level Two (T 3) tree preservation and mitigation requirements in
Section 3. Subd.4.Q shall apply to Natural Resource Protected Areas.
(c) Prairie and other non -woody natural and semi- natural communities shall be
considered for protection, restoration, and /or inclusion in the surface water
management system.
(d) Structures shall be setback a minimum of 10 feet from the edge of
protected natural and semi - natural areas.
b) Natural Resource Conservation Areas. These areas shall be conserved to
maintain the function and value of the area while allowing encroachment and
disturbance to accommodate development. Specific performance standards within a
Natural Resource Conservation Area are as follows:
i. Natural and Semi- Natural Areas. Conserve and enhance the function and
value of these areas for habitat, water quality, surface water management,
aesthetics, and passive recreational use.
(a) Suitable habitat for rare, threatened, or endangered species shall be
protected to the extent practical.
(b) The Lcvcl Two (T 2) tree preservation and mitigation requirements in
Section 3. Subd.4.Q shall apply to Natural Resource Conservation Areas.
(c) Prairie and other non -woody natural and semi - natural communities shall be
considered for protection, restoration, and /or inclusion in the surface water
management system.
Attachment 1: Site Layout Performance Standards Page 4
(d) Structures shall be setback a minimum of 10 feet from the edge of
protected natural and semi - natural areas.
ii. Wetlands Non - contiguous to the WPC: These areas shall be conserved in
accordance with applicable watershed district and Army Corps of Engineers
rules and permit requirements, as amended.
iii. Vegetated Wetland Buffer. Establish an upland buffer of native vegetation
to wetlands non - contiguous to WPC to maintain water quality and habitat.
(a) The buffer width must be at least 25 feet adjacent to the entire wetland.
The location of the buffer should maximize the protection of ESAs.
(b) The vegetated wetland buffer and upland habitat area must meet the
requirements in RCWD RMP -3 and the Vadnais Lake Area Water
Management Organization, as amended.
(c) Structures shall be setback a minimum of 10 feet from the edge of the
wetland buffer.
c) Natural Resource Corridor Enhancement Areas. These corridors shall be
established to provide contiguous and complete natural open space system, surface
water conveyance, and passive recreational uses. Specific performance standards
for Natural Resource Corridor Enhancement Areas are as follows:
i. Corridors should minimize natural resource fragmentation by creating
connections within and between natural resource protected areas or natural
resource conservation areas located on site and on adjacent properties.
ii. Corridors should be established where there is a convergence of multiple
features, such as surface water management areas, natural and semi- natural
areas, and existing or proposed trail corridors.
iii. The Level Two (T 2) tree preservation and mitigation requirements in Section 3.
Subd.4.Q shall apply within Natural Resource Corridor Enhancement Areas.
3) Wetland Buffer and Upland Habitat Requirements.
a) As a condition of approval, a property owner must record a declaration in a form
approved by the City establishing vegetated wetland buffer area adjacent to the
delineated edge of a wetland and upland habitat defined as an ESA through the site
planning process. The declaration must state that on further subdivision of the
property, each subdivided lot of record shall meet the monumentation requirement
of paragraph E.2.b.3.b. On public land or right -of -way, in place of a recorded
declaration, the public owner may execute a written maintenance agreement with
the City. The maintenance agreement will state that if the land containing the buffer
or upland habitat area is conveyed to a private party, the seller must record a
declaration for maintenance in a form approved by the City.
b) Buffer or upland habitat area is to be indicated by permanent, freestanding markers
at the buffer or habitat area upland edge, with a design and text approved by City
staff in writing. A marker shall be placed at each lot line and at all angle and curve
points, with additional markers at an interval of no more than 200 feet. On public
land or right -of -way, the monumentation requirement may be satisfied by the use of
•
•
•
•
•
•
Attachment 1: Site Layout Performance Standards Page 5
markers flush to the ground, breakaway markers of durable material, or a
vegetation maintenance plan approved by City staff in writing.
c) The application must include a natural resource management plan for City approval
that includes the following: site inventory, management goals, management
activities, maintenance activities, monitoring activities, funding mechanisms, and
any other information requested by City staff.
d) The buffer or upland habitat area will consist of vegetated land, primarily plant
species native to this region that is not otherwise disturbed, except for periodic
cutting or burning that promotes the health of the buffer or upland habitat area,
actions to address disease or invasive species, or other actions to maintain or
improve buffer or habitat area quality, each as approved in writing by City staff.
The following are prohibited: land that is cultivated; cropped; pastured; mowed;
fertilized; used as a site for depositing snow removed from roads, driveways or
parking lots; or subject to the placement of mulch or yard waste. For public road
authorities and stormwater system maintenance, the terms of this subsection will be
modified as necessary to accommodate safety and maintenance feasibility needs.
e) Wetland buffer and upland habitat area may be disturbed to alter land contours or
improve buffer and upland habitat function if the following criteria are met:
i. An erosion control plan is submitted under which:
• alterations are designed and conducted to expose the smallest amount
of disturbed ground for the shortest time possible;
• fill or excavated material is not placed to create an unstable slope;
• mulches or similar materials are used for temporary soil coverage; and
• permanent native vegetation is established as soon as possible.
ii. Wooded buffer and native riparian canopy trees are left intact.
iii. When disturbance is completed:
• sheet flow characteristics within the buffer are improved;
• average slope is no steeper than preexisting average slope or 5:1
(horizontal:vertical), whichever is less steep; however, preexisting slopes
steeper than 5:1 containing dense native vegetation will not require
regrading;
• the top 18 inches of the soil profile is not compacted, has a permeability
at least equal to the permeability of the preexisting soil in an
uncompacted state and has organic matter content of between five and
15 percent; and
• habitat diversity and riparian shading are maintained or improved.
iv. A re- vegetation plan is submitted specifying removal of invasive species and
establishment of native vegetation suited to the location.
v. A recorded declaration or, for a public entity, maintenance agreement is
submitted that states that for three years after the site is stabilized, the
Attachment 1: Site Layout Performance Standards Page 6
property owner will correct erosion, maintain and replace vegetation, and
remove invasive species to establish permanent vegetation according to the re-
vegetation plan.
vi. Disturbance is not likely to result in erosion, slope failure or a failure to establish
vegetation due to existing or proposed slope, soil type, root structure or
proposed construction methods.
f) No above- or below- ground structure or impervious surface may be placed within
the buffer or upland habitat area permanently or temporarily, except as follows:
i. A public utility, or a structure associated with a public utility, may be located
within a buffer or upland habitat area on a demonstration that there is no
reasonable alternative that avoids or reduces the proposed buffer intrusion. The
utility or structure shall minimize the area of permanent vegetative disturbance.
ii. Stormwater features that are vegetated consistent with E.2.b.3.d may be
located within buffer on site - specific approval.
iii. Buffer or upland habitat area may enclose a linear surface no more than 10 feet
in width and, for buffer, no less than 25 feet from the delineated wetland edge
for non - motorized travel if wetland habitat will not be measurably reduced. Trail
edge mowing is not permitted.
3. Disconnect and Distribute Stormwater. The guidelines established in this section are for
the purposes of maximizing the use of pervious areas at the site to help filter and infiltrate runoff
generated from impervious areas and to spread excess runoff over pervious areas.
a. Compost and Amended Soils. To recover soil porosity lost due to compaction, soils
should be amended to allow for adequate water holding capacity for plant growth and
infiltration of runoff.
b. Disconnect Impervious Surfaces. Runoff from impervious surfaces such as parking lots,
driveways, and sidewalks should be routed to adjacent pervious areas to be filtered or
infiltrated into the soil.
c. Rooftop Disconnection. Runoff from rooftops should be spread over lawns and other
pervious areas.
4. Reduce Impervious Cover. Less impervious cover directly results in less stormwater runoff
and pollutant loads generated at the site. Impervious surface should be reduced to the extent
practical.
•
•
•
Attachment 1: Site Layout Performance Standards Page 7
Incentives. To provide for equitable economic return in consideration of protection and conservation of
ESAs and surface water management areas, potential incentives may be offered. The following are
potential incentives that may be offered (the location of these incentives in the ordinance is yet to be
determined):
1) Wetland replacement credits
2) Stormwater management credits
3) Density bonus or transfer
4) Tree preservation credits
5) Landscape requirement credits
6) Park ded /cation credits
7) Trunk utility and stormwater management fee credits
8) Reduced setbacks
9) Staging plan flexibility
10) Financial incentives when consistent with city poly
11) Reduce required front yard setback to reduce driveway length
12) Reduce required side yard setback to allow narrower frontages to reduce street length
13) Reduce required street width
14) Reduce required cul -de -sac radius
15) Reduce required parking ratios
16) Reduce required parking lane widths
17) Reduce required parking stall dimensions
18) Reduce driveway width
19) Allow shared driveways
20) Allow alternative surfaces for driveways (pervious)
21) Reduced sidewalk requirements
•
•
Attachment 2: Landscaping and Tree Preservation Standards - REVISED May 26, 2010 Page 1
Q.
Landscaping and Tree Preservation Standards
1 Purpose. To establish landscaping standards and tree preservation requirements to promote
high quality site development, compatibility of uses, biodiversity, tree japateetieopreservation,
and to enhance the health, safety and general welfare of the residents of the community.
2 Definitions. The following words and terms, wherever they occur in this Ordinance, shall be
interpreted as herein defined:
Approved Species: Species found on the City maintained list which may be planted. The City
may restrict applicant's use of approved species in certain situations where the species may
be inappropriate.
Basic use area: Area dedicated to site's primary- use, including buildings, parking, loading,
driveways, streets, outbuildings, trash enclosures, utilities, landscaping, and grading
necessary for cmc . the construction of the above uses. Surface water detention
ponds are not part of the basic use area.
Biodiversity: The variety, distribution and abundance of living organisms in an ecosystem.
Buffer: Linear bands of vegetation, and /or space providing separation between two separate
land uses.
Caliper: Standard measure of tree size for newly planted trees. The caliper inches of a tree
is the diameter of the trunk. This dimension is measured at 6" above the ground when the
trees are 4" caliper and less. For trees over 4" caliper, the diameter of the trunk is measured
at 12" above the ground.
Canopy: The top layer or crown of trees.
Cutting: The feeling or removal of a tree or any procedure in which the natural result will
lead to the death or substantial destruction of a tree. Such acts include, but are not limited
to, severe cutting back of limbs to stubs larger than three inches in diameter, and damage
inflicted upon the root system of the tree. Cutting does not include normal pruning within
the bounds of normal arboricultural practice.
Damage: Action or inaction which does not follow good arboriculture practices. Damage
may include damage inflicted upon roots by machinery, changing the natural grade above
the root system or around the trunk, destruction of the natural shape or any action which
causes infection, infestation or decay.
DBH: Diameter at breast height, typically measured at 4' -6' above the ground.
Detention Area: Area of a detention pond from the normal water level and up the side
slopes to 10' offset from the high water level.
Disturbance: Any construction, development, removals, earth movement, clearing or other
similar activity.
Diseased tree: A tree with a health condition which makes it subject to a high probability of
failure.
Dripline: Imaginary line on the ground that is extended straight downward from the
outermost edge of the canopy.
Foundation Landscape Zone: Within 15' of the building.
Invasive species: A plant non - native to the local ecosystem which exhibits, or has the
potential to exhibit, uncontrolled growth and invasion or alteration of the natural functions of
any native habitat.
1 Attachment 2: Landscaping and Tree Preservation Standards - REVISED May 26, 2010 Page 2
Large Shrub: Large shrubs have a mature height over 6'.
Large Tree: Overstory deciduous trees with a mature height of at least 40'.
Medium Shrub: Medium shrubs have a mature height of 3' -6'.
Medium Tree: Deciduous trees with a mature height over 18' and up to 39'.
Native species: A plant species that is indigenous to the local ecosystem.
Perennial: A plant, usually a flowering species, having a lifespan of more than two (2) years.
Prohibited species: Species that may not be planted within the City that are typically invasive
or considered a nuisance.
Removal: Actual removal or effective removal through actions resulting in the death of a tree.
Root Protection Zone: A protected area around an existing tree established by offsetting the
dripline 5' away from the tree center.
Screen: A barrier that hinders sight and, potentially, access.
Small Shrub: Small shrubs have a mature height of less than 3'. Small shrubs are
interchangeable with perennials, ornamental grasses and groundcovers to fulfill landscape
requirements.
Small Tree: Understory deciduous trees with a mature height of 18' and under.
Tree: Any self supporting woody plant, growing up the earth with one trunk of at least 3"
dbh, or a multi- stemmed trunk system with a definitely formed crown.
Undesirable tree: Trees that are dead, diseased, structurally weak, invasive or trees that are
hazardous to people, infrastructure or buildings.
Topping: Severe pruning removing at least 30% of a tree canopy, and drastically altering the
shape.
Whip: Small bare root tree with a juvenile root system.
•
•
•
•
•
1 Attachment 2: Landscaping and Tree Preservation Standards - REVISED May 26, 2010 Page 3
I3
ApplieabilityLandsca ping Standards. New residential platted subdivisions, mixed use,
commercial, institutional and industrial uses shall be subject to the landscaping requirements.
The landscape requirements have been divided into four categories: Canopy Cover (C),
Foundation Landscape (FL), Open Areas Landscape (OL),. Landscape Screen (LS) and
boulevard trees. - - -- - - - - - - - - - -- - - levels for the C, FL, and OL
Use
Mixed-Use
Buildings
Connnereial
Institutional
Industrial
NA
X10% C 2
Foundation Foundation Open -Areas
Landscape-EFL) Landscape CQ � .
NA
F 2. Front Facade
F i1--L : back and
sidefacades
10% C 1
IL 2:facadc3
facing -public -reads
of-less-intense
uses
FL 1: all othcr
facades
X10°/, C 2
FL 2:facadc3
faces- public -reads
. t.
vIet-less-intense nRCl'19e
uses
FL 1: all othcr
facades
10% C 2
FL 2: facades
facing public -reads
or 1. nt
USE'S
FL 1: all othcr
facades
10% C 2
FL 2: facades
facing - public -reads
et-less-intense
uses
FL 1: all other
facades
NA
Sec Section
Q.5 for
Foundation
Landscape
fequirement
fet-frontr sidei
back. -and
facing-stfeets
OL 1: outietsj
areas
OL 2: outlot;
OL 3: dctcntion pond
areas
detention -areas
areas
OL 1: applicable non
dctc as
areas
dctcntion a
OCTCRI'IOII'QreQJ
OL 3: dctcntion pond
areas
OL 2: applicable non
detention- areas
areas
Landseape
See-Sectien
Q.7 for
Landscape
Seteen
t
1 Attachment 2: Landscaping and Tree Preservation Standards - REVISED May 26, 2010 Page 4
4 Canopy Cover (C). The purpose of this requirement is to mitigate the effects of vehicular
hardscape by establishing tree canopy cover to intercept rainfall, protect pavement from sun
deterioration, reduce the heat island affect, and improve aesthetics. Vehicular hardscape
areas includes loading drives, parking lots, driveways, dropoffs and other areas covered with
a hard surface intended for vehicles.
a. The required minimum canopy coverage for all uses is 40 %. each level is described in
tne-following table-
b. The following equation shall be used to calculate required canopy coverage:
Vehicular Hardscape (Square Feet) x Canopy Cover Percent = Required Minimum Canopy Cover (Square Feet)
The total of the assigned canopy coverage values for all the trees in or near the vehicular
hardscape must be equal or greater than the required minimum. Pervious pavements are
considered 50% hardscape.
c. The assigned canopy coverage value of each tree is based on planting location, tree size
and anticipated tree canopy size 15 years after planting. The assigned canopy cover
value to each deciduous tree is described in the following table and illustrations:
Assigned Canopy Cover Value
Planting Location
(for new trees)
Interior parking
lot islands
Within less than 7' of
vehicular hardscape
edge
7' -12' from
vehicular
hardscape edge
Assigned Canopy Coverage
Value
100% of the
canopy square
footage
50% of the canopy
square footage
25% of the
canopy square
footage
Square feet (SF) of
canopy coverage
assigned to each
deciduous tree*
Large Tree
1200958 SF, or
600175 SF
SF
9504489 SF per
tree in islands
with 1 or 2
treesh 3 or
trcc
morc
Medium Tree
498 -500 SF
215 250 SF
123 125 SF
Small Tree
250 SF
125 SF
NA
Existing Tree:
6 -12 "dbh
1900 SF
950 SF
NA
Existing Tree:
12+ "dbh
2850 SF
1425 SF
NA
•
•
•
•
•
Attachment 2: Landscaping and Tree Preservation Standards - REVISED Mav 26, 2010 Page 5
d. Existing trees may be used to fulfill canopy coverage as described in Section 9 when the
dripline has proximity to the edge of the hardscape; therefore, existing trees do not need
to be within less than 7' feet of the vehicular hardscape edge.
Wrge trey, an is nd containing
3 more trees are given oicabond
Canopy Wlue. See Crape Cordage
Table
Trees unfounded by hardscape on 3
sides are valued at 100% Canopy.
Trees with access to planting soil
outside of the island are required to
meet soil volume requirements for a
shared bed.
Trees in anterior ilia
100% Canopy
5 Foundation Landscape (FL). The purpose of this requirement is to soften and enhance
building architecture, define access points, add color and seasonal interest, and to blend
buildings in with the natural environment.
a. The foundation landscape planting requirement for cash tcvcl 'care described in the
following table:
Foundation Landscape (FL) Requirements
*Round to the nearest plant
b. The following equation shall be used to calculate required foundation landscape
plantings:
Building Linear Feet / 100 = # of required trees and shrubs
c. _The foundation landscape shall be planted in the foundation landscape zone adjacent to
the building face where the requirement applies. The City may allow flexible planting
locations where service areas or other constraints make the requirement difficult to meet.
a-d. Existing trees may be used to fulfill foundation landscaping as described in Section 9.
6 Open Areas Landscape (OL): The purpose of this requirement is to provide general site
beautification and high aesthetic quality with a mix of plant materials in open areas. Open
areas include disturbed site areas, such as outlets; cul de sac islands, boulevard medians,
storm water detention-management areas, common areas in multifamily sites that are not for
Per 100 linear feet (LF) of Building*
Locationevel
Trees and Shrubs
Rear and Side
1 large,
1.5 medium, or
2 small
3 large,
5 medium, or
10 small
�� y
T'��Z'
Front and Street
2 large,
3 medium, or
4 small
6 large,
10 medium, or
20 small
Foundation
Landscape Zone
Within 15' of the building
*Round to the nearest plant
b. The following equation shall be used to calculate required foundation landscape
plantings:
Building Linear Feet / 100 = # of required trees and shrubs
c. _The foundation landscape shall be planted in the foundation landscape zone adjacent to
the building face where the requirement applies. The City may allow flexible planting
locations where service areas or other constraints make the requirement difficult to meet.
a-d. Existing trees may be used to fulfill foundation landscaping as described in Section 9.
6 Open Areas Landscape (OL): The purpose of this requirement is to provide general site
beautification and high aesthetic quality with a mix of plant materials in open areas. Open
areas include disturbed site areas, such as outlets; cul de sac islands, boulevard medians,
storm water detention-management areas, common areas in multifamily sites that are not for
1 Attachment 2: Landscaping and Tree Preservation Standards REVISED May 26, 2.01.0 Page 6
recreation facilities, and disturbed areas that are not located within the foundation landscape
zone, vehicular hardscape area or the building footprint. Open areas landscaping shall meet
the following requirements.
a. The open areas planting requirements for-each Icvc is described in the following table:
Open Areas Landscape (OL) Requirements
Level
Per 2000 SF
Trees and Shrubs
1 large,
1.5 medium, or
2 small
3 large,
5 medium, or
10 small
AL-I
Per-WOO-SF
Per 5000 SF
OL-2
Per 3000 Sf
Per-3094.-6F
9143
Per 2000 Sr
2000
Per SF
b. Round all calculations to the nearest whole number of plants.
c. Only land above the normal water level shall be included in the open area calculation for
storm water detention areas. Planting shall be located above the normal water level in
detention areas. The City may require specific tree species in locations where water
levels vary.
d. Existing trees may be used to fulfill open areas landscaping as described in Section 9.
e. Areas that are included in a project - specific natural resource management plan that
addresses vegetation are not subject to the open areas landscaping requirements.
7 Landscape Screen: The purpose of this requirement is to separate and buffer different land
use types, screen roads and parking, and hide utility and loading areas. Landscape screens
shall meet the following requirements.
residential uscs, provide a year round scrccn at least 30" in hcight. Tlhe parking lot
years. Sec Q.7.d.
1) Between residential uses and arterial or collector roads.
•
•
•
•
•
1 Attachment 2: Landscaping and Tree Preservation Standards - REVISED May 26, 2010 Page 7
#eHewing mctheds
.. -- - --
a. Required screen location, height, and materials are described in the following table:
Screen Location, Height and Materials
Location
Required
Required Screen Materials
Screen
Height
Between a parking lot
30 inches
• year round continuous planting screen in
and
public right of way or
accordance with paragraph 7.b.
sidewalk
or
• continuous wall or fence of permanent
material
Between a parking lot
30 inches
• continuous berm or wall or fence of
and
permanent materials to block headlights
adjacent residential
and
uses
• plantings shall provide shrub cover for 50%
of the wall or fence on the exterior side
Between residential
6 feet
• year round continuous planting screen in
uses
accordance with 7.b.
and
or
• wall or fence of permanent materials
arterial or collector road
Between any
and plantings shall provide shrub cover for
development
50% of the wall or fence on the exterior side
and
or
• 6 ft. berm
adjacent, less intense,
residential land use
or
• 4 ft. berm with additional 2 ft. year round
Between loading /service
area
continuous screen in accordance with
and
paragraph 7.b.
public view
+#b. - - e : S .:.. - - .: ,AII continuous year round
planting screens shall require at a minimum a double row of plans with .
triangulated spacing ke -u;ed. See illustration. Shrubs Plantings
shall be spaced so that visibility through the screen is completely
blocked within 5 years of the time of planting. Small shrubs shall be a planted at a
maximum of interval of 3' on center, medium shrubs shall be planted at a maximum
1 Attachment 2: Landscaping and Tree Preservation Standards REVISED May 26, 2010 Page 8
interval of 4' on center, and large shrubs shall be planted at a maximum interval of 6' on
center unless otherwise authorized by the City.
c. A wall or fence intended to provide a continuous year round screen shall block visibility
completely.
d. In addition to the shrub and wall /fence screen requirements, all screens shall be planted
with large trees every 50 LF, medium trees ever 35 LF, or small trees every 25 LF or
some combination thereof, along the length of the screen.
. Existing vegetative screens should be left in place unless composed of invasive species or
otherwise directed by the City. Existing screens may be enhanced with new plantings to
comply with the requirements.
f. Berms shall be irrigated withand have maximum side slopes of 3:1.
g. Permanent walls and fences shall be offset by a
minimum of 2' at intervals of 75' maximum length
for stability and visual relief. See illustration.
1 mr
h. Approved permanent wall /fence materials include wood, metal, masonry, concrete and
stone. Fences also may be vinyl.
8. Boulevard Tree Requirements:
a. Boulevard trees are required at the rate of one tree per 70 linear feet of road frontage
where property fronts any public road. The City shall collect a standard fee per tree
based on the estimated market rate cost to purchase and install trees within the
development site.
b. Existing trees may be used to fulfill boulevard tree requirements at the City's discretion.
9. General Landscaping Requirements:
a. Desirable existing trees may be used to fulfill Canopy Cover, Foundation Landscape and
Open Areas Landscape requirements if applicable by placement. Desirable existing trees
are valued according to the following table:
Existing Tree Value
Tree Size
Deciduous
trees under 6"
DBH or
Evergreen
trees under
12' tall
Deciduous
trees between
6 " -12" DBH or
Evergreen
trees between
Deciduous trees
over 12" DBH or
Evergreen trees
over 20' tall.
12' -20' tall
Tree Value
1 large tree
2 large trees
3 large trees
b. Requirements may be met by grouping different sizes of trees and shrubs.
c. New trees may fulfill Canopy Coverage, Foundation Landscape and Landscape Screen
requirements simultaneously if applicable by placement.
d. An existing tree is considered to be removed if the tree trunk is damaged or if more than
30% of the dripline area is disturbed during the construction process.
•
•
•
•
•
•
1 Attachment 2: Landscaping and Tree Preservation Standards REVISED May 26, 2010 Page 9
e. The City may allow flexibility in landscape requirements if there are conflicts with solar
power, wind power, water harvesting, food production or other innovative measures
proposed for the site.
f. The landscape plan shall be compared to all applicable CPTED (Crime Prevention
Through Environmental Design) standards and reviewed by the police department.
g.
Trees and shrubs shall not be planted in the right of way without City authorization.
10. Landscaping Guidelines and Technical Requirements: The purpose of the guidelines
and technical requirements is to encourage plant longevity, minimize maintenance, and
mitigate conflicts with other site features. An initial investment in high quality materials,
careful design and planning, and proper construction techniques can result in plant longevity
and long term maintenance cost reduction.
a. Species Selection: Appropriate species selection is critical to maximize the benefits of
plant materials. Healthy, long lived plants well suited to a site will reduce maintenance
and replacement costs, while providing the most aesthetic and environmental gain.
Native species in the built environment will supplement and connect the existing natural
areas. Diversity is also important for an overall healthy and balanced landscape that is
less susceptible to pests and disease.
1) The City shall maintain a list of approved species. The list is based on Lino Lakes
area natural vegetative cover and includes additional hardy, non - invasive species.
Approved species are classified by size. For each site, plants shall be selected based
on mature size and adaptability to site conditions, such as microclimate, salt,
pollution and other factors. The list of approved species is not exhaustive.
Applicants requesting to plant a species not on the list shall submit species name,
height, width, form, hardiness zone, and other relevant information. The City shall
classify new species based on tree size standards. For large projects the City may
require applicants to comply with the following requirements:
i. Species diversity
ii. A minimum percentage of native species
iii. A minimum percentage of large trees
iv. A minimum percentage of evergreen trees.
2) The City shall maintain a list of prohibited species. This list includes species that are
invasive or have other negative characteristics that may lead to ecological damage.
3) Exposed soil is not allowed. All areas not covered by a structure or hardscape shall
be planted and mulched in accordance with the following:
i. In areas with low pedestrian traffic, the use of low maintenance turf, typically
fescue blends, is encouraged. In areas of high pedestrian traffic, the use of turf
mixes with a higher percentage of rye grass is encouraged.
ii. Turf in areas near roads and parking lots shall be salt tolerant.
iii. Groundcovers shall be turf, perennials, annuals, small grasses, or low spreading
shrubs. Type of groundcover should be determined by site conditions and
1 Attachment 2: Landscaping and Tree Preservation Standards REVISED May 26, 2010 Page 10
anticipated use. Mulch is acceptable in landscape beds and areas not suitable for
living groundcovers.
iv. Hardy perennial forbs and ornamental grasses should be used in car overhang
areas and places where snow may be stored.
4) Annual plantings should be minimized within 10' of a tree. The process of frequently
replanting may damage the tree's shallow root system.
5) Seed mixes should be used in large expanses of naturalized areas. The City shall
maintain a list of approved seed mixes. Where seed mixes are used, the City may
request that visible edge treatments be planted with more deliberate groupings of
flowering plants.
6) A permanent solid edge such as a 6" concrete, stone or other barrier is required
between native seeded areas and turf unless otherwise approved by the City.
b. Planting Requirements:
1) To promote development of a large, healthy canopy, trees shall be planted in
accordance with the requirements in the following table and illustration:
Planting Requirements
Tree Size
Minimum
island width
for roots
(back of curb
to back of
curb)
Minimum
tree
opening
Minimum
planting
soil
depth
Minimum
cubic feet
of soil
available
per tree in
a single
bed
Minimum
cubic feet of
soil available
per tree in a
shared bed or
three sided
island
Large Tree
9, 0„
4' x 6' or
5' x 5'
2430"
440486 CF
—
400325 CF
—
Medium Tree
6' -0"
4' x 6' or
5' x 5'
2430"
—
300256 CF
—
27024 -5 CF
—
Small Tree
5' -0"
4' x 5'
1830"
250486 CF
2254-35 CF
F
c
a L
E 51y
c
inimum Island Width
i
Calculate planting soil volume by Length x Width x Depth
16' typical car space
At tr. Tea LIGel
nf:.ic = .litTttt ?�:
Planting Soil
Engineered Planting Soil
Minimum Island Width dimension can be reduced to the Minimum Tree Opening dimension if
engineered planting soils are used beneath adjacent hardscape to achieve required soil volume.
•
•
•
•
•
1 Attachment 2: Landscaping and Tree Preservation Standards - REVISED Mav 26, 2010 Page 11
2) Soils: Landscaped areas need high quality soils that retain moisture for plants to use,
but drain adequately. Soil shall be uncompacted existing soil, new planting soil or
engineered soils designed to allow plant growth. Proper soil preparation helps to
ensure long term survival of the plants and to reduce the need for ongoing
maintenance, additives, and pest control. If soil compaction exceeds 1400 kPa (200
psi) at the time of planting, the soil shall be loosened. Preexisting soils may be used
and should be protected from compaction during construction.
3) Mulch: Mulch helps plant health by keeping the soil moist, protecting soil nutrients,
preventing erosion, encouraging infiltration, and inhibiting weed growth. Mulch from
decomposing materials such as wood chips enriches the soil over time. Although
decomposing mulch needs to be replenished approximately twice a year to maintain
adequate thickness, once plants grow together there is often need for little or no
mulch. Mulch shall comply with the following requirements:
a) Provide mulch at a depth of 3 -4" for wood chips, 4 -6" for shredded bark and 3 -4"
for rocks or other non - organic matter.
b) Provide a 3' minimum diameter mulch ring at the base of trees.
c) Prohibit mounding mulch at the bases of trees, or allowing mulch within 4" of
plant stems and trunks, as this will cause them to rot.
d) If used, only water permeable fabric is permitted as a weed barrier.
e) Leave one inch of space from the top of the mulch layer to adjacent hardscape
surfaces to prevent spilling.
f) The City may limit certain types of mulch in areas where safety or spilling may be
an issue.
g)
Mulch should not be mixed with underlying soil.
4) Fertilizer: When fertilizer is used, organic and slow release fertilizers are
recommended.
5) Drainage: Tree planting pits shall drain adequately. Drainage for trees may be
accomplished through the use of non - compacted and well draining soils. The City
may require the following drainage test: Dig 8" diameter holes 1' deep and fill with
water. If the holes do not drain within 24 hours adjust bed design or composition in
order to achieve proper drainage. If the underlying soils retain water, the applicant
shall provide additional drainage measures.
6) Tree protection after construction: Bollards, barriers, or spacing may be necessary
to protect trees from cars. Bike parking should be included to discourage locking
bikes to trees. For tree protection during construction see Section Q.15.
c. Tree and Infrastructure Placement: Tree placement should be given consideration when
locating overhead and underground utilities. Service utilities should be located outside of
plant beds where they may conflict with tree plantings. Consider using conduits for
buried utilities to allow future work with less disruption to roots. The clearances in the
1 Attachment 2: Landscaping and Tree Preservation Standards - REVISED Mav 26, 2010 Page 12
following table are recommended from the center of the tree trunk to avoid future
conflicts:
Tree and Utility Spacing Recommendations
Utility
Distance to Center of Tree
Lights, Utility Poles, Fire Hydrants
10'
Water, Sanitary, Storm and Gas lines
6' from the center of the line.
Conduit for dry utilities (electric, cable)
3'
Utility clean outs and access points
3'
Overhead utility lines (consult utility
company for additional requirements)
5' to mature tree canopy (may require
trimming, topping is prohibited, see
Section Q.10.f)
d. Clear Vision Area for Local Residential Roads: Shall
mean the triangular area of a corner lot formed by the
intersection of the right -of -way (ROW) lines and a line
connecting them at points 20' from the intersection
unless otherwise directed by the City (see illustration).
Within this area, visibility shall be unobstructed
between a height of 30 inches and 8 feet above the
center line grades of the intersecting roads.
Clear Vision Area for County Roads: Shall be
determined on a case by case basis, depending on the road alignment, grading, traffic
speed and the nature of the intersection and is subject to County and City review.
e. The minimum plant size requirements are described in the following table:
Minimum Plant Size Requirements
Plant Type
Minimum Size*
Large trees
Bare Root - 1.75"
Balled and Burlapped or Container - 2" caliper
Medium and small trees
Bare Root - 1.5"
Balled and Burlapped or Container - 1.5" caliper
Evergreen trees
6' height
Large shrubs
3 gallon container
Medium shrubs, small shrubs and
groundcovers
1 gallon container
Ornamental grasses and perennials
4" pot
* City may limit bare root plantings in areas of high visibility. In selected situations the City may
allow ten (10) whip bare root plantings, or five (5) 3/4" caliper bare root plantings to be
substituted for 1 large tree. Bare root plantings must be protected with rodent guards.
f. All boulevard trees shall be balled and burlapped and a minimum size of 2" caliper
g. Installation and Maintenance
1) Installation: Proper planting is the first and most important step toward establishing
healthy and low maintenance vegetation. All plantings shall be installed in
accordance with standard practices of horticultural professionals.
•
•
•
•
•
•
1 Attachment 2: Landscaping and Tree Preservation Standards - REVISED May 26 2010 Page 13
Stem girdling roots are often fatal for trees that have been planted too deep or have
mulch or soil built up around the trunk. All trees shall be planted so that the root
flare (where the trunk widens out just above the roots) is visible above the ground
level and the highest large root is within 1/2" of the ground surface. All adventitious
roots should be cut away at the time of planting to avoid the formation of stem
girdling roots.
2) Maintenance: The property owner or if applicable, the homeowners association, shall
be responsible for maintenance of landscape elements (plants, structures, pavement,
etc.) so as to present a neat and aesthetically pleasing appearance free of any
unhealthy or potentially unsafe conditions. Landscaping shall be maintained to be
weed -free, healthy, trimmed, mown, edged, reseeded, pruned, and replaced with
similar plant species if necessary. Specific requirements for watering and pruning
follow:
i. Watering: All plantings require regular watering for at least the first three years
to get established. Once the root system has developed, many hardy plants,
especially native plants, may only need supplemental watering in drought
conditions.
Cultured turf areas and landscape berms shall be permanently irrigated. The
City may allow low maintenance turf to be non - irrigated if a method for
supplemental watering, such as a spigot or rain barrel, is provided.
For landscape beds ongoing irrigation may be provided through a permanent or
temporary system, or by hand. (Note: typical installed irrigation systems do not
provide adequate water for new trees.) Permanent irrigation systems with an
automatic controller shall utilize rain sensing technology. Overspray should not
fall outside of the landscaped area. Water efficient drip or underground
irrigation is required in shrub and groundcover landscape beds for permanent
systems. Temporary systems may use spray irrigation for shrubs or plugs. See
Water Conservation Ordinance for additional watering requirements.
ii. Pruning: Plants shall be pruned to avoid conflict with other structures, remove
dead or diseased limbs and for optimum shaping. The City recommends that
trees be pruned by a certified arborist every 4 -7 years, which can help reduce
maintenance costs. Topping or extreme crown reduction is prohibited unless the
tree is a safety hazard or such measures are approved by the City.
Trees overhanging walkways should be pruned up to 7' when mature. Trees
overhanging streets should be pruned up to 10' when mature. Smaller trees
should receive limited pruning appropriate to the size and age of the tree.
Branches that are hazardous for any reason shall be removed immediately. The
City may direct pruning.
The property owner or if applicable, the homeowners association, shall be
responsible for removing any trees or shrubs or parts thereof that are dead,
diseased or overhang or interfere with traffic control devices, public sidewalks, or
rights -of -way.
Attachment 2: Landscaping and Tree Preservation Standards REVISED May 26, 2010 Page 14
1 11. Tree Preservation and Mitigation StandardsRequirentents: The purpose of these
requirements is to protect valuable trees and stands of vegetation, while not interfering with
landowners' reasonable use and development of property. The goal is to minimize
unnecessary loss of habitat, biodiversity and forest resources and to replace removed trees in
areas where tree cover is most critical. Except where specifically excepted, tree preservation
and mitigation requirements apply to all plats, site plans, conditional use permits, interim use
permits, excavating, grading, building, or other similar activity.
1
1
a. Tree preservation and mitigation requirements fer—eaehIevclare described in the
following table:
Tree Preservation and Mitigation Requirements
Environmentally
Sensitive Area
(ESA) Category
Tree Location:
within Basic
Use Area
Tree Location: not within Basic
Use Area
Deciduous
trees 6" dbh
and over or
Evergreen trees
between 12'-
20' tall
Deciduous trees
6 -12" dbh or
Evergreen trees
between 12' -20'
tall
Deciduous
trees over 12"
dbh or
Evergreen
trees over 20'
tall
Non ESA
Lcvcl T 1
no mitigation
required
provide 1 tree per
1 tree removed
provide 2 trees
per 2 1, trees
removed
Natural Resource
Conservation Area
or Natural Resource
Corridor
Enhancement Area
Lcvcl T 2
provide 1 tree per
4 removed
provide 2 trees
per 1 tree
removed
provide 3 trees
per tree
removed
Natural Resource
Protected Area
provide 1 tree per
2 removed
provide 2 trees
per 1 tree
removed
provide 3 trees
per tree
removed
b. Trees used for mitigation purposes must meet the Landscaping Guidelines and Technical
Requirements in Section Q.10.
c. Trees used for mitigation may also fulfill the Open Areas Landscape Requirement at the
discretion of the City.
d. Trees with thirty percent (30 %) of the roots damaged are considered to be removed and
must be mitigated for at the applicable rates.
e. Undesirable trees are not subject to preservation and mitigation requirements.
f. On existing Tots with existing buildings where no building or development activity that
requires a permit or approval from the City is occurring, the removal of trees Trccs on
is not subject to tree preservation and mitigation requirements.
g. Replacement trees shall be planted on site.
h. The applicant may request to pay a fee per tree in lieu of some or all of the trees
required for mitigation. At the City's discretion, the City may accept the fee for planting
trees within the general area of the development project. The City shall maintain a
standard fee per tree based on the estimated market rate cost to purchase and install
trees.
•
•
•
•
•
Attachment 2: Landscaping and Tree Preservation Standards - REVISED May 26, 2010 Page 15
12. Tree Survey:
a. A tree survey is required for all property that contains a deciduous tree greater than 6"
dbh or an evergreen tree greater than 12' tall.
b. The tree survey shall be the basis for the tree preservation plan, tree mitigation
requirements, and the use of existing trees to fulfill landscape requirements.
c. The tree survey shall provide the following information:
1) in the basic use area and other areas where tree removal is proposed, for all
deciduous trees over 6" dbh and all evergreen trees greater than 12' tall:
i. tree species
ii. size
iii. location
iv. dripline
v. tree condition
2) the location of the combined driplines of all tree stands designated for preservation
tree-stands-on the development property
3) on adjacent properties, the dripline of deciduous trees over 6" dbh and evergreen
trees greater than 12' tall where the dripline is within 5' root zone extends ofnte the
development property.
d. For a new plat or new Planned Unit Development, the tree survey shall be one plan sheet
and the tree preservation plan shall be a separate plan sheet.
e. For a building permit for a new structure on an existing lot, the tree survey and
preservation information may be included on the lot survey typically required for a
building permit instead of on a separate document. For a building permit for an addition
to an existing structure, the tree survey information may be provided in an informal
medium that sufficiently conveys the information.
f._ At the City's discretion, the tree survey requirement may be waived under the following
circumstances:
1) Deciduous trees greater than 6" dbh or evergreen trees greater than 12' tall will not
be removed e� -and are not likely to be impacted by construction.
2) Deciduous trees greater than 6" dbh or evergreen trees greater than 12' tall will only
be removed within the basic use area and the basic use area is not an ESA.
13. Tree PretectienPreservation Plan:
a. A tree pretectienpreservation plan shall be required for all soil disturbance activities
where tree preservation and mitigation requirements apply in accordance with Q.11.a. A
tree preteetienpreservation plan shows how pretectiernpreservation and mitigation
requirements will be met and how preserved trees will be protected during construction
and other potentially harmful activities.
1 Attachment 2: Landscaping and Tree Preservation Standards - REVISED May 26, 2010 Page 16
b. The tree preteetionpreservation plan shall be based on the tree survey.
c. If a tree survey shows that no desirable deciduous trees over 6" dbh or evergreen trees
greater than 12' in height on the development property or adjacent properties are near
the construction area, the City may waive the tree preteetienpreservation plan
requirement.
d. A tree preservation plan shall include: the basic use area, the disturbance area,
tree size (dbh), species, condition, location, and root protection zone (5' out from the
dripline) for all deciduous trees over 6" dbh or evergreen trees greater than 12' tall to be
preserved or the combined root protection zone of all stands of trees designated for
preteetienpreservation, whichever is applicable. The plan shall show location and type of
tree protection fence, staging areas, and concrete washout areas. Fencing shall be
installed and inspected by the City prior to soil disturbance. The plan shall show
directional felling if necessary to avoid damage to adjacent trees.
e. Trees to be preserved shall be tagged in the field and keyed to the tree
preservation plan. The City may inspect the trees to verify compliance with the
preteetienpreservation plan at any time during construction.
f. The tree preteet+enpreservation plan s#heeld- -shall not conflict with natural resource
management plan required for environmentally sensitive areas. See Section 2, Subd.
6.E.2.b.
g.
See the Stormwater Ordinance for other construction related requirements.
14. Individual Lot Tree Preservation Plan: To be determined.
15. Tree PreteetienPreservation During Construction: Trees that are to be preserved
must be protected by the following methods unless otherwise approved by the City.
1) Tree protection fencing shall be installed and maintained 5' out from the identified
drip line of the trees (root protection zone) prior to soil disturbance. Fencing shall be
a minimum of 4' high and of a highly visible material, such as snow fence or
polyethylene laminar safety netting, and must be standing throughout the
construction process. Cut roots with clean, pruning cuts at the fence line prior to
fence installation to avoid later tearing of the roots. Signage should be installed to
instruct workers to stay out of the root protection zone.
2) Areas where development must encroach upon the root protection zone must be
identified on the tree preservation plan in which case the fencing shall be
installed at that edge.
3) No actions that may harm the health of the tree, including, but not limited to
construction, traffic, compaction, storage of equipment or materials, including soil,
grading, or concrete washout areas may occur in the root protection zone.
4) Trees damaged by construction, or with more than thirty percent of the roots
disturbed, shall be counted as removed and mitigated at applicable rates.
16. Non - Compliance: If the City finds that the property is not in compliance with the approved
landscaping plan or tree preservation plan, it shall inform the property owner or if applicable,
the homeowners association, regarding the non - compliance and describe, in writing, the
steps needed to bring the property into compliance within a reasonable timeframe, not to
exceed sixty (60) calendar days.
•
•
1 Attachment 2: Landscaping and Tree Preservation Standards REVISED May 26, 2010 Page 17
•
17. Use of Performance Security: If after notification of non - compliance, the property owner
or if applicable, the homeowners association, fails to achieve compliance within sixty (60)
calendar days, the City may exercise its authority to use the performance security to address
compliance.
•
•
•
§ 1001.02S -020 GENERAL.
.1.° -
CONCEPT PLAN
plat, applicants shall prepare and submit a concept plan.
infermal-review-prief 4e- - • :. .. -. . The concept plan shall be the product of a
collaborative design process. On the basis of the concept plan, the city shall informally advise
the subdivider as- pfemptly- spossible of the extent to which the proposed subdivision generally
conforms to the Comprehensive Plan, to the design standards of this chapter, and to other
applicable requirements, and shall discuss possible modifications.
(Ord. 04 -03, passed 2 -24 -2003)
ATTACHMENT 2
19
Prior to submittal of a preliminary
Purpose. The purpose of the Concept Plan is to provide an opportunity for the applicant
to submit a plan to the City showing the basic intent and the general nature of the entire
development before incurring the substantial cost of preparing a preliminary plat application.
This Concept Plan provides an opportunity for the proposal to be publicly considered at an early
stage.
§ 1001.021 4 1001.024 reserved
§ 1001.025 COLLABORATIVE DESIGN PROCESS
!l Purpose. The purposes of the collaborative design process are:
(a) to incorporate into the design of the project the goals and public values in the
Comprehensive Plan and other elements deemed to serve public purposes;
(b) to gather information and obtain guidance as to the general suitability of the
proposal for the area in which it is proposed and its conformity to city policies;
(c) to determine as early as possible if a Planned Unit Development is the most
appropriate and effective means of achieving the goals of the Comprehensive Plan and
complying with the City's site performance standards;
(d) to recognize the economic needs of the project and incorporate them into the
project design;
draft revisions to Chapter 1001 subdivisions draft date 5/17/2010 Page 19 of 72
20
(e) to provide the opportunity to accomplish these things before incurring the
substantial public or private expense of preparing detailed plans and information required for
formal application and review of a preliminary plat.
(2) City staff and the applicant shall meet to collaborate on the design of the project to
incorporate the goals and public values in the Comprehensive Plan. Specialists with expertise on
the issues and elements of the site shall be included in the process when deemed appropriate by
the City or the applicant. For projects that include land within Environmentally Sensitive Areas,
the discussions and meetings shall include representatives of the Rice Creek Watershed District.
The collaborative design process shall include three steps: initial collaboration meeting,
neighborhood meeting, and the collaborative design meeting.
Initial Collaboration Meeting.
(a) Prior to preparing and submitting the concept plan under the requirements of this
chapter, an applicant for a project requiring aplat or Planned Unit Development (PUD) shall
meet with city staff to discuss the proposed development, the requirements for pursuing a
development application, the collaborative design process, and other issues relevant to the
project.
note: The City strongly recommends that the applicant refrain from preparing any site
layout plans prior the initial collaboration meeting in order to avoid the expense of changing the
plans.
(b) _ Information for collaborative design process. The City staff shall assemble and
provide at this meeting environmental information it has that is relevant to the project.
(c) At the initial collaboration meeting, City staff, selected specialists, and the
applicant shall discuss elements to be considered and included in theproject design when
applicable, including but not limited to:
site
District
1. City goals and public values described in Comprehensive Plan relevant to the
2. the City's Resource Management System Plan
3. Resource Management Plan and Rule RMP -3 of the Rice Creek Watershed
4. the collaborative design process
5. existing conditions and environmental features
6. preservation and/or enhancement of Environmentally Sensitive Areas (ESA)
7. site layout performance standards and other official controls
8. economic needs of the developer
9. potential for flexibility with a PUD
10. general location of streets and utilities
11. general location and extent of public and common open space
draft revisions to Chapter 1001 subdivisions draft date 5/17/2010 Page 20 of 72
21
• 12. general location of land use types (residential and non - residential) and
intensities
13. architectural themes
14. a staging and time schedule of development
15. other special criteria relevant to development of the site
(4) Neighborhood meeting. After the initial collaboration meeting, the City and applicant
shall hold a neighborhood meeting for discussion and feedback prior to,submitting a concept plan
application. The purpose of the neighborhood meeting is to discuss the relative issues listed in
paragraph (3) above and gather information and input from the community.
(5) Collaborative design meeting. After the neighborhood meeting, a collaborative design
meeting shall occur. The applicant, City staff and consultants, and appropriate specialists with
expertise on the issues and elements of the site shall meet to collaborate on designing the concept
plan. The applicant shall incorporate information and recommendations of the meeting and
prepare the concept plan submittal information required in § 1001.026.
(a) For projects that include land within Environmentally Sensitive Areas, this design
group shall include a representative of the Rice Creek Watershed District.
(6) The City may waive the need for the collaborative design meeting if, at the discretion of
the City, the site design issues are resolved to a sufficient degree that the concept plan can be
prepared based on information gathered by the initial collaboration meeting and the
neighborhood meeting.
draft revisions to Chapter 1001 subdivisions draft date 5/17/2010 Page 21 of 72
draft date 5/14/2010
• Zoning Ordinance: Section 2
Subd. 10. PUD, Planned Unit Development.
•
ATTACHMENT 3
OP/en Space Ownership and Management. Each designated open
sOece area shall be owned and managed in acbordance with
standards,,ih Section 1.001.099 of the Lino Lakes City Code.
a-} The
2) The PtJD design wrig roc It in h tion
:, -- - - -- - - (12)
et-
pe
The- PUD ctecign wit# -ae• hasis- ►
streetscape, - • - - , - • e • - - - - ilding
b. Architectural Guidelines. Commercial and industrial buildings shall comply
with design standards of Section. 3, Subd. 4.B.4 (future §1007.04) of this
Ordinance.
Uses within a commercial, industrial, or institutionalPUD ;shall be
consistent with the land use categories of the Comprehensive Plan.
F. Procedure for Processing a Planned Unit Development.
1. Stages of PUD. All PUD applications shall be subject to the information submittal
requirements and the review process described in Chapter 1001, even if the PUD
does not include a subdivision. As described in this chapter and in Chapter
1001, additional information may be required for a PUD compared to other
development applications. The information and review processing steps for a
PUD are intended to provide for an orderly development and progression of the
PUD project -flan, with the greatest expenditure of developmental funds being
made only after the City has had ample opportunity for informed decisions as to
the acceptability of the various segments of the whole as the plan affects the
public interest. The various steps and applications, wed -i detail +n the
feliewing sections, are:
a. lication .
discussiens,
- General PUD Concept Plan Application. Collaborative desiqn of and
consideration of the overall concept and plan, including the information
and process required in this chapter and the information and process
required for a concept plan in § 1001. This includes the information,
Zoning Ordinance Sec. 2, Subd. 10 —PUD —Page 13 of 25
Zoning Ordinance: Section 2
Subd. 10. PUD, Planned Unit Development. draft date 5/14/2010
meetings, and process for collaborative design described in § 1001.The
concept plan review is voluntary „ strongly ended.
Gb. PUD Preliminary Plan Application. One-of-more
detailed lens as part of4hewhole-final plan Consideration of plans and
documents establishing the uses, densities, architectural themes,
conditions, management structure and duties, staging, layout of streets,
utilities, open space, and building sites, and other elements of the project,
including information and process required in this chapter and the
information and process required for a preliminary plat in § 1001.
dc. PUD Final Plan Application. • - • • _ _ - - - - ' - _ _ . _ _ _ • e each
Development-Stage Plan in
planConsideration of the Final Plan, which is to serve as a complete, final,
detailed, and permanent public record of the PUD and the manner in
which it is to be developed. It shall incorporate all prior approved plans
and all approved modifications thereof resulting from the PUD process,
including the information and process required in this chapter and the
information and process required for a final plat in § 1001.
w+t tie Development Department
,
applicant-shall-be-
-to proviele
wit# eppoFtunity-to gather information -the
-for-the-area-for - ch-it is-proposedand
its conformity to the icion &-of
cub&tantial expense-i-n4he
,
. a
Neighborhood Meeting
- neighborhood meeting -4o
feedbaslec- prier#a -submitting
•
23. The person applying for a planned unit development shall fill out and submit to
the Zoning Administrator an application form together with a fee as established
by the City_ -GGLI-1461---reseitttien, The request for wed
be-plased-en-- tbeagendaeof# The Park Board leg
and-Zoninghoard according -to
Zoning Ordinance Sec. 2, Subd. 10- -PUD —Page 14 of 25
•
• Zoning Ordinance: Section 2
Subd. 10. PUD, Planned Unit Development. draft date 5/14/2010
34.PA planned unit developmentlfezening application shall be posted and
advertised as required by city code for a zoning amendment. in-
Section 2, bbd- 4 of this finance
46.PA public hearings shall be held at-for the PUD Preliminary Plan development
stage.
57. General Concept Plan Application.
a. Purpose. The purpose of the PUD Concept Plan is to provide an
opportunity for the applicant to submit a plan to the City showing the basic
intent and the general nature of the entire development before incurring
the substantial cost of preparing a preliminary plat application. This
Concept Plan provides an opportunity for the proposal to be publicly
considered at an early stage.
eppertunity-fer-the-applioant 4e-submit-
showing -his- basic tent -and# general fie of the
before cost. This
stage.
The -fellowing-elements-of-the-proposecl-General-Goneept-Plan-represent
the immediately _ - _ - - •• - - • - • -
which decision
staff note these "immediately significant elements" have been incorporated into
collaborative design discussion points at 1001.025
1 }erali
3}
4)- General
Uses with-Approximate Typeand Intensities-of
Development
-Gommon--Open
5-} -A-Staging-and- Development.
6} derespecial Criteria -#e
staff note: submittal information to be listed in platting chapter, not PUD chapter
Zoning Ordinance Sec. 2, Subd. 10 —PUD —Page 15 of 25
•
Agenda Item 5B
Staff Originator: Marty Asleson
Environmental Board Meeting Date: Environmental Board June 2, 2010
TOPIC: Anoka County Ditch 10 -22 -32 Historic Review /Request for Support
Background:
Anoka County Ditch (ACD) 10 -22 -32 is located in the NW corner of Lino Lakes
with a small portion in Columbus Township. A series of separate and new ditch
improvements has occurred over the years, since the first ACD 10 ditch was
constructed in 1890. Each new recorded ditch segment added to ACD 10
overlapped the previous ditch section. Rice Creek Watershed District (RCWD),
the ditch authority for 10- 22 -32, intends to consolidate these ditch segments into
one legal ditch branch.
The Rice Creek Watershed District is requesting a resolution of support from the
cityfor the use of the District's authorities under the watershed law and
metropolitan surface water management act to repair and /or maintain public
• drainage ditches, including 10- 22 -32, located in the city. In legal terms, they are
looking for municipal concurrence for the drainage authority to use its alternative
authorities under the watershed law.
•
This request has been prompted by the district's efforts to systematically inspect
and repair the legal drainage systems in the district (approximately 100 miles) as
necessary. In Lino Lakes this includes Anoka County Ditch (ACD) 10- 22 -32,
ACD 25, ACD 72 and ACD 53. Since the Rice Creek Watershed District recently
started the repair report on ACD 10 -22 -32 system, and as they progress through
the repair report, they want to make sure they have the City's concurrence to use
the authorities granted under the watershed law and surface water management
act to pay for the work required.
This is important to RCWD for the following reasons:
1. If they stay under the narrow confines of the ditch law, the district
would have to do a re- determination of benefits and damages which
would add unnecessary costs to any project.
2. Watershed law would allow them to set up a stormwater charge
system which is more equitable since the land use is no longer just
agricultural.
3. It allows the District to better address the protection and enhancement
of wetlands and other water resources as part of any project to repair
and maintain the system.
This approach falls in line with the processes set up in the Resource
Management Plan (RMP). The ACD 10 -22 -32 branch system is the largest and
most complex in Lino Lakes. The headwaters of the ditch are in Columbus,
where traditional agricultural land use is principally in practice and drainage is an
important benefit. Aggressive management of a ditch system management plan
will incorporate the need for agricultural benefit practices that maintain drainage
in the headwaters, and also respect the shift away from agricultural land uses
downstream, incorporating and recognizing the new urban ditch benefits. The
new urban benefits will provide ancillary benefits for subwatershed —wide flood
reduction and wetland protection where such benefits are desired. New ditch
management planning will use branch maintenance in rural areas, retrofits in
urbanizing areas, and master planned communities with greenways and open
space to reduce downstream flooding and retain and reuse water in local
catchments. Since the RCWD has a legal obligation to inspect, operate and
maintain surface water management systems in Lino Lakes, it would be
beneficial to the city to support the RCWD in a way that follows our RMP
The recognition of the use of alternative authorities is important. This does not
mean, however, that concurrence with the use of alternative authority is an
endorsement of any project, and that there will be a separate public process for
any future project.
Recommendation:
Recommend resolution of support for the use of the District's authorities under
the watershed law and metropolitan surface water management act to repair
and /or maintain public drainage ditches, including 10 -22 -32 located in the city.
Further recommend that this resolution be forwarded on to the City Council with
any comments the Environmental Board has.
Attachments:
1. Miscellaneous RCWD Attachments
2. Draft Resolution
•
•
•
•
DRAFT RESOLUTION
CITY OF LINO LAKES
APPROVAL TO CONDUCT DRAINAGE PROCEEDINGS FOR ANOKA COUNTY
DITCH 10 -22 -32 UNDER THE WATERSHED LAW
WHEREAS, Rice Creek Watershed District ( "RCWD ") is the drainage authority for Anoka
County Ditch 10- 22 -32. (the "Drainage System ");
WHEREAS, RCWD is proceeding on a petition to repair the Drainage System;
WHEREAS, the RCWD Engineer is preparing a repair report recommending a repair option that
balances the drainage function of the Drainage System with ecological concerns in the
watershed;
WHEREAS, Minnesota Statute 103D.621 Subd. 4, grants RCWD the authority to undertake
proceedings related to the Drainage System in accordance with the Watershed Law (Minnesota
Statutes Chapter 103D) rather than the Drainage Code (Minnesota Statutes Chapter103E),
subject to concurrence by city councils and town boards where the Drainage System is located;
WHEREAS, RCWD has requested concurrence from the City of Lino Lakes to conduct the
necessary proceedings related to the Drainage System under the Watershed Law, rather than the
Drainage Code;
WHEREAS, the purpose of conducting proceedings under the Watershed Law is to provide
consistent management of all drainage systems under RCWD management, comprehensive
wetland management, and appropriate administration of resource management plans; and
WHEREAS, conducting the proceedings under the Watershed Law will facilitate flexibility in
financing the recommended repair option.
NOW THEREFORE BE IT RESOLVED BY THE CITY OF LINO LAKES THAT:
The City of Lino Lakes, in accordance with Minnesota Statute 103D.621 Subd. 4., consents to
the Rice Creek Watershed District's request to conduct proceedings for Anoka County Ditch 10-
22-32 under Minnesota Statutes Chapter 103D.
Adopted , 2010.
ATTEST: Mayor
City Clerk/Administrator
DRAFT
1
Rice Creek Watershed District
Ditch Origins in 53 -62, 10 -22 -32 Area
"1890 - Anoka Count y Ditches 9, 10
•
ai
r1... 26L'.
K.IJrPo
/i71�1ar t,.IJf,, . "1 . , ... r -rsy y Psrl.y ls�rt 1�i,�+ . /aSc
J'eic X.
r. ?Ind
re( r
26
6C.
141'.
See, 6t;.
° - 4.16O.
See.5
'4
14
4 160. .2 le
•
Jeri(
.r€-. n
SeC 7
Y _
f.6 v '!r
L 160.
160
Sea
At; J
I«•,/
.44 ✓
Str.IS.
z
1.144.1.
160
Main Line i
,z
COUNTY
DITCH 9
Legend
• Background shows Original
Public Land Survey Maps
- -' 1890 Ditch Excavation
(Co. Ditches 9& 10)
Future Major Roads
Original Marsh Survey
2
{ 11 N.)Y+
01 !VIER
RNOLke N
wwdircwd !cwmpsl63- 62Jhistorical ditc
Rice Creek Watershed District
Ditch Origins in 53- 62,10 -22 -32 Area
1894 - Anoka County Ditches 22, 24
w4*N
040: a
iac. x.
aJS JJ-4
,ree t
40 ft
100:
4Iii' I MI
Ser.5
.44#t 1+
SO_f � 4 160. .2 I
CO t . TY DITCH 22-"
Ma►n`toe
eCQUNTY DITCH 10
160,
SACJI.
t.
Main Line
Legend Background shows Original
Public Land Survey Maps
1894 Ditch Excavation
(Co. Ditches 22 & 24)
--- 1890 Ditches
(Co. Ditches 9 & 10)
Future Major Roads
Original Marsh Survey
0
0
0
N
L)
Rice Creek Watershed District
Ditch Origins in 53-62, 10-22-32 Area
898 - Anoka County Ditch 32
49,01e
7
.710 t'-'.1.1114 iIJV#g Li
1.1%4;
..rec 2.
14 11
J
Yer..5
,lit '4.
6'17. '1 260.
160. L 1 16
161.
striz
Branch 13
-Line
Branch 5
Main Line
•
set: 26.
Legend Background shows Original
Public Land Survey Maps
1898 Ditch Excavation
(Co. Ditch 32)
1894 Ditches
(Co. Ditches 22 & 24)
1890 Ditches
(Co. Ditches 9 & 10)
Future Major Roads
Original Marsh Survey
Miles
pvn
nt.,„,,,„
&o,&
.„...
x /wdircwdicwmps /53- 62lhistorical _ditch _
Rice Creek. Watershed District
Ditch Origins in 53- 62,10 -22 -32 Area
1911 - Anoka County Ditch 53
are 2
! _lr a�
1641.
!�r
Sft.5
.IiJ! /y 4
.1 160. i 111
Branch 13
Ser,I
Mai.s. ��
y0
LegenLegend " Background shows Original
d Public Land Survey Maps
1911 Ditch Excavation
tCo. Ditch .53)
1898 Ditches
(Co. Ditch 32)
1894 Ditches
(co. Ditches 22 & 24)
1890 Ditches
(Co. Ditches 9 & Ifl!
Future Major Roads
Original Marsh Survey
kso
t NMONS
. Ol t%9EA
ON/UK/Er
•
Rice Creek Watershed District
Ditch Origins in 53-62, 10-22-32 Area
1917 - Anoka County Ditch 62
f
1.4
160 Int
'fr. 5
.414)
160.
Main
Branch 13
160.
JAL
1,V.1s11
f..1.0.4 •
ree- /4'
,
e ne
Legend Background shows Original
Public Land Survey Maps
1917 Ditch Excavation
(Co, Ditch 62)
1911 Ditches
(Co. Ditch 53)
1898 Ditches
(Co. Ditch 32)
1894 Ditches
(Co. Ditch 22 & 24)
1890 Ditches
(Co. Ditches 9 & 10)
Future Major Roads
Original Marsh Survey
anch 4
Is.
$t(27.
AV. ,`.114,410,
*40-11.4,
Hennepin
Anoka
Project Location
Location Map
�, •
Ramsey
Washington
J
t
Blaine
Anoka
Ham
Lake
-- ----------------------------------- - - - - --
Washington
Columbus
Columbus
twp.
CrosisWays
Upper Rice
! Creek
Forest
Lake
rip
Horseshoe
Forest Lake twp.
Hardwood
Creek
Loch
Ness
Middle Rice
Creek
Circle
Pines
Golden • o
' Baldwin
Lexington '
George
Watch Centerville
Marshan
Centerville
CShennan
Reshanau
Cedar
Spring fake Mounds
Park View Shoreview
Spnng,
Brooklyn Fridley
Park iLocke.
Hennepin
WesttMoore
EasVMoore
350
3
Nevi Brighton'
1, Rush h
Pike
Long
Lower
Rice Creek
Marsden
Evergreen Fonds North
P4Pa r� ;_ Oaks
Arden
HiIIS
Sunfish__iMartha
Round Karth
U
Columbia
Height ve
3ir
Poplar
llai
Anthony
'Roseville
Farrel's Valentine
Island
Johanna
Litt le— Jo es p
anna hine
Joh 1
Little Jshephine
Langton
Minneapolis
Lauderdale
Falcon
! "'Heights
Zimme aan
White u B- ald
Bean Eagle
twp.)
r '
Sunset
Clearwater r'-r1
Creek y
Dellwood
Pia)
_„jTree
Ramsey
White
Bear Grant
Mahtomedi gyp'
)Birchwood
L. j Village' _.
Preys Wllernie
- Lo'Washingtonj • Pine
Springs
Long
!f
White,,Rock
New Scandia
twp.
May twp.
Rice Creek
Watershed District
Hydrologic Boundary
Anoka County Ditch 10 -22 -32
Hydrologic Boundary ACD 10 -22 -32
Public Drainage Systems
Interstate
Lakes
Lino Lakes
Rivers
- ! Counties
! ! Clearwater Creek Planning Region
L____ - ! Hardwood Creek Planning Region
Lower Rice Creek Planning Region
- _ ! Middle Rice Creek Planning Region
i
Upper Rice Creek Planning Region
� - - - - -, p p g 9
0 1.25 2.5
Sources: RCWD, TLG, MN DOT
5
Miles
Figure 1: Hydrologic Boundary -Anoka County Ditch 10 -22 -32
Scale:
AS SHOWN
Drawn by: I Checked by:
SMW MRD
Project No.:
5555- 080.10
Date:
06/04/08
Sheet
1 of 1
i
Houston
Engineering Inc
Hennepin
Project Location
Map
8
Washington
9
17
20
29
32
16
21
33
26
35
2
25
30
29
28
32
36
�i iii � 4 i i
4�� 4i
Pr' .4 ir Wen"
, 4 ' er
: Pzir.• ror re.;
'ffin Jr'
proir r.rarAntaraio
APPM
4
27
Crossways
34
3
RondeaLi
ACD 10- 22 -32`
Hydrologic Boundary
9 10
" ,
ri 'AP/2 7" ,
!dr" Pin Er WM
/17,4:07.1
r.".1
Loch Ness
22
Aed ANA
rA
PA r
GoAliden
26
35
24
tV
19
30 N
Baldwin �}
31-
Rice
9t
Reshanau
George
Watch
16
21
28
15
Centerville
22
Sherman
- ,
Wards,—
27
4 Cedar
Rice Creek
Watershed District
Benefitted Areas
Anoka County Ditch 10 -22 -32
///
RCWD Boundary
ACD 10 -22 -32 Hydrologic Boundary
ACD 53 -62 Benefitted Area
Lakes
ACD 22 Benefitted Area
ACD 32 Benefitted Area
ACD 10 Benefitted Area
JSection Lines
0 0.25 0.5
1
Miles
Note: Area outside of subwatershed boundary
now part of Anoka County Ditch 53/62 system.
Source: MN DNR Data Deli;
Basis for hydrologic boundary EOR.
Figure 2: Benefitted Area -Anoka County Ditch 10 22 -32
Scale:
AS SHOWN
Drawn by:
SMW
Checked by:
MRD
Project No.:
5555- 080.10
Date: Sheet
06/04/09 I 1 of 1
Houston
Engineering Inc.
t/le Gro.
763 493 45[
Rice Creek
Watershed District •
Anoka County Ditch 10
As Designed (1890)
As Designed - ACD 10
RCWD Boundary
Lakes
Cities
Section Lines
s
0 0.25 0.5 1
Note: Alignment based upon 1890 plan sheets.
Source: MN DNR Data Deli
Figure 3: As Designed - Anoka County Ditch 10.
Miles
Scale:
AS SHOWN
Drawn by
KZS
Checked by:
MRD
!Project No.:
5555- 080.10
Date:
06/04/09
Sheet
1 of 1
Houston
Engineering Inc
Rice Creek
Watershed District
Anoka County Ditch 22
As Designed (1894)
As Designed -ACD 10
As Designed - ACD 22
RCWD Boundary
Cities
Section Lines
Lakes
Note: Alignments based upon 1893 plan sheets.
Note: Penoc Branch added in 1915 repair.
Described in 1893 procedings as Pin Oak
Detach of ACD 22.
0 0.25 0.5
1
Source: MN DNR Data Deli
Miles
Figure 4: As Designed -Anoka County Ditch 22.
Scale:
AS SHOWN
Drawn by:
KZS J
Checked by:
MRD
Project No.:
5555- 080.10
Dale.
06/04/09
Sheet
I 1 of 1
u Houston
Engineering Inc.
Rice Creek
Watershed District
Anoka County Ditch 32
As Designed (1898)
Designed But Not Constructed
As Designed - ACD 32
RCWD Boundary
Cities
Section Lines
ILakes
Note: Alignments Based upon 1898 plan sheets.
Public System west of Sunset Avenue is now
incorporated into Anoka County Sitch 53/62 system.
0 0.25 0.5
Source: MN DNR Data Deli
1
Miles
Figure 5: As Designed - Anoka County Ditch 32.
Scale:
AS SHOWN
Drawn by
KZS
Checked by:
MRD
Project No.:
5555- 080.10
Date:
06/04/09
Sheet
1 of 1
Houston
Engineering Inc
76? 443 45:
14 OTI1
Hennepin
Anoka
Washington
Ramsey
Project Location
Map
wI_
2
14
14
1-
12 .
13
'Cock
`Ness
(1
Rice Creek
-Watershed District
Drainage System
Anoka County Ditch 10-97-3
Flow Direction
Private Drainage
Public Drainage
RCWD Boundary
Section Lines
Township /Range
Note: Alignment based on survey data provided by RCWD.
0 0.25 0.5 1
Miles
Sources: MN DNR Data Deli, TLG
Figure 6: Public Drainage System Anoka County Ditch ACD 10 -22 -32
Scale:
AS SHOWN
Drawn by:
SMhfJ
Checked by:
MRD
Project No.:
5565060.10
Date:
06/04 .09
Sheet:
1 oft
Houston
Engineering Inc.
>- 140TH
211' f'r µP 39TH LN
Anoka
Washington
Ramsey
Project Location
Map
-0KINAWA
CIR NE
3 125T , LN NE
z Z
O
LAKESpkw
2
0
„'i 128TH AVE NE
wti
aN
Z
U'
126TH
AVE NEE
rn
N
11
14
0r
ti
NE 0'w
3 0,z
f` 0
7tH AVE NE
14
111TH AVE NE
LEVER ST NE
T32N -R23W
T32N -R22W
124TH
LN NE
T31 N -R23W
1212
_ 1ST LEVER _ 121ST AVE NE
_
t. AVE NE CT NE
4_
T31 N -R22W
ROBINSON DR
Z..
32
Br. 14
PINE ST
N
m
Br. 14
Er1
m!,
UI AND/U1
81 STNS
of
5
Penoc Br.
NDALL ST
T32N -R22W
T31 N -R22W
1�
9114• .0▪ 0 N LN
0NTURY ..TRL 'AR ST
� Br. 12
go
PALOMINO
PALOMINO LN
CARL ST
1
THOMAS ST
Penoc
0
0
w
33
0
O
0
35TH AVE
NE
z
C
2
0
g
0
:LN o'
ZI JE'� 4-Q4,,,, z VIIC
KY LN
41 LNVRTLEIw HIGHLAND Gi, Z
Br. Iy TRL;
ARLO LN 'P
/ a
_
z
f;HERWOOD ti
LN 0
GREENWOOD LN
LOIS LN
> h
00_
°
PRAIRIE
VIEW PL
NA79TH ST W NCY`
k1AK <ar
LN O'0
T-1
BARBARA
¢. LN
23
Z
=• =...ern.—
OLIVE ST
<ORANGE ST
MAPLE ST
DIANE
T
10
OAK LN
EVERGREEN
P
0O_
JAMES ST
KELLY ST
LOIS LN
�y0
77TH ST W
°NYYcMain Trunk BEHM
LN
MUSTANG
Z CT .7.7-' TECKLA
r5.1Z e CT LILAC ST
153
¢•
Ui
77TH ST W
A.
��,oe
QOM
F �
APOLLO 4R'
115TH AVE,I,
F w'
r9�0 .1N AVE NE
13 yF9
`Loch
Ness
w:
1-
rn
o:
z'
B °LEVr!
ST
0
MARCIA
• LN
O 0
w
z • F',
w a',
CONNIE_
LN
18
George
Watch
16
74TH ST
'0
MARVY ST
PARK
CT
12
-y
is
ARSHAN
CT
Marshan
Rice Creek
Watershed District
Drainage System
Anoka County Ditch 10 -22 -32
Flow Direction
ACD 22
ACD 32 Branch 11A
---- -- ACD 32 Branch 11B
ACD 32 Branch 12
ACD 32 Branch 14
ACD 32 Branch 15
ACD 32 Main Trunk
ACD 32 Penoc Branch
Private
RCWD Boundary
Section Lines
Twp Range
Note: Alignment based on survey data provided by RCWD.
0 0.25 0.5
1
Sources: MN DNR Data Deli, TLG
Miles
Figure 7: Functional Alignment of ACD 10 -22 -32
Scale:
AS SHOWN
Drawn by:
SMW
Checked by:
Project No.:
5555- 080.10
Date:
07/06/09
Sheet
1 of 1
Houston
Engineering Inc
It !19714
763 443 457;
F 7634 ',," •
p aoy - pau6!sea sy
Background: 1938 Agricultural Stablization and Conservation Service (ASCS)
Figure 8 Public Drainage System 1890