HomeMy WebLinkAbout09/28/2011 Env Bd Packet•
•
•
City of Lino Lakes
Environmental Board Meeting
September 28, 2011
6:30 p.m.
AGENDA
1. Call to Order
2. Approval of Minutes
July 27, 2011
3. Approval of Agenda
4. Open Mike
5. Action Items
A. Final Approval of Emerald Ash Borer Preparedness Plan
6. Discussion Items
A. Off -site Fall Recycling day
B. Blue Heron Days Parade Update
C. Community Garden Fall Update
D. Other updates
7. Adjourn
0
0
ENVIRONMENTAL BOARD MEETING
APPROVED CITY OF LINO LAKES
DATE
TIME STARTED
TIME ENDED
MEMBERS PRESENT
MEMBERS ABSENT
STAFF PRESENT
1.
2.
July 27, 2011
: July 27, 2011
. 6:25 P.M.
. 7:50 P.M.
: Barbara Bor, Paula Andrzejewski, Martha
DeHaven, Steve Heiskary and Theresa Klaman
: Martha DeHaven, Nancie Klebba and Mary Jo
O'Dea
: Environmental Coordinator Marty Asleson
CALL TO ORDER
Ms. Bor called the meeting to order at 6:25 p.m.
APPROVAL OF MINUTES
April 27, 2011Environmental Board Minutes Approved.
Ms. Klaman made a motion to approve the April 27, 2011 Environmental Board
Minutes. Mr. Heiskary seconded the motion to approve. Motion carried
unanimously.
3. APPROVAL OF AGENDA
Add D: Rice Lake Elementary Rain Gardens
Add E: Quality of the Lino Lakes trail system.
Add F: Community Garden discussion on rules.
Ms. Andrzejewski made a motion to approve the agenda. Ms Klaman seconded
the motion to approve the agenda. Motion carried unanimously
4. OPEN MIKE
Open mike closed at 6:58 p.m.
5. ACTION ITEMS
Oppidan Grocery Store Proposal — Hodgson Road /County Rd J
Concept plan review for Oppidan Grocery Store proposal on Hodgson Road and
County Road J.
DRAFT MINUTES 1
ENVIRONMENTAL BOARD MEETING July 27, 2011
Mr. Asleson stated the Board's focus is on environmental issues.
The intention of the owner is to build a grocery store, attached liquor store, and
multi tenant building on 8 acres of land. Should the concept plan go forward to a
formal submittal, the development will occur under the rules of a Planned Unit
Development (PUD).
Ms. O'Dea, Environmental Board Chair, sent her comment to be read as she was
not present. She requested a much more detail landscaping plan from developer.
Mr. Asleson reviewed his staff report with the Board. He reviewed Unique
Ecologic Features, Stormwater and Wetlands, Soils, Lighting and his
recommendation.
Mr. Asleson stated he found an unprotected abandoned well just off of the site.
He is in the process of getting it capped.
All board members stated they would like to see a detailed landscape plan.
Ms. Andrzejewski questioned who is responsible of maintaining landscaping. Mr.
Asleson stated the developer should be looking at maintaining a 5 year plan with
irrigation.
Ms. Andrzejewski stated the neighbors were concerned about hydrology. Mr.
Asleson stated there is an infiltration plan required for this project. This project is
a proposal, not a sketch. Whether a pond or not, there will be infiltration.
All board members would like to see an infiltration planning evaluation of the
impact of the adjoining neighbors.
If there is a 40' wide berm, the board wants to see irrigation to maintain health
and guaranteed plant replacement.
It was stated it would be nice if they incorporated organic matter in the existing
soil and tilled as a BMP.
The Board would like to see any type of road curbing that would allow reptile
movement.
Mr. Bor stated looking at sustainable businesses to establish and identity that one
would relate to. Such as, a unique identity, welcoming site aesthetics and
architecture and landscaping. Incorporate lead designs into the site as much as
economically possible in hopes it is a sustainable business.
DRAFT MINUTES 2
•
•
•
•
ENVIRONMENTAL BOARD MEETING July 27, 2011
Board recommends forwarding as a concept plan review. Ms. Klaman moved to
approve the above recommendation and Ms. DeHaven seconded the
recommendation. Recommendation carried unanimously.
6. DISCUSSION ITEM
A. Pheasant Hills Preserve - Floating Bog — Pond D
The Environmental Board requested a site visit to view the progress of the
floating bog in Pheasant Hills Preserve. Mr. Asleson stated the bog was not doing
well and there was nothing to look at, at this time. Pheasant Hills Preserve
Association paid for a floating bog.
Aryls Freeman from Midwest Floating Island, LLC was present and explained
how their product would clean up the pond in Pheasant Hills Preserve. She had
someone from her company look at the site. It was reported that there was not
water fall protection. Midwest Floating Island, LLC will put waterfall protection
on the bog as well as replace the plants. Waterfall protection is like a fence that
you can see though with tomato stakes. It provides habitat for ducks and birds.
Ms. Freeman stated they do not want geese to chomp it up. In the next few weeks
the work will be done to bring the bog back in order.
Ms. Freeman stated she had concerns about how the previous testing was done.
Normal levels of phosphorus for every 1 acre of surface area recommended for
660 sq' of island. They have less than half of what they needed. We will not get
results as quickly. She stated the bog is a nodule so you can keep adding to it in
the future.
Ms. Bor questioned the intent of the association and was it for habitat. Mr.
Asleson stated no, that was not the original intent.
B. Blue Heron Days Parade — Saturday, August 20, 2011 — 11:00 a.m.
Mr. Asleson stated the City will have garbage cans set up along parade route.
Ms. Hogstad - Osterhues mentioned there will be a few girls from Girl Scout Troop
52831 and a few girls from Centennial Middle School who will help carrying the
banners.
There will be two banners in the parade. One banner will state how many tons
have been recycled in 2011 thus far.
Environmental Board members are asked to wear their Earth Day t -shirts and
bring gloves.
DRAFT MINUTES 3
ENVIRONMENTAL BOARD MEETING July 27, 2011
Meet behind Target/Kohl's about 12:00 stated Mr. Asleson.
C. Peltier Island Heron Rookery /Tiger Productions
Mr. Asleson stated Tiger Productions, who is part of National Geographic
Magazine, will be in Lino Lakes to produce a segment on the Blue Heron
Rookery. The Environmental Board and the City of Lino Lakes will be mentioned
in their production. They will be in town August 1, 2nd and 3rd
D. Rice Lake Elementary Rain Gardens
Ms. Andrzejewski stated there are a couple of areas the rain gardens have not been
completed. One garden did not have the drain installed and the sand bags were
not there. It was stated that Dawn Pape from Rice Creek Watershed District
(RCWD), has been contacted regarding this. The garden in front of the school
holds too much water. A storm drain needs to be connected and drain tile added.
Ms. Andrzejewski mentioned she would like educational signs for the gardens and
she had spoke with Dawn Pape, at RCWD, who stated she would have a sign
printed.
E. Lino Lakes Trail System Maintenance
Mr. Klaman stated her concerns are the trails behind City Hall. She stated there
are three major sites underwater. Mr. Asleson stated the water level in the Chain
of Lakes is very high this year. Anoka County is aware of the problems and is
looking into the issues.
Mr. Asleson stated he would ask Mr. DeGardner if Public Works could sweep to
make safer ask Mr. DeGardner.
F. Community Gardens discussion and rules
Change the Community Garden Guidelines under fencing to state: Use metal or
mesh fencing, no plastic fencing allowed.
7. ADJOURN
It was noted that the next meeting of the Environmental Board will be on
Wednesday, August 31, 2011at 6:30 p.m.
There being no further business, Ms. Andrzejewski moved to adjourn at 7:50 p.m.
Mr. Heiskary seconded the motion. Motion carried unanimously.
DRAFT MINUTES 4
•
•
•
•
0
ENVIRONMENTAL BOARD MEETING July 27, 2011
Transcribed by:
Lisa Hogstad
Community Development Secretary
DRAFT MINUTES 5
t
•
Agenda Item 5A
Staff Originator: Marty Asleson
Environmental Board Meeting Date: September 28, 2011
TOPIC: Final Approval of the Emerald Ash Borer Preparedness Plan
Background: The Environmental Board has reviewed past draft Emerald Ash
Borer documents. Updates have been given to the City Council on the Draft EAB
Preparedness Plan as compiled by the Environmental Board. The last two
updates to the City Council occurred on May 2, 2011 and August 22, 2011. The
use of the two parcels mentioned in the plan has been extensively discussed for
marshalling diseased Ash Trees. Minor improvements would be needed for the
south marshal area. Gravel would be needed to gain entrance to this site.
Since the last EAB preparedness plan document a few things have changed.
First, the Emerald Ash borer has now been found in Northern Ramsey County
within about 8 miles from Lino Lakes.
Second, The City has received a grant to establish tree diversity and by next year
will have replaced about 150 of our public trees. This changes the calculations of
the Purdue University model previously in the draft document. I have removed
the calculations in that these numbers are different now and will change
periodically based on market prices and grant awards.
Thirdly, we are now certain that City crews would be performing removal,
planting, and chemical treatment for any EAB function on public trees. The City
has the trained staff, equipment and licenses need to do any of the management
options.
Fourth, Anoka County Integrated waste is in the process of updating the solid
waste, recycling management plan and city staff have made it clear to the
advisory board that EAB must be incorporated into the County Plan for yard
waste.
The final draft document also incorporates by reference the City Tree Disease
Ordinance into the Preparedness Plan.
Recommendation:
.Approve final draft Preparedness plan document to be forwarded on to the City
Council.
Attachments:
1. EAB Preparedness Plan
2. Tree Disease Ordinance
•
•
•
•
September 28, 2011
City of Lino Lakes, MN
Emerald Ash Borer Management Plan
Purpose:
The provisions of this management plan are intended to provide a cost effective and
culturally acceptable method of management for the outbreak of Emerald Ash Borer.
The death of all the ash trees in the City of Lino Lakes will have a detrimental effect on
home values, quality of life and environmental benefit. The goal of this plan is to
mitigate the impact of EAB as much as practical, to residents and City Ash trees.
Introduction:
Emerald Ash Borer (EAB) is an invasive, non - native, introduced pest that came into the
USA from ports in Detroit Michigan. The insect is indigenous to China and is suspected
to come into this country in packing crates. EAB most likely existed in Michigan for at
least 5 years before a plant pathologist noticed something wrong with their Ash Trees in
2002. All efforts in Michigan to stop this insect have failed. It is now estimated that
EAB can travel up to 4 miles by its self, or an average of 10 miles with human help.
Humans help this insect get around to new areas mainly by firewood transport. With
only 6 or seven years of study and research, managers at this time are unable to stop
this insect. Scientists do know that once established in a City, all of the City's Ash trees
will be killed in five to 10 years. It will be perhaps 20 years minimum until effective
controls may be available.
Minnesota has a tremendous amount of Ash trees (900 million). This number does not
include the trees planted in Cities in parks and along street scapes. The City of Lino
lakes has approximately 328 Ash trees in parks and 598 Ash trees on street boulevards.
There are also 157 Ash trees on Peltier Island that have supported Great Blue Heron
nests in the past. Preliminary remote sensing from the Minnesota Department of
Natural Resources estimates 10000 Ash trees overall in the City of Lino Lakes.
There are three options (other than doing nothing), or combination of these options that
cities can decide to follow. First, a city can remove all of their Ash trees. If the trees are
not removed, unsightly and hazardous trees are left in the landscape. Secondly, a City
can remove and replace the dead ash trees with another type of tree, thus mitigating the
benefits of the lost trees. Third, a City can chemically treat the trees with an insecticide
for an indefinite amount of time. A city can also do a combination of any of these
options. The following highlights each option.
1. Remove all City Ash Trees: All Trees will die in 5 years so removal costs are
associated with the city or a contractor removing all trees in 5 years. This plan
has the lowest out of pocket expense. This plan also causes the greatest losses
September 28, 2011
to aesthetic and ecological value that the Ash trees provided for Lino Lakes. The
City will remove all public Ash trees using City Crews
2. Remove /Replace all City Ash trees. This option replaces every Ash tree with a
new tree that won't get Emerald Ash borer. This plan is the least costly way to
manage the Lino Lakes Ash forest and allow it to regain its former size. The City
will utilize City crews to remove and replace all City Ash Trees
3. Treat City Ash trees with insecticide. This plan has the lowest annual out of
pocket costs, but it has the greatest cost over time. It also produces the largest
remaining forest over time. Research demonstrates that insecticides can protect
small trees < 12" in diameter until they reach a 15 inch diameter. Effective
treatment of larger trees would require either a more frequent application, or a
higher dose of inspective. Research as of 3.8.2010 shows one application of
insecticide will treat a tree for at least 3 years. The City will utilize City personnel
trained and licensed in treatment for EAB, to treat City trees chosen to be
treated.
4. Combination of the first 3 options.
0
Treating at least the middle range of City tree size also gives the City time to spread our loss
over a much greater time period, and possibly eliminate our losses for treated trees. Treated
trees should be limited to trees in good vigor with good form. Poor formed trees or trees in
declining condition should be removed as soon as possible. Natural controls with parasitic and
predatory insects, genetic selection and manipulation, all take time. The estimated time to
achieve success in one of these areas is 20 years minimum.
Administration
The City Forester shall coordinate efforts with the Public Works Department, the Minnesota
Department of Agriculture and /or the Minnesota Department of Natural Resources, Anoka
County, and St Paul District Energy to seek assistance for the removal, disposal, replacement,
and treatment of City Plan Ash trees. Furthermore the City Forester shall enforce the City
Shade Tree Disease Control Ordinance and assist and educate the public in private Ash tree
disposal. The disease control ordinance shall be an integral part of this plan.
City Park and Boulevard Tree Management Recommendations
Recommended procedure for City Ash Trees is removal of all poorly- formed and /or defective
trees first. Chemically treat all trees in the 6 to 12 inch classification, remove and replace all
ash trees < 6 inches and trees > 12 inches. Should future chemical labels allow for higher
chemical injection rates, than the City may choose to treat the larger trees.
1
•
t
•
September 28, 2011
Peltier Island Nest Supported Trees
It is recommended that Ash Trees supporting Heron nests on Peltier Island (County Property)
be managed in such a way as to support the present and future heron Populations, and that a
coordinated effort between Anoka County, and the City of Lino Lakes be arranged to this end.
Coordinated efforts may be chemical treatment of existing trees and /or replacement of the Ash
trees with Basswood„ Hickory Trees., or other species that would afford good habitat for the
herons.
Disposal
Since all trees within an infected county will be severely transport limited by quarantine, It is
recommended that two diseased tree stock pile sites be designated in the City. These sites
would be open to the residents of Lino Lakes to dispose of their dead Ash trees. Trees would
be allowed to stay on site until such a time that there would be sufficient volumes for tub
grinding by St Paul District Energy, or other party interested in tub ground wood product.
Stock pile sites are the north western corner of the old city hall site, and the athletic complex
land on Centerville Road and Birch. The City will maintain an open invitation to better -use
utilization of Ash wood..
Public Information
Connect to the public by newsletter articles, web page, kiosk information booth and PSA's on
local cable TV.
Partnerships
Share resources with other communities where possible. Investigate the use of marshaling of
materials on a common interest basis.
•
•
•
Reading:
Publication:
2nd Reading:
Effective:
Council Member _ moved for adoption of the following
ordinance:
CITY OF LINO LAKES
ORDINANCE NO. 07 -10
Amending Title 900, Chapter 902 of the Lino Lakes Code of
Ordinances relating to Tree Diseases.
The City Council of Lino Lakes ordains:
Section 1. That Section 902.01 of the above - entitled ordinance be
amended by adding thereto a new subdivision (3) to read as follows:
902.01 NUISANCES DECLARED.
The following are declared to be public nuisances whenever and wherever
they may be found in the city.
(3) All Species and Varieties of Ash trees (trees of the genus Fraxinus)
infested with Emerald Ash borer (Agrilusplanipennis Fairmarie), and all species
and varieties of Ash trees that are dead or substantially dead, all dead ashwood
to which the bark is still attached which because of their condition, may serve as
a breeding place for Emerald Ash Borer (Agrilusplanipennis Fairmarie), are
hereby declared to be public nuisances and furthermore all ash trees are hereby
declared to be public nuisances as determined by (2) or more visual symptoms
as listed herein; basal sprouting, bark fissures, woodpecker damage (holes).
One - eighth inch (1/8 ") D shaped holes, presenence of larvae or the adult
Emerald Ash borer (Agrilusplanipennis Fairmarie), bark falling off exposing S
shaped galleries.
Section 2. That Section 902.03 of the above - entitled ordinance be
amended to read as follows:
902.03. INSPECTION AND INVESTIGATION.
The Council may designate a person or persons who shall inspect all
premises and places within the city as often as practical or necessary to
determine whether any condition described in § 902.01 exists thereon. The tree
inspector shall investigate all reported incidents of infestation by oak wilt fungus
or Dutch elm fungus or elm bark beetles or emerald ash borer. The tree
inspector so designated by the Council may enter upon private premises at any
reasonable time for the purpose of carrying out the duties assigned to him or her
under this chapter. That person or persons shall, upon finding conditions
indicating oak wilt, er Dutch elm infestation, or emerald ash borer take steps for
diagnosis as may be appropriate. ' al-ified laboratory of
Whenever possible, diagnosis shall
be based upon accepted field symptoms.
Section 3. That Section 902.05, subdivision (1), of the above - entitled
ordinance be amended to read as follows:
902.05 PROCEDURE FOR ABATEMENT AND REMOVAL.
(1) Whenever it is found with reasonable certainty that the infestation
exists, he or she shall proceed as follows. If the tree inspector finds that the
danger of infestation of other oakfef elm, or ash trees is net imminent, he or she
shall notify the owner of the property on which the nuisance is found by certified
mail addressed to the owner at his or her last known address that the nuisance
must be abated within a time specified in the notice, but in no event later than
April 15 of the following year. The tree inspector shall immediately report the
action to the Council and after the expiration of the time limited by the notice, the
tree inspector may proceed to abate the nuisance as herein provided. The cost of
the abatement shall be assessed against the owner of the property involved or
against the property itself.
Section 4. That Section 902.05 of the above - entitled ordinance be
amended by adding thereto a new subdivision (9) to read as follows:
902.05 PROCEDURE FOR ABATEMENT AND REMOVAL.
(9) Ash trees found to be infected with Emerald Ash Borer must be
treated and /or disposed of in compliance with all recommendations of the
Minnesota Department of Agriculture, and the Minnesota Department of Natural
Resources
Section 5. That Section 902.06 of the above - entitled ordinance be
amended to read as follows:
902.06 TRANSPORTING ELM ,AND ASH, AND OAK WOOD
PROHIBITED.
It is unlawful for any person to transport within the city any bark - bearing
elm, ef-oak, or ash wood without having obtained a permit from the city forester.
The city forester shall grant the permits only when the purposes of this chapter
will be served thereof.
•
1
•
0
•
•
Section 6. Effective
This ordinance shall be in force and effect from and after its passage and
publication according to the Lino Lakes City Charter.
Jeff Reinert, Mayor
Attest: Julianne Bartell, City Clerk
Adopted by the Lino Lakes City Council this day of , 2010.
The motion for the adoption of the foregoing ordinance was duly seconded by
Council Member and upon a vote being taken thereon, the following
voted in favor thereof:
The following voted against same:
Whereupon said ordinance was declared duly passed and adopted.
t
f
•
Agenda Item 5B
Staff Originator: Marty Asleson
Environmental Board Meeting Date: September 28, 2011
TOPIC: Off Site Recycling Day
Background:
John Freimuth is a Lino Lakes Resident that owns a recycling facility in East
Bethel. John gave us excellent prices for electronics at our last two Spring
Recycle Days. Mr. Freimuth is offering Lino Lakes residents only, the week of
October 3rd to the 7th to bring their recyclables to his business in East Bethel.
Attachment 1 is a breakout of the agreed upon prices for different materials.
Weights of all the materials will be tallied and applied to the City's credit for
tonnages. Given the short notice on this, staff decided to post this opportunity
on the City Web page.
Recommendation:
Staff would like the Environmental Board to endorse this opportunity.
Attachments:
1. Fall Recycling Day Pricing Sheet
•
•
CITY OF LINO LAKES FALL RECYCLE DAY
PRICING FOR LINO LAKES RESIDENTS ONLY*
Monday, October 3, 2011— Friday, October 7, 2011
Facility: Freimuth Enterprises LLC
Drop off Location: 18641 Hwy 65 in East Bethel
Hours of Operation: Monday - Thursday 10:00 a.m. -6:00 p.m. and Friday 10:00 a.m. -7:00 p.m.
Items Accepted and Fees:
All Appliances with or without Freon $5 fee each
TV's with CRT screens (glass tube TV's)
Small (up to 17 inches) $10 fee each
Medium (up to 27 inches) $20 fee each
Large (no limit on size) $30 fee each
Computer Monitors (any size) $5 fee each
TV's and monitors LCD (flat screen not glass tube)
Small (up to 17 inches) $5 fee each
Medium (up to 27 inches) $15 fee each
Large (no limit on size) $20 fee each
Electronics $2 fee each
(Includes all DVD, home printers, VCR's, kid's toys (bulk toys get lower price) coffee makers,
laptops, computer towers, cameras, video game systems, etc.)
Large electronics (big copiers /printers /paper shredders) $20 fee each
Lawn mowers $5 fee each and lawn tractors for $10 fee each
Also accepted for a fee are: weed whips, rototiller, snow blowers and most yard equipment.
Free Electronics include: Disk drives, Circuit boards, cell phones, lithium batteries, hard
drives, computer wiring.
Bicycles are free of charge.