Loading...
HomeMy WebLinkAbout05/29/2013 Env Bd Packet• • • City of Lino Lakes Environmental Board Meeting May 29, 2013 6:30 p.m. AGENDA 1. Call to Order 2. Approval of Minutes: April 24, 2013 3. Approval of Agenda 4. Open Mike 5. Action Items A. PUBLIC HEARING for Stormwater Pollution Prevention Plan, Tim Payne of City of Lino Lakes and Mark Ostrander & David Rydeen of Minnesota Correctional Facility in Lino Lakes. 6. Discussion Items A. Century Farm North PUD Amendment Update B. McDonald's / Main Street Shoppes Update 7. Adjourn • • • ENVIRONMENTAL BOARD MEETING April 24, 2013 DATE TIME STARTED TIME ENDED MEMBERS PRESENT MEMBERS ABSENT STAFF PRESENT 1. CALL TO ORDER CITY OF LINO LAKES : April 24, 2013 . 6:32 P.M. . 8:11 P.M. : Mary Jo O'Dea, Barbara Bor, Paula Andrzejewski, Martha DeHaven, Steve Heiskary, Nancie Klebba, and Nancy Morin : none : Environmental Coordinator Marty Asleson Ms. O'Dea called the Environmental Board meeting to order at 6:32 p.m. on April 24, 2013. 2. APPROVAL OF MINUTES March 27, 2013 Meeting Minutes have been approved with a few small changes. Mr. Heiskary made a motion to approve the March 27, 2013 Meeting Minutes. Ms. DeHaven seconded motion to approve the minutes. Motion carried unanimously. 3. APPROVAL OF AGENDA ADD — D. Web Cam E. Public Service Announcements by Ms. Andrzejewski 5th grade students Ms. DeHaven made a motion to approve the agenda. Ms. Andrzejewski seconded the motion to approve the agenda. Motion carried unanimously. 4. OPEN MIKE Open mike closed at 6:35 p.m. 5. ACTION ITEMS A. Metro Transit Park & Ride Facility Mr. Asleson presented a Site Plan for a Metro Park and Ride Facility in the NW corner of 35E and Country Road 14 with 297 parking spots and lighting. DRAFT MINUTES 1 ENVIRONMENTAL BOARD MEETING April 24, 2013 Environmental board members recommended approval of the Site Plan for the Metro Transit Park & Ride Facility based on the following conditions: 1. Sediment traps /clean out traps for sediment to be installed into the surface water management features so that sediment can be removed before it gets into the filtration area of the system. 2. A P8 analysis and a comparison to be performed before and after the implemented of the site of the nutrient loads. 3. A protection plan is to be submitted for the preservation of the storm water pond features and the use of low impact excavation equipment 4. A native seed management company that is approved by the city is hired to plant and manage the native seed areas for a minimum of 3 years. 5. The Storm Water Pollution Plan must show a. The name and certifications /qualifications of the Storm Water manager on site b. The location of the SWPPP on site where weekly, post rainfall event inspection, and follow -up corrections documents will be located Mr. Heiskary made a motion to recommend approval the Site Plan for the Metro Transit Park & Ride Facility. Ms. Andrzejewski seconded the motion. Motion carried unanimously. 6. DISCUSSION ITEM A. Earth Day Mr. Asleson stated that Earth Day had a good turnout. Mr. Heiskary who attended suggested that the Environmental Board should improve the displays for next year to get the visitors to participate more in conversations concerning the environment. There were discussions on getting pictures and information on the following: herons, rain gardens, rain barrels, recycling and community gardens. Comments included: Ms. O'Dea stated that they should start preparing in January. Ms. Andrzejewski suggested that if a board meeting is cancelled than it becomes a work meeting for booth material. Ms. Bor suggested that everyone should take an area to work on. B. Arbor Day Mr. Asleson stated that he should be able to get a tree for planting at Lino Lakes Elementary on April 26, 2013. DRAFT MINUTES 2 • • • • • • ENVIRONMENTAL BOARD MEETING April 24, 2013 C. Recycle Day Mr. Asleson stated that the city wide recycling day will be held on May 4, 2013 from 9 a.m. — 3 p.m. D. Web Cam Mr. Asleson stated that Brian Bourassa from the Rotary Club asked city staff to consider a presentation to Rotary Club for a wildlife camera. On April 30th there will be a meeting at Rice Lake Elementary about this subject with Mr. Bourassa, Ms Andrzejewski, council member Dale Stoesz and Mr. Asleson. E. Public Service Announcements Ms. Andrzejewski presented a power point presentation that her 5th grade students created relating to environmental issues. 7. ADJOURN It was noted that the next meeting of the Environmental Board will be on Wednesday, May 29, 2013 at 6:30 p.m. Mr. Heiskary made a motion to adjourn at 8:11 p.m. Ms. Klebba, Ms. DeHaven, and Ms. Morin all seconded the motion. Motion carried unanimously. Transcribed by: Mary Fogarty City of Lino Lakes Office Tech 1 DRAFT MINUTES 3 ENVIRONMENTAL BOARD • AGENDA ITEM 5A • • STAFF ORIGINATOR: Marty Asleson, Environmental Coordinator MEETING DATE: May 29, 2013 TOPIC: Public Hearing: Annual Stormwater Pollution Prevention Program/City of Lino Lakes and the Minnesota Correctional Facility of Lino Lakes VOTE REQUIRED: N/A BACKGROUND: In compliance with the provisions of the Clean Water Act, as amended, and Minnesota Statutes Chapters 115 and 116, as amended, and Minnesota Rules Chapter 7001, the City of Lino Lakes has adopted a Stormwater Pollution Prevention Plan (SWPPP) and authorized its submittal to the Minnesota Pollution Control Agency as part of the City's application for enrollment in the State of Minnesota's General National Pollution Discharge Elimination System Phase II Permit program. The permit authorizes the City and Correctional Facility to discharge stormwater. As part of the SWPPP, the City and Correctional Facility must solicit public input at an annual meeting required under the Public Education and Outreach Plan including: • A presentation about implementation of the City's Surface Water Pollution Prevention Program in 2012. • Affording interested persons an opportunity to make oral statements concerning the Stormwater Pollution Prevention Plan. • Consideration of relevant written materials that interested persons submit concerning the Stormwater Pollution Prevention Plan. • Consideration of public input in making adjustments to the 2012 implementation plan for the Stormwater Pollution Prevention Plan. ANALYSIS: According to the 1996 National Water Quality Inventory, stormwater runoff is a leading source of water pollution. Stormwater runoff can harm surface waters such as rivers, lakes, and streams which in turn cause or contribute to water quality standards being exceeded. Stormwater runoff can change natural hydrologic patterns, accelerate stream flows, destroy aquatic habitats, and elevate pollutant concentrations and loadings. Development substantially increases impervious surfaces thereby increasing runoff from city streets, driveways, parking lots, and sidewalks, on which pollutants from human activities settle. Common pollutants in runoff include pesticides, fertilizers, oils, metals, pathogens, salt, sediment, litter and other debris are transported via stormwater and discharged — untreated — to water resources through storm sewer systems. The Stormwater Program for Municipal Separate Storm Sewer Systems (MS4's) is designed to reduce the amount of sediment and pollution that enters surface and ground water from storm sewer systems to the maximum extent practicable. Stormwater discharges associated with MS4's are regulated through the use of National Pollutant Discharge Elimination System (NPDES) permits. NPDES permits are legal documents. Through this permit, the City and Correctional Facility are required to develop a Stormwater Pollution Prevention Plan (SWPPP) that incorporates Best Management Practices (BMP's) applicable to their MS4. Tim Payne of the City of Lino Lakes, Mark Ostrander and David Rydeen of the Lino Lakes Correctional Facility are here to give a presentation on the 2012 BMP's occurring for each MS4. Following these presentations a public hearing will be open for public comments. RECOMMENDATION: Staff recommends opening the public hearing, soliciting comments and then closing the public hearing. • • • • City of Lino Lakes and the MN Correctional Facility -LL Stormwater Pollution Prevention Plan Annual Public Meeting May 29, 2013 • This Meeting Provides: A forum for the City to present the purpose, goals, and requirements of the SWPPP to educate, inform and encourage citizens to provide input and comment on the SWPPP An opportunity for the City to consider input from the public • This Meeting Shall: Comply with Public Notice Requirements - Provide an opportunity for interested persons to make oral or written comments on the Stormwater Pollution Prevention Plan (SWPPP). Persons not in attendance may submit written comments on the SWPPP Provide an opportunity for members of the community to ask questions and provide input concerning stormwater management policies and Best Management Practices Lino Lakes Stormwater Pollution Prevention Plan 2012 Implementation NPDES Stormwater Permitting Construction Sites The NPDES (National Pollutant Discharge Elimination System) Stormwater Permitting Program for MS4's (Municipal Separate Storm Sewer System) is designed to reduce pollution that enters surface waters from storm sewers to the maximum extent practicable MPCA NPDES Permits Industrial Sites Municipalities (MS4's) • • • • Each NPDES permit type requires the creation and implementation of a Stormwater Pollution Prevention Plan (SWPPP) • 2012 Accomplishments • Six Minimum Control Measures (MCMs) 1 Public Education and Outreach 2. Public Participation and involvement 3. Illicit Discharge Detection & Elimination 4. Construction Site Stormwater Runoff Control 5. Post - Construction Stormwater Management (New & Redevelopment) 6 Pollution Prevention /Good Housekeeping 2012 Accomplishments Public Participation and Involvement IMCM 2r He,a Compliec regauen, c ,,,., No plan PI RAC .10111,1 3 2012 Accomplishments Illicit Discharge Detection and Elimination (MCM 3) • an) discharge to a Municipal Separate Storm Sewer Systems (MS4) that is not composed entirely of storm - water Improved storm sewer map to Include sub-watersheds catchment areas and outtalls of al szes Created an Illicit Discharge Detection and E Itm natal, Plan that includes ident■f.cation of non-storm flows procedures report form. etc - Deve loping ODE ordinance (for 2010) 2012 Accomplishments Construction Site Stormwater Runoff Control (MCM 4) • 38 notices Of violation No Stop Work Orders 2012 Accomplishments Post-ConstrC: :' r eo.o.n5 Pc Comtsat0 Re*eveintvoe, .varhin a sto.^,ater cvdinani, itor Rite iairt Svennwater Retrofit Asuuntertt • • • 4 • Target Basins • 2012 Accomplishments Pollution 1'll =vontlon and 4, ;00(1 HOUSOK00111119 101 Municiio 101101(411ons (MCM 6) Cdy 16441 poll0mxH malnlmulnr: x,11 IV :1 11 :vllo0s and (n00 00160 08810 tini:i 1 • .aui .d >, t08111c1y elenr)o41 aH iltletc/t71alt, .0101 401 r1! events lolala() approxinlaicly 6161.1Aoi 400)6 Ropauodh000nslmclts1 51 sto101w0101 0810.2 6asm (18646 , Swept 301 10iIos of CO alfrets Mom detections, twice pm yawl) Spring swooping includt -s 3 sweep000. two 160165,17 days, 6,46 Ns) 442 spo0lo4 20% of ponds (71), 0011al ?s and 54,106110211 0.21015 Inspected 100°% of 046010tat pulluI100 496601140112 deviuss (82 total PdoOOood 13 anlmeted 5011800 wa40 m81n1e0811ce 4wole046 In House Project 1 Prioritizing 2012 Surface Water Projects - None of the 12 projects were located in the scheduled inspection zone for 2012 Project sites are prioritized by severity of problem, cost efficiency and accessibility when compared to other problem sites within the zone and also with "carry over' problems from previous years Unforeseen surface water issues may also arise and require emergency maintenance • • 6 • • 2013 Best Management Practice and Implementation Goals: Public education will be emphasized in 2013 through pamphlets, mailings and city newsletter Education for contractors pertaining to site erosion and mitigation practices Promote school and volunteer organizations participation. work on environmental education curriculum with the school districts Continue to educate City Staff in the areas of pollution prevention /good housekeeping, illicit discharge detection and elimination and construction practices New Permit emphasis in pollutant reduction AND volume reduction • MCF -Lino Lakes Stormwater Pollution Prevention Program David Rydeen and Mark Ostrander May 29, 2013 CONTRIBUTING TO A SAFER MINNESOTA • Background Information • Correctional facility has MS4 permit • Campus size is 150 acres • Storm sewer system has 5 outfalls and 3 retention ponds • Approximately1330 offenders and 450 staff • Developed and implemented SWPPP in 2006 • BMPs focus on maintenance activities, lawn & grounds care, chemical storage, spill prevention • 2012 SWPPP Activities • Training on preventing illicit discharges • Outfall and retention pond inspections • Storm drain inlet cleaning and repairs • Campus parking lot & street sweeping • Winter parking lot and sidewalk maintenance • Eliminating soil erosion Educational Materials In addition to training, visual displays are used to educate staff and offenders about impact of stormwater run off on water quality. • • • • • 2013 SWPPP Activities • MCF -Lino Lakes will continue to focus on preventing stormwater pollution by: 1. Keeping parking and storage areas clean 2. Maintaining BMPs for lawn and grounds care including sand /salt application during winter months 3 Inspecting /cleaning storm drain inlets 4 Performing pond /ditch maintenance as needed 5. Spill prevention •