HomeMy WebLinkAbout10/04/2004 Park Board PacketLino Lakes Parks and Recreation Department
600 Town Center Parkway
Lino Lakes, MN 55014
(651) 982 -2440 Fax (651) 982 -2439
CITY OF LINO LAKES PARK BOARD MEETING
Monday, October 4, 2004
** *AGENDA * **
1. Call to Order and Roll Call
2. Approval of Minutes from June 7, 2004
3. Setting Agenda
4. Open Mike
6.30pm
6:32pm
6:35pm
6:40pm
5. Determine Skating Rink Locations and Hours 6:45pm
• 6. Rice Lake Estates Park Update 6:55pm
7. Recreation Department Update 7:10pm
8. Parks Department Update 7:20pm
9. Next Park Board Meeting — November 1, 2004, 6:30pm 7:25pm
10. Adjourn 7:30pm
If you are unable to attend the meeting please call Sandie at 651 982 -2442.
sw /parkbrd /10 -4 -04 Park Board Agenda.doc
Lino Lakes Parks and Recreation Department
600 Town Center Parkway
Lino Lakes, MN 55014
(651) 982 -2440 Fax (651) 982 -2439
www.ci.lino-lakes.mn.us
CITY OF LINO LAKES PARK BOARD MEETING
Monday, June 7, 2004
** *EXPANDED AGENDA * **
1. Call to Order and Roll Call
(The meeting was called to order at 6:30p.m. Members present: George Lindy,
Pam Taschuk, Katie Boyle, Pat Huelman, Aaron Frederickson. Members absent:
Paul Montain and Bill Kusterman. Also present was Rick DeGardner, Public
Services Director.)
2. Approval of Minutes from May 3, 2004
(Pam Taschuk made a motion to approve the May 3, 2004 minutes. Seconded by
Katie Boyle and approved.)
3. Setting Agenda
(There were no additions or deletions.)
4. Open Mike
(There was no one present for open mike.)
5. Old Business
A. Memorial Plaque Information
(It was decided to allow park benches with engraved plate at this time.)
6. New Business
A. Email Related to Baseball Field at Birchwood Acres Park
(The Park Board decided to have staff remove park benches and install ag-
lime infield.)
7. Recreation Department Update
(Members reviewed the information in the packets. Rick advised board that Barry
Bernstein was resigning and going to work as Park and Recreation Director in
Hastings.)
8. Parks Department Update
(Rick reviewed the memo in the packets and responded to questions.)
• 9. Next Park Board Meeting
(The next Park Board Meeting will be Tuesday, July 6, 2004 6:30p.m.)
•
•
•
10. Adjourn
(Pam Taschuk made a motion to adjourn, seconded by Aaron Frederickson. The
meeting was adjourned at 6:57p.m.)
The Parks, Greenway and Trail System Plan Open House was held in the Community
Room immediately following the Park Board Meeting
sw /parkbrd /6 -7 -04 Expanded Park Board Agenda.doc
These were approved as the June 7, 2004 minutes at the October 4, 2004 Park Board Meeting.
Lino Lakes Parks and Recreation Department
600 Town Center Parkway
Lino Lakes, MN 55014
(651) 982 -2440 Fax (651) 982 -2439
www.ci.lino-lakes.mn.us
5,
•
September 29, 2004
TO:
FROM:
SUBJECT:
Park Board Members
Rick DeGardner, Public Services Director
Determine 2004/2005 Skating Rink Locations and Warming House Hours
Staff is recommending the following warming house shelters and hours of operation as follows:
PARK LOCATION WEEKDAY HOURS
Sunrise Park 6918 Sunrise Drive 4 -9 p.m.
2 hockey rinks and general skating
Birch Park 6520 Pheasant Run S
1 hockey rink and general skating
4 -9 p.m.
WEEKEND HOURS
Saturday 12 -9 p.m.
Sunday 12 -6 p.m.
Saturday 12 -9 p.m.
Sunday 12 -6 p.m.
Staff also recommends the following ice rink locations that do not have shelters:
City Hall Park 1189 Main Street
Hockey rink and general skating
Lino Park
General skating
7850 Lake Drive
These are the same locations and hours as last year.
sw /parkbrd /meeting info /Determine 2004 -2005 Skating Rink Locations and Warming House Hours.doc
Lino Lakes Parks and Recreation Department
600 Town Center Parkway
Lino Lakes, MN 55014
(651) 982 -2440 Fax (651) 982 -2439
www.ci.lino-lakes.mn.us
(.
September 29, 2004
TO: Park Board Members
FROM: Rick DeGardner, Public Services Director
SUBJECT: Rice Lake Estates Park Update
On Wednesday, September 22, I was informed that City of Circle Pines staff removed the
playground equipment at Rice Lake Estates Park. The following is a brief summary of the
history of this situation:
In 1998, the City of Lino Lakes leased a small area of land from the City of Circle Pines to
provide some leisure amenities for residents in the Rice Lake Estates Development. The park
area is located directly behind well house #2, 6697 Sandhill Drive. When the existing lease was
discussed in 1998, the City of Circle Pines' future plans for the property at the intersection of
Hodgson Road and Lake Drive was for future commercial and/or industrial development.
In 1999, a trail connection from the park area to Baldwin Park (Circle Pines Park) as well
playground equipment and a 1/2 court basketball court were installed.
On June 29, 2004, I was informed by Circle Pines staff that they had recently platted this
property consisting of 52 single - family homes. Unfortunately, the southern boundary of this
residential subdivision bisects the existing location of the playground structure. Several options
were discussed with Circle Pines staff agreeing to resolve this matter to our satisfaction. Last
Wednesday, Mike Hoffman stopped at Rice Lake Estates Park and observed the playground
structure being dismantled. Circle Pines staff was immediately contacted to express our
disappointment on how this was handled.
Consequently, the residents of Rice Lake Estates and city staff were caught off guard with the
sudden removal of the playground equipment. It was my intent to notify the residents of the
situation (including timeline of when equipment was scheduled for removal, how situation was
going to be resolved, etc.) once an action plan from Circle Pines was developed. To date, we
still have not received any communication/correspondence from Circle Pines pertaining to how
this matter is going to be resolved.
I have received several telephone calls from area residents wondering what happened to the
playground equipment. Some residents have also contacted the Quad and Star Tribune. Perhaps
a formal position statement from the Park Board may help expedite a workable solution to this
situation.
sw /parkbrd /meeting information / Rice Lake Estates Park Update
•r„
Youth
Youth Instructional: Our fall youth instructional programs are beginning to get under
way. As is usual this time of year, registration for most programs is slow - the beginning of the school year tends to be
a hectic time and registering for programs usually takes a back seat to school. Our registrations generally increase in
the late fall and winter once school life gets more settled. A new program we added this fall was Tae Kwon Do. The
response to it has been very positive.
Lino Lae ParKs and 1Zecreation Department
Program Highlights -
$eptember Part: 'oard Update
Field Trips: We have a great lineup of fall trips planned including some options just for middle school age youth. We
hope to have more success with these trips than we did this summer. Fall trips planned for the elementary age youth
include: Wheels & Reels, Bowling Lunch & Como Zoo, Pumpkin Patch, Wild and Crazy Day, and A Tropical After-
noon. Middle school trips include: Rockin' Out at Vertical Endeavors, The Ultimate Big Screen Experience: IMAX at the
Zoo, and On the Wild Side - Rainforest Cafe and The Tropics.
TAAG Beach Party: 56 middle school age youth participated in the TAAG Beach Party on August 20, 2004. Despite
the cool temperatures the youth still had a great time. Activities included the giant bounce, tandem biking, volleyball,
free play games, swimming, canoeing and lunch. The collaborative partners of the event included: the University of
Minnesota TAAG Study team, Anoka County Parks and Recreation, Lino Lakes Parks and Recreation, Centennial
Community Services, Centennial Middle School and the Chain of Lakes YMCA.
Football: A total of 310 participants (grades 2 -8) are in fall football - a total of 17 teams. The season began on
•ptember 7 and will conclude with the post season tournament on Saturday, October 30.
Soccer: A total of 412 participants (ages 5 -12) are in fall soccer this year - equaling 45 total teams. The season
began on Saturday, September 11 and will conclude with the post season tournament on Saturday, October 30.
Mutt
Fall Softball: Lino Lakes offered four leagues this fall: Sunday Co -Rec (9 Teams), Monday Mens (7 Teams), Tuesday
Mens (7 Teams), and Thursday Mens (7 Teams). The end of the season softball tournament was held on Saturday,
September 18. Northern Wholesale won the tournament with Toppers and More finishing second. The top three
teams from Lino Lakes will advance to the Fall State tournament that will be held on Saturday, October 2 and
Sunday, October 3.
Family Turkey Shoot: Our 7th Annual Family Turkey Shoot is just around the
corner. We are currently looking for volunteers to help with this event - scheduled
for Saturday, November 13, 2004 from 10 a.m. - Noon at Centennial Middle School.
If you are interested in volunteering please call Liz Bursack at 651- 982 -2443
or email Liz at Ibursack @ci.lino- lakes.mn.us. Thank you.
reation Review: The fall edition of the Recreation Review went out the last
ek of September. Work has just begun on the winter edition - which is scheduled
to be in homes the last week of November.
Questions? Please call Liz Bursack or Brian Hronski at 651- 982 -2440.
Lino Lakes Parks and Recreation Department
600 Town Center Parkway
Lino Lakes, MN 55014
(651) 982 -2440 Fax (651) 982 -2439
www.ci.lino- lakes.mn.us
September 28, 2004
TO: Park Board Members
FROM: Mike Hoffman, Parks Supervisor
SUBJECT: August and September Maintenance Update
Well, summer has officially ended and that can mean only one thing, my seasonal staff have left
and gone back to school! Maintenance performed during a, very busy August and September has
included:
• Weekly mowing of all turf areas. Athletic fields are growing like crazy and are getting cut
twice weekly. Trim mowing and weed whipping have been neglected due to being short
handed since our seasonals left. I hope to be caught up by the end of next week, please bear
with us.
■ Weekly garbage pickup. Again we are not getting to everything weekly, but hope to be back
on schedule by the end of next week.
• Soccer and football field layout. Layout, line cut -ins and painting of 12 game and 5 practice
soccer fields and 3 game fields for football.
• Athletic field preparation:
Softball fields — Three or four fields are being game prepped on Sunday, Monday,
Tuesday and Thursday. Fair /foul lines are being cut -in and painted weekly.
Soccer — 12 game fields and 5 practice fields. Weekly maintenance includes line cut -ins,
painting as needed, and checking nets and anchors.
Football — Three game fields. Maintenance includes weekly line cut -ins and painting as
needed.
• Athletic field improvements. Sodded three wear areas at CMS #5 (center circle area) and
CMS #7 (2 soccer goal mouth areas).
• Clearwater Creek Park.
• Installed park sign. Sod cut and mulched all trees and shrub beds.
■ Highland Meadows Park.
Worked with girl scouts on entrance sign project. Project consisted of:
Site preparation. (staff)
•
•
Installed first course of block. (staff)
Installed remainder of block. (girl scouts)
Added soil to bed. (staff)
Planted native grasses and wildflowers. (girl scouts)
Installed cap block. (staff)
Remaining work on this project includes, installing sign, mulching bed and backfilling
around bed.
• Applied fertilizer to approximately 40 acres of turf (parks and school sites).
• Broadleaf weed control (contracted).
Applied to athletic fields at CMS, RLE, Sunrise and Highland Meadows turf areas.
• Added rec. step (wood mulch) to playgrounds as needed.
• Picked up and delivered party wagon.
• Irrigation system audits:
Checked all systems to determine maintenance needs. Example:
Heads — spray pattern rotating properly - raise /lower.
Valve boxes — locate, raise /lower, replace as needed.
• Assisted Recreation Department with Safety Camp and playground party set -up.
• Assisted Environmental Department with watering trees and oak wilt control.
• Core aerated athletic fields at CMS, RLE, and Sunrise.
• Leveled BMX track in S. Reshanau trail area. Cut Buckthorn and stump treated, left
Buckthorn lay to discourage rebuilding of BMX track.
• Equipment maintenance as needed.
Those are the highlights from August and September. Hopefully we will be caught up soon.
sw /parkbrd /Mike /August- September 2004 Park Update.doc