HomeMy WebLinkAbout02/04/2008 Park Board Packet•
Lino Lakes Parks and Recreation Department
600 Town Center Parkway
Lino Lakes, MN 55014
(651) 982 -2440 Fax (651) 982 -2439
•
CITY OF LINO LAKES PARK BOARD MEETING
Monday, February 4, 2008, 6:30pm
Library — Not Televised
** *AGENDA * **
1. Call to Order and Roll Call
2. Approval of Minutes from January 7, 2008
3. Setting Agenda
4. Open Mike
5. Review Proposed 2008 Park Dedication Fee Analysis
6. Review Recreation Department Update
7. Review Parks Department Update
8. Old Business
9. New Business
10. Next Park Board Meeting — March 3, 2008, 6:30pm
11. Adjourn
If you are unable to attend the meeting please call Sandie at 651 982 -2442.
sw /parkbrd /2 -4 -08 Park Board Agenda.doc
•
•
Park Board Meeting — January 7, 2008
Minutes
The January 7, 2008 City of Lino Lakes Park Board meeting was called to order at
6:35 p.m., by Chair Lindy.
Roll call was taken; members present were Pam Taschuk, Pat Huelman, Bill Kusterman
and George Lindy. Members absent were Paul Montain and Katie Boyle.
Also present was Rick DeGardner, Public Services Director and Sandie Wood, Public
Services Office Manager.
APPROVAL OF MINUTES FROM MAY 7, 2007 AND NOVEMBER 5, 2007:
Pat Huelman made a motion to approve the May 7, 2007 minutes. Seconded by Pam
Taschuk and approved. Pam Taschuk made a motion to approve the November 5,
2007 minutes. Pat Huelman seconded the motion and the minutes were approved.
SETTING AGENDA:
There were no changes to the agenda.
OPEN MIKE:
No one was present for open mike.
REQUEST TO PLACE MEMORIAL IN CLEARWATER CREEK PARK:
Rick told members that a letter from the "Neighbors of Clearwater Creek" requesting
that one of the park benches in Clearwater Creek Park be dedicated to the memory of
Brittany Nelson was included in the packet. He said the Nelson family at 6656 Tele
Lane lost their daughter when she was attempting to cross Highway 61 when she was
struck by an oncoming car. The neighborhood has raised over $500 for this endeavor.
Mr. DeGardner went on to say that in the past, city staff has worked with residents in
placing park benches along our trail system to serve as memorials, but have not
addressed the placement of memorials in our neighborhood parks.
He said that if the Park Board was comfortable with this request, city staff would work
with Mrs. Sylvander in coordinating the design and placement of a small memorial plate
on one of the benches near the playground area. Since the park bench has already
been installed perhaps the Park Board could designate the $500 donation for future
enhancements to Clearwater Creek Park (i.e. landscaping).
Rick said that it is also imperative that the "Neighbors of Clearwater Creek" understand
that the City does not guarantee the safety /future replacement of the memorial. When
graffiti, vandalism, or the effects of the weather have a negative impact on the
memorial, it can be very upsetting to the individuals who made the memorial donation.
He will certainly inform Mrs. Sylvander of any circumstances that may arise in the
future.
Pat Huelman made a motion to approve the placement of a plate on an existing park
bench in Clearwater Creek Park and the $500 donation be used for future park
enhancements. The motion was seconded by Pam Taschuk and approved.
1
d
Park Board Meeting — January 7, 2008
Minutes
• REVIEW 2007 PARKS AND RECREATION ACCOMPLISHMENTS:
Rick reviewed the memo included in the member's packets. He mentioned the
renovation work at Lino Park which included demolishing the park building, removal of
30 green ash trees, backstop, player benches and concrete pads. He also said
regrading and importing topsoil, installation of paved trail loop, irrigation system, seed
bed preparation and reseeding turf areas had been done. He said Recreation staff was
kept busy processing 3,916 program registrations.
REVIEW RECREATION DEPARTMENT UPDATE:
Rick referred to the Program Highlights Flyer from December, 2007. He touched on the
new brochure look and format. The front cover is full color now! He talked about the
Secret Holiday Shop and Breakfast with Santa. He asked member's to review the
update and to contact him if there were any questions.
PARKS DEPARTMENT UPDATES:
Rick reviewed a memo from Mike Hoffman, Parks Supervisor, which summarized the
parks maintenance highlights for December.
OLD BUSINESS:
9a. Determine 2008 Park Board Meeting Schedule:
Staff recommended the following 2008 Park Board meeting dates. He asked members
to please note that the September meeting will be the annual park tour and bbq:
411 Monday, January 7, 2008 Monday, July 7, 2008
Monday, February 4, 2008 Monday, August 4, 2008
Monday, March 3, 2008 Tuesday, September 2, 2008 — Tour and BBQ
Monday, April 7, 2008 Monday, October 6, 2008
Monday, May 5, 2008 Monday, November 3, 2008
Monday, June 2, 2008 Monday, December 1, 2008
Pam Taschuk made a motion to accept the Park Board meeting dates as presented.
Bill Kusterman seconded the motion and the 2008 Park Board Schedule was approved.
9b. Discuss 2008 Park Board Goals:
Members were told that it is time to start thinking about the 2008 goals. Rick attached
an updated Park Dedication Fund Summary for member's to review. He said it was
again expected that $50,000 from the Dedicated Park Fund would be used to reimburse
the Area and Unit Fund for the debt to secure the land purchased in 1999.
Rick informed members that this item was discussed at the November's meeting but no
action had been taken. There was a general consensus from the Board not to
designate any specific projects for 2008 due to a low undesignated fund balance. Rick
said that there is $25,000 in the General Fund for trails again this year.
• Pat Huelman made a motion to proceed with the completion of the Pheasant Hills trail
and to consider the completion of the trail along the north side of Clearwater Creek from
2
Park Board Meeting — January 7, 2008
Minutes
• the existing trail along Otter Lake Road to the existing trail at Elmcrest (City of Hugo
Trail System) based on figures staff would submit to the Park Board. Seconded by
Pam Taschuk and approved.
•
•
Pat told the Park Board that the Friends of the Park Foundation is disbanding and a
donation of a few thousand dollars will be given to the Parks Department for future
project(s).
New Business:
10a. 2008 Park Board Vacancies:
Rick took the opportunity to express his appreciation to the outgoing Park Board
Members for their service to the City of Lino Lakes.
Mr. Paul Montain has been a Park Board Member since 1996 and has provided city
staff and Board Members with a wealth of history and knowledge that has been
beneficial during his tenure.
Mrs. Katie Boyle served on the Park Board since 2002 and provided her knowledge and
a fair perspective on the recent development of the city's parks and trail system.
Mrs. Kathi Gallup is vacating her current Park Board position due to her recent election
to the City Council. Congratulations Kathi!
He said the city is accepting applicants for all advisory board vacancies until January
14, 2008. He asked that if members knew anyone interested in serving on the Park
Board to have them contact Dan Tesch or himself.
NEXT PARK BOARD MEETING:
The next Park Board meeting will be held on Monday, February 4, 2008, 6:30 p.m.
ADJOURN:
The meeting was adjourned at 7:06 p.m.
Respectfully Submitted,
Sandra Wood
Public Services Office Manager
Lino Lakes Parks and Recreation Department
600 Town Center Parkway
Lino Lakes, MN 55014
(651) 982 -2440 Fax (651) 982 -2439
www.ci.lino-lakes.mn.us
January 31, 2008
TO: Park Board Members
FROM: Rick DeGardner, Public Services Director
SUBJECT: Review Proposed 2008 Park Dedication Fee Analysis
Staff has spent the last several months preparing the attached Park Dedication Analysis Report to
help determine whether any adjustments to the current Park Dedication Fee Ordinance are
warranted. The current Park Dedication Fee is $2,075 per residential unit, and $2,175 per acre
for commercial and industrial.
I will explain the report in more detail at Monday's meeting. I would be interested in the Park
Board's comments and suggestions. Staff is also exploring the possibility of incorporating an
open space and/or recreation complex fee. We anticipate bringing the proposed ordinance to city
council within the next few months.
sw /parkbrd /meeting info /Review Proposed 2008 Park Dedication Fee Analysis.doc
2008 CITY OF LINO LAKES PARK DEDICATION ANALYSIS REPORT
Name
Total
Acres
Existing Park Amenities
Future Park Amenities
FUTURE
AMENIT ES COST>
EST1MA1'`ES
Total Park ODStfalue
% Of Total Park
CostNalue Paid by
Existing
Development
$ Of Total Park
CostNalue Paid
by Existing
Development
Arena Acres Park
100% Existing Development
Behm's Park
100% Existing Development
Birch Park
100% Existing Development
1.0
6.1
5.5
1.0 acre land
Playground
Basketball
Tennis Courts (2)
Sub Total
6.1 acres and
Turf, Irrigation, Benches, etc
Playground
1/2 Basketball Court
Gazebo
Looped Trail
Sub Total
5.5 acres and
Playground
Turf, Irrigation, Benches, etc
Ballfields
Gazebo
Hockey Rink
Warming House
Birchwood Acres Park
75% Existing Development
25% Future Development
18.4
Brandywood Park
75% Existing Development
25% Future Development
8.0
OOQ General Improvements
{140
Sub Total
•
$60 MC
iQ 'i.OU Pave
45 000 1/2 1 :44
4 Q00 P is iiilding
00,500
100%
% Of Total Park
CostNalue Paid
by Future
Development
$ Of Total Park
Cost/Value Paid
by Future
Development
$265,000
$600,500
Sub Total
>f:
18.4 acres land "•••• ••
: >::.. <.f� �1:fl1'�; elopmeri�:#�83:;.Master Plan
Playground x% $$0000
Ballfield
Turf, Irrigation, Trails, etc
Sub Totem:: #;; ;:::::> ::$ >t 154000 F' ` Sub Total
3.5 acres land
Playground
Turf/Looped Trail
evelopment Per Master Plan
Sub Total
$225,900
$200;000
$840,500
100%
$840,500
$1,354,000
$545,000
75%
75%
$1,015,500
$40t,750
•
•
•
25%
$338,500
25% $136,250
J: \Ricks Folder \Park Dedication\Analysis 1- 08.xls
1/31/2008
•
Name
City Hall Park
50% Existing Development
50% Future Development
Clearwater Creek Park
100% Existing Development
Total
Acres
24.0
5.5
24.0 acres land
Playground
Ballfields (2)
Skate Park
Hockey Rink
Warming House
Sub Total
5.5 acres land
General Development
Sub Total
Future Park Amenities
2t 00 General Improvements
..............
..............
St 00
..............
..............
..............
24400
Eif)0
.....................
$'E hS15" O;W
Sub Total
F1 TURE
: >AMENITIES':COST
>'<`ESTIMATES s
Total Park Cost/Alpe
% Of Total Park
Cost/Value Paid by
Existing
Development
$1,810,000
Sub Total
$602,500
100%
$ Of Total Park
Cost/Value Paid
by Existing
Development
$905,000
$602,500
% Of Total Park
CostNalue Paid
by Future
Development
50%
$ Of Total Park
Cost/Value Paid
by Future
Development
$905,000
Country Lakes Park
100% Existing Development
Highland Meadows Park
100% Existing Development
Lamotte Park
100% Existing Development
1.0
Lino Park
100% Existing Development
7.5
22.0 acres land
Fishing Pier /Canoe Launch
Trails, Benches, etc
4.0 acres land
Gazebo
Playground
1/2 Basketball Court
Turf, Irrigation, Trails, etc
Sub Total
1.0 acres land
Sub
7.5 acres land
Playground
Turf, Trails, Benches, etc
Picnic Shelter
•
$500,000
100%
$500,000
eral Im '' { nts
Sub Total
D z <hr •ment Per Master Plan
Sub Total
$155,000
bod
$802,500
100%
100%
$155,000
$802,500
J: \Ricks Folder \Park Dedication\Analysis 1- 08.xls
1/31/2008
Name
Marshan Park
100% Existing Development
Pheasant Hills Park
100% Existing Development
Quail Ridge Park
100% Existing Development
Shenandoah Park
100% Existing Development
Sunrise Park
100% Existing Development
Total
Acres
5.7
3.0
6.0
8.0
20.0
Existing Park Amenities
5.7 acres land
Playground
Turf, Trails, Benches, etc
Sub Total
3.0 acres land
Playground
Basketball
Turf, Trails, Boardwalk, etc
Sub Total
6.0 acres land
Sub Total
8.0 acres land
Playground
Turf, Trails, Benches, etc
Sub Total
20.0 acres land
Ballfields (4)
Hockey Rink (2)
Warming House
Playground
Picnic Shelter (2)
Sunset Oaks Park
100% Existing Development
2.1
2.1 acres land
Playground, Turf, etc
Wenzel Farms Park
100% Existing Development
•
1.0
500
is{
Future Park Amenities
Development Per Master Plan
Gazebo
Sub Total
ENITIES Ci S'
STIMA 'E; ; Total Park CostNalue
% Of Total Park
Cost/Value Paid by
Existing
Development
100%
Sub Total
Development Per Master Plan
General Improvements
$580,000
/•::,:i{ •, '• f.`:•.;., Sub To
£.;
1OE F eneralImprov*Vits
Sub Totaf!%
1.0 acres land
Playground, Basketball, etc
Sub Total
:195,999
•
I Improvements
Landscaping
Sub Total
Sub Total
Sub Total
$500,000
100%
100%
$ Of Total Park
Cost/Value Paid
by Existing
Development
$593,500
$320,000
$580,000
% Of Total Park $ Of Total Park
Cost/Value Paid Cost/Value Paid
by Future by Future
Development Development
$1,602,000
$245,500
$107,000
100%
100%
100%
100%
•
$500,000
$1,602,000
$245,500
$107,000
J: \Ricks Folder \Park Dedication\Analysis 1- 08.xls
1/31/2008
•
Name
Woods of Baldwin Lake Park
75% Existing Development
25% Future Development
Wollan's Park
50% Existing Development
50% Future Development
Behms Park North
50% Existing Development
50% Future Development
11 Future Parks
100% Future Development
TOTAL PARKS
SYSTEM
TOTAL TRAILS
SYSTEM
TOTAL PARKS &
TRAILS SYSTEM
•
Total
Acres
3.0
18.0
8.0
100.0
277.8
Existing Park Amenities
3.0 acres land
Playground, Trail, Turf, etc
Sub Total
18.0 acres land
(Estimated)
8.0 acres land
24 Miles
st;1E: t'1E:
EkISTINti
FACIL/TIES:]*
Sub Totall
Sub Total
40,000
440P
Future Park Amenities
General Improvements
General Development
General Development
Sub Total
Sub Total
AMENITIES >COST:
ES TI MATES _>
Total Park ;0alue
% Of Total Park
Cost/Value Paid by
Existing
Development
$265,000
(;290,000
S.tit,Jotal
$310tf,, $740,000
100.0 acres land (Estimate
General Development
(@ $300,000 each)
Sub TdE
S'sI32 0141es
•
75%
50%
$ Of Total Park
Cost/Value Paid
by Existing
Development
50%
$24,125,500
$11,114,400
$35,239,900
•
$19t7.750
% Of Total Park
Cost/Value Paid
by Future
Development
25%
$ Of Total Park
Cost/Value Paid
by Future
Development
$66,250
$645,000
100%
$12,827,000
$370,000
$8,800,000
$11,261,000
J: \Ricks Folder \Park Dedication\Analysis 1- 08.xls
1/31/2008
•
TRAIL SYSTEM
TOTAL EXISTING TRAILS
Future Trails
Destination Trails
Linking Trails
TOTAL FUTURE TRAILS
Value
TOTAL VALUE EXISTING AND FUTURE TRAIL SYSTEM
TOTAL VALUE EXISTING PARKS
TOTAL VALUE FUTURE PARKS /AMENITIES
TOTAL VALUE EXISTING AND FUTURE PARKS
TOTAL VALUE EXISTING TRAILS
TOTAL VALUE FUTURE TRAILS
TOTAL VALUE EXISTING AND FUTURE TRAILS
TOTAL VALUE EXISTING PARKS AND TRAILS
TOTAL VALUE FUTURE PARKS AND TRAIL
TOTAL VALUE EXISTING AND FUTURE PA
EXISTING HOUSEHOLDS (DEC, 2007)
ADDITIONAL HOUSEHOLDS
TOTAL FULL BUILD HOUSEHOLDS
Lengs,(Miles
Foot Mile
24
$5,174,
,168,000
7,946,400
$11,114,400
15
43
110
52%
48%
29%
71%
Existing Trail
Future Trail
$25 $132,000
$35 $184,800
$15,791,500 45%
6,075
12,889
18,964
55%
32%
68%
J: \Ricks Folder \Park Dedication\Analysis 1- 08.xls
1/31/2008
Percent of Existing Parks vs Total Parks
52%
Percent of Future Parks vs Total Parks
Percent of Existing Trails vs Total Trails
Percent of Future Trails vs Total Trails
Percent of Existing Park & Trails vs Total Parks & Trails
Percent of Future Park & Trails vs Total Park & Trails
PARK DEDICATION FEES
Total Value Future Parks & Trails /Additional Households
Total Value Parks & Trails/Total Households
Existing Development Responsibility (% x Total)
Future Development Responsibility (% x Total)
Future Development Responsibility Per Unit
48%
• •
$1,858
J: \Ricks Folder \Park Dedication\Analysis 1- 08.xls
1/31/2008
• •
Lino Lakes Parks & Recreation Department
Program Highlights
January Park Board Update
SPECIAL EVENTS
Snow Day: This year's Snow Day event was held on Saturday, January 26,
2008 at Wargo Nature from 1 - 4 p.m. As in the past, the event was a
collaborative effort between the Parks and Recreation Departments of Lino
Lakes, Blaine, and Anoka County. One of the most amazing parts was
that we actually had good snow this year (a first in quite awhile) and the
weather warmed up (finally!). The event included several outdoor activities
including kicksledding, snowshoeing, ice fishing, cross country skiing, and
snow snakes. Inside activities included winter bingo, refreshments, and two
performances by Magician Brian Richards. The event was attended by
approximately 332 participants - another great turnout!!
Sweetheart Dance: Our annual Sweetheart Dance is just around the corner. It is scheduled for Friday, February 8 from 6:30 -
8 p.m. at Centennial Elementary School. This is a change from previous years when it was held on a Saturday morning. We are
hoping the time and date change will allow families to enjoy a full weekend, but yet still participate in a special event. So far the
response to the change has been positive - 85 children are currently registered and we still have almost two weeks until the event.
YOUTH PROGRAMS
Youth Instructional Programs: Many of our youth instructional programs began this month including Dance, Toss, Kick
and Catch, Tae Kwon Do, Soccer Mini Camp and Floor Hockey Mini Camp. Participation levels are good and only a couple
of classes had to be cancelled due to low enrollment (which is something that happens just about every season). Many of
these programs will through March and end by the start of Spring Break.
efirls Fastpitch Pitching Clinics: The clinics have started and we have five participants enrolled this winter.
Skating Programs: Snack and Skate skating lessons and Hockey Skills class started on Saturday, January 5 at Sunrise
Park. We have had good ice and have excellent numbers. We have 30 participants in Snack and Skate and 15 registered
for Hockey Skills.
ADULTS
Men's Basketball: Men's Basketball is at the midway point of the season. Play -offs will be starting at the end of February
Open Volleyball: Open Volleyball on Friday nights at Centennial Middle School has been averaging 20+ players per night.
Open Basketball: Open Adult Basketball on Monday nights at Centennial Middle School has been averaging 15+ players per night.
WARMING HOUSES
All three skating rinks and warming houses are open and we were open over the holiday break this year for the first time in
three years. The rinks have only been closed three days so far this season... we are having a great year to this point!
LINO LAKES NEWS
Work has begun on our new Spring/
Summer guide - scheduled to be out
in homes in early March. This
combined brochure is new for us
this year so we aren't sure the
reaction it will get. We'II keep you
posted on the feedback.
Questions? Please feel free to
contact Liz Benoit or Brian Hronski
at 651- 982 -2440.
•
•
Lino Lakes Parks and Recreation Department
600 Town Center Parkway
Lino Lakes, MN 55014
(651) 982 -2440 Fax (651) 982 -2439
www.ci.lino - lakes.mn.us
January 29, 2008
TO: Park Board Members
FROM: Mike Hoffman, Parks Supervisor
SUBJECT: January Park Maintenance Update
What a difference a day makes. Yesterday mid 40's, this morning 9 °F with wind chills
approaching -35 °. The rinks went from having 1/4" -1/2" of melted water on them to being frozen
solid and smooth as glass this morning.
Maintenance activities during January have included:
• Rink maintenance — daily sweeping, snow blowing, shoveling and flooding of our 4
hockey and 3 pleasure rinks.
• Hockey goal repair — weld broken goals, mend holes in nets and relace as needed.
• Park building maintenance — clean shelters, bathrooms, and garages as needed.
• Equipment maintenance — grease, fuel, wash, clean and repair as needed.
• Pheasant Hills boardwalk — construction is well under way, actually nearing completion
on the boardwalk connection from Sherman Lake Road into Pheasant Hills Park. City
staff plowed the trails into the site. Tree Trust began work on the project on January 14th,
they are expecting to complete the project by February 1. They have been using our
compressor and post pounder to help lower project costs.
• Trail plowing and widening.
• Attended Green Expo and recertified Pesticide Application license.
• Tunnel maintenance at Rice Lake Elementary School as needed.
• Installed shelving in Marshan Park building.
Those are the major highlights of a pretty boring January. More to come in February.
sw /Parkbrd/Mike /January 2008 Park Maintenance Update.doc
7.