Loading...
HomeMy WebLinkAbout05/05/2008 Park Board PacketF s Lino Lakes Parks and Recreation Department 600 Town Center Parkway Lino Lakes, MN 55014 (651) 982 -2440 Fax (651) 982 -2439 www.ci.lino- lakes.mn.us CITY OF LINO LAKES PARK BOARD MEETING Monday, May 5, 2008, 6:30pm Council Chambers - Televised ** *AGENDA * ** 1. Welcome New Park Board Members — Charles Evans, Richard Jensen and Matt Koehn 2. Swearing In of Newly Appointed Members — Mayor Bergeson 3. Call to Order and Roll Call 4. Approval of Minutes from January 7, 2008 and February 4, 2008 5. Setting Agenda 6. Open Mike 7. Clearwater Creek Trail Project Update 8. New Business a. Review 2007 -2008 Warming House Report b. Review Dedicated Parks Fund Balance Sheet c. Distribute Updated Roster 9. Parks Update 10. Next Park Board Meeting — June 2, 2008, 6:30pm 11. Adjourn If you are unable to attend the meeting please call Sandie at 651 982 -2442. sw /parkbrd /agendas /5 -5 -08 Park Board Agenda.doc Park Board Meeting — January 7, 2008 Minutes • The January 7, 2008 City of Lino Lakes Park Board meeting was called to order at 6:35 p.m., by Chair Lindy. Roll call was taken; members present were Pam Taschuk, Pat Huelman, Bill Kusterman and George Lindy. Members absent were Paul Montain and Katie Boyle. Also present was Rick DeGardner, Public Services Director and Sandie Wood, Public Services Office Manager. APPROVAL OF MINUTES FROM MAY 7, 2007 AND NOVEMBER 5, 2007: Pat Huelman made a motion to approve the May 7, 2007 minutes. Seconded by Pam Taschuk and approved. Pam Taschuk made a motion to approve the November 5, 2007 minutes. Pat Huelman seconded the motion and the minutes were approved. SETTING AGENDA: There were no changes to the agenda. OPEN MIKE: No one was present for open mike. REQUEST TO PLACE MEMORIAL IN CLEARWATER CREEK PARK: Rick told members that a letter from the "Neighbors of Clearwater Creek" requesting that one of the park benches in Clearwater Creek Park be dedicated to the memory of Brittany Nelson was included in the packet. He said the Nelson family at 6656 Tele Lane lost their daughter when she was attempting to cross Highway 61 when she was struck by an oncoming car. The neighborhood has raised over $500 for this endeavor. Mr. DeGardner went on to say that in the past, city staff has worked with residents in placing park benches along our trail system to serve as memorials, but have not addressed the placement of memorials in our neighborhood parks. He said that if the Park Board was comfortable with this request, city staff would work with Mrs. Sylvander in coordinating the design and placement of a small memorial plate on one of the benches near the playground area. Since the park bench has already been installed perhaps the Park Board could designate the $500 donation for future enhancements to Clearwater Creek Park (i.e. landscaping). Rick said that it is also imperative that the "Neighbors of Clearwater Creek" understand that the City does not guarantee the safety /future replacement of the memorial. When graffiti, vandalism, or the effects of the weather have a negative impact on the memorial, it can be very upsetting to the individuals who made the memorial donation. He will certainly inform Mrs. Sylvander of any circumstances that may arise in the future. Pat Huelman made a motion to approve the placement of a plate on an existing park bench in Clearwater Creek Park and the $500 donation be used for future park enhancements. The motion was seconded by Pam Taschuk and approved. 1 Park Board Meeting — January 7, 2008 Minutes • REVIEW 2007 PARKS AND RECREATION ACCOMPLISHMENTS: Rick reviewed the memo included in the member's packets. He mentioned the renovation work at Lino Park which included demolishing the park building, removal of 30 green ash trees, backstop, player benches and concrete pads. He also said regrading and importing topsoil, installation of paved trail loop, irrigation system, seed bed preparation and reseeding turf areas had been done. He said Recreation staff was kept busy processing 3,916 program registrations. • REVIEW RECREATION DEPARTMENT UPDATE: Rick referred to the Program Highlights Flyer from December, 2007. He touched on the new brochure look and format. The front cover is full color now! He talked about the Secret Holiday Shop and Breakfast with Santa. He asked member's to review the update and to contact him if there were any questions. PARKS DEPARTMENT UPDATES: Rick reviewed a memo from Mike Hoffman, Parks Supervisor, which summarized the parks maintenance highlights for December. OLD BUSINESS: 9a. Determine 2008 Park Board Meeting Schedule: Staff recommended the following 2008 Park Board meeting dates. He asked members to please note that the September meeting will be the annual park tour and bbq: Monday, January 7, 2008 Monday, February 4, 2008 Monday, March 3, 2008 Monday, April 7, 2008 Monday, May 5, 2008 Monday, June 2, 2008 Monday, July 7, 2008 Monday, August 4, 2008 Tuesday, September 2, 2008 — Tour and BBQ Monday, October 6, 2008 Monday, November 3, 2008 Monday, December 1, 2008 Pam Taschuk made a motion to accept the Park Board meeting dates as presented. Bill Kusterman seconded the motion and the 2008 Park Board Schedule was approved. 9b. Discuss 2008 Park Board Goals: Members were told that it is time to start thinking about the 2008 goals. Rick attached an updated Park Dedication Fund Summary for member's to review. He said it was again expected that $50,000 from the Dedicated Park Fund would be used to reimburse the Area and Unit Fund for the debt to secure the land purchased in 1999. Rick informed members that this item was discussed at the November's meeting but no action had been taken. There was a general consensus from the Board not to designate any specific projects for 2008 due to a low undesignated fund balance. Rick said that there is $25,000 in the General Fund for trails again this year. • Pat Huelman made a motion to proceed with the completion of the Pheasant Hills trail and to consider the completion of the trail along the north side of Clearwater Creek from 2 Park Board Meeting — January 7, 2008 Minutes • the existing trail along Otter Lake Road to the existing trail at Elmcrest (City of Hugo Trail System) based on figures staff would submit to the Park Board. Seconded by Pam Taschuk and approved. • • Pat told the Park Board that the Friends of the Park Foundation is disbanding and a donation of a few thousand dollars will be given to the Parks Department for future project(s). New Business: 10a. 2008 Park Board Vacancies: Rick took the opportunity to express his appreciation to the outgoing Park Board Members for their service to the City of Lino Lakes. Mr. Paul Montain has been a Park Board Member since 1996 and has provided city staff and Board Members with a wealth of history and knowledge that has been beneficial during his tenure. Mrs. Katie Boyle served on the Park Board since 2002 and provided her knowledge and a fair perspective on the recent development of the city's parks and trail system. Mrs. Kathi Gallup is vacating her current Park Board position due to her recent election to the City Council. Congratulations Kathi! He said the city is accepting applicants for all advisory board vacancies until January 14, 2008. He asked that if members knew anyone interested in serving on the Park Board to have them contact Dan Tesch or himself. NEXT PARK BOARD MEETING: The next Park Board meeting will be held on Monday, February 4, 2008, 6:30 p.m. ADJOURN: The meeting was adjourned at 7:06 p.m. Respectfully Submitted, Sandra Wood Public Services Office Manager • • Park Board Meeting — February 4, 2008 Minutes The February 4, 2008 City of Lino Lakes Park Board meeting was called to order at 6:40 p.m., by Chair Lindy. No action was taken on the agenda items as there wasn't a quorum present. Roll call was taken; members present were George Lindy, Bill Kusterman and Pat Huelman. Members absent were Paul Montain, Pam Taschuk and Katie Boyle. Also present was Rick DeGardner, Public Services Director and Sandie Wood, Public Services Office Manager. APPROVAL OF MINUTES FROM JANUARY 7, 2008: No action taken. SETTING AGENDA: There were no changes to the agenda. OPEN MIKE: No one was present for open mike. REVIEW PROPOSED 2008 PARK DEDICATION FEE ANALYSIS: Rick told members that staff has spent the last several months preparing the Park Dedication Analysis Report to help determine whether any adjustments to the current Park Dedication Fee Ordinance are warranted. The current Park Dedication Fee is $2,075 per residential unit, and $2,175 per acre for commercial and industrial. He explained the report in more detail at the meeting. He said he is interested in the Park Board's comments and suggestions. Staff is also exploring the possibility of incorporating an open space and /or recreation complex fee. It is anticipated that the proposed ordinance will be going to city council within the next few months. RECREATION DEPARTMENT UPDATE: Rick referred to the Program Highlights Flyer from January 2008. He touched on Snow Day, Sweetheart Dance, Open Volleyball, Open Basketball and warming houses. He said staff is currently working on the next brochure which comes out early March. PARKS DEPARTMENT UPDATES: Rick told the members the work on the Pheasant Park boardwalk was going along very well. It is anticipated that Tree Trust will complete the project in February. He responded to member's questions. Rick told members that staff is working on trail clearing and rink maintenance. OLD BUSINESS: Members asked Rick if he had gone before the city council with the 2008 goals. He said he is still working on this and will go before city council when he is finished. NEW BUSINESS: There was no new business to discuss. 1 Park Board Meeting — February 4, 2008 Minutes • NEXT PARK BOARD MEETING: The next Park Board meeting will be held on Monday, March 3, 2008, 6:30 p.m. ADJOURN: The meeting was adjourned at 7:30 p.m. Respectfully Submitted, Sandra Wood Public Services Office Manager • • • Lino Lakes Parks and Recreation Department 600 Town Center Parkway Lino Lakes, MN 55014 (651) 982 -2440 Fax (651) 982 -2439 www.ci.lino - lakes.mn.us April 30, 2008 TO: Park Board Members FROM: Rick DeGardner, Public Services Director SUBJECT: Clearwater Creek Trail Project Update During the 2008 Park Board goals discussion at the January Park Board meeting, staff was directed to further refine the estimated project costs to complete the trail along the northern edge of Clearwater Creek from Otter Lake Road to Hugo's trail system. The preliminary engineer's estimate provided at the January Park Board meeting provided preliminary construction costs of $21,000. This included mobilization, aggregate base, wear coarse, topsoil borrow, and silt fence. • A recent on -site visit identified some issues that staff will need to further investigate: • The wetland area north of the eastern portion of the proposed trail drains into Clearwater Creek. We will work with RCWD to identify the number /size /locations of culverts so we don't interrupt the flow. • The eastern portion of the proposed trail appears to skirt possible wetland areas. We will contact RCWD to explore options (ie. asphalt trail vs. boardwalk) • The original proposed trail alignment was placed along the northern side of the pond (directly east of Otter Lake Road). It appears that locating the proposed trail between the pond and Clearwater Creek is a better option from an economic, environmental, and trail user experience standpoint. Staff will address these issues and report back to the Park Board for consideration. It is anticipated that actual construction costs will exceed the preliminary estimated construction costs discussed at January's meeting. •11 IN l ■11 ■11■ ■11 ■11 *11 ■11 ■11 ■11 ■11 ■11 ■1 O W J ZU)W ZZW CAOW0 m11 `L W DWQC2 0 O w O J O i- 0 0233).1111 23 3 110 Lino Lakes Parks and Recreation Department 600 Town Center Parkway Lino Lakes, MN 55014 (651) 982 -2440 Fax (651) 982 -2439 www.ci.lino- lakes.mn.us �a, Date: 4/29/08 To: Rick DeGardner, Public Services Director From: Brian Hronski, Recreation Program Supervisor Subject: Final 2007 -08 Warming House Report The 2007 -08 warming house and skating year was the finest season we've had in a number of years. We opened all the rinks on December 13`h and we had very few closings once we got started this season. The highlight was that for the first time in over three years we were open throughout the students holiday break in December. Once that happened we were off and running for the season. The best news was that we only had to close the rinks 7 days during the year. The rinks were open a total of 73 days and the rinks stayed open until March 3`a The Centennial Hockey Association continued using our rinks again this season for its supplemental practices. They have continued to be a very respectful user group and they have talked about helping us flood after hours at Birch and Sunrise Parks. Hopefully next year they will be able to put together a group to make this happen. One of the new services we provided this skating season was weekend ice cleanup and rink maintenance. Part-time seasonal staff was up bright and early on Saturday mornings to sweep and clean the rinks at Sunrise, Birch, and City Hall Parks. In past years the rinks would not be cleaned over the weekends which created a bigger job on Monday mornings for Mike Hoffman and his staff. Cleaning the rinks on Saturday mornings not only provided a nice service to resident skaters but it also helped not make quite as large of job for Monday morning cleanup. There were two accident reports turned in during the 2007 -08 season and one occurred at City Hall Park and the other came from Sunrise Park. Neither of the injuries were serious as the child at City Hall Park was cut above his eyebrow due to a high stick and injury at Sunrise was a cut on a thumb from a skate blade. Both injuries were treated on site and were not serious. Our number of injuries at the rinks have been down over the last few years and that is a trend we'd like to see continue. The overall numbers for the skating season were up due to the great skating conditions. Our maintenance staff did an outstanding job of preparing the rinks and getting them ready to be skated on. As always the busiest rink was Sunrise Park and on many occasions there were kids waiting to skate right at 4:00 PM when we opened. The numbers at Birch Park were much better this year and that was great to see. The rink at City Hall Park continues to be open on a limited basis and has shown a steady group of skaters over the last two seasons. I hear of more and more skaters going over to City Hall because they know it's not quite as busy as Sunrise and Birch Parks. In closing we had an outstanding skating season and the weather was very cooperative. We provided great ice, a safe environment, and friendly staff which led to a fine season. CC: Lino Lakes Park Board BH /warminghouse2008/ 2007- 08finalwarminghousereport.doc Lino Lakes Parks and Recreation Department 600 Town Center Parkway Lino Lakes, MN 55014 (651) 982 -2440 Fax (651) 982 -2439 www.ci.lino-lakes.mn.us WARMING HOUSE REPORT 2007 -2008 PARK TOTAL SKATERS HOURS OPENED AVERAGE NUMBER OF SKATERS PER HOUR SUNRISE PARK 2005 -2006 4253 312 13.63 2006 -2007 3082 268 11.5 2007 -2008 4078 423 9.6 BIRCH PARK 2005 -2006 1852 124 5.89 2006 -2007 946 243 3.89 2007 -2008 2109 416 5.06 CITY HALL PARK 2005 -2006 566 169 3.35 2006 -2007 569 182 3.12 2007 -2008 1127 303.5 3.71 • • • E E /) u_ O 0 coi 0 0 N As of May 1, 2008 Q) g) a m co O O Thru April 30, 2008 Comments C.) co co 0 LO O M) IE) O) Cr) F LO I ti ,C 14 N N EA 1,-. i Fil EA EA BALANCE ON 1/01/08 2008 Revenues TOTAL 2008 EXPENSES DEDICATED PARKS FUND BALANCE E CU 0 O O O N 0 N CO EA- 0 O O CO O O N L O LL Received Sept 2003 0 O 0 O Ef} O CO M EA- O O O O Efl O 0 Ef3 (6 0 0 Q -Q 1) o E O L i _0 m E y N O 1 E c 0 LL a Q m c D Z O E D as • a) Q 11. > 0 0 O °) N -O 0- cu • 5 _J O O J LL Q LL 1- 0 M C▪ O co' co- 0) h EA EA Total Undesignated Funds ** Still need to pave trail sections adjacent to Pheasant Hills Boardwalk • CITY OF LINO LAKES PARK BOARD MEMBERS -2008 3 YEAR TERM Date Appointed Jan., 1982 Jan., 1987 Jan., 1990 Feb., 1993 Mar., 1996 Mar., 1999 Jan., 2002 Feb., 2005 Mar. 2008 Member George Lindy, Chair 6823 East Shadow Lake Dr. Lino Lakes, MN 55014 W) 426 -8088 Fax) 426 -1871 E -Mail) GeorgeLindy(acomcast.net Pamela Taschuk 467 Post Road Lino Lakes, MN 55014 H) 651 780 -0696 W) 763 561 -2120 E -Mail) ptaschuk(a)brookcntr.k12.mn.us William Kusterman 744 Country Lakes Drive Lino Lakes, MN 55014 H) 651- 490 -9865 W) 612 - 371 -8370 E- Mail) william.kusteiman@)ey.com Pat Huelman 570 Lonesome Pine Tr. Lino Lakes, MN 55014 H) 651 484 -1427 W) 612 624 -1286 E -Mail) phuelman@tJMN.edu Matt Koehn 649 Arlo Lane Lino Lakes, MN 55014 H) 651-784-2272 W) 763 - 717 -3899 mattkoehn19@hotmail.com Charles Evans 502 Wood Duck Trail Lino Lakes, MN 55014 H) W) 651- 340 -2878 c ev ans (c )cpc of late. c om Richard Jensen 7037 Caribou Circle Lino Lakes, MN 55014 H) 651-780-2774 Feb., 1994 Mar., 1997 Jan., 2000 Jan., 2003 April, 2006 May, 2000 Jan., 2003 April, 2006 Mar., 1998 Jan., 2001 Jan., 2004 Jan., 2007 Mar. 2008 Mar. 2008 Mar. 2008 J: /Park Board /Committee Information/Park Board Roster -2008 Term Expires Dec., 1986 Dec., 1989 Dec., 1992 Dec., 1995 Dec., 1998 Dec., 2001 Dec. 31, 2004 Dec. 31, 2007 Dec. 31, 2010 Dec., 1996 Dec., 1999 Dec.31, 2002 Dec. 31, 2005 Dec. 31, 2008 Dec., 2002 (Jeff's Term) Dec. 31, 2005 Dec. 31, 2008 Dec., 2000 Dec. 31, 2003 Dec. 31, 2006 Dec. 31, 2009 Dec. 31, 2010 Dec. 31, 2010 Dec. 31, 2009(Gallup's Term) Lino Lakes Parks and Recreation Department 600 Town Center Parkway Lino Lakes, MN 55014 (651) 982 -2440 Fax (651) 982 -2439 www.ci.lino-lakes.mn.us April 30, 2008 TO: Park Board Members FROM: Mike Hoffman, Parks Supervisor SUBJECT: April Parks Maintenance Update Maintenance activities during an extremely busy April have included the following: • Garbage collection at all parks. In addition, many of our parks were cleaned up by volunteer groups as part of the Earth Day celebration. Their efforts are greatly appreciated. • Equipment maintenance and preparation for spring. Picked up mowers from water towers (winter storage), convert Groundsmaster from winter machine to mower, service and prepared all mowers for spring. Prepared JD4100 tractor for field grooming. Inspected and serviced all trailers, weed whips and leaf blowers. • Conducted prescribed burns at Town Center, Behms Park, and Centennial Middle School. • Continued structural pruning of young park trees. • Inspected all athletic fields. • Athletic field layout: - Layout of 10 soccer fields. - Layout of one lacrosse field. - Layout and grooming of 15 ballfields. - Soccer fields are in the process of being painted. Goals and nets should be in place by the end of the week. • Assisted with Earth Day: - Delivered and picked up picnic tables and popcorn popper to Wargo Nature Center. - Picked up trash bags that were filled by volunteers. • Swept trails, Rice Lake Elementary tunnel, debris from turf adjacent to parking lots, ballfield infield/outfield edges. • Irrigation startups — filled systems with water, checked for leaks, line breaks (have not completed all systems). • Shop work — organized parks loft areas. Fabricated hard hat rack, weed whip rack, and hand tool rack. • Pumped water from Clearwater Creek Park playground. • Snow plowing as needed (parking lots and sidewalks). • Building maintenance — painted Sunrise Park interior and bathrooms at Marshan Park. • Pheasant Hills boardwalk — ramped up class 5 at both ends, bituminous will be installed later this spring/summer. • • • Received bare root tree order — began planting at Lino and Arena Acres Parks. • Athletic field game preparation — so far 3 adult softball fields on Sunday, 4 on Monday and Tuesday. Youth baseball and softball schedules have started to arrive so more game preparations are on the way. Those are the major highlights from April. Thankfully two of my seasonal staff are already on board, which is good because I anticipate beginning to mow next week. sw /parkbrd/mike /April 08 Park Update.doc C1TY A‘ OF Lino Lakes Parks and Recreation Department 600 Town Center Parkway Lino Lakes, MN 55014 (651) 982 -2440 Fax (651) 982 -2439 www.ci.lino-lakes.mn.us April 2, 2008 TO: Park Board Members FROM: Mike Hoffman, Parks Supervisor SUBJECT: February and March park Maintenance Update Maintenance activity during the months of February and March includes: • Rink maintenance — Rinks were officially opened on December 15 and our last maintenance was performed on March 4th. This is by far the longest skating season we've experienced in the last 15 years. • Remove goals from rinks — Goals and nets were then evaluated for condition, nets were removed and goal frames were repaired. Goals will be painted before next season and many will receive new nets. • Building maintenance — Bathrooms and shelters have been cleaned, garbage cans emptied and rubber mats rolled up and stored for the season. ■ Sunrise warming house — Interior walls and ceiling have been painted. • Equipment maintenance and repairs — Chain saws, line painter, weed whips, etc have been maintained and repaired. • Tunnel maintenance at Rice Lake Elementary School — The tunnel has become a maintenance headache again this spring. As always, snow melting from the south side of Birch Street runs into the tunnel where it is supposed to run through the tunnel to the north and then drain into a ditch on the west side. A couple of problems with this scenario: First, as the snow melt enters the tunnel it begins to refreeze as the temperature inside the shaded tunnel is considerably colder than the temperature on the south facing slope. Second, the north facing slope on the north side of Birch Street melts at a much slower rate than the south side which often causes any runoff that does make it to the north to be dammed up at the end of the tunnel. Well enough complaining, when the tunnel is slippery we sand; when the ice is soft we scrape it out with our Toolcat, when there is 4" of water on the north end we chisel a trench to allow it to drain. Job security I guess. Well let's move on. • Assisted the Streets Department with snow removal as needed. ■ Purchased siding and windows for Birch Park. We plan to complete the exterior and painting before the summer playground program begins. • Secured storage space in track building at Centennial Middle School (CMS), then moved all football blocking dummies from Marshan Park building to CMS storage. • Prepped wood duck boxes for spring nesting. In 2007, 33 out of our 52 boxes successfully hatched approximately 185 ducklings • Organized recreation supplies at Marshan Park building. • Delivered and picked up bounce from YMCA. • Picked up storage racks, pallet jack and break room table and chairs that were donated by Accent Media. • Pheasant Hills Boardwalk — construction was completed on February 12. Boardwalk is barricaded off until we can match grade on both sides. • Completed playground inspections and ordered replacement slide panel for Sunrise Park. • Began structural pruning of all young park trees (trees planted in the last 10 years). • Ordered bare root trees and athletic field supplies for spring projects. • Attended safety and recertification training — Topics included: chain saw safety, right -to- know, AWAIR, shade tree short course and sports turf workshop. • Hired summer seasonal positions. Those are the major highlights for February and March. Think spring. sw /parkbrd /Mike/February and March 2008 Park Update.doc •