HomeMy WebLinkAbout07/14/2003 Council Packet•
WORK SESSION AGENDA
CITY OF LINO LAKES
Wednesday
July 9, 2003
CITY COUNCIL WORK SESSION
Community Room (not televised)
5:30 P.M.
1. West Shadow Lake Drive, Jim Studenski
2. Senior Housing Project on Lake Drive, Dave Crandall, Jeff Smyser
3. Livable Communities Grant Application, Mary Alice Divine, Michael Grochala
4. 62nd Street Road Improvements, Jim Studenski
5. Marshan Lane Utilities, Jim Studenski
III6. Regular Agenda Items
7. Adjourn
Revised 07/08/03 ajb 11:35 a.m.
•
PAGE 1
•
AGENDA
CITY OF LINO LAKES
Monday,
July 14, 2003
Council Chambers
City Council meeting
6:30 p.m.
(Scheduled to be broadcast on Channel 16)
Call to Order and Roll Call
Pledge of Allegiance
Setting the Agenda: Addition or deletion of agenda items
1. Consent Agenda -
A) Consideration of Expenditures:
i) July 14, 2003 (Check No. 68464 through 68640 in the amount of
•
$319,442.61).
ii) Centennial Fire District (Check No. 13839 through 13852 in the
amount of $14,556.38).
B) Consideration of Not Waiving Monetary Limits on Tort Liability Per
Minn. Statute 466.04, Al Rolek
C) Consider Resolution 03 -111, Approving Solicitors/Peddlers License for
Monitronics International, Inc.
D) Assessments -- Resolution No. 03 -72, Certifying Delinquent Water and
Sewer Utility Charges, Shirley Kaye's
2. Open Mike
3. Finance Department Report, Al Rolek
None.
4. Administration Department Report, Dan Tesch
None.
Page 1
•
•
AGENDA
5. Public Safety Department Report, Dave Pecchia
A) Accept Grant from State of Minnesota for Compliance Checks
B) Consider Adoption of Resolution No. 03 -96 Accepting Donation from the
Lino Lakes Lions Club for LLPD Equipment - Tasers
6. Public Services Depai huent Report, Rick DeGardner
A) None.
7. Community Development Department Report, Michael Grochala
A) Consideration of Resolution No. 03 -94, Authorizing application for a
Development Grant through the Livable Communities Demonstration
Program, Mary Alice Divine
B) Elm Street Reconstruction Project
i) Public Hearing, Consideration of Resolution No. 03 -97 Adopting
Proposed Assessment Roll, Elm Street Reconstruction Project, Jim
Studenski
ii) Consideration of Resolution No. 03 -98 Accepting Bids and
Awarding Contract for Elm Street Improvement Project, Jim
Studenski
iii) Consideration of Resolution No. 03 -99 Approving Right -of -Way
Acquisition, Elm Street Reconstruction Project, Jim Studenski
iv) Consideration of Resolution No. 03 -110 Accepting Permanent
Easements, Elm Street Reconstruction Project, Jim Studenski
C) Century Farms North
i) Consideration of Resolution No. 03 -100, Approving Development
Agreement, Jim Studenski
ii) Consideration of Resolution No. 03 -101, Approving Final Plat,
Jeff Smyser
D) Consideration of Resolution No. 03 -104, Accepting Bids and Awarding
Contract for Twilight Acres Watermain Extension, Jim Studenski
•
•
•
AGENDA
E) Consideration of Resolution No. 03 -105, Authorizing Final Payment for
Ditch and Pond Cleaning Project, Jim Studenski
F) Consideration of Resolution No. 03 -106, Authorize Preparation of Plans
and Specifications for Marshan Lane Utility Improvement Project, Jim
Studenski (to follow on Friday)
G) Consideration of Resolution No. 03 -108, Calling for Hearing on Prairie
Flower Surface Water Management Project, Jim Studenski (to follow on
Friday)
H) Consideration of Resolution No. 03 -109, Authorizing Distribution of
Lakes Business Park EAW, Michael Grochala
8. Unfinished Business
A) None.
9. New Business
A) Approval of minutes ofJune 18, 2003 Council Work Session
B) Approval of minutes ofJune 23, 2003 City Council Meeting
10. Community Calendar, July 15, 2003 through July 28, 2003:
A) Council Work Session, Wednesday, July 23, 2003, 5:30 p.m.
B) City Council Meeting, Monday, July 28, 2003, 6:30 p.m.
11. Adjourn
Revised 07/09/03 MMG 8:35 a.m.
Page 3
•
EXPENDITURES
JULY 14, 2003
•
•
Date: 06/20/2003 Time: 12:56:11 City of Lino Lakes
FM Entry - Invoice Journal
Vendor #: (A)
Invoice #: (A)
Entry Journal #: (R) 3245 - 3245
Trans #: (A)
Line #: (A)
Due Date: (A)
Bank #: (A)
Operator: JAL Page: 1
Options: Detail / Summary: S Invoice Status: A # of copies: 1
Sort: N Check Over Expend: N
Discount
Vendor # Name # of items Net Gross Discount Lost
000200 AMERICAN FAMILY LIFE ASSUR, INC. 1 176.20 176.20 .00 .00
000539 TARGET 1 166.16 166.16 .00 .00
000755 BIESANZ, PHIL 1 100.00 100.00 .00 .00
000769 EXCELSIOR, CITY OF 1 60.00 60.00 .00 .00
001605 GOVERNMENT FINANCE OFFICERS ASSOC 1 415.00 415.00 .00 .00
002000 INTL UNION OF OPER ENGR 1 420.00 420.00 .00 .00
002551 ANDERSON, KAREN 1 22.00 22.00 .00 .00
002566 BADER, LINDA 1 39.00 39.00 .00 .00
002582 ECKERT, SCOTT 1 33.00 33.00 .00 .00
002583 FOSTER, BRAD 1 18.50 18.50 .00 .00
0 8 KURAK, SUSAN 1 28.00 28.00 .00 .00
0 8 LEDIN, PAUL 1 16.50 16.50 .00 .00
002609 PAWLAK, KIM 1 37.00 37.00 .00 .00
002610 RIES, PATTI 1 33.00 33.00 .00 .00
002612 ROISUM, ERIC 1 37.00 37.00 .00 .00
003091 MINN NCPERS GROUP LIFE INSURANCE 1 400.00 400.00 .00 .00
003250 XCEL ENERGY 1 1,000.02 1,000.02 .00 .00
003600 PRESS PUBLICATIONS, INC. 1 762.75 762.75 .00 .00
004575 UPS /UNITED PARCEL SERVICE 1 13.91 13.91 .00 .00
Grand Totals: 19 3,778.04 3,778.04 .00 .00*
•
Date: 06/26/2003 Time: 10:35:24 City of Lino Lakes
FM Entry - Invoice Journal
,es:
Vendor #: (A)
Invoice #: (A)
Entry Journal #: (R) 3248 3248
Trans #: (A)
Line #: (A)
Due Date: (A)
Bank #: (A)
Options: Detail / Summary: S
Sort: N
Operator: JAL Page: 1
Invoice Status: A # of copies: 1
Check Over Expend: N
Discount
Vendor # Name # of items Net Gross Discount Lost
000077 DEMARS, MITCH 1 13.04 13.04 .00 .00
000080 ABLE HOSE AND RUBBER, INC. 1 27.60 27.60 .00 .00
000100 AID ELECTRIC SERVICE, INC. 1 3,550.38 3,550.38 .00 .00
000110 A T & T WIRELESS 1 49.00 49.00 .00 .00
000155 O'DEA, MARY JO 1 150.00 150.00 .00 .00
000157 ALL SEASONS RENTAL, INC. 1 38.34 38.34 .00 .00
000163 TOLER HALEN, PATRICE 1 150.00 150.00 .00 .00
000176 GRAYBAR ELECTRIC COMPANY, INC. 1 92.14 92.14 .00 .00
000190 INTERSTATE ALL BATTERY CENTER, INC. 1 97.91 97.91 .00 .00
000227 DELL MARKETING L.P. 1 2,318.50 2,318.50 .00 .00
1,6 O'CONNELL, TERESA 1 150.00 150.00 .00 .00
3 WIPERS AND WIPES, INC. 1 98.66 98.66 .00 .00
000364 NORTHERN AIR CORPORATION 1 5,795.67 5,795.67 .00 .00
000539 TARGET 1 24.37 24.37 .00 .00
000548 GRUNDHOFER, CONSTANCE 1 150.00 150.00 .00 .00
000617 MICRO WAREHOUSE, INC. 1 325.00 325.00 .00 .00
000680 BEST ACCESS SYSTEMS, INC. 1 100.17 100.17 .00 .00
000724 BLUE TOW SERVICE, INC. 1 80.00 80.00 .00 .00
000770 BOYER TRUCKS, INC. 2 70.16 70.16 .00 .00
000946 C. P. OFFICE PRODUCTS 3 204.67 204.67 .00 .00
000988 NOBLE NURSERY RETAIL, INC. 1 454.76 454.76 .00 .00
001014 T/C BUILDERS, INC. 1 402.92 402.92 .00 .00
•
Date: 06/26/2003 Time: 10:35:25 City of Lino Lakes
FM Entry - Invoice Journal
Operator: JAL Page: 2
Discount
-
11111r # Name # of items Net Gross Discount Lost
001050 CENTENNIAL SCHOOLS 1 12.50 12.50 .00 .00
001110 CIRCLE PINES, CITY OF 1 2,490.52 2,490.52 .00 .00
001270 DALCO, INC. 1 186.32 186.32 .00 .00
001329 DONLIN, AMY 1 150.00 150.00 .00 .00
001395 NEXTEL COMMUNICATIONS 1 1,221.02 1,221.02 .00 .00
001480 HAWKINS WATER TREATMENT GROUP, INC. 1 2,362.80 2,362.80 .00 .00
001560 FRATTALLONE'S HARDWARE, INC. 1 168.30 168.30 .00 .00
001561 EMERGENCY AUTOMOTIVE TECHNOLOGIES, INC. 1 17.89 17.89 .00 .00
001618 GLENN REHBEIN EXCAVATING, INC. 1 3,525.00 3,525.00 .00 .00
001771 HALVORSON CONCRETE, INC. 1 7,434.00 7,434.00 .00 .00
001940 K.E.E.P.R.S., INC. 1 113.22 113.22 .00 .00
002036 JACKSON- HIRSH, INC. 1 66.41 66.41 .00 .00
002225 ANDERSON, CALVIN 1 82.00 82.00 .00 .00
002270 LAKESIDE AUTO & PAINT, INC. 1 1,350.71 1,350.71 .00 .00
002328 LEEF BROTHER, INC. 1 11.32 11.32 .00 .00
0 9 INTERNATIONAL CODE COUNCIL 1 100.00 100.00 .00 .00
01,0 LINO AUTO MACHINING 1 50.00 50.00 .00 .00
002550 MENARDS, INC. 1 46.53 46.53 .00 .00
002565 METRO ATHLETIC SUPPLY, INC. 1 382.97 382.97 .00 .00
002614 ANOKA COUNTY HOUSING /REDEVELOP AUTHORITY 1 7,000.00 7,000.00 .00 .00
002666 RICHARDS, BRIAN 1 250.00 250.00 .00 .00
002670 SKRAMSTAD, STEPHEN 1 72.00 72.00 .00 .00
002743 BCA /FORENSIC SCIENCE LABORATORY 2 400.00 400.00 .00 .00
003300 NORTHWAY IRRIGATION /LANDSCAPING 1 1,172.51 1,172.51 .00 .00
003868 S & S WORLDWIDE, INC. 1 19.99 19.99 .00 .00
004030 SMITH MICRO TECHNOLOGIES, INC. 1 164.75 164.75 .00 .00
004240 STREICHER'S, INC. 1 278.18 278.18 .00 .00
•
Date: 06/26/2003 Time: 10:35:25 City of Lino Lakes
FM Entry - Invoice Journal
Operator: JAL Page: 3
Discount
1110r # Name # of items Net Gross Discount Lost
004485 TRIARCO ARTS /CRAFTS INC. 1 7.67 7.67 .00 .00
004562 NATIONAL WATERWORKS, INC. 1 6,929.96 6,929.96 .00 .00
004840 WINNICK SUPPLY, INC. 1 569.79 569.79 .00 .00
900591 CORPORATE EXPRESS, INC. 1 77.68 77.68 .00 .00
950061 KUKONEN, ROD 1 225.00 225.00 .00 .00
Grand Totals: 58 51,282.33 51,282.33 .00 .00*
•
•
Date: 07/03/2003 Time: 09:49:51 City of Lino Lakes
FM Entry - Invoice Journal
,es:
Vendor #: (A)
Invoice #: (A)
Entry Journal #: (R) 3271 3271
Trans #: (A)
Line #: (A)
Due Date: (A)
Bank #: (A)
Operator: JAL Page: 1
Options: Detail / Summary: S Invoice Status: A # of copies: 1
Sort: N Check Over Expend: N
Discount
Vendor # Name # of items Net Gross Discount Lost
001100 CIRCLE PINES POST OFFICE 1 390.72 390.72 .00
Grand Totals: 1 390.72 390.72 .00 .00*
•
•
Date: 07/03/2003 Time: 13:15:12 City of Lino Lakes
FM Entry - Invoice Journal
,es:
Vendor #: (A)
Invoice #: (A)
Entry Journal #: (R) 3273 - 3273
Trans #: (A)
Line #: (A)
Due Date: (A)
Bank #: (A)
Options: Detail / Summary: S
Sort: N
Operator: JAL Page: 1
Invoice Status: A # of copies: 1
Check Over Expend: N
Discount
Vendor # Name # of items Net Gross Discount Lost
000110 A T & T WIRELESS 1 23.90 23.90 .00 .00
000408 AFSCME COUNCIL #14 1 609.68 609.68 .00 .00
000461 BONFE HOME BUILDERS, INC. 1 500.00 500.00 .00 .00
000468 RELIASTAR LIFE INSURANCE COMPANY 1 1,171.45 1,171.45 .00 .00
000539 TARGET 1 26.20 26.20 .00 .00
000670 BERNSTEIN, BARRY 1 110.88 110.88 .00 .00
000710 ROGGENBUCK CUSTOM BUILT HOMES, INC. 1 500.00 500.00 .00 .00
000755 BIESANZ, PHIL 1 200.00 200.00 .00 .00
001301 DELTA DENTAL PLAN OF MINNESOTA 1 3,034.00 3,034.00 .00 .00
001395 NEXTEL COMMUNICATIONS 1 1,452.89 1,452.89 .00 .00
0 0 FORTIS BENEFITS, INC. 1 834.34 834.34 .00 .00
0 82 US LINK 1 1,661.08 1,661.08 .00 " .00
002120 KELLY INSURANCENTER 1 249.00 249.00 .00 .00
002208 LAW ENFORCEMENT LABOR SERVICES, INC. 1 777.00 777.00 .00 .00
002467 MAC MAY HOMES 1 500.00 500.00 .00 .00
002540 MEDICA 1 28,168.12 28,168.12 .00 .00
002673 EWINGS, KIMBERLY 1 20.00 20.00 .00 .00
002685 MCLEAN, CLAIRE 1 76.00 76.00 .00 .00
003390 OFFICEMAX, INC. 1 21.28 21.28 .00 .00
004671 VERIZON WIRELES, BELLEVUE 1 32.34 32.34 .00 .00
900066 AVALON HOMES 1 500.00 500.00 .00 .00
900305 HOMETOWN PIZZA, INC. 1 132.00 132.00 .00 .00
•
Date: 07/03/2003 Time: 13:15:13 City of Lino Lakes
FM Entry - Invoice Journal
Operator: JAL Page: 2
Discount
41111r # Name # of items Net Gross Discount Lost
Grand Totals: 22 40,600.16 40,600.16 .00 .00*
•
•
Date: 07/08/2003 Time: 09:24:01 City of Lino Lakes
FM Entry - Invoice Journal
es: Vendor #: (A)
Invoice #: (A)
Entry Journal #: (R) 3276 - 3276
Trans #: (A)
Line #: (A)
Due Date: (A)
Bank #: (A)
Operator: JAL Page: 1
Options: Detail / Summary: S Invoice Status: A # of copies: 1
Sort: N Check Over Expend: N
Discount
Vendor # Name # of items Net Gross Discount Lost
000020 A & L SUPERIOR SOD CO, INC. 1 16.71 16.71 .00 .00
000080 ABLE HOSE AND RUBBER, INC. 1 104.09 104.09 .00 .00
000093 ACE SOLID WASTE, INC. 1 489.28 489.28 .00 .00
000095 ADVANCED GRAPHIX, INC. 1 286.34 286.34 .00 .00
000158 ALL STAR SPORTS, INC. 2 3,521.35 3,521.35 .00 .00
000165 ALAUN DISTRIBUTING, INC. 1 168.00 168.00 .00 .00
000225 WHITE BEAR LOCKSMITH, INC. 1 44.75 44.75 .00 .00
000227 DELL MARKETING L.P. 1 1,712.49 1,712.49 .00 .00
000230 HEADSETS.COM 1 40.00 40.00 .00 .00
000232 AMERICAN IRON & SUPPLY COMPANY, INC 1 374.75 374.75 .00 .00
1/8 SWEENEY BROTHERS, INC. 1 58.44 58.44 .00 .00
3 WIPERS AND WIPES, INC. 1 110.25 110.25 .00 .00
000366 ORIENTIAL TRADING COMPANY, INC. 1 28.70 28.70 .00 .00
000465 MN DEPT OF ADMIN /INTECH GROUP 1 37.00 37.00 .00 .00
000471 APITZ GARAGE, INC. 2 130.77 130.77 .00 .00
000522 INTERSTATE BATTERIES, INC. 1 147.32 147.32 .00 .00
000540 AUTO- MEDICS, INC. 2 193.46 193.46 .00 .00
000542 MYERS TIRE SUPPLY COMPANY, INC. 1 36.21 36.21 .00 .00
000861 BEE LINE ALIGNMENT SERVICE 1 50.00 50.00 .00 .00
000877 ST. LOUIS PARK PARK & REC 1 186.00 186.00 .00 .00
000891 ZYLSTRA HARLEY - DAVIDSON, INC. 1 377.19 377.19 .00 .00
000946 C. P. OFFICE PRODUCTS 1 19.70 19.70 .00 .00
•
Date: 07/08/2003 Time: 09:24:01 City of Lino Lakes
FM Entry - Invoice Journal
Operator: JAL Page: 2
Discount
®r # Name # of items Net Gross Discount Lost
001000 CATCO PARTS, INC. 1 124.82 124.82 .00 .00
001040 CENTENNIAL FIRE DISTRICT 1 109,312.75 109,312.75 .00 .00
001148 CLEARWATER CREEK CONVENIENCE CENTER, INC 1 4.26 4.26 .00 .00
001187 CONNEXUS ENERGY 1 3,245.03 3,245.03 .00 .00
001260 STANTON GROUP 1 181.25 181.25 .00 .00
001270 DALCO, INC. 1 205.58 205.58 .00 .00
001292 DEHN OIL COMPANY, INC. 4 6,118.65 6,118.65 .00 .00
001380 EARL ANDERSON ASSOCIATION, INC. 1 82.23 82.23 .00 .00
001396 INSTITUTE FOR ENVIRONMENTAL ASSESSMENT, 1 696.00 696.00 .00 .00
001480 HAWKINS WATER TREATMENT GROUP, INC. 1 6,040.94 6,040.94 .00 .00
001520 FLANAGAN SALES, INC. 1 3,140.69 3,140.69 .00 .00
001530 FOREST LAKE FORD, INC. 1 319.58 319.58 .00 .00
001540 FORESTRY SUPPLIERS, INC. 1 140.33 140.33 .00 .00
001560 FRATTALLONE'S HARDWARE, INC. 1 202.35 202.35 .00 .00
001600 GALL'S INC. 1 53.44 53.44 .00 .00
OltGOA COMPANY, INC. 1 261.41 261.41 .00 .00
KENNEDY AND GRAVEN, INC. 1 263.50 263.50 .00 .00
001971 INFRATECH TECHNOLOGIES, INC. 1 161.99 161.99 .00 .00
002153 KNOWLAN'S SUPER MARKETS, INC. 1 95.57 95.57 .00 .00
002248 LARSON ALLEN WEISHAIR & CO., LLP 1 4,933.95 4,933.95 .00 .00
002270 LAKESIDE AUTO & PAINT, INC. 1 58.57 58.57 .00 .00
002340 IMAGE PRINTING & GRAPHICS 1 1,415.19 1,415.19 .00 .00
002387 LTG POWER EQUIPMENT, INC. 1 74.61 74.61 .00 .00
002686 MINNESOTA HIGHWAY SAFETY /RESEARCH CENTER 1 350.00 350.00 .00 .00
002687 CMI, INC. 1 52.71 52.71 .00 .00
002694 SBC, INC. 1 33.93 33.93 .00 .00
002740 MITY -LITE, INC. 1 627.13 627.13 .00 .00
•
Date: 07/08/2003 Time: 09:24:02 City of Lino Lakes
FM Entry - Invoice Journal
Operator: JAL Page: 3
Discount
# Name # of items Net Gross Discount Lost
002760 MN. DEPT OF HEALTH 1 4,357.00 , 4,357.00 .00 .00
002777 MN. DEPT OF NATURAL RESOURCES 1 280.11 280.11 .00 .00
002788 QUICKSILVER EXPRESS COURIER 1 30.25 30.25 .00 .00
002790 TESSMAN SEED COMPANY 1 212.32 212.32 .00 .00
002816 USTA NORTHERN SECTION 1 57.00 57.00 .00 .00
002821 FETTING, SHARON 1 96.00 96.00 .00 .00
002839 MINNESOTA TAXPAYERS ASSOCIATION 1 125.00 125.00 .00 .00
002900 MN. DEPARTMENT OF SAFETY 1 42.25 42.25 .00 .00
002963 MINNESOTA SOCIETY OF ABORICULTURE 1 20.00 20.00 .00 .00
003180 NEWMAN TRAFFIC SIGNS, INC. 1 228.87 228.87 .00 .00
003250 XCEL ENERGY 1 3,003.43 3,003.43 .00 .00
003300 NORTHWAY IRRIGATION /LANDSCAPING 1 24,363.72 24,363.72 .00 .00
003443 OTTER LAKE ANIMAL CARE CENTER, INC. 1 374.91 374.91 .00 .00
003500 PHOTO WORLD, INC. 1 34.60 34.60 .00 .00
003816 RO -SO CONTRACTING, INC. 1 3,100.00 3,100.00 .00 .00
0 SHORT - ELLIOTT - HENDRICKSON, INC. 3 12,282.61 12,282.61 .00 .00
0 882 SHRED -IT, INC. 1 54.95 54.95 .00 .00
003900 SAFETY KLEEN CORPORATION, INC. 6 1,018.62 1,018.62 .00 .00
004030 SMITH MICRO TECHNOLOGIES, INC. 1 31.95 31.95 .00 .00
004120 ST. JOSEPH EQUIPMENT, INC. 1 15.61 15.61 .00 .00
004125 ST. PAUL CITY OF 2 1,600.00 1,600.00 .00 .00
004150 STAR TRIBUNE, INC. 1 164.40 164.40 .00 .00
004172 STATE OF MINNESOTA 1 390.00 390.00 .00 .00
004340 T.A. SCHIFSKY AND SONS, INC. 3 4,578.80 4,578.80 .00 .00
004410 THANE HAWKINS POLAR CHEVROLET, INC. 1 1,588.55 1,588.55 .00 .00
004427 TIMESAVER OFF -SITE SECRETARIAL, INC 3 539.74 539.74 .00 .00
004562 NATIONAL WATERWORKS, INC. 3 2,126.62 2,126.62 .00 .00
•
Date: 07/08/2003 Time: 09:24:03 City of Lino Lakes
FM Entry - Invoice Journal
er#
Name
Operator: JAL Page: 4
Discount
# of items Net Gross Discount Lost
004730 VIKING SAFETY PRODUCTS, INC. 1 65.79 65.79 .00 .00
900217 ARNT CONSTRUCTION, INC. 1 15,424.00 15,424.00 .00 .00
900223 REHBEIN TRANSIT, INC. 1 285.00 285.00 .00 .00
900524 BURGER, LUANN 1 570.00 570.00 .00 .00
Grand Totals: 100 223,391.36 223,391.36 .00 .00*
•
•
Date: 07/08/2003 Time: 09:32:32 Operator: JAL
•
Ranges:
Options:
Page: 1
City of Lino Lakes
FM Entry - Invoice Payment - Approval of Bills
Fund: (A)
Dept Id: (A)
Program: (A)
Vendor #: (A)
Invoice #: (A)
Schedule Journal #: (R) 3247 - 3278
Bank #: (A)
Cash #: (A)
Payroll Check Dates: (A)
Print: D
Report Format: 1
# of copies: 1
Total By Account: Y
Check # Vendor Alpha Name
68539
68464
68487
68465
68540
68466
68543
0
68498
68544
68468
68545
68470
0
072
473
68549
68474
68550
68551
68552
68475
0
0
0
68476
68477
0
68556
68478
68557
68479
0
68528
68531
0
•
Sort: D
Print Ranges /Options: Y
Process Payroll: N
Page on Sort: N
Description
Dept
Amount
AFSCME COUNCIL #14
AMERICAN FAMILY LIFE A
ANDERSON, CALVIN
ANDERSON, KAREN
AVALON HOMES
BADER, LINDA
BONFE HOME BUILDERS, I
DELL MARKETING L.P.
DELL MARKETING L.P.
DELTA DENTAL PLAN OF M
ECKERT, SCOTT
EWINGS, KIMBERLY
FOSTER, BRAD
INTERSTATE BATTERIES,
INTL UNION OF OPER ENG
KURAK, SUSAN
LAW ENFORCEMENT LABOR
LEDIN, PAUL
MAC MAY HOMES
MCLEAN, CLAIRE
MEDICA
MINN NCPERS GROUP LIFE
MN. DEPARTMENT OF SAFE
MN. DEPT OF HEALTH
MN. DEPT OF NATURAL RE
PAWLAK, KIM
PRESS PUBLICATIONS, IN
QUICKSILVER EXPRESS CO
RELIASTAR LIFE INSURAN
RIES, PATTI
ROGGENBUCK CUSTOM BUIL
ROISUM, ERIC
SHORT - ELLIOTT - HENDRICK
SKRAMSTAD, STEPHEN
T/C BUILDERS, INC.
WHITE BEAR LOCKSMITH,
PAYROLL WITHHOLDING
PAYROLL WITHHOLDING
* * * * * * **
* * ** ****
REIMBURSE PROGRAM REC * * * * * * **
REIMBURSE PROGRAM REC * * * * * * **
REIMB BLDG ESCROW /7995 H * * * * * * **
REIMBURSE PROGRAM REC * * * * * * **
REIMB BLDG ESCROW /2327 T
COMPURTER PURCHASE /TIM P
COMPUTER PURCHASE PROGRA
DENTAL INSURANCE
REIMBURSE PROGRAM REC
REIMBURSE PARTY WAGON
REIMBURSE PROGRAM REC
BATTERIES
PAYROLL WITHHOLDING
REIMBURSE PROGRAM REC
PAYROLL WITHHOLDING
REIMBURSE PROGRAM REC
REIMS BLDG ESCROW /7975 H
REIMBURSE PROGRAM REC
MEDICAL INSURANCE
PAYROLL WITHHOLDING
LICENSE TABS
2ND QTR STATE WATER FEE
WILDLIFE PACKS
REIMBURSE PROGRAM REC
ADVERTISING
DELIVERY SERVICE
LIFE INSURANCE
REIMBURSE PROGRAM REC
REIMB BLDG ESCROW /603 HI
REIMBURSE PROGRAM REC
LAKE DRIVE TRAFFIC STUDY
REIMBURSE PROGRAM REC
REIM BLDG ESCROW /6497 LA
KEYS
** * ** ***
*** *****
** **** **
**** ** **
* ** * ** **
* *** ** **
***** ***
* * * ** ***
* **** * **
* ** *****
* ** ** * **
* **** ***
* *** * * **
* **** ***
* **** * **
** ** ** **
* * ** ** **
* ** * * * **
***** ***
*** ** * **
*** ** ***
*** * ****
* *******
*** * ****
* *** ****
** ** * ***
* ** * ** **
* * **** **
* ** *** **
** *** ***
609.68
176.20
82.00
22.00
500.00
39.00
500.00
1,712.49
2,318.50
1,763.32
33.00
20.00
18.50
36.67
420.00
28.00
777.00
16.50
500.00
76.00
6,265.34
400.00
42.25
4,357.00
280.11
37.00
103.20
30.25
837.52
33.00
500.00
37.00
12,282.61
72.00
402.92
44.75
Date: 07/08/2003 Time: 09:32:32 Operator: JAL
•
Page: 2
City of Lino Lakes
FM Entry - Invoice Payment - Approval of Bills
Check # Vendor Alpha Name Description Dept
O ZYLSTRA HARLEY- DAVIDSO OIL /FILTER /GASKET /SEAL /0 * * * * * * **
Total for Dept **
O LARSON ALLEN WEISHAIR AUDIT /FINANCIAL STATEMEN PROGRAM
Total for Dept 200
0 ALL STAR SPORTS, INC. T- SHIRTS /CAPS ADULT SP
O BURGER, LUANN DANCE CLASSES ADULT SP
68517 METRO ATHLETIC SUPPLY, UMPIRE BAGS /TENNIS BALLS ADULT SP
Total for Dept 202
0 ALL STAR SPORTS, INC. T- SHIRTS
O ORIENTIAL TRADING COMP PROGRAM REC SUPPLIES
0 REHBEIN TRANSIT, INC. PROGRAM REC
68526 RICHARDS, BRIAN PROGRAM REC PERFORMER
0 ST. LOUIS PARK PARK & PROGRAM REC
Total for Dept 205
0
0
68467
68542
68547
0
68517
68527
0
•
68480
ALAUN DISTRIBUTING, IN
ALL STAR SPORTS, INC.
BIESANZ, PHIL
BIESANZ, PHIL
HOMETOWN PIZZA, INC.
KNOWLAN'S SUPER MARKET
METRO ATHLETIC SUPPLY,
S & S WORLDWIDE, INC.
USTA NORTHERN SECTION
SUPPLIES
T- SHIRTS /CAPS
REIMBURSE PROGRAM REC SU
PROGRAM REC
PIZZAS
SUPPLIES
UMPIRE BAGS /TENNIS BALLS
BUCKET FUSE BEADS
TENNIS BALLS
Total for Dept 207
TARGET FILM /CONTAINERS
Total for Dept 208
68558 TARGET SUPPLIES
O TIMESAVER OFF -SITE SEC JUNE 18
Total for Dept 401
68544
68469
68546
68552
68520
68477
68556
0
68538
68546
68520
68556
•
DELTA DENTAL PLAN OF M
EXCELSIOR, CITY OF
FORTIS BENEFITS, INC.
MEDICA
NEXTEL COMMUNICATIONS
PRESS PUBLICATIONS, IN
RELIASTAR LIFE INSURAN
STANTON GROUP
A T & T WIRELESS
FORTIS BENEFITS, INC.
NEXTEL COMMUNICATIONS
SPECIAL
SPECIAL
SPECIAL
SPECIAL
SPECIAL
YOUTH IN
YOUTH IN
YOUTH IN
YOUTH IN
YOUTH IN
YOUTH IN
YOUTH IN
YOUTH IN
YOUTH IN
YOUTH SP
MAYOR /CO
MAYOR /CO
DENTAL INSURANCE ADMINIST
REGISTRATION /JEAN V E. AN ADMINIST
LONG TERM DISABILITY INS
MEDICAL INSURANCE
MONTHLY SERVICE /MAY -JUNE
ADVERTISING
LIFE INSURANCE
FLEXIBLE SPENDING
Total for Dept 402
ADMINI
MONTHLY SERVICE /JUNE
LONG TERM DISABILITY INS
MONTHLY SERVICE /MAY -JUNE
RELIASTAR LIFE INSURAN LIFE INSURANCE
ADMINIST
ADMINIST
ADMINIST
ADMINIST
ADMINIST
ADMINIST
SENIORS
SENIORS
SENIORS
SENIORS
Amount
377.19
35,751.00*
98.68
98.68*
838.00
570.00
21.19
1,429.19*
1,624.50
28.70
285.00
250.00
186.00
2,374.20*
168.00
779.25
100.00
200.00
132.00
95.57
191.60
19.99
57.00
1,743.41*
54.92
54.92*
21.95
433.74
455.69*
81.40
60.00
71.97
948.14
62.96
351.52
23.75
181.25
1,780.99*
18.36
4.63
124.98
4.75
Date: 07/08/2003 Time: 09:32 :32 Operator: JAL
•
Page: 3
City of Lino Lakes
FM Entry - Invoice Payment - Approval of Bills
Check # Vendor Alpha Name Description
Dept
Amount
Total for Dept 406
68544 DELTA DENTAL PLAN OF M DENTAL INSURANCE
68546 FORTIS BENEFITS, INC. LONG TERM DISABILITY INS
68471 GOVERNMENT FINANCE OFF CERTIFICATE OF REVIEW FE
0 LARSON ALLEN WEISHAIR AUDIT /FINANCIAL STATEMEN
68552 MEDICA MEDICAL INSURANCE
0 MINNESOTA TAXPAYERS AS MEMBERSHIP /AL R
68556 RELIASTAR LIFE INSURAN LIFE INSURANCE
Total for Dept 407
68488
68544
68546
68552
68556
ANOKA COUNTY HOUSING /R
DELTA DENTAL PLAN OF M
FORTIS BENEFITS, INC.
MEDICA
RELIASTAR LIFE INSURAN
FACILITIES DEVELOPMENT
DENTAL INSURANCE
LONG TERM DISABILITY
MEDICAL INSURANCE
LIFE INSURANCE
Total for Dept 415
68544 DELTA DENTAL PLAN OF M DENTAL INSURANCE
68546 FORTIS BENEFITS, INC. LONG TERM DISABILITY
68552 MEDICA MEDICAL INSURANCE
68477 PRESS PUBLICATIONS, IN ADVERTISING
68556 RELIASTAR LIFE INSURAN LIFE INSURANCE
O TIMESAVER OFF -SITE SEC JUNE 9, 11
Total for Dept 416
8544 DELTA DENTAL PLAN OF M DENTAL INSURANCE
46 FORTIS BENEFITS, INC. LONG TERM DISABILITY
52 MEDICA MEDICAL INSURANCE
68556 RELIASTAR LIFE INSURAN LIFE INSURANCE
Total for Dept 418
FINANCE
FINANCE
FINANCE
FINANCE
FINANCE
FINANCE
FINANCE
P ECONOMIC
ECONOMIC
INS ECONOMIC
ECONOMIC
ECONOMIC
PLANNING
INS PLANNING
PLANNING
PLANNING
PLANNING
PLANNING
Communit
INS Communit
Communit
Communit
68483 A T & T WIRELESS MONTHLY SERVICE /MAY POLICE
68485 AID ELECTRIC SERVICE, SIREN MAINTENANCE POLICE
68489 BCA /FORENSIC SCIENCE L CLASS /MELISSA H POLICE
68491 BLUE TOW SERVICE, INC. TOW /CHEV CAVALIER POLICE
0 C. P. OFFICE PRODUCTS OFFICE SUPPLIES POLICE
68493 C. P. OFFICE PRODUCTS OFFICE SUPPLIES POLICE
68494 CENTENNIAL SCHOOLS COFFEE /DARE GRADUATION POLICE
O CLEARWATER CREEK CONVE CAR WASH POLICE
O CMI, INC. SUPPLIES POLICE
O CONNEXUS ENERGY MONTHLY SERVICE /JUNE POLICE
68544 DELTA DENTAL PLAN OF M DENTAL INSURANCE POLICE
68499 DEMARS, MITCH MEALS POLICE
68546 FORTIS BENEFITS, INC. LONG TERM DISABILITY INS POLICE
O GALL'S INC. UNIFORM SUPPLIES POLICE
0 IMAGE PRINTING & GRAPH PRINTING POLICE
68511 K.E.E.P.R.S., INC. NAME TAGS /BATTERIES POLICE
O LAKESIDE AUTO & PAINT, PAINT /REFINISH '02 CROWN POLICE
68552 MEDICA MEDICAL INSURANCE POLICE
152.72*
91.70
46.37
415.00
1,973.56
1,135.80
125.00
14.97
3,802.40*
7,000.00
26.20
12.75
300.30
4.75
7,344.00*
52.40
24.71
600.60
74.18
9.50
106.00
867.39*
52.40
27.04
588.49
9.50
677.43*
49.00
3,550.38
400.00
80.00
19.70
84.23
12.50
4.26
52.71
15.98
339.60
13.04
315.24
53.44
355.55
113.22
58.57
8,888.46
Date: 07/08/2003 Time: 09:32:32 Operator: JAL
•
Page: 4
City of Lino Lakes
FM Entry - Invoice Payment - Approval of Bills
Check # Vendor Alpha Name
0
0
68553
0
68556
0
0
0
68530
68480
68532
68481
68560
Description
Dept
Amount
MINNESOTA HIGHWAY SAFE
MN DEPT OF ADMIN /INTEC
NEXTEL COMMUNICATIONS
OTTER LAKE ANIMAL CARE
RELIASTAR LIFE INSURAN
SHRED -IT, INC.
ST. PAUL CITY OF
STATE OF MINNESOTA
STREICHER'S, INC.
TARGET
TARGET
PIT COURSE /CLIFF R
MAY USAGE
MONTHLY SERVICE /JUNE
IMPOUND FEE /TRANSPORATIO
LIFE INSURANCE
DESTROY CONFIDENTIAL MAT
COURSE
CONNECT CHARGES /JUNE
UNIFORM SUPPLIES
FILM /CONTAINERS
TAPES
UPS /UNITED PARCEL SERV DELIVERY SERVICE
VERIZON WIRELES, BELLE MONTHLY SERVICE /JUNE
Total for Dept 420
POLICE
POLICE
POLICE
POLICE
POLICE
POLICE
POLICE
POLICE
POLICE
POLICE
POLICE
POLICE
POLICE
0 CENTENNIAL FIRE DISTRI FIRE DISTRICT BUDGET FIRE
68544 DELTA DENTAL PLAN OF M DENTAL INSURANCE FIRE
68546 FORTIS BENEFITS, INC. LONG TERM DISABILITY INS FIRE
68552 MEDICA MEDICAL INSURANCE FIRE
68556 RELIASTAR LIFE INSURAN LIFE INSURANCE FIRE
Total for Dept 421
68544 DELTA DENTAL PLAN OF M DENTAL INSURANCE BUILDING
68546 FORTIS BENEFITS, INC. LONG TERM DISABILITY INS BUILDING
68502 FRATTALLONE'S HARDWARE PARTS /SUPPLIES BUILDING
68508 INTERNATIONAL CODE COU MEMBERSHIP /PETE K BUILDING
68552 MEDICA MEDICAL INSURANCE BUILDING
556 RELIASTAR LIFE INSURAN LIFE INSURANCE BUILDING
Total for Dept 422
0
0
68490
0
68544
0
68546
0
68502
68506
68509
0
68520
0
68556
0
0
0
68535
0
•
A & L SUPERIOR SOD CO,
AUTO- MEDICS, INC.
BEST ACCESS SYSTEMS, I
CONNEXUS ENERGY
DELTA DENTAL PLAN OF M
EARL ANDERSON ASSOCIAT
FORTIS BENEFITS, INC.
FRATTALLONE'S HARDWARE
FRATTALLONE'S HARDWARE
HALVORSON CONCRETE, IN
INTERSTATE ALL BATTERY
NEWMAN TRAFFIC SIGNS,
NEXTEL COMMUNICATIONS
PHOTO WORLD, INC.
RELIASTAR LIFE INSURAN
SBC, INC.
T.A. SCHIFSKY AND SONS
VIKING SAFETY PRODUCTS
WINNICK SUPPLY, INC.
XCEL ENERGY
SOD
TOWING /2
PADLOCK KEYED
MONTHLY SERVICE /JUNE
DENTAL INSURANCE
STREET SIGN
LONG TERM DISABILITY INS
PARTS /SUPPLIES
PARTS /SUPPLIES
BENCH PADS /CURB RAMPS /CO
BATTERIES
SOLAR FLASHERS FOR BARRI
MONTHLY SERVICE /MAY -JUNE
FILM PROCESSING
LIFE INSURANCE
MONTHLY SERVICE /JUNE
ASPHALT
SUPPLIES
BATTERY /CUTTING WHEEL /VA
MONTHLY SERVICE /JUNE
STREETS
STREETS
STREETS
STREETS
STREETS
STREETS
STREETS
STREETS
STREETS
STREETS
STREETS
STREETS
STREETS
STREETS
STREETS
STREETS
STREETS
STREETS
STREETS
STREETS
350.00
37.00
1,452.89
374.91
128.25
54.95
1,600.00
390.00
278.18
111.24
24.37
13.91
32.34
19,253.92*
109,312.75
76.78
36.39
1,724.29
14.25
111,164.46*
104.80
46.21
2.00
100.00
2,023.70
17.34
2,294.05*
9.11
79.88
100.17
702.08
104.80
82.23
63.02
64.66
42.83
1,518.00
69.11
228.87
197.79
34.60
27.79
9.18
4,578.80
21.93
127.80
3,003.43
Date: 07/08/2003 Time: 09:32:32 Operator: JAL
•
Page: 5
City of Lino Lakes
FM Entry - Invoice Payment - Approval of Bills
Check # Vendor Alpha Name
0
0
0
68492
0
0
68544
68501
0
68546
0
68502
0
0
68514
68515
0
68552
0
68556
0
0
0
0
68535
0
68493
68495
0
68496
0
68497
68546
68502
0
0
0
68509
68510
68548
68513
68552
68518
68521
68522
•
Description
Dept
Amount
Total for Dept 430
APITZ GARAGE, INC.
AUTO- MEDICS, INC.
BEE LINE ALIGNMENT SER
BOYER TRUCKS, INC.
CATCO PARTS, INC.
DEHN OIL COMPANY, INC.
DELTA DENTAL PLAN OF M
EMERGENCY AUTOMOTIVE T
FOREST LAKE FORD, INC.
FORTIS BENEFITS, INC.
FRATTALLONE'S HARDWARE
FRATTALLONE'S HARDWARE
GOA COMPANY, INC.
INTERSTATE BATTERIES,
LEEF BROTHER, INC.
LINO AUTO MACHINING
LTG POWER EQUIPMENT, I
MEDICA
MYERS TIRE SUPPLY COMP
RELIASTAR LIFE INSURAN
SAFETY KLEEN CORPORATI
ST. JOSEPH EQUIPMENT,
SWEENEY BROTHERS, INC.
THANE HAWKINS POLAR CH
WINNICK SUPPLY, INC.
TRACER STICK
TOW #234
FRONT END ALIGN #247
PARTS
LAMP
DIESEL FUEL
DENTAL INSURANCE
SPEAKER /STROBE TUBE
PARTS /SUPPLIES
LONG TERM DISABILITY INS
PARTS /SUPPLIES
PARTS /SUPPLIES
OIL /DRUM DEPOSIT
BATTERIES
SHOP TOWELS
TURN ROTOR
KEY
MEDICAL INSURANCE
SUPPLIES
LIFE INSURANCE
PARTS CLEANER
PLUG /SEAL /WASHER
GASKET /SEAL
PARTS /SUPPLIES
BATTERY /CUTTING WHEEL /VA
Total for Dept 431
ACE SOLID WASTE, INC.
ADVANCED GRAPHIX, INC.
C. P. OFFICE PRODUCTS
CIRCLE PINES, CITY OF
CONNEXUS ENERGY
CORPORATE EXPRESS, INC
DALCO, INC.
DALCO, INC.
FORTIS BENEFITS, INC.
FRATTALLONE'S HARDWARE
HEADSETS.COM
IMAGE PRINTING & GRAPH
INSTITUTE FOR ENVIRONM
INTERSTATE ALL BATTERY
JACKSON - HIRSH, INC.
KELLY INSURANCENTER
LAKESIDE AUTO & PAINT,
MEDICA
MICRO WAREHOUSE, INC.
NOBLE NURSERY RETAIL,
SOLID WASTE /JULY
GRAPHS /3 SQUADS
OFFICE SUPPLIES
MONTHLY SERVICE /MAY
MONTHLY SERVICE /JUNE
OFFICE SUPPLIES
JANITORIAL SUPPLIES
JANITORIAL SUPPLIES
LONG TERM DISABILITY INS
PARTS /SUPPLIES
HEADSET
PRINTING
HVAC /BUILDING STUDY
BATTERIES
FORMS
LINO LAKES ALARM /COMM BO
REPAIR /REFINISH 355/356/
MEDICAL INSURANCE
TONER CARTRIDGE
FABRIC /MULCH
NORTHERN AIR CORPORATI TECH SERVICE
FLEET
FLEET
FLEET
FLEET
FLEET
FLEET
FLEET
FLEET
FLEET
FLEET
FLEET
FLEET
FLEET
FLEET
FLEET
FLEET
FLEET
FLEET
FLEET
FLEET
FLEET
FLEET
FLEET
FLEET
FLEET
GOVERNME
GOVERNME
GOVERNME
GOVERNME
GOVERNME
GOVERNME
GOVERNME
GOVERNME
GOVERNME
GOVERNME
GOVERNME
GOVERNME
GOVERNME
GOVERNME
GOVERNME
GOVERNME
GOVERNME
GOVERNME
GOVERNME
GOVERNME
GOVERNME
11,066.08*
130.77
113.58
50.00
70.16
124.82
6,118.65
26.20
17.89
319.58
12.77
8.31
2.90
261.41
110.65
11.32
50.00
74.61
1,489.39
36.21
5.46
270.02
15.61
58.44
1,588.55
127.80
11,095.10*
347.71
286.34
120.44
2,409.90
961.47
77.68
205.58
186.32
9.84
5.30
40.00
198.53
696.00
14.40
66.41
249.00
1,350.71
588.49
325.00
454.76
5,795.67
Date: 07/08/2003 Time: 09:32:33 Operator: JAL
•
Page: 6
City of Lino Lakes
FM Entry - Invoice Payment - Approval of Bills
Check # Vendor Alpha Name Description
68554
68556
0
68529
68558
68559
0
68536
0
68538
0
68486
68495
68544
0
68546
0
68502
68509
68552
68516
68517
68520
68523
68477
4111556
0
0
68535
68538
0
68541
68544
68546
68552
0
68520
68556
0
68534
Dept
Amount
OFFICEMAX, INC. COMP PAPER
RELIASTAR LIFE INSURAN LIFE INSURANCE
SMITH MICRO TECHNOLOGI DATA CART
SMITH MICRO TECHNOLOGI DATA CART
TARGET SUPPLIES
US LINK MONTHLY SERVICE /JUNE
WIPERS AND WIPES, INC. C -FOLD TOWELS
WIPERS AND WIPES, INC. CAN LINERS
Total for Dept 432
A & L SUPERIOR SOD CO,
A T & T WIRELESS
ACE SOLID WASTE, INC.
ALL SEASONS RENTAL, IN
CIRCLE PINES, CITY OF
DELTA DENTAL PLAN OF M
FLANAGAN SALES, INC.
FORTIS BENEFITS, INC.
FRATTALLONE'S HARDWARE
FRATTALLONE'S HARDWARE
INTERSTATE ALL BATTERY
MEDICA
MENARDS, INC.
METRO ATHLETIC SUPPLY,
NEXTEL COMMUNICATIONS
GOVERNME
GOVERNME
GOVERNME
GOVERNME
GOVERNME
GOVERNME
GOVERNME
GOVERNME
SOD PARKS
MONTHLY SERVICE /JUNE PARKS
SOLID WASTE /JULY PARKS
SOD CUTTER RENTAL PARKS
MONTHLY SERVICE /MAY PARKS
DENTAL INSURANCE PARKS
BENCHS /TABLES PARKS
LONG TERM DISABILITY INS PARKS
PARTS /SUPPLIES PARKS
PARTS /SUPPLIES PARKS
BATTERIES PARKS
MEDICAL INSURANCE PARKS
POSTS /RAILS PARKS
UMPIRE BAGS /TENNIS BALLS PARKS
MONTHLY SERVICE /MAY -JUNE PARKS
NORTHWAY IRRIGATION /LA PIPE /COUPLING /CLAMPS
PRESS PUBLICATIONS, IN ADVERTISING
RELIASTAR LIFE INSURAN LIFE INSURANCE
TESSMAN SEED COMPANY CHALK
PARKS
PARKS
PARKS
PARKS
VIKING SAFETY PRODUCTS SUPPLIES PARKS
WINNICK SUPPLY, INC. BATTERY /CUTTING WHEEL /VA PARKS
Total for Dept 450
A T & T WIRELESS
ALL STAR SPORTS, INC.
BERNSTEIN, BARRY
DELTA DENTAL PLAN OF M
FORTIS BENEFITS, INC.
MEDICA
MITY -LITE, INC.
NEXTEL COMMUNICATIONS
MONTHLY SERVICE /JUNE RECREATI
T- SHIRTS RECREATI
MILEAGE RECREATI
DENTAL INSURANCE RECREATI
LONG TERM DISABILITY INS RECREATI
MEDICAL INSURANCE RECREATI
SUPPLIES RECREATI
MONTHLY SERVICE /MAY -JUNE RECREATI
RELIASTAR LIFE INSURAN LIFE INSURANCE
STAR TRIBUNE, INC. ADVERTISING
TRIARCO ARTS /CRAFTS IN FOAM ROLLER
Total for Dept 451
RECREATI
RECREATI
RECREATI
68544 DELTA DENTAL PLAN OF M DENTAL INSURANCE ENVIRONM
68500 DONLIN, AMY QUARTERLY STIPEND ENVIRONM
68546 FORTIS BENEFITS, INC. LONG TERM DISABILITY INS ENVIRONM
68502 FRATTALLONE'S HARDWARE PARTS /SUPPLIES ENVIRONM
•
21.28
4.75
31.95
164.75
4.25
1,661.08
110.25
98.66
16,486.52*
7.60
1.32
141.57
38.34
80.62
144.10
3,140.69
63.41
63.02
16.65
14.40
1,387.09
46.53
170.18
320.00
842.83
150.00
26.13
212.32
21.93
127.80
7,016.53*
4.22
279.60
110.88
57.64
36.28
418.00
627.13
317.50
15.20
164.40
7.67
2,038.52*
11.79
150.00
6.96
59.61
Date: 07/08/2003 Time: 09:32:33 Operator: JAL
•
Page: 7
City of Lino Lakes
FM Entry - Invoice Payment - Approval of Bills
Check # Vendor Alpha Name Description
Dept
Amount
68505 GRUNDHOFER, CONSTANCE QUARTERLY STIPEND
68512 KUKONEN, ROD QUARTERLY STIPEND
68552 MEDICA MEDICAL INSURANCE
68524 O'CONNELL, TERESA QUARTERLY STIPEND
68525 O'DEA, MARY JO QUARTERLY STIPEND
68556 RELIASTAR LIFE INSURAN LIFE INSURANCE
68533 TOLER HALEN, PATRICE QUARTERLY STIPEND
Total for Dept 461
ENVIRONM
ENVIRONM
ENVIRONM
ENVIRONM
ENVIRONM
ENVIRONM
ENVIRONM
0 AMERICAN IRON & SUPPLY RECYCLING DAY SOLID WA
68544 DELTA DENTAL PLAN OF M DENTAL INSURANCE SOLID WA
68546 FORTIS BENEFITS, INC. LONG TERM DISABILITY INS SOLID WA
68552 MEDICA MEDICAL INSURANCE SOLID WA
68556 RELIASTAR LIFE INSURAN LIFE INSURANCE SOLID WA-
0 SAFETY KLEEN CORPORATI RECYCLE USED OIL SOLID WA
Total for Dept 462
68544
0
68546
0
68552
0
68556
DELTA DENTAL PLAN OF M DENTAL INSURANCE FORESTRY
FORESTRY SUPPLIERS, IN PAINT /TAPE /TAGS FORESTRY
FORTIS BENEFITS, INC. LONG TERM DISABILITY INS FORESTRY
FRATTALLONE'S HARDWARE PARTS /SUPPLIES FORESTRY
MEDICA MEDICAL INSURANCE
MINNESOTA SOCIETY OF A MEMBERSHIP /MARTY A
RELIASTAR LIFE INSURAN LIFE INSURANCE
Total for Dept 463
0 ABLE HOSE AND RUBBER,
484 ABLE HOSE AND RUBBER,
37 M CIRCLE PINES POST OFFI
O CONNEXUS ENERGY
68544 DELTA DENTAL PLAN OF M
68546 FORTIS BENEFITS, INC.
68502 FRATTALLONE'S HARDWARE
68504 GRAYBAR ELECTRIC COMPA
0 HAWKINS WATER TREATMEN
68507 HAWKINS WATER TREATMEN
0 IMAGE PRINTING & GRAPH
O INFRATECH TECHNOLOGIES
O LARSON ALLEN WEISHAIR
68552 MEDICA
O NATIONAL WATERWORKS, I
68519 NATIONAL WATERWORKS, I
68520 NEXTEL COMMUNICATIONS
68523 NORTHWAY IRRIGATION /LA
68556 RELIASTAR LIFE INSURAN
0 SBC, INC.
O VIKING SAFETY PRODUCTS
68535 WINNICK SUPPLY, INC.
68482 XCEL ENERGY
•
ADAPTER
BRASS ADAPTERS
UTILILTY BILLING POSTAGE
MONTHLY SERVICE /JUNE
DENTAL INSURANCE
LONG TERM DISABILITY INS
PARTS /SUPPLIES
SPLICE CONNECTION
CHEMICALS
LIQUID PHOSPHATE /PUMP
PRINTING
FLAGS /PAINT
AUDIT /FINANCIAL STATEMEN
MEDICAL INSURANCE
PAINT
MOUNTING BRACKETS
MONTHLY SERVICE /MAY -JUNE
PIPE /COUPLING /CLAMPS
LIFE INSURANCE
MONTHLY SERVICE /JUNE
SUPPLIES
BATTERY /CUTTING WHEEL /VA
MONTHLY SERVICE /MAY
Total for Dept 494
FORESTRY
FORESTRY
FORESTRY
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
150.00
225.00
264.82
150.00
150.00
2.14
150.00
1,320.32*
374.75
2.62
1.55
58.85
.47
748.60
1,186.84*
11.79
140.33
6.96
57.57
264.82
20.00
2.14
503.61*
104.09
27.60
195.36
1,305.89
43.23
24.11
39.01
92.14
6,040.94
2,362.80
861.11
161.99
493.40
610.77
2,126.62
6,929.96
197.79
329.68
11.42
20.16
21.93
186.39
181.31
22,367.70*
Date: 07/08/2003 Time: 09:32:33 Operator: JAL
•
Page: 8
City of Lino Lakes
FM Entry - Invoice Payment - Approval of Bills
Check # Vendor Alpha Name Description
Dept Amount
68537 M CIRCLE PINES POST OFFI UTILILTY BILLING POSTAGE
0 CONNEXUS ENERGY MONTHLY SERVICE /JUNE
68544 DELTA DENTAL PLAN OF M DENTAL INSURANCE
68546 FORTIS BENEFITS, INC. LONG TERM DISABILITY INS
0 FRATTALLONE'S HARDWARE PARTS /SUPPLIES
0 LARSON ALLEN WEISHAIR AUDIT /FINANCIAL STATEMEN
68552 MEDICA MEDICAL INSURANCE
68556 RELIASTAR LIFE INSURAN LIFE INSURANCE
0 SBC, INC. MONTHLY SERVICE /JUNE
68482 XCEL ENERGY MONTHLY SERVICE /MAY
Total for Dept 495
0
0
68503
68506
0
0
0
68477
0
•
ARNT CONSTRUCTION, INC
FETTING, SHARON
GLENN REHBEIN EXCAVATI
HALVORSON CONCRETE, IN
KENNEDY AND GRAVEN, IN
LARSON ALLEN WEISHAIR
NORTHWAY IRRIGATION /LA
DITCH /POND CLEANING
IMPLEMENTATION SPECIAL A
HIGHLAND MEADOWS PARK DE
BENCH PADS /CURB RAMPS /CO
LEGAL SERVICE
AUDIT /FINANCIAL STATEMEN
IRRIGATION /CLEARWATER CK
PRESS PUBLICATIONS, IN ADVERTISING
RO -SO CONTRACTING, INC REPLACE CULVERT
Total for Dept 499
0 KENNEDY AND GRAVEN, IN LEGAL SERVICE
Total for Dept 500
SEWER 195.36
SEWER 259.61
SEWER 43.23
SEWER 24.13
SEWER 8.79
SEWER 493.40
SEWER 610.77
SEWER 11.37
SEWER 4.59
SEWER 818.71
2,469.96*
OTHER 15,424.00
OTHER 96.00
OTHER 3,525.00
OTHER 5,916.00
OTHER 217.00
OTHER 1,874.91
OTHER 24,363.72
OTHER 83.85
OTHER 3,100.00
54,600.48*
TIF ADMI 46.50
46.50*
Grand Total 319,442.61*
Centennial Fire District
Check Register
7/9/2003
The disbursements listed below are submitted by the Centennial Fire District for your approval:
DATE CHECK# NAME
7/3/2003 13839
7/3/2003 13840
7/3/2003 13841
7/3/2003 13842
7/3/2003 13843
7/3/2003 13844
7/3/2003 13845
7/3/2003 13846
7/3/2003 13847
7/3/2003 13848
7/3/2003 13849
7/3/2003 13850
7/3/2003 13851
7/3/2003 13852
•
•
Amoco Oil Company
Aspen Mills
Brad Racutt
Centennial Firefighters Relief Assn.
Centennial Utilities
CenterPoint Energy
City of Lino Lakes
Hugo Feed Mill & Elevator
Lynn Card Company
McLeod USA
Metro Fire
Metrocall
Milo Bennett
Qwest
1 of 1
ACCOUNT
42100 - Fuel and Lube
42120 - Uniform Expense
41012 - Fire Prevention
43010 - Relief Association
42251 - Station 1 - Gas
42253 - Station 2 - Gas
43030 - Common Area Charge
42230 - Cleaning Supplies
42180 - Office Supplies
42240 - Telephone
42130 - Equipment Expense
42240 - Telephone
42000 - Vehicle Maintenance
42240 - Telephone
AMOUNT
205.74
144.40
360.00
6,585.00
101.10
161.88
5,551.75
27.99
81.80
356.29
42.42
73.73
801.97
62.31
•
•
•
Consent Agenda Item 1B
STAFF ORIGINATOR: Al Rolek
DATE: 07/14/03
TOPIC: Consideration of not waiving monetary limits
on tort liability per MN Statute 466.04
BACKGROUND
Each year, the City has the option of waving its monetary limits on tort liability to the
extent of the coverage purchased. The decision to waive or not to waive the statutory
limits has the following effects:
If the city does not waive the statutory tort limits, an individual claimant would be able to
recover no more than $300,000 on any claim to which the statutory tort limits apply. The
total which all claimants would be able to recover for a single occurrence to which the
statutory tort limits apply would be limited to $1,000,000. These statutory tort limits
would apply regardless of whether or not the city purchases the optional excess liability
coverage.
If the city does waive the statutory tort limits and does not purchase excess liability
coverage, a single claimant could potentially recover up to $1,000,000 on a single
occurrence. The total which all claimants would be able to recover for a single occurrence
to which the statutory limits apply would also be limited to $1,000,000, regardless of the
number of claimants.
If the city does waive the statutory tort limits and purchases excess liability coverage, a
single claimant could potentially recover an amount up to the limit of the coverage
purchased. The total which all claimants would be able to recover for a single occurrence
to which the statutory tort limits apply would also be limited to the amount of coverage
purchased, regardless of the number of claimants.
Claims to which the statutory municipal tort limits do not apply are not affected by this
decision.
The city carries $1,000,000 in excess liability coverage ($1,000,000 per occurrence and
annual limit).
The City of Lino Lakes has never waived its' monetary limits on tort liability.
OPTIONS
1. The City of Lino Lakes does not choose to waive its' monetary limits on tort
• liability established by Minnesota Statutes 466.04.
2. The City of Lino Lakes chooses to waive its' monetary limits on tort liability to
the extent of the limits of the excess liability coverage obtained from the League
of Minnesota Cities Insurance Trust.
RECOMMENDATION
Recommend option 1.
•
• AGENDA ITEM 1C
•
•
STAFF ORIGINATOR: Jean Viger, Deputy City Clerk
DATE: July 14, 2003
TOPIC: Resolution No. 03 -111, Approving Solicitor's/Peddlers
License for Monitronics International, Inc.
VOTE REQUIRED: Simple Majority (3/5 Vote)
BACKGROUND:
Bradley Farr and Paul Behan, sales representatives for Monitronics International, Inc.,
submitted peddlers license applications to the city clerk's office. Mr. Farr and Mr. Behan
will be going door to door offering Lino Lakes residents installation of home security
alarm systems at no cost in exchange for a monitoring contractual agreement. Mr. Farr
and Mr. Behan have complied with all of the provisions of the Lino Lakes City Code for
obtaining the necessary license, including a background check. Sergeant Steve
Mortenson of the Lino Lakes Police Department indicated that the background checks
came back clear and there would be no reason to recommend denial of the license.
The applications and all other required information are on file in the city clerk's office for
review.
OPTIONS:
1. Approve Resolution No. 03 -111
2. Deny Resolution No. 03 -111
RECOMMENDATION:
Option No. 1
•
•
CITY OF LINO LAKES
COUNTY OF ANOKA
RESOLUTION NO. 03 -111
RESOLUTION APPROVING SOLICITOR'S/PEDDLERS LICENSE
WHEREAS, Bradley Farr and Paul Behan, sales representatives for Monitronics
International, Inc., have submitted solicitors /peddlers applications to the city clerk's
office; and
WHEREAS, Mr. Farr and Mr. Behan have complied with all of the provisions of
Ordinance No. 01 -89 of the Lino Lakes City Code for obtaining the necessary license for
a profit business; and
WHEREAS, the City of Lino Lakes has conducted a background check on Mr. Farr and
Mr. Behan;
NOW, THEREFORE, by order of the Lino Lakes City Council, and virtue thereof, the
said business, Monitronics International, Inc., is hereby authorized to solicit for a period
of six - months beginning July 15, 2003 and ending January 14, 2003 subject to all
conditions and provisions of said ordinance.
Passed by the City Council of the City of Lino Lakes this 14th day of July, 2003.
ATTEST:
Ann Blair, City Clerk
John J. Bergeson, Mayor
•
•
•
AGENDA ITEM 1D
STAFF ORIGINATOR Al Rolek
MEETING DATE July 14, 2003
TOPIC Consider Resolution 03 -72 Authorizing the Certification of
Delinquent Water and Sewer Utility Charges for collection with 2003
Property Taxes Payable in 2004
VOTE REQUIRED
BACKGROUND
Simple Majority (3/5)
Staff periodically brings before the City Council delinquent water and sewer utility charges for
certification to the County Auditor for collection with the following year property taxes.
Consideration of such certification was scheduled for this evening to give affected property
owners an opportunity to address the City Council on this impending action. Affected property
owners received mailed notice of this proceeding.
Staff recommends that the City Council adopt Resolution 03 -72 authorizing the certification of
delinquent water and sewer utility charges to be collected with 2003 property taxes payable in
2004.
OPTIONS
1) Adopt Resolution No. 03 -72.
2) Return to staff for further review.
3) Do not adopted Resolution No. 03 -72.
RECOMMENDATION
Option 1.
•
CITY OF LINO LAKES
RESOLUTION NO. 03-72
RESOLUTION AUTHORIZING THE CERTIFICATION OF DELINQUENT WATER AND
SEWER UTILITY CHARGES FOR COLLECTION WITH THE 2003 PROPERTY TAXES
PAYABLE IN 2004
WHEREAS, pursuant to City Code Section 401.29 and Section 402.14, Subd. 5, the City
Clerk has prepared a list of properties having delinquent water and sewer
charges to be certified to the Anoka County Auditor for collection with the
2003 property taxes, payable in 2004, and
WHEREAS, the City Council has met to consider the certification of such delinquent
water and sewer charges, and
WHEREAS, notice of such certification was mailed to affected property owners.
NOW, THEREFORE, BE IT RESOLVED by the City Council of Lino Lakes, Minnesota
that the City Clerk is hereby authorized to certify the delinquent water and sewer charges
as indicated on the attached listing to the Anoka County Auditor to be collected with the
2003 property taxes, payable in 2004.
• Adopted by the City Council of Lino Lakes, Minnesota this 14th day of July, 2003.
Ann J. Blair, City Clerk
•
John J. Bergeson, Mayor
•
•
•
July 8, 2003
Shirley Kay's
6810 Lake Drive
P.O. Box 365
Lino Lakes, MN 55014
Property Number: 00- 00 -00 -00 -0000
Account Number: 2159510
For Address: 6810 Lake Drive (Irrigation Meter)
Lino Lakes, MN 55014
Total Amount Pending Certification $283.76.
Dear Property Owner:
You were recently notified of our intent to certify your delinquent water an /or sewer
billings to your 2004 Property taxes. The dates listed in the original notification were
incorrect. The correct date that the City Council will consider this is July 14, 2003, with
the final certification to go to Anoka County for collection on July 15, 2003.
If you have any dispute with the certification process, you may appear before the City
Council on Monday July 14, 2003, or you may submit something in writing to City Hall by
4:00 PM July 14, 2003.
If you have paid this bill, please disregard this notice.
If you have further questions regarding your delinquent water and /or sewer utility billing,
please feel free to call. You may reach me at (651) 982 -2412.
Respectfully,
(pin `6tc-n6r
Lynn Francis
Finance Department
600 Town Center Parkway, Lino Lakes, Minnesota 55014 -1182
Phone: 651 - 932 -2400 • Fax: 651 -982 -2499 • TDD: 651 - 982 -2410
•
July 8, 2003
Shirley Kay's
6810 Lake Drive
P.O. Box 365
Lino Lakes, MN 55014
Property Number: 19- 31 -22 -34 -0001
Account Number: 2159500
For Address: 6810 Lake Drive
Lino Lakes, MN 55014
Total Amount Pending Certification $4,352.55.
Dear Property Owner:
You were recently notified of our intent to certify your delinquent water an /or sewer
• billings to your 2004 Property taxes. The dates listed in the original notification were
incorrect. The correct date that the City Council will consider this is July 14, 2003, with
the final certification to go to Anoka County for collection on July 15, 2003.
If you have any dispute with the certification process, you may appear before the City
Council on Monday July 14, 2003, or you may submit something in writing to City Hall by
4:00 PM July 14, 2003.
If you have paid this bill, please disregard this notice.
If you have further questions regarding your delinquent water and /or sewer utility billing,
please feel free to call. You may reach me at (651) 982 -2412.
Respectfully,
Tv)? Guru S
Lynn Francis
Finance Department
600 Town Center Parkway, Lino Lakes, Minnesota 55014 -1182
Phone: 651 - 982 -2400 A Fax: 651 -932 -2499 0 TDD: 651 -982 -2410
•
•
•
AGENDA ITEM 5 -A
STAFF ORIGINATOR David J. Pecchia, Public Safety
Director /Chief of Police
DATE July 14, 2003
TOPIC
VOTE REQUIRED
BACKGROUND
Request to accept grant dollars from the
Minnesota Department of Public Safety,
Alcohol and Gambling Enforcement
Division.
Simple Majority
The Minnesota Department of Public Safety, Alcohol and
Gambling Enforcement Division requires local liquor
licensing officials to pursue civil penalties against
licenses whose establishments sell alcohol to minors during
underage compliance checks. The grant dollars will be used
to defer the cost of payroll expenses in conducting the
compliance checks and for any other cost related to these
enforcement actions.
OPTIONS
1. Accept grant dollars to conduct compliance checks.
2. Return to staff for further information.
RECOMMENDATION
Option No. 1
•
•
•
AGENDA ITEM 5 -B
STAFF ORIGINATOR David J. Pecchia, Public Safety
Director /Chief of Police
DATE July 14, 2003
TOPIC
VOTE REQUIRED
BACKGROUND
Consideration of Resolution No 03 - 96
Accepting a Donation from the Lino Lakes
Lions Club.
Simple Majority
The Lino Lakes Lions Club realizes the increased risks faced
by police departments and the need for a greater push to use
Less Lethal Tactics and have graciously donated $1,000 to
defer the cost to purchase Tasers for use by the Public
Safety Department.
The purpose of Resolution 03 -96 is to accept and publicly
thank the Lino Lakes Lions Club for their generous donation
to the City of Lino Lakes.
OPTIONS
1. Adopt Resolution No. 03 - 96 accepting the donation.
2. Return the Resolution to staff for further information.
RECOMMENDATION
Option No. 1
• Council Member
and moved its adoption: introduced the following resolution
CITY OF LINO LAKES
RESOLUTION NO. 03 - 96
RESOLUTION ACCEPTING DONATION FROM THE LINO LAKES LIONS CLUB FOR
TWO TASERS
WHEREAS,
WHEREAS,
tasers are equipment used as Less Than Lethal Tactics
by the police officers; and
the Lino Lakes Lions Club has graciously made an offer
to donate $1,000 toward the cost of these tasers, and
NOW, THEREFORE, BE IT RESOLVED, the Lino Lakes City Council
members, do hereby accept the $1,000 donation to purchase the two
tasers and wishes to express its gratitude to the Lino Lakes
Lions Club for the donation.
John Bergeson, Mayor
•
Ann Blair, City Clerk
Adopted by the Lino Lakes City Council this 14th day of July,
2003.
The motion for the adoption of the foregoing resolution was duly
seconded by Council Member and upon vote being
taken thereon, the following voted in favor thereof:
The following voted against same:
Whereupon said resolution was declared duly passed and adopted.
•
•
•
•
AGENDA ITEM 7A
STAFF ORIGINATOR: Mary Alice Divine
DATE: 7/14/03
TOPIC:
Resolution No. 03 -94 authorizing application for a
Development Grant through the Livable Communities
Demonstration Program
Vote Required: Simple Majority
BACKGROUND:
As part of the city's participation in the Minnesota Livable Communities Act,
funds are made available to cities to promote the purposes of the Act. In 1997
the Lino Lakes Council applied for planning funds through the Livable
Communities Demonstration Account for the creation of compact, efficient,
mixed use development. The city received $220,000 in funds to hire Calthorpe
Associates to complete a master plan and design standards for the Town
Center. The results from that process have been the foundation of the city's
planning efforts to create a mixed use downtown on Lake Drive and 35W. The
city has worked closely with developers interested in building this type of
downtown project, and hopes to complete approvals on it by early next year.
In 2000 the city received $450,000 to assist with implementation of the project.
This year an application is being made for approximately $1.3 million in funding
to assist with streetscape elements in the public realm, decorative lighting and
planning /design costs for the community green.
Thirty -six cities have applied for grants, totaling $48 million in requests. This year
$7.9 million is available for development grants.
The application process requires a resolution of support from the city council by
July 31, 2003.
RECOMMENDATION:
Adopt Resolution No. 03 -94 authorizing application for a Development Grant
through the Livable Communities Demonstration Program
•
•
•
CITY OF LINO LAKES
RESOLUTION NO. 03-94
AUTHORIZING APPLICATION FOR A DEVELOPMENT GRANT THROUGH
THE LIVABLE COMMUNITIES DEMONSTRATION PROGRAM
WHEREAS, The City of Lino Lakes is a participant in the Livable Communities Act's
Housing Incentives Program for 2003 as determined by the Metropolitan Council, and is
therefore eligible to make application for funds under the Livable Communities
Demonstration Account; and
WHEREAS, the City has identified the proposed Woods Edge project within the City as a
project that meets the Demonstrations Account's purpose and criteria; and
WHEREAS, the City has the institutional, managerial, and financial capability to ensure
adequate project administration; and
WHEREAS, the City certifies that it will comply with all applicable laws and regulations
as stated in the contract agreements; and
WHEREAS, the City Council of Lino Lakes, Minnesota agrees to act as legal sponsor for
the project contained in the Demonstration Account application submitted on June 30,
2003;
BE IT RESOLVED that the City Administrator is hereby authorized to apply to the
Metropolitan Council for this funding on behalf of the City of Lino Lakes and to execute
such agreements as necessary to implement the project on behalf of the applicant.
Adopted by the Lino Lakes City Council this 14th day of July, 2003.
Ann Blair, City Clerk
John J. Bergeson, Mayor
•
•
•
LIVABLE COMMUNITIES DEMONSTRATION ACCOUNT
DEVELOPMENT GRANT APPLICATION FORM 2003
Office Use
Instructions: Submit form and attachments by 4:30 p.m. on June 30, 2003. Use font size 11. Use of bulleted lists
is encouraged. Do not attach a coversheet, page(s), or use any graphic images on top of the application form.
Limit application to 12 pages plus attachments, for a total of no more than 19 pages.
Project Information:
Project Name:
Legacy at Woods Edge
Applicant (Governmental Unit):
City of Lino Lakes
Project Location (city):
Lino Lakes
Address (street boundaries or
Major intersection):
SE Quadrant of 35W and County Road 23 (Lake Drive)
Primary Project Contact: Name:
Title:
Mary Alice Divine
Economic Development Assistant
Address:
600 Town Center Parkway
Phone:
651/982 -2423
Fax:
651/982 -2499
E -mail:
mdivine @ci.lino- lakes.mn.us
Authorized official(s) - (names and
titles for contract execution)
Linda Waite Smith, City Administrator
Project Summary
In the space below, summarize the project goals and components.
(Limit 20 lines)
• Combine a privately owned commercial site with city -owned land to create a 65 -acre, $150 million, mixed -
use, walkable neighborhood in the heart of Lino Lakes, instead of big boxes that would typically occur.
• Implement the Calthorpe Plan developed for the site to provide economic, cultural and recreational amenities
within a human scale environment.
• Leverage public /private commitments the city has made, including the completed Civic Complex and future
YMCA, so they interact as part of a greater plan rather than become separated suburban destinations.
• Demonstrate that new suburban development can provide the vital blend of all the classic components of
Traditional Neighborhood Development — civic, residential, commercial and recreational uses —to create
sustainable value in a community.
• Provide physical connections to a nearby employment center, large suburban retail center, elementary and
middle school and surrounding neighborhoods.
• To make use of unparalleled opportunities for wilderness within the metro area through direct access to the
Rice Creek Chain of Lakes Regional Park Reserve. Those living in and coming to Woods Edge will be those
seeking active living. They can enjoy miles of woods and wetlands, lakes and meadows, while still having
convenient access to the rest of the metro area via 35W. Hiking, biking and canoeing can be an integral part
of their lives. If developed conventionally, this site would instead be big boxes, loading docks and parking.
• Major components include 450 units of lifecycle housing including owner and rental townhomes, apartments
and condos over commercial, workforce and senior housing; more than 300,000 sq.ft. of commercial; a
YMCA; a city hall /police station/community room; and a community green. Tree -lined streets and buildings
sited at the sidewalk, with frequent entries and windows, will create an interesting pedestrian environment.
End Date
0
0
N
Start Date
Spring 2004
the following section, listing project tasks and specific task details in priority order, requested amount of funds, and timelir
eligible uses. For the Task/Eligible Cost, provide as much specificity and detail about the task as you can. Examples: If the
the details might include information about location of parking structure if there is more than one, how many stalls and cosi
tinn. the details might include number. type and location of buildings, or size of parcel; and if cost includes demolition and I
$ Request
O
in
N
r+
69
OO
Coss,
69
CO
O
o
11111111
O
N
N
69
Inwino certinn_ if annlicable. list future phases of the project and estimated start and completion dates.
I:'
Public Realm/streetscape elements per Calthorpe Master Plan
Decorative Lighting: 48 Domus Fixtures (amount beyond standard lighting)
Park Planning and Desian. including water feature design
1
1
Total dollars requested and the start and completion date for the entire project or phase:
Planning funds used to hire Calthorpe Associates for master plan and design standards, revisions,
housing study and economic impact study. Approximately $10,000 remains for architectural
(iecion review of final developer plans.
All components of the development proposal are anticipated to be complete within two years
from start date.
•p
,
0
r-1
N
M d' v� ∎O
l--
oo O�
Q
a�
Cam,
4
2. Additional Project Information (limit one page)
•
• In the space below, provide additional project information or history of the site (not included in
the project summary on page 1), including any plans to phase the project.
(Limit 20 lines)
•
• City/Anoka County partnership finalized an unprecedented land exchange that gave the city the opportunity
to build a Civic Complex and offer land to the YMCA
• City committed $6 million to build the Civic Complex on the site
• City purchased 14 acres of land and installed Phase I infrastructure.
• City sold two parcels for Fairview Clinic and a community bank.
• Calthorpe Associates developed Land Use and Regulatory Plans which concentrate development at
intensities that bring within walking distance a complementary mix of land uses. The standards require
mixed use, and include a framework of required streets. They specify street standards, open space amenities,
build -to and setback lines, pedestrian walkways and landscaping.
• City/YMCA partnership will provide a community center for area residents. City contribution is $1.5 million
towards construction, plus land and infrastructure. YMCA will provide discounted memberships, community
events, teen center. The YMCA is in architectural design phase.
A Redevelopment TIF District analysis was completed and a portion of the site qualifies. The schedule calls
for establishing the district by December 2003.
• Hartford Group has secured a purchase agreement with the private landowner. That has been a major
obstacle in the past, and was key to moving the project forward.
• An EAW is in process.
• Hartford Group anticipates full buildout within two years of start date.
• In the space below, state how LCDA funding will overcome obstacles or provide a catalyst.
Describe any time constraints, financial hardship or complexity that requires LCDA funding.
Address what could not be accomplished but for receipt of an LCDA grant.
(Limit 20 lines)
In 2000, LCDA request was for $1.5 million to write down the costs of the land purchase. The city received
$450,000, which was not enough to fund the gap. The city has been working with the development
community and financial consultants to find additional ways to leverage its investment to make the project
move forward.
The city has made a significant investment in this project to date, and additional investment will be required.
Improvements to Lake Drive and the 35W overpass will be necessary.
The privately owned land was zoned commercial, making it priced higher than the market for residential
development.
Tax reform significantly reduced the viability of TIF.
Amenities that set a neighborhood apart from conventional suburban development and create a true sense of
place are not TIF eligible and often are slashed from the development plan for lack of available funding. The
amenities are crucial in a pedestrian environment. People walk when it is pleasant, safe and comfortable to
do so. People stay because the setting draws them. People value what has value.
The public realm the "outdoor rooms" that invite people to gather —does not happen in new Traditional
Neighborhood Developments without public assistance.
•
3. Regulatory Status
A. Please check (X) the following if it will be needed, is underway or is completed, and briefly provide
additional information as noted. If not applicable, place a `NA' in the box.
Will be
Needed
Underway
Completed
X
Will buildings be demolished? If yes, indicate the number of and type of buildings:
The privately owned land has one home and a sandblasting business consisting of three pole type
structures.
X
Comprehensive plan amendment. If needed, please describe:
Will new buildings be constructed? If yes, list the percent mix of commercial, residential, public
or other uses:
30 % Commercial 5% Public (already constructed)
60 % Residential 5 % Other Uses (YMCA)
X
Environmental Reviews — EAW, EIS, AUAR. If needed, please describe:
An EAW is being prepared. The public hearing will be held in August, with
Council declaration in September.
X
X
.
Zoning changes and variances. If needed, please list and include change
to /from:
The current zoning is Limited Business. The Comprehensive Plan
designates it as mixed use. At the time of site plan approval it will be
rezoned to a PUD.
4. Project Site and Components
A. Proposed land use changes: (check appropriate box)
Yes No
4
X
Will buildings be rehabilitated? Briefly describe:
X
Will buildings be demolished? If yes, indicate the number of and type of buildings:
The privately owned land has one home and a sandblasting business consisting of three pole type
structures.
X
Will new buildings be constructed? If yes, list the percent mix of commercial, residential, public
or other uses:
30 % Commercial 5% Public (already constructed)
60 % Residential 5 % Other Uses (YMCA)
X
Will new streets or other infrastructure be added?
X
Will any park land be converted? Briefly describe:
X
Will new pedestrian infrastructure be added? If yes, check type:
X Sidewalks
X— Bike paths
X Trails
4
B. Mix and Type of Uses: List the number and types of commercial, retail, office, government /civic,
arts /cultural, entertainment or other uses existing or planned in the project site.
Type of Use
Number of
Existing
Uses
Square
Footage or
Acreage
Number of
Planned
Uses
Square
Footage or
Acreage
Indicate if planned uses
are new construction or
rehab
Single- family
New
Rehab
Commercial /Retail &
Office
1
3,000
Multi
334,115
X
Restaurant
Government/Civic
0
1
16,600
X
0
3
50,000
0
Other (list):
Arts /Cultural
0
0
Entertainment
0
unknown
Single- family
0
Open Space /Public
Space
0
4
3 -acre park
7 -acre open
X
91
Other (list)
Clinic
YMCA
1
3,000
1
40,000
X
Duplexes
Other (list):
C. Type and Tenure of Housing: List the number of housing units by type and tenure (owner /renter)
currently in the project site area and planned.
Current Overall Density (units per acre — net)
Total # of
Units
# Units
Owner
# Units
Rental
Distinguishing Features:
(# of stories,
architectural design)
Existing Housing:
Single- family
1
1
Townhouse
0
Apartments or Condominiums
0
Duplexes
0
Other (list):
Planned Housing:
Single- family
0
Townhouse
•
272
181
91
Rear entry garages,
distinct vertical building
forms. bay windows,
balconies, gabled roofs,
reveals and recesses
Apartments or Condominiums
178
178
Units in 2 to 3 stories over
commercial, built to
street, underground
parking.
Duplexes
Other (list):
Current Overall Density (units per acre — net)
Planned overall density (units per acre — net)
N/A
± 13 units .er acre
5
•
•
•
E. Housing Affordability: List affordability levels for existing and planned housing in the following
format: (Area median income - $75,300)
F. Employment connections: Estimate the number of jobs within 2 miles of the project site and list major
employers.
Number of Jobs
# of Units up to
50% of Area
Median Income
# of Units at 50-
80% of Area
Median Income
# of Units at
Market Rate
# of Affordable units to
be demolished (if any)
Existing housing
0
0
1
1,000 -3,000
Planned housing
91
0
359
N/A
Less than 500
Yes
No
(Check appropriate box)
X
Are there mechanisms to ensure long -term affordability? If yes, what type?
(Check any that aPply)
Land trust
Resale price indexing
X
Other (list):
Low Income Housing Tax Credits (if approved)
F. Employment connections: Estimate the number of jobs within 2 miles of the project site and list major
employers.
Number of Jobs
Check appropriate
number
Major employers within 2 mile
More than 5,000
Type
400
3,000 -5,000
X
Target Superstore, Kohls, Synovis, Centennial Middle and
Elementary School, State Prison, Molin Concrete
1,000 -3,000
500 -1,000
Less than 500
G. Creation of new jobs:
Yes No (Check appropriate box)
X
Will this .ro'ect create an new obs? If es, how man and what .e?
Number
Type
400
Commercial /retail/office /apartment management/recreation
6
•
H. Adjacent land uses and relationships: Describe any plans or opportunities to Zink adjacent land uses to
the project site.
Limit 8 lines
• Immediate linkages will include pedestrian path along Lake Drive to connect new proposed business
park, elementary and middle schools. Lake Drive will be reconstructed in 2004, at which time the trails
can be completed.
• County/city trail connections in the regional park open up pedestrian /bike opportunities, connecting the
most populated residential areas to Woods Edge.
• The other quadrants of the interchange include SuperTarget, Kohl's, new commercial /retail, a 100 -acre
business park and the state correctional facility. Reconstruction of the overpass on Lake Drive will
provide opportunities for safe and effective pedestrian /bike connections.
I. Describe how the project links to transit, if transit is available.
Limit 8 lines
One express bus passes the site daily. The city is eager to work with transportation officials to provide a transit
stop that will offer residents of Woods Edge direct bus access to 35W, plus a "kiss- and - ride" opportunity close
to daycare, coffee shops, a bank and gas/convenience store.
• J. Environmental protection and enhancement:
Yes No (Check appropriate box)
X
Does this project include environmental protection practices and environmental enhancement
measures? If yes, what kind?
(Check all that apply)
X
Ecologically sensitive stormwater management practices - including draining, filtering and
retaining storm water in innovative ways that maximize use of natural systems
X
Preservation or restoration of existing trees and other natural vegetation
X
Use of natural resources to create communities amenities, e.g. restoration of buried creeks and
wetlands
X
Provision of green spaces for recreation and scenic value
Other (describe):
K. Replicability: State how you will use components of or processes developed for the project in other
locations in your community, or in the comprehensive plan and zoning codes.
Limit 8 lines
Lino Lakes is a typical single family, large lot suburb. A success story is needed to change perception here, as
well as in other suburban cities. This city has come a very long way to accepting, now championing, this type
of development. More suburbs are now doing "Village Centers" which are mainly just prettied up shopping
centers, but still little connectivity. Woods Edge will demonstrate that all the critical elements — residential,
commercial, civic and recreational— within walking and biking distance, plus a transit stop, are vital to
true sustainability.
This will open the door to our city's understanding of what really makes neighborhoods work. Future
development on 35E /Cty Rd. 14 calls for high and medium density housing, plus commercial, retail, office, and
light industrial uses. One success story will make others so much easier, in Lino Lakes and in other cities.
7
5. Partnerships and Community Participation (Begin new page)
A. Planning and Implementation Partnerships: List and briefly describe the type and nature of
partnerships in the project among government, private, for - profit and non -profit sectors.
Name of Partners
Type of Partnership
Hartford Group, Inc.
Master Developers
YMCA
City is contributing 1/3 construction costs in
exchange for resident discounts, teen center, all -
city events etc.
Centennial School District
10 -year lease in Civic Complex for ECFE
Anoka County
Collaborated in land exchange, joint parks and
trails plan
Metropolitan Council
LCDA grants for planning and development
Fairview Hospitals
Clinic on site, joint programming with YMCA
B. Community's role: Describe any public participation processes (including residents,
businesspersons and others) in developing the proposal, including the process to date, and plans for
future community involvement in project implementation.
Limit 8 lines
• Comprehensive Plan Task Force. Set direction for creation of a mixed use town center on the site.
• Town Center Group. A citizen group led by consulting architect/planner created to establish
principles for development and set standards for architectural design.
• Economic Development Advisory Committee. Local business owners and residents with expertise
in finance and development who have supported the project as the first priority for the city.
• Calthorpe Associates held citizen /landowner discussion groups during master planning phase.
• Approvals schedule has frequent updates to city council, P &Z and Environmental Board. Public
hearings scheduled for PUD and EAW
C. City's role: How has the city supported the project?
Limit 8 lines
Woods Edge is a city- initiated project.
• Successful negotiation of land exchange for civic complex. City cost: $300,000
•. City purchase of 14 acres of property: $2,316,252
• City completion of Phase One infrastructure: $565,242
• Completion of the Civic Complex on the site: $6,100,000 construction cost.
• YMCA/City partnership: City contribution is $1,500,000 in construction costs; 6.7 acres of land,
plus costs of infrastructure.
• Future creation of Tax Increment Financing District.
8
•
•
•
6. Regulatory And Implementation Tools and Strategies (Begin new page)
A. City review /regulatory process: (check appropriate box)
Yes
No
Were any new city review or regulatory processes or procedures used or developed for
this project
If yes describe them: (limit 6 lines)
Review procedures: Because of the complexity of the project, a development team has been assembled.
• Master Developer: Hartford Group and its team of architects and engineers
• Short, Elliott, Hendrickson (SEH): all aspects of EAW, public improvements and site plan review
• Springsted, Inc.: city financial analysts /tax increment financing
• Additional consultants as needed.
• Additional meetings are scheduled with city boards and for council review and approval.
B. Zoning /regulatory changes: (check appropriate box)
Yes
No
Were any zoning or other regulatory tools necessary for the project to be implemented as
planned?
State status of development or city adoption of them: (limit 6 lines)
• Comprehensive Plan amendment to designate the site as high density mixed -use.
• Exemption of the site from the city's growth management ordinance.
• Future rezoning to PUD
C. Design standards: (check appropriate box)
No j
X Were any design standards developed?
Yes
Eyes state status of adoption or inclusion in formal regulatory processes, and how the standards were
or will be used: (limit 6 lines)
Calthorpe Associates developed "Lino Lakes Town Center Design and Development Guide" which will
be included in the developer's agreement as part of the PUD.
9
•
7. Developability (Begin new page)
A. Market and feasibility studies: (check appropriate box)
Yes
No
X
Have market and feasibility studies been conducted for the project?
• Market Assessment for Independent Senior Housing
• Town Center Fiscal Impact Analysis
• Building Condition Assessment (TIF Redevelopment Feasibility)
• YMCA Market Research Study
• Hartford Group is conducting its own market research studies
B. Developer's role: (check appropriate box
Yes
No
X
X
Is a developer(s) committed to the project? If yes -
Name of Developer(s)
Type of contract or commitment
Hartford Group, Inc.
Real Estate Purchase Agreement
YMCA
$5 million raised for construction
8. Readiness and Financial Aspects of the Project
A.
Yes
No
X
Is the development site as represented currently within a designated development district,
or an approved development (Le. PUD)?
B. _ Describe the applicant's controls of the site, or sites represented in the proposal? (check appropriate box)
X
Under option (Developer has control of private land contingent upon final approvals)
X
Own (City owns a portion of the project site, has preliminary development agreement with
developer
Condemnation
X
Within a TIF District Will be .laced in a district durin: a. •royals •rocess)
Other (list):
• C. If the site is not under the applicant's control, what steps will need to be taken in order to do so?
Limit 5 lines
10
•
•
•
N/A
D.
Yes
No
X
Are market studies or appraisals available for all components of the project (i.e. retail,
office, ownership housing, rental housing)?
E.
Yes
No
X
If the developer is acquiring the development site from the city, is the site being sold at
fair - market value?
F.
Yes
No
X
Has an architect/engineer been selected for the project?
If yes what level of completion are the drawings at? (limit 4 lines)
Planning stage, concept drawings
G. How have costs been determined? (check appropriate box
H. If commercial is proposed, provide as much specificity as possible regarding the type of tenants and
projected rents.
•
Bidding
Projected Rents
Contracting estimates
X
Developer estimates
X
City estimates
X
Other (list):
Consultant Infrastructure Estimates
H. If commercial is proposed, provide as much specificity as possible regarding the type of tenants and
projected rents.
•
Type of Tenant
Projected Rents
Restaurants
3
Market rate rents to be determined by
owner
Daycare
1
Office building
Unknown
n
Retail
75,000 s.f.
II .
Service uses
Unknown
II
Note: The master developer, Hartford Group, will be selling approved sites to various users and owners.
I.
Yes
No
X
Does the applicant intend to apply for LCDA funds for this project in future years for
additional phases or components?
J. Provide project sources /uses budgets on the following page.
11
SOURCES AND USES
Sources
r
$ Amount
Status
Approval Anticipated by:
For Sale Townhomes
$2,896,000
Planning Stage
December 2003
Commercial Retail Pads
3,250,000
"
"
Apartments over Retail
936,000
"
n
Daycare
250,000
4,522,422
"
Affordable Townhomes
1,092,000
96,000
"
Senior Apartments over Retail
1,200,000
250,000
"
LCDA 2000
450,000
Approved
LCDA 2003
1,297,250
Requested
Other public sources
3,481,509
Planning
TOTAL:
$14,852,759
Uses
$ Amount
$ Portion from
LCDA Source
$ Other Public
Sources
$ Other Private
Sources
Hard Costs:
Land Acquisition
$6,217,754
($450,000 from
2000 grant)
$1,700,000
•
Infrastructure Costs
5,708,672
1,186,250
4,522,422
Decorative Street Lights
96,000
96,000
Traffic Signal
250,000
1
Total Hard Costs:
$12,272,426
Soft Costs:
Third Party Reports/Tests
135,000
Municipal /Development costs
450,960
Financing
1, 181,373
Commissions /Closing costs
798,000
Park design /water feature
15,000
15,000
Total Soft Costs:
$2,580,333
OVERALL TOTAL
$14,852,759
$1,297,250
$6,222,422
(2003 grant
request)
12
AGENDA ITEM 7Bi
•
STAFF ORIGINATOR: James E. Studenski, City Engineer
COUNCIL MEETING DATE: July 14, 2003
TOPIC: PUBLIC HEARING - Resolution No. 03 -97, Adopting Proposed
Assessment Roll, Elm Street Reconstruction Project
VOTE REQUIRED: 3/5 Vote Required
BACKGROUND:
On June 23, 2003, the City Council set the Public Hearing for the proposed
assessments for the Elm Street Reconstruction project. The necessary notices
have been mailed to property owners indicating the amount of the assessment
and the date of the hearing.
Summaries of the project costs and assessments are attached. Project costs are
as projected in the feasibility report at a total cost of $2,490,000.00.
OPTIONS:
1. Adopt Resolution 03 -97, Adopting Proposed Assessment Roll for the Elm
Street Reconstruction Project.
2. Not Adopt Resolution No. 03 -97.
3. Return to staff for further review.
RECOMMENDATION:
Option No. 1 - Staff recommends that Resolution No. 03 -97 be adopted.
•
•
CITY OF LINO LAKES
RESOLUTION NO. 03 -97
ADOPTING PROPOSED ASSESSMENT ROLL FOR THE ELM STREET
RECONSTRUCTION PROJECT
WHEREAS, pursuant to proper notice duly given as required by law, the City Council
met and heard and passed upon all objections to the proposed assessment for the Elm
Street Reconstruction Project,
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF LINO LAKES,
MINNESOTA:
1. Such proposed assessment, a copy of which is attached hereto and made a part
thereof, is hereby accepted and shall constitute the special assessment against
the lands named therein, and each tract of land therein included is hereby found
to be benefited by the proposed improvement in the amount of the assessment
levied against it.
2. Such assessment shall be payable in equal annual installments extending over a
period of fifteen years, the first installment to be payable on or before the first
Monday in January 2004, and shall bear interest at the rate of seven percent
(7 %) per annum from the date of the adoption of this assessment resolution. To
the first installment shall be added interest on the entire assessment from the
date of this resolution until December 31, 2003. To each subsequent installment
when due shall be added interest for one year on all unpaid installments.
3. The owner of any property so assessed may, at any time prior to certification of
the assessment to the County Auditor, pay the whole of the assessment on such
property, with interest accrued to the date of payment, to the City Treasurer,
except that no interest shall be charged if the entire assessment is paid by
November 26, 2003. The owner may, at any time thereafter, pay to the City
Treasurer the entire amount of the assessment remaining unpaid, with interest
accrued to December 31 of the year in which such payment is made. Such
payment must be made before November 15 or interest will be charged through
December 31 of the next succeeding year.
4. The clerk shall forthwith transmit a certified duplicate of this assessment to the
County Auditor to be extended on the property tax lists of the County. Such
assessments shall be collected and paid over in the same manner as other
municipal taxes.
Adopted by the Council of the City of Lino Lakes this 14th day of July, 2003.
Ann Blair, City Clerk
John J. Bergeson, Mayor
AGENDA ITEM 7Bii
• STAFF ORIGINATOR: James E. Studenski, City Engineer
COUNCIL MEETING DATE: July 14, 2003
TOPIC: Resolution No. 03 -98, Accepting Bids and Awarding Construction
Contract, Elm Street Reconstruction
VOTE REQUIRED: 3/5 Vote Required
BACKGROUND:
Sealed bids were received and publicly opened at 10:00 a.m. on June 3, 2003. The
results of the bid opening are presented below. City Council action is required to award
a construction contract to the lowest responsible bidder.
Contractor Amount of Bid
F.M. Frattalone $1,513,221.79
Arcon Construction $1,515,506.97
Barbarossa & Sons, Inc. $1,576,445.70
Northdale Construction $1,738,903.49
Friedges Contracting $1,770,639.24
S.R. Weidema, Inc. $1,806,800.30
Engineer's Estimate $1,475,461.00
The low bid is approximately 3% over the Engineer's Estimate for this project. A copy of
the complete bid tabulation is attached. This 3% overage falls within the 10%
contingency budgeted for the project.
The substantial completion date for this project is November 15, 2003, with a final
completion date of June 6, 2004.
OPTIONS:
1. Return to staff for further review.
2. Adopt Resolution Number 03 -98, Accepting Bids and Awarding a Construction
Contract to F.M. Frattalone for the Elm Street Reconstruction project.
3. Not adopt Resolution No. 03 -98.
RECOMMENDATION:
Option No. 2 - Staff recommends adoption of Resolution Number 03 -98.
•
•
CITY OF LINO LAKES
RESOLUTION NO. 03 -98
RESOLUTION ACCEPTING BIDS AND AWARDING A CONSTRUCTION CONTRACT — ELM
STREET RECONSTRUCTION PROJECT.
WHEREAS, pursuant to an advertisement for bids for the construction of the EIm Street
Reconstruction project, bids were received, opened and tabulated according to law, and the
following bids were received complying with the advertisement:
Contractor Amount of Bid
F.M. Frattalone $1,513,221.79
Arcon Construction $1,515,506.97
Barbarossa & Sons, Inc. $1,576,445.70
Northdale Construction $1,738,903.49
Friedges Contracting $1,770,639.24
S.R. Weidema, Inc. $1,806,800.30
Engineer's Estimate $1,475,461.00
AND WHEREAS, it appears that F.M. Frattalone is the lowest responsible bidder;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO
LAKES, MINNESOTA:
1. The Mayor and Clerk are hereby authorized and directed to enter into a contract with F.M.
Frattalone, in the name of the City of Lino Lakes for the construction of the EIm Street
Reconstruction project according to the plans and specifications approved by the City
Council and on file in the office of the City Clerk.
2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the
deposits made with their bids, except that the deposits of the successful bidder and the next
lowest bidder shall be retained until a contract has been signed.
Adopted by the Lino Lakes City Council this 14 ' day of July 2003.
Ann J. Blair, City Clerk
John J. Bergeson, Mayor
TKDA
ENGINEERS • ARCHITECTS • PLANNERS
June 4, 2003
Honorable Mayor and City Council
City of Lino Lakes, Minnesota
Re: Elm Street Reconstruction
City of Lino Lakes, Minnesota
TKDA Commission No. 12390 -03
✓(/N
OF [ /NO LAOS
1500 Piper Jaffrey Plaza
444 Cedar Street
Saint Paul, MN 55101 -2140
(651) 292 -4400
(651) 292 -0083 fax
www.tkda.com
Dear Mayor and City Council:
Bids for the referenced project were received on June 3, 2003, with the following results. A
complete Tabulation of Bids is enclosed for your information.
Contractor
F.M. Frattalone
Arcon Construction
Barbarossa & Sons, Inc.
Northdale Construction
Friedges Contracting
S.R. Weidema, Inc.
Base Bid
$1,513,221.79
$1,515,506.97
$1,576,445.70
$1,738,903.49
$1,770,639.24
$1,806,800.30
Engineer's Estimate $1,475,461.00
Recommendation
We recommend that you award the Contract to the lowest bidder, F.M. Frattalone, Inc., for their
base bid of $1,513,221.79.
Please do not hesitate to call me with any questions or comments you may have.
Sincerely,
i%
Scott A. Brink, P.E.
Project Manager
zae
SAB:art
Enclosure
An Employee Owned Company Promoting Affirmative Action and Equal Opportunity
GIJMMIJJION VIU. IZ6tlu -U.
ENGINEERS • ARCHITECTS • PLANNERS
BIDS OPENED: JUNE 3, 2003, AT 10 AM
*DENOTES ERROR IN BIDDERS CALCULATION
MN /DOT ENGINEER'S ESTIMATE F.M. FRATTALONE ARCON CONSTRUCTION
ITEM SPEC. UNIT TOTAL UNIT TOTAL UNIT TOTAL
NO. NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
0 0
O
00
00
0)
to M
I, r
49 64
$ 10,425.00
$ 7,660.80
$ 420.00
$ 462.00
$ 1,017.60
0
NCO
64
20,816.00
1,200.00
1,140.00
750.00
2,850.00
1,250.00
6 3,145.00
6 500.00
720.00
450.00
i 112,710.00
i 47,601.00
69,419.16
i 3,533.40
31.51
i 9,000.00
i 121,680.00
i 61,762.50
24,557.50
59,940.00
00
o
h
N
E9
$ 1,188.00
$ 3,954.00
$ 1,860.00
$ 4,608.00
$ 66,302.58
0
IN
N
EA
$ 26,410.56 ]
00
N
69
$ 2,100.00
$ 3,020.13
o
''I'01
NN
6
CO
E9
o
-c
N
69
$ 38,630.46
-- _•
v.. ..w EA E9 E9 E9 E9 EH 69 E9 :- -- E9 yr 09 E9
E9
$ 7,500.00
$ 100.00
$ 75.00
- 000000
14J c0
rM0)0
- - EA 69 69
1lY
E9
O O
-0
M
EA E9
60.00
5.00
3.00
25.00
85.00
25.00
180.00
90.00
5.78
4.92
9.18
7.80
0.01
i 450.00
10.14
$ 30.50
$ 44.65
O
CO
N
ui
O
to
Co
64
$ 1.35
$ 659.00
$ 930.00
$ 9.00
$ 24.26
$ 25.93
$ 29.28
OOi�n
p
Onvv
E9
1...
E9 E9
64
$ 56.33 I
cD
64
_. sr, 177 w era E9 - - Hi E9 E9 w yr
.■ U
$ 89,700.00
$ 13,900.00
$ 4,865.00
$ 6,384.00
$ 700.00
$ 924.00
$ 1,060.00
O
f04
E9
$ 32,264.80
$ 1,200.00
$ 1,900.00
$ 1,050.00
$ 1,900.00
$ 1,250.00
$ 3,145.00
$ 500.00
$ 2,400.00
$ 375.00
$ 178,425.00
$ 50,793.75
$ 80,535.30
$ 4,530.00
$ 7,089.75
$ 2,780.00
$ 81,600.00
$ 64,091.25
$ 21,477.50
$ 64,091.25
$ 15,000.00
$ 2,200.00
$ 3,750.00
$ 1,650.00
$ 3,072.00
$ 59,442.75
$ 19,712.50
$ 23,677.50
$ 4,000.00
$ 6,600.00
$ 4,229.70
$ 38,006.00
$ 26,359.00 1
a°o
0)
co
M
69
I
$ 89,700.00
$ 100.00
$ 35.00
C0 N
EA E9
C7 0
r
E904_.
] $ 0.50
6 1.55
300.00
6 100.00
7.00
2.00
6 25.00
i 85.00
i 25.00
i 600.00
$ 75.00
O
0
.1
$ 5.25
$ 10.65
$ 10.00
$ 2.25
$ 139.00
$ 6.80
$ 31.65
$ 39.05
$ 31.65
$ 10.00
$ 2.50
$ 625.00
$ 825.00
$ 6.00
$ 21.75
$ 23.75
$ 26.25
$ 4,000.00
$ 220.00
$ 61.30
$ 61.30
$ 61.30
$ 61.30
_. or E9 E9 err yr
1000
C
000
O
0
c00
E9
O O
u)11)
CO Co
N N
64 E9
$ 11,172.00
$ 1,120.00
O O
O O
00
1. c0
1- O
r
E9 E9
] $ 3,088.00
$ 37,468.80
$ 1,600.00
$ 3,800.00
$ 750.00
$ 2,850.00
$ 400.00
$ 1,850.00
$ 600.00
$ 1,200.00
$ 1,000.00
$ 136,500.00
0
00.9
(0
Na'
N
1-
E9
$ 90,744.00
$ 4,983.00
$ 5,356.70
$ 4,000.00
$ 120,000.00
$ 72,900.00
$ 19,800.00
$ 70,875.00
$ 15,000.00
$ 2,200.00
$ 4,200.00
$ 1,600.00
$ 3,072.00
$ 71,058.00
$ 24,900.00
$ 30,668.00
$ 3,000.00
$ 1,800.00
$ 1,380.00
$ 13,640.00
$ 10,320.00
$ 16,276.00
$ 50,000.00
$ 150.00
$ 150.00
$ 14.00
$ 4.00
$ 5.00
10.00
O
al
E 9
1.80
6 400.00
6 200.00
5.00
3.00
8.00
i 50.00
S 30.00
I 300.00
0 0
ON
N
E9 E964
0
$ 12.00
$ 11.00
$ 1.70
$ 200.00
$ 10.00
$ 36.00
$ 36.00
$ 35.00
$ 10.00
$ 2.50
$ 700.00
$ 800.00
$ 6.00
$ 26.00
$ 30.00
$ 34.00
$ 3,000.00
$ 60.00
$ 20.00
$ 22.00
$ 24.00
$ 26.00
_,
E9 ER- -
.�.1� cc
JILL!)CDW
W JJ
¢¢er
W W W 000
U -I=HI-. -'F!Z-
a W W JJJ JW W JJJ�
'-M N00
r r
n N
00
r r
1 1544
LE
09
056
091.
61
1'
9190?
0.147 o0
t0
0)
r
cn
c^O
0)
7562
453
3151
20
12000
2025
550
2025
0051
880
6
2
512
2733
830
902
1
30
69
620
430
cD
CD
1ELM STREET RECONSTRUCTION
MOBILIZATION
ICLEARING
GRUBBING
1REMOVE PIPE (CULVERT OR STORM SEWER)
REMOVE CURB & GUTTER
1REMOVE FENCE
REMOVE WATERMAIN
REMOVE CONCRETE PAVEMENT
REMOVE BITUMINOUS SURFACING
REMOVE MANHOLE OR CATCH BASIN
REMOVE CONCRETE APRON
SAWCUT CONCRETE PAVEMENT (FULL DEPTH)
SAWCUT BITUMINOUS PAVEMENT (FULL DEPTH)
SALVAGE FENCE
SALVAGE MAIL BOX SUPPORT
SALVAGE SIGN (INCL. POST & ASSEMBLY)
SALVAGE HYDRANT
SALVAGE GATE VALVE & BOX
COMMON EXCAVATION (P)
POND EXCAVATION
SELECT GRANULAR BORROW (CV) (P)
TOPSOIL BORROW (LV)
CRUSHED ROCK 6' DEPTH (TRENCH STABILIZING)
EXPLORATORY DIGGING
AGGREGATE BASE CLASS 5
TYPE LV AGG. 3 WEARING COURSE (B)
TYPE LV AGG. 4 WEARING COURSE FOR TRAIL (B)
TYPE LV AGG. 3 NON - WEARING COURSE (B)
TYPE LV AGG. 4 WEARING COURSE 2' THICK FOR DRIVEWAYS
(B)
BITUMINOUS MATERIAL FOR TACK COAT
15' RC PIPE APRON W/ TRASH GUARD
21' RC PIPE APRON W/ TRASH GUARD
4° PERF PE PIPE DRAIN (W/ SOCK)
15' RC PIPE SEWER CLASS V DESIGN 3006
18' RC PIPE SEWER CLASS V DESIGN 3006
21' RC PIPE SEWER CLASS III DESIGN 3006
CONNECT TO EXISTING MANHOLES (SANITARY SEWER)
8 "X4" PVC WYE (SCHEDULE 40)
8' PVC, SDR 35 PIPE SEWER (10' -12' DEPTH)
8° PVC, SDR 35 PIPE SEWER (12' -14' DEPTH)
8" PVC. SDR 35 PIPE SEWER (14' -16' DEPTH)
8' PVC, SDR 35 PIPE SEWER (16' -18' DEPTH)
2021.501
2101.502
2101.507
2104.501
c01)
0)
N
] 2104.501
10 4)
O
N
2104.503
2104.505
0
O
N
0
O
N
2104.511
2104.513
2104.521
2104.523
1 2104.523
2104.523
2104.523
2105.501 1
101)
O
N
2105.522
2105.525
2105.603
2123.610
2211.501
2350.501
2350.501
2350.502
2350.503
2357.502
2501.515
2501.515
2502.541
2503.541 1
1t0
in
N
2503.541
2503.602
2503.602
2503.603
2503.603
2503.603
2503.603 1
N
co
et
in
C O
N.
CO
00
r
N
M
V
LO
CO
f,
M
CI)
O
N
NN
NMd'tn
NN
NN
corN
NN
0 )
N
O
MMM
N
CO
MM
e4
ct)
01
cOh
MM
cDO)O
M CE)
'V'
V
N
COMMISSION NO. 12390 -03
ENGINEERS • ARCHITECTS • PLANNERS
BIDS OPENED: JUNE 3, 2003, AT 10 AM
*DENOTES ERROR IN BIDDERS CALCULATION
MN /DOT ENGINEER'S ESTIMATE F.M. FRATTALONE ARCON CONSTRUCTION
ITEM SPEC. UNIT TOTAL UNIT TOTAL UNIT TOTAL
NO NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
01 et CO N O000000
V' OR CO c O CD 0 0 0
V'Mhr. O(D O
O M V M M C 4) It)
N O r r (O (D r
N0101t` W OhMOp
V' MrN V'
V! E9 fa EA fA fA E9 EA
O O
0000(ri
O eY
C) 47
of
E9 fA
O O
CV O
r 4) I�
M V'rrr
EA 64
S
M
G9
0000000
O
0000
N
r
E9
O
0
Cn
EA
O
N
4)
rte
fA
O
CO
64
O
C
00
M
hNrr�
fA
O
4)
et
C)
EA
O
M
V'
(0
ER
COCOON
Cl r O
n 000000N
N CO 43
W O N
W
01 T.-
E9 fa (A
00
M O
C) CO
ED et
7(7
fa ER
V
N
O
tO
E9
0
O
ca
O
r
EA
0 0
O O
O O
O M
co_ M
C)
et
EA E9
O
C
O
N
in
N.
IT
Ea
O
O
O
N
(
N
U)
0
O
O
(D
(0
64
O
O
O
CO
(O
h
EA
000
O
0041
0
'R
N+-
E9
O
(0
R
69
O
O
r
N
N
f i
O
O
0)
n
0)
EA
Oreti■ 00000000000000003CO
W'- (O M CO CO 00000000000000
CO 011-1-CO120 rC
CO M (0 f. 03 .1.• V'
rr
E9 E9 f9 fR EA u) E9 4R
0004)
Oet
C) LID
ai N
EA EA
ct (
N V'
ER EA
(0
h
r
EA
•
(O
4)
EA
•
4)
V'
EA
04104)().1-07
CO
P
fA
CO
C D
fA
CO
o
EA
O)
fA
4)
EA
V'NO(A
r 4) C.
0
C4 T.. r
E9 E9 EA
CO Nr
(C N
fR EA
01
EA
$ 79.00
$ 1,400.00
$ 1,555.00
O
O
0
O_
N
EA
O
O
0
CV
EA
$ 1,660.00I
o
d
4)
CV
EA
$ 300.00 I
oo
m4J
NO
E9
CV
EA
o
0
fA
6 1,961.60
6 14,668.00
6 7,172.10
29,424.00
6 12,995.60
6 14,405.50
6 20,229.00
6 2,678.35
000000.0
0 0
0 0
C°_, W.
M
EA d)
Lc) 0000
0 4)
r N
r4)N
EA
O
4)
O
4)
0
O
N
i 1,580.00
5,220.00
8,000.00
5,115.00
0
W
4)
(O
m
1,911.00
32,786.00
15,980.00
0 0
0 N.
co 0)
EA E9
N
CO
V•
fA
O
0
CO
N
r
EA
O Q. O
0 0
N V'
h ' '
(O (�
M
fA fA
0
pp
(0
0)
Ti
r
EA
0
0
CO.
EA
0
r
EA
0
O
0)
4)
ER
0
0
(Op
r
EA
$ 1,500.00I
0
0
NE
et
e-
EA
0
0)
CO
C)
fA
ov ow
69
EA
EA
E9
eft
w
f a
ea
EA
as If, EA
0 0 0 0 0 0 0 4)
074)(70101 01 01 0000
(OOtO CO CO (O (0000
E9 EA E9 EA V) E9 EA EA
0 0
01
Or 01
E9 E9...
6 85.00
525.00
2,500.00
6 250.00
O
8
o
fA
6 790.00
870.00
4,000.00
165.00
6 118.00
O O O
OO V'
NNO
i 50.00
18.00
0
N
EA
$ 90.00
$ 1,080.00
$ 1,240.00
$ 1,870.00
0
M
N
EA
O
r
EA
S
O
pz
r
E9
$ 200.00
$ 750.00 I
$ 1,310.00
$ 90.00
Tx
o:
Ir7
or
or
w
oa
tn.
fA E9 EA
=- --
896.00
$ 15,440.00
$ 3,393.00
$ 14,880.00
$ 6,996.00
$ 8,225.00
$ 12,210.00
$ 1,575.50
6,000.00
800.00
O 0
0 00pp
(ODOR
N O
TT
EA EA
O
0
r �..
EA
6 1,000.00
-
S
0
N(D
r
0
o0op
(0
4,000.00
-
-
0
0
CO. 0
i 2,002.00
i 30,264.00
i 15,300.00
3,040.00
i 4,125.00
4,788.00
0
O
OM)
f9
$ 37,400.00
$ 8,400.00
0
0
O
(O
Ea
0
p0p
00
N
69
0
0
T
r
fA
$ 6,000.001
$ 2,400.00
$ 1,400.00
$ 19,250.00
0
0
Or
-0
fg
-.
EA
E9
-'
EA
as m EA
m
$ 28.00
$ 10.00
$ 29.00
$ 31.00
$ 33.00
$ 35.00
$ 37.00
$ 0.50
0000 0
pOp
O S
CO
EA) fR
0 0
N. O
r
EA EA
I $ 1,800.00
S
0
40)
fa
$ 500.00
000
000
c00
EA
0
O
r
fA
0
S
N
fA
$ 110.00
S
O
CO
E9
$ 22.00
$ 24.00
$ 9.00
0 0
et N
EA fR
0
EA
S
0
f�
E9
$ 1,100.00
$ 1,400.00
S
O
00
N
EA
S
O
000
N
E9
S
0
Ef)
S
0
0
N
A
S
0
00)
E9
$ 700.00
$ 1,750.00
$ 100.00
JJ J J J J J
J J
WW
WQ
WWWWQQ
nJJJJ�23
J
W
W
W
W
W W
J
32
1544
117
480
212
235
330
3151
r .-
1 13
10
r
N
V'
N
CO
N
01010)
O
CO 0
r
CO 4)
I- CO
1596 I
7
r
et (D
M
01
r
r
01
CO
N r
r
0
r
18" PVC. SDR 35 PIPE SEWER (18' -20' DEPTH)
4" SANITARY SERVICE PIPE (SCHEDULE 40)
8° PVC, SDR 26 PIPE SEWER (18' -20' DEPTH)
8' PVC, SDR 26 PIPE SEWER (20' -22' DEPTH)
8" PVC, SDR 26 PIPE SEWER (22' -24' DEPTH)
8' PVC, SDR 26 PIPE SEWER (24' -26' DEPTH)
8° PVC, SDR 26 PIPE SEWER (26' -28' DEPTH)
TELEVISE SANITARY SEWER MAINS
WATER METERING MR
LOWER WATERMAIN
1ADJUST VALVE BOX
CONNECT TO EXISTING WATERMAIN
Z
¢J
0
m
as w
>
>¢°d
W
¢
J
x
0
>
>
�
18" GATE VALVE & BOX
16" GATE VALVE & BOX
1' CURB STOP & BOX
1' CORPORATION STOP
6" WATERMAIN DUCTILE IRON CL 52
8' WATERMAIN DUCTILE IRON CL 52
1" TYPE K COPPER PIPE
16' WATERMAIN DUCTILE IRON CL52
INSULATION (4° THICKNESS) I
(n
LL
Z
o
CONSTRUCT CATCH BASIN -TYPE 402 EXTRA DEPTH (> 5'
DEPTH)
CONSTRUCT CATCH BASIN -TYPE 402
CONSTRUCT 48" DIAMETER CATCH BASIN MANHOLE -TYPE 406
CONSTRUCT 60' DIAMETER CATCH BASIN MANHOLE -TYPE 406
CONSTRUCT 72' DIAMETER CATCH BASIN MANHOLE -TYPE 406
CONSTRUCT 48" DIAMETER STORM SEWER MANHOLE -TYPE
409
CONSTRUCT 60' DIAMETER STORM SEWER MANHOLE -TYPE
409
ADJUST EXISTING FRAME AND RING CASTING
RECONSTRUCT EXISTING MANHOLE
CONSTRUCT SANITARY MANHOLE (4' DIA. - TYPE 301)
CONSTRUCT SANITARY MANHOLE EXTRA DEPTH (> 8' DEPTH)
01
0
CO
MMM
0
4)
N
MM
0
CO
0
4)
N
0
CD
0
(0
N
M
0
CO
M
0
4)
N
M
0
CO
C7
0
4)
N
CO
0
CO
M
0
10
N
0101
0
O
(h
0
4)
N
000
(O
Met
0
4)
N
CO
0
4)
N
CO
et
0
IA
N
N
0
CO
4
0
47
N
N
0
CD
V
0
ID
N
N
0
O
K
0
(0
N
N
0
(D
V
0
43
N
N
00
CO
4
0
10
N
NN
CO
4
0
01
N
0
CO
et
0
0
N
NN
0
CO
of
0
(A
N
000
CO
V'
0
4)
N
NM
(O
4
0
4)
N
0101
0
COO
V' V'
0 0
4) (0
N N
0
(D
V'
0
4)
N
M
0
(D
V'
0
4)
N
4)
0
CD
V'
0
N
N
co
0
(0
V'
0
(C
N
0
4)
(0
0
(0
N
N
0
(0
(0
O
(0
N
2506.502
2506.502
2506.502
2506.502
2506.502
01
04
CO
CD
N
MIN
000
M 0
0 CD
N N
2506.603
CO
'V
'.V
VO'
VV''
CO
Oet
100
(A
((0 Cg
01 LO
(4A
41
IOC
I(0
(MC
(0
COD
(r0
(NO
CO ((0
((00
CO O
((00
((00
COO
^O
n
n
h
n
ti
n CO
n
UUMMISSIUN NO. iZ U -U:i
ENGINEERS • ABG ITFCIS - PLANNERS
BIDS OPENED: JUNE 3, 2003, AT 10 AM
*DENOTES ERROR IN BIDDERS CALCULATION
MN /DOT ENGINEER'S ESTIMATE F.M. FRATTALONE ARGON CONSTRUCTION
ITEM SPEC. UNIT TOTAL UNIT TOTAL UNIT TOTAL
NO. NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
p op oo
CO N
V'
inrnmhrmh
r CO
di 69
pp
to
O
er
d9
op
O
M
CD
di
0000
U)
'V'
QO
69
41
N
d9
O7
N
r
di
CO
r7_OCOCDh0107v_r
N
d9
0000n000�rn
oOhN
to
r
49
0
0
r
69
0
CD
d9
to
r
d9
007CON
O
69
O
di
CD
CV
69
°vornpop0000colCDCDoo
7
r
E9
N
r
d9
C7
N
69.
C
O
LO.
r
d9
OOO
O
COtnhCO
d9
O
CO
d9
In
0
d}
N0O
h
r
di
N
CD
69
0
.-°
h
04
69
07
Co
CD
69
o,
h
O
°
CO
69
a
t0
to
tD
r
6A
0000
ocmoo
Oih
CO C)
40 di di
0
C7)
69
1 $ 85.00
00
00
too
N 0
r
49 49
1 $ 19.50
0 0
o on
00
N O
0
d9 d9
In
N
di
0007
03
N
419
007,mroe000oh
4707
CD C!)
69 619
r
di
N0
o
69
00
69
h 00000
O 000 r
O ut. CI O N
r CI
di di di d9 40 di
$ 125.00 1
0tC)
cc!
rr
d9
69
0
o
di
$ 880.00
$ 75,888.00
$ 4,960.00
co
0
to
CA
d9
00'SPt'£ - $ 1
$ 625.00
$ 875.00
$ 2,184.00
$ 1,450.00
$ 37,800.00
�
O
CO
CO
49
6 1,652.00
700.00
300.00
v
CD
O
N
d9
cc
'Cr
7
r
di
CV
N
7_
r
63
6 2,131.92
625.00
345.00
6 6,200.00
i 19,750.00
i 14,418.60
i 3,920.00
i 27,000.00
i 6,993.00
h
CD
co.
M
di
N
N
Ch
r
di
.,, .,r
or 49 w di E9 WS' d9
arr d9
$ 40.00
$ 7.20
$ 32.00
$ 35.60
6 85.00
6 125.00
6 25.00
'00,00
CD a)
r O
CI
21.75
i 28.00
i 35.00
i 50.00
$ 14.44
$ 0.32
CCOO otoo 00r000
N r 0 COON COOrr
CD N N
CO
4969 d9696i 49 C9 d) di di
$ 790.00
.., ..,
d, 69. 69
lir or 69 dim
1,540.00
6 84,320.00
6 5,270.00
6 11,676.00
6 1,850.00
6 500.00
6 1,225.00
6 5,600.00
500.00
6 20,000.00
6 7,825.00
6 1,475.00
800.00
420.00
0 0
00
7 CO
010
OC+7
7r
1,422.00
i 3,240.00
775.00
480.00
i 1,000.00
i 19,750.00
i 13,732.00
i 1,960.00
I 37,500.00
i 19,980.00
0
0
0
O
O.
7
69
0
O_
tD
7
U)
7
dT
_, _,
.,,
.,, .,,
or
di err
69 69
w d9 or yr di 69 ar art rrt di
$ 70.00
$ 8.00
$ 34.00
$ 42.00
$ 50.00
$ 100.00
$ 35.00
6 50.00
10.00
6 20,000.00
6 25.00
6 25.00
6 40.00
70.00
i 28.00
0.30
0000000'410
I ^O C.-CD 41 NCh
r O N
r
d9 d9 d9 69 69 di d9 d} 69 69
0
pO
O
r
d9
_, _,
wa .. di d3
Cr, di
Q
UJU)OW
WJJJ-I
V)C)W W
LL LL
JcoQJWCJ)cn
Q LU
22
10540
155
278
37
c1 m T O r
r
313
59
20
6
143
4520
9480
216
1
30
1
79
6866
49
15000
6660
4.3
RANDOM RIPRAP CLASS III
CONCRETE CURB AND GUTTER DESIGN B618
6' CONCRETE DRIVEWAY PAVEMENT
8' CONCRETE DRIVEWAY PAVEMENT
INSTALL MAIL BOX SUPPORT
MAIL BOX SUPPORT
SALVAGE & REINSTALL STEEL PLATE BEAM GUARDRAIL
WOODEN FENCE
INSTALL SALVAGED FENCE
TRAFFIC CONTROL
SIGN PANELS TYPE C (INCLUDING POSTS & ASSEMBLY)
SIGN PANELS TYPE D (INCLUDING POSTS & ASSEMBLY)
INSTALL SIGN (INCL. POST & ASSEMBLY)
DELINEATOR TYPE (X4 -2)
PVMT MARK. 24" STOP LINE WHITE -POLY PREFORMED
PVMT MARK. 4" DOUBLE SOLID LINE YELLOW -PAINT
PVMT MARK. 4" SOLID LINE WHITE -PAINT
ZEBRA CROSSWALK- WHITE POLY PREFORMED
PEDESTAL FOUNDATION
1.25" RIGID STEEL CONDUIT
RELOCATE CROSSWALK WARNING FLASHER SYSTEM
TRANSPLANT TREE (3' CAL DECIDUOUS)
SILT FENCE, TYPE PREASSEMBLED
INLET PROTECTION
SODDING TYPE SALT RESISTANT
EROSION CONTROL BLANKET
SEEDING (INCL. SEED MIX 50B OR 60B, FERTILIZER, MULCH &
DISC ANCHORING)
TOTAL BID AMOUNT
2511.501
2531.501
2531.507
2531.507
2540.602
2540.602
2554.603
2557.603
2557.603
2563.601
2564.531
2564.531
2564.536
2564.550
2564.603
2564.603
2564.603
2564.618
2565.602
2565.603
2565.616
2571.541
2573.502
2573.602
2575.505
2575.604
O
0
CD
tri
h
N
N
N M 7
COOO O CD
to CO h CD CD O N M <f in CD h CO Co 0 0 0 0 0 0
CO on O co O rn O to co O W co co O) O)
O
r
0
r
hNN
0)
C
CO
(A
.td'0
N
h
D
ER
OOCON'r,crom000atoco
CO
N N
N N
CO
tR 63
O r •0 ‘3.. °CI C4 N"': 000n N
Cm Or Orr NN CO
N h '1'N. N CO N. CO CD O
O CO r Co CO CO r h CO CO N
rCO COr� C)'
CA ER 69 69 EA EA 49 ER 69 ER ER
$ 439.80
$ 7,545.76
$ 758.85
$ 172,185.00
$ 95,589.00
$ 82,652.66
$ 4,235.55
$ 22,340.59
$ 10,074.60
$ 150,120.00
$ 65,853.00
$ 19,332.50
O
n
O
h
h
et
ER
$ 10,875.00I
$ 2,481.60
$ 4,118.10
$ 1,621.66
$ 8,227.84
$ 82,290.63
$ 26,667.90
$ 1,588.381
$ 75,397.78
1
$ 264.19
CA 0
r c D
r
N r
E9 ER
0 h h <1' 0 r V (D CC') N
C CD r " Cn N c l 7 r Lc) N in
m CCi O N N (V CC; O Ch hN
r . N N CO
EA 44. 69 E9 63 EA fR 69 di 69 ER
CO rY h CO CO
Cn et!� C O C
C[). -CO aia
N m to
r r
EA 69 ER EA fA
CO Cn O) c,
OC7Oh
a) h ca
r 0
O
69 ER 69 EA
12.51
32.52
i 35.15
N Co
C n N
h
C)
ER ER
$ 2.82
$ 686.35
$ 810.83
$ 16.07
$ 30.11
$ 32.13
$ 34.90
$ 9,225.19
o
M
fR
$ 23.02 1
N CO Cn
r Cp
NN CO
Eli ER EA
err err tn.
COMMISSION NO. 12390 -03
BIDS OPENED: JUNE 3, 2003, AT 10 AM
*DENOTES ERROR IN BIDDERS CALCULATION
MN /DOT BARBAROSSA & SONS NORTHDALE CONSTRUCTION
ITEM SPEC. UNIT TOTAL UNIT TOTAL
NO. NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT
$ 91,345.00
0
-
CO
64
$ 20,850.00
1{j $ 7,980.00
$ 450.80
1,540.00
1,060.00
1,544.00
41,632.00
2,000.00
1,900.00
900.00
3,800.00
1,344.00
3,381.06
537.60
2,000.00
2,500.00
121,095.00
51,180.75
74,636.94
3,800.67
9,453.00
9,500.00
130,800.00
72,596.25
25,393.50
n 00.
CD 0
m CO
n +0'
FR ER
o
Ov.N -0 CCO -
-
OCOD CD
w. r� Cl o
.-CO .-Er
di ER ER 64 - -
$ 32,490.04
$ 2,375.00
$ 5,458.50
$ 3,734.97
$ 36,363.00
$ 27,945.70
$ 46,630.74
_. _, or
or sr" IR err err
ER ER ER EA d! err err
$ 91,345.00
1 $ 250.00
$ 150.00
$ 10.00
$ 1.61
$ 10.00
$ 10.00
$ 1.00
$ 2.00
$ 500.00
$ 100.00
$ 6.00
$ 4.00
$ 26.88
$ 91.38
$ 26.88
$ 500.00
$ 500.00
$ 6.21
$ 5.29
$ 9.87
$ 8.39
$ 3.00
$ 475.00
$ 10.90
$ 35.85
$ 46.17
$ 36.87
$ 10.54
$ 1.83
$ _ 560.02
$ 682.50
$ 7.97
$ 31.76
$ 36.02
$ 2,375.00
$ 181.95
$ 54.13
$ 58.65
$ 64.99
$ 74.49
■■
$ 67,000.00
1 $ 7,645.00
0 0
00
Lo co
O O
CO h
ER EA
$ 560.00
$ 1,540.00
$ 1,060.00
$ 926.40
$ 27,060.80
$ 1,200.00
$ 5,700.00
$ 750.00
$ 2,850.00
$ 1,250.00
$ 1,110.00
$ 400.00
$ 1,200.00
$ 250.00
$ 118,950.00
$ 50,310.00
$ 75,620.00
$ 3,624.00
$ 7,877.50
$ 3,000.00
$ 132,000.00
$ 64,800.00
$ 25,850.00
$ 62,775.00
$ 15,000.00
0 0 0 0 0
00000
Nat 0 T CO
CO CO O
r N e- Eli W
69 ER ER 69 E9
$ 27,390.00 1
$ 34,276.00
$ 1,500.00
$ 3,000.00
$ 5,313.00
$ 47,740.00
$ 33,110.00
$ 48,202.00
I 180
OO
O
Cho
69
0
If)
ER
0
0
CO
EA
$ 10.00
2.00
10.00
10.00
0.60
1.30
300.00
300.00
5.00
3.00
25.00
30.00
20.00
; 300.00
50.00
6.10
5.20
10.00
8.00
2.50
150.00
00'01 $
00'1£ $
00'LP $
OOZ£ $
00'11 $
$ 1.50
$ 440.00
$ 550.00
$ 10.00
$ 30.00
$ 33.00 1
$ 38.00
$ 1,500.00
$ 100.00
$ 77.00
$ 77.00
$ 77.00
$ 77.00
_.
. . r or 69 err err
or err ER to ER
ER 69. err er
J1.
--�JJ
JCp W JJJ W
W W W OOOO
SF
-��1- CO
0W W JJ
J
JW W JJJJ
'-
C)
C) N.
r
280
154
106
1544
20816
4
19
150
950
50
37
20
4
5
19500
9675
7562
453
3151
20
12000
2025
550
2025
1500
880
6
2
512
2733
830
902
1
30
69
620
430
626
1ELM STREET RECONSTRUCTION
p
1•-
NZZ
maw
OW)
200
Ur
GRUBBING
REMOVE PIPE (CULVERT OR STORM SEWER)
REMOVE CURB & GUTTER
REMOVE FENCE
REMOVE WATERMAIN
REMOVE CONCRETE PAVEMENT
REMOVE BITUMINOUS SURFACING
REMOVE MANHOLE OR CATCH BASIN
REMOVE CONCRETE APRON
SAWCUT CONCRETE PAVEMENT (FULL DEPTH)
SAWCUT BITUMINOUS PAVEMENT (FULL DEPTH)
SALVAGE FENCE
SALVAGE MAIL BOX SUPPORT
'SALVAGE SIGN (INCL. POST & ASSEMBLY)
SALVAGE HYDRANT
SALVAGE GATE VALVE & BOX
COMMON EXCAVATION (P)
POND EXCAVATION
U
0
OTC
0
m
¢
a
Cr
W
-)
TOPSOIL BORROW (LV)
CRUSHED ROCK 6" DEPTH (TRENCH STABILIZING)
EXPLORATORY DIGGING
AGGREGATE BASE CLASS 5
TYPE LV AGG. 3 WEARING COURSE (5)
TYPE LV AGG. 4 WEARING COURSE FOR TRAIL (B)
TYPE LV AGG. 3 NON- WEARING COURSE (B)
TYPE LV AGG. 4 WEARING COURSE 2" THICK FOR DRIVEWAYS
(B)
BITUMINOUS MATERIAL FOR TACK COAT
15" RC PIPE APRON W/ TRASH GUARD
21" RC PIPE APRON W/ TRASH GUARD
4" PERF PE PIPE DRAIN (W/ SOCK)
15" RC PIPE SEWER CLASS V DESIGN 3006
18" RC PIPE SEWER CLASS V DESIGN 3006 {
21" RC PIPE SEWER CLASS III DESIGN 3006
CONNECT TO EXISTING MANHOLES (SANITARY SEWER)
8 "X4" PVC WYE (SCHEDULE 40)
8° PVC, SDR 35 PIPE SEWER (10' -12' DEPTH)
8" PVC, SDR 35 PIPE SEWER (12' -14' DEPTH)
8" PVC, SDR 35 PIPE SEWER (14' -16' DEPTH)
8" PVC, SDR 35 PIPE SEWER (16-18' DEPTH)
0
in
NO
N
Nh
0
Cn
0
N
0
In
0
N
0
C0
V'
0
N
0
0
V'
0
N
0
(0
d'
0
N
0
Ca
sY
0
N
Cr)
0
III
'7
0
N
(4)OOrM
0
In
V
0
N
0
O
V
0
N
0
O
V
0
N
Cn
et
0
N
c0
a{
0
N
N
LC)
at
0
N
Cc)
N
LO
V
0
N
C+)
N
In
d'
0
N
C+)
N
U)
4
0
N
C+)
N
II)
4
0
N
0
CO
cfl
0
N
0
In
Clf
0
N
Ntn
N
In
c4i
0
N
N
in
Cn
0
N
M0
0
CO
cn
0
N
CO
Ch
N
N
2211.501
2350.501
2350.501
2350.502
2350.503
2357.502
2501.515
2501.515
V
0
N
0
N
"7
413
c•)
0
N
2503.541 1
4
CO
nO
0
N
NN
0 0
CO CD
vi C'6
0 0
N N
CO
0
CO
CO
0
N
CO
0
CO
Ci
0
N
2503.603
2503.603
r
N
C)
at
Lo
CD
h
to
O
0
r
..-
r
N
r
cc)
r
d-
r
0
r
CD
r
h
r
CO
r-
CO
r
O
01
01
N
01
(9
01
V
N
Cn
N
CD h
N N
CO
N
O
N
O
CO
CO
N
CO
c9
CO
cr
CO
in
CO
cD
CO
h co
C) CO
O)
CO
O
<C
t
N
$ 23,544.00 I
$ 11,954.68
ON
N
00
(A
r
EA
(')
N
<r
M
EA
I $ 1,638.52 I
CO
(1)
^
co
EA
I $ 4,586.58
W
r
N
co
(h
E9
0
N
r
r
(O"
E9
1 $ 1,798.24 I
$ 421.48
0
N
1A
M
N
EA
1 $ 1,105.58 I
N
1:
O)
1A
M
<1
EA
0
M
<}
<t
to"
EA
CO
1n
n
d'
in
N
69
to
Nf:
to
O
r
4/9
1!100
N
co.
r
EA
00(*)0)CD
O
N
N
N
EA
v
10
N
EA
N
to
to
r
(0
E9
O
(D
M
V
(0
EA
CO
M
(-.
1n
E9
"'
to
N
r
EA
d'
r
(
CO
co"
E9
<t
N
O
CO
r
0)
E9
N
O
CO
O
t0
r
69
I-
O
0)
O
CD
N
E9
vT
to
COD
CO.
r
69
0
r
(OD
to
t0
E9
0
CDO)N
0
h
C9
EA
0 0)
0 M
0 N
CO
r
69 E9
r
r
O
t0
EA
0
vtoo
EA
EA
I $ 67.34
$ 104.64
$ 0.52
a))
(000
O
EA
N
d.
EA
$ 301.63
$ 811.21
1 $ 1,798.24
1 $ 210.74
$ 588.15
$ 552.79
$ 726.62
$ 3,222.15
$ 82.18
$ 33.75
$ 20.25
$ 20.00
$ 12.62
$ 41.57
$ 20.83
$ 3.58
C
E9
$ 1,436.21
$ 1,531.54
$ 2,008.14
0
(OOD
N
69
$ 1,568.54I
$ 2,188.70
$ 464.45
$ 464.45
$ 1,659.39
ro
V9
TABULATION OF BIDS
ELM STREET RECONSTRUCTION
CITY OF LINO LAKES
COMMISSION NO. 12390 -03
BIDS OPENED: JUNE 3, 2003, AT 10 AM
*DENOTES ERROR IN BIDDERS CALCULATION
MN /DOT BARBAROSSA & SONS NORTHDALE CONSTRUCTION
ITEM SPEC. UNIT TOTAL UNIT TOTAL
NO. NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT
1 $ 36,158.40
t0
0)
CA
(0f
.O-
V9
$ 21,422.60
$ 40,533.90
$ 4,222.34
$ 15,209.37
$ 3,248.30
$ 1,950.00
$ 14,537.50
$ 1,659.99
t0
T.
0)
(0
E9
0 0
0 0
O1 N
M to
CD r
N r
69 EA
$ 4,491.18
$ 6,577.00
$ 6,531.70
$ 2,853.24
$ 3,172.26 I
$ 47,627.97
$ 33,660.00
$ 4,430.04
$ 4,110.15
$ 6,415.92
$ 1,529.78
$ 47,833.92 I
N
n
0
M
E9
N
0)
co
r
EA
$ 2,939.42I
m
VO
r
E9
$ 6,401.22 I
$ 1,400.16
$ 1,532.50
$ 17,888.971
0
V,
N
r
CA
1 $ 75.33
cc)
to
N.
EA
$ 91.16
6 122.83
$ 1.34
$ 15,209.37
6 3,248.30
6 150.00
6 1,453.75
6 1,659.99
000
CN
VT
6 659.75
6 576.00
6 748.53
i 3,288.50
i 210.70
92.04
34.86
i 37.77
19.80
I 58.29
24.91
4.02
$ 109.27
$ 1,406.88I
$ 1,484.62
$ 2,133.74
$ 2,939.42
$ 1,484.62
$ 2,133.74
$ 175.02
$ 766.25
$ 1,626.27 I
0
V.
r
49
E
_ _,
.., EA
sr" Err w w E9 E9 613. 69 EA E9
S
O
O
O
OV
EA
j$ 18,020.00
$ 19,975.00
$ 28,050.00
$ 3,151.00
$ 10,000.00
$ 1,700.00
$ 1,690.00
$ 10,000.00
$ 1,800.00
O
0000
0
M
69
O O
0 0
N O
Ch ,-
69. E9
$ 4,200.00
$ 6,400.00
$ 2,480.00
$ 775.00
$ 2,002.00
$ 31,525.00
$ 34,000.00
$ 3,800.00
$ 2,475.00
$ 3,192.00
$ 1,260.00
100'008'Oti $
$ 9,000.00
S
0
O
N
T
EA
S
00
(0
N
wi
$ 1,300.00
0
0
R
to
E9
$ 2,000.00
$ 1,600.00
$ 16,500.00
0
0
0
O
69
O
N
69
0
W
EA
$ 85.00
$ 85.00
$ 1.00
$ 10,000.00
$ 1,700.00
$ 130.00
$ 1,000.00
$ 1,800.00
0
0
E9
$ 800.00
$ 500.00
$ 700.00
$ 3,200.00
$ 80.00
$ 25.00
$ 22.00
$ 25.00
$ 20.00
$ 50.00
$ 15.00
$ 2.00
0
O
0)
E9
0
0
0
N
r
69
0
O
0
O
r
EA
$ 1,900.00
0
O
M
N
EA
O
O
(0
E9
0
0
m
r
E9
$ 250.00
$ 800.00
$ 1,500.00
0
0
0
E9.
J
-
LLLLLLLL(AWWWWWWWW
J
J J J J J
W WJJJJ(0m
J
W
W
W
W
W
W
WWW
J
480
NN
1
01
EL
1918
055
SEZ
9691
991
9L
OOLI
1921
16
15
15
9
*--.
(0
CD
[O
r
r
M
MN^
Or
18' PVC, SDR 26 PIPE SEWER (20' -22' DEPTH)
8' PVC, SDR 26 PIPE SEWER (22' -24' DEPTH)
8" PVC, SDR 26 PIPE SEWER (24' -26' DEPTH)
8' PVC, SDR 26 PIPE SEWER (26' -28' DEPTH)
TELEVISE SANITARY SEWER MAINS
WATER METERING MH
LOWER WATERMAIN
ADJUST VALVE BOX
CONNECT TO EXISTING WATERMAIN
HYDRANT
INSTALL GATE VALVE & BOX
INSTALL HYDRANT
6" GATE VALVE & BOX
8' GATE VALVE & BOX
16" GATE VALVE & BOX
1" CURB STOP & BOX
1" CORPORATION STOP
6' WATERMAIN DUCTILE IRON CL 52
8° WATERMAIN DUCTILE IRON CL 52
1 " TYPE K COPPER PIPE
16" WATERMAIN DUCTILE IRON CL52
INSULATION (4' THICKNESS)
DUCTILE IRON FITTINGS
CONSTRUCT CATCH BASIN -TYPE 402 EXTRA DEPTH (> 5'
DEPTH)
CONSTRUCT CATCH BASIN -TYPE 402
CONSTRUCT 48" DIAMETER CATCH BASIN MANHOLE -TYPE 406
CONSTRUCT 60" DIAMETER CATCH BASIN MANHOLE -TYPE 406
CONSTRUCT 72° DIAMETER CATCH BASIN MANHOLE -TYPE 406
CONSTRUCT 48' DIAMETER STORM SEWER MANHOLE -TYPE
409
CONSTRUCT 60' DIAMETER STORM SEWER MANHOLE -TYPE
409
ADJUST EXISTING FRAME AND RING CASTING
RECONSTRUCT EXISTING MANHOLE
CONSTRUCT SANITARY MANHOLE (4' DIA. - TYPE 301)
CONSTRUCT SANITARY MANHOLE EXTRA DEPTH (> 8' DEPTH)
2503.603
2503.603
2503.603
2503.603
2503.603
2504.601
2504.601
2504.602
2504.602
2504.602
2504.602
2504.602
2504.602
2504.602
2504.602
2504.602
2504.602
2504.603
2504.603
2504.603
2504.603
2504.605
2504.608
O
0
O
to
N
2506.502 1
2506.502
2506.502
2506.502
2506.502
2506.502
2506.522
2506.602
2506.602
2506.603
tD
<c
h
v
00 0) 0 N (0 (0
v v 1A 1n O 0 to (A
t0
to
t- 00
to (A
at O. N M V to CD h 03
to co to to CD CD CD CD CD CD
0)
CD
0
n
h
N
n
M
n
a
n
0
n
CD (0
t- N N.
0)
n
ldVrvuvuoQww IvW. ILJUV-.7
ENGINEERS - ARCHITECTS • PLANNERS
BIDS OPENED: JUNE 3, 2003, AT 10 AM
*DENOTES ERROR IN BIDDERS CALCULATION
MN /DOT BARBAROSSA & SONS NORTHDALE CONSTRUCTION FRIEDGES CONTRACTING
ITEM SPEC. UNIT TOTAL UNIT TOTAL UNIT TOTAL
NO. NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
CO
CO
r
49
1 $ 91,381.80
1 $ 6,155.05 1
0o
ChN
o
Tr
49
"i
69
$ 294.20
$ 843.15
1 $ 2,403.521
COC)
C7
U
r
64
1 $ 25,273.93 I
o
6
n
CD
49
1 $ 1,545.80 I
N
CO
00)
69
$ 288.30 1
o
t0
co
or
fR
$ 5,695.201
NrN-4-N.
CO
c'
CO
ON
69
6
V'
v
49
4
CD
N
49
to
030
69
00))'--
co
)
CO..
49
N
0)
M
OpmN�N
69
U),-Oo
O
N.
tD
69
cr)
CO
CO
69
o
0
V
64
0)
h
CO_
fA
00))
tp
CO
0)
()
49
N
CO
m
CO
69
Tr
CO
CO
49
CDN
CD
00
49
N.
0)
my
69
LO
C!)
Eft
43.05
58.84
24.09
6 21.46
r.•
C)
69
6 25,273.93
21.46
26.20
48.31
0+-N0
6'6
co
"-.-
11.32 1
T.0)
•NCO
64
�
49
"LP CO
COO
co_ r
ffs fts
$ 2.72(
$ 58.84
C•)C7
69
r
69
$ 922.55
_.
_.
_.
_.
...
69 .,
w
69
69 49
69
m
0
0
N-
•-
fA
$ 82,739.00
$ 5,713.30
$ 11,322.94
3,381.06
00),
n
co
69
6 3,762.50
6 2,347.52
G 1,559.00
LOn
m
O
N
M
0) o co O
1.: to cm
MN. N.
h r
322.50
CO 000
0) (0
c71M
N r-
1,516.80
2,291.76 1
00'999
00'09L
7,471.25 1
$ 4,246.25 1
$ 12,564.78
$ 5,267.50
o
or
O
N
69
m
IA
P.
49
n
COD
CO
49
$ 1,738,903.49I
_. _. _.
_.
_. _.
...
69 69 69
en
4A 64
m
CO.
Cts CO
vs
I $ 80.00
$ 7.85
$ 36.86
$ 40.73
CO
C7
CA
49
I $ 134.38
0 CO CO 0 CO 0 01
to a3 e-Cn C7r-CD
n 0 N Cr) 0 t'.
O N CO O N CO CO
03
69 49 69 49 69 64 f9
1$ 53.75 1
N V CO
CL)0).
C0 0 O
r
69 69 69
C0
0
r
64
$ 750.00 I
$ 18.50
$ 7,471.25
$ 53.75
CO
(0
r
64
$ 107.50 1
47
0)r
r
69
0)
r
to
Cn
N
0)
N
69
$ 1,320.00
$ 80,104.00
$ 5,115.00
$ 10,286.00
$ 3,145.00
o
Con
CD
EA
$ 2,100.00
$ 2,800.00
$ 1,750.00
$ 10,000.00
$ 6,886.00
$ 1,770.00
$ 700.00
°0
o
CO
4113.
$ 2,431.00
$ 1,808.00
$ 1,896.00
$ 2,592.00
$ 300.00
$ 300.00
0 °0
00 00)
0 CD
''0
ys 69
$ 13,732.00
$ 4,900.001
$ 30,000.00
$ 7,992.00
10)
CD
Ch
64
$ 1,576,445.70I
p
O
o
64694969QQ
COO o 0
n m m
1$__85.00
0
m
I-
6969
$ 60.00
$ 25.00
$ 35.00
$ 10,000.00
$ 22.00
$ 30.00
$ 35.00
1 $__- 50.00
$ 17.00
$ 0.40
$ 0.20
$ 12.00
$ 300.00
$ 10.00
$ 4,000.00
$ 110.00
$ 2.00
$ 100.00 1
o N
r
6949
$ 850.00
C�J�N
W
W
�J--IJ CAS W
QQ
W
J -I-1CO QJ
W
CO CO
0
N
10540
155
278
37
O
35
112
50
1
313
59
20
CD
143
4520
9480
216
1
30
1
79
6866
O)
15000
6660
4.3
!RANDOM RIPRAP CLASS III
CONCRETE CURB AND GUTTER DESIGN B618
6' CONCRETE DRIVEWAY PAVEMENT
8' CONCRETE DRIVEWAY PAVEMENT
INSTALL MAIL BOX SUPPORT
MAIL BOX SUPPORT
SALVAGE & REINSTALL STEEL PLATE BEAM GUARDRAIL
WOODEN FENCE
INSTALL SALVAGED FENCE
TRAFFIC CONTROL
SIGN PANELS TYPE C (INCLUDING POSTS & ASSEMBLY)
SIGN PANELS TYPE D (INCLUDING POSTS & ASSEMBLY)
INSTALL SIGN (INCL. POST & ASSEMBLY)
!DELINEATOR TYPE (X4 -2)
PVMT MARK. 24" STOP LINE WHITE -POLY PREFORMED
PVMT MARK. 4' DOUBLE SOLID LINE YELLOW -PAINT
PVMT MARK. 4' SOLID LINE WHITE -PAINT
ZEBRA CROSSWALK- WHITE POLY PREFORMED
PEDESTAL FOUNDATION
1.25" RIGID STEEL CONDUIT
RELOCATE CROSSWALK WARNING FLASHER SYSTEM
TRANSPLANT TREE (3' CAL DECIDUOUS)
SILT FENCE, TYPE PREASSEMBLED
INLET PROTECTION
SODDING TYPE SALT RESISTANT
EROSION CONTROL BLANKET
SEEDING (INCL. SEED MIX 50B OR 60B, FERTILIZER, MULCH &
DISC ANCHORING)
TOTAL BID AMOUNT
2511.501
2531.501
2531.507
2531.507
2540.602
O
D
N
2554.603
2557.603
2557.603
2563.601
2564.531
2564.531
2564.536
2564.550
2564.603
2564.603
2564.603
2564.618
2565.602
2565.603
2565.616
2571.541
2573.502
2573.602 1
2575.505
2575.604
2575.605
00
N CO
CO 00 00
7'
00
O
C%)
CD I, CO Cn O N
00 CO Cp 0 O) o CA
Ch
0
'ch in CO n o O) 0 0 0
CA rn o O CA (0
0
0 0
O
r
ULAWI IOOivry rvv. IL,] U -Ua
ENGINEERS •ARCHITECTS • PLANNERS
BIDS OPENED: JUNE 3, 2003, AT 10 AM
'DENOTES ERROR IN BIDDERS CALCULATION
MN /DOT S.R. WEIDEMA INC
ITEM SPEC. UNIT TOTAL UNIT TOTAL UNIT TOTAL
NO. NO. DESCRIPTION UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
ER
EA
ER
ER
ER
ER
ER
ER
ER
69
ER
ER
69696969
ER
69
ER
ER
K9
ER
ER
69 ER
ER
ER
ER
ER
69
ER
ER
ER
69
ER
ER
69
ER 69
ER
EA
ER
ER
ER
ER
ER
ER
ER
ER
64
69
ER
ER
ER
69
ER
ER
ER
ER
ER
EA
ER
ER
69
EA
ER EA
ER
ER
ER ER
fA
ER
ER
ER ER
ER
EA
ER
ER
ER ER
ER
ER
$ 88,250.00
0
O
10
T
ER
$ 5,560.00
o
•-
o
0�I
f,
ER
1,680.00
246.40
000
00
0)
00_
rNC
ER
v
o
v.
ER
co
vi
ER
1,000.00
0
0
(ri
m
N
ER
787.50
2,517.50
262.50
1,165.50
420.00
0
O
o
0
r
625.00
0
O
0
0
43,053.75
99,440.30
5,707.80
11,816.25
3,800.00
138,600.00
0
O
0
ti
m
O
EA
$ 24,805.00
$ 72,900.00
$ 29,325.00
00
v
CO
in
rd'
ER
O
o
h
m:
ER
$ 1,830.00 I-
$ 5,734.40
$ 69,964.80
$ 23,074.00
$ 27,375.70
$ 8,285.00 1
0
0
o
0
N
r
ER
$ 7,383.00
$ 66,340.00
000
o
o0)
OV
69
c'i
m
cci
CD
ER
__
_.
_.
_.
...
..r
177
07
69 w
EA
yr
69
va 69 ER EA
ER ER
1 $ 88,250.00
O
0
ER
$ 40.00
0)O
Oi
69.
for
ER
COD,c0')100
ER
�
ER
,-
ER
$ 2.10
O
N
69
$ 125.00
$ 5.25
$ 2.65
$ 5.25
$ 31.50
$ 21.00
_$ __. 250.0
$ 125.00
$ 5.00
$ 4.45
$ 13.15
$ 12.60
$ 3.75
0 rM
1-
ER EA
(n
ER
-0
t)i
V
69
0
)
0r
EA 69
a00
,-
fA
$ 745.00 1
$ 915.00 1
$ 11.20
$ 25.60
$ 27.80
$ 30.35
$ 8,285.0C
00000.
O
O
d'O
69
O O
000
00
ER ER
O
EA
O
0
EA
- II-I
-J
J
J
JN�
W
4-LL.(J
J¢W
W
W
UUUU -(S
I• -
I• -I-
I- 0)
0W
W
JJ J JW
1.0
-I J
JJ
,-00000
r
M
r
CD
^
Cp
N
154
O''
0
Cr
(4)
20816 _
CO
150
950
50
37
20_
'V
O
19500
9675
7562
453
3151
000Z I.
OZ
2025
550
2025
1500
0
CO
CD
N
512
2733
830
902
r
000
M
(D N
CO
0
M
d'
626 1
ELM STREET RECONSTRUCTION
REMOVE PIPE (CULVERT OR STORM SEWER)
REMOVE CONCRETE PAVEMENT
REMOVE BITUMINOUS SURFACING
REMOVE MANHOLE OR CATCH BASIN
REMOVE CONCRETE APRON
SAWCUT CONCRETE PAVEMENT (FULL DEPTH)
SAWCUT BITUMINOUS PAVEMENT (FULL DEPTH)
SALVAGE MAIL BOX SUPPORT
SALVAGE SIGN (INCL. POST & ASSEMBLY)
SALVAGE GATE VALVE & BOX
COMMON EXCAVATION (P)
SELECT GRANULAR BORROW (CV) (P)
)
CRUSHED ROCK 6" DEPTH (TRENCH STABILIZING)
3
3S 5
TYPE LV AGG. 3 WEARING COURSE (8)
TYPE LV AGG. 4 WEARING COURSE FOR TRAIL (B)
TYPE LV AGG. 3 NON - WEARING COURSE (B)
TYPE LV AGG. 4 WEARING COURSE 2' THICK FOR DRIVEWAYS
(B)
BITUMINOUS MATERIAL FOR TACK COAT
15" RC PIPE APRON W/ TRASH GUARD
21" RC PIPE APRON W/ TRASH GUARD
4" PERF PE PIPE DRAIN (W/ SOCK)
15" RC PIPE SEWER CLASS V DESIGN 3006
18" RC PIPE SEWER CLASS V DESIGN 3006
21" RC PIPE SEWER CLASS ID DESIGN 3006
CONNECT TO EXISTING MANHOLES (SANITARY SEWER)
8'X4" PVC WYE (SCHEDULE 40)
3" PVC, SDR 35 PIPE SEWER (10' -12' DEPTH)
3" PVC, SDR 35 PIPE SEWER (12' -14' DEPTH)_
8" PVC, SDR 35 PIPE SEWER (14' -16' DEPTH)
8" PVC, SDR 35 PIPE SEWER (16' -18' DEPTH)
2021.501
N
O
N
2101.507
2104.501
2104.501
2104.501
O
N
2104.503
2104.505
2104.509
2104.509
2104.511
2104.513
2104.521
2104.523
2104.523
2104.523
2104.523
2105.501
2105.501 I
2105.522
2105.525
2105.603
2123.610
2211.501
2350.501
O
N
2350.502
2350.503
2357.502
2501.515
2501.515
2502.541
2503.541
2503.541
2503.541
2503.602
2503.602
2503.603
2503.603
2503.603
2503.603
r
N
CO
Cr
co
c0
n
co
O
O
r
N
M
d'
(o CD
n
m
CO O r N M! O
N N N N N N
0
N
f,.
N
CO CO
N N
0
CO
M
N
CO
M Co CD
CO CO M M
1•
CO
CO
CO
O) 0
M 7
V'
N
'a
FR
E9
E9
E9
E9
E9
E9 ER
E9
69.
E9
E9
E9
E9
ER.
ER
fit
E9
Eft
E9
69
ER
E9
E9
E9
E9
1
E9
1
69
I
E9
1
E9
1
VI
1
.9
1
E9
1
ei
1
63.
I
E9
1
69.
GUMMISJIUN NU. 1ZJW -UJ
ENGINEERS "ARGI
BIDS OPENED: JUNE 3, 2003, AT 10 AM
'DENOTES ERROR IN BIDDERS CALCULATION
MN /DOT S.R. WEIDEMA INC
ITEM SPEC. UNIT TOTAL UNIT TOTAL UNIT
NO. NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE
EA
EFT
CO
64
E9
E9
ER E9
E9
E9
E9
E9
E9
Eft
E9
E9
69.
E9
E9
69
E9
E9
E9
Efl
E9
E9
1
E9
I
E9
1
E9
1
69
I
E9
I
E9
1
GA
E9
1
E9
1
E9
1
E9
$ 3,424.00
$ 15,594.40
$ 18,954.00
$ 77,760.00
$ 34,344.00
$ 38,070.00
$ 53,460.00
$ 1,733.05
0
0
O
o
T
E9
1 $ 3,170.00
O
O
O
CO
N
E9
oo
o
tD
t`t
C]r
E9
to
ti
E9
1 $ 450.00
O V
O C]
a0 N
90
CV
di 69.
$ 4,200.00
$ 6,800.00
$ 775.00
$ 2,170.00
$ 2,288.65
32,029.40
00
to
v
r-
CD
T
64
$ 4,408.00
$ 4,372.50
$ 4,788.00
$ 1,260.00
q
O
10
o
10
s'
�
$ 8,880.00I
O
O
10
t`
7-
T
�'
$ 2,825.001
$ 1,495.00
0
IO
o
CI)
O
O
o
N
69
$ 1,690.00
$
Io
n.
O
64
o
O
O
0
64
0 o7
1.0
r
6464
$ 162.00
$ 162.00
$ 162.00
$ 162.00
O tO
N O
E9 Eft
9,000.00
OO
d
T
CO
o
1,075.00
O
r
i 225.00
720.00
510.00
4�
O 04 Or t
o d N 0 10 N
"Eh.
CO
69491.64 69640969E96364.
C)Otoo
o 00 N DM
O
0
E9
$ 1,325.00
$ 1,480.00
$ 2,220.00
$ 2,825.00
$ 1,495.00
O
N
EA
$ 250.00
$ 845.00 1
$ 1 ,795.00 1
O
0
E9
_.
Vt
E9
...
6%
6.764
ow
J J
J J
J J
J J-J
J
W
W
W
W
W W
W W W W J J
J J C
J
W
W
W
W
W
W
W
W
J
32
1544
t.CN
rCON
212
235
330
3151
Tr
1 13
OTN`CC04
T
CON CD CD to CD
MCI CA CO Oh CD CA
.N -T r 40
T
V
r
34 J
CD
CO
r
T
CO
CONr
r
8" PVC, SDR 35 PIPE SEWER (18' -20' DEPTH)
4' SANITARY SERVICE PIPE (SCHEDULE 40)
8" PVC, SDR 26 PIPE SEWER (18' -20' DEPTH)
8" PVC. SDR 26 PIPE SEWER (20' -22' DEPTH)
8" PVC, SDR 26 PIPE SEWER (22' -24' DEPTH)
8" PVC, SDR 26 PIPE SEWER (24' -26' DEPTH)
8° PVC, SDR 26 PIPE SEWER (26' -28' DEPTH)
TELEVISE SANITARY SEWER MAINS
CONNECT TO EXISTING WATERMAIN
1_
INSTALL HYDRANT
K
K
1" CURB STOP & BOX
6' WATERMAIN DUCTILE IRON CL 52
8° WATERMAIN DUCTILE IRON CL 52
16' WATERMAIN DUCTILE IRON C1_52
INSULATION (4" THICKNESS)
DUCTILE IRON FITTINGS
CONSTRUCT CATCH BASIN -TYPE 402 EXTRA DEPTH (> 5'
DEPTH)
CONSTRUCT CATCH BASIN -TYPE 402
CONSTRUCT 48" DIAMETER CATCH BASIN MANHOLE -TYPE 406
CONSTRUCT 60' DIAMETER CATCH BASIN MANHOLE -TYPE 406
CONSTRUCT 72' DIAMETER CATCH BASIN MANHOLE -TYPE 406
CONSTRUCT 48' DIAMETER STORM SEWER MANHOLE -TYPE
409
CONSTRUCT 60" DIAMETER STORM SEWER MANHOLE -TYPE
409
ADJUST EXISTING FRAME AND RING CASTING
RECONSTRUCT EXISTING MANHOLE
CONSTRUCT SANITARY MANHOLE (4' DIA. - TYPE 301)
DONSTRUCT SANITARY MANHOLE EXTRA DEPTH (> 8' DEPTH)
z
Q
Q
0
i
Z
2503.603
2503.603
2503.603
2503.603
2503.603
2503.603
O 000
CD 10 CO CD
CO CO t v
O O O O
LO t0 10 LO
N N N N
2504.602
2504.602 1
CV
CD
v
O
t0
N
CO
st
O
to
N
2504.602
2504.602
2504.602
2504.602
2504.602
2504.602
2504.603
2504.603
2504.603
2504.603
2504.605
2504.608
100
CO
O
t0
04
2506.502 1
2506.502
N
LC)
CO
O
10
N
N
lO0
CD
O
10
N
N
100
CD
O
N
N
2506.502
2506.522
2506.602
2506.602
0
COO
CD
O
(I)
N
tI V V v O vv
v 53251
50
d
t0
t0
0
ti D Co
CA CO i N ID V O o O n fD
0D
O
n
7.:
to
n
C
1.
CO
n
V VIVIIVIIJJIMY IVV. 1COOL-VJ
ENGINEERS • ARCHITECTS - PLANNERS
BIDS OPENED: JUNE 3, 2003, AT 10 AM
*DENOTES ERROR IN BIDDERS CALCULATION
MN /DOT S.R. WEIDEMA INC
ITEM SPEC. UNIT TOTAL UNIT TOTAL UNIT TOTAL
NO. NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
49
69
Ea
49
49
64
E9
49
49
69
49
64
69
49
49
EH
M
49
49
d}
49.
49
vi
49
E9
e
49
�
49
69
6944
4949:
9949
69.
1/3.
49
69
4 9
69
49
63
49
49
65
49
49
69 69
69
6.694949
49
6A
1 $ 1,760.00
$ 81,158.00
t`
N
0
4R
$ 12,259.80
SO
1
In
r
69
0
C)
69.
6 1,925.00
6 2,352,00
6 1,575.00
6 21,000.00
0
(l7
CO
V
CD
6 1,486.80
i 1,000.00
300.00
3,753.75
I 1,808.00
I 1,990.80
I 2,840.40
OOOONO
C00)
r
63
COO 0
V' N
V'
49 40p9
OV
CD
CV
r
49
nN
CO.
r
r
6:69
$ 3,920.00 f
$ 31,500.00
$ 13,986.001
$ 3,397.00
$ 1,806,800.30 1.
__
__
_.
_.
_.
49
E9 49 or
49 or 63
w
p
O
O
0
69
(�
49
I $ 40.45
1 $ 44.10
1 $ 42.00
O
O
CO
ER
1 $ 55.00
$ 21.00
1$ 31.50
0
0
OO
.&
49
t0O
0
N
49
0 0 0
to 0 0
N (n W
49 49 fg
$ 26.25
$ 0.40
$ 0.21
$ 13.15
$ 130.00
$ 16.00
$ 4,200.00
0
0
v-
6.3
1 OE L
OO 0
O N
0
63 49
0
CV
49
$ 790.00
%-LL
0JCOu)W
i-
�-QQLt_LLLLCI)
WJJJ_1CACALLIW
U-
ILQQ
LL LL LL LLQLL s_wLLQ��
JJJCgWJ0
J
CJ
(/)
LLI
CC
0
N
1 10540
i
to
1 278
C,tOMTO
r1-
59
20
6
rr
d'040On(0pr r ``V N
V' CO
O
co
0
0
to
N
CO
0)
RANDOM RIPRAP CLASS III
CONCRETE CURB AND GUTTER DESIGN B618
6" CONCRETE DRIVEWAY PAVEMENT
8" CONCRETE DRIVEWAY PAVEMENT
INSTALL MAIL BOX SUPPORT
MAIL BOX SUPPORT
SALVAGE & REINSTALL STEEL PLATE BEAM GUARDRAIL
INSTALL SALVAGED FENCE
SIGN PANELS TYPE C (INCLUDING POSTS & ASSEMBLY)
SIGN PANELS TYPE D (INCLUDING POSTS & ASSEMBLY)
INSTALL SIGN (INCL. POST & ASSEMBLY)
DELINEATOR TYPE (X4 -2)
PVMT MARK. 24° STOP LINE WHITE -POLY PREFORMED
PVMT MARK. 4" DOUBLE SOLID LINE YELLOW -PAINT
PVMT MARK. 4" SOLID LINE WHITE -PAINT
ZEBRA CROSSWALK- WHITE POLY PREFORMED
1.25" RIGID STEEL CONDUIT
RELOCATE CROSSWALK WARNING FLASHER SYSTEM
TRANSPLANT TREE (3° CAL DECIDUOUS)
SILT FENCE, TYPE PREASSEMBLED
SODDING TYPE SALT RESISTANT
EROSION CONTROL BLANKET
ED MIX 50B OR 60B, FERTILIZER, MULCH &
7
2511.501
2531.501
2531.507
2531.507
2540.602
2540.602
2554.603
2557.603
2557.603 I
2563.601
M
t1)
CO
11)
N
2564.531
2564.536
2564.550
2564.603
2564.603
2564.603
2564.618
2565.602 1
2565.603
2565.616
2571.541 r
2573.502
2573.602 I
2575.505
2575.604
2575.605 1�
O
CO
0
N
CO
(7
0
V
CO
to
W
CO
O
(�
CO
CO
(O
O)
W
0
O
N M
0) O) (A
tO (O h (O CA 0
0) O (A Q) O) a,
0
0
0 0
0
co
AGENDA ITEM 7Biii
STAFF ORIGINATOR: James E. Studenski, City Engineer
COUNCIL MEETING DATE: July 14, 2003
TOPIC: Resolution No. 03 -99, Approving Right -of- Way /Easement
Acquisition, EIm Street Reconstruction Project
VOTE REQUIRED: Simple Majority
BACKGROUND:
Due to the deteriorating condition of EIm Street between Sunset Road and Grey
Heron Drive, the City Council authorized the preparation of plans and
specifications for the EIm Street Reconstruction project. As part of this project,
acquisition of additional right -of -way and drainage /utility easements is necessary
for the completion of the street and storm sewer construction.
City Staff was authorized payment of acquisition up to and equal to the amount
detailed in the attached appraisal dated April 22, 2003 for a total amount of
$153,415.00 on May 12, 2003. After the properties were re- appraised and
negotiations complete the total amount for acquisition resulted in a $3,775.00
increase for a total amount of $157,290.00. The increase resulted in revisions to
the following properties:
Property Address Previous Total Settlement
11 Elm Street $1,550.00 $2,200.00
7181 Sunrise Drive $1,600.00 $1,975.00
7180 Sunset Avenue $4,950.00 $7,000.00
17 EIm Street $1,800.00 $2,500.00
City Staff is requesting authorization for payment of acquisition for a total amount
of $157,290.00.
OPTIONS:
1. Adopt Resolution 03 -99, Approving Right -of- Way /Easement Acquisition, EIm
Street Reconstruction Project.
2. Not Adopt Resolution No. 03 -99.
3. Return to staff for further review.
RECOMMENDATION:
Option No. 1 - Staff recommends that Resolution No. 03 -99 be adopted.
CITY OF LINO LAKES
RESOLUTION NO. 03 -99
RESOLUTION APPROVING RIGHT -OF- WAY /EASEMENT ACQUISITION - ELM
STREET RECONSTRUCTION PROJECT.
WHEREAS, pursuant to resolutions of the Council adopted May 14, 2001, a study has
been prepared by the City Engineer, with reference to the improvement of Elm Street
Reconstruction by constructing Street, storm sewer, sanitary sewer and watermain
extensions, and
WHEREAS, pursuant to resolutions of the Council adopted October 28, 2002 and
January 13, 2003, authorizing the preparation of plans and specifications for the
Reconstruction of Elm Street, and
WHEREAS, the improvement consisting of construction of sanitary sewer, watermain,
storm sewer and street improvements is herein determined necessary to provide for
safety of the public, and
WHEREAS, permanent easements and fee simple interests over certain lands are
required to provide for said construction, and
WHEREAS, Lino Lakes has authority to acquire right -of -way for said improvements
pursuant to Minnesota Statutes.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
LINO LAKES, MINNESOTA:
1. Authorizes the payment of acquisition of right -of- way /easements for a total
amount of $157,290.00.
Adopted by the Lino Lakes City Council this 14th day of July 2003.
John J. Bergeson, Mayor
Ann Blair, City Clerk
0
N
O
"O
ig 0.4
o
C/2
Review
Appraiser Value
I000`68$
el
�p
in
S
i�
69
•+P
O
.-i
6Q
I• .1
�(1
Cj'
p
/y�/
�J
wr
• '
•
SO
re
"' '
i9 ,
O
4,
.
.
i��
041
d3 .
O
O
N .
6A
n�i
tel
ti
69
'b
N
C�
r+ iZ
0 At
00
69
g
N
co •
49
O
O
'Q'
iR
O
y�
•,:
69
outs 1
69
O
N
49 ,
O
O
e
w
69
O'
O•
eI '.
d9
649
vO� •
�p '
69..
O
'..
4'.
O. :
.
f g •4
•
G
C
•
to
N
90
!P
i3
202 Elm St.
•
t
its •
mi
g
8851 Hastings Circle NE
Blaine MN 55449
7164-Sunset Avenue
.Circle Pines, MN 55014
171 EIm St. PO Box 187
Circle Pines, MN 55014
11 Elm Street
Lino Lakes, MN 55014 .
1 7181 Lakeview Drive-
Circle Fines, MN 55014
7181:Sunrise Drive
Circle Pines, MN 55014
7180 Sunset Avenue
Circle Pines, MN 55014 .
17-Elm Street . .
=Lino takes, -MN-55014 ._
.7172 Sunset Avenue . •
Circle Pines, Ml`I 53014. •
Circle pines, MN 55014
298 Elm Street • •
Lino Lakes; MN 550i4
Bob Evianika .
414-Nicollet Mall
Minneapolis, MN 55401 •
183122430019
193122220023
193122120002 .
183122330050
193122220039
o
193122220020
193122220021
183122330051
CS
0 p
tvl
ON
r
183122330059.-
•
di•
111
a.
z
10
4
Ra
›
•
�o
.
Ot.
,
v�
En
1
P4
C7
173
•
t
v
•
Cottage Homestead
of Willow Ponds
SUB TOTAL:• • •
Z0 3Jtld f 2S d0'13A3a NOS1IM
9L968t' t9 93 :VI £003 /33/1,0
AGENDA ITEM 7Biv
STAFF ORIGINATOR: James E. Studenski, City Engineer
COUNCIL MEETING DATE: July 14, 2003
TOPIC: Resolution No. 03 -110, Accepting Permanent Easements, Elm
Street Reconstruction Project
VOTE REQUIRED: Simple Majority
BACKGROUND:
Due to the deteriorating condition of Elm Street between Sunset Road and Grey
Heron Drive, the City Council authorized the preparation of plans and
specifications for the Elm Street Reconstruction project on October 28, 2002. As
part of this project, negotiations with all the property owners for the acquisition of
additional right -of -way and drainage /utility easements necessary for the project
have been completed.
City Staff is requesting acceptance of all easements required for the completion
of the sanitary sewer, watermain, street and storm sewer construction detailed in
the attached summary table dated March 6, 2003.
OPTIONS:
1. Adopt Resolution 03 -110, Accepting Permanent Easements, Elm Street
Reconstruction Project.
2. Not Adopt Resolution No. 03 -110.
3. Return to staff for further review.
RECOMMENDATION:
Option No. 1 - Staff recommends that Resolution No. 03 -110 be adopted.
CITY OF LINO LAKES
RESOLUTION NO. 03 -110
RESOLUTION ACCEPTING PERMANENT EASEMENTS - ELM STREET
RECONSTRUCTION PROJECT.
WHEREAS, pursuant to resolutions of the Council adopted May 14, 2001, a study has
been prepared by the City Engineer, with reference to the improvement of EIm Street
Reconstruction by constructing Street, storm sewer, sanitary sewer and watermain
extensions, and
WHEREAS, pursuant to resolutions of the Council adopted October 28, 2002 and
January 13, 2003, authorizing the preparation of plans and specifications for the
Reconstruction of Elm Street, and
WHEREAS, the improvement consisting of construction of sanitary sewer, watermain,
storm sewer and street improvements is herein determined necessary to provide for
safety of the public, and
WHEREAS, permanent easements and fee simple interests over certain lands are
required to provide for said construction, and
WHEREAS, Lino Lakes has authority to acquire right -of -way for said improvements
pursuant to Minnesota Statutes.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
LINO LAKES, MINNESOTA:
1. Accepts permanent easements required for the completion of the sanitary
sewer, watermain, street and storm sewer construction detailed in the
attached summary table dated March 6, 2003.
Adopted by the Lino Lakes City Council this 14th day of July 2003.
John J. Bergeson, Mayor
Ann Blair, City Clerk
•
W
• Z
CC Q W
N 0
Z Z
O J
N O
5 _
✓ 0
▪ m
1-- F
Z
W Z
2 O
W0
Q W
W cc
}• W
�F-
N
W 2
O
F- W
C'3
1
TKDA COMMISSION # 12390 -03
M
0
0
a
W
CC
a
851
C D
��
r
lf)
r
52423
2282
1680
crt;
r
1882
329
2426
D
°'
324
623
1246
01
83521
TYPE
Permanent Drainage Easement
Permanent Drainage Easement
Permanent Drainage Easement
Property Acquisition (Storm Pond)
Right of Way Acquisition '
Right of Way Acquisition
Right of Way Acquisition
Temporary Construction Easement
Temporary Construction Easement
[Temporary Construction Easement
Permanent Drainage Easement
Right of Way Acquisition
Temporary Construction Easement
Permanent Drainage Easement
Temporary Construction Easement
TOTAL ACQUISITION (S.F.)
ADDRESS
11 Elm Street
17 Elm Street
(Lot 11, Block 1, Willow Ponds Addn.
No Address
202 EIm Street
210 EIm Street
298 Elm Street
7180 Lakeview Drive
7181 Sunrise Drive
'7180 Sunset Road
7172 Sunset Road
7164 Sunset Road
7181 Lakeview Drive_
PARCEL
118-31-22-33-0050
118-31-22-33-0051
118-31-22-33-0059
118-31-22-43-0019
119-31-22-12-0002
119-31-22-12-0003
119-31-22-12-0035
119-31-22-22-0001
119-31-22-22-0020
19- 31 -22 -22 -0021
119- 31 -22 -22 -0022 1
co
N
O
O
N
CV
N
N
'En-
6
r
119- 31 -22 -22 -0039 1
AGENDA ITEM 7Ci
STAFF ORIGINATOR: James E. Studenski, City Engineer
COUNCIL MEETING DATE: July 14, 2003
TOPIC: Resolution No. 03 -100, Authorizing Execution of Development
Agreement, Century Farm North
Vote Required: Simple Majority
BACKGROUND:
The City Council approved the preliminary plat of Century Farm North on April
28, 2003 and authorized execution of a grading only development agreement on
May 27, 2003. Century Farm North Addition consists of 249 units of residential
development.
In accordance with the preliminary plat approval and City policy, staff has
prepared a Development Agreement the Century Farm North Development. The
agreement provides for the following:
1. Submittal by the developer of a Letter of representing 150 percent of the
development improvement costs to insure completion of the project in
accordance with the approved plans.
2. Deposit of a cash escrow to reimburse the City for costs incurred by the
City related to the development and improvements of the site and
developer improvements.
Century Farm Development, Inc. has reviewed the contract and is aware of the
conditions set forth.
OPTIONS:
1. Return to staff for further review.
2. Adopt Resolution Number 03 - 100, Authorizing Execution of Development
Agreement, Century Farm North.
3. Not adopt Resolution Number 03 — 100.
RECOMMENDATION:
• Option No. 2 - Staff recommends that Resolution Number 03 - 100 be adopted.
•
CITY OF LINO LAKES
RESOLUTION NO. 03 -100
RESOLUTION AUTHORIZING EXECUTION OF DEVELOPMENT AGREEMENT, CENTURY
FARM NORTH.
WHEREAS, the City Council approved the preliminary plat of Century Farm North on April 28,
2003, and a grading only development agreement on May 27, 2003, and
WHEREAS, the City's subdivision ordinance and conditions of approval require the execution of
a development contract, between the Developer and the City of Lino Lakes, prior to
commencement of site construction activities and final plat approval to insure satisfactory
completion of public improvements.
NOW, THEREFORE, BE IT RESOLVED THAT the Lino Lakes City Council approves the
Development Contract with Century Farm Development, Inc., for Century Farm North
Subdivision and authorizes the Mayor and City Clerk to execute such agreement on behalf of
the city.
Adopted by the Lino Lakes City Council this 14th day of July, 2003.
Ann J. Blair, City Clerk
John J. Bergeson, Mayor
•
•
•
nc
DEVELOPMENT CONTRACT
Century Farm North
THIS AGREEMENT made this 14th day of July, 2003, is by and between the City
of Lino Lakes, whose address is 600 Town Center Parkway, Lino Lakes, Minnesota, 55014, a
municipal corporation organized under the laws of the State of Minnesota, hereinafter referred to as
the "City ", and Century Farm North Development, Inc. whose address is 3157 Berwick Knoll,
Brooklyn Park, Minnesota 55443 hereinafter referred to as the "Developer ".
WHEREAS, the Developer has received preliminary plat approval from the City
Council for a plat of land within the corporate limits of the City known as Century Farm North,
hereinafter called "Subdivision ", said land is legally described to -wit
Lots 15, 16, 17, 18, 19 and 20, Block 1, LINO AIR PARK NORTH, according to the recorded
plat on file and of record in the Office of the County Recorder, Anoka County, Minnesota,
AND
Lots 13, 14, 15 and 16, Block 1, SUNSET OAKS, according to the recorded plat on file and of
record in the Office of the County Recorder, Anoka County, Minnesota,
AND
Lot 5, Block 1, SUNSET OAKS, except the West 184.18 feet thereof, according to the recorded
plat on file and of record in the Office of the County Recorder, Anoka County, Minnesota,
AND
Lot 1, Block 1, HIDDEN POND, according to the recorded plat on file and of record in the
Office of the County Recorder, Anoka County, Minnesota,
•
Development Contract
Century Farm North 7 -11 -2003
AND
Outlots B, C, and D, BEHM'S CENTURY FARM 5TH ADDITION, according to the recorded
plat on file and of record in the Office of the County Recorder, Anoka, County, Minnesota.
AND
The Southeast Quarter of the Northwest Quarter of Section 7, Township 31, Range 22, Anoka
County, Minnesota.
AND
That portion of vacated Pinto Lane which lies northwesterly of the centerline of Pinto Lane
together with that part of said vacated Pinto Lane which lies southeasterly of the centerline of
Pinto Lane as dedicated in BEHM'S CENTURY FARM 5TH ADDITION, and was accrued by
Outlot C, said BEHM'S CENTURY FARM 5TH ADDITION, according to the recorded plat on
file in the office of the County Recorder, Anoka County, Minnesota. That portion of said
vacated Pinto Lane is described as follows:
That part of Pinto Lane dedicated in BEHM'S CENTURY FARM 5TH ADDITION, Anoka
County, Minnesota, according to the recorded plat on file in the office of the County Recorder,
which lies easterly of a line commencing at the southwest corner of Lot 21, Block 3, BEHM'S
CENTURY FARM 5TH ADDITION; thence North 0 degrees 01 minutes 41 seconds East,
assumed bearing, along the westerly line of said Lot 21, 24.80 feet to the point of beginning;
thence continuing North 0 degrees 01 minutes 41 seconds East, 80.61 feet; thence along a
tangential curve to the left, 91.12 feet, said curve having a radius of 330.00 feet and a delta angle
of 15 degrees 49 minutes 12 seconds, to the westerly line of said Pinto Lane; thence northerly
along said westerly line of Pinto Lane to the northerly line of BEHM'S CENTURY FARM 5TH
ADDITION and there terminating.
AND
That part of vacated CARL STREET lying westerly of the Northerly extension of the East line of
Lot 17, Block 1, LINO AIR PARK NORTH, according to the recorded plat on file and of record
in the Office of the County Recorder, Anoka County, Minnesota and easterly of the northerly
extension of the westerly line of said Lot 16, Block 1, SUNSET OAKS, according to the
recorded plat on file and of record in the office of the County Recorder, Anoka County,
Minnesota.
AND
That part of vacated Laurie Avenue which lies within the above described properties. Said
vacation per Document No. 1462634.
page 2
•
•
Development Contract
Century Farm North 7 -11 -2003
AND
The Southwest Quarter of the Northwest Quarter of Section 7, Township 31, Range 22, except
those parcels described as follows:
Beginning at the Northwest corner of the Southwest Quarter of the Northwest Quarter of Section
7, Township 31, Range 22, thence South along the West line of said Southwest Quarter of the
Northwest Quarter of Section 7; a distance of 120 feet; thence East parallel with the North line of
the Southwest Quarter of the Northwest Quarter a distance of 360 feet; thence North parallel with
the West line of the Southwest Quarter of the Northwest Quarter to a point of intersection with
the North line of the said Northwest Quarter; thence Westerly along the North line of the
Southwest Quarter of the Northwest Quarter to the point of beginning, and also except: That part
beginning at the Southwest corner of the Southwest Quarter of the Northwest quarter of Section
7, thence East along the South line of said Northwest Quarter a distance of 285 feet; thence North
and parallel with the West line of the said Northwest Quarter a distance of 175 feet, thence West
and parallel with the South line of the said Northwest Quarter to a point of intersection with the
West line of said Northwest Quarter; thence South along the West line of said Northwest Quarter
to the point of beginning; and also except: That part of the Southwest Quarter of the Northwest
Quarter of Section 7, Township 31, Range 22, described as follows: Beginning at a point on the
West line of said Southwest Quarter of the Northwest Quarter distant 536 feet South of the
Northwest corner of said Southwest Quarter of the Northwest Quarter; thence East parallel with
the North line of said Southwest Quarter of the Northwest Quarter a distance of 1047 feet; thence
South parallel with the West line of said Southwest Quarter of the Northwest Quarter a distance
of 208 feet; thence West parallel with the North line; of said Southwest Quarter of the Northwest
Quarter a distance of 1047 feet to the West line of said Southwest Quarter of the Northwest
Quarter; thence North along said West line a distance of 208 feet to the point of beginning, and
also except:
That part of the Southwest Quarter of the Northwest Quarter of Section 7, Township 31, Range
22, described as follows: Beginning at a point on the West line of said Southwest Quarter of the
Northwest Quarter distance 328 feet South of the Northwest corner of said Southwest Quarter of
the Northwest Quarter; thence East parallel with the North line of said Southwest Quarter of the
Northwest Quarter a distance of 1047 feet; thence South parallel with the West line of said
Southwest Quarter of the Northwest Quarter a distance of 208 feet; thence West parallel with the
North line of said Southwest Quarter of the Northwest Quarter a distance of 1047 feet to the
West line of said Southwest Quarter of the Northwest Quarter; thence North along said West line
a distance of 208 feet to the point of beginning, Anoka County, Minnesota.
AND
Excepting the following described parcels of property:
That part of Section 7, Township 31, Range 22, Anoka County, Minnesota described as follows:
page 3
•
•
•
Development Contract
Century Farm North 7 -11 -2003
Commencing at the Southwest corner of said Southwest Quarter of the Northwest Quarter of
Section 7; thence North 00 degrees 27 minutes 22 seconds West on an assumed bearing, along
the West line of said Southwest Quarter of the Northwest Quarter of Section 7 a distance of
175.00 feet to the point of beginning; thence continuing on said bearing of North 00 degrees 27
minutes 22 seconds West along said West line of the Southwest Quarter of the Northwest
Quarter of Section 7 a distance of 150.00 feet; thence North 87 degrees 32 minutes 14 seconds
East along a line parallel with the South line of said Southwest Quarter of the Northwest Quarter
of Section 7 a distance of 759.5 feet; thence South 00 degrees 27 minutes 22 seconds East along
a line parallel with said West line of the Southwest Quarter of the Northwest Quarter of Section 7
a distance of 150.00 feet; thence South 87 degrees 32 minutes 14 seconds West along a line
parallel with South line of the Southwest Quarter of the Northwest Quarter of Section 7 a
distance of 759.50 feet to the point of beginning, subject to a county road over the West 33 feet.
AND
That part of Section 7, Township 31, Range 22, Anoka County, Minnesota described as follows:
Commencing at the Southwest corner of said Southwest Quarter of the Northwest Quarter of
Section 7; thence North 00 degrees 27 minutes 22 seconds West on an assumed bearing, along
the West line of said Southwest Quarter of the Northwest Quarter of Section 7 a distance of
325.00 feet to the point of beginning; thence continuing on said bearing of North 00 degrees 37
minutes 22 seconds West along said West line of the Southwest Quarter of the Northwest
Quarter of Section 7 a distance of 150.00 feet; thence North 87 degrees 32 minutes 14 seconds
East along a line parallel with the South line of said Southwest Quarter of the Northwest Quarter
of Section 7 a distance of 759.50 feet; thence South 00 degrees 27 minutes 22 seconds East along
a line parallel with said West line of the Southwest Quarter of the Northwest Quarter of Section 7
a distance of 150.00 feet; thence South 87 degrees 32 minutes 14 seconds West along a line
parallel with said South line of the Southwest Quarter of the Northwest Quarter of Section 7, a
distance of 759.50 feet to the point of beginning, subject to a county road over the West 33 feet.
WHEREAS, the Developer requested that the City construct and finance certain
improvements to service the subdivision; and
WHEREAS, the Developer is to be responsible for the installation and financing of
certain private improvements within the subdivision; and
WHEREAS, Minnesota Statute 429 provides a method for assessing the cost of City
installed improvements to the benefited property.
WHEREAS, the City Subdivision Ordinance and Minnesota Statute 462.358
authorize the City to enter into a performance contract secured by cash escrow or other security to
guarantee completion and payment of such improvements following final approval and recording of
final plat; and
page 4
•
•
Development Contract
Century Farm North 7 -11 -2003
NOW, THEREFORE, in consideration of the mutual promises of the parties made
herein,
IT IS AGREED BY AND BETWEEN THE PARTIES HERETO: that the
I. DESIGNATION OF IMPROVEMENTS
A. Improvements to be installed at the Developer's expense by the Developer as
hereinafter provided are hereinafter referred to as "Developer Improvements ".
B. Improvements to be installed by the City and financed by the Developer are
hereinafter referred to as "City Improvements ".
II. DEVELOPER IMPROVEMENTS
A. The Developer's Engineer shall prepare, at the Developer's expense, a grading plan,
street including CSAH 53 and utility plan, and a surface water management plan.
The Developer shall secure a contractor to install these improvements; said
contractor shall be approved by the City at its ABSOLUTE discretion. All
Developer Improvements shall require City inspection and approval and, where
appropriate, the approval of any other governmental agency having jurisdiction. The
Developer will construct and install at Developer's expense the following
improvements according to the following terms and conditions:
1. Grading Plan
a) A final site grading plan, including certified wetland delineation,
with maximum two -foot contours and cross sections as necessary
shall be submitted and approved by the City prior to
commencement of any site grading.
2. Erosion Control Plan
a) The Developer shall submit an erosion control plan, detailing all
erosion control measures to be implemented during construction.
Said plan shall be approved by the City prior to the commencement
of site grading or construction.
b) The Developer shall submit a turf establishment plan which details
topsoil placement, seeding, sodding, mulching, fertilizing and
watering. Said plan shall be approved by the City prior to the
commencement of site grading or construction.
page 5
Development Contract
Century Farm North 7 -11 -2003
3. Tree Preservation Plan
a) Developer will provide a tree preservation plan prior to any site
grading which shall be in accordance with the City Tree Preservation
Policy. Developer shall escrow for boulevard tree planting for each
side of a lot which abuts a street. The City Forester shall determine
species, size and location.
b) The Developer shall remove, dispose of, or treat all dead and
diseased trees in accordance with the City Forester's
recommendation before building permits will be issued.
4. Grading and Erosion Control Construction & Maintenance
a) Prior to the commencement of site grading and erosion control, the
Developer shall complete items II.A.l, lI.A.2, and II.A.3 as listed
above.
b) The Developer shall grade the site to within 0.2 foot of the grades
shown on the approved grading plan. No deviations will be allowed
unless a revised plan is submitted and approved by the City and all
other regulatory agencies.
c) All development shall conform to the natural limitations presented
by the topography and soil of the subdivision in order to create the
best potential for preventing soil erosion.
d) Erosion and siltation control measures shall be coordinated with the
different stages of development. Appropriate control measures as
required by the City shall be installed prior to development when
necessary to control erosion.
e) Land shall be developed in increments of workable size such that
adequate erosion and siltation controls can be provided as
construction progresses. The smallest practical area of land shall be
exposed at any one period of time.
f) Where the topsoil is removed, sufficient arable soil shall be set aside
for respreading over the developed area. The topsoil shall be
restored to a depth of at least four (4) inches and shall be of a quality
at least equal to the soil quality prior to development.
• B)
The Developer shall install four (4) inches of topsoil on all
boulevards and seed or sod as approved by the City. The Developer
page 6
•
Development Contract
Century Farm North 7 -11 -2003
shall make all necessary adjustments to the curb stops to bring them
flush with the topsoil prior to occupancy.
h) All disturbed areas shall be seeded.
i) The front 50 feet of the lots, the street right -of -way, storm water
storage ponds, and surface water drainage ways shall be graded prior
to commencement of utility construction.
j)
Drainage swales, ditches, storm water storage ponds and other high
risk erosion areas shall be protected from erosion.
k) All remaining grading must be completed prior to issuance of
building permits.
1) Protect streets from erosion deposits. This should include a
combination of roadside silt fences, roadside sod strips, catch basin
rock bale inlet protection, rock construction entrances, straw mulch,
and/or street sweeping.
m) The Developer's engineer shall certify, in writing with an as -built
survey, that all grading complies with the grading plan prior to
issuance of building permits.
5. Final street grading, subbase, gravel base, bituminous binder course, and
concrete curb and gutter.
6. Storm sewers when deten iined to be necessary by the City Engineer,
including all necessary laterals, catch basins, inlets and other appurtenances.
7. Sanitary sewer, laterals or extensions, including all necessary building
services and other appurtenances.
8. Water, laterals or extensions, including all necessary building services,
hydrants, valves and other appurtenances.
9. The Developer shall place iron monuments at all lot and block comers and at
all other angle points on boundary lines. Iron monuments shall be placed
after all street and lawn grading has been completed in order to preserve the
lot markers for future property owners. Lot corner irons on the back
property line shall be installed so that the top of the iron corresponds to the
finished ground elevation in accordance with the approved grading plan -
guard stakes shall be appropriately installed to mark these irons.
• 10. The Developer agrees to maintain, at all times before acceptance of the
streets by the City, an access road suitable for use by emergency, police and
page 7
•
•
•
Development Contract
Century Farm North 7 -11 -2003
fire department equipment. The adequacy of such road shall be the sole
determination of the City. Furthermore, such access road shall be located no
more than 150 feet from any structure built within the Subdivision.
11. The Developer shall promptly clear dirt and debris, within public right -of-
ways, and drainage and utility easements, resulting from construction by
the Developer, its purchasers, builders and contractors within five (5) days
after notification by the City. The Developer or its assigns shall be
responsible for all necessary street and storm sewer maintenance including
street sweeping, storm sewer cleaning, ditch cleaning and pond dredging,
resulting from the accumulation of said dirt and debris, until all
Certificates of Occupancy are issued. Warning signs shall be placed when
hazards develop in streets to prevent the public from traveling on same and
directing attention to detours. If and when the streets become impassable,
such streets shall be barricaded and closed. The Developer shall maintain a
smooth, hard driving surface and adequate drainage on all temporary streets.
12. Street Lighting:
a) Residential street lighting shall be owned by the City. Such street
lighting system shall be installed, operated, and maintained by the
electric utility company. City and electric utility company may enter
into a contractual agreement on the rate and maintenance of the
street lighting system.
b) It shall be the responsibility of the Developer to pay for street
lighting operation charges for the initial 15 months of operation of
the system.
13. The Developer shall dedicate to the City, prior to approval of the final plat,
at no cost to the City, all permanent or temporary easements necessary for
the construction and installation of the Developer Improvements. All such
easements required by the City shall be in writing, in recordable form,
containing such terms and conditions as the City shall determine.
14. The Developer shall be responsible for securing all site grading and
development approvals and permits from all appropriate Federal, State,
Regional and Local jurisdictions prior to the commencement of site grading
or construction and prior to the City awarding construction contracts for
public utilities.
15. The Developer shall make provision that all gas, telephone, cable TV and
electric utility designs be submitted to the City for review and approval prior
to construction of the streets. Following review and approval by the City,
the Developer shall insure that all installations comply with applicable City,
page 8
•
•
Development Contract
Century Farm North 7 -11 -2003
County and State design standards and show proof of security arrangements
with said utility companies.
16. Cost of Developer Improvements, description and completion dates are as
shown on Attachment A.
17. Construction of Developer's Improvements:
a) The construction, installation, materials and equipment shall be in
accordance with the plans and specifications approved by the City.
b) All of the work shall be under and subject to the inspection and
approval of the City and, where appropriate, any other governmental
agency having jurisdiction.
c) Prior to the acceptance of Developer Improvements by the City, the
Developer shall obtain final plat approval and record the final plat
which will dedicate all permanent easements necessary for the
construction and installation of the Developer and City
Improvements as determined by the City.
d) All construction debris and trash shall be properly disposed of at the
Developer expense and in a timely manner as determined by the
City.
18. CSAH 53 improvements shall be at the Developer expense. The Developer
must obtain all necessary approvals from Anoka County. The Developer is
responsible for acquiring any necessary right -of -way, temporary easements,
or permanent easements for the construction of the CSAH 53 improvements.
19. The Developer shall construct and pay for all improvements as described in
the landscaping plan.
20. The Developer shall make an application to FFMA for a Letter of Map
Amendment (LOMA) or Letter of Map Revision (LOMR) to revise the
existing Flood Plain maps consistent with the proposed grading plan.
21. Guarantee
a) Faithful Performance of Construction Contracts and Letters of Credit
(1) The Developer will fully and faithfully comply with all terms
and conditions of any and all contracts entered into by the
Developer for the installation and construction of all
Developer Improvements and hereby guarantees the
page 9
•
•
•
Development Contract
Century Farm North 7 -11 -2003
workmanship and materials for a period of one year
following the City's final acceptance of the Developer's
Improvements. Concurrently with the execution hereof by
the Developer, the Developer will furnish to, and at all times
thereafter maintain with the City, a cash deposit, certified
check, or Irrevocable Letter of Credit, based on one hundred
fifty (150 %) percent of the total estimated cost of
Developer's Improvements. An Irrevocable Letter of Credit
shall be for the exclusive use and benefit of the City of Lino
Lakes and shall state thereon that the same is issued to
guarantee and assure performance by the Developer of all the
terms and conditions of this Development Contract and
construction of all required improvements in accordance with
the ordinances and specifications of the City. The City
reserves the right to draw, in whole or in part, on any portion
of the Irrevocable Letter of Credit for the purpose of
guaranteeing the terms and conditions of this contract. The
Irrevocable Letter of Credit shall be automatically extended
for additional periods of one year from present or future
expiration dates unless thirty (30) days prior to such the City
Clerk or Administrator is notified in writing by certified mail
that the Letter of Credit will not be renewed.
b) Reduction of Escrow Guarantee.
(1) The Developer may request reduction of the Letter of Credit,
or cash deposit based on prepayment or the value of the
completed improvements at the time of the requested
reduction. Prior to the final acceptance of the Developer
Improvements the City shall require a Performance Bond or
Cash Escrow to cover the one -year warranty provisions of
the agreement. The amount shall be determined by the City
Engineer.
III. CITY IMPROVEMENTS
A. The City shall credit the Developer for the following described improvements to
serve the Subdivision on the terms and conditions herein set forth:
1. Storm sewer trunks.
2. Sanitary sewer trunks.
3. Water trunks.
page 10
•
•
•
Development Contract
Century Farm North 7 -11 -2003
B. The Developer shall reimburse the City for the following described improvements
to serve the Subdivision on the terms and conditions herein set forth:
1. Sanitary sewer trunks.
C. Construction Procedures
1. AU City Improvements above shall be instituted, constructed and financed as
follows: The City shall commence proceedings pursuant to Minnesota
Statute 429 and City Charter providing that such improvements be made and
assessed against the benefited properties. After preparation of preliminary
plans and estimates by the City Engineer, an improvement hearing, if
required by law, will be called by the City Council for the purpose of
ordering such City Improvements. After preparation of the final plans and
specifications by the City Engineer, bids will be taken by the City and
contract awarded for the installation of City Improvements under the City's
complete supervision.
D. Security, Levy of Special Assessments and Required Payment Therefore.
1. Prior to the preparation of final plans and specifications for the construction
of said City Improvements, the Developer shall provide to the City a cash
escrow or letter of credit in an amount equal to thirty -five (35 %) percent of
the total estimated assessments as established by the City Engineer. (See
Attachment B)
2. Said letter of credit or cash escrow including accrued interest thereon, may
be used by the City upon default by Developer in the payment of special
assessments pursuant hereto, whether accelerated or otherwise. Developer
must receive written notice and a reasonable opportunity to cure before City
draws on cash escrow for special assessments. That such cash escrow or
letter of credit shall remain in full force and effect throughout the term of the
special assessments, except, the amount of such escrow or letter of credit
may be reduced, upon the request of the Developer, at the City's option, but
in no event shall be less than 35% of the outstanding special assessments
against all properties within the Subdivision. The entire cost of the
installation of such City Improvements, including any reasonable
engineering, legal and administrative costs incurred by the City, shall be
assessed against the benefited properties within the Subdivision in
accordance with City policy existing the date of this agreement, in equal
annual principal installments plus interest on the unpaid installments at a
rate not to exceed the maximum allowed by law.
page 11
•
•
•
Development Contract
Century Farm North 7 -11 -2003
3. All related special assessments levied hereto shall be payable to the City
Clerk in semi- annual installments over fifteen (15) years commencing on
April 15 of the year after the levy of such assessment and on each September
15 and April 15 thereafter until the entire balance plus accrued interest is
paid in full unless paid earlier. In the alternative, the City, at its option, may
certify the entire assessment roll to the Anoka County Auditor for collection
with the Real Estate Taxes. In the event any payment is not made on the
dates set out herein, the City may exercise its rights granted hereunder for
such default. The Developer waives any and all procedural and substantive
objections to the installation of the City Improvements and the special
assessments, including but not limited to hearing requirements and any
claim that the assessments exceed the benefit to the property. In the event the
total of all City Improvements is less than originally estimated by the City
Engineer in his feasibility report, Developer waives any appeal rights
otherwise available pursuant to M.S.A. 429.081.
E. Required Payment of Special Assessments by Developer.
1. Developer, its heirs, successors or assigns hereby agrees that within thirty
(30) days after the issuance of a certificate of occupancy for a residence on a
lot located within the Subdivision which is assessed for the cost of such City
Improvements, the Developer, its heirs, successors or assigns, agrees, at its
own cost and expense, to pay the entire unpaid Cost of City Improvements
whether assessed or to be assessed under this agreement against such
property.
2. If a certificate of occupancy is issued before the special assessments have
been levied, the Developer, its heirs, successors or assigns shall pay the City
the sum of cash equal to one hundred twenty percent (120 %) of the
Engineer's estimate of the special assessments for such City Improvements
that would be levied against the property. Upon such payment the City shall
issue a certificate showing the assessments are paid in full. Notwithstanding
the issuance of said certificate, the Developer shall be liable to the City for
any deficiency and the City shall pay the Developer any surplus arising from
the payment based upon such estimate. Developer will be paid interest on
all assessments paid before the levy of such assessments by the City at the
bond interest rates paid by the City.
F. Acceleration Upon Default.
1. In the event the Developer violates any of the covenants, conditions or
agreements herein contained to be performed by the Developer, violates any
ordinance, rule or regulation of the City, County of Anoka, State of
Minnesota or other governmental entity having jurisdiction over the
Subdivision, or fails to pay any installment of any special assessment levied
page 12
•
•
Development Contract
Century Farm North 7 -11 -2003
pursuant hereto, or any interest thereon, when the same is to be paid
pursuant hereto, the City at its option, in addition to its rights and remedies
hereunder, after ten (10) days' written notice to the Developer, may declare
all of the unpaid special assessments which are then estimated or levied
pursuant to this agreement due and payable in full, with interest. The City
may seek recovery of such special assessments due and payable from the
security provided herein. In the event that such security is insufficient to pay
the outstanding amount of such special assessments plus accrued interest the
City may certify such outstanding special assessments in full to the County
Auditor pursuant to M.S. 429.061, Subd. 3 for collection the following year.
The City, at its option, may commence legal action against the Developer to
collect the entire unpaid balance of the special assessments then estimated or
levied pursuant hereto, with interest, including reasonable attorney's fees,
and Developer shall be liable for such special assessments and, if more than
one, such liability shall be joint and several. Also, if Developer violates any
term or condition of this agreement, or if any payment is not made by
Developer pursuant to this agreement the City, at its option, may refuse to
issue building permits for any parcel with the Subdivision for which the
assessments have not been paid.
IV. RECORDING AND RELEASE
A. The Developer agrees that the terms of this Development Contract shall be a
covenant on any and all property included in the Subdivision. The Developer agrees
that the City shall have the right to record a copy of this Development Contract with
the Anoka County Recorder to give notice to future purchasers and owners. This
shall be recorded against the Subdivision described on Page 1 hereof. City shall
provide to Developer upon payment of all the special assessments levied against a
parcel, a release of such parcel from the terms and conditions of this Development
Contract subject to provisions contained in this contract.
REIMBURSEMENT OF COSTS
A. The Developer agrees to establish a non - interest bearing escrow account with the
City in an amount determined by the City Administrator or his designee for the
payment of all costs incurred by the City related to the development of the
Subdivision and the Developer Improvements including, but not limited to, the
following (See Attachment B for breakdown of costs):
1. Plat Review Fee
2. Planner Review Fee
3. Administration - 3% Construction Cost
4. Engineering
page 13
•
Development Contract
Century Farm North 7 -11 -2003
a) Administration
5. Legal - Plat Review
6. Publications
7. Park Dedication Fee
8. Tree Preservation Policy
9. Street Lighting - Install/Operate
10. Traffic Signing Improvements
11. Boulevard Tree Planting
12. Street - Storm Sewer - Pond Maintenance
13. Sealcoating Fund
14. Aerial Photo Recovery Cost
B. If the above escrow amounts are insufficient, the Developer shall make such
additional deposits as required by the City. The City shall have a right to reimburse
itself from the Escrow upon notice to the Developer, with suitable documentation
supporting charge.
VI. BUILDING PERMITS
A. The Developer agrees that building permits may be issued upon approval of the
Final Plat by the City Council at which time all required Financial Security shall be
in place with the City.
B. The Developer further agrees that City Sewer, Water, Storm Sewer, and Bituminous
Base Construction of the Streets, temporary street signs, gas, electric, and telephone
will be completed prior to the issuance of building permits.
C. The Developer further agrees that an as -built survey certifying that all the grading
complies with the grading plan prior to issuance of building permits.
D. The Developer further agrees to make an application to rEMA for a Letter of Map
Amendment (LOMA) or a Letter of Map Revision (LOMR) to revise the existing
Flood Plain maps consistent with the proposed grading plan prior to issuance of
building permits.
E. Each lot must comply with erosion control measures to prevent any material from
leaving the lot. The City of Lino Lakes will not perform any requested inspections
on the lot until it complies to the erosion control requirements.
page 14
•
Development Contract
Century Farm North 7 -11 -2003
F. Each lot must have a City approved Certificate of Grading showing the as -built
survey prior to an issuance of a Certificate of Occupancy. It shall be the
responsibility of the Developer, its purchasers, builders or contractors to ensure
compliance with the grading plan.
VII. PHASING PLAN
A. The development shall be constructed in accordance with the approved phasing plan
as follows:
1. A total of 55.0 acres of MUSA shall be allocated for the project, and the
project's 249 residential units shall be developed in accordance with the
following phasing plan, which is illustrated on Attachment C:
Year
2003
2004
2005
2006
2007
total
MUSA acres to be
Allocated
15.3
11.4
13.5
5.4
9.4
55.0
Lots to be final platted
5 6
6 5
5 2
4 3
3 3
2 4 9
VIII. HOURS OF CONSTRUCTION ACTIVITY
A. All construction activity shall be limited to the hours as follows:
Monday through Friday 7:00 a.m. to 7:00 p.m.
Saturday 9:00 a.m. to 5:00 p.m.
Sunday and Holidays No working hours allowed
IX. OWNERSHIP OF IMPROVEMENTS
A. Upon completion of the work and construction required by this contract and
acceptance by the City, the improvements lying within the public easements shall
become City property without further notice or action.
X. INSURANCE
A. Developer or all its subcontractors shall take out and maintain until one (1) year
after the City has accepted the Developer Improvements, public liability and
property damage insurance covering personal injury, including death, and claims for
property damage which may arise out of the Developer's work or the work of his
subcontractors or by one directly or indirectly employed by any of them. Limits for
bodily injury and death shall be not less than Five Hundred Thousand and no /100
($500,000.00) Dollars for one person and One Million and no /100 ($1,000,000.00)
Dollars for each occurrence; limits for property damage shall be not less then Two
page 15
•
•
•
Development Contract
Century Farm North 7 -11 -2003
Hundred Thousand and no /100 ($200,000.00) Dollars for each occurrence; or a
combination single limit policy of One Million and no /100 ($1,000,000.00) Dollars
or more. The City, its employees, its agents and assigns shall be named as an
additional insured on the policy, and the Developer or all its subcontractors shall file
with the City a certificate evidencing coverage prior to the City signing the plat.
The certificate shall provide that the City must be given ten (10) days advance
written notice of the cancellation of the insurance. The certificate may not contain
any disclaimer for failure to give the required notice.
XI. REIMBURSEMENT OF COSTS FOR DEFENSE
A. The Developer agrees to reimburse the City for all costs incurred by the City in
defense of enforcement of this contract, or any portion thereof, including court costs
and reasonable engineering and attorneys' fees if the City prevails in such action.
XII. VALIDITY
A. If a portion, section, subsection, sentence, clause, paragraph or phrase in this
contract is for any reason held to be invalid by a court of competent jurisdiction,
such decision shall not affect or void any of the other provisions of the Development
Contract.
XIII. GENERAL
A. Binding Effect
1. The terms and provisions hereof shall be binding upon and insure to the
benefit of the heirs, representatives, successors and assigns of the parties
hereto and shall be binding upon all future owners of all or any part of the
Subdivision and shall be deemed covenants running with the land.
B. Notices
1. Whenever in this agreement it shall be required or permitted that notice or
demand be given or served by either party to this agreement to or on the
other party, such notice or demand shall be delivered personally or mailed by
United States mail to the addresses hereinbefore set forth on Page 1 by
certified mail (return receipt requested). Such notice or demand shall be
deemed timely given when delivered personally or when deposited in the
mail in accordance with the above. The addresses of the parties hereto are as
set forth on Page 1 until changed by notice given as above.
C. Final Plat Approval
1. The City agrees to give final approval to the plat of the Subdivision in
accordance with section VII upon execution and delivery of this agreement
page 16
•
•
•
Development Contract
Century Farm North 7 -11 -2003
and all required petitions, bonds, security, and documents including the
following:
a) Review and approval of a Homeowner's Association agreement,
which includes provisions for the operation and maintenance of all
signage and buffer areas.
b) Review and approval of informational brochure including Best
Management Practices with regard to buffer and wetland area
requirements.
c) Receipt of warranty deeds or dedication of all outlots proposed to be
conveyed to the City.
d) Detail of proposed wetland and buffer area signage.
e) Receipt of permanent easements covering temporary cul -de -sacs
lying outside dedicated right -of -way.
f) Receipt of Conservation Easements covering wetland buffer areas.
g)
A total of 55.0 acres of MUSA shall be allocated for the project.
The phasing plan will have 15.3 acres of MUSA in 2003 for 56
dwelling units.
h) The applicant provides documentation to the City that all applicable
runway safety requirements have or will be satisfied. The runway
safety zone requirements are hereby established as a zoning
restriction.
i) Specific hanger designs be submitted subject to City approval prior
to consideration of the final plat approval of the lots with the
hangers.
j)
The project is subject to all requirements of Anoka County regarding
access to Sunset Road/CR 53.
k) Additional right -of -way for Sunset Road/CR 53 shall be dedicated,
to total 60' from centerline, within all areas of the plat.
1) The airplane hangers in Lots 1 -4 and Lot 9, Block 4 (Phase 1) shall
be built on the runway side of the houses, with the houses fronting
on the road rather than the houses on the runway side of the lots.
page 17
•
•
•
Development Contract
Century Farm North 7 -11 -2003
m) Signs shall be installed along all wetland buffer /easement areas.
Wetland easements shall extend, at a minimum, 10 feet outward
from the delineated wetland boundary.
XIV. VIOLATIONSBUILDING PERMITS
A. In the event that Developer violates any of the covenants and agreements contained
in this Development Contract and to be performed by the Developer, the City, at its
option, in addition to the rights and remedies as set out hereunder may refuse to
issue building peanuts and/or Certificate of Occupancies to any property within the
Subdivision until such time as such default has been corrected to the satisfaction of
the City.
XV. PARK DEDICATION
A. Park dedication for Century Farm North shall consist of both land dedication and a
$103,821.00 park dedication fee.
XVI. PROPERTY TAXES
A. Should the recording of the Final Plat occur after July 1, any and all property taxes
on any public property dedicated as a part of this plat shall be the responsibility of
the Developer. Dollars shall be incorporated into the escrow agreement to cover the
cost of said property taxes.
page 18
•
•
•
Development Contract
Century Farm North 7 -11 -2003
DEVELOPER CITY OF LINO LAKES
By
Developer
STATE OF MINNESOTA )
) SS
COUNTY OF ANOKA )
By
Mayor
ATTEST:
By
Clerk
On this day of , 20_. before me, a Notary Public within and for said County,
personally appeared
(Mayor) and (Clerk), to me known to be respectively the Mayor
and Clerk of the City of Lino Lakes, and who executed the foregoing instrument and acknowledge
that they executed the same on behalf of said City.
Notary public
page 19
•
•
•
Development Contract
Century Farm North 7 -11 -2003
STATE OF MINNESOTA )
) SS
COUNTY OF ANOKA )
On this day of , of 20_, before me, a Notary Public within and for
said County, personally appeared (Developer), to me known to be the
, of , a corporation under the laws of the State of Minnesota, and that
they executed the foregoing instrument and acknowledged that they/he executed the same on behalf
of said corporation.
Notary Public
page 20
ATTACHMENT A
SUMMARY OF IMPROVEMENT COSTS
DEVELOPER INSTALLED IMPROVEMENTS
• PROJECT NAME: Century Farm North NUMBER OF REU's: 56
APPLICANT: Century Farm North Development, Inc. ASSESSED AREA (ac.): 24.5
BUDGET DEVELOPER CITY ESCROW
ITEM NECESSARY IMPROVEMENTS COST NOTE IMP. (X) IMP. (Y) AMOUNT (Z)
1 SITE GRADING bid e $303,520
2 EROSION CONTROL Estimate e $11,250
3 SITE ENGINEERING & SURVEYING Estimate e $80,000
4 LANDSCAPING Estimate e $10,000
5 OPEN SPACE MANAGEMENT $0 e
6 STREET CONST.
A. Subgrade /Base Course Estimate e $202,080
B. Wear Course Estimate e $69,570
C. CSAH 53 (Sunset Avenue) Estimate e $25,000
7 STORM SEWER CONST.
A. Trunk Estimate e $3,300
B. Lateral Estimate e $182,420
C. Surface Water Mgmt. Charge (s.f.) $0.050 a $50,060
SANITARY SEWER CONST.
A. Trunk Area Charge (ac.) $2,203 a $53,975
B. Trunk Unit Charge (REU) $955 a $53,480
C. Lateral Estimate e $464,450
D. Lift Station (13.5 %) $28,990
9 WATERMAIN CONST.
A. Trunk Area Charge (ac.) $2,350 a $57,575
B. Trunk Unit Charge (REU) $1,541 a $86,296
C. Lateral Estimate e $207,360
SUBTOTALS: $1,558,950 $330,376 $0
Sanitary Trunk Credit $190,677
Watermain Trunk Credit $17,230
TOTALS $122,469
See Attachment B for security amounts to be posted
NOTE:
a: Cost by City policy
b: Estimated Cost or Budget by City
c: Previously Assessed
d: Cash Requirement per Agreement with Park Board
• e: Provided by Developer
f: Estimate by Feasibility Study
7/11/03
attachments 7-1 1-03.xls
ATTACHMENT B
CITY FEES
DEVELOPER INSTALLED IMPROVEMENTS
up PROJECT NAME: Century Farm North NUMBER OF REU's: 56
APPLICANT: Century Farm North Development, Inc. ASSESSED AREA (ac.): 24.5
BUDGET DEVELOPER CITY ESCROW
ITEM NECESSARY IMPROVEMENTS COST NOTE IMP. (X) IMP. (Y) AMOUNT (Z)
1 PLAT REVIEW FEE $7,500 b $7,500
2 PLANNER REVIEW FEE $7,500 b $7,500
3 ADMINISTRATION -3% OF CONST. 3% of const. a $28,400
4 ENGINEERING
A. Plan /Plat/Grading Review $0 b $10,000
B. Preparation of Plans & Specs. $0 b
C. Construction Services $0 b $50,000
D. Construction Staking $0 b
E. City Engineering $0 b $20,000
5 LEGAL PLAT REVIEW FEE $1,000 b $1,000
6 PUBLICATIONS $1,000 b $1,000
7 PARK DEDICATION FEE $1,665 d $103,821
8 TREE PRESERVATION POLICY $960 b $4,480
Alli STREET LIGHTING INST. & OPER. $1,680 b $11,760
TRAFFIC SIGNING IMPROV. $6,000 b $3,000
11 BOULEVARD TREE PLANTING $15,600 b $16,800
12 STREET, ST. SWR. & POND MAINT. b $5,049
13 SEALCOATING FEE a $24,450
14 FEMA Processing Fee N/A $3,000
15 AERIAL PHOTO COST RECOVERY a $5,040
16 OTHER - Property Tax Escrow b $5,000
TOTALS: $3,000 0 $304,800
Less previous grading deposit $47,000
Total $257,800
SECURITY AMOUNTS TO BE POSTED Att. A Att. B Total
X = DEV. IMPROVEMENT COSTS X 1.5 (LETTER OF CREDIT) $2,338,500 $4,500 $2,343,000
Y = CITY IMPROVEMENT COSTS X 0.35 (LETTER OF CREDIT) $42,900 $0 $42,900
Z = CITY FEE COSTS X 1.0 (CASH ESCROW) $0 $257,800 $257,800
NOTE:
a: Cost by City policy
b: Estimated Cost or Budget by City
c: Previously Assessed
d: Cash Requirement per Agreement with Park Board
e: Provided by Developer
f: Estimate by Feasibility Study
7/11/03 attachments 7- 11- 03.xls
•
•
•
COMM FIRM NOflM
AS3 WA,. KAM.
AoGtM PMN, W AN
00000
0 0 0 0 0
■.1 CA LA A 1.4
1 1 1 1 S
'O L -V 13 'G
- r
W N
3 N •
{A A
1A0 W EN N LA GNx
0 0 0 0 0
O D 0 0 0
PHASING PLAN u:,rosNx
CENRIRY FARM NORTH 18T ADD ,r=ut
THRU
CENTURY FARM NORTH 6111 ADD su1.1.340.
150 LAKES, MINNESOTA
•
•
AGENDA ITEM 7 C (ii)
STAFF ORIGINATOR: Jeff Smyser
C. C. MEETING DATE: July 14, 2003
TOPIC: Resolution 03 -101: Final Plat, Century Farm North
VOTE REQUIRED: 3/5
The final plat is being considered by the Planning & Zoning Board at the
July 9 meeting.
The P & Z report is attached, for information purposes.
It is possible that the staff recommendation and conditions will be amended
after the discussion at the P & Z meeting.
A complete report, including the resolution, will follow on Friday.
AGENDA ITEM 7 C (ii)
STAFF ORIGINATOR: Jeff Smyser
C. C. MEETING DATE: July 14, 2003
TOPIC: Resolution 03 -101: Final Plat, Century Farm North
VOTE REQUIRED: 3/5
BACKGROUND
The preliminary plat for Century Farm North was- approved by the City Council on April
28. The developer has submitted the final plat for phase 1. Under the new subdivision
ordinance, final plats are to be reviewed by the P & Z. This is the first final plat to which
the new requirement applies. It was reviewed by P & Z on July 9. The developer has
requested that the City Council approve the final plat on July 14. At the time of writing
this report, some issues were unresolved pending direction from the City Council.
The submitted final plat includes individual lots for units in phase one of the approved
phasing plan. This includes 56 units: 17 single family detached townhomes and 39
single family lots. Of the 39 SF lots, nine of them in Block 4 will be airpark lots.
ANALYSIS
As required by the subdivision ordinance, the following requirements shall be met before
consideration of the final plat by the Planning and Zoning Board or the City Council:
a. The final plat shall substantially conform to the approved preliminary plat and
phasing plan.
b. For plats that consist solely of individual single family residential lots, final plat
applications for subsequent phases shall not be approved until building perniits
have been issued for forty (40) percent of lots in the preceding phase. This
paragraph applies only when the preceding phase consists of forty (40) or more
lots.
c. City Attorney approval of the status of title /property ownership related to the final
plat.
d. Completed development contract including all required financial securities and
timeframe for final plat and final grading completion.
Century Farm North Final Plat
page 2
e. Conditions attached to approval of the preliminary plat shall be fulfilled or
secured by the development agreement, as appropriate.
f. All fees, charges, and escrow related to the preliminary or final plat shall be paid
in full.
Conformance With Preliminary Plat (a): The submitted final plat includes the
phase one lots with the remainder of the site in outlots. The final plat is in substantial
conformance with the approved preliminary plat.
Completion of Preceding Phase (b): This is the first phase of the project, so the
`minimum completion' clause doesn't apply. However, it will apply to subsequent
phases. It is expected that the final plat for phase two will be submitted for approval
early in January 2004. With construction beginning in mid -2003, it is unknown if 40% of
phase one (22 units) will be sold and have building permits issued.
Title (c): The title commitment and the final plat must be submitted to the City
Attorney in time for an opinion for the City Council meeting. Among other things, the
City Attorney compares the title commitment with the signature page of the plat to ensure
all persons with property interest are represented on the signature page.
As of July 9, the City Attorney had not received the title commitment and plat. As of
Friday, July 11, I have no further information from the City Attorney. The City should
not approve the plat without a complete and acceptable title commitment.
Development Agreement and Fees (d) and (f): Agenda item 7 C (i) addresses this
item.
Conditions of Approval (e): Resolution 03 -60 approved the preliminary plat and lists
conditions of approval (see attached). The development agreement often includes
conditions that cannot be met prior to construction. For example, the phasing plan is an
ongoing requirement. Location of airplane hangars and wetland easement signs are other
examples. However, other conditions should be met prior to final plat approval to ensure
they get done.
Condition #7 requires review of airplane hangar design prior to final plat approval.
The attached drawings show the proposed hangar design. In addition to the drawings, the
draft homeowner covenants include the restrictions listed below.
Airplane Hangars. Airplane hangars are permitted on Air Park Lots subject to the
Lino Air Park North Declaration, the Permit and the following additional restrictions:
(a) Any airplane hangar constructed upon an Air Park Lot shall be built in
conformance with all building codes and regulations of the City and other
governmental and quasi - governmental entities having jurisdiction over the Air
Century Farm North Final Plat
page 3
Park Lots and over Outlot B, Lino Air Park North, and its use as a private air
strip.
(b) Aircraft hangars and their construction and location upon an Air Park Lot, are
subject to prior approval by the Committee.
(c) Airplane hangars must meet the following minimum criteria:
(i) Architectural compatibility with living units located upon the Air Park
Lot including color (earth tones only) and architectural style, although
they may be constructed with metal sidewalls.
(ii) Must not exceed 3200 square feet.
(iii) Sidewall height of not less than twelve feet nor more than eighteen feet.
(iv) Not less than one entry door.
(v) An overhead clear span door a minimum of ten foot wide and eight foot
high.
(vi) 3/12 maximum roof pitch.
(vii) Roof color coordinated with sidewall color.
(viii) Minimum 24 inch and maximum 36 inch sidewall overhang, and
minimum 12 inch and maximum 18 inch gable overhang.
(ix) A forty foot minimum clear span door on the gable end facing the
applicable taxi way.
(x) Such additional aesthetic detail as the (Air Park Architectural Control)
Committee may designate including, but not limited to, windows and
window treatments, louvers and landscaping.
(xi) Any improved apron fronting the taxi way door of the airplane hangar
not to extend with ten feet of the lot line.
(d) Commercial use (including space rental) of any airplane hangar is not
permitted.
These (or a revised version) would be included in the covenants on the property.
However, the City has no authority to enforce private covenants. If the City wants to
enforce specific conditions, it would have to be done through a separate mechanism.
Condition #8 requires City review of the homeowner association documents.
Drafts have been submitted and forwarded to the City Attorney.
Condition #10 refers to the unresolved park dedication question. A new plan
illustrating park dedication has been received. It indicates 4.7 acres of contiguous upland
and another 3.1 acres of upland that is not contiguous. This acreage is acceptable.
However, the subdivision ordinance requires that dedicated upland, at a value of $28,000
per acre, be subtracted from a total cash amount calculated at $1665 per dwelling unit.
Other credits can be subtracted as well. In discussion with the Public Services Director,
the following park dedication scenario is proposed:
Century Farm North Final Plat
page 4
TOTAL CASH CONTRIBUTION
previously total new cash per
total units platted units unit
total
249 8 241 $ 1,665
VALUE OF LAND DEDICATION _
upland acres 7.813
addl. acres for east trail 0.060
addl. acres for north trail 0.250 per acre
total dedication credit 8.123 $ 28,000
OTHER
construction of concrete sidewalk (5') and bituminous trail (8')
balance: cash dedication
401,265
(227,444)
(70,000)
103,821
That is, the land indicated on the "Preliminary Park Plan" of June 23, 2003 would be
dedicated. Upland would be credited toward the park dedication as would two small
additional pieces to preserve the potential for future trail connections. Construction of
the sidewalk and trail would be credited. The listed cash balance would be dedicated as
well.
The developer has agreed to the land dedication and to escrow the cash, but wants to
investigate the justification of the formula and the land values being used in the
dedication policy.
Condition #15 requires additional right of way for Sunset Road. This is supplied
on the final plat.
OPTIONS.
1. Approve Resolution 03 -101 approving the final plat for Century Farm North.
2. Return to staff with direction.
RECOMMENDATION
At the time of writing this report, the title commitment and homeowner association
documents have not received City Attorney approval.
The City Council must decide if it is acceptable to rely on the homeowners association to
enforce the airplane hangar design elements.
If the issues listed above are satisfactorily resolved, staff recommends Option 1.
Century Farm North Final Plat
page 5
If the above issues are not resolved, staff does not recommend approval.
This report is based on the following:
Final Plat, Century Farm North, received July 9, 2003.
Preliminary Park Plan, June 23, 2003
Hangar drawings, June 20, 2003
Century Farm North Final Plat
page 6
CITY OF LINO LAKES
RESOLUTION NO. 03-101
RESOLUTION APPROVING THE FINAL PLAT FOR
CENTURY FARM NORTH
WHEREAS, a request has been submitted to the City for the approval of a final plat, and
WHEREAS, review and approvals of plats are governed by state statutes and City
ordinances, and
WHEREAS, the site is included in the Century Farm North preliminary plat approved by
the City Council on April 28, 2003, by Resolution 03 -60, and
WHEREAS, the preliminary plat approval included phasing of the development over
several years, and
WHEREAS, the final plat for Century Farm North received by the City July 9, 2003 is
consistent with that phasing plan and other City requirements, and
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Lino
Lakes hereby approves the final plat for Century Farm North.
Adopted by the Lino Lakes City Council this day of
ATTEST:
Ann Blair, City Clerk
John J. Bergeson, Mayor
, 2003.
SHEET 1 OF 4 SHEETS
N
N
o<—
z
_1 ON
OHO
r�0
'- O w
i'I
00A lk
Ilh4pi Ip� 1"
(S.1.331-IS $ 30 £ 133HS 33S)
d 2NIl HOlYW
:b " tsae, e
a L. S ,r;, ;� II,Sa,LSAON 3 :a•inS
UMW! 1 9E O M N MI 41 Ns ml MI A Sal ldl /
= rm .i, *
w
SHEET 2 OF 4 SHEETS
.II 'al 't tlt I0 dl • 104 a e/1 E 00 a Nil IM - --
r.LlsI.00S
- - -- orrss,
SHEET 3 OF 4 SHEETS
V1
Q
Z
10r
01-0
Z�
mow
U U U,
IC
0
z
ILL '4 7R A • /Ixx axl L 3/330 aw <aMlaxa
II,LI ,6 LOOS
oe'S69I - - --
w
W
et
MATCH LINE C
_1
a
a
O
1
e
(SEE SHEET 3 OF 4 SHEETS)
gavYta'[
C .`
I1
•
o0'oal
Y,Z1,LZ.DON
JO IOWA AIN
G 2
0 i
a
N f
N O
^\
00'90Z
Y„Z1.4Z.00N
0091Y °0 aoc �,
Y,Z1.LZ400111 8 �j
8 1L
1
1
w
a
If;
3�
� x
pp
- - --1—�
n
O
mwa
903 S9'801
161,4.1
poop 00'SL1 1
II,ZI,LZ.00N
II,Zl,LZ.00N 14'M1p2 4/1
414 34 3 4n,wwu3/343033 naw, uy,-•."
w
z
—J
2
(SEE SHEET 2 OF 4 SHEETS)
•
•
A's
CITY OF LINO LAKES
RESOLUTION NO. 03-60
RESOLUTION APPROVING A MUSA RESERVE ALLOCATION AND
PRELIMINARY PLAT/ PLANNED UNIT DEVELOPMENT STAGE PLAN
FOR CENTURY FARM NORTH
WHEREAS, the City has received applications for developing an area known as Century
Farm North; and
WHEREAS, the development requires approval of the allocation of Metropolitan Urban
Service Area (MUSA) reserve and approval of a preliminary plat/planned unit
development stage plan; and
WHEREAS, a public hearing was held before the Planning & Zoning Board on
December 11, 2002 and was continued to January 8, 2003 and February 12, 2003; and
WHEREAS, the proposed MUSA allocation and preliminary plat/planned unit
development stage plan meet the requirements of the City's Growth Management, Zoning
and Subdivision Ordinances; and
WHEREAS, the City Council approved Ordinance 12 -03 rezoning the site to Planned
Unit Development for residential development; and
NOW, THEREFORE, BE IT RESOLVED that the City Council of Lino Lakes hereby
approves the MUSA allocation and preliminary plat/planned unit development stage plan
for Century Farm North with the following conditions:
1. A total of 55.0 acres of MUSA shall be allocated for the project, and the project's 249
• residential units shall be developed in accordance with the following phasing plan,
which is illustrated on Attachment A:
year
2003
2004
2005
2006
2007
total
MUSA acres to be
Allocated
15.3
11.4
13.5
5.4
9.4
55.0
Lots to be final platted
56
65
52
43
33
249
2. A cul de sac will be constructed at the east terminus of the new Carl Street within
Century Farm North. Carl Street will not be connected to the existing Carl Street as
part of the Century Farm North development.
3. The driveway of Lot 7, Block 6 be shifted eastward to the extent possible.
•
4. The submitted townhome housing types and building elevations be modified to
specify finish materials and be subject to City approval. Side walls facing public
streets shall include windows or other architectural features to avoid the appearance
of a blank wall.
5. Lots 1 -3, Block 4 shall be "airpark" lots. If these or other designated airpark lots are
to be converted to non - airpark lots, in the future, depending on the extent of changes
to the design or configuration of the lots and roads, this could require replatting and a
PUD amendment, at the City's discretion.
6. The applicant provide documentation to the City that all applicable runway safety
requirements have or will be satisfied. The runway safety zone requirements are
herebay established as a zoning restriction. As shown on the preliminary plat, the
restricted area is measured from the edge of a 200' wide strip centered on the runway.
At 126' from the edge, the maximum structure height is 18'. At 175' from this edge,
the maximum structure height is 25'. The structure height maximum limit shall
follow the slope of this imaginary surface and shall continue to extend over the
development.
7. Specific hanger designs be submitted subject to City approval prior to consideration
of the final plat approval of the lots with the hangers.
8. All homeowner association by -laws be subject to review and approval by the City
Attorney prior to consideration of the final plat for lots where the association applies.
9. The wetland mitigation plan be subject to comment and recommendation by the City
Engineer and Rice Creek Watershed District. All conditions imposed by the Rice
Creek Watershed District shall be satisfied. The filling of land intended to be upland
for park dedication must be accepted with the mitigation plan.
10. Park dedication shall include cash as well as land, shall include the trail across the 2°d
Addition to the eastern plat boundary, and include rough grading of the park land.
Generally, park land shall be as indicated on the "Parks /Open Space" plan submitted
in the April 2003 booklet. However, a new preliminary plat shall be submitted that
clearly shows the park dedication lands, along with upland data for all areas intended
to be dedicated as parkland. This data shall be reviewed to ensure acceptability prior
to final plat approval. There must be a minimum of 4.5 (four and one -half) acres of
contiguous upland useable for active recreation uses as determined by the Public
Services Director, and a minimum of 7.0 (seven) acres total upland. The cash
dedication may, at the City's discretion, be reduced by the cost of trail construction or
other in -kind activities by the developer. Trail locations within the park areas shall be
determined by the overall park design. The final park dedication shall be included in
the development agreement, which must be reviewed by the City Council for
approval.
11. Grading, drainage and utility related modifications and comments as recommended
by the City Engineer in the attached memorandum (dated April 16, 2003) shall be
addressed and incorporated into the plans.
12. The project is subject to the results of the sewer feasibility study.
13. The project is subject to the City's determination of the number of residential units to
be allowed to connect to the City water system, based on the system's ability to
provide adequate service, prior to the construction of the infrastructure needed to
provide service to the units.
14. The project is subject to all requirements of Anoka County regarding access to Sunset
Road/CR 53.
15. Additional right of way for Sunset Road/CR 53 shall be dedicated, to total 60' from
centerline, within all areas of the plat.
16. The City formally vacate the segment of Carl Street as needed for developing this
plat.
17. The airplane hangers in Lots 1 -4 and Lot 9, Block 4 (Phase 1) shall be built on the
runway side of the houses, with the houses fronting on the road rather than the houses
on the runway side of the lots.
18. Signs shall be installed along all wetland buffer /easement areas. Wetland easements
shall extend, at a minimum, 10 feet outward from the delineated wetland boundary.
19. This resolution shall not be effective until the rezoning approved by Ordinance 12 -03
is in effect.
20. Elements of the project not specifically designed or addressed in the plans and
supporting documents are subject to the standards of the zoning ordinance. R -1
standards will apply to single family detached portions, the R -3 standards to the
multi - family attached portions.
21. Prior to consideration of a final plat, a revised preliminary plat shall be submitted for
City review to ensure that it reflects approved revisions.
22. This approval is based on the following plans and information, and supporting
documentation:
Existing Conditions Plan, received January 31, 2003
Preliminary Plat, dated January 20, 2003, received January 31, 2003
Preliminary Site Plan, dated January 20, 2003, received January 31, 2003
Phasing Plan (data April 18, plan sheet April 23, 2003)
Preliminary Landscape Plan, dated January 20, 2003, received January 31, 2003
Preliminary Grading Plan, dated March 20, received March 28, 2003
Preliminary Utility Plan, dated March 20, received March 28, 2003
Townhome Building Elevations, received April 2003
Alternative Airpark Lot Layout, received January 31, 2003
City Engineer Comments dated April 16, 2003
Public Services Director Comments (Park Board)
dated August 6, 2002 and December 4, 2002
23. Prior to commencing site work on Century Farm North, the developer must supply a
plan that includes pond reconfiguration, tree planting, landscaping, and buffering for
the pond south of the air park which incorporates neighborhood concerns and is
acceptable to the City as approved by the City Council.
Passed by the Lino Lakes City Council this day of 2003.
John J. Bergeson, Mayor
ATTEST:
Ann Blair, City Clerk
19
taiNit
4--
.o
94 ID
k4cZ
n1753aan51X1r1 omt
OOV HLA HIHON Y'k!7'd A41111N30
NHL
tic ABl 1411U0N WHVi AIMED
NVId ONFLVHd
Otte an YWa aaxow
1/131c101300
WIKM IWiA4flllH0
oamoaWaaaa
0 0 0 0 0 0
F
I-- m— 1 o
-- o-- l m— H
N b h M 0
N
C.— N M V I/)
m m o o m
.N 0 0 0 0 0
Q Q_ a 0 .0 0.
0. 0.
CI Coo.] cea
:u 6,2
LU a-
te ct
CITY OF LINO LAKES
0) 0) 00 0.
0 0 0 0 0
N N N N N
. • , • *.i."5„5'45.:;.',1 -`• •
1'4:k
• 3
•
;■•
It
1.
(1)
LU
0
u_
0
5
Ln
8
...
INNS
NM MI
0
w�
LLJ
C7
1:11
• . I
J
0
Q4
Lu
Lug
Uy
c
O_
d
>
a
Li
+,
v
cu
s
GI
m
0
0
N
n
IN
Elevation
Cu
cu
v
V3
STAFF ORIGINATOR:
TOPIC:
AGENDA ITEM V. E.
Jeff Smyser
TING DATE: July 9, 2003
Final Plat: Century Farm North
BACKGROUND
The preliminary plat for Century Farm North was approved by the City Council on April
28. The developer has submitted the final plat for phase 1. Under the new subdivision
ordinance, final plats are to be reviewed by the P & Z. This is the first final plat to which
the new requirement applies.
The developer has requested that the City Council approve the final plat on July 14. This
leaves only three business days between the P & Z and Council meetings. Staff has
agreed to schedule these meetings, though at the time of writing this report several issues
remain, as described below.
A final plat submitted June 23 includes platting individual lots for units in phase one of
the approved phasing plan. This includes 56 units: 17 single family detached
townhomes and 39 single family lots. Of the 39 SF lots, nine of them in Block 4 will be
airpark lots.
ANALYSIS
As required by the subdivision ordinance, the following requirements shall be met before
consideration of the final plat by the Planning and Zoning Board or the City Council:
a. The final plat shall substantially conform to the approved preliminary plat and
phasing plan.
b. For plats that consist solely of individual single family residential lots, final plat
applications for subsequent phases shall not be approved until building permits
have been issued for forty (40) percent of lots in the preceding phase. This
paragraph applies only when the preceding phase consists of forty (40) or more
lots.
c. City Attorney approval of the status of title /property ownership related to the final
plat.
d. Completed development contract including all required financial securities and
timeframe for final plat and final grading completion.
e. Conditions attached to approval of the preliminary plat shall be fulfilled or
secured by the development agreement, as appropriate.
f. All fees, charges, and escrow related to the preliminary or final plat shall be paid
in full.
Conformance With Preliminary Plat (a): The submitted final plat includes the
phase one lots with the remainder of the site in outlots. Outlot I creates a lot around an
existing single family home. This was not included in the approved preliminary plat or
phasing plan: this home was to be removed. It adds an extra dwelling unit beyond the
approved phasing plan, and creates a lot that has no road frontage (or access), no sanitary
sewer or water service, and that is only 7954 sf.
While it may or may not be worthwhile retaining this existing house, if it is to be retained
it must be on a lot that meets the minimum requirements. No lot without sewer and water
can be less than 10 acres. Staff suggested combining Outlots I, D, and E. This would
leave the house on an outlot of 18+ acres. Dividing this outlot could be resolved in the
future, perhaps with a new preliminary plat that incorporates the house.
At the time this report was written, this issue is unresolved. Staff and the developer will
discuss this prior to the meeting. A new final plat must resolve this prior to staff
recommending approval.
Completion of Preceding Phase (b): This is the first phase of the project, so the
`minimum completion' clause doesn't apply. However, it will apply to subsequent
phases. It is expected that the final plat for phase two will be submitted for approval
early in January. 2004. With construction beginning in mid -2003, it is unknown if 40% of
phase one (22 units) will be sold and have building permits issued.
Title (c): The title commitment and the final plat must be submitted to the City
Attorney in time for an opinion for the City Council meeting. Among other things, the
City Attorney compares the title commitment with the signature page of the plat to ensure
all persons with property interest are represented on the signature page.
Development Agreement and Fees (d) and (f): The City Engineer is assembling the
development agreement. This requires cost estimates that serve as the basis of the
financial securities. In addition, trunk utility fees and outstanding charges are collected
along with the securities.
Conditions of Approval (e): Resolution 03 -60 approved the preliminary plat and lists
conditions of approval (see attached). The development agreement often includes
conditions that cannot be met prior to construction. For example, the phasing plan is an
ongoing requirement. Location of airplane hangers and wetland easement signs are other
examples. However, other conditions should be met prior to final plat approval to ensure
they get done.
Condition #7 requires review of airplane hanger design prior to final plat approval. The
attached drawings show the proposed hanger design. In addition to the drawings, the
draft homeowner covenants include the following restrictions:
Airplane Hangers. Airplane hangers are permitted on Air Park Lots subject to the
Lino Air Park North Declaration, the Permit and the following additional restrictions:
(a) Any airplane hanger constructed upon an Air Park Lot shall be built in
conformance with all building codes and regulations of the City and other
governmental and quasi - governmental entities having jurisdiction over the Air
Park Lots and over Outlot B, Lino Air Park North, and its use as a private air
strip.
(b) Aircraft hangers and their construction and location upon an Air Park Lot, are
subject to prior approval by the Committee.
(c) Airplane hangers must meet the following minimum criteria:
(i) Architectural compatibility with living units located upon the Air Park
Lot including color (earth tones only) and architectural style, although
they may be constructed with metal sidewalls.
(ii) Must not exceed 3200 square feet.
(iii) Sidewall height of not less than twelve feet nor more than eighteen feet.
(iv) Not less than one entry door.
(v) An overhead clear span door a minimum of ten foot wide and eight foot
high.
(vi) 3/12 maximum roof pitch.
(vii) Roof color coordinated with sidewall color.
(viii) 36 inch sidewall overhang and 18 inch gable overhang.
(ix) A forty foot clear span door on the gable end facing the applicable taxi
way.
(x) Such additional aesthetic detail as the (Air Park Architectural Control)
Committee may designate including, but not limited to, windows and
window treatments, louvers and landscaping.
(xi) Any improved apron fronting the taxi way door of the airplane hanger
not to exceed ten feet in length.
(d) Commercial use (including space rental) of any airplane hanger is not
permitted.
•
•
These (or a revised version) would be included in the covenants on the property.
However, the City has no authority to enforce private covenants. Therefore, the City
should consider including such requirements in the development agreement.
Condition #8 requires City review of the homeowner association documents. Drafts
have been submitted and forwarded to the City Attorney.
Condition #10 refers to the unresolved park dedication question. A new plan illustrating
park dedication has been received. It indicates 4.7 acres of contiguous upland and
another 3.1 acres of upland that is not contiguous. This acreage is acceptable. However,
the subdivision ordinance requires that dedicated upland, at a value of $28,000 per acre,
be subtracted from a total cash amount calculated at $1665 per dwelling unit. Other
credits can be subtracted as well. In discussion with the Public Services Director, the
following park dedication scenario is proposed:
TOTAL CASH CONTRIBUTION
previously total new cash per
total units platted units unit
total
249 8 241 $ 1,665 $ 401,265
VALUE OF LAND DEDICATION
upland acres 7.813
addl. acres for east trail 0.060
addl. acres for north trail 0.250 per acre
total dedication credit 8.123 $ 28,000
$ (227,444)
OTHER
construction of concrete sidewalk (5') and bituminous trail (8') $ (70,000)
balance: cash dedication $ 103,821
That is, the land indicated on the "Preliminary Park Plan" of June 23, 2003 would be
dedicated. Upland would be credited toward the park dedication as would two small
additional pieces to preserve the potential for future trail connections. Construction of
the sidewalk and trail would be credited. The listed cash balance would be dedicated as
well.
Staff has not discussed this proposal in any depth with the developer. The developer and
city staff will meet prior to the P & Z meeting to discuss this proposal to resolve the park
dedication.
Condition #15 requires additional right of way for Sunset Road. While the right of way
is shown on the plat, the dedication statement on the signature page does not include it.
This must be corrected.
Other Final Plat Requirements: The subdivision ordinance includes specific
requirements for all plats. One is that monument locations be shown on the final plat.
The submitted plat includes a statement that monuments will be located in the future.
Monuments are needed for setback measurements for new homes new structures, and
fences. Because monument location and placement is vital to locating property lines, the
City requires that these must be shown on the plat.
Easements have been included over stormwater facilities in phase one areas. Additional
easements will be necessary over future phases when they are final platted.
OPTIONS.
1. Approve the final plat.
2. Return to staff with direction.
RECOMMENDATION
At the time of writing this report, the above issues remained unresolved. Staff will meet
with the developer prior to the P & Z meeting and bring additional information to the
meeting. If the above issues cannot be resolved, staff will not recommend approval.
Assuming the issues listed above are satisfactorily resolved, staff recommends Option 1.
CITY OF LINO LAKES
RESOLUTION NO. 03-60
RESOLUTION APPROVING A MUSA RESERVE ALLOCATION AND
PRELIMINARY PLAT/ PLANNED UNIT DEVELOPMENT STAGE PLAN
FOR CENTURY FARM NORTH
WHEREAS, the City has received applications for developing an area known as Century
Farm North; and
WHEREAS, the development requires approval of the allocation of Metropolitan Urban
Service Area (MUSA) reserve and approval of a preliminary plat/planned unit
development stage plan; and
WHEREAS, a public hearing was held before the Planning & Zoning Board on
December 11, 2002 and was continued to January 8, 2003 and February 12, 2003; and
WHEREAS, the proposed MUSA allocation and preliminary plat/planned unit
development stage plan meet the requirements of the City's Growth Management, Zoning
and Subdivision Ordinances; and
WHEREAS, the City Council approved Ordinance 12 -03 rezoning the site to Planned
Unit Development for residential development; and
NOW, THEREFORE, BE IT RESOLVED that the City Council of Lino Lakes hereby
approves the MUSA allocation and preliminary plat/planned unit development stage plan
for Century Farm North with the following conditions:
1. A total of 55.0 acres of MUSA shall be allocated for the project, and the project's 249
• residential units shall be developed in accordance with the following phasing plan,
which is illustrated on Attachment A:
year
2003
2004
2005
2006
2007
total
MUSA acres to be
Allocated
15.3
11.4
13.5
5.4
9.4
55.0
Lots to be final platted
56
65
52
43
33
249
2. A cul de sac will be constructed at the east terminus of the new Carl Street within
Century Farm North. Carl Street will not be connected to the existing Carl Street as
part of the Century Farm North development.
3. The driveway of Lot 7, Block 6 be shifted eastward to the extent possible.
4. The submitted townhome housing types and building elevations be modified to
specify finish materials and be subject to City approval. Side walls facing public
streets shall include windows or other architectural features to avoid the appearance
of a blank wall.
5. Lots 1 -3, Block 4 shall be "airpark" lots. If these or other designated airpark lots are
to be converted to non - airpark lots in the future, depending on the extent of changes
to the design or configuration of the lots and roads, this could require replatting and a
PUD amendment, at the City's discretion.
6. The applicant provide documentation to the City that all applicable runway safety
requirements have or will be satisfied. The runway safety zone requirements are
herebay established as a zoning restriction. As shown on the preliminary plat, the
restricted area is measured from the edge of a 200' wide strip centered on the runway.
At 126' from the edge, the maximum structure height is 18'. At 175' from this edge,
the maximum structure height is 25'. The structure height maximum limit shall
follow the slope of this imaginary surface and shall continue to extend over the
development.
7. Specific hanger designs be submitted subject to City approval prior to consideration
of the final plat approval of the lots with the hangers.
8. All homeowner association by -laws be subject to review and approval by the City
Attorney prior to consideration of the final plat for lots where the association applies.
9. The wetland mitigation plan be subject to comment and recommendation by the City
Engineer and Rice Creek Watershed District. All conditions imposed by the Rice
Creek Watershed District shall be satisfied. The filling of land intended to be upland
for park dedication must be accepted with the mitigation plan.
10. Park dedication shall include cash as well as land, shall include the trail across the 2nd
Addition to the eastern plat boundary, and include rough grading of the park land.
Generally, park land shall be as indicated on the "Parks /Open Space" plan submitted
in the April 2003 booklet. However, a new preliminary plat shall be submitted that
clearly shows the park dedication lands, along with upland data for all areas intended
to be dedicated as parkland. This data shall be reviewed to ensure acceptability prior
to final plat approval. There must be a minimum of 4.5 (four and one -half) acres of
contiguous upland useable for active recreation uses as determined by the Public
Services Director, and a minimum of 7.0 (seven) acres total upland. The cash
dedication may, at the City's discretion, be reduced by the cost of trail construction or
other in -kind activities by the developer. Trail locations within the park areas shall be
determined by the overall park design. The final park dedication shall be included in
the development agreement, which must be reviewed by the City Council for
approval.
•
•
11. Grading, drainage and utility related modifications and comments as recommended
by the City Engineer in the attached memorandum (dated April 16, 2003) shall be
addressed and incorporated into the plans.
12. The project is subject to the results of the sewer feasibility study.
13. The project is subject to the City's determination of the number of residential units to
be allowed to connect to the City water system, based on the system's ability to
provide adequate service, prior to the construction of the infrastructure needed to
provide service to the units.
14. The project is subject to all requirements of Anoka County regarding access to Sunset
Road/CR 53.
15. Additional right of way for Sunset Road/CR 53 shall be dedicated, to total 60' from
centerline, within all areas of the plat.
16. The City formally vacate the segment of Carl Street as needed for developing this
plat.
17. The airplane hangers in Lots 1-4 and Lot 9, Block 4 (Phase 1) shall be built on the
runway side of the houses, with the houses fronting on the road rather than the houses
on the runway side of the lots.
18. Signs shall be installed along all wetland buffer /easement areas. Wetland easements
shall extend, at a minimum, 10 feet outward from the delineated wetland boundary.
19. This resolution shall not be effective until the rezoning approved by Ordinance 12 -03
is in effect.
20. Elements of the project not specifically designed or addressed in the plans and
supporting documents are subject to the standards of the zoning ordinance. R -1
standards will apply to single family detached portions, the R -3 standards to the
multi - family attached portions.
21. Prior to consideration of a final plat, a revised preliminary plat shall be submitted for
City review to ensure that it reflects approved revisions.
22. This approval is based on the following plans and information, and supporting
documentation:
Existing Conditions Plan, received January 31, 2003
Preliminary Plat, dated January 20, 2003, received January 31, 2003
Preliminary Site Plan, dated January 20, 2003, received January 31, 2003
Phasing Plan (data April 18, plan sheet April 23, 2003)
Preliminary Landscape Plan, dated January 20, 2003, received. January 31, 2003
•
Preliminary Grading Plan, dated March 20, received March 28, 2003
Preliminary Utility Plan, dated March 20, received March 28, 2003
Townhome Building Elevations, received April 2003
Alternative Airpark Lot Layout, received January 31, 2003
City Engineer Comments dated April 16, 2003
Public Services Director Comments (Park Board)
dated August 6, 2002 and December 4, 2002
23. Prior to commencing site work on Century Farm North, the developer must supply a
plan that includes pond reconfiguration, tree planting, landscaping, and buffering for
the pond south of the air park which incorporates neighborhood concerns and is
acceptable to the City as approved by the City Council.
Passed by the Lino Lakes City Council this day of 2003.
ATTEST:
Ann Blair, City Clerk
John J. Bergeson, Mayor
NPR
Wag
Y10SJII1aI 'WW 1 MO
QCV H19 HLHON 1`RIVd AMMO
O
'OOV 191 H1FlON rand maws?
NY1d ONBVHd
Mil AI ',WI n1s001111
1100 MOM Lite
All .11HIdOTIVO
Mal VIM 1.1111N32
aI4'L1NI .LN
0 0 0 0 0 0
- h1E 1
SO Ill N II M Cl
111 LO N f MI N
N M Y N
•III 0
sos 0 0 0 0
0 L L L O
O. a a a a
a
I
w
w v
0
N
GV
CL.
CC
uj
IJI
g
A
J
lL
0
Q
tal 10 11
0 0 0 0
O O O O O
N N N N
v3053W., Y3.W1 DPI1
'OOV H19 H.WON 11121yi Art,LN30
,Ik141
'GOY H1}JON MOW AMMO
NV'Id 3ll8 ANYN17'HHJ
PM .w 41. wanes
1' wi ale
L8W81B0
W1tlN/iiV�lf1111®
Iu on
t-
i1C
0
Z
4
CE 11U# 'r
3
i
5
1
P
a
8
5.
S
3 1
1
8
3"
s 1
3 g
al -
S
gi s
ik s
5
31
25
I; 1
8
1
k a
1
1
1
2
i
1
1
1
11 I
8 s
s5
Eg
1
g
e a
1151
ff
da
i$
8
8
5
a 3 S a Se .G
dA i g - aY 6L 5 QeIIS •5 •9i, 5 °P_
1! 8° 1 1. 3 °6E. if . iii F°6 t6- $gai3_ ,I;11
1 11 Saba 1 56 °5a iii: 153° L�Sg° ya 5$II
g 3 9
°- 1 °5 y.3 5'a '6 eL y3a i53 y1 s i:. �65= -e
a� a 1 s,Y S3: 'S $ i b 2j5_ 95 -yya se „:1 6g,J�`°e
1
! 8 1 $_ _h :53, aF 15dS 6.i2�6a 63!.0,5°,:
€, i 1 1 1 $ 3 WF ' 3ai s° a:Ea ''Fs ggaae� 1 8581
12 3 1�as � -F5 5� !Ili aIIS�• aga° 5
_a 5$ 53 Jul $
Ili!
506^ t 5 ii a 5$Yfig � 513 5e 6�a° 6°�a° �• °N' a r¢6 b gi 1 F) 5 ��$$; Vime, ca5 5pa 3fis $6b_ L }5 ^aa
5 p ° 9 s 54.i. Fg 10 331 °5a. _`aF G° -11 1% -jay
3i s a s i 5 6 .sgg a At-
Li. €g: 'F:a °a=5 > Sf!`8; ^i aa5
I s • s ▪ g�9 asbp3 13 X # nit ;15 ill 1 -L 3 21,...
5: Fyldaa
i "' iiii! a "3i iii 11 511= 1511 - a -? :'b
_ .s 5 1 6 5 -la 3 L °¢y 6i_.. 6 ,qc $8L1iS -° La is "g xa m t d �i O 7 �a 1 1 !iii 5 1 a55L �a a�L3 YS° i� $L�i
a g s �• �.° o ° sJ$ p'ps2 e'S i i_a g g EgbF�6 gyi'3� s°saa_F 5°i°a3
^y s saa d a 5 $d5i� adsAi ^sSbF "65 °i5
qG ° $ 5 s 5 "d3 asi8 _L$ g i 5i- ,6 gill n aE 1a15si $aaa-
1: fi Y 8 c g 5 3 l�SO] ^ill 1 iEd „f ba a a$ i 55 J°1-': -
3 9 2 i_a_E s 8°_-
�° E s $ s 5 ga r5= FeFs aoSF 315_1F1 115 a3a55s
e • ya si j1i_3 1 111.9 1 -be =is5s 6s1€ a
all!, a bNF353:
q }� t dy :� 3•g ° We 5 D-� it
°a6 d "5y a 111;1;1: 5 �.
65 5 8 - Y Y c 56r it Y� ZE S a35ad5 iy•3o k 59 SSu� Sa s i4a 5s r 5 F F1� �qe gF_ ;L
y Y a 5 .: a - 71;1 Y 1 Ni 5? ,: = ia1 ade`ca CC
g5 @ a Y i 2. p iii 99E 111 7 D 1a1i I! 1Fia: 8!.8h i 410 4 3 55SN°gs
's5 Y3 Y ia'aq i� Sis' ayp_F{°F li;x i 1 3 „F5 sa5x gainS =RFa 1 ai3s$I° 1 e1 :gs yy.
i/t 5 a 6 i ag n^ I =�J t` 1 -s° 5 151.8 e5 -5 k !! b -5
i+l $ - 5 n 3 �'..d' n
lei 7 D•u�D F °� ,ai a °'6 OYS ijfi oY G,a 153
41 c 1 1 ; g 1 S Lrsa S a 5 33E a°65a 1111 ssi° Pie . ks° a a
1 E 5 5 31E ,gal pp a 1 F a °° i F-i °;
8 2 a ¢1 I N) _.gi 1 1 �° s Sa3 F:°ra LL ° °3 t f 5�:.i3- s 56 -•i g
1 5 ¢ 4 3 1 €i . °s a s^ 15s ,sb;s' xj�, f '3 "s� 3 �; "a
,S _ $ 1$�i "11�z �.s .I 3g ts• Eats �1 - a i5gesg° �.iiaaa: i
:8 J aie b y _ 5, = S 5II_ =i a fi.s z 5e.7
6t 5 s i t`- 3qi Y° 9 2 -351 1s "L5„ -01g. i 1111': 1314 § -d
ge 1 -la . V] e_rs Flt` 1II i a5 g U . "' ; sg saza s D E3l a i °si _A. F;B "a 5-55s ,° 5aa1s a ^ e EiC - 1 1 11 s q m � §aga Y fi E b 5555 ,1111 :s sbi5 G ^i a•", aX
'�- 5 1 1 Ys° a II °v 5 a sP°°.. i '3i 5 5•FQ ^a° 5 5•L L"'E°
" ^_ _ _ a =s ds ei s°i a 2 s1 18ti a i "5;Ii^.i 3 _411:16
J t • fii! a5j a 1 a$5L Iv Al eS Fs a5F5d 8^Ss 8^ s
�a = x 9a 1 m
1;1 L .s as2._ 5 a '°�e a3= a "a
aC : ❑ as B o 3 gi5 iiiel �gtg 3 Iii- a� $a,3iF $ .. 3 € 6g41121; 1 Ufa
it A 3 9 3 -s1 i 3 1 a 3 5 3 !is Mil 1 i$3 1 1 1 5 .a',1 Illi Hid Iii11 1 1 1 ,Wilt= ? 1 as al
SHEET 1 OF 4 SHEETS
24 2/1 arn.~~
SHEET 2 OF 4 SHEETS
r,sa,or.aas
l•66C
C)
w
w
V
W
ce
CITY OF LINO LAKES
m.m z p:w3u s v: a P41 Ai
11.11.81.00s
— as•sss;
krett
al
aiuwm
WI kilt
+13 4.4100$0 w,N a.
0
z
0
w
z
J
2
Q
(SEE SHEET 4 OF 4 SHEETS)
(S133HS b 30 Z 133HS 33S
V DMA HOIVW
CS14TUR''r
___ new. 'L ATP ♦ /1 eM
vc.ccsa.
wrn
00.02'1
r1.Z1,LZ.00111
M P (11
41.21.61.005
09•x691 - --
LL
1
!s
C0
11
W
z
J
2E
tl
1I
e!, 4wAL.ION.J,.lj?n8r'3"4N1-74
ea ,k
(SEE SHEET 3 OF 4 SHEETS)
4,
a
112.103 .
•
0o'80Z
A.Z1,LZ.00N
00'91P
A.Z1.4Z.00N
1
Iii
b
art-
,
I i n
as. 58
tS bg
0
4
1
001w 99'901
•
/1.Zl,LZ.00N
L'p It/ 1,3S Pr/I• IaP./I...P0101—
w
pt k
. ssoilm■�t
t 8S
as t -$
.41. VS, I ZAON „.
0
0 0
w 0
w 0
�
OI
0
1
voevs 16,41 !I
P"P 00'941 1
41.Z1,LZ.00N
7t
r`
O C
FA
esw 0/I n
3
(SEE SHEET 2 OF 4 SHEETS)
SHEET 4 OF 4
V1053.111 IDIV1 ONf1
'OOV 1419 HUM Yklvd AH(WB
Y 1St H111ON NAY I AFYllN33
Wel AlVd AHVNWfBHd
co
W
0
x
0
9
•
•
Lil
2
0
111
2
r• .
..4 :;:p.. •.......
•
•
•
CITY OF LINO LAKFC
•
AGENDA ITEM 7D
STAFF ORIGINATOR: James E. Studenski, City Engineer
COUNCIL MEETING DATE: July 14, 2003
TOPIC: Resolution No. 03 -104, Accepting Bids and Awarding Construction
Contract, Twilight Acres Watermain Improvement Project
VOTE REQUIRED: 3/5 Vote Required
BACKGROUND:
Sealed bids were received and publicly opened at 10:00 a.m. on June 7, 2003. The
results of the bid opening are presented below. City Council action is required to award
a construction contract to the lowest responsible bidder.
Contractor Amount of Bid
C & L Excavating, Inc. $165,192.50
BNR Excavating, Inc. $169,350.00
Forest Lake Contracting, Inc. $173,097.00
Redstone Construction Company, Inc. $179,183.82
Friedges Contracting $179,596.22
Meyer Contracting, Inc. $184,566.00
Penn Contracting, Inc. $184,586.40
Northdale Construction, Inc. $193,853.18
Engineer's Estimate $154,616.00
The low bid is approximately 7% over the Engineer's Estimate for this project. A copy of
the complete bid tabulation is attached. This 7% overage falls within the 10%
contingency budgeted for the project.
The substantial completion date for this project is September 1, 2003, with a final
completion date of September 23, 2003. The project is to be funded by the City's trunk
funds and reimbursed through utility connection charges.
OPTIONS:
1. Return to staff for further review.
2. Adopt Resolution Number 03 -104, Accepting Bids and Awarding a Construction
Contract to C & L Excavating, Inc. for the Twilight Acres Watermain Improvement
project.
3. Not adopt Resolution No. 03 -104.
RECOMMENDATION:
Option No. 2 - Staff recommends adoption of Resolution Number 03 -104.
CITY OF LINO LAKES
RESOLUTION NO. 03 -104
RESOLUTION ACCEPTING BIDS AND AWARDING A CONSTRUCTION CONTRACT —
TWILIGHT ACRES WATERMAIN IMPROVEMENT PROJECT
WHEREAS, pursuant to an advertisement for bids for the construction of the Twilight Acres
Watermain Improvement project, bids were received, opened and tabulated according to law,
and the following bids were received complying with the advertisement:
Contractor Amount of Bid
C & L Excavating, Inc. $165,192.50
BNR Excavating, Inc. $169,350.00
Forest Lake Contracting, Inc. $173,097.00
Redstone Construction Company, Inc. $179,183.82
Friedges Contracting $179,596.22
Meyer Contracting, Inc. $184,566.00
Penn Contracting, Inc. $184,586.40
Northdale Construction, Inc. $193,853.18
Engineer's Estimate $154,616.00
AND WHEREAS, it appears that C & L Excavating, Inca is the lowest responsible bidder;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO
LAKES, MINNESOTA:
1. The Mayor and Clerk are hereby authorized and directed to enter into a contract with C & L
Excavating, Inc., in the name of the City of Lino Lakes for the construction of the Twilight
Acres Watermain Improvement project according to the plans and specifications approved
by the City Council and on file in the office of the City Clerk.
2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the
deposits made with their bids, except that the deposits of the successful bidder and the next
lowest bidder shall be retained until a contract has been signed.
Adopted by the Lino Lakes City Council this 14th day of July 2003.
John J. Bergeson, Mayor
Ann J. Blair, City Clerk
TKDA
• ENGINEERS • ARCHITECTS • PLANNERS
July 8, 2003
Honorable Mayor and City Council
City of Lino Lakes, Minnesota
Re: Twilight Acres Watermain Improvements
City of Lino Lakes, Minnesota
TKDA Commission No. 12278 -05
1500 Piper Jaffray Plaza
444 Cedar Street
Saint Paul, MN 55101 -2140
(651) 292 -4400
(651) 292 -0083 Fax
www.tkda.com
Dear Mayor and City Council:
Bids for the referenced project were received on July 7, 2003, with the following results. A complete
Tabulation of Bids is enclosed for your information.
Contractor Base Bid
C & L Excavating, Inc.
BNR Excavating, Inc.
Forest Lake Contracting, Inc.
Redstone Construction Co., Inc.
Friedges Contracting Co.
Meyer Contracting Co.
Penn Contracting, Inc.
Northdale Construction, Inc.
$165,192.50
$169,350.00
$173,097.00
$179,183.82
$179,596.22
$184,566.00
$184,586.40
$193,853.18
Engineer's Estimate $154,616.00
Recommendation
We recommend that you award the Contract to the lowest bidder, C & L Excavating, Inc., for their low
bid of $165,192.50.
Please do not hesitate to call me with any questions or comments you may have.
Sincerely,
Scott A. Brink, P.E.
Project Manager
SAB:art
Enclosure
An Employee Owned Company Promoting Affirmative Action and Equal Opportunity
I $ 1,600.00
0
0
o
0)
CO
c
E9
0
0
o
CO
CO
co
0
0
o
O
(O
N
V!
0 0
0 0
o o
M O
(n 40
r (G
03 EA
0
0
o
O
CO
t:
69
0 0
0 0
O o
O O
0 0
(O cr
Vi E9
0
0
o
O
O
N
V►
0
0
'v
N
N
E9
0
0
o
O
60.
r
VE
0
0
et
O
CO.
/R
0000000000 0
0 0 0 0 0 0 0 0 0 0 0
O ri o cci ( 0 0 0 0 0 0
0 r 0 00 (O O CO O O O O
(n O CO CO O (n 0) CO (n v r
00 r M N co- 0 V' V'
fR f9 Vi fit E9 ER Ea fa Vf E9 E9
$ 1,200.00 I
0
0
c0
el
ti
oi
fA
$ 169,350.00 I
1 lWI lr JIV11V11JJi V1Y IYV. 1LL1U -UiJ
ENGINEERS • ARCI
BIDS OPENED: JULY 7, 2003, AT 10:00 AM
•
*DENOTES ERROR IN BIDDERS CALCULATION
ENGINEER'S ESTIMATE " C & L EXCAVATING BNR EX
ITEM UNIT TOTAL UNIT TOTAL UNIT
NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE
$ 800.00
O
0
0)
N
V!
$ 24.00
$ 650.00
$ 510.00
$ 2,200.00
0
0
0
r
V!
$ 240.00
$ 200.00
$ 2.50
0
O
e-
V}
0
0
r
ffl
$ 8,500.00
$ 1,013.00
$ 160.00
$ 4.80
$ 5.00
$ 2.00
$ 13.80
$ 44.00
$ 15.00
$ 2.20
$ 1.00
0
O
o
co
f9
$ 900.00
0
O
CO
o
O
cfh
V}
$ 1,400.00
0
0000
0
o
'
c
Vi
0 0
0 0
(1) 0
0) n
r CO.
Vi E9
0
cD
N.
0)
Vi
$ 1,250.00
$ 1,875.00
0
0
0
0
CO
N
f9
0
0
0
N
r
e-
V►
0
0
0
O
00
er
V!
0
0
(0
Is
r
h
49
$ 7,200.00
$ 2,000.00
$ 1,500.00
$ 2,227.50
$ 1,239.00
$ 4,500.00
$ 31,500.00
0
0
00000
(/)
0
N
E9
0
0
0
N
V}
0 0
0 0
0 0
0 d'
(1)
V► E9
0
0
0
01
1
E9
0
10
cc;
0
co N
49
0
IC)
N
0)
e
(100
f9
$ 450.00
$ 20.50
I$ 35.00
$ 850.00
$ 650.00
$ 1,900.00
$ 19.20
0 0
00
CO ti
V! V!
$ 3.50
0
0
E9
$ 3.00
$ 7,200.00
$ 2,000.00
$ 300.00
$ 2.75
$ 3.00
$ 18.00
0
0
s
V3
$ 41.50
$ 14.00
0 0
(000
N
V; f9
0
0
d'
V?
0
0
O
0
O
r
E9
$ 41,860.00
960.00
$ 4,000.00
$ 2,400.00
$ 5,700.00
-
-
-
$ 1,875.00
$ 3,750.00
0
0
0
O
Nr
N
69
0
0
cV
N.
co
E9
0
0
o
0
er
N
f9
$ 76,377.00
$ 10,000.00
$ 1,000.00
$ 1,500.00
$ 2,025.00
$ 1,239.00
$ 1,875.00
$ 21,000.00
0
0
0
O
OOO
00
N
Vi
0
0
0
O
M
Eli
$ 6,000.00
$ 200.00
0
0
O
O
N1•
N
Vi
0
O
Oi
M
N
CO
Is
W
$ 154,616.00
$ 500.00
0
0
N
49
1 $ 24.00
$ 1,000.00
$ 800.00
$ 1,900.00
$ 75.00
$ 150.00
0
0
ci
49
0
0
ci
69
0
(0
e-
V!
$ 10,000.00
$ 1,000.00
$ 300.00
$ 2.50
$ 3.00
$ 7.50
$ 10.00
$_ 40.00
0
co
o
r
49
$ 3.00
$ 2.00
0
O
0
0)
FR
W
1 LF
1 LF
W W
LF
W W
LBS
u.
fn
LF
AO
Al
AS
331:11
Sl
Si
TON
Is
V
(1) J
W
N
CO
'�f ('O
780
N N
800
224
(00
r
DIVISION 11- STREET CONSTRUCTION AND RESTORATION
r r
10
810
413
250
2,100
0
00£
001,
000'Z
00
1DIVISION I - WATERMAIN CONSTRUCTION
CONNECT TO EXISTING WATERMAIN
8" DIP WATERMAIN (CL 52)
6" DIP WATERMAIN (CL 52) •
8" GATE VALVE AND BOX
6" GATE VALVE AND BOX
FIRE HYDRANT
11" COPPER SERVICE PIPE (TYPE K)
1" CORPORATION STOP
1" CURB STOP AND BOX
0
o
INSULATION (4" THICKNESS)
TRENCH STABILIZATION ROCK
SUBTOTAL DIVISION I
MOBILIZATION
TRAFFIC CONTROL
CLEAR AND GRUB
REMOVE BITUMINOUS PAVEMENT (ALL DEPTHS)
SAWCUT BITUMINOUS PAVEMENT (ALL DEPTHS)
COMMON EXCAVATION (STREET AND DRIVEWAY)
AGGREGATE BASE (CL 5) 100% CRUSHED
2350 TYPE LV 3 WEAR COURSE B
TOPSOIL BORROW (LV)
SOD - LAWN TYPE
EROSION CONTROL FENCE
ADJUST SANITARY MANHOLE
SUBTOTAL DIVISION 11
TOTAL TWILIGHT ACRES WATERMAIN IMPROVEMENTS 1
+-
N
M
4
(n
c0
1-
00
0)
O
r-
"
r
N
M
d'
*0
(0
I\
00
0)
Or
"
el
11\Vll VVIVIIVIIIJIJIVI• IVV. IGG/ V'VV
ENGINEERS • ARCHITECTS -PLANNERS
BIDS OPENED: JULY 7, 2003, AT 10:00 AM
*DENOTES ERROR IN BIDDERS CALCULATION
FOREST LAKE CONTRACTING REDSTONE CONSTRUCTION FRIEDGES CONTRACTING CO
ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL
NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
0
M
O
()
e-
T."
$ 37,770.60
$ 814.80
$ 2,882.28
st
M
0
t0
r
$ 5,302.17
$ 9,820.20
$ 766.75
$ 1,917.00
$ 2,912.00
$ 1,550.08
$ 16.00
N
I)
O
r
10
H)
CO
69
$ 4,295.53
$ 700.00
$ 2,158.35
$ 3,645.00
$ 2,304.54
$ 2,200.00
0
O
0
N
M
T'
69
$ 35,455.00
$ 4,893.00
$ 9,980.00
0
0
ti
CD
CO
69
$ 3,529.28I
O
ti
1n
CO
O
M
T-
69
$ 179,596.22
$ 569.65
$ 23.46
$ 20.37
$ 720.57
CO
M
10
E9
$ 1,767.39
$ 12.59
$ 30.67
$ 76.68
$ 3.64,
$ 6.92
$ 0.01
$ 4,295.53
$ 700.00
$ 431.67
$ 4.50
CO O
to CO
In CO.
69 69
O
CD
N
69
10 r 0)
CO CO CO
10 0 CD �t
69 69 69
O
CO
CO
69
$ 441.16
$ 1,904.28
-
$ 928.80
$ 4,151.84 1
$ 2,070.60
$ 6,622.41
$ 17,409.60
$ 3,961.75
$ 5,286.00
$ 8.00
$ 788.48
$ 16.00
to
0
M
N
r
�
69
co
r
a
CO
CO
N.
69
$ 500.00
$ 875.00 •
$ 1,620.00 •
$ 1,032.50 I
O
00000
C7
00000
O
M
69
O
C7
d'
N
69
O O O
G C O
LO 0) 0)
M or m
69 69 69
$ 400.00
0
N
CM
CO
N
N
69
00
CO
O)
Cp
O
w
N
CO,
O
r
r
69
$ 952.14
-
$ 23.22
$ 1,037.96
N
N
CO
69
$ 2,207.47
$ 22.32
$ 158.47
$ 211.44
$ 0.01
$ 3.52
$ 0.01
a-
0)
CD
CO
69
$ 500.00
$ 175.00
$ 2.00
$ 2.50
0
01
69
0
r
69
$ 45.00
$ 13.00
$ 2.45
0
'V'
CO
$ 282.90
$ 1,200.00
0
0
O
CO
O
69
0 0
0 0
0 O
04 0
CO N
M
69 69
$ 1,800.00
$ 6,600.00
$ 14,040.00
$ 1,250.00
$ 2,250.00
$ 800.00
0 0
0 0
CC) O
cc}} 0
NI' O
CO
69 69
$ 77,538.00
0
0
O
0
010
N
r
69
$ 500.00
$ 1,000.00
$ 1,620.00
0
0
a)
M
N
r
69
0
0
O
0
4)
et
48
0
0
O
0
sf
0)
N
E9
0 0 0
0 0 0
O 0 O
0 0 0
0 at ti
N N M
M
69 69 69
$ 200.00 1
0
0
O-
0
0
'
69
O
O
0)
IA
10
IC)
CO
69
O
O
CA
ct.
M
n
r
69
•
- -
O
0
N
69
$ 23.00
$ 800.00
1 $ 600.00
$ 2,200.00
$ 18.00
$ 50.00
$ 90.00
$ 1.00
$ 2.00
$ 5.00
0
0
O
p
01
r•
69
$ 500.00
$ 200.00
$ 2.00
ooc $
0
0
-
69
$ 14.00
$ 50.00
$ 8.00
$ 1.85
0
0
N
69
0
0
0
10
to
W
J
LF
EA
Q
W W J (�,�
co
6 m
J
SF
LF
J
LS
TREE
CO
J
AO
TON
AS
AO
NOl
J
40
N
.-
r
a
3
3
780
25
25
800
224
1,600
DIVISION 1I - STREET CONSTRUCTION AND RESTORATION
r
r
0
O
CO
CO
_
'V
O
N
p
N
700
300
2,000
100 _1
O
DIVISION 1- WATERMAIN CONSTRUCTION
CONNECT TO EXISTING WATERMAIN
18" DIP WATERMAIN (CL 52)
6" DIP WATERMAIN (CL 52)
8" GATE VALVE AND BOX
16" GATE VALVE AND BOX
FIRE HYDRANT
1" COPPER SERVICE PIPE (TYPE K)
1" CORPORATION STOP
1" CURB STOP AND BOX
DIP FITTINGS
INSULATION (4" THICKNESS)
TRENCH STABILIZATION ROCK
SUBTOTAL DIVISION 1
MOBILIZATION
TRAFFIC CONTROL
CLEAR AND GRUB
REMOVE BITUMINOUS PAVEMENT (ALL DEPTHS)
SAWCUT BITUMINOUS PAVEMENT (ALL DEPTHS)
}
ce
0
D
Z
Q
W
ce
F-
cn
Z
O
H
U
6
Z
O
2
2
O
U
AGGREGATE BASE (CL 5) 100% CRUSHED
2350 TYPE LV 3 WEAR COURSE B
,TOPSOIL BORROW (LV)
SOD - LAWN TYPE
EROSION CONTROL FENCE
ADJUST SANITARY MANHOLE
SUBTOTAL DIVISION II
TOTAL TWILIGHT ACRES WATERMAIN IMPROVEMENTS I
r
N
M- V'
10 CO
n
CO 0)
O
r
01
CO
d'
C0
CO
4,
CO O)
O
r,
ENGINEERS- ARCHITECTS - PLANNERS
BIDS OPENED: JULY 7, 2003, AT 10:00 AM
"DENOTES ERROR IN BIDDERS CALCULATION
MEYER CONTRACTING CO PENN CONTRACTING NORTHDALE CONSTRUCTION
ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL
NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
0
0
O
O
C9
I $ 38,318.00
$ 971.20
$ 2,825.68
$ 1,613.94
$ 5,268.45
COD
c
O
CD
EA
I $ 1,671.75
•
--
0
10
V
Vi
69
0
C1)
O
49
O
(IS
U!
$ 82,531.68
$ 17,000.00
0
O
O
Ch
E9
0
N
r
0-1
64
0
CO•)
C0
N
69
$ 2,271.50 I
$ 3,750.00
••
--
0
O
0
co-
co
E9
$ 4,650.00I
O
OV
O
1`
E9
$ 500.00 I
$ 4,400.00
$ 111,321.50
$ 193,853.18
0
O
o
v.
64
$ 23.80
$ 24.28
$ 706.42
$ 537.98
I $ 1 ,756.15
�
N
64
'•
.
.-
$ 134.74
$ 4.32
O1
`t
E9
0
O
E9
$ 17,000.00I
0
ci
0
VI-
CO
$ 625.00 I
10
C)
E9
0
1
E9
0
Ci
`'
69
$ 13.50
O
o0
`�
E9
$ 15.50 I
0))
ei
E9
0
CCl
49
$ 550.00
0
0
0
O
CD
(0
E9
$ 49,910.00
$ 1,120.00
$ 3,480.00
$ 2,130.00
0
O
N
I,
E9
0
CC)
'V:
h
49
0
O
.-
69
1 $ 2,875.00
00'080'Z $ I
0
v
Elio
0
a0
E9
0
0
0
et
N
E9
0
"0'
Oi
CO
1�
(
w
00'005'£
I00'000'£ S_f
0
0
oui
0
CO
.-
E9
0
0
M
CO
CV
E9
$ 1,652.00
0
0
0000000
O
CO
E9
0
0
O
CD
M
E9
0
0
O
CO
co M
69
0
0
O
r
CC7
49
0
0
O
0
6*
49
0
0
O
M
49
0
0
CD
r
N.
ER
o
0
1:
0)
ti
ti
0)
49.
O
a
co
CO
Y)
(0
r
CO
1000
O
O
CD
CV
49
$ 31.00
$ 28.00
$ 870.00
$ 710.00
0
0
0
.4'
N
E9
0
CO
O
69
$ 68.00
{ $ 115.00
O
CO
N
E9
1 $ 3.60
0
M
r
69
1 oo -oo '£ S
$ 3,000.00
0
0
0
co
CO
0
CD
CM
E9
0
O
d'
E9
$ 18.00
0
to
.-
fPr
$ 48.00
O
O
,-
Cf}
0
CO
CV
69.
0
O
C•i
19
$ 270.00 I
$ 900.00
O O O O
00000
0 0 0 0
CO O N CD
N CD M 1,-
o r V.- N
64 69 69 E9
O
0
0
CO
n
69
I $ 13,416.00
O
0
0
0
O
CCl
E9
O
0
0
CO
N
CO
69
$ 4,000.00
0
00
er
0
I,-
'.t
69
0
O
CO
0
co-
E9
O
0
O
CO
tr
�
N
1 00•005'L $
O
0
O
0
CO
.--
E9
$ 875.00 1
$ 1,296.00I
O
0
10
CD
0
N
E9
O
0
0
0
M
d'
E9
$ 30,450.00 I
O
0
0
O
C.)
r-
N
E9
O
0
0
0
N
'V-
E9
O
0
0
0
0
<O
E9
O
0
0
0
C+)
69
$ 1,800.00 I
O
O
Co
CO
P
ti
co
E9
O
O
Co
ID
CO
of
3
r
69
I$ 450.00
$ 25.00
$ 40.00
$ 1,080.00
$ 920.00
0
0
C5
0
CO
CV
44
0
N
a-
E9
$ 200.00
$ 250.00
$
5.00 i
$ 21.00
$ 3.80
$ 7,500.00
0
0
00
CO
r
E9
0
0
n
.-
E9
0
0
r
69
0
0
N
iR
0
0
CD
69
$ 14.5
0
0
M
E9
$ 14.00 I
0
0
M
69
0
0
!'d
E9
$ 225.00 I
JJ W W
W
LF
LBS
u.
CnJ
LS
J
TREE 1
coJUOODUJ
f"
F-
N
O O V' M
CO V'
r
M
780
0
CO
224
1,600
DIVISION II - STREET CONSTRUCTION AND RESTORATION
r
r
O
0
OD
413
250 I
0
N
0
�
0
M
0
O
N
0
O
tO
DIVISION I - WATERMAIN CONSTRUCTION
CONNECT TO EXISTING WATERMAIN
8" DIP WATERMAIN (CL 52)
6" DIP WATERMAIN (CL 52)
8" GATE VALVE AND BOX
6" GATE VALVE AND BOX
(FIRE HYDRANT
Y
W
D..
W
a.
E.
w
U
r
W
co
r
W
IL
tL
O
U
1" CORPORATION STOP
1" CURB STOP AND BOX
DIP FITTINGS
INSULATION (4" THICKNESS)
TRENCH STABILIZATION ROCK
SUBTOTAL DIVISION I
MOBILIZATION
TRAFFIC CONTROL
CLEAR AND GRUB
REMOVE BITUMINOUS PAVEMENT (ALL DEPTHS)
SAWCUT BITUMINOUS PAVEMENT (ALL DEPTHS)
COMMON EXCAVATION (STREET AND DRIVEWAY)
AGGREGATE BASE (CL 5) 100% CRUSHED
2350 TYPE LV 3 WEAR COURSE B
TOPSOIL BORROW (LV)
SOD - LAWN TYPE
EROSION CONTROL FENCE _
ADJUST SANITARY MANHOLE
SUBTOTAL DIVISION 11
TOTAL TWILIGHT ACRES WATERMAIN IMPROVEMENTS I
.-
N
co
et
O
CD
t�
0)
Of
r
N-
.--
N
M
NI'
Cn
CO
ti
CO
0)
Or
r
•.N-
AGENDA ITEM 7E
STAFF ORIGINATOR: James E. Studenski, City. Engineer
COUNCIL MEETING DATE: July 14, 2003
TOPIC: Resolution No. 03 -105, Authorizing Final Payment for Ditch /Pond
Cleaning
VOTE REQUIRED: 3/5 Vote Required
BACKGROUND:
Quotes were received and publicly opened on December 10, 2002. Arnt
Construction Company, Inc. was the low bidder at $49,731.70. They have
completed the work and city staff has approved it. A copy of the invoice is
attached. Payment in the amount $47,245.11 for work completed was issued to
the contractor previously.
The funding for this work is provided by the Surface Water Management Fund.
This fund was established in 1992 as a revenue source in order to meet the
"administrative, planning, ponding, mitigation, and water quality needs" of the
City. It is reimbursed through assessments to new subdivisions and is also
collected as property owners connect to City utilities.
Staff recommends final payment to Arnt Construction Company, Inc. in the
amount of $2,486.59.
OPTIONS:
1. Return to staff for further review.
2. Approve Resolution 03 -105 Authorizing Final Payment for the Ditch /Pond
Cleaning project.
RECOMMENDATION:
Option No. 2 - Staff recommends that Resolution 03 -105 be approved.
•
CITY OF LINO LAKES
RESOLUTION NO. 03 -105
RESOLUTION AUTHORIZING FINAL PAYMENT FOR THE DITCH /POND
CLEANING PROJECT
WHEREAS, the construction of the Ditch /Pond Cleaning Project has been
completed by Arnt Construction Company, Inc.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF LINO LAKES, MINNESOTA:
Final Payment in the amount of $2,486.59 is approved for a total contract
amount of $49,731.70.
Adopted by the City Council this 14th day of July 2003.
Ann J. Blair, City Clerk
John J. Bergeson, Mayor
ARNT CONSTRUCTION COMPANY INC.
P.O. BOX 549 HUGO, MINNESOTA 55038
OFFICE: 651/426-1296 FAX: 651/426-3760
Bill To: Invoice
City of Lino Lakes Number
1189 Main Street
Lino Lakes 1LIN 55014
P.O. Number
9795
Date 03/07/03
Terms General Info
DUE UPON RECEIPT 1.5% INTEREST AFTER 30 DAYS
Description Amount
RE: Lino Lakes Pond and Ditch
Ditch and Pond Cleaning 49, 731.70
TOTAL AMOUNT DUE $49,731.70
An Equal Opportunity Employer
•
•
AGENDA ITEM 7.H
STAFF ORIGINATOR: Michael Grochala
C. C. MEETING DATE: July 14, 2003
TOPIC: Resolution 03 -109 Approving Distribution of the
Environmental Assessment Worksheet for the Lakes
Business Park
ACTION REQUIRED: 3/5 vote
BACKGROUND
Glenn Rehbein Companies is proposing to develop a 32 acres Business Park, east of Lake Drive
to create a site for a potential light industrial user, and three additional lots for future
development. The size of the development, which could potentially exceed 300,000 square feet
of light industrial development, triggers the need to prepare and Environmental Assessment
Worksheet.
The City retained the services of Short, Elliott, Hendrickson, Inc., (SEH) to prepare the EAW.
The EAW is being reviewed by the City's Environmental Board on July 9, 2003. Pending the
Environmental Boards review and recommendation, staff is anticipating City Council
authorization to distribute the document for public review and comment at the July 14, 2003
council meeting.
A revised staff report, including the Environmental Board's comments and staff
recommendation, will be completed for the Friday update.
ATTACHMENTS
1. Environmental Assessment Worksheet
•
•
•
STAFF ORIGINATOR:
COUNCIL MEETING DATE:
TOPIC:
VOTE REQUIRED:
AGENDA ITEM 7F
James E. Studenski, City Engineer
May 12, 2003
Resolution No. 03 -106, Authorizing
Preparation of Plans and Specifications
for Marshan Lane Utility Extension.
Simple majority
BACKGROUND:
On October 8, 2001 the City Council ordered the preparation of a feasibility
study, following a petition from residents, for the extension of sanitary sewer and
water on Marshan Lane, east of Lake Drive. The Council received the feasibility
study on January 14, 2002. Following a petition submitted by four of 10
residents, to construct the utilities, the City held a public hearing on July 8, 2002.
Following the public hearing, the city received a petition against the proposed
improvements and the project has not moved forward. However there is still
interest by some of the residents for the extension of utilities. Opponents of the
improvements have indicated that the proposed cost of the utilities and additional
charges are their primary concern.
Staff is aware of on -site septic system issues developing along Marshan Lane
and believe that it is beneficial for the city, from a public health standpoint, to
further evaluate the extension of utilities.
Staff is requesting authorization to prepare plans and specification for the utility
extension. The completed plans will provide a more up to date and accurate
estimate of the project costs and allow the city to address, more accurately, the
possible financing scenarios.
RECOMMENDATION
Staff recommends approval of Resolution No. 03 -106.
ATTACHMENTS
1. Resolution No. 03 -106
•
•
•
CITY OF LINO LAKES
RESOLUTION NO. 03 -106
RESOLUTION AUTHORIZING THE PREPARATION OF PLANS AND
SPECIFICATIONS — MARSHAN LANE UTILITY EXTENSION.
WHEREAS, pursuant to resolution of the council adopted October 8, 2001, a report has
been prepared by TKDA, the City's Engineer for the extension of water and sanitary
sewer improvements to Marshan Lane, and this report was received by the council on
January 8, 2002; and
WHEREAS, the council finds that it is in the best interests of the City to prepare plans
and specifications for the improvements to further evaluate the making of such
improvements.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
LINO LAKES, MINNESOTA:
1. The City Engineer is designated as the engineer for this improvement and he is
directed to prepare plans and specifications for the Marshan Lane Utility Extension.
Adopted by the Lino Lakes City Council this 14th day of July, 2003.
Ann Blair, City Clerk
John J. Bergeson, Mayor
•
AGENDA ITEM 7G
STAFF ORIGINATOR: James E. Studenski, City Engineer
COUNCIL MEETING DATE: July 14, 2003
TOPIC: Resolution No. 03 -108, Calling for a Public Hearing on Prairie
Flower Road Surface Water Management Project
VOTE REQUIRED: Simple Majority
BACKGROUND:
At the April 28, 2003, City Council meeting, a feasibility study was ordered to
evaluate storm drainage improvements on Prairie Flower Road, west of West
Shadow Lake Drive and south of Birch Street. The report is currently being
completed. The study will address, on a preliminary basis, design, cost,
assessment, schedule, and other issues as they relate to providing storm
drainage improvements. Improvement options will be discussed with the
•
property owners.
The next step in the process will be to hold a Public Hearing on the proposed
improvements at which time a detailed review of the report will be presented.
OPTIONS:
1. Return to staff for further review.
2. Adopt Resolution No. 03 -108, Calling for a Public Hearing on Prairie Flower
Road Surface Water Management Project.
RECOMMENDATION:
Option No. 2 - Staff recommends that Resolution No. 03 -108 be adopted.
•
•
•
CITY OF LINO LAKES
RESOLUTION NO. 03 -108
CALLING FOR A PUBLIC HEARING ON PRAIRIE FLOWER ROAD SURFACE
WATER MANAGEMENT PROJECT
WHEREAS, pursuant to resolutions of the Council adopted April 28, 2003, a study has
been prepared by the City Engineer, with reference to the improvement of Prairie Flower
Road west of West Shadow Lake Drive and south of Birch Street by constructing storm
drainage improvements and
WHEREAS, the report provides information regarding whether the proposed project is
necessary, cost - effective, and feasible,
WHEREAS, the City proposes to assess the benefited property for all or a portion of the
cost of the improvement, pursuant to Minnesota States, Chapter 429, and Chapter 8 of
the Lino Lakes City Charter.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
LINO LAKES, MINNESOTA:
1. That a Public Hearing be held for the proposed storm drainage improvements.
Adopted by the Lino Lakes City Council this 14th day of July, 2003.
Ann Blair, City Clerk
John J. Bergeson, Mayor
AGENDA ITEM 7.H
STAFF ORIGINATOR: Michael Grochala
C. C. MEETING DATE: July 14, 2003
TOPIC: Resolution 03 -109 Approving Distribution of the
Environmental Assessment Worksheet for the Lakes
Business Park
ACTION REQUIRED: 3/5 vote
BACKGROUND
Glenn Rehbein Companies is proposing to develop a 32 acres Business Park, east of Lake Drive
to create a site for a potential light industrial user, and three additional lots for future
development. The size of the development, which could potentially exceed 300,000 square feet
of light industrial development, triggers the need to prepare and Environmental Assessment
Worksheet.
The City retained the services of Short, Elliott, Hendrickson, Inc., (SEH) to prepare the EAW.
The EAW was reviewed by the City's Environmental Board on July 9, 2003. The
Environmental Board recommended approval of the EAW for Distribution with the changes
outlined in the attached letter from SEH, dated July 10, 2003.
Rules written by the Minnesota Environmental Quality Board describe the requirements for the
environmental review. These rules were written to implement MN Statute 116D, the Minnesota
Environmental Policy Act. Environmental review starts with an environmental assessment
worksheet (EAW). An EAW is defined as a brief document which is designed to set out the
basic facts necessary to determine whether an environmental impact statement (EIS) is
necessary. The EAW form was created by the Minnesota Environmental Quality Board (EQB).
It is a list of questions that must be completed based on the project specifics.
Approving the EAW for distribution means that the City is comfortable that the document is
accurate and complete to the best of its knowledge. Approving the EAW for distribution does not
mean that the City is approving the project. On the contrary, once the EAW process has been
initiated, the project cannot be started and no governmental entity can make a final decision on
the project until the environmental review process is completed.
After the public comment period, the City decides if it has enough information to determine if
the project will cause significant environmental effects. If it will not cause such effects, the City
makes a "negative declaration" meaning that an Environmental Impact Statement (EIS) is not
necessary. If the review process reveals, in the judgement of the City, that the project will cause
• significant environmental effects, the City makes a "positive declaration" meaning an EIS is
necessary.
It should be noted that the EAW process does not replace nor eliminate the need for the required
review and approval of detailed plans, for a specific project, in accordance with City, County,
Watershed District, or State requirements. An EAW is defined as "a brief document which is
designed to set out the basic facts necessary to determine whether an EIS is required for a
proposed action"
RECOMMENDATION
Staff is recommending approval of Resolution 03 -109 authorizing distribution of the Lakes
Business Park EAW with the modification noted in the July 10, 2003 letter from SEH.
ATTACHMENTS
1. Resolution No. 03 -109
2. July 10, 2003 SEH letter
CITY OF LINO LAKES
RESOLUTION NO. 03-109
RESOLUTION APPROVING THE DISTRIBUTION OF AN ENVIRONMENTAL
ASSESSMENT WORKSHEET FOR THE LAKES BUSINESS PARK
WHEREAS, MN Rules 4410 establishes the requirements for the preparation of an
Environmental Assessment Worksheets (EAW); and
WHEREAS, the City has initiated an environmental review to determine if a project has the
potential for significant environmental effects, as required by MN Rules, Chapter 4410.4300,
Subpart 14.; and
WHEREAS, the City has prepared the EAW based on data submitted by the project proposer
and determined to the best of the City's knowledge that the EAW is complete and accurate;
NOW, THEREFORE BE IT RESOLVED, that the Lino Lakes City Council approves the
distribution of the Lakes Business Park EAW for public comment.
Adopted by the Lino Lakes City Council this 14th day of July, 2003.
John J. Bergeson, Mayor
ATTEST:
Ann Blair, City Clerk
ff5EH
July 10, 2003
3535 Vadnais Center Drive, St. Paul, MN 55110 -5196 651.490.2000 651.490.2150 FAX
architecture engineering • environmental • transportation
Mr. Mike Grochala
Community Development Director
City of Lino Lakes
600 Town Center Parkway
Lino Lakes, MN 55014 -1182
Dear Mr. Grochala:
RE: Lino Lakes, Minnesota
Lakes Business Park EAW
Summary of Document Changes
SEH No. A- LINOL0306.00 14.00
After meeting with the City's Environmental Board on Wed nesday, July 9, 2003, the draft EAW for
the Lakes Business Park will be modified as follows:
1. An additional figure will be included. The figure represents the existing MLCCS data for the
site. Figure numbers will be adjusted to account for the additional figure.
2. Question #10 (cover types):
Acreage calculations will be modified for before and after categories of each cover type.
3. Question #11 (Fish, Wildlife...):
Narrative will be modified to indicate the project site has marginal wildlife habitat, as cited in
the City's Wild Urban Interface Study.
4. Question #12 (Physical impacts on water resources):
Narrative will be modified to indicate that all storm sewers will be routed through onsite holding
ponds and /or infiltration basins.
5. Question #17.a (Water quality: surface water runoff):
Narrative for the second paragraph will be modified to clearly show that surface water runoff is
to be managed onsite.
6. Question #25 (Nearby resources):
Narrative will be modified to include reference to a letter received from the State Historic
Preservation Office (SHPO).
7. Question #26 (Visual impacts):
Narrative will be deleted in its entirety.
Please call me at 651.490.2147 if you have questions.
Sincerely,
fri,rAg(/
Robert L. Moberg, PE
Project Manager
nm
\lspfiles I \spli\ko \liuol\ 030600 \corres \grochala071003.doc
Short Elliott Hendrickson Inc.
• Your Trusted Resource • Equal Opportunity Employer