HomeMy WebLinkAbout10/29/2003 Env Bd PacketCity of Lino Lakes Environmental Board Meeting October 29, 2003 6:30 p.m. AGENDA 1. CALL TO ORDER 2. APPROVAL OF MINUTES 3. APPROVAL OF AGENDA 4. OPEN MIKE ACTION ITEMS A. Eagle Brook Church, 7709 20th Ave. N., Site Plan Review and Conditional Use Permit B. Circle -Lex VFW Post, 7868 Lake Drive, Site Plan Review and CUP 6. DISCUSSION ITEMS A. 2004 Goals 7. OTHER DEPARTMENT REPORTS A. Forestry B. Solid Waste Recycling /Recycling Day C. Environmental /Heron Issues 8. ADJOURN AGENDA ITEM 5A Staff Originator: Marty Asleson Environmental Board Meeting Date: October 29, 2003 Topic: Background: Eagle Brook Church, 7709 20th Ave North, Site Plan Review and Conditional Use Permit. Eagle Brook Church is proposing to build a new church on a 91 Acre site located on County State Aid Highway (CSAH) 21(20th Avenue), 1.25 miles north of CSAH 14 (Main Street.) The Church will be approximately 88,000 square feet, and provide seating for 2,100 people, with a potential for 700 additional seats. Parking is planned for 1,100 vehicles with potential to add 350 spaces. Construction is planned to begin in April 2003. Eagle Brook Church previously prepared an Environmental Assessment Worksheet (EAW) for the proposed project. The Lino Lakes City Council rendered a negative declaration on the EAW in May of 2003. This review is based on the following submittals: Project Narrative received October 13, 2003 Certificate of Survey, dated October 10, 2003, prepared by SRF Consulting Group. Site Plan, dated October 13, 2003, prepared by SRF Consulting Group and BWBR Architects. Grading Plan, dated October 13, 2003, prepared by SRF Consulting Group and BWBR Architects. Utility Plan, dated October 13, 2003, prepared by SRF Consulting Group and BWBR Architects. Landscaping Plan, dated October 13, 2003, prepared by SRF Consulting Group and BWBR Architects. Tree Preservation Plan, dated October 13, 2003, prepared by SRF Consulting Group and BWBR Architects. Photometric Plan, dated October 14, 2003, prepared by BWBR Architects. Building Floor Plans, dated October 13, 2003, BWBR Architects. Building Elevations, dated October 13, 2003, prepared by BWBR Architects. ANALYSIS Rice Creek Watershed District (RCWD) The RCWD reviewed the proposal on October 8, 2003 and issued a CAPROC (Conditional Approval Pending Receipt of Changes). Findings of the Rice Creek Watershed include the proposal to relocate the mainline of Anoka County Ditch #72, and reconstruction of Branch 1, within the project's parcel boundary. Findings show no increase in the runoff rates from the site onto adjacent properties. The ditch relocation will remain in a piped condition. RCWD will maintain a 50 -foot easement on either side of the pipe. There are no proposed wetland impacts associated with this project. There is no proposed flood plane fill for the site. An acceptable erosion control plan has been submitted. Grading, Drainage and Erosion Control Many bioretention /raingarden areas are incorporated into a stormwater treatment train. The treatment train is designed to capture at least a % inch rainfall event. Stormwater from proposed parking /impervious areas is channeled through curb cuts into these depressional areas. A P8 phosphorous load model was run for the site. The model demonstrates a 19% reduction of phosphorous outflow for phase 1, and a 16% outflow reduction for phase 2. The P8 model shows an increase in site phosphorous inflows. This is because of atmospheric dust particles attached to phosphorous particles settling on impervious surfaces. The rain garden design directly captures these additional phosphorous accumulations from the impervious surfaces (for a 3/ inch rain event). Minnesota Land Cover Classification System (MLCCS) MLCCS data shows nothing significant on the site. The site however, is immediately adjacent to a natural resources lake. The lake boundary next to the church site is indicated as cattail marsh, with sedge meadow inclusions, lake sedge and tussock sedge. In addition, water willow (unique plant) is found along the shoreline of the island and in cattail inclusion areas along the shorelines in this area. Proposed best management surface water practices should help to attenuate effects of nutrient loading into the lake, and the effects on vegetation present immediately off site. The church is proposing to use native plants in vegetative swale, bio- retention, infiltration, and ponding areas. This is another recommended BMP. Zone 1 and 2 protection areas are mapped just east of the lake in the seasonally flooded areas of the MLCCS. This area is also mapped in the city Comprehensive Land Use Plan as greenway. It is my understanding that the church is proposing to create a conservation easement in this area and write a management plan that is suitable to Anoka County and the City of Lino Lakes. Individual Sewage Treatment System (ISTS) The projects proposes to utilize an on -site sewage treatment system to treat wastewater. Anoka County is currently reviewing the proposed on -site wastewater treatment system. Effluent treatment levels (with the proposed system) for CBOD and TSS appear to be on the lower range of limits for effluents before reaching the soil treatment area There appears to be an existing well and septic system at the existing residence. If this residence is abandoned as part of the project, than the septic system needs to be appropriately removed and the well sealed. Wildlife Habitat Construction of the church is proposed to commence in April. This is about the time the Great Blue Herons are returning to nest. Eagle Brook Church has established an environmental sub - committee that would be willing to act as a communication group between the church and the public agencies. Since the construction area of the church is outside the theoretical nesting buffer of the birds, we should be ok. However, should observations indicate otherwise, we will have the quick link with the church. Buffering standards for nesting herons were tested for highway construction activities. There is always the possibility that something in the church construction process could disturb the nesting herons. Landscaping A landscape plan has been submitted that includes substantial areas restored to native grasses, as well as combinations of cultured grass, rain garden plantings, perennials, ground covers, shrubs and trees. City specifications for native seed and forbs should be used. A substantial portion of the site is proposed to be planted to Autumn blaze maple. Autumn blaze is a new cross between silver and red maple that has a nice fall color, rapid growth rate, and stronger wood structure than the silver maple. A bit of caution should be used to over planting any one species. Northern pin oak also has a nice fall color. I would prefer a native screening material on the north side. White pine would most likely do better in the long run, rather than Austrian pine. Eagle Brook Church environmental subcommittee has indicated that it will also assume responsibilities for native plant restoration and maintenance. Tree Preservation A tree preservation plan has been submitted. There are no impacted trees indicated in the plan. All tree preservation measures must be taken before any soil disturbance. Lighting The Photometric Plan submitted for review indicates that the proposed site lighting is consistent with the City's Zoning Ordinance requirements. Pole mounted lights are proposed to be 22 feet in height. All light fixtures are proposed to be hooded with a ninety degree cutoff angle. Impervious Surface Coverage The City's Zoning Ordinance does not specify a standard for impervious surface coverage in R, Rural Zoning Districts, The PSP, Public /Semi - Public Zoning District which provides for similar institutional uses, ( i.e.; schools, governmental buildings,) establishes a maximum impervious percentage of 65 %. Approximately 19% of the site is proposed to be impervious. OPTIONS 1. Recommend approval of the Eagle Brook application with recommendations and Environmental Board comments. 2. Recommend no approval. RECOMMENDATION This staff person cannot ; address the cultural, economic, or traffic issues concerning the proposal. These elements always play a role, as modeled in the Lino Lakes Handbook for Conservation Development In saying this, staff recommendation is 1. Approve the project with Environmental Board and Staff comments and recommendations. 2. Recommend not approving. Environmental Board Comments: ATTACHMENTS 1. General Location Map 2. Lino Lakes Environmental Board EAW comments 3. Rice Creek Watershed Report 4. Project Narrative /Phosphorous Model 5. Eagle Brook Church Planning Information 6. Site Plan 7. Grading Plan 8. Utility Plan 9. Landscaping Plan 10. Tree Preservation Plan 11. Floor Plans 12. Building Elevations TIER LAKE Iii■ A imwmpurAimi Era Et s'IQra me s� pal R:; aaaal`Y:lJ IRIS =i layar�i� 'a M tnrrOR' S It'll l RrmStPSM . ENVIRONMENTAL BOARD MEETING OCTOBER 30, 2002 Chair Kukonen inquired about the depth of the sand. Mr. McCully responded that the site was very low, so it would be about two to three feet deep. Grundhofer asked for an example of a site that was very low and the system worked.' Mr. McCully answered that the bank on 35E was a good example. The water leaving the system into the sewer was clear and only a trickle. Mr. McCully stated that pervious paving areas would be vacuum cleaned once a year. He had used them in Minneapolis, Saint Paul, and in Wisconsin. Asleson stated that it was a well - designed treatment train, however his only question was the final destination of the water above the groundwater. Mr. McCully stated that another soil boring could be done on the west side and that it would not be a problem. The system needed to be verified. The species of trees needed to be changed such as the honeysuckle. The only other concern was lighting issues. Chair Kukonen requested that the new copies of the lighting codes be sent to the developer. He called for a motion per the approval of the City Engineer, a redesigning of the lighting plan, and the noted species changed. Halen made a motion to approve with the recommendations of staff and Board. O'Dea seconded the motion. Donlin reiterated her concern over the use of pesticides. Asleson indicated that the Best Management Practices were encouraged for storage and maintenance. He indicated that the site was on a sanitary sewer. There was filtration at the doors where any spills would occur. Halen accepted the friendly amendment. Schneider seconded the motion. Motion carried unanimously. B. Eagle Brook Church, EAW Comments Asleson introduced the topic by reviewing the background material. A citizen petition was submitted to the Environmental Quality Board to perform an Environmental Assessment Worksheet (EAW) for the development proposal. When the application was received, the project developer was required to supply all data to the Responsible Government Unit, which prepared the EAW using a standard form supplied by the Environmental Quality Board. The Responsible Government Unit was the City of Lino Lakes, with Jeff Smyser as the Lead Person in the review. The EAW was prepared by the information supplied, and was approved by the City Council for distribution. Copies had been sent to several review agencies for a comment period of 30 days. After the comment period, the Responsible Government Unit would respond to comments and APPROVED MINUTES ENVIRONMENTAL BOARD MEETING OCTOBER 30, 2002 determine whether an Environmental Impact Study would be required. The comments made by other review agencies might require modifications to the project to mitigate environmental impacts. The Board received several copies of letters by residents concerning the site. Art Hawkins submitted on October 16, 2002 to the Members of Lino Lakes City Council. He discussed the need for protection for the birds, consultation of Joan Galli, Jeff Perry and himself, and an adherence to the Comprehensive Plan. A letter from Art Hawkins to Joan Galli, MN DNR and Jeff Perry, Anoka County Parks dated October 24, 2002, on challenging the assumption that the birds would not be disturbed by the proposed site. A letter and attachment from Wayne LeBlanc to the Lino Lakes Environmental Board dated October 29, 2002. He urged the No Wake Zone Ordinance to be continued beyond September 1, 2004, and that an Environmental Impact Study be performed. The following comments were made by the Board and citizens present on a page- by -page basis. • Page 2, Section 5: Asleson recommended adding National Wetlands Inventory and MLCC maps. Section 6B: Asleson indicated the need for detailed description of construction methods, operational features and project closure actions. In addition, Saint Paul Public Works proximity should be stated in last paragraph. Other issues needed to be addressed, including surface water information, the compaction of soils prevention, and sequencing under construction to prevent compaction. Page 3, Section 6B: Ms. Bor submitted that "two consecutive seasons of nesting of herons would be affected." O'Connell added that no construction should take place during that time (the nesting seasons). O'Dea disagreed. She believed the statement should stay to show the reason for needing an EIS. Asleson noted that a 500 -foot buffer was based on one paper written in relation to road building and logging, and stated that the model cannot be automatically applied to nesting herons. He urged the monitoring of the birds' behavior, and cease and desist if the birds were negatively impacted (if constructing in the nesting period) Chair Kukonen indicated that this would be the first year the No Wake Zone Ordinance would be in effect during the nesting period. Asleson answered that they did not know if it would impact the birds. He further stated the birds were used to a certain amount of background and freeway noise and that no one knows APPROVED MINUTES ENVIRONMENTAL BOARD MEETING OCTOBER 30, 2002 what the impacts to nesting herons would or could be for this type if activity at this range — particularly being a "new" type of disturbance. Donlin stated that the point was that the birds could be impacted. Page 4, Section 6D: Donlin mentioned that the site should require more environmental review. Ms. Bor indicated under the statute they needed to submit all stages and allow plans for an environmental review. She stated that the Church probably had plans for summer camps that could impact the lake. There was also a barn and a farmhouse existing on the lot and it was unclear if those would be utilized and under what circumstances. O'Dea addressed "describing future stages," indicated that the expansion should have been included in that section. Section 7: ' Donlin stated that an 80 -foot spire would be offensive, in light of the building requirement of under 36 -feet. Even though churches were exempt, the conditional use permit required the building be similar height to surrounding buildings in the neighborhood. O'Dea added that the spire could be 60 -80 feet high, and wanted the height clearly defined. Grundhofer recommended there be no lights on at the site at night, especially pointed upward at the spire. Donlin stated that a variance must meet nine criteria, and that it would not be required. There was precedence with a church. Rod Kukonen requested that site compatibility be further addressed. Page 5, Section 8: Grundhofer noted that the table appeared incomplete. O'Dea indicated none of the permits were discussed, but merely identified. Ms. Bor stated that if the Environmental Assessment Worksheet did not go well, they might not use the plan. She believed that the project should be addressed in concept. If they asked the correct questions, the environment could be protected. Grundhofer requested to see the permits and approvals from Table I, and to postpone comments until the next meeting. Donlin questioned if by getting the permits, had they not gone beyond the approval process. Asleson clarified that they were listing the permits and agencies. Those agencies would be receiving a copy of the Environmental Assessment Worksheet. Donlin stated that a Shoreline Management Review should take place. ENVIRONMENTAL BOARD MEETING OCTOBER 30, 2002 Grundhofer indicated that at the November 20, 2002 meeting she would like to the comments from Table I. • Page 5, Section 9: Donlin stated that they had not discussed project compatibility with adjacent homeowners and nearby land uses. It was further stated that within a %2 mile there are 38 residents not directly on the property line as well as public utility property, and that the paragraph is not accurate. • Page 6, Section 9: O'Connell noted that on 20th Avenue there were nine homes adjacent to the site. Ms. Bor indicated that 20th Avenue was zoned light industrial. She stated that her family had lived there for six generations. She found that in the text that the first paragraph was not accurate in the number of homesteads. In the third paragraph, the reference to the Comprehensive Plan was incorrect. In the fourth paragraph the Pig's Eye Wastewater Treatment Facility was used. In addition, the tile system from 1910 was inadequate and there was ponding in the Rehbein addition. O'Dea indicated that land use concerning Environment did not address the Minnesota Land Cover Classification. Chair Kukonen agreed the Environmental Assessment Worksheet was lacking in many areas. He asked for clarification in Section 10 where the numbers changed from 7.2 to 48.6 for brush/grassland classification. O'Connell stated that the concept of rainwater guards was good. She referred to page 12, and noted that all impervious needed to be addressed. Kukonen added that the number given was 15 acres, when on page 12 the number given was 50 acres. Page 7, Section 11: Asleson noted that he had given the developers the cover type natural features map and information on the aquatic survey. These were absent from the discussion section. Grundhofer stated that she would like to see a MLCC map included in the document, and more detail in the Natural Features section. O'Dea indicated that they were unable to assess the impact because there was not enough data available. Asleson answered that the information and maps were available. He also mentioned that there were no construction limits indicated. He recommended that they add the City of Lino Lakes, and the Peltier Lake Association in the fifth paragraph. They should not state their assumption that the birds would not be impacted, if other experts could not. He urged a monitoring standard and a plan to stop contractors, should observers indicate it necessary. ENVIRONMENTAL BOARD MEETING OCTOBER 30, 2002 Donlin noted that in the first paragraph, wild turkeys and the Sandhill Cranes were omitted. O'Dea stated that a sequencing and a staging plan needed to be submitted. ` They had not described the measures to be taken to minimize or avoid impacts. Asleson answered that they ran out of time. He had spoken to them and gave them information and contacts that were not used. In the last paragraph - developer should define which habitat on the western portion of the northeast property. So should the word "substantial" in substantial buffer be defined. Grundhofer posed the question concerning a substantial buffer. Schneider stated there was no mitigation plan for the protection of existing wildlife. Mr. Ron Marier of HERON, noted that they were supposed to identify the habitats near the site. It was stated that Peltier Lake would not be affected, however they initially had proposed trails. They had not addressed any potential trails and their impacts. Donlin stated that the easement was about 20 -feet wide, but they spoke as if it was a substantial open space. Page 8, Section 11B: O'Dea questioned the amount needed for a natural buffer, and were the woodlands sufficient. Mr. Marier mentioned that the land was low, and because of that, the runoff and backup could possibly flood the soil and destroy the woodlands. The area had a tradition of flooding. In addition instead of the figure 500 acres, the area was closer to 1000 acres. The number of acres needs to be researched and restated if different. Chair Kukonen indicated that they had not addressed any adverse impacts to the wetland. Asleson stated there were eight rare species near that location. Additionally, in Section 12 the answer "no," was incorrect, because there would be changes in the hydrology of the site. APPROVED MINUTES ENVIRONMENTAL BOARD MEETING OCTOBER 30, 2002 Mr. Marier noted that for Wetland B the ponds would not hold the water that was only three feet deep and drains into an open ditch and into the lake. He predicted erosion problems. This needs to be addressed in the EAW. • Page 10, Section 12 under the Avoidance and Minimization of Wetland Impacts: O'Connell stated that it was inadequately addressed. Grundhofer added the area was degraded, and that it should be made better. Asleson indicated that the soil had clay so the soil structure and any infiltration presently on the site could be easily destroyed. To prevent that, it helps to pull a ripper behind the equipment that is grading. It would take 100 years or more to restore the soil if restoration practices or preservation practices were not used. It would not cost any more money. A sequencing plan should be added as stated with the Best Management Practices. Schneider noted in the County Ditch System section that the tile system was very important to the adjacent owners. Asleson indicated that a surface water systems train should be better addressed for the impervious parking. They needed to analyze the hydrological changes that could occur. Chair Kukonen added that they needed staff comments. Asleson stated that there was no description of the surface water volumes before and after, or where the volume was going. Mr. Kevin Lawrence noted that there would be an overflow from the impervious to the mitigation pond, because the distance between them was not large enough. Asleson stated that the design of the Surface Water Management appeared confusing, and that the statement concerning discussions with the watershed district about drain tiles is inaccurate. In particular, that the existing drain tile alignment will remain in place or be replaced with new tile, and that this procedure is endorsed by the Rice Creek Watershed District. Mr. Marier cited a utility ditch to the drainfield location would be three feet over the high water level, and needed to clarify plans for mitigation. The water could rush over the berm into the lake. Donlin referred to Section 13, that at peak times, there could be 4,200 gallons released for 4,000 people. The project would need MUSA, not a septic system. Ms. Bor added that it would not only be on Sunday morning but there would probably be other programs and other uses. APPROVED MINUTES ENVIRONMENTAL BOARD MEETING OCTOBER 30, 2002 Donlin stated that the potential numbers were inappropriate for septic use. If the site was not sewered, it probably should not be at that location. Ms. Bor indicated that the MPCA would be contacted for review. Donlin added that septics had a thirty-year life, and expressed concern over the possible failure of that system. Asleson noted that the soils on this site infiltrate, but the speed was slow. They were proposing a mound system with sand. Mr. LeBlanc stated that the proposed well needed further review, because it could cause drainage of 500 acres. Asleson answered that, in the report, they should address the proposed well and how it could affect the other wells. Donlin expressed concern for adequate water in case of fire, because they did not have city water. • Page 11, Section 14: Donlin noted that if Peltier Lake was a natural environment lake, the setback cited in the 6th paragraph was inaccurate. It should be 200 feet for non - sewered land. If the woodlands flooded, there would be no buffer for the heron colony. Page 12, Section 14: Asleson stated that a floodplain map should be overlaid on their existing map. Donlin indicated the lake access needed to be addressed in Section 15. Asleson answered that they should be able to use the lake, but that they needed to be more descriptive about their intentions on use, such as types of water craft. Asleson stated for Section 16, that the soils and compaction needed to be addressed. Somewhere in the document protection measures and remedial measures to be taken to restore compacted soils should be addressed. Grundhofer asked for clarification if 50 acres was the amount disturbed included 15 acres of impervious. (See also page 6.) This clarification should address where the 50 acres is, and how it will be disturbed. The report should address the soils budget. • Page 13, Section 16: O'Dea indicated that more information was needed for slopes between 0 -12 %. Asleson answered that infiltration and filtration was under Section 17, but agreed that more detail was necessary in the areas of how, what and why there was no planned pervious overflow and pervious paving. The technology was available. Systems can be designed to trap and store the water, to give it time to go into the soil. 10 ENVIRONMENTAL BOARD MEETING OCTOBER 30, 2002 • Page 14, Section 6: The last two sentences are blank statements. EAW guidelines indicate this has to be more specific. • Page 14, Section 17B: Chair Kukonen stated it would be necessary to cite details concerning treatment systems. O'Dea noted in the guidelines they were required to cite any water bodies that would be affected. For this item, more detailed information and analysis is necessary. Mr. LeBlanc questioned in Section 18A the assumptions used for the numbers averaging 2,800 gallons per day and 4,200 gallons per day at peak times. What method are they using to evaluate this and how did they come up with these numbers? • Page 15, Section 18B: Grundhofer stated that they did not indicate a mound system in the third paragraph. In addition, the proximity of the septic system to the woodland and the lake should be defined. Asleson referred to the Sandplane Model that takes the physical structure and gives the site a rating. This site was decades to a century for surface water to get into the groundwater, but that did not apply to the lake. If the soils were compacted, the infiltration rate changed, resulting in runoff. He recommended that they adequately address the soil density infiltration systems. He added that in Lake Protection Zones, development should not take place. Extraordinary measures should be taken to minimize impact if development does occur in Lake Protection Zones. Donlin inquired about the acreage of the red zone. Mr. LeBlanc answered that he had roughly estimated 600 acres. Donlin questioned the amount the church was paying for the land. Ms. Bor answered that they had paid 1.2 million dollars. Grundhofer inquired about details of the sub - grade correction and the need for the City to approve imported soils. • Page 18, Section 20: O'Dea posed a question concerning the location on the map and size of the diesel fuel tank. (That it is not shown on the map.) Halen inquired in Section 21, about at what point the Carbon Monoxide levels became significant. 11 APPROVED MINUTES ENVIRONMENTAL BOARD MEETING OCTOBER 30, 2002 Mr. LeBlanc questioned the regulations for the Carbon Monoxide emission levels. Ms. Bor answered that the levels for cows were lower than the standards, and should have been noted for that section. • Page 23, Section 22: Asleson asked for clarification on how the numbers related to people and animals. Page 28, Section 24: O'Dea noted there were no receptors (testing devices) placed near the herons, and therefore were unable to address the heron issue. Grundhofer stated that the level of noise disturbance was unknown for the birds, and that monitoring is needed by a trained observer. • Page 30, Section 24: O'Connell stated that the projected traffic with noise levels were one to three decibels higher than the state standards in the four receptor sites. Ms. Bor answered that Doug Fisher was a county road, and even though the standards were exceeded, it did not affect the road. • Page 31: Grundhofer inquired if comments were available from Rice Creek Watershed District. • Page 32, Section 25C: Grundhofer inquired about plans for a trail. Asleson answered that they had discussed a trail down to the lake. They may be willing to have a conservation easement, land trust, or have the area turned over to the county with a buffer, due to the heron habitat in the Southwest corner. This question should be addressed and answered in the report. Mr. LeBlanc submitted that the tree line could be extended across to form the buffer. Grundhofer added that there would be a need for signage. Grundhofer indicated that Section 25E needed to change the answer to yes and to explain their plans to minimize adverse impacts. Donlin inquired about the height of the Centerville water tower. Asleson answered about 100 feet high. • Page 33, Section 26: Grundhofer suggested night -time lighting in the building only, and no lights in the parking lot because of the lake when the building was unoccupied. Chair Kukonen indicated it would be helpful to have more information on lighting. Schneider questioned the basis for the statement in Section 27, third paragraph that the growth areas were not relevant. 12 APPROVED MINUTES ENVIRONMENTAL BOARD MEETING OCTOBER 30, 2002 O'Connell inquired about which aquifer they would be using. Schneider indicated that it was necessary to answer the questions how and why, to assure no impact. O'Connell noted a conditional use permit was necessary. Donlin stated that it was not a small matter. • Page 35, Section 27: Asleson stated that the Surface Water treatment train (management plan) was incomplete. Chair Kukonen inquired about the measures to be taken and plans for maintaining the buffer. Ms. Bor stated it would be helpful to address plans to compensate for he turn agricultural ditches that would be redone. Donlin indicated that it was necessary to add the word "known" to no foreseeable future projects, because it addresses adjacent property. Chair Kukonen called for a motion to pass on the recommendations from the Board, staff, and citizens. Schneider made a motion to pass on the recommendations from the Board, staff, and citizens in the attendance. Grundhofer seconded the motion. Motion carried unanimously. DISCUSSION ITEMS . Metro Greenways Focus Areas Asleson noted that according to the Metropolitan Wildlife Corridors Project, the entire Rice Creek area was identified as a focus area. He also indicated that to the North of Lino Lakes Elementary there were 21 rare species identified including a unique wild orchid that was still in bloom as recent as yesterday. He stated that the Department of Natural Resources had grant money available, and that he had submitted an application concerning the area. He was able to apply for the grant because the special areas were now designated. He contacted groups such as the Soil Conservation District and others to work together on the project. Zoning Task Force Update Chair Kukonen discussed the recent developments on the zoning ordinances. There were no new open space requirements. There could be no more than 65% OCT- 20- 2111.5 12:35 KILL CKttK WH I LKbI1tU bbl Ybb 41`Jb t'. bWWUY 1ti 5 At their meeting held October 8, 2003 the Board of Managers of the Rice Creek Watershed District took action on your Permit Application as shown on the attached document. The following definitions may be helpful to acquaint you with our procedure and effect timely permit issuance: CAPROC (Conditional Approval Bending Receipt Of Changes) = The District has nearly all exhibits required for adequate review and issuance of a permit; you have 90 days to submit the required non - administrative item(s) and six months to submit the required administrative items. After this time, the application reverts to a denial and a new application will need to be submitted. Please submit additional exhibits with your application number affixed in duplicate and one copy in an electronic .pdf format. Failure to identify your exhibits by Permit Application number could mean a delay in issuing your permit ut. Cash surety: If your project requires a cash surety, the surety will be kept through final inspection to assure erosion control measures remain current as shown in plan and also for compliance with other permit requirements. Up to the first $5,000 must be cash — a check from the applicant is acceptable. Amounts over $5,000 are accepted in the form of an irrevocable letter of credit or an insurance company bond. The format for the letter of credit and bond can be found on the RCWD web page listed in the next paragraph. Your project requires an easement and an Operation and Maintenance agreement. The easement needs to be submitted either on a final plat with language legally conveying the easement on the final plat, or as a separate legal document. The Operation and Maintenance Agreement needs to be submitted as a separate legal document. Guidelines for separate legal documents are available on the RCWD website www.ricecreekwd.com. Forward two draft documents (unsigned), or copies of the plat language, including the legal description in the body of the document or language for review by the District's Attorney and Engineer. Following their comments, you must submit an acceptable original document to the County Recorder's Office and provide RCWD with a photocopy exhibiting the Document Number. PERMIT WILL BE ISSUED AFTER WE RECEIVE FINAL COPY AND PROOF OF RECEIPT BY COUNTY RECORDER. When you receive the final recorded document, you must send a copy to RCWD. No surety refund will be made by RCWD until official proof of recording is provided. After receipt and review of additional exhibits, more information may be required for clarification to ensure that District's requirements have been met. If you have any questions, please call Karl Hammers, Rice Creek Watershed District Permit Coordinator, at 763 - 398 -3072. C: City of Lino Lakes Applicant's Consultant: Walter Eshenaur, SRF Consulting Correspondence RCWD File # 03 -073 Emmons & Olivier Resources, Inc, i 10/9/03 Utr 1: GCJ- -GUCJJ - 1G• JJ Permit Annlication N073 Eagle Brook Church R1 LC. I..RGGR w1-1 1 GRJfICL Rice Creek Watershed District Permit Application Number Applicant: Scott Anderson Eagle Brook Church 5212130'h Street North White Bear Lake, MN 55110 Ph: 651 -429 -9927 Fx: 651 -429 -7663 scott .anderson ®caglebrookchurch.com Purpose: Location: oi (00 4+17b 03 -073 Consultant: Walter Eshenaur SRF Consulting Group One Carlson Parkway N Suite 140 Minneapolis, MN 55407 Ph: 763 -475 -0010 Fx: 763 -475 -2429 weshenaur®srfconsulting.com Final Site Drainage Plan for the Eagle Brook Church and a Public Ditch System Plan for a partial abandonment and realignment of Anoka County Ditch 72, 54,000± SF, 91± acres. North of 771 Street and west of 20`n Avenue, Lino Lakes. T -R -S: 31 -22 -11 d AIM Recommendation: Conditional approval pending receipt of changes and outstanding items related to: • Stormwater Management Verification of the datum conversion provided for the 1922 plan profile. Proposed construction sequencing plan ensuring that ditch capacity is maintained during all phases of construction. Incorporation of additional Grading Plan Notes specific to the infiltration features including; use of topsoil/sand mix for top dressing instead of topsoil, revegetation specifications (deep rooted native vegetation), and other measures necessary to protect these features from siltation during construction (i.e., silt fence and use of infiltration basins as temporary sediment basins during construction and excavation to final grade (final 3 feet) after stabilization of upstream areas, etc.). Floodplain Specification of the low floor elevation on the grading plan to be a least two-feet above the 100 -year flood elevation of the Emmons & Olivier Resources, Inc. 10/9/03 vv. v..v iG'J�J - 1 \i \..L. \..t \LLI\ wl 1 LI\ II IL✓ Permit Anplicat_ ion N Eagle Brook Church 001 100 4170 17'.U4/07 onsite ponds and 1 -foot above the emergency overflow elevations for the onsite ponds. Administrative Draft "legal document with satisfactory form and description granting ponding and flowage easements over all onsite ponds, wetlands and 100 -year floodplain (below 887.0). Letter from the City indicating which stormwater management features will be maintained by the City and a Draft Declaration for Maintenance of Stormwater Management Facilities acceptable to District engineer and attorney for proposed onsite stormwater management features that will not be maintained by the City. 7. Copy of receipt from County Recorder and signed/notarized legal document(s). Note that legal docurnent(s) are to be submitted by Applicant to County for recording only after approval by District. . Finalized plan set signed by a professional engineer. Cash surety in the amount of $20,000. The final grade of the realigned Anoka County Ditch 72 open ditch section may require minor revisions per surveyed field location (horizontal and vertical) of the existing tile- line at the point of diversion from existing to proposed alignment. Permit Application dated June 5, 2003, received June 5, 2003. Project Narrative prepared by SRF Consulting Group, Inc., undated, received June 5, 2003. Eagle Brook Church Campus Plan Set (31 Sheets), dated November 7, 2003, received June 5, 2003. MPCA NPDES permit application, received June 5, 2003. Environmental Assessment Worksheet prepared by SRF Consulting Group, Inc., dated October 28, 2002, received October 28, 2002. Certificate of Survey prepared by SRF Consulting Group, Inc., June Emmons & Olivier Resources, Inc.. 10/9/03 Ul. l - GU"-GYJYJJ K l Lt LKttK WH I tKbrItU Permit Application Nnr -073 Eagle Brook Church 651 766 4196 P.05/07 3, 2003, received June 5, 2003. Hydrologic Calculations prepared by SRF Consulting Group, inc., dated June 4, 2003, received June 5, 2003. Response' to- .Draft Engineers Report prepared. by SRF Consulting Group, Inc., dated June 16, 2003, received June 17, 2003. 9. 1922 Anoka County Ditch 72 Plans, received June 17, 2003. 10. Pipe Capacity Calculations prepared by SRF Consulting Group, Inc., dated June 16, 2003, received June 17, 2003. 11. Petition for Partial Abandonment and Reestablishment of County Ditch 72, prepared by SRF Consulting Group, Inc., dated August 11, 2003, received August 13, 2003. 12. Copy of 1922 Anoka County Ditch 72 Plan and Profile. 13. Copy of Anoka County Ditch 72 Statement of Auditor Showing Assessments Made on Lands dated March 29, 1923. 14. Engineer's Memo regarding partial ditch abandonment prepared by FOR Inc., dated September 19, 2003. 15. P8 model and supporting documentation prepared by SRF Consulting Group, Inc., dated September 30, 2003, received October 1, 2003. 16. Tile Line Capacity Calculations prepared by SRF Consulting Group, Inc., dated September 30, 2003, received October 1, 2003. Findings: 1 This project entails construction of a 54,000± SF church to be known as Eagle Brook Church on 91± acres. The project also entails a partial abandonment and reestablishment of the mainline of Anoka County Ditch 72 and reconstruction of Branch 1 within the project's parcel boundary. The proposed stormwater management plan includes two NURP ponds and 14 bioretention/infiltration features. These features meet District water quality treatment, rate control, and infiltration requirements. The submitted hydrologic calculations and grading plan demonstrate that there will be no increase in runoff rates from the site onto adjacent properties. The main line of Anoka County Ditch 72 (ACD 72) and Branch 1 of .— �+•+•+ +� • .Ju �\ a \..L L.I�LLr\ WPl 1 LI \ 'l ILL Permit Application No 073 Eagle Brook Church Anoka County Ditch 72 pass through the site. The ditch consists mainly of tile lines which daylight onsite and then flow via open ditch to Peltier Lake. The proposed plan is to remove the most downstream 1,4001 linear feet of the main line tile line onsite and abandon the existing alignment. Conveyance for this abandoned section of tile line was previously proposed to be reestablished via an open ditch along the south property boundary and discharge to the existing open ditch section. At the September 24th Board Meeting it was proposed that the reestablished ditch section should be a piped system instead of a ditched system. The Applicant has since submitted plans and hydrologic calculations for a piped system along the same realignment. This system is proposed as a 14 -inch pipe that ties into the main branch (existing 10 -inch at the tie-in location), and at the location of Branch 1 the pipe system is proposed to be upsized to an 18 -inch pipe to handle both the flows from the main branch tile line and Branch 1 (also a 10 -inch pipe). The Applicant has indicated the willingness to construct the reestablished ditch section as either a piped or ditched system. The Applicant will convey a perpetual easement over the realigned section of the ditch to the District and the ditch will be maintained by the District. Based on the submitted hydrologic calculations the proposed reestablished ditch section OR piped system will not reduce the capacity of the ditch system. Design of the proposed realigned section is based on a datum conversion (100 -feet = 904- feet), per survey of the invert of the exiting tile outlet. Minor plan revisions may be required if this datum conversion is not exact at the diversion point and if the existing tile line is at a lower elevation than expected. All lateral connections to the proposed realigned/reconstructed sections of Anoka County Ditch 72 will be maintained. A wetland delineation report has been received and accepted during earlier planning efforts for this site. There are no proposed wetland impacts associated with this project. The RCWD regulatory flood elevation for this site is 887.0. There is no proposed floodplain fill. The submitted plans do not specify a low floor elevation for the Emmons & Olivier Resources, Inc. WV. (-V GVfJJ 1G• Ju 1\ l VG l.f\GGI� WI 1 LI \JI lLL Permit Application N.. -073 church. A revised grading plan specifying the low floor elevation to be at least 2 -feet above the 100 -year flood elevations for the onsite ponds and 1 -foot above the emergency overflow elevations for the onsite ponds is required. An acceptable erosion control plan has been submitted. On August 27`h,' the RCWD Board tabled this permit application until the September 24th Public Hearing regarding the realignment of the Anoka County Ditch 72. See Engineer's Memo dated September 19, 2003 regarding partial abandonment of ACD -72. Due to public concerns regarding water quality and drainage in the ACD 72 system this permit was not acted upon at the September 24, 2003 board meeting. See the Engineer's Memo dated October 3, 2003 which outlines the review of additional information submitted by the Applicant to address these concerns. On October 8, 2003 the board acted to approve the abandonment and realignment of the ditch with the condition that the signed finalized plan set will be reviewed and approved by the District Engineer. Knit 4 4144 ' SRF Consulting Group, Inc. City of Lino Lakes Conditional Use Permit Narrative Eagle Brook Church — Lino Lakes Campus Development 0 OF' SRF Consulting Group, Inc. in coordination with BWBR Architects is submitting the following Plans and computations in support of the conditional use permit application for the Eagle Brook Church Campus Development. Eagle Brook Church proposes a new church on a 91.2 -acre site located in Lino Lakes on County State Aid Highway (CSAH) 21, 11/4 miles north of CSAH 14, south of the intersection of I -35W and I -35E. The project is located within Section 11 in T 31N, R 22W in Anoka County. Existing Conditions The project site currently contains a farmstead consisting of a two -story single - family - house, a garage, a barn, and silo located on the south portion of the property. Approximately 60 acres of the property is cultivated for crop production that includes coin, soybeans, and a tree farm. The remainder of the property consists of natural wetlands and woodlands. Existing land uses on adjacent properties include rural, agricultural and large -lot residential uses. To the north and south are privately owned agricultural and rural residential properties. Peltier Lake is _ located to the west of the proposed project and is adjacent to a small comer of the parcel on the southwest. Based on data provided on the DNR website, Peltier Lake normal water level (NWL) is estimated at 884.50 feet, the ordinary high water (OHW) level is 884.70 feet, and the highest flood elevation recorded is measured at 886.63 feet. County Ditch 72 passes through the property from southeast to northwest. The ditch is shown on the Anoka County 1/2 section maps but a drainage easement of record has not been discovered that covers this ditch within the proposed development area Two lines comprise County Ditch 72 - Main and Branch 1. Both Main and Branch 1 consist of drain tile buried below ground. The Main drain tile line begins approximately 4,300 feet southeast of the property and Branch 1 begins approximately 2,500 feet south of the property line. County Ditch 72 drains between 590 and 650 acres. A number of short drain tile laterals are also connected to the Main and Branch 1 within the property. The Main drain tile daylights into a shallow open channel which discharges into a wetland attached to Peltier Lake. There are no distinguishing surface characteristics demarcating the County Ditch 72 drain tile and its laterals until it surfaces near the wetland. Agricultural cultivation currently occurs directly over the majority of drain tile within the property. County Ditch 72 is regulated by the Rice Creek Watershed District. Storm water runoff from County Road 21 is currently routed through a system of road - side vegetated swales to a wetland system to the north and to a vegetated swale system to the south of the property. No pretreatment of the storm water occurs prior to discharge from the swales to the wetlands. H: \Civil \047 \4443\sent\BWBR \10 -17 -03 \City submittal narrative.doc SRF Consulting Group, Inc. Proposed Conditions Storm Water Discharge Rates The existing discharge rates will be reduced under the proposed conditions utilizing Best Management Practices (BMPs). Existing cropland will be replaced with building development, parking areas, grass meadows, storm water ponding areas, wetland swales, and bioretention areas. Based on drainage patterns, the rate control analysis has been split between two areas, County Road 21 and the primary development site. The existing County Road 21 runoff routes will be maintained in the proposed condition. The roadway runoff will be routed to the wetland located to the north of the project site and to a swale outlet south of the property. Due to space constraints, no rate control devices area proposed for this portion of the project. The runoff from the proposed building and parking portion of the site, as well as the areas to the east of the proposed parking lot are routed through bioretention and swale systems -'` to the proposed detention ponds. The ponds are sized to provide water quality treatment for the 2.5" storm event per watershed district requirements, while also providing 1 -year storm event skimming per watershed district requirements. As can be seen by the table below, significant rate control from the site is also demonstrated. Overall, the proposed development will significantly decrease the runoff rates from the property relative to existing conditions. Table 1: Storm Water Runoff Rates At outlet of Lower Pond. H: \Civil \047 \4443\sent\BWBR \10 -17 -03 \City submittal narrative.doc 2 - YR Storm Event Discharge (cfs) 10 — YR Storm Event Discharge (cfs) 100 - YR Storm Event Discharge (cfs) Existing Site 52.9 113.9 192.5 Proposed Site* 3.7 13.4 18.6 Existing CSAH 21 5.8 10.1 14.5 Proposed CSAH 21 7.4 13.0 18.4 TOTAL RUNOFF RATE CHANGE 33.2 cfs decrease 97.6 cfs decrease 170 cfs decrease At outlet of Lower Pond. H: \Civil \047 \4443\sent\BWBR \10 -17 -03 \City submittal narrative.doc SRF Consulting Group, Inc. Storm Water Treatment BMP Utilization The proposed development project will exceed Rice Creek Watershed infiltration guidelines through the implementation of depressed storage areas, bioretention areas, and vegetated swale systems, see Drainage Area Figure (attached). Infiltration areas will reduce runoff discharge rates while also providing storm water treatment by infiltrating runoff through the soil. The bioretention areas in the proposed parking lots are designed to capture and infiltrate, at a minimum, the 0.34" rain event for the directly connected impervious areas. Storm water runoff is routed into the rain gardens through curb cuts in the parking areas. The slopes of the rain gardens are stabilized with erosion control mats to prevent soil erosion as the vegetation establishes. Larger storm events will be routed into the storm sewer system through overflow drop inlet structures located in each rain garden. The runoff from two north parking areas not connected to rain gardens is routed to the upper pond for treatment and rate control. The upper pond is designed to outlet either - 7. through a skimmer outlet structure during small storm events, or over a reinforced berm during larger events to a swale system that leads to the lower pond. The swale system will provide conveyance of water away from structures and parking areas to the lower pond during larger storm events. The lower pond is designed with enough active storage capacity to ensure controlled release through the designed outlet up through the 100 -year storm event. County Ditch 72 County Ditch 72, which comprises a drain tile line system, passes through the Eagle Brook development site Per the watershed district resolution, the system will be rerouted around the proposed development area and will continue to function as it does currently. The Rice Creek Watershed District has completed the necessary procedures (petition for abandonment and reestablishment, a public hearing and passage of a resolution) to allow the church to move the ditch to a new location. The church will continue to benefit from the ditch. The watershed district board of managers requested that the rerouted drain tile line remain as an underground system, which the church has incorporated into the construction plans (see submitted grading and utility plan sheets). Computations associated with the Stormwater Management Plan are attached to this permit application. Erosion Control Some potential for erosion during construction will exist as soils are disturbed by excavation. To minimize the potential, all exposed soils will be reseeded or sodded as soon as possible following construction. Best Management Practices (BMPs) for temporary and permanent erosion/sedimentation control are incorporated into construction plans in conformance with MPCA's requirements for the NPDES (National Pollutant Discharge Elimination System) Phase II permit for construction sites. BMPs H:\ Civil \047\4443\sent\BWBR \10 -17 -03 \City submittal narrative.doc SRF Consulting Group, Inc. for erosion prevention and sediment control during construction include silt fences, temporary seeding and mulching, use of erosion control blankets on 'slopes and coir logs in swales. Permanent ponds will be constructed as early in the project as possible in order to trap sediment during construction. Excess fill material will not be deposited in wetlands or other environmentally - sensitive areas. Construction Implementation Schedule Construction implementation is expected to conform to the following schedule: Table 2: Anticipated Construction Implementation Schedule Date Activity March 2004 Rough grading, pond construction, County Ditch 72 realignment, well drilling March — September 2004 Site grading, parking lot construction, landscaping and permanent vegetation establishment, building shell construction, sanitary system construction, CSAH 21 improvements, utility installation June 2005 — September 2005 Building construction, final landscaping September 2005 Owner Occupancy Responsible Party for Erosion Control Measures Blair Juliar Sheehy Construction Company 360 W. Larpenteur Ave St. Paul, MN 55113 Ph. 651- 488 -6691 Certificate of Survey An existing property Certificate of Survey is attached. Please note that County Ditch 72 actual alignment has not been defined on the certificate because field location has not been possible and a record of easement has not been found. The ditch will be physically located during construction. A final certificate of survey granting an easement over the realigned County Ditch 72 to the Rice Creek Watershed District will be issued once construction is complete and actual tile line and ditch alignments are surveyed. H :\ Civil \047 \4443\sent\BWBR \10 -17 -03 \City submittal narrative.doc EAGLE BROOK CHURCH SRF Consulting Group, Inc. Comm. #4443 POND STORAGE VOLUMES Upper Pond Lower Pond NW HWL Contour Elevation (ft) Area (ac) Ave. Area (ac) Volume (ac. ft) Cumulative Volume (ac -ft) Comments 887 0.31 0.3 0.3 0.33 888 0.35 0.4 0.4 0.70 889 0.39 0.5 0.5 1"15.` 890.0 0.52 NWL = 888.00 ft 0.5 0.5 1.69 NWL = 890.25 ft 891.0 0.56 1 YR HWL = 891.17 ft 0.6 0.6 228 Weir = 891.25 ft 892.0 0.61 100YR HWL = 892.16 ft 0.6 0.6 2.92 Overflow Spillway = 892.00 ft 893 0.66 Contour Elevation (ft) Area ac Ave. Area (ac) Volume (ac ft) Cumulative Volume (ac-ft� Comments 884 1.30 1.3 1.3 1.34 885 1.38 1.4 1.4 1.42 886 1.46 1.5 1.5 2.91' 887.0 1.54 NWL = 888.00 ft 1.6 1.6 r: 9 t 1 YR HWL = 888.35 ft 888.0 1.62 Weir = 888.75 ft 1.7 1.7 6.15 100YR HWL = 890.31 ft 889.0 1.70 Overflow Spillway = 890.75 ft 1.8 1.8 7.90 890 1.81 (TOTAL POND DEADPOOL = 5.64 ac -ft H: \Civil \047 \4443 \DRAINAGE \EXCEL \pond volumes.xls Page 1 of 1 10/13/2003 SRF Consulting Group, Inc. 09/30/03 Eagle Brook Church Water Quality Modeling Assumptions and Results At the request of Rice Creek Watershed District, a water quality model of the proposed Eagle Brook Church site was developed to determine total phosphorus loading from the existing conditions, Phase I and Phase II development on the site on Lake Peltier. The P -8 Model software was utilized to analyze the efficiency and potential phosphorus removal rates of infiltration basins, swales, and ponding areas proposed in the project. The modeling includes the following assumptions. Input Data for all models 1. NURP 50 particle distribution 2. Actual temp data files utilized for all model scenarios. Air temperature and data recorded at MSP airport between January 1949 and December 1997. 3. Rainfall scenarios modeled include: a. Actual 49 -year rainfall data from MSP Airport, recorded between January 1949 and December 1998 b. One -year storm event (Minnesota Zone 1) c. Ten -year storm event (Minnesota Zone 1) Existing Model 1. The model includes all areas within the property lines as well as a minor drainage area at the north side of the property that drains into the proposed church property under existing conditions. Model separates the area outside of the construction limits. The area outside of the construction limits is for informational purposes only, and was not included in the summary results. 2. Assumed B Soils based on NRCS soils mapping. 3. The existing land use is primarily row crops, with the exception of the farmsteads and the tree farm. 4. The wetland /swale device does not contribute to infiltration for the site as the soils are likely saturated as a result of the current lake levels. 5. Low infiltration rates (0.1 in /hr) are assumed for the depression area 6. Swales and ponds are assumed to have no infiltration. Phase I Model 1. Parking lot and building construction per the DD plan set have been modeled. 2. Associated infiltration areas and ponding devices included in the DD design are included in the model. 3. All row crop areas are converted to native prairie meadows. 4. Swales and ponds are assumed to have no infiltration. 5. Infiltration within the infiltration basin devices is assumed to be low (0.1 in /hr), to match Existing condition infiltration assumptions. 6. Flow routing - in general: infiltration basins to swales to ponds to Lake Peltier H:\ Civi1'O47\4443\sent\BWBR11O- 17 -03\P8 Narrative - Eaglebrook.doc SRF Consulting Group, Inc. Phase II Model 1. Additional parking lot area (350 cars), building expansion area (3,750 square feet), and associated infiltration basins are incorporated into the model. The proposed impervious areas are assumed to replace (reduce) restored meadow areas within the project area 2. Infiltration within the infiltration basin devices is assumed to be low (0.1 in /hr), to match Existing condition and Phase I infiltration assumptions. 3. All water from the proposed infiltration devices is routed to the lower pond. 4. The proposed elevation of the infiltration devices is assumed to be 810 ft, two feet above the NWL of the Lower Pond. Results are shown in the following table. The project generally shows a reduction in overall phosphorus loading, resulting from the inclusion of both ponding and infiltration measures. The additional parking and building areas in Phase II show a slight increase over that in Phase I as the land converted to parking was no longer considered row crops but rather prairie. Phase II continues to show a decrease in loading compared to-- , the existing condition. H: \Civi1'047\4443 \sent \BWBR\10- 17 -03\P8 Narrative - Eaglebrook.doc SRF Consulting Group, Inc. 09/30/03 Table 1 — Phosphorus Loading Eaglebrook Church Notes: 1. Only Areas within grading limits were modeled 2. Summary percentages and loading values do not include changes in phosphorus loading from areas outside of grading limits 3. Infiltration rate of 0.1 in /hr utilized for infiltration areas in existing and proposed conditions. 4. Models located at H: \Civil \047 \4443 \DRAINAGE \MODELING \P8 H;\ CiviP047 \4443\sent\BWBR\10- 17 -03\P8 Narrative - Eaglebrookdoc Total Phosphorus Load Inflow (Ibs) Load Outflow (Ibs) o� Removal Scenario 48 year Actual Data (1949 - 1997) Existing Condition 711 581 18% Average Annual 14.8 121 Phase I Proposed Condition 2,022 472 77% Average Annual 42.1 9.8 Phase 11 Proposed Condition 2,226 488 78% Average Annual 46.4 10.2 1 -yr 124hr Storm Event Existing Condition 0.2 0.1 22% Phase I Proposed Condition 1.8 0.3 86% Phase!! Proposed Condition 2.0 0.3 84% 10 -yr / 24 hr Storm Event Existing Condition 2.2 1.6 26% Phase! Proposed Condition 2.7 0.8 73% Phase!! Proposed Condition 3.1 0.9 70% Loading Increase / Decrease (Between Existing and Phase I) Based on 48 Year Data5 1,311 -109 -19% Loading Increase / Decrease (Between Existing and Phase II) Based on 48 Year Data5 1,515 -93 -16% Notes: 1. Only Areas within grading limits were modeled 2. Summary percentages and loading values do not include changes in phosphorus loading from areas outside of grading limits 3. Infiltration rate of 0.1 in /hr utilized for infiltration areas in existing and proposed conditions. 4. Models located at H: \Civil \047 \4443 \DRAINAGE \MODELING \P8 H;\ CiviP047 \4443\sent\BWBR\10- 17 -03\P8 Narrative - Eaglebrookdoc 21:1111101111111111 MS MIME C 1381918Si3919, i 91933 IEEE � 1::: ME I III EI �9�E lIIf: � 9ME iim aii�� IEEE �� SISEMEMIllffill11111 11111111111111 M SIMMESSIISEMIGESI EMS: 133311993337111EI37E 9E2 i6P9ii IIIIIIIIIIIIII I l i�i�II9I�IAIIIII m 111 2010 010:003111M1111111111111 SM ME MN IN: �iii Illliin IIuNI II ��um � IC �E�1un i11i.0 � � e�onnm 0 0 0 W2 Eagle Brook Build (Phase I) P8 Model Inputs (OFFSITE MODEL) 4 1 . 1 (9 't / 0 j I , Model Limits 1 Minor Watershed Boundaries /4 L- //% : ' 1/ �� 11 1 .. _,, ,..I I ''''‘ ., ,vir....;---40r,,, .„44 1,4110,1_11,12 1 40•1. iJ ,,, , ____,_.:____ ‘,,./.1,,,,,,."...._____,>___,..2.2-;...:4)(0?..- .. _ v , , , .,„, , ___,-- , ,( 4 __,......1,11111.. , 11W1:1‘5 7 ' 0: 4 Alii. ACIII 44*111,17All. In I II I „ ....k\ - ' . a I . I 41 I I 0 1/ f X `� APV ,WA -SHE' I11111111 `�, ' WI , 41, 1 ' f y 1r W1 (OFFSITE MODEL) 4 ,_ J (� �� R\ \ ____., .,, ---\ ..------j 1 1 WATERSHED WP2 \ \ 1 � -- r he \ CIVIL. \047 \4443\8ase \4443P8build.dgn _ - ' II • 0 1 iI Eagle Brook Existing P8 Model Inputs ,jqiii11 �_,,11,111:1 _4.,,, A! ....-9.0 - Model Limits 1 ' rii,„ Mino r Watershed Boundaries � \ �� I OF SITE = ! � , : • - ..► ' X er OF �,� - INFB A/ C (II, :, . „ ER A ERS D C ilov. -41111N-Z4-,<Ar 4011111 '1.14 . 1,-: ‘e ( 4 10,F Y 4411.itr,..51001 41.i...., A 0 .(iii oil OFFSITE MODEL �� MOD' � EBEXOFSTCAS �� EEXS .� A, WATERSHED . j E'•H:D 1 I 1 , )1' 1 ,..,.at.y/791111, . ••'-..iim-44,ar711 .11,1 I I r 1 I : : \ *-- - 1 a 1 4 \ 1 1 o_ a . .. ///__CVI r9 1 Pl . . . _ Litle I Kik .kk i A r - mil v_,, -- ,,,iti' , . \CIVIL \047 \4443 \Base \4443PB.dgn 1 - - - SRF Consulting Group, Inc. Comm. # _4443 Designed by: _JJK Date _10 /17/03 Checked by Date Pond Volume Computation -- English Units SCS Methodology Pond Location Eaglebrook Church Rainfall event = Initial Abstraction 2_5 inches 0.2 (typically use 2.5 inches if sediment loading is included here) ically 0.2 Type B Soils ) Dead ueaa Sub- Pool Pool Drainage Sub -Area Area Area Runoff Runoff Volume Volume Area Description (acres) (hectares) CN (inches) (mm) (ac -ft) (m3) upper Parking Lot 4.56 1.84 98 2.27 57.68 0.86 1063 upper Grass 0.79 0.32 58 0.13 3.39 0.01 11 Totals 5.349881 2.17 0.87 1074 Sediment Loading (25 design life is the typical critieria Area (acres) Avg. Erosion Rate (tons /ac/yr) Erosion Time Period (years) Erosion (tons) Area of Construction 50 1 Turf Establishment 2 1 Tributary Developments 1 2 Total Drainage Area 1 23 Gross Erosion Predominant soil type (sandy, silt, silty clay, or clay) silty clay Sediment delivery ratio for watershed ( %) (See worksheet labeled Fig. 1) Basin trap efficiency (%) -- typically use 90% 90 (See worksheet labeled Fig. 2) Estimated sediment density in basin (pcf) 90 (See worksheet labeled Table 2) Volume required for sediment storage acre -feet cubic- meters Sediment Loading (25 design life is the typical critieria Total Required Permanent Pool Volume As calculated on this sheet: Or user input (if not calculated above): 0.87 acre -feet acre -feet cubic- meters cubic- meters H: \Civi1\047 \4443 \DRAINAGE \EXCEL \Dead Pool Size_t }t itIs Area (acres) Avg. Erosion Rate (tons /ac/yr) Erosion Time Period (years) Erosion (tons) Area of Construction 50 1 Turf Establishment 2 1 Tributary Developments 1 2 Total Drainage Area 1 23 Gross Erosion Predominant soil type (sandy, silt, silty clay, or clay) silty clay Sediment delivery ratio for watershed ( %) (See worksheet labeled Fig. 1) Basin trap efficiency (%) -- typically use 90% 90 (See worksheet labeled Fig. 2) Estimated sediment density in basin (pcf) 90 (See worksheet labeled Table 2) Volume required for sediment storage acre -feet cubic- meters Total Required Permanent Pool Volume As calculated on this sheet: Or user input (if not calculated above): 0.87 acre -feet acre -feet cubic- meters cubic- meters H: \Civi1\047 \4443 \DRAINAGE \EXCEL \Dead Pool Size_t }t itIs SRF Consulting Group, Inc. Comm. # _4443__ Designed by: _JJK_ Date _10 /17/03__ Checked by: _ Date Pond Volume Computation -- English Units SCS Methodology Pond Location Rainfall event Initial Abstraction Eaglebrook Church Phase 2.5 inches (typically use 2.5 inches if sediment loading is included here) 0.2 (typically 0.2 Type B Soils ) Dead ueaa Sub- Pool Pool Drainage Sub -Area Area Area Runoff ' Runoff Volume Volume Area Description (acres) (hectares) CN (inches) (mm) (ac -ft) (m3) lower Parking Lot 10.73 4.34 98 2.27 57.68 2.03 2504 lower Meadow 38.90 15.74 58 0.13 3.39 0.43 533 Totals 49.63 20.09 2.46 3038 Sediment Loading (25 design life is the typical critieria) Area (acres) Avg. Erosion Rate (tons /ac/yr) Erosion Time Period (years) Erosion (tons) Area of Construction 50 1 Turf Establishment 2 1 Tributary Developments 1 2 Total Drainage Area 1 23 Gross Erosion Predominant soil type (sandy, silt, silty clay, or clay) silty clay Sediment delivery ratio for watershed ( %) (See worksheet labeled Fig. 1) Basin trap efficiency ( %) -- typically use 90% 90 (See worksheet labeled Fig. 2) Estimated sediment density in basin (pcf) 90 (See worksheet labeled Table 2) Volume required for sediment storage acre -feet cubic- meters Sediment Loading (25 design life is the typical critieria) Total Required Permanent Pool Volume As calculated on this sheet: Or user input (if not calculated above): 2.46 acre -feet acre -feet 3038 cubic- meters cubic- meters H: \Civil \047\4443 \DRAINAGE \EXCEL \Dead Pool Size_IblargexIls Area (acres) Avg. Erosion Rate (tons /ac/yr) Erosion Time Period (years) Erosion (tons) Area of Construction 50 1 Turf Establishment 2 1 Tributary Developments 1 2 Total Drainage Area 1 23 Gross Erosion Predominant soil type (sandy, silt, silty clay, or clay) silty clay Sediment delivery ratio for watershed ( %) (See worksheet labeled Fig. 1) Basin trap efficiency ( %) -- typically use 90% 90 (See worksheet labeled Fig. 2) Estimated sediment density in basin (pcf) 90 (See worksheet labeled Table 2) Volume required for sediment storage acre -feet cubic- meters Total Required Permanent Pool Volume As calculated on this sheet: Or user input (if not calculated above): 2.46 acre -feet acre -feet 3038 cubic- meters cubic- meters H: \Civil \047\4443 \DRAINAGE \EXCEL \Dead Pool Size_IblargexIls PERMIT NAME: RICE CREEK WATERSHED DISTRICT INFILTRATION WORKSHEET Eaglebrook Church PERMIT NO. STEP 1: Determine impervious and pervious areas. Note: Include all pervious and impervious areas located in any rights of way. (a) Total Site Area (b) Impervious Area 91.2 15.7 ac ac (examples: roads, roofs, parking lots, gravel drives) (c) *Effective Pervious Area 14.1 ac [not (a) - (b)] * Only use horizontal component of surface area which is subject to intermittent prolonged wetting. Do not include area of permanent pools of ponds or wetlands (See Stormwater Infiltration Guidance Design Parameters). Note: The effective area available for infiltration must be capable of receiving the runoff from impervious surfaces. Pervious "islands" located above adjacent parking lot surfaces, for example, will not be credited. STEP 2: Demonstrate % imperviousness for the site. [(b) _ (a)] x 100 = 17 % (d) (d) MUST BE = 80% STEP 3: Determine runoff volume from impervious surfaces generated by median storm of 034 inches. 15.7 (b) x 0.9 x 0.34 inches 1ft 12 inches 0.40 (e) Impervious Coefficient Mpls. -St. Paul Volume Area (ac) Median Storm Needed to be Rainfall Infiltrated (ac-ft) STEP 4: Calculate volume capable of being infiltrated on site within 72 hours. Use infiltration rates listed on page 2 of Stormwater Infiltration Guidance Design Parameters. Saturated infiltration rate (if multiple on -site soil types, use most restrictive) for Type B soils = 0.25 (f) in /hr Effective Pervious Area (ac) 0.25 (f), x 72 Infiltration Hours Rate Corresponding to Soil Type (in/hr) 1ft 12 inches STEP 5: Compare volume generated to volume infiltrated. 21.15 (g) MUST BE GREATER THAN OR EQUAL TO 0.40 (e) 21.15 (g) Volume Infiltrated in 72 Hours (ac-ft) EAGLE BROOK CHURCH: PLANNING INFORMATION Parking Requirements: Ordinance requires "at least 1 parking stall for each three seats, based on the design capacity of the main assembly hall." Eagle Brook is providing 760 stalls (9' X 18'). In talking with the architect of the project, it appears a number of different things were used to generated the 760 figure: the number of seats in the main hall, stalls for nurseries (2 stalls per nursery), stalls for classrooms (1 stall per), stalls for additional staff at the church during services, and a general estimate of parking needs based on attendance at the current church. Minimum Requirements per Ordinance Proposed for the Site • "Church, Theater, Auditorium: 1 stall • 760 seats candles at street R.O.W., and 0.4 on for each 3 seats" • size: 9' X 18' • (2100 seats /3 = 700 stalls) Fixtures: source of light "shall be Pervious/Impervious Coverage: Ordinance does not address pervious /impervious surface coverage for the Rural District. The Eagle Brook site has 73.1 acres in pervious surface, with 17.0 acres impervious. (For comparison, the Lino Lakes Zoning Ordinance controls pervious /impervious in other Districts in the following ways: Residential: 65% impervious, 35% pervious Neighborhood & Limited Business: 65% impervious, 35% pervious General Business: 75% impervious, 25% pervious Light & General Industrial: 85% impervious, 15% pervious) Lighting Requirements: Ordinance controls lighting in the following ways: Minimum Requirements per Ordinance Proposed for the Site • Light Intensity: is limited to 1.0 foot • Light Intensity: meets ordinance candles at street R.O.W., and 0.4 on requirements. any adjacent residential property. • Fixtures: meet ordinance requirements. Fixtures: source of light "shall be • Pole Height: 22' pole on a 36" concrete hooded or controlled in some manner so as not to light adjacent property." base. • Pole Height: is not addressed for the Rural District (is limited to 30' in Business/Industrial Districts) EAGLE BROOK CHURCH -rr PELTIER LAKE �. rr WETLAND DELINEATION BOUNDRY WETLAND DELINEATION BOUNDRY PROPERTY .LINE - T1T1h *`.. 25' WETLAND b ML. ' - SET— BACK1l11 (VOLUNTARY) ` I � �I`.7 j 'I SECTION QUARTER LINE-.... I ///' e& 4 erlll '� 1 iI 6 1 a, t% ; f i 255' A iF $ �' � �‘ 17,T' f, \ �: !-7 i,.a. -�i, ). / r y if !: P" 'ii- // I. `4 _ n '�ab a a ! i1 Tre J i I -aa 1,e ti• `:D - _S j C _ -- LOWER s Pa1�0 } Iii/ � �` �I.11 v q'. q, �1 % �' aJ / ! i (9e 1A 1111+ db qY s // 1 I r ,f jl GENERAL. AREA IDENTIFIED FOR PRIMARY DRAIN FIELD SITE � 11 1t1 r 111I71 CONSULTING CROUP, INC. Suite 150 One Carlson Parkway Minneapolis, MN 55447 CarlInestion Maby can y « e. • plan. or nowt prop M or .aw.y sr.A rye WqL I•rdanbNl a1R' w oz. Ow Ion .r rha &UN. of ItamOtO. «. Welter C. Resnais .. CUP Bah.IltUl 10/Bh93 < J K PROPERTY LINE 4 TOTAL PARKING STALLS — 160 (10 +-LAND IGAP STALLS) s‘TYPICAL PARKING STAL1_ DIMENSIONS — 9'x18' UNDERGROUND STORAGE TANG FOR FIRE' SUPRESSION SYSTEM, SEE ARCHITECTURAL AND MECHANICAL PLANS FOR DETAILS STORAGE OF WASTE, GARBAGE AND R ECYCLABLES LOCATED INSIDE BUILD/NCs, SEE ARCHITECTURAL PLANS FOR DETAILS L. 1-.1-.P,•" PROPOSED COLINTT DITCH REAL IGNME �.rZDo zoo — scale - feet EGL,LE SPOOK C IRCFI oau aom 100/03 J. 61LLIK5C N Dal* . 1.:qua By 0/11,53 J ?YKE°.r.'N sah (Iced By 17/15/077 11 ESFEteLIR WO TO SITE PLAN - —` — `-- --- °— — — — — — — - -RIGHT _OF WAYS— NA,IE w.i 1., 047 . 4443,Cn CONY or, D«Ti Oi' 22. .71.,;a LEG =_FID: AFPF❑k'MATE DPDI'NAFY HIGH WATEP ' LINE :IMATE OHVL ELDG BAC1 APFF❑ > :P'1ATE 3 \ERAL NOTES: • SEE CRO55 SECTIO 15 FOR GRADP. k3 ALO' IG C5d1-1 .1. • REFER TO SHEETS C230.5 4 C230.6 FOR 5P••OT ELEvATIONb AND EUR`.EY CONTROL PELT ER L ^KE 100' u'ETLAINID MITIGATION `=. EUFFEF ZONE PRCPCSEC tUILDING, 5EE ARCHITECTUR =._" PL N5 FOR DET,;'LS WETLAN: DELINEATION' BOUNDRY WETLAND DELINEATION BOUNDRY 25' WETLAND SET —BACK RECEIVED OCT13 1003 CITY OF LINO L AK6'� BWBR ARCHITECTS Iaw,on Commons 360 St. Peter Street, Site 600 Stint Peal, MN 551024996 651.22 3701 25' WETLAND S CVO NTA SILT FENCE. TYPE MACHINE SLICED CONSULTING GROUP, INC. Suite 150 One Carlson Parkway Minneapolis. MN 55447 Tel. :763 -475 -0010 F. 763- 475 -2429 C.orwatan 1 hereby ritzy Mb. tha p4a ,pscabatior or report was rept. by wYobs, ^o eher *Mr AIM and 1 .n an a duly Cheney erwwewkl . erpw. bx}e W hurt or yn state or ra.e,eu. Nw■ IN5.r C. Browse 4yaya.t�,ior. c ,% a an..tcSTE -.. ClP 5,67wtta 10/13/03 50' :ET -PACs i_ 2° soak E.4:aLE BROC8( CAURC4 Dote n3!3 Lae 10413/05 faa 1043/03 Wet ,roe GRADING PLAN ilr; h; H •Ci 047 44.4: = a,greclir,g- pI:I,,..:w L'4 -TE' OCT T :/4E.. _24 .At PELTIER LAKE WETLAND DELINEATION BOUNDRY 25' WETLAND SET -BACK TURE SAN! ART SELLER CONNE TION ROUT FUTURE WA EIc1AIN CONNECTI WETLAND DELINEATION BOUNDRY 25' WETLAND s CVO NTARY) CONSULTING CROUP, INC. Suite 150 One Carlson Parkway. Minneapolis, MN 55447 Tel. 703 - 475 -0010 Fax. 783- 475 -2429 Crua..om I Ns., e.. "y Nat L W. plan. mirtos.w �....po.. ws p yu.a q no or .e.. y e...0 .w... a:«, ..a N. 1.100.01 1.100.01 ner.wwi a^ew a y 1.100.01 wr a. w..r m. sta. vmseu. nose Waller C. Eshxav I om 10/13/03 Rey Np 40035 .,.•s,11.411, CLP Summa. 1043.03 �CT.¢:L b5'u"`Sirn •aL CONNECT TO EXISTING TILE L • SEE 51-IEET 230.1 FOR PIPE LOCATION INFORMATION AND STORM SEWER TA6ULATIONS COUNTY PITCH 12 REALIGNMENT 1S" RCP soots feat EAGLE ER0.71G C l+ on. u,.. 0243/03 J. GILLIKS 4 Nure4 By 1043/03 J. T7K!00N R1. tt.4A 05 0233/03 W ES4ENCUR 55.4 T01 UTILITY PLAN !LAME: H 037'..444_ Cti'.. t ty- ptr•�dw LAT- -. 0 :T 2u, �UU2 TIr 2'22 PM PROPERTY LINE • NEW • POND • EXISTING WETLAND (31 oslund.and.assoc. MWfXMAMNN IMIE NNI�MNMM. MMNMMMMITOIAM IuNNVIMMMANI. s MMINLNIq I NM; ..l Od•L PTO*.. mot 1 row. M w sage* Map.. odoo.O. uroJr tlx la.: A ti Mae N Won. LEGEND; eGC€e .� .LANM M.A96MIN+IIMq . MAIM OMYMMM6..MNMe COM.LVW171101V WO :AMMO .6NN00, -MN MMN.& •PIIMMILIMIVAIANI..IMOg011191.441 NOTES. IAiCNIAN. i6UY0N®1M!N111 I. Of NMT NMMI N TE N/MT WIPMH gOOM ILANDTNANILMNN.NMLL MINIM L MLO61111 MNTMMM.INO1asNt M 111AM MN NNNMENNIIIIOAMOAIIW M1MlMMMNN000 NNILNMOMMMMM6MWLMLM11476. IMMI / OMIM OIMMION IINMN IMOIIE tlMO COPIA1 . a MOM OMOMMMNMNlOPo.OTIMMO MOM IM IWOMIL NMIWIMMW M1917910 N9QNMLMMNMION NNMMIOMIIMNM MGM. O NINMLTNC.OMMNMW INI MM - IIM MINTIN10MNtlCMMOLKAMIIMM ooNO 1� �pMMOIIIM SCALE: V.W -r Inb 10/13/2003 corn IA 2001.113.01 art UM LANDSCAPING PLAN EXISTING CONIFEROUS TREE STAND ON NEIGHBORING PROPERTY.-' LINE OF EXISTING DES TREES EXISTING DECIDUOUS TREE STAND TO BE PRESERVED oslund.and.assoc. MS= M laaalaNUa. amlalraaw anwauanLara S MMNM0IWMNM alwaaN la. Ma 4NWaa1 RaaawaN araa]rait alrylol t0 On t... a �wl.a rpm h NeS+W'b an Ix 1 a a M; aloha 4.Y4..10 a4n WW1 a M Slam w I4unm Ob 10H3/2006 6aa Ma 1!!62 LEGEND; rr� - malaaarawaTOaaNaO `t34 � . - 0arrormmaawa LS •Loavaa eakamouants maravowno w..sq >TIMPLN11®TNa RMIfOtNMLOaalaaw Ica TMaa1a(!a m ML IaaNalla ®WAICN a: an ONIar C ONaryCapN Iamm111luE nI ®IML Ta MIPM4mON W Tr Zia IOG10ar a O0ra61m NO aa01H0aTLNarNalllla MIES; I. PKIIICTIDIMISTIIMMII Tl6aTMpmY rLNIaOar 1aNICNaIaYalO11 WIN1W11.00N010alYNlfaaTlN OMNI naaaamaLamrma a 1.11[11117IIIIMAND PAWS NNIUlsaalNOliL.1rT. a NTMLaawaaMLnrw10rC1aaaaaallw MnxelawNlmr. 4 arrYLC�aNWrapINAICMIOR61 (IOaTQrOprplapaaRpLmrL a AMY aomanwtamawm TIMILIWOSIM onaEN. an ratalwaamuateawvtwmiulaan amlaivana MSR!auMIXIII S!u!a®. a fN101r11 raTrrSNNLL0ara76KtMama.Ymahmaurn aTIAVI. HILL Tanwaraimn. m My.lnaa aaTMUnN*. T11a012Mnaaa10I1a1.1. am1111H1 Nt GlIEMINI111.11110‘1110FIVIS Ta®ma UMW 0a0aNlaraNL a MLaa\nW IrRMOBB?af1MMalL aawTNISwuaarMlrl n11161...10.01.6.110.111= wIlrlmllrrNNIRMYWTaIwa.t 00aaa1011aw sKMYpa m.ScTNLT151Bw r®ma! IROOMmTIr IAAO W M[ MlNalma. t W111OOfaR *WLNONMLO40MCaarmlIarINAYNa1a1 IwaorNwnsroaWLw .NSaNnollallwllrre'rala SCALE: 1• • 100' -0' 10/13/4003 Caw Na 4001.11101 Na l rua TREE PRESERVATION PLAN wa+rC� . t U11W1[p 2 Eagle Brook Church CODE SUMMARY- NEW BUILDING 441.5114 40:VIOTIP411 1. OC,..VPMCV cu5srtsso4s, _ I ■-!, Par4OUS RONt.. N; te,11 r'r-N NCol 4APLIG.LBLE 4,.. 4. UNLMEC. + 75; UNLAVED . .5. .. • ..tjr•4-41is .......... g 3 - Samilen OA* 21,V3 MIL ViK 41(XX 4444 DIM10.01....1 4 gr.]. <PIA oft. 5T 5 BUILRIC H4011 MIL W., F€ET 1,40 itn-IESSINI KM a BALM apart 57,43 1 1F.D $ECOND 21,V3 MIL ViK 41(XX 4444 DIM10.01....1 IV 45 5T 5 BUILRIC H4011 MIL W., F€ET 1,40 itn-IESSINI KM a BALM apart 4411% (WI 1555 .1,031MAla 2 ',XV remotrA. ao '. 2 414 DIM10.01....1 IV 45 2 444.4 2 XXxi mem - 4.41- VAIIIE1 !EE f.P114(41 TIM WI MAW a D. 2 leoa ikiNA mom um 44.4.44 1711 144 (1) 1.111MMiNf pouttuggli Co541a11; WAIF' GATHEFM40 SPA '1* II* mg, ra.1.■ on ar. at tt. vett troaogsso Dole Reg. Wulf F1, 0..m CUP SUBMIT& 10/13/03 ' ut. °MOSER 134 2003 ISAL 444 551444 2001.113.06 g. Shen Tak 8E-COND FLOOR PLAN SECOND FLOOR PLAN A 4 • k 1' TOP e.F ; ALL El 3 -0 /�...P.Y,F DECK EL. I _. -0 Ar, _SECOND FLOOR `J EL. 11.T-0 ID ALUMINUM WINDOW T fC:P STEM. TYPICAL FIR PCC I f /ALL CAP. PC'y� WALL: CAP PCC#2 WALL CAP, pin TYPI zC FREFN'irED METAL �_�_ -- ��® �� 111111111111 __111....111.1MIIIIMILIMENNINIMEmil FEE- EE METAL I - Iii;E: :TEL -...mr--;... .._. _ IIIIIMMEINVE111 .. ■__•■rS_._ ■i_i "Cry_. I_ �.!_iuu ®� mar s luuluuuuuu�u, = _ .�... -- .__.�___ME luul�u : lull E��uI®EuM■I®�ral- ■..:':: _:_:_......� - ■ ■ . s��A�UI��s -- . ■. .- .- T .- aMI .1s__ r ■Ali lam - .�■- 1�ri1��i�����C��� �I ■�Iri:y 1�.— r na =s.- . -_- —��.� �8.. ®3.�lS - �MM.= iC �Gi ��: ���_ �■� ■n , . jij MEMO !.. _ ® ® =■ 1 !!11 � 1 , I ���!l�����1"raae:..'era mmoll N ■ �� ®�+ss�II�'� • 1!n u lu PC(: #_ WALL CAP. T■PSAL Li''UTUUOUS HIPI:ONTAL REVEAL. FiWAL F X31 CA iFi,AL PREF NI H [ At FASCIA - VLLI' U1I CUP mil WALL S YTEM SOUTH BUILDING ELEVATION • ALUMINUM CURTAIN -- WALL SYSTEM. PAINTED INSULATED C;' OR: AND FRAME 510.1 3: X'•t• -D' 015- 1161 -417 '- ALUMINL0 I URTAIN ALUMINUM CURTAIN —' WALL S STEM WALL . SYSTEM PPEFIN LHED METAL COP, IG. TYPICAL PCC =3 WALL CAF. T1Pf:AL —CC #2 WALL CAP, TYPICAL ,1 All IP II OW —. PREFINISHED METAL COPING. JM WINDOW TYPICAL _ -- PCC#j2 WALL CAP, TYPICAL R OF DECK �� ALUMINUM WINDOW SrSTEM. TYPICAL ALUMINUM CUJ, -roll li'AIRSYSTEM 51 5t —St�� 141G{ FF'Li�199 1H FIRST FLOOR 100 -0 ®111Wom=0u ■=EC 4 l�il�� p �! MEE EAST BUILDING ELEVATION 510.1 PREFINISHED METAL ALUM NUM 'OLUMN DC OR /WINDOW PREFINISHED METAL SYSTEM FASCIA PCC #1 WALL CAP, TYPICAL PCC#3 WALL CAP, TTICAL -- ALUMINUM WINDOW SYSTEM. — TfFiCAL PCC#2 WALL CAP, TYPICAL 1' CONTINUOUS HORIZONTAL REVEAL, TYPE:AL FR REFINISHED METAL FASCIA. TYPICAL 11111111111111rn ®u®„I®I_11111111 mimmounommin PREFINISHED METAL FASIJIA TOP OF 5AL EL: '.c0 -v -v WORSHIP 5 ENTER ROOF rLldi._4 ROCIF DE ELIi -Q E- O ID FLOOR L- t,�'rJr =';Cid ,ALL 500. T:FICAL- EHONE'P 50 :1IE COURSE -1 1 MMMBMel1•11111______ -===1._ 911■ ___I_1 MN____. — ...mg ; ;9 iramm;tr.,.._,Tain_......ii.__ ..:.:1:17.unimmen PCC;N4 WALL CAP, TYPICAL HONED STONE �COURSt uuuu 11111111111111.111111111 uuuu 111111111111®ill_ •111111111111E - 111111•111111M - -ALUMINUM CURTAJN WALL SYSTEM PC C #_ WALL .CAP. TYPICAL —' ALL "..IW1J`•I WINCCW SYSTEM, T W- :AL TOP EL 111 -4 FIRST FLOOR EL ICID -O - -PCC #i :TALL CAP, TYPICAL WORSHIP CENTER Rir1F EL. 147 -4 •— PREFINISHED METAL COPING TYPIY ROOF DECT. EL 128 0 ROOF DECK L 124 - ROOF DECK t2- 120 -0 - PREFINISHED METAL fASCIA SECOND FLOOR EL 114 -0 FIRST FLOOR. p i .. �. U�JIM1uCv;K - PWIJTEC INSULATED HM 0000 AND FRAME PC4 1 WALL CAP. 11PIC.AL -'- RECEIVED OCT 1 3 2003 CITY OF LINO LAKES EL 06 -0 agle Brook Church LINO LAKES CAMPUS B R ARCHITECTS Limon Common. 380 St Parr Street, Suite 600 S.Im P.•1. MN 55102-1996 6513223701 .■a,nan, miry enh M.e.,aa v.. fin• ar';AyWN ....loaf on was el State et Meow Name Dm. 0ma. r„ Nrn Duce CUP SUBMITTAL 10113/03 D... [.■w OCTOBER 13, 2003 DOH /S113 . x• <nxa. Crate 2001.113.00 10. %.A Tint SOUTH AID EAST BLDG. ELEVATIONS 510.1 P( t2' WALL CAF, TYPICAL. 1' C IQIIIUOU`. HORIZONTAL REA kL TYPICAL P(CII 'NALL CAF, TYPICAL - PCC#2 WALL C. T'.PIYAL PPEFINIS,E1 METAL OWING. TYPICAL �. — PC'C #1 W LL .AP, TiP1CAL Fi'C #4 WALL LAP, TYPICAL HONED STONE COURSE RO(IF DECK PREFIFIISHED METAL COPING, TYPICAL EL 124- b—\_ • ,- F:OC�F DECK PCC #2 WALL CAP. TYPICAL t-' EL 12U -0 ALUMINUM CURTAIN WALL S'rSTEM ECONt FLOOR PCC #4 WALL CAP. TYPICAL EL. 14 -0 ALUMINUM WINDOW SYSTEM:, TYPI,a PAINTED INSULATED HM DOOR AND FRAME INSULATED OVERHEAD OOR--' -PR'CAST t ONCPETE COLUMN. PAINTED INSULATED HM DOOR — PfiEFIFIr3HED METAL FASCIA. TYPICAL ,'— PAINTED. STEEL STAIR AND RAILING PCC #2 WALL CAP, TYPICAL —PAINTED INSULATED HL DOOR AND FRAME-/ NORTH BUILDING ELEVATION us- B.01-ar PCC 1 WALL CAP, TYPICAL—,..„, WORSHIP CENTER ROOF EL 147 -4 PREFIN:SHED METAL COPING, TYPICAL ALUMINUM C 11RTAIN WALL SYSTEM —P C#4 WALL CAP, TYPICAL —HONED STONE COURSE PCC#2 WALL CAP, TYPICAL PAINTED INSULATED HM MOP `— ALUMINUM WINDOW SYSTEM, TPICAL FC7#2 WALL CAP. TYPICAL ALUM1I JM WINDOW /DOOR SYSTEM -1 ALLIMINJM CURTAIN WALL SYSTEM -ALUM NUM WINLOW/DOOP. SYSTEM: ALUMNA! WINDOW SYSTEM. T1 PL.AL - - -- FnEFINIEIEE- METAL COPING, TYPIC PREFINILIHED METAL FASCIA ROOF EL. 128 -U ALUMII'UM CURTAIN WALL SYSTEM ALUMINUM WINDOW :.,STEM, TYPIC SECTIID FLD)R EL 114 -�) "'iv INSULATED PAINTED HM DOOR AND ■ FIRST FLT:, EL 100 -4 J — ALUMINUM CURTAIN WALL SYSTEM boOCICOER 13, 2003 OOH/SIB ,Fmm. 1.. CM:IM 2001.113.00 EL WEST BUILDING ELEVATION Agenda Item 5B Environmental Board Meeting Date: October 29, 2003 Topic: Circle -Lex VFW, Post 6583, 7868 Lake Drive, Site Plan Review and Conditional Use Permit Background: On September 19, 2003, the Environmental Board reviewed a sketch plan for the proposed new VFW. The following recommendations were made at the September 19th meeting: On October 10, 2003, the VFW made formal application to build the new facility. Analysis: Application information is included as Attachment 1 Site map and designated resource protection zones are depicted on Attachment 2. There are no designated resource protection zones on this site There are no impacted wetlands on the site. There are no soil /water relationships on this site that would support rare plant communities. There are no significant vegetation types on the site. See MLCCS (Attachment 3). There are several large trees on the site. There was no Tree Preservation plan submitted for the site Although it appears that all trees will be removed from the site, adjacent property trees may need protection. The zoning code specifies screening to 80% opacity. The applicant needs to demonstrate how this will be accomplished. (Attachment 4) Larger shade trees should be planted on south lot lines to screen flag pole lighting from the adjacent residence. The parking lot, % impervious, lighting, and buffering requirements are also in (Attachment 4). Lighting requirements are in non- conformance with City standards. VFW is in the limits for % pervious /impervious. Required parking stalls 69. Actual parking stalls is indicated as 89. This is down 10 from the August sketch plan. Planting islands have been provided in the new plan. It appears the developer has rounded up the figures for parking. The VFW is proposing a combination of sod and seed for ground cover. All sod areas appear to be indicated as irrigated. There are no seed specifications included. City native -seed specifications should be used for surface water treatment areas. Several shade trees have been added to the site plan, including the use of disease resistant elms. The site plan does not seem to show the total number of trees indicated on their plant list. There is no information from Rice Creek Watershed concerning surface water. Our City engineer has indicated that the proposed ponds on the County right-of- way will not be acceptable. Options: 1. Approve site plan with recommendations. 2. Recommend not approving. Recommendation: Approve with the following comments /recommendations: Environmental Board Comments: Attachments: 1. Application information. 2. Resource protection zones. 3. MLCCS 4. Planning Department information sheet. E AFF. 0 A POMOFW. CPT. 0 F. !IEC. AML Amos VW CRC Cams - EC AP. Moms P., E.I. Cab Emil EWA AC.T. AmmI Elb C.CA. Carauck,C I p EL AM MORENA Mahmlalm HER AD4 '. CFA CWimuabnChWp Ma. Man LP. AC AS Cendllaft 0t Calm EC. ALT. LUM. A1mMr CC .L ▪ ComM. r. ES.. Awl. Amt Br CT. E N0. M AAA EOW - Ca. MOP ore CM. ARRCN AAprml ma MR. CMriWnb AAL AmAS Y BImRWmnri C0. CrnW • W AWN. MWWa MOEN AUTO. A..Yp e .a ▪ . Baapet LP. Ram Mob B REL MAME LPL - PAY AY BM Bad Kw. Baas SIM Bt Omba B M BIBS BO. Bond ELT. BensasaUBM RA BM Skis COMP. Cmda.d. FA COMC. User* CALM. Ono. Moony RR CONT. CabaS. COMA CONN. Com meNce F. CLL Ca* et LANI ne CJL C.W.Afe 60 Mawr G M CORR. Cadmr CTR CLAM* CSC Cub l libr 0 ▪ EftlErg O� EM6 Oundllo 1 Ui&a DULL • Bkte Mawr MM. 9A MOOSE Assassin DM WA DO DRmee D0. B.0. Ny 0a. DM Dam OW R DA Dimly OEM.. e .• °ne` O wn D amped Otowr &MFp Fautla Fpse.Lq� 6MN0Ws* al. 1Om !Swam W.WCmM MO. EM . MM. PIN IOC EnNawr BRFROY 1R. E rprra R OMAN NO& E xpErelen m Ja" NYC Fa.ENO LIT. Flew Dr,. NM. BMA MT. Me • GmOMr FM BMmWr COMM FM Rd Fl. FM ROA .YIN FA FNMA ' FetT. Fb.NO .O- EL& MON Merarm RAN PAUL Fe0ary 10 a FANCIER FT Po � rO. Emma KR FR F0666 MW KOA0.. FELL Fare MIER G IA& GL Gaga TAB GALV. Bents! Mc Soong Ca,a,ae, uv. LT. 0..M.V.. Blued Mowry UM u_ . BEL 016` „u GYP. CEP= 0.110 OM= bed ABBREVIATIONS L (goal N.dmppea L1I. MAN 11•r LEM L WW N"1:° LPT. Ir1 Pr. IMMANDO Hmaa HANNERMAIMNI AFC Nam Cara ma.B. Holm MOO um. WE NER ILL Mow* UT. MAE M.hY MOAN WYK. Aft Matr Vrar JAM MUM Bablm Klemm Mock Darr Knack 04 Lm. LNKIINOW tae Lbws m lag OPO. Lang Lang g6NMM OA.• NECK M.C. MBR MET. AU▪ L MK MULL NNAA NL0. NTa N0. P.6P. T A P66 • .q T n0.6600. m CtlM ip6 RM MW Raa ‘ WO . U RN P R tlRrMtln V Nod PER. 00000 BNA. S.dry MWhM CeIaN VAR bas WRY Pw. BNA BENNO bee AME VNR YMa ROOM P�. PUKE LENNY VER. bmYb PL PPmMaraYG BIIfB BMraa VET. VWWfyy 0.Ba P0006 ENT. BMY VEST. 100/YY Pad • Mon„ s tee.. P RV. Parr Rap VwaletrV. ; - vAT "'°"` Ml P.�lat P.daeM. Bpi Mrl.m v.W.G. VMMWr ca.vm PR P.pa.1p� eprw On FMeaeeNG Pl P.paU IM. LL 6. Bee WCSi Wrrr o son 16 WA WaMeb.n an. 8p�6r6�1 6001. ...dB". 006 WeMpsd 0.T. Oimryl'1a SUMP. SA0.T. &6000 Agl60Callm wpRW. Tlis VCIL noes REEL RAD. Reba Manic* SYa Bt.a Ta W& RnMr.etaaar - 0 0 WOW TM man W REC. lices0s0 Manic* T - Warr. WOe P.r ROW gRqeeaYMrVPV.rgpriie.a�d TEL Timbre 10 ReMa.paCan+MS TTLLM. T m ■ 1111 60 v ✓ Yea Of NEON DAME NOW ah . MMr MINS* AMMEMLENN W PA a.. lAmmy Macaw °maim MOM Una MEM Maria MWW. PENNON a MEW Mrwam LANs MMM.a. W ESEL MAW NaMpMeabia Noll CAMEO EMU Bele 10 RFL ROE 00- , - 0b RFAt 0C. On6aa. R680. 0.F.C1 gaiWF.Yla6Careeb, RMV. Mr0.6 REB 0.PAL 060F.M.aOarm REV. M.bEN a DD RY RD. pt Oarat 0.F. prim Fes 6aeame Await TOG Tmwa Raaatl TA. Tat Refire Rmon(Ma) MK Wbgmml amount Throb* OWEN T.P. TaMParm Nolo TAO T MAR TR. Trs� f & a ear Real Gtr T.O. TEAO. MATERIALS LEGEND SYMBOLS PNGIIWOOD Nome ewe 0 Lm rat 0 ROOM oBxrmxwTmN �MmiMWr mr1MnAMmemO. GTeOabenre .i .I: FAR1N /CDYMCTFLL .'■_�\\ •r••r••r• 0Gahm 0..... i [ POROUS FNL1 AVL. ' 'MA 6ac110M ® NOR EME MILTON 16>1.11a. � 0.- MRTn1O11TYPE WbatlB swwwwaft ii... .. .....i..:::.......:7: BAND /MORTAR /PIASTER [ \ WOOD swoon RYWO GYPSUM NoRO mini / Loonnu.SEULAO ""Mi OAMNKLUIDN BmlalaOW �r Bain aWFama �/'� FACE WICK A�, ELEVATIONS CAM INE DOOR MYB9R Om Tad ow Swam as Sant t:16 :i CONCRETE M.• N barn maw w•Fa•° o.raMC.rre �(��I�•/ Rim 0 r EEVAfON IMAM WNDOM TYPE WYaw Mama ALIDUAL MC& wan ors ULar / //44474 maw MOW MrI BYwrarMNNW IIIIIIIIIIIIIIIIIIIIII ROONNIIATION SHEET MK CODE A2-1 SOLID LINE M Yea aealYNNW or papa ones mesas . trorn A0.1 A0.2 A1.1 A2.1 A5.1 A6.1 SHEET INDEX: ARCHITECTURAL COVER SHEET BOUNDRY AND TOPOGRAPHIC SURVEY (NO SHEET NUMBER) CODE DATA SITE PLAN FLOOR PLAN EXTERIOR ELEVATIONS AND DETAILS BUILDING SECTION AND STAIR SECTIONS CIVIL U1 UTILITY PLAN G1 GRADING PLAN LANDSCAPE L1.0 LANDSCAPE PLAN L2.0 LANDSCAPE DETAILS ELECTRICAL EP SITE PHOTOMETRICS OWNER: DESIGN TEAM: Circle -Lex VFW Post 86568. 7885 Lek* Dine Lino lakes, MN 55014 XICOC XXXX CONTRACTOR: Kraus Anderson COnStVU ion Company 5825 Rendova Skeet N.E P.O. B6s 158 Lino LBkse, Minnesota 55014 Contact Brett Bvidy (783)788.7711 (phone) (783)788.2850 ARCHITECT: DSGW ARCHITECTS INC.. 548 Apollo Drive, Suite 10 Lino Lakes, Minnesota 551314 (851) 784-7924 (phone) (551)784-7925 (let) mtlomasedepw.son (e+ur9 Contact Mkiwl J. Thomas CIVIL Metro Land Surveying 8 Engineering 412 East County Road D LAtle Canada, MN 55117 (851)7850112 (p8000) (851)788.0812 (et) Contact Brian Baaassa MECHANICAL AND ELECTRICAL: Design Build enriching' communities through architecture &kith • virgin& • grand rapid+• Rod elfin mmmdegte.wm CIRCLE -LEX VFW POST #6583 7868 LAKE DRIVE LINO LAKES, MN 03098 dab July 07,2003 file Mme drama 69 NLR 0he0ked85 MJT neM .6.8 eign dab MICHAEL J. THOMAS 23592 XXXXX )0(, 2003 f hereby miff thatthbplan, spulfiallon, r report ma prepared by re or nap "g diremnlperobion anti that 7 r a duly Licensed &Alba ander the ban of the Stab of MMnrnte. meek rpbbm&wa dab Sn6 B !Mimes Pus Rimy 10/05/03 COVER SHEET A0.1 Circle —Lex VI FW Post 6583 7868 Lake Drive Lino Lakes, Minnesota 55014 EXISTING PROPERTY Ag of Lot 8 and that part of Lot 7, AuanreS 5CWW. h V Na 104 oecordb+0 to the mw. or plot :thereof on 8e and of record In the office of the County Recorder h on for Anoka P-tert; Minnesota gJIng southerly of Me following dsscribed liner the southeast comer of said Lot Tehthence norlhwesMAy to of point on the w westerly /he of sold 7, said paint being 150 feet northeasterly from the southwesterly caner of sold Lot 7 (as measured along sold westerly /he) and them tamnhothg EXCEPTING therefrom any part /}rig within the Plat of Anoka County Highway Plat No. 17. And That pat of Lot bC Auditor's .Subdivision Nor 104 Anako County Minnesota described as bilown: Canmenchg of a point on the Southerly /kw of sold lot a distance of 234 feet Wsstaly of the Southeast corner thereat thence Northerly on a lha (If projected would Intersect the Northerly /he of said lot of o point 200 feet Water& of Me Northeast comer thereo4 for o dewy* of 101.6 feet to point of beginning* thence continuing Northerly an last described line 134.3 feet maw or lee; to the Northerly line of sold lot thence Westerly on Me Northerly line of sold Lot 151.28 4,4 more or lees, to the Northwest caner thereof, thence Southwestsgy on the Westerly /he Mereog also being Me Easterly right- of-way the of State Trunk Highway Nor 8 for a distance of 100 feet Men Southeasterly 18467 lost more err les; to point of beginning. And Mat pat of Lot 9. Auditor's Subdivision Na 104 Anako Combs Minnesota i6ng Westerly and Southerty of the'agowhg described line: Beginang of a point on the Southerly the of said Lot 9 o distance of 234 feet westerly of the Southeast corner thereof Mane Northerly an a the (if projected would Intersect the Northerly line of sold rot at a point 200 het Westerly of the Northeast caner thereof) her a datarce of 101.6 feat then Northwesterly to paint ce Ma Westerly line of said lot a distance of 100 feet (as measured on sold westerly /he) Southwesterly of the Northwest corner thereof, and there term/noting Together with that pat of vacated Lols And Together with that part of vacated Lon Lan; also bang described as that part of the north 8 Met of Lot 14 Audtcr'$ Subd/Nskw Na 100. Anoka Count; Mhnssota acauhg thwarter by reason of the vacation thereof (Document Na. 510484). An4 the westerly 10 feet of the Northerly 134.31 Net of that part of Lot 9, Auditor's SL6th ision No. 104 Anoka Capft/t Mkaeseta, described as Moor Bsg/nnhg at a point on the Southerly line of sold Lot 9 o distance of 120 feet Westerly of the Southeast comer of saki lot thence westerly an saki Southerly /Ins a defence of 114 feet then Northerly to a point an the Northerly line of said let o o/staice of 200 feet westerly of the Northeast corner thereat thence Easterly on said Northerly fine a dstanoe of 90 hat thence Southerly to profit of beginning. I hereby certify that this survey, plan or report was prepared by me or under my direct supervision and that 1 am a duly Registered Land Surveyor under the Imes of the State of Minnesota. Date: 9- 4.f• ems Ucense No. Moe WV lino lot 7 awe C. let 7 >maw Note Existing Old House & Garage on Lot 8 Not Located or shown (as Regulated by Client) wl7 wen of lot 9-.. 200.00 189.89 x5017 t@ am lot a REVISIONS 09-05-0.3 Add parking revisions & new utilities GRAPHIC SCAM le A M NORTH Prepared j: E. G. RUD 4 507.18, INC. Lan e.r.i.ijOrs CIRCLE i8 XINNGET5ON AVENUE NE 2 TeL 185 -5556 Pax 186 -6001 (09 rat) 1 mein a so ft. 1/4.00 Kai 9E Cor. lot 9 7 T -T' a lT ,1 v, , 1 9 l..tl� -Mww., WW onv.w flUiI111IIDHHIHHMflhII 1 un ..I .._-1,1-1L-10., b l .. X , T jkk S re�,i 1 r wn w. v w vm .w v 1 t I ■ Len 1 W pa. , 1 um(j f ^7 Rao1 111 •W sic • m1 L1� 1 I�'q:: rxIi I 1 11a 1 W L "v '' wI ° 1 w I w pr+n. sa.r■••• tIOULIERLDifIO awl I+..+n■vl =MRZT]:1tA'7 I.,.I.I.I 31334.33433n 34.3 463.4.43143333 3,33.34.3.443 I xaml wll+wer., I 'N "iii 7.-2�.-• -1•. '-]a_�.-� ^>•- ter_-=— r— r�:.1•� =T-7_1L ME I_ L': W OIAE AttESS TO NORINEON NEIGHBORING WERE/ ..... enriching communities through architecture duloth • otrginia • grand ropida • tack drier eurdgmm. CIRCLE -LEX VFW POST #6583 7868 LAKEDRiE LINO LAKES, MN project B 03098 dies July 07, 2003 jik, nose dram by NLR dmdad by MIT sense MICHAEL J. THOMAS r.g.e 23592 dgaJae )0000( )0(, 2003 79TH STRE NMI zaro6'orr hereby rnNfy dmtddeAm, rpsdfiaedse, or report met pngeradby mew under ley divot wpmoabn mu the I lea duly LJnard Arddteet . under the Um of the St hl of SITE SUMMARY WISER ,7J555)ORib1ACR S NMI0U55URIAQ. AMOR 81.11I) PERVIOUS SUNFME.55AO5E(15A1D mar* reoabnAme - date SITE & eunoiNG Putt Rom 10/09/03 PROVIDED PARKING BBROJARSTAUS =IS MRCP RDAS. IOTAIS LOTS LANE SITE PLAN ()SITE, PLAN S' 0 -ff LINO 24 ' 1404• 1r? law r MAKE• NUM EMIPACE r VESTIBULE J1 /_ reiiii = iiii = /iii = iiii = r iii. Alf SO1m.104K —. OP MI6. 1OWtOT ♦ 1ROSS) ;CI 1111 11 Coolie iii - got" • a • W W W W MMMM g - -- i I _ i • - - - MMM_ or 101.11110114 --- 1- MM a a a 00 AA MMM MM -- -- to Irma MMMMM rata -- MMMM ;AAAaaa- MM_IMM i a a 1 MMi S,z M i .. it MMMi N WWWit J 11 11 11 %I. 01' i' 4$150 CAP. mors a W 300 CAP. ROO• ASSEMBLY HALL 000 r i r rrt MM_ i a W W W W MMM— W i - - -- aaaa MM_ W W W W - i - G AAA; W MMAM - - -- MMMM W W W W a _ i i - - -- MMMM Walla - W - W 11011110111 -i i l MECH. & ELEC. SA 000 MEN KITCHEN 000 CI BINGO BOOTH •e• MAO KMLWAY4, POST MAY HALLWAY •J •66+x; TABLE STORAGE 000 WOMEN °oo e I STORAGE Cl LET .um KITCHEN STORAGE Cl JAN. 000 STAFF BREAK ROOM CI KEG COOLER BAR STORAGE KITCHEN OFFICE (S ;Mg ULL TABS PULL STORAGE = E, 000 ♦ ti - - W W 111 M7MANDER & QURTR MSTR OFFICE ® FACILITY MANAGER ; ING MANAGER OFFICE OFFICE DANCE ROOK Wt•W W MMMMM caCIOR PLAN r r iii —tole _tura --iii---r r MEGRIM! WALL ASSEMBLE - ITMMN COW (SH ELEV. ION MUMMA 21AYUSOFII/2• 1160 WIK.•/ ml.•r KI K ME • W QC IOREIMU KOE.TIEi ORB VOQ,LAI trOKRA A i ' 1ARITIIRAE1 N ODE 1. 0tl�0POWE0*c ONT. QS #9'-CTO 0U4KouiDRESS NOM 021 0lKd •EQ.T.ROOMI6AT RESTAJ OMEN, BAR AND ® � o PROYOEYREYOIIRWIE$s� tallif UST0u15/rmsn.J./sir6nRO EA. SEE. O 1 2003 C;TYO CT LINOLf� 0 �S enriching communities through architecture dulath • oirginis • grand sapid/ • twin aim nwod•moow CIRCLE -LEX VFW POST #6583 7868 LAKE DRIVE LINO LAKES, MN • pope R 03098 dote July 07, 2003 flo moo drown y NLR dwcbdby MIT 11..11 MICHAEL J. THOMAS ng.It 23592 /g11 dm X1000( )0, 2003 1 hereby certify that tAtepko, tion, or report ion prepared by me or 11eder my diva w,pwobive sod that ate s duly UvnedArchWa ander doe law of the State of on* r.ddoaA..w time Sol& Rotuma PAN Wow FLOOR PLAN A2.1 enriching communities s through architecture dulNek • oirgtNia • grand roptdr • twin cilia u nw.drgu cou CIRCLE -LEX VFW POST #6583 I_ I II - _- _ -_.=- 7868 LAKE DRIVE LINO LAKES, MN project* 03098 duo July 07, 2003 file wow drams tog NLR eh.egdby MIT nom MICHAEL J.THOMAS ..g. s 23592 sign dm X00( XX, 2003 II hereby are due Wolin, aped». Man. ., ffpalC NMf prepsrad by ms or under ms Areasupnobbn sad d • / an • duly Wamddraheat Radar As law of the Seats of Yinansta. ❑UTH ELEVATI ❑N P11-11161111121 =11011165111M MERL R0AF5751EN WEER 1RUSSASSENRET,UERIDATRE, ANENT Mfg revision/ism dam Sits • swWu.G PLAN Rainer 10/09/03 oXES,To. ELEVATI ❑N EXTERIOR ELEVATIONS abest d. sheet number A5.1 PREEREDIEEED SWIOWBSEAM METAL ION SYSTEM W /SEEELM USS ASSEMBLY, MIRED ARK, AND DAR IXSUL enriching communities through architecture doluth • otrginle • greed rapids • pots cida weuw.d gw.cow VCBBI..BR/�B�CLE -LEX i■ ■■ POST #6583 saw sir WAN OVER MEW.SIUDS ®24.OZ. 7868 LAKE DRnE LINO LAKES, MN 12' EMU OVER 0) LAYERS 1112' MID ROIL W/ METAL NUM 624' OLDIE[AYER IIORO.IHE OBIFRVERT.) DYER Sir GYP Ba giUILDING SECTI ❑N project a 03098 dots July 07, 2003 file nem drams by NLR Arcked iv MIT mine MICHAEL J. THOMAS rg.• 23592 sign dote )0(X)0( )X, 2003 I hereby certify that thkplln, specipeetiec, or report we prgwrd by ow or under 'ay &net nprobbn.ndtha . • duly UesnndArehiteet order the hew of the Step of Miasmata. PIIWIRIMEEED O REM SEAM MEW. ROOF SYS1IMW /SIEtTRUSS ASSEMBLY, KNEED ARK, AND BAR RLSUL PREEIIWREEED MINN SWA METAL ROOF EISENWI MERINO ASSEMBLY. YEMFD ARK, ARI BAR IRSUL work reoldobAnse des Sac • BuILOIns Puy Rmay 10/09/03 lr OMIIOVER 01 LAYEM 11/2' WWDINsuLW/ METAL FORMS R24. 0.C. PE LAYER NOEL VIE ORO VERD OVER sir GYP BO. BUILDING SECTION UILDING 1 8• 1'-D• shat tide deed nuwbw A6.1 CORE DRILL! Ex. s mi RSI 977.4 INV. 902.110 V. 903.5 CONCRETE SPILLWAY 26L15 RCP CUII 0 1.0% 15 "RCP FES INV. 903.80 70LF- 15"RCR CUII 0 0.00 %1 76LF- 15 "RC1,1 CUII 0 0.00 %I 15 "RCP FE (2) INV. 904.0 \ 15 "RCP FES (2) INV. 904.0 REMOVE EXIST. CULVERT CONCRETE SPILLWAY +-•E1y In Lot 7 CONCRETE PED RAMP REMOVE CULVERT �/ A / STMH �� RIM 90 .0 �" /INV. • ■2.25 10LF -15 "RCP CUII 0 0.32% / i CORE £' INV. .1111 ? •••' a EX . T INV/902.05 % 152LF -15 "RCP CUII 0 0.32, / CB 5 RIM 9 .0 INV. '•2.50 I / N89•05'08"W • - .DENOTES FOUND MONUMENT o - DENOTES MANHOLE ® - DENOTES CATCHBASIN IP - DENOTES UGNT POLE SS'" — DENOTES STREET SON.. ew —e— - DENOTES SIGN xm DENOTES HYDRANT Ty O - DENOTES TELEPHONE PEDESTAL tt 0 — DENOTES ELECTRIC PEDESTAL TV O - DENOTES CABLE TV PEDESTAL 990 - DENOTES MAILBOX 0 - DENOTES WOODEN PST -• -- DENOTES FENCE -•• -- DENOTES UG ELECTRIC UNE -." DENOTES UG GAS UNE DENOTES UG TELEPHONE UNE --en DENOTES OVERHEAD POWER UNE o - DENOTES BUSH x-na 8 - DENOTES DECIDUOUS TREE. 9etw9 * - DENOTES CONIFEROUS TREE. BB - DENOTES ELECTRIC HAND HOLE - DENOTES GAS MARKER O - DENOTES SANITARY MANHOLE - DENOTES WATER VALVE DENOTES SPOT ELEVATION <�. - DENOTES PROPOSED STORM SEWER 0 N - DENOTES PROPOSED CATCHBASW • - DENOTES PROPOSED STORM MANHOLE - DENOTES PROPOSED WATERMAN DENOTES PROPOSED SANITARY SEWER 30LF -8 DIP WATERMAIN (7.5' MIN. 0 ERVE OVER) 7OLF -6 "PVC SDR26 SANITARY ERVICE 0 1.0% MIN \� FFST "PVC CLE: • T 90.) °e�.�i11 VACATED LOIS LANK DOC. NO. S. gin of tat 9 1. EXISTING WATER PRESSURE (FROM OTT OF LINO LAKES) 919 GPM - 2. ORIFACE 60 PSI STADCE PRESSURE 53 PSI RESIDUAL PRESSURE 30 PSI PT N 0 2. CONTRACTOR TO REMOVE EXISITNG GRAVED. PARKING AREA AFTER PROPOSEDC PARKING LOT CONSTRUCTION I5 COMPLETED. 3. CONTRACTOR TO BEAVERTA9. PROPOSED CURB AND GUTTER AT DRIVEWAY ENTRANCES TO LAKE DRIVE AND LOIS LANE 4. CONTRACTOR TO PROVIDE PAVEMENT MARKINGS AS SHOWN 8 U1 a N89 05 08 "1P ONE FOOT CONTOUR INTERVAL • - DENOTES FOUND MONUMENT O DENOTES MANHOLE • - DENOTES CATCHBA9N " DENOTES UGHT POLE + — DENOTES STREET SIGN -. -- DENOTES SIGN. Nyy{1-- DENOTES HYDRANT ,EL p - DENOTES TELEPHONE PEDESTAL a p - DENOTES ELECTRIC PEDESTAL iv0 - DENOTES CABLE TV PEDESTAL LBO — DENOTES MAILBOX • — DENOTES WOODEN POST —e -- DENOTES FENCE —. -- DENOTES UG ELECTRIC LINE. —w -- DENOTES UG GAS UNE —n -- DENOTES UG TELEPHONE UNE -- --..�- DENOTES OVERHEAD POWER UNE o - DENOTES BUM M-e- DENOTES DECIDUOUS TREE sPeNI112111 + — DENOTES CONIFEROUS TREE - DENOTES ELECTRIC HAND HOLE ® - DENOTES CAS MARKER O - DENOTES SANITARY MANHOLE ND - MOTES WATER VALVE too.o DENOTES SPOT ELEVATION • S - DENOTES PROPOSED CATCHBASIN • - DENOTES PROPOSED STORM MANHOLE. - DENOTES PROPOSED CONTOUR - DENOTES DIRECTION OF SURFACE DRAINAGE 111 II 111- - DENOTES EROSION CONTROL 9LT FENCE -. DENOTES ROCK CONSTRUCTION ENTRANCE a ID CO S. 6u et Lot 1 LOIS LANE G1 ddNd, • of gLdo • grand r.pid. • *ohs elan • SEED 5EE&DITCH AREA SEED DITCH AREA N28 °80'07 "E /UU N1 EXGEPT1 CIRCLE -LEX VFW POST #6583 SHOWN GRAPHICALLY TO AREAS TO BE WATERED (IYP.) 7868 LAKE DRIVE LINO LAKES, MN pr.jme• 03098 d... July 07, 2003 Ake .a.. 03098- LAND- SITE-CL -VFW damn TS clinked! MMA .... MICHAEL J. THOMAS reg. • 23592 .1•. door X7000( )0X, 2003 IRRIGATION LOOP SHOWN GRAPHICALLY TO AREAS TO BE WATERED DTP.) SITE &Bynu mm PLAN 1U171131110/09/03 PLANT LIST ! QUAN. CODF BOTANICAL NAMF COMMON NAME SIZE !CONDITION 2 FRPE FRAXINUS PENNSYLVANICA'SUMMIT' SUMMIT ASH 3" CAL. IB &B 4 GLTR GLEDISTSIA TRIACANTHOS 'IMPCOLE' IMPERIAL HONEYLOCUST 3" CAL. IB &B 8 ULCA ULMUS 'CATHEDRAL' CATHEDRAL ELM 3" CAL. B&B 3 MAHO MALUS 'HOPA' HOPA CRABAPPLE 7' HT, B &B 18- ARMS ARONIA MELONOCARPA GLOSSY BLACK CHOKEBERRY 36 B &B 1 5 VIPR. VIBURNUM PRUNIFOLIUM BLACKHAW VIBURNUM 4' HT. B &B 62 JUPO )UNIPERUS HORIZONTALIS 'PRINCE OF WALES' PRINCE OF WALES JUNIPER 5 GAL, 1 20 SPGF SPIREA X BUMALDA 'GOLDFLAME' GOLDFLAME SPIREA 5 GAL. 136 CETO CERASTIUM TOMENTOSUM SNOW IN SUMMER QTS. 12" O.C.; 72 HEMO HEMEROCALLIS 'STELLA DE ORO' STELLA DE ORO DAYLILIES 1 GAL. 124" O.C., STMU STONE MULCH WITH WEED BARRIER I j @LANDSCAPE PLAN CIRCLE -LEX -VFW •- 1 Ia SCALE: =20' LANDSCAPE PLAN CIRCLE -LEX RUNE CROSSING OR INJURED LIMBS IN CROWN EMOVE BINDING FROM TRUNK OF TREE EEP MULCH 1e AWAY FROM TRUNK SHREDDED BARK MULCH SLOPE FOR DRAINAGE BARRIER ENTIRE ISLAND ROOTBALL 2' -3e ABOVE GRADE /2TOPSOIL/ 1/2 PLANTING MIXRURE tEPTH OF SOIL TO BE 1 1/2 THE DEPTH OF THE ROOTBALL re CRETE CURB AND GUTTER NISHED GRADE /3 PULVERIZED EXISTING CLAY AND 1/3 PUNTING MIXTURE. TAMP UGHTLY ETAIN BURLAP & TWINE AROUND ROOT BALL �0 NOT OVERDIG DEPTH OF HOLE EXISTING GRAVEL RUNE CROSSNG OR INJURED UMBS IN CROWN ()PLANTING DETAILS -SHADE TREE IN ISLAND 2 LTS SPACING /LAYOUT PLAN Varies (SEE PUWTUST) CUT REDLINE WHERE ADJACENT D LA#1 /2- SHREDDED HARDBM8C MULCH TO COYER PLANTING DETAILS - PERRENIALS ON.TS MOVE BINDING FROM TRUNK OF TREE EEP MULCH 1e AWAY FROM TRUNK SHREDDED BARK MULCH SAUCER OOTBALL 2e -3- ABOVE GRADE NISHED GRADE /2 TOPSOIL/ 1/2 PLANTING MIXTURE SHAPED TO CREATE SAUCER OLE DIAMETER TO BE TWICE BALL VADTH /3 PULVERIZED EXISTING CLAY AND TOPSOIL MIXTURE THEN TAMP UGHTLY AIN BURLAP & TWINE AROUND ROOT BALL to NOT OVERDIG DEPTH OF HOLE DISTURBED SOIL ()PLANTING DETAILS -SHADE TREE N.TS. ROOT COLLAR AT RIMED GRADE »• MULCH r AWAY FROM BASE OF SHRUB SHREDDED BARK MULCH, MOUND 10 FORM SAUCER GRADE /2 TOPM/ 1/2 PLANTING SHAPED MATE SAUCER M""JRE: 2/3 PULVERIZED EXISTING CLAY AND TOPS() . L unAIE, TAMP UGHTLY • STRING AT BASE OF SHRUB ONLY, RETAIN BURLAP AROUND BALL 2 PLANTING DETAILS-DECIDUOUS SHRUB ()N.TS... STAKE TREES W./3 STAMFBR0X 1/2 UP TREE KEEP MULCH 1e AWAY FROM TRUNK OF TREE Y SHREDDED BARK MULCH, MOUND TO FORM SAUCER FINISHED GRADE TO CREATE SAUCER 1 PULVERIZE EDSTNG CLAY, TAMP LIGHTLY CAIN BU� AND 1WME�AROUPD PUNT BBALI. DO NOT OVERDO DEPTH OF HOLE ()PLANTING DETAILS - STAKED EVERGREEN TREE ()PLANTING enriching communities through architecture dulath • of g nta • grand rapt• • Gain dh. weeroo.drgnum CIRCLE -LEX VFW POST #6583 7868 LAKE DRIVE LINO LAKES, MN 03098 July 07, 2003 03098-LAND-SITE-CL-VFW TS MMA MICHAEL I. THOMAS 23592 MO= X04 2003 I hereby certify that adapine, apsri imtYe, or sport roa praporedbywor radar my dboetaoperuhbn Jed that 1 an a doty Gamed Architect radar the Taw alas Smsof NGneob. wrA roYoaAme dare SrrE & Buxom PLAN Ream 10/09/03 LANDSCAPE DETAILS CIRCLE -LEX LUMIMIRE SCHEDULE SNnEar L..68 ab. C.W.g Number L09.l. OF Weds 1rSOI APESECURDY/ 0 e" 3 069007 PERINEIERGlLGF 17a WATT 81 SE94171• 14000 1.00 200 10° PARMHGROADWAY 0 A 3 PRMO / TYPE N 400WA1TMN PR440k 31056 1.00 p IrPARIONGROADWAY p • p 1 PRNO / TYPE N MO WATT AO1 PR110Jp 96000. 1.00 1820 .8 1. 0.3 . 1. .. rows CTY or. i.utio r= • • • 0 co 0 cT Cn N N O ®® O ix. CD N in in • o • ".D 1 O rt CD _rt O� 0 CD 0 iii Attachment 2 0 CD 5Ti CD 0 0 cD 0 FD1' o .• 0 N 0 CD • • • E ;uewq a ;; grna�Piene.4*— -1 CIRCLE — LEX VFW POST #6583 PLANNING INFORMATION Parking Requirements: there are a number of different ways to figure parking area for the site, based on which category one chooses. Total net building square footage is 10,954 sq.ft.: Requirements per Ordinance Proposed for Site • "Private clubs serving food and/or drinks ": 10 spaces for each 1,000 sq.ft. of dining room, plus 1 for each • Totals were figured based on a more specific breakdown of uses, as described on Plan Sheet A1.1: employee." Bar: 28 Dance Hall: 33 Office Area 8 Total: ` 69 stalls Actual stalls to be constructed is 89. This is down somewhat from what was shown on the concept plan back in August (98 stalls). In addition, more islands have been provided. Pervious/Impervious Coverage: Ordinance controls impervious coverage in the General Business District in the following way: Requirements per Ordinance Proposed for Site • Impervious is limited to 75 %, with pervious at 25% • Impervious at 64.1 %, with pervious at 35.9% Lighting Requirements: Ordinance controls lighting in the following ways: Requirements per Ordinance Proposed for the Site • Light Intensity: is limited to 1.0 foot • Light Intensity: intensity does not candles at street R.O.W., and 0.4 on any adjacent residential property conform to requirements, as there are readings over 1.0 and 0.4 • Fixtures: "shall contain a cutoff which • Fixtures: there is no information on directs and cuts off the light at an angle fixtures at this time more that 3 feet of the required screen of 90 degrees or less." • Pole Height: there is no information on • Pole Height: maximum height of the pole height at this time fixture and pole above the ground grade is 30 feet. Buffering Requirement: Ordinance notes that "where any business or industrial use abuts property zoned for residential use, that business or industry shall provide screening along the boundary of the residential property." (NOTE: this clause may or may not apply, as the abutting property is zoned Rural, not Residential. That is, its use is residential, but it is not zoned residential). Requirements per Ordinance Proposed for Site Buffering is required in one of the There appears to be a fence proposed, or following ways: existing, for the property boundary abutting • Green Belt: "shall be designed to neighboring residential areas. provide 80% opacity to a minimum height of 6 feet" • Fence: "shall provide a solid screening effect 6 feet in height" • Berm: "shall not be used to achieve more that 3 feet of the required screen (6 feet total is req.) .r • • Agenda Item 6A Environmental Board Meeting Date: October 29, 2003 Topic: 2004 Environmental Board Goals Summary: Environmental Board Chair Kukonen requested that board goals for 2004 be placed on this agenda. The 2003 Environmental Board Goals are included as Attachment 1. If there is any additional information you think you might need before the discussion of goals, please give me (Marty) a call. Comments: Attachments: 1. 2003 Environmental Board Goals 2003 ENVIRONMENTAL BOARD GOALS Promote public education and provide handouts available at city hall on such subjects as invasive non - native species, where to buy native plants, . environmental landscaping, composting, organic gardening, promoting and protecting wildlife habitat..:: :..: Seek funding and agencies to help with land acquisition for open space, wildlife habitats, greenvway corridors, and to protect high ecological value areas.:: Seek funding and agencies for staff help. Research ways to obtain dedication fees from developments and/or the to preserve open space. GOING GOALS ontinueworldng with the Anoka Conservation District Metro reenways Program. ontinue to monitor Peltier Lake. ontinue.to contribute to each. City News Letter. ontinue to work with our .Elementa Elementary and Middle schools.