HomeMy WebLinkAbout10/12/2005 Env Bd Packet•
•
City of Lino Lakes
Environmental Board Meeting
October 12, 2005
6:30 p.m.
(This meeting not televised)
AGENDA
1. CALL TO ORDER
2. APPROVAL OF MINUTES: Minutes from August 31, 2005 to be approved at
the October 26, 2005 Meeting
3. APPROVAL OF AGENDA
4. OPEN MIKE
5. ACTION ITEMS
A. I -35E Corridor Final AUAR
6. DISCUSSION ITEMS
A. Hardwood Creek Update
B. Rice Creek Professional Building
7. ADJOURN
•
•
Environmental Board
Meeting Date:
Topic:
Background:
Agenda Item 5A
October 10, 2005
Final Alternative Urban Areawide
Review (FAUAR)
l -35E Corridor
The l -35E DRAFT Alternative Urban Areawide Review (AUAR) was transmitted
to persons on the Environmental Quality Board's (EQB) official distribution list on
June 30, 2005 for the required 30 -day public comment period. The 30 -day
comment period started on July 4, 2005 and ended on August 3, 2005. The
document was distributed to all required state and federal agencies, the AUAR
Advisory Panel, and local units of government including Anoka County,
Washington County, Rice Creek Watershed District, City of Centerville, City of
Hugo, and Columbus Township. The document was also made available to the
public at local and regional libraries, City Hall, and the City's website.
The AUAR process requires that the Draft AUAR be distributed for the public
comment period and revised to address comments received during the public
comment period. This gives the city the opportunity to have the knowledge and
expertise of various public agency staff reflected in the Final AUAR.
Draft AUAR Comment Letters
The City received comment letters from the following state agencies and local
units of government during the 30 -day public comment period:
• Washington County Department of Transportation and Physical Development
• Brit -Vue, LLP
• Emmons & Olivier Resources for Rice Creek Watershed District
■ County of Anoka Public Services Division Highway Department
■ City of Hugo
■ HERON Group
• Minnesota Department of Natural Resources
• Metropolitan Council
• Minnesota Department of Transportation Metropolitan District
• Village of Hardwood Creek, LLC
■ Wayne LeBlanc
Response to Draft AUAR Comment Letters
As required by Minnesota Rules, the City must provide replies to comments that
are substantive (involving matters with major or practical importance). City staff
and the AUAR consultant team has completed the "Response to Comments"
element of the Final AUAR, which provides responses to substantive comments
received
Mitigation Plan
The Final AUAR document includes a Mitigation Plan. The mitigation plan takes
on the nature of a commitment by the City to prevent potentially significant
impacts from occurring from specific projects within the AUAR area. It is more
than just a list of ways to reduce impacts -- it includes information about how the
mitigation will be applied and assurance that it will. The City's final action on the
AUAR must specifically adopt the mitigation plan; therefore, the plan has a
"political" as well as a technical dimension.
Final AUAR Review Process
The Lino Lakes Environmental Board and AUAR Advisory Panel met on
September 22, 2005 to review and comment on the city's Response to Draft
AUAR Comments and the Mitigation Plan.
The City Council authorized distribution of the Final AUAR to persons on the
EQB's distribution list as well as to any persons who commented on the Draft
AUAR. State agencies and the Metropolitan Council have ten days from receipt
of the document to file an objection to the Final AUAR. If no objections are filed,
then the City Council is required to adopt the Final AUAR. The objection period
ends on October 14, 2005. The City Council will be considering the adoption of
the Final AUAR on October 24, 2005.
Recommendation:
Staff is recommending adoption of the Final AUAR.
Attachments:
1. Final AUAR Executive Summary
2. Distribution List
I -35E Corridor Final AUAR September 26, 2005
• Executive Summary
The I -35E Corridor Final AUAR has been prepared for the City of Lino Lakes (city) in accordance with
Minnesota Rules Chapter 4410. This AUAR process was prompted by the fact that large portions of the
AUAR area are facing development pressure, that the city has a strong commitment to conserving natural
resources and that the city wants to balance development with natural resource conservation. The city
determined that undergoing the AUAR process would provide the city with an invaluable tool as they plan
for and manage growth within the northeastern portion of the city (Figure 5 -1). The AUAR follows the
format of an Environmental Assessment Worksheet (EAW) and provides a level of analysis commensurate
with an Environmental Impact Statement (EIS).
The large geographic scope of the AUAR area (over 4,500 acres) allows for a comprehensive analysis of the
cumulative impacts of development within the AUAR area (Figure 5 -2). Mn Rules state that, "the
Responsible Governmental Unit (RGU) may specify more than one scenario of anticipated development
provided that at least one scenario is consistent with the adopted comprehensive plan. At least one scenario
must be consistent with any known development plans of property owners within the area," (Mn Rules.
Chapter 4410.3610 subp.3). This AUAR includes a review of three development scenarios.
1. Scenario One is consistent with the adopted plans of the city and allows for an additional 2,237
housing units, 2,985,733 ft2 of commercial uses, and 11,175,035 ft2 of industrial uses (see Figure 6-
2).
2. Scenario Two is based on known development plans of property owners within the AUAR area and
has a commercial and industrial emphasis (see Figure 6 -3). Scenario Two allows for an additional
5,715 housing units, 5,617,890 ft2 of commercial uses, and 9,570,045 ft2 of industrial uses.
3. Scenario Three has a residential emphasis and allows for an additional 8,659 housing units,
4,141,554 ft2 of commercial uses, and 5,829,722 ft2 of industrial uses (see Figure 6 -4).
Distribution of the proposed Final AUAR does not constitute approval of any specific project pursuant to
zoning, subdivision, or other official controls of the City of Lino Lakes. Rather, preparation and
distribution of the proposed Final AUAR is mandated by the Environmental Review Program,
Environmental Quality Board, Chapter 4410 Minnesota Rules. Any proposed specific project within the
AUAR area remains subject to applicable local zoning, subdivision, or other official controls. Specific
projects that are consistent with the assumptions of the adopted Final AUAR and which comply with the
mitigation plan within the Final AUAR are exempt from further environmental review pursuant to
Minnesota Rules Section 4410.3610 Subp. 5 E.
AUAR PROCESS SUMMARY
This AUAR process is unique in that it includes a strong public participation and an agency participation
component throughout the process, rather than only involving the public-and reviewing agencies after the
Draft AUAR is completed, which is the standard process required by Minnesota Rules. To ensure very
strong and timely communication and the participation of numerous key stakeholder groups throughout the
planning process, an Advisory Panel was selected to serve as the primary working group during the course
of the research, planning and environmental review process. The Advisory Panel includes property and
business owners within the AUAR area as well as members of the city's Planning and Zoning Board,
Environmental Board, and Economic Development Advisory Committee. All information, work products,
findings and recommendations developed by the AUAR consultant team were presented to the Advisory
Panel for its review and comment. Also, this information was made available to the general public on the
city's website
viii
I -35E Corridor Final AUAR September 26, 2005
• Advisory Panel
A series of Advisory Panel workshops were held to present research related to the AUAR, to assist in the
creation of the development scenarios that are reviewed in this AUAR document, and to review the Draft
and Final AUAR documents. Several Advisory Panel workshops were held for the purposes of presenting
the development scenarios, receiving comments on the scenarios, reviewing the revised development
scenarios. A list of workshops follows.
•
Topic
Introduction to the AUAR Process
Municipal Services
Natural & Cultural Resources
Transportation
Demographics and Market Analysis
Development Scenarios I
Development Scenarios II
Development Scenarios III
Draft AUAR
Final AUAR
Date
November 18, 2004
December 2, 2004
December 16, 2004
January 6, 2005
January 20, 2005
February 3, 2005
February 17, 2005
March 3, 2005
June 9, 2005
September 22, 2005
Environmental Board
Several members of the Lino Lakes Environmental Board are on the Advisory Panel. In addition to their
participation on the Advisory Panel, the Environmental Board devoted its June 7, 2005 meeting to
reviewing and discussing the Draft AUAR. The Environmental Board discussed and provided comments
on each AUAR item. Several revisions to the Draft AUAR were made to address the comments of the
Environmental Board prior to the City Council authorizing its distribution. The Environmental Board met
jointly with the Advisory Panel on September 22, 2005 to review the Final AUAR. The focus of that
meeting was reviewing the Mitigation Plan.
City Council
All of the information provided by the Advisory Panel and Environmental Board, including comments,
suggestions, and concerns, was assembled and delivered to the Mayor and City Council prior to their review
and consideration of the work completed. The City Council held three work sessions regarding the AUAR
prior to ordering the preparation of the document at their April 11, 2005 City Council meeting. The
purpose of the first work session, held January 19, 2005, was to introduce the City Council to the AUAR
process and review the relevant background research. The City Council held two work sessions to review
the draft development scenarios on March 29 and April 6, 2005. The City Council held a work session on
September 21, 2005 to review the Final AUAR and Mitigation Plan. The City Council authorized
distribution of the Final AUAR and Mitigation Plan at its September 26, 2005 meeting.
Agencies
To engage reviewing agencies early in the AUAR process, a series of agency meetings were held to present
background research, to solicit initial comments on the research, and to help the AUAR team scope out the
level of detail needed in the AUAR analysis. Valuable information was gained from agency staff that was
incorporated into the AUAR analysis. Staff from the following agencies attended some or all of the
meetings: Department of Natural Resources, Department of Transportation, Metropolitan Council, Anoka
I -35E Corridor Final AUAR September 26, 2005
• County, Washington County, US Army Corps of Engineers, US Fish and Wildlife Service, Anoka
Conservation District, Rice Creek Watershed District, and Environmental Quality Board. A list of agency
meetings follows.
Topic Date
Municipal Services & Tour of AUAR area November 23, 2004
Natural & Cultural Resources December 7, 2004
Transportation December 28, 2004
Development Scenarios I January 25, 2005
Development Scenarios II February 22, 2005
The City received comment letters on the Draft AUAR from the following agencies: Department of Natural
Resources, Department of Transportation, Metropolitan Council, Anoka County, Washington County, and
Rice Creek Watershed District. City staff and members of the AUAR technical team met with agency staff
to better understand the comments on the Draft AUAR and to further involve the agencies in the preparation
of the Final AUAR and Mitigation Plan. City staff and members of the AUAR technical team met with the
commenting agencies to discuss their comments, the city's approach to addressing the comments, and
additional mitigation strategies. A meeting was held with Rice Creek Watershed District staff on August 23,
2005 to discuss stormwater management issues and a meeting was held on August 26, 2005 with staff from
the Department of Transportation, Metropolitan Council, and Anoka County to discuss transportation
issues.
Public Open House
In addition to the Advisory Panel, City Council, and agency workshops, a public open house was held on
February 17, 2005. The purpose of the public open house was to give the general public the opportunity to
review and submit comments on the background research and the draft development scenarios.
Public Comment Period
The Draft AUAR, including a draft Mitigation Plan Outline was prepared and distributed to the
Environmental Quality Board (EQB) and persons and agencies on the official EQB mailing list in
accordance with EQB rules. In addition, the Draft AUAR was transmitted to the Advisory Panel and
surrounding communities. The 30 -day comment period occurred from July 4 to August 3, 2005. Two state
agencies, five local units of government, two business ventures, one citizen group and one citizen submitted
comment letters on the I -35E Corridor Draft AUAR. The Draft AUAR comment letters are included in
Appendix H.
MAJOR ISSUES AND PROPOSED MITIGATION SUMMARY
The potential impacts and major issues identified in the Draft AUAR and/or in the Draft AUAR comment
letters are summarized in the following section. The major issues include traffic, ecologically sensitive
resources, storm water management, regional sanitary sewer infrastructure capacity, and cultural resources.
The discussion of each issue also includes a discussion of the proposed mitigation measures that address the
identified impacts and issues. A comprehensive summary of potential impacts and the proposed mitigation
strategies are included in the Mitigation Plan. The final Mitigation Plan will become a component of the
action plan to ensure that the city avoid, minimize, or mitigate significant environmental impacts from the
development of the AUAR area
• Traffic
A detailed traffic impact analysis has been prepared to fully investigate the effects of the proposed land use
scenarios on the local and regional roadway systems (see Item 21. Traffic). The traffic analysis focused on
x
l -35E Corridor Final AUAR September 26, 2005
the operation of the primary roadways and their intersections during the p.m. peak period, which is typically
the time when the most severe traffic congestion is incurred. The traffic analysis was expanded to include a
noise impact analysis (see Item 21, Traffic), a 2020 no -build traffic analysis (see Appendix E), and a 2030
a.m. peak analysis (see Appendix F) to address comments received on the Draft AUAR.
Evaluating the development scenarios involved the complex process of developing and distributing
background and development scenario related traffic through the areas roadway network. The network
includes a system of frontage roadways that will assist in the circulation of traffic through the area. This
roadway system, which was presented to the City and Anoka County early in the AUAR process, was used
as a guideline in determining where to put the various developments.
The key guidelines included:
• Limit access to CSAH 14 and 80th Street between CSAH 21 and Elmcrest Avenue North
• Limit access and preserve mobility on CSAH 14, CSAH 21, and 80th Street (assuming future
interchange)
• Signalized (primary) intersections at 'A mile spacing
• Collector (secondary) intersections at '/ mile spacing
• Enhance existing street network to serve local trips (e.g., upgrade Elmcrest Avenue North)
• Develop frontage/backage road system to provide property access
• Consolidate existing access as opportunities arise
• Consider I -35E park and ride location
• Provide bicycle /pedestrian trail connectivity
In general, the overall development scenarios resulted in significant increases in traffic to /from the AUAR
area. The major problems with the intersection were southbound left -turns and westbound left -turns. The
lane geometry that was assumed was single left -turns on all approaches. The results indicate that given the
expected development in the AUAR area that several of the approaches would require dual left-turn lanes to
adequately accommodate study area traffic. The redesigned interchange at CSAH 14 and I -35E overall
functioned satisfactory during the p.m. peak hour for the 2030 land use scenarios. The northern section of
the AUAR area, along 801 Street and the bypass, also showed high traffic volumes and intersections
projected to operate over - capacity under the assumed lane geometry.
Table 21 -5 displays the overall Level of Service (LOS) for all of the analyzed intersections for the
development scenarios for 2030 build -out and post 2030 build -out conditions. Table 21 -6 displays the LOS
for each of the turning movements for the 2030 build -out conditions. The intersection traffic volumes for
the full development of the scenarios (post 2030) resulted in severe congestion for virtually all turning
movements and therefore are not shown in the table.
The proposed developments will increase traffic on roadways within, and adjacent to the AUAR area.
Mitigation will include adding traffic signals and turn lanes and widening roads as necessary during the
various stages of development (see Figures 25 -8 through Figure 25 -12). In general, Scenario One had the
least impact on traffic congestion with two intersections performing at LOS F, without mitigation. Scenario
Two had four intersections and Scenario Three had six intersections operating at LOS F, respectively. With
reasonable mitigation measures all the intersections in Scenarios One and Two were able to operate at LOS
E or better. Even with reasonable mitigation measures, Scenario Three, which has a residential emphasis,
still had intersections performing at LOS F. These include the east ramps at the proposed Northerly
Bypass/I -35W interchange, and the intersection of CSAH 14 and Otter Lake Road.
xi
I -35E Corridor Final AUAR September 26, 2005
• To mitigate the impact of the additional traffic on the regional system I -35W and I -35E would need to be
reconstructed to provide a six -lane cross - section. It should be noted that it was determined that an
expansion will be necessary even without the development scenarios used in this analysis. As the interstates
serve a much larger area, the proj ected growth of the entire Twin Cities region should warrant expansion to
the interstates by the year 2030.
•
•
As future growth occurs, alternative modes of transportation may be needed to maintain the area's mobility.
These modes may include express bus service, buses operating on exclusive right -of -way (busways), or
commuter rail. All three of these modes were looked at in the transit study conducted in 2001 by the Rush
Line Corridor Task Forces. The general alignment proposed for the Rush Line is adjacent to TH 61 in
Washington County, or within 2 -miles AUAR area. Opportunities should be explored to provide a link to
this system as it is being developed.
Pedestrian and bicycle paths are another way to improve mobility within and to the AUAR area. It is
recommended that any roadway improvements being planned in the AUAR area should include provisions
for the addition of pedestrian / bicycle facilities. These facilities should ideally be at least 10 feet wide and
separated from the highway shoulder by a minimum of 20 feet.
Figures 21 -8, 21 -9, and 21 -10 display the intersection LOS for each of the scenarios and also display the
mitigation measures that were identified to address the deficiencies. These figures represent
general/conceptual improvements that were shown to improve overall traffic operations for the respective
development scenarios. The improvements are intended to represent the minimum level of infrastructure
investment that would be needed to meet acceptable level of service standards. Additional roadway and
non - motorized improvements, beyond the minimum level, may be identified to accommodate specific
development needs that are identified within the AUAR area.
Draft AUAR comment letters suggested that the city establish a monitoring program in an effort to link
permitted development to the capacity of the surrounding road network. The City will implement an on-
going traffic management plan to monitor traffic volume growth and any operational issues that may
develop in and around the AUAR area. This monitoring program is intended to give the City, County and
other agencies the opportunity to evaluate future development projects within the AUAR area and their
cumulative impacts on the transportation system. The results of the monitoring program will be shared
with the various road authorities on a regular basis.
To implement the monitoring program, a traffic impact study will be required for all developments within
the AUAR area and a consistent methodology will be followed. Each traffic impact study will identify the
deficiencies and reasonable mitigation measures that are related to the development. Per the City of Lino
Lakes subdivision and zoning ordinances, specific level of service guidelines must be followed to obtain an
acceptable level of service. Section 1002 -6 of the Lino Lakes Subdivision Ordinance states that if a
proposed subdivision is not consistent with the Comprehensive Plan with respect to the Land Use Plan, or
the Transportation Plan, specific guidelines to roads or highways to serve the development must be met.
For reference, Section 1002 of the Subdivision Ordinance is included under the "General Implementation
Tools" of the Mitigation Plan. If no reasonable mitigation measures are agreed upon or are unfeasible, the
intensity or timing of the proposed development would be staged so as to not overly burden the
transportation system.
xii
•
•
I -35E Corridor Final AUAR September 26, 2005
Ecologically Sensitive Resources
The AUAR area contains a wealth of ecologically sensitive resources including high quality natural and
semi - natural areas, wildlife corridors, two rare animals, the Peltier Lake Island Heron Rookery, two rare
plant communities, and portions of the Rice Creek Chain of Lakes Regional Park. Mitigating impacts to
ecologically sensitive resources is discussed throughout the Final AUAR.
The Conservation Design Framework (Figure 10 -3 and described under Item 10) is designed to conserve
wildlife habitat and natural plant communities, and will provide an invaluable tool for conservation of
wildlife and rare features within the AUAR area. Most importantly, the Conservation Design Framework
protects the existing significant fish, wildlife, and ecological sensitive resources in the northwest portion of
the AUAR, and goes beyond to identify and protect the most significant outlier habitats, buffering them,
and connecting them with greenway corridors. In brief, conservation design principles behind the
Framework include:
• protect streams, lakes, and groundwater by purifying, filtering, and infiltrating surface runoff to the
maximum extent possible
• preserve, restore, and enhance existing natural and semi - natural areas and wildlife habitat
• create wildlife opportunities by restoring and managing wildlife habitat
• establish wide buffers and connections around and between core and outlier habitats
The greenway corridors are designed to connect the larger and higher quality natural areas. These corridors
will provide three main services: 1) stormwater collection and conveyance, 2) ecological corridors for
wildlife movement and native plant dispersal, and 3) recreational trails for people. Certain greenway
corridors may warrant design for specific wildlife species, may provide certain stormwater management
opportunities, or may need to accommodate different types of trails or passive recreational uses. Design
considerations may include corridor width, appropriate vegetation structure, human access and use, and
whether or not it is appropriate for a corridor to cross a particular type of roadway.
New developments represent opportunities to plan and carry out ecological restoration and management.
Ecological restoration, enhancement, and/or expansion will help mitigate potential impacts on wildlife and
rare features, and if these activities are planned, scheduled, and carried out at the recommended broad scale,
will likely result in a net increase in conservation and ecological benefits within the AUAR area compared
with existing conditions.
Various tools exist or can be developed to ensure the protection and stewardship of the preserved, restored,
and enhanced natural resources in the AUAR area. These tools can be used to establish a consistent set of
standards for treating the open space across different areas as they are developed. For example, the buffers
shown on the Conservation Design Framework (Figure 10 -3) are conceptual and will allow the city the
flexibility to consider several land protection and preservation tools in these areas. The variety of tools listed
throughout this Final AUAR will enable public and private sectors to cooperate in creating this natural open
space network over time in a realistic market and regulatory context.
Stormwater Management
Effective stormwater management and planning within the AUAR area is a challenging pursuit, but one that
is critical to prudent and environmentally sound development. The AUAR process presents an opportunity
for logical and innovative stormwater management that integrates traditional stormwater detention and
water quality requirements with environmental restoration and conservation objectives. This ideal can be
implemented on both a regional and site scale to minimize the impact of development on runoff rates and
volumes, water quality, and the region's aquatic resources. The stormwater analysis is fully discussed under
Item 17 and Appendix D contains the Hydrologic Analysis.
X111
I -35E Corridor Final AUAR September 26, 2005
The majority of the AUAR area faces many obstacles to effective stormwater management. In many cases
agricultural ditch and tile networks have significantly altered drainage basins and changed sub - watershed
divides. The drainage capacity of these existing tile networks will be insufficient to convey stormwater
runoff from further residential, commercial, or industrial development. The recommendations made within
this AUAR document are intended to improve post - development runoff water quality; attenuate runoff
release rates downstream and drainage infrastructure capacities for both frequent and occasional rainfall
events; and enhance groundwater recharge as the AUAR area is developed.
Stormwater management areas (SMAs) will play a critical role in mitigating potential impacts from
stormwater following development of the AUAR area. Appropriate design, construction, and maintenance
of these areas will enable development to occur without compromising the integrity of the region's aquatic
resources. The stormwater management approach outlined in this Final AUAR provides adequate detention
of runoff for post - development conditions. It also provides a framework for water quality enhancement and
increased groundwater recharge. The stormwater detention facility design will provide hydraulic properties
appropriate for native plant species to thrive. All of these factors will help mitigate potential water quality
problems associated with development in the AUAR area.
The most effective approach to addressing stormwater issues is by implementing an integrated system of
stormwater management elements. The Conservation Design Framework provides an appropriate layout for
the regional implementation of an integrated system (see Figure 10 -3). Within the greenway corridors
shown in the Framework, bio- swales, wet prairie, and wetlands can be oriented in series to effectively retard
runoff rates, reduce stormwater volume, and enhance water quality. Runoff rates and volumes are decreased
due to increased infiltration, evapotranspiration, and increased friction imparted on the flow. These
decreased rates also reduce the ability of runoff to generate and carry sediment and associated pollutants.
The runoff volume into the receiving waters will likely increase with development due to the increased
impervious area constructed in the AUAR area. However, with the stormwater management requirements
outlined in this document, the peak runoff release rates will be decreased from storms of 1 -, 10 -, and 100 -
year recurrence intervals and runoff volumes will be no less than 80% and no more than 150% of existing
conditions. The recommended large area stormwater management elements will result in relatively small
water level fluctuations, provide area to enhance the groundwater recharge necessary to provide base flow to
the receiving streams, and provide the detention time necessary to cleanse the runoff of contaminants and
meter the increased runoff volume in compliance with Rice Creek Watershed District (RCWD) Rules.
Regional Sanitary Sewer Infrastructure Capacity
The city has met with Metropolitan Council Environmental Services (MCES) staff on several occasions
from 2003 through Spring 2005 to discuss existing and future MCES service to Lino Lakes. The MCES is
in the process of updating their comprehensive planning for the "Northeast Region," which includes Lino
Lakes, Centerville, North Oaks, Forest Lake, Hugo, White Bear Lake, and White Bear Township. They
anticipate the need to provide additional capacity in the Forest Lake Interceptor and downstream facilities to
serve the future needs of those communities. Currently, MCES is engaged in plans to construct additional
capacity support for the Forest Lake Interceptor.
Following a series of meetings in early 2005, MCES agreed to construct an additional interceptor to serve
the easterly portion of Lino Lakes. The MCES intends to construct this pipe in 2006, in conjunction with a
proposed county highway improvement project. The new interceptor should be designed to convey the
excess flow not accommodated by the existing Centerville Interceptor. Assuming the existing interceptor
can handle 1.7 MGD, the new pipe should be designed to convey flows ranging from 1.3 MGD for Scenario
One to 2.5 MGD for Scenario Three (see full discussion under Item 18).
xiv
l -35E Corridor Final AUAR September 26, 2005
Design of the new interceptor is now in progress. Lino Lakes provided flow estimates, based on the
Comprehensive Sanitary Sewer Plan Scenario, to MCES in March 2005 (see Item 18 for additional
information). MCES has directed the designers to provide capacity in the new interceptor for 2.0 MGD
average daily flow. Discussions are currently underway between Lino Lakes and MCES regarding the
capacity to be provided in the new interceptor. Assuming capacity remains at 2.0 MGD, the existing and
new interceptors will have adequate capacity for projected development through at least 2030 under any of
the three AUAR Scenarios. However, ultimate development as projected by Scenarios Two and Three
could eventually exceed capacity. If the city chooses to amend its Comprehensive Plan to accommodate
components of Scenarios Two or Three, then a subsequent revision to the Comprehensive Sanitary Sewer
Plan will be required. The Comprehensive Planning process, including review by the Metropolitan Council,
is the appropriate process to resolve any potential sewer capacity issues.
Cultural Resources
Ten precontact archaeological sites have been recorded in the north and western portions of the AUAR area,
and numerous others have been documented in proximity to it (see Table 25 -1). For the most part, sites are
located in proximity to water: Centerville Lake, George Watch Lake, Peltier Lake, Rondeau Lake,
Clearwater Creek, Hardwood Creek, and Rice Creek. The undisturbed landforms adjacent to these bodies
of water have the greatest potential for containing intact archaeological sites. Several sites have been
identified on slight rises within the wetlands surrounding Rice Creek; therefore, those wetlands, and the
northern portion of Peltier Lake, have high potential to contain intact archaeological resources. Further,
those undisturbed areas adjacent to known sites are also considered to have high archaeological potential.
Because of the high level of archaeological sites in the AUAR area, appropriate levels of historical and
archaeological surveys in areas identified as having high potential for containing cultural resources will
occur prior to future development. This is intended to mitigate any intentional or unintentional damage to,
or destruction of, important archaeological sites and historic properties without due process and
consideration.
The 106 Group created a map that shows areas with a high potential for archaeological sites. Given the
sensitive nature of this information, this map cannot be included in the AUAR document, nor can it be
made available to the public. The city will have this map on file and consult it when development
applications are submitted for review. If a development application falls within an area that is considered to
have a high potential for archaeological sites, the city will require that the following steps and procedures
involved in the identification and analysis of any archaeological sites is followed prior to development:
• Conduct a Phase I archaeological survey within the area of potential effect (APE). The objective of
the archaeological fieldwork is to determine if there are archaeological sites in the areas identified
as having high potential for such, and define the extent of those sites that may be impacted by
development plans.
• Conduct a Phase II archaeological survey. If archaeological resources are uncovered within the
APE that may be eligible for listing on the National Register of Historic Places (NRHP) a Phase II
survey should be conducted. The objective of the investigation is to determine whether
archaeological resources are eligible for listing on the NRHP.
• Plan for avoidance or conduct Phase IlI data recovery. If a significant archaeological site is
identified that will be impacted by development, avoidance is recommended. If this is not possible,
then a data recovery of the site should occur.
xv
•
•
•
I -35E Corridor Final AUAR September 26, 2005
MITIGATION PLAN
A comprehensive summary of potential impacts and the proposed Mitigation Plan are included in this Final
AUAR. A draft mitigation plan outline was included in the Draft AUAR to assist in the public in
understanding the City's initial approach to mitigating impacts. The potential impacts and mitigation
strategies included in the Draft Mitigation Plan Outline in the Draft AUAR have been revised and expanded
upon to address Draft AUAR comments. The final Mitigation Plan will become a component of the action
plan to ensure that the city avoid, minimize, or mitigate significant environmental impacts from the
development of the AUAR area.
xvi
Distribution List
• The FAUAR was transmitted to the following agencies and individuals:
• Environmental Quality Board, Environmental Review Program
• Board of Water and Soil Resources
• Department of Agriculture
• Department of Health, Environmental Health Division
• Department of Commerce
• Department of Natural Resources
• Minnesota Pollution Control Agency
• U.S. Army Corp of Engineers
• U.S. Fish and Wildlife Service
• Department of Transportation .*
• Metropolitan Council ,
• Minnesota Historical Society
• Technology and Science, Minneapolis Public Library
• Anoka Conservation District
• U.S. Environmental Protection Agency
• Legislative Reference Library
• Anoka County Highway Department
• Anoka County Parks and Recreation
• Anoka County Libraries - Centennial Branch
• Washington County, Transportation and Physical Development 4
• Rice Creek Watershed District -
• City of Hugo -4-
• City of Centerville
• Columbus Township
• Dean Johnson, Resource Strategies
• HERON Group
• Brite -Vue, LLP
• Village of Hardwood Creek, LLC
• Wayne LeBlanc