HomeMy WebLinkAbout03/29/2006 Env Bd PacketCity of Lino Lakes
Environmental Board Meeting
March 29, 2006
6:30 p.m.
AGENDA
1. CALL TO ORDER
2. APPROVAL OF MINUTES: FEBRUARY 22, 2006
3. APPROVAL OF AGENDA
4. OPEN MIKE
5. ACTION ITEMS
A. Legacy Town Homes /Legacy at Woods Edge.
6. DISCUSSION ITEMS
A. Earth Day
B. Other
7. ADJOURN
•
ENVIRONMENTAL BOARD MEETING FEBRUARY 22, 2006
DATE
TIME STARTED
TIME ENDED
MEMBERS PRESENT
MEMBERS ABSENT
STAFF PRESENT
1. CALL TO ORDER
Chair O'Dea called the meeting to order at 6:32 p.m.
2. APPROVAL OF MINUTES
August 31, 2005
CITY OF LINO LAKES
DRAFT MINUTES
: February 22, 2006
. 6:32 P.M.
. 8:53 P.M.
: Barbara Bor, Barbara Bauman, Constance
Grundhofer, Teresa O'Connell, and Mary Jo
O'Dea and Rod Kukonen
: Dennis Smith
: Environmental Coordinator Marty Asleson,
Page Two, seventh paragraph, change text from "...11200- 1250..." to "...1120 to
1250."
Page 3, fifth paragraph, 1st sentence, change text from "...sites where
disturbance." to "site where disturbance has occurred."
Page 5, eighth paragraph, change text from "...Green Velvet Foxwood..." to
"...Green Velvet Boxwood..."
Page 8, second paragraph strike the following text: "...for instance Stoneybrook,
that had no stones or brook on site" and strike the following text: "Asleson added
that he had questions about the landscaping ".
Page 8, fourth paragraph, 1St Sentence strike the following text: "...and if there
are documents."
Page 8 fourth paragraph, 2nd Sentence change text to read as "The meeting time
for a review of Stoneybrook was set for 5:45 p.m. on Wed. Sept. 28, 2005 before
the next Environmental Board meeting."
Page 8, fifth paragraph change text from "...for Stoneybrook... " to "for
Distribution Alternatives."
Page 8, eighth paragraph, change text from "...Community Wildlife..." to
"...Community Wildlife Habitat..."
1 DRAFT MINUTES
ENVIRONMENTAL BOARD MEETING FEBRUARY 22, 2006
January 25, 2006
Page 1, third paragraph: "The Board approved the agenda as amended" to "The
Board approved the agenda as amended to elect no approval of minutes and add
6C."
Page 1, fifth paragraph: Move "Motion was by Kukonen to amend seconded by
O'Connell" to 3. APPROVAL OF AGENDA
Page 2, fourth paragraph 1st sentence: ... "tree grates placed "... to "place."
Page 3, fifth paragraph from bottom, third line: ... "magnate "... to "magnets."
Next sentence should read how water will be filtered instead of other word."
Page 4, fifth paragraph: "...and have to be tricked to have them stay..." to "...if
there was a trick to having them stay..."
Page 4, sixth paragraph "...there is a need to keep grass longer around daffodils so
they survive..." to "...the daffodils foliage needs about 4 weeks to turn brown so
they will re -bloom the following year..."
Page 5, first paragraph, 1st line: "Ken Tallion discussed lighting" to Ken Tallion
was onto lighting."
Page 5, fourth paragraph from bottom: "...the large parking lot areas will not be
lighted..." to "...the lighting plan did not include large parking lot area..." and
strike rest of text." "...this was different than this lighting..." to "...the parking
lot lighting was different than the lighting discussed here..."
Page 5, eighth paragraph: Change "O'Connell asked if the lights could have a
green glow to them." to "O'Connell asked if the flood light fixtures shining into
trees can we have them green shade until the trees mature. Reason being is that it
has less of glare affect going into the skv. Less night light pollution." Change
text of next sentence "...no, the lights are more of a "flood light" fixture..." to
"...no, the lights had to stay here because of the type of fixture..."
Page 5, ninth paragraph: change text from "...200 feet..." to "...20' feet..."
Page 5, third paragraph: "...receptacles will have a tree base ..." to "...receptacle
will be at the tree base..."
Page 6, fourth paragraph: "...it was asked if the police station was manned all
night..." "... it was remarked that the police department sign would need to be on
all night..." Delete rest of text.
2 DRAFT MINUTES
ENVIRONMENTAL BOARD MEETING FEBRUARY 22, 2006
Page 7, sixth paragraph: "...we have ever asked the city to consider as a to
help with money for the project..." to "...the city has every considered helping
with money for the project..."
Page 7, last paragraph: "...such as sent or decoy..." to "...such as decoy..."
"They need to understand the grant, when it ends and who will be running" to
"They need to understand the grant and its duration ". Bor asked if the city has
ever considered helping with money for the project."
Page 7, paragraph two: "...emailed Gordon about a survey..." to "... emailed
Gordon about the City Survey..." "Gordon Heitke's response was something
based on a previous survey SEE GORDON'S EMAIL" to "Gordon Heitke's
response was attached for review by the Board." Add the following text: The
survey's questions were based upon questions form a previous survey.
Page 7, third paragraph: Delete
Page 7, seventh, change text from "...Fox..." to "...Fuchs..."
Page 8, first paragraph: "...O'Dea said that we love having you on the board and
you've meant a great deal to the board..." to "...O'Dea has been a great asset to
the Board..."
Page 8, second paragraph: "We would like as many of us there as possible and
will I present asked Mary Jo O'Dea" to "Any board members who can be there
would be appreciated."
Page 8, second paragraph, last sentence: "...it is up in the air about a Blue Heron
update..." to "...the date of the council update of the Blue Herons is unclear at this
time..."
Bor made a motion to approve the August 5, 2005 and January 25, 2006 meeting
minutes. Bauman seconded the motion. Motion carried unanimously.
3. APPROVAL OF AGENDA
Approval of agenda as amended. Motion by Bauman to amend seconded by
Kukonen.
4. OPEN MIKE
No citizen comments were made. Open mike closed at 6:55 p.m.
3 DRAFT MINUTES
ENVIRONMENTAL BOARD MEETING FEBRUARY 22 2006
5. ACTION ITEMS
A. Pheasant Stroll Estates/Rezone to R -3 and Preliminary Plat for 28 lots.
Marty Asleson presented the staff report. He stated that the applicant is
requesting a rezoning and preliminary plat approval for a 28 lot subdivision called
Pheasant Stroll Estates. The property is proposed to be rezoned from R, Rural to
R -3, Medium Density Residential. The site is guided for medium residential in
the City's Comprehensive Plan. Sewer & water and storm sewer are available for
this site. The developer has submitted a tree preservation plan. Portions of the
project site fall within a Natural Resource Conservation Area as defined in the
City's Park and Open Space Plan and is an excellent place for connectivity. Plan
specifications for landscaping contractor should be approved by the city. Mr.
Asleson recommended approval with the conditions noted in the staff report.
Mike Black, representing the developer, presented an overview of the project. Mr.
Black commented the drainage design has been submitted to Rice Creek
Watershed District (RCWD) for their review. The design was completed in
accordance with the districts requirements and standards. The RCWD has raised
questions concerning the existing flood plain elevation and the developer's
engineers are currently collecting information. Mr. Asleson suggested relocating
the infiltration and mitigation ponds and suggested the southeast corner of the
property as a potential location. Black said we know we have to do a mitigation
pond. Mr. Asleson also suggested the developer work with RCWD to pursue a
wetland enhancement project as an alternative. Mr. Black said they would
continue to work with city and are not taking issue with the recommendation. He
would prefer to mitigate on site. He stated that they would continue to look at
adding more infiltration areas.
Ms O'Dea asked if the access road would be extended in the future.- Mr. Black
responded that the City is currently studying roadway alignments. He noted that
currently the road is proposed to be a private road maintained by the association
with a width of 28 feet. Ms. O'Dea asked about parking. Mr. Black said the road
is wide enough to park on the side.
Ms. O'Connell asked if the existing house would remain. Mr. Black confirmed
that it would. Mr. Black also noted that they were trying to minimize the amount
of fill brought onto the site. Ms. O'Dea asked if there was going to be a
conservation easement on the property. Mr. Black stated that he did not think
there would be any objection to that. Mr. Asleson informed that board that a
conservation easement could be provided. Mr. Asleson expressed concern with
the size of the proposed spillway noting that a large rain storm could wash
sediment into the wet land area. This issue needs to be further examined.
4 DRAFT MINUTES
•
ENVIRONMENTAL BOARD MEETING FEBRUARY 22, 2006
Ms. Bauman asked if the small house was staying or would it be demolished. Mr.
Black stated it would be removed along with the septic system. It will b a taken
care of appropriately said Black.
Mr. Asleson stated that the Board should make a recommendation on the project,
noting that Rice Creek Watershed District needs to look at the overall plan and
wetland impacts. The Developer will provide evidence of capping of well and
septic, fuel tank. Mr. Black also stated that the above ground LP tank is not a fuel
tank. Mr. Asleson recommended the completion of a rare plant inventory for the
site.
Ms. O'Dea mentioned the board would like a more detailed landscaping plan to be
submitted to include ground cover and seed.
Ms. O'Dea made a motion to approve with recommendations from staff and the
board. Bor seconded the motion. Motion carried unanimously.
6. DISCUSSION ITEMS
A. Stoneybrook Representative /Kim Brouillet
Kim Brouillet, 6434 Pheasant Hills Drive was here to talk to the Environmental
Board about the Stoneybrook development. Mr. Asleson mentioned that
Stoneybrook was a site selected for the Board to review as one of their goals.
Asleson included a number of attachments with recommendations and he
proceeded to read through the bullet points.
Ms. Brouillet elaborated on her experience with the Stoneybrook Development
and the developer Tollefson. Ms. Brouillet was concerned that there were issues
with the developer and completion of improvements. Ms. Brouillet feels that
Tollefson is not holding builders accountable. She noted that the monuments are
overgrown and weeds overpower flowers. Mr. Asleson said that this spring the
city will go to evaluate the site.
Ms. O'Dea asked if Tollefson is still in control. Ms. Brouillet said that the city
still has leverage over Tollefson and the Stoneybrook development. Ms. O'Dea
asked if it was the city or homeowners getting involved in this. Mr. Asleson said
both. Ms. O'Dea asked how to insure that recommendations are followed
through. Ms. Bauman stated that the board is trying to learn how its
recommendations can be improved and be made clearer as to what is expected.
Ms. Brouillet said that what should be mandated is that homeowners who
purchased should have been giving building covenants so they knew what was to
be expected. Ms. O'Dea said the Board was led to believe there would be a
homeowners association. Ms. Brouillet said there will be when the residents vote
•
•
ENVIRONMENTAL BOARD MEETING FEBRUARY 22, 2006
on this issue, adding that Brouillet only an Architectural Control Committee exists
now.
Mr. Kukonen asked if there were any restrictive signs in the development at all
and Ms. Brouillet said yes at the corner of every lot. The plan for the spring is to
go in and reevaluate and site.
Ms. Brouillet requested that a representative from the city and make clear to
Tollefson of their responsibility and send a report to the Architectural Control
Committee. Ms. Bor asked if Tollefson has any other building going on in the
city. Ms. Brouillet said that Tollefson marketed an executive home site and did
not follow through. Mr. Asleson said maybe as soon as it warms up we should
take a field trip out there to take a look. Ms. Bor asked Mr. Asleson would go to
staff and propose a spring site visit. Mr. Asleson said yes.
Ms. Brouillet also raised concerns about grading with the two new homes going in
across from her house. Mr. Asleson stated he would notify the City Engineer to
follow up on this issue.
Ms. Bor said that we are very appreciative of Kim Brouillet giving her experience
and what has been going on.
Ms. O'Dea said to Ms. Brouillet that we appreciate her coming in and giving the
Board a report. Ms. Bor suggested that Ms. Brouillet write a summary for the
Board and deliver by email to Mr. Asleson.
Ms. O'Dea asked if Ms. Brouillet should continue working with Mr. Asleson.
Mr. Asleson stated that she should and also with Jim Studenski regarding grading
issues.
B. Wildlife Backyard Habitat
The Board discussed Wildlife Backyard Habitat program. Mr. Asleson stated that
the course will be held at Lino Lakes City Hall, Saturday, March 11.
Lisa Hogstad was asked to call the Quad to try to put an article about the Wildlife
Habitat in the paper. Lisa also mentioned that she will put the information on the
web site.
C. Earth Day
Mr. Asleson stated that Earth Day is scheduled for April 22 and requested Ms.
O'Connell help with Earth Day. Ms. Bor also volunteered. Mr. Asleson will be
sending letters out to businesses for donations.
6 DRAFT MINUTES
•
ENVIRONMENTAL BOARD MEETING FEBRUARY 22, 2006
D Environmental Board Application Process
Mr. Kukonen requested input from staff and board members on how to address an
issue with his advisory board application. Mr. Kukonen explained that he
submitted his application on the due date, January 31, 2006 after City Hall was
closed. He stated that the City considered the application late and therefore it
was not accepted. .
The Board asked Council Member Carlson to comment on this issue. Council
Member Carlson said that Board should make its own decision and that she does
not want to influence any decision.
Ms. O'Dea suggested that Mr. Kukonen submit the Quad advertisement of the
board openings, summary of his position and the process he followed. The board
noted that interviews were being held this evening. Ms. O'Dea suggested that Mr.
Kukonen prepare the letter tonight. Ms. Grundhofer suggested the letter be copied
to other people within the city.
7. ADJOURN
It was noted that the next meeting of the Environmental Board will be on March
29, 2006.
There being no further business, Ms. O'Connell moved to adjourn at 8:53p.m.
Ms. Grundhofer seconded the motion. Motion carried unanimously.
Transcribed by:
Lisa Hogstad
Community Development Secretary
7 DRAFT MINUTES
AGENDA ITEM 5A
STAFF ORIGINATOR: Marty Asleson
DATE: March 29, 2006
TOPIC: Legacy Town Homes /Legacy at Woods Edge
BACKGROUND:
Legacy Town Homes is located in the NE quadrant of the Legacy at Woods
Edge Development site. See Attachment 1.
Since the preliminary plan has been reviewed for Legacy of Woods Edge, input
is now confined to site specifics for projects programmed within the Preliminary
Plat approval. The landscape, lighting plan, and erosion plans are submitted as
review items. Surface Water issues and general landscape issues have
previously been brought to the Board.
Landscape
The proposed plant schedule is presented on sheet C5.0 (Attachment 4).
Several changes should be made to the plant schedule. Recommend changing
Sunburst Honeylocust to straight thornless Honeylocust. It is fairly well known
that Honeylocust will develop nectria canker in artificially created urban micro -
climates and Sunburst more so than thornless honeylocust. Sugar maples will
not do well in the sandy soils of Woods Edge. Red or Sunburst maples should
be substituted for the Sugar maples. Americanna /native (Redmond) Lindens
should be substituted for the Cordata /non native (Greenspire) Lindens.
European larch should be changed to the native Eastern Larch. Ponderosa pine
should be changed to native White Pine or Red Pine.
The area to the east of impervious areas and bordering the basin area (trail
location area) should be planted with native Eastern Larch in the wet to mesic
soils, and white oak with Red oak in the upland areas. This area including the
pond areas to the North and South should be placed in a Conservation
Easement with the City named as the easement holder. This area should be
planted with a City native Seed mix. No top soil should brought in for native
seed areas.
Conservation easement areas should be protected from construction impacts
such as compaction, debris and material stockpiling, and cement truck cleaning.
Top soil note in the landscape plan. Should read "all areas disturbed by
construction activities except for native specified seed areas should have 4
inches of loam top soil thourghly incorporated into the subsoil and seeded or
sodded..." Again, where native plants are specified, no topsoil shall be
specified.
Raingarden and infiltration basins...should read "shall receive the City specified
native seed mix."
Under the Sodding Installation Notes, should read "4 inches of top soil should be
thouroughly incorporated into the subsoil." Areas to receive sod should not be
fertilized with a 10 -10 -10 fertilizer. A starter fertilizer with "0" phospherous must
be used.
Again, under the seeding section of the notes, there should be no specification
for top soil /organic matter incorporation into the infiltration basin areas. In
filtration basin areas should be seeded with the City native seed mix and any
changes approved by the City of Lino Lakes.
Notes allude to the maintenance agreement for future native plant maintenance.
A copy of the maintenance agreement should be submitted to the City of Lino
Lakes Environmental for review and approval.
Sodded Areas must be irrigated.
The Sheet does not appear to show any Street Trees. Consistancy in the
Woods Edge landscaping is a desirable feature and should be reflected in Street
trees of similar species carried through the Woods Edge plan. The City is
responsible for these trees on this project and checking the City Specifications
there are indeed trees planted in appropriate planting areas and consistant with
hackberrys planted to the West.
Trail
The trail location should be staked by the City. This trail should be placed higher
on the contour than otherwise. There has been discussion on the Tamarack
basin restoration to the East and since the hydrologic elevations of such a
restoration project have not been modaled yet, the trail should generally be
placed as high as possible.
Storm Water Pollution Prevention Plan
A copy of the mandatory Storm Water Pollution Prevention Plan (SWPPP)
submitted to the MPCA for approval should be submitted to the City of Lino
Lakes Environmental for Review and Approval before any construction activity
proceedes. A copy of the final approved plan must be maintained on site with
the required weekly and post storm event inspection reports. The SWPPP site
manager's name should be submitted to the City with how to contact this person.
The location of this site must be indicated on the SWPPP. The SWPPP must
indicate where rock entrances to the site construction area will be placed. The
rock entrance must be at least 50 feet in length. The rock must be 1.5 inches in
diameter and maintained for rock pore space. The SWPPP must indicate a
"trigger point" for cleaning silt fence areas. Silt fences must be cleaned when
the fences becomel /3 full. The SWPPP must indicate specific plans and
intentions for dewatering on anticipated and unanticipated storm events. The
plan must indicate procedures for dewatering that would prevent turbid /floculant
waters from leaving the site. The plan should also indicate a method to control
wind erosion off of the site. The SWPPP must show one, and only one area on
the site where cement trucks will clean their tanks. This area must be protected
from the movement of cleaned materials from the clean site. The SWPPP must
indicate disposal of Cement Truck Cleaning materals after construction is
finished.
All storm water sewer inlets must be protected with a mechanical device such as the
Royal Industries Infra Safe device.
Lighting
All security lighting that may be installed on the Town Homes must meet City
specifications. Trail areas to the east will be lit with the approved roadway decorative
lighting fixtures.
OPTIONS:
1. Approve with Staff and Environmental Board recommendations
2. Recommend not to approve
RECOMMENDATION:
Option 1
Attachments:
1. Location Map
2. Preliminary Enlargement Plans
3. Preliminary Grading and Erosion Control Plan
4. Preliminary Landscape Plan
5. Preliminary Site Detail C6.1
6. Preliminary Site Detail C6.2
7. Preliminary Site Detail C6.3
VICINITY MAP
ABBREVIATIONS
AL. ACOUSTIC
OUT. ACOUSTIC 796E
AOJ ADJACENT OR ADJUSTABLE
ARE ABOVE FINISHED FLOOR
ALAI. ALUMINUM
ALT. ALTERNATE AT
AP. ACCESS PANEL
ARCH. ARCHITECT
O AT
BD. BOARD
9lOC.. BALDING
MC BLOCK
BLD G. BLOCKING
BD'T. BOTTOM
CA. CASING
CALL CABINET
CEO. CEMENT
LEN. CERAMIC
CI CASH NON
CIO. CENJNG
CL CLOSET
COL COLUMN
CONC. CONCRETE
COREY. CONSTRUCTION
COAT. CONTINUOUS
CONTR. CONTRACTOR
CORK CORRIDOR
CPT. CARPET
CR CARD READER
C.T. CERAMIC TILE
C.W. W. CASEWORK
OEE DETAIL
DIM. DIMENSION
OR. DOOR
OW. DISH WASHER
WAGS DRAWINGS
EA EACH
EL ELEVATION
EIEL ELEVATOR
ELEC. ELECTRICAL
ENGR. ENGINEER
E ENTRANCE
ED S. EQUAL
EQUIP. EQUIPMENT
COST E%ISTNG
EA•. DMOSED OR EXPANSION
EM. DOERAR
EX W/MC ONAUST W./MC
FTC
F.E
FURN
FOR.
OA.
GALV.
OW.
GYP.
H.C.
HOOP.
HMWO.
AM.
HOW2.
HR
IBC
INSUL
NT.
AST.
MATERIALS + SYMBOLS
FLOOR DRAW
RASH FLOOR ELEVATOR
FIRE EKTINDUISHER
FIXTURE
FURNACE
GAUGE
GALVAN®
GROSS WEIGHT
GYPSUM
HOLLOW CORE
HANDICAP
HARDWOOD
HOLLOW METAL
HORIZONTAL
HOUR
INTERNARDNAL BUILONO CODE
INSULATION
INTERIOR
JANITOR
JOIST
KO. KICK DOWN
LAV. LAVATORY
UN. UREA CLOSET
MAN. IMMANENCE
IAWUF. MANUFACTURER
MAX MAXIMUM
MECH. MECHANICAL
MED. CAB. MEDICINE CABINET
MFR MANUFACTURER
MN. MINIMUM
M0. MASONRY OPENING
M_ METAL
RIC NOT IN CONTRACT
N.T.O. NOT TO SCALE
NO. NUMBER
NOM. NOMINAL
O.C. ON CENTER
OUTSIDE D
O.D. PMETER
O.H. OPPOSITE HAND
P.C. PRECAST
PL PLATE
PLAZA PUS00 LAMINATE
PR PAIR
PT PAINT OR
QUARRY TILE
POINT
O.T.
R RADAR
REF. REFERENCE OR REFRIGERATOR
REF. REFLECTED
REFRD.
REINT.
REV.
REG'D
P.O.
SC.
S.C.
G.E. G.E.
SHY.
SM.
S ECD
SPEC
OIL
STOR.
SIROCT.
Si.
TOG
T.O.
T.P. DO
TUB
T.V.
ARC
LAND
V.C.T.
V.B.
VERT.
VEST.
V.W.C.
WARS.
ND
WD
W
W/ /
W/O
VS.
REFRICFRATOR
REINFORCED
REVISION
REQUIRED
ROD PANT SHELVE
DOUG CORE OR SECURITY CAMERA
SECTION
SIDUARE FEET
SHEET
SIMILAR
SINK WITH DISPOSAL
SPECIFICATIONS
STANDARD
SIEEL
STORAGE
STRUCTURAL VINYL
TTENO E AND GROOVE
TOP OF
TOLER PAPER DSPENSOR
BATHTUB
TELEVIDON
TYPICAL
UNFORM BUILDING CODE
UNLESS NOTED OTHERWISE
VINYL FUROR COVERING
VAPOR BARER
VERTICAL
VESTIBULE
WILL U WALL COVERING
WAINSCOT
WATER CLOSET
WOOD
WATER RESISTANT
WITH
WASHER / DRYER
WITHOUT
YARD
><
'I
CONCRETE
CONCRETE BLOCK
METAL STUD MICRON
FINISHED WOOD
ROUGH WORD OR
BLOCKING
BLOCKNG DR OHM
�■N� WOOD DUO PMRTON
SOIL BORING
i I TO.n'
± 100.0' NEW GRACE ELEVATION
EXISTING GRADE ELEVATOR
GENERAL NOTES
;HIL=L
.1I.I11.II.
SAND
EMIH
GRAVEL
PLYWOOD
STET.
IINNSULAATCRA RIGID
MUTATION
... ADDIISOC TILE
EESING GRADE CONTOUR
NEW GRADE CONTOUR
-4,- ELEVATION
DETAIL ND.
SHEET NO.
SECTOR OR ELEVATION
DIRECTION INDICATION
0-- }- WAIL TYPE
WINDOW TYPE
(OH ODOR NUMBER
OFFICE- ROCM DESCRIPTION
ROOM NUMBER
CODE REVIEW
LEGACY
TOWN HOMES
LEGACY
AT
WOODS
EDGE
LINO LAKES, MINNESOTA
PROJECT TEAM
OWMER
LEGACYY HCLLONOS-U-
LBEpEONAE 554 1 LOO EWDTN MN LLC
JACK BRANIDT
OD) 838 -2400
JJEIRANDTMIUAIFDRROORP.CN
ARCHMECTURAL BEAVICES
WARDRD CROW, INC. A CHECTS /DBNEERS
780 USESF'AppUp UTH
BLOOMINGTON, MN 55431
HA PIERCE AM
(952) 838 -2437
HNFRCEOWRIFOROCRP.CM
8TfllCRJRAL LSYOO�Mq
HARTFORD
Bt0DMNG1000NS, INC. A CHHIILI.V/ENDNEEFS
1300 CAN 5543g
GARY RENHOID, PE
(052) 538 -2435
CRCWELDBHARIFORDCRP.COM
LANDSCAPE ARCHPTEC URAL SBMCEB
HARTFORD CROUP. INC. ARCHRECIS/ESDAEERS
1300 WELLS FARGO PUVA
BLOOMINTO. MN 55431 PATRCY SHINER ASIA
(952) B38 -2422
PSAVERNHARIFORDERP.cca
CTVL ENGEMERNO
HARTFORD GROUP INC. ARCHITECTS /EMONEERS
1300 WNOV15 FPFJA PUIIA
7900 AVENUE SOUTH
BLOOIBAOIDH MN 55431
MXDN . PE
(962) BOB -2432 38-202
A/ICXBOLDONWTFDRDCPP.CN1
C#p_7T:C110 SLAV
Bon Moller
Braun MONc
11001 NmnpeN5 Ave. S.
(052)GSS MN 55438
(962) 995 -2200
rAmHerObrouNlBedeneom
ENVIRONMENTAL SERVICES
Kevin Hoffman
Bald IMMec
11001 HempehN. AR. S.
M nneepoAe, MN 55478
(952) 995 -2200
MhdYWLOpannlsM1eemm
I
/7Y-.
•
--1 -
- `�P-- i1•riy"D
•Ai 005aIGH RDA IMAROWLDI AIL BILMBViliCiY/E/037BRIMONSBB
SHEET INDEX DATE
3510
________- __- _-- -_ -__- 7/10/2006
C1.0 EXISTING CONDITIONS & REMOVALS PLAN -- -------- - - - - -- 3/10/2006
C2.0 PRELIMINARY SITE PLAN ---------------------- _- ---3 /IO /7006
02.1 PREUMINARY ENLARGEMENT PLANS ---------------- - - - - -- x/10/2006
C3.0 PREUMINARY GRADING & EROSION CONTROL PLAN-------- - - - - -- x/10/2006
C4.0 PRELIMINARY SANITARY SEWER & WATERMAIN PLAN---------- - - - - -- x/10/2006
C4.1 PRELIMINARY STORM SEWER PLAN-------------- - - - - -- -3/30/2006
C5.0 PRELIMINARY LANDSCAPE PLAN---- - - - - -- --------- - - - --3 /10/7006
C6.1 PRELIMINARY SITE DEVILS----------------- - - - - -- x/10/2006
C8.2 PRELIMINARY SITE DETAILS--------------- _---- ___ - -_-- 3/10/7008
C8.3 PRELIMINARY SITE DETMlB-------- - - - - -- - - --3 /10/2006
C7.0 PREUMINARY PLAT__-- _--- _--- _- __- __-- -_ -__- ___3/10/2008
9HGtl®7BAL_
A1.1 SEVEN (7) UNIT BUILDING 1 FLOOR PLANS----------- - - - - -- 3/10 /TLA6
A1.2 SEVEN (7) UNIT BUILDING 1 FLOOR PLANS---- - - - - -- - -- -3/10/2006
A1.3 SEVEN (7) UNIT BUILDING 2 FLOOR PLANS------------- -- - - -- 3/10/2006
A1.4 SEVEN (7) UNIT BUILDING 2 FLOOR PUNS------- - - - - -- - - -- 3/10/2006
A3.1 ENLARGED UNIT "A1" FLOOR PLANS - 3/10/2006
A3.2 ENLARGED UNIT "B7" FLOOR PLANS - 3/10/2006
A3.3 ENLARGED UNIT "B2" FLOOR PLANS ------------------3/10/2005
A3.4 ENLARGED UNIT "B3" FLOOR PUNS---------- - - - - -- - 3/10/2006
A3.5 ENLARGED UNIT "CM FLOOR PLANS ------------ ---- -- 3/10/7006
A3.5 ENLARGED UNIT "Cr FLOOR PLANS - 3/10/2006
1.3.7 ENLARGED UNIT "Cr FLOOR PLANS 3/10/2006
A3.15 ENLARGED UNIT "C4" FLOOR PLANS - 3/10/2006
A5.1 SEVEN (7) UNIT BUILDING 1 ELEVATIONS --------- - - - - -- -3/10/2006
A5.2 SEVEN (7) UNIT BUILDING 2 ELEVATIONS ----------- - - - - -- 3/10/7008
A6.1 ENLARGED ELEVATIONS UNITS "At" & "Bt" -_ ---- - - - - -- 3/10/7006
A6.2 ENLARGED ELEVATIONS UNITS B2" & "B3" ------ ------ - - - - -- 3/10/7006
A6.3 ENLARGED ELEVATIONS UNITS "CM & "Cr -- 3/10/2006
A6.4 ENLARGED ELEVATIONS UNITS "C3" & "CA" 3/10/2006
A7.1 BUILDING SECTIONS _ _-- -- __ -- - _ - -_ -- 3/10/2006
A9.1 DETAILS I.- COMMON AREAS & STAIR --
A9.2 DETAILS II- WALL TYPES & JOINTS
A9.3 DETAILS III- WINDOW /DOOR
A9.4 DETAILS N- FLOOR /CEILING
A95 DETAILS V- ROOF
A10.1 CASE & MILLWORK ELEVATIONS & DETAILS
A11.1 FIXTURE ELEVATIONS AND DOOR & WINDOW SCHEDULES
A112 ROOM FINISH SCHEDULE & GENERAL NOTES
ARCHITECT /ENGWEER
PLANNER
HARTFORD
' Rl:T)nlryyyft %
u 1 OOA ▪ wROIlIS
NOM
k
I Wnb/ Folly BM N. PIED molredlm
N Awl •a Nona N a N PT
undo &.d wpnWen .M 910 In 0 duly
AMMO 111.4 oar M w of MW
MN M 1001 .
TOM IL Pox
DOT- 5N711d•1 W. 10062
FOR BID REVIEW ONLY
NOT FOR CONSTRUCTION
CONSULTANT:
OWNER:
LEGACY
HOLDINGS -LL, LLC
13m WR15 MUGS NASA
7900 WPM WENT SOUTH
532-039-080
PR-0X -1181
PRO3ECT:
LEGACY
TOWNHOMES
LEGACY
AT
WOODS
EDGE
UNOlNO3
MINNESOTA
ISSUE:
II /I1 /2005 CONCEPT
12/1/2005 REV. CONCEPT
12/7/2005 REV. CONCEPT
12/21/2008 RN. CONCEPT
1/13/2008 REV. CONCEPT
2/3/2008 REV. CONCEPT
3/13/2006 CITY SUBMITTAL
REV. THIS SHEET
NO REV. THIS SHEET
SHEET TIRE:
TITLE
SHEET
SHEET NUMBER:
T1
ZLALLAIII.A516`. NMI
CONCRETE CURB
08840E ACCF55
DECK
0
DWGS
21.5'
PER AND MTNAMENTA FENCE
®®
BUILDING)
1: 5'NI Y .: 1A
GRADING PLAN
GARAGE ACCESS
TYPICAL TOWN HOME
BUILDING #1 — #14
(SEE ARCHITECTURAL
DRAWINGS)
DECK j GARAGE ACCES'Fi
SEEARW'L .._._._. J ,
DINS -- _ _. __
CONCRETE. PAD
FOR MECHANICAL AND UTIL1Y CDIENEC1IONS
COORDINATE MIN ARCHITECTURE
(TIP. PER UNIT) -
=QM
.CC /ADIIL
OROS
CONCRF10 WALL., _
CS.t
RETAINING WALL
15EE GRADING PLAN (TIP.)
GARAGE ACCESS � -13.8 7 A
_ STAIR AND STOOPS PER UNIT
SEE ARCHITECTURAL DRAWINGS (TIP.) /
TYPICAL BUILDING ENLARGEMENT LAYOUT PLAN (BUILDINGS #1 — #10)
TYPICAL GARAGE ACCESS ENLARGEMENT LAYOUT & LANDSCAPE PLAN (BUILDINGS #1 —#10)
GARAGE
ACCESS
DECK
Dyers.
6.11.
4ANADl
ACCESS
TYPICAL GARAGE ACCESS ENLARGEMENT LAYOUT AND LANDSCAPE PLAN (BUILDINGS #11 —#14)
N
1
j
j% SOD
SEE TAO LANDSCAPE
NEST —SOUTH NEST 510E
961-1400. SHADE SPECIE&
B 9A SHRUBS
B
NM SHRUBS
4 L0. SHRUBS
PAM LATOUR LA514 LAYDI1k
FRONT LANDSCAPE: • FROM LANDSCAPE
, 10 9A SHRUBS 10 91. SHRUBS
B MEO. SHRUBS 6 NED. 01iRUB5
2 LG. SHRUBS 2 l4 5XPUB5
1 SPE2MEN OI•ANENTAL 1 SPECIMEN ORNAMENTAL
I 25-50 SF ACM PLANTING BEDS. 25-30 SF ACM. RANTING BEDS.
REAR LANDSCAPE TEAR LANDSCAPE
6 MA SHRUBS 6 S1 SHRUBS
NOTES:
1. ALTERNATE PATIO LAYOUT AND LAWN
LAYOUT PER UNIT,.
2. LOCATION OF RETAINING WALL, BRICK
PIER AND ORNAMENTAL FENCE. AND STAIRS
SHALL BE STAKED IN THE FIELD AND
REVIEWED BY THE LANSCAPE ARCHITECT
PRIOR TO INSTALhATION.
B SAC SHRUBS
11 MED. SHRUBS
4 LG. %RIBS
1 —
TYPICAL BUILDING ENLARGEMENT LANDSCAPING PLAN (BUILDINGS #1 — #10)
TYPICAL UNIT ENLARGEMENT LANDSCAPE PLAN (BUILDINGS #1 —#14)
•
_ u 5
ARCHITECT /ENGINEER
PLANNER
HARTFORD
ISSONNWEAV
BM
;.. PmR.aal
m56 MaiPia MI imellation
and 85.1*0m ant that I AR aduty
I'a45 LN;imoA NTA6N6 ada 51,
Nn of Um Male M NaamN
Om Pabk4 IL IM 24504
CONSULTANT:
OWNER:
LEGACY
HOLDINGS
LL.., LLC.
MOO WELLS FA1h9RIU
2TOOM ASAUDABIGUDI
11DOH61D1ON.INSII1
RO (sus MRS
COMMUNITY PARK ENLARGMENT LAYOUT AND LANDSCAPE PLAN
TYPICAL PATIO ENLARGEMENT LAYOUT PLAN (BUILDINGS #1 — #14)
d mPNDONTSM. NwTw0BmuPms, BIG AmBIQIMB*INl9WRANI6l5
FOR REVIEW ONLY
NOT FOR CONSTRUCTION
PROJECT:
LEGACY
TOWNHOMES
LEGACY
AT
WOODS
EDGE
MINNESOTA
LINO LAKES
MINNESOTA
ISSUE:
12/28/91 PROM. SITE PLAN
5/10105 CITY SUBMITTAL
REV. THIS SHEET
NO REV. THIS SHEET
SHEET TITLE:
PRELIMINARY
ENLARGEMENT
PLANS
1 SHEET NUMBER:
C2.1
•
•
•
m Vim'. NPALIIL
BUILDING B2
•
' 7 UNIT TOWN HOME
BUILDING TYPEB ,
:.., BLauK�E'T Im
SEGMENT
:ww fEl (Try —)-
1 GRADING NOTES:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
MAINTENANCE OF GRADE STARES THROUGHOUT THE
DURATION OF CONSTRUCTION TO ESTABLISH PROPER
GRADES. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE
FOR A FINAL FIELD CHECK OF FINISHED GRADES
ACCEPTABLE TO THE ENGINEER /LANDSCAPE ARCHITECT
PRIOR TO LOANING AND SODDING ACTIVITIES.
2. UNSUITABLE EXCESS FILL MATERIAL. AS SPECIFIED.
SHALL BE REMOVED AND LEGALLY DISPOSED OF BY THE
CONTRACTOR OFF —SITE.
3. SUITABLE EXCESS FILL MATERIAL SHALL BE STOCKPILED
IN A MANNER AND LOCATION AS APPROVED BY THE
ENGINEER /LANDSCAPE ARCHITECT.
4. ALL AREAS DISTURBED OUTSIDE THE UNIT OF WORK
SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE IN A
MANNER APPROVED BY THE ENGINEER /LANDSCAPE
ARCHITECT.
5. PROPOSED SPOT GRADES ARE FLOWLINE FINISHED GRADE
ELEVATIONS.
B. LONGITUDINAL SLOPES OF WALKS SHALL BE 5R (MAX.)
AND IR (MIN.) AND 2R (MAX) CROSS SLOPE EXCEPT AS
SHOWN ON THE DRAWINGS.
7. PROPOSED SLOPES SHALL NOT EXCEED 311 UNLESS
INDICATED OTHERWISE ON THE DRAWINGS. SLOPES GREATER
THAN 211 SHALL REOUIRE SURFACE ROUGHENING BY EITHER
.STAIRSTEP' GRADING, GROOVING, FURROWING, DR
TRACKING TO AVOID RUNOFF VELOCITY AND RECEIVE
EROSION CONTROL BLANKET. SLOPES LESS THAN 3:1 NOT
STABIU2EO WITH VEGETATION SHALL HAVE THE SURFACE
ROUGH GRADED TO REDUCE RUNOFF VELOCITY UNTIL SOD
HAS BECOME STABILE AND MATURE. AT NO TIME
THROUGHOUT THE DURATION OF THE CONTRACT, SHALL
SLOPES BE A SMOOTH GRADE DR A COMPACTED SURFACE.
241- EROSION CONTROL NOTES: -()-
1. THE CONTRACTOR SHALL PROVIDE SEDIMENTATION AND
EROSION CONTROL SYSTEMS AS SHOWN ON THE DRAWINGS
IN AODIOON TO OTHER MEASURES THAT MAY BE
NECESSARY TO PREVENT SEDIMENTATION ANO EROSION
CAUSED BY CONSTRUCTION ACTIVITIES IN ACCORDANCE TO
THE CITY ORDINANCE.
2. THE CONTRACTOR 'MLL BE RESPONSIBLE FOR
MAINTAINING THE SEDIMENTATION AND EROSION CONTROL
SYSTEMS THROUGHOUT THE DURATION OF THE CONTRACT.
THIS MAINTENANCE SHALL INCLUDE CLEANING AND /OR
REPLACING SYSTEMS THAT HAVE BECOME CLOGGED OR NO
LONGER FUNCTIONAL AS DETERMINED BY THE
ENGINEER/LANDSCAPE ARCHITECT.
3. CONTRACTOR SHALL INSPECT MONTHLY AND AFTER EACH
STORM EVENT AND REPAIR AS NECESSARY ALL EROSION
CONTROL MEASURES TO INSURE THE INTEGRITY OF THE
EROSION CONTROL SYSTEM.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL
AND SATISFACTORY DISPOSAL OF ALL EROSION CONTROL
STRUCTURES UPON COMPLETION OF ALL WORK ANO SOIL
STABIU2ATION AS DIRECTED BY THE ENGINEER.
5. FURNISH AND INSTALL APPROXIMATELY 30 LF. OF SILT
FENCE PERPENDICULAR TO THE OUTLET OF EACH STORM
DRAIN PIPE TO CONTROL AND MINIMIZE SILT RUNOFF.
LEGEND:
419
42D
+ 422.0
1' CONTOUR
ELEVATION INTERVAL
5' CONTOUR
ELEVATION INTERVAL
SPOT GRADE ELEVATION
SILT FENCE
UNITS OF EROSION
CONTROL BLANKET
STAIRWAY NOTE:
ALL STAIRWAYS AT BUILDING STOOPS WILL BE EITHER B' OR
35 IN HEIGHT, DEPENDING ON SURROUNDING GRADES.
AODITONAL STEPS MAY BE REQUIRED AT THE CONNECTION
TO SIDEWALKS. FINAL STAIRWAY DETERMINATIONS WALL BE
OVEN ON CONSTRUCTION PLANS.
FOR REVIEW ONLY
NOT FOR CONSTRUCTION
ARCHITECT/ENGINEER
PLANNER
HARTFORD
720 MAPS
w,wm
I *My xary Vat BM PWN B»
L awl we pmeeB M m x xdr my
Md wwmNilp eId Dot I on o duly
Camel ImdmM McNel weir IM
low et dab M Y'sWi
PAM U SmBP
Ode_ Ikeee NA 2401
CONSULTANT:
OWNER:
LEGACY
HOLDINGS
LL., LLC.
11080815 FMBO RATA
ROOmW00 AMINE SOUNI
el NWmI EN,1•1
NfS t
PH: BOFNN
RU (932) BrNm
PROJECT:
LEGACY
TOWNHOMES
LEGACY
AT
WOODS
EDGE
MINNESOTA
LINO LU23
MTNNEOTA
ISSUE:
3/10/Di OW SUBMITTAL
REV. THIS SHEET
ONO REV. THIS SHEET
SHEET TITLE:
PRELIMINARY
GRADING &
EROSION
CONTROL PLAN
SHEET NUMBER:
C3.0
t• CON1116.11,005.14.1420 GOUn NE. Da PACHITECMEHMEMS/PLMOWB
:POND 4
NWL 890.00
'HWL 992.30
EXISTING
WETLAND
EXISTING
WETLAND
-$H- LANDSCAPING NOTES: - , i-
1. AREAS DISTURBED BY CONSTRUCTION ACTIVITIES SHALL
RECEIVE 4' LAYER LOAM AND SEED AS SPECIFIED UNLESS
OTHERWISE NOTED ON THE DRAWINGS. AREAS 'WITHIN
STREET RIGHT -OF -WAY SHALL RECEIVE LOAM AND SOD
WITHIN 72 HOURS OF FINAL GRADING. SEE SOD
INSTALLATION NOTES BELOW.
2. SYMBOL OF TREES AND SHRUBS SHOWN ON THE
DRAWINGS ARE REPRESENT FULL MATURITY SIZE OF THE
PLANT. COORDINATE LOCATION WITH UNDERGROUND AND
OVERHEAD UTILITIES. LIGHTING FIXTURES DOORS AND
WINDOWS. CONTRACTOR SHALL STAKE IN THE MELD FINAL
LOCATION OF TREES AND SHRUBS FOR RENEW AND
APPROVAL BY THE LANDSCAPE ARCHTECT PRIOR TO
INSTALLATION.
3. TREES AND SHRUBS SHALL BE BALLED AND
BIODEGRADABLE BURLAP.
4. PLANTING BEDS SHALL RECEIVE 4' LAYER OF 1 -1/2'
DIAMETER GRAY ANGULAR TRAP STONE ON TOP OF A
NON- BIODEGRADABLE FILTER FABRIC AND BORDERED WITH
3/16' THICK STEEL OR ALUMINUM EDGING.
5. RAINGARDEN AND INFILTRATION BASINS SHALL RECEIVE
A NATIVE WETLAND SEED MIS AS SPECIFIED. 6. ENTIRE
SITE SHALL BE FULLY IRRIGATED. THE CONTRACTOR
SHALL SUBMIT IRRIGATION SHOP DRAWINGS FOR RENEW
AND APPROVAL BY THE LANDSCAPE ARCHITECT PRIOR
TO INSTALLATION.
SODDING INSTALLATION: -I:-
1. THE LOAM AND SOIL SHALL BE 4' LATER MINIMUM.
LOOSENED. AND FREE OF CLODS, ROCKS, AND DEBRIS
2. AREAS TO RECEIVE SOD SHALL BE FERTUZED WITH 25
POUNDS PER 1000 SOFT. (TODD LB /AC) OF 10 -10-10
FERTIU200 AND WORKED INTO THE TOPSOIL
3. TOPSOIL SHALL BE DAMPENED PRIOR TO LAYING THE
SOD. JOINTS IN THE SOD SHALL BE STAGGERED. AND
THE EDGES BUTTED TOGETHER TIGHTLY TO AVOID GAPS
BETWEEN SOD LENGTHS.
4. SOD INSTALLED O N SLOPES 3:1 OR GREATER OR IN
AREAS OF CONCENTRATED FLOWS. SHALL BE STAKED IN
PLACE. INSTALL THE SOD WITH THE LENGTH
PERPENDICULAR TO THE WATER FLOW FOR SLOPES WITH
SHEET FLOW.
5. AFTER INSTALLATION. AREAS SHALL BE TAMPED OR
ROLLED TO PROVIDE GOOD CONTACT BETWEEN S00 AND
SOIL AFTER ROLLING, THE SOD SHOULD BE WATERED SO
THAT THE SOIL IS MOISTENED 4 INCHES BELOW THE SOD.
(- SODDING MAINTENANCE: ---CFI-
1. IN THE ABSENCE OF ADEQUATE RAINFALL, WATER
DAMNS THE 30 DAY PERIOD FOLLOWING SOD PLACEMENT
TO KEEP SOIL MOIST. FOLLOWING THIS INITIAL 3D DAY
ESTABUSHMENT PERIOD. WATER AS NECESSARY TO
MAINTAIN ADEQUATE MOISTURE IN THE ROOT ZONE.
2. WHERE MOWING IS DESIRED. MAINTAIN GRASS HEIGHT OF
3 INCHES AND SHOULD NOT BE ATTEMPTED UNTIL THE
000 IS FIRMLY ROOTED. USUALLY TWO TO THREE WEEKS
AFTER SOD IS LAID.
3. INSPECT AREAS OF CONCENTRATED FLOW ANNUALLY
AND FOLLOWING INTENSE STORMS. MAKE NEEDED REPAIR
AND REVEGETATE PROMPTLY.
:3I-- SEEDING RECOMMENDATIONS: -- }
I. INFILTRATION BASIN SOIL MIXTURES SHALL BE 50%
SANDY SOIL, 302E TOPSOIL, AND 20% ORGANIC MATERIAL
2. INFILTRATION BASIN SHALL BE A MIX OF WILDFLOWERS,
GRASSES, SEDGES, AND BULRUSHES SUCH AS AND NOT
LIMITED TO A MIX OF NEW ENGLAND ASTER CANADA TICK
TREFOIL BLUE FLAD IRIS. SWEET BLACK EYED SUSAN.
CANADA WILD RYE, FOWL MANNA GRASS. FOX SEDGE.
MIXES SHALL BE PROVIDED BY PRAIRIE NURSERY;
WESTFIELD. WI 53964 (BOO) 476 -9453.
3. STABILIZED SEED MIXTURE SHALL BE MNDOT BOA AND
INSTALLED NO LATER THAN JUNE 15TH. IF PLANING
OCCURS AFTER AUGUST 15TH. SEED WITH A NURSE CROP
OF RYE NO LATER THAN OCTOBER 5TH. IF PLANTING HAS
NOT OCCURRED BY OCTOBER 5TH, THEN DORMANT SEED
THE SITE NO LATER THAN NOVEMBER 1ST.
4. LOCATION OF RAIN GARDEN BASIN SHALL BE 1G
MINIMUM FROM BUILDING FOUNDATIONS.
5. CONTRACTOR SHALL INSPECT BASIN SEEDING WEEKLY
AND AFTER EACH STORM EVENT AND REPAIR AS
NECESSARY ALL EROSION CONTROL MEASURES AND
SEEDING TO INSURE THE INTEGRITY OF THE EROSION
CONTROL SYSTEM AND STABILIZATION OF THE BASIN.
6. THE CONSECUTIVE 'YEAR MAINTENANCE
RECOMMENDATIONS FOR NATIVE PLANTINGS ARE NOTED IN
THE MAINTENANCE AGREEMENT. PREPARE SITE AND SEED
BASIN BETWEEN MAY 1 -JULY 1. MOW BASIN SLOPES AT A
HEIGHT OF 6' -B' EVERY 30 DAYS AFTER PLANTING UNTIL
SEPTEMBER 3D DR PER SUPPUERS RECOMMENDATIONS.
FOR CONSECUTIVE YEAR MAINTENANCE RECOMMENDATIONS,
SEE MAINTENANCE AGREEMENT.
?g IRRIGATION NOTES: -41-
1. ALL TURF AREAS SHALL BE IRRIGATED. IRRIGATION
SYSTEM WILL BE DESIGN- BUILT.
-r*- PLANTING SCHEDULE --$H
STTY. COMMON NAME BOTANICAL NAME
DECIDUOUS TREES
SUNBURST HONEY LOCUST GeditsiB TNacanthos Var In.r.1w 'SUncole
SUGAR MAPLE Parer sachanrm
GREENSPIRE UNOEN
- RED OAK
T.
Tlia aordat0 'Greeneolre'
Quercus rubrum
ROOT MINUMUM SIZE COMMENTS
BBB 2 1/2" CAL STRAIGHT LEADER -FULL FORM
B&B 2 14 CAL STRAIGHT LEADER -FULL FORM
B&B 2 1/2 CAL STRAIGHT LEADER -FULL FORM
8&B 2 1/2' CAL STRAIGHT LEADER -FULL FORM
CONIFERIOUS TREES
BLACK HILLS SPRUCE Picea glouca deneato
B&B 6' HT. SINI.LE LEADER -DENSE FORM
h:l
EUROPEAN LARCH
Lora dealduo
B&B 6' HT. SINGLE LEADER -DENSE FORM
- PONDEROSA PINE
Plnus ponderosa
B&B 6' HT.
SINGLE LEADER -DENSE FORM
SPRING SNOW CRABAPPLE
M01ue 'Sarin Snow'
JAPANESE TREE ULAC 51TInaa reticulate,
THORNLESS HAWTHORN
- PAPER BIRCH
DECIDUOUS SHRUBS
B&B 1 1/2' CAL SPECIMEN FORM
B&B 1 1/2" CAL. SPECIMEN FORM
Crata.Rue eve -oalli variety /norm's' B&B 1 1/2' CAL STRAIGHT LEADER -FULL FORM
Betula paperifero
B&B 1 1/2' CAL STRAIGHT LEADER -FULL FORM
COMPACT PJM RHODODENDRON Rhododendron T.J.M. Compact'
CONT. 1B' -24' HT. DENSE BRANCH
IVORY HALO DOGWOOD
Comm alba 'Saaholo'
CONT. 1B' -24' HT. DENSE BRANCH
UTTLE PRINCESS SPIRAEA
Soiroea i000na. 'tittle Princess;
CONT. 1B' -24' HT. DENSE BRANCH
COMPACT BURNING BUSH EuonIRUR dotus 'Con)oaOtu9
GREEN VELVET BOXWOOD Bums w Green Velvet
CONT. 1B" -24' HT. DENSE BRANCH
CONT. 15-18' HT. _ DENSE BRANCH
- ROYAL BURGUNDY BARBERRY Berbera thlnberoli 'Gentry CultIvar'
CONT. 15-15 HT, DENSE BRANCH
CONIFERIOUS SHRUBS
TECHNY ARBORIVITAE
Thuio oceldentalis 'Tecnnv
CONT. 6. HT.
DENSE BRANCH
MUSH° SLOWMOUND
Pint. mu CIO 'Slewlneund'
CONT. 15-24' HT. DENSE BRANCH
- GOLDEN ARBORIVITAE Thu is occidental's cures
CONT. 15-15 HT. DENSE BRANCH
0-
- DWARF BLUE GLOBE SPRUCE Plcea Duman, 'Globose'
CONE 1B' -24" HT. DENSE BRANCH
EROSION CONTROL SEED MIX
FOR REVIEW ONLY
NOT FOR CONSTRUCTION
ARCHITECT /ENGINEER
PLANNER
HARTFORD
irsiLIMIKLNAL`AMII
7111111IROS AV! 911111
11.001911/21.,1111. 001
ro
I 1st* ceRy that 116 Nat ndflen..
sr Mel sot And .menemnmm taai i an and er
band Lanan 101MW 001 tM
Mn d Ua slots *net
PdM J Sea
0ds_ Lune It 24504
CONSULTANT:
OWNER:
LEGACY
HOLDINGS
LL.., LLC.
1.100 WELLS MIB IAr
'hales= M.I
BLOOMINGTON, IN IORBNI
M1: 100393HMN
0
M: 11334101
PROJECT:
LEGACY
TOW NHOMES•
LEGACY
AT
WOODS
EDGE
MINNESOTA
LINO LAKES
MINNESOTA
ISSUE:
12/28/06 PREUU. SITE PLAN
3/10/011 CITY 60eMRAL
REV. THIS SHEET
ONO REV. THIS SHEET
SHEET TITLE:
PRELIMINARY
LANDSCAPE
PLAN
SHEET NUMBER:
C5.0
C. OSONIC."'%G . NMTOIW GIW.NW, DC. MOI1TECIVINGINEERPUVO.6
'B' TAMP THE TRENCH FULL
OF SOIL SECURE WITH
ROW OF STAPLES. 10'
SPACING, 4' DOWN FROM
TRENCH _
'A' BURY THE TOP END OF
THE MATTING IN A
TRENCH 4' OR MORE IN
DEPTH
'C' OVERLAP: BURY
UPPER END OF
LOWER STRIP AS IN
'A' AND 'B'. OVERLAP.
END OF TOP STRIP
4' AND STAPLE
'D' EROSION STOP. FOLD OF
MARINO BURIED IN SILT
TRENCH AND TAMPED.
DOUBLEROW OF STAPLES.
PLACE STAPLES 2 FEET
APART TO KEEP MATTING
FIRMLY PRESSED TO
SOIL
TYPICAL STAPLE #B
GAUGE WIRE
EROSION CONTROL BLANKET
DETAIL
NOT TO SCALE
NOTE
1. PLACE STAPLES 2 FEET
APART TO KEEP MATTING
FIRMLY PRESSED TO SOIL
1/2 zit' STEEL ROD
WITH SLEEVE 2' O.C.
3' WIDE SMOOTH
STEEL TROWEL FINISH
1/4' TOOLED RADIUS
1/2' FC(PANSION JOINT
CONCRETE WALK AS SPECIFIED
RIGID NON- BITUMINOUS
JOINT FILLER
_ — 2" WEAR COURSE
TACK COAT
2' BINDER COURSE
8" CLASS 5
AGGREGATE SUBBASE
71 IZi"TllllI I 'COMPACTED
SUBGRPDE
BITUMINOUS PAVEMENT
DETAIL
I I•T
WBITUMINOUS EAR COURSE PAV'
BITUMINOUS BINDER
COURSE iI
DENSE GRADED -- I
AGGREGATE BASE
PROCESSED —7 1
COMPACTED II 'I
SUBGRADE il
— GAWCUT EXISTING
PAVEMENT, APPLY
TACK COAT
EXISTING
PAVEMENT
CUSTING
7 BASE
IIiIIIIflhInl IhlIp!u
PAVEMENT MATCH
DETAIL
I•ILT T•J CCALE
-- —3' WIDE SMOOTH
STEEL TROWEL FINISH
—1/2' W X 3/4' D TOOLED JOINT
mac' I� UGHT BROOM FINISH
PERPENDICULAR TRAFFIC WITH
_ .. 3" WIDE SMOOTH TROWELLED EDGE
EXPANSION JOINT NOTE, CONTROL JOINT
1. CONC. WALK SHALL HAVE 3 STEEL RODS MIN.
2. EXPANSION JOINTS SHALL BE LOCATED 30 FT.
MIN. O.C. AND AT THE END OF EACH DAYS POUR.
- -- — 1/2' W K 3/4' D TOOLED CONTROL
JOINT (MAX. 5' O.C. TIP.) W/ 1/4' RADII.
— — UGHT BROOM FINISH
PERPENDICULAR TO TRAFFIC WITH
3' WIDE SMOOTH TROWELLED EDGE
5' CONCRETE AS SPECIFIED
—W1.6 X W1.6 WIRE MESH AND
CHAIRS AS SPECIFIED
— B" CUSS 5 AGGREGATE BASE
CONCRETE WALK
DETAIL
NOT T_ SC.-.LE
COMPACTED SUBGRADE
NOTES:
1. SEE LAYOUT DRAWINGS
FOR LIMITS OF WALKS.
2. 1/2' WIDE EXPANSION
JOINT AT CURBS.
3. WIRE MESH REQUIRED
FOR WALES 6' WIDE OR IN
LOCATIONS FOR VEHICULAR
TRAFFIC.
WOF30G117MOS, MITPCOD 880. WC 8t ARIMITCTMBGBN®IA W*GBW
3' RADIUS CORNERS
— 1:3 BATTER SLOPE
GUTTER 3/471'
— 0.5% SLOPE - CONSTRUCT WITH REVERSE
SLOPE GUTTER WHERE THE PAVEMENT
SLOPES AWAY FROM CURB
CURB AND
DETAIL
LE
FINISHED GRADE
II III III
W.-`' CLASS V AGGREGATE
SUBBASE -SEE BITUMINOUS
PAVEMENT DETAIL (6" MIN.)
NOTE
1. INSTALL CONSTRUCTION
JOINTS AT 1O' -0' O.C. +/-
2. BASE DEPTH DEPENDANT
UPON SOIL CONDITIONS
GUTTER (B612)
20'
—5.5% SLOPE
— CONTINUOUS SLOPE CONCRETE
CURB AND GUTTER
— PAVEMENT MATERIALS
SEE DETAIL
NOTE
1. INSTALL CONSTRUCTION
JOINTS AT 10' -0' O.C. +/-
2. BASE DEPTH DEPENDANT
---7 UPON SOIL CONDOIONS
RIBBON CURB AND GUTTER
DETAIL �71
ENGINEER GRADE REFLECTIVE
SCREENED STEEL PANEL AS
SPECIFIED
GALVANIZED STEEL FASTENER
(GYP OF 2)
GREEN POWDER COATED STEEL
SQUARE POST AS SPECIFIED
— ' '— GALVANIZED HARDWARE
TO ATTACH TO SLEEVE
SHED GRADE
— PAVEMENT MATERIALS
VARY SEE PLAN
SLEEVE TO
ACCOMMODATE
REPLACEMENT POST
— PROCESSED GRAVEL BASE
— 12' DIA CONC.
FOOTING. SLOPE TOP
OF FOOTING TO DRAIN
SITE TRAFFIC SIGN (STS)
DETAIL
lIST TO SC: E
— COMPACTED SUBGRADE
4" . —LEVEL LANDING 1.0%
4"4.'
q' MAX. CROSS SLOPE
FOR DRAINAGE
7.5 = =LOPE' �k 7.5R mo SLOPE
5.00' MIN
ACCESSIBLE CURB RAMP
DETAIL
GI■T TO SCALE
FILL W/ CONC & ROUND
OFF TOP
— REFLECTIVE SHEETING AS
SPECIFIED
6' DIA SEW 40 STEEL PIPE
PAINTED YELLOW AS SPECIFIED
— FINISHED GRADE
CONCRETE ENCASEMENT
SLOPE TOP 1/2' PER FT.
DIA
STEEL BOLLARD
DETAIL
NOT TO SCALE
PVC COATED CHAIN UNK RAILNG AT
- WALL WHERE APPUCABLE -SEE PLANS
-- 8' MINIMUM LOW PERMEABLE
SOIL AS SPECIFIED
CAP BLOCK WITH 3/4" OVERHANG FROM
FACE OF WALL -2 BEADS OF NDATIO E
PER MANUFACTURERS RECOMENDATIDNS
MODULAR BLOCK RETAINING WALL
i UNIT AS SPECIFIED (TAP.)
GEOGRID REINFORCEMENT
AS SPECIFIED- VERIFY
LENGTH WI114 ENGINEER
12' WIDE DRAINAGE
LAYER -3/4' DIA STONE
-- 95% COMPACTED BACI(FTLL
I' ' • SOIL IN 6' UFIS
DIA. PERFORATED PIPE WITH
▪ FILTER SOCK (SLOPE TD OUTLET)
Ems— MATERIALS VARY
SEE PLANS
-6" MINIMUM COMPACTED
LEVEUNG PAD
COMPACTED SUBGRADE
RETAINING WALL
DETAIL
NOT TO 'SCALE
NOTES
1. ALL SOIL PARAMETERS SHALL BE VERIFIED BY A
GEOTECHNICAL CONSULTANT OR SITE ENGINEER PRIOR TO
CONSTRUCTION. IF ACTUAL SITE CONDITIONS DIFFER FROM THOSE
ASSUMED. NOTIFY MANUFACTURER OF C.M.U. RETAINING WALL 72
HOURS PRIOR TO INSTALLATION.
2. RAUNG IS REQUIRED ON RETAINING WALLS IN LOCATIONS
MERE DIFFERENCES IN GRADE ON EITHER SIDE OF THE WALL
ARE IN EXCESS OF 2.5' AND ARE LOCATED CLOSER THAN 4' TO
A WALK, PATH. PARKING AREA, OR DRIVE ACCESS ON THE HIGH
SIDE -SEE PLANS.
3. RAILING. FABRIC. AND APPURTENANCES SHALL BE BLACK PVC
COATED STEEL AS SPECIFIED.
4. AIR DRIVE RAILING FOOTINGS AS SPECIFIED AND IN A
MANNER TO NOT DISTURB THE WALL GEDGRIO AS RECOMMENDED
BY THE WALL MANUFACTURER. COORDINATE INSTALLATION AND
SCAEDUUNG OF RAUNG FOOTING WITH WALL MANUFACTURER TO
OBSERVE INSTALLATION OF RAILING FOOTINGS,
FOR REVIEW ONLY
NOT FOR CONSTRUCTION
ARCHITECT /ENGINEER
PLANNER
iIARTFORD
3Ci33i17��atyg
IMO Re
v°°AmNa�mww MC (OM ONO
�Nab/ 3y gat 3M pq NiwSaetlm
Intl NlaNwm oS lho1l l m 12 by
MAMA Icdsp IBMW
in Mthe MN of Week
OMs Pallid J Saw
Liam W. 2004
CONSULTANT:
OWNER:
LEGACY
HOLDINGS
LL., LLC.
1300 WELLS FARO hUlA
7900 MUM AVBAB SWAP
BIOOMNBICN,IB 8431
M: TP3i183FM.
PR 932 02101
PROJECT:
LEGACY
TOWNHOMES
LEGACY
AT
WOODS
EDGE
MINNESOTA
LOBO 1/JS
MINNESOTA
ISSUE:
12/23/05 PREM. STE PLAN
3/10/08 CITY SUBMTAL
`.. REV. THIS 9'IEET
ONO REV. THE; SHEET
SHEET TITLE:
PRELIMINARY
SITE DETAILS
SHEET NUMBER:
C6.1
PRUNE AS FIELD DIRECTED BY
LANDSCAPE ARCHITECT TO IMPROVE
APPEARANCE (RETAIN NORMAL
SHAPE)
PLANT TOP OF ROOTBALL 1 -2' ABOVE
ABOVE SURROUNDING GRADE
- - -- 1 -1/2' TRAP STONE MULCH TO OUTER EDGE
OF SAUCER. KEEP MULCH T FROM TRUNK
THREE TIMES %BOTH
OF ROOTBALL
SHRUB PLANTING
DETAIL
HOT T:, SCALE
- THREE TIMES WIDTH
OF ROOTBALL
EVERGREEN TREE PLANTING
EXISTING GRADE
-' ROOTS AT OUTER EDGE OF ROOTBALL LOOSENED TO
ENSURE PROPER BACKFILL-TO -ROOT CONTACT
-- SLOPE SIDES OF HOLE
- BACKRLL AS PER
SPECIFICATION
'- DO NOT EXCAVATE BELOW
ROOTBALL
- PRUNE AS FIELD DIRECTED BY THE
LANDSCAPE ARCHITECT TO IMPROVE
APPEARANCE (RETAIN NORMAL TREE
SHAPE)
THREE 2'%4'X8' WOODEN STAKES. STAINED
- BROWN WITH TWO STRANDS OF WIRE TWISTED
TOGETHER. STAKES SHALL BE PLACED AT 120'
TO ONE ANOTHER WIRE SHALL BE THREADED
THROUGH BLACK RUBBER HOSE COLLARS
-- TRUNK FLARE JUNCTION:
PLANT TREE 1' -2' ABOVE EXISTING GRADE
- 1 -1/2' TRAP STONE MULCH TO
OUTER EDGE OF SAUCER. KEEP
MULCH 2' FROM TRUNK
-- EXISTING GRADE
- CUT AND REMOVE BURLAP FROM TOP 1/3
OF ROOT BALL IF NON - BIODEGRADABLE.
REMOVE COMPLETELY
-- SLOPE SIDES OF HOLE
- BACKFILL AS SPECIFIED
-- DO NOT EXCAVATE BELOW ROOTBALL
DETAIL
11i4 TO SCALE
THREE TIMES WIDTH
OF ROOTBALL
DECIDUOUS TREE PLANTING
DETAIL
NOT TO SCALE
V OOMIGNT 1a.!➢AIMS° QOM NF SING MOIGYTBI9UI MIMP%
PRUNE AS FIELD DIRECTED BY THE
LANDSCAPE ARCHITECT TO IMPROVE
APPEARANCE (RETAIN NORMAL
TREE SHAPE)
THREE SX4"XB' WOODEN STAKE, STAINED BROWN
WITH TWO STRANDS OF WIRE TYFISTED TOGETHER.
STAKES SHALL BE PLACED AT 120' TO ONE
ANOTHER. WIRE SHALL BE THREADED THROUGH
BLACK RUBBER HOSE COLLARS
TRUNK FLARE JUNCTION:
PLANT TREE 1 " -2' ABOVE
EXISTING GRADE
1 -1 2" TRAP STONE MULCH TO
OUTER EDGE OF SAUCER. KEEP
MULCH 2" FROM TRUNK
- EXISTING GRADE
CUT AND REMOVE BURLAP FROM TOP
1/3 OF ROOT BALL IF
NON- BIODEGRADABLE REMOVE
COMPLETELY
- SLOPE SIDES OF HOLE
BACKFILL AS SPECIFIED
- DO NOT EXCAVATE
BELOW ROOTBALL
4' O.C.
,-47(4' TUBULAR STEEL POST
PICKETS SPACED 3 5 /B°
- 7 3 5/B 0 C. TIP.
FINISHED GRADE
SLOPE TOP OF FOOTING
— TD DRAIN (TIP.) --
TX2' STEEL. POST —
GROUTED M PUCE
E" CONCRETE
POST FOOTING
CLASS V AGGREGATE- -
SUBBASE
—TX2" TUBULAR STEEL POST
' -1° SQUARE TUBULAR STEEL PICKETS
I I -3/3' X 2' STEEL RARE
_FULL SEAN WEIR ON
' ! I BOTTOM OF RAIL (TIE)- `
I 1/ , —
r4.---
ELEVATION
ORNAMENTAL FENCE /RAIL
DETAIL
ACT TO SCALE
12"
112111E1 galii=
I
MATERIAL VANES -SEE
LAYOUT PLAN
m F NOTES
1. ALL STEEL FENCE AND APPURTENANCES SHALL BE
m I PREMANUFACIURED, PONGER COATED, AND PRIMED AS SPECIFIED.
-TXY STEEL POST
-1' SQUARE STEEL PICKETS (TYP.)
-3/3' X 2' STEEL RAILS (TIP.)
FULL SEAM WELD ON BOTTOM OF RAIL TYP.
FOR ALL RAIL AND PICKET INTERSECTIONS
1/T DIA% 2 1/2' SALVO DOLT.
TACK HELD BOTTOM OF NUT (TIP.)
FULL SEAM WELD GN DIM STEEL
1 -AROSE BRACKET 10 STEEL POSOF T (TIP.)
-3/r THICK STEEL ANGLE BRACKETS
WITH (2) 5 /B' DIA HOLES (TIP.)
PICKET FENCE, RAIL
POST CONNECTION
2 COLOR OF POWDER COUGHS RNISH SHALL BE DETERMINED BY INE
LANDSCAPE ARCHITECT PRIOR TO FABRICATION
3. FULL WELD ALL SEAMS APO GRIND SMOOTH AS SPECIFIED.
4. SHOP DRAWINGS OF FENCE PRO PANEL SHALL BE PROVIDED TO THE
LANDSCAPE ARCHITECT AND FINAL RENEW BY THE OWNER PRIOR TO
FABRICATION.
5. LOCATION OF FENCE/RAIL SNAIL BE 1S' MINIMUM FROM BACK EDGE
OF WALL A 4' LAYER OF 1 -1/2' DIAMETER DRAINAGE STONE WITH
WEED PREVENTIVE FABRIC SHALL BE INSTALLED BETWEEN ANY
RETAINING WALL MO FENCE LIMIT OF STONE SMALL BE 5' MINIMUM
FROM EDGE OF FENCE
— INSTALL POSTS INTO 1 3/B' DIA CORE HOLE
WITH NON - SHRINK GROUT, CROWN FOR
DRAINAGE SEAL AS SPECIFIED (TIP.)
—5.1-1 X B'W CONCRETE
SIDE WALL
SPACE POSTS EQUALLY.
4'-0• MAXIMUM 0.0
1 1/2' DIA BRUSHED ALOMINUM POSTS AND RAIL
1/4' SEAM WELD JOINTS. FURNISH AND INSTALL
RAIUNG TO MATCH SLOPE OF STAIR. COORDINATE
FINAL FINISH COLOR WITH LANDSCAPE ARCHITECT
PRIOR TO FABRICATION.
FINISHED GRADE
III = 111-_
11111 -III -III LTII( �.
RAILING AND 1
WALL DETAIL -I -I 1i'
SECTION A -A' -
18'
I_/ 3K' S.C. (TYP.)
-1' CHAMFER ON (4) FOUR
SIDES OF CURB WALL
-.4'4 REBAR SPACED 12'
0.C. 3' CLEARANCE
-#4 REBAR SPACED
1/2' WIDE EXPANSION JOINT.
WITH SEALANT. 2'L X 3/8'
DIA STEEL DOWEL WITH SLEEVE ■
MATERIALS VARY —. ,I
SEE PLANS '•L
1' -0'
FINISHEDI *.GRADE
8" CLASS V
AGGREGATE
SUBBASE
11.. Ii -Tip
`�s =III
- Iii- 7 - -11 =T
FINISHED GRADE
SDE WALL
SEE ABOVE DETAIL
/ 1/2" DIA RADIUS
ON NOSE (TYP.)
BROOM FINISH TREADS
PERPENDICULAR TO
TRAFFIC
Iy3 REBAR AT NOSE
OF TREAD (TYP.)
--(-- 1" BATTER TYP. !WITH SEALANT. 2'L J/
2'LON 3/8'
5 /D� '' / DIA STEEL DOWEL WITH SLEEVE
MATERIALS VARY
SEE PLANS
FINISHED GRADE
7-1 _ . III -
-1Ti -1111 =111 II
#4 REBAR SPACED 12'
O.C. 3' CLEARANCE
#4 RERAN (1) PER
NOSE OF TREAD
COMPACT
SUBGRAOE
-1' CHAMFER (4) FOUR
EDGES OF CURB WALL
B'H X B'W
CONCRETE WALL
HANDRAIL CENTERED WITHIN WALL
(1) ONE PER SIDE OF STAIR
SEE ABOVE DETAIL
STAIR RISER (TYP.)
PLAN
CONCRETE STAIR
WITH CURB WALL
DETAIL /
T. SCALE
FOR REVIEW ONLY
NOT FOR CONSTRUCTION
ARCHITECT /ENGINEER
PLANNER
HARTFORD
M W 4uos
mN■HA
I It,Ml =NW Ira MA s aOSR
P Pm PPM. m▪ aumnkM n ad Rd Ion a ANy
Carl Imp. Meisel PAN 1M
low U UP Nob S Se m&
B4
NM& ISom I W.24804
CONSULTANT:
OWNER:
LEGACY
HOLDINGS
LL,, LLC,
1300 WBLU DAGORAZA
11 10AI05AY&50 ISUIH
3UK7nwGTOK 55431
rag Fx: RalpwRm
PROJECT:
LEGACY
TOWNHOMES!
LEGACY
AT
WOODS
EDGE
MINNESOTA
LINO LAKES
MRI? OTA
ISSUE:
12/13/05 PRELIM. SITE PLAN
3/10/03 CITY SUBMITTAL
REV. THIS SHEET
NO REV. THIS SHEET
SHEET TITLE:
PRELIMINARY
SITE DETAILS
SHEET NUMBER:
C6.2
LIEU-01211W 310 toll
E
•
L
•TOR1- 51.1IELD' SEAL
OR EQUAL
A
1/2" MORTAR ON
OUTSIDE BETWEEN
RINGS. CASTING &
MANHOLE FINISH
SMOOTH ON INSIDE.
NO MORTAR ON
INSIDE
RINGS
(1.0' MAX. OF
RINGS &
MORTAR).
CEMENT
MORTAR
SECTION
A -A
4B' I 6' PRECAST
"I BASE SLAB
ELEVATION
A UNEDWE OR BUM SEAL SHALL BE IME0 10 SEAL 11E TOP LAMS TO
IRE EASSTNV MO 1NE BOTTOM RIO TO THE DONE CR T01. STAB.
NO W000 SMALL BE 119® FOR ADILL511NO CASNP, CEMBR MORTAR ONLY.
AMMO RINDS MAY BE CONCRETE OR PUSfIC
CAS1 NON MANHOLE FROM @ COVER AS PER SPEC01CAIIXli
MANHOLE STEPS SIO4L SE CIS( IOW, ALL.. DR STEEL 90040 CEO PLASTIC
PER OM 0478 LOCATION SHALL BE AS NOTED IN WE SPECIFICATIONS.
PRECAST PENROR00 COMMIE MANHOLE SECTORS @ SASE SLAB PER 49TH CAM.
FURN61I PRECAST MANHOLE SECTORS WITH 0 -0N0 CASKETS @ LLERCMT EXCEPT
AS 00ERW9E SPECIFIED.
A 12. OR 18. 2AR22. SECTION SMALL BE INSTALLED 49OER TIE CCNE
WHENEVER POWELi
FILL OPEMNO BETWEEN PIPE @ MH WA L 143 CEMENT MDR. MIX SURFACE SOUL. SE FINN. 9/00151.
STORM SEWER MANHOLE, TYPE 407
(PIPES 27" OR LESS)
PROPOSED DR EXMTNC
ROADWAY
B STEEL
PAINTED BLUE
BOX 0'
7-r MW LONG AT FULL
COVER AS SPECFED
SIZE, LENGTH, AND TYPE
OF MATERIAL FOR 5ERVME
UNE AS SPECIFIED
r TM. WITH
CRIMPED END
IORROMAL LOOP
GDRPOP411DN STOP
WATER SERVICE DETAIL
P.
rtt
:xW
G.moor F9mr 9m m 70i
STS A-A
at. PM2. arena or awa W 3D•. w IS.
QT. ton. . m 2 opt . mm nernimcmoisaum
ores of Ms Rm.. atby on. MWl apron 3
®MmWwm 'C *5424 002* WMI0 DI apron
_SUPPORT CURB
BOX WITH CONIC
BLOCK
TABLE C- C4J.AIITIES
TABLE OF r11111Ei
ROMP AT RpM CAMEO or BOYS OF EWMMENT SPAN WONT
CLASS 1
ayC
CUM m
.3Cre
CLASS N
4yp.t2•
On
LI .)
L
191)
12•
02.01
( O R i . T e .
s
Me10
OmarMr
CU W
r
0.
IP.
)(Co.
88940
Ma Mr
W.)(C.
21•
DeDN
lY
Ir
0s4p
IvnmerjI
12
TS
10
24
20
b
42
a
O
8
8
108
14
11
i o
ZO
29
.
2.2
59
Sa
13
92
ie1i
i
IA
9
i0
L1
22
331
T
A0
s
AI
S9
8.3
53
27
108
lu
v4
21
u
3D
4.2
4.2
S
9
e
4S
SB
7B
84
11.0
1.5
14
.
217i.
(1.48
OS
29
3A
2
SS
S
0.3
I
1JL
TABLE OF r11111Ei
ROMP AT RpM CAMEO or BOYS OF EWMMENT SPAN WONT
OD
Map Pm. FIN''.' m maohWD mat waeara..e ma
RIPRAP AT RCP OUTLETS
1NFI- SHIELD" �
SEAL OR EQUAL
1/2' MORTAR -r
ON OUTSIDE,
BETWEEN RINGS,
CAS1150 & AND
MANHOLE. FINISH
SMOOTH ON
THE INSIDE.
1,10 MORTAR ON
INSIDE.
MANHOLE
SLEEVE
SEE DETAIL
IL
27'
RINGS
(1' MAX OF
RINGS &
MORTAR).
SECTION A -A
S
`f
2
PLAN
I
10
IN.
STAINLESS
STEEL
STRAP
S
FLEXIBLE
SLEEVE
MANHOLE SLEEVE
A UREBMNE OR BUM SEAL SHALL BE USED 10 SEAL THE TOP ROC TO
THE GAS. AND THE 91371CM RPM TO THE GORE 00 TOP 9A8.
NO MOOD SHALL BE USED FOR MIMING CASTOR CEMENT MORTAR ONLY.
ADJUSTNC WINS ANY BE CONCRETE OR PLASTIC.
CAST EON MMICE FRAME It COYER AS PER SPECIFICAONL
MANHOLE STEPS WALL BE DIET IRON. ALIAANM OR STEEL RONFORCW PLA9mm, PER
AVM C475. STEP LOCATION SHALL BE AS NOTED IN THE SPECPOATONS.
P2200T 901400 ICED CCIOREIE WMMLE SECO0NS PER 05114 C478. FURNBHED
O -RING 44(5005 AND 4491MWf OREPT AS OTHERWISE SPECIFIES
A 1ST 05 5• BARREL SECTION SMALL BE !STALLED UNDER THE CO. 5/HOMIER
POSSIBLE
PIPE CONNECTORS TO 020140.E SEWN. BE MME WATER TOH1 BY CAST INPLACE
RUBBER BOOT MD COMBAT MORTAR. INSIDE SURFACE SHALL BE FINISl1ED SMOOTH.
SANITARY SEWER MANHOLE, TYPE 301
(PIPES 27" OR LESS)
2' X 2" HARDWOOD
MARKER W/SPIKE
E -s METAL FENCE
POST MARKER
PANTED GREEN
SERVICE SLOPE 1X MM.
WE ,7=
II
=I�YrI�II�y GRANULAR (BEDDING
MATERIAL (COMPACTED)
WITHOUT RISER
NOTE SERVICE PIPE TO BE PVC.
SCH. 40 (ASTM D- 2136S).
SOLVENT WELD ALL JOINTS.
DEPTHS GREATER THAN
14' WHERE RISER APPROVED
BY ENGINEER.
SERVICE
WYE -
I.9L 2BI' 0I
2' x 2' HARDWOOD
MARKER W /SPIKE
AIRTIGHT
PLUG OR
CAP
B' METAL FENCE
POST MARKER
PANTED GREEN
3'
SLOPE 1R MIN
7] h�
45•
WITH RISER
i
IL 1
ARTCHT
PWG OR
GAP
45' BEND
GRANULAR BEDDING
MATERIAL (COMPACTED)
SERVICE WYE TO BE
EMBEDDED IN CONCRETE
NOTE SERVICE PIPE TO BE PVC,
SCH. 40 (ATM D- 2865).
SOLVENT WELD ALL JOINTS.
SANITARY SEWER SERVICE
GEOTEXIILE WITH NET
BACKING -�
5' METAL OR 2'X2'1/000 FENCE POST
II
BACKFILL I
t
I dl
i
II
II
GEOTEXTIIE TO
OVERLAP THROUGH
TRENCH.
NOTE : -SILT FENCE SHALL CONFORM TO
MNDOT 3006, TYPE B.
- FENCING SHALL BE PLACED ALONG CONTOURS
OR AS DIRECTED BY ENGINEER.
SILT FENCE
00-
NOTE COO-BLUE BOLTS
OR EQUAL REQUIRED ON
ALL WATERMAN FITTINGS.
Pp= "_
ELEVATION
PLAN
SECTION
UNDISTURBED
SOIL
501 -6' DUCTILE
IRON PIPE BLOCKING
UNDISTURBED
SOIL
ELF 6' DUCTILE
IRON PIPE BLOCKING
DUCTILE IRON PIPE REACTION BACKING
(FOR BENDS)
A URETHANE OR BUM SEAL SHALL BE USED TO SEAL TIC TOP 1182 TO
TFE 0451100 AND TIE 957TOM RIND TO WE CONE OR TOP SLAB.
'NTT- SHIELD' SEAL
OR EQUAL
RINGS
(1.0' MAX. OF
RINGS & MORTAR).
MJOIP, CL 50 PIPE AND FITTINGS
TO BE USED FOR DROP SECTION.
DROP SECTION PIPE SIZE TO BE
EQUIVALENT TO INLET PIPE SIZE.
END OF DP PIPE TO BEAR
ON UNDISTURBED SOIL
18' MIN. DIP
100
CONSTRUCTION JOINT
IF NECESSARY.
OUTSIDE DROP TO BE
SECURED TO MANHOLE
WITH 3' X 14 GA. GALV.
STRAPS ANCHORED WITH
4-KWIK BOLTS O 5' O.C.
SLOPE INVERT
AS SHOWN
49
117
SANITARY SEWER OUTSIDE DROP
V20
SO
(O" _.O
QV
6'IAIN
1' - 2'
WASHED ROCK
ROCK CONSTRUCTION ENTRANCE
PLAN
II
� IE
L UNDISTURBED
I
6LF -6" DUCTILE
IRON PIPE BLOCKING
BIIIIF�I�III�IIWIIESIk
�I I
PLAN
I_
I I
SECTION
II
6LF -6' DUCTILE
IRON PIPE BLOCKING
NOTE CO2 -BLUE BOLTS
DR EQUAL REQUIRED ON
ALL WATERMAIN FITTINGS.
DUCTILE IRON PIPE REACTION BACKING
(FOR TEES AND CROSSES)
ATERMAN
HYDRANT
GATE VALVE
at BOX
ACK OF
CURB
VARIES
CURB
NOTE: COR -BLUE BOLTS
OR EQUAL REQUIRED ON
ALL WATERM2N FITTINGS.
3/4' GALVANIZED
STEEL TIE ROOS
OR 'MEGA LUG' THRUST
RETAINER GLANDS (OR
EOUNALANT) AT JOINTS
SEE STD. DWG. 203
TYPICAL HYDRANT LAYOUT
(VALVE IN BOULEVARD)
24
PROP UNE
WELD CONDUCTIVITY
STUD 2' BELOW FLANGE
(FOR
URP000)RON
COVER AS
SPECIFIED
6"X8'%16'
CONCRETE
BLOCK
NOTE: COW -BWE BOLTS
OR EQUAL REQUIRED ON
ALL WATERMAIN FITTINGS,
WATERMAIN SIZE VARIES
CURB
COVER AS
SPECIFIED
6'XB'X16' CONC. BLOCK
GEOTEATLE FABRIC
MNDOT 3733
TYPE 3
CONCRETE
BLOCK
REACTION
BACKING
1 1/2' WASHED
ROCK AU.
AROUND
MIN. 1/3 C.Y.
(MIN.
MPERVIOUS IN
SOILS.)
GATE VALVE BOX
GATE VALVE
1 1/2' WASHED ROCK ALL
AROUND. MIN.1 /3 C.Y.
(MIN. 1 C.Y. IN IMPERVIOUS SOILS)
TIE RODS OR MEGA LUG
RETAINER GLANDS (OR EQUAL)
MNDOT 3733 TYPE 3
GEOTEXOLE FABRIC
MIN. 1 LAYER
ATTACH TO TOP SECTION
OF VALVE BOX
MAr1 2006 GATE VALVE INSTALLATION
TMT
FOR REVIEW ONLY
NOT FOR CONSTRUCTION
ARCHITECT /ENGINEER
PLANNER
HARTFORD
AM
amrm$203•mOR, Mk
Int 00111.11.1.11M
re Masw
I lash RIBF that tl4 .011a.
or 101 w pelt. h m Imdm my
OM NPN4e. aid 4B l an OM/
Ummi Pre 4 EM. ui 14
Ion M M*RAM M Mum..
M. IL Art. /
CONSULTANT:
OWNER:
LEGACY
HOLDINGS
LL., LLC.
IMO.. MOO RAO
9DMNOTON MI
22
FNI IBSETBIBM00
9: WMN01
PROJECT:
LEGACY I
TOWNHOMES
LEGACY
AT
WOODS
EDGE
MINNESOTA
LINO WG3
MINNEOTA
ISSUE:
12/25 /2.s PREU4. SITE PLAN
3/10105 CITY SUBNITAL
REV. THIS SHEET
NO REV. THIS SHEET
SHEET TITLE:
PRELIMINARY
SITE DETAILS 4
SHEET NUMBER:
C0PE190IDOE IMORI00 GROUP WE DIG. AR01ITECTOOMMEOPIAMB8
C6.3 I,
ew•aM•q�
0g10 I91W911M
x. Tx
rN)(IU
AM
Ya.)gca.
ay9•,0rr
:.
m94y
Ta.1(
101.9
1
118.1
284
ON1M
18
S5
Z
B.3
10.0
120
5eev
R.
OK)
L
(2.)(a
OTM ID W9%R
Spy FPMr
Ya.)I(u. r1)(CU
22
20
10
12
16
i
20
u 1 3D
SS DA
73 25
3
1449 53
211
a.9
ea
tm
a
a@
411
02
I S
OD
Map Pm. FIN''.' m maohWD mat waeara..e ma
RIPRAP AT RCP OUTLETS
1NFI- SHIELD" �
SEAL OR EQUAL
1/2' MORTAR -r
ON OUTSIDE,
BETWEEN RINGS,
CAS1150 & AND
MANHOLE. FINISH
SMOOTH ON
THE INSIDE.
1,10 MORTAR ON
INSIDE.
MANHOLE
SLEEVE
SEE DETAIL
IL
27'
RINGS
(1' MAX OF
RINGS &
MORTAR).
SECTION A -A
S
`f
2
PLAN
I
10
IN.
STAINLESS
STEEL
STRAP
S
FLEXIBLE
SLEEVE
MANHOLE SLEEVE
A UREBMNE OR BUM SEAL SHALL BE USED 10 SEAL THE TOP ROC TO
THE GAS. AND THE 91371CM RPM TO THE GORE 00 TOP 9A8.
NO MOOD SHALL BE USED FOR MIMING CASTOR CEMENT MORTAR ONLY.
ADJUSTNC WINS ANY BE CONCRETE OR PLASTIC.
CAST EON MMICE FRAME It COYER AS PER SPECIFICAONL
MANHOLE STEPS WALL BE DIET IRON. ALIAANM OR STEEL RONFORCW PLA9mm, PER
AVM C475. STEP LOCATION SHALL BE AS NOTED IN THE SPECPOATONS.
P2200T 901400 ICED CCIOREIE WMMLE SECO0NS PER 05114 C478. FURNBHED
O -RING 44(5005 AND 4491MWf OREPT AS OTHERWISE SPECIFIES
A 1ST 05 5• BARREL SECTION SMALL BE !STALLED UNDER THE CO. 5/HOMIER
POSSIBLE
PIPE CONNECTORS TO 020140.E SEWN. BE MME WATER TOH1 BY CAST INPLACE
RUBBER BOOT MD COMBAT MORTAR. INSIDE SURFACE SHALL BE FINISl1ED SMOOTH.
SANITARY SEWER MANHOLE, TYPE 301
(PIPES 27" OR LESS)
2' X 2" HARDWOOD
MARKER W/SPIKE
E -s METAL FENCE
POST MARKER
PANTED GREEN
SERVICE SLOPE 1X MM.
WE ,7=
II
=I�YrI�II�y GRANULAR (BEDDING
MATERIAL (COMPACTED)
WITHOUT RISER
NOTE SERVICE PIPE TO BE PVC.
SCH. 40 (ASTM D- 2136S).
SOLVENT WELD ALL JOINTS.
DEPTHS GREATER THAN
14' WHERE RISER APPROVED
BY ENGINEER.
SERVICE
WYE -
I.9L 2BI' 0I
2' x 2' HARDWOOD
MARKER W /SPIKE
AIRTIGHT
PLUG OR
CAP
B' METAL FENCE
POST MARKER
PANTED GREEN
3'
SLOPE 1R MIN
7] h�
45•
WITH RISER
i
IL 1
ARTCHT
PWG OR
GAP
45' BEND
GRANULAR BEDDING
MATERIAL (COMPACTED)
SERVICE WYE TO BE
EMBEDDED IN CONCRETE
NOTE SERVICE PIPE TO BE PVC,
SCH. 40 (ATM D- 2865).
SOLVENT WELD ALL JOINTS.
SANITARY SEWER SERVICE
GEOTEXIILE WITH NET
BACKING -�
5' METAL OR 2'X2'1/000 FENCE POST
II
BACKFILL I
t
I dl
i
II
II
GEOTEXTIIE TO
OVERLAP THROUGH
TRENCH.
NOTE : -SILT FENCE SHALL CONFORM TO
MNDOT 3006, TYPE B.
- FENCING SHALL BE PLACED ALONG CONTOURS
OR AS DIRECTED BY ENGINEER.
SILT FENCE
00-
NOTE COO-BLUE BOLTS
OR EQUAL REQUIRED ON
ALL WATERMAN FITTINGS.
Pp= "_
ELEVATION
PLAN
SECTION
UNDISTURBED
SOIL
501 -6' DUCTILE
IRON PIPE BLOCKING
UNDISTURBED
SOIL
ELF 6' DUCTILE
IRON PIPE BLOCKING
DUCTILE IRON PIPE REACTION BACKING
(FOR BENDS)
A URETHANE OR BUM SEAL SHALL BE USED TO SEAL TIC TOP 1182 TO
TFE 0451100 AND TIE 957TOM RIND TO WE CONE OR TOP SLAB.
'NTT- SHIELD' SEAL
OR EQUAL
RINGS
(1.0' MAX. OF
RINGS & MORTAR).
MJOIP, CL 50 PIPE AND FITTINGS
TO BE USED FOR DROP SECTION.
DROP SECTION PIPE SIZE TO BE
EQUIVALENT TO INLET PIPE SIZE.
END OF DP PIPE TO BEAR
ON UNDISTURBED SOIL
18' MIN. DIP
100
CONSTRUCTION JOINT
IF NECESSARY.
OUTSIDE DROP TO BE
SECURED TO MANHOLE
WITH 3' X 14 GA. GALV.
STRAPS ANCHORED WITH
4-KWIK BOLTS O 5' O.C.
SLOPE INVERT
AS SHOWN
49
117
SANITARY SEWER OUTSIDE DROP
V20
SO
(O" _.O
QV
6'IAIN
1' - 2'
WASHED ROCK
ROCK CONSTRUCTION ENTRANCE
PLAN
II
� IE
L UNDISTURBED
I
6LF -6" DUCTILE
IRON PIPE BLOCKING
BIIIIF�I�III�IIWIIESIk
�I I
PLAN
I_
I I
SECTION
II
6LF -6' DUCTILE
IRON PIPE BLOCKING
NOTE CO2 -BLUE BOLTS
DR EQUAL REQUIRED ON
ALL WATERMAIN FITTINGS.
DUCTILE IRON PIPE REACTION BACKING
(FOR TEES AND CROSSES)
ATERMAN
HYDRANT
GATE VALVE
at BOX
ACK OF
CURB
VARIES
CURB
NOTE: COR -BLUE BOLTS
OR EQUAL REQUIRED ON
ALL WATERM2N FITTINGS.
3/4' GALVANIZED
STEEL TIE ROOS
OR 'MEGA LUG' THRUST
RETAINER GLANDS (OR
EOUNALANT) AT JOINTS
SEE STD. DWG. 203
TYPICAL HYDRANT LAYOUT
(VALVE IN BOULEVARD)
24
PROP UNE
WELD CONDUCTIVITY
STUD 2' BELOW FLANGE
(FOR
URP000)RON
COVER AS
SPECIFIED
6"X8'%16'
CONCRETE
BLOCK
NOTE: COW -BWE BOLTS
OR EQUAL REQUIRED ON
ALL WATERMAIN FITTINGS,
WATERMAIN SIZE VARIES
CURB
COVER AS
SPECIFIED
6'XB'X16' CONC. BLOCK
GEOTEATLE FABRIC
MNDOT 3733
TYPE 3
CONCRETE
BLOCK
REACTION
BACKING
1 1/2' WASHED
ROCK AU.
AROUND
MIN. 1/3 C.Y.
(MIN.
MPERVIOUS IN
SOILS.)
GATE VALVE BOX
GATE VALVE
1 1/2' WASHED ROCK ALL
AROUND. MIN.1 /3 C.Y.
(MIN. 1 C.Y. IN IMPERVIOUS SOILS)
TIE RODS OR MEGA LUG
RETAINER GLANDS (OR EQUAL)
MNDOT 3733 TYPE 3
GEOTEXOLE FABRIC
MIN. 1 LAYER
ATTACH TO TOP SECTION
OF VALVE BOX
MAr1 2006 GATE VALVE INSTALLATION
TMT
FOR REVIEW ONLY
NOT FOR CONSTRUCTION
ARCHITECT /ENGINEER
PLANNER
HARTFORD
AM
amrm$203•mOR, Mk
Int 00111.11.1.11M
re Masw
I lash RIBF that tl4 .011a.
or 101 w pelt. h m Imdm my
OM NPN4e. aid 4B l an OM/
Ummi Pre 4 EM. ui 14
Ion M M*RAM M Mum..
M. IL Art. /
CONSULTANT:
OWNER:
LEGACY
HOLDINGS
LL., LLC.
IMO.. MOO RAO
9DMNOTON MI
22
FNI IBSETBIBM00
9: WMN01
PROJECT:
LEGACY I
TOWNHOMES
LEGACY
AT
WOODS
EDGE
MINNESOTA
LINO WG3
MINNEOTA
ISSUE:
12/25 /2.s PREU4. SITE PLAN
3/10105 CITY SUBNITAL
REV. THIS SHEET
NO REV. THIS SHEET
SHEET TITLE:
PRELIMINARY
SITE DETAILS 4
SHEET NUMBER:
C0PE190IDOE IMORI00 GROUP WE DIG. AR01ITECTOOMMEOPIAMB8
C6.3 I,