Loading...
HomeMy WebLinkAbout08/02/2006 Env Bd PacketCity of Lino Lakes Environmental Board Meeting August 2, 2006 6:30 p.m. AGENDA 1. CALL TO ORDER 2. APPROVAL OF MINUTES 3. APPROVAL OF AGENDA 4. OPEN MIKE 5. ACTION ITEMS A. Comforts of Home B. Golden Acres 6. DISCUSSION ITEMS A. Storm Water Utility B. Blue Heron Days C. Volunteer Stream Monitoring Program D. Other Updates 7. ADJOURN • • • Agenda Item 5A Environmental Board Meeting Date: August 2, 2006 Topic: Comforts of Home /PUD Development Background: The Comforts of Home proposal is located on the NW Corner of Hodgson Road and County Road J. It is an approximately 17 acre project proposal. The existing land -use is mixed -use, and it is proposed to have mixed -use. The applicant proposes a PUD for the site. Analysis: Land Cover The MLCCS is included as Attachment 4. The land consists of Aspen forest in the NW corner, upland soils with planted, maintained or cultivated, long grasses and sparse tree coverage on hydric soils, and grassland with sparse conifer or mixed deciduous /coniferous trees. The Aspen forest area is highly impacted with glossy buckthorn and garlic mustard. The grass land plant communities have spotty butterfly grass and blue joint clumps. Wetlands The wetland delineation report is included as Attachment 17. The isolated wetland area delineated on the site is inundated with glossy buckthorn and garlic mustard. It is recommended that that the developer be responsible for all noxious plant removals on the property. The preliminary utility plan has the wetland labeled with "Temporary Wetland Impact Permit Required." Temporary Wetland impact permits are sometimes given when a utility is proposed to run through a wetland. In this case, existing soils are lifted up and placed back down over a pipe. Care should be given to ensuring a minimum disturbance and that the existing soils are indeed placed back on top of the pipe. City native seed mix used to restore disturbed infiltration, pond, wetland, and infiltration swale areas. Rare and Unique Resources There are no recorded rare, threatened or endangered species on this site. Our computer wildlife model does not indicate anything on this site. Attachment 16 shows a small amount of what we were calling Level 1 Habitat in the open space plan. This is in the area of the delineated wetland on the site. Once the • • buckthorn in this wetland is removed, the ground will be basically bare. The City Native Seed Mix should be seeded into this area. Soils Soils are depicted on Attachment 15. The soils are upland, non - wetland types of soils, except where the wetland was delineated in the NW corner. The upland soils are highly permeable and should be used to the greatest extent possible to infiltrate storm water. On the other hand, precautions should be taken with these soils when proposing fueling stations. A fueling site spill containment area should be designed into the plan if this fueling station goes forward. A requirement of this and every project in Lino Lakes is that no soils are to be imported or exported without City approval. Surface Water Surface water from this site, flows to Baldwin Lake. The Developer is proposing to route excess water over to Woodridge Lane and than into a wetland complex to the West. This would change the sub watershed water flow for this area. In Tight that direct discharge into wetlands may not be allowed in the future, it is important to look at every opportunity to maintain the predevelopment water quantities as possible. Impervious parking areas must be kept to the minimum allowed under our City code. Parking lots are draining to catch basins. Instead of the pipe, maybe the design could mirror the HB Fuller model, or the use of ECS, and include a rain garden /infiltration area where the pipe is. Pervious pavers should be used on at least 10 % of the parking areas. Additional Bio- retention /rain - garden should replace the pipe going through the large parking area East of Bik. 1. Again, an ECS system would work here as well. Also, suggest day - lighting the storm pipe wrapping around Block 1 to the South and West to allow for infiltration These rain gardens could be connected to swales with additional rain - gardens in most areas. The design is using infiltration drain pipe in the pond areas that will infiltrate additional surface water. Rain gardens should be designed according to models set forth in the Maplewood rain garden design. The Town homes on the NW need additional distance added to existing residents houses. Again, day - lighting pipes into a series of rain gardens would be a highly effective way to infiltrate water. Drainage swales should have a low profile planting. Parking island bioretention /infiltration (if used), and rain garden areas (if used) should be designed and have a more formal design that is approved by the City. Access to all surface water treatment areas must be provided for and indicated on the plat proposal. A common maintenance agreement for maintaining planted surface water treatment train areas should be written and approved by the City. • • All ponds should be designed with a for -bay to allow for more efficient maintenance. Just as an informational piece, the City Engineer indicated that the OHW elevations of the ponds are higher than the on grade elevations of adjacent houses. This will have to be corrected. It is better /easier, and cheaper to design volume controls into our new subdivision designs now rather than having to retrofit design into built areas. Lino lakes missed (Lino Lakes was #31 on a list of 30). The first 30 cities that are being asked to do just that. That is they are being asked to reduce runoff to pre - 1988 development volumes. Removing pipe is cheaper cost for the developer and most likely cheaper for the City in the long run. Storm Water Pollution Prevention Plan The SWPPP must be received and approved and implemented by the City prior to a grading permit. This is a separate and distinct document from the detail sheets submitted as part of the application process. This SWPPP must have the responsible manager listed and a 24 hour phone number that this person can be reached. The SWPPP should be sent to the environmental and engineering divisions of the Community Development Department for approval. The SWPPP must address dewatering and ensure that no turbid dewatering is done to receiving waters. This contradicts the language of not applicable to this project (Attachment 14 —SWPPP sheet). An alternative /temporary pond should be designated and located on the plan (See Attachment 18 for RCWD recommendation on SWPPP maters). Final stabilization note should indicate stabilization will be done with the City native seed mix. Canada wild rye can be increased in the city mix to address any quick stabilization concerns. The site plan must show the location of the SWPPP's location on the construction site, as well as weekly and post rainfall event inspection reports. A mail box works well for storing SWPPP information. All existing and new storm water catch basins must be protected with a city approved device. Infrasafe or a city approved substitute is required. Filter fabric will not be allowed. In addition the plan must show a designated concrete truck wash -out area. This area must be identified in the field and designed so that water and material does not leave the wash -out area. The concrete residue must not be later wasted on the site. The developer must indicate to the City how these materials will be disposed (recycled) of. The rock entrance must be installed before grading occurs. A stockpile of rock is recommended to be on site for top- dressing sediment filled rock. All SWPPP violations will have a 24 hour correction period. After this the City will take action to correct inefficiencies. This may include red -tags, project shut - downs, and outside contract for work to make corrections. All expenses will be charged to the project. Tree Preservation A Tree Inventory is tabulated on Attachment 10. City code requires a tree preservation plan. That is the trees that are shown as "save" must have a written plan on how they will be saved. Fencing must be shown installed at a minimum of 1.5 Feet for every diameter inch of tree. This fence must be installed prior to soil disturbance and approved by the City. The City reserves the right to specify fence type. Generally a 4 -foot orange snow fence is adequate for tree protection. Penalties shall apply for trees lost or damaged in preservation areas. Trail The trail location is shown on Attachment 5. The trail is located too close to the wetland in lot 2. At least a 10 foot buffer is required. A 16 foot minimum buffer is preferable. In order to prevent damage to landscaped areas later, all "T" type trail intersections must be tapered, or "feathered out" to allow for maintenance equipment turns. • Lighting Lighting fixtures are shown on Attachment 19. It is unclear if the wall mount fixture lens conforms to the City standard. The fixture lens must have a flush mount lens. • Landscape Plan The landscape plan (Attachment 20) depicts a planting schedule of deciduous and evergreen screenings and accents. A planting schedule (more specific than coniferous and deciduous and ornamental) needs to be written and approved by the City as part of the approval project. The large parking lot shows a number of islands. A linear island dividing the parking lot, in a rain garden setting would better serve parking lot and surface water landscaping issues. The rain garden should include larger trees and formal native plantings. The parking lot should drain to this area. The plan should be approved by the City of Lino Lakes. Landscaping in suggested pipe removal areas should also be designed rain garden plans. Between the town homes and existing residential lots, rain gardens could if designed properly, as well as conifers or fence on the property line afford the required screening. Again, there needs to be more separation /space between existing residential and the town - homes. All surface water areas not formally planted, or exposed pond, infiltration or wetland areas should be planted with the City Native Seed mix by a contractor approved by the City. Contractors on the DNR Native plant contractors list would be suitable. A Contract should be signed to plant and maintain all native seed areas for a minimum of 3 years. This contract should include at least 1 burn after 3 years. All rain - gardens must be designed similar to the Maplewood low maintenance rain garden. A contract with • • a landscape maintenance company must be signed to manage these rain gardens, as well as an agreement with the City that this management will occur in perpetuity Options: 1. Recommend approval with Staff and Environmental Board Recommendations. 2. Recommend further review /or denial Recommendation: Option 1 Attachments: 1. Location 2. Location 3. COH Photo 4. MLCCS 5. Preliminary Plat 6. Preliminary Utility Plan 7. Preliminary Grading Plan 8. Stormwater Pollution Prevention Plan 9. Storm Water Pollution Prevention Plan 10. Tree Inventory 11. Senior Living 12. Senior Living 13. Senior Living 14. Surface Water 15. Soils 16. Level 1 Habitat 17. Wetland Delineation Report 18. RCWD Permit Application /CAPROC 19. Lighting 20. Landscape Plan NOTES I) The o-IenIOlen of Ms booting system is based on the north Me of the Southwest Piaster or the Southeast Puorl., or Section 31. Township 315, Range 220, .each Is assumed to here o 500ri9 or 5eufh 88. 28' 5?" East 2) Existing public and private oII1hes services. an0 underground stnichoss shown hereon were located either physically. /corn existing records. or by resident 255000ny and ore provided for n /0ma?cn0 purposes only. Other pobito and primate .5152:0 Ono services may be preset! Verification and McKim or d0 0141(s should be aolane0 from the owners or the MN: maim 01Nfies Prior la an7 e850O ?On Jr) E,sli9 condo?? shorn 0009 mooted; Pr operly boundary contains telephone lines per Gopher One 5r01e Colt utility nWOles. The number and ty9e or lies are uMnOwn. Verification and 2c0tnn of 01l .Bates should be obtained horn the owners Of Me respecters. utilities Prior l0 any .050Wlpn. I) The Properly described hereon is ...err General Business (GB) 75. 2800009 550num 00250000 05957 20 Property Knell GB (per City of Lim Lakes Zoning OrOnonae- Amended per Ord 21 -0.3) From Streets. Principe, Building Nom Local Street w J0 lee? Principal Bu5Onv horn Collector or Arterial Sheol 40 feel Parking Lot/Dri.e.ey w t5 Not Rear Tort Prncpal Building = 3D feet. Accessory &MOing . 5 Net Parking Lot w ID feet. Side Toro Principal Building w ID feet. .5nesery Building w 10 feel Parkk9 lot w 10 reel. from Roo80,, inl District w 35 Not Between Principal Buildings w Not less than one -1101' (1/2) the sum or the 5uidnv heights of the Iwo (2) buildings 5) The properly described hereon is in flood Zane C (areas of minimal Bopping) per Federal Emergency Moapem.nl Agency Community Panel No 270015-0010 B. doled Noy :7, 1982 6) The leg01 description and easement information Mein hereon were obtained Iran Chicago Title nsurena0 Company. Issued by its Agent. Land Title. arc. Commitment Cos, No. 259146, doted July 1J, 2005 7) The area or the properly described hereon is 748317 ewer, Net a 1718 acres 8) No evidence Mr Me 50021 r or the septic system was found near five 5015109 residence Mere may also be en additional 005 on properly for the existing residence No evidence ores round of on additional residential .ell I W Lot 4. Au No 107, Anoka Carty, Minnesota, AIM The port a Lot 22. Auditor's Subdivision No 107. Anoka Coolly. Minnesota. lying Eoslerly or the Westerly 50 feet thereof and lying between the Westerly extensions of the North and South Ines of Lot 4. said Auditor's Subdivision No. 107 =CAM/ 5 2,0,08; carlify INN? MIS 0555 7 ads prepared by me or under my direct 0505*sian• and that 1 an a duly 5.9islerea lon0 arroyo, under the loos Of fen Slate of Yinn.eala. York ' MaislrcNM, Land Surveyor Yka s0to License No 25287 • 0(NOICS MINK Rib PST 200.101[.0? tiNES 0550055 0080 b 050025 (0805 4(0?It 5087 • 0NDIES LAWNS Sor 0•7 • WAITS (NSW ELL t 0E0025 mama RARID CID 0755N/LLLKR? O VENOMS E.SNSC S5n(mr 00101E e 051/025 f055NC R(COKN 05(I O DOMES 5A1s705 MEP/OW 5(057.0. • 0CN02s 85.500 I95(5055 8501.7 • 0[X025 (X0150 WOWS 555 iNN N • 05.025 EOSNN RCN 0(Np25 (05010 um Box • 055025 (c5Nht 25' 0.5010 WIAL 505? - - - - 050OI5 (0SWO 004N40. AND WOLI+(45(555 PER 5045 Or 0900■02 (55.1Es - err- KNOWS (155500 IAO(R0O s• 55075ad 505 MOWS 1 05 mom! ?055- 0PPR00017 LOCANO) - m- 055025 (155005 15055500000 5(C(05 LN5 (4555U0400 LOCH NON) -Irl- (0025 (W570/0 20a,10.1089 W5 WC fWOR00029 SWAIM) -1,W- 050025 roses 8 111007LROWV (HR 0P11C WV (ONaO50MIr LOCH O0) - sir -- 0,5DLE5 vow SIOMI SEER - s•v- 050025 (5500 5A01Mr MER -eve 0500155 (057005 0095 1545 YIV 08 _. -.-r- 05■025 CNSBOC (7095 Loa MI055025 (055IN0 .5EONC WOES 7 5NNG MISSED 000/054051 4*14 WW01I3 [050000 COMMf2 1 rY ,Y lrr +r rA•iW A: •..nilAfr..- �\ 1 58878 5, •� 1015.95 7 a 5 ry S 4, (P71 SUP1rnP x 5 .115. 1587 72 . r e • •+YrY Urr .r•, „tr rR,l•er • rN ' 1. • 5. M ::I ,) • :.O 111 1 ASI J -L 14 7 E \ 1• 5 • •In,2 /05 • 770 • 1Yr•IK Sr, Ili ) PC1.1 Dunn • - S NIw l J.R f.APgl' W IAr I,m 0 se maw ACV S: 100' 1X0I0•20.0 rail Orr Low '(008.5 If LsSillo1 lm a IA51 50 -IV r a 101 72 AW7110S 9U01.00510N NO O) 0NYNa - (5O arm.) WAHI 00H.•r way thaf -201WA T K 7]51 wen Plat - 00 227? NO ]251 _0_ 00171001d' (008/ (Qf NOIC5) Ras MK 0M5N0N? el 1 1 1 1 1 1 1 _ _ (552505 SO NT? a 10? 72. '405lw5 52601,5,0 501 107 • 'n Nor PP( M01510? N.. 2251 STOW, VAT AV •0400? MO 550 moil or 047 0(0 A0W.Aa( < 701NNr SWAM LAPS 50 \- �\ NONIAENI N0 12251 50: Ja- JI -22 -0-0210 \e5 72, 55NIA2 Wt. ,, \ 51057 LN( SOUS Or PROP(RI5 LN7 ?.51 50,105.5' MIL a LOI 4. -- 447.50 11 1t 1L- 1 111 (45251, 20129 a for 1, 1 MONKS SKON 50v NO 101 MCC or druaota0*5 AVOW a PROP(RI7 INF 9^5t 7Js CARE DEVELOPMENT SERVICES FROM CPTCOMPLETION P A S S E E NC N E EI NQ (N e - at% ENGINEER 5 • LAND SURVEYORS 6wu EAPOLIs mason( a CAMBRIDGE (763)780-4100 ' (715)387 -11 (763)689 -4042 wi W.pasSB•CIIf.00111 I I� BIAt0WCS 0 SS2 PC. J•- JI- 22- 4J -OO5? 5101710NC01 L B • N40HKEN 1 1 I I 0951[01 r CXUN55N a nnit .• r 5011EAL, LAC aLOI5- 00N05 900005 00 107 Ra, MO, Orr I W YONYd.0Tn L COMFORTS Of HOME PO JI- J1- 27- 45_0010 P55r50L MICE -E ° 00.5. ROOM, 0 5451105 NB817247 "W 499.21 BIta005 0 012 ND JI- 3I -22 -4J -pro s 00u took LLC Rowe= a arc mama 50.01 0' BKOOC S05 a ND a -J1 -22-43 -0085 PKPERIY Loa I.52 5AN8 La A EA WIC PROP(Rf, LPL IJ1 J10N .' 13 2086 OFUNO LAKE` E1 A10110173 .55 5100 550 . 107 Comforts of Home Location • Attachment 2 • 0.5 0 ASH 0.5 • • 1 11 1111 1111111111 1 Miles Comforts of Home Location Streets Parcels N S COH Photo Attachment 3 0.06 0 0.06 Streets Comforts of Home Location Parcels 0.12 Miles MIll COH MLCCS Attachment 4 \ -i 1 0.07 0.07 0.14 Miles Comforts of Home Location Parcels Coh_mlccs 6 Aspen forest Grassland with sparse conifer or mixed deciduous /coniferous trees Long grasses with sparse tree cover on hydric soils Other deciduous trees with 11- 25% impervious cover Planted mixed coniferous /deciduous trees with 26 -50% impervious cover Upland soils with planted, maintained, or cultivated coniferous trees MIER t Me orientation of this bearing system is based an No north fine of the 5.00,007 Quarter of 601 Southeast Quarter of Scotian 37, 7owshe 31N, Range 22W which in assumed to have o bearing of South BC 28' 51' fast 2) EKLSthg public and private 07Aitiee minims. and underground structures show hereon were located either physically from existng records, or by resident tsstinony and are p0Nd d for informational purpoase only Other public and private utIties and melees may be present Verification and location of a0 uNRhs Mods be obtained from the owners of the respective utgiti.s prior to any eraoveton. 3) Loafing conWR Mown along easterly property boundary =tans telephone lines per Gopher One State Call ONO locate& the number and type of lines are unknown. Verification and location of all ut*Rkr Mould be obtainer/ ham the Owners of the reep.athe Winks prior to any escays7lon. 4) The property descried hereon s coned Gomm/ Business MB) The foliating minimum setbacks apply to Property zoned C.S. (per City of Lino Lakes Zoning Ordinance-Amended per Ord 21 -03). From Streets: Principal Building from Local Street - 30 het Principal Buf®ng from Collector or Arterial Street w 40 Amt. Parting Lot/Driesnoy w 15 feet Rea. Yot Principal Bu6derg - J0 Mot Accessory Building - 5 het Parkhp Lot - 10 het Side Yard Principal 806010171 = 10 feet Accessory Building - 10 foot Parking Lot - 10 het Finn Residential District = 35 hot Berson Prirmipol 5u/d7gs - Not less than one --her (1/2) the rain of the building heights of the two (2) bu04 gs. 5) Me property descried hereon is in Rood Zone C (areas of minimal flooding) per Federal Emergency Management Agency Community Panel Nn 270015 -0010 6, dated May 17, 1982 6) The legal description and easement information shown hereon were nbto004 from Chicago 1771. Insurance Company Issued by Its Agent Land Tl0a Ina, Commitment Cass No. 259146 dated Ally iJ 2005. 7) The Yea of the property described hrearn 8 74$317 square het or 17.18 acre. 8) No evidence for the location .7 the septic: )'0700 was found near the mating residence. There may oleo be an additional well an property far the exbthg residence. No esidence was found of an additional residential wok Lot 4, AuINtar1 Subdivision Na 707, Anoka County, Minnesota; And The part of Lot 22 AudRar's Subdivision Na 10Z Anoka County Minnesota lying Easterly of the Westeriy 50 het thereof and help between the Westerly extensions of the North and South /ire of Lot 4, said Auditor's Subdhbhn Na 707. I hereby certify that Otis enemy was prepared by me or under my direst supervision. and that I am o duly registered land surveys under the laws of the State of Minnesota. Mark F. Mobbo0ph• Land ANw)ar Minnesota License No 25287 • Dow DENOTES route WON PPE AIOO4WT MESS OMRMSE N07S1 .O. DEMOS; E9511N0 07WTY POLE • 004016 DOING WY NNE • DENOTES DOSING NEL. • OENWES DOMING FLARED ENO SECTION/WOW O LEWES 25007AG SANITARY NANNGLE e DENOTES DOOM ELECIRGAL OUTLET • arrows DOTING 7EIEPYIONE PEDESTAL • LENSES WINO TFIEEPNOE MAIKNE a DENOTES EASY° FIBERGLASS OAS MARKER DEPOTS DISIO 900 berths OWING 071.7 Box DENOTES EWING 25- ROUND METAL POST - — — - O0OIES DOSING 00006E AND WRIT, EASEMENT PER PLAT 0' NOOPRIDE OWE —rr— 000IES 00TING UNDERGROUND E1EPHOIE LIE (CONDUIT 0M AOL7PIE t/6- MR007477 LOG7109) —ur— DENOTES WONG UNDERGROUND EIECTRC IANE (APPROWA77 LWOW) DENOTES EASING UNDEROn700 GAS LME (APPROR 440 LOG0W) - OENOES EM51N0 LINCERGROUPD 718E8 OPTIC LAE (APPROMATE 1O 47101) - 000ES mews ST3w SEVER —ace-- DENOTES DOS1N0 SANITARY SENER —a..— DENOTES DOW OLEO ICAO 7/71WBS 001071S EO51e1G FENCE INC DENOTES MOW WILDING DENOTES E WING CRUSHED R0f21/DRAIEL AREA 0P'0ES CASSN0 CONCRETE ■EE1EA1.1 EXE37LN or 77E NORTHERLY WE OF LOT 4 AUDITORS 51EZAIIS Y NO. 107 IRON PPE YWIAIE 47 FENCE L1E IOmN 5,' ,•ND. 090E 6PR00771101' ,I i 81.11.1711165 COI 917 ,l 7 r PP. 31 -37 -22-42 -0014 1 ti ' NUM ROBERT a 5E771. ANN i 00: ta xa Ann PIPE 710151ERT NO 9809 SOWINGS ON 91E PO 31-37-22-42-0020 ODIC DOOMS & KAM M 1 MEE 1/f NORM :. AND 40 ar enonERTY leer •' L- U 749AIEN7 _ - )- 0.0.0005 ON SHE PER PLAT OF `• 1 1 PD: 31 -37- 22-42 -0079 RONANC 0•55 y 1 1 FECA0E077 ROBERT a er 1 5887831T 101.193 BINDINGS ON 9101 .7. PI& 37 -37 -22-42 -0078 FENCE UIE NORM RO.SENTHA1. PEER OF PROPERTY LINE -- 017707707 ON 91E PP 31 -37 -22-42 -0077 917110_ 77006 s 1e11.40. 77 e€ s"n pOPN�iai IIET7ERLY WE OF EAST 50 FEET OF WT 22 AUDITORS 9.®I1907 N0. 107 - 1----- 2ZR0- S' oot p- ,IpJV' raT,D1r4. sr. I s :DER u EA51E8r LAE OF EAST 50 --FEET OF LOT 22 ALUT/RS 51.000907 NO 707 11 \\ \yam ' \ ::: ... \\E\ \ R \ \1,\ \\ gym ,a"FpOu i ;I 9t'Rrtdtl�i /� VO 'a UNDERGROUND IEERNOE CONDUIT (SEE 90775) Y \ - ( 3it0fL'a3' \ \ \ • 50 _Ran PPE LLOw2 25( N0 12231 PD: 31- 31- 22- 44-0070 PAUM°. MICE EANETI1? INC OF LOT 4 • PROM?? OE 7.51 AWf/0R5 SID0IN90N AO. 10? I 1-1 B1SDn65 ON 9E PP. 37- JI -22 -47 -0071 SNOC ENC1 M B s KARRIDN • -•• I 1 1 PS 31- 31- 22- 07-0009 KOHL ROBER7 a PA Mae PESTERY EN7EN907 OF ME SOVMERLr LNE OF WT 4. AUDITORS SUMMON No 707 2'477Y 499.21 BINDINGS ON SE PD: A -31 -22 -43-006 01)400 SOLIDI OF" We LAND I[L PROPERTY LINE 7.31 YHM1IA/ti OF FOE PREIYYARY PLAT CERTIFICA7E 0,F 8URVEY ARAN H SCSI PROEDT7 .49-6 CIT F` OF C•RE DEVELOPMENT SERVICES FROM CONCEPT TO COMPLETION t A WW I= WI SEE SWAM SCUM OF FID 37- 37 -22 -43 -0005 PROPERTY 19.E Vet Nee W 8 MA YAM 1 D SURVEYORS (�liu cuA9Rx�ce (763)710-4 ;: )381 s°N oni (763)6894042 www ?t - e119.com E1 r rry n I !Kin t LEGEND M- bane fine sandy loam THIS NEARLY LEVEL SOIL 15 IN SMALL DEPRESSIONS, ON NARROW RIMS SURROUNDING LARGE AREAS OF ORGANIC SOILS AND IN NARROW LOW -LYING DRAINAGEWAYS. AREAS ARE 5 TO 80 ACRES IN S /ZE THE WATER TABLE IS HIGH. SLOPES ARE 0 TO 2 PERCENT INCLUDED WITH THIS SOIL IN MAPPING AREAS ARE SOILS THAT CONTAIN STRATA OF COARSE SAND. ALSO INCLUDED ARE SMALL AREAS OF MARKEY AND LINO SOILS. THE CHEIF LIMITATIONS FOR BOTH FARM AND URBAN USE ARE THE HIGH WATER TABLE AND THE RESULTING HAZARD OF WETNESS. MOST AREAS ARE PASTURED. SOME DRAINED AREAS ARE CROPPED. COMMONLY GROWN CROPS ARE CORN AND SOYBEANS. Sat SMderva Ike send 0 to 3 percent slopes THIS NEARLY LEVEL TO GENTLY SLOPING SOIL IS IN SMALL LOW -LYING DRAINAGEWAYS AND SMALL DEPRESSIONS, ON LOW BROAD FLATS, AND IN SMALL AREAS THAT ARE A FEW TEE/ HIGHER THAN THE SURROUNDING LARGER, VERY POORLY DRAINED AREAS. AREAS ARE 4 TO 60 ACRES IN SIZE. IN UNDISTURBED AREAS, THE SURFACE LAYER I5 2 TO 6 INCHES THICK. INCLUDED MTH THIS SOIL IN MAPPING ARE AREAS OF SOILS THAT ARE NOT MOTTLED WITHIN A DEPTH OF 30 INCHES AND AREAS OF LINO SOILS. THE MODERATELY HIGH WATER TABLE AND THE RESULTING HAZARD OF W£7NE55 ARE THE MAJOR IMITATIONS FOR BOTH FARM AND URBAN USE. DURING DRY PERIODS, SOIL BLOWING IS A HAZARD TO IMMATURE CROPS. MOST AREAS ARE USED FOR CROPS, TO WHICH THE SOIL IS MODERATELY WELL SUITED. COMMONLY GROWN CROPS ARE CORN AND SOYBEANS. Zn a Zi mermen fine send 2 to 6 percent dopes THIS GENTLY UNDULATING SOIL IS IN BROAD OUTWASH AREAS 5 TO 160 ACRES IN SIZE. IT HAS THE PROFILE DESCRIBED AS REPRESENTATIVE OF THE SERIES. INCLUDED WITH THIS 50/L IN MAPPING ARE SMALL DEPRESSIONS OF ISANTI SOILS. ALSO INCLUDED ARE SMALL AREAS OF SARTELL SOILS. THE LOW AVAILABLE WATER CAPACITY AND THE RESULTING HAZARDS OF SOIL BLOWING AND DROUGHTINESS ARE LIMITATIONS FOR BOTH FARM AND URBAN USE. LARGE AREAS ARE UNDER URBAN DEVELOPMENT. THIS SOIL IS WELL SUITED TO THIS USE. IT I5 POORLY SUITED TO CORN AND SOYBEANS, MODERATELY WELL SUITED TO ALFALFA AND PASTURE AND MODERATELY WELL SUITED TO WOODLAND. NOTES ALL LOCATIONS AND DESCRIPTIONS OF SOIL TYPE CLASSIF7CATION5 PER THE SOIL SURVEY OF ANOKA COUNTY, MINNESOTA (PREPARED BY THE UNITED STATES DEPARTMENT OF AGRICULTURE SOIL CONSERVAVON SERVICE IN COOPERATION 14777/ THE UNIVERSITY OF MINNESOTA AGRICULTURAL EXPERIMENT STATION). VICINITY MAP 1 MN MEET- SEC 31 T3M , R22W CITY OF LINO LAKE5 MN DEVELOPMENT SERVICES FROM CONCEPT TO COMPLETION PASSE ENG!NEE'IN, !Ala CIVIL EN6.INEER5 :LAND SURVEYORS MINNEAFOLIS � I LIDSON • CAMBRIDGE ( 763 )780 -410D 1715)381 -1150 (763 )689 -4042 www 6.sse- eng.cem r' a a JUL 1 0 2006 CITY OF LINO LAKES COMFORTS OF HOME PRQ/MINARY PLAT AERIAL / 30I1..3 DRAWN PRO.ECI EASEMENT TO BE VACATED \\ ■ \ \ \\ ✓N - - -- of 120' BUILDING SETBACK Ic -- --1 -- P IMIVL4IE 59eaMT 1 1 0 I u kIBLIC TRAIL 1 1 DEVELOPER COR E DEVELCRIEiTSERVICES 1793 BI/ERKLE CIRCLE 164117E BEAR LAKE, MN 55110 PHONE (651) 481 -9027 ARCHITECT. F"R•I•S "B•I•E L l C 1 l T I C T I , I N C 215 NORTH SECOND STREET, SUITE 204 RIVER FALLS IN 54022 PHONE: (715) 426 -4908 ENGINEER/SURVEYOR PamaljnulingInc 1611 COUNTY HIGHWAY 10 N.E. SPRING LAKE PARK, MINNESOTA 55432 PHONE (763) 780 -4100 SITE DESCRIPTION AREA OF PROPERTY = 17.18 ACRES AREA OF UPLAND = 16.72 ACRES AREA OF WETLAND = 0.46 ACRES AREA OF COUNTY R.O.W. = 1.27 ACRES 5 PROPOSED LOTS ZONING EXISTING ZONING = NEIGHBORHOOD BUSINESS PROPOSED ZONING = P.U.D. LEGAL DESCRIPTION Lot 4, Auditor's Subdivision No. 107, Anoka County, Minnesota; And The port of Lot 22 Auditor's Subdivision No. 107, Anoka County, Minnesota, lying Easterly of the Westerly 50 feet thereof and lying between the Westerly extensions of the North and South lines of Lot 4, said Auditor's Subdivision No. 107. SETBACKS COUNTY HIGHWAY PARKING 15 FT. BUILDING 40 FT. ADJACENT LOTS PARKING 10 FT. BUILDING 20 FT. PUBLIC TRAIL BEILAND a BY GRAHAM ENV EXISANG TRAIL 1 FUTURE COUNTY RIGHT OF WAY 40' BUILDING SETBACK 15' PARKING SETBACK 7- BLOCK 1 a 20' BUILDING SE78ACK 1 1 NOTE: BLANKET EASEMENTS OUTSIDE ALL PROPOSED BUILDING LINES \ \ FUTURE COUNTY RIGHT OF WAY EXISTING COUNTY RIGHT OF WAY PROPOSED COUNTY RIGHT OF WAY FUTURE COUNTY RIGHT OF WAY \ \\ -,-\-,-- \ II \\1 \1. III `San \ I 11i `y,r � ' � 1 1 s i r, - II \ I IT III I PROPOSED EASEMENTS TO BE ACQUIRED k 1 UTILIAES I I i I ail Ir. --�_....__.L{1 — AIV/87/WET • ImaNNAANN r r AAA COMYNEO(6QM4?Y RATA° 4 — awl AR NE FUTURE COUNTY RIGHT OF WAY 1 L SCALE IN FEET 1 INCH - 100 YLLI (22" X 34" SHEET) 1 INCH = 200 FEET (11" x 17" SHEET) PUBLIC TRAILS TRAIL EASEMENTS TO BE PROVIDED BY SEPARATE DOCUMENT FOR ALL PUBLIC TRAILS AND WALKWAYS. TYPICAL TRAIL EASEMENTS ARE 70 BE 12 FEET IN WIDTH. LOT DESCRIPTION AND USE LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 GROSS ACREAGE = 3.99 - SENIOR HOUSING (APARTMENTS) GROSS ACREAGE - 3.83 - SENIOR HOUSING (TOWIVHOMES) NET ACREAGE = 3.37 GROSS ACREAGE = 7.14 - SUPERMARKET CROSS ACREAGE = 0.57 - RETAIL GROSS ACREAGE = 0.50 - RETAIL DATE REVISIONS BY 7/70/06 j- RAH CITY 004144ENTS - 6/23/06 RECZVJE RFCORD DRAWING COMFORTS OF HOW PRELIMINARY PLAT Jul 1 0 2006 CrY OF LINO LAKE OF CORE GAR, SREa0CARGM BY YE d> NCER NE MAE I AY A DULY MOER Rd SURVEYORS CAMB8Th6E _usD • (763)689-4042 DEVELOPMENT SERVICES FROM CONCEPT TO COMPLETION LA .A7E -C11g.CONI MARA ARE150YFR Pi MATERIALS SANITARY 8" MAIN — SDR 35 SERVICE — SCHEDULE 40 WATERMAIN 8" CL 52 DUC77LE IRON PIPE 6" CL 52 DUC77LE IRON PIPE SERVICE — 1" TYPE K COPPER ALL 8" SANITARY MAIN 0 0.40Z 801.49 7 LA■E I I I - - ---I'' A4W916 cater EXISTING 8' SANITARY SEWER TT-- EXISTING 8" WATERMAIN CQ COJNECT EC I Ex1snN� 1 18" WATERMAIN I I I I F 1-- L__I_ -IrL_ POND 2 NIX = 898.5 HML = 902.6 OF = 903.1 10.'1 BENCH 907 0 895. TEMPORARY WETLAND IMPACT °ERMIT REQUIRED I POND t 3N =9020 H = 904.2 E =905.6 O. 907 J: 1 BENCH = 901.079020 POND 2 tl LOT 2 -r Min " ■LTLAR. E DEUA11• BY GRAHAM ENV FLOW DRAIN II PROPOSED DIRECTIONALLY BORE WATERMAIN ALONG COUNTY ROAD 49. WATERMAIN UNDER CSAH 49 TO BE DIRECTIONALLY BORED WITH A STEEL CASING. EXISTING TRAIL OR.IN_ At 0 \ 'i:t ill 1 \ \ BLOCK 1 RETAINING WALL / PROPOSED T RETAINING WALL 1 POD .5 NIL = 894.5 HAL = 902.0 EOF = 902.5 l0'1 BENCH = 896.0 -895.0 PEAK OUTFLOW = 4.0 CFS 1111: IIII II \I.•II1 II: 1I I CONNECT TD EXISTING — WATERMAIN a MICE I EASEMENT 10 BE .44RE0 II III I III LL ! -0I ROPOSED FORCEMk/N UTILITY STUBS I�_g11 SOUTH ROl TSED 8" WATET IN- NRE CidEC I t • \ II -1 0 700 200 SCALE IN FEET 1 INCH = 100 FEET (22" X 34" SHEET) 1 INCH = 200 FEET (11" x 17" SHEET) GALVANIZED ORATE (SPOT) 4' X 4' OPENINGS NORMAL WATER ELEVABON 12" MIN PIPE SIZE WLL VARY NORMAL WATER ELEVATION _PIPE SIZE AND LENGTH IWLL VARY GOING INTO POND DOGHOUSES SHALL BE GROUTED ON BOTH THE OUTSIDE AND INSIDE TYPICAL POND SKIMMER NOT TO SCALE RECEIVED JUL 1 0 2006 CITY OF LINO LAKES I.Y. 05 REPORT N DIRECT 51IFER S PUN, SPECSIRCARW. BT IOC INVER MT NAR Olt DATE REVISIONS BY 7L,s/o6 _I_ RIB CITY COMMENTS - 6/23/06 J— J— RFCORD DRAWING COMFORTS OF HOME PREUMINARY UTILITY PLAN DRAM RIO SCALE SDR -BS Ul \ • \/2g4v\\ \ \ \Lk\ s \\ / 6.7 \ \ i DIT H) OW \ \ \ -- REGRADE LO7L/NE R \ \\ TO CREATE EOF AT 896.O / PAWN SUM RAD 907. 860 \ \\ = \\ '9,4.5 \a \\ ' .\ to 896. , 89 • • 11. \ \ \ (596. .- IDITCHA \\ \/i/ - Y 88087 `,F POND 3- NWL =8' WL • 90 o E0F = 90 10'\( BENS PEAK OU • 7ENCHI IN DOCKSG ,�� ST-4 -906 901.0 ■ rj ' , I D~\~ f 'f 1 , 903.8. F.F. 906. LOT 40' BUILDING SETBACK' (904.9 DITCH) 15' PARKING SETBAOC RAIN GARD, ELEV = 90 (904.5 DITCH) (904.7 DITCH) (904.3 DITCH) RAIN GARDEN ELEV = 902.0 03.1 905.0' 5 EX RET. WALL SOIL BORINGS BORING DEPTH GROUND WATER ELEVATION SOIL BORING ST -7 15.5' 899.1 ST -2 15.5' 896.1 ST-3 15.5' 895.9 5T -4 15.5' 894.7 ST-5 15.5' 894.7 ST-6 NOT PERFORMED NOT PERFORMED ST-7 15.5' 897.0 ST-8 15.5' NONE OBSERVED ST-9 15.5' NONE OBSERVED ST-10 NOT PERFORMED NOT PERFORMED ASH STREET COMM ANOKA F-WAY PLAT NO 48 C.SAH Na 32 C - == - *06 - -t. SOL TYPE DESCRIP710N SOIL BORING SOIL TYPE ST-1 POORLY GRADED S4ND ST-2 POORLY GRADED S4ND ST -3 POORLY GRADED SAND ST-4 POORLY GRADED SAND ST-5 POORLY GRADED 54N0 ST-6 NA ST-7 POORLY GRADED SAND ST-8 POORLY GRADED SAND ST-9 POORLY GRADED SAND ST-10 NA 11 8 II 7 11 �.0 J O W 120 SCALE IN FEET 1 INCH = 60 FEET (22' X 34' SHEET) 1 INCH = 120 FEET (11' x 17' SHEET) I11019 OF WALK ROUND ALL SLOPED INTERSECTIONS ''\\ APPROX 10e7 SLOPE I S'-0- 14-0' e• jCLAW AND CUTTER EXPOSED AGGREGATE CONCRETE PAIR 9C7TON A -A (D SURFACE TREATMENT - AFTER NORMAL CONC/E7E 718484 OWED AGOT EG4TE LIE7NG 17E IE1XIIREMDWS OF SPEC 3137 04 70 MODRED ID TOO 77 F BE MATERIAL 1/2' ID 3AT N SIZE N BE GRIM CONCRETE 77E EMBEDDED AGGREGATE SHALL PROTRUDE AT [EAST 3/16' A801E PE CONCRETE SURFACE 71E EPOSED AGATE MAY BE WIRY RINSED 70 WASH MORTAR OFF OF IT PEDE13TRIAN CM RAMP RI IDLE NOTE NOWT FIRE SERNCE LOCATIONS AND SIZES 787N CITY FIRE MARSHALL NOTE SOD ALL DISTURBED DRAINAGE AREAS INCLUDING SWALES AROUND STORM SERER FLARED END SECRONS AND OFT STREET CATCH BASINS NOTE THE CITY'S PUBUC KIRKS DEPARTMENT MUST BE CONTACTED FOR 1NSPECDON OF ALL UUUTY WORK PERFORMED. NOTE SPOT ELEVATIONS AT GU 7ERLNE UNLESS 011ER1I5E NOTED. NOTE REFERENCE 517E PLAN BY ARCHITECT FOR PARIGNG & BUILDING DRENSPONS ETC. 1.5' BITUMINOUS REAR COURSE *9, DOT 2341 1.5' BITUMINOUS BASE COURSE MR DOT 2331 4' AR, DOT CLASS V AGGREGAIE BASE NOTE T185 CSS-1 TACIT COAT SHALL BE PLACED BEIREEN BITUMINOUS LIFTS NOTE THE PARKINQ.OT SHALL Be CLEANED PRIOR 70 PLACING DE TAM COAT PARKING LOT SEC770N NOT TO SCALE NOTE PROP a EX* FOR APAR ENT C JUL 1 0 2006 CITY OF LINO LAKES GRADE DEVELOPMENT SERVICES FROM CONCEPT TO COMPLETION PASSE ENG ING, !NC. (763 SURVEYORS CAMBRIDGE -1150 (763)689-4042 KATE REVISIONS BY _17 1_ RIB - CITY COMMENTS - 6/23/06 RECORD DRAWING J OF HOW PR UARNARY GRADING PLAN GRAIN RFD SOME TN0ECT 636-89 G1 / 6 o r90?TrJ �8J \I ) 0s2) ('902.8)_ -- -- T9bB 2� ,^ (p00. 2) °J - - 9o0-.POND x NIX = 89 &5 HNL�= 902.6 EOF = 9011 1Q :1 BENCH 896.0-897.0 901.0 901.8 897. 898.2 7 898. I it vv 4— 901.8 • sTr8 i z III'�i�ii sd 4._0/ ('907.8 09. 901.5 �9 I I II I I I �I rlrl rl' -4 / (899.01;7_0, ° �ry\ \ OUTLET /'STTGTUR \ 901 5 \896. NNlER ELEVATION op D/3/156 E7EVAIKN MIL=89& l NNL�900.4 WER.AND DELINEA17 BY GRAHAM(- , -- D o °o J O WL..�AEN1I ' (89g' 4 INTO) ST -7 DRAT AGKFLQ TER (904.1 DITCH) (904.6 DITCH) (904.9 DITCH) (905.1 DITCH) • (905.4 DITCH) EA (905.3 DITCH) (904.9 DITCH) 15' PARKING SETBACK 40' BUILDING SETBACK REGRADE LOTL1NE AR TO CREATE EOF AT896. OROPO� RETAIN WA4 `, F POND 3- �NI$L =8' 1F(ML =90 EOF= 90 10:`{ BEN. PEAK OU RAIN GARDEN ELEV = 902.0 (904.5 DITCH) 90 899.5' Cgs. NY 89123 NM A90.RI NOTE VERIFY FIRE SERMCE LOCAT IONS AND SIZES MYTH CITY FIRE MARSHALL. NOTE SOD ALL DISTURBED DRAINAGE AREAS 8NGLUDING SMILES AROUND STORM SENSE FLARED END SECTIONS AND OFF STREET CATCH BASINS NOTE INE CITY'S PUBLIC WORKS DEPARTMENT MUST BE CONTACTED FOR INSPECTION OF ALL UTILITY MURK PERFORMED. NOTE. SPOT ELEVATIONS AT GUT7ERUNE UNLESS OTTERK/SE NOTED. NOTE REFERENCE SITE PLAN BY ARCHITECT FOR PARKING & BUILDING DIMENSIONS ETC �R OSED LIMNING • f" " Y. \, (R9R n NOTE PROPOSED BUILDINGS ARE TO BE SLAB ON GRADE EXCEPT FOR UNDERGROUND PARKING FOR APARTMENT COMPLEX. F.F 906.1 LOT kio (904.7 DITCH) (904.3 DITCH) CONT. 5 - 10 FEET 0 a 120 SCALE IN FEET 1 INCH s 60 FEET (22 X 34" SHEET) 1 INCH - 120 FEET (11" X 17" SHEET) RIOTN VARIES MATCH 0051IN GRADE SIDE SLOPE VARIES PER D RIBBON CURB (FOR ADDITIONAL. CONVEYANCE OPTIONS SEE PAVEMENT DETAIL LINK) CRASS BUFFER UNDISTURBED AND UBCONPACTED NMI) SOIL NATIVE VEC (SEE RECOMMENDED PLANTS) PLANTING MEDAN TYPICAL RAINGARJEN CROSS— SE'(BIORETENTION) RE E VED JUL 1 0 2006 CI Y CIF LINO LAKES DEVELOPMENT SERVICES FROM CONCEPT TO COMPLETION 11mRDT ., . OR REPORT DIRECT RIPER TR B NAT RIATI ANA DOLT ,.: 9YlafED DICER RE DINS 'y ' DALE EA` NARK IPEnCNER iDA1E REVISIONS BY J111oi 1 — ? _ OTT COMMENIS - 6/23/06 RECORD DRAWING OF MIZE PRELIMINARY GRADING PUM DRAW R! SCALE PROTECT I 3411-05 C� - eFaB,1\ 1 -- \ \I. \ I\ \ \ �1i \1. \' Y:l / -1 _r 0 POND 2 NML - 89851 HM! 902.61 EOF < 903.1 10:1 DEVON r' ROPMICLAIE I \ 1 1 1 \ I / SWUM w.163 areaEr 611011 6 A•6 Or. Paw a..s w .w+ m �1M m�N.et e< lee ro116n. ni./ *MO* 91e1..e 5r 1 Ser 0 1' O ' other* re0 .u10I a M.46 ow the ono el 0. .nm9 end a ra under woven q.n 3 mLL LIBIE OF CUANMES TABLE OF aUMWIEs DPW 4T SLP-A 031304 or OBOES OF 1331.1.1D17 SHP 001M suss 1 4so-1 CKS .50. 0 cues W duel? MO. IK L (9) wDlemeru�� CM 01 Granular OS. SILXCnl(a Depth 0' 95..4 idN WW1 it Wee. no. W.) 12 15 10 21 27 24 30 36 42 40 5 0 17 1 14 15 19 20 23 23 35 53 51 7.3 9.2 10.9 129 1 S 24 21 L 46 53 15 4.1 4 s9 03 109 115 113 194 21 2.2 39 12 56 61 MZ 9.7 8. 39 73 is 143 193 21.7 255 24 0.5 34 1 7.3 99 103 123 TABLE OF aUMWIEs DPW 4T SLP-A 031304 or OBOES OF 1331.1.1D17 SHP 001M noter Mar ramie 't be for serer W rose Me..ee one MpMW in the 1,.. u \ I = ________... , \ 1 ail \ I Oil Ex RE,: ;SA±.'. T -1 SILT FENCE 6- MINIM 1 1/2' CLEAR AGGREGATE 2' BERM 0 SILT FENCE 2r..y 4, C. ADD/77ONAL AGGREGATE PILE TO BE KEPT ON SITE TO REFRESHEN ENTRANCE AFTER SOILING GRAVEL CONSTRL C77ON ENTRANCE WITH BERM AND SILT FENCE NOT TO SCALE eeddlAtrS N SOIL BORINGS,' BORING DEPTH B1r6 sus' I.le.■ e5v9' OsM 45�1s Fore 899.1 r 15.5' 896.1 91e1su 1C 895.9 a 25 36 43 51 56 26 f2 14 11 16 m 39 55 72 12 109 127 21 36 u 53 6.4 1 e.2 101 112 163 1. 11 1 S4 69 63 93 21 101 143 1513 21.7 214 19 53 72 93 101 tit noter Mar ramie 't be for serer W rose Me..ee one MpMW in the 1,.. u \ I = ________... , \ 1 ail \ I Oil Ex RE,: ;SA±.'. T -1 SILT FENCE 6- MINIM 1 1/2' CLEAR AGGREGATE 2' BERM 0 SILT FENCE 2r..y 4, C. ADD/77ONAL AGGREGATE PILE TO BE KEPT ON SITE TO REFRESHEN ENTRANCE AFTER SOILING GRAVEL CONSTRL C77ON ENTRANCE WITH BERM AND SILT FENCE NOT TO SCALE eeddlAtrS N SOIL BORINGS,' BORING DEPTH (MOUND MITER ELEVATION SOIL BORING ST-7 15.5' 899.1 ST-2 15.5' 896.1 ST-3 15.5' 895.9 ST-4 15.5' 894.7 ST-5 15.5' 894.7 ST-6 NOT PERFORMED NOT PERFORMED ST-7 15.5' 897.0 ST-8 15.5' NONE OBSERVED ST-9 15.5' NONE OBSERVED ST -10 NOT PERFORMED NOT PERFORMED SOL TYPE DESCRIPTION SOIL BORING ST-1 ST-2 ST-3 ST-4 ST -5 ST-6 ST -7 ST-8 ST-9 ST-10 SOIL TYPE POORLY GRADED SAND POORLY GRADED SAND POORLY GRADED SAND POORLY GRADED SAND POORLY GRADED SAND NA POORLY GRADED SAND POORLY GRADED SAND POORLY GRADED SAND NA 0 100 200 SCALE IN FEET 1 INCH : 100 FEET (22' X 34' SHEET) 1 INCH - 200 FEET (11' X 17' SHEET) IIIIM BI NOTES` 4) INSTALL SILTFENCE PRIOR TO START OF SOIL DISTURBING ACTIVITIES. •INSTALL TEMPORARY STONE EXIT PAD PRIOR TO START OF SOIL DISTURBING ACTMTIES. ® INSTALL SILTFENCE AROUND PERIMETER OF POND AT THE FOLLOWING ELEVATIONS IMMEDIATELY AFTER COMPLETING POND GRADING: POND 1 902.0 POND 2 897.0 POND 3 894.5 INSTALL CULVERT INLET PROTECTION IMMEDIATELY AFTER CULVERT INSTALLATION. • INSTALL STORM SEWER INLET PROTECTION IMMEDIATELY AFTER STRUCTURE INSTALLATION. (WIMCO OR APPROVED EQUAL) INSTALL RIP RAP AT ALL CULVERT OUTLETS ACCORDING 70 PROVIDED ® BOX AND RAIN GAUGE ON SITE ® CONCRETE TRUCK WASHOUT PAD. GENETLIL NOTE& 1. SEE SHEET f2 FOR ADDITIONAL SWPPP REQUIREMENTS. 2. PERFORM SEEDING FOR FINAL STABILIZATION OF DISTURBED AREAS AS FOLLOWS: 0. REPLACE TOPSOIL TO PROVIDE A UNIFORM THICKNESS LOOSEN TOPSOIL 70 MINMUM DEPTH OF 3. b. APPLY COMMERCIAL GRADE: SLOW RELEASE FERRII7FR OF ANALYSIS 22 -0 -10 AT RATE OF 2 POUNDS ACTUAL NITROGEN PER 7,000 SQUARE FEET. c. INCORPORATE FERTILIZER INTO SOIL BY USE OF HARROW OR OTHER MEANS TO PLACE FERTILIZER BELOW GROUND LEVEL d. APPLY MNDOT SEED MIXTURE 909 AT RATE OF 50 POUNDS PER ACRE WITH BRILLION TYPE SEEDER OR OTHER MEANS TO COVER SEED WITH 14' TD 34' OF SOIL e. APPLY UNIFORM COVERING OF MNDOT TYPE 1 MULCH AT A RATE OF 2 TONS PER ACRE f. ANCHOR MULCH TO DEPTH OF 2 TO 3' 1$7771 DISC ANCHOR OR OTHER MEANS IMMEDIATELY AFTER SEEDING. (OPTIONAL)) POST Ott STA20; DIRECTION OF RUNOFF FLOW OE TRENCH BAL7O1LL WITH 6 INCH MIN. NATURAL MIL RE JUb EIVED 1 0 2006 CITY O UNO LAKES Poi 165 NOTE. DEPENDING LPON CCBNLRATOIC ATTACH FABRIC 70 MRE MESH MIN H00 RINDS STEEL. POSTS WIN 1E MIRES OR 13000 POSTS 11177/ STAPLES TYPICAL INSTALLATION FOR SILT FENCE FABRIC ANCHORAGE N07 TO SCALE CITY COMMENTS - J2106 RECORD DRAWING z ES iti 1 :111 giagE Eltk 6 _63 a 8 L" a a Fl Stormwater Pollution Prevention Plan The war* described to implement the following Storm Water Pollution Prevention Plan (SWPPP) shell be considered part of the Contract Documents and shall be performed by the Contractor. The work to install and maintain the Best Management Practices ( BMP's) to prevent erosion and provide sediment control shall be in accordance with Permit No. MN R100001 and shall include. but are not necessarily be limited to, the requirements contained herein. 1. Construction Activity Information Project Name: QOtrdin OF HOME Project Address /Location: City/ Township: fate of LM1O LAKKSStote: MN Zip Code: 55014 County Parcel ID Number(s): 3- 119 -21 -22 -0011 3- 119 -21 -22 -0020 .3-119-21-22-0008 3- 119 -21 -22 -0007 3- 119 -21 -22 -0001 3- 119 -21 -22 -0017 All cities where construction will occur ay of Lino Lakes All townships where construction will occur. Not Applicable All counties where construction will occur. Moira Project Size (number of acres to be disturbed): 16.85 Project Type: a Residential _ Road Construction _Other (describe) Cumulative Impervious Surface: Existing area of impervious surface to nearest quarter acre: 0 Post construction area of impervious surface to nearest quarter acre: 10.5 Receiving Waters: Nome of Water Body jyRa Appendix A Special Water? XX WEfAAID No Dates of Construction Estimated Construction Start Date: AUGUST 1, 2006 Estimated Completion Date: AUGUST 1, 2007 Contact Information Owner of Project Site: CORE DEVELOPMENT Business /Firm Nome: CORE DEVELOPMENT Federal Tax ID Number able as needed State Tow ID Number available as needed Contact Person: Mork Birdbath Tit /e: President Phone: (851) 481 -9027 Moiling Address: 1793 Buse& Circle City !pits Bear Lake State: MN Zip Code: 55110 E -mail Address: none Contractor (Party who will oversee implementation of the SWPPP. May be same party as Owner above): Business /firm Name: CORE DEVELOPMENT Federal Tax ID Number. available as needed State Tax ID Number available as needed Contact Person: Mark Elgelaach Title: sons Phone: some Mailing Address: same City an State: MN Zip Code: same E -mail Address: none Altemote Contact Person: 7B0 Phone: 780 E -mail: nee General Construction Project Information Descipfion of the construction activity (what will be built genera! timeline, etc.): Comforts of toms is a MC lot commercial and residential subdivision on o 17.18 acre property. Lot / and Lot 2 are restilmtiaL Lot 1 being a condominium complex and Lot 2 consisting of to,nhome. Lots 3, 4, and 5 ace commercial sites. The conbuaten actAsities will include grading operation for the construction of surface drainage, sedimentation ponds, and an uvbah section street Siam sewer construction. exposed sap stabilization, and bituminous paw will fallow pasting operations. Description of soil types found at the project: Axodng to soil borings taken by a g otedmical engineering consultant, the majority of the sops as poorly graded. 2. General Site Information Description of the location and type of all temporary and permanent erosion prevention and sediment control BMP's to be used, including the timing for installation and procedures used to establish additional temporary BMP's as necessary: Contractor shall install and maintain the temporary and permanent erosion prevention and sediment control BMP's as shown on the accompanying drawing and as described herein. The timing shall be in accordance with the Construction Activity Sequence below and in accordance with sound and proactive construction scheduling and practices Accompanying this SWPPP is a site plan that includes the following features: • Existing and proposed grades, including dividing lines and direction of flow for all pre- and post- construction stormwater runoff drainage areas located within the project limits. • Locations of impervious surfaces and soil types. • Locations of areas not to be disturbed. • Location of areas of phased construction. • All surface waters and existing wetlands within one -half mile from the project boundaries that will receive stormwater runoff from the site (identifiable on maps such as USGPS 7.5- minute quadrangle maps or equivalent). Where surface waters receiving runoff associated with construction activity will not fit on the plan sheet, they must be identified with an arrow, indicating both direction and distance to the surface water. • Method(s) to be used for final stabilization of all exposed sal areas. Description of stormwater mitigation measures required as the result of an environmental, archaeological, or other required local, state, or federal review of the project Not applicable to this project Description of the type and locations of BMP's appropriate for this site and sufficient to comply with all applicable requirements of the TMDL implementation plan and identification of the receiving water and of the areas of project site discharging to on impaired water that has on approved TMDL implementation plan that contains requirements for construction Stormwater discharger Not applicable to this project Selection of Permanent Stormwater Management System Will the project create a new cumulative impervious surface greater than or equal to one acre? XX Yes _ No If yes, o water quality volume of )t inch of runoff from this area must be treated before leaving the site or entering surface waters (1 inch of runoff from this area if dischorging to special waters). Method(s) to be used to treat runoff from the new impervious surfaces created by the project dz Met sedimentation basin la Infiltration/Filtration basin Regional ponds _ Combination of practices Description of treatment method(s) to be used, including design information for each method : MIRE wet sedimentation basks wit be constructed as shown on the plan. fie basins have been designed to provide a water quality volume of 0.5 inch of runoff from the new impervious surfaces that drain to each respective bosh, Each bash has also been deigned to provide o permanent vdume of 1,800 cubic feet d starge below the outlet invert pipe eMvation fair each an that drabs to the respective basin. The permanent depth of each basin will be between 3 and 10 feet Each basins outlet Is designed to &scheme the water quality polaris at no more than 5.66 cubic feet per sealed per acre of basin surface area. Access is provided to each bash for future bash maintenance. The outlet for each bosh has been located to minimize the potential for Eachhbb�, hoe been section and riized for energy designed vein o stabilized energeey overflow to accommodate storm events in excess of to basins hydroid= deign. Description of why if is not feasible to meet the treatment requirement for water quality volume. This can include proximity to bedrock or road projects where the lock of right -of -way precludes the installation of any permanent stormwater management practices. Description of what other treatment, such as grossed swales, smaller ponds, or grit chambers, will be implemented to treat runoff prior to discharge to surface waters: Not Apppcabe Description of how o proposed alternative method to treat runoff from new impervious surfaces will achieve approximotey BOX removal of total suspended solids on an annual overage basis: Not Applicable 3. Erasion Prevention Practices Description of construction phasing, vegetative buffer strips, horizontal slope grading, and other construction practices to be used to minimize erosion: Stage the sal disturbing activities to minimize the amount of disturbed soil prior to stabilization. Disturbed areas will be considered stabilized when covered with materials such as anchored mulch, stoked sod. riprop, wood fiber blanket or other materials that prevent erosion from occurring. Grass seeding alone will not be considered stabilization. Disturb ony those areas where proposed contours and elevations are shown to differ from the existing and where removals and other operations are noted. Special areas of the project site that are not to be disturbed by construction activity are noted on the plan. Install wood fiber blanket where shown on the plan to provide temporary erosion protection. Description of temporary erosion protection or permanent cover to be used for exposed positive slopes within 200 lineal feet of a surface water (stream, lake, pond, marsh, wetland, reservoir, spring, river, storm water basin, storm water drainage system, waterways, water courses, and irrigation system whether surface water is natural or artificial, public or private with maximum time an exposed soil area con remain exposed when the area is not actively being worked: Provide year round stabilization to the above mentioned areas in accordance with the following table: Steepness of slope (H:V) Greater than 3:1 .3:1 through 10:1 Less than 10:1 Maximum Exposure Duration When Area Is Not Actively Worked 7 Days 14 Days 21 Days Description of practices to be used to stabilize the normal wetted perimeter of drainage or diversion ditches within 200 lineal feet of the property edge or point of discharge to o surface water within 24 hours of connecting the ditch to the surface water. Instal seed fertilizer, and dx anchasd mulch or temporary wood fiber blanket h alt hwe and ..ales within 24 hours of connecting the dads or steals to the surface rotor Mtge shown an to plat h accordance with the deters Description of other erosion prevention practices to be used: install the specified energy dissipation method each as dprap and geotexte fabric, at pipe outlets within 24 hours of installation. Permanently seed disturbed areas prior to end of seeding date specified by WIDE. 4. Sediment Control Practices Description of sediment control practices to be used to minimize sediments from entering surface waters, including curb and gutter systems and storm drain inlets: Permanent sediment control practices loo be used on this project corset of sedimentation basins. Tempa ry sediment control predt es to be used as silt fence, eyelet ktlet protection, storm sewer inlet etch cheeks. and If riecesacry, street . protection. skins pad ends, 5. Dewatering and Basin Draining If the project includes dewotering or basin draining, describe the BMP's to be used to prevent the discharge from adversely effecting the receiving waters and downstream landowners. Not apple to this project B. Additional BIfrir for Special Waters and Discharges to Wetlands This project does not discharge stormwater directy to Special Water. This project does not discharge stormwater directly to wetlands. 7. Construction Activity Sequence In addition to performing and sequencing the tasks associated with implementing this SWPPP as described herein and shown on the plan, the Contractor shall perform construction activities in occonionce with the following sequence: (1) Install silt fence along property line of project site where shown on plan and where property line is down gradient and within 100 feet of areas to have disturbed soil and where property line is within 20 feet of soil disturbing and other construction activities. (2) Instal/ silt fence along edge of wetlands and of other locutions shown on the plan. (3) Install stone exit pods where shown on plan and at other locations where vehicles and equipment will leave the site onto poved and grovel surfaces. (4) Construct storm water ponds and related piping and control structures as shown on the project plans. Install and maintain temporary erosion prevention measures as shown on the plan. (5) Instal/ silt fence along bottom of storm water pond inslopes and where shown on the plan. (6) Complete earthwork activities. Install and maintain sediment control measures such as ditch checks and stormwater inlet protection. (7) Complete utility construction. Install and maintain sediment control measures such as inlet protection as work proceeds. (8) Remove silt deposits from site, remove silt deposits from stormwater basins. (9) Provide soil stabilization to disturbed oreos by preparing topsoil, seeding, fertilizing, mulching, anchoring mulch in accordance with plans and specifications. (10)Remove perimeter silt fence, other silt fence, check dams, and other sediment control measures upon achieving final stabilization and Owner submits the Notice of Termination. 8. Inspections and Maintenance Description of procedures to be token to routinely inspect the construction site: Contractor shall inspect erosion prevention and sediment control BMP's to ensure integrity and effectiveness. Repair. replace, or supplement non - functional BMP's to provide continualy functional BMP's. Contractor shall inspect the entire construction site o minimum of once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours. Inspections shall include stabilized areas, erosion prevention and sediment control BMP's, and infiltration areas. Specific tasks associated with the inspection and maintenance of the BMP's include the following: • Maintain and retain at the construction site written records of the inspections and maintenance performed. Records of each inspection and maintenance activity shop include: Date and time of inspection /maintenance activity, Name of person(s) performing the activity Finding of inspection; Recommended corrective actions; Corrective actions token; and Date and amount of rainfall events greater than 0.5 inches in 24 hours. • Repair, replace, or supplement silt fences that become non - functional or accumulate sediment to the level of 1/3 the silt fence height or more within 24 hours of discovery or as soon as conditions allow access. • Drain temporary and permanent sediment basins and remove sediment when the volume of sediment collected reaches 1/2 the permanent storage volume within 72 hours of discovery or as soon as conditions allow access. • Inspect surface waters, drainage ditches, and stormwater conveyance systems for evidence of sediment deposited by erosion. Remove deltas and deposited sediment and restablize areas where sediment removal results in exposed soil within seven (7) days of discovery unless precluded by legal, regulatory, or physical constraints. Removal and stabilization shall be completed within seven (7) days of obtaining access. The NPDES /SDS permit holder is responsible for contacting the local, regional, state. and federal authorities and receiving the applicable permits prior to performing this work. • Inspect construction site vehicle exit locations for evidence of sediment being track off-site onto paved surfaces. Remove tracked sediment from of -site paved surfaces within 24 hours of discovery. • Inspect perimeter of construction site. Remove off-site accumulations of sediment in o manner and at o frequency to minimize off -site impacts. a Pollution Prevention Management Measures Contractor shall implement the following pollution prevention management measures on the site: • Solid Waste: Collect and properly dispose of sediment asphalt and concrete millings, floating debris, paper, plastic, fabrics, construction and demolition debris. and other wastes in accordance with MPCA disposal requirements. • Hazardous Materials Properly store, provide required secondary containment, and dispose of all products, fuels, point products, and other hazardous substances to prevent spills, leaks, and other discharges in accordance with MPCA regulations. Provide restricted access storage oreos to prevent unauthorized access and vandalism. • Equipment Washing: Restrict external washing of trucks and other construction equipment to a defined area of site. Contain runoff and properly dispose of waste. Engine degreasing is prohibited on the property. • Spifl Prevention: Park construction equipment and store potentially hazardous materials in a designated area located as for as practicable from potential environmentally sensitive oreos. Construct impoundment dike and take other measures required to contain spilled material. Remove and dispose of contaminated soil. vegetation, and other materials and perform other mitigation measures as required in accordance with MPCA regulations. • Sanitary and Septic Waste: Provide and maintain temporary facilities in accordance with MPCA and Minnesota Department of Health regulations. 10. Final Stabilisation Contractor shall achieve final stabilization of the construction site by achieving the following: • Soil disturbing activities hove been completed and soils are stabilized by e uniform perennial vegetative cover with a density of 70 percent over the entire pervious surface area or other equivalent means to prevent soil failure under erosive conditions. • Temporary synthetic and structural erosion prevention and sediment control BMP's are removed. • Sediment is removed from permanent sedimentation basins to return basins to the design capacity, removed from stormwater conveyance systems, and is stabilized or removed from the site. 11. Notice of Termination Contractor shall notify Owner immediately upon achieving Final Stabilization. Owner must submit the Notice of Termination within 30 days after Final Stabilization or within 30 days of another owner assuming control according to Part 11.6.5. over all oreos of the site that have not undergone Final Stabilization. RE PIED JUL 1 0 2006 CITY OF ! ii'!O LAKES p 4 RECORD DRAWING O it 5 17 E :iSE4k t PIP 0 F2 :Tag :Sp IDER1 141 :Cond :Trees of note that are potertially "Specimen Trees I 404. • n . .101. ... 4 . .• .... 161711:g I 32: I 1661:bOT. 1 251 1663:13o I 281 1 : , 27 169150 1697:ro 261 : 7: 1.. • 1 1 1-- ---1---- I-- : 1702to • 301 -4-. s„ .(- : 1703:to : . • : • • I ; 1043-Se : 35: : •-• •• . • ; : i I- 1 ; • • ; -1 • 1 : 1 -- 1:------ i; 9621 ...4 ; ; II round h - -1- •••••, : ; • . • • • • • 4; 4032: • -. • 1 I.. ,. ;1 fret found; • , • II • 1- -I 1-T-or; small ;17, healthy tree measuring a minimum of six (8) inches in diameter for !deciduous trees. or a minimm of Mehe (12) feet in height for coniferous tre 1 1I51ashi 1. • 5.4 „ 4 . 2; 1142: 41 - 1 1186:ag_i__51,___: 1----1- ---------61 1281:Se ...L. . I 1 • -1- 7: 1440se 1 5: . 4 .; • ., i . 8: 1493se i 5,4„„„_;,_____.;___,-,1 I;-----4---"---"---S11-11712100:7-7.----8, - - -I-- - ------: 1 ------ --le- ,804.... i ..._...iT _..i_.__-4--------: '-------"---------iit 1821:W ` 5, , -1 . -1 : • 12: 3831:se 4 5: 4 • 4 •• _._ lqi.. Avg.:T.. .. . . :, i ! • • • • - - ' • - ••••• • iii 1" I jiiikga„ , s: . 02•1 3905 :Ts_ 1 i . . ___, ----i----- 7213:17_ 39261qa„ i_. ...§4._ 954 , 4: ; . . . , .! - -41- " ±2; 35 1- •°1; • • • ; - - - -1- - --• -1 •_•• .... • ....pm • . : . . • : ,;,;; • : 4-• : : : 1 :Conditions on all trees were briefly evaluated, but only recorded for bees - 1 16, poor condition (3 or less on a 1 to 10 scale = ggt Ihealthe). Conifers :located under powetlines Mat had been severely topped and were likely to 1 1 • 3: 1120: ' • • 2: ( I : 1 2 : ;.• I__________91_,.. 1 it 1. :11 5: 12617se -7-- iiii- , - • • - - 77 1-Te lee • tell 11RF •.1 i.-----.1------ -1,51-1-495...1,*--....1........4 ..........L........4„...... 11: 1413* 1 • ; 2: 1.-- - -1-1---- --- lit -1-1417(9 , 4,.. 4 . . ?.4• _ 13: 1419Isc 1. : : 2: 19: 1458:ws .4,,,_ 1 15: 16: 1460st 1 1 : 21 ---: 16; 1462sc 171 1486ST0 ' : 8 21 18 I 1 • 1500•qa 18' 151.11W .s- 23! 1858:1P I. I °I. • •• 1. I 25 15611:sc 1 : , 2: • 1-1-- 28; 18281i____i_____4............L..._?1_______I 1'77-11-7----t-- 11**IiiP p: .1. i.... 4.- 29' 1997-4P----*---1--7 2: - • 31: 19111 i , • : I 52' IWO I. 1 1 • ZS- 33: 1630:ae ; : 1, 39: 1662150 • 29: , 3, • 35, 1676:sc 1 2: I _ 361 16871500 341 371 1688 ro 24: : 21; • •1 38: 1694:mpno 161. ; 3; 39-i _..1§.99 ilpia..._...1.§.;_...,;......i.: - ------ - -401 1701:crab : 8; • 2: . ----- --- --- 41: 1727 isc_ • .11________I 2. 1:- - I .... .1" - • 1431 17481rp. •______..............;___. -.j_ -................ 44824e 6; - ._•; • ••••• . 4t16 6 3i _ .; ! . ----..--------;-417- 1949'96 4 1:(1 1 21- .. .1 481.. .1815191. ....I.. let. . ..; . .: ....31.._...___I - 50: 1848 (__. :qa 10! • 2! 1 - ; • • • • 51: 184911:e 1 7 ._,1 2»)» - .; . 521 185141. ..; • 9) I 31. .... . 53: 1873.5a. • I 9( S .1...1. • : • • •r• 59: 1880:sc 1 : ; 11 . • 55; 1914:box 7 12! 1: 2: . • 56: 1997:10_,I, 1 ___4___91.___ - ;--- , 571 3448lp.. • i ( • ....., • 1 • : 1 58: 3763.11p .1. 4 . 1 60: 313_29jt p • 1 1 31 • • • 61: 3837 • I qa ' : • _134. •-- • E21 3878161 I : ( • 3: • 4 • • • . : 63 i 3935199 I 84.. ..S. .1.._. •1 64: 39(8 .i, _, ,;'• .. : 2: i 1 65: 40411jp : : : of • • 6766; 441111961q399: ..11-; 41 • ; 221 . .4 • • es: 41531)p. , ). ' 1 .1 ?,;.. .. ; eel -7.7TIT_...?1___...- ;Mw:liple SIM711 1 jr_ ; We count multiple-stemmed trees sprouting from a common base as a i ;single tree, with diameter measured as the dbh of the largest plus 1/2 the 1 ;dbh of each additional stem. » 1- 1023; : . :dbl 2! 10851 idbl • ' 3: 11941 id ---1 bl 1 ; / • ; 1 41 12001 i 4 idbl , i 5: 11251' 1 fl 1 ibl = 61 1252' , „..._1 1 ,d ldbl / . I 7: 126211 - i- -4- , ' idbl : 4 - < , . , . ; 8109,1 1112226663431 1i 11 1i!cldblbi 11 i 1275; . -1..! 12; 12781 idbl . , :; 1 idtit 1 : - 114311 1122779611 ld 12771 1 bl ; ...4,-- 1 i iri -.1-. bl 1 ;"-- 15; 1300; , 1 Labi 1 I 115' 13015r- 61 ' , -I- 171 13121 , I 18: 1325 , 1 :dbl 9: 133i 1 1 1 10b1 ' ;dbl i - ; 20, 1333. • 1 1dbi ! - --I . i 1 • s 21: 1339! I ; idbl 1 1 - 1- , . . 13401 , idbl 1 , -4- : 1 22!11 1345! l Idbl ! , 1 1 1 ; ,c1b1 , : ! 25 1355; 1 1 idbl i I i 1 7267" 11435%11 : 1 'quad , 14571 ' 1 !quad : 1 -29; 14701- ' , Auad 1 I -4 • I . 4 • quad , 1 ! ; 32: 14841 : I ;quad 1 , i 41 .. . 1525! .4_. , , 35351 11959731! ' ' __I_ _ IiriP ! : ;bib = __ I ----I 1 ---t- , 1 I 371 19671 i 1 trip 1 i j - • ilPf? 38 38611_ i j. _ ;trip 39: 3932; , 1 Lblp , I 40' 41231 1 , f.F2._!...._ 1 i I , • - • . . . flag numbers not on list provided to us : ., ,- , -7- 17.-Trees we found and added 4- -, , I- 1 ---4 159 I 11 • : ; , 16 451 _ • I • : "r' • - - - - -r -r- li I L---1-1 I o o 1904411C LAW LJ 911 181 761 1817 179 17Si 1737 ;r; 1 • ' 34621* • 34951 _ L .; 38091* 1 I 38441 ' 1 ' i le21- - ' I : I 39751 „ , 1--- 1 I 4043," , 1 I : 40501. , I i-f-- --i-- . • .....,1 ....... ---, ---1 41691 ..............; IDuplicatetagnuinbers i 1 16731 . ___ . . , 3452' , ; 1 ' 38341 • 4 i 40531 • , , 1 --i---- , 1 4185! .-t- t , 1 1 , 'Approximate species count (some cull trees included) ijp [jack pine I 37! • . 1 Icla _t_quaking asPeo 1 239; . „ leo Iscotch pine 217, , 1 : .se isiberian eim 1 1-429:11 rp ired pine 1 , , -•4- ', - 1-, ro lred (pin) oak " 711 , rc ;eastern red cedar 56! boXrbria....elder : 4 I 53; , ae remerican elm • ' be •Iblue spruce 291 ---1. , ws ;white spruce 15; : 61 bc Iblack cherry , 1 --- -- box ;bur oak . ' 1 i 14! ; ; awn ;siker maple " firb balsam fir 1._ i .4._ Inc locust ; - ; crab 1crabapple 1 3; 31 ; wp !white pine - 2. , » a cot icottonwood : 11 11 1 mpnorinorway maple , ; 4 ---- sugm!sugar 1 maple , „ , 14741 , , • 61 ashg ;green ash- I \ tra, '11111,--a; 700 SCALE IN FEET 1 INCH = 100 FEET (22" X 34" SHEET) 1 INCH = 200 FEET (11" x 17" SHEET) EA7S71NG 711W CALCULATIONS TOTAL EXISTING TREES = 1,521 TOTAL EXIS77NG TREES REMOVED = 1,181 TOTAL EXISTING TREES SA LED = 340 4006 DENO7ES EXISTING TREES ,• 4006 aDENO7ES EXISTING 77?EES SA VED r PRAPP■-- AMIN worn myhypoF4ow FrAr Not 411 A69 1777967 DEVELOPMENT SERVICES FROM CONCEPT TO COMPLETION RECEIVED - JUL 1 0 2006 rIrry nr-7 LINO LAS PASSE 6NQffll (LE REVISIONS BY jZt2/06 j 61113 arY COMMENTS - 6/23/06 RECORD DRAWING COMFORTS OF HOME EE INVENTORY AN DRAW SCALE PROJECT 568-03 Ti STAR 1r V A SENIOR APARTMENT BUILDING 6, 6, • PARKINO Lam. LOO PLOON PLAN 1 1 1 1 1 1 STAR W A V Mmm =NM .11MM IRON.T..A.p WOOD V. TOTAL PLD.. AMA SCALE. MY.M P a R EC R (ED JUL 1 0 2006 CITY OF LINO LAKES • H W w ■ ■ • ■ 1 COMFORTS OF HOME LAW) SEMOR l.d W) LINO LASES MINNESOTA ■ PROJECT 60. 05-053 SCHEMATIC DESIGN All 10 JULY 2006 I ■\ • DRIVE31NDER CANOPY SENIOR APARTMENT BUILDING IiA�I I.�VN�� SCALla war • wp ql.. .r. ?VOL n OAR AMA 1. PLAM MORrx a R JV JUL 1 0 2006 Cif OF LJNO LAKES MKS if .004 IN.17 Mu�QM 0111141, 101.1011• MID WAR • gel • ■ ■ ■ ■ 1 COMPORTS OF HOME MINNESOTA Pacrom SEMOR LAns ■ W ECT Na 06-053 SCHEMATIC DESIGN Al2 10 JULY 2006 t 11 I ■\ • DRIVE31NDER CANOPY SENIOR APARTMENT BUILDING IiA�I I.�VN�� SCALla war • wp ql.. .r. ?VOL n OAR AMA 1. PLAM MORrx a R JV JUL 1 0 2006 Cif OF LJNO LAKES MKS if .004 IN.17 Mu�QM 0111141, 101.1011• MID WAR • gel • ■ ■ ■ ■ 1 COMPORTS OF HOME MINNESOTA Pacrom SEMOR LAns ■ W ECT Na 06-053 SCHEMATIC DESIGN Al2 10 JULY 2006 • r L smolt APARTMeNT SUILDMNS MOND LEVEL MOON PLAN •OAL!• SAY •*V nfw SP. TOTAL PL000 ARIA 1 J RECFIVED JUL 1 0 2006 C1 iY OF LiNC LAKES INQMPINIVIMMAIIMPOINK MVP ON/MN .e MOP 1 1■1 F ■ ■ ■ ■ 1 ■ COMFORTS OF Hoi SENOR. PROPOSED LIVING » WOE MINNESOTA PRO€ECT NO. 05.053 DESIGN SCHEMATIC A13 10 JLY 2006 mo liri IN ow a■.mmo 0 gm. EN IN moo W im NE ME MEN El E Li" ::�� w4 rip= di 1141* , &lb 4 il i[i :ji 1■ 11111111191 1 ��ul■■ OH 9 MFAIIIEVOirg ;7187igiN L gr. ; Enna - IIIv, n �I+ LI)Z 43 MINI C)W CO UpCOCOCOCOI0 CAF -1 - 1- 1 -1 -1 -1 �� x13 13 corD-r�' ococcc0000 � < '015 � � � � 0 �' � NC0�000� < i11 Ic00000� 0_ mI CO V CY) .11 W N� Vl Vl VT CD CO Ps) OO CD CA toy a • . • • 1 OWOH Jo spoIwo COH Soils Attachment 15 Comforts of Home Location Parcels Floodplain • Coil soils SoA C I T Y ZmB N COH Level 1 Habitat • Attachment 16 • 0.2 0.2 0.4 Miles Comforts of Home Location Parcels Level 1 Habitat N S 1- ? , 6 Graham Environmental Services, Inc. -117,41Z4 Wetland Delineation Report Lino Lakes Delineation Prepared for: Comforts of Home Lino Lakes, Minnesota Site Looking West GES Project No. 2005.150 December 22, 2005 Graham Environmental Services, Inc. P.O. Box 189 Ellsworth, Wisconsin 54011 Wetland Delineation Report Lino Lakes Delineation Prepared for: Comforts of Home Lino Lakes, Minnesota December 22, 2005 Background Graham Environmental Services, Inc. (GES) has completed the wetland delineation of a site located in part of the S' /2, SE'/, Section 31, T31N, R22W, in Anoka County, Minnesota. County Highway 49 borders the property on the east. County Highway 32 is located to the south. Business and residential property is located to the north, south and west (Figure 1). The topography is relatively flat according to the U.S.G.S. Circle Pines and New Brighton Quadrangles (Figure 2). On November 4, 2005, GES conducted the delineation of one wetland on the property. The approximate site and wetland boundaries are shown on a 2000 aerial photo in Figure 3. Methodologies The wetland was delineated using the methods contained in the "Routine Determinations" section of the U.S. Army Corps of Engineers "Wetlands Delineation Manual' (Technical Report Y -87 -1, 1987). This is the methodology currently used by both the U.S. Army Corps of Engineers for implementation of Section 404 of the Clean Water Act and by local government units administering the Minnesota Wetland Conservation Act. GES classified the wetland under the U.S. Fish and Wildlife Service's (FWS) Cowardin system and Circular 39 methodologies. Subsequent to wetland delineation field work, the flagged boundaries were located by the project surveyor. Soil colors described herein follow "Munsell Soil Color Charts ". Phone: 715- 647 -5110 / 888- 279 -2070 Fax: 715- 647 -5209 / 888 - 279 -2069 RECEIVED JUN 1 3 2006 Lino Lakes Delineation Wetland Delineation Report GES Project No. 2005.150 December 22, 2005 Page 2 Results The site consists of old field (Figure 3) characterized by smooth brome (Bromus inermis), common dandelion (Taraxacum officinale), big bluestem (Andropogon gerardii), stinging nettle (Urtica dioica), common burdock (Arctium minus) and foxtail (Setaria spp.) with scattered quaking aspen (Populus tremuloides), red oak (Quercus rubra) and spruce (Picea spp.) at the edges. Two businesses are located in the southern portion of the property. Wetland A Wetland A is a small wetland located in the northwest portion of the property. Dominant wetland vegetation consists of reed canary grass (Phalaris arundinacea), river bulrush (Scirpus fluviatilis), willow (Salix spp.) and quaking aspen. Upland vegetation consists of red oak, quaking aspen, Canada goldenrod (Solidago canadensis), common buckthorn (Rhamnus cathartica) and smooth brome. The National Wetlands Inventory (NWI) (Figure 4) maps the wetland as seasonally flooded, palustrine, partially drained /ditched, emergent (PEMCd) and semi - permanently flooded, palustrine, unconsolidated bottom (PUBF). GES would classify the wetland as seasonally flooded, palustrine, emergent (PEMC), which equates to Type 3 inland shallow fresh marsh under the Circular 39 system. Soils in the wetland were examined approximately six feet from flag A -1 and were found to contain very dark gray fine sandy loam over dark gray fine sandy loam. Depth of surface water was estimated at approximately four inches with no free water observed in the wetland soil pit. Upland soils were examined approximately five feet from flag A -1 and were found to contain very dark grayish brown sandy loam over dark brown sandy loam over brown sand. No free water was observed in the upland soil pit. The Anoka County soil survey (Figure 5) shows the soils in the vicinity of Wetland A to be Soderville fine sand and Zimmerman fine sand. The Minnesota DNR Protected Waters Inventory (Figure 6) does not map the wetland. Jurisdiction The enclosed wetland delineation data forms indicate whether wetlands are isolated or not for purposes of U.S. Army Corps of Engineers jurisdiction under Section 404 of the Clean Water Act. This determination is made by GES in the field at the time of the delineation and is essentially our professional opinion based on the portion of the particular wetland we observe. In some cases, only a small portion of the wetland edge is evaluated. If no inlets or outlets are observed in the evaluated area, and none are apparent on available aerial • Lino Lakes Delineation Wetland Delineation Report GES Project No. 2005.150 December 22, 2005 Page 3 photos or the U.S.G.S. topographic map, we are inclined to determine the wetland is isolated. However, since the entire wetland is sometimes not assessed, it is possible that inlets and /or outlets do exist and that the wetland has a surface connection to a federal "navigable" water and, thus, falls within the jurisdiction of Section 404. Therefore, a determination by GES of whether a particular wetland is isolated or not should not be considered a final determination with regard to Corps jurisdiction. A copy of this report should be submitted to the Corps of Engineers, the Local Government Unit administering the Wetland Conservation Act and, if DNR- protected waters are present on the site, the Minnesota Department of Natural Resources. It is also possible that the city or watershed district (if applicable) has wetland ordinances which must be complied with. Supplying these reports will serve the dual purpose of determining which agencies have jurisdiction and beginning the process of obtaining concurrence with the delineated wetland boundaries. Prior to construction that could affect any of the on -site wetlands, any necessary permits should first be obtained. Additional information regarding the wetland's vegetation, soils and hydrology is included in Appendix A. Ground photos of the site and wetland are included in Figures 7 and 8. The information contained herein represents the findings of GES during wetland delineation activities conducted on November 4, 2005, at the referenced site. Respectfully, Graham Environmental Services, Inc. George Callow Wetland Scientist Enclosures Date RECEIVED JUN 1 3 2006 CITY U� L .P LAKES Circle Pines Circle Pines City Hall Lino Lakes' :Birch St Li .: •-1110! •Baidwinlake IX o cib Rice Creek.Chain, Co.untyReg'" �... Park ;m ' 162n' d St - VVeo -dr '1 to . -_ V +N E .'ASt - -1, _- i _ —5t�t1 e N �. --� u' it y, ` —'-—'' `.filcher Pont R 1l R ! � " it Frr�IF e --I! IL f � �1, .lt ti 1 1; %I 1 G> p,-----T-:;-'21 ' .7..ii_i_Li...; 1131 j1 1 -..- l' 2 , �', Shoreview L�1LUL m �� ) r a7; -- -- 11514 - — t r- l " —= 1, p i f I L .1 '11 .±.? it] 1 j, lI 1 Si 0 11 q'�t 11 i f ll �.' ii f u L_.: , „ V i,tit � l , I JL 11 .V. 1 1 —R ©'2002icrosort Corp All riresreserved - -I1— I = ,rr 411 !Blaine 171 • i10 Approximate Project Location •Poplar Lakt, Open Space' • .f North Oaks '! .) N Not to Scale Graham Environmental Services, Inc. Figure 1. Site Location Map Lino Lakes Delineation Lino Lakes, Minnesota GES Project No. 2005.150 • • • .C3r0 WN Approximate Site Boundary A17• ,47": OA D. -1 •-•7 , Cz, 89 0 41, C.? 1.• t* 14'..■• , 0 \`'.■/ . - I' .'":\:0•J i e i alli ,3 • ' 7,...;::" 1_ -(.:- :. ' ''s '' -&-‘,.. 44 -ai. t ..• "CD ik Z.-, •-• 4•••••• ..,, , • s n I thr•' literrigiaLEPRPIMrz re MININHAINICKW*INIIESOMBIWAIEr ,_..EtDYN aliatigiVE iiir e, \t_ • .N. • . :.• 1.1. " gro..7-- •• A N Not to Scale • • 7. - • • C, otitiwpitmix10(tga ui ko R "TUR %LE RECEEVED JUN 1 3 2006 CITY OF LINO LAKES Graham Environmental Services, Inc. Figure 2. U.S.G.S. Circle Pines/ New Brighton Quadrangles Lino Lakes Delineation Lino Lakes, Minnesota GES Project No. 2005.150 A N Not to Scale Graham Environmental Services, Inc. Legend Approximate Site Boundary Approximate Wetland Location Approximate Transect Location Figure 3. 2000 Aerial Photo Lino Lakes Delineation • Lino Lakes, Minnesota GES Project No. 2005.150 • • • N Not to Scale EMCd a 6.. us ,�...�.�..:� 45 • 1lJTEiRion--- GcoLocitc:A'l (. LMV :S7ON rr[i4N'x A ALf 1,`" ILI Yr L, I rni. 73 *0/1ln RECE VED JUN 1 3 2006 CITY OF LINO LAKES Graham Environmental Services, Inc. Figure 4. National Wetlands Inventory Lino Lakes Delineation Lino Lakes, Minnesota GES Project No. 2005.150 Legend SoA- Soderville fine sand (Aquic Glossoboralfs) ZmB- Zimmerman fine sand (Alfic Udipsamments) N Not to Scale Graham Environmental Services, Inc. Figure 5. Anoka County Soil Survey Lino Lakes Delineation Lino Lakes, Minnesota GES Project No. 2005.150 • • • • • 0 0 * $ . •• • •4 :. ••• ▪ '• . . • 4 :• ■ • ': ••.. • • .• ••••••.• • • •: • •R••.••••.. •:11.11 •■ • • • • ••11.11_.•• •• • }4. • •.••■• • • .:e.., 1111• , •1111.... •NORTH :. .RD.:;• • 111/4..•. • �•..••••••• • �• • • • •. •:• • • • • • • • • ••• • • • .• • • ••• • •••••• • 11• :•• • 11•• • •• . • • • • • • . R • • • 11.11•. 5,t 19 V.I. . 1111. V. • 1111 .� 1111 1111 .• (0.t . 11.1 . 1111 IRC 11L es La) • * • • • • • • pPOP 39 11••••• •. .1. • • • •;•• • • .• •• 1 • • • 10110 1111... ••••• ► •• ▪ •••• •*t • • . ■ • 1 • • • • • • • • • • 0 A ••••••••• •••••• 4r v•. • •• . • • •••• • 4/•• ••••••p ■••••• •lp y•�•� p`• �,4� * • • •111••••11,111 .••••104.4 04 1 4 ► • • . 4 A 4.4 0410* . •• ••••• ••••• • • 4.4• ••••• . • . • 44. :. • • . • . •. ••7 'i•••1/• • 1 :• • 1 • • • • • . I •.({•fi•1* Y • f • • • . • • • + . 1 4 1 • i . 4 • • , • 1 • 00 *•• 1/i•• • _ •. I.. 1111•�••s}.'R •M• • . • • ■ A N •.•1 • ••4+�.• •4r •• MA •1. •' ■ . • ...1.1.•:...0:.0.10.11..„.„ • • •'.11 • A Y • • • • f • 4 ♦ • Y ••••••••••••• 5n SHOREIEW • • 011 • • • • • •.1 .+;. •• ** • •• .•10 .•. •. ■••Y • •4••.1.• • i y x i A • • 0 1 11 • . M . • • . • 1.. .,w r4 ••••••••• O. w. Not to Scale RECEIVED JUN 1 3 2006 CITY OF LINO LAKES s Graham Environmental Services, Inc. Figure 6. Minnesota DNR Protected Waters Inventory Lino Lakes Delineation Lino Lakes, Minnesota GES Project No. 2005.150 Wetland A Looking North S Graham Environmental Services, Inc. Figure 7. Lino Lino Ground Photo Wetland A Lakes Delineation Lakes, Minnesota GES Project No. 2005.150 • Site Looking West RECEIVED JUN 1 3 2006 CITY OF LINO LAKES Graham Environmental Services, Inc. Figure 8. Site Photo Lino Lakes Delineation Lino Lakes, Minnesota GES Project No. 2005.150 Appendix A • • DATA FORM ROUTINE WETLAND DELINEATION Project: Lino Lakes Delineation Applicant: Comforts of Horne Delineator: GWC Wetland ID: A Transect ID: 1 Normal Circumstances? Problem Area? Yes Date: 11 -04 -05 County: Anoka State: Minnesota Atypical Situation? Yes( o) VEGETATION Dominant Plant Species: Wetland Stratum % Aerial Coverage Indicator Status Common Name Scientific Name Reed canary grass Phalaris arundinacea H 60 FACW+ River bulrush Scirpus fluviatilis H 10 OBL Willow Salix spp. S 10 Quaking aspen Populus tremuloides T 10 FAC Sedge Carex spp. H 5 Aster Aster spp. H 5 Iris Iris spp. H 5 Percent of Dominant Species that are OBL, FACW or FAC (excluding FAC -) 100 Dominant Plant Species: Upland Stratum % Aerial Coverage Indicator Status Common Name Scientific Name Red oak Quercus rubra T 10 FACU Quaking aspen Populus tremuloides T 30 FAC Raspberry Rubus spp. H 5 Canada goldenrod Solidago canadensis H 10 FACU Common buckthorn Rhamnus cathartica S 30 FACU Smooth brome Bromus inermis H 10 Stinging nettle Urtica dioica H 5 FAC+ JUN f3 2006 Percent of Dominant Species that are OBL, FACW or FAC (excluding FAC -) 20 OBL — Obligate. Occurs with an estimated 99% probability in wetlands; FACW — Facultative Wetland. Occurs with an estimated 67- 99% probability in wetlands; FAC — Facultative. Occurs an estimated 34 -66% probability in wetlands; UPL — Obligate Upland. Occurs with an estimated 99% probability in non - wetlands. NI — No indicator. Insufficient information available to establish an indicator. Positive or negative signs indicate a tendency toward higher ( +) or lower ( -) frequency of occurrence within a category. Page 2 Ju II Wetland ID: A • HYDROLOGY — Transect 1, Pit 1 Flag No. A -1 Field Observations: Depth of Surface Water: 4 (in.) Depth to Free Water in Pit: (Transect 1) NA (in.) Depth to Saturated Soil: NA Wetland Hydrology Indicators Primary Indicators: Secondary Indicators Oxidized Root Channels in Upper 12 X Inundated Inches _ Saturated in Upper 12 Inches X Water- Stained Leaves X Water Marks Local Soil Survey Data Drift Lines X FAC- Neutral Test Sediment Deposits Other (Explain in Remarks) Drainage Patterns in Wetlands SOILS Soil Profile: WETLAND (Pit 1, Transect 1) (6 feet from flagged boundary) Depth (inches) Horizon Matrix Color (Munsell Moist) Mottle Colors (Munsell Moist) Mottle Abundance/ Contrast Texture, Concretions, Structure, etc. 0 -8 10YR 3/3 10YR 3/1 No Sandy loam Fine sandy loam 8 -18 Indicators: 10YR 4/1 No Fine sandy loam Cowardin Classification: PEMC Histosol Concretions Remarks: Soil Profile: UPLAND (Pit 2, Transect 1) (5 feet from flagged boundary) 0 -6 X 10YR 3/2 No Is this sampling point within a wetland? . Sandy loam 6 -15 No 10YR 3/3 Yes No Sandy loam 15 -18 Hydric Soil Indicators: 10YR 5/3 No Sand Cowardin Classification: PEMC Histosol Concretions Remarks: Histic Epipedon High Organic Content in Surface Layer in Sandy Soils Sulfidic Odor Organic Streaking in Sandy Soils X Aquic Moisture Regime Listed on Local Hydric Soils List X Reducing Conditions Listed on National Hydric Soils List X Gleyed or Low - Chroma Colors Other (Explain in Remarks) WETLAND DETERMINATION Hydrophytic Vegetation Present? Wetland Hydrology Present? Hydric Soils Present? X Yes No Is this sampling point within a wetland? . X Yes No X Yes No X Yes No Cowardin Classification: PEMC Remarks: 'hoto Aspect: North ..umber of Flags: 11 X Isolated Non - Isolated. Describe connection: 16' 2006 let' 35 n- FT41-61-#1t4 a/yr (8 Clr-,146 ?„001/005, AX TRANSMJTTAL Date: June 76, Tor From Carl Almer Fax No 651 Hale Avenue Oakdale, MN 55126 Phone: (651) 77041446 Fax: (851) 770-2552 onmet@oorinc. Total Pages: __ Subject: Rice Creek Watershed District Permit Application No. Jt Attached is the DRAFT Engineer's Report for your Rice Creek Watershed District Permit Application, the comma ion on the following page is: Approwl. Your Permit will be issued after the June 28+ 13car4 of Managers meeting. Conditional Approval Pending r ‘.aint of Otanges (CAPROC) . You rave 12 months from Wednesday June 2 to submit the pending items listed below the recommendation. If` this information is not received and approved by staff within 12 months, the application status wens to a Denial. Denial, Your application will not be considered et the June 2s1 Bard ar Managers meeting unless the additional information specified below the TVCOMMendation is received. Yav to until 5;00 pan„ Monday the 19* to submit additional information for consideration beihre the Demi of Managers meeting (and to potentially upgrade the recornmeindation). incomplete. Insufficient information has been submitted to sess compliance with District Rules, Your application wWI not be considered at a 11-wird of Managers meeting until the additional information Noitied below the recommendation is received, You have until 5:00 p.m, Monday the 196 to submit additional information for consideration before the June 2 Board of Managers meeting Please not that same pending items siten as completion of the Wei/ comment period are "dote-dependant" and cannot always be addressed by the applicant prior Yfi' the deadline. Therefore, these applications will be carried over to a ntbsequent permit meeting after completion af the comment period Additional information, if intended for a recommendation upgrdde. should be submitted directlY to my attention in duplicate at the above address before 5:00 -pm,. Monday June 19111. Noe that all applications involving a ViCA petite will remain incomplete rnri1 the comment period ends. Ali other submittals should he directed to the District Office in duplicate , For large plan sheets, one copy most be a reduced size (11 xi 7 or smei ler) or an electronic file t „pdf or jpg forrnat) Feel free to contact me with any questions, Emmons & Olivier Resources, :no Distplet Eirimers [X) On 'y copy yoci will receh f } Original follows by mail, ..16'2006 Rice Creek WatrL s btrktl1 it Application Number Applicant: John Hayden Core Development 1793 Buerkle angle White Bern- Lake, MN $5 IC Ph: 651-481-9027 Px: 651-481-908 johnh@corcdevserviees.COM .032.13'35 Consultant: Mark Kretschmer Passe Engineering, Inc. 1611 Courdy Highway 10 NE Ph: 763-7804100 Fx: 763-7804200 markepasse-eng.com Purpose: Final Site Drainage Plan for a mixed-use development to bc known as "Comforts of Rome% 17.2a.- acres. Location! 300* LF north of Ash Street and west offrodgson Road, Lino Lakes. T-R-S: 31-22-31 de District Rule: C. D. E and E Rego endation: Incomplete pending receipt of the following Items 1-5. 8 and 17 related to: Stompa, t r Magert 1, Existing and proposed sulywatershed boundary maps with identified acreage and hydrologic model 1Ds. 2. Revised hydrologic calculations including the full site area Revised stonnwater management plan complying with District water quality treatment requirements. 4. Revised Plan addressing volume control (it.Tiltration) standard on a subwate-shed basis. 5. innitration area details and c ss-s eller. 6. Pond outlet derails on Grading Plan providing skimming capability up to the I-year event. incorporation of addition Onsding Plan Notes specific to the infiltration &attires including: no mining of sandy soils, use of topsoil/sand mix for to dressing instead of topsoil. revegetation !ipecifications (deep-rooted native vegetation), and other measures necessary to protect these features from Emmons & Otivier 'Resources, inc. - 616/06 • • ion Core vel ring fter sta fiction i, > silt fence and excavation to on of upstream was, ete.Y). Ravi an cumin t ng pa " t for int of t e onsite wetland, Revised Plan outlining recto disturbed wed nd areas, R i, ' f l sp cifyn that shown elevations tfnns " o .fy ng that buildings are slab -on -. t dewatern .drr nistrafi e Preliminary Plat or d legal doctor t prnv d n t r°y form and description granting pondtn and i wne easements over all onsite wetlands, ponds and other hydrologic features (including infiltration features). tter from the City indi ting whi b st rmw ter management tares will be maintained by the City and Draft Does ti n in ns rice tt f Stontwater , ge ent Facilities e to Di tri ' eer and atto rrtey for proposed onsite n =age' neat f aces tttat WIT not be maintained by the City. of receipt from Co Reorder and signedin zed document( s;. Note that ; i doe eats o be tted by A ppii atat t County for ecording only tt act Copy p Nt , Pt) permit applioati+ Cttsh s r Addition ompiete subrnittaL Application dated nlah set signed by r fession n�ino t, em of`3.2 neeess A Findings; ore Dcvarl l Infiltration Wort nc 8. 2006. WCA Notice of Decision (deli ti a appru° at)„ dated June 1„ 2t Geotechnical Report rt pr * ; 2006, received June 8, 2006. fret ee, dated May Hydrologic Calculations premed b Passe Er gi ng„ Inc_ dated June 8, 2006, received June 8, 2006. Wetland Dein aetrt Report prepared by Gra Services. Inc, dated December 22, 2005. receive Preliminary1 (2 sheets) prepared by Pasee E i aert dated June 12. 06, received June 8, 200 Preliminary .tilt °. Plan prepared May 9, 2006, received June 8, 200 E it ,eering, Inc Preliminary Oradi'ag Plan prepared by Pam Etagiuecrin Inc., dated May 9, 2006, mete Jwie 8, 2006, 10. Storni Water P. Engineering, l: Prevent; :cat Plan April Zia. 2006. reoiv"cd Ju c The pr ject entails a nixed t se development to be known as *Comforts of Rate`. including four commercial/retail uildings of various square rootage tage t an - 4,500± to .S : SF) and multi-fsmily residential buildings (24 units). The site is ultimately tributary to ald x n alp . The project proposes three vet detention ponds grad one infiltra tton area. Revis ed ie; ddr l die calculations are required including ding for tlacr:ali area cif to site and existing and proposed 1- or and I00 -year t d It atic caic"ul< Lions. Existing and proposcc subwatershed bou day .apps wide identified " acreage and hydrologic model [s are required.. An effective pervious aret map demonstrating ct °aplian" a ith District infiltration standard is required. E "ect"i to pervious areas must be capable off. receiviaag retainirt , and in fii t ri runoff from t impervious are on subwaters rn = submitted hydro) is calcutati ns indicate thw. Pond t d p s not satisfy District ty $ hero . dead star revised plan complying with a uirements is required. Pond outlet indicating. skimming, capability up to tl ponds. 6 t6/ „c, • nime4eixa---4 4 r s r w *,, , et rG6rr ',fit „,9„,..,..,:,...,•1,, i:, e• •sru -+ :r-s irk °) .r. .F '$."'0e' } ;.. }+: ......w- r•..». .rr-r r-s .- '.+n"r .i : ■• ",r� �y4, -,,:' • N^” 1 ` f. ,.ab - --- — * J ` r r ' i t r -ci U ..`Y: .r y y$. w'- r- 1 may. - - y r, , 4"!1" �g -., ^.�, y-'u.,r.Y, } - r s. r.,..__ .. ', >- +....a. ��,'r`'i ".Ls[. v.r +�- ,? - ` k$ -.y r -r ,.rrn.y ai - - - • 1 ?S, F Y r T., } r } r - 1r r 7, r.s' w 4 •yb v r; q 'r r w - '- $t�i1. -rx_tl- ` - J .§, r •-- - i'ry rI Get r r r Y } r r rrr, Y 4 1 S g-.. W'LpyrJ Y r • .}.Y1.�0• yr✓ y ry_p ''. '.V ✓ ! ~ i .I. - I .?AL13 ,-- .. ` •••ny5'v y ' r r r / - -: • �. vrr . r' _ rr !.r c;...y r rr ti Tar H.. xai-' S. ry Ir`F Lrr�yrrrr r. ✓rrrrrrYlr r.w a�.y it. �r -f+,J - 1 `�"TL'�" ri r -. • x Ir, i—'fl w r' „9„ r.,7-----; '� T �� .,y ' 1 4. 7--re••i ',,,, T% - v r r r. r r .._...:+r - Ir r r•....w 4.:+' r �'. ( .eye r V",..,4 y i • rr ~.rs`ui, .._ Tr J'J -r r y-r- -- ..Sn.r L.L r _ ! L _..._ ._ ... ._ ... • !� Y :r+yrvritivvV rrrr. rr rrVV r5.'L rry rvr r'1 'r LV rV'Lrr1'rr1 r11.rr rrrJ .i ►. AyfTYi }TJ YY:t �� ` _rl .K+.v 4:' k y-�. .. Y` r `"e? r'A' r i i'r.Frr r•ru ,.° r ri.!•• :. + rrr:.Jr '6v'- rrr ✓4v r,rr 1 r,.. rr err nE.r.xijr+r^ . - 1:rrri r r Frl .4.-.. ................... rr r —{ 1 •r r s�.•xts,r r hxxx. ♦ r_Yxa. r rxxr�. r r.. r r- 'i.''+.�i -T`.•r r -'. ��a "W V Y'1 Y i r r r.'.. 1 rr q. V V�� � � .1. ...,1,,,F.:-.. Vd� � 1,..;,....... �� r '✓ _'i y+iL rte,+ -. r r � w.1 ag. vr1' y ar Y {�r.��'a.'y3r5z•yi (: —fir r r w+e.r Y vr-'G .:.+M rr�.Gaasaw 1 r r,str, .._r. .. r r r m v ..Y 1'Lx",yF a � k I rii. i4 y r • r r-r�, r -+•..r r r-r-r..r r w..,.- -r.,. r r , r r r - � _ c : .,! ' M { �'+�^ "t': .� + I r V r'Y_r r r�Y..-+. r- .r -..�. w T.� V_y_ Yf ,,,, r r r ...•:',".!°... r y e: ir.r r-.r.+ +...r. r r.'Y '_y�!S"h'' . y. rrr • r .. ...!'0.i...-.-,... - r n w Y'P-r Y-o-s.ti -- r' -Y}-a r � r--- - +� f. w )r r. }.y • tofu 'r JJr rr rY LSliri_ Lr, r rrYT ............... S _ wrr SF. ,..,,,i iv ---?,. FTn}1Y'4• r r r r ■ r r'. ra } a.-x. r w .� r_r r . ... u . r ��•!�� • .r r!rrr tor, _,t, tor' .I • yr- +..r w V .i;,r1 r G.i ,j-ER •. r ..r aT Vr Y - — .. - -_. } it r 116 13._ ▪ 1. r rrr - - -_ - ` '1 1 r, r r Yj. w Var r .r tl 49%,.. r�i ..... VS� r' tl y r r r r r }V�r r� r rr .. �Y w� }-h -T�� 1 r1 .1 V J t ........... r.r V i. r' ��� . _ ...+............4.4 .,r �.i'r 1-S. - Ci. V .... r'TI +11 -' µ -�. to p �. -Y.y -r yy V,$ r V r w V rrr V V r r y L Y 1 ..h.. .r r v iCV 1'rVr _ r�'rro -- '-' • v-srvw -rvw r ....M""'-'r; r: .. . r-r... air Yx h tr,1r �i E x} r rile r :6-44,4.r ..•A•�. _ a +w F itr i. :a2 .' J ,, Lr w f. erl .: 1. `'L . sr-a.r r�_ r j �j • ,i:r r.M+. r r r .. - - r.- ,e.a.....:.e r n_r_r r Maxa..4 +� 1y1 r . r _r —.... • '�'. r ia.ilr -`L' 'i.'. .r. Y* }z� r r .. r r r i'..} Y.... a.a. r..r ti' w ,, r ..... . r r ... yir r }'J r : - -r Lrrrrrrr titr ' ei.' .'.r"�' r. Yr Y r r r Gr r tot: r r r rrTr 5V ,'6 '4 } }rV_.};r1r r Yti s� er ,.---,..,......."......,,.....i.....,.... wrrrrrrrrrrr' 1-. -..•....�...wa_.�Y4:**'447.44 q. "'...4..'L:.. r F-.-r -r v- w -...3T V .. r-r 4. r-.. y. ./'r w J lry vrr r r�) .. .-. r ..:.+a -{ ..c._ -_. ' 1 4 "'r. >YY2 -7"" •w V-" 1XCb.3L.K.•• '" r 1 V'a'• 4h i - r'" r ____„......,....,s72 . ..y„ -�. .tl .:..� -" - _L.}sJ.J. #., i!--- r•••-ra•-+ b VVr -14w 111 -'-- -5 r.-- ,,,7 - d1. -r' .. ac1� r- as'c.. , r -g.c Tf '1 I 1 r x_ a n. _ .l FEATURES & SPECIFICATIONS aAAeIA -- r..M.R sr IR'..P.r- rr'r...rM.a nw • rrr, rs r. OW rt/MY4.IY .r...0•11 r.......i..:.M...r..aY ri.rr MW WP•,11. ...w.lrr..r../r.w.. .Ye..tlYiY, r.ArWrr r 'a 11...1 i•.Ii.e.a.YrYr roam* r ImeAr Me. M Amon ▪ 9..•rr. *9w.rw..r. xlr r... ars *err IV rt. r..rreey.ry.w...r I Yw.*. oral tM*yv.yw A.. kA .w eA w eA .r.CYwr3.I..r.� •.:.... Aroma r+.. R•I..w.r...yr.r 4 - rwwr..rr.. r room +Er...r. • Pa* LLiw.�i•r OI..r W , r.... ars....errs. =ger aerr w. scacY s..lo ... .+ I 01'.11.. , ! suu r .MR W at. •_i4 44, •.. 0 .14/.....9 war Ir.. so war r. b Y.I.r..e.... 0.. Y..1 ...... R3 e4TM•.1... RRfa•T.. A* r w .Tw.Y r.wr.....A 4a..4... ..r AN w9... .1w. OW Y..w TAMyr..r4.IY •....r... Y6 arve A YiM1... UM 1..r• al Y rrr.awrw CI ... W ...r kw.. MR AM Oa { . Irr.. .r..r • ............ r OMfi9�. . 1.. Iw M9.9.r.. oWY � .... PHOTOMETRIC SITE PLAN SCALE: 1'= 60' -0' UNiWIRESQ DUDE •e.+• IA1Y q or4r.Ir e1AT•. 1.A HA L W V ,q A 1 R1112 4101111112 MWIOM® P6�MRGWI ti as wldlrcvlvs msIRMEwu� It �o an S • weleelrlee�acrl uol®wwromwr Eusolowena n ■ e lanmlo elmelraera• aE+orwnaelw b es�mcellen enasrAUeiw, ®ens RICO an a naweo nGn>marRl.rannot stiee:eaE ele�(Pe[IIElOEI0 OII4 TTH CLEAR C • 004= TOM OIIYYBeBfel9 ®,i�AL11eL� �9 f� •R �! REFLECTOR Ma®NfALRmEOL T+I.I.ee1LMR. ae.mwaTarwl D . Oe@•esf 111eC a116R11NMeF ELiIETALMNAE. � � ..>_ IlaemerAEen•moel Elue•..aowf, weoeeeealnalVE mr•1TAlaAAnea • E = awn U.M1e6.G11 a eeaalosllr MOO nTE m • 1lAIIGIOe� -TTRY m JUL 1 0 2006 CITY OF LINO LAKES ICI • 11 • • • • • • 1 NEW RACKET COMFORTS OF HOME LIMO IIND IAMB IQEISIOIA • PHOTOMETRIC PLAN P1 U .LLY 20013 tl ATE O ORTNIELTTION UNiWIRESQ DUDE •e.+• IA1Y q or4r.Ir e1AT•. 1.A HA L W V ,q A 1 R1112 4101111112 MWIOM® P6�MRGWI ti as wldlrcvlvs msIRMEwu� It �o an S • weleelrlee�acrl uol®wwromwr Eusolowena n ■ e lanmlo elmelraera• aE+orwnaelw b es�mcellen enasrAUeiw, ®ens RICO an a naweo nGn>marRl.rannot stiee:eaE ele�(Pe[IIElOEI0 OII4 TTH CLEAR C • 004= TOM OIIYYBeBfel9 ®,i�AL11eL� �9 f� •R �! REFLECTOR Ma®NfALRmEOL T+I.I.ee1LMR. ae.mwaTarwl D . Oe@•esf 111eC a116R11NMeF ELiIETALMNAE. � � ..>_ IlaemerAEen•moel Elue•..aowf, weoeeeealnalVE mr•1TAlaAAnea • E = awn U.M1e6.G11 a eeaalosllr MOO nTE m • 1lAIIGIOe� -TTRY m JUL 1 0 2006 CITY OF LINO LAKES ICI • 11 • • • • • • 1 NEW RACKET COMFORTS OF HOME LIMO IIND IAMB IQEISIOIA • PHOTOMETRIC PLAN P1 U .LLY 20013 ifIefideof LANDSCAPE LEGEND DECIDUOUS SHADE TREES 00QO ORNAMEMAL ME 00 TREES .�C9yOy�8NIFEROUS DECIDUOUS SHRUBS AND PERENRMLS GRAPHIC SCALE 0 30 60 120 ( IN FEET ) 1 men . 60 11. T NORTH f IED ! JUL 1 2 2006 0 LAKES MELCHERT WALKKY LANDSCAPE ARCHITECTURE CIVIL ENGINEERING LAND SURVEYING 798 HIGHWAY 12 HUDSON, NI 59018 PHONE (715) 388 -7738 FAX (725) 388 -7889 REVISIONS: 07 -11 -2006 SCHEMATIC DESIGN COMFORTS OF HOME LINO LAKES. MN LANDSCAPE CONCEPT PLAN I hereby certify that this plan. specification. or report was prepared by me or under my direct supervision, and that I om o duly registered Landscape Architect under the lows 01 the Stole oI Minnesota Reg. Number None Date Date Project Number Drawn By RGH Checked By RW KEY PLAN SHEEP _ L1 • • • AGENDA ITEM 5B STAFF ORIGINATOR: Marty Asleson DATE: August 2, 2006 TOPIC: Golden Acre BACKGROUND: This is a preliminary plat proposal for a rezone, variance for lot size /width /depth. This is almost an identical proposal to the adjacent Haley Manor Plat that was reviewed in 2003. Golden Acre has a total acreage of 1.11 acres. The existing zoning is R -1 Residential. The Developer wishes to subdivide to 4 lots. The project is located in Mar Don Acres, North of Lois Lane and South of Arlo Lane (Attachment 1, 2, 3). As with Haley Manor, there are no significant pre- existing land covers on site, nor are there any pre- existing soil -water relationships that would indicate rare plant features. There are no National heritage Consideration and no existing wetlands. Although the site is not large enough for the RCWD to review, recommend following standard guidelines for addition of impervious. That is an infiltration area must be provided to infiltrate the impervious area from the Mpls -St. Paul median storm (.34 inches) in 72 hours. This area could be in the form of a rain garden between the 4 houses with as much impervious area as possible directed to it. The infiltration area must be protected from compaction before construction begins. The grading plan shows the surface water flowing to the neighbor lot. The grading plan should be changed to reflect on site storage /infiltration of water. A SWPPP (Storm Water Pollution Prevention Plan) and a MPCA permit are required for this project. The SWPPP must be submitted to the City for approval before any soil disturbance occurs, as well as the MPCA permit. The SWPPP must be located on site (Preferably a mail box) with weekly and post rain fall event inspection reports. The developer did submit an erosion control plan (Attachment 4). The erosion plan should be made more comprehensive to address pollution issues such as concrete truck cleaning and litter containment. The plan needs to show a concrete truck wash site that is protected by containment barriers. All wash out must be removed from the site after construction. The plan signature is the responsible person that will inspect and correct deficiencies. The name and 24 hour phone number of this person must be added to the plan. Location of the required rock entrance must be shown on the plan. Storm sewer catch basins need to be protected with an Infrashield type of device. Silt fabric will not be allowed. Much of the language in the Erosion Control Notes are template /cut and past sentences with little thought on specifics or site realities. For instance, the notes • • • talk about Tree Preservation where there are no significant trees to be saved on the site. The SWPPP needs to be very site specific. With out revision, the project should not be allowed to move forward. There are no significant trees on the site. Escrow one boulevard tree per house frontage will be required. OPTIONS: RECOMMENDATION: Option 1 Attachments: 1. Location 2. Preliminary Plat 3. Boundary/Topographic Survey 4. Grading and Erosion Control Plan 5. Utility Plan Golden Acre • Location Map • Attachment 1 Golden Acre Location Map Streets Parcels 0.09 Miles s T 4 5 .4"'/ r+/__ -_ +, 0 ARLO LANE 389'27'24 E 66.00 1. \� (enlMINaus SURFACE) M c-YA880X RACKS rt7L CURB & GUTTER -, d +1 br 111 6 L 2.50 82.:' • -XX- FEN • 2 _ f________------- + / 1 / / I +, (3 4, 4 I + 71-: 10.65 e} R W 0.25 sass i nr v O _ y. ce -I 6 br • /r 4, R +4 4i N,r cf + 1 , < ./1 q' 1 ( \ t 03 1 r ' \ _ -1 1 I 82.50 f • 77.50 - N89'27.24'W < • • v R A \ - / N89•2T24'W 82.50 87.50 is .r 4 ,. ` t, ■ 1 'F --l7c FENCE o 1 .4----, ° I ni I T. „0 ` ')- am =K la ``\ 0.23 aces ^ • ` I � fi° 1 a 1 +d► IJ 40-r--6-35 ;' R I / 1 I , ,o i i Y - - +4 +0. % 77.50 87.50 J6 1 PVC VENT +4p y‘50 a A 1 0.26 acres I 0 M 16.951 -- p S89'27 24 E 165.00 0 CD F gJ '-ex. cun az GUTTER LOIS LANE (BITUMINOUS SURFACE) ,..-EX CURB & GUTTER 0 .o' +e 0 RECEIVED JUN 3 0 2006 CITY OF LINO LAKES �-.-�- -rte- -� Seale: 1 leak = 20 Feet LEGAL: Lot 4, Block 1, MAR DON ACRES, Anoka County, Minnesota NOTES For the purposes of this survey. the south line of Lot 4, Block 1, MAR DON ACRES, has an assumed bearing of North 89 degrees 27 minutes 24 seconds West Subject to easements of record if any BENCIIMARZC T.N.H. located on the north side of Arlo Lane across from Lot 5, Block 1, MAR DON ACRES. EL =912.34 TOTAL AREA 1.11 Acres (48,510 Sq.Ft.) EXISTING ZONING A -1 RESIDENTIAL R -I (SINGLE FAMM ) TOTAL ACREAGE = 43.560 sq.ft. (Excluding R /W) = 1.00 acres TOTAL NUMBER LOTS = 4 NET DENSITY = .25 UNITS /ACRE MINIMUM LOT SIZE = 10.890 sq.ft. = 0.25 acres MAXIMUM LOT SIZE = 43,004 sq.ft. = 0.99 acres AVERAGE LOT SIZE = 14,721 sq.ft. = 0.34 acres LOCATION MAP NOT TO SCALE Nil' N4.,► A' ao Sti CIA WE co'► SITE IM IAIE , ►A SECTION 8, TOWNSHIP 31, RANGE 22 ANOKA COUNTY, MINNESOTA. OWNER/DEVELOPER TIM ANDERSON 547 LOIS LANE UNO LAKES, MINNESOTA 55014 (715) 386 -5050 ENGINEERING BY: METRO LAND SURVEYING & ENGINEERING 248 APOLLO DRIVE UNO LAKES, MINNESOTA 55014 -3036 (763) 398 -6830 CONTACT: THOMAS HALEY SURVEYING BY: METRO LAND SURVEYING & ENGINEERING 248 APOLLO DRIVE LINO LAKES, MINNESOTA 55014 -3036 (763) 398 -6830 CONTACT: ERICK ORTIZ R -1. HOUSE ORDINANCE SETBACK AND FRONTAGE INFORMATION FRONT AND CORNER LOTS: 35 FEET FRONT ON COLLECTOR STREET (LOIS LANE): 40 FEET REAR YARD: 30 FEET SIDE YARD: 10 FEET MINIMUM LOT WIDTH AT SETBACK UNE, 80 FEET VARIANCES A:) LOT 2 = LOT WIDTH TO 77.50 FEET B:) LOT 1 = SIDEYARD SETBACK TO 6.3 FEET TYPICAL EASEMENTS: TYPICAL DRAINAGE & UTILITY EASEMENT STREET 1 10.00 VARIABLE L 10.00 05.00 - VARIABLE t REAR LINE I BEING 10 FEET IN WIDTH ADJOINING STREET UNES. AND 5 FEET IN WIDTH AND ADJOINING SIDE LOT IJNES AND REAR UNE EASEMENTS ARE REFLECTED ON DRAWING UNLESS OTHERWISE SHOW ON THE PLAT. LEGEND D DENOTES 1/2 INCH BY 14 INCH IRON PIPE MONUMENT MARKED BY UCENSE N0. 17765 • DENOTES IRON PPE FOUND DENOTES FIRE HYDRANT DENOTES SANITARY MANHOLE p DENOTES CURB STOP DENOTES NELL -x- DENOTES FENCE - e - DENOTES FENCE NGVD VERTICAL DATUM X 908.0 DENOTES EJOSTING ELEVATIONS m 0 PRELIMINARY PLAT DRAM JMA PROW ZEJO -015 001E 6/28/06 SHEET r PP -1 • • • 5 — Nb i 4, 4, • • 4, CURB & GUTTER O I S cBm..NOUB SURFACE) L A N E S 1 CURB N1 OUT1E7t 4, Sane 1 Lets • Be Fat LOCATION MAP NOT W sou& 4.01,411' '• - SECTION 8, TOWNSHIP 31, RANGE 22 ANOKA COUNTY, MINNESOTA. LEGEND O DONORS 1/2 NON BY 14 INCH IRON PPE MONUMENT WARNED BY UCENSE NO. 17785 • CUWI 8 IRON PPE POUND 4 DENOTES FIE HYDRANT .Oo DENO1ES SANITARY MANHOLE 8 0ENO1ES CURB STOP CENOEB REIL —x fO101E8 PENCE — 10— DENOTES FENCE NBVD VER1IGN. DA1SI 1 BOBA 0EN01ES ENOSAUi 6EVA1ICt8 TJ7Gd7.• Lot 4, Block 1, MAR DON ACRES. Anoka County, Mknnesoto NOTES Far the purpo of this survey, the south fine of Lot 4, Block 1. MAR DON "ACRES, has an assumed bearing of North 89 degrees 27 minutes 24 seconds West T.N.H. located on the north side of Arlo Lane across from Lot 5. Nock 1. MAR DON ACRES. EL-912.34 (NGVD 1929) TOTAL AREA 1.11 Acres (48,510 Sq.Ft.) m y 5 5 SRAM .JA4A avm ZEJO.015 DAN 6/29/06 990 I B -1 • • 74.1166(tifikci GRADING, DRAINAGE, AND EROSION CONTROL PLAN R _ R AR M S89'z7'24'3 85.00 \ (BITUMINOUS SURFACE) ` ,....--MAILBOX RACKS 1 ...—EX. CURB R GUTTER-, i 7 - � r cs 0 a • 03 __________ ,., / , , , 1 , . CM . • LOT 2 SELO GAR: 912.0 LFE: 907.9 LO: 911.9 //ir / /iei7ir /i /: WeR 0 DRAINAGE S! S89'27 24 B 165.00 r - `--EX OURS k GUTTER LOIS LANE (BITUMINOUS SURFACE) CURB h GUTTER SLT N IIREM NTS FABRIC AS PER MNOOT SPEC. 3666 r MAXIMUM SPACING BETNEEN STAKES MBNYUM ONIEOMOIT OF STAKES 1' MINIMUM EIIBFDIIDIT OF FABRIC 3X3 X5' YYIMM OUENSIOONS OF M000 STAKES HEAVY OUT SILT FENCE P01 MNDOT SPEC 3886 SILT FENCE WOOD POST Lam No. 500 GRADING LEGEND s EXISTING CONTOURS PROPOSED CONTOURS SILT FENCE DRAINAGE ARROW SELO -� GAR: 912.0 LOCATION MAP NOT TO SCALE SECTION 8, TOWNSHIP 31, RANGE 22 ANOKA COUNTY, MINNESOTA. RECEIVED JUL 2 5 2006 CITY OF UNO LAKES PROPOSED HOUSE TYPE (SPLIT ENTRY LOOK 1 PROPOSED GARAGE ELEVATION 0....„-----PROPOSED LOWEST FLO ELENAATION LEE. 907. PROPOSED LOVEST OPENNIING ELEVATION LO: 911.9 �� GRADING NOTES PROPOSED CONTOURS REPRESENT FINISHED SURFACE ELEVATIONS. SPOT ELEVATIONS ALONG PROPOSED CURB DENOTE GUTTER UNE OF CURB. EXISTING UTILITIES SHOWN ON THESE PLANS ARE BASED ON RECORD DRAWINGS AND, WHERE POSSIBLE. MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE CONTRACTOR SHALL CONTACT THE APPROPRIATE UI1UTY COMPANIES AT LEAST HOURS PRIOR TO EXCAVATION. TO REQUEST EXACT HELD LOCATION OF UTRJTIES. THE CONTRACTOR IS RESPONSIBLE FOR RELOCATING ALL EXISTING UTIU WHICH CONFUCT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. CONTRACTOR TO CALL GOPHER STATE ONE CALL (1- 800 -252 -1166) 48 HOURS PRIOR TO EXCAVATION FOR LOCATIONS OF UTILITIES. CONTRACTOR REQUIRED TO PROTECT THE TREES TO BE SAVED. SHOULD ANY PORTION OF THE TREE BRANCHES REQUIRE REMOVAL TO PERMIT OPERATION THE CONTRACTOR'S EQUIPMENT. THE CONTRACTOR SHALL OBTAIN THE SERVICES OF A PROFESSIONAL TRIMMING SERNCE TO TRIM THE TREES. SHOULD TH CONTRACTOR'S OPERATIONS RESULT IN THE BREAKING OF ANY LIMBS. THE BROKEN UMBS SHOULD BE REMOVED IMMEDIATELY AND CUTS SHALL BE PROPEL PROTECTED TO MINIMIZE ANY LASTING DAMAGE. NO TREES SHALL BE REMOVED WITHOUT AUTHORIZATION BY THE ENGINEER. COSTS FOR TRIMMING SERVII SHALL BE CONSIDERED INCIDENTAL TO THE GRADING CONTRACT. CONTRACTOR SHALL STRIP. STOCKPILE AND RE- SPREAD SUFFICIENT TOPSOIL TO PROVIDE A MINIMUM FOUR INCH DEPTH TO ALL DISTURBED AREAS TO BE St OR SEEDED. THE PROPOSED GRADING PLAN INDICATES FINAL GRADING AFTER THE HOUSES ARE CONSTRUCTED. THE CONTRACTOR SHALL APPLY A HOLDDOWH OF Z.5' ACROSS THE BUILD PAD LOCATIONS DURING THE GENERAL GRADING OF THE SITE. THE FINISHED BUILDING SUBGRADE ELEVATION SHALL NOT VARY BY MC THAN 0.10 FEET ABOVE OR BELOW THE PROPOSED ELEVATION. STREET OR PARKING AREA SUBGRADE ELEVATION SHALL NOT VARY BY MORE THAN 0.05 ABOVE OR BELOW, THE PRESCRIBED ELEVATION. AREAS TO RECEIVE TOPSOIL SHALL BE GRADED TO WITHIN 0.10 FEET OF THE REQUIRED ELEVATION UNLE DIRECTED OTHERWISE BY THE ENGINEER. TOPSOIL SHALL BE GRADED TO WITHIN 1i INCH OF THE SPECIFIED THICKNESS. THE CONTRACTOR SHALL COMPLY WTH THE REQUIREMENTS OF THE MINNESOTA POLLUTION CONTROL AGENCY - NATIONAL POLLUTANT DISCHARGE EUMINAT SYSTEM (NPDES) PERMIT. CONTRACTOR SHALL BE A CO- APPUCANT WITH THE OWNER. THE CONTRACTOR SHALL COMPLETE THE REQUIRED INSPECTION REPORTS AND BE RESPONSIBLE FOR MAINTENANCE OF THE EROSION CONTROL DEVICES. EROSION CONTROL NOTES ALL EROSION CONTROL MEASURES MUST BE INSTALLED PRIOR TO COMMENCEMENT OF GRADING OPERATIONS AND BE MAINTAINED UNTIL AU. DISTURBED ARE. ON THE SITE HAVE BEEN RESTORED. TEMPORARY EROSION CONTROL TO BE PLACED AROUND STORM DRAIN STRUCTURES DURING CONSTRUCTION. SEDIMENT SHALL BE REMOVED FROM ALL SEDWFNT CONTROL DEVICES AS NECESSARY AND MUST BE REMOVED IF DESIGN CAPACITY HAS BEEN REDUCED BY FIFTY PERCENT. A STABILIZED CONSTRUCTION ENTRANCE SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR DURATION OF PROJECT. ALL SLOPES 3:1 CR STEEPER, NOT TO BE SODDED AND GREATER THAN EIGHT FEET IN HEIGHT. SHALL HAVE EROSION CONTROL FABRIC INSTAU.ED. CONTRACTOR SHALL SEED AND MULCH ALL DISTURBED AREAS NOT TO BE SODDED. SEEDING SHALL BE PER MnDOT SPECIFICATION 3876 APPUED AT A F OF FIFTY POUNDS PER ACRE. SEEDING IN POND AND INFILTRATION AREAS SHALL BE MIXTURE 310NWT (NATIVE NET TALL) IN ACCORDANCE WITH MnDOT SPECIFICATION 3878 APPUED AT A RATE OF 82 POUNDA PER ACRE. MULCH SHALL BE PER MnDOT SPECIFICATION 3882, TYPE 2. THE MULCH SHALL BE APPUED IN ACCORDANCE WITH MnDOT SPECIFICATION 2575.3, F1. MULCH TO BE APPUED AT A RATE OF TWO TONS PER ACRE. MULCH SHALL BE ANCHORED WITH A DISC. CLODBUSTER OR OTHER APPROVED EQUIPMENT. • UTILITY PLAN S89.27'24 "E 66.00 I BirerniSI -I (BITUMINOUS SURFACE) •- MAILBOX RACKS CURB A GUTTER`) WWI WISP 0 CS O Ieww m NO wu. 11•m AINAGE • UTILITY EASEMENT --, OWING ml YO mY 64 3 -\ 44,4 4 C F • "T L,• K DRAINAGE St r a 4 <� L1___1�� DECK -6.27 , jI •Tr -5.35 sL_ . -PVC VENT 1 1 :.: 5' 1 MO w /54,2! / EXISTING HOUSE Wel 1715.3 oat M WPM AMMXWO EXISTING DRIVE T I B I T Y E A S E M E N T I-0XX man OM I' .mem[ r INMOND =MM. S89'27'24'E 166.00 .wm>am a,a T e�i m,wweim .I s. mosoo \`-EX CURB & GUTTER • — �'-- 8— "'"�O°",c"""'►"°°`°'W, - I •LQLS_. l A • J ► (BITUINNOUS SURFACE) 0060M6117 WM Imewq • 5 i 5 A-wm zo WM& 41twwm (W a oesmwim ee mac m9 unsq 0 • r 5- • WWTI w' we.w ; Mw ecom 1 1 1 1 1 -EX. CURB k GUTTER / .° ' rm,wc XXXI MOWN °rem AMMOmar NMI MEN MOM. M COMM' ID [WM MOMS ► ..mAes m w..i46 1 I o.e..."•, am »Imwwur 5 Mt NWILYIII LEGEND UTILITY NOTES SECTION 8, TOWNSHIP 31, RANGE 22 ANOKA COUNTY. MINNESOTA. RECEIVED JUL 2 5 2006 crry OF LINO LAKES EXISTING WATEMAIN EXISTING SANITARY SEWER PROPOSED WATEMAIN PROPOSED SANITARY SEWER CONTRACTOR SHALL FIELD VERIFY LOCATIONS AND ELEVATIONS OF EXISTING UTTUTIES AND TOPOGRAPHIC FEATURES PRIOR TO THE COMMENCEMENT OF SITE GRADING. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY ENGINEER OF DISCREPANCIES OR VARIATIONS FROM THE PLANS. ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE CONTACT "GOPHER STATE ONE CALL' (651- 454 -0002) FOR UTIUTY LOCATIONS, 48 HOURS PRIOR TO EXCAVATION. UTIUTY CONSTRUCTION SHALL CONFORM TO THE CURRENT EDITION OF 'STANDARD SPECIFICATIONS FOR WATER MAIN AND SERVICE UNE INSTALLATION AND SANITARY SEWER AND STORM SEWER INSTALLATION' AS PREPARED BY THE CITY ENGINEERS ASSOCIATION OF MINNESOTA. CATCH BASINS AND MANHOLES IN PAVED AREAS TO BE SUMPED 0.04 FEET. CATCH BASINS IN GUTTERS TO BE SUMPED 0.08 FEET PER DETAILS. A MINIMUM OF 18 INCHES OF VERTICAL SEPARATION AND 10 FEET OF HORIZONTAL SEPARATION IS REQUIRED FOR UTIUTIES, UNLESS OTHERWISE NOTED. SANITARY SEWER WYES SHALL BE 8 INCH BY 4 INCH SCHEDULE 40. SANITARY SERVICES SHALL BE 4 INCH SCHEDULE 40. ALL SANITARY SEWER PIPE TO BE POLYVINYL CHLORIDE PIPE (P.V.C.) SOR 35 UNLESS 01HERWISE NOTED. CONTRACTOR SHALL MAINTAIN AS -BUILT PLANS THROUGHOUT CONSTRUCTION AND SUBMIT THESE PLANS TO ENGINEER UPON COIAPLE11ON OF WORK. In 5 W 0 Z o W W y J Q z Ct Z N� Z -JW Q n Q 2Ln� z z LINO LAKES, MN UTILITY PLAN (¢5.1x0 KG DRAWN KG PNOdc1 • ZEJO -015 07/24/06 SHEET / 1/1 • • Agenda Item 6A Environmental Board Meeting Date: August 2, 2006 Topic: Storm Water Utility Background: Maintaining the City's Surface Water Management system is an important component of protecting our valuable natural resource system of lakes, streams and wetlands. With the intent of improving water quality, the Environmental Protection Agency (EPA) devised the National Pollutant Discharge Elimination System (NPDES) Phase II permit program. The City of Lino Lakes is required to comply with regulations set forth by the Minnesota Pollution Control Agency (MPCA). As a result, over the last three years the City has been in the process of implementing its Storm Water Pollution Prevention Plan (SWPPP) in conformance with the (NPDES) Phase II permit. This process has led to 1) a better understanding of the City's surface water management system, 2) a proactive approach to maintaining and improving the system, and 3) recognition that current levels of funding are inadequate. In January the City Council retained the services of Short, Elliott, Hendrickson, Inc., to prepare the Feasibility Study, Financing Alternatives for Lino Lakes' Storm Water Management Program, to assist in identifying a dedicated and equitable means of funding the system. The study, completed in May, recommended the establishment of a Storm Water Utility. An informational brochure was mailed to all residents, which explained the rationale for instituting a storm water utility to adequately and equitably fund storm water management in Lino Lakes and meet NPDES requirements. Two open house informational meetings were held in July to explain the storm water utility concept and to receive questions and initial comments from the public. Mr. Andy Lamberson, a surface water management specialist with SEH, will be present at the meeting to provide an overview of the study, NPDES, and the mechanics of the proposed Storm Water Utility. Attachments: Storm Water Utility Executive Summary Minnesota Plant Press The Minnesota Native Plant Society Newsletter Volume 25 Number 4 Summer 2006 Monthly meetings Minnesota Valley National Wildlife Refuge Visitor Center, 3815 American Blvd. East Bloomington, MN 55425 -1600 952 -854 -5900 6:00 p.m. — Building east door opens 6:00 p.m. — Refreshments, information, Room A 7 — 9 p.m — Program, society business 9:00 p.m. — Building closes Programs The MN NPS meets the first Thursday in October, November, December, February, March, April, May, and June. Check the website for more program information. Oct. 5: "Semi- Natural Grasslands for Biofuel and Ecological Services ?" by Dr. Nicholas Jordan, professor, Department of Agroecology, Agronomy and Plant Genetics, University of Minnesota. Plant of the Month: to be determined. Nov. 2: "The Importance of Native Plants in the Streamside Environment," by Brian Nerbonne, stream habitat specialist, MN DNR Central Region Fisheries. Annual seed exchange. Dec. 7: "Growth Pressures on Sensitive Natural Areas in DNR's Central Region," by Sharon Pfeifer, regional planner, DNR Central Region. Feb. 1: "Recent Highlights in the Minnesota County Biological Survey," by Carmen Converse, county biolgical survey supervisor, DNR. MN NPS website www.rnnnps.org e -mail: contact @mnnps.org MN NPS Listserve Send a message that includes the word "subscribe" or "unsubscribe" and your name in the body of the message to: rnn- natpl- request @stolaf. edu Natural prairies hold key to sustainable fuels By Deane Morrison. Reprinted with permission, from UMNnews, University of Minnesota. As gas prices inch higher, the search is on for renewable, plant - based fuels that don't require fertilizer or pesticides, which both require energy to produce. A solution may be at hand, from University ecologist David Tilman and two colleagues: Instead of growing a single fuel - source crop, grow many species together, because such plantations yield more total vegetation — and do it more reliably — than any growing just one species. The most cited ecologist in the world, Tilman has long been singing the praises of biodiversity, as the coexistence of many species is called. In May, he and two colleagues (University forest resources professor Peter Reich and Johannes Knops of the University of Nebraska) published a paper in the journal Nature in which they sum up 12 years of experiments at the University's Cedar Creek Natural History Area. The longest - running experiment of its kind, it shows unequivocally that plots of land with numerous species produce much more "biomass" and suffer less from fluctuations in productivity than plots with only one or a few species. This makes diverse plantings the likeliest candidates to drive the "bio" revolution. Think species diversity The paper is a call to everyone who wants to extract energy from biomass to start thinking in teens of species diversity. Biomass can be either burned for energy or refined to produce concentrated energy in the form of biofuels, such as ethanol, or synfuel gasoline and diesel. The greater the yield of biomass per acre, the better, and data from. Cedar Creek show that diverse plantings fill the bill. "Diverse prairie grasslands are 240 percent more productive than grasslands with a single prairie species," says Tilman, a Regents Professor of Ecology in the Continued on page 4 In this issue Presidents' columns 2, 3 Field trip 3 Art Hawkins 3 Hastings prairie 4 SE Minnesota sites 5 Mad dog skullcap 6 Arden Hills restoration 6 Membership form 7 From the president by Scott Milburn I would first like to start off by recognizing the great job done by our outgoing president, Jason Husveth. The Society has gained a good deal of momentum under Jason's leadership, focusing on exciting field trips, symposia, and monthly meetings, along with increasing membership numbers and revenue. Looking forward, it is important for the Society to keep focusing on what has led to this gain in interest while continuing to grow. The Society is dependent on the involvement of our membership. Many members have been stepping up in the past few years to lead field trips and organize a social hour before the monthly meetings. In the next year, we should look for ways to maintain our existing members, increase our membership, and increase committee involvement by the membership. We need to continue to offer our excellent services (programming and field trips), but we also need to modify how we deal with memberships. One idea that has been talked about for the past year at board meetings is to offer three -year memberships, rather than having to renew each year. Additionally, we need to look for ways to increase our membership numbers. One way that folks can help with this is to publicize the Society's monthly meetings by posting a list of meeting topics and times at your neighborhood plant nursery or grocery store. The Society must also increase committee involvement by the membership, including the Symposium Committee, Field Trip Committee, etc. This upcoming year's monhly programming, symposium, and field trips look very promising. I would like to thank Linda Huhn for the great job she has done organizing speakers for this upcoming year. The Symposium Committee is also starting to prepare for next year's meeting, with several potential topics, including the Prairie Coteau. Furthermore, it looks like another good year for field trips under the direction of Ken Arndt. In closing, I am looking forward to this opportunity to serve as the president of the Society and welcome input from our members. Minnesota Native Plant Society's purpose (Abbreviated from the bylaws) This organization is exclusively organized and operated for educational and scientific purposes, including the following: 1. Conservation of all native plants. 2. Continuing education of all members in the plant sciences. 3. Education of the public regarding environmental protection of plant life. 4. Encouragement of research and publications on plants native to Minnesota. 5. Study of legislation on Minnesota flora, vegetation and ecosystems. 6. Preservation of special plants, plant communities and scientific and natural areas. 7. Cooperation in programs concerned with the ecology of natural resources and scenic features. 8. Fellowship with all persons interested in native plants through meetings, lectures, workshops and field trips. MN NPS Board of Directors President: Scott Milburn, president @mnnps.org Vice President: Shirley Mah Kooyman, vp @mnnps.org Secretary: Daniel Jones, secretary@mnnps.org Treasurer: Ron Huber, treasurer @mnnps.org Ken Arndt, board member, karndt @mnnps.org Jason Husveth, board member, jhusveth @mnnps.org Sandy McCartney, board member, smccartney @mnnps.org Program Coordinator: Linda Huhn, 612 - 374 -1435 Listsery Coordinator: Charles Umbanhowar, ceumb @stolaf.edu Field Trips: fieldtrips @mnnps.org Memberships: memberships @mnnps.org; 651- 739 -4323 Historian /Archives: president @mnnps.org Technical or membership inquiries: contact @mnnps.org Minnesota Plant Press editor: Gerry Drewry, phone, 651 -463- 8006; plantpress @mnnps.org Updated plant identification CDs are now available Flora ID Northwest, LLC announces that its Minnesota and Great Plains plant identification CDs for PCs have been updated. MN NPS members who have purchased either or both of these CDs can get the latest update for $6 shipping and handling. Contact Bruce S. Barnes, Flora ID Northwest, LLC, 731 NW 5th, Pendleton, OR 97801; call 541 -276- 5547 (FAX 541- 276 -8405) or email: flora @uci.net New users may purchase updated CDs from the Society at $70 (Minnesota) and $150 (Great Plains). From the former president by Jason Husveth, president, 2003 - 2006 Greetings members! I hope you are all enjoying Minnesota's native flora and wealth of natural areas during these warm summer months. I have had the honor of serving as your president for the past three years. With the help of an energized and talented board and enthusiastic members, we have accomplished a great deal in this time. I want to thank all of you for making my term as president so rewarding and, I hope, productive. As many of you may know, a new slate of officers was elected at the June 2006 board meeting. Scott Milburn will be taking over the reins of president, and I am certain he will excel in this role. Shirley Mali Kooyman was elected vice president, and her professional skills and considerable experience on the board will serve her and the society well. I am excited to see the new directions that our senior officers will take us. After several years on the board and serving as secretary, Karen Schik has stepped down to pursue and develop local conservation initiatives in her community. Among her many contributions, Karen has served as an invaluable resource on the board and has volunteered countless hours to planning our annual symposia for the past several years. I wish to thank Karen for her exceptional service to the society. She will be missed (and called upon in a pinch). Daniel Jones was elected as secretary and continues to offer his talents and passion to the society. Ron Huber will continue to serve as treasurer, and he and Cathy are doing a fine job at managing the society's assets and financial concerns. Ken Arndt continues to raise the bar with field trip planning and coordination, and will continue on the board. Sandy McCartney is working on developing an annual scholarship for Minnesota students. Many thanks to Gerry Drewry for keeping us on task with the quarterly newsletter, and to Linda Huhn for coordinating fantastic speakers and topics for our monthly meetings. It has been a pleasure to serve as your president for the past three years. I will continue serving on the board through 2007, and I look forward to helping the society grow well into the future. Thank you! Art Hawkins dies Conservationist Art Hawkins, 92, died on his property at Lake Amelia March 9. As a United States Fish and Wildlife manager in Minnesota, Hawkins developed many of the research protocols and waterfowl management plans used by the agency. He was a member of the Commissioners Advisory Committee to Scientific and Natural Areas for almost 20 years. Hawkins held a bachelor's degree from Cornell and a master's degree from the University of Wisconsin, where he worked under Aldo Leopold. He was one of Leopold's last surviving students. Like Leopold, Hawkins restored his land to a wildlife preserve. Hawkins placed some of the first nesting platforms for osprey on his land and kept a diary or journal about the property for nearly 50 years. The MN NPS has started a memorial fund for Art Hawkins. If you wish to contribute, make your check out to the Society, mark it for the Art Hawkins memorial, and mail it to Minnesota Native Plant Society, P.O. Box 20401, Bloomington, MN 55420. Take an evening tour of Hastings Sand Coulee July 18 by Elizabeth Storey, river stewardship coordinator Friends of the Mississippi River Join Friends of the Mississippi River Vermillion Stewards for a prairie tour of the Hastings Sand Coulee Tuesday, July 18, from 6:30 – 8 p.m. Karen Schik, restoration ecologist for Friends of the Mississippi River (FMR), will introduce us to this rare dry prairie that has survived since the early 1800s. Karen prepared the stewardship plan that has determined the course of action for efforts to return the coulee to its pre - settlement condition. Technically a sand - gravel prairie, this special place is home to several rare habitat types; endangered plant species including James' polanisia ( Polanisia jamesii), sea -beach needle grass (Aristida tuberculosa), and kittentail (Besseya bullii); and the threatened blue racer snake (Coluber constrictor). The 2.5- mile -long coulee is a former glacial stream valley identified by Minnesota County Biological Survey as one of the most biologically important sites in Dakota County. Space is limited. To register, contact Elizabeth at Friends of the Mississippi River, estorey @fmr.org or 651- 222 -2193, ext. 16. This event is free of charge. Newsletter is available by E -mail or regular mail This newsletter is available in two formats — printed and e-mail. If you wish to change to the other format, just send an e -mail to memberships @mnnps.org or phone 651 -739 -4323. 3 Biodiversity Continued from page 1 College of Biological Sciences, which operates the Cedar Creek field station. "That means that if a plot with one or two plant species produces 100 pounds of vegetation a year, a plot with 16 species [the most diverse plots planted at Cedar Creek] will produce 340 pounds. This huge advantage comes when you plant numerous grasses and legumes and various prairie flowers together." Findings from Cedar Creek suggest that plantings of multiple species of prairie plants will produce fuels, such as ethanol, with greater net energy gains per acre than corn, soybeans, or even switchgrass, which has been touted as a promising source for biomass. But the higher energy gains aren't just from higher productivity. Diverse plantings require little or no inputs of fertilizer or pesticides, both of which require lots of energy to make and apply. Experiments now under way in Germany and the Netherlands are yielding similar effects of diversity on yields, says Tilman, even though they use totally different species. Also, because prairie plants are perennial, they would not have to be replanted year after year. Farmers would need only to mow their fields in the fall. Biomass could replace some coal If burned, biomass could replace some of the coal that now pumps carbon dioxide and mercury into the atmosphere. "You can bum prairie grass using the fluidized bed technology of existing coal -fired power plants, and can mix it in with coal," says Tilman. "The energy density of biomass is 60 to 70 percent that of coal. If power plants wanted to buy biomass and fanners wanted to grow it, it could happen, but it will take much work to get there." 4 Now that the value of biodiversity has been shown, the next step should be an economic analysis, says Tilman. It remains to be seen whether biomass farmers, along with energy producers and the people who transport biomass from one to the other, can each make money if they put the vision that he and his colleagues have into practice. For optimal results, each region of the country and the world would have to be studied to determine what mix of plant species would work best in that particular soil and climate. "In Minnesota, there are over a million acres of abandoned farmland in the Conservation Reserve Program," says Tilman. "That land is mainly planted with just a few grass species" and so may hold potential as a future site of biomass plantations. Planting more species should allow not only bigger yields of vegetation, but more predictable yields. As the Cedar Creek experiments show, yields of vegetation fluctuate less from season to season if the vegetation contains many species. This kind of reliability is important, because no one wants to see boom and bust years in the energy supply. "This paper suggests there might be an unsuspected benefit to restoring land to a more native condition," Tilman says. "Restoring land so it can produce biofuels is a new idea, but there are many reasons to do it. We need a stable and productive source of bioenergy. Biodiversity can give us this on abandoned agricultural land around the world, and it doesn't have to be just grasses. As we get away from fossil fuels, we're going to have to have a diversity of approaches." Plant sale results Treasurer Ron Huber reported net income from the June 2006 plant sale was $789. Non - auction plants sold for $749. Profit from the auctioned orchids was $40. The late Tim Wallace's trees brought in $73, which has been added to his memorial fund. Hastings turns industrial park into a prairie by Karen Schik A drive on Eddy St. from downtown Hastings to Lock and Dam Number Two used to include a drive past a series of petroleum storage tanks owned by Flint Hills Resources. In 1995, the tanks were removed and a portion of the land was given to the City of Hastings. What was once an unsightly industrial park is now being slowly transformed into mesic prairie through a native planting completed in 2003 by Friends of the Mississippi River (FMR). Although some Minnesotans are able to recognize the hallmark native plants of a wet prairie and meadow, others may only recognize the former tank farm as a grassy field. In an effort to raise consciousness of the area as a restoration site, the City of Hastings erected a sign welcoming visitors to the Hastings Nature Preserve. In the spring of 2006, a group of Hastings High School students, in partnership with the city and FMR, planted native grasses and forbs around the sign. Now a sign surrounded by beautiful native plants will highlight the area and attract visitors even more effectively. The project partners would like to thank the Minnesota Native Plant Society for the "Think Native" grant, which helped in purchasing the plant materials. This was a great educational project for the students and something they can take pride in every time they pass the park. Getting students and other community members to participate in restoring their local natural areas is one of the best ways to ensure long -term protection of such areas. Protecting native plants in southeastern Minnesota by Daniel Tix, biodiversity area review team leader, MN Chapter of the Society for Conservation Biology At this year's MN NPS annual symposium in April, we explored the incredible biological riches of the "land that glaciers forgot," the driftless area of southeastern Minnesota and adjacent portions of Wisconsin and Iowa. For native plant enthusiasts, this region is a treasure trove of rare species and interesting native plant communities. It is also a region whose management could significantly benefit from the input ofNative Plant Society members. In fact, there have been few better opportunities for those interested in native plant conservation to inform management decisions impacting rare plants and diverse native plant communities. In southeastern Minnesota, the County Biological survey highlighted 13 areas with biological values that merit special protection on state lands. Having been selected from 917 sites surveyed in six counties of southeastern Minnesota, these are truly exceptional areas for their large concentrations of rare species and highest quality examples of the rare native plant community types. These communities include moist, moderate cliffs, algific talus slopes, dry oak savanna, maple- basswood forest, and northern hardwood - conifer forest and occur on land already owned by the Minnesota Department of Natural Resources. Rare plant species include false mermaid (Floerkea prosperpinacoides), goldenseal (Hydrastis canadensis), Jame's sedge (Carex jamesii), and rough - seeded fameflower (Talimum rugospermum) . As part of regional forest management planning, the DNR is writing plans to guide management of these areas. The draft plans have proposed such management activities as timber harvest, prescribed burns, and set aside of small areas around rare species. In some cases, especially in the forested communities, proposed management will unduly jeopardize the quality of some of the highest quality native plant communities in the region. The public comment period on these management plans presents a significant opportunity for MN NPS members to voice support for strong protection of native plant species and communities. Voicing support is as easy as reading an 8- to 12 -page draft management plan and writing a comment letter during the 30 -day public comment period. Unlike many other issues, these plans receive few comments, so each letter can be very important. Six plans have already been completed, but seven are still to be released for public comment. If you are interested in reviewing these plans, go to www.dnr.state.mn.us /forestry/ subsection /blufflands /index.html From this link, you can e -mail Jon Nelson and ask to be notified about the public comment period for each high biodiversity area management plan in southeastern Minnesota. If you would like more information or talking points to inform your confluent letter, feel free to contact me at dtix @greatrivergreening.org Seedling plant guide will be printed in August The Prairie Seedling & Seeding Evaluation Guide will be available in August 2006. It is expected to cost about $5, plus shipping and handling and will be available through the Bonestroo &Associates website. For additional details, contact author Paul Bockenstedt at 651- 604 -4812 or pbockenstedt@bonestroo.com Botany by Berton Braley, "Science News Letter," March 9, 1929 There should be no monotony In studying your botany; It helps to train And spur the brain — Unless you haven't gotany. It teaches you, does Botany, To know the plants and spotany, And learn just why They live or die — In case you plant or potany. You learn, from reading Botany, Of wooly plants and cottony That grow on earth, And what they're worth, And why some spots have notany. You sketch the plants in Botany, You learn to chart and plotany Like corn or oats — You jot down notes, If you know how to jotany. Your time, if you'll allotany, Will teach you how and whatany Old plant or tree Can do or be — And that's the use of Botany! Note: Thor Kommedahl submitted this poem, which he found in his files. Bluffland management guide is available Conserving Your Blufflands, a management guide for the St. Croix River bluffs, has been completed by Great River Greening ecologists. Its goal is to help decision - makers and landowners conserve the bluffs' ecological value and beauty and help halt the decline of the water quality. Great River Greening developed the guide under a contract with the Minnesota DNR. It will be distributed by the DNR and the National Park Service in the St. Croix Valley. Copies are available through the DNR Information Center, 651- 296 -6157 or 888 -MINN DNR, and from Deb Gagner at Great River Greening, 651- 665 -9500, ext. 10, or dgagner@greatrivergreening.org 5 Plant Lore Restoration of Arden Hills site studied by Thor Kommedahl What is mad -dog skullcap? Mad -dog skullcap is Scutellaria lateriflora, a Minnesota native plant in the mint family. How did it get its names? It was reported in the 1770s as a cure for rabies; hence, the name mad - dog. Scullcap refers to the flower shape, which resembles a helmet with the visor raised. Scutellaria means dish, referring to the pouch on the fruiting calyx. Lateriflora refers to the one -sided flower racemes borne in leaf axils. Where does the plant grow? It grows in moist woods, meadows, and swampy areas throughout the state. What do plants look like? They are perennials; one to three feet tall; paired, opposite, toothed leaves on four -sided stems; and have slender rhizomes. Its blue (sometimes, pink, violet, or white) flowers appear in one -sided racemes from leaf axils (distinguished from common skullcap which has a single bloom in the axil). It flowers from July to September. Has it any medicinal value? Its use for rabies treatment has since been discredited; however, plants contain scutellarin, a flavonoid with sedative and antispasmodic properties. It has been used for treatment of epileptic seizures. Skullcap was once listed in the US Pharmacopeia and the National Formulary for treatment of nervous disorders. Is it poisonous? Not likely. Where cases of toxicity have been reported, the poisoning has been attributed to adulterants such as wood sage added to commercial supplies of skullcap. 6 by Wade J. Hammer, wetland ecologist, Svoboda Ecological Resources. This is an abstract of his talk at the April 6 meeting. The Arden Hills Army Training Site (AHATS) is a 1,786 -acre military installation in Arden Hills, Minn. It is located in Township 30N, Range 23W, within Sections 9, 10, 15, and 16 in Ramsey County. The Original Land Survey, completed in the late 1800s, makes note of bur oak and white oak woodlands, with some tamarack swamps in the low areas in the approximate vicinity of the property. Thirty home sites were displaced when the land was purchased in 1941 by the federal government for use as a military installation. The majority of the construction at the site began prior to World War II. Active munitions production took place there for 22 years, through the Vietnam War. At its peak, 26,000 people were employed as part of the military munitions facility. Due to the industrial use of the site and the solvents discarded on the property, it was listed as a superfund site in 1983. Clean-up of remnants of the industrial production at the site continues. Tallgrass prairie restoration projects have occurred at the AHATS since the early 1990s. As part of a masters of science project, a study assessing the relationships among management (seeding and burning), vegetation, and environmental factors (soil, aspect, and slope) was completed. The study included completion of 75 vegetation surveys, consisting of three random plots in 25 purposively placed grids. The surveys consisted of cover class data for all plant species. The surveys were completed twice during the summer of 2002 (late June /early July and mid - August). Multivariate statistical analyses of the vegetation survey data revealed relationships between vegetation and soil texture, vegetation and shallow depth to ground water (within one meter), and individual plant species and fire frequency. The intended use of the findings is to improve management of designated tallgrass prairie restoration sites at the AHATS. Pale or cream gentian This is a summary of the April 6 Plant -of -the -Month talk by Wade J. Hammer Gentiana flavida, pale or cream gentian, grows one to three feet tall and is typically unbranched. The leaves and stems are yellowish -green and glabrous; the flowers are cream or white. It is found in moist prairies and open woodlands in the Upper Midwest and Great Lakes states. Pale gentian flowers in late summer to early fall, and bumblebees are its primary pollinators. Its small seeds are dispersed by wind and water. Bob Djupstrom retires as head of SNA program Bob Djupstrom retired March 2 as head of the Scientific and Natural Areas Program. He led it for 24 of its 33 years and oversaw the acquisition of 125 of its 140 sites. The program now encompasses 184,635 acres — more protected acreage than any other state. In the SNA newsletter, Bob sent "an open thank you to the many folks who volunteered their time and energy to the SNA program over the years. I hope the cadre of volunteers out there will continue, will expand, and take an even greater interest in preserving our existing sites as well as assisting in having new sites established." • • Hastings High School, Oakdale receive grants by Karen Schik The Minnesota Native Plant Society has awarded two Think Native Grants. Hastings High School Biology Class A $200 grant was awarded to Joe Beattie's biology class for the purchase of native plants to install in a prairie planting at the entrance to the Hastings River Flats Park. Beattie's students have worked on a lakeshore planting at the same location in the past two years, as well as other restoration projects in Hastings. As part of a class project, they installed prairie plants at the site entrance and will return to help weed and water them over the next year. The City of Hastings will maintain Nature exhibits at Bell Museum Botanical art and Jim Brandenburg's prairie photos are featured in exhibits at the Bell Museum of Natural History, University of Minnesota. "Bloom," an exhibit of botanical art, will be on display at the museum through Aug. 27. It features, approximately 60 drawings, paintings, prints, books, botanical models, and fine crafts from public and private collections. "Bloom" includes magnificent hand - colored prints and books from the golden era ofbotanical art in the 18th century; stunning botanical wall charts, beautiful in themselves and an important means of teaching plant science; and contemporary drawings and paintings that exemplify the living traditions of botanical art as well as imaginative interpretations of plants and ecosystems. the planting in the long term. Friends of the Mississippi River, which has conducted the restoration work at the park since 2003, will manage the grant and oversee the project. City of Oakdale The City of Oakdale received the leftover plants from the plant sale and will receive the leftover seed from the seed exchange to be used at their restoration sites. They will utilize them to enhance the public wetland buffer areas adjacent to the community streetscape projects and/ or as ground cover materials in their buckthorn removal areas. The contact person is Ron Rogstad, administrative services director, City of Oakdale. "Touch the Sky," an exhibit of Jim Brandenburg's photos of the American prairie, will be displayed from Oct. 1 — Dec. 31. This exhibit is a tribute to the vistas and creatures that live in the tallgrass prairies of Minnesota, Nebraska, Iowa and North and South Dakota. Name Minnesota Native Plant Society Member Registration Address City State Zip Phone (work) (home) E -mail newsletter? Yes No E -Mail Membership category (New Renewal $15 Individual $15 Family (2 or more people at same address) $8 Student (full time) $8 Senior (over 62 or retired) $20 Institution The membership year starts Oct. 1. Please fill in this form and check the appropriate membership category. Make your check payable to the Minnesota Native Plant Society. Bring the completed form and your check to the October meeting, or mail them to the Minnesota Native Plant Society, P.O. Box 20401, Bloomington, MN 55420. 7 Minnesota Native Plant Society P.O. Box 20401 Bloomington, MN 55420 Summer 2006 HWY MALL AM & TE SIT CENTER 8 •