HomeMy WebLinkAbout12/20/2006 Env Bd Packet•
•
City of Lino Lakes
Environmental Board Meeting
December 20, 2006
6:30 p.m.
AGENDA
1. CALL TO ORDER
2. APPROVAL OF MINUTES\
NOVEMBER 29, 2006
3. APPROVAL OF AGENDA
4. OPEN MIKE
5. ACTION ITEMS — THERE ARE NO ACTION ITEMS
6. DISCUSSION ITEMS
A. EAW /Natures Preserve /Discussion /Number of Responses /Record of
Decision Recommendation
B. Stream Health Monitoring Program (SHEP) — Gary Averbeck to give
Power Point presentation
C Environmental Board Goals
D Resource Management Planning /TMDL Study Update — Verbal update
7. ADJOURN
•
•
ENVIRONMENTAL BOARD MEETING
DATE
TIME STARTED
TIME ENDED
MEMBERS PRESENT
MEMBERS ABSENT
STAFF PRESENT
CITY OF LINO LAKES
APPROVED MINUTES
NOVEMBER 29, 2006
: November 29, 2006
. 6:30 P.M.
. 7:50 P.M.
: Constance Grundhofer, Mary Jo O'Dea,
Martha DeHaven, Kimberly Brouillet, Sarah
Norman and Barbara Bor
: Jeff McDowell
: Environmental Coordinator Marty Asleson,
1. CALL TO ORDER
Ms. O'Dea called the meeting to order at 6:30p.m.
2. APPROVAL OF MINUTES
August 2, 2006
Ms. O'Dea had one change. Page 2, second paragraph. Add in addition to
recommendations of staff to end of this paragraph.
October, 4, 2006
Ms. Bor had a change on Page 2, under Description. Take out - so it is not just a
big lump at end of paragraph.
Ms. O'Dea had changes on Page 2, Actions Items, second paragraph. Add the
word received after comments and take out the word going. Add the comments
go after the word before. Same paragraph, second to last sentence. Change
neighborhood to surrounding area and add of the EAW after receive a copy. Add
the word one to very end of this paragraph.
Ms. Grundhofer had a change on Page 3, sixth paragraph under Wetland Impacts.
Change to read have the percentage of instead of have a percentage of.
Ms. O'Dea had changes on Page 3, 4th paragraph. Add: on the importance of soils
after comment now in first sentence. Page 3, 6th paragraph. Change first sentence
to percentage of wetland areas instead of percentage of lots. Third sentence to
read which wetland area stay and which wetland areas go instead of which lots
stay and which lots go. Page 3, 8th paragraph. Add referenced in the documents
to end of first sentence. Page 3, 9th paragraph. Stated that the school property
1 DRAFT MINUTES
ENVIRONMENTAL BOARD MEETING NOVEMBER 29, 2006
• located SE of the proposed instead of stated that a school property located SE of
proposed...
Ms. Bor had a change on Page 4, fifth paragraph. Add a sentence to say Mr.
Stadums letter indicated the dates of the sightings in the EAW were incorrect.
Mr. Husveth agreed to that.
Ms. O'Dea had a change on Page 4, 4th paragraph. Ms. O'Dea wants to be
given... change to read Ms. O'Dea asked if the document could identify...
Ms. O'Dea had a change on Page 5, third paragraph. Add the work expected in
between these things. Change Than to then. Page 5, eighth paragraph. Add to in
between needs be.
Ms. O'Dea had a change on Page 7, sixth paragraph. Take the word Lou out.
Ms. Bor made a motion to approve the August 2, 2006 and October 4, 2006
meeting minutes with changes. Ms. Brouillet seconded the motion. Motion
carried unanimously.
3. APPROVAL OF AGENDA
• There are no changes to the agenda.
•
Approval of agenda. Motion by Ms. Grundhofer to amend seconded by Ms.
Brouillet to approve agenda as is. Motion carried unanimously
4. OPEN MIKE
Open Mike closed at 6:36 p.m.
5. ACTION ITEMS
No action items.
6. DISCUSSION ITEMS
A. Stream Health Monitoring Program
Mr. Asleson explained to the Board what SHEP (Stream Water Evaluation
Program) is. Mr. Gary Averback, a Lino Lakes resident and volunteer,
explained his experiences and accomplishment with SHEP. Ms. Bor also
gave the board history about SHEP.
2 DRAFT MINUTES
•
ENVIRONMENTAL BOARD MEETING NOVEMBER 29, 2006
The SHEP group did a spectacular reclamation project. The program has
improved water banks and native vegetation. They collected habitat and
insect samples from Hardwood Creek near the north and south ends of
County Road 14 to see if and what the differences are. They are banking
the information collected. There have also been evaluations done at
Clearwater Creek and Rice Creek. Friends of the Mississippi chose where
to sample.
Mr. Asleson said we could give the information from the samples to other
boards and maybe publish in the Lino Lakes Newsletter. Ms. Bor stated
the data collected may help evaluate our Storm Water Management. Mr.
Averback gave a short history of a certain type of parasites and tape worms
in raccoons that could transfer to humans, etc.
B. Environmental Board Goals
Mr. Asleson explained what progress the board has made.
Mr. Asleson stated building has slowed down considerable this year.
Mr. Asleson said one goal should be a review and comment on the
Resource Management Plan. The planning process is going to be a
collaborative process between Rice Creek Watershed and City of Lino
Lakes. There will be a 60 day comment period in the future.
2007 Environmental Board Goals:
Promote Environmental stewardship, B., add: Inventory, current participants
and work to expand program.
Blue Heron Days — leave as is.
- Earth Day — leave as is.
Monitor any activity in AUAR, add: onto other proposed development areas
to end of first sentence.
Perform an evaluation paragraph, add: Review a sampling of a variety of
projects .....
Continue to collate information — delete this goal off.
Collaborate with Kim Sullivan — delete this goal off.
- Next three goals — leave as is.
Add new goal — Participate in comp plan and process.
- Add new goal - Review and comment on the RMP planning process for the
City of Lino Lakes, JD4 and TMDL study for the Rice Creek Chain of Lakes.
Ms. O'Dea stated the Environmental Board reviewed a couple of development
projects. The biggest project reviewed was Stoneybrook. We have not written a
report, as we are still in the process of completing our goal. Letters were sent out
3 DRAFT MINUTES
•
•
ENVIRONMENTAL BOARD MEETING NOVEMBER 29, 2006
to many residents to fix their conservation easements by Mr. Asleson. Ms. O'Dea
would like a list of what has been done and where we are, that the board can
submit to the city council. Ms. Brouillet and Ms. Norman will prepare the list.
Ms. Bor stated that the Board should have a standard evaluation format. After the
board is finished with reviewing Stoneybrook, the board will come up with a
standard format. Mr. Asleson encouraged anyone to initiate a standard format.
C. EAW Discussion /Number of Responses
Deadline was November 22nd for responses. It will take awhile to put together the
responses. The agencies that had comments were EOR, Rice Creek Watershed, a
resident, Columbus Twp. Met Council, PCA and a few others. We will hopefully
look at the responses by our next meeting on December 20th. After the Board's
review, the document will go to council.
D. Environmental Board Members
The deadline for submissions of applications is December 4. Ms. Bor presented
her application to Ms. Hogstad, Community Development Secretary, to deliver to
the Administration Department November 30. Ms. Grundhofer will not
reapplying for her term on the Board unless there are not enough people to fill
vacancies.
E. Peltier Island Management Activities
Mr. Asleson stated that 4 raccoons and 15 opossums have been removed from the
island. Mr. Asleson is concerned about the Blue Heron's nesting trees that are
coming down. He stated we are going to loose most, if not all, of the Ash trees on
the island due to disease. There are a few Hackberry's coming up. We should
plan an Arbor Day project on the island. Mr. Asleson will talk to the county
regarding this.
There have been 32 Blue Herons who have fledged this year. Last year there were
two.
F. Earth Day
Earth Day will not be canceled as discussed at a previous meeting. Mr. Asleson
will share more information with the board when we are closer to the event. The
event is held the third weekend in April. This event is hosted at Wargo Nature
Center.
7. ADJOURN
4 DRAFT MINUTES
ENVIRONMENTAL BOARD MEETING NOVEMBER 29, 2006
It was noted that the next meeting of the Environmental Board will be on
November 20, 2006.
There being no further business, Ms. Norman has moved to adjourn at 7:50 p.m.
Ms. DeHaven seconded the motion. Motion carried unanimously.
Transcribed by:
Lisa Hogstad
Community Development Secretary
•
•
5 DRAFT MINUTES
•
•
AGENDA ITEM 6 A
STAFF ORIGINATOR: Jeff Smyser
ENV. BOARD MTG DATE: December 20, 2006
TOPIC: Record of Decision
Environmental Assessment Worksheet (EAW)
Nature's Refuge
BACKGROUND
An Environmental Assessment Worksheet (EAW) has been prepared for the Nature's
Refuge conservation development project as prescribed by state environmental review
requirements. The EAW was filed with the Minnesota Environmental Quality board
(MEQB) and circulated for review and comments to the required EAW distribution list.
A Notice of Availability was published in the EQB Monitor on October 23, 2006.
The thirty -day comment period closed on November 22, 2006. We received a number of
written comments from agencies and citizens. The City must respond to every
substantive comment.
The City must decide, based on the EAW information, if an Environmental Impact
Statement should be prepared for the project. In doing so, we must prepare a record of
decision that includes information supporting the decision. The attached draft Record of
Decision document includes findings, comments and responses, and conclusions. The
comments we received and our responses are summarized in the section "EAW Comment
and Responses ". The actual commenting letters and e -mails are included as well.
You will see some blank spaces for responses to specific comments. Unfortunately, the
ecologist on the project has been ill and could not provide all responses before this
document was printed for distribution to the Environmental Board. We will forward
additional responses as we get them or bring them to the Board meeting. I apologize for
the incomplete document, but sometimes this happens.
OPTIONS
1. Review draft Record of Decision and provide comment to staff
2. Recommend adoption of Record of Decision.
3. Return to staff with direction
RECOMMENDATION
•Options 1 and 2
•
RECORD OF DECISION
NATURE'S REFUGE DEVELOPMENT
ENVIRONMENTAL ASSESSMENT WORKSHEET
Findings of Fact
Responses to Comments
Conclusions
•
City of Lino Lakes
Jatittiry 2007
DRAFT DECEMBER 14 2006 DRAFT
1
•
DRAFT DECEMBER 14, 2006
FINDINGS OF FACT
ADMINISTRATIVE BACKGROUND
The City of Lino Lakes is the responsible governmental unit (RGU) for this project. An
Environmental Assessment Worksheet (EAW) has been prepared for this project as
prescribed by Environmental review requirements. Lino Lakes prepared the EAW.
The EAW was filed with the Minnesota Environmental Quality board (MEQB) and
circulated for review and comments to the required EAW distribution list. A Notice of
Availability was published in the EQB Monitor on October 23, 2006.
The thirty -day comment period closed on November 22, 2006. Written comments
received from agencies and citizens are summarized and responded to in this report in the
section "EAW Comment and Responses ".
PROJECT DESCRIPTION
Nature's Refuge is a proposed conservation development that will create a new
residential subdivision combined with a wetland conservation area in the City of Lino
Lakes. The subdivision will provide additional housing capacity in the form of an infill
development. The conservation area will restore and preserve valuable natural resources
by combining residential development with a large, high - quality existing wetland
complex containing rare plant species and communities. The project relies upon a
strategy to create a nature preserve by enhancing (through restoration and active
management) a large area of higher - quality wetland as compensation for filling a smaller
acreage of lower - quality wetland.
The proposed project includes 278 single family residential lots. Sanitary sewer and
water supply will be extended from existing infrastructure to service these new lots. The
streets will wind through the development, avoiding the majority of wetlands. The
typical lot will be rectangular and approximately 80' by 120', but the winding, irregular
nature of the streets will mean that many lots will have different dimensions and shape,
though their sizes will be similar.
The project will include restoration and management activities for the majority of the
property's wetland area in order to create conservation areas and to offset wetland
impacts created by the project. Based in part on the presence of rare plant species and
communities on the project site, the Minnesota Board of Water and Soil Resources
(BWSR) has already given verbal approval to apply the "Exceptional Natural Resource
Value" (ENRV) provisions of the Minnesota Wetland Conservation Act (WCA) to the
wetland impact mitigation plans for the project. Under these provisions, the applicants
will gain extra mitigation credits for properly restoring the wetlands that support rare
species and unique vegetative wetland communities. This will provide enhancement and
•
Nature's Refuge
DRAFT DECEMBER 14, 2006 EAW Record of Decision
page 2
protection for a valuable natural area, while providing wetland mitigation credit to offset
the proposed wetland impacts created by the project, and excess mitigation credits that
will be used as wetland mitigation bank credit.
The proposed conservation areas will consist of non - impacted wetlands and adjacent
forested upland areas. The conservation areas will be placed under conservation
easement, and will be restored according to a formal restoration plan. The plan will
include initial restoration activities, plus a 5 -year maintenance and monitoring plan.
Following this establishment period, the conservation areas will be preserved, and
managed in perpetuity. The specifics of the funding plan for this ongoing management
has not yet been determined, but will include a combination of sources such as escrow
earnings and homeowner fees.
The City has not received a formal application for the project, which will include specific
design details. While the actual design has not been completed, a significant amount of
information has been gathered to allow for completion of the EAW. The intent of
preparing the EAW based on the concept plan is to utilize information gathered through
environmental review to inform and improve on project design.
CRITERIA FOR DETERMINING THE SIGNIFICANCE OF
• ENVIRONMENTAL EFFECT
Minnesota Rule 4410.170, Subp. 7 specifies the following criteria to be used in deciding
whether a project has the potential for significant environmental effects. An
Environmental Impact Statement (EIS) is not considered necessary for this project based
on the criteria listed below.
1. Type, Extent, and Reversibility of Environmental Effects
The EAW and this Findings of Fact summarize the type and extent of impacts to the
surrounding environment. Alternatives to avoid potential impacts on the environment
were considered and evaluated during the development of the site plan and prior to
the preparation of the EAW. The proposed site plan also includes design features to
mitigate potential social, economic, and environmental impacts
The following is a summary of the major findings of the EAW regarding potential
social, economic, and environmental impacts as a result of the proposed mixed -use
development project.
•
•
Nature's Refuge
DRAFT DECEMBER 14, 2006 EAW Record of Decision
page 3
Compatibility with Local Plans
The project is consistent with local and regional plans, which includes the following:
• City of Lino Lakes Comprehensive Plan
o Land Use Plan
o Sanitary Sewer Plan
o Transportation Plan
o Surface Water Management Plan
o Parks, Natural Open Space /Greenways and Trail System Plan.
The City's Comprehensive Plan guides the project area for Low Density Sewered
Residential development. The City's Zoning Ordinance provides for conservation
development through the use of the Planned Unit Development process. The Parks
Plan designates this area for natural resource protection and conservation as well as a
city trail. These goals would be fulfilled with the Nature's Refuge project.
Conservation Development
The project will combine residential development conservation of a valuable wetland
complex. This rare wetland type and its rare plant species will be restored to higher -
quality conditions and managed to remain a high - quality system dominated by native
plant species, while maintaining its present suite of wetland services and values (e.g.
flood retention, protection of downstream public waters). The revenue generated by
the development of the residential subdivision will allow for the full funding of the
restoration and management plan. A small percentage of wetland area and a quantity
of forested upland will be lost as a result of the development, in exchange for creation
of the high - quality conservation reserve including the remaining wetlands and
surrounding forested uplands. From the ecological perspective, the project will result
in a net gain in environmental quality. This plan has been given initial provisional
support by several regulatory agencies.
Wetland Impacts
The project will result in filling of 7.5 acres of wetland, and in the restoration,
management, and preservation of 132 acres under a conservation easement with an
ongoing management plan in perpetuity. Most wetland area to be filled is presently
in a disturbed, degraded condition. All wetland acreage to be put under conservation
management will be restored to higher - quality conditions with greater floristic
diversity and reduced abundance of exotic invasive plant species. The conservation
plan will also include restoration and management of upland wooded areas and other
vegetated buffers along wetland boundaries.
Wetland losses are expected to be mitigated by wetland credits generated through the
establishment and management of the conservation area. It is hoped that this area
•
Nature's Refuge
DRAFT DECEMBER 14, 2006 EAW Record of Decision
page 4
will be designated as an area of Exceptional Natural Resource Value (ENRV) based
on the existence of several rare (state - listed) plant species and a rare wetland
community. The BWSR Wetland Committee has expressed initial approval of this
approach for this site (April 2006 meeting). This designation will allow greater
wetland credit generation. It is expected that the conservation plan will allow
accumulation of excess wetland credit, which will be banked for future off -site
wetland mitigation needs within the city and/or watershed.
Forest and Tree Impacts
The project will cause the conversion of 51 acres of forest, resulting in the loss of
forest wildlife habitat and a large number of trees. The development is designed to
preserve forested upland buffers wherever possible. Remaining forest patches will be
restored and maintained as part of the conservation area.
Rare Species Impacts
Blanding's turtles and five rare plant species have been recorded on the site. At
present, it is unknown how many turtles use the site, but they are most likely to occur
in and around the larger, deeper wetlands, which will be protected from loss or impact
by the project. By including upland wooded buffer zones in the planned conservation
areas, upland foraging and nesting habitat for Blanding's turtles will be maintained,
though there may be some permanent reduction in this type of habitat. As
recommended by DNR, signs will be installed to inform residents and visitors of the
need for caution around turtle habitat. The installation of ribbon curbs in some places
will reduce barriers to turtle movements. Flyers will be given to all contractors
working in the area, and future residents will be informed of the presence of the
turtles and their habitat needs. Silt fencing will exclude the turtles from construction
areas, but will be removed after construction and revegetation to allow free turtle
movement. Culverts connecting wetlands and ponding areas will be of recommended
size and shape to allow turtle passage. The runoff and sedimentation controls, and
restriction on fertilizer use, will help maintain habitat quality for the turtles. In
general, the placing of the conservation areas under easement and long -term
management will maintain habitat quality.
The rare plant species found on the site are all native wetland plants that respond well
to wetland restoration measures that are planned for the conservation areas.
However, a minority of populations of these plants presently occur in wetlands that
would be filled by the project. This will constitute a taking of rare plant populations
which will require a permit from the DNR. The DNR has expressed initial support
for this approach on condition that the conservation areas be fully restored and
maintained as improved habitat for these plant species. Also, attempts will be made
to transplant existing populations from those wetlands that will be filled into wetlands
that will be restored. Because future active restoration and management activities are
•
Nature's Refuge
DRAFT DECEMBER 14, 2006 EAW Record of Decision
page 5
primarily aimed at restoring and maintaining native plant communities, the
populations of rare species are expected to continue and possibly expand.
Floodplain
A portion of the site lies within a Zone A 100 -year flood plain, though the flood
elevation has not been established. The project will result in a re- grading of part of
the site, so changes to the flood elevation contour will be required. Construction and
re- grading in the present flood zone will be minimized, because only one street will
cross the flood plain and no houses will be located within it. The 100 -year flood
elevation will be established as part of the project design and compensatory storage
will be created for any floodplain fill. The FEMA floodplain map revision will be
prepared as needed.
Water Quality and Stormwater Management
The project will be designed to avoid altering drainage conditions and protect water
quality. Runoff will be directed to vegetated swales, rain gardens, and infiltration
ponds. Sedimentation ponds and rain gardens will be designed to treat storm water
runoff before discharge. The ponds will be designed to retain a 100 -year storm event
and control the discharge rate to pre- development conditions. Drainage from
residential areas and impervious surfaces will be directed into infiltration areas in
order to prevent sedimentation or contamination of wetlands, to control inflow rates,
and to maintain present hydrology as well as possible. Infiltration ponds will be
protected from soil compaction by construction equipment, and any compacted areas
will be disked to de- compact the soil, which will ensure water infiltration and
successful re- vegetation.
Erosion Control
Erosion control measures will be implemented in accordance with the Storm Water
Pollution Prevention Plan (SWPPP) developed for this project to mitigate the
potential for adverse surface water and air quality impacts from runoff and wind
erosion during construction. The SWPPP will incorporate Best Management
Practices prescribed by the MPCA. These measures, including silt fencing, ditch
checks, stone exit pads, and prompt turf restoration (including de- compacting,
mulching, seeding) in graded areas. The phasing of construction will minimize the
area of soil exposed at any given time.
Construction- Related Noise, Dust
Standard Best Management Practices will be employed to minimize dust Water will
be applied to exposed soils during dry weather to mitigate dust movement. The dust
and wind erosion BMPs will be employed to minimize inconveniences to them.
•
Nature's Refuge
DRAFT DECEMBER 14, 2006 EAW Record of Decision
page 6
Noise generation will be typical of any residential construction activity and will cease
after the construction phase. Construction hours will be limited according to City
policy: 7 a.m. to 7 p.m. Monday — Friday; 9 a.m. to 5 p.m. Saturday; no work
Sundays or holidays.
The elementary school building has air conditioning, so the windows will be closed
much of time during hot weather and during cold weather heating months.
Traffic
The project will generate a new traffic, primarily on CSAH 14. Completing the
recommended improvements will mitigate the additional traffic volume to minimize
impacts on adjacent roadways. These improvements include signalization of the
CSAH 14 /CSAH 23 intersection and additional right of way for turn lanes on CSAH
14. The timing of the installation of a signal will need to be an important
consideration in the review of the Nature's Refuge project application.
In addition, the City is working with the developer, Anoka County, and Forest Lake
School District 831 regarding combining the school's access with the new
development. To date, all entities have expressed support for this option. This option
of a combined access to CSAH 14 will comply with and further the implementation
of the TH 242 /CSAH 14 Access Management Study.
Air quality will not be significantly impacted by the traffic increase and proposed
residential land use.
2. Cumulative Potential Effects of Related or Anticipated Future Projects
The EAW and this Findings of Fact address the impacts related to the proposed
development, based on existing conditions and post - development conditions. The
City of Lino Lakes is not aware or any other large -scale development plans that are
contingent upon the completion of the Nature's Refuge Development
3. Extent to Which Environmental Effects Are Subject to Mitigation by Ongoing
Public Regulatory Authority
The mitigation of environmental impacts will be designed and implemented in
coordination with regulatory agencies and would be subject to plan approval and the
permitting process. An extensive list of permits and approvals that may be required
for the proposed development are listed in Item 8 of the EAW. An additional
approval would be the Section 401 Water Quality Certification from the Minnesota
Pollution Control Agency that is needed for the Section 404 Permit from the U. S.
Army Corps of Engineers. In addition to the approvals listed, ongoing
implementation of the conservation management plan prepared for the specific site
and project will be an important regulatory and mitigation measure.
Nature's Refuge
DRAFT DECEMBER 14, 2006 EAW Record of Decision
page 7
4. Extent to Which Environmental Effects Can be Anticipated and Controlled as a
Result of Other Environmental Studies Undertaken by Public Agencies or the
Project Proposers, Including EIS's Previously Prepared on Similar Projects
The RGU, City of Lino Lakes, has extensive experience in the planning and review of
residential and commercial development projects. Specifically, this will be the third
conservation development management plan to be implemented in Lino Lakes. The
management plan for the conservation areas of the project will describe management
activities such as invasive species removal, restoration, and rare species habitat
protection. This management plan must be prepared and included in the approvals of
the project prior to earth work or logging of the site.
The City of Lino Lakes finds that the environmental effects of the proposed mixed -
use development have been anticipated and will be controlled as a result of
environmental review and experience with other residential developments prepared as
conservation developments within the City.
EAW COMMENTS AND RESPONSES
The EAW for the Legacy at Woods's Edge Development was distributed for public
comment on October 23, 2006 to agencies and organizations on the official distribution
list of the Environmental Quality Board (EQB), as well as additional
agencies /organizations that had either requested a copy of the document, and /or that
could be affected by the proposed project. The comment period for the EAW officially
expired on November 22, 2006.
Consistent with state and federal environmental review rules, substantive comments are
responded to in this Record of Decision/Findings of Fact. Comment summaries and the
City's responses are listed below. The full comment letters are included at the end of the
list.
Transportation
• Anoka County Highway Department (ACHD) comments that CSAH 14 is a principal
arterial roadway, one of the few continuous east -west routes in Anoka County.
Safety and mobility are of primary concern.
• • ACHD comments that the City and County adopted the TH 242 /CSAH 14 Access
Management Study to ensure and enhance safety and mobility.
Nature's Refuge
DRAFT DECEMBER 14, 2006 EAW Record of Decision
page 8
o The study does not identify a full access location for the Nature's Refuge site.
o Replacing the Wood Duck Trail full access with one for the Nature's Refuge
development would not conform to the study.
o It is not necessarily true that changing the access would provide access for a
higher volume cross street.
o It is not true that combining the access with the school would combine two
separate full access points into one full access point because the new development
would only be allowed a partial access. A combination would result in one full
access from one full and one partial access.
o Nor is it correct that the appropriate time for reviewing access in detail would be
during planning for the CSAH 14 upgrading to four lanes: access has been
studied in detail already with the Access Management Study.
o ACHD does not support a full access for the project alone.
• ACHD comments that Lino Lakes Elementary school is expected to keep its (full)
access locations for bus circulation as long as safety is not an issue. In the future, the
school is likely to have its access change as traffic volumes increase. There is no
guarantee that the school will continue to have full access; it may end up with 3/4
access depending upon safety concerns.
• The Metropolitan Council comments that CSAH 14, as a principal arterial, is an
element of the Metropolitan Highway System. The Met Council supports the access
alternative that will not compromise the roadway's function and that is consistent
with spacing and management guidelines.
Response: The City of Lino Lakes agrees that CSAH 14 is a vitally important
element of the transportation system. The City also fully supports and has been
implementing the TH 242 /CSAH 14 Access Management Study.
In retrospect, the EAW may not be clear on the City's preference for access for the
Nature's Refuge project. The traffic study prepared for the developer by Wenck
Associates includes a number of statements that generated comments by ACHD. Some
of the statements do not represent the City's approach to planning the access for the
project. The text in Item 21 of the EAW includes the City's positions.
The City does not support a new, full access serving only the Nature's Refuge project.
The City is proposing the option of combining the access with the elementary school. As
explained in the EAW, the school's full access driveways are labeled "rio change" in the
Access Management Study. The City initiated discussions with Anoka County and the
Forest Lake School District 831 regarding combining access with the new development.
To date, all entities have expressed support for this option. In the past, Anoka County
prepared a similar combination of a school access and a public road to provide access to
Main Street for Roosevelt Middle School in Blaine.
•
•
•
•
Nature's Refuge
DRAFT DECEMBER 14, 2006 EAW Record of Decision
page 9
Because of the spacing required by the Access Management Plan, an additional full
access solely for the Nature's Refuge development would not be allowed. The other
option is a partial access (right - in/right -out). The City does not support the partial access
option because it would not allow an east turn onto CSAH 14. Most drivers leaving the
development would want to turn east on CSAH 14 then south on CSAH 23 to the I -35W
interchange. A partial access would not meet the needs of the development.
The City will continue to work with the developer, Anoka County, and Forest Lake
School District 831 toward designing an access road that will maintain a full access for
the school, improve safety and circulation for the school, and provide a safe, full access
for the Nature's Refuge development.
• ACHD comments that it will want a full complement of turn lanes for project access
as part of the project design because funding has not been identified for upgrading
CSAH 14 into a four -lane facility (with medians).
Response: The City concurs that turn lanes constructed with this project would be
appropriate. The City will work with ACHD and the developer to design appropriate
improvements to CSAH 14 at the project access point. This would include the dedication
of the additional right of way for CSAH 14 to accommodate roadway needs. The City
also needs to consider the potential need for a local trail on the north side of CSAH 14
that would provide access to a future regional trail that would be constructed on the south
side.
• ACHD comments that Pine Street is not a county road and so county spacing
guidelines do not apply.
Response: The City concurs with this. The traffic study applied the County's
guidelines to Pine Street as an exercise only, since the City does not have comparable
spacing guidelines.
• The City of Columbus wishes to explore the paving of Pine Street, possibly during
early stages of the Nature's Refuge development rather than in the last phase.
Response: As noted in the EAW, Lino Lakes and Columbus have discussed
improving Pine Street in the past. Pine Street should be paved to the access point of the
Nature's Refuge access. The timing needs to be worked out with the developer and the
two cities.
• Columbus recommends that Pine Street not be used as a construction road for the
project.
•
Nature's Refuge
DRAFT DECEMBER 14, 2006 EAW Record of Decision
page 10
Response: The site is large and there are two possible accesses. Pine Street is one of
them. The route of construction vehicles has not been specified, but it is likely that Pine
Street would be needed for access during construction. Lino Lakes will discuss
possibilities with the developer. Lino Lakes does enforce requirements for mitigating
dust during construction and limits work times on construction sites.
• Columbus notes that if the improvements on CSAH 14 are not completed prior to the
development, the traffic analysis will not be accurate and Pine Street will be affected.
Response: The traffic analysis assumed signalization of the CSAH 14 /CSAH 23
intersection when concluding the intersection would function at Level of Service C or
better. Without a signal, the LOS would be F for many movements. As noted in the
EAW, the timing of the installation of a signal will need to be an important consideration
in the review of the Nature's Refuge project application.
Municipal Utilities
• The City of Columbus is interested in discussing the possibility of extending sewer
and water service further north on Lake Drive to serve Columbus.
Response: Lino Lakes has not previously planned to oversize sanitary sewer facilities
to serve property outside of Lino Lakes. Several issues arise when considering doing so.
Columbus should discuss the situation with the Metropolitan Council to see if the
Council's system plans allow for utility service. We would need to determine the
capacity of Metropolitan Council facilities into which the Lino Lakes system flows.
Next, the capacity of the Lino Lakes system is not endless, and planning studies to date
indicate there is not excessive capacity. The feasibility of extending the Lino Lakes pipe
would need to be examined. The cost of the feasibility study as well as construction
would need to be examined as well. Lino Lakes would need to ask if serving land in
Columbus should preempt providing service for land within Lino Lakes along Lake
Drive. While Columbus' proposal may be feasible, it raises larger questions that would
need to be resolved.
Water Quality, Wetlands, Stormwater Management
• The Rice Creek Watershed District (RCWD) asks for clarification of the statement in
EAW Item 6 that "The goal will be to cause no net change to existing drainage
patterns in remaining wetlands ". Does this refer to rate and /or volume? Changes in
volumes could impact the wetland resources.
Nature's Refuge
DRAFT DECEMBER 14, 2006 EAW Record of Decision
page 11
Response: It is the goal to minimize the impact of development on the annual runoff
loading (volume).
• RCWD notes that the wetland delineation for this property has not been formally
approved and at this point is considered preliminary.
Response: This statement is correct. Many, though not all of the wetlands have been
delineated, but there has been no formal approval by the Watershed District. The
delineation will need approval by the RCWD.
• RCWD notes the approximate proposed wetland impacts of 7 acres will be subject to
WCA sequencing and mitigation through the RCWD permitting process and should
be considered as only an initial estimate at this time. < Jason et al to address>
• RCWD notes that wetlands serve both hydrologic and water quality functions. The
RCWD strongly encourages the project proposer to conduct a functional assessment
of both the water quality and hydrology of the existing wetland to ensure the
avoidance and minimization of impacts to these functions. <Jason et al to address>
• RCWD notes that there is an indication of some floodplain fill. The RCWD is
concerned about how this will affect the hydrology of the adjacent wetlands in
complex 7.
Response: The City and project proposer share the understanding that minimizing the
impact to the hydrology of the wetlands is a critical component to maintaining the
integrity of the wetland complexes. Floodplain fill will be minimized in recognition of
this project goal.
• RCWD notes that no comparison of quantity and quality of runoff pre- and post -
construction was constructed. Because the project site ultimately discharges to
Marshan Lake which is an impaired waterbody under the MPCA 303(d) list, such an
assessment needs to be conducted.
•
•
•
•
Nature's Refuge
DRAFT DECEMBER 14, 2006 EAW Record of Decision
page 12
Response: Site - specific data has been collected including infiltration parameters
using a double -ring infiltrometer for existing and impacted portions of the property. In
addition, surface water and groundwater data has been collected throughout 2006. This
data is being used in the development of a hydrologic model of the project site. The
proposer has met with the RCWD to discuss the model development and looks forward to
continuing collaboration with the RCWD in finalizing the model to represent the existing
and constructed environment. The model results will be an important component of the
required RCWD permit process.
• The Minnesota Pollution Control Agency (MPCA) notes that a Section 401 Water
Quality Certification from the MPCA is needed for the issuance of a Section 404
Permit from the U. S. Army Corps of Engineers. The 401 Certification should be
included in the list of permits and approvals in Item 8 of the EAW. Although the
MPCA will likely waive its 401 authority, an application for the certification is still
necessary.
Response: The City thanks the MPCA for this clarification and acknowledges the
need for the 401 Certification as one of the needed approvals.
• The Minnesota Pollution Control Agency (MPCA) comments that to be effective,
infiltration areas should not be compacted during construction or receive construction
runoff. Soil ripping may be necessary if soil compaction occurs.
• The Minnesota Pollution Control Agency (MPCA) comments that it is a state
requirement that three feet of separation be provide between the bottom of the
infiltration bsins and the seasonally saturated groundwater table. This may be
difficult to achieve give the relatively shallow groundwater table.
• MPCA recommends that information be provided to homeowners at the time of sale
to ensure they understand what a rain garden is, how it works, and why they are
important.
•
Nature's Refuge
DRAFT DECEMBER 14, 2006 EAW Record of Decision
page 13
Land Use
• The Metropolitan Council notes that the density of 2.78 units per acre is below the
Metropolitan Council standard for sewered, urban development. The Met Council
also notes that a portion of the project currently is not within the City's Metropolitan
Urban Service Area so some of the City's undesignated MUSA must be applied.
Response: The Metropolitan Council density standard of 3.0 units per acre for
sewered urban development is a citywide average for new development. It is correct that
this project's density is lower than that. Development of higher density elsewhere in the
city will be included in the citywide average.
The City allocates MUSA reserve acres at the time of preliminary plat approval. If this
project reaches the approval stage, MUSA will be allocated then.
Parks and Open Space
• The Metropolitan Council comments that the majority of the site is withing a Metro
Wildlife Conservation Corridor and a Regionally Significant Ecological Area of
Outstanding Quality, while the eastern portion of the site is a Regionally Significant
Natural Resources Area of High Quality, as designated by the DNR and the
Metropolitan Council.
• The Metropolitan Council notes that the south portion of the property lies along the
proposed Central Anoka County Regional Trail. The City should coordinate with
Anoka County Parks to define the relationship of this trail with the development.
Response: The EAW describes the trails through the development and how they
implement the City's System Plan. It was an oversight that the EAW did not mention this
important transportation trail along CSAH 14. The Lino Lakes Parks, Natural Open
Space /Greenways and Trail System Plan includes a "proposed designated bike route"
along CSAH 14, the route of the Central Anoka County Regional Trail. The Central
Anoka County Regional Trail is tentatively planned along the south side of Main Street.
When funding becomes available the County will consider funding and trail needs when
comparing an off road trail vs. a paved roadway shoulder. The regional trail may fulfill
the City's desire for a bike route.
Nature's Refuge
DRAFT DECEMBER 14, 2006 EAW Record of Decision
page 14
The Nature's Refuge site is on the north of CSAH 14. There is a crosswalk for the
elementary school immediately east of the Nature's Refuge project site. Residents of the
development could cross CSAH 14 in the crosswalk to access the regional trail on the
south side of the road. In the future, CSAH 14 likely will be improved to four lanes.
Conveying pedestrians and bicyclists to the signalized intersection of CSAH 14 /CSAH
23 would be the best way to cross CSAH 14 for access to the regional trail. For this
reason, the City may consider a local trail on the north side of CSAH 14 to complement
the regional trail on the south side.
The City agrees that continued coordination with Anoka Parks and the Anoka County
Highway Department should continue for the planning of the County's and City's trail
systems to optimize the coordination of the two systems.
Wildlife Habitat
• Rod Kukonen comments that the suggestion that the bird population contains various
songbirds such as the American Gold Finch and robin is extremely weak. He list
numerous other species he has observed on the site.
Response: While Item 11 of the EAW cites some examples of species observed, it
does not pretend to be a complete list. Long term residents of the area surely have
observed many more species than could be noted during site visits. The City recognizes
the extensive wildlife diversity in this area of the community. It is the richness of habitat
and ecological resources in the area that make it a good site for a conservation
development project.
• The Minnesota Department of Natural Resources (DNR) comments that there will be
substantial reduction of forest and grassland areas due to the project. To provide
Blanding's turtle habitat, some protected upland grassland area adjacent to the
wetland would have to be left undeveloped and protected. It may be necessary to
create more buffer adjacent to the wetland and manage it as dry prairie.
• The DNR comments that the EAW mentions a restoration and management plan but
does not include it. Nor does the EAW identify an entity that would be responsible
for implementing the management plan. Without this information, DNR cannot be
confident that the project will in fact result in an acceptable level of habitat benefit.
•
Nature's Refuge
DRAFT DECEMBER 14, 2006 EAW Record of Decision
page 15
• The DNR comments that the project could be a candidate for implementation under
the "exceptional natural resource value" provision of the Wetland Conservation Act,
which allows credit for projects that restore exception natural resource values. Before
the DNR would agree to the use of thes provision or permit the taking of state - listed
plant species, the City would have to assure us that it would put in place adequate
regulatory and management mechanisms to protect and sustain these resource values
well into the future.
Other
• The DNR notes that the project will result I the removal of a significant amount of
wood from the site. Depending on the condition of the wood, the developer may elect
to market it as sawlog, landscaping material, firewood, or bio -fuel for the production
of energy. The DNR strongly recommends that the City contact the DNR for advice
on this subject.
Response: The City will convey this advice to the developer and follow up on the
possibilities of utilizing the wood as suggested by the DNR.
• Rod Kukonen comments that buffering between existing neighborhoods and new
development should be included in the design of new development so existing
residents can still view natural settings from their backyards instead of a garage or
shed..
Response: The City recognizes that changes on nearby property that has long been
undeveloped is disturbing to many people, and the EAW acknowledges this. Buffering
and greenspace are important design elements. Greenspace buffers surround all
developed areas in the Nature's Refuge concept plan analyzed in the EAW, and will be
included in any final design on the site. It may be unrealistic to expect that existing
residents will not see any evidence of new homes on new development sites.
• Frederick and Melanie Hedervare comment that it is inaccurate to call the project a
`conservation development'. They comment that the developer is trying to avoid an
environmental impact study by proposing a number of units just under the number
that would make an environmental impact study mandatory. They comment that the
City should abide by the growth limits that are on the books.
Nature's Refuge
DRAFT DECEMBER 14, 2006 EAW Record of Decision
page 16
Response: The proposed project includes 278 detached dwelling units. The threshold
for a mandatory environmental assessment worksheet (EAW) is 250, and that is why the
EAW was prepared. The threshold for a mandatory environmental impact statement is
1000, which is well above what is proposed.
There is some misunderstanding about conservation developments. Lino Lakes
Ordinance No. 24 -04 defines conservation development as a collaborative process which
results in a development plan, typically a planned unit development, in which certain
stipulated public values are achieved in exchange for greater flexibility on general
development requirements and the growth limits defined in the ordinance.
Lino Lakes Ordinance No. 24 -04 allows the City Council reasonable discretion to
approve housing units in excess of the stipulated growth limits when a project would
result in significant and discernable public values above and beyond those achievable
under conventional development. The Nature's Refuge project design includes all the
public values listed in the ordinance, which includes:
a. Preserving more natural open space than required under current ordinances and
development policies
b. Reducing the extent of impervious surfaces and size of the development footprint
c. Restoring /enhancing ecological systems on the site as part of the development
process
d. Protecting off -site ecological systems through increased buffering
e. Ensuring long -term natural resource stewardship through an endowment program
sponsored by the Developer
f. Providing public park and trail opportunities consistent with or in excess of the
System Plan
g. Managing stormwater (flow rates and quality) using natural infiltration and
ecologically -based approaches
h. Preserving the open space aesthetic to which community residences have become
accustomed
i. Maintaining natural buffer between established and new developments
As proposed and analyzed in the EAW, the Nature's Refuge project clearly meets the
definition of a conservation development.
CONCLUSIONS
1. All requirements for environmental review of the proposed project have been met.
2. The EAW processes has generated information that is adequate to determine whether
the project has the potential for significant environmental effects.
•
Nature's Refuge
DRAFT DECEMBER 14, 2006 EAW Record of Decision
page 17
3. Mitigation will be provided where impacts are expected to result from project
construction and operation of the site. Mitigative measures are incorporated into the
project design and the restoration and management plan for the conservation areas,
and have or will be coordinated with state and local agencies during the permit
process.
4. Based on the criteria in Minnesota Rules 4410, the project does not have the potential
for significant environmental effects.
5. An EIS is not required on the proposed Nature's Refuge development project.
6. The City of Lino Lakes passed Resolution No. 07- on , 2007,
stating its approval of the Environmental Assessment Worksheet and its acceptance
of the Findings of Fact and Conclusions for the Nature's Refuge Development. (See
Attached Resolution).
•
•
•
11/09/06
Mr. Jeff Smyser
City Planner
600 Town Center Parkway
Lino Lakes, MN 55014
COUNTY OF ANOKA
Public Services Division
HIGHWAY DEPARTMENT
1440 BUNKER LAKE BLVD. NW, ANDOVER, MINNESOTA 55304
(763) 862 -4200 FAX (763) 862 -4201
2006
Nov � /,
caNt
Re: Comments on the Nature's Refuge Residential Subdivision EAW
Dear Mr. Smyser:
Thank you for providing us the opportunity to comment on the proposed Nature's Refuge Residential
Subdivision EAW for approximately 232 acres in the City of Lino Lakes. The following comments
have been gathered from the Highway Department:
• CSAH 14 is one of the few continuous east -west routes in Anoka County. It is a Principal
Arterial roadway that is expected to carry a significant amount of traffic as the communities in
the area develop because it connects to other major freeway facilities and other principal
arterials. Because CSAH 14 is a Principal Arterial roadway, safety and mobility are of primary
concern to the County.
• Anoka County and the City of Lino Lakes adopted the TH 242 /CSAH 14 Access Management
Study to ensure and enhance safety and long -term mobility on the TH 242 /CSAH 14. As part
of the study, a general access strategy was developed and applied to the corridor. Within the
study area for Nature's Refuge, no full access location has been identified. Full access
locations with traffic signals have been identified for Lake Drive (CSAH 23) and for Wood
Duck Trail. Lino Lakes Elementary, which presently has direct driveway access to CSAH 14,
is expected to keep its access locations for bus circulation as long as safety is not an issue.
Right - in/right -out access has been identified for other locals streets (Aenon Place and Nancy
Drive).
• Anoka County and the City of Lino Lakes also agreed to a future "full build" of CSAH 14 that
will realign the CSAH 14 corridor north of its present condition and provide interchange access
NOV ?006
crry c ::._ EKES
to both I -35W and I -35E in the future. These planned improvements to the CSAH 14 corridor
further enhance its status as a Principal Arterial roadway and result in significantly higher
traffic volumes on CSAH 14 within the project area in the next 20 years (see attached exhibits).
• Replacing the full access at Wood Duck Trail with a right - in/right -out so that a full access
could be used for the Nature's Refuge development is not in conformance with the TH
242 /CSAH 14 Access Management Study. Spacing between Lake Drive (CSAH 23) and the
new proposed access would still be too close. Mobility for a majority of the traffic using both
CSAH 14 and Lake Drive would be negatively impacted with the closer spacing.
• The logic for the premise that changing the access would combine two separate full access
points into one full access point is not sound. The proposed development would only be given
a right - in/right -out under the TH 242 /CSAH 14 Access Management Study guidelines and the
Anoka County Highway Department Access Spacing Guidelines. Thus, at best, a full access
combined with a right - in/right -out. In the future, the school is likely to have its access change
as traffic volumes increase. There is no guarantee that the school will continue to have full
access, it may end up with three - quarter access depending upon safety concerns as traffic
volumes grow.
• The comment that changing the access would provide access for a higher volume cross streets
is not necessarily true. Wood Duck Trail serves a couple of subdivisions on both the north and
south sides of CSAH 14. There are a number of homes on the south side of CSAH 14 that
currently depend on full access at Wood Duck Trail. These individuals have purchased a home
in the area with an understanding that an access study had been completed for the area and that
they are to have full access at Wood Duck Trail. Changing that access to serve roughly the
same number of residences does not necessarily provide any advantage, it goes against an
adopted plan, and it changes public expectations.
• Funding has not been identified for upgrading CSAH 14 into a four -lane facility in this area.
The proposed development would be in place before such funding could be obtained. Because
of the proposed amount of traffic that will be added as a result of this project, the County is
likely to want to see the geometries of the proposed access to CSAH 14 to have a full
complement of turn lanes to ensure driver safety and promote mobility. This is true whether or
not the access would be right - in/right -out or full.
• County Access Spacing Guidelines do not apply to access to Pine Street as it is a local facility
and not a County facility (Page 4 -4).
• The conclusion that planning during the upgrading of CSAH 14 to a four -lane facility is the
appropriate time to review access in detail is not correct. An access study that took into
account considerable detail arrived at the conclusion that a right - in/right -out access in this
location is appropriate to serve the long -term safety and mobility needs on this corridor.
• The traffic analysis indicates that vehicles from the proposed development will contribute to the
•
poor level of service at Lake Drive (CSAH 23). It will also add a number of additional trips
onto both CSAH 14 and CSAH 23.
While we agree to continue to work with City staff and the developer on access issues and
improvements to the County Highway System as a condition of access (CSAH 14 mainline and the
CSAH 14 /CSAH 23 intersection), we cannot support the proposed full access on CSAH 14 as
described in the EAW. Again, we would like to invite city staff and the developer to discuss access to
the site and potential additional traffic analyses to address safety and mobility concerns presented by
the development.
Thank you again for allowing us the opportunity to comment on the Nature's Refuge EAW. We hope
we can further discusses the issues highlighted in our letter and come to an understanding of how
access to the site will be provided. We hope to continue coordinating our efforts with the City of Lino
Lakes to improve transportation as the area continues to grow.
Please contact me to set up a time when we can continue our discussions on access to CSAH 14 and
the implications of the EAW.
Sine
J . ck Corkle, AICP
• Senior Multimodal Transportation Planner
cc: Douglas W. Fischer, P.E.
Lyndon Robjent, P.E.
Kate Garwood, AICP
Jane Rose
•
County Engineer
Assistant County Engineer
Multimodal Transportation Manager
Traffic Engineering Manager
LL BUILDOUT
• ption 4 Includes
▪ Additional regional access provided at I-35E.
• Additional regional access provided at I-35W.
• A local connection on the north between
County Road 14 and County Road 21
(20th Street).
• Full Buildout land uses.
XX = PROJECTED 2030 AVERAGE DAILY TRAFFIC (ADT)
COUNTY ROAD 14 PROJECT AREA
PLANNED FUTURE IMPROVEMENTS
REGIONAL ACCESS IMPROVEMENT ALTERNATIVE
28,000
RICE CREEK. - CHAIN OF LAKES
REGIONAL PARK
RESERVE
SAmnon
�'S% mold`
Full Build - Option 4
Option 1 Includes
XX = PROJECTED 2030 AVERAGE DAILY TRAFFIC (ADT)
COUNTY ROAD 14 PROJECT AREA
PLANNED FUTURE IMPROVEMENTS
REGIONAL ACCESS IMPROVEMENT ALTERNATIVE
COLUMBUS
TOWNSHIP
2000 POP. 3,957
PIK ST.
PLAT n. G
LINO LAKES
N' 1
2000 POP. 16,791
11,100
3,300
3,300
LINO LAKES
2000 POP. 16.791
OPTION 1 RICE CREEK - CHAIN OF LAKES
EXISTh0 ALIGNMENT
REGIONAL PARK
RESERVE
COMORO, 4.1-04
CENTERVILLE
2000 POP.3.202 m
Regional Access Alternatives - Option 1
•
•
•
Message
Jeff Smyser
Page 1 of 2
From: Insook, Chai [Chai.lnsook @state.mn.us]
Sent: Friday, November 17, 2006 8:36 AM
To: Jeff Smyser
Subject: Environmental Assessment Worksheet for the Nature's Refuge Residential
Subdivision Development Project in Lino Lakes, Anoka County
Attachments: Section 401 Water Quality Certification.pdf
Dear Mr. Smyser:
Thank you for the opportunity to review this EAW. The Minnesota Pollution Control
Agency (MPCA) has the following comments:
Item 8 indicates the project will require a Section 404 Wetland Permit from the U.S.
Army Core of Engineers ( USACE). Please note that an MPCA Section 401 Water
Quality Certification is also needed for the issuance of the USACE Section 404 Permit.
Although the MPCA will likely waive its 401 authority, an application for a 401
certification is still necessary. The attached Fact Sheet explains the MPCA's Section
401 Certification Program and explains how to apply.
Item 16 indicates that stormwater runoff management infiltration and rain gardens is
proposed. To be effective, it is important that these areas are not compacted by
construction activities and do not receive construction runoff. The MPCA recommends
that these areas be created near the final phases of construction, and soil ripping may
be necessary in areas where soil compaction was unavoidable during construction. It is
a state requirement that 3 feet of separation be provided between the bottom of the
infiltration basins and the seasonally saturated groundwater table. This may be difficult
to achieve given the relatively shallow groundwater table in the proposed project
area. Finally, the MPCA recommends that information be provided to homeowners at
the time of sales to ensure they understand what a rain garden is, how it works, and
why they are important.
These comments address matters of concern to MPCA staff reviewing the EAW and is
submitted for consideration by the responsible governmental unit in determining the
need for an EIS. It does not constitute approval by the MPCA for any element of the
Project for the purpose of pending or future permit action by the MPCA. We have
attempted to identify and consult with interested program staff to identify the MPCA
permits that may be required. Additional comments or requests for information may be
submitted in the future to address specific issues related to an MPCA permit that is
required.
Thank you again for the opportunity to review this EAW. Ultimately, it is the
responsibility of the Project proposer to obtain the required permits and comply
with permit conditions. If you have questions about these comment, please contact
Todd Smith with our Stormwater Policy and Technical Assistance Unit at (651) 215-
6008. If you have other questions concerning our review of this EAW, please contact
me at (651) 296 -7718.
Sincerely,
11/20/2006
•
Message Page 2 of 2
Chai Insook
Minnesota Pollution Control Agency
Environmental Review and Operations Section
520 Lafayette Road
St. Paul, MN 55155-44194
http://www.pca.state.mn.us/
http://www.pca.state.mn.us/water/stormwater/stormwater-c.html
11/20/2006
Minnesota Pollution Control Agency
November 2001
Facts about MPCA reductions to the Clean Water Act
Section 401 Certification Program
Introduction
The Minnesota Pollution Control Agency has
experienced a three -year trend in decreased staff
funding, and has lost about nine percent of its former
staffing level. Therefore, we've had to reduce service
in a number of programs so that the state's highest
environmental priorities can still be met.
This fact sheet describes the effect of this downsizing
on the agency's Section 401 Certification program for
water quality.
Background
Under the federal Clean Water Act, any time a federal
permit is needed for activities which may result in a
discharge into waters of the United States, an
applicant for the permit must obtain a Section 401
Water - Quality Certification. The purpose of the
certification is to ensure the quality of the waters in
question will not be adversely affected. In Minnesota
the Minnesota Pollution Control Agency has done all
Section 401 certifications.
Examples of projects that require 401 certifications
include:
• Activities authorized by the Corps of Engineers,
such as flood control projects, habitat restoration
projects, emergency stream -bank protection,
modifications to local and dam structures, and
river and harbor dredging and channel
maintenance
• Activities permitted by the Federal Energy
Regulatory Commission, such as FERC permitting
of hydropower dams and other similar activities
• Coast Guard - permitted activities, such as bridge
crossings of navigable waters, dumping septic
tanks in navigable waters, treatment of bilge
waters on Great Lakes, and pipeline or other utility
crossings of waters or wetlands.
While the number and type of activities can vary quite
broadly, the majority of the MPCA's 401 certification
activity has been focused on wetlands.
How will downsizing affect 401 certifications?
As part of the agency's current downsizing, the
MPCA proposed in the 2001 Legislative session to
eliminate the staffing required to operate the 401
certification program. The agency made this decision
based mainly on overall priorities, but also because of
the program's success in creating successful working
relationships with a number of other public partners to
protect water quality. These partnerships have
diminished the need to continue the same level of
oversight of other governmental entities that was
needed in the past. The Legislature concurred with
this view. This change will result in a reduction in
level of effort from two full -time equivalents to 0.1
FTEs.
Because staff are no longer assigned to evaluate 401
applications for conformance with water - quality
standards, the MPCA has decided to waive its 401
authority in most cases. When a project is required to
undergo environmental review and that review has not
been completed, the MPCA will deny certifications
until the review process has been completed.
Regardless, these changes at the MPCA do not in any
way relieve applicants of the obligation to meet water -
quality standards.
Determination of environmental review still
needed
The application for a 401 certification requires the
applicant to state whether or not the project is subject
to environmental review. If not, the project is eligible
Minnesota Pollution Control Agency, 520 Lafayette Rd. N., Saint Paul, MN 55155 -4194
(651) 296 -6300, Toll -free (800) 657 -3864, TTY (651) 282 -5332 Or (800) 657 -3864
This material can be made available In alternative formats for people with disabilities.
•
•
•
for a waiver. When environmental review is required
and has not yet been completed, the MPCA will issue
a denial without prejudice.
If environmental review is required and has been
completed, the Agency will issue a waiver. This
change in procedure promotes better up -front
environmental planning by emphasizing the
importance of environmental review in the earlier
stages of the project planning process. Furthermore,
because the underlying 401 certification authority is
not changing, the MPCA will always reserve the right
to proceed differently if extreme or unique situations
merit a different approach.
Minn. Rules 7001.1420, regarding the issuance of 401
certification, requires that determinations, including
waivers, must be made only in response to an
application for 401 certification. Therefore, formal
applications for 401 certification must still be sent to
the MPCA (care of Regional Environmental
Management Division, attn: 401 Certification) as they
have been in the past. For projects, this application
would consist of a completed copy of the Minnesota
Local /State /Federal Application Forms for
Water/Wetland Projects or the Minnesota
Local /State /Federal Application Forms for
Water/Wetland Projects - Public Transportation and
Linear Utility Projects (found on the Board of Water
and Soil Resources Web site,
www.bwsr.state.mn.us/programs/maioriprompt.html.
For more information
For more information about current reductions in
MPCA program service, please visit the MPCA's
Web site at www.pca.state.mn.us /about /changes.
•
MEMORANDUM
To:
From:
Subject:
Jeff Smyser
City Planner
The City of Lino Lakes
Marcey L. Westrick
Mandatory EAW for Nature's Refuge
Conservation Development
EMMONS
& OLIVIER
RESOURCES
Date: November 21, 2006
The purpose of this memorandum is to provide comments of concern on behalf of the Rice Creek
Watershed District (RCWD) on the Mandatory EAW for the Nature's Refuge Conservation
Development located in the City of Lino Lakes. The comments listed below are with reference
to the pertinent section in the EAW.
#6 Drainage. Please define "no net change in existing drainage pattern in remaining wetlands ".
Does this refer to rate and/or volume? Changes in volumes could impact the wetland resources.
#9 It should be noted that the wetland delineation for this property has not been formally
approved and at this point is considered preliminary.
#10. The approximate proposed wetland impacts of 7 acres will be subject to WCA
sequencing and mitigation requirements through the RCWD permitting process and should be
considered as only an initial estimate at this time.
#12. Wetlands serve both hydrologic and water quality functions. The RCWD strongly
encourages the project proposer to conduct a functional assessment of both the water quality and
hydrology of the existing wetlands to ensure the avoidance and minimization of impacts to these
functions.
#14. There is indication of some floodplain fill. The RCWD is concerned about how this will
affect the hydrology of the adjacent wetlands in complex 7.
#17. No comparison of quantity and quality of runoff pre- and post- construction was
conducted. Because the project site ultimately discharges to Marshan Lake which is an impaired
waterbody under the MPCA 303(d) list, such an assessment needs to be conducted.
The RCWD commends and encourages the City of Lino Lakes in their efforts to integrate
development with conservation. Please feel free to contact me if you have any questions
regarding these comments.
c: RCWD Board of Managers
• RCWD District Office, ATTN: Steve Hobbs
• COLUMBUS
•
•
Phone: (651) 464 -3120 • Fax: (651) 464 -5922
November 21, 2006
City of Lino Lakes
Attn: Jeff Smyser, City Planner
600 Town Center Parkway
Lino Lakes, MN 55014
RE: Lino Lakes EAW "Nature's Refuge" Conservation Development
Dear Mr. Smyser,
Thank you for providing the City of Columbus with a copy of the EAW for
the "Nature's Refuge" Conservation Development for our city's review and
comment. The City of Columbus would like to express their interest in
cooperative planning with the City of Lino Lakes and offers the following
suggestions and/or comments related to the proposed development:
• The City would like to explore the opportunity to evaluate /discuss any common
improvements to Pine Street. Would the developer be willing to complete
improvements on Pine Street prior to the last phase of the project?
• We strongly recommend that Pine Street not be used as a construction road or
haul road for the project.
• If the improvements are not completed on CSAH 14 prior to the development, we
believe that the traffic flow analysis would not be accurate and could impact Pine
Street.
• Columbus is interested in discussing the future possibility of extending sewer and
water utilities further north on Lake Drive on a cooperative basis perhaps through
a Joint Powers Agreement and/or alternate joint arrangement.
Should you have any questions, please contact me at the City Hall Offices.
Sincerely,
Elizabeth Mursko
City Administrator
City of Columbus 16319 Kettle River Boulevard Columbus, Minnesota 55025
tMetropolitan Council
•
•
•
November 20, 2006
Jeff Smyser, City Planner
City of Lino Lakes
600 Town Center Parkway
Lino Lakes, MN 55014
RE: Nature's Refuge Residential Subdivision
Environmental Assessment Worksheet (EAW)
Metropolitan Council District 11
Metropolitan Council Review No. 19884 -1
Dear Mr. Smyser:
This EAW is for a residential development on an irregularly- shaped 232 -acre property. It is
proposed as a conservation development under the City's recently enacted conservation design
ordinance. The resulting site plan would have 278 single - family lots on about 100 acres of the site
with the remaining 132 acres of mostly wetlands restored and preserved through a permanent
conservation easement.
Metropolitan Council staff review of the EAW finds that it is complete and accurate with respect to
regional concerns. An Environmental Impact Statement is not necessary for regional purposes.
Council staff suggests the following advisory comments for the City's consideration before final
project approval.
Land Use (Bob Mazanec, 651- 602 -1330)
The EAW indicates the net residential density of the development will be 2.78 units per acre.
Since this density is below Metropolitan Council standards for sewered, urban development,
it will be important for the City to include the final project density in future plat monitoring
reports to the Council.
Also, the EAW indicates a portion of the project site is lies outside the currently designated
Metropolitan Urban Service Area (MUSA) but is within the City's Growth Area 1, 1998-
2010. While this part of the site is outside the already designated MUSA, it is within the
City's undesignated MUSA area previously approved by the Council and will need to be
added to the current MUSA as the project proceeds. It will be important for the City to
include this transfer of undesignated MUSA area to the City's current MUSA area in its
annual MUSA status reports to the Council and on future growth staging maps.
Parks and Open Space (Jan Youngquist, 651- 602 -1029)
Staff notes that the majority of the site is within a Metro Wildlife Conservation Corridor and
a Regionally Significant Ecological Area (RSEA) of Outstanding Quality, while the eastern
portion of the site is a Regionally Significant Natural Resources Area (RSNRA) of High
Quality as designated by the Minnesota Department of Natural Resources (DNR)
and the Metropolitan Council. The Council, in partnership with the DNR and others,
conducted the inventory and assessment of natural resources in the metropolitan area. The
www.metrocouncil.org
390 Robert Street North • St. Paul, MN 55101 -1805 • (651) 602 -1000 • Fax (651) 602 -1550 • TTY (651) 291 -0904
An Equal Opportunity Employer
•
•
Page Two
Jeff Smyser
November 20, 2006
RSEA and RSNRA are tools that can be used by local governments to assist in identifying
areas for the protection of priority natural resources.
The south portion of the property lies along the proposed Central Anoka County Regional
Trail as identified in the Council's 2030 Regional Parks Policy Plan. Final design and
development of this subdivision should be coordinated with the Anoka County Parks
Department in order to define the interrelationship between the subdivision's trails and the
regional trail. John VonDeLinde, Anoka County Parks Director, can be contacted for further
information at 763 - 767 -2860.
Transportation (Ann Braden, 651- 602 -1705)
The development is located north of CSAH 14, which is designated a principal arterial and
therefore is an element of the Metropolitan Highway System. Full access from CSAH 14 has
been requested but would not satisfy Anoka County's current access spacing guidelines for a
full- movement intersection. According to the EAW, the County, City and developer are
continuing to study access options for the site. The Council supports whichever access
alternative does not compromise the highway's continued function as a principal arterial and
is consistent with County guidelines for access spacing and management.
If you need further information about the Council's review, please contact Bob Mazanec, Principal
Reviewer, at 651 602 -1330.
Sincerely,
Phy Hanson, Manager
Loc. Planning Assistance
cc: Georgie Hilker, Metropolitan Council District 11
Cheryl Olsen, Reviews Coordinator
Bob Mazanec, Sector Representative & Principal Reviewer
John VonDeLinde, Anoka County Parks
Jack Jackson, MultiFamily Market Analyst, MHFA
Tod Sherman, Development Reviews Coordinator, MnDOT - Metro Division
V:\REVIEWS \Communities\Lino Lakes\Letters\Lino Lakes 2006 EAW Nature's Refuge 19884 -1.doc
Minnesota Department of Natural Resources
Mr. Jeff Smyser, City Planner
City of Lino Lakes
600 Town Center Parkway
Lino Lakes, Minnesota 55014 -1182
1200 Wamer Road
St. Paul, Minnesota 55106
651.772.7900
November 21, 2006
RE: Nature's Refuge Residential Subdivision Environmental Assessment Worksheet (EAW)
Dear Mr. Smyser:
The Minnesota Department of Natural Resources has reviewed the EAW prepared for the
Nature's Refuge residential development in the City of Lino Lakes. The document describes the
project as a 250 -acre "conservation development." We compliment the City for taking a
conservation approach to development. At the same time, however, we are concerned that the
proposed ecological improvements rest on a management plan that we have not seen. Without
knowing the details of that plan, we cannot determine whether the City will be able to accomplish
those improvements. We offer the following comments for your consideration.
Fish, wildlife and ecologically sensitive resources (Item No. 11)
The EAW provides an excellent description of good quality, diverse habitat occupying a large
portion of the site and notes the occurrences of five state - listed vascular plant species and one
state - listed animal species, the Blanding's turtle. Direct impacts resulting from the proposed
project, particularly to the forest and grassland habitats, are substantial. As noted in the EAW,
the project would result in a 56% deduction of forest area and a 66% reduction in grassland, and
expose the remaining habitat areas to the effects of adjacent development. If this site is to
provide any Blanding's turtle habitat, then some protected upland grassland area adjacent to the
wetland would have to be left undeveloped and protected. It may be necessary to create more
buffer adjacent to the wetland and manage it as dry prairie.
The EAW also states that preservation, restoration and the long -term management of the
remaining habitat areas will result in a positive effect, i.e., higher quality wildlife habitat. The
EAW mentions a restoration and management plan, but does not include it. The City's cover
letter (October 20, 2006) suggests that the City has not yet approved that plan. Additionally, the
EAW does not identify an entity that would be responsible for implementing the plan. Without
that information, and considering the extent of the project impacts, we cannot be confident that
the project will in fact result in an acceptable level of habitat benefit. This is not a minor concern.
An Equal Opportunity Employer Who Values Diversity
DNR Information: 651 - 296 -6157 1- 888 - 646 -6367 TTY: 651 - 296 -5484
1- 800 - 657 -3929
•
Nature's Refuge EAW
November 21, 2006
Page 2
This project could be a candidate for implementation under the "exceptional natural resource
value" provision of the Wetland Conservation Act (Rule 8420.0541, subpart 4), which allows
credit for projects that restore exceptional natural resource values. Before we would agree to
the use of this provision or permit the taking of state - listed plant species, the City would have to
assure us that it would put in place adequate regulatory and management mechanisms to
protect and sustain these resource values well into the future.
Cover types (Item No. 10)
The table shows the conversion of fifty -one acres of wooded /forest cover. As mentioned above,
this is a substantial reduction in woodland cover. If the City approves this project, it will result in
the removal of a significant amount of wood from the site. Depending on the condition of this
wood, the project proposer may elect to market it as sawlog, landscaping material, firewood, or
bio -fuel for the production of energy. We strongly recommend that the City contact Jean
Mouelle, Regional Forest Utilization and Marketing Specialist (651 772 - 7567), for advice on this
subject.
Thank you for the opportunity to review this project and the EAW. We look forward to receiving
your record of decision at the conclusion of environmental review. Additionally, we would be
pleased to review and provide guidance on the restoration and management plan. If you have
any questions about these comments, please contact Wayne Barstad, regional environmental
assessment ecologist, at 651 772 -7940.
Sincerely,
•
M. Kurcinka
gional Director
c: Wayne Barstad, Steve Colvin, Bernice Cramblit, Hannah Texler, Tom Hovey, Bob Welsh,
Dave Zappetillo, Doug Norris Jean Mouelle, Heather Tetrault, Sarah Wren (DNR)
Jon Larsen (EQB)
Nick Rowse (USFWS)
ERDB# 20060543 -2
LL06NaturesRefuge.doc
An Equal Opportunity Employer Who Values Diversity
DNR Information: 651- 296 -6157 1- 888 - 646 -6367 TTY: 651 - 296 -5484
1- 800 - 657 -3929
•
•
•
Page l of l
Jeff Smyser
From: fnm1001 @usfamily.net
Sent: Tuesday, November 21, 2006 6:39 PM
To: Jeff Smyser
Subject: Development
Mr. Smyser,
Consider this our formal objection to the "proposed" development on Cty. 14 west of Cty. 23. It is truly
profane for city leaders to circumvent the peoples' will by calling the development a "conservation
development." Calling a duck a turkey does not make it fit for Thanksgiving dinner. It is quite obvious
that the developer is trying to avoid an environmental impact study by proposing a number of units just
under the minimum to make the study mandatory. We strongly suggest that the city order the
environmental impact study and reconsider the vision of filling every open space in Lino Lakes with
developments as rapidly as possible. City leaders should abide by the growth limits that are on the
books.
Sincerely,
Fredrick W. Hedervare
Melanie Marie Hedervare
Lino Lakes
11/22/2006
- -- USFami1y.Net - $8.25/mo! -- Highspeed - $19.99/mo! - --
•
Page 1 of 1
Jeff Smyser
From: RKEACBIRD @aol.com
Sent: Wednesday, November 22, 2006 4:23 PM
To: Jeff Smyser
Subject: EAW for Natures Refuge
Dear Jeff
In the EAW it states " Views for local residence will include new houses in places that presently have
no buildings. The appearance of new homes is a common change in any outer suburb in a
metropolitan area ".
It has been a recommendation and goal of the Environmental Board, endorsed by members of staff,
that the impacts of new developments on older established existing neighborhoods be greatly reduced
through creative and well planned use of buffering, wildlife corridors and /or open space so these
residents can still enjoy viewing nature or natural settings from their backyards instead of a garage or
shed.
The suggestion that the bird population contains various song birds such as the American Gold Finch
and Robin is extremely weak. I would be glad to send my "Life List" of birds I have viewed from my
deck to anyone that would like a copy. Some examples are: Great Blue and Green Herons, various
ducks including Wood Ducks and Teal, various Hawks and Falcons, Pheasants, Grouse, Wild Turkey,
Quail, Doves, Various Owls, Humming Birds, various Wood Peckers and the Northern Flicker (year
around), Chickadees, Red and White Breasted Nut Hatches, Blue Birds, Thrushes, Thrashers, Cat
Birds, Scarlet Tanager, Cardinals, Evening and Rose Breasted Grosbeaks, Indigo Buntings, Juncos,
various Sparrows, Orioles, Purple and House Finches and Red Polls.
If you have any questions or comments, please contact me.
Rod Kukonen
11/22/2006
(0C__
•
Memorandum
CIT
OF
To: Environmental Board
From: Marty Asleson
Date: 12/15/06
Re: 2007 Goals
Please find attached the revised goals for 2007.
•
• Council Member
its adoption: introduced the following resolution and moved
CITY OF LINO LAKES
RESOLUTION NO.
RESOLUTION TO ADOPT THE ENVIRONMENTAL BOARD GOALS FOR 2006
WHEREAS, The City of Lino Lakes has an established Environmental Board,
AND WHEREAS, ; The purpose of the Environmental Board is to provide aid and advice
to the council in its efforts to encourage productive and enjoyable harmony between
people and their environment ; to promote efforts which will prevent or eliminate damage
to the environment and stimulate the health and welfare of people; to enrich the
understanding of ecological systems and natural resources important to the city; to
advise the City in the use and management of its natural resources in order to preserve
and enhance the environmental amenities for present and future residents, and to
ensure a lasting quality of life within the city,
• AND WHEREAS: The Environmental Board approved the following 2007 goals at their
December 20, 2006 meeting:
• Promote environmental stewardship with the citizens of Lino Lakes by:
A. Communicating environmental initiatives in the city using various means of
communication, i.e., City WebPages, newsletter, homeowners association
meetings, the information kiosk, and press coverage. Pursue providing
articles and information to the Quad Press.
B. Promote individual Backyard Wildlife Habitat through the National Wildlife
Federation. Inventory, current participants and work to expand program.
•
• Participate in Blue Heron Days, providing educational material to the public.
• Participate in Earth Day activities in the community, promoting environmental
awareness and collaboration with other environmental focused organizations.
• Monitor any activity in the AUAR onto other proposed development areas, focusing
on the values Lino Lakes citizens have expressed in the vision for our city and the
unique ecological aspects of our wetlands, lakes and streams and subsurface
waters. Apply mitigation plan as defined for that area.
• Perform an evaluation of past Environmental Board recommendations for
development projects. Review a sampling of a variety of projects by site visits,
discussion with city staff, and landowners, neighbors, on the outcomes of the Boards
recommendations. Submit a summary of significant findings resulting from the
review in writing to the Community Development Director .
•
• Promote conservation development within the City incorporating the Open
Space/Trail Plan and Handbook for Environmental Planning and Conservation
Development.
• To meet or exceed our City recycling goal of 50 percent or greater of our Municipal
solid waste. Find innovative ways to promote and encourage recycling as a city.
Add recycling materials to kiosk.
• Continue to monitor the Heron rookery and water quality in the northern one third of
Peltier Lake and to support the protection of resources in that area.
• Participate in comp plan and process.
• Review and comment on the RMP planning process for the City of Lino Lakes, JD4
and TMDL study for the Rice Creek Chain of Lakes.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
LINO LAKES, MINNESOTA:
1. That the 2007 goals of the Lino Lakes Environmental Board be adopted.
• John Bergeson, Mayor
Julianne Bartell, City Clerk
Adopted by the Lino Lakes City Council this _th day of , 2007.
The motion for the adoption of the foregoing resolution was duly seconded by Council
Member and upon vote being taken thereon, the following voted in
favor thereof:
The following voted against same:
Whereupon said resolution was declared duly passed and adopted.
•