HomeMy WebLinkAbout04/25/2007 Env Bd PacketCity of Lino Lakes
Environmental Board Meeting
April 25, 2007
6:30 p.m.
AGENDA
1. Call to Order
2. Approval of Minutes
March 28, 2007
3. Approval of Agenda
4. Open Mike
5. Action Items
A. LaMotte Soil Excavation
6. Discussion Items
A. Comprehensive Plan Draft Goals and Strategies
B. Arbor Day, Recycling Day and Earth Day
C. Project Updates
7. Adjourn
•
•
ENVIRONMENTAL BOARD MEETING
DATE
TIME STARTED
TIME ENDED
MEMBERS PRESENT
MEMBERS ABSENT
STAFF PRESENT
1. CALL TO ORDER
CITY OF LINO LAKES
DRAFT MINUTES
MARCH 28, 2007
: March 28, 2007
. 6:32 P.M.
. 8:10 P.M.
: Barbara Bor, Alan Traylor, Martha DeHaven,
Kim Brouillet, Peter Brown, Mary Jo O'Dea,
Paula Andrzejewski
: None
: Environmental Coordinator Marty Asleson
Chair O'Dea called the meeting to order at 6:32 p.m. Ms. O'Dea removed items 2
and 3 from the agenda, as they occurred at the last meeting.
2. APPROVAL OF MINUTES
January 31, 2007
Ms. Brouillet made the following changes: Page 2, last paragraph, delete the
following sentence: The site meets RCWD's standard of water. Page 3, first
paragraph, change to read: rain gardens instead of rain garden. Page 3, second
paragraph change to read: Ms. O'Dea instead of Mr. O'Dea. Page 3, ninth
paragraph change the word sight to site. Page 4, 4th paragraph, delete: the word
by. Page 4, last paragraph, change to read: 100 year flood plain instead of flood
plane. Page 8, Recycling Day, change to read: Arbor Day is April 27 instead of
Recycling day.
February 28, 2007
Mr. Brown made a motion to approve the February 28, 2007 meeting minutes.
Ms. Andrzejewski seconded the motion. Motion carried unanimously.
3. APPROVAL OF AGENDA
Ms. Brouillet requested to add a discussion item regarding Stoneybrook
development.
Ms. Andrzejewski requested to add a discussion item regarding Target
landscaping.
Ms. Bor requested to add a discussion item for Comprehensive Plan updates.
1 DRAFT MINUTES
ENVIRONMENTAL BOARD MEETING MARCH 28, 2007
Ms. DeHaven made a motion to approve the agenda as amended. Mr. Traylor
seconded the motion. Motion carried unanimously.
Mr. Brown excused himself from the meeting at 6:38 p.m.
4. OPEN MIKE
Open Mike was opened and closed at 6:38 p.m. No citizen comments were made.
5. ACTION ITEMS
A. Conditional Use Permit for earth material storage at 6644 20th Avenue, Royal
Oaks Realty
Mr. Asleson reviewed the background and analysis. He noted that he was
informed that additional storage material was proposed to be stored since he wrote
the staff report. He was informed that this project requires approval from the Rice
Creek Watershed District. He noted that the wetland on the property was
delineated but not marked and there is a silt fence in place.
Mr. Asleson stated that a tree preservation plan is necessary.
Ms. O'Dea asked if access to the site should be addressed. Mr. Asleson replied
that access would be addressed as part of the SWPP Plan.
Mike Black, Royal Oaks Realty, Applicant, stated that the Conditional Use Permit
will be used until the property gets developed. He anticipated a use for two to
three years. They will stockpile black dirt on site to be used as needed. He noted
it is not intended for a large use and there will be no sale of material.
Mr. Black stated that they plan to store approximately 15,000 cubic yards,
however they would accept a condition of approval limiting the amount of storage
material. He noted that the amount of dirt will fluctuate as it is used. He stated
the storage area will only be visible from 35E. He expects trucks to access the site
about once a week.
Mr. Asleson stated that inactive areas need to be covered per the SWPPP, which
is required for more than one acre. Mr. Black stated that the usable area of the site
will be less than one acre, but will follow the city and RCWD's recommendations.
Mr. Black noted that they do not intend to remove any trees. Mr. Asleson stated
that the property will be considered a construction site, which requires a tree
preservation plan if there is a soil disturbance within 50 feet of any trees.
2 DRAFT MINUTES
•
t
•
ENVIRONMENTAL BOARD MEETING MARCH 28, 2007
Ms. Brouillet asked where the soil is coming from that will be stockpiled. Mr.
Black responded that the dirt will come from both Lino Lakes and Centerville.
Ms. Bor asked staff if the ordinance requires that the applicant would need to
come back to the city for any alterations of the use, and if the city can visit the site
for compliance. Mr. Asleson replied yes to both questions.
Mr. Black stated that he understands that the CUP can be revoked if conditions
are not met.
Board members recommended that the wetland delineation area be remarked. Mr.
Asleson said that he is meeting on Friday morning to discuss the wetland
delineation area. Mr. Asleson explained that the RCWD is the city's LGU, and
that the city has responsibility for management and integrity of our construction
sites. He stated that the city has an inspector on staff, Tim Payne, who will be
invited to the meeting on Friday morning.
Mr. Black stated that they will do a SWPP Plan and they will follow Best
Management Practices. Mr. Black stated that they measured the pile of dirt from
its deepest and widest measurements at just under an acre. He noted that the dirt
pile is not as wide as the silt fence area.
• Ms. Bor made a motion to recommend approval of the Conditional Use Permit
with the following recommendations:
1) Clarify the wetland delineation area.
2) Submit a tree preservation plan or move the dirt pile away from tree root
areas.
Ms. Brouillet seconded the motion. Motion carried 7 -0.
6. DISCUSSION ITEMS
A. Stoneybrook
Ms. Brouillet stated concerns about the Stoneybrook development. She said there
is a dispute over who is responsible for maintenance of the monument signs and
the wetlands in Stoneybrook. She asked Mr. Asleson if he could look into the
issue to see if there is escrow money from the developer at the city for this
purpose. Ms. Brouillet wants developers to be responsible for maintenance of
these areas and does not want to see problems with future developments. Mr.
Asleson agreed to look into who is responsible for these items.
Ms. O'Dea stated that the board should be able to review conservation easements
as they are proposed prior to council approval. Ms. O'Dea asked if they could add
3 DRAFT MINUTES
ENVIRONMENTAL BOARD MEETING MARCH 28, 2007
this discussion to next month's meeting agenda. She asked if Mr. Grochala could
attend to speak on the issue. Mr. Asleson agreed to speak with Mr. Grochala
about this issue.
B. Target Landscaping
Mr. Asleson explained that ponding and wetland mitigation was necessary for the
Target site as the city looked for every opportunity to maintain water by
maximizing a small site. He explained that the small native islands were for
storing rainwater. He noted the design was to take water overflow to the north
side of the building. He stated that ultimately the design failed and Target
recognized they did not get what they paid for. He stated that about three years
ago they redesigned the site, which will include a berm at the end of this year. He
said they will perform a burn at the end of one more year, then they will see how it
looks after the three -year cycle. He stated that the site should look better next
spring or changes will need to be made. He explained that lots of new structural
BMPs are being designed. Mr. Asleson explained that a presence of native plants
greater than 50% would be a success. Mr. Asleson stated that Target has worked
well with the city.
C. Comprehensive Plan Update
Mr. Asleson said that the first Comprehensive Advisory Panel meeting took place.
Ms. Bor gave a summary of the meeting, stating that there seems to be a lot of
pressure that the city is divided in two by its East and West sides. She stated that
the city acknowledges and supports resident input. She noted that over 60% of the
subjects addressed environmental issues. The next Advisory Panel meeting is
scheduled for April 4.
Updates /Other Items
Mr. Asleson stated that the city is in the top three running for environmental
initiative.
SHEP
Mr. Asleson noted that SHEP will be going to the Monday Council Work Session.
He will find out what is necessary for the presentation. He stated that the city is
considered an in -kind partner and the data presented will be useful for the future.
Peltier Island
Mr. Asleson stated that as of Monday, three birds were seen on their nests. He
stated that Glen Fox saw a dozen and will continue to observe. Mr. Asleson
informed the board that four raccoons and 14 opossums were trapped. He noted
that there are no cameras set up for monitoring this year. Mr. Asleson said they
will provide additional sticks and twigs to improve the habitat.
4 DRAFT MINUTES
•
•
•
•
•
•
ENVIRONMENTAL BOARD MEETING MARCH 28, 2007
Arbor Day
Mr. Asleson reminded the board that Arbor Day is on April 27t • A presentation
will be held again at Lino Lakes Elementary. Mr. Asleson noted that a memorial
tree will be planted in honor of a teacher who passed away. There will also be an
educational session on pruning trees.
Earth Day
Mr. Asleson noted that Earth Day is on April 21. He stated that the city met the
requirements for Tree City USA for the 18th year. He stated that Wargo Nature
Center is working on vendors and displays for this year's Earth Day celebration.
He noted that they are short on money this year as the Friends of the Park was
dissolved, and they were the funding tool for this event. He noted that Lisa
Hogstad is scheduling clean up groups at the city, and that 15 groups have already
signed up. Mr. Asleson said that sometimes garbage haulers will assist with bag
pickup, otherwise he will coordinate pickup through city staff. He asked board
members about the interest in starting a garden club. Ms. DeHaven volunteered to
take over this initiative and encourage community gardens.
Ms. Bor noted that she did not see hooks for hanging flower pots on the light
posts in the Legacy development.
Ms. Andrzejewski noted that she has participants interested in display booths for
Earth Day. Mr. Asleson asked her to contact Wargo directly. Mr. Asleson noted
that Connie Grundhofer had stamps for kids, and that Environmental Board
members can talk to kids about environmental issues while at Wargo. Mr.
Asleson said that the city will provide popcorn. He stated that the next Earth Day
meeting is at Wargo on April 5 at 6:00 p.m. Ms. Bor agreed to contact Connie
Grundhofer about the stamps.
Ms. Brouillet asked if a garbage hauler such as Walters is willing to donate a bin
for recycle day, could the Environmental Board then use their bins to throw trash
in for the Blue Heron Days Parade? Mr. Asleson replied that whichever hauler
was willing to offer bins could be used.
Mr. Asleson informed the board that he submitted burn permits to the DNR for
Stoneybrook, Otter Lake Road, Clearwater Creek 3rd addition, Clearwater Creek
wetland area, south Reshanau Lake Estates, Elm Street mitigation pond,
Shenandoah Park entrance area, Highland Meadows and Century Farms. He
stated that all bums will depend on weather and if the DNR issues the permits.
Mr. Asleson stated that the fire department is informed of burns but that no
permits are required. He informed board members that the fire department should
be contacted for private burns.
5 DRAFT MINUTES
ENVIRONMENTAL BOARD MEETING MARCH 28, 2007
Mr. Asleson spoke of possible future burns at Rice Lake Elementary, Centennial
Middle School, Behm's Pond area and a small burn on Elm Street.
The Board discussed possible signage for restoration areas. Mr. Asleson stated
that the DNR offers free "Don't Mow" signs and that the city could budget for a
dozen or so permanent signs.
7. ADJOURN
There being no further business, Ms. Brouillet moved to adjourn at 8:10 p.m. Ms.
DeHaven seconded the motion. Motion carried unanimously.
Transcribed by:
Lisa Hogstad
Community Development Secretary
6 DRAFT MINUTES
•
•
•
•
•
Agenda Item 5A
Staff Originator: Marty Asleson
Environmental Board
Meeting Date: April 25th 2007
Topic: Lamotte Property Grading CUP
Applicant: AIT/ Del Zentgraf
BACKGROUND:
Request: To remove 90,000 cubic yards of material from the site, the
majority of which will be deposited in The Preserve development (Integra Homes
Attachment 1 & 3). Future plans include single family houses in the upland areas
to the east. The request proposes to mine the soils and create two rather deep
ponds on the site (Attachment 3).
Site Location: 12th Avenue and Birch Street
ANALYSIS:
Land Cover: The site consists of short grasses. The land on the east side
of the property is mostly upland, slopping down rather quickly to the west. This
area below the slope is extensive type 2 wetland and flood plain. CD 25 bisects
the floodplain area from south to north.
Rare and Unique Resources
The possibility exists for rare plant communities on a part of the site that does not
appear top be in the proposed excavation areas.
Parks, Natural Open Space/ Greenways and Trail System Plan:
The Parks Open space Greenways and Trails Plan shows this as an important
link and flood plain area. (Attachment 7)
Wetlands:
There is an approved Wetland Delineation for the property (Attachment 2).
Soils
According to the Ground water model, the soils in this area are classified as
moderately susceptible to ground water pollution. Although the proposed
constructed ponds will not be accepting stormwater from impervious areas at this
time, future platting may direct water to these ponds. When that happens,
additional water treatment bmp's must be implemented to filter water to these
ponds.
Surface Water
Surface water from this site goes into CD25, approximately 7000 -foot tributary to
Wards Lake.
Storm Water Pollution Prevention Plan
A comprehensive Storm Water Pollution Prevention Plan has been submitted for
this project (Attachments 4, 5, 6). Additional information must be submitted
concerning the name and phone number of the SWPPP site manager, and where
the SWPPP and inspection forms will be located on site. A mailbox is preferred.
Although the proposed ponds that will be created appear to be in ordinary high
groundwater, there is no proposed impervious runoff from the site at this time.
However, when platting is done on the site where surface water from impervious
areas can run into the pond, than additional pond/filtration structures will be
needed, or the ponds that are dug modified to accept storm water runoff from the
impervious areas.
Item 16, under the General Erosion Control Notes of the Erosion and Sediment
Control Notes and Details sheet of the plan submittal (Attachment 3), # 16 should
read Disturbed portions of the site where construction activity has stopped shall
be temporarily covered and seeded. Under the same #, "Flatter than 10:1"
should say 14 days per RCWD requirements.
Ponds should be final grade stabilized with the City native seed mix
Tree Preservation
There are no tree preservation plans needed at this time.
Landscape Plan
All final grades should be seeded with the City native Seed mix.
•
•
•
•
•
RECOMMENDATION:
Staff recommends that the following modifications be forwarded to the Planning
and Zoning Board for consideration:
1. When platting is done on the site where surface water from impervious areas
can run into the pond, than additional pond /filtration structures will be needed, or
the ponds that are dug modified to accept storm water runoff from the impervious
areas.
2. Recommended changes to the SWPPP are submitted to the City Engineer to
make changes to the documents submitted. Changes should include City native
seed mix in all final grade stabilization, and installed by a DNR listed contractor.
ATTACHMENTS:
1. Lamotte Soil Movement
2. Wetland Delineation
3. Lamotte Property Grading Plan
4. Lamotte/ Phase 1 Erosion and Sediment Control
5. Lamotte /Phase 2 Erosion and Sediment control
6. Lamotte Erosion and Sediment Control Notes
7. Greenway Plan
8. SWPPP Letter /Seed Specs
tr„
Lamotte Soil Movement
•
•
0.9
0
0.9
Parcels
Ponds
1.8 Miles
•
•
•
Notice of Decision
Minnesota Wetland Conservation Act
Mailing Date: 12/12/06
LGU:
Rice Creek Watershed District (RCWD)
4325 Pheasant Ridge Drive NE, Suite 611
Blaine, MN 55449
Project Name: LaMotte Property
RCWD Ref. #: 06 -132R
Location: Lino Lakes, Anoka County
Name of Applicant: AIT c/o MFRA, Inc.
Wetland Decision Type: Wetland Boundary Determination
Date of Decision: 12/12/06
Description of Decision: A wetland delineation report was received on 11/02/06. The
delineation was reviewed by RCWD staff on 11/16/06. The
RCWD approves the delineated wetland boundaries as depicted
in the attached figures for use in implementing the Wetland
Conservation Act.
Wetland delineation approvals are generally valid for a period
of 3 years.
You are hereby notified that the above - referenced decision was made by the Local
Government Unit on the date stated above. The decision becomes final if not appealed to the
Board of Water & Soil Resources within 30 days of the mailing date.
/
Ken Powell, Permit Coord.
Date
C: MN Board of Water and Soil Resources, ATTN: Lynda Peterson
U.S. Army Corps of Engineers, ATTN: Tim Fell
Anoka Conservation District ATTN: Dennis Rodacker
MN DNR Ecological Services, ATTN: Wayne Barstad
City of Lino Lakes
Consultant, MFRA, Inc. ATTN: Todd Ullom
•
Mp►PctVEs-r
Beaver or
2006 MapQuest, lnr,
Rice
Creek - Chain
County
Regional Pk
Q
jA ttr—we P/
6
0 co
c as
441 2
g
pc-
0
Tamarack Ln
8ircu
Park
Aspen Ln
Wards
Lake
Gr0UsP fi
a
okecherry Rd.
B ckthorn Ln
4te Oak Rd
ItapcOsCt ••••'• a
.�C
Holly Ct E
Centerwifle 01 ,300t
' 00ft
Lake
Park Access Road E
Sherman
Lake
Cer
Hunters, ro
er
Vc\- Birch St
r
N
Karth Rd
3
4
Holly Dr E
rr�
02006 N)UTE
SCALE =
NONE
MFRA#
16172
Client
AIT
Ogilvie, MN
Project
LAMOTT
PROPERTY
Lino Lakes, MN
LOCATION
MAP
Wetland boundary
Survey
c I ingineerhly • Plannkg • u/Irving
IVFRA'-417..zzrz
Oen. 70/476,-6070
lillarbs hat Rea 90 75J/I79e130
Associoss, Yu
•
A19pBJ J J / -
r
9pp �BqB/ i
12TH AVENUE
e26/ —
���1
/�� �•- � / rg94 R
890
e\ �
4s,0
/
4 (es +.,,
--88,__ B84_ _ _ _
1
92 \B �9B\ �\ \
T \\DON\ \\
< III I °I 1 I
.o I 1 1 1 / /
/ //
/ lJi / / / �,p
,F' 18gB '�J:11' ▪ �B 9, // / / /
. / _ _B92� J� l � / 1 (/ /
:mo / J1
'/ (v' / , / m / C (/ r ( \\
A /
. 0
/ ` q
\ D \ \` 1\ DOB
` 9
C� \�D \ \\ \ mD \ \ \ c \ s\ k �'..:�•r4: /a
99 4 6 11 ` ` --890- B92. \ --r5 -�_��•
L -\ 1- -8ee- 4 ,'„.
��` -fib
884 -� \L�`
- \
j/
oa
q0
91B
Er9 r-r
\
1F/
1e
,-9
ass
a
4 ~ - -884- - - 884- -
•F ON I-0110 J.1N00�
4
I I
X11
t,
LJ .
4
4
121H AVENUE
HO
mop
V321Y 03000M
533Y939ligCS-
`9
CHEW DM-
(Tl�. 533211 3-rNdS
\`
4 B
PROPOSED SILT FENCE
- ' 4
• ` SZ`J1 0 ll n \
•
4
B'6
4
r
r s
eb, o \
'
\
✓ ''
0 L —O.' -\ 4 11 4 "iks
\ //.
Bee \fib 4 —� \ .j
/�4e - 4
4
r[)1 / \lt ^/lt I
L_1 \I v! \ kJI V
THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS 5 A 015111 WAUTY LEVEL D. THIS OUAl11Y LEVEL WAS DETERMINED
ACCORDING TO THE GUIDELINES OF CHASM 36-02, 1T11ED'STANDARD GUIDELRUES FOR TIE COLEECIION AND DEPICTION OF EXISTING
SUBSURFACE UTILITY DATA' THE CON1RACIOR AND/CR SUBCONTRACTORS SHAD- DETER TIE EXACT LOCARON OF ALL DOMING
MIRES BEFORE COMMENCING WORM, BY CONTACTING THE NOTIFICATION CENTER (COPIER STATE 011E FOR MINNESOTA). THE CONIRACTOR
AND /OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY NS OR HER
FAl6E 10 EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILM S (UNDERGROUND AND OYT76CAD).
0Aln
�1 VLJ
4
`1 \
1 44
Y 4 m ''4"
'1 7 � 4
4,
l \4 43/'
A 1,nITf(Th 1
r\LJLJI I I /I
986-'
4 4
m916-
L
/
/ / 1
/ /
/ / I
, - , - 7 1 - - . . . . „ 1 / _ 1`J
\ IL 1 r
\fir \\\ , - 4
-_. 4LC —
/\ 1
.4 1 I-1
\4 I
I ` I 11
■
r - ) \ I - ,J�'�,
'/ /� /' _+o-. -7--=-, _ - -- c� --/,/ 4cj /
9NISS0210 S213ddV81 H180N
1
r 1
r I
I 1 I
1 / I
°o.- - - - - -;
GRADING NOTE:
CONTRACTOR TO SEED TO THE OBSERVED WATER
LEVEL WITH SEED MIXTURE 310 AF)tt
CONSTRUCTION IS COMPLETED.
(
\• = Xr,/
1 `` \ \ \ `
4
I� \\ �\\_1 - ter/ \ \�''\ \ I . /
.ti
SPOT ELEVATION
CONTOUR
RIP RAP
CURB & GUTTER
STORM SEWER • — »- --.
SANITARY SEWER
FORCEMALN (SAN.)
WATERMAN
EASEMENT
SOL BORING LOCATION
EXISTING WETLANDS --
LEGEND
PROPOSED
X 11625
902
EXISTING
x9625
HOZ
;J s 0
tt-
SB -1 $
APR 0 2007
Ca., Y (_:r Lit. t.D
0
100
SCALE IN FLEI
200
FINAL GRADING PLAN
m
N
cc
m
m
0
z
CO
W
J
0
0
0
mc°
S
0i
SLEET NLU1®Qt RE
C -4.01
9FRA FILE } 16172
•
•
ROSIOR CWIR0.dfl
to-
12TH AVENUE
IIi / / r II,A.y� / /�Qb= ." qA �0 z_ _ -189 98\ \
q0B�gD // ' _�. / /L
9U2 /�0a2/ mm- ° 1 1 P1
i
q ,...
L,,,,,
,( _,„
.,_____ , ms' s / 4 , s \ � 0 /' 4 � q I I I 1' / Q
° J 7,.___________„,_,/, / ( f E` 1 °
4 c , ,/ / 1 1 / 3 L
., , I / of \ / / _ O,'" q°° / m / I I 922-/ r
I _ MII q a „,.../// IJ
11 / -_ 892 .... o 0' / �� mqm,/ q/ (\ • g q1a
�J `– _�9� \ <.1> , ,�;;� , q/ ,/ r \ \ `bo o �
11 �' / 1 1 ( < l t 2 `, 1, CSI g \ l
I BBB - - -`j
C.n
— 886.`] 978
k<41,4„
4
e44\ �� \ \ `914_
\
\
-9° \\ \
898\ s \ \ \
92 \
1 j s
1ST
12TH AVENUE
7'
V36V 03000N,
\1
- X916--- - - -�J�
m i
-_ \ \
96\ • - -_ -�
_s- -BBB-
'� ' -'-B84 _ l - -884- \ \ 8
61,r
\ pC B • e9479,\ \ — ------9°6 � \
L
O4�
4 4
SIB—
•
—
B8� 88 --••••• \ I
034-
9-
•
99�
\892-
89
4 ` ` ���` \ \1890._ \
\886 \� H9, \\
4 sZ�10 . \ l m / 886\
• `1N 0 ` • \
/
J r -886 "Q
ep , I 4 4 4 / 4 4 d _\g
s (I - 1
�� II u1 s B4' — 8b4_-_, 4 l4
111ZZZddd�11- - --- r 86 4 \ r / 1 \ ; 5,�
m - - - -_ - I'
____ 5 \ f �- i 1 1 ,t it I %
02 4 1 • q _> i /c7 m I I 4 m 0�4
°\'� L -ea6� �/ S4
1\ 4 I • 1 ///� 4 ' "XSQ 4 / / \ a\ .>/
asB_ VI 4 4 '1 ill 4
- BBB---
e90.- �- -B9O� --BBB- - \III - -
V.
L)1 /•1� ^/'lA I
LI\I..r \..i1_/IV
7AIr1
�1VL./
A f'• /1 I T T /•l A I
/–TVVI 1 IIJI V
'S '8\ —1
r\'v� wv, r'v v-vwv- > oyv� , -v-.�v P 'fir
TDiPORARY D1R , \\ \
A 1 FOR c ONSTRUCT 81 3,3 ladS 1 \ \ \\
1-9
T�.
SILT FENCE(TYP.)`
N \ —918-
-916-
CHECK DAY (DTP,)
(
SILT FENS -)
9NISSObC SN3dc
vaL HU ON
I
/ / T%v I
I
/ / I I 1
1
\ ■ I `TI r
/ ''-•....i."- --- �L I'�_
a t / I
• _ 1-' I ”)
\- I
I \\
r-- .1 \I
:) //
/ — ._ —_ - -- • J "� ---/v r1/ \
ACREAGE SUMMARY
in ACRES
PAVEMENT AREA
0.00 AC
BUILDING AREA
0.25 AC
SEEDED AREA
6.75 AC
TOTAL DISTURBED
7.0 AC
DEVELOPER /OWNER:
ALLAN LAMOTTE
6497 12TH AVE 5
LINO LAKES, MINNESOTA 55014
SITE OPERATOR /CONTRACTOR /GENERAL CONTRACTOR
SUPERINTENDENT:
SEQUENCE OF CONSTRUCTION
PHASE J:
1. INSTALL STABILIZED CONSTRUCTION ENTRANCES
2. PREPARE TEMPORARY PARKING AND STORAGE AREA.
1 CONSTRUCT THE SILT FENCES DN THE SITE
4. CONSTRUCT 114E SEDIMENTATION AND SEDIMENT TRAP 8451115.
5. HALT ALL ACTIVITIES AND CONTACT THE CIVIL ENGINEERING CONSULTANT
TO PERFORM INSPECTION OF BMPS. GENERAL CONTRACTOR SHALL
SCHEDULE AND CONDUCT STORM WATER PRE-CONSTRUCTION MEETING WITH
ENGINEER AND ALL GROUND DISTURBING CONTRACTORS BEFORE
PROCEEDING KITH CONSTRUCTION.
6. CLEAR AND GRUB THE SITE.
7. BEGIN GRADING THE SITE
PHASE It:
1. TEMPORARILY SEED DENUDED AREAS.
2. INSTALL UTILITIES. UNDERDRAINS, STORM SEWERS. CURBS AND GUTTERS
3. COMPLETE GRADING AND INSTALL PERMANENT SEEDING AND PLANTING
.
t. REMOVE AU. TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES
(ONLY IF SITE 15 STABILIZED), IF REQUIRED BY THE CONTRACT
O-
rc
fir/
SOIL EROSION /SEDIMENTA11ON CONTROL OPERATION 11ME SCHEDULE
NOTE CONTRACTOR OR GENERAL CONTRACTOR TO COMPLETE TABLE WITH THEIR SPECIFIC PROJECT SCHEDULE
CONSTRUCTION SEQUENCE
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
.IAN
FEB
MAR
APR
MAY
JUN
TEMPORARY CONTROL MEASURES
STRP & STOCKPLE TOPSOIL
ROUGH GRADE / SEDIMENT CONTROL
TEMPORARY CONSTRUCTION ROADS
FOUNDATION / BUILDING CONSTRUCTION
SITE CONSTRUCTION
PERMANENT CONTROL STRUCTURES
FINISH GRADING
LANDSCAPING /SEED/FINAL STABLRATION
STORM FACILITES
• REI-tX TO SHEET C.5.03 FOR GENERAL NOTES, MAINTENANCE NOTES, LOCATION MAPS, AND
STANDARD DETAILS
SPOT ELEVATION
CONTOUR
RIP RAP
CURB & GUTTER
STORM SEWER O - -i 0
SANITARY SEWER
FORCEMAIN (SAN.)
WATERMAIN
EASEMENT
OVERFLOW ELEV.
RETAINING WALL
PROPOSED
X 962.5
LXIS 1146
962.5
SILT FENCE
SOL BORINGS
DIRECTION OF
OVERLAND FLOW
TEMPORARY
DIVERSION DITCH
CHECK DAM
TEMPORARY STONE
CONSTRUCTION ENTRANCE
TEMPORARY SEDIMENT BASIN
EOF
TEMPORARY STORAGE AND PARKING
AREA
0
'ST-9 i PA -10
2007
0
100
SCALE IN FEE
200
0
cc
LU
0
0
0
W
1-
1--
0
J
0
O
4-
z
O
U
O F-
I- o
- w
W < (/]
J
O Z
0
O
tz
w
w
w
0
a
00
a
6
8
m
U
m
CC
SHEET NUMBER
C -5.01
REV.
"ERA FILE 1 16172
•
12TH AVENUE
12TH AVENUE
\
V323V 03000M
b -
LiJ
W
892_
\ ff
\\ o�N
\ o
\ ,c \ / 1.
„Kik
04,(4r
SILT FENCE(TYP.) 1
_806.4
\v I
eD�
SB31iI--39A'dds-
4
4
Y..
1ST
j B 1 4
4 _ -- 884 .. -- -- 884_ -�
4 4
"884-`_
4 -..70e4 - \ -L2
�
_ X884
_ .GZ 'ON HOL10 /,LNE10� �� . 4 4 --4-
-6.96- . -1 r- - ___-_ 1 •
- I
88 .] 4 L
✓ I .B • € O �89p8Re (� ` `SZ ON HOB l` 4
�- )`'Jf I I 4 4 4 ”.
_ i° �� e
8P / 4 4 4 /' -886
090 r _ r - 1
�� I LI �` — 53'B84�-
9— • 4
1 -186= -
( _ - - - -- r �'�6� 4
,�i /
I i I 4 \0 4 4 1 • N. 4 �>
I I T \ 1 I 10 L _Be6�
\ 4 I /// ▪ 4 kS 4
�p8 V� /4 4 4,
b
890- �� - -- - -
--B9
baL
ACREAGE SUMMARY
in ACRES
;I I PAVEMENT AREA I 0.00 AC
41.1::J.n: ` APIA
(? SE005 AREA
TOTAL DISTURBED 7.0 AC
0 25 AC
6.75 AC
DEVELOPER /OWNER:
ALVIN LAM0TIE
6497 12TH AVE S
LINO LAKES. MINNESOTA 55014
SHE OPERATOR /CONTRACTOR /GENERAL CONTRACTOR
SUPERINTENDENT:
SEQUENCE OF CONSTRUCTION
PHASE I:
1. INSTALL STABILIZED CONSTRUCTION ENTRANCES.
2. PREPARE TEMPORARY PARKING AND STORAGE AREA.
3. CONSTRUCT 1HE SILT FENCES ON 1HE SITE
4. CONSTRUCT THE SEDIMENTA110N AND SEDIMENT TRAP BASINS.
5. HALT ALL ACTIVITIES AND CONTACT THE CIVIL ENGINEERING CONSULTANT
TO PERFORM INSPECTION CIF BAP. GENERAL CONTRACTOR SHALL
SCHEDULE AND CONDUCT STORM WATER PRE - CONSTRUCTION MEETING NTH
ENGINEER AND ALL GROUND DISTURBING CONTRACTORS BEFORE
PROCEEDING NTH CONSTRUCTION.
6 CLEAR AND GRUB 114E 517E
7. BEGIN GRADING THE SITE
PHASE II:
1. 1EMPORARILY SEED DENUDED AREAS
2. INSTALL UTILITIES. UNDERDRAINS. STORM SEWERS, CURBS AND GU11000.
3. COMPLETE GRADING AND INSTALL PERMANENT 000008G AND PLANING.
4 REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES
(ONLY IF SITE IS STABILIZED). IF REQUIRED BY THE CONTRACT
LEGEND
SPOT ELEVATION
CONTOUR
RIP F:AP
CURB & GUTTER _
STORM SLIER •- =
SANITARY SEWER O
FORC94AIN (SAN.) J
WATERMAIN
EAMON(
OVERFLOW ELEV.
RETAINING WALL
PROPOSED
x 962.5
E7(ISTING
A9625
SILT FENCE
SOIL BORINGS
DIRECTION OF
OVERLAND FLOW
TEMPORARY
DIVERSION DITCH
CHECK DAM
TEMPORARY STONE
CONSTRUCTION ENTRANCE
TEMPORARY SEDIMENT BASIN
TEMPORARY STORAGE AND PARKING
AREA
SOIL EROSION /SEDIMENTATION CONTROL OPERATION TIME SCHEDULE
NOTE CONTRACTOR OR GENERAL CONTRACTOR TO COMPLETE TABLE WITH THEIR SPECIFIC PROJECT SCHEDULE
CONSTRUCTION SEQUENCE
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
TEMPORARY CONTROL MEASURES
STRIP & STOCKPILE TOPSCIL
ROUGH GRAD / SEDIMENT CONTROL
TEMPORARY CONSTRUCTION ROADS
FOUNDATION / BUILDNG CONSTRUCTION
SITE CONSTRUCTION
PERMANENT CONTROL STRUCTURES
FINISH GRADING
LANDSCAPING/SEED/FINAL STABILIZATION
STORM FACLUTES
REFER TO SHEET C.5.03 FOR GENERAL NOTES,
MAINTENANCE NOTES, LOCATION MAPS, AND
STANDARD DETAILS
ST-9 i4A PA -10
AFAR 0 9 2007 yq.
0
100
SCALE IN FLLI
200
IX
W
0
NON
LL
W
0
J
1
Designed DJD /JMD
0
2 O
0
m
U
•L
SHEET NU183ER
C-5.02
REV.
18RA FILE 1 16172
•
E -06
05/06
NO SCALE
SITE LOCATION MAP
NOT TO SCALE
7 ACRPS CR I FSS OF DRAINAGE AREA.
(DONNSIREAY VFW)
2 -1O ACRFS OF DRANAGE AREA
ROCK CHECK DAM
M FRA
USGS MAP
NOT TO SCALE
CONSTRUCT r HIGH BERM NTH
MAX AM 510E SLOPE CF 4:1
x103
GRAVEL
E -07
05/06
NO SCALE
NOTE DIE R0O( ENTRANCES SHALL BE
INSTALLED PRIOR 7D THE START (IF ANY 511E
NORF( THE ROCK ENTRANCES SHALL IF INSPECTED
FELDIING EACH RAINFALL MAINTENANCE OF THE
RO ( ENTRANCES SHALL INCWOE A TOP
DRESSING OF NEW GRAVEL OR REMOVAL AND
REPLACEENT OF TIE GRAVEL AS NEEDED, TO
KEEP THE ENTRANCE FREE FROM COLLECTED MUD.
ROCK ENTRANCE DRIVE
2'=2 rom
POSTS 4.13. 0.G
VFRA
Yfami GWllMs
A� ;AG
E -1D
05/06
NO SCALE
DIRECTION Cr
DRAINAGE
MORE STRINGENT SPECIFICATION SHALL APPLY.
2 114E CWTRACTOR 15 SPECIFICALLY CAUTIONED THAT THE LOCATIONS AND /OR ELEVATIONS OF EXISTING UTILITIES AS SHOWN ON THESE PLANS ARE BASED ON RECORDS OF THE VARIOUS UTIUTY COMPANIES AND, WHERE POSSIBLE.
MEASUREMENTS TAKEN IN THE FIELD. THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTIUTY QUALITY LEVEL D. THIS QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDWNES OF Cl/ASCE 38-02. ENTITLED
STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTIUTY DATA.' THE INFORMATION I5 NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE THE CONTRACTOR MUST CONTACT ALL THE APPROPRIATE
UTIUTY COMPANIES AT LEAST 48 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTLrt1ES. IT SHALL BE 114E RESPONSBWTY OF 114E CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE
PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. THE LOCATIONS OF SMALL UTILITIES SHALL BE OBTAINED BY THE CONTRACTOR BY CAWNG MINNESOTA GOPHER STATE ONE CALL AT 800- 252 -1166 OR 651- 454 -0002
3 'NE GENERAL CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASES OF 114(5 PRO.ECT. THE CONTRACTOR WILL BE HELD SOLELY RESPONSIBLE
FOR ANY DAMAGES OCCURRING TO THE ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASES OF 1X15 PROJECT.
THE STORMWATER POLL611ON PREVENTION PLAN (SWPPP) IS COMPRISED OF THIS DRAWING (EROSION 8 SEDIMENTATION CONTROL PLAN -ESC PLAN), THE STANDARD DETAILS. THE PLAN NARRATIVE, ATTACHMENTS INCLUDED IN THE 91EWORK
SPECIFICATIONS SECTION 02370 (SWPPP). PINS THE PERMIT AND ALL SUBSEQUENT REPORTS AND RELATED DOCUMENTS.
5 THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETING k SUBMITTING THE APPLICATION FOR THE MPCA GENERAL STORMWATER PERMIT FOR CONSTRUCTION ACTIVITY. ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED WITH STORM
WATER POLLUTION PREVENTION SHALL OBTAIN A COPY OF THE SWPPP AND THE STATE OF MINNESOTA NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL PERMIT (NPDES PERMIT) AND BECOME FAMTUAR WI1H THEIR CONTENTS
'RE SIM AID ALL DINER RELATED DOCUIO71S MUST BE KIST AT 11E ST1E WRNS CONS1RUC110/
6. CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES (BMP'S) AS REQUIRED BY 111E SWPPP & PERMITS THE CONTRACTOR SHALL OVERSEE THE INSPECTION @ MAINTENANCE OF THE BLIP'S AND EROSION PREVENTION FROM BEGINNING
OF CONSTRUCTION AND UNTIL CONSTRUCTION IS COMPLETED. IS APPROVED BY ALL AUTHORITIES. THE NOTICE OF TERMINATION (10T) HAS BEEN FILED 'MTH THE MPCA BY EITHER THE OWNER OR OPERATOR AS APPROVED ON PERMIT
ADDITIONAL NAPS SHALL BE IMPLEMENTED AS DICTATED BY CONDITIONS AT NO ADDITIONAL COST TO OWNER THROUGHOUT ALL PHASES OF CONSTRUCTION
7. BMP'S AND CONTROLS SHALL CONFORM TO FEDERAL STATE, OR LOCAL REQUIREMENTS LR MANUAL OF PRACTICE. AS APPLICABLE CONTRACTION SMALL MPLEUENT ADDITIONAL CONTROLS AS DIRECTED BY PERMITTING AGENCY OR OWNER.
8. ESC PLAN MUST CLEARLY DELINEATE ALL STATE WATERS. PERMITS FOR ANY CONSTRUCTION ACTIVITY IMPACTING STATE WATERS OR REGULATED WETLANDS MUST BE MAINTAINED ON Sill AT ALL TWES.
9. GENERAL CONTRACTOR SHALL DENOTE ON PLAN THE TEMPORARY PARKING AND STORAGE AREA WHICH SHALL ALSO BE USED AS THE EQUIPMENT MAINTENANCE AND CLEANING AREA, EMPLOYEE PARKING AREA AND AREA FOR LOCATING
PORTABLE FACTURES. OFFICE TRAILERS. AND TOILET FACILITIES
10. ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING, EQUIPMENT CLEANING, ETC.) MUST BE LIMITED TO A DEFINED AREA OF THE SITE AND SHALL BE CONTAINED AND PROPERLY TREATED OR DISPOSED. ND ENGINE DEGREASING I5
ALLOWED ON SITE.
11. SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND FLOTATION BOWS SHALL BE MAINTAINED ON SITE OR READL1 AVAILABLE TO CONTAIN AND CLEAN -UP FUEL OR CHEMICAL SPILLS AND LEAKS
12. DUST ON THE SITE SHALL BE CONTROLLED. THE USE O MOTOR OILS AND OTHER PETROLEUM BASED OR TDXLC U0JID5 FOR DUST SUPPRESSION OPERATIONS 15 PROHIBITED.
13. SOLO NAVE COLLECTED SEDIMENT. ASPHALT A CONCRETE MILLINGS. FLOATING DEBRIS. PAPER, PLASTIC, FABRIC. CONSTRUCTION k DEMOLITION DEBRIS 3 OTHER WASTES MUST BE DISPOSED OF PROPERLY k MUST COMPLY WITH MPCA
DISPOSAL REOJRNEMENTS.
14. HAZARDOUS MATERIALS: OIL GASOLINE. PAINT k ANY HAZARDOUS SUBSTANCES MUST BE PROPERLY STORED, INCLUDING SECONDARY CONTAINMENT, TO PREVENT SPILLS. LEAKS OR OTHER DISCHARGE. RESTRICTED ACCESS TO STORAGE AREAS
MUST BE PROVIDED TO PREVENT VANDAUSA. STORAGE & DISPOSAL OF HAZARDOUS WASTE MUST BE 1N COMPLIANCE NM MPCA REGULATIONS
15. ALL 5TORHA WATER POLLUTION PREVENTION MEASURES PRESENTED ON THIS PLAN, AND IN THE SWPPP, SHALL BE INITIATED AS SOON AS PRACTICABLE AND PRIOR TO ANY 0IEWORK.
15 DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS STOPPED SHALL BE TEMPORARILY SEEDED. SEEDING SHALL BE IN ACCORDANCE WITH MN/DOT SPEC. 2575 0 10DL85 /ACNE (0R APPROVED EQUAL) AND IN ACCORDANCE
WITH 711E FOLLOWING GUIDWNES:
0411E OF 5L0PE MME
STEEPER THAN 3:1 7 DAYS
10:1 TO 3:1 14 DAYS (MAX RUE AN AREA CAN REMAIN OPEN WHEN THE AREA IS NOT ACTIVELY BEING WORKED)
FLATTER THAN 10:1 21 DAYS
17. DISTURBED PORTIONS DF THE 910 WHERE CONSTRUCTION ACTIVITY HAS PERMANENTLY STOPPED SHALL BE PERMANENTLY SEEDED. THESE AREAS SHALL BE SEEDED IN ACCORDANCE 1M114 THE TIME TABLE DESCRIBED ABOVE REFER TO THE
GRADING PUN AND /0R LANDSCAPE PLAN FOR VEGETATIVE COVER.
TEL CONTRACTORS OR SUBCONTRACTORS WILL BE RESPONSIBLE FOR REMOVING SEDIMENT FROA CONVEYANCES k FROM TEMPORARY SEDIMENTATION BASINS THAT ARE TO BE USED AS PERMANENT WATER OUA1ITY MANAGEMENT BASINS. SEDIMENT
FAUST BE STABILIZED TO PREVENT IT FROM BENG WASHED BACK INTO THE BASIN, CONVEYANCES. OR DRAINAGEWAYS DISCHARGING OFF -91E OR TO SURFACE WATERS. THE CLEANOUT OF PERMANENT BASINS FAUST BE SUFFICIENT TO RETURN
THE BASH TO DESIGN CAPACITY.
I9. ON -9TE W OFT-SITE SOIL STOCKPLE AND BORROW AREAS SHALL BE PROTECTED FROM EROSION AND SEDIMENTATION THROUGH IMPLEMENTATION OF BMP'S. STOCKPILE AND BORROW AREA LOCATIONS SHALL BE NOTED ON THE SITE MAP AND
PERMITTED IN ACCORDANCE WITH GENERAL PERMIT REQUIREMENTS_
20. TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCE OR OTHER EFFECTIVE SEDIMENT CONTROLS & CANNOT BE PLACED N SURFACE WATERS, INCLUDING STORMWATER CONVEYANCES SUCH AS CURB & GUTTER SYSTEMS OR CONDUITS &
DITCHES.
21. SLOPES SHALL BE LEFT N A ROUGHENED CONDITION DURING THE GRADING PHASE TO REDUCE RUNOFF VELOCITIES AND EROSION.
22. DUE 1D THE GRADE CHANGES DURING THE DEVELOPMENT OF THE PROJECT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING THE EROSION CONTROL MEASURES (5LT FENCES, CHECK DAMS, MILD- PROTECTION DEVICES ETC.) TD
PREVENT EROSION.
23. ALL CONSTRUCTION SHALL BE STABILIZED AT THE END OF EACH WORKING DAY, 111I5 INCLUDES BACKFIWNG OF TRENCHES FOR UTILITY CONSTRUCTION AND PLACEMENT OF GRAVEL OR BITUMINOUS PAVING FOR ROAD CONSTRUCTION.
MAINTENANCE:
ALL MEASURES STATED ON THIS EROSION AND SEDIMENT CONTROL PLAN. AND IN THE STORM WATER POLLUTION PREVENTION PLAN SHALL BE MAINTAINED N FULLY FUNCTIONAL CONDITION UNTIL NO LONGER REQUIRED FOR A COMPLETED PHASE OF
WORK OR 0NAL STABILIZATION OF THE SITE THE DESIGNATED CONTACT PERSON NOTED ON THIS PLAN MUST ROUTINELY INSPECT THE CONSTRUCTION ON SITE ONCE EVERY SEVEN DAYS WRING ACTIVE CONTRUCTION AND WHIN 24 HOURS AFTER A
RAINFALL EVENT GREATER THAN 0.5 INCHES N 24 HOURS. Al EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE CLEANED AND REPAIRED N ACCORDANCE WITH THE FOLLOWING:
I. ALL STORM DRAIN INLETS MADE OPERABLE DURING CWSTRUCTION MUST BE PROTECTED BY APPROPRIATE BMP'S UNTIL ALL 501JRCE5 NTH POTENTIAL FOR DISCHARGING TO THE INLET HAVE BEEN STABIUZED.
2 ALL SEEDED AREAS SHALL BE CHECKED REGULARLY TO SEE THAT A COCO STAND 145 MAINTAINED. AREAS SHOULD BE FERTILIZED, WATERED, AND RESEEDED AS NEEDED.
3. SILT FENCES SHALL BE REPAIRED. REPLACED CR SUPPLEMENTED TO THEN ORIGINAL CONDITIONS IF DAMAGED. SEDIMENT SHALL BE REMOVED FROM THE SILT FENCES WHEN IT REACHES ONE -THIRD THE HEIGHT OF 711E SILT FENCE. THESE REPAIRS
MUST BE MADE WITHIN 24 HOURS OF DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS.
4. VEHICLE TRACKING LF SEDIMENT FROM THE CONSTRUCTION SITE MUST BE MINIMIZED BY BMP'5 SUCH AS STONE PADS, CONCRETE OR STEEL WASH RACKS, OR EQUIVALENT SYSTEMS. STREET SWEEPING MUST BE USED 1F SUCH BMP'5 ARE NOT
ADEQUATE TO PREVENT SEGMENT FROM BEING TRACKED 0NTD THE STREET. TRACKED 5FOMENT MUST BE REMOVED FROM ALL OFF -SITE PAVED SURFACES WHIN 24 HOURS OF DISCOVERY OR SOONER.
5. THE 7EMP0RARY PARKING AND STORAGE AREA SHALL BE KEPT IN GOOD CONDITION (SUITABLE FOR PARKING AND STORAGE). THIS MAY REQUIRE PERIWIG TOP DRESSING O THE TEMPORARY PARKING AS CONDITIONS DEMAND.
6. OUTLET STRUCTURES IN IRE TEMPORARY AND PERMANENT SEDIMENTATION BASINS SHALL BE MAINTAINED IN OPERATIONAL CONDITIONS AT ALL TIMES. SEDIMENT SHALL BE REMOVED FROM SEDIMENT BASINS OR TRAPS WHEN THE DESIGN CAPACITY
REACHES ONE -HALF THE STORAGE VOLUME. DRAINAGE & REMOVAL FAUST BE COMPLETED WITHIN 72 HOURS OF DISCOVERY OR AS SOW AS FIELD CONDITIONS ALLOW ACCESS.
FLIER FABRIC
(111RAFI- ENVRNO FENCE ON
APPROVED EQUAL) 104. 30.
- MAIL 36' ABOVE GRADE
TRENCH
6- = 6'
FRA
Yfmbfarlrl
JAHmlA`c
SILT FENCE DETAIL
L „N rY C
Pty f'' L�
0
O
a
00
51
O
CD
CO
1
5
CO
m
i
0
a
SHEET NUMBER
C -5.03
REV.
MFRA FILE j 16172
•
•
•
ntr La es Pa
•
•
•
ATTACHMENT 8
MEMORANDUM
DATE: April 25, 2007
TO: Jim Studenski
FROM: Marty Asleson
RE: LaMotte Soil Excavation
The following comments should be addressed:
1. This SWPPP must have the responsible manager listed and a 24 hour phone
number that this person can be reached.
2. The SWPPP must contain the name and telephone number of the person
responsible for the SWPPP.
3. The SWPPP must state specifically that inspections will occur on a weekly and
post 1/2 inch storm event
4. The SWPPP must be located on the site (preferably in a mailbox), and the site
location indicated in the SWPPP.
5. All references to Mindot seed mix for final grade should be changed to the
City Native seed mix. Native seed application should be applied at the time
of initial stabilization if soil stabilization plants would pose a problem for
establishing the permanent City native seed mix.
•
•
•
icy, e
VI. DETENTION BASIN
FORBS
Description % by wt.
Alisma subcordatum 11.4
Mud Plantain
Iris versicolor 5.7
Northern Blue Flag
Sagittaria latifolia 2.85
Common Arrowhead
Totals for FORBS:
19.94
GRASSES, SEDGES & RUSHES
Description % by wt.
Calamagrostis canadensis 1.14
Blue Joint Grass PLS
Carex scoparia 2.85
Lance - fruited Oval Sedge
Carex stipata 2.85
Common Fox Sedge
Eleocharis acicularis 1.42
Spike Rush
Elymus canadensis 56.98
Canada Wild Rye PLS
Gylceria grandis 5.7
Reed Manna Grass
Scirpus atrovirens 0.57
Dark -green Bulrush
Scirpus validus 2.85
Great Bulrush
Spartina pectinata 5.7
Cord Grass PLS
Totals for GRASSES, SEDGES & RUSHES:
80.06
Totals for this mix:
100
•
•
•
IV. WET PRAIRIE
FORBS
Description
% by wt.
Agalinis tenuifolia
Slender Gerardia
0.34
Agastache foeniculum
Anise Hyssop
0.69
Aster umbellatus
Flat - Topped Aster
0.69
Eupatorium maculatum
Joe Pye Weed
0.69
Eupatorium perfoliatum
Boneset
0.69
Iris versicolor
Northern Blue Flag
5.5
Liatris pycnostachya
Prairie Blazing Star
5.5
Mimulus ringens
Monkey Flower
0.34
Pycnanthemum virginianum
Mountain Mint
0.69
Rudbeckia hirta
Black -eyed Susan
2.75
Sisyrinchium campestre
Prairie Blue -eyed Grass
0.69
Solidago graminifolia
Grass - leaved Goldenrod
0.34
Solidago uliginosa
Bog Goldenrod
0.69
Zizia aurea
Golden Alexanders
0.69
Totals for FORBS:
20.27
GRASSES, SEDGES & RUSHES
Description
% by wt.
Andropogon gerardii
Big Bluestem PLS
5.5
Calamagrostis Canadensis
Blue Joint Grass PLS
1.37
Carex atherodes
Hairy- leaved Lake Sedge
1.37
Elymus canadensis 54.98
Canada Wild Rye PLS
Sorghastrum nutans 11
Indian Grass PLS
Spartina pectinata 5.5
Cord Grass PLS
Totals for GRASSES, SEDGES & RUSHES:
79.73
Totals for this mix:
100
•
•
•
•
V. DRY PRAIRIE
FORBS
Description
% by wt.
Agastache foeniculum
Anise Hyssop
0.61
Asclepias hirtella
Tall Green Mildweed
0.61
Asclepias tuberose
Butterfly Weed
0.61
Aster oblongifolius
Aromatic Aster
0.08
Aster sericeus
Silky Aster
0.08
Liatris aspera
Button Blazing Star
1.22
Monarda fistulosa
Wild Bergamot
0.61
Penstemon grandiflorus
Large- flowered Beardtongue
0.61
Petalostemum candidum
White Prairie Clover
0.61
Petalostemum purpureum
Purple Prairie Clover
0.61
Potentilla arguta
Prairie Cinquefoil
0.31
Rudbeckia hirta
Black -eyed Susan
2.44
Sisyrinchium campestre
Prairie Blue -eyed Grass
0.31
Solidago rigida
Stiff Goldenrod
0.31
Solidago speciosa
Showy Goldenrod
0.31
Tradescantia occidentalis
Western Spiderwort
0.61
Verbena stricta
Hoary Vervain
0.31
Viola pedatifida
Prairie Violet
0.31
Totals for FORBS:
10.53
•
•
TREES, SHRUBS & VINES
Description % by wt.
Amorpha canescens 0.61
Lead Plant
Ceanothus americanus 0.31
New Jersey Tea
Totals for TREES, SHRUBS & VINES:
0.92
GRASSES, SEDGES & RUSHES
Description % by wt.
Andropogon gerardil 4.89
Big Bluestem PLS
Andropogon scoparius 9.77
Little Bluestem PLS
Bouteloua curtipendula 9.77
Side -Oats Grama PLS
Bouteloua hirsute 0.31
Hairy Grama
Bromus kalmii 0.61
Prairie Brome PLS
Calamovllfa longifolia 0.31
Sand Reed Grass
Carex muhlenbergii 0.61
Sand Bracted Sedge
Elymus canadensis 48.85
Canada Wild Rye PLS
Koeleria cristata 1.22
June Grass PLS
Sorghastrum nutans 7.33
Indian Grass PLS
Stipa spartea 4.89
Porcupine Grass - Untrimmed
Totals for GRASSES, SEDGES & RUSHES:
88.55
Totals for this mix:
100
•
•
•
MEMORANDUM
DATE: April 20, 2007
TO: Environmental Board
`
FROM: Michael Grochal Community Development Director
RE: Agenda Item 6.A. Comprehensive Plan Draft Goals and Strategies
The Comprehensive Plan Advisory Panel is nearing completion of the first phase of the
Comp Plan update process. Over the past two months the panel has been working on
establishing goals and strategies. A draft of the goals and strategies is being prepared for
review by the City Advisory boards. Comments received from the boards will be brought
back and discussed with the advisory panel at their May 16 meeting.
Discussion of the goals and strategies is included on the Environmental Boards agenda.
However, we were unable to get the revised draft, based on the panel's April 21 meeting,
completed for distribution. We hope to have these delivered by Monday evening. I have
enclosed copies of the first two comp plan newsletters which provide an overview of the
first two panel meetings.
See you on Wednesday.
J: \Forms \Memo Template.dot
o,.
Spotlight on March 27, 2007
Issue 1
Advisory Panel lists issues
during SWOT exercise
Below are the top responses identifying
strengths, weaknesses, opportunities
and threats in Lino Lakes. The number
of votes received is shown next to each
response.
Strengths
• Natural amenities (parks, open space,
lakes) - 18
• Location (close to economic engines
Mpls /St. Paul) - 14
• Access to I -35E and I -35W - 13
• Conservation development - 6
• Sense of unique, small town community - 4
Weaknesses
• Commercial and industrial development
(lack of tax base, small businesses, bed
room community) - 26
• Lack of community identity (no social,
economic center, lack of community
gateways) - 12
• Deteriorating road system - 6
• Lack of diversified housing - 5
• City Charter - 4
Opportunities
• Conservation development - 13
• To have a novel plan - 9
• Location - 9
• AUAR process for comprehensive
planning - 7
• Amend City Charter - roads - 6
• Mass transit - 6
Threats
• Business climate - 16
• Water quality, pollution - 13
• Transportation issues - 9
• Private property rights - 5
• Failure to consistently implement plans - 5
Advisory Panel discuss
issues facing Lino Lakes
Input to be used to create city's goals any
policies for the 2030 Comprehensive Plan
In an effort to make the city's 2030
Comprehensive Plan citizen - driven,
an Issues Forum was conducted on
March 21 at Lino Lakes City Hall. The
2030 Comprehensive Plan Advisory
Panel spent the evening discussing
and wrestling with the biggest issues
facing the city currently.
To begin the meeting Ciara
Schlichting, of the planning consulting
firm Bonestroo, gave an introductory
presentation, Ciara Schlichting
described what a comprehensive plan
is, and why it is important to plan
for the future. Also included in the
presentation was information about
the Advisory Panel and how it was
selected. For the full presentation go
to the city's website at www.ci,lino-
lakes,mn,us,
At that point the Advisory Panel
formed smaller groups to discuss their
A member of the Advisory Panel
votes on his top issues in Lino Lakes.
thoughts about the top issues facing
Lino Lakes. A SWOT exercise was then
conducted. SWOT stands for Strengths
- Weaknesses - Opportunities - Threats.
Citizens were directed to think about
Lino Lake's strengths and weaknesses,
then to think about what opportunities
and threats the city faces in the future.
Getting thoughts out into the open
helps citizens see what kind of city
they have today and where they would
like it to go over the next 20 years.
The groups spent about 40 minutes
discussing all of these issues with each
other. After the discussion period,
Ciara Schlichting moderated a group
discussion where each group took
turns sharing their thoughts from the
SWOT exercise.
Every group contribution to the SWOT
exercise was written down and hung
up on the wall. The participants were
invited to vote on their top three
issues in each category.
The sidebar to the left shows the
issues that received the most votes
from the people at the forum. These
issues will be utilized to shape the
city's goals and polices, which is the
next step of the 2030 Comprehensive
Plan.
City of Lino Lakes
Michael Grochala,
Community Development Director
600 Town Center Parkway
Lino Lakes, MN 55014
michael .grochala @ci.lino - lakes.mn.us
Next step: The Advisory Panel will meet on
April 4 to discuss draft goals and policies.
If you have questions or comments, please contact:
compplan2030 @ci. lino - lakes. mn. us
•
Spotlight on 2030
April 13, 2007
Issue 2
Advisory Panel utilizes meeting to
explore and confer over important issues
Panel spent almost two hours sharing, listening and discussing issues that
they feel are important to the City of Lino Lakes' future
The 2030 Lino Lakes Comprehensive Plan Advisory Panel spent
the evening of April 4th at City Hall discussing and wrestling
with some of the biggest topics and issues facing Lino Lakes. To
begin the meeting Ciara Schlichting, of the planning consulting
firm Bonestroo, reported back the results of the SWOT exercise
that was conducted on March 21st. This exercise let advisory
panel members state what they thought the strengths,
weaknesses, opportunities, and threats were in Lino Lakes.
After the results had been reported back a discussion was
held that lasted almost two hours where a wide range of
topics were discussed. The Advisory Panel discussed how
future opportunities connect and /or conflict with one another
job creation and housing, transportation and economic
development, transportation and housing, and conservation
development and housing. Some of the topics included:
housing conditions, the Metropolitan Council's definition of
affordable housing, redevelopment opportunities, conservation
development, job growth, and business retention and
expansion. This discussion afforded the Advisory Panel a chance
to express their opinions and to hear different view points on
the various topics that are important to the City's future. Also
the Advisory Panel was able to hear what city staff is currently
doing to address many of these issues already, while also
learning what limitations the City faces when trying to solve
some of the more complex subjects.
This discussion is feeding the creation of goals and strategies
for the 2030 Comprehensive Plan. The Advisory Panel will be
continuing its work on the goals and strategies for Lino Lakes
at its April 18th meeting. For more information of the 2030
Comprehensive Plan please visit www.ci.lino- lakes.mn.us.
Below is a list of topics that were discussed during the Advisory Panel meeting. The topics are organized by the
categories from the City's 2030 Vision Plan with Community Facilities added. The Panel ran out of time to discuss
Community Assets and Natural Resources.
Community, Residential
and Neighborhood
Development
- Redevelopment /Infill
- Rehab and maintenance of
housing
- Tying together transportation
and residential uses
- Conservation development
and affordable housing; How
will it work together?
- Accommodating
affordable housing
- Metropolitan Council
mandates
Economic and Commercial
Development
- Proactive economic
development
- Business retention and
expansion
- Housing -jobs balance
- Capturing local dollars "On
Our Way Home"
- Marketing all assets; income,
businesses
- How does industrial,
commercial, and residential
development all work
together?
Roads and Transportation
- Light rail transit
- Multiple modes of
transportation
- Walkable communities
- Planned roads
- Coordination with County
Community Facilities
- Continuing education
- Post secondary
education (i.e, Minnesota
School of Business)
- Niche facility? Band shelter,
theater, fountain - Need for
community center?
- Community facilities as
economic generator
- Athletics
- Partner with large
corporations
City of Lino Lakes
R✓lichael Grochala,
Community Development Director
600 Town Center Parkway
Lino Lakes, MN 55014
michael .grochala @ci.lino- lakes.mn.us
If you have questions or comments, please contact:
compplan2030 @ci.lino- lakes. mn. us