HomeMy WebLinkAbout05/30/2007 Env Bd Packet•
•
City of Lino Lakes
Environmental Board Meeting
May 30, 2007
6:30 p.m.
5:30 p.m. Meet at City Hall for site visit of Legacy of Woods Edge.
AGENDA
1. Call to Order
2. Approval of Minutes
April 25, 2007
3. Approval of Agenda
4. Open Mike
5. Action Items
A. Grandview Preliminary Plat and Variance
6. Discussion Items
A. Water Emergency and Conservation Management — Verne Jacobsen
B. Recycling Day
C. Updates
7. Adjourn
•
•
•
Memorandum
To: Environmental Board Members
From: Marty Asleson
Date: 5/30/07
Re: Pre Meeting Site Visit
It has been a tradition of the Environmental Board during the spring/summer months to
visit some of the past reviewed project sites. For those that can, we will meet at city hall
at 5:30 p.m. to walk through the Legacy of Wood Edge development.
•
•
•
ENVIRONMENTAL BOARD MEETING APRIL 25, 2007
DATE
TIME STARTED
TIME ENDED
MEMBERS PRESENT
MEMBERS ABSENT
STAFF PRESENT
CITY OF LINO LAKES
MINUTES
: April 25, 2007
. 6:33 P.M.
. 7:30 P.M.
: Mary Jo O'Dea, Martha DeHaven, Barbara
Bor, Kimberly Brouillet, Peter Brown and
Paula Andrzejewski
: Alan Traylor
: Environmental Coordinator Marty Asleson,
1. CALL TO ORDER
Ms. O'Dea called the meeting to order at 6:33 p.m.
2. APPROVAL OF MINUTES
Ms. O'Dea had a change to the March 28, 2007 minutes on page 3, should read:
Motion carried 6 -0, not 7 -0. Page 4, second paragraph, should read: include a
bum, not berm at the end of this year.
Ms. Brouillet made a motion to approve the March 28, 2007 minutes with
changes. Ms. Andrzejewski seconded the motion. Motion carried unanimously
3. APPROVAL OF AGENDA
Ms. Brouillet made a motion to approve the agenda as is. Ms. Brouillet seconded
the motion. Motion carried unanimously.
4. OPEN MIKE
Opened and closed at 6:35 p.m.
5. ACTION ITEMS
A. LaMotte Soil Excavation
Mr. Asleson presented his staff report to board members. He noted that at this
time, Rice Creek Watershed District has determined this application to be
incomplete.
Mr. Asleson stated that a tree preservation plan is not necessary.
1 DRAFT MINUTES
ENVIRONMENTAL BOARD MEETING APRIL 25, 2007
Mr. Brian Baroussa from MFRA Engineering was present to answer questions.
Ms. O'Dea questioned if this was a stock pile. Mr. Bourassa stated this project is
not an ongoing pit application. The purpose of this project is to excavate good
material from this site and bring it to a project around the corner. Mr. Baroussa
stated this is a temporary project that will be rimmed with silt fence. Ms. O'Dea
asked what we are creating. Mr. Bourassa stated basically a hole in the ground.
Mr. Bourassa stated that organic material will be placed at the side slopes and
seeded. Mr. Brown asked Mr. Asleson if this is a good or bad way of doing this.
Mr. Asleson stated this is an economical way.
Ms. Bor questioned the safety of children. It was stated the side slopes are 4 to 1.
Ms. O'Dea asked if there will be three holes that will be dug. Mr. Bourassa said
at this time it is only a proposal. All three holes might not be dug.
Ms. Brouillet questioned at what point if the hole(s) become a pond can Rice
Creek Watershed District come in and say they are going to delineate? Mr.
Asleson stated after 25 years. Mr. Asleson stated this isn't the first time this type
of project has been done in the city.
Mr. Bourassa stated Rice Creek Watershed District has asked for additional
information on this project. MFRA has submitted the information to Rice Creek
Watershed District twice. They are reviewing MFRA's material at this time. The
material that will be going to be put back in the MFRA analysis shows they will
not draw down on the wet land area.
Ms. O'Dea asked if the wet land started to dry up is there a way to deal with that?
Mr. Bourassa has requested a dewatering permit from the city engineer.
Mr. Brown asked how many gallons of water will be retained in the holes. Mr.
Bourassa stated he did not know at this time. He stated he believes the pond will
be 1/2 the elevation of the existing ground water. Ms. Brouillet questioned if there
will be a buffer between the existing lots in Trappers Crossing and this project.
Mr. Bourassa stated that they will not be taking any trees. He stated the project
will take place approximately 30' from their property lines.
Ms. O'Dea asked for motion to approve or deny this project and for staff
recommendations.
Ms. Bor made a motion to forward with the following staff recommendations:
1. Add Rice Creek Watershed District approval.
2. Add fencing or other barrier around the property for safety purposes.
Ms. Andrzejewski seconded the motion. Motion carried unanimously.
2 DRAFT MINUTES
•
•
•
•
•
•
ENVIRONMENTAL BOARD MEETING APRIL 25, 2007
6. DISCUSSION ITEMS
A. Comprehensive Plan Draft Goals and Strategies
Mr. Grochala was present to update the board on the first phase of the
Comprehensive Plan process. The advisory panel has been meeting over the past
two months.
Ms. O'Dea noted on page 11 of the Draft Goals and Strategies, under Strategies,
the SHEP program information should be included. Board members discussed the
wording to be used. It was decided that the following language would be added to
the Draft Goals & Strategies document on page 11 under Strategies: 4. Continue
to support programs that measure environmental best practices.
Ms. O'Dea noted on page 4 of the Draft Goals and Strategies, under Goal 3, add
#8. Encourage the use of green building techniques.
Mr. Grochala stated the word "new" will be added under sewered section. Under
the current zoning ordinance, we will not rezone any property or industrial district
unless public sewer and water are available. Another change will be that
commercial, industrial and institutional buildings or any type of building of that
magnitude will also be covered by this.
Ms. O'Dea asked the board members if there were any other questions. There
were none. Ms. O'Dea stated the document is very well put together document.
Mr. Grochala stated that the format will continue to be changed and updated with
new information.
B. Arbor Day, Recycle Day and Earth Day
Arbor Day - Arbor will take place April 27, 2007 at Lino Lakes Elementary
School at 2:00 p.m. Mayor Bergeson will present the Tree City Award and give
the proclamation. There will be a tree plated and dedicate to the teacher from
Blue Heron Elementary who passed away in an automobile accident this year.
Mr. Asleson stated that if other schools want to participate in Arbor Day, he is
open to doing this.
Recycle Day — Lino Lakes Recycle Day is scheduled to take place from 9:00 a.m.
to 3:00 p.m. Saturday, May 5. This will be the only recycle day of the year for the
city. Mr. Asleson stated that if there are board members who would like to
volunteer to help they could come at anytime during scheduled hours.
3 DRAFT MINUTES
ENVIRONMENTAL BOARD MEETING APRIL 25, 2007
Ms. Brouillet mentioned that Walter's Recycling has donated a dumpster for
recycling day.
Earth Day — Mr. Asleson stated that about 735 people attended the Earth Day
celebration at Wargo Nature Center. He stated that this event was a success. Ms.
Andrzejewski had a booth at Wargo Nature Center for the event. She brought
information resources and activities for the kids.
C. Project Updates: Blue Heron Days, Spring Restoration Burns and
Heron Colony Update
Blue Heron Days - Walter's will donate trash bins with wheels for Blue Heron
Days stated Ms. Brouillet.
Spring Restoration Burns. Mr. Asleson reviewed with the board where burns
have taken place in the past week. He stated that a Blanding's turtle was found on
the Fox Borough site. Mr. Husveth from Critical Connections will document the
finding. Pictures were taken and the turtle was then released.
Heron Colony Update: Mr. Asleson is looking into an inventory flyover of
Peltier Island to record the number of Blue Heron nests present at this time.
7. ADJOURN
It was noted that the next meeting of the Environmental Board will be on May 30,
2007.
There being no further business, Ms. Bor moved to adjourn at 7:30 p.m. and Ms.
Brouillet seconded the motion. Motion carried unanimously.
Transcribed by:
Lisa Hogstad
Community Development Secretary
4 DRAFT MINUTES
•
•
• Agenda Item 5A
•
Environmental Board Meeting Date: May 30, 2007
Topic: Grandview /Preliminary Plat and variance for minimum lot depth and
minimum lot area within the shoreland area.
Background:
Request
Royal Oaks Realty has submitted an application for Preliminary Plat of Eight
(includes parsonage house) single family lots known as "Grandview ".
Site Location
The Grandview Development proposal is located east of Lake Drive, and North
of Gethsemane United Methodist Church, and adjacent to Marshan Lake.
Site Data
Gross Area: 3.32 acres
Upland Area: 3.24 acres
Wetland: 0.08 Acres
Total Lots 8
Existing Zoning is R -1. Proposed Zoning is R -1. The proposed development is
in a Shoreland Overlay District. Shoreland means land located within 1000 feet
from the ordinary high water level (OHW) of the lakes and land located within 300
feet from the streams classified in section 1102.05 of the code, or the landward
extent of a flood plain designated by ordinance on a river or stream , whichever
is greatest.
The area would be serviced with city sewer and water and is located in the
MUSA boundary area.
Analysis:
Shoreland Area
The development proposal is in a shoreland overlay area, and NPDES area of
"Within 200 feet of Lake."
The Shore Impact Zone within a Shoreland Area is defined as land located
between the ordinary high water level of a public water and a line parallel to it at
a setback of 50 % of the structure setback. This is the closest distance that a
structure may be built in a shoreland district. The Grandview proposal meets
•
•
•
these requirements. The removal of vegetation is also prohibited in a shore
Impact Zone.
Surface Water Management
Preliminary Grading Plan (Attachment 4) shows a National Urban Runoff Pond
(NURP) and an infiltration pond on the SW side of the project. Sizing must be
verified for volume storage, runoff rate and infiltration requirements on proposed
infiltration and storage ponds.
All infiltration areas must be protected from construction as part of the Storm
Water Pollution Prevention Plan.
All infiltration, pond, and disturbed wetland areas must be planted with the City
native seed mix and managed by a company listed with the Minnesota DNR as
recommended for such work for a period of at least 3 years.
Plan should show access for pond and infiltration area maintenance.
Suggest that all houses direct runoff from impervious to pervious grass areas
through the use of downspouts.
A temporary sediment pond should be installed somewhere on the site that will
accept construction water from storm events.
There should be an agreement that all builders agree to landscape contractor
requirements for tilling top soil into the subsoil before sodding occurs.
Suggest that the developer prepare a brochure for new home owners. The
brochure should discuss the importance of water treatment and that some areas
may be a bit wet after a storm. Other information should include Shoreland
Overlay district restrictions on vegetation removal.
Conservation Easement Recommended
In an effort to address MNDNR concerns for rare species, a conservation
easement should be required to include the shoreland Impact Zone to Marshan
Lake. Signage should be placed at the boundaries where the easement areas
are described. The Conservation Easement should be similar in nature to the
easement granted in the Marshan Meadows Development. City control over all
surface water treatment features should be maintained. Surface water
management areas are covered by drainage and utility easements.
Storm Water Pollution Prevention Plan
•
The developer has submitted a Storm Water Pollution Prevention Plan (SWPPP).
The SWPPP must be approved and implemented prior to the commencement of
a grading permit. A number of modifications to the SWPPP have been identified
and will need to be incorporated into the final plan as identified in the attached
SWPPP memo.
Site Vegetation
Almost the entire site is classified as medium tall grass non - native dominated
grassland. The Eastern -most edge falls into a Native dominated temporarily
flooded shrubland.
Trees: There are no trees within the proposed construction area..
Rare and Unique Feature Search
Developer should check with the Minnesota DNR on how to develop with
National Heritage concerns in the area.
There is an indication from the Lino Lakes Blandings Turtle Model that we have
activity and breeding on this site. Given that there is a potential for breeding and
activity on this site, the site should be designed to enable Blanding's Turtle
• activity. Low - profile, surmountable curbing to allow turtles to cross roads should
be used. Signs similar to the signs placed in Marshan Meadows indicating a
potential nesting area should be placed on along the same contour as Marshan
meadows.
A wetland delineation report submitted is shown on Attachment 6. Wetlands are
confined to the eastern edge of the site. The wetland area is a shrub swamp
type of wetland. Rice Creek Watershed District has declared the delineation as
incomplete due to seasonal constraints related to vegetation and frozen soils.
The report is considered incomplete until the vegetation is analyzed.
Because of the rare features concerns and the shoreland overlay district, a
conservation easement should be drafted that is contiguous with that of Marshan
Meadows. Literature should be given to new residents notifying them of the
easement and the reasons for it. Conservation easement signs should be placed
along the easement line with at least one sign per frontage of easement. The
sign should state that "no cutting, planting, filling or excavating should occur
within the easement."
Soils
Soils on the proposed development site are for the most part fine sand, and Lake
Beach along the lake shore. No soils should be imported or exported with out
City approval. Soils must be protected from compaction and restored if
•
•
•
development process changes the pre - development soil density. Suggest
fencing around the new surface water treatment areas before and after
construction.
No soils should be imported or exported without city approval.
Recommendation:
Staff recommends that the following staff and Environmental Board
recommendations be forwarded to the Planning and Zoning Board for
consideration:
1. Sizing must be verified for volume storage, runoff rate and infiltration
requirements on proposed infiltration and storage ponds.
2. All infiltration areas must be protected from construction as part of the Storm
Water Pollution Prevention Plan.
3. All infiltration, pond, and disturbed wetland areas must be planted with the
City native seed mix and managed by a company listed with the Minnesota DNR
as recommended for such work for a period of at least 3 years.
4. Plan should show access for pond and infiltration area maintenance.
5. Suggest that all houses direct runoff from impervious to pervious grass areas
through the use of downspouts.
6. A temporary sediment pond should be installed somewhere on the site that
will accept construction water from storm events.
7. Suggest that the developer prepare a brochure for new home owners. The
brochure should discuss the importance of water treatment and that some areas
may be a bit wet after a storm. Other information should include Shoreland
Overlay district restrictions on vegetation removal.
8. A number of modifications to the SWPPP have been identified and will need
to be incorporated into the final plan as identified in the attached SWPPP memo.
9. Developer should check with the Minnesota DNR on how to develop with
National Heritage concerns in the area.
10. Because of the rare features concerns and the shoreland overlay district, a
conservation easement should be drafted that is contiguous with that of Marshan
Meadows. Literature should be given to new residents notifying them of the
easement and the reasons for it. Conservation easement signs should be placed
along the easement line with at least one sign per frontage of easement. The
sign should state that "no cutting, planting, filling or excavating should occur
within the easement."
11. No soils should be imported or exported without city approval
12. The developer has submitted a Storm Water Pollution Prevention Plan
(SWPPP). The SWPPP must be approved and implemented prior to the
commencement of a grading permit. A number of modifications to the SWPPP
have been identified and will need to be incorporated into the final plan as
identified in the attached SWPPP memo.
Attachments:
•
•
1. Grandview Location Map
2. Certificate of Survey
3. Preliminary Plat
4. Preliminary Grading
5. Preliminary Utility
6. Storm Water Pollution Prevention Plan
7. SWPPP Memo
AERIAL LAYOUT
s
RANDVIEW
ATTACHMENT 1
•)R: ROYAL OAKS REALTY (DEVELOPER) OWNER: GETHSEMANE UNITED METHODIST CHURCH
1000 COUNTY ROAD E. WEST, SUITE 150 .7330 LAKE DRIVE -"
SHOREVIEW MN 55126 LINO LAKES MN 55014
PHONE (651) -483 -5518
PROPERTY DESORPTION
Tracts B and C, REGISTERED LAND SURVEY NO. 182,
Anoka County, Minnesota.
•
ICKE. G. RUD a SONS, INC.
Est /BM Professional Land Surveyors
, ,1, om 6776 Lake Drive NE, Suite 110
Lino Lakes, MN 55014
Tel. (651) 361 -8200 Fax (651) 361 -8701
NOTES
survey was completed by E.G. Rud and Sons, Inc
include the location of the OHM_
Wetland located by E0. Rud & Sons on 2 -05 -07
on 02 -05-07 to
Wetland delineation completed by Earth Science Inc (651)- 674 -6210 Jan 07.
Feld verified and approved by Watershed on 1 May 07.
- Bearings shown are on Anoko County datum.
- Curb shots are token at the top and bock of curb.
- This survey was prepared without the benefit of title work. Additional
easements, restrictions and /or encumbrances may exist other than those
shown hereon. Survey subject to revision upon receipt of a current title
commitment or an attorney's title opinion.
NORTH
GRAPHIC SCALE
b 0 b 69 M6
(It1 FEET )
1 Inch = 80 f7.
BENCHMARK
At gage site, a 60d spike, 1.0 feet above
ground, on Northwest side of 0.5 foot ash tree
at the intersection of wooden romp for dock.
Devotion = 886.37 (N.G. V.D. 1929)
DEVELOPMENT DATA
- Total Piet area = 3.76 Acres
- Upland within plat = 3.67 Acres (98X)
LEGEND
• DENOTES IRON MONUMENT FOUND AS LABELED
o DENOTES IRON MONUMENT SET, MARKED RLS# 25341
• DENOTES SANITARY SEWER MANHOLE
T,T DENOTES HYDRANT
La
DENOTES GATE VALVE
DENOTES 12' CMP
e DENOTES WELL
m DENOTES SANITARY STUB
• DENOTES WATER STUB
m DENOTES TELEPHONE BOX
31,. DENOTES WETLAND AREA
r "`"c•a:= DENOTES EXISTING CONTOURS
X 952.]6
DRAMS BY: "NAA
JOB NB 06543PP I DATE: O5 -14-07
CHECK Br. OVA
BAG NO PRE - PUT -3) SCANNED ❑
2
NO.
DAZE
DESCRWnON
BY
DENOTES EXISTING SPOT ELEVATION
DENOTES FENCE
DENOTES BRUSH LINE
DENOTES FLOOD ZONE UNE
DENOTES SOIL UNE
DENOTES WETLAND UNE
DENOTES OHW LINE
DENOTES CONCRETE SURFACE
DENOTES BITUMINOUS SURFACE
DENOTES GRAVEL SURFACE
VICINITY MAP
SEC. 17. TWP. 3I. RNG. 22
ANOKA COUNTY, MINNESOTA
NOT TO SCALD
GUIDING
- Property guiding Low Density Single Family.
MUSA
- Property falls within the MUSA.
- No MUSA amendment proposed
ZONING
- Property is Zoned R -1
ZONE R I
MINIMUM BU LDNG SETBACKS
Front = 30.00 feet
Rear = 30.00 feet
Side = 10.00 feet (house)
Side = 5.00 feet (garage)
Lake (OHW) = 150.00 feet
ZONE R I
MINIMUM LOT STANDARDS
Lot Area = 10,800 sq. ft.
= 20,000 sq. ft. (upland) shoreland lot
Lot Depth = 135.00 feet
Lot Width = 80.00 feet
Lot Width = 700.00 feet (comer)
CERTIFICATION
I hereby certify that this survey,
or report was prepared by me or under
my direct supervision and that I am
a duly Registered Land Surveyor under
the laws of the State of Minnesota.
RECEIVED
MAY 1 4 2007
CITY OF LINO LAKES
Le3
DANIEL W. OBERMILLER
Date: ,.3 /1 LL /o 7 License No. 25341
PP
nr.54APP\PRF=PI_AT -adwo 5/14/2007 12.14■37 PM CDT
RESOURCE INVENTORY /CERTIFICATE OF SURVEY
GRANDVIEW
110R: ROYAL OAKS REALTY (DEVELOPER)
1000 COUNTY ROAD E. WEST, SUITE 150
SHOREVIEW MN 55126
PHONE: (651) -483 -5518
OWNER:'GETHSEMANE UNITED METHODIST CHURCH
7330 LAKE DRIVE
LINO LAKES MN 55014
NORTH U11E OF GOVERNMENT LOT 4. SOUTH
UNE OF DO NMENT LOT 3, & SOUTH UNE,-
OF THE OF MARSHAN MEADOMS .•
'`/ satyr 1 .,
r r.40‘56 '9°4'. I >... R,1 p�plLY ~
/ 4. ......` TON: -O , F . ,JA0,
5tN 0. t 1
A r ■ r l , - . i r eEN51'i�' • ate _- . -....- - / „,‘„,,,o,,.
\/I // , , � f -1...9,-': \xl 044 T.
1
,i-7, if i t, xy�PwN1
. xFp 1 / , .. ( ,/
�,�01
..
0
/ 1-'
/
EXISTIN
CHURCH
BUILDIN
4:10
IN
1 __tat/ -.
...0 -6.& „c/so
137.7
3 �
TONS R_ b�J m.
elg
1:/ r:6. T/ 10 #; 1 1 JI 1 / 11. o (
1'
_
\¢ , 7 . 4f7.474 - s
A
\ \.
ATTACHMENT 2
PROPERTY DESCRIPTION
Trocts 8 and C, REGISTERED LAND SURVEY NO. 182,
Anoka County, Minnesota
0�W c1. 3 \ � b`� - \ 1i da?a°T s 11 c6ee°
J e LOCATION OF WETLAND DELINEATION
."xiL•.... \ .
• . -BY EARTH SCIENCE JAN. 2007.
.A? •`
' LOCATION OF B83-3 OHW UNE
l I
\
I \ I I 1
1
b04.5
>_ .
L
/
e.Ln
/ I TpN� R_1.
xeeT ae
-401W" _ De.°
8'64'E6"B
)ft.ao
E. G. ROD a SONS, INC.
MA" Professional Land Surveyors
wwW7.egrud.com 6776 Lake Drive NE, Suite 110
Lino Lakes, MN 55014
TeL (651) 361 -8200 Fax (651) 361 -8701
y1I 11 hir-
• r
I` 1
. 1
5l��
`0W
°E149 I
woo
NOTES
Field survey was completed by E.G. Rud and Sons, Inc on 02 -05 -07 to
include the location of the OHWL
Wetland located by-E.G. Rud & Sons on 2 -05 -07
Wetland delineation completed by Earth Science inc. (651) -674 -6210 Jon 07.
Field verified and approved by Watershed on 1 May 07.
Bearings shown are on Anoka County datum.
Curb shots are token at the, top and back of curb.
This survey was prepared without the benefit of title work Additional
easements, restrictions and /or encumbrances may exist other than those
shown hereon. Survey subject to revision upon receipt of o current title
commitment or an attorney's title opinion.
A
%.111 /1 -h r
h ti F 1 I% v 1
1 1T 1
f LO
DRAWN BY: NAA
JOB Na 06543PP'DATE 05 -14-07
HEC ( or DWD
DWG Na. PRE - PLAT -3I SCANNED ❑
2
3
Na
DATE
DESCRIPTION
BY
NORTH
GRAPHIC SCALE
o 10 40 !.
( FEU )
1 inch = 40 FL
BENCHMARK
At gage site, o 60d spike, 1.0 feet above
ground, on Northwest side of 0.5 foot ash tree
at the intersection of wooden romp for dock.
Elevation = 886.37 (N.G.V.D. 1929)
DEVELOPMENT DATA
- Total Plot area = 3.76 Acres
Upland within plot = 3.67 Acres (98Z)
LEGEND
• DENOTES IRON MONUMENT FOUND AS LABELED
• DENOTES IRON MONUMENT SET, MARKED RLS{ 25341
el DENOTES SANITARY SEWER MANHOLE
T( DENOTES HYDRANT
p
Q DENOTES GATE VALVE
• DENOTES 12- CMP
O DENOTES WELL
• DENOTES SANITARY STUB
® DENOTES WATER STUB
m DENOTES TELEPHONE BOX
il. DENOTES WETLAND AREA
DENOTES EXISTING CONTOURS
■
DENOTES EXISTING SPOT ELEVATION
DENOTES FENCE
DENOTES BRUSH LINE
DENOTES FLOOD ZONE UNE
DENOTES SOIL LINE
DENOTES WETLAND LINE
DENOTES OHW LINE
DENOTES CONCRETE SURFACE
DENOTES BITUMINOUS SURFACE
DENOTES GRAVEL SURFACE
VICINITY MAP
SEC. I7, TWP. 31. RNG. 22
ANOKA COUNTY, MINNESOTA
NOT TO SCALD
GUIDING
- Property guiding Low Density Single Family.
MUSA
- Property falls within the MUSA
- No MUSA amendment proposed
ZONING
- Property is Zoned R -1
ZONE R1
MINIMUM BUILDING SCI HACKS
Front = 30.00 feet
Rear = 30.00 feet
Side = 70.00 feet (house)
Side = 5.00 feet (garage)
Lake (OHW) = 150.00 feet
ZONE RI
MINMUM LOT STANDARDS
Lot Area = 10,800 sq. ft
= 20,000 sq. ft. (upland) shorelond lot
Lot Depth = 735.00 feet
Lot Width = 80.00 feet
Lot Width = 100.00 feet (comer)
CERTIFICATION
I hereby certify that this survey, plan
or report was prepared by me or unde
my direct supervision and that I am
o duly Registered Land Surveyor under
the lairs of the State of Minnesota.
DANIEL W. OBERMILLER
Date: c5 /p,i /D7 License No. 25341
RECEIVED
MAY 1 4 200?
CITY OF LINO LAKES
PP-�
PRELIMINARY. PLAT OF
GRANDVIEW:
•R: ROYAL OAKS REALTY (DEVELOPER)
1000 COUNTY ROAD E. WEST, SUITE 150
SHOREVIEW MN 55126
PHONE (651) -483 -5518
I
r
ATTACHMENT 3
PROPERTY 'DESC2PTION-
Trocts 8 pond C, REGISTERED. LAND SURVEY NO. 182,
Anoka County, Minnesota.
OWNER GETHSEMANE UNITED. METHODIST CHURCH
7330 LAKE DRIVE
LINO LAKES MN 55014
NORTH UGI aF Gow GENT LOT 4. SOUTH ,•;:.-'•
.......-LINE of LOT 3 & SOUTH. LNE.+-
i OF THE
P LAj Or MARSH_ A N MEADOW .!
.•y ,
r am `1 14
A r♦ /- I I Ar
I I t- i \•..41 �,ti' 1 I Y
•
LOCATION OF N OLMD DELINEATION
• �••`?C % .--BY EARTH SPENCE JAIL 2007.
,■-- LOCATION Cr 8833 0Hw LINE •
I-- 137.7
® i
EXISTIN
CHURCH
BUILDIN
75.0'
rr r
Veal
/ / /
'
E. O. 111111 & SONS, INC.
Professional Land Surveyors
TNW1B.•giud.com 6776 - Lake - Drive NE, Suite 1.10
Lino Lakes, MN 55014
Tel. (651) 361 -8200 Fax (651) 3614701
64186E
. '_r , /
.A i--
J1 n I i L_ ./
NOTES'
Field survey was completed by E.G. Rud .and Sons, Inc. on 02 -05-07 to
indude the location of the OHWL
- Wetland located by EG Rud & Sons on 2-05-07
-Wetland :delineation completed by Earth Science Inc. '(651) -674 -6210 Jan
held verified and approved by Watershed On 1 May 07.
Bearings shown are on Anoka County datum.'
Curb shots are token at the top and back of curb.
- This _survey. was prepared without the benefit of .titie work. Additional'
easements, restrictions and /or encumbrances may exist' other than those
shown hereon: Survey subject to revision upon receipt of a current title
commitment or on attome /s title opinion.
07.
SE
t .4 4 r \. /:- I I A • r
)rI r rr -: ri ?1 i'.i'
DRAM BY:- NAA
J013 N� 06543PP I DAIS: 055 -14-07
CHECK eW. JAW
elm ma PRE- PLAT -31 SCALPED ❑
3
ND.
DATE
DESCRIPTION
BY
NORTH
GRAPHIC SCALE
M 0 - - -
wC
(m )
1 Each - 40 n
TYPICAL
DRAINAGE E UTILITY EASEMENTS
it
I
4.
I
J L
Being 5 feet in width, unless otherwise indicated, and adjoining
side lot lines, and rear lot lines and 10 feet in width and
adjoining street fines,
DEVELOPMENT DATA
- Total Plot ores = 3.76 Acres
- Upland within plat = 3.67 Acres (98X)
- 8 Proposed Single Family Lots
- Single Forney Lots = 3.26 Acres
- Streets = 0.49 Acres
- Average Lot Size = 17,78Bi sf
- Density - - 212 Lots / Acre
• DENOTES IRON MONUMENT FOUND :AS LABELED
• .DENOTES IRON MONUMENT SET, MARKED RLS# 25341
m DENOTES SANITARY SEWER MANHOLE
XL DENOTES HYDRANT
pQ DENOTES CATE VALVE
DENOTES 12' CHP
e DENOTES WELL
0
0
DENOTES SANITARY STUB
DENOTES WATER STUB
ID DENOTES TELEPHONE BOX
I DENOTES WETLAND AREA
DENOTES EXISTING CONTOURS
o rem DENOTES EXISTING SPOT ELEVATION
DENOTES FENCE
DENOTES BRUSH UNE
DENOTES SETBACK UNE
DENOTES WETLAND LINE
DENOTES OHW UNE
DENOTES CONCRETE SURFACE
DENOTES BITUMINOUS SURFACE
DENOTES GRAVEL SURFACE
1
YICINIr`t' MAP
SEC. 17, TWP. 31, RNG. 22
ANOKA COUNTY, MNN ESOTA
NOT TO SCALE)
GLADING
— Property guiding Low Density Single Family.
MUSA
- Property fails within the MUSA.
- No MUSA amendment proposed
ZONING
- Property is Zoned R -1
ZONE RI
MWIMUnA BIADWG SETBACKS
Front = 30.00 feet
Rear = 30.00 feet
Side = 10.00 feet (house)
Side = 5.00 feet (garage)
Lake (OHW) = 150.00 feet
ZONE R I
MINIMUM LOT STANDARDS
Lot Area = 10,800 sq. ft.
= 20.000 sq. ft (upland) shorelond lot
Lot Depth = 135.00 feet
Lot Width - 80.00 feet
Lot Width = 100.00 feet (corner)
.13ENC —MARK
At gage site. a 60d spike, 1.0 feet above
ground, on Northwest side of 0.5 foot ash tree
at the in - - -- ., of wooden romp far dock.
Elevation
CERTIFICATION
I hereby certify that this survey, plan
or report was prepared by me or unde
my direct supervision and that 1 om
a duly Registered Land Surveyor under
the I of the State of Minnesota.
DAFIIEL W. OBERMILLER `��
Date: SIP / o* License No. 25341
PP -3
S/ rud\CAD\06proJ\06543PP\PRE= PLAT -3.dwg 5/14/2007. 12112 51 P14 CDT
PRELIMINARY GRADING
CIUNDVIEW
ATTACHMENT 4
.R: ROYAL OAKS REALTY (DEVELOPER) : OWNER GETHSEMANE UNITED METHODIST CHURCH
1000 COUNTY ROAD E. WEST, SUITE 150 7330 LAKE. DRIVE
SHOREVIEW MN 55126 LINO LAKES MN 55014
PHONE: (651) -483 -5518
I
41
x0A"
xeo' ' : ; a, r.
I V I Lt Fe 1-41 fr I'.
�7 mo,
x50•
ost 010 ..;
NORTH LeffI�0F OO'I S1 NTLOT 4. SOUTH _,.••'''
Leff OF CO4ER1t1ENTxLOT s.:& SOUTH UIE/ .
*. OF 7FE KLAi
tOF YARSIlAN YEAOOwS ,. -" .
I %` -i:
t - - -x
%weX'
EXISTIN
SHELTER/
00
- PR PERTY DESCRIPTION
Tracts C, REGISTERED LAND SURVEY. NO. 782, Anoka
County, Minnesota
BENCHMARK
At gage site, a 60d sp &e, 1.0 feet above
ground, on Northwest .side of 0.5 foot ash tree
at the intersection of wooden romp for dock.
Devotion _- 886.37 (N.G.V.D. 1929)
905
• . yt
05S d
P°6*t
'.•- ., --/`: 41k. - ' LOCATION OF WETLAND DEL8IEATION
,/ �� --SY EARTH SCIENCE JAN. 2007.
5AT'�. �.se .— LOCATON aF :883.3 O4W UNE
F � i'
A0
In In ImG
�e 7Dro °
w Z
f' vm-ns' 4.0
0
c
rea000.saz.rp
gZls.v�
4'pZ.s4
N N 1 20 : ,
°w
„W4ll1
vA1
EXISTIN
CHURCH
BUILDIN
• %ai
u y-�
vwvw.egrud.coon
-a I I e,
1- -I; IF( 1--
J I I •• I I L-
SE
., x i. i •1 I A e r
//1 r1 he to Lt rl1
1 I r t I I r -I I x
10
NOTES
Field survey was completed by E.G. Rud and Sons, Inc. on 02 -05-07 to
include the location of the ONIM..
— Wetland located by EG.'Rud & Sons on 2 -05-07
E. G. RUD 8t SONS, - INC. -
Professional Land_ Surveyor -
6776 Lake Drive NE, Suite 110
Lino Lakes, MN 55014
TN. (651) 361-8200 Fax (651) 3618701
Wetland delineation completed by Earth Science Inc. .(651)- 674 -6210 Jan 07.
Field verified and approved by Watershed on -1 May 07.
Bearings shown are on Anoka County datum.
Curb shots are token at the top and bock of curb.
This survey was prepared without the benefit of title work ' Additional
easements. restrictions and /or. encumbrances may exist other than those
shown hereon. .Survey subject to revision upon receipt of a current title
commitment or on attorney's title opinion.
SI\r•ud\ CAD \06proJ \06543PP\PRE4PLAT -3.dwp 5/14/2007 12124,21 PM CDT
ZONE R
MINMUM BULDNG SETBACKS
Front = -- 30.00. feet
Rem = 30.00 feet
Side = 1CLOO feet (house)
Side = 5.00 feet (garage)
Lake (0111V) = 150.00. feet -
ZONE 'R
MINIMUM LOT STANDARDS
Lot -Areo = 10.800 sq. ft.
= 20;000 sq. ft. (upland) shoreland lot
Lot Depth - 135.00 feet
Lot Width = 80.00 feet
Lot Width - 100.00 feet (comer)
NORTH
GRAPHIC SCALE
140
( DI FEET )
1 inch - 40 R
PROPOSED HOUSE PAD INFORMATION
'— ' \�Darotas proposed mid,
Garage floor is 0.3' oboe the elm front M ��`
N.—Denotes house stile. (w0- sdiuwtxFLATX (- iooIout).
(Assumed 12 as bent depth proposed)
',Denotes suggested amount to drop prose
Denotes finishpInds 0 rear of hams Finished
Boor is --" "_ and 2.5 below this elevation on lookout tots homes above this elev. co
lookout s
NOTE Minimum- Lowest floor to be 2' feet above H. or 4' feel above NUM. of
odioeent sonde, and lowest opening to be 1' foot above a controlling EOF.
TYPICAL
DRAINAGE E UTIUTY EASEMENTS
I.
II
sal
1I
J L'
Being 5 feet in width,: unless otherwise indicated, and adjoining
side lot lines, and rear lot lines and 10 feet In width and
- adjoining street lines,
DRANK BY. NM
JOB NM 05543PP 1 DATE 5 -14-07
CHECK 8Y.• DHO
DSO NQ PRE- PLAT -3f SCANNED ❑
2
3
NO.
DATE
DESORPTION
87
'I hereby o. Uly that this pbn was pepret by me as widr
my direct ahpeMdon and•that 1 am o.ddy, Licensed Professional
Engineer r the ides te of Minnesota.
08102
AD8nt• 610115E
. 5/14/07 ucENSE i -43983
Mt ten UMW SUM lb
130 LAM MI nor
Mai
VICINITY MAP
SEC, 17, TWP. 3L RNG, 22
ANOKA COUNTY. MINNESOTA
(NOT TO SCALE)
• DENOTES IRON MONUMENT FOUND AS LABELED
• DENOTES IRON MONUMENT SET, MARKED RLS# 25341
CD DENOTES SANITARY SEWER MANHOLE
T,T DENOTES HYDRANT
M DENOTES GATE VALVE
DENOTES 7r PAP
O DENOTES SANITARY STUB
1 DENOTES WATER STUB
ID DENOTES TELEPHONE BOX
1E DENOTES WETLAND AREA
DENOTES EXISTING CONTOURS
x nss.x DENOTES EXISTING SPOT ELEVATION
DENOTES FENCE
DENOTES BRUSH UNE
DENOTES WELL
(W1
D DENOTES SILT FENCE
laigN DENOTES EMERGENCY OVERFLOW (EOF)
--+0— DENOTES PROPOSED STORM LINE
DENOTES WETLAND LINE
• =_.■ DENOTES O1IW LINE
44 DENOTES STORM STRUCTURE/RIPRAP
O DENOTES PROPOSED CATCH BASIN
DENOTES CONCRETE SURFACE
DENOTES BITUMINOUS SURFACE
DENOTES GRAVEL SURFACE
_ DENOTES POND LINER UP 7D 890 CONTOUR
CERTIFICATION
I hereby certify that this surve
or report was prepared by me
my direct supervision and that
a duly Registered Land Surveyor
the /9ws of the S ote of Minnesota.
RECEIVED
MAY 1 4 2007
Plan
r OF LINO LAKF_,S
under
DANIEL W- OBERMILLER
Date: s//•f I License Na 25341
C
GRANDVIEW
"'PRELIMINARY UTILITY PLAN
Ci ly of Lino Lakes, Minnesota
OENERAL NOTES
• The iafortn.Uoo dam an them dnwi,ge concerning type and location of existing
utilities is not guaranteed to 4. accurate r atl YMu.Ha The contractor le
responsible far making his own determination as to tsp. and location of Meths as
necessary to ovoid damage to thew utilities.
• Cant Gopher State On.-Ca at (651) 454 -0002 far existing utility locations.
• The contractor shag tied verify .ise, dewti.n, and location of sedating sanitary
seer, storm tower. and aot•Imaln and notify &lob r of any discrepancies prior
to the start of installations.
• iat0atia s she conform 1. Use City Engineer's Association at Minnesota (CEAM)
Standard Utility Bpedlkotloro (1999 Edition) and the Oils Standard Sp•d6w0one.
• Contractor show notify City of Lino Lakes Engineering Dena-Mont at (651)
982 -2400 a minimum of 24 hors prior to the intoraption of any seer or water
services to existing hams or businesses.
WA'EERMAW NOTES
• Maintain a minimum of 7.5 fest over awe wotermoin pips
• Watomain shun be 5• DP pass 52 (minimum).
• Combined seater imam to church lot shall be 6' DP ass 52 (minimum).
• Hydrant Mods shave be 6' DP pose 52 (minimum).
• Donhestlo Srvke Lips shun b. roomer
• Field verify size and location of exletleg watrmdn aid notify engineer at my
derepohd.e prior to any imtalblbm.
• Provide preformed insulation, PPG Foamglo.., or approved equal where emery
mover or storm weer mosses within 16' of watornah
• Ytotetmain bends, tees, fittixgt, and hydrant leads shall be threat restrained with
•Mago -Lugs' or droved equal
SAWTAI YSEWER NOTES
• Sanitary sewer pipe shun be PVC SDR 35, unless oth.ruim noted Field verify dm, • d
engineer of any discrepancies prior to y sewer and notify
• Ssrr Swam to Church lot to be 6' PVC Schedule 40, and on other smeary sewer
services dub be 4' PVC Sehed de 40 (to be stationed from the downstream MH).
• serer shun be RCP (dose • minimum) or HOPE as seem
STOWS SEWER NOTES
• Field verity size, elevation, and Meatier: of existing atom ewer and notify engineer
of my discrepancies prior to any Installations.
• Stan sew lengths include the laying length of the apron
• Um Band /granule material for McMinn and compaction of HOPE pipe in
accordance Nth th. requirements at ASV 2321.
ROBB IMES
• Back-filling of curbs with on-eR• materials is Inddmtd to the orb construction.
• C.tb and gutty Moen Mail be D412 mime otherwise noted on plans.
STREET AND BITIIMI00BS NOTES
• Saw -cut existing bituminous and concrete curb to provide butt -joint
• Removal and disposal of Meting street materials as required for caabuMan
purpose in Incidental.
• Restore dlelurbed street to existing or better section as approved by engineer.
• Contractor shun 6m tra0lc control measures (h accordance with the 'Minnesota
Manual of Uniform Traffic Control Devies7 as necessary whenever grading, ut9Ry
or paving operations encroach ante ad)xent streets
•
0
0
i$
—p6F-
Existing 7Astennain
Proposed Watermain
Exthfing Sanitary Sewer
Proposed Smeary Sewer
Existing Sturm Seer
Proposed Storm Sewer
EdsUng Sanitary Manhole
Proposed Sanitary Sewer Manhole.
Existing Hyde*
Proposed Hydrant
Esbting storm Sewer Manhole /Apr,
Proposed Catch Basln/Stonn Sewer Manhole
Fxiatlp Fiend -End Section
Propo.ed Flare -End Seethes
Existing Cate Valve
Prpasd cote Valve
Existing Overhead Wit
Existing Telephone Line
Existing Ut9Hy Pole
% A e
/
A A //
•
r /
t .' I
1 \ L
/\,
T—
NORTH UNE OF GOVERNMENT LOT 4, SOUTH
UNE OF GOVERNMENT LOT 3, & SOUTH UNE
OF THE PLAT OF MARSHAN MEADOWS
CLEAN -OUT
fee 899.50
NV 081.01
wine p
6' 01 PLUG
r
A
1 /r
ATTACHMENT 5
EXISTING HYDRANT
AND VALVE
PROP SAN Mil 2
NV emus \
A 4 r- A r\ P\
,4/1 F-- /_I 1 1 1 1
1 l L- ,/
CO*ECT 10 D051BD.
r 0r t•ATERMAN 11/.
130,1E VALVE
1 A /
1/I/
V V .i
X8'
of
0ao' os
CX 06
/ P 6
,.-- -LOCATION OF 883.3 OHW UNE
ivek
•
LOCATION OF WETLAND DELINEATION
—BY EARTH SCIENCE JAN. 2007.
RAUL
tli0CD BY:
C.C.S.
DESIGN BY:
C.C.S.
PROJ.NO.
07 -1131
ORIGINAL DATE:
FEBRUARY 9, 2007
ROM OAKS
WRALTT
1000 COUNTY RD 0,580
SHOREVIEW 1N 55128
PRONE (651) 489 -5516
1 I., /:\ 1 1
1 IY� r , •
SITE PLANNING
& ENGROURING
PLOWS
EIGHBEIMM 1111
T
1
E T��HYDRANT
AND
6778 L02! DTD92
BOle6 110
LINO LASS. MN 55014
PHDNE (651) 881 -821
FAN (651) 881 -670
NORTH
EXIST.
HSE
A 4 A
\/1 / 1
1 1 / 1
es
'.
o� 15 30
1 NCH s 30 FEET
02
GRANDVIEW
$TORM WATER POLLUTION
PREVENTION PLAN [SWPPP)
City M Lino lades, Minnesota
MOO INLET PBOiECuON
NOT 10 SCALE
5.
GRANULAR FLIER BLMOET
(SEE NOTE)
NOTE IRE CONTRACTOR. AT HIS OPTION, MAY SUBSTITUTE
A GEO1EXIV.E FABRIC, SPEC. 3501 FOR WE GRANULAR
FILTER BLANKET UNLESS OTHERWISE SPEOF ®N THE
PLANS. FABRIC SMXBD COVER THE AREA OF DIE
RIP -RAP OVERFLOW
NOT TD SCALE
ROC[ CONSiIORTION EBiMANCE
NOT TO SCALE
11- PAT Sff >S A-A
NOR WE OOORAODL AT NS OP71E0. NAY 0606165
A WARE[NL PILING. W16. 3001 F1R111E MIRROR
RUM RiANR= OMER 01BIE SPEOFID M 1E
RAM. 11E PANR 0 01RD GORR M AREA OF 1E
WRAP AN DI10D NCO lE NLVRT APR11I S FRT.
WP -BAP DETAIL
NOT TO SCALE
ATTACHMENT 6
NOTE0
- ALL MINTS SHALL E SOLVENT WELD 0RCEPT AS NOTED.
— ALL PFE 70 E SCHEDULE 40
SERVICE CLEAN OUT
Y X.r wow "OR STEEL
POST •-r 0.C.
WIRE MESH REINFORCEMENT, STD.
FEND FENCE. NN. 30 HIGH, MAX.
MESH SPAC140 OF 6' AND MN. •
14 -1/r 0AURE W8E IB OPTIONAL
8EOIEXILE FLIER FABRIC =
OVERLAP 6' AND FASTEN AT 2'
NIERVALS. LAY FABRIC N TRENCH.
FABRIC ANCHORAGE TRENCH.
BACKED. TRENCH NATURAL SOIL 1611i ili TAMPED
EXTEND WME MESH
INTO 1RENCH
ANCHORAGE R4-STU SOIL.-
=
1) MOUE RESIT IS NOT REQUIRED.
2) CONTRACTOR IS RESPONSIBLE fOR
REMOVAL OF ALL EROSION CONTROL
MATERIALS FOLLORNG TUFF
ESTABU996NT.
EROSION CONTROL FENCE
NOT TO SCALE
NOT TO SCALE
INCED GRA
1
5/6' 0
WELL- TREADED PLANING
MEDIUM (SEE NOTE /1)
AGGREGRIE
(SEE NOTE {2)
NON -WOVEN GEOTEXT115
(WIDOT TYPE 1) OVER
AGGREGATE
C PERFORATED DRAIN
2/ SOCK
886.25
(EXTEND TO MANHOLE)
1/4' STEEL
BAND
WELD
6e
�4D6'
; _ EIFV=990.60
1/4' STEEL
PIATE
ELEV- 890.10
TOP WALL=889.75
10' DIAL ORIFICE
INY 888.75
WEN WALL
/2' RNAMMER. ANCHCW
60.T. INOWM 4'
EASE IDIT
ELEV =88625
6' DRAINIILE
NY 886.25
(ENTERS THIS SIDE OF 1EIR WALL)
110.6000150
1. WELL-GRADED PLANTING NEDRA/ TOE COMPRISED OF (BY
VOWMEK
40.5 SEMI -COURSE WASHED OR NATIVE SAND
302 M11DOT GRADE 2 COMPOST
302 NATIVE TOPSOIL
2. AGGREGATE SHALL E THE FOLLOWING
1' -1S DOUBLE WASHED SIDE
1/$ -1/2' WASHED RHEA RUN PEA GRAVEL
3. STABILIZATION BLANKET TO E DATABLE FOR SEEDING (E.6.
STRAW -COCONUT D ANKET).
4. NO 10240 OF SANDY SOBS ALLOWED N BASIN.
5. FINAL GRADE ONLY UPON STABILIZATION OF UPSTREAM AREAS.
6. 810- FLTRMION BASIN TO REMAIN UNLINED.
7. PROTECT BASIN FROM RUN -OFF DURING LOT 004SIROLTION
*011811155. AREAS. BASIN ONLY UPON STABIUZAlION OF
B. USE NCH-PERFORATED ORAW1LLE OUTSIDE OF BASIL
BI0- FNiIAfON BASIN
NOT TO SCALE
1/2' TTP.
GRATE GALVANIZED
Rr tam moo
MNWN 1/2'
5
1/4' 55 � 11516 5150. PLA1E
1/2' OAMETR. 6' LONG
TREADED ANCHOR BOLTS
1110 1 1/4' FLAT WASHER
AND NUT N 4 LOCATIONS
51011. BAND 1/4' 1100 BY
1 1/2' AWE BY 7'-B 5/B' I2:045
WRAPPED AROUND AND
MELDED 1O STEM ROBS
CONCREiE OUTLET STROCiVRE
NO SCALE
TOP VIEW
16' STEEL RODS
4 QC, EACH WAY
NE1D AT EACH
NTERSECIIOI
STEEL PIAIE 1 4' ROCK
MELDED 1D SM. RODS
1151501. 4 MATION1
DRAWN TRY: DESIGN BY:
84.8. C.C.S.
0400) BY: PRO& NO.
C.C.S. 07 -1131
ORIGINAL DATE
. MAY 14. 2007
z
S3
ROYAL OAKS
REAM
1000 COUNTY RD $1641
QHOREIIEL 1111 55128
PHONE (651) 483 -5518
srrA lewl6c
k ZNOINITERING
PLOWE
BIGINEBUNI
BTm TAKE lova mt
sorra 110
TAD 11108, MN 55014
PEONS (651) 301 -8215
HA& (651) 981 -8701
C4
•
ATTACHMENT 7
MEMORANDUM
DATE: May 30, 2007
TO: Jim Studenski
FROM: Marty Asleson
RE: Grandview SWPPP
The following comments should be addressed:
1. Must provide maps with :
• Existing and final grades
• Locations and types of Erosion and sediment control practices
• Stormwater flow directions
• Soil types, undisturbed areas, wetlands, and receiving waters
• Show design and location of Pretreatment and biofiltration basins.
2. Change the Type of Slope/Time chart to 14 days vs. 21 days in the "Flatter
than 10:1 slope category.
3. Change the total site area chart to 4.35 acres vs. 3.29 acres.
4. Any vegetation shall be the City Native Seed mix and planted and managed
by a DNR listed contractor that is suitable for Native plant installation and
maintenance.. This maintenance should include one bum at the end of 3 years.
5. Since this is in a shoreland area, a temporary storm pond should be
constructed on site to capture construction surface water runoff.
6. A concrete washout area should be shown on the map.
• Agenda Item 6A
•
•
Environmental Board Meeting Date: May 30, 2007
Topic: Water Emergency and Conservation Plan
Background:
Public water suppliers that service more than 1,000 people are required to have
a Water Emergency and Conservation Plan approved by the Department of
Natural Resources (Minnesota Statutes 103G.291). These plans were first
required in 1996 and must be updated every ten years. The Minnesota
Department of Natural Resources has prepared a schedule for each public water
supplier, with a due date for the City of Lino Lakes of October 15, 2007. The
plan must address supply and demand reduction measures and allocation
priorities and must identify alternative sources of water for use in an emergency.
The current Water Emergency and Conservation Plan was created by TKDA in
1997 and revised in 2004 to meet the requirements of a federal mandate of the
USEPA, under the Homeland Security Act. That federal mandate required the
City of Lino Lakes to prepare a Water System Vulnerability Assessment and
amend and update the Water Emergency and Conservation Plan with the
purpose of evaluating the existing security of the water system.
Analysis:
The Water Emergency and Conservation Plan Benchmarks and Conservation
Measures are below. The City must address these items through their report to
the DNR.
Benchmarks and Conservation Measures. Permit approvals will be based on meeting
specified benchmarks listed below. If water demands exceed Benchmarks for
unaccounted water, residential per capita, and peak demands then permit approval will
be contingent on implementation of one or all the listed Conservation Measures or
Programs until the benchmark is achieved.
Benchmarks
Conservation Measures or Programs
Unaccounted Water
If over 10 %, a plan is required that
(water withdrawals minus sales)
addresses reduction of unaccounted water
Less than 10%
through universal metering and accounting
of water use, routine meter testing and
repair, and distribution system leak
detection and repair.
➢ Metering of source water and
customers.
➢ Accounting for public uses.
•
•
D Water audits to determine
unaccounted water.
D A leak detection survey that also
includes an inspection of hydrants
once each year.
D Operational procedures that include
an established schedule for
repairing leaks within 30 days.
D Operational procedures that include
an established schedule for meter
testing, maintenance and repair.
Residential Gallons Per Capita
If over 75 GPCD, a plan is required that
Less than 75 GPCD
evaluates and implements measures
targeted at reducing residential per capita.
D Analyze residential customer use to
determine reasons for high per
capita use.
D Customer education a minimum of
four times per year that targets
reduction of indoor and outdoor
uses.
D Contact customers with high
volumes and large volume
increases and offer home audits
and conservation tips.
D Incentive programs to reduce per
capita use, such as distributing
showerheads, aerators, leak
detection kits, or soil moisture
meters, rebates for washing
machines or ULF toilets rebate
programs, or other types of
incentives.
Peak Demands
If over a ratio of 2.6, a plan is required to
Maximum Day to Average Day
reduce peak demands.
Ratio Less than 2.6
D Ordinances for lawn watering
including time of day, scheduling
(along with information on how
often to water) and water wasting
(runoff) with adequate enforcement
and penalties for noncompliance.
D Development approvals with criteria
that minimize large open turf areas,
require organic soil augmentation
for new turf areas on sandy soils,
and require one or more trees for
new construction.
D Customer education /conservation
tips during summer peak demands
•
Currently, the City is below the maximum threshold of 10% unaccounted water
so our established practices are working appropriately.
• For benchmark item Residential Gallons Per Capita, the DNR is following the
AWWA Research Foundation study that found the average indoor water use in
a conserving home is 45.2 GPCD (gallons per capita day). The study also
found that the average indoor water use for a non - conserving home is 63.9
GPCD. The DNR requires Cities to be at 75 GPCD. Lino Lakes is currently at
90 GPCD. Our task is to reduce consumption from our current 90 GCPD to 75
GCPD (20 %).
The current peak demand ratio for the City is 3.3. A reduction of over 25% in
the peak water demand will be required.
Recommendation:
This is an informal meeting that requires no action at this time. We are
requesting input from the environmental board on how to obtain the DNR
benchmarks.
•
a minimum of four times between
May and September of each year.
D Conservation Water Rate Structure:
Increasing block or summer
surcharge with 25 -cent minimum
increments between blocks or
normal rates.
Rate Structures - A conservation or conservation neutral rate structure is required that
does not include any volume of water in the service or base charge (lifeline exceptions
allowed).
Monitoring Plan — A monitoring plan approved by DNR that includes monthly water
level readings in production wells and /or observation that may be required. Monitoring
data must be submitted to DNR once each year or upon request.
Sustainability — All impacts and limits on natural resources and other water users must
be satisfied.
Currently, the City is below the maximum threshold of 10% unaccounted water
so our established practices are working appropriately.
• For benchmark item Residential Gallons Per Capita, the DNR is following the
AWWA Research Foundation study that found the average indoor water use in
a conserving home is 45.2 GPCD (gallons per capita day). The study also
found that the average indoor water use for a non - conserving home is 63.9
GPCD. The DNR requires Cities to be at 75 GPCD. Lino Lakes is currently at
90 GPCD. Our task is to reduce consumption from our current 90 GCPD to 75
GCPD (20 %).
The current peak demand ratio for the City is 3.3. A reduction of over 25% in
the peak water demand will be required.
Recommendation:
This is an informal meeting that requires no action at this time. We are
requesting input from the environmental board on how to obtain the DNR
benchmarks.
•
The Anoka County Board of Commissioners
commends the resource conservation efforts of
The City of Lino Lakes
its curbside recycling service providers
Ace Solid Waste, Inc., Allied Waste Services,
Walter's Recycling &Refuse, Inc.,. and
Waste Management of Minnesota, Inc.
and its recycling center, recycling day, and reuse providers
American Iron, Anoka County Community Action Program
(ACCAP), Asset Recovery Corporation, Courage Center, Disabled
American Veterans (DA 0, Epilepsy Foundation of Minnesota,
First State Tire Recycling, Inc., Green Lights Recycling, Inc.,
J..R.'S Advanced Recyclers, Knights of Columbus - Cedar Council
9585, Lupus Foundation, Safety. Kleen Corp., U'SAgain,
and. Vietnam Veterans of America (VVA)
The City has consistently met its goals from 1988 -2006. During 2006,
the City of Lino Lakes recycled 1,760.67 tons of materials, composted
1.5 tons of yard waste, and collected 63.92 tons of problem materials
. for proper management. . •
Dennis D. Berg
District #1
Y " _
Dick Lang
Di : 'ct #2'
P w
Kordiak
Distrii #4
Sco
DH
5.
i
o . yn ; est - Rhonda Sivarajaf
District #3 District #6
•
Dan Erhart
District #7 .
•
1001 ENVIRONMENTAL INITIATIVE AWARDS
MI NNESOTA>EN VI RONMENTAL<I NITIATIVE
•
NATURAL RESOURCE PROTECTION
Minnehaha Creek Land Conservation Program
Nominated by Michael Pressman, Minnehaha Creek Watershed District
The Minnehaha Creek Watershed District's Minnehaha Creek Land Conservation
Program is among the most pro- active efforts in Minnesota to address the link between
land use and Minnesota's growing list of impaired waters. Through technical assistance
programs and acquisition of conservation easements, the Minnehaha Creek Land
Conservation Program works collaboratively to help promote growth and development
that conserves and restores natural resources and enhances the value of previously
developed areas.
Project partners include: Minnehaha Creek Watershed District, Carver County Planning
Department, Carver County Soil and Water Conservation District, Hennepin Conservation District,
Hennepin County, Minnesota Land Trust, Public and Private Landowners, State of Minnesota, and
Three Rivers Park District.
Minnesota Forest Legacy Partnership
Nominated by Bernadine Joselyn, Blandin Foundation
Itasca County has the largest concentration of privately held landscape -scale industrial
forestland in the State of Minnesota. Despite this fact, since 1999 over 400,000 of
Minnesota's few remaining large tracts of working forestlands have been parcelized or
sold, leading to forest fragmentation and loss of wildlife habitat. In 2005, the Blandin
Foundation created the Minnesota Forest Legacy Partnership for the Itasca County Area
to help ensure that these lands remain working forest landscapes open to a variety of
public uses. By April of 2007, this partnership -based effort will have protected 52,000
acres of biologically diverse ecosystems and important, commercially productive
timberland in Itasca and southern Koochiching counties.
Project partners include: Blandin Foundation, The Conservation Fund, Grand Rapids Chamber of
Commerce, Kresge Foundation, Minnesota Deer Hunters Association, Minnesota Department of
Natural Resources, Minnesota Forest Industries, Inc., Minnesota Forest Resources Council, The
Nature Conservancy, Surdna Foundation, and The Trust for Public Land.
Pine Bend Bluffs Natural Area
Nominated by Tom Lewanski 6- Karen Schik, Friends of the Mississippi River
Over the past eight years, a unique collection of collaborators, from industry to
government to nonprofits, have worked together to protect and restore one of the
highest - quality remaining natural areas in the Twin Cities on the bluffs of the Mississippi
River. The 1,800 acre Pine Bend Bluffs Natural Area has been designated by the
Minnesota Department of Natural Resources as an area of outstanding biological
diversity. To date this project has resulted in the permanent protection of 256 acres of
land as well as the development of ecological management plans for 800 acres with
extensive ecological restoration work having been completed on more than 160 acres.
Project partners include: Big Rivers Partnership, Friends of the Mississippi River, City of Inver
Grove Heights, Dakota County, Dakota County Soil and Water Conservation District, Flint Hills
Resources, Great River Greening, Legislative Citizen Commission on Minnesota Resources,
Macalester College, Minnesota Department of Natural Resources, Mississippi River Fund, National
Park Service - Mississippi National River and Recreation Area, and The Trust for Public Land.
•
•
•
GREEN BUSINESS AND ENVIRONMENTAL MANAGEMENT
Andersen's Bayport Steam Generating Facility
Nominated by Charles Lederer, TKDA
In February 2005, Andersen Corporation, Minnesota's largest window manufacturer,
was notified that the steam energy provided from a nearby power plant would no longer
be available for use, requiring Andersen to find a steam source within two years.
Adhering to their environmental performance guidelines for both manufacturing
products and process, Andersen selected a steam sourcing solution that provided the
ability to use virtually all renewable energy, including wood waste and sawdust by-
product from Andersen's manufacturing operations. The new steam source produces
100% of Andersen's steam demand and eliminated Andersen's reliance on coal -based
steam.
Project partners include: TKDA, Andersen CAC, Anderson Corporation, City of Bayport, Hunt
Electric, Minnesota Pollution Control Agency, Pioneer Power, Siegfried Construction, and Xcel
Energy — Alan S. King Facility.
Medtronic Packaging and Literature Waste Reduction Program
Nominated by Douglas Fullen, Medtronic
The U.S. Environmental Protection Agency estimates that landfills contain 30 -40% of
packaging waste. As part of its commitment to reducing the amount and toxicity of
packaging waste, Medtronic developed and adopted a voluntary packaging and literature
reduction strategy to reduce landfill waste. Through this effort, Medtronic has developed
new packaging designs, and is moving from paper to electronic literature. These new
designs have reduced Medtronic's packaging waste and paper literature by over 500,000
pounds, and saved $2 million.
Project partners include: Medtronic, eManual Consultants, TUV, and the U.S. Food and Drug
Administration.
Sparc's Lead Window Replacement Program
Nominated by Seth Benziger, Sparc
Sparc is a community development corporation working in St. Paul's North End, South
Como and Hamline Midway neighborhoods. In conjunction with the St. Paul — Ramsey
County Department of Public Health, Sparc developed a program to help homeowners
replace windows in their homes that contain lead paint. The primary goal of this
program is to reduce children's exposure to lead, with a secondary benefit being an
increase in the energy efficiency of the house. Sparc has overseen 33 projects over a two -
year period and two other community development corporations in St. Paul have
replicated the programs.
Project partners include: Sparc, St. Paul - Ramsey County Department of Public Health, and City of
St. Paul -STAR program.
GREEN BUILDING AND DEVELOPMENT
Hawk Ridge Estates
Nominated by David Peterson, Housing and Redevelopment Authority of Duluth
The Hawk Ridge Estates development is a major land redevelopment in the city of
Duluth that was within a mile of a national birding area known as Hawk Ridge. In order
to minimize the impact to the birding area, the Housing and Redevelopment Authority
of Duluth, in consultation with the Hawk Ridge Nature Preserve, had its engineers
conduct a study of migratory raptors. Storm water issues were also a concern, as the site is
just upstream from a tributary to Lake Superior. The site was able to be reassembled and
redesigned in such a way as to maximize the utilization on small building sites while
leaving as much as 38% of the total land undisturbed or allowed to return to its natural
vegetation.
Project partners include: Housing and Redevelopment Authority of Duluth, Billman Homes and
Construction, City of Duluth, David Carmin -Hawk Ridge Observation Association, Greater
Minnesota Housing Fund, Hawk Ridge Nature Reserve, Lakeside Lester Park Planning District,
Laura Erickson - Birding Expert, Minnesota Housing Finance Agency- Community Revitalization
Program, Northern Community Land Trust, Saint Louis County, and Women in Construction
Company.
Lino Lakes 1 -35 Corridor Alternative Urban Areawide Review (AUAR)
Nominated by Ciara Schlichting, Bonestroo
The I -35 Corridor Alternative Urban Areawide Review was a proactive, citizen - driven
environmental review process that comprehensively assessed the environmental impacts
of development in a 4600 -acre growth area in the city of Lino Lakes. The AUAR assessed
the impact of development on sensitive natural resource areas and provided a mitigation
plan for protecting these areas as well as documenting and planning for infrastructure
needs and improvements.
Project partners include: American Institute of Certified Planners /Bonestroo, Anoka Conservation
District, Anoka County, City of Hugo, City of Lino Lakes, Lino Lakes AUAR Advisory Panel,
Metropolitan Council, Minnesota Department of Natural Resources, Minnesota Department of
Transportation, Rice Creek Watershed District, U.S. Army Corps of Engineers, U.S. Fish and
Wildlife Service, University of Minnesota - Hubert H. Humphrey Institute of Public Affairs, and
Washington County.
Viking Terrace Apartments
Rick Goodemann, Southwest Minnesota Housing Partnership
The Southwest Minnesota Housing Partnership (SWMHP) is a non - profit agency
committed to developing and preserving affordable housing. In 2006, SWMHP acquired
the Viking Terrace Apartments with the goal of preserving affordable housing for the
community while also undertaking extensive green redevelopment of the property. The
project included the substantial rehabilitation of the interior and exterior of the building
with multiple green technologies, including the installation of a geothermal heating and
cooling system.
Project partners include: Southwest Minnesota Housing Partnership, Blue Cross and Blue Shield
Foundation, City of Worthington, Enterprise Social Investment Corporation, Enterprise
Foundation, Greater Minnesota Housing Fund, Minnesota Green Communities, Minnesota
Housing Finance Agency, National Center for Healthy Housing, NeighborWorks America,
Southwest Mental Health Center, University of Minnesota, and Worthington Regional Economic
Development Corporation.
•
ENVIRONMENTAL EDUCATION
Big River Journey
Nominated by Lyndon Torstenson, United States National Park Service
Big River Journey is a collaborative environmental education program among twelve
organizations that connects school children with the Mississippi River's science and heritage,
and fosters river and watershed stewardship. The partnership engages students in river -
related curriculum over several months, including hands -on exploration, restoration, and
community service projects that provide students with the chance to learn and practice
citizenship in the form of river stewardship.
Project partners include: National Park Service, Center for Global Environmental Education, Fort
Snelling State Park, Friends of the Mississippi River, Historic Fort Snelling- Minnesota Historical
Society, Minnesota Valley National Wildlife Refuge -U.S. Fish and Wildlife Service, Mississippi
National River Recreation Area, Mississippi River Fund, Padelford Packet Boat Company,
Minnesota Department of Natural Resources, Science Museum of Minnesota, and Shakopee
Mdewakanton Sioux (Dakota) Community.
LakeSuperiorStreams.Org and the Regional Stormwater Protection Team
Nominated by Mindy Granley, Minnesota Department of Natural Resources
The goal of LakeSuperiorStreams.org and the Regional Stormwater Protection Team is to
protect and enhance the Minnesota North Shore region's shared water resources through
stormwater pollution prevention. The LakeSuperiorStreams project uses a partnership of
regional scientists, managers and educators to enhance public understanding of streams and
their connections to watershed land use by using real -time data and interpretive materials to
illustrate the nature and consequences of degraded stormwater and its real cost to society.
Project partners include: Minnesota Department of Natural Resources, City of Duluth, Minnesota's
Lake Superior Coastal Program, Sea Grant Minnesota, University of Minnesota - Duluth Natural
Resources Research Institute, U.S. Environmental Protection Agency, and Western Lake Superior
Regional Stormwater Protection Team.
The Eco Experience at the Minnesota State Fair
Nominated by Jeff Ledermann, Minnesota Pollution Control Agency
The Eco Experience is a partnership between the Minnesota State Fair and the Minnesota
Pollution Control Agency, as well as dozens of additional public and private partners, to
create a first -of -its -kind "eco experience" at the Minnesota State Fair. This partnership was
the first in the nation to undertake such a large scale effort to demonstrate how
environmentally friendly practices and choices can keep our water and air clean and preserve
natural resources, as well as support economic development.
Project partners include: Minnesota Pollution Control Agency, Minnesota State Fair, American
Lung Association of Minnesota, Birch Clothing, Congregations Caring for Creation, ECONAR
Energy Systems, Electric Auto Association - Minnesota Chapter, Emmons and Olivier Resources
(EOR), ePower Synergies, e-Ride Industries, Extreme Panel Technologies, Inc., Fresh Energy,
Hamline University's Center for Global Environmental Education, Kestrel Design Group,
Minnesota Department of Commerce, Minnesota Renewable Energy Society, Natural Built Home,
Neighborhood Energy Connection, Northwoods Custom Homes, Panelworks Plus, Inc., University
of Minnesota College of Design, Renewing the Countryside, Solid Waste Management Coordinating
Board, Sun Energy, University of Minnesota - Initiative for Renewable Energy and the Environment
(IREE), University of Minnesota - Solar Vehicle Project, University of St. Thomas Psychology
Department, Upper Midwest Hydrogen Initiative, Great Plains Institute, Windustry, and
Winkelman's Environmentally Responsible Construction (WERC).
AIR QUALITY AND CLIMATE PROTECTION
Elk River Landfill Gas to Energy Project
Nominated by Julie Ketchum, Waste Management
The Elk River Landfill Gas to Energy Project collects landfill gas that is generated by the
natural decomposition of municipal solid waste and uses that gas to generate electricity.
Burning the methane gas for fuel produces electricity, which supplants the need for fossil
fuel. The gas to energy facility currently generates approximately 27 million kilowatt -
hours per year, displacing the need for 14,000 tons of coal annually. This project
represents an opportunity to reduce our dependence on fossil fuel and reduce the
production of greenhouse gases.
Project partners include: Waste Management, Elk River Municipal Utility (ERMU), Great River
Energy, and Sherburne County.
Laurentian Energy Authority — Biomass Energy Project
Nominated by Michael R. Kunz, Sebesta Blomberg
The Laurentian Energy Authority (LEA) is a joint powers public authority formed
between the municipal utilities of Virginia and Hibbing to develop and operate
combined heat and power renewable energy biomass plants in Northeastern Minnesota.
The LEA Biomass Energy Project preserves public utilities, creates new jobs, reduces
reliance on fossil fuels, improves environmental impacts, and provides a framework for
biomass research opportunities in northern Minnesota.
Project partners include: Sebesta Blomberg, Barr Engineering, Biomass, Forest Management Systems,
Forest Resource Council, Harris Group Inc., Innovative Ventures, Institute of Agriculture and Trade
Policy, Iron Range Resources, Minnesota Department of Natural Resources, RBC Dain Rauscher,
Springsted Incorporated, State of Minnesota, University of Minnesota Extension Service University
of Minnesota - Natural Resources Research Institute (NRRI), and USDA Forest Service.
Waldsee BioHaus
Nominated by Warren Shulze, Concordia Language Village
Waldsee BioHaus serves as a unique Environmental Living Center for the Concordia
Language Villages in Bemidji, Minnesota. The BioHaus features cutting -edge approaches
to energy conservation and innovations in sustainable building design. These approaches
resulted in a dramatic reduction in energy consumption, as well as the showcasing of a
green roof system and low- emission building products such as paints, flooring materials,
and cabinetry.
Project partners include: Concordia Language Village, Albert W. Cherne Foundation Amvic,
Ecolab, Deutshe Bundesstiftung Umwelt, Intep, Integrated Planning, LLC, Kresge Foundation,
Muller Fensterbau, REHAU North America, Sto Corporation, System One Controls, and Zetah
Construction.
•
•
•