HomeMy WebLinkAbout2009-061 Council Resolution• • • Council MembersTOLTZ introduced the following resolution and moved its adoption: CITY OF LINO LAKES RESOLUTION NO. 09-61 RESOLUTION ACCEPTING QUOTES AND AWARDING A CONTRACT — 2009 SURFACE WATER MANAGEMENT PROJECTS WHEREAS, pursuant to a request for quotes for the construction of 2009 Surface Water Management Projects, quotes were received, opened and tabulated according to law, and the following quotes were received complying with the request: Contractor Amount of Bid Penn Contracting, Inc. $ 96,890.00 Arnt Construction Co. $ 100,588.80 CW Houle, Inc. $ 105,999.00 Rehbein Companies $ 134,772.65 Engineer's Estimate $ 98,775.00 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. The Mayor and Clerk are hereby authorized and directed to enter into a contract with Penn Contracting, Inc., in the name of the City of Lino Lakes for the construction of the 2009 Surface Water Management Project. Kathi Gallup, Ac ' g Mayor e Bartell, C ty Clerk Adopted by the Lino Lakes City Council this 24th day of August, 2009. The motion for the adoption of the foregoing resolution was duly seconded by Council Member O'Donnell and upon vote being taken thereon, the following voted in favor thereof: Stoltz, O' Donnnell, Reinert, Gallup The following voted against same: None (absent - Bergeson) Whereupon said resolution was declared duly passed and adopted. • • • AGENDA ITEM 6C STAFF ORIGINATOR: James E. Studenski, City Engineer COUNCIL MEETING DATE: August 24, 2009 TOPIC: Resolution No. 09 - 61, Accepting Quotes and Awarding a Contract, 2009 Surface Water Management Project. VOTE REQUIRED: Simple Majority BACKGROUND: Quotes were received by 10:00 a.m. on August 14, 2009. The results of the quotes are presented below. Contractor Amount of Bid Penn Contracting, Inc. $ 96,890.00 Arnt Construction Co. $ 100,588.80 CW Houle, Inc. $ 105,999.00 Rehbein Companies $ 134,772.65 Engineer's Estimate $ 98,775.00 Penn Contracting completed the 2008 Surface Water Management project and performed well. Staff is recommending awarding the contract for the 2009 Surface Water Management Project to Penn Contracting. A copy of the complete quote tabulation is attached. RECOMMENDATION: Staff recommends approval of Resolution Number 09 — 61, Accepting Quotes and Awarding a Contract, 2009 Surface Water Management Project. INSULATION OF BIDS m W 2009 SURFACE WATER MANAGEMENT PROJECTS TKDA CITY OF LINO LAKES, MINNESOTA TKDA PROJECT NO. 14292.004 I�.NCirdIE:EaiNC • nrac nTi_cniri[ PI ninth, The sight thm. The right people Tin right company BIDS OPENED: AUGUST 14, 2009, AT 10:00 A.M. "DENOTES ERROR IN BIDDERS CALCULATION ENGINEER'S ESTIMATE PENN CONTRACTING, INC. ARNT CONSTRUCTION COMPANY INC. ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT $ 800.00 $ 200.00 $ 1,026.00 00'001 $ 00'091.' L $ $ 2,870.00I $ 320.00 1 $ 600.00 $ 1,860.00 $ 8,736.00 $ 4,000.00 $ 1,408.00 $ 600.00 $ 2,500.0il $ 2,016.00 $ 1,860.80 $ 1,920.00 00 00 acoov ONO 1.- 4!4)694949 O 00 CO CO_ N 4- r CO h CO a CO r 0 0 0 O CO 69 $ 270.00 $ 200.00 $ 144.00 $ 1,440.00 $ 736.00 $ 692.00 $ 480.00 $ 1,800.00 $ 1,200.00 $ 1,260.00 $ 13,222.00 0 0 . O O m 69 $ 200.0 $ 1,026.00 00 0 O V7O O 49 44 $ 28.70 $ 64.00 00 0 0 m0 0 - r 49 43 $ 200.00 $ _ 12.80 $ 600.00 $ 2,500.00 $ 42.00 $ 34.60 $ 84.00 $ 2.00 $ 12.00 $ 5.00 $ 1,280.00 000000 0 0m 0 co Ce 0 0 ON Or N 4i CO 0 0 00 .-N 49 49 0 N N 49 O 0 m 49 $ 34.60 $ 18.00 000 0 0 OOO W (O 49 49 0 . N N 49 $ 500.00 $ 500.00 $ 500.00 $ 1,600.00 $ 250.00 $ 3,000.00 $ 750.00 $ 400.00 $ 1,000.00 O O O 'it co 44 $ 4,000.00 $ 1,100.00 $ 1,000.00 $ 3,500.00 $ 4,800.00 $ 480.00 $ 3,000.00 0 0 O O a N f� 49 4i $ 1,440.00 $ 1,000.00 $ 21,690.00 0 O 0 UO 4) $ 270.00 $ 300.00 $ 240.00 $ 800.00 $ 320.00 $ 200.00 $ 800.00 $ 4,000.00 $ 2,000.00 00'0£0`Z6 $ 00'008 $ $ 500.00 $ 500.00 $ 500.00 $ 8.00 $ 250.00 0000 0000 O O CO 4- 49 44 N 0 0 O 49 49 $ 200.00 $ 10.00 $ 1,000.00 $ 3,500.00 $ 100.00 00 00 O 0 0 49 49 $ 3.00 $ 12.00 00 00 'C 0 0 0 69 49 000000 000000 0 0 IO 4! m 0 0 CO 43 49 N 0 N O 4) 49 0 O O 4) 0 0 N N 4► $ 10.00 $ 20.00 $ 200.00 $ 100.00 00'008 $ 0 O O 49 $ 500.00 $ 1,000.00 $ 2,000.00 $ 500.00 $ 1,500.00 $ 500.00 $ 300.00 $ 250.00 0 0 O CO O N 49 $ 10,000.00 $ 2,200.00 $ 1,000.00 $ 2,500.00 $ 2,880.00 $ 480.0 $ 3,000.00 0 O O O � O N a- 49 49 $ 1,800.00 $ 500.00 o CO CD N M 0 O N CO $ 450.00 $ 250.00 $ 120.00 $ 480.00 $ 160.00 $ 200.00 $ 600.00 $ 2,000.00 $ 2,000.00 $ 250.00 $ 11,510.00 0 0 O O 40 00'000'1. $ 00'009 $ $ 10.00 $ 500.00 0000 00 U ) 0 .- O 49 49 u? O . 0 N 49 49 $ 500.00 $ 20.00 $ 1,000.00 $ 2,500.00 $ 60.00 $ 10.00 $ 100.00 00 00 N O N 49 4) $ 5.00 $ 500.00 0 0 O 0 N 69 $ 5.00 $ 250.00 00 00 O O 4- CO 4> 49 $ 10.00 00 00 0 0 4- N 4) 4) $ 100.00 $ 100.00 $ 250.00 LS EA LF EA LF CY CO -I . 1 • • 0 V• no EA CY EA EA LF JU LF CY SY LS Q CO W LF LF QQ W J LL JH TN CY CO r r 200 1 100 5 200 1 . 20 110 1 1 48 48 30 50 60 360 1 REPAIR 1 08 12 8 N CO 20 30 20 20 1 • ROHAVIC LANE MOBILIZATION ROCK CONSTRUCTION ENTRANCE CLEAN /OPEN STORM SEWER OUTFALL CLEAN STORM SEWER PIPE CLEAR AND GRUB TREE (4" DIA OR GREATER) REGRADE DITCH CLASS III RIPRAP W/ FABRIC EROSION CONTROL BLANKET CATEGORY 3 SEED / RESTORATION SUBTOTAL PROJECT 1 CLEAR AND GRUB TREE (4" DIA OR GREATER) COMMON BORROW (FILL OVER PIPE) SALVAGE AND REINSTALL 30" FES STORM SEWER MANHOLE, TYPE 409 30" RCP STORM SEWER, CLASS 3 TRENCH STABILIZATION ROCK / PIPE BEDDING 'CLASS III RIPRAP W/ FABRIC SILT FENCE TOPSOIL BORROW FOR EXISTING YARD AREA SOD FOR EXISTING YARD AREA SEED / RESTORATION OVER NEW PIPE SUBTOTAL PROJECT 2 •■• _C ■11. .. MOBILIZATION REMOVE BITUMINOUS PAVEMENT CLEAR AND GRUB TREE (4" DIA OR GREATER) ----------------- - - - - -- - REMOVE STORM SEWER PIPE 28" X 18" RCP ARCH SEWER PLACE BENTONITE AROUND PIPE (MATERIAL SUPPLIED) TRENCH STABILIZATION ROCK / PIPE BEDDING AGGREGATE BASE CLASS 5 (6" DEPTH) BITUMINOUS WEAR COURSE (2" DEPTH) CLASS III RIPRAP W/ FABRIC SEED / RESTORATION SUBTOTAL PROJECT 3 4- NCO t 0 CO n CO W N my 0 CO P 03 03 a " N CO a O CO N- CO 03 0‘-" w TKDA nr1INI I flINC • nIacn1I CTU[WE • PLANNING The Tlu right people. The right =many PENN CONTRACTING, INC. ARNT CONSTRUCTION COMPANY INC. UNIT TOTAL UNIT TOTAL PRICE AMOUNT PRICE AMOUNT 0 CD 4) $ 2,000.00 $ 300.00 $ 5,400.00 $ 900.00 $ 1,250.00 $ 800.00 $ 1,260.00 0 0 0 CO N N $ 400.00 $ 896.00 $ 900.00 $ 150.00 $ 500.00 $ _ 480.00 $ 3,326.00 $ 400.00 $ 1,120.00 $ 300.00 $ 1,800.00 $ 900.00 $ 300.00 $ 780.00 $ 1,260.00 0 o amt CO N 0 0 0 4) $ 400.00 $ 300.00 $ 192.00 $ 1,600.00 $ 672.00 $ 320.00 0 00 00 Oa 69 49 $ 5,944.00 0 0 . 0 CO 69 $ 5.00 $ 100.00 $ 21.60 $ 3.00 $ 1,250.00 $ 3.00 $ 1,260.00 $ 400.00 $ 44.80 $ 9.00 $ 150.00 $ 500.00 0 0 69 $ 400.00 $ 20.00 $ 300.00 $ 1,800.00 0000 0 0 C D O CD CD N 69 69 69 69 0 0 0004-0 OD 4)49 $ 100.00 $ 300.00 $ 12.00 $ 1,600.00 $ 42.00 $ 64.00 0 O 0 0 . CD N 40 43 $ 500.00 $ 1,500.00 $ 3,200.00 $ 600.00 $ 6,250.00 $ 600.00 $ 50.00 $ 800.00 $ 1,000.00 0 O O 0 V 49 $ 500.00 1 0 0 0 0 0000 0 0 0 0 000m .- N. 49 69 69 4) $ 600.00 $ 5,150.00 $ 500.00 $ 1,120.00 $ 200.00 $ 3,500.00 $ 1,500.00 $ 400.00 $ 600.00 $ 500.00_ 0 O O N 1.1 Oro 49 $ 500.00 $ 800.00 $ 200.00 $ 320.00 $ 1,100.00 $ 1,280.00 $ 750.00 $ 400.00 $ 500.00 0 O 0 ID a0 ID $ 500.00 , $ 500.00 $ 8.00 $ 200.00 $ 25.00 $ 2.00 $ 50.00 $ 4.00 $ 1,000.00 0 0 0 0 ..O di 0 0 0 0 0 0 O 0 O N 0 O O N 0 O 0 49 49 4969 $ 5.00 $ 500.00 $ 20.00 00'005'£ $ 00.00Z $ $ 100.00 $ 4.00 $ 2.00! $ 500.00 $ 500.00 $ 200.00 $ 200.00 $ 20.00 $ 1,100.00 $ 80.00 $ 150.00 $ 2.00 $ 500.00 $ 500.00 $ 3,000.00 $ 4,000.00 $ 1,500.00 $ 3,750.00 $ 450.00 $ 300.00 $ 1,000.00 $ 750.00 0 O 0 N m H $ 500.00 $ 300.00 $ 2,000.00 $ 1,000.00 $ 150.00 0 0 0 0 O O 0 ID V 4)H $ 500.00 $ 1,400.00 0 0 0 0 O O 0 0 N 4! 69 $ 1,500.00 $ 500.00 $ 450.00 $ 750.00 0 O 0 0 (0 N $ 500.00 $ 1,000.00 $ 500.00 $ 160.00 $ 1,000.00 $ 720.00 $ 500.00 $ 300.00 $ 750.00 O 0 O VI 10 49 $ 500.00 $ 1,000.00 $ 10.00 $ 500.00 $ 15.00 $ 1.50 $ 300.00 $ 5.00 $ 750.00 0 0 0 0 m 49 $ 15.00 $ 20.00 $ 1,000.00 $ 150.00 0 0 m 69 $ 500.00 $ 25.00 00'009'Z $ 00'009 $ 0000 00ID 0 0 O O 0 m 69 49 49 4) 0 0 0 0 O 69 $ 250.00 $ 500.00 $ 10.00 $ 1,000.00 $ 45.00 $ 100.00 $ 1.50 $ 750.00 ULATION OF BIDS D9 SURFACE WATER MANAGEMENT PROJECTS fY OF LINO LAKES, MINNESOTA DA PROJECT NO. 14292.004 )S OPENED: AUGUST 14, 2009, AT 10:00 A.M. ENOTES ERROR IN BIDDERS CALCULATION DESCRIPTION QUANTITY UNIT LS EA LF EA LF SY LS SY LS CY LF EA LS >- LS LF Q QQ W W CY SY SY LS EA EA LF EA LF CY CO -I ROBBING 3 400 3 250 300 1 200 1 C. NO .- 120 1 56 r r 15 100 300 1 V CD CD 200 1 PROJECT 4 - WEST SHADOW LAKE DRIVE C MOBILIZATION CLEAN /OPEN STORM SEWER OUTFALL CLEAN STORM SEWER PIPE CLEAR AND GRUB TREE (4" DIA OR GREATER) REGRADE DITCH EROSION CONTROL BLANKET CATEGORY 3 SPRINKLER REPAIR SOD FOR EXISTING YARD AREA SEED / RESTORATION SUBTOTAL PROJECT 4 PROJECT 5 - STAGECOACH TRAIL MOBILIZATION EXCAVATION AND GRADING 4" PE PERFORATED DRAINTILE W/ ROCK AND FABRIC WRi INSTALL YARD DRAIN BOX SPRINKLER REPAIR SOD FOR EXISTING YARD AREA SUBTOTAL PROJECT 5 PROJECT 6 - APOLLO MEADOWS TOWNH MOBILIZATION SALVAGE AND REINSTALL 15" RCP STORM SEWER SALVAGE AND REINSTALL 15" FES CONSTRUCT MH OVER EXISTING 15" STORM SEWER, TYPE 409 CLASS III RIPRAP W/ FABRIC SOD FOR EXISTING YARD AREA EROSION CONTROL BLANKET CATEGORY 3 SEED / RESTORATION SUBTOTAL PROJECT 6 PROJECT LO 7 - IS LANE MOBILIZATION CLEAR AND GRUB TREE (4" DIA OR GREATER) REMOVE 24" APRON REMOVE STORM SEWER PIPE 24" RCP FES W/ TRASHGUARD 24" RCP STORM SEWER, CLASS 3 CLASS III RIPRAP W/ FABRIC EROSION CONTROL BLANKET CATEGORY 3 SEED / RESTORATION ISUBTOTAL PROJECT 7 r f 0 ' Y `� G Irr N 0 I - - m a FZ 4- N C.) V in fO N. at OA .- NCO V LO O D 4- N C 3 Y III O D t w CO 4- N 43 V ID OD f,- CON f f O O C 41 $ 708.00 $ 445.00 $ 200.00 $ 1,620.00 00'009 $ 00'009 $ $ 1,480.00 $ 6,253.00 $ 600.00 $ 708.00 $ 1,513.00 $ 200.00 $ 3,450.00 $ 1,280.00 O a- A N 0 O CD 4) $ 708.00 $ 483.00 $ 200.00 $ 1,620.00 $ 1,480.00 $ 5,091.00 $ 800.00 $ 708.00 $ 445.00 $ 200.00 $ 1,820.00 $ 1,280.00 $ 4,853.00 0 O OD 4i $ 240.00 $ 1,400.00 $ 1,440.00 $ 2,048.00 $ 1,280.00 $ 7,208.00 fD O a O O M TX] NENlING • /WHIFF g}d lima The rightpe9 ARNT COP COMP UNIT PRICE 0 0 O 0 CD 49 $ 708.00 $ 8.90 00'49 $ 00'00I. $ O O 0 tC 49 49 O 0 O aD 49 $ 800.00 $ 708.00 0 0 CO 0 a0 0 43 49 $ 46.00 $ 1,280.00 O 0 O O m 49 O O 0 CD cci 0 r 4. 49 $ 100.00 $ 54.00 $ 1,480.00( $ 800.00 $ 708.00 0000 CO 000 aD OCDO 0 43 4l O N N di 49 00'008 $ O O O 0 mO O 49 49 $ 96.00 $__ 10.24 0 0 O CD N N 49 $ 500.00 $ 500.00 $_ 500.00 $ 400.00 $ 900.00 $ 50.00 $ 375.00 $ 500.00 $ 3,725.00 $ 500.00 $ 500.00 $ 1,700.00 400.00 $ 1,875.00 $ 500.00 $ 5,475.00 $ 500.00 $ 500.00 $ 700.00 $ 400.00 $ 900.00 O O O O O O O O O W I+f' di 4! $ 500.00 $ 500.00 $ 500.00 $ 400.00 00'009 S 00'006 $ 0 O O 0 M e) H $ 500.00 $ 300.00 $ 500.00 $ 1,050.00 $ 2,000.00 $ 500.00 $ 4,850.00 0 O 0 D) aD m Of N $ 500.00 $ 500.00 $ 10.00 $ 200.00 $ 30.00 O O O O 0 0 O 49 4T O O 0 O O d) $ 500.00 $ 500.00 O O O O O O .—O N di di $ 25.00 $ 500.00 $ 500.00 $ 500.00 $ 10.00 $ 200.00 $ 30.00 O O O O O 4) $ 500.00 $ 500.00 $ 10.00 $ 200.00 O O O O O O OD 0 O 4) 49 $ 500.00 00000 O O O O a— 0 O 4► 49 O O O O h .- 49 49 O O 0 O 4> $ 500.00 $ 1,000.00 $ 500.0001 $ 500.00 $ 450.00 $ 150.00 $ 375.00 $ 250.00 $ 3,725.00 $ 500.00 $ 1,000.00 $ 1,700.00 $ 500.00 $ 1,125.00 $ 250.00 $ 5,075.00 $ 500.00 $ 1,000.00 $ 700.00 $ 500.00 $ 450.00 $ 250.00 $ 3,400.00 O O O O O O O O O O a— 4) 4► $ 500.00 $ 500.00 $ 450.00 $ 250.00 O O O N OD H $ 500.00 $ 450.00 $ 1,000.00 $ 375.00 $ 2,000.00 $ 1,000.00 $ 5,325.00 S 98,775.00 O O . 0 O 43 O O O O 0 0 O 4) CO $ 250.00 $ 15.00 O O 0 0 0 0 4) 43 $ 250.00 00'000' I. $ 00'009 $ $ 10.00 $ 250.00 $ 15.00 $ 250.00 $ 500.00 O O O O O O O 49 49 $ 250.00 $ 15.00 $ 250.00 O O O O O O O O CO 49 O O O O O O N di 49. $ 15.00 $ 250.00 $ 500.00 O O O O 0 0 O 49 49 $ 25.00 $ 10.00 0 0 O O 4► RBULATION OF BIDS )9 SURFACE WATER MANAGEMENT PROJECTS rY OF LINO LAKES, MINNESOTA DA PROJECT NO. 14292.004 )S OPENED: AUGUST 14, 2009, AT 10:00 A.M. ENOTES ERROR IN BIDDERS CALCULATION DESCRIPTION QUANTITY UNIT CO J EA LF EA LF LS SY LS LS EA LF EA LF LS EA LF EA LF LS LS EA __ -- LF EA LF LS LF EA CY LF LS 30 1 � N — 1 50 2 30 1 75 a— a— a— N-N 75 1 1 70 - - - -2 30 .— �� 50 2 cOr1 EggagijaniusliE MOBILIZATION SALVAGE AND REINSTALL SPLIT RAIL FENCE CLEAN /OPEN STORM SEWER OUTFALL EXCAVATION AND GRADING CLEAN STORM SEWER PIPE SEED / RESTORATION SUBTOTAL PROJECT 12 TOTAL SURFACE WATER MANAGEMENT PROJECTS pROJECT10 -JAMES STREET MOBILIZATION CLEAN /OPEN STORM SEWER OUTFALL CLEAN STORM SEWER PIPE CLEAR AND GRUB TREE (4" DIA OR GREATER) REGRADE DITCH SEED / RESTORATION SUBTOTAL PROJECT 10 PROJECT 11 - DIANE STREET ,MOBILIZATION CLEAN /OPEN STORM SEWER OUTFALL CLEAN STORM SEWER PIPE CLEAR AND GRUB TREE (4" DIA OR GREATER) REGRADE DITCH SEED /RESTORATION SUBTOTAL PROJECT 11 L CC L NE MOBILIZATION ERgaglig CLEAN /OPEN STORM SEWER OUTFALL CLEAN STORM SEWER PIPE CLEAR AND GRUB TREE (4" DIA OR GREATER) REGRADE DITCH SPRINKLER REPAIR SOD FOR EXISTING YARD AREA SEED / RESTORATION SUBTOTAL PROJECT 8 H W W Z i- t* 0 Z N CD Of F V W 0 4 MOBILIZATION CLEAN /OPEN STORM SEWER OUTFALL CLEAN STORM SEWER PIPE CLEAR AND GRUB TREE (4" DIA OR GREATER) REGRADE DITCH SEED / RESTORATION SUBTOTAL PROJECT 9 ii_. N 0 F m W Z N an < O t0 f• m r N r) at O CO .— N co St O O N r) .n CO .— N co at O f0 • • 2009 SURFACE WATER MANAGEMENT PROJECTS TKDA CITY OF LINO LAKES, MINNESOTA TKDA PROJECT NO. 14292.004 ENGINE GRIN; • 1,,3 f1nE(I IRE • Al ANGINA The right tlme. The right pea The eight eemPenSt BIDS OPENED: AUGUST 14, 2009, AT 10:00 A.M. "DENOTES ERROR IN BIDDERS CALCULATION C.W. HOULE, INC. REHBEIN COMPANIES ITEM UNIT TOTAL UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT • • f 0 O co 69 $ 1,000.00 $ 215.00 $ 4,100.00 $ 460.00 $ 1,700.00 $ 750.00 O CO O N 0 a C9 C• m A co P CO N $ 8,400.00 $ 3,740.00 $ 600.00 $ 1,750.00 $ 2,976.00 $ 1,008.00 $ 3,810.00 $ 825.00 $ 2,970.00 $ 2,448.00 $ 210.00 O A CO W O in H $ 415.00 $ 585.00 $ 453.00 $ 1,194.00 $ 2,880.00 $ 284.00 $ 420.00 $ 984.00 00'06L $ 00'09L'Z $ 00'005'£ $ $ 16,585.00 O O O W 69 $ 1,000.00 $ 215.00 $ 20.50 $ 460.00 0 0 O O 1.:0 .0- f9 69 $ 3.00 $ 2.65 $ 420.00 $ 34.00 $ 600.00 $ 1,750.00 $ 62.00 $ 21.00 $ _ 127.00 $ 16.50 $ 49.50 0 0 CO 0 00 N C9 f9 $ 415.00 $ 6.50 1 $ 453.00 $ 99.50 $ 360.00 0 0 CO 69 U.) h .- 69 $ 21.00 $ 32.80 $ 175.00 $ 138.00 $ 790.00 O O O W 69 $ 850.00 $ 1,500.00 $ 1,400.00 $ 800.00 O O O 0 O O CO O CO CO 69 00'00l' l $ 00.00Z' l $ O 0 O O O) N $ 7,000.00 $ 2,090.00 $ 930.00 $ 1,710.00 $ 2,448.00 $ 288.00 $ 3,030.00 $ 150.00 $ 1,140.00 O O 0 0 O O 0 03. O 49 69 $ 22,686.00 $ 1,000.00 $ 450.00 $ 600.00 $ 156.00 $ 504.00 O 0 O U) V) 4l O 0 0 69 $ 120.00 $ 810.00 $ 4,600.00 $ 2,060.00 $ 750.00 14 984.00 $ 950.00 $ 850.00 $ 1,500.00 0 0 0 O h0 0 0 69 69 $ 8.00 $ 132.00 00'00l' l $ 00'9 $ $ 350.00 $ 19.00 $ 930.00 $ 1,710.00 $ 51.00 $ 8.00 $ 101.00 $ 3.00 $ _ 19.00 0 0 0 0 a)O O f9 69 0 0 0 0 0 0 O1nO 0 0 O 0 E9 69 CQQ9 $ 13.00 $ 83.00 0 0 I) CO 0 CO 0 0 vi 69 $ 6.00 $ 27.00 $ 230.00 $ 103.00 $ 750.00 � I LS EA LF EA �U SY LS PROJECT 2 - TOMAHAWK TR AND CHIPPEWA TR DITCH REPAIR CO j Q EA EA LF LF CY LF CY SY LS C/)>- W LF LF 111 -1 LF TN TN CY LS •-• •- 200 1 OO 200 1 00 N . 1 1 48 48 30 50 60 m' W E - • 1, 90 1 12 8 N 20 30 20 20 1 PROJECT 1 - ROHAVIC LANE MOBILIZATION ROCK CONSTRUCTION ENTRANCE CLEAN /OPEN STORM SEWER OUTFALL CLEAN STORM SEWER PIPE CLEAR AND GRUB TREE (4" DIA OR GREATER) REGRADE DITCH CLASS III RIPRAP W/ FABRIC EROSION CONTROL BLANKET CATEGORY 3 SEED / RESTORATION SUBTOTAL PROJECT 1 CLEAR AND GRUB TREE (4" DIA OR GREATER) COMMON BORROW (FILL OVER PIPE) SALVAGE AND REINSTALL 30" FES STORM SEWER MANHOLE, TYPE 409 30" RCP STORM SEWER, CLASS 3 TRENCH STABILIZATION ROCK / PIPE BEDDING CLASS III RIPRAP W/ FABRIC SILT FENCE TOPSOIL BORROW FOR EXISTING YARD AREA SOD FOR EXISTING YARD AREA SEED / RESTORATION OVER NEW PIPE SUBTOTAL PROJECT 2 PROJECT 3 - FAWN LANE EQUILIZER PIPE MOBILIZATION REMOVE BITUMINOUS PAVEMENT CLEAR AND GRUB TREE (4" DIA OR GREATER) REMOVE STORM SEWER PIPE 128" X 18" RCP ARCH SEWER ,PLACE BENTONITE AROUND PIPE (MATERIAL SUPPLIED) TRENCH STABILIZATION ROCK / PIPE BEDDING AGGREGATE BASE CLASS 5 (6" DEPTH) ,BITUMINOUS WEAR COURSE (2" DEPTH) CLASS III RIPRAP W/ FABRIC SEED / RESTORATION [SUBTOTAL PROJECT 3 N C')NI' O O h 00 •- NCO O O4-U)a) " '- N CO V7 CC) CO C` 00 °�" I • • • TABULATION OF BIDS REHBEIN COMPANIES C.W. HOULE, INC. co 0 Z 00 a Cr j Z < ¢ Q to 0 0 0 H Z Z O sr: 0 H Ul CO j Z • 3YZ Mo 0 0 oz U 0 w W W u Z O Z CO re ce Ili LIJ (00a 00 Z Nl p U m. J Z Z F O Q W Z V-a, DESCRIPTION W0 • z 69 69 0 0 O m 19 0 0 0 fa O O U) 9 0 0 0 68 0 0 U) m 69 0 O 0 N 0 0 CA N N M 0 0 m m 4, 0 0 O O 4, 0 0 v O di 0 0 0 4, 0 0 O c+) 4, 0 0 o 4, 0 0 a m N O O N CO 4, O 0 O 4, O O W r- 49 O O 0 O N CO 0 O L0 N 4, O O O 4, 4, O O 0 O 4, 0 0 a Oi w O 0 O 4, 0 O 0 N 4, 0 0 O m 4, 0 0 co 4, 0 0 O co 4, O O r- 43 4, O O m N 4, 0 0 CD m 1- w O O U, 4, 0 U) N 4, 0 N 4, O O O a 4, 0 N 4, O O 4, O U) p) 4, U) 69 O O O N 4, O O O 4, O O O m O N 4, O O O N 4, O O U) 4, O R co 4, O U) CO 4, O U ) N 4, O m F- 4, 0 O N 4, 0 49 O ca 4, O N 4, O 4, 0 O N 4, 0 O 4, 0 O N 4, 0 a 4, 0 O • m 4, N C- 4, 0 4, U) N 4, N N 4, O O 00 O CO O O 00 O ai 4, O O 00 m N 4, O O 0v 4, O O U) C- 4, O O 00 U) 4, O O 00 d, O O 00 N 4, O O U) n 4, 0 0 H O O U) 4, O O m C.) 4, O O 00 4, O O LO c0 4, O O 00 4, O O N 4, 0 0 0 cO v N O O O O 4, O O CO F- 4, O O 0 N 4, O O 0 I- 4, 4, O O O m 4, O O O O CO 0 O O O 4, 0 0 e C, 0 M O O O O d, O O 0 c0 4, O O M O 4, 0 0 N N 4, O O r 4, O O O 4, O O m di O O 0 N 4, 0 0 0 O 4i 0 0 CO m N O O O O 4, 0 O 0 O 4, O O 1- 4, O O O co 4, O O n 4, O O O 0 0 O 4, 4, O O O n 4, O O O C- 4, O O m 4, O O 4, O O n m 4, O O O 4, O O CO 4, 4, O O 4, O O O N 4, O O O N n 4, O O O 4, O O CO 4, O O O OD 69 O O ci O O 4, O O O0 R 4, O O C) O 4, O O 4, O O 0v F- 4, O O 0 4, O O N 0 4, O O m 4, O O O CO 4, ROJECT 4 - WEST SHADOW LAKE DRIVE CROSSING U J LL J 6 LL J r co U J co U) J C) O O v o) O O N O O CO O O N z I J LL O CC W co 0 co a 0 QZ W a a Ui w w 0 Qz x I- 0 W ❑ W re M 0 0 W 0 tu w Z m 0 a z z 0 z 0 0 y re W a' a w a a w J z Fe a co ❑ 0 z U) w re O ❑ 0 U) a I- U W 0 a 0 H m U) NJ PROJECT 5 - STAGECOACH TRAIL CO J 0 W J y J N O N O O O N z I 0 Z_ ❑ z z 0 Q Q X W d U z co ❑ z U 0 K W F z ❑ 0 LL z W o- w a O m z 0 ❑ re r J w a w J z_ a- a re ❑ } 0 z U) re O ❑ 0 U) a I- U W 0 re O. a 0 m U) N CO W 0 x O O 6 2 O J O Q co O re a CO J L.L. J 6 0 y N N J co O O O O z QO N m O re LU W U 2 re 0 re U) a U U) J ❑ ❑ co LU W La W rey re 0 U) 0 Z co w LU 0 U rn o - .4 Z W O}a} F ❑ r, 0 z U) W x O ❑ 0 U) co CC 0 W U W Z U) re z z 0 U z 0 U 0 W m I- U W 0 O. O. -J 0 m CO CO N J LL J LL J } 0 N U) J m C15 O 0 0 N PROJECT 7 - LOIS LANE z 0 O z 0 a- a- < N W 0 LU W W a d Ui w co re 0 U) W 0 2 W ❑ 7 X I- I- U) w LL O. U N U z co LL a a. N co 0 N M a O m C- CO 0) N M O f0 N M R O m r CO N l+) 7 O m I- CO O) • • • $ 134,772.65 o o o O N CO $ 213.00 $ 1,050.00 $ 900.00 $ 660.00 $ 314.00 $ 750.00 $ 265.00 $ 00.0ZZ $ 00'00I.' l $ $ 3,570.00 $ 900.00 $ 1,425.00 $ 790.00 o O o o O m H O o o o N 69 $ 213.00 $ 1,470.00 $ 910.00 $ 660.00 $ 790.00 $ 5,243.00 $ 625.00 $ 213.00 $ 1,050.00 $ 590.00 $ 450.00 $ 788.00 $ 3,716.00 O O 0 O co 0 $ 870.00 $ 215.00 $ 1,380.00 $ 4,200.00 $ 790.00 $ 9,055.00 TKI INt ERINC3 - +iRCIIIiFCTt yM time. The right people.' REHBEIN C UNIT PRICE O O O N 69 $ 213.00 $ 21.00 $ 450.00 $ 22.00 $ 314.00 $ 10.00 O O O c0 N Vf $ 1,100.00 $ 220.00 $ 21.00 $ 450.00 $ 19.00 $ 790.00 O O O N 69 $ 213.00 $ 21.00 $ 455.00 $ 22.00 0 O W f- 0 $ 625.00 $ 213.00 $ 21.00 $ 295.00 O O m .- m N- 69 69 0 O O m 69 $ 29.00 $ 215.00 $ 92.00 $ 21.00 0 O O n 49 $ 400.00 $ 800.00 $ 550.00 O O q CD O O f9 4) $ 400.00 $ 450.00 $ 500.00 $ 4,360.00 $ 500.00 $ 800.00 $ 1,530.00 $ 960.00 $ 750.00 I $ 500.00 q O O W M $ 500.00 $ 800.00 $ 770.00 O O O) c000 W e9 f9 69 $ 800.00 $ 4,130.00 $ 500.00 800.00 $ 550.00 $ 980.00 $ 300.00 $ 800.00 0 O at ••• 49 $ 500.00 $ 1,200.00 $ 1,000.00 $ 315.00 $ 1,400.00 $ 650.00 $ 5,065.00 O) 1A O 49 0 O 49 $ 800.00 $ 11.00 0000 O O 69 43 O m Ui 49 $ 500.00 $ 500.00 $ 800.00 $ 9.00 $ 480.00 $ 10.00 $ 500.00 $ 500.00 $ 800.00 $ 11.00 $ 480.00 $ 10.00 0 O m 49 $ 500.00 $ 800.00 $ 11.00 $ 480.00 $ 10.00 $ 800.00 $ 500.00 $ 40.00 $ 1,000.00 $ 21.00 $ 7.00 $ 650.00 ABULATION OF BIDS W )9 SURFACE WATER MANAGEMENT PROJECTS fY OF LINO LAKES, MINNESOTA DA PROJECT NO. 14292.004 )S OPENED: AUGUST 14, 2009, AT 10:00 A.M. ENOTES ERROR IN BIDDERS CALCULATION DESCRIPTION QUANTITY UNIT CO J EA IF EA LF LS SY LS LS EA LF EA LF I LS EA LF EA LF Cl) LS EA LF EA LF LS LS LF EA o J LS 170 2 75 1 - - - - - -- - - - -- 1 70 2 30 50 2 O O 15 200 4— 1 50 2 30 75 PROJECT 10 - JAMES STREET MOBILIZATION CLEAN /OPEN STORM SEWER OUTFALL CLEAN STORM SEWER PIPE CLEAR AND GRUB TREE (4" DIA OR GREATER) REGRADE DITCH SEED /RESTORATION SUBTOTAL PROJECT 10 PROJECT 11 - DIANE STREET MOBILIZATION CLEAN /OPEN STORM SEWER OUTFALL CLEAN STORM SEWER PIPE CLEAR AND GRUB TREE (4" DIA OR GREATER) - REGRADE DITCH SEED / RESTORATION SUBTOTAL PROJECT 11 PROJECT 12 - COUNTRY LANE MOBILIZATION SALVAGE AND REINSTALL SPLIT RAIL FENCE CLEAN /OPEN STORM SEWER OUTFALL EXCAVATION AND GRADING CLEAN STORM SEWER PIPE SEED / RESTORATION SUBTOTAL PROJECT 12 TOTAL SURFACE WATER MANAGEMENT PROJECTS _PROJECT NO.8 - BLACKBIRD LAN! MOBILIZATION CLEAN /OPEN STORM SEWER OUTFALL CLEAN STORM SEWER PIPE CLEAR AND GRUB TREE (4" DIA OR GREATER) REGRADE DITCH SPRINKLER REPAIR SOD FOR EXISTING YARD AREA SEED / RESTORATION SUBTOTAL PROJECT 8 Egsjiguattimum MOBILIZATION CLEAN /OPEN STORM SEWER OUTFALL CLEAN STORM SEWER PIPE CLEAR AND GRUB TREE (4" DIA OR GREATER) - - REGRADE DITCH SEED / RESTORATION ISUBTOTAL PROJECT 9 - N U F CO ti. W Z 4— N c9 V' 10 6D r CO 4— N c V' 1n CD 4— N P) < 10 6D 4— N c9 1n CO 4— N f+) O tD •