Council Member Donnel moved for adoption of the following resolution:
CITY OF LINO LAKES
RESOLUTION NO. 09-71
RESOLUTION ACCEPTING FEASIBILITY REPORT AND CALLING FOR A
PUBLIC HEARING — PINE STREET PAVING IMPROVEMENT PROJECT
WHEREAS, pursuant to approval of the Council July 13, 2009, a study has been
prepared by the City Engineer, with reference to the Pine Street Paving Improvement
Project Feasibility Report, received by the City Council September 28, 2009, and
WHEREAS, the report provides information regarding whether the proposed project is
necessary, cost - effective, and feasible,
WHEREAS, the City proposes to assess the benefited property for all or a portion of the
cost of the improvement, pursuant to Minnesota States, Chapter 429, and Chapter 8 of the
Lino Lakes City Charter.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF LINO LAKES, MINNESOTA:
1. The Pine Street Paving Improvements Feasibility Report has been accepted and the
Engineer is designated as the engineer for this improvement and he is directed to call
for a public hearing for the Pine Street Paving Improvements Project.
2. The Council will consider the improvement of such street in accordance with the
report and the assessment of abutting property for the portion of the cost of the
improvement pursuant to Minnesota Statutes, Chapter 429 and City Charter at an
estimated total cost of the improvement of $398,500 for the paving of Pine Street
from Lake Drive to 4th Avenue / Jodrell Street.
3. A public hearing shall be held on such proposed improvement on the 26th day of
October, 2009 in the Council chambers of the City Hall at 6:30 p.m. and the clerk
shall give mailed and published notice of such hearing and improvement as required
by law.
Bartell, City Clerk
. Bergin, Mayor
Adopted by the Line)Lakes City Council this 28th day o
p y ty y f September, 2009.
The motion for the adoption of the foregoing ordinance was duly seconded by Council
MemberGa1lup and upon vote being taken thereon, the following voted in favor
thereof o' DonnP1 1 , (;all iip, fPPi nPrt-, Bergeson
The following voted against same: none ( absent - Stoltz )
Whereupon said resolution was declared duly passed and adopted.
•
•
STAFF ORIGINATOR:
CITY COUNCIL
MEETING DATE:
TOPIC:
AGENDA ITEM 6A
James E. Studenski, City Engineer
September 28, 2009
Resolution No. 09 -71, Accepting Feasibility
Report and Calling for a Public Hearing,
Pine Street Paving Improvement Project
ACTION REQUIRED: 4/5 Vote
BACKGROUND
The Pine Street Paving Improvement Project Feasibility Report was authorized by the
City Council on July 13, 2009. The report was initiated by a resident petition to research
the costs of paving Pine Street.
The attached feasibility report dated September 23, 2009 includes paving and minor
surface water management improvements for Pine Street from both Lake Drive to the
Westem Terminus and Lake Drive to 4th Avenue. This report was prepared in
coordination with the City of Columbus. The estimated improvement project costs to
pave Pine Street from Lake Drive to the western terminus are $699,500 and $398,500 to
pave from Lake Drive to 4th Avenue. The estimated project costs include a 5%
contingency and 20% indirect costs (legal, engineering, and administrative).
The City of Columbus is going through their process for the feasibility report with their
pertinent assessment information attached. City staff will continue to work with City of
Columbus staff on a Joint Powers Agreement for this project.
The Lino Lakes public hearing will be held at the October 26th City Council Meeting.
RECOMMENDATION
Staff recommends accepting Resolution No. 09 -71, Accepting Feasibility Report and
Calling for a Public Hearing, Pine Street Paving Improvement Project.