Council Member Gallup introduced the following resolution and
moved its adoption:
CITY OF LINO LAKES
RESOLUTION NO. 09-72
RESOLUTION ORDERING IMPROVEMENT
I -35E /CSAH 14 INTERCHANGE
WHEREAS, a resolution of the City Council adopted the 6th day of July, 2009, fixed a
date for a Council hearing on the I -35E /CSAH 14 (Main Street) interchange
improvements including the reconstruction of the interchange between 21st Avenue and
Otter Lake Road by bridge replacement and widening, roadway replacement and
widening, reconstruction of existing freeway ramps and construction of new ramps,
installation of traffic control signals, improvement to local road connections and
construction of pedestrian /bicycle facilities; and
WHEREAS, two weeks' mailed notice and two weeks' published notice of the hearing
was given, and the hearing was held thereon on the 27t day of July, 2009, at which all
persons desiring to be heard were given an opportunity to be heard thereon; and
WHEREAS, in accordance with the City Charter, 60 days have elapsed from the date of
such hearing and no petition against such improvement has been filed with the Council.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
LINO LAKES, MINNESOTA:
1. Such improvement is necessary, cost - effective and feasible as detailed in the
feasibility report.
2. Such improvement is hereby ordered as proposed in the council resolution adopted
the 6th day of July, 2009.
Bartell, City ler
.74
John J. Bergeson, Mayor
Adopted by the Lino Lakes City Council this 5th day of October, 2009.
•
•
The motion for the adoption of the foregoing resolution was duly seconded by Council
Member g -01 t, and upon vote being taken thereon, the following voted
in favor thereof:
Gallup, Stoltz, Reinert, O'Donnell, Bergeson
The following voted against same:
none
Whereupon said resolution was declared duly passed and adopted.
•
STAFF ORIGINATOR:
CITY COUNCIL
MEETING DATE:
TOPIC:
ACTION REQUIRED:
BACKGROUND
AGENDA ITEM 1A (i)
Michael Grochala
October 5, 2009
Consideration of Resolution No. 09 -72
Ordering Improvements - I35E/CSAH 14
Interchange
4/5 Vote
The City Council authorized preparation of a Feasibility Study for the I- 35E/CSAH 14
Interchange Improvements on April 27, 2009. The study was completed by SRF
Consulting Group, the City's consulting engineer, and presented to the City Council on
July 6, 2009. Following the required mailed and published notice the City Council held
a public hearing on July 27, 2009 in accordance with state law and charter
requirements.
The City Charter requires that 60 days elapse after the public hearing before any further
action can be taken by the council on the proposed improvement. During this 60 day
period property owners proposed to be assessed for the improvement may file a petition
against such improvement. The 60 day period terminated on Friday, September 25,
2009. No petition was received.
Accordingly the next step in the process is to "order the improvement". Typically, this
would coincide with authorizing the preparation of plans and specifications. However,
since Anoka County is the lead agency on the project no additional steps are necessary
to prepare the project for bid.
Approximately $5.5 million was proposed to be assessed to benefiting property owners.
The final amount to be assessed will be determined following award of the contract and
determination of final costs. Staff is anticipating that the assessment process will be
completed in fall of 2010. The process will be as follows:
1. Council declares cost to be assessed and Orders Preparation of Proposed
Assessment.
2. Council calls for Hearing on Proposed Assessment
3. Council holds Hearing on Proposed Assessments and Adopts Assessment Role
•
•
RECOMMENDATION
Staff is recommending approval of Resolution No. 09 -72 ordering the improvement.
ATTACHMENTS
1. Resolution No. 09 -72