Loading...
HomeMy WebLinkAbout2009-009 Council ResolutionCouncil Member Stoltz introduced the following resolftzon and moved its adoption: CITY OF LINO LAKES RESOLUTION NO. 09-09 RESOLUTION AUTHORIZING PREPARATION OF PLANS AND SPECIFICATIONS FOR THE 2009 SEALCOAT PROJECT. WHEREAS, it is proposed to perform maintenance activities on several city streets, and WHEREAS, it is proposed to finance the project using the 2009 budget of $175,000.00 allocated for street repair along with Sealcoating Funds. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: The City Engineer is designated as the engineer for this improvement and he is directed to prepare plans and specifications for the 2009 Sealcoat Project. ianne Bartell, ity Clerk Adopted by the Lino Lakes City Council this 9th day of February 2009. The motion for the adoption of the foregoing resolution was duly seconded by Council Member Donnell and upon vote being taken thereon, the following voted in favor thereof: Stoltz, O'Donnell, Reinert, Gallup, Bergeson The following voted against same: none Whereupon said resolution was declared duly passed and adopted. • • • AGENDA ITEM 6Cii STAFF ORIGINATOR: James E. Studenski, City Engineer COUNCIL MEETING DATE: February 9, 2009 TOPIC: Resolution No. 09 — 09, Authorizing Preparation of Plans and Specifications, 2009 Sealcoat Project. Vote Required: Simple Majority BACKGROUND: In accordance with the City's Pavement Management Policy, streets are selected annually for sealcoating. Sealcoating is a maintenance activity that places a thin layer of oil and rock on the street to enhance the surface and prolong the useful life of the street. A nationally accepted asset management software known as CarteGraph was used to analyze the current condition of City streets and recommend segments that met sealcoating requirements. Streets were selected based on pavement management criteria, input from Public Works, and feasibility of locations. This year, approximately 7 miles of streets are estimated to be sealcoated. The City has allocated a budget for the 2009 Sealcoat Project of $175,000.00, which is the same as last year. The schedule for this project is as follows: City Council Authorizes Plans and Specifications City Council Approves Plans and Specifications City Council Authorizes Ad for Bids Open Bids City Council Awards Contract Construction Begins February 9, 2009 March 9, 2009 March 9, 2009 April, 2009 April 27, 2009 June, 2009 RECOMMENDATION: Staff recommends adoption of Resolution Number 09 -09 Authorizing Preparation of Plans and Specifications, 2009 Sealcoat Project.