Council Member RP; nPrtintroduced the following resolution and moved its adoption:
CITY OF LINO LAKES
RESOLUTION NO. 09-38
APPROVING PLANS & SPECIFICATIONS FOR PROJECT WITHIN MUNICIPAL
CORPORATE LIMITSANOKA COUNTY STATE AID HIGHWAY (CSAH) 14/ I -35E
INTERCHANGE S.P. 02- 614 -28
WHEREAS, plans for Project No. SP 02- 614 -28 showing proposed alignment,
profiles, grades and cross - sections for the construction, reconstruction or improvement of
the County State -Aid Highway No. 14/ Interstate 35E Interchange within the limits of the
City as a Federal Aid Project have been prepared and presented to the City.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF LINO LAKES, MINNESOTA: that said plans be in all things approved and the City
Engineer is hereby authorized to sign the construction plans on behalf of the City.
Adopted by the Lino Lakes City Council this 22th day of June, 2009.
The motion for the adoption of the foregoing resolution was duly seconded by Council
MemberGa 11 up and upon vote being taken thereon, the following voted in favor
thereof:
Reinert, Gallup, O'Donnell, Bergeson
The following voted against same:
none (Absent - Stoltz)O
Whereupon said resolution was declared duly passed and adopted.
2
•
•
STAFF ORIGINATOR:
CITY COUNCIL
MEETING DATE:
TOPIC:
ACTION REQUIRED:
BACKGROUND
AGENDA ITEM 6A
Michael Grochala
June 22, 2009
Consideration of Resolution No. 09 -38
Approving County Project within Municipal
Corporate Limits (CSAH 14/1 -35E Interchange)
Simple Majority
City staff has been working with Anoka County for the past two years, to complete the
design of the CSAH 14 (Main Street)/ I -35E Interchange. The proposed project includes
total reconstruction of the interchange into a partial cloverleaf. (Attachment 2). The
project also includes the widening of CSAH 14 from two lanes to four lanes, between
950 feet west of the west ramps and 800 feet east of the east ramps of the interchange,
and the replacement of the CSAH 14 bridge over I -35E,.
The proposed new bridge will follow urban design standards and be 250 feet long with a
6 -foot median. Westbound, there will be 8 -foot and 4 -foot shoulders, two 12 -foot
through lanes, and a 12 -foot right turn lane. Eastbound, there will be a 14 -foot left turn
lane, two 12 -foot through lanes, an 8 -foot shoulder, and a 10 -foot pedestrian /bicycle
trail.
The total estimated cost of the project is approximately $23,000,000. The project has
been the recipient of nearly $11,580,000 in federal funding and it is anticipated that the
State of Minnesota will contribute construction engineering in the amount of $1,200,000.
However, that leaves approximately $10,200,000 to be split locally by Anoka County
and the City of Lino Lakes. Discussion with Anoka County regarding the local funding
component are ongoing.
At this time staff is requesting council approval of the interchange plans. Approval of
the plans does not commit the City to any funding obligation. The funding component of
the project will be subject to approval of a subsequent Joint Powers Agreement.
RECOMMENDATION
Staff is recommending approval of Resolution No. 09 -38.
ATTACHMENTS
• 1. Resolution No. 09 -38
2. Project Layout
•
z
0
EXISTING S.B. 35E7
-r T T
530
BEGIN S.P. 02- 614 -28
E.B. C.S.A.H. 14 STA. 180 +62.73
. N.W. LO
S.W. POND HO
��Q' RETAINING WALL
Gv�4 SIGNAL SYSTEM "B"
<i, t S.W. RAMP
20TH AVE. IV
'. .B. C.S.A.H. 14
SIGNA SYSTEM "A"
W.B. c.s.A.H. 14
CITY OF CENTERVILLE
CITY OF LINO LAKES
N.W. POND
. N.W. LOOP
. N.W. RAMP
BEGIN S.P. 0282 -25
EXISTING N.B. 35E STA 532 +42.69
\`EXISTING N.B. 35E
130
ANOKA COUNTY
0 300 600
Boa I• In feet
END S.P. 0282 -25
EXISTING N.B. 35E STA 608 +47.00
810
200/(1076i
8,800 ADT
. S.E. RAMP
131
<153>
E. RAMP
. POND
. E. LOOP
SIGNAL SYSTEM "C"
47,300 ADT
END S.P. 02- 614 -28
E.B. C.S.A.H. 14 STA.
211 +63.20
J
XXX
LEGEND
TOPOGRAPHY AND UTILITY PLANS
SHEET NO.
REMOVAL PLANS SHEET NO.
CONSTRUCTION PLANS SHEET NO.
SUPERELEVATION PLANS SHEET NO.
INPLACE ROADWAY
PROPOSED CONSTRUCTION
SIGNAL SYSTEM
XXXX /(XXXX) = PEAK HR.AM /PEAK HR.PM
XXXXADT = 2030ADT
NOTES:
PROJECTED TRAFFIC VOLUMES (2030) SHOWN
ON THIS SHEET WERE OBTAINED FROM SRF
REPORT C.S.A.H. 14/I35E PROJECTED TRAFFIC VOLUMES,
DATED JULY 2006.
NO DATE BY CKD APPR
REVISION
Ian \CO261429 _GL 1 DGN
I hereby certify that this pion, specification, or report
was prepared by me or under my direct supervision and
that I am a duly Licensed Professional Engineer under
the laws of the State of Minnesota.
Print Name: AARON VACEK
a to 1,-
Date 5-'
License
44277
STATE PROJECT NO.
0282 -25 CTH 35E)
STATE PROJECT NO.
02- 614 -28
COUNTY PROJECT NO.
X
CITY PROJECT NO. X
DRAWN BY
V. MICHELS
DESIGNED BY
A. VACEK
CHECKED BY
S. PRUSAK
COMM. NO. 0086509
SRF
CONSULTING
GROUP, INC.
ANOKA COUNTY
GENERAL LAYOUT
C.S.A.H. 14 /T.H. 35E INTERCHANGE
SHEET
2
OF
471
olop
1
111 129
1
640
340,.
330
128
= — _ . =
- = =- =550
e
540
550 120,000 ADT
560
22ND AVE. — -
- --
— .—
���
r_-) _, -,
— — T
BEGIN S.P. 0282 -25
EXISTING N.B. 35E STA 532 +42.69
\`EXISTING N.B. 35E
130
ANOKA COUNTY
0 300 600
Boa I• In feet
END S.P. 0282 -25
EXISTING N.B. 35E STA 608 +47.00
810
200/(1076i
8,800 ADT
. S.E. RAMP
131
<153>
E. RAMP
. POND
. E. LOOP
SIGNAL SYSTEM "C"
47,300 ADT
END S.P. 02- 614 -28
E.B. C.S.A.H. 14 STA.
211 +63.20
J
XXX
LEGEND
TOPOGRAPHY AND UTILITY PLANS
SHEET NO.
REMOVAL PLANS SHEET NO.
CONSTRUCTION PLANS SHEET NO.
SUPERELEVATION PLANS SHEET NO.
INPLACE ROADWAY
PROPOSED CONSTRUCTION
SIGNAL SYSTEM
XXXX /(XXXX) = PEAK HR.AM /PEAK HR.PM
XXXXADT = 2030ADT
NOTES:
PROJECTED TRAFFIC VOLUMES (2030) SHOWN
ON THIS SHEET WERE OBTAINED FROM SRF
REPORT C.S.A.H. 14/I35E PROJECTED TRAFFIC VOLUMES,
DATED JULY 2006.
NO DATE BY CKD APPR
REVISION
Ian \CO261429 _GL 1 DGN
I hereby certify that this pion, specification, or report
was prepared by me or under my direct supervision and
that I am a duly Licensed Professional Engineer under
the laws of the State of Minnesota.
Print Name: AARON VACEK
a to 1,-
Date 5-'
License
44277
STATE PROJECT NO.
0282 -25 CTH 35E)
STATE PROJECT NO.
02- 614 -28
COUNTY PROJECT NO.
X
CITY PROJECT NO. X
DRAWN BY
V. MICHELS
DESIGNED BY
A. VACEK
CHECKED BY
S. PRUSAK
COMM. NO. 0086509
SRF
CONSULTING
GROUP, INC.
ANOKA COUNTY
GENERAL LAYOUT
C.S.A.H. 14 /T.H. 35E INTERCHANGE
SHEET
2
OF