Loading...
HomeMy WebLinkAbout2009-045 Council ResolutionCouncil Member Stoltz introduced the following resolution and moved its adoption. • • CITY OF LINO LAKES RESOLUTION NO. 09 -45 RESOLUTION AUTHORIZING PREPARATION OF PLANS AND SPECIFICATIONS FOR THE 2009 SURFACE WATER MANAGEMENT PROJECT. WHEREAS, it is proposed to perform cleaning and repair activities on the City storm sewer system, and WHEREAS, it is proposed to finance the project using the 2009 budget of $125,000.00 allocated for Surface Water Management. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: The City Engineer is designated as the engineer for this improvement and he is directed to prepare plans and specifications for the 2009 Surface Water Management Project and shall be paid by the hour in an amount not to exceed $12,500.00. Ju ianpie Bartell, Cfty Clerk / l Adopted by the Lino Lakes City Council this 13th day of July 2009. The motion for the adoption of the foregoing resolution was duly seconded by Council Member Reinertand upon vote being taken thereon, the following voted in favor thereof: Stoltz, Reinert, O'Donnell, Gallup, Bergeson The following voted against same: none Whereupon said resolution was declared duly passed and adopted. • AGENDA ITEM 6A STAFF ORIGINATOR: James E. Studenski, City Engineer COUNCIL MEETING DATE: July 13, 2009 TOPIC: Resolution No. 09 — 45, Authorizing Preparation of Plans and Specifications, 2009 Surface Water Management Project. Vote Required: Simple Majority BACKGROUND: After storm sewer, storm water ponds and drainage ways are constructed, they require periodic maintenance to ensure their effectiveness. To maintain the effectiveness of the storm sewer system, cleaning and repair of pipe sections, catch basins, manholes, drainage ways and flared ends must be completed. • The City conducts yearly reviews of 20% of the City's MS4 outfalls, sediment basins, storm sewers, and ponds to comply with NPDES requirements. We are now in our 6th year which means our entire storm sewer pipe system has been inspected and we have restarted on the area that was first inspected in 2004. The 2009 Surface Water Management project will consist of the cleaning and repair of the pipe sections, catch basins, manholes and flared ends and drainage ways identified in the yearly NPDES reviews of storm sewers, public works identified projects, and through resident issues. The project schedule is as follows: City Council Accepts Plans and Specifications July 27, 2009 City Council Approves Request for Quotes July 27, 2009 City Council Awards Contract August 24, 2009 Construction Begins August, 2009 RECOMMENDATION: Staff recommends adoption of Resolution Number 09 -45 Authorizing Preparation of Plans and Specifications, 2009 Surface Water Management Project. •