Loading...
HomeMy WebLinkAbout2010-028 Council ResolutionCouncil Member -Roese it introduced the following resolution and moved its adoption: CITY OF LINO LAKES RESOLUTION NO. 10 -28 RESOLUTION ACCEPTING BIDS AND AWARDING A CONSTRUCTION CONTRACT, 2010 STREET SEALCOAT PROJECT WHEREAS, pursuant to an advertisement for bids for the construction of 2010 Street Sealcoat Project, bids were received, opened and tabulated according to law, and the following bids were received complying with the advertisement: Contractor Amount of Bid Pearson Bros., Inc. $ 129,970.00 Astech Asphalt Surface $ 137,285.00 Allied Blacktop Company $ 144,650.00 Precision Sealcoating, Inc. Incomplete Engineer's Estimate $ 139,125.00 • AND WHEREAS, it appears that Pearson Bros., Inc. is the lowest responsible bidder; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. The Mayor and Clerk are hereby authorized and directed to enter into a contract with Pearson Bros., Inc., in the name of the City of Lino Lakes for the construction of the 2010 Street Sealcoat Project according to the plans and specifications approved by the City Council and on file in the office of the City Clerk. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the Bid Bonds made with their bids, except that the deposits of the successful bi der and the next two lowest bidders shall be retained until a contract has b • 7uli.: e Bartell, C ty C e k Jeff Reine a or Adopted by the Lino Lakes City Council this 12th day of April, 2010. The motion for the adoption of the foregoing resolution was duly seconded by Council Member @a 11 up and upon vote being taken thereon, the following voted in favor thereof: ._ -` ° e s er, C9ct 1`P "Re, n c. The following voted against same: o (A10 (51)0Vi 1= 1, R4 f e!tli Whereupon said resolution was declared duly passed and adopted. • AGENDA ITEM 6Eii STAFF ORIGINATOR: James E. Studenski, City Engineer COUNCIL MEETING DATE: April 12, 2010 TOPIC: Resolution No. 10 -28, Accepting Bids and Awarding a Construction Contract, 2010 Street Sealcoat Project Vote Required: Simple Majority BACKGROUND: Sealed bids were received and publicly opened at 11:00 a.m. on March 31, 2010. The results of the bid opening are presented below. City Council action is required to award a construction contract to the lowest responsible bidder. Contractor Amount of Bid Pearson Bros., Inc. $ 129,970.00 Astech Asphalt Surface $ 137,285.00 Allied Blacktop Company $ 144,650.00 Precision Sealcoating, Inc. Incomplete Engineer's Estimate $ 139,125.00 The low bids are competitive bids for this project. The bid from Precision Sealcoating, Inc. as shown on the attached tabulation of bids was not considered because the bid was incomlete. The final completion date for this project is September 15, 2010. A summary of the Lino Lakes Pavement Management System will be presented at the May 5t' Council Work Session. RECOMMENDATION: Staff recommends that Resolution No. 10 — 28 Accepting Bids and Awarding a Construction Contract, 2010 Street Sealcoat Project to be adopted. TABULION OF BIDS 2010 SEALCOAT PROJECT CITY OF LINO LAKES, MINNESOTA TKDA PROJECT NO. 14563.001 BIDS OPENED: MARCH 31, 2010, AT 11:00 AM *DENOTES ERROR IN BIDDERS CALCULATION PRECISION ENGINEERS ESTIMATE SEALCOATING INC. ITEM UNIT TOTAL UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT W TKDA ENSINEERING - PECHITECLI •PisNNws The right Hme.The right people. The right oompnp PEARSON BROS. INC. UNIT TOTAL PRICE AMOUNT 2010 SEALCOAT 1 BITUMINOUS SEALCOATING W/1/8" TRAP ROCK 110,500.00 SY $ 1.25 $ 138,125.00 $ - * $ 1.14 $ 125,970.00 2 CRACK SEALING - (MATERIAL SUPPLIED BY CITY) 4,000.00 LBS $ 0.25 $ 1,000.00 $ 1.90 $ 7,596.00 $ 1.00 $ 4,000.00 TOTAL 2010 SEALCOAT $ 139,125.00 # $ 7,596.00 * $ 129,970.00 Page 1 TABULAW N OF BIDS 2010 SEALCOAT PROJECT CITY OF LINO LAKES, MINNESOTA TKDA PROJECT NO. 14563.001 BIDS OPENED: MARCH 31, 2010, AT 11:00 AM *DENOTES ERROR IN BIDDERS CALCULATION ASTECH ASPHALT SURFACE ALLIED BLACKTOP CO. ITEM UNIT TOTAL UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT TKDA ENGINEERING • AN( RIrLCINK • P-ANNiNc ""right thh Th. right peop1eT".tight °'l...° UNIT TOTAL PRICE AMOUNT 2010 SEALCOAT 1 BITUMINOUS SEALCOATING W/1/8" TRAP ROCK 110,500.00 SY $ 1.17 $ 129,285.00 $ 1.30 $ 143,650.00 $ - 2 CRACK SEALING - (MATERIAL SUPPLIED BY CITY) 4,000.00 LBS $ 2.00 $ 8,000.00 $ 0.25 $ 1,000.00 $ - TOTAL 2010 SEALCOAT $ 137,285.00 $ 144,650.00 $ - Page 2