HomeMy WebLinkAbout2008-024 Council Resolution• • • Council Member Stoltz introduced the following resolution and moved its adoption: CITY OF LINO LAKES RESOLUTION NO. 08 -24 RESOLUTION APPROVING CHANGE ORDER NO. 9 LAKE DRIVE /I35W IMPROVEMENT PROJECT WHEREAS, pursuant to the resolution of the City Council adopted May 14, 2007, the City awarded the construction contract for the Lake Drive /I -35W Improvement Project to Lunda Construction Company, and WHEREAS, the aggregate test reports and material disposition forms compiled by Mn /DOT indicate that on August 23, 2007 the coarse aggregate for ready -mix concrete failed to meet the gradation requirements for Mn /DOT Specification 3137 CA -50, and WHEREAS, upon recommendation of the Mn /DOT Concrete Office, the concrete containing the deficient material will be allowed to remain in place at a reduced price. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. Change Order No.9, deducting the amount of $300.00, is hereby approved. . Jo —J. Ber eso , Mayor e Bartell, Cit Cle Adopted by the Lino Lakes City Council this 25th day of February, 2008 The motion for the adoption of the foregoing resolution was duly seconded by Council Member O'Donnell and upon vote being taken thereon, the following voted in favor thereof: Stoltz, O'Donnell, Gallup, Reinert, Bergeson The following voted against same: none Whereupon said resolution was declared duly passed and adopted. • • STAFF ORIGINATOR: CITY COUNCIL MEETING DATE: TOPIC: AGENDA ITEM 1 E Michael Grochala February 25, 2008 Resolution No. 08 -24, Approving Change Order No. 9, Lake Drive /35W Improvement Project ii. Resolution No. 08 -25, Approving Change Order No. 10, Lake Drive /35W Improvement Project iii. Resolution No. 08 -26, Approving Change Order No. 11, Lake Drive /35W Improvement Project VOTE REQUIRED: 3/5 Vote Required BACKGROUND: On May 14, 2007 the City Council awarded the Lake Drive /I -35W Improvement Project to Lunda Construction Company in the amount of $7,531,701.71. The center pier and north abutment have been completed. Work is currently taking place on the south abutment walls. Change Order No. 9 is a deduct for concrete materials that failed to meet the gradation requirements. This concrete was used for curb and gutter. The Mn /DOT Concrete Office has determined that the material can remain in place at a reduced price. The change order represents a credit in the amount of $300.00. Change Order No. 10 is a deduct for concrete materials that failed to meet gradation requirements. This concrete was used for the bridge abutment. The Mn /DOT Concrete Office has determined that the material can remain in place at a reduced price. The change order represents a credit in the amount of $360.00. Change Order No. 11. a portion of the south approach panel is in conflict with the new guard rail that needs to be installed. The project engineer has determined that a portion of the approach panel will need to be removed in order to construct the new guardrail. The total cost of Change Order No. 11 is $1,600.00 RECOMMENDATION: • Staff is recommending approval of Resolution No. 08 -24 through No. 08 -26. • ATTACHMENTS 1. Resolution No. 08 -24 2. Change Order No. 9 3. Resolution No. 08 -25 4. Change Order No. 10 5. Resolution No. 08 -26 6. Change Order No. 11 • • Mn/DOT TP- 2460- 0112 -92) SHEET 1 OF 1 SHEETS State of Minnesota - Department of Transportation CHANGE ORDER # 9 Contractor: Lunda Construction Co. Address: 15601 Clayton Avenue S. Rosemount, MN 55068 State Project No.: 0280 -55 Contract No. Z07502 Location: In Lino Lakes on CSAH 23 (Lake Dr.) From 1000 ft. south of Town Center Parkway to Apollo Dr. In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the Work as altered by the following provisions. The aggregate test reports and material disposition forms compiled by Mn/DOT indicate that on 8 -23 -07 the coarse aggregate for ready -mix concrete supplied by AME 5 Ham Lake failed to meet the gradation requirements for Mn/DOT Specification 3137 CA -50. This concrete was used for Curb and Gutter. Upon recommendation of the Concrete Office, the concrete containing the deficient material will be allowed to remain in place at a reduced price. The dollar amount to be deducted from the Contractor's project payable monies is computed as shown below in the Estimate of Costs. Estimate of Costs •ecrease - Group No. #1 @ 100% Description Unit Deduct for Failing Gradation CY Lab. No. 1A =1Q CHANGE IN CONTRACT TIME Due to this change the Contract Time: a. Is increased ( ) by Working Days Is decreased ( ) by Working Days Is increased ( ) by Calendar Days Is decreased ( ) by Calendar Days b. Is not changed (X ) c. May be revised if the work affected the controlling operation ( ) riginal to Proje Quantity 100 Unit Price -$3.00 Total Credit this Change Order Issued By: Project/Resideggi"County Engineer Amount - $300.00 - $300.00 Date Approved By: City of Lino Lakes Approved By: Anoka County Date Accepted By: L-76. Contractor's Authorized Representative Date Engineer; copies; to Contractor, -City of Lino Lakes, Anoka County