HomeMy WebLinkAbout2008-026 Council Resolution• • Council Member Stoltz introduced the following resolution and moved its adoption: CITY OF LINO LAKES RESOLUTION NO. 08 -26 RESOLUTION APPROVING CHANGE ORDER NO. 11 LAKE DRIVE /135W IMPROVEMENT PROJECT WHEREAS, pursuant to the resolution of the City Council adopted May 14, 2007, the City awarded the construction contract for the Lake Drive /I -35W Improvement Project to Lunda Construction Company, and WHEREAS, the south approach panel for Bridge No. 02817 was constructed as surveyed and is in conflict with the new guardrail that is needed to be installed, and WHEREAS, the Project Engineer has determined that a portion of the approach panel needs to be removed to install the new guardrail. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. Change Order No.11, in the amount of $1,600.00, is hereby approved. n Bartell, City ler Adopted by the Lino Lakes City Council this 25th day of February, 2008 The motion for the adoption of the foregoing resolution was duly seconded by Council Member O'Donnell and upon vote being taken thereon, the following voted in favor thereof: Stoltz, O'Donnell, Reinert, Gallup, Bergeson The following voted against same: none Whereupon said resolution was declared duly passed and adopted. Mn /DOT TP- 2460- 0112 -92) • SHEET 1 OF 1 SHEETS State of Minnesota - Department of Transportation CHANGE ORDER # 11 Contractor: Lunda Construction Co. Address: 15601 Clayton Avenue S. Rosemount, MN 55068 State Project No.: 0280 -55 Contract No. Z07502 Location: In Lino Lakes on CSAH 23 (Lake Dr.) From 1000 ft. south of Town Center Parkway to Apollo Dr. In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the Work as altered by the following provisions. Due to a staking error the south approach panel for Bridge No. 02817 stage I was constructed as surveyed and now in conflict with the new guardrail that is needed to be installed. After review the Project Engineer has determined that the approach panel needs to have the portion in conflict with the new guardrail removed. This Change Order directs the Contractor to furnish all equipment, materials and labor necessary to remove the portion of the approach panel in conflict with the new guardrail. All work will be performed in accordance with the pertinent portions of the Special Provisions, Mn/DOT Standard Specifications, Mn/DOT Standard Plates and as directed by the Engineer. Payment to the Contractor for this work will be at the Mn/DOT 1904 Force Account, as shown below in the Estimate of •ost: ESTIMATE OF COST Force Account Description Approach Panel Removals Distribution: S.P. 0280 -55 Group 01 — 100% CHANGE IN CONTRACT TIME Due to this change the Contract Time: a. Is increased ( ) by Working Days Is decreased ( ) by Working Days Is increased ( ) by Calendar Days Is decreased ( ) by Calendar Days b. Is not changed (X ) c. May be revised if the work affected the controlling operation ( ) Issued By: Amount $1,600.00 �,��r� 'Resident/ 1Tr Engineer Date Approved By: City of Lino Lakes Date Approved By: Anoka County Accepted By:,.:__ L Contractor's Authorized Representative 11110riginal to Project Engineer; copies to Contractor, City of Lino Lakes, Anoka County Date 1Z -ZB - °" Date