HomeMy WebLinkAbout2008-027 Council Resolution• • Council Member Stoltz introduced the following resolution and moved its adoption: CITY OF LINO LAKES RESOLUTION NO. 08 -27 RESOLUTION APPROVING CHANGE ORDER NO. 4 LEGACY AT WOODS EDGE PHASE 2 — STREETLIGHTING IMPROVEMENTS WHEREAS, pursuant to the resolution of the Council adopted April 24, 2006, awarding the construction contract for the Legacy at Woods Edge Phase 1 — Streetlighting Improvements to W.H. Response, and WHEREAS, repairs of damage to the street lighting system caused by a lightning strike are necessary to complete installation and operation of the street lighting system, and WHEREAS, under the contract provisions the contractor is not responsible for repair costs associated with "Acts of God ". NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA that: 1. Change Order No.4 in the amount of $2,811.44 is hereby approved. J. Be •es •" , Mayor anlne Bartell, City Cle Adopted by the Lino Lakes City Council this 25th day of February, 2008. The motion for the adoption of the foregoing resolution was duly seconded by Council Member O' Donnelland upon vote being taken thereon, the following voted in favor thereof: Stoltz, O'Donnell, Gallup, Reinert, Bergeson The following voted against same: none Whereupon said resolution was declared duly passed and adopted. • AGENDA ITEM 1F STAFF ORIGINATOR: Michael Grochala CITY COUNCIL MEETING DATE: February 25, 2008 TOPIC: ACTION REQUIRED: BACKGROUND Resolution No. 08 -27, Approving Change Order No. 4, Legacy at Woods Edge Phase 2 — Streetlighting Improvements Simple Majority On April 24, 2006 the City Council awarded the Legacy at Woods Edge Phase 2 — Street lighting Improvements contract to W.H. Response. Change Order No. 4 is for repair of damage to the street lighting system caused by a lightning strike last fall. Under the terms of the contract, the contractor is not responsible for repair costs associated with "acts of God ". The total cost of Change • Order No. 4 is $2,811.44. RECOMMENDATION Staff is recommending the adoption of Resolution No. 08 -27, Approving Change Order No.4 in the amount of $2,811.44. ATTACHMENTS 1. Resolution No. 08 -27 2. Change Order No. 4 • SEH CHANGE ORDER City of Lino Lakes, Minnesota OWNER OWNERS PROJECT NO. Legacy at Woods Edge - Phase 2 PROJECT DESCRIPTION January 21, 2008 DATE 4 CHANGE ORDER NO. A- LINOL0305.03 SEH FILE NO. The following changes shall be made to the contract documents: Description: GFI — Damage caused by lightning strike • Cost of GFI $274.24 • 6 hours Electrician and Equipment $609.00 • 6 hours Foreman and Equipment $370.98 • 6 hours Laborer $237.90 • Total for this work $1,492.12 Maintenance items on Punch List that were not a craftsmanship /warranty item (see attached for more detail): • 9 hours Foreman, Laborer and Equipment $913.32 • 4 hours Electrician and equipment $406.00 • Total for this work $1,319.44 Total Cost: $2,811.44 Purpose of Change Order: Damage caused by a lightning strike. Maintenance items on Punch List that were not a craftsmanship /warranty item Basis of Cost: ® Actual ❑ Estimated Attachments (list supporting documents) Details of work completed for Change Order #4 Contract Status Original Contract Net Change Prior C.O.'s 1 to 3 Change this C.O. Revised Contract Time N/A Recommended for Approval: Short Elliott Hendrickson Inc. by Cost $483,135.84 $150,203.95 $2,811.44 $636,151.23 ..��. 11 1/1•- Pusan M. on / roject Manager Agreed to Contractor: Approved for Owner: BY Signature Lighting Inc. TITLE Distribution Contractor 2 Owner 1 s:NkoW inoI\ 030503 Uegacypioconstphaseko#4.doc BY City of Lino Lakes, Minnesota TITLE Project Representative 1 SEH Office 1 Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St. Paul, MN 55110-5196 SEH is an equal opportunity employer 1 www.sehinc.com 1 651.490.2000 1 800.325.2055 1 651.490.2150 fax 1/04 %18/2007 15:55 IFAX Fax@sehinc.cos Dec 18 07 03:51p John Olson -, Debbie McJames IJ002 /004 783 -753 -7581 p.2 SIGNATURE LIGHTING, INC 18430 Krypton Street NW Anoka, MN 55303 (763)753 -8157 (763)753 -7581 Fax CHANGE ORDER Maintenance Items and Replacement Electrical Equipment Date: December 18, 2007 Phone: Submitted to: Work to be performed at S E H - City of Lino Lakes Legacy Lino Lakes. MN Project Additional Labor as Itemized below: Purchased and installed 16 new GFI Receptacles damaged by fghtning strike. Troubleshot system to determine problem, purchased new GPI's, removed old and installed new GFrs. This work was perfomued on 12/5/2007 • Cost of GFI - $17.14 x 16 =27424 • 6 hours electrician and equipment - $609.00 • 6 hours foreman and equipment - $370.96 • 6 hours laborer- $237.90 • Total for this work - $1,492.12 • Maintenance Items on Punch List- these are the items we feet are not a craftsmanshiph•arranty item. This work was performed on 11/28 and 11/29/2007. • Painted several poles that were dearly not damaged by our installers (we did paint poles that had scuffs that could have been caused by us as we wired the poles) • Reamed and re -wined Trne Clodcs that were either faulty from the factory or damaged due is the rightnirg &Ice • Reinstalled contactors in service cabinets that were damaged by the lightning strike • Retested entire electrical system after contactors and time dodos were reinstalled • Replaced stainless steel bolts in all hand holes that were removed by the utility beaters so they can gain quicker access to wires inside hand holes • Re-aimed flood rights in roundabout after we were given direction to aim them straight up • Bitable hours - 9 hours for the foreman, laborer and equipment - $913.32 • Bitable hours - 4 hours for the electrician and equipment $406.00 • Total for this work - $1,319.32 • Total Cost $2.811A4 AN material guaranteed as specified end completed in a substanfal worionanlfae mannerforthe lump sum priming as listed above: Payment to be made as blows: 15 days net John Ols9rf- President Date: December 18, 2007 The above prime specifications and co :Sons are sa s cto y and are hereby accepted You are authorized to complete this contract as spec:Wed Signature Name: Title: Date of Acceptance: