HomeMy WebLinkAbout2008-046 Council Resolution• • • O'Donnell, Council Member introduced the following resolution and moved its adoption: CITY OF LINO LAKES RESOLUTION NO. 08-46 RESOLUTION ACCEPTING BIDS AND AWARDING A CONSTRUCTION CONTRACT, 2008 STREET OVERLAY PROJECT WHEREAS, pursuant to an advertisement for bids for the construction of 2008 Street Overlay project, bids were received, opened and tabulated according to law, and the following bids were received complying with the advertisement: Contractor Amount of Bid W B Miller Inc. $ 176,147.40 Northwest Asphalt, Inc. $ 183,087.75 North Valley, Inc.. $ 192,630.01 Rum River Contracting $ 192,798.46 ASTECH Corp. $ 196,944.10 Hardrives Inc. $ 198,824.20 Knife River Corp. $ 200,698.69 T A Schifsky & Sons Inc. $ 200,901.05 FPI Paving Contractors $ 201,938.10 Midwest Asphalt Corp $ 208,110.17 Engineer's Estimate $ 196,018.50 AND WHEREAS, it appears that WB Miller, Inc. is the lowest responsible bidder; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. The Mayor and Clerk are hereby authorized and directed to enter into a contract with W B Miller, Inc., in the name of the City of Lino Lakes for the construction of the 2008 Street Overlay Project according to the plans and specifications approved by the City Council and on file in the office of the City Clerk. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposits of the successful bidder and the next two lowest bidders shall be retained until a contract ham.; en signed. uiann, Bartell, C Cler Adop ed by the Lino Lakes City Council this 28th day of April, 2008. The motion for the adoption of the foregoing resolution was duly seconded by Council Member Gallup and upon vote being taken thereon, the following voted in favor thereof: 0' Donnell, Gallup The following voted against same: Stoltz, Bergeson none CAbsent - Reinert) Whereupon said resolution was declared duly passed and adopted. AGENDA ITEM 6Cii STAFF ORIGINATOR: James E. Studenski, City Engineer COUNCIL MEETING DATE: April 28, 2008 TOPIC: Resolution No. 08 -46, Accepting Bids and Awarding a Construction Contract, 2008 Street Overlay Project Vote Required: Simple Majority BACKGROUND: Sealed bids were received and publicly opened at 10:00 a.m. on April 17, 2008. The results of the bid opening are presented below. City Council action is required to award a construction contract to the lowest responsible bidder. Contractor Amount of Bid W B Miller, Inc. $ 176,147.40 Northwest Asphalt, Inc. $ 183,087.75 North Valley, Inc. $ 192,630.01 Rum River Contracting $ 192,798.46 ASTECH Corp. $ 196,944.10 Hardrives Inc. $ 198,824.20 Knife River Corp. $ 200,698.69 T A Schifsky & Sons Inc. $ 200,901.05 FPI Paving Contractors $ 201,938.10 Midwest Asphalt Corp $ 208,110.17 Engineer's Estimate $ 196,018.50 The low bid is approximately 90% of the Engineer's Estimate for this project. WB Miller, Inc. also completed the street overlay project in 2006 and 2007. A copy of the complete bid tabulation is attached. The final completion date for this project is September 30, 2008. RECOMMENDATION: Staff recommends that Resolution Number 08 - 46 Accepting Bids and Awarding a Construction Contract for the 2008 Street Overlay Project be adopted. • TABULAWN OF BIDS 2008 OVERLAY PROJECT CITY OF LINO LAKES, MINNESOTA TKDA PROJECT No. 14043.002 BIDS OPENED: APRIL 17, 2008, AT 10:00 AM *DENOTES ERROR IN BIDDERS CALCULATION ENGINEER'S ESTIMATE W.B. MILLER, INC. ITEM UNIT TOTAL UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT ■ TKDA ENGINEERS - ARCHITECTS - PLANNERS NORTHWEST ASPHALT INC. UNIT TOTAL PRICE AMOUNT 2008 OVERLAY PROJECT 1 MOBILIZATION 1 LS $ 5,000.00 $ 5,000.00 $ 5,700.00 $ 5,700.00 $ 4,925.00 $ 4,925.00 2 RECLAIM BITUMINOUS 13146 SY $ 0.65 $ 8,544.90 $ 0.40 $ 5,258.40 $ 0.50 $ 6,573.00 3 HAUL OUT EXCESS MILLINGS (LV) 587 CY $ 6.30 $ 3,698.10 $ 5.00 $ 2,935.00 $ 2.00 $ 1,174.00 4 RESHAPE MILLINGS (3% CROWN) 43.8 RS $ 140.00 $ 6,132.00 $ 130.00 $ 5,694.00 $ 100.00 $ 4,380.00 5 BITUMINOUS BASE COURSE 2360 (LVNW 35030) 1675 TN $ 48.00 $ 80,400.00 $ 45.40 $ 76,045.00 $ 45.71 $ 76,564.25 6 BITUMINOUS WEARING COURSE 2360 (LVWE 45030) 1350 TN $ 52.00 $ 70,200.00 $ 51.90 $ 70,065.00 $ 51.49 $ 69,511.50 7 BITUMINOUS MATERIAL FOR TACK COAT 730 GAL $ 1.75 $ 1,277.50 $ 2.00 $ 1,460.00 $ 2.00 $ 1,460.00 8 BITUMINOUS CURBING 500 LF $ 5.00 $ 2,500.00 $ 2.00 $ 1,000.00 $ 1.50 $ 750.00 9 SAWCUT BITUMINOUS DRIVEWAYS 220 LF $ 2.80 $ 616.00 $ 2.00 $ 440.00 $ 1.00 $ 220.00 10 REMOVE BITIMINOUS DRIVEWAY MATERIAL 250 SY $ 5.00 $ 1,250.00 $ 3.00 $ 750.00 $ 2.00 $ 500.00 11 BIT. WEARING COURSE 2360 (LVWE 45030) (FOR DRIVES) 250 SY $ 20.00 $ 5,000.00 $ 14.00 $ 3,500.00 $ 8.12 $ 2,030.00 12 REMOVE AND REPLACE CATCH BASIN (TYPE 402) 3 EA $ 1,800.00 $ 5,400.00 $ 550.00 $ 1,650.00 $ 2,150.00 $ 6,450.00 13 REMOVE AND REPLACE CATCH BASIN (TYPE 406) 3 EA $ 2,000.00 $ 6,000.00 $ 550.00 $ 1,650.00 $ 2,850.00 $ 8,550.00 TOTAL WOODLAND ESTATES 4TH ADDITION $ 196,018.50 $ 176,147.40 $ 183,087.75 Page 1 TABULA • N OF BIDS 2008 OOY PROJECT CITY OF F LINO LAKES, MINNESOTA CITY TKDA PROJECT No. 14043.002 BIDS OPENED: APRIL 17, 2008, AT 10:00 AM *DENOTES ERROR IN BIDDERS CALCULATION NORTH VALLEY, INC. RUM RIVER CONTRACTING ITEM UNIT TOTAL UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT TKDA ENGINEERS - ARCHITECTS • PLANNERS ASTECH CORP. UNIT TOTAL PRICE AMOUNT 2008 OVERLAY PROJECT 1 MOBILIZATION 1 LS $ 3,500.00 $ 3,500.00 $ 7,361.76 = $ 4,000.00 • $ 0.45 $ 4,000.00 $ 5,915.70 • • $ 9,500.00 $ 9,500.00 $ 7,887.60 • • 2 RECLAIM BITUMINOUS 13146 SY $ 0.56 $ 0.60 3 HAUL OUT EXCESS MILLINGS (LV) 587 43.8 CY RS $ 5.25 $ 150.00 $ 3,081.75 $ 6,570.00 • • $ 5.48 $ 100.00 $ 3,216.76 $ 4,380.00 • • $ 7.50 $ 95.00 $ 4,402.50 $ 4,161.00 • • RESHAPE MILLINGS (3% CROWN) BITUMINOUS BASE COURSE 2360 (LVNW 35030) 1675 1350 TN TN $ 47.00 $ 52.00 $ 78,725.00 $ 70,200.00 • • $ 49.04 $ 55.19 $ 82,142.00 $ 74,506.50 • • $ 46.74 $ 55.31 $ 78,289.50 $ 74,668.50 • 6 BITUMINOUS WEARING COURSE 2360 (LVWE 45030) 7 BITUMINOUS MATERIAL FOR TACK COAT 730 GAL $ 2.00 $ 1,460.00 • $ 1.00 $ 730.00 • $ 2.00 $ 1,460.00 • 8 BITUMINOUS CURBING 500 LF $ 3.50 $ 1,750.00 $ 550.00 • • $ 3.81 $ 2.00 $ 1,905.00 $ 440.00 $ 4.50 $ 2.50 $ 2,250.00 $ 550.00 • • 9 SAWCUT BITUMINOUS DRIVEWAYS 220 LF $ 2.50 10 REMOVE BITIMINOUS DRIVEWAY MATERIAL 250 SY $ 3.50 $ 875.00 $ 10.52 $ 2,630.00 • $ 3.00 $ 750.00 • 11 BIT. WEARING COURSE 2360 (LVWE 45030) (FOR DRIVES) 250 SY $ 12.00 $ 3,000.00 $ 14.29 $ 1,560.00 $ 3,572.50, $ 4,680.00 • $ 12.50 $ 1,500.00 $ 3,125.00, • 12 REMOVE AND REPLACE CATCH BASIN (TYPE 402) 3 EA $ 2,250.00 $ 6,750.00 $ 4,500.00 13 REMOVE AND REPLACE CATCH BASIN TYPE 406 3 EA $ 2,935.50 $ 8,806.50 • $ 1,560.00 $ 4,680.00 • $ 1 800.00 $ 5,400.00 • TOTAL WOODLAND ESTATES 4TH ADDITION -C $ 192 630.01 192 $ 196 0 Page 2 TABULAWN OF BIDS 2008 OVERLAY PROJECT CITY OF LINO LAKES, MINNESOTA TKDA PROJECT No. 14043.002 BIDS OPENED: APRIL 17, 2008, AT 10:00 AM *DENOTES ERROR IN BIDDERS CALCULATION ITEM NO. DESCRIPTION VF HARDRIVES, INC. KNIFE RIVER UNIT TOTAL UNIT TOTAL QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT mi. TKDA ENGINEERS • ARCHITECTS • PLANNERS T.A. SCHIFSKY & SONS INC. UNIT TOTAL PRICE AMOUNT 2008 OVERLAY PROJECT 1 MOBILIZATION 1 LS $ 5,000.00 $ 5,000.00 $ 1,111.56 $ 1,111.56 $ 6,580.00 $ 6,580.00 2 RECLAIM BITUMINOUS 13146 SY $ 0.45 $ 5,915.70 $ 0.68 $ 8,939.28 $ 0.50 $ 6,573.00 3 HAUL OUT EXCESS MILLINGS (LV) 587 CY $ 2.50 $ 1,467.50 $ 4.99 $ 2,929.13 $ 6.35 $ 3,727.45 4 RESHAPE MILLINGS (3% CROWN) 43.8 RS $ 80.00 $ 3,504.00 $ 105.11 $ 4,603.82 $ 104.00 $ 4,555.20 5 BITUMINOUS BASE COURSE 2360 (LVNW 35030) 1675 TN $ 49.50 $ 82,912.50 $ 48.48 $ 81,204.00 $ 52.00 $ 87,100.00 6 BITUMINOUS WEARING COURSE 2360 (LVWE 45030) 1350 TN $ 56.50 $ 76,275.00 $ 54.26 $ 73,251.00 $ 52.20 $ 70,470.00 7 BITUMINOUS MATERIAL FOR TACK COAT 730 GAL $ 1.40 $ 1,022.00 $ 1.51 $ 1,102.30 $ 1.80 $ 1,314.00 8 BITUMINOUS CURBING 500 LF $ 4.30 $ 2,150.00 $ 6.40 $ 3,200.00 $ 2.00 $ 1,000.00 9 SAWCUT BITUMINOUS DRIVEWAYS 220 LF $ 3.25 $ 715.00 $ 4.83 $ 1,062.60 $ 1.45 $ 319.00 10 REMOVE BITIMINOUS DRIVEWAY MATERIAL 250 SY $ 3.55 $ 887.50 $ 4.90 $ 1,225.00 $ 3.00 $ 750.00 11 BIT. WEARING COURSE 2360 (LVWE 45030) (FOR DRIVES) 250 SY $ 12.00 $ 3,000.00 $ 28.28 $ 7,070.00 $ 11.05 $ 2,762.50 12 REMOVE AND REPLACE CATCH BASIN (TYPE 402) 3 EA $ 1,775.00 $ 5,325.00 $ 2,150.00 $ 6,450.00 $ 2,400.00 $ 7,200.00 13 REMOVE AND REPLACE CATCH BASIN (TYPE 406) 3 EA $ 3,550.00 $ 10,650.00 $ 2,850.00 $ 8,550.00 $ 2,850.00 $ 8,550.00 TOTAL WOODLAND ESTATES 4TH ADDITION $ 198,824.20 $ 200,698.69 $ 200,901.15 Page 3 "TABULATION OF BIDS 2008 OOY PROJECT CITY OF F LINO LAKES, MINNESOTA CITY TKDA PROJECT No. 14043.002 BIDS OPENED: APRIL 17, 2008, AT 10:00 AM *DENOTES ERROR IN BIDDERS CALCULATION FPI PAVING CONTRACTORS ITEM UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT TKDA ENGINEERS • ARCHITECTS • PLANNERS MIDWEST ASPHALT CORP. UNIT TOTAL PRICE AMOUNT 2008 OVERLAY PROJECT 1 MOBILIZATION 1 LS $ 4,900.00 $ 4,900.00 $ 6,850.00 $ 6,850.00 2 RECLAIM BITUMINOUS 13146 SY $ 0.60 $ 7,887.60 $ 0.32 $ 4,206.72 3 HAUL OUT EXCESS MILLINGS (LV) 587 CY $ 4.00 $ 2,348.00 $ 10.20 $ 5,987.40 4 RESHAPE MILLINGS (3% CROWN) 43.8 RS $ 125.00 $ 5,475.00 $ 122.25 $ 5,354.55 5 BITUMINOUS BASE COURSE 2360 (LVNW 35030) 1675 TN $ 48.00 $ 80,400.00 $ 47.80 $ 80,065.00 6 BITUMINOUS WEARING COURSE 2360 (LVWE 45030) 1350 TN $ 54.00 $ 72,900.00 $ 53.45 $ 72,157.50 7 BITUMINOUS MATERIAL FOR TACK COAT 730 GAL $ 2.25 $ 1,642.50 $ 2.30 $ 1,679.00 8 BITUMINOUS CURBING 500 LF $ 6.00 $ 3,000.00 $ 5.75 $ 2,875.00 9 SAWCUT BITUMINOUS DRIVEWAYS 220 LF $ 3.00 $ 660.00 $ 3.00 $ 660.00 10 REMOVE BITIMINOUS DRIVEWAY MATERIAL 250 SY $ 6.50 $ 1,625.00 $ 2.90 $ 725.00 11 BIT. WEARING COURSE 2360 (LVWE 45030) (FOR DRIVES) 250 SY $ 16.00 $ 4,000.00 $ 19.00 $ 4,750.00 12 REMOVE AND REPLACE CATCH BASIN (TYPE 402) 3 EA $ 2,850.00 $ 8,550.00 $ 2,900.00 $ 8,700.00 13 REMOVE AND REPLACE CATCH BASIN (TYPE 406) 3 EA $ 2,850.00 $ 8,550.00 $ 4,700.00 $ 14,100.00 TOTAL WOODLAND ESTATES 4TH ADDITION $ 201,938.10 $ 208,110.17 Page 4