Loading...
HomeMy WebLinkAbout2008-054 Council ResolutionCouncil Member o'Donnelintroduced the following resolution and moved its adoption: CITY OF LINO LAKES RESOLUTION NO. 08 -54 RESOLUTION APPROVING CHANGE ORDER NO. 13 LAKE DRIVE /I35W IMPROVEMENT PROJECT WHEREAS, pursuant to the resolution of the City Council adopted May 14, 2007, the City awarded the construction contract for the Lake Drive /I -35W Improvement Project to Lunda Construction Company, and WHEREAS, the construction plans did not provide for guardrail to protect the bridge pier between northbound and southbound I -35W; and WHEREAS, Mn /DOT has determined that guardrail needs to be installed to protect eh bridge piers. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. Change Order No.13, in the amount of $22,052.50 is hereby approved. • • —du an e Bartell, it Ierk Adopted by the ino Lakes City Council this 27t" day of May, 2008. The motion for the adoption of the foregoing resolution was duly seconded by Council Member Stoltz and upon vote being taken thereon, the following voted in favor thereof: O'Donnell, Stoltz, Gallup, Reinert, Bergeson The following voted against same: none Whereupon said resolution was declared duly passed and adopted. • • • STAFF ORIGINATOR: CITY COUNCIL MEETING DATE: TOPIC: AGENDA ITEM 6D Michael Grochala May 27, 2008 Resolution No. 08 -54, Approving Change Order No.13, Lake Drive /35W Improvement Project VOTE REQUIRED: 3/5 Vote Required BACKGROUND: On May 14, 2007 the City Council awarded the Lake Drive /I -35W Improvement Project to Lunda Construction Company in the amount of $7,531,701.71. Upon reviewing the guardrail plans for the project it was discovered that there was no guardrail included for protecting the bridge pier between northbound and southbound I- 35W. Mn /DOT has determined that guardrail is needed at this location to protect the bridge pier. The total cost of Change Order No. 13 is $22,052.50. Funding for unanticipated construction expenses was included within the project budget. With the approval of Change Order No. 13 the project budget will still include $383,972 for contingency purposes. RECOMMENDATION: Staff is recommending approval of Resolution No. 08 -54. ATTACHMENTS 1. Resolution No. 08 -54 2. Change Order No. 13 Mn /DOT TP- 2460 - 0112 -92) State of Minnesota - Department of Transportation CHANGE ORDER # 13 contractor: Lunda Construction Co. Address: 15601 Clayton Avenue S. Rosemount, MN 55068 SHEET 1 OF 1 SHEETS State Project No.: 0280 -5 5 Contract No. Z07502 Location: In Lino Lakes on CSAH 23 (Lake Dr.) From 1000 ft. south of Town Center Parkway to Apollo Dr. In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the Work as altered by the following provisions. Upon reviewing the guardrail plans for the project it was discovered that there was no guardrail included for protecting the bridge pier between northbound and southbound I -35W. It was determined that guardrail is needed at this location to protect the bridge pier. This Change Order directs the Contractor to furnish all equipment, materials and labor necessary to install guardrail and bullnose in accordance with the additional plan sheet 81A. By signing this Change Order the Contractor acknowledges receipt of plan sheet 81A. All work will be performed in accordance with the pertinent portions of the Special Provisions, Mn /DOT Standard Specifications, Mn/DOT Standard Plates and as directed by the Engineer. Payment to the Contractor for this work will be at the contract unit prices and negotiated prices as shown below in the Estimate of Cost. Negotiated Items- Group No.1 Item No. Description Traffic Barrier Design Bullnose Contract Items- Group No. 1 Item No. Description Traffic Barrier Design B8338 CHANGE IN CONTRACT TIME Due to this change the Contract Time: a. Is increased ( ) by Is decreased ( ) by Is increased ( ) by Is decreased ( ) by b. Is not changed (X ) Working Days Working Days Calendar Days Calendar Days c. May be revised if the work affected the controlling operation ( ) ESTIMATE OF COST Unit lin ft Unit lin ft Quantity 200 Quantity 450 Unit Price Amount $66.50 $13,300.00 Unit Price Amount $19.45 $8,752.50 TOTAL ESTIMATED INCREASE $22,052.50 Issued By: Project /Resident /County Engineer Date Approved By: City of Lino Lakes Date Approved By: Anoka County Date Accepted By: Contractor's Authorized Representative Date Original to Project Engineer; copies to Contractor, City of Lino Lakes, Anoka County