Loading...
HomeMy WebLinkAbout2011-002 Council Resolution• Council Member Gallup adoption: • introduced the following resolution and moved its CITY OF LINO LAKES RESOLUTION NO. 11 -02 RESOLUTION AUTHORIZING PREPARATION OF PLANS AND SPECIFICATIONS FOR THE 2011 SEALCOAT PROJECT. WHEREAS, it is proposed to perform maintenance activities on several city streets, and WHEREAS, it is proposed to finance the project using the 2011 budget of $202,500.00 allocated for street repair along with Sealcoating Funds. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: The City Engineer is designated as the engineer for this improvement and he is directed to prepare plans and specifications for the 2011 Sealcoat Project and shall be paid by the hour in an amount not to exceed $6,450.00. Adopted by the Lino Lakes City Council this 24th day of January, 2011. The motion for the adoption of the foregoing resolution was duly seconded by Council Member Rafferty and upon vote being taken thereon, the following voted in favor thereof: Gallup, Rafferty, Roeser, O'Donnell, Reinert The following voted against same: none Whereupon said resolution was declared duly passed and adopted. • • • • AGENDA ITEM 6Fi STAFF ORIGINATOR: COUNCIL MEETING DATE: TOPIC: Vote Required: James E. Studenski, City Engineer January 24, 2011 Resolution No. 11 -02 Authorizing Preparation of Plans and Specifications, 2011 Sealcoat Project. Simple Majority BACKGROUND: In accordance with the City's Pavement Management Policy, streets are selected annually for sealcoating. Sealcoating is a maintenance activity that places a thin layer of oil and rock on the street to enhance the surface and prolong the useful life of the street. A nationally accepted asset management software known as CarteGraph was used to analyze the current condition of City streets and recommend segments that met sealcoating requirements. Streets were selected based on pavement management criteria, input from Public Works, and feasibility of locations. This year, approximately 8 miles of streets are estimated to be sealcoated. The City has allocated a budget for the 2011 Sealcoat Project of $202,500.00. The engineering cost to be paid by the hour shall not exceed $6,450.00. The schedule for this project is as follows: City Council Authorizes Plans and Specifications City Council Approves Plans and Specifications City Council Authorizes Ad for Bids Open Bids City Council Awards Contract Construction Begins RECOMMENDATION: January 24, 2011 February 28, 2011 February 28, 2011 March 30, 2011 April 11, 2011 June, 2011 Staff recommends adoption of Resolution Number 11 - 02 Authorizing Preparation of Plans and Specifications, 2011 Sealcoat Project.