Loading...
HomeMy WebLinkAbout2011-035 Council Resolution110 Council Member moved its adoption: Roeser introduced the following resolution and • • CITY OF LINO LAKES COUNTY OF ANOKA RESOLUTION NO. 11 -35 CONSENT TO CONDUCT DRAINAGE PROCEEDINGS FOR ANOKA COUNTY DITCH 10 -22 -32 UNDER THE WATERSHED LAW WHEREAS, Rice Creek Watershed District ( "RCWD ") is the drainage authority for Anoka County Ditch 10 -22 -32 (the "Drainage System "); and WHEREAS, RCWD is proceeding on a petition to repair the Drainage Systems; and WHEREAS, the RCWD Engineer is preparing a repair report recommending a repair option that balances the drainage function of the Drainage Systems with ecological concerns in the watershed; and WHEREAS, Minnesota Statute 103D.621 Subd. 4, grants RCWD the authority to undertake proceedings related to the Drainage Systems in accordance with the Watershed Law (Minnesota Statutes Chapter 103D) rather than the Drainage Code (Minnesota Statutes Chapter103E), subject to concurrence by city councils and town boards where the Drainage Systems are located; and WHEREAS, RCWD has requested concurrence from the City of Lino Lakes to conduct the necessary proceedings related to the Drainage Systems under the Watershed Law and the Drainage Code; and WHEREAS, the purpose of conducting proceedings under the Watershed Law is to provide consistent management of all drainage systems under RCWD management, comprehensive wetland management, and appropriate administration of resource management plans; and WHEREAS, conducting the proceedings under the Watershed Law will facilitate flexibility in financing the recommended repair option. NOW, THEREFORE, BE IT RESOLVED that the City of Lino Lakes City Council, in accordance with Minnesota Statute 103D.621 Subd. 4., the City of Lino consents to the Rice Creek Watershed District's request to conduct proceedings for Anoka County Ditch 10 -22 -32 under Minnesota Statutes Chapter 103D. ATTE T: ne Bartell, City C Adopted by the Lino Lakes City Council thisl4 day ofMarch , 2011. The motion for the adoption of the foregoing resolution was duly seconded by Council Member Rafferty and upon vote being taken thereon, the following voted in favor thereof: Roeser, Rafferty, Gallup, Reinert The following voted against same: none (Absent - O'Donnell) Whereupon said resolution was declared duly passed and adopted. • AGENDA ITEM 6G STAFF ORIGINATOR: Michael Grochala COUNCIL MEETING DATE: March 14, 2011 TOPIC: Resolution No. 11 -35, Consent to Conduct Drainage Proceedings for Anoka County Ditch 10 -22 -32 Under the Watershed Law ACTION REQUIRED: Simple Majority BACKGROUND: Anoka County Ditch (ACD) 10 -22 -32 is located in the NW corner of Lino Lakes with portions of the system and /or contributing area extending into both Blaine and Columbus. The RCWD, the ditch authority for 10- 22 -32, is working on a repair report for the ditch system. The report is part of a systematic effort by the RCWD to inspect, maintain & repair all public drainage systems. Under state law the Rice Creek Watershed District may undertake proceedings related to the drainage system in accordance with the Watershed Law (Minnesota Statute Chapter 103D) rather than the Drainage Code (Minnesota Statutes Chapter 103E) subject to concurrence by the city council where the system is located. This alternative authority was created by the state legislature to simplify the improvement and repair process to more adequately and economically improve and repair drainage systems in the metropolitan area. The RCWD is requesting City consideration of a resolution consenting to their proposal to use its watershed law and metropolitan surface water management authorities to finance the repairs. If they do not get concurrence from each of the City's, they are forced to stay within the antiquated and narrow confines of ditch law. The cities of Blaine and Columbus have previously consented to this approach. Concurrence with the use of alternative authority is not an endorsement of any project. A separate legally established procedure is required for any future project. The Environmental Board reviewed the request in June of 2010 and recommended approval. The RCWD previously provided an overview of the ditch system and this request to the city council in June of 2010. No action was taken by the council. The City Council reviewed the request with the Watershed District at the February 7 and March 7, 2011 work sessions. Following discussion the council directed staff to place the item on the March 14, 2011 agenda for consideration. RECOMMENDATION: Staff is recommending adoption of Resolution Number 11 -35. ATTACHMENTS 1. Resolution 11 -35 2. 10 -22 -32 Ditch System • • • Project Location Map 3 T32N -R23W 'of 0./ , T31N -Fjr3W "�'L VI Water Control Structure 3 Water Control Structure 2 12 13 Water Control Structure 1 Lower Culvert 1- ti O t b e by Re iu D'3-14 v k. es-s)o,(1 29 ev_-YU rm Lower Culvert 32 T32N -R22W T31 N -R22W 0, x ST 5 +ee T31N -R23W tN tN C.1 Z as Br. 2 ceae tieha ueu '14^ Erosion Area Repairs Br. la Br.1 / W.e.i c George, Ylatch;Lifie al al Sources: TLG, WWI, MNDNR 0 0.125 0.25 0.5 Miles f* Remove Beaver Dams ® Eliminate Field Xing (By Owner) * Jodrell St Culvert • Replace/Modify Culvert --►- Flow Direction Repair Public Ditch to Functional Profile Current Private System Maintain Public Ditch RCWD Boundary (2010) DHydrologic Boundary r"7:, ± Section Lines Township/Range ® Install Water Control Sevcture Rice Creek Watershed District ACD 10-22-32 Addendum to the Repair Report Figure A-1 ACD 10-22 -32 Revised Engineer's Recommended Allemettoe 501b: I Drown try: 'Chinked by A6 SHOWN t $MW 111(;:i Houston. Inc Pr*IM No.: 1 Dee: j6boot 5514060.10 129/2011 1 of 1 Maple Glrs:? P: 1 763.493.4522 F 1769.493.5577