HomeMy WebLinkAbout2011-038 Council ResolutionRafferty Council Member introduced the following resolution and moved its adoption: CITY OF LINO LAKES RESOLUTION NO. 11 -38 RESOLUTION ACCEPTING CORRIDOR STUDY REPORT CSAH 34 (BIRCH STREET) CORRIDOR STUDY WHEREAS, Anoka County and the City of Lino Lakes have long exhibited concern for the safety of the corridor along CSAH 34 (Birch Street) from CSAH 49 to CR 54, in the City of Lino Lakes; and WHEREAS, the County and the City entered into a Joint Powers Agreement to conduct a study of the corridor and develop recommendations for the improvement of the corridor; and WHEREAS, SRF Consulting Group Inc. has completed said study. NOW, THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. that the City Council hereby accepts the CSAH 34 (Birch Street) report, dated March 2011. --dull e Bartell, C ty C erk Ili■ • Jeff R '-. or Adopted by the Lino Lakes City Council this 28th day of May, 2011. The motion for the adoption of the foregoing resolution was duly seconded by Council MemberRoeser and upon vote being taken thereon, the following voted in favor thereof: Rafferty, Roeser, O'Donnell, Reinert The following voted against same: None (Absent - Gallup) Whereupon said resolution was declared duly passed and adopted. • • • EXECUTIVE SUMMARY CSAH 34 CORRIDOR STUDY NEEDS, RECOMMENDATIONS, AND IMPLEMENTATION STRATEGIES A. Public Input There were many opportunities for public participation throughout the study process. This input was recorded, shared with the Technical Advisory Committee (TAC), and incorporated into the corridor improvement plan. The following list is a summary of the key public input received early in the study process: Consensus on Needs • CSAH 34 is experiencing high levels of congestion during the peak periods. • It can be difficult to access CSAH 34 from intersecting roadways (Ware Road, West Shadow Lake Drive, CSAH 21, etc.). • Vehicular safety is an important concern and there is a need for short-term improvements (e.g., left turn lanes, traffic signals, bypass lanes). • Pedestrian and bicycle safety is a concern; many residents feel that there should be more pedestrian trails along and safe crossings of CSAH 34. • There is support for minimizing impacts to natural resources within the corridor. B. Recommended Corridor Improvements and Implementation Strategies Four roadway and trail alternatives were prepared and evaluated during the course of the corridor study. These alternatives were developed to accommodate projected future traffic volumes in order to ensure mobility, improve safety, and coordinate improvements with development. The recommended improvements address the needs and issues identified during the planning process (see Figure 1 for plan recommendations). Stakeholder in general, supported most of the TAC's corridor improvement recommendations, including the following: • Traffic signals should be constructed at Ware Road and West Shadow Lake Drive when warranted. It is anticipated that future signals will also be needed at Black Duck Drive, CSAH 21 and CSAH 54. • Raised medians are appropriate at signalized locations with turn lanes. • Turn lanes should be provided at major intersections to separate through and turning traffic (painted or channelized, as appropriate). • Modification or elimination of access should be considered as opportunities arise. • The county's access and intersection spacing guidelines should be used in new development areas and as property redevelops. • Frontage and backage roads should be constructed as development occurs to support local traffic and to manage access onto CSAH 34. • A four -lane roadway on CSAH 34 between CSAH 49 and Black Duck Drive is needed to accommodate both existing and future traffic volumes. A two -lane roadway between • • • Black Duck Drive and CSAH 54 will serve both existing and future traffic volumes if access is managed according to county guidelines. • A two -lane divided roadway (with raised medians) from CSAH 21 to CSAH 54 is recommended, since the undeveloped nature of the area provides an opportunity to incorporate county access spacing into future development. • Trail system improvements on both sides of the CSAH 34 corridor are recommended along with crossings of CSAH 34 at signalized intersections. • Limited landscaping/streetscaping may be appropriate in select locations along the corridor. It should be noted that the Lino Lakes City Council expressed concern and a lack of support for a four -lane divided roadway, due to potential property impacts. However, raised medians were considered appropriate at some locations, such as signalized intersections. Based on current and forecasted corridor conditions, it is recommended that any major reconstruction of the CSAH 34 corridor consider raised medians in its design, if it is to achieve maximum safety and mobility benefits. However, a decision on the implementation of raised medians will be deferred by the county and city until the impact of other improvements are understood and actual future needs (traffic and/or land use development) are more defined. The recommended corridor improvements for CSAH 34 were developed based on projected future (2030) conditions and it is likely that improvements will be implemented as safety and operational needs dictate, and as funding becomes available. Therefore, the corridor recommendations are framed as conceptual improvements that can be implemented over time, as opportunities arise, and/or conditions along the corridor require. As noted on Table 1, some of the proposed improvements have clear thresholds as to when they should be implemented (e.g., traffic signals) and some are more subjective (e.g., bicycle /pedestrian and/or streetscape). Implementation of improvements without clear thresholds to trigger the project will be based on apparent need, as mutually agreed upon between the county and the city. • Table 1: Implementation of Corridor Improvement Projects • • DESCRIPTION LOCATION TRIGGER ESTIMATED COST Traffic Signal Improvements (Includes new and revised signals) CSAH 34 Intersections with: • CSAH 49 • Ware Road • West Shadow Lake Drive • Black Duck Drive • CSAH 21 • CSAH 54 - Development - Traffic /safety issues - Minnesota Mannaul on Uniform Traffic Control Devices (MMUTCD) Warrants - Availability of Funding $250,000 to $1.0 million per intersection Posted Speed Limit Modifications Western Segment of Corridor (West of Black Duck Drive) - Mn/DOT sets speeds limits on state and local roadways. - Monitor speeds and request a Mn/DOT speed study when the difference between posted and the 85th percentile speeds approach 10 mph. Minimal cost for roadway section Capacity Improvements: Additional Lanes (Through Lanes) Western Segment of Corridor (West of Black Duck Drive) - Consider additional lane in each direction along CSAH 34 when traffic volumes reach 10 to 12,000 vehicles per day. $5.0 million per mile Turn Lanes (Left and Right) Improvements Major Intersections along Corridor as Development Occurs - Traffic volumes - Safety /crash experience - Sight distance $100,000 to $500,000 per turn lane Access Management Strategies Entire Corridor - Development/redevelopment - Safety /crash experience - Congestion Varies dependent on Access Management Strategy Safety Improvement Strategies • Traffic Signal Improvements • Turn Lane Improvements • Improved Roadway Delineation CSAH 34 Intersections with: • CSAH 49 • Ware Road • S -Curve (Deerwood Ln - E. Shadow Lk. Court) - Safety/crash experience See costs above for traffic signal and turn lane improvements. Minimal cost for roadway delineation Y Bicycle/Pedestrian Trail Improvements Entire Corridor - Development - In conjunction with other planned roadway or trail improvements - Availability of funding $160,000 per mile for trail, $185,000 to $1.0 million for pedestrian underpass Streetscape Improvements Entire Corridor (with emphasis areas at Ware Road and CSAH 21) - In conjunction with other planned roadway or trail improvements - Availability of funding Varies depending on level of streetscape desired • • STAFF ORIGINATOR: CITY COUNCIL MEETING DATE: TOPIC: AGENDA ITEM 6C Michael Grochala March 28, 2011 Consideration of Resolution No. 11 -38 Accepting Corridor Study Report and Recommendations, CSAH 34 (Birch Street) Corridor Study ACTION REQUIRED: Simple Majority BACKGROUND The 2008 -2009 Council Goals, Objectives and Management Action Plan included the objective to "Initiate an Access Management Plan for Birch Street (CSAH 34) that includes provisions for pedestrian and bicycle safety improvements ". Additionally, the city received a petition in early 2008 requesting improvements to the Ware Road and Birch Street intersection. In response the City Council approved Resolution No. 08 -34, directing staff to work with Anoka County on a corridor study and incorporate the Ware /Birch intersection. In April of 2009 the council passed Resolution No. 09 -21 entering into a Joint Powers Agreement with Anoka County to prepare a Corridor Study for Birch Street. In April of 2010 the council discussed the draft report and expressed concerns regarding the ultimate plan which proposed a four lane divided (raised median) roadway. The council noted that short term improvements that balanced safety with convenience would be more appropriate. Over the past year city staff has worked with Anoka County and SRF Consulting Group to incorporate the City Council's comments into the final draft report. The project team has worked to develop a staged approach to improvements that can be implemented as conditions warrant. A decision on the implementation of raised medians will be deferred by the county and city until the impact of other improvements are understood and actual future needs are more defined. A copy of the executive summary is attached which includes a table identifying proposed improvements, triggers and estimated costs. The draft report recommendations were reviewed by the council on March 7, 2011. RECOMMENDATION Staff is recommending approval of Resolution No. 11 -38 • ATTACHMENTS • • 1. Resolution No. 11 -38 2. CSAH 34 Corridor Study Executive Summary 2