Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2011-041 Council Resolution
• Council MemberRafferty introduced the following resolution and moved its 111 adoption: CITY OF LINO LAKES RESOLUTION NO. 11 -41 RESOLUTION ACCEPTING BIDS AND AWARDING A CONSTRUCTION CONTRACT, 2011 STREET OVERLAY PROJECT WHEREAS, pursuant to an advertisement for bids for the construction of 2011 Street Overlay Project, bids were received, opened and tabulated according to law, and the following bids were received complying with the advertisement: Contractor Amount of Bid North Valley, Inc. Rum River Contracting GMH Asphalt Corp. Knife River Corp. Midwest Asphalt, Inc Omann Brothers Paving Hardrives Inc. Northwest Asphalt T.A. Schifsky & Sons, Inc. $ 298,100.50 $ 310,783.50 $ 312,871.50 $ 313,193.40 $ 318,465.00 $ 319,979.50 $ 325,479.58 $ 354,243.00 $ 383,150.30 Engineer's Estimate $ 318,930.00 AND WHEREAS, it appears that North Valley, Inc is the lowest responsible bidder; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. The Mayor and Clerk are hereby authorized and directed to enter into a contract with North Valley, Inc., in the name of the City of Lino Lakes for the construction of the 2011 Street Overlay Project according to the plans and specifications approved by the City Council and on file in the office of the City Clerk. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the Bid Bonds made with their bids, except that the deposits of the successful bidder and the next two • • lowest bidders shall be retained until a contract has been signed. Juli. e Bartell, City Cler Adopted by the Lino Lakes City Council this 1 lth day of April, 2011. The motion for the adoption of the foregoing resolution was duly seconded by Council Member Gallup and upon vote being taken thereon, the following voted in favor thereof: Rafferty, Gallup, O'Donnell, Roeser, Reinert The following voted against same: none Whereupon said resolution was declared duly passed and adopted. Jeff Reine , Mayor • • • AGENDA ITEM 6Bi STAFF ORIGINATOR: James E. Studenski, City Engineer COUNCIL MEETING DATE: April 11, 2011 TOPIC: Resolution No. 11 -41, Accepting Bids and Awarding a Construction Contract, 2011 Street Overlay Project Vote Required: Simple Majority BACKGROUND: Sealed bids were received and publicly opened at 11:30 a.m. on March 30, 2011. The results of the bid opening are presented below. City Council action is required to award a construction contract to the lowest responsible bidder. Contractor North Valley, Inc. Rum River Contracting GMH Asphalt Corp. Knife River Corp. Midwest Asphalt Corp Omann Brothers Paving Hardrives Inc. Northwest Asphalt, Inc T.A. Schifsky & Sons, Inc. Amount of Bid $ 298,100.50 $ 310,783.50 $ 312,871.50 $ 313,193.40 $ 318,465.00 $ 319,979.50 $ 325,479.58 $ 354,243.00 $ 383,150.30 Engineer's Estimate $ 318,930.00 The low bids are competitive bids for this project. A copy of the complete bid tabulation is attached. The final completion date for this project is July 31, 2011. RECOMMENDATION: Staff recommends that Resolution No. 11-41 Accepting Bids and Awarding a Construction Contract for the 2011 Street Overlay Project be adopted. • • TABULATION OF BIDS 2011 OVERLAY PROJECT CITY OF LINO LAKES, MINNESOTA TKDA PROJECT NO. 14817.002 BIDS OPENED: MARCH 30, 2011, AT 11:30 AM TEM NO. DESCRIPTION ENGINEER'S ESTIMATE UNIT TOTAL QUANTITY UNIT PRICE AMOUNT NORTH VALLEY UNIT TOTAL PRICE AMOUNT TKDA ENai;MER NG - AHCN,ECVne • r..ANNIN( Tailed Um The fled pmpe Sa right ueery.gs RUM RIVER CONTRACTING GMH ASPHALT CORP UNIT TOTAL UNIT TOTAL PRICE AMOUNT PRICE AMOUNT GENERAL MOBILIZATION 1 LS $ 5,500.00 $ 5,500.00 $ 6,600.00 $ 6,600.00 $ 10,000.00 $ 10,000.00 $ 9,500.00 $ 9,500.00 2 TRAFFIC CONTROL 1 LS $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 900.00 $ 900.00 3 TOPSOIL BORROW WITH SEED 180 CY 15.00 $ 2,700.00 $ 5.00 $ 900.00 $ 15.80 $ 2,844.00 $ 18.00 $ 3,240.00 4 SODDING 100 SY 4.00 $ 400.00 $ 4.10 $ 410.00 $ 4.20 $ 420.00 $ 4.20 $ 420.00 5 EROSION CONTROL BLANKET CATEGORY 3 WITH SEED 600 SY 3.00 $ 1,800.00 $ 1.30 $ 780.00 $ 1.80 $ 1,080.00 $ 2.60 $ 1,560.00 6 SILT FENCE 200 LF 3.00 $ 600.00 $ 2.58 $ 516.00 $ 1.80 $ 360.00 $ 2.65 $ 530.00 7 BIODEGRADEABLE FIBER EROSION CONTROL ROLLS 100 LF 4.00 $ 400.00 $ 3.75 $ 375.00 $ 3.00 $ 300.00 $ 3.90 $ 390.00 STORM SEWER AND WATER QUALITY 8 REMOVE 15" CMP CULVERT 100 LF 10.00 $ 1,000.00 $ 7.25 $ 725.00 $ 6.00 $ 600.00 $ 2.10 $ 210.00 9 REMOVE 30" RCP CULVERT 60 LF $ 15.00 $ 900.00 $ 10.30 $ 618.00 $ 6.00 $ 360.00 $ 4.75 $ 285.00 10 REMOVE AND DISPOSE OF CATCH BASIN 2 EA $ 600.00 $ 1,200.00 $ 206.00 $ 412.00 $ 200.00 $ 400.00 $ 265.00 $ 530.00 11 INSTALL 15" RCP STORM SEWER 100 LF $ 40.00 $ 4,000.00 $ 30.00 $ 3,000.00 $ 29.00 $ 2,900.00 $ 37.10 $ 3,710.00 12 INSTALL 15" RCP FES 4 EA $ 600.00 $ 2,400.00 $ 570.00 $ 2,280.00 $ 635.00 $ 2,540.00 $ 610.00 $ 2,440.00 13 INSTALL 30" RCP STORM SEWER 60 LF $ 55.00 $ 3,300.00 $ 59.00 $ 3,540.00 $ 59.00 $ 3,540.00 $ 84.80 $ 5,088.00 14 INSTALL 30" RCP FES 2 EA $ 1,000.00 $ 2,000.00 $ 775.00 $ 1,550.00 $ 1,338.00 $ 2,676.00 $ 710.00 $ 1,420.00 15 CONSTRUCT 4' CURB CUT 4 EA $ 200.00 $ 800.00 $ 250.00 $ 1,000.00 $ 100.00 $ 400.00 $ 93.50 $ 374.00 16 CONSTRUCT INFILTRATION DITCH WITH NATIVE SEEDING 250 LF $ 20.00 $ 5,000.00 $ 11.00 $ 2,750.00 $ 24.00 $ 6,000.00 $ 8.00 $ 2,000.00 17 REHABILITATE CATCH BASINS 13 EA $ 700.00 $ 9,100.00 $ 335.00 $ 4,355.00 $ 200.00 $ 2,600.00 $ 425.00 $ 5,525.00 STREET 18 ADJUST GATE VALVE 1 EA $ 215.00 $ 215.00 $ 206.00 $ 206.00 $ 185.00 $ 185.00 $ 210.00 $ 210.00 19 ADJUST MANHOLE 1 EA $ 315.00 $ 315.00 $ 375.00 $ 375.00 $ 390.00 $ 390.00 $ 385.00 $ 385.00 20 RECLAIM BITUMINOUS 19,700 SY 0.70 $ 13,790.00 $ 0.69 $ 13,593.00 $ 0.97 $ 19,109.00 $ 0.62 $ 12,214.00 21 HAUL OUT EXCESS MILLINGS (LV) 1,000 22 RESHAPE MILLINGS (3% CROWN) 58 CY RS 5.00 $ 150.00 $ 5,000.00 $ 8,700.00 $ 6.95 $ 160.00 $ 6,950.00 $ 9,280.00 $ 4.00 $ 140.00 $ 4,000.00 $ 8,120.00 $ 3.95 $ 3,950.00 $ 129.00 $ 7,482.00 23 SAW CUT BITUMINOUS 300 LF 2.50 $ 750.00 $ 2.50 $ 750.00 $ 2.00 $ 600.00 $ 2.00 $ 600.00 24 SAWCUT CONCRETE 75 LF 4.00 $ 300.00 $ 4.50 $ 337.50 $ 2.00 $ 150.00 $ 4.00 $ 300.00 25 REMOVE BITUMINOUS DRVEWAY PAVEMENT 180 SY 4.00 720.00 $ 4.85 $ 873.00 $ 2.10 $ 378.00 $ 4.60 $ 828.00 26 REMOVE CONCRETE DRIVEWAY PAVEMENT 120 SY 5.00 600.00 $ 8.00 $ 960.00 $ 2.10 $ 252.00 $ 9.70 $ 1,164.00 27 SUBGRADE EXCAVATION 230 CY 14.00 $ 3,220.00 $ 11.00 $ 2,530.00 $ 6.90 $ 1,587.00 $ 13.85 $ 3,185.50 28 SELECT GRANDULAR BORROW 230 CY 12.00 $ 2,760.00 $ 15.00 $ 3,450.00 $ 10.00 $ 2,300.00 $ 5.40 $ 1,242.00 29 GEOTEXTILE STABILIZATION FABRIC 500 SY 3.00 $ 1,500.00 $ 2.00 $ 1,000.00 $ 1.25 $ 625.00 $ 1.15 $ 575.00 30 AGGREGATE BASE FOR DRIVEWAYS 90 TN 18.00 $ 1,620.00 $ 16.50 $ 1,485.00 $ 15.00 $ 1,350.00 $ 11.20 $ 1,008.00 31 BITUMINOUS BASE CORSE 2360 (LVNW 35030) 2,330 TN 53.00 $ 123,490.00 $ 48.85 $ 113,820.50 $ 51.25 $ 119,412.50 $ 51.70 $ 120,461.00 32 BITUMINOUS MATERIAL FOR TACK COAT 990 GAL 3.00 $ 2,970.00 $ 3.50 $ 3,465.00 $ 2.50 $ 2,475.00 $ 3.35 $ 3,316.50 33 BITUMINOUS WEARING COURSE 2360 (LVWE 45030) 1,760 TN 58.00 $ 102,080.00 $ 55.85 $ 98,296.00 $ 57.25 $ 100,760.00 $ 60.00 $ 105,600.00 34 BITUMINOUS CURBING 450 LF 5.00 $ 2,250.00 $ 3.50 $ 1,575.00 $ 3.00 $ 1,350.00 $ 6.20 $ 2,790.00 35 BITUMINOUS DRIVEWAY PAVEMENT 180 SY 15.00 $ 2,700.00 $ 16.50 $ 2,970.00 $ 21.00 $ 3,780.00 $ 18.00 $ 3,240.00 36 6" CONCRETE DRIVEWAY PAVEMENT 110 SY 35.00 $ 3,850.00 $ 48.85 $ 5,373.50 $ 54.00 $ 5,940.00 $ 56.35 $ 6,198.50 TOTAL BASE BID $ 318,930.00 $ 298,100.50 $ 310,783.50 $ 312,871.50 Page 1 • - TABULATION OF BIDS 2011 OVERLAY PROJECT CITY OF LINO LAKES, MINNESOTA TKDA PROJECT NO. 14817.002 BIDS OPENED: MARCH 30, 2011, AT 11:30 AM KNIFE RIVER CORP -NORTH MIDWEST ASPHALT CORP OMANN BROTHERS PAVING HARDRIVES, INC CENTRAL TEM UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT GENERAL 1 MOBILIZATION 1 LS $ 23,000.00 $ 23,000.00 $ 18,000.00 $ 18,000.00 $ 5,000.00 $ 5,000.00 $ 10,958.06 $ 10,958.06 2 TRAFFIC CONTROL 1 LS $ 3,000.00 $ 3,000.00 $ 1,000.00 $ 1,000.00 $ 1,533.00 $ 1,533.00 $ 914.61 $ 914.61 3 TOPSOIL BORROW WITH SEED 180 CY $ 18.00 $ 3,240.00 $ 15.00 $ 2,700.00 $ 27.59 $ 4,966.20 $ 23.58 $ 4,244.40 4 SODDING 100 SY $ 3.95 $ 395.00 $ 8.00 $ 800.00 $ 13.29 $ 1,329.00 $ 4.52 $ 452.00 5 EROSION CONTROL BLANKET CATEGORY 3 WITH SEED 600 SY $ 2.45 $ 1,470.00 $ 4.00 $ 2,400.00 $ 1.64 $ 984.00 $ 1.94 $ 1,164.00 6 SILT FENCE 200 LF $ 2.50 $ 500.00 $ 2.00 $ 400.00 $ 3.58 $ 716.00 $ 1.94 $ 388.00 7 BIODEGRADEABLE FIBER EROSION CONTROL ROLLS 100 LF $ 3.65 $ 365.00 $ 3.00 $ 300.00 $ 1.64 $ 164.00 $ 3.44 $ 344.00 STORM SEWER AND WATER QUALITY 8 REMOVE 15" CMP CULVERT 100 LF $ 5.00 $ 500.00 $ 2.00 $ 200.00 $ 7.15 $ 715.00 $ 4.30 $ 430.00 9 REMOVE 30" RCP CULVERT 60 LF $ 5.00 $ 300.00 $ 5.00 $ 300.00 $ 10.22 $ 613.20 $ 7.53 $ 451.80 10 REMOVE AND DISPOSE OF CATCH BASIN 2 EA $ 400.00 $ 800.00 $ 275.00 $ 550.00 $ 204.40 $ 408.80 $ 161.40 $ 322.80 11 INSTALL 15" RCP STORM SEWER 100 LF $ 40.00 $ 4,000.00 $ 38.00 $ 3,800.00 $ 29.64 $ 2,964.00 $ 41.96 $ 4,196.00 12 INSTALL 15" RCP FES 4 EA $ 400.00 $ 1,600.00 $ 615.00 $ 2,460.00 $ 562.10 $ 2,248.40 $ 540.16 $ 2,160.64 13 INSTALL 30" RCP STORM SEWER 60 LF $ 70.00 $ 4,200.00 $ 85.00 $ 5,100.00 $ 58.25 $ 3,495.00 $ 75.32 $ 4,519.20 14 INSTALL 30" RCP FES 2 EA $ 700.00 $ 1,400.00 $ 715.00 $ 1,430.00 $ 766.50 $ 1,533.00 $ 1,162.10 $ 2,324.20 15 CONSTRUCT4' CURB CUT 4 EA $ 100.00 $ 400.00 $ 400.00 $ 1,600.00 $ 332.15 $ 1,328.60 $ 101.01 $ 404.04 16 CONSTRUCT INFILTRATION DITCH WITH NATIVE SEEDING 250 LF $ 15.00 $ 3,750.00 $ 10.00 $ 2,500.00 $ 16.35 $ 4,087.50 $ 13.08 $ 3,270.00 17 REHABILITATE CATCH BASINS 13 EA $ 500.00 $ 6,500.00 $ 430.00 $ 5,590.00 $ 332.15 $ 4,317.95 $ 591.81 $ 7,693.53 STREET 18 ADJUST GATE VALVE 1 EA $ 150.00 $ 150.00 $ 185.00 $ 185.00 $ 75.00 $ 75.00 $ 161.40 $ 161.40 19 ADJUST MANHOLE 1 EA $ 230.00 $ 230.00 $ 550.00 $ 550.00 $ 225.00 $ 225.00 $ 247.48 $ 247.48 20 RECLAIM BITUMINOUS 19,700 SY $ 0.47 $ 9,259.00 $ 0.50 $ 9,850.00 $ 0.97 $ 19,109.00 $ 0.93 $ 18,321.00 21 HAUL OUT EXCESS MILLINGS (LV) 1,000 CY $ 11.50 $ 11,500.00 $ 1.30 $ 1,300.00 $ 4.00 $ 4,000.00 $ 6.50 $ 6,500.00 22 RESHAPE MILLINGS (3% CROWN) 58 RS $ 160.00 $ 9,280.00 $ 225.00 $ 13,050.00 $ 120.00 $ 6,960.00 $ 89.54 $ 5,193.32 23 SAW CUT BITUMINOUS 300 LF $ 4.00 $ 1,200.00 $ 3.00 $ 900.00 $ 1.75 $ 525.00 $ 4.30 $ 1,290.00 24 SAWCUT CONCRETE 75 LF $ 5.00 $ 375.00 $ 4.00 $ 300.00 $ 1.75 $ 131.25 $ 5.38 $ 403.50 25 REMOVE BITUMINOUS DRVEWAY PAVEMENT 180 SY $ 4.00 $ 720.00 $ 3.00 $ 540.00 $ 2.20 $ 396.00 $ 4.30 $ 774.00 26 REMOVE CONCRETE DRIVEWAY PAVEMENT 120 SY $ 4.00 $ 480.00 $ 6.00 $ 720.00 $ 2.20 $ 264.00 $ 4.30 $ 516.00 27 SUBGRADE EXCAVATION 230 CY $ 8.00 $ 1,840.00 $ 18.00 $ 4,140.00 $ 8.84 $ 2,033.20 $ 8.61 $ 1,980.30 28 SELECT GRANDULAR BORROW 230 CY $ 12.00 $ 2,760.00 $ 8.00 $ 1,840.00 $ 2.00 $ 460.00 $ 12.91 $ 2,969.30 29 GEOTEXTILE STABILIZATION FABRIC 500 SY $ 1.50 $ 750.00 $ 1.00 $ 500.00 $ 1.65 $ 825.00 $ 1.61 $ 805.00 30 AGGREGATE BASE FOR DRIVEWAYS 90 TN $ 12.00 $ 1,080.00 $ 23.00 $ 2,070.00 $ 21.25 $ 1,912.50 $ 19.37 $ 1,743.30 31 BITUMINOUS BASE CORSE 2360 (LVNW 35030) 2,330 TN $ 49.75 $ 115,917.50 $ 51.00 $ 118,830.00 $ 56.82 $ 132,390.60 $ 51.00 $ 118,830.00 32 BITUMINOUS MATERIAL FOR TACK COAT 990 GAL $ 0.01 $ 9.90 $ 3.00 $ 2,970.00 $ 1.50 $ 1,485.00 $ 2.25 $ 2,227.50 33 BITUMINOUS WEARING COURSE 2360 (LVWE 45030) 1,760 TN $ 52.20 $ 91,872.00 $ 57.00 $ 100,320.00 $ 59.98 $ 105,564.80 $ 59.00 $ 103,840.00 34 BITUMINOUS CURBING 450 LF $ 4.00 $ 1,800.00 $ 4.00 $ 1,800.00 $ 0.01 $ 4.50 $ 5.36 $ 2,412.00 35 BITUMINOUS DRIVEWAY PAVEMENT 180 SY $ 20.00 $ 3,600.00 $ 19.00 $ 3,420.00 $ 19.00 $ 3,420.00 $ 41.31 $ 7,435.80 36 6" CONCRETE DRIVEWAY PAVEMENT 110 SY $ 45.00 $ 4,950.00 $ 55.00 $ 6,050.00 $ 34.50 $ 3,795.00 $ 50.84 $ 5,592.40 - TOTAL BASE BID $ 313,193.40 $ 318,465.00 $ 319,979.50 $ 325,479.58 Page 2 TABULATION OF BIDS 2011 OVERLAY PROJECT CITY OF LINO LAKES, MINNESOTA TKDA PROJECT NO. 14817.002 BIDS OPENED: MARCH 30, 2011, AT 11:30 AM NORTHWEST ASPHALT, INC T.A.SCHIFSKY & SONS ITEM UNIT TOTAL UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT GENERAL 1 MOBILIZATION 1 LS $ 6,800.00 $ 6,800.00 $ 15,000.00 $ 15,000.00 2 TRAFFIC CONTROL 1 LS $ 1,200.00 $ 1,200.00 $ 3,605.00 $ 3,605.00 3 TOPSOIL BORROW WITH SEED 180 CY $ 30.00 $ 5,400.00 $ 10.30 $ 1,854.00 4 SODDING 100 SY $ 4.25 $ 425.00 $ 4.38 $ 438.00 5 EROSION CONTROL BLANKET CATEGORY 3 WITH SEED 600 SY $ 2.00 $ 1,200.00 $ 2.58 $ 1,548.00 6 SILT FENCE 200 LF $ 2.75 $ 550.00 $ 3.09 $ 618.00 7 BIODEGRADEABLE FIBER EROSION CONTROL ROLLS 100 LF $ 3.25 $ 325.00 $ 3.76 $ 376.00 STORM SEWER AND WATER QUAUTY 8 REMOVE 15" CMP CULVERT 100 LF $ 5.00 $ 500.00 $ 10.30 $ 1,030.00 9 REMOVE 30" RCP CULVERT 60 LF $ 15.00 $ 900.00 $ 20.60 $ 1,236.00 10 REMOVE AND DISPOSE OF CATCH BASIN 2 EA $ 400.00 $ 800.00 $ 669.50 $ 1,339.00 11 INSTALL 15" RCP STORM SEWER 100 LF $ 32.00 $ 3,200.00 $ 36.05 $ 3,605.00 12 INSTALL 15" RCP FES 4 EA $ 840.00 $ 3,360.00 $ 927.00 $ 3,708.00 13 INSTALL 30" RCP STORM SEWER 60 LF $ 56.00 $ 3,360.00 $ 113.30 $ 6,798.00 14 INSTALL 30" RCP FES 2 EA $ 1,600.00 $ 3,200.00 $ 1,442.00 $ 2,884.00 15 CONSTRUCT 4' CURB CUT 4 EA $ 500.00 $ 2,000.00 $ 257.50 $ 1,030.00 16 CONSTRUCT INFILTRATION DITCH WITH NATIVE SEEDING 250 LF $ 14.50 $ 3,625.00 $ 22.66 $ 5,665.00 17 REHABILITATE CATCH BASINS 13 EA $ 2,000.00 $ 26,000.00 $ 566.50 $ 7,364.50 STREET 18 ADJUST GATE VALVE 1 EA $ 150.00 $ 150.00 $ 293.55 $ 293.55 19 ADJUST MANHOLE 1 EA $ 380.00 $ 380.00 $ 293.55 $ 293.55 20 RECLAIM BITUMINOUS 19,700 SY $ 0.64 $ 12,608.00 $ 1.29 $ 25,413.00 21 HAUL OUT EXCESS MILLINGS (LV) 1,000 CY $ 10.65 $ 10,650.00 $ 8.24 $ 8,240.00 22 RESHAPE MILLINGS (3% CROWN) 58 RS $ 150.00 $ 8,700.00 $ 149.35 $ 8,662.30 23 SAW CUT BITUMINOUS 300 LF $ 2.00 $ 600.00 $ 1.55 $ 465.00 24 SAWCUT CONCRETE 75 LF $ 5.00 $ 375.00 $ 2.58 $ 193.50 25 REMOVE BITUMINOUS DRVEWAY PAVEMENT 180 SY $ 3.00 $ 540.00 $ 5.15 $ 927.00 26 REMOVE CONCRETE DRIVEWAY PAVEMENT 120 SY $ 5.00 $ 600.00 $ 5.15 $ 618.00 27 SUBGRADE EXCAVATION 230 CY $ 12.50 $ 2,875.00 $ 9.79 $ 2,251.70 28 SELECT GRANDULAR BORROW 230 CY $ 17.50 $ 4,025.00 $ 9.27 $ 2,132.10 29 GEOTEXTILE STABILIZATION FABRIC 500 SY $ 2.00 $ 1,000.00 $ 4.64 $ 2,320.00 30 AGGREGATE BASE FOR DRIVEWAYS 90 TN $ 18.00 $ 1,620.00 $ 15.45 $ 1,390.50 31 BITUMINOUS BASE CORSE 2360 (LVNW 35030) 2,330 TN $ 52.45 $ 122,208.50 $ 62.83 $ 146,393.90 32 BITUMINOUS MATERIAL FOR TACK COAT 990 GAL $ 3.75 $ 3,712.50 $ 2.58 $ 2,554.20 33 BITUMINOUS WEARING COURSE 2360 (LVWE 45030) 1,760 TN $ 60.90 $ 107,184.00 $ 62.83 $ 110,580.80 34 BITUMINOUS CURBING 450 LF $ 9.00 $ 4,050.00 $ 7.00 $ 3,150.00 35 BITUMINOUS DRIVEWAY PAVEMENT 180 SY $ 22.00 $ 3,960.00 $ 18.54 $ 3,337.20 36 6" CONCRETE DRIVEWAY PAVEMENT 110 SY $ 56.00 $ 6,160.00 $ 53.05 $ 5,835.50 TOTAL BASE BID $ 354243.00 $ 383,150.30 Page 3