HomeMy WebLinkAbout2011-050 Council Resolution• • Council Member Rafferty introduced the following resolution and moved its adoption: CITY OF LINO LAKES RESOLUTION NO. 11 -50 RESOLUTION ACCEPTING QUOTES AND AWARDING A CONTRACT FOR THE OLD OTTER LAKE SERVICE ROAD CULVERT REPLACEMENT. WHEREAS, pursuant to a request for quotes for the repair of the Old Otter Lake Road Service Road Culvert, quotes were received, opened and tabulated according to law, and the following quotes were received complying with the request: Contractor Amount of Bid Arnt Construction Co $ 98,254.00 Penn Contracting, Inc. $ 109,670.00 C.W. Houle, Inc. $ 132,836.00 Forest Lake Contracting, Inc. No Quote Submitted NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. The Mayor and Clerk are hereby authorized and directed to enter into a contract with Arnt Construction Company, in the name of the City of Lino Lakes for the repair of the Old Otter Lake Road Service Road Culvert ' - = - e nt. Juliar)ne Bartell, C. Clerk Jeff Rein: rt, Mayor Adopted by the Lino Lakes City Council this 23rd day of May 2011. The motion for the adoption of the foregoing resolution was duly seconded by Council Member Gallup and upon vote being taken thereon, the following voted in favor thereof: Rafferty, Gallup, O'Donnell, Roeser, Reinert The following voted against same: none Whereupon said resolution was declared duly passed and adopted. • • • STAFF ORIGINATOR: COUNCIL MEETING DATE: TOPIC: AGENDA ITEM 6D James E. Studenski, City Engineer May 23, 2011 Resolution No. 11 -50, Accepting Quotes and Awarding a Contract, Otter Lake Service Road Culvert Replacement. Vote Required: Simple Majority BACKGROUND: Public Works was contacted by a business near the culvert failure on Old Otter Lake Road. The culvert failure consisted of a sinkhole developing in the traffic lanes above the failure in the pipe. After inspection of the culvert failure it was determined that the culvert is not functioning properly and requires replacement. A request for quotes was prepared and distributed to four local contractors. Quotes were received by 11:00 a.m. on May 17, 2011. The results of the quotes are presented below. Contractor Arnt Construction Co Penn Contracting, Inc . C.W. Houle, Inc. Forest Lake Contracting, Inc. Engineer's Estimate Amount of Bid $ 98,254.00 $ 109,670.00 $ 132,836.00 No Quote Submitted $ 98,651.00 A copy of the complete quote tabulation is attached. Staff recommends authorizing the contract for the Old Otter Lake Road Service Road Culvert Replacement, to Arnt Construction Company. RECOMMENDATION: Staff recommends adoption of Resolution Number 11 -50 Accepting Quotes and Awarding a Contract, Otter Lake Service Road Culvert Replacement. TABULATION CLEAR OF BIDS WATER CREEK CROSSING REPLACEMENT ROAD LAKES, MINNESOTA PROJECT NO. 14817.000 OPENED: MAY 17, 2011, AT 10:00 AM ERROR IN BIDDERS CALCULATION ENGINEER'S ESTIMATE ARNT CONSTRUCTION CO UNIT TOTAL UNIT TOTAL DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT TKDA SERVICE LINO ENGINEERING • ARCHITECTURE • PLARAIII,3 12. time... 1.01... Tn. ...P+a PENN CONTRACTING UNIT TOTAL PRICE AMOUNT TKDA BIDS *DENOTES ITEM NO. ALTERNATE BID 1, General 1 MOBILIZATION 1 LS $ 5,000.00 $ 5,000.00 $ 1,500.00 $ 1,500.00 $ 5,000.00 $ 5,000.00 2 TRAFFIC CONTROL 1 LS $ 500.00 $ 500.00 $ 300.00 $ 300.00 $ 500.00 $ 500.00 3 TOPSOIL BORROW WITH SEED 100 CY $ 15.00 $ 1,500.00 $ 0.50 $ 50.00 $ 20.00 $ 2,000.00 4 EROSION CONTROL BLANKET CATEGORY 3 WITH SEED 400 SY $ 3.50 $ 1,400.00 $ 6.00 $ 2,400.00 $ 1.50 $ 600.00 5 SILT FENCE 100 LF $ 3.00 $ 300.00 $ 3.00 $ 300.00 $ 2.00 $ 200.00 Surface Water Management $ - $ - 1 REMOVE EXISTING 96" CS PIPE 92 LF $ 100.00 $ 9,200.00 $ 20.00 $ 1,840.00 $ 25.00 $ 2,300.00 2 DEWATERING / DIVERSION (SEE DETAIL B) TRENCH STABLIZATION - 1 -1/2 " CRUSHED OR WASHED ROCK (SEE DETAIL A) 1 190 LS CY $ 3,600.00 $ 23.00 $ 3,600.00 $ 4,370.00 $ 5,900.00 $ 62.00 $ 5,900.00 $ 11,780.00 $ 16,000.00 $ 40.50 $ 16,000.00 $ 7,695.00 3 4 INSTALL 96" RCP 64 LF $ 650.00 $ 41,600.00 $ 598.00 $ 38,272.00 $ 506.00 $ 32,384.00 5 INSTALL 96" FES 2 EA $ 8,000.00 $ 16,000.00 $ 10,200.00 $ 20,400.00 $ 11,062.00 $ 22,124.00 6 RIP RAP CLASS III 50 CY $ 53.00 $ 2,650.00 $ 80.00 $ 4,000.00 $ 90.00 $ 4,500.00 7 GEOTEXTILE FABRIC 1,000 SF $ 3.00 $ 3,000.00 $ 0.20 $ 200.00 $ 2.00 $ 2,000.00 Street $ - $ - 1 REMOVE BITUMINOUS 180 SY $ 0.70 $ 126.00 $ 1.00 $ 180.00 * $ 3.00 $ 540.00 2 SAW CUT BITUMINOUS 48 LF $ 2.50 $ 120.00 $ 4.00 $ 192.00 $ 4.00 $ 192.00 3 REMOVE GUARD RAIL 150 LF $ 5.00 $ 750.00 $ 3.00 $ 450.00 $ 5.00 $ 750.00 4 INSTALL GUARDRAIL 150 LF $ 12.00 $ 1,800.00 $ 6.00 $ 900.00 $ 15.00 $ 2,250.00 5 GRANULAR BORROW 135 CY $ 12.00 $ 1,620.00 $ 16.00 $ 2,160.00 $ 15.00 $ 2,025.00 6 5" CLASS 5 AGGREGATE BASE 70 TN $ 18.00 $ 1,260.00 $ 12.00 $ 840.00 $ 20.00 $ 1,400.00 7 BITUMINOUS BASE COURSE 2380 (LVNW 35038) 50 TN $ 53.00 $ 2,650.00 $ 92.00 $ 4,600.00 $ 99.00 $ 4,950.00 8 BITUMINOUS MATERIAL FOR TACK COAT 15 GAL $ 3.00 $ 45.00 $ 10.00 $ 150.00 $ 4.00 $ 60.00 9 BITUMINOUS WEARING COURSE 2360 (LVWE 45030) 20 NT $ 58.00 $ 1,160.00 $ 92.00 $ 1,840.00 $ 110.00 $ 2,200.00 TOTAL $ 98,651.00 $ 98,254.00 * $ 109,670.00 Page 1 • TABULATION CLEAR OF BIDS WATER CREEK CROSSING REPLACEMENT ROAD LAKES, MINNESOTA PROJECT NO. 14817.000 OPENED: MAY 17, 2011, AT 10:00 AM *DENOTES ERROR ERROR IN BIDDERS CALCULATION CW HOULE, INC UNIT TOTAL UNIT TOTAL DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT w TKDA SERVICE LINO ENGWEFRV6 •ARCHI;ECTUdE •PLANNING TKDA Th. AO. ... .,h, ,».w.T.. ...v.V, IN BIDDERS CALCULATION UNIT TOTAL PRICE AMOUNT BIDS *DENOTES ITEM NO. # 1 ORNATE BID 1 General 1 MOBILIZATION 1 LS $ 4,800.00 $ 4,800.00 $ - $ - 2 TRAFFIC CONTROL 1 LS $ 575.00 $ 575.00 $ - $ - 3 TOPSOIL BORROW WITH SEED 100 CY $ 18.00 $ 1,800.00 $ - $ - 4 EROSION CONTROL BLANKET CATEGORY 3 WITH SEED 400 SY $ 4.50 $ 1,800.00 $ - $ - 5 SILT FENCE 100 LF $ 3.50 $ 350.00 $ - $ - Surface Water Management $ - $ - $ _ 1 REMOVE EXISTING 96" CS PIPE 92 LF $ 30.00 $ 2,760.00 $ - $ - 2 DEWATERING / DIVERSION (SEE DETAIL B) 1 LS $ 11,500.00 $ 11,500.00 $ - $ - 3 TRENCH STABLIZATION - 1 -1/2 " CRUSHED OR WASHED ROCK (SEE DETAIL A) 190 CY $ 42.00 $ 7,980.00 $ - $ - 4 INSTALL 96" RCP 64 LF $ 763.00 $ 48,832.00 $ - $ - 5 INSTALL 96" FES 2 EA $ 13,400.00 $ 26,800.00 $ $ - 6 RIP RAP CLASS III 50 CY $ 98.00 $ 4,900.00 $ - $ - 7 GEOTEXTILE FABRIC 1,000 SF $ 0.60 $ 600.00 $ - $ - Street $ - $ - $ - 1 REMOVE BITUMINOUS 180 SY $ 5.00 $ 900.00 $ - $ - 2 SAW CUT BITUMINOUS 48 LF $ 8.00 $ 384.00 $ - $ - 3 REMOVE GUARD RAIL 150 LF $ 8.00 $ 1,200.00 $ - $ - 4 INSTALL GUARDRAIL 150 LF $ 22.00 $ 3,300.00 $ - $ - 5 GRANULAR BORROW 135 CY $ 22.00 $ 2,970.00 $ - $ - 6 5" CLASS 5 AGGREGATE BASE 70 TN $ 23.00 $ 1,610.00 $ - $ - 7 BITUMINOUS BASE COURSE 2380 (LVNW 35038) 50 TN $ 132.00 $ 6,600.00 $ - $ - 8 BITUMINOUS MATERIAL FOR TACK COAT 15 GAL $ 9.00 $ 135.00 $ - $ - 9 BITUMINOUS WEARING COURSE 2360 (LVWE 45030) 20 NT $ 152.00 $ 3,040.00 $ - $ - TOTAL $ 132,836.00 $ - $ - Page 2