HomeMy WebLinkAbout2011-059 Council Resolution• • • Council Member Roeser introduced the following resolution and moved its adoption: CITY OF LINO LAKES RESOLUTION NO. 11 -59 APPROVING PAYMENT REQUEST NO. 3 (FINAL) AND COMPENSATING CHANGE ORDER NO. 1, 2010 SURFACE WATER MANAGEMENT DRAINAGE PROJECT WHEREAS, pursuant to the resolution of the Council adopted August 23, 2010, awarding the contract for 2010 Surface Water Management Drainage Project to C. W. Houle, Inc.; WHEREAS, a complete breakdown is detailed in Payment No. 3 (Final) and Compensating Change Order No. 1; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: Payment Request No. 3 (Final) and Compensating Change Order No. 1 is approved for a final contract amount of $68,769.70. Jeff Rein'-rt, ayor Adopted by the Lino Lakes City Council this 13th day of June, 2011. The motion for the adoption of the foregoing resolution was duly seconded by Council Member n nrnnell and upon vote being taken thereon, the following voted in favor thereof: Roeser, O'Donnell, Rafferty, Gallup, Reinert The following voted against same: none Whereupon said resolution was declared duly passed and adopted. • AGENDA ITEM 6Aii STAFF ORIGINATOR: James E. Studenski, City Engineer COUNCIL MEETING DATE: June 13, 2011 TOPIC: Resolution No. 11 -59, Approving Payment Request No. 3 (Final) and Change Order No. 1, 2010 Surface Water Management Drainage Project. VOTE REQUIRED: Simple Majority BACKGROUND: At the August 23, 2010 City Council Meeting the 2010 Surface Water Management Project was awarded to C.W. Houle, Inc. The contractor for the 2010 Surface Water Management Drainage Project, C. W. • Houle, Inc. is requesting City approval of Payment Request No. 3 (Final) in the amount of $2,750.79. A copy of the Final Payment is attached. The City reviewed all project restoration this spring and the contractor has satisfactorily completed all work and has provided all necessary documentation. Also included with the request for Final Payment is Compensating Change Order No. 1 in the deduct amount of a deduction of $3,988.30. A copy of the Compensating Change Order is attached. With this Change Order, the final project amount is $68,769.70 which is below the contract amount of $72,758.00. Approval of the Final Payment will begin the one -year warranty period. RECOMMENDATION: Staff recommends the approval of Resolution No. 11 -59, Approving Payment Request No. 3 (Final) and Compensating Change Order No. 1, 2010 Surface Water Management Drainage Project. • TKDA ENGINEERING •ARCHITECTURE • PLANNING illThe right time. The right people. The right company 444 Cedar Street, Suite 1500 Saint Paul, MN 55101 (651) 292-4400 (651) 292-0083 Fax www.tkda.com Proj. No. 14563.004 Cert. No. 3F St. Paul, MN, May 24 , 2011 To City of Lino Lakes, Minnesota This Certifies that C.W. Houle, Inc. For 2010 Surface Water Management — Street Drainage Improvements Owner , Contractor Is entitled to Two Thousand Seven Hundred Fifty Dollars and 79/100 being 3rd FINAL estimate for partial payment on contract with you dated August 23 Received payment in full of above Certificate. C.W. Houle, Inc. , 20 TKDA ($2,750.79) es E. Studenski, P.E. , 2010 RECAPITULATION OF ACCOUNT An Employee Owned Company Promoting Affirmative Action and Equal Opportunity CONTRACT PLUS EXTRAS PAYMENTS CREDITS Contract price plus extras $ 72,758.00 All previous payments $ 66,018.91 All previous credits - Compensating Change Order No. 1 $ 3,988.30 ,, 11 11 11 II 11 11 AMOUNT OF THIS CERTIFICATE $ 2,750.79 Totals $ 68,769.70 $ 68,769.70 $ - Credit Balance $ - There will remain unpaid on contract after payment of this Certificate $ - $ 68,769.70 $ 68,769.70 $ - An Employee Owned Company Promoting Affirmative Action and Equal Opportunity • TKDA Engineers- Architects - Planners Saint Paul, Minnesota 55101 PERIODICAL ESTIMATE FOR PARTIAL PAYMENTS Estimate No. 3F Period Ending May 24 , 20 11 Page 1 of 1 Proj. No. 14563.004 Contractor C.W. Houle, Inc. Original Contract Amount $72,758.00 Project 2010 Surface Water Management Projects Location City of Lino Lakes, Minnesota Total Contract Work Completed Total Approved Credits Total Approved Extra Work Completed Approved Extra Orders Amount Completed Total Amount Earned This Estimate $ 68,769.70 $ 0.00 0.00 $ 0.00 $ 68,769.70 Less Approved Credits $ 0.00 Less 0 % Retained $ 0.00 Less Previous Payments $ 66,018.91 Total Deductions $ Amount Due This Estimate $ 66,018.91 2,750.79 Contractor Date 0/C.W. Houle, Inc. 0„.....,.., • Engineer ' Date James 5-- 2i - 11 E. Studenski, P.E. • • • ESTIMATE NO. 3F 2010 SURFACE WATER MANAGEMENT PROJECT CITY OF LINO LAKES, MINNESOTA TKDA PROJECT NO. 14563.004 PERIOD ENDING: May 24, 2011 ITEM CONTRACT QUANTITY UNIT AMOUNT NO. DESCRIPTION UNIT QUANTITY TO DATE PRICE TO DATE PROJECT B1 -1 and B1 -2 - 4TH AVENUE PIPE IMPROVEMENTS 1 MOBILIZATION LS 1 1.0 $ 700.00 $ 700.00 2 TRAFFIC CONTROL LS 1 1.0 $ 650.00 $ 650.00 3 REMOVE BITUMINOUS PAVEMENT SY 150 77.0 $ 6.00 $ 462.00 4 REMOVE STORM SEWER PIPE LF 75 75.0 $ 13.00 $ 975.00 5 STORM MANHOLE, TYPE 409 EA 1 1.0 $ 1,810.00 $ 1,810.00 6 18" RCP (TIE AT ALL JOINTS) LF 80 64.0 $ 43.00 $ 2,752.00 7 18" RCP APRON EA 1 1.0 $ 2,170.00 $ 2,170.00 8 REMOVE /REPLACE 15" APRON EA 1 1.0 $ 2,030.00 $ 2,030.00 9 CONSTRUCT DRAINAGE STRUCTURE - DESIGN 2 EA 1 1.0 $ 4,075.00 $ 4,075.00 10 TRENCH STABILIZATION / PIPE BEDDING LF 90 0.0 $ 8.00 $ - 11 SELECT GRANULAR BORROW (FILL OVER PIPE) CY 200 36.0 $ 17.00 $ 612.00 12 AGGREGATE BASE CLASS 5 (6" DEPTH) TN 90 65.0 $ 21.00 $ 1,365.00 13 BITUMINOUS BASE COURSE 2360 (LVNW 35030) TN 20 18.0 $ 93.00 $ 1,674.00 14 BITUMINOUS MATERIAL FOR TACK COAT GAL 64 0.0 $ 5.00 $ 15 BITUMINOUS WEARING COURSE (LVWE 45030) TN 15 7.5 $ 110.00 $ 821.70 16 CLASS III RIPRAP W/ FABRIC CY 10 16.0 $ 115.00 $ 1,840.00 17 EROSION CONTROL BLANKET CATEGORY 3 SY 300 258.0 $ 3.00 $ 774.00 18 SEED / RESTORATION LS 1 1.0 $ 1,390.00 $ 1,390.00 19 SOD FOR EXISTING YARD AREA SY 100 104.0 $ 8.00 $ 832.00 SUBTOTAL PROJECT B1 -1 and B1 -2 $ 24,932.70 PROJECT B2 -1 - TIMBERWOLF TRAIL DRAINAGE 1 MOBILIZATION LS 1.0 1.0 $ 700.00 $ 700.00 2 TRAFFIC CONTROL LS 1.0 1.0 $ 1,100.00 $ 1,100.00 3 RECLAIM BITUMINOUS SY 800.0 750.0 $ 3.00 $ 2,250.00 4 HAUL OUT EXCESS MILLINGS (LV) CY 160.0 160.0 $ 11.00 $ 1,760.00 5 REMOVE OF AND DISPOSE OF CONCRETE CURB LF 460.0 447.0 $ 5.00 $ 2,235.00 6 BITUMINOUS BASE COURSE 2360 (LVNW 35030) TN 90.0 78.0 $ 77.00 $ 6,006.00 7 BITUMINOUS MATERIAL FOR TACK COAT GAL 40.0 50.0 $ 5.00 $ 250.00 8 BITUMINOUS WEARING COURSE (LVWE 45030) TN 70.0 105.0 $ 80.00 $ 8,400.00 9 D412 CONCRETE CURB AND GUTTER LF 460.0 447.0 $ 13.00 $ 5,811.00 10 SODDING AND TOPSOIL BORROW SY 30.0 150.0 $ 11.00 $ 1,650.00 11 BIODEGRADABLE FIBER EROSION CONTROL ROLLS LF 50.0 $ 9.00 $ SUBTOTAL PROJECT B2 -1 $ 30,162.00 PROJECT B3 -1 - OTTER LAKE TRAIL IMPROVEMENTS 1 MOBILIZATION LS 1 1.0 $ 1,500.00 $ 1,500.00 2 REMOVE BITUMINOUS PAVEMENT SY 70 74.0 $ 8.00 $ 592.00 3 REMOVE/REPLACE RCP 51.12" x 31.31" ARCH APRON EA 1 1.0 $ 4,870.00 $ 4,870.00 4 RCP 51.12" x 31.31" ARCH PIPE LF 16 16.0 $ 193.00 $ 3,088.00 5 SELECT GRANULAR BORROW (FILL OVER PIPE) CY 20 20.0 $ 20.00 $ 400.00 6 AGGREGATE BASE CLASS 5 (6" DEPTH) TN 20 20.0 $ 23.00 $ 460.00 7 BITUMINOUS WEAR COURSE (2" DEPTH) TN 10 10.0 $ 150.00 $ 1,500.00 8 EROSION CONTROL BLANKET CATEGORY 3 SY 200 93.0 $ 5.00 $ 465.00 9 SEED / RESTORATION LS 1 1.0 $ 800.00 $ 800.00 SUBTOTAL PROJECT B3 -1 $ 13,675.00 TOTAL ESTIMATE NO. 3F $ 68,769.70 • CHANGE ORDER TKDA Engineers- Architects - Planners Compensating Saint Paul, MN May 24 20 11 Project. No. 14563.004 Change Order No. 1 To C.W. Houle, Inc., 1300 W. County Road I, Shoreview, Minnesota 55126 for 2010 Surface Water Management Street Drainage Improvements for City of Lino Lakes, Minnesota You are hereby directed to make the following change to your contract dated August 23 , 20 10 . The change and the work affected thereby is subject to all contract stipulations and covenants. This Change Order will (increase) (decrease) (not change) the contract sum by Three Thousand Nine Hundred Eighty Eight Dollars and 30 /100 ($3,988.30 ). COMPENSATING CHANGE ORDER This change order shows the actual quantities installed at the unit price bid amounts (see attached itemization): NET CHANGE = $ (3,98830) Amount of Original Contract $ 72, 758.00 Additions approved to date (Nos. ) $ Deductions approved to date (Nos. ) Contract amount to date $ 72, 758.00 Amount of this Change Order (Add) (Deduct) (No Gbange) $ (3,98830) Revised Contract Amount $ 68,769.70 Approved City of Lino Lakes, Minnesota TKDA By By J knes E. Studenski, P.E. • Approved White - Owner C.W. Houle, Inc. Pink - Contractor Blue - TKDA By COMPENSATING CHANGE ORDER NO. 1 • PERIOD ENDING: May 24, 2011 • 2010 SURFACE WATER MANAGEMENT PROJECT CITY OF LINO LAKES, MINNESOTA TKDA PROJECT NO. 14563.004 ITEM CONTRACT QUANTITY UNIT AMOUNT NET CONTRACT NO. DESCRIPTION UNIT QUANTITY TO DATE PRICE TO DATE CHANGE AMOUNT PROJECT B1 -1 and B1 -2 - 4TH AVENUE PIPE IMPROVEMENTS 1 MOBILIZATION LS 1 1.0 $ 700.00 $ 700.00 $ $ 700.00 2 TRAFFIC CONTROL LS 1 1.0 $ 650.00 $ 650.00 $ $ 650.00 3 REMOVE BITUMINOUS PAVEMENT SY 150 77.0 $ 6.00 $ 462.00 $ (438.00) $ 900.00 4 REMOVE STORM SEWER PIPE LF 75 75.0 $ 13.00 $ 975.00 $ - $ 975.00 5 STORM MANHOLE, TYPE 409 EA 1 1.0 $ 1,810.00 $ 1,810.00 $ - $ 1,810.00 6 18" RCP (TIE AT ALL JOINTS) LF 80 64.0 $ 43.00 $ 2,752.00 $ (688.00) $ 3,440.00 7 18" RCP APRON EA 1 1.0 $ 2,170.00 $ 2,170.00 $ - $ 2,170.00 8 REMOVE /REPLACE 15" APRON EA 1 1.0 $ 2,030.00 $ 2,030.00 $ - $ 2,030.00 9 CONSTRUCT DRAINAGE STRUCTURE - DESIGN 2 EA 1 1.0 $ 4,075.00 $ 4,075.00 $ - $ 4,075.00 10 TRENCH STABILIZATION / PIPE BEDDING LF 90 0.0 $ 8.00 $ - $ (720.00) $ 720.00 11 SELECT GRANULAR BORROW (FILL OVER PIPE) CY 200 36.0 $ 17.00 $ 612.00 $ (2,788.00) $ 3,400.00 12 AGGREGATE BASE CLASS 5 (6" DEPTH) TN 90 65.0 $ 21.00 $ 1,365.00 $ (525.00) $ 1,890.00 13 BITUMINOUS BASE COURSE 2360 (LVNW 35030) TN 20 18.0 $ 93.00 $ 1,674.00 $ (186.00) $ 1,860.00 14 BITUMINOUS MATERIAL FOR TACK COAT GAL 64 0.0 $ 5.00 $ - $ (320.00) $ 320.00 15 BITUMINOUS WEARING COURSE (LVWE 45030) TN 15 7.5 $ 110.00 $ 821.70 $ (828.30) $ 1,650.00 16 CLASS III RIPRAP W/ FABRIC CY 10 16.0 $ 115.00 $ 1,840.00 $ 690.00 $ 1,150.00 17 EROSION CONTROL BLANKET CATEGORY 3 SY 300 258.0 $ 3.00 $ 774.00 $ (126.00) $ 900.00 18 SEED / RESTORATION LS 1 1.0 $ 1,390.00 $ 1,390.00 $ - $ 1,390.00 19 SOD FOR EXISTING YARD AREA SY 100 104.0 $ 8.00 $ 832.00 $ 32.00 $ 800.00 SUBTOTAL PROJECT B1 -1 and B1 -2 $ 24,932.70 $ (5,897.30) $ 30,830.00 PROJECT B2 -1 - TIMBERWOLF TRAIL DRAINAGE 1 MOBILIZATION LS 1.0 1.0 $ 700.00 $ 700.00 $ - $ 700.00 2 TRAFFIC CONTROL LS 1.0 1.0 $ 1,100.00 $ 1,100.00 $ - $ 1,100.00 3 RECLAIM BITUMINOUS SY 800.0 750.0 $ 3.00 $ 2,250.00 $ (150.00) $ 2,400.00 4 HAUL OUT EXCESS MILLINGS (LV) CY 160.0 160.0 $ 11.00 $ 1,760.00 $ - $ 1,760.00 5 REMOVE OF AND DISPOSE OF CONCRETE CURB LF 460.0 447.0 $ 5.00 $ 2,235.00 $ (65.00) $ 2,300.00 6 BITUMINOUS BASE COURSE 2360 (LVNW 35030) TN 90.0 78.0 $ 77.00 $ 6,006.00 $ (924.00) $ 6,930.00 7 BITUMINOUS MATERIAL FOR TACK COAT GAL 40.0 50.0 $ 5.00 $ 250.00 $ 50.00 $ 200.00 8 BITUMINOUS WEARING COURSE (LVWE 45030) TN 70.0 105.0 $ 80.00 $ 8,400.00 $ 2,800.00 $ 5,600.00 9 D412 CONCRETE CURB AND GUTTER LF 460.0 447.0 $ 13.00 $ 5,811.00 $ (169.00) $ 5,980.00 10 SODDING AND TOPSOIL BORROW SY 30.0 150.0 $ 11.00 $ 1,650.00 $ 1,320.00 $ 330.00 11 BIODEGRADABLE FIBER EROSION CONTROL ROLLS LF 50.0 $ 9.00 $ $ (450.00) $ 450.00 SUBTOTAL PROJECT B2 -1 $ 30,162.00 $ 2,412.00 $ 27,750.00 PROJECT B3 -1 - OTTER LAKE TRAIL IMPROVEMENTS 1 MOBILIZATION LS 1 1.0 $ 1,500.00 $ 1,500.00 $ - $ 1,500.00 2 REMOVE BITUMINOUS PAVEMENT SY 70 74.0 $ 8.00 $ 592.00 $ 32.00 $ 560.00 3 REMOVE /REPLACE RCP 51.12" x 31.31" ARCH APRON EA 1 1.0 $ 4,870.00 $ 4,870.00 $ - $ 4,870.00 4 RCP 51.12" x 31.31" ARCH PIPE LF 16 16.0 $ 193.00 $ 3,088.00 $ $ 3,088.00 5 SELECT GRANULAR BORROW (FILL OVER PIPE) CY 20 20.0 $ 20.00 $ 400.00 $ - $ 400.00 6 AGGREGATE BASE CLASS 5 (6" DEPTH) TN 20 20.0 $ 23.00 $ 460.00 $ $ 460.00 7 BITUMINOUS WEAR COURSE (2" DEPTH) TN 10 10.0 $ 150.00 $ 1,500.00 $ - $ 1,500.00 8 EROSION CONTROL BLANKET CATEGORY 3 SY 200 93.0 $ 5.00 $ 465.00 $ (535.00) $ 1,000.00 9 SEED / RESTORATION LS 1 1.0 $ 800.00 $ 800.00 $ - $ 800.00 SUBTOTAL PROJECT B3 -1 $ 13,675.00 $ (503.00) $ 14,178.00 TOTAL COMPENSATING CHANGE ORDER NO. 1 $ 68,769.70 $ (3,988.30) $ 72,758.00