Loading...
HomeMy WebLinkAbout2005-018 Council Resolution• • CITY OF LINO LAKES RESOLUTION NO. 05 -18 RESOLUTION AUTHORIZING ADVERTISEMENT OF BIDS FOR WELL CONSTRUCTION OF WELL NO. 5. WHEREAS, pursuant to the Council adopting the Comprehensive Water System Plan on April 26, 2004, with reference to the first phases of improvement by constructing Well No. 5; and WHEREAS, the report provides information showing the proposed project is necessary, cost - effective, and feasible; and WHEREAS, the City's Engineer, TKDA, shall perform such services; and WHEREAS, the City proposes to use Trunk Area & Unit funds for all of the cost of the improvements, NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. The City Engineer is designated as the engineer for this improvement and he is directed to authorize advertisement of bids for well construction of Well No. 5. Adopted by the Lino Lakes City Council this 28th day of February, 2005. • Ann Blair, qty Clerk r l? John J. erge so Ma yo AGENDA ITEM 6G • STAFF ORIGINATOR: James E. Studenski, City Engineer COUNCIL MEETING DATE: February 28, 2005 TOPIC: Resolution No. 05 -18, Authorizing Advertisement for Bids for Well Construction of Well No. 5. VOTE REQUIRED: Simple Majority BACKGROUND: In accordance with the Water System Comprehensive Plan, construction of Well No. 5 was recommended to accommodate the City's water demand. The location of this well has been determined at Captain's Place within the Lakes Addition area. The well construction will be bid as a separate item from the pumphouse structure to keep the project moving forward. This is standard practice in construction of a new well. The total estimated project cost for the well design and construction is $210,000.00. Staff is currently working on the pumphouse structure design and costs will be presented through that process. The City proposes to use Trunk Area & Unit funds for all costs of this improvement. OPTIONS: 1. Adopt Resolution No. 05 -18, Authorizing the Advertisement of Bids for Well Construction of Well No. 5. 2. Return to staff for further review. RECOMMENDATION: Option No. 1 - Staff recommends that Resolution No. 05 -18 be adopted. •